User Tools

Site Tools


26013witness_statement_of_simon_gibbon

This is an old revision of the document!


For: Claimant 

Witness: Dr Simon Gibbon 
1st Witness statement 

Exhibit: SG1 
Made: 13 January 2026 

IN THE HIGH COURT OF JUSTICE 

AC-2026-LON- 

KING’S BENCH DIVISION 

ADMINISTRATIVE COURT  

In the matter of an application for permission for judicial review 

BETWEEN: 

R (DR SIMON GIBBON) 

Claimant 

-and-

MARINE MANAGEMENT ORGANISATION 

Defendant 

-and-

PD TEESPORT LIMITED 

Interested Party 

WITNESS STATEMENT OF DR SIMON GIBBON 

I, DR SIMON GIBBON, ……, a retired industrial chemist, say as follows:  * 1. I am the Claimant in these proceedings. * 2. I make this witness statement to: - set out my background and expertise; - explain my involvement relating to the River Tees and my specific involvement in this licence application. As such, I make this statement on matters of fact (not as an expert witness); - explain the permitted dredging area; - set  out  my  financial  means  in  this  Aarhus  Convention  claim  pursuant  to  CPR 46.25(1)(b) at Exhibit SG1; and - exhibit  the  relevant  documents  in  this  matter,  namely  the  paginated  bundle  of documents relevant to the claim marked ‘Index to Claim Bundle’ which I will refer to  as  [CB/page  number]  and  the  exhibit  SG1,  which  I  will  refer  to  as [SG1/exhibit number]. * 3.  The facts and matters set out in this statement are within my own knowledge unless otherwise stated, and I believe them to be true.  Where I refer to information supplied by others, the source of the information is identified; facts and matters derived from other sources are true to the best of my knowledge and belief. * 4. This statement has been prepared by me with the assistance of my solicitors through a series of email exchanges and phone calls.    * 5. I confirm that I have read the Statement of Facts and Grounds in this case and agree its contents.  ===== Professional expertise and experience ===== * 6. I am a retired industrial chemist with over 30 years of experience in colloid science, 
surface  chemistry,  physical  measurement,  and  polymeric  materials.
  I  hold 
qualifications from Imperial College (BSc and PhD) and am a Visiting Professor in the 
Department of Materials Science and Engineering, University of Manchester (retired). 
My  career  focused  on  the  interaction  between  chemicals  and  particle  surfaces,  the 
statistical  validity  of  sampling  heterogeneous  materials,  the  modeling  of  complex 
physical systems, and transport in polymeric materials. 
  7.  I have extensive career experience specializing for over 20 years in colloid science and 
surface analysis at ICI and latterly in corrosion protection by polymeric materials at 
AkzoNobel. My background involves the precise characterization of how chemicals are 
adsorbed onto surfaces and absorbed into particles. This is the fundamental physical 
mechanism  governing  how  historical  industrial  toxins  (such  as  PCBs)  bind  to  river 
sediment.  I  was  also  involved  in  the  design  of  rigorous  testing  protocols  for 
heterogeneous  industrial  materials,  determining  the  statistical  validity  of  sampling 
regimes specifically, calculating the minimum sample density required to detect 'out-
of-spec' anomalies (hotspots) within large-scale production outputs. 
  8.  During  my  career,  I  was  a  lead  specialist  in  designing  measurement  protocols  for 
complex,  heterogeneous  materials.  This  required  developing  rigorous  statistical 
frameworks  to  ensure  that  small-scale  samples  accurately  represented  large-scale 
industrial outputs.   
9.  I  am  a  former  manager  of  a  physical  measurement  group  specializing  in  particle 
analysis  (sizing,  surface  area,  and  heterogeneity)  and  the  development  of 
robotic/automated testing systems for scale-up operations. Dredging is fundamentally 
a particle transport issue.  
A103 background image   3     
Involvement with the River Tees and NEMRG 
 
10.  Since 2022, I have applied my expertise specifically to sediment contamination issues 
in the River Tees, collaborating with academic researchers to catalogue and scrutinize 
the environmental risk assessments provided by the Marine Management Organisation 
(MMO). In the last 3 years, I have conducted independent forensic reviews of a range 
of  South  Tees  planning  applications  and  collaborated  with  scientists  from  Durham 
University.  
  11.  I  am  an  active  member  of  the  North  East  Marine  Research  Group  (“NEMRG”),  an 
informal  coalition  comprising  academics  from  Durham,  Newcastle,  and  Hull 
Universities, representatives from the North East Fishing Collective, the Fishmongers’ 
Company’s Fisheries Charitable Trust, and community organizations (including Climate 
Action  Stokesley  &  Villages  and  Reclaim  Our  Sea).  NEMRG  has  been  active  since 
approximately 2023.  
  12.  My work with NEMRG involves the examination of technical data to ensure regulatory 
bodies  are  adequately  addressing  contamination  issues.  In  2023,  I  developed  and 
continue  to  enhance  a  bespoke  web  application  that  allows  for  the  independent 
analysis  and  comparison  of  sediment  quality  datasets  provided  in  marine  licence 
applications.  
  13.  Between  2022  and  2023,  I  led  a  specialist  working  group  (comprising  two 
environmental  scientists  and  a  forensic  analyst)  to  conduct  a  detailed  audit  of  the 
documentation  surrounding  a  widely-publicized  crustacean  die-off.  We  investigated 
causal  links,  identified  inconsistencies  in  agency  reporting,  and  assessed  risks 
associated with capital dredging. 
  14.  As a part of NEMRG, I engaged with the Environment Agency regarding the extensive 
contamination caused by the South Bank Quay dredge—an event now documented on 
the Marine Case Management System’s Public Register. 
  15.  I have presented written and oral evidence and technical critiques to various regulatory 
and governmental bodies, including the Environment Food and Rural Affairs (EFRA) 
Committee (at the inquiry into the crustacean die-off), the Multi-Council Crustacean 
Die-off Working Group (detailing the risks of Teesworks developments and specifically 
highlighting the environmental dangers of trailing suction hopper dredgers operating 
with  overspill),  the  MMO  (technical  representations  objecting  to  marine  licence 
applications),  and  a  2023  joint  meeting  with  the  MMO,  Environment  Agency,  and 
Natural  England  (to  formally  articulate  our  ongoing  concerns  regarding  the 
deteriorating state of the River Tees).
 
  A104 background image   4    16.  My overarching objective in relation to my activities outlined above is to try to address 
contamination in the River Tees with a view to improving the state of the river and the 
wider environment. 
   
Permitted dredging area 
 
17.  My application for judicial review relates to the MMO’s decision to grant a ten-year 
marine  licence  for  the  disposal  of  dredged  material.  I  understand  dredging  by  PD 
Teesport  Limited  (“
the  IP”)  as  the  Port  Authority  is  permitted  by  the  Tees  and 
Hartlepool Port Authority Act 1966. That Act does not, however, authorize the disposal 
of  dredged  material  at  sea,  which  requires  a  marine  licence.  The  2025  licence 
(L/2025/00366/1) was granted  by  the  MMO on 5 November  2025  (“
the Licence”) 
[
CB/A66-78]. 
  18.  The Licence permits dredged material taken from areas defined in Schedule 2 and 3 
of the licence to be disposed at Tees Bay A (as defined in Schedule 1) and excludes 
dredged material from certain locations defined at 5.2.3 from being disposed at Tees 
Bay A (“
the Licenced Dredging Area”)[CB/A79-96].  
  19.  Also included with the licence online were ‘shape files’, which are files that can be read 
by specific computer software to plot geographical locations. I used those shape files 
to produce a map that can be found at SG1/2; [
CB/A119]. I believe this shows the 
same  area  as  the  IP’s  map  at  p.11  of  Tees  Maintenance  Dredge  Protocol  (MDP) 
Baseline Document (“
the Baseline Document”) [CB/A382].    
20.  I have checked the shape files against Schedules 2 and 3 of the licence, and I believe 
they mirror one another.    
21.  On the basis of the shape files and schedules 2 and 3, I therefore calculate that the 
total area from which dredged material may be disposed at sea is 12,104,900m2.    
  22.  Based on the IP’s navigation channel documentation, I understand that approximately 
6,300,000m2 or slightly over 50% of the total area from which dredged material can 
be disposed at sea, has historically been dredged [
CB/A265-271].   
  23.  Pursuant to section 5.2.3 of the licence, dredged material from certain areas must be 
excluded  from  disposal  at  sea  [
CB/A75-76].  I  asked  for  information  about  these 
areas before the licence was granted, but responses from the MMO indicated that they 
did not hold the information [
CB/A322-329] (see para. 58 below). Following pre-
action correspondence, the MMO has sent a map showing approximate locations of 
the excluded areas [
SB/C799].    
  A105 background image   5    Disposal area and the surrounding environment 
 
24.  Included in  the  claim  bundle  is a  map  showing  the  disposal area,  Tees Bay  A, the 
Teesmouth  and  Cleveland  Coast  Special  Protection  Area  (SPA)  boundary,  and  the 
water bodies regulated under  the  Water Environment  (Water Framework  Directive) 
(England and Wales) Regulations 2017 [
SB/C988-992].   
  25.  Also included in the claim bundle is a map showing the Greater North Sea area of the 
Marine Strategy Area [
SB/C891].  
  26.  The  Licenced  Dredging  Area  lies  within  the  Teesmouth  and  Cleveland  Coast  SPA. 
According to Natural England:  
  The SPA comprises of a wide variety of habitats including: intertidal sand and 
mudflats,  rocky  shore,  saltmarsh,  freshwater  marsh,  saline  lagoons,  sand 
dunes and estuarine and coastal waters on and around the Tees estuary, which 
has been considerably modified by human activities. These habitats provide 
feeding  and  roosting  opportunities  for  important  number  of  waterbirds  in 
winter and during passage periods including in particular common redshank, 
red knot and ruff, which occur in internationally important numbers. Freshwater 
and brackish pools also support breeding avocet during summer.  
 
The saltmarsh and mudflat habitats of the Teesmouth and Cleveland Coast SPA 
are  of  great  importance  to  a  diverse  assemblage  of  bird  species.  Mudflats 
support high densities of benthic invertebrates, including worms, molluscs and 
crustaceans,  which  provide  an  important  food  resource  for  migrant  and 
overwintering SPA bird species. Areas of saltmarsh provide significant feeding 
and roosting opportunities for many species of waterbird including common 
redshank and red knot.  
 
In summer, little tern breed on the sandy beaches within the site and feed out 
at sea while the common tern, which breed at various locations, feed within 
the River Tees and associated water bodies and within the wider estuary mouth 
and bay. In late summer, Sandwich tern aggregate in important numbers at 
Coatham Sands, Seal Sands, North Gare Sands/Seaton Snook and Bran Sands 
when on passage. (p.5) [
CB/A422]   
27.  The SPA is designated for the following features:   •  Avocet, Recurvirostra avosetta - A132-A, b 
•  Common tern, Sterna hirundo - A193, b  
•  Knot, Calidris canutus - A143, nb  
•  Little tern, Sterna albifrons - A195, b  
•  Redshank, Tringa totanus - A162, nb  
A106 background image   6    •  Ruff, Calidris pugnax - A151, nb 
•  Sandwich  tern,  Thalasseus  sandvicensis,  syn.  Sterna  sandvicensis  -  A191, nb  •  Waterbird assemblage    28.  The site is currently in unfavourable condition as a result of nutrients, namely nitrogen. 
I understand that the SPA is not regularly tested for the presence of toxic chemicals, 
but I note that in its consultation response on the IP’s application, Natural England 
noted that the Supplementary Advice on Conservation Objectives for the SPA contains 
a target to  “reduce aqueous contaminants to levels equating to High Status according  to Annex VIII and Good Status according to Annex X of the Water Framework Directive, 
avoiding deterioration from existing levels.”
 [SB/B713
  29.  The  permitted  dredging area  also lies within  the  Tees Coastal Water Body  and  the 
Tees Water Body.  
  30.  The Tees Coastal Water Body runs parallel to the coastline and is a coastal water body 
with an area of 8,844 ha. It has moderate ecological status. It has high levels of specific 
pollutants  and  fails  to  meet  standards  for  some  priority  hazardous  substances, 
including mercury and polybrominated diphenyl ethers (PBDE) [
CB/A120]. 
  31.  The ‘Tees Water Body’ is a transitional water body covering an area of 1,148ha. It 
currently has moderate ecological status. It has high levels of numerous pollutants and 
fails to meet standards required for priority hazardous substances such as benzo(g-h-
i)perylene,  mercury,  polybrominated  diphenyl  ethers  (PBDE)  and  tributyltin 
compounds. The reason for not achieving ‘good’ status is either due to industry, is 
unknown, or cannot be attributed.[
CB/A120]  
  32.  Also of relevance to this area is the UK Marine Strategy Part One (2019) [
SB/C874]. 
Tees Bay A sits within the Greater North Sea area. The Strategy makes clear that:  a.  Harbour  seals  in  the  Greater  North  Sea  have  not  yet  achieved  Good  Environmental Status (“
GES”)  and there  is a  lack  of certainty  about  the 
causes of decline (pp 51-53);  b.  Highly persistent legacy chemicals such as PCBs in marine sediments and  biota  are  the  cause  of the  few failures to  achieve GES  in  respect  of  the 
‘contaminant’ descriptor, mainly in coastal waters close to polluted sources 
(pp 75 - 79). 
 
33.  The UK Marine Strategy Part Three: 2025 UK programme of measures, confirms that 
pollution  and  toxins,  including  the  prevalence  of  pollutants  (for  example, 
Polychlorinated Biphenyls (PCBs) and other persistent organic pollutants (POPs) in the 
environment and cetaceans, are a threat to harbour seals (p.11), although the cause 
of  harbour  seal  decline  is  unknown  (p.11)  [
SB/C931].  Furthermore,  in  relation  to  A107 background image 7  contaminants,  failures  to  meet  GES  come  from  highly  persistent  legacy  chemicals 
mainly in coastal waters close to polluted sources (2.12.1). It is recognised that:   “Actions  to  address  the  following  would  support  the  maintenance  of  GES 
related to Contaminants (D8) and the further safeguarding of the UK marine 
environment:  
• legacy chemicals in sediment and biota
• new chemicals or groups of chemicals with the potential to adversely impact
sea life and human health that are continually being identified (for example,
per- and polyfluoroalkyl substances: PFAS) (para.2.12.1)” [
SB/933]. IP’s application  34. I first learnt that the IP had applied for the Licence on 7 July 2025 (“the Application”)
[
CB/A344]. I contacted the MMO to point out that no documents were visible on the
MCMS Public Register. This was rectified on 9 July 2025. 35. The Application included the IP’s Baseline Document [
CB/A366-486]. The Baseline
Document includes plume modelling for Tees Bay A at Figures 6-3 and 6-7 (pages 33-
34). 36. At SG1/3; [
CB/A119] is a map showing the plume modelling overlaid on the map
showing the SPA boundary. It shows that the modelled plume from disposal at Tees
Bay A will reach very close to the SPA. 37. The IP’s modelling does not appear to have been updated since first prepared for the
2006  Environmental  Statement  for  the  Northern  Gateway  Container  Terminal
(para.6.1.4, Baseline document) [
CB/A404]. From the description in the 2006 ES, it
appears that this modelling assumes only ‘calm (no wave) conditions’ (p.451) so does
not model for more dynamic sea conditions. It also appears to assume disposal in the
centre  of  the  disposal  quadrant  only  [
CB/A182].  In  fact,  disposal  will  take  place
throughout the entire quadrant depending on the month of the year (Fig 3-3, Baseline
document)  [
CB/A390].  As  such,  the  IP’s  model  is  not  an  exact  description  of  the
effects and suffers from inherent uncertainty. On the basis of the modelling provided,
it is at least possible to say that there is a real risk that the plume would, at times,
reach into the SPA. Despite almost 20 years of disposal at Tees Bay A since the model
was first produced, it does not appear that there has been any real-life monitoring or
measurement of the plume to assess the model’s accuracy. 38. However, in 2022, CEFAS, following a mass crustacean die-off event, shows the plume
from disposal at Tees Bay A entering the SPA and remaining suspended for at least 72
hours after disposal [
CB/A203]. I exhibit at SG1/4 an annotated map showing the
CEFAS plume in comparison to the SPA [
CB/A121]. A108 background image   8    39.  It is clear from the mid-licence sediment analysis carried out by the IP in 2017/18 and 
2024, and submitted by the IP in support of the application, that the plume contains 
sediment with levels of contamination that would not ordinarily be safe for disposal at 
sea.  
  40.  In accordance with OSPAR requirements, Cefas applies formal “action levels” (‘
ALs’) 
to  certain  pollutants  and  (since  2020)  has  applied  de  facto  ALs  known  as  “other 
assessment  criteria”  for  pollutants  for  which  the  AL  levels  are  recommended  for 
revision and to pollutants without formal ALs. The IP’s mid-licence sediment analysis 
shows:  a.  In the year 3 (2018 and 2019) results:     i.  36 samples from the benthic environment of the River Tees, taken in 2019,  indicated  that  there  were  concentrations  of  metals,  the  majority  of  PAH 
compounds, C-napthalenes, phenanthrene, and PCBs in excess of Cefas AL1, 
and  high  concentrations  of  total  hydrocarbons.  In  some  samples,  levels  of 
BDE209  were  far  in  excess  of  the  AL2  “other  assessment  criteria”  (up  to 
407 g/kg as compared to the AL2 threshold of 47.5 g/kg) 
[CB/A446].    ii.  10 surface sediment samples taken upstream in December 2018 showed one  exceedance each of AL2 for PCB, mercury and zinc, and BDE209 far in excess 
of the AL2 “other assessment criteria” (up to 912 g/kg as compared to the AL2  threshold of 47.5  g/kg) [
CB/A448.    iii.  For Low Molecular Weight (‘LMW’) PAHs, only one sample out of a total of 57  samples was below the AL1 “other assessment criteria”, and only four of the 
57 samples were below the AL2 “other assessment criteria”, meaning the vast 
majority exceeded the AL2 “other assessment criteria” [
CB/A446-450].    b.  In the year 9 results (2024) of sedimentary analysis of 31 samples from the benthic  environment of the Harbour, taken in 2024:    i.  levels of metals were in excess of Cefas Action Level 1 [CB/A460];     ii.  levels of LMW  PAHs in excess of the  AL2 “other assessment  criteria”  (up  to  4820 g/kg as compared to the AL2 threshold of 3160g/kg) [CB/A460-466];    iii.  levels of PBDEs, BDE209, BDE99 and BDE100 far in excess of the AL2 “other  assessment criteria”: BDE209 up to 337 g/kg as compared to the AL2 threshold  of  47.5 g/kg;  BDE99  up  to  6g/kg  as  compared  to  the  AL2  threshold  of  1.0 g/kg; BDE100 up to 1.27g/kg as compared to the AL2 threshold of 1g/kg  [CB/A460-466].    A109 background image   9    41.  For  reasons  that  are  unclear,  while  these  exceedances  would  ordinarily  render  the 
material unsafe  for disposal at  sea  if  dredged  from any  other  river in England, the 
MMO has permitted the material to be disposed at Tees Bay A because the material is 
taken from a river with historically and consistently high levels of pollution.    
Representations regarding the Application 
 
42.  On 6 August 2025, I submitted objections to the Application on behalf of the NEMRG, 
including  a  cover  note  [
SB/B575],  a  representation  [SB/B601]  and  supporting 
evidence [
SB/577-600]. Amongst other concerns, I highlighted the following issues:   a.  More frequent sampling is required;  
b.  Current and past sampling is insufficient (the sediment quality analyses are  insufficient and treat the samples as being homogenous and coming from 
a river with predictable sediment quality);   c.  Proposed sampling fails to satisfy OSPAR guidelines;  
d.  A  precautionary  approach  should  be  adopted,  particularly  because  of  crustacean die-offs and seal pup mortality;  e.  The  method  of  dredging  is  inappropriate  in  the  Tees  Estuary  (using  a  trailing  suction  hopper  dredger  (“
TSHD”)  and  allowing  overspill)  and  is 
dangerously outdated, with no monitoring during dredging or any annual 
calendar of ecological sensitivity; and  f.  Alternatives  for  the  disposal  of  dredged  material  should  be  assessed.  [
CB/A550-574; A601-699].   
43.  My concerns about inadequate sampling arose from the fact that only a small number 
of samples have been undertaken in the past relative to the size of the contaminated 
area from which this material is dredged.  
  44.  Concerns  that  the  2025  licence  would  not  improve  on  this  low  level  of  historical 
sampling were raised by the sample plan advice for mid-licence sampling in relation to 
the  2015-2025  licence  (L/2015/00427/7),  which  again  required  limited  sampling 
despite suggesting the sampling plan was ‘in accordance with the OSPAR Guidelines 
for  the  Management  of  Dredged  Material’  (the  
“OSPAR  Guidelines)  [CB/A258-
246].  
  45.  Although a second letter from the MMO to the IP about mid licence sediment sampling 
under the 2015 licence stated that “MMO remind the applicant that new sampling will 
be required for any future Marine Licence applications” [
CB/A342-343], upon calling 
and emailing the MMO, I learnt that no more samples would be taken, as the samples 
from October 2024 were considered sufficient to inform their recommendations for the 
licence [
SB/B548-549]. 
 
A110 background image   10    46.  Considering  the  industrialized  nature  of  the  Tees  for  over  a  century,  it  is  widely 
accepted, including by the MMO and the IP, that there are a range of contaminants in 
the benthic environment, sometimes at levels that are clearly harmful to the marine 
environment [
CB/A383-389; SB/B544; SB/B713; SB/B664-673]. For example, 
I exhibit a map showing the location of harmful contaminants (Low Molecular Weight 
(LMW)  Poly  Aromatic  Hydrocarbons  (PAHs))  at  levels  that  should  not  ordinarily  be 
disposed of at sea, based on CEFAS’ interpretation of the IP’s 2024 sampling under 
the 2015 licence [SG1/5; 
CB/A122]. The map shows that sediment removed from 29 
of the 31 sampled locations would ordinarily be considered unsafe for disposal at sea. 
  47.  It is also clear that there is a lack of homogeneity in the benthic environment, not least 
since  six  areas  are  excluded  from  the  disposal  licence  due  to  contamination 
[
CB/A387-388; SB/B544; CB/A75-77; SB/B664-673]. 
  48.  Moreover, there is both long-standing and recent evidence that PCB contamination of 
the food chain is contributing to the high and unsustainable levels of Tees seal pup 
mortality  (PCBs  bioaccumulate  higher  up  the  food  chain,  posing  greater  risks  to 
mammals at the top of the food chain, such as seals, cetaceans, and humans). It is 
likely that dredging and/or disposal of dredged material is contributing to the high level 
of PCBs in seals. I referenced evidence relating to seal pup mortality in my consultation 
responses [
SB/B553; SB/B565-566]. The evidence, which I linked in footnotes to 
my consultation responses, is exhibited at 
[CB/A164-179; CB/A277-298] 
   
49.  I have conducted a detailed analysis of the spatial resolution of sampling proposed in 
the 2024 sampling plan 
[SG1/6, CB/A123]. On the basis of that analysis:    a.  It appears that the MMO has required only 20 samples to be produced from the  industrialized river channel (Chart Sectors 1–9), which covers 10 to 12 kilometers 
of river; and  b.  In specific instances, such as Chart Sector 4 and Chart Sector 5, the plan relies on  a single sample to verify over a kilometer of riverbed.    50.  Although the MMO claims to apply OSPAR Guidelines on sediment sampling, it appears 
that the samples required from the IP by the MMO were dramatically less than what 
is required by the OSPAR Guidelines [
SB/C166-169]. In particular, paragraphs 5.1 
to 5.4 of those Guidelines require samples to take account not only of the volume of 
material to be dredged (by reference to the ‘volumetric table’) but also of the area to 
be dredged (by reference to the ‘spatial table’ at para.5.3). The MMO’s sampling plan 
from  2024  upon  which  reliance  is  placed  for  the  Licence  appears  to  have  only 
considered the volume of the material to be dredged, and did not consider the spatial 
table at all. 
  A111 background image   11    51.  The Licenced Dredging Area is 12,104,900m2 (see para.21 above). Applying the spatial 
table to this area, I calculate that the minimum number of samples required by the 
OSPAR Guidelines is 611, almost twenty times the number required by the MMO. Even 
if the OSPAR Guidelines are applied only to the approximately 50% of the Harbour 
that has historically been dredged (c. 6,300,000m2) (para.22 above), the minimum 
number of samples required by the OSPAR Guidelines is still 320, more than 10 times 
the number required by the MMO.   
52.  The  reason  the  OSPAR  Guidelines  require  consideration  of  a  spatial  approach, 
alongside  a  volumetric  approach  is  to  ensure  that  horizontally  and  vertically 
heterogeneous  benthic  environments  are  properly  sampled.  A purely  volume-based 
approach assumes the riverbed is a homogeneous tank, ignoring the spatial variance 
of sediment deposition. It results in a low-level sampling resolution (approx. 1 sample 
per km), which lacks the statistical power to detect localized contamination hotspots. 
In a highly heterogenous riverbed like the Tees, that approach gives rise to a very real 
risk  that  highly  contaminated  sediment  is  missed  because  the  sampling  grid  is  too 
coarse  to  detect  the  hazards.  Consequently,  the safety  data  derived  from  this plan 
represents a 'false negative': it does not prove the river is safe; it proves only that the 
sampling grid was too coarse to detect the hazards. Adopting such a coarse sampling 
grid is therefore providential rather than precautionary. This was the point I made on 
behalf of NEMRG in our consultation response. 
  53.  Even using a volume-based approach only, the number of samples required by the 
MMO  appears  to  be  less  than  required  by  the  application  of  the  volume  table  at 
para.5.3 of the OSPAR Guidelines. Below is a table showing the samples required using 
the spatial table and the volume table at para.5.3  of the OSPAR Guidelines for the 
whole licenced area or the area that has historically been dredged. 
    Area (m2)  Volume (m3)  Samples Required  using Spatial  Approach    Samples Required  using Volume  Approach     Licenced Area    12,104,900  2,400,000  611  35  Estimated Area Dredged  Historically     6,300,000  2,400,000  320  35    The table demonstrates that even if only a volume-based approach is used, the number 
of samples should have been 35, not 31.    
A112 background image   12    54.  In practice, 31 samples for the total licenced area equates to 1 sample for every 55 
football pitches of the licensed area (or 1 sample for every 29 football pitches of the 
estimated area historically dredged). 
  55.  The fact that sampling has been undertaken for many years is no answer to the under-
sampling taking place. First, the OSPAR Guidelines are clear that sampling should be 
repeated every three years. While in some circumstances, this can extend to 5 years, 
that is only if contamination is below AL1 and there are no material changes to the 
sediment (e.g dredging) (para.5.5 [
CB/A387-388]). Neither condition applies to the 
Tees. In addition, it is clear that the Tees is a dynamic river, as demonstrated by the 
fact that mid-licence sampling in 2019 at Billingham’s Reach returned PCBs at levels 
above AL2 [
CB/A387-388]. While subsequent sampling returned samples below AL2, 
this demonstrates only that the contaminated sediment likely moved elsewhere in the 
river. 
   56.  This  under-sampling  is  particularly  problematic  in  relation  to  areas  that  are  being 
dredged  in  close  proximity  to  excluded  areas,  which  are  known  to  contain 
contaminants at levels prohibited from disposal at sea.  
  57.  There are several mechanisms by which contaminated material is likely to be carried 
from exclusion zones into the dredged channels:    i.  ‘Sloughing’  -  the  local  physical  collapse  of  the  estuary  bed  at  the  edge  of  an 
exclusion zone resulting in contaminated material falling or sliding into the dredged 
channel. This occurs as a result of gravity and the slope created by dredging an 
area adjacent to the exclusion zones.     ii.  ‘Scour’ - tidal currents will result in the “stripping” of the surface of the riverbed 
from the exclusion zone, with the resuspended sediment settling in deeper areas 
within the dredged river.  iii.  Propeller wash due to ship manoeuvres close to an excluded zone will result in 
violent  resuspension  of  excluded  sediment,  which  drifts  into  the  river  and  is 
deposited in the dredged channel.  iv.  Under  certain  circumstances  a  high-concentration  mud-like  suspension  can  be 
formed on the riverbed, which, if this happens in an exclusion zone, will flow under, 
gravity carrying contamination into the river channel. 
 
Follow-up correspondence with the MMO 
 
58.  On 5 November 2025, I contacted the MMO to request coordinates of areas excluded 
from dredging and also stated that I believed the licence was in breach of the OSPAR 
Convention, as it did not consider the inadvertent release of fine particles, which are 
more contaminated than bulk sediment. I did not receive any response from the MMO 
[
SB/B729-750]. On 30 November 2025, I followed up with the MMO and asked for  A113 background image   13    the  missing  information  for  the  mid-licence  sampling  [CB/A323-329].  On  1 
December 2025, the MMO informed me that my query had been sent to the licence 
holder [
CB/A322-329]. I responded the same day and stated that the MMO should 
be able to provide me with a correct version of “MMO_Results_Template MAR00179 
V3.xlsm”,  which  was  quoted  in  licence  application  MLA/2025/00263  and  is  on  the 
Public Register as a return to variation 4 of L/2015/00427 [
CB/A323]. I noted that 
the version in the Public Register is missing all coordinates and instead has locations 
on  land.  Following  pre-action  correspondence,  the  MMO  has  sent  a  map  showing 
approximate locations of the excluded areas [
SB/C799].     59.  On 5 December 2025, I sent an information request to PD Teesport Limited under the 
Environmental  Information  Regulation  2004  requesting  information  about  their 
dredging and assessment of alternatives [
CB/A140-141].  I understand a response 
will be provided on 5 February 2026 [
CB/A150-152].      Aarhus Convention Claim  
 
60.  I am advised that this is an Aarhus Convention claim as defined at CPR 46.24(2)(a) as 
it  is  brought  by  a  member  of the  public  (construed  in  accordance  with  the  Aarhus 
Convention) by way of judicial review, which challenges the legality of the decision, 
which  is  within  the  scope  of  9(3)  of  the  Aarhus  Convention,  there  being  a  wide 
definition of the environment at Article 2(3) of the Aarhus Convention. 
  61.  I understand that the Court rules concerning costs protection in Aarhus Convention 
claims require me to file a statement of my financial resources (verified by a statement 
of  truth)  which  provides  details  of  (i)  my  significant  assets,  liabilities,  income  and 
expenditure  and  (ii)  the  aggregate  amount  of  financial  support  which  has  been 
provided and which is likely to be provided to me by any other person. 
  62.  I therefore exhibit a schedule of my financial resources pursuant to CPR 46.25(1)(b) 
verified by a statement of truth.  I am advised that following the judgment of Mr Justice 
Dove in  R (RSPB, FoE and ClientEarth) v SSJ and LC [2017] EWHC 2309 (Admin), the  statement of financial resources is to be regarded as a confidential document. 
  Costs estimate 
 
63.  I have been advised by my solicitors that they estimate my own costs of this judicial 
review to be in the region of £20,000 - £25,000 plus VAT if the case progresses in a 
straightforward manner. Counsel’s fees will be in the region of £20,000 - £25,000 plus 
VAT. There will also be court fees, including the fee for issue, which is £174, and a 
continuation fee of £874, and potentially printing costs in the region of £1,000 - £1,500 
+ VAT for the claim and trial bundle. 
 
A114 background image 14  64. As to the Defendant’s costs, my solicitors have estimated an exposure to its costs of
circa  £10,000  -  £25,000  if  the  case  progresses  in  a  straightforward  manner.    In
addition, I understand that there is also a potential risk that I will be ordered to pay
the costs of the Interested Party, which I am told can often exceed the Defendant’s
claim for costs by a considerable margin. 65. I believe I can just about afford to bring these proceedings, as there has been some
fund-raising  in  the  local  community  to  meet  the  costs.  I  have  also  set  up  a
crowdfunding page on CrowdJustice which has, as at the date of this statement, raised
£8,313. 66. However,  I  cannot  afford  exposure  to  the  Defendant  and  Interested  Party’s  costs
beyond £5,000.  This means that if the Court does not grant me costs protection in
this Aarhus Convention claim, these proceedings would be prohibitively expensive for
me. 67. The order that I seek is pursuant to CPR 46.26(2)(a) i.e., that the Claimant’s liability
for the Defendant and Interested Party’s costs is limited to £5,000. The liability of the
Defendant  for  the  Claimant’s  costs  is  limited  to  £35,000  and  the  liability  of  the
Interested Parties for the Claimant’s costs is limited to £35,000. Statement of Truth  68. I believe that the facts in this witness statement are true, or in context, true to the
best  of  my  knowledge,  information,  and  belief.    I  understand  that  proceedings  for
contempt of court may be brought against anyone who makes, or causes to be made,
a false statement in a document verified by a statement of truth without an honest
belief in its truth. ……………………………………..
 
DR SIMON GIBBON 
13 January 2026 
A115 background image 15  For: Claimant  Witness: Dr Simon Gibbon 
1st Witness statement  Exhibit: SG1 
Made: 13 January 2026  IN THE HIGH COURT OF JUSTICE  AC-2026-LON-  KING’S BENCH DIVISION  ADMINISTRATIVE COURT   In the matter of an application for permission for judicial review  BETWEEN:  DR SIMON GIBBON  Claimant  -and- MARINE MANAGEMENT ORGANISATION  Defendant  -and- PD TEESPORT LIMITED  Interested Party  _________________________________________  EXHIBIT SG1  _________________________________________  This exhibit marked “SG1” is the exhibit referred to in the first witness statement of Dr Simon 
Gibbon made on 13 January 2026.  Contents  1. CONFIDENTIAL  Exhibit  SG1/1  -  schedule  of  the  Claimant’s  financial  resources pursuant to CPR 46.26…..………………………………………………………………………xx  2. Exhibit SG1/2 - Map of dredging area as defined by Schedules 2 and 3 of the 2025 Licence ………………………………………………………………………………………………..xx  3. Exhibit SG1/3 - Map of Tees Bay A, SPA, and the Water Bodies with IP’s plume modelling (annotated version of fig.6.5 of the Baseline document)…………….xx  4. Exhibit SG1/4 -  Map of CEFAS dispersal plume (Fig.7 of 09.22 report) annotated to showin location of SPA……………………………………………………………………….xx  5. Exhibit SG1/5 - Map of Low Molecular Weight PAHs at levels of concern and levels prohibited from disposal based on 2024 sampling…………………………………….xx  6. Exhibit  SG1/6  -  Claimant's  map  of  spatial  resolution  of  MMO's  2024  sampling plan……………………………………………………………………………………………………..xx 
A116 Statement of Truth 
I believe that the facts stated in this schedule of financial resources are true, or in context, 
true to the best of my knowledge, information and belief.  I understand that proceedings for 
contempt of court may be brought against anyone who makes, or causes to be made, a false 
statement in a document verified by a statement of truth without an honest belief in its truth. 
…………………………… 
DR SIMON GIBBON 
13 January 2026 
A118**