260906_cefas_eir_request_-_maintenance_dredging_protocol_consultations [2026/09/16 21:01] nefcadmin260906_cefas_eir_request_-_maintenance_dredging_protocol_consultations [2026/09/21 20:03] (current) – [Summary] nefcadmin
Line 1: Line 1:
-===== Cefas EIR Request - Maintenance Dredging Protocol Consultations =====+===== 260906 Cefas EIR Request - Maintenance Dredging Protocol Consultations =====
  
 +===== Summary =====
 +
 +Cefas has never been consulted by a statutory harbour authority on Maintenance Dredging Protocols and only once in 2015 did Cefas provide any advice on the MDP.
 +
 +Cefas say that reference to Cefas in previous documents refer to the Marine and Fisheries Agency a predecessor of the MMO.  So they do not expect to be consulted on MDPs and have never been by any Statutory Harbour Authority.  Cefas suggest that the MMO is consulted on the MDP.
 +
 +None of this agrees with the processes described in [[https://webarchive.nationalarchives.gov.uk/ukgwa/20121031094143mp_/http://archive.defra.gov.uk/wildlife-pets/wildlife/protect/documents/mdp-cap.pdf|Maintenance Dredging and The Habitats Regulations 1994 - A Conservation Assessment Protocol for England]], where Cefas's role is well defined, but the Marine and Fisheries Agency is mentioned by name.
 +
 +Cefas are consulted extensively by the MMO on marine licence applications involving dredging.
 +
 +The MMO say they are not the competent authority for the operations of dredging and as such only provide advice on an MDP where it refers to disposal at sea.
 +
 +The SHAs are responsible to keep navigation channels open and so are tasked by specific Acts of Parliament to dredge their ports' navigation channels.  This means the SHAs are the competent authority for the operations involved in maintenance dredging and so are responsible to ensure that these activities are compliant with all environmental legisations/regulations.
 +
 +So if the SHAs perform the same function as the MMO do for certain types of dredging why do SHAs not regularly consult Cefas as the MMO do?
 +
 +Cefas refered me to the the [[https://assets.publishing.service.gov.uk/media/69f46f16ab602a88957eefa2/20260408_Ports_Sandbox_Top_Tips_v3_Final.pdf|Ports Regulatory Sandbox]], while this does mention Cefas explicitly it does state that all MDPs have been signed off by Natural England.  So I await NE's response to a simialr EIR request.
 ===== Request ===== ===== Request =====
  
Line 19: Line 36:
 As I do not know when PD Ports consulted yourselves, I am only able to limit the date range to 2010 to the present day inclusive. However, I only require information which is part of a direct request from PD Ports to yourselves on the River Tees and Hartlepool Maintenance Dredging Protocol. I do not require information you have supplied to the Marine Management Organisation as part of the licencing of either capital dredging or disposal of dredge arisings at sea. As I do not know when PD Ports consulted yourselves, I am only able to limit the date range to 2010 to the present day inclusive. However, I only require information which is part of a direct request from PD Ports to yourselves on the River Tees and Hartlepool Maintenance Dredging Protocol. I do not require information you have supplied to the Marine Management Organisation as part of the licencing of either capital dredging or disposal of dredge arisings at sea.
  
-EIR Requests:+==== EIR Requests: ====
   - Please confirm that PD Ports has consulted yourselves directly on the Port of Tees and Hartlepool Maintenance Dredging Protocol and the years of these consultations.   - Please confirm that PD Ports has consulted yourselves directly on the Port of Tees and Hartlepool Maintenance Dredging Protocol and the years of these consultations.
   - Please provide all information, including advice, correspondence, other communications, and meeting minutes related to PD Ports on the original Maintenance Dredging Protocol you were consulted on.   - Please provide all information, including advice, correspondence, other communications, and meeting minutes related to PD Ports on the original Maintenance Dredging Protocol you were consulted on.
Line 36: Line 53:
 Responses to your questions: Responses to your questions:
  
-Question 1: Please confirm that PD Ports has consulted yourselves directly +==== 1. Consultation Dates ==== 
-on the Port of Tees and Hartlepool Maintenance Dredging Protocol and the +Question 1: Please confirm that PD Ports has consulted yourselves directly on the Port of Tees and Hartlepool Maintenance Dredging Protocol and the years of these consultations.
-years of these consultations.+
  
-Cefas are not, and (to our knowledge) have never been, directly consulted +Cefas are not, and (to our knowledge) have never been, directly consulted by any Port or similar applicant for these requests. Such requests are only facilitated through the Marine Management Organisation at their request, under the Service Level Agreement Cefas have with the MMO to provide marine licensing advice. Prior to the establishment of the MMO, such requests would have been similarly facilitated by the Marine and Fisheries Agency and other regulatory predecessors. It should be noted that Cefas are generally not consulted on new or updated MDP documents. They are sometimes submitted as supporting documents or for more direct consultation with Statutory Nature Conservation Bodies (SNCBs) where impacts to statutory designations are referenced. For the purposes of Cefas advice, MDPs are more so used to provide contextual information for an application.
-by any Port or similar applicant for these requests. Such requests are +
-only facilitated through the Marine Management Organisation at their +
-request, under the Service Level Agreement Cefas have with the MMO to +
-provide marine licensing advice. Prior to the establishment of the MMO, +
-such requests would have been similarly facilitated by the Marine and +
-Fisheries Agency and other regulatory predecessors. It should be noted +
-that Cefas are generally not consulted on new or updated MDP documents. +
-They are sometimes submitted as supporting documents or for more direct +
-consultation with Statutory Nature Conservation Bodies (SNCBs) where +
-impacts to statutory designations are referenced. For the purposes of +
-Cefas advice, MDPs are more so used to provide contextual information for +
-an application.+
  
-Question 2: Please provide all information, including advice, +==== 2. Consultation on First Version of MDP ====
-correspondence, other communications, and meeting minutes related to PD +
-Ports on the original Maintenance Dredging Protocol you were consulted on.+
  
-Cefas has undertaken extensive searches of its records, including historic +Question 2: Please provide all information, including advicecorrespondence, other communications, and meeting minutes related to PD Ports on the original Maintenance Dredging Protocol you were consulted on.
-case management databasesthe HPE document repository, and relevant team +
-shared mailboxes. Following these searches, we have been unable to +
-identify any records relating to Cefas advising on the original Tees +
-Maintenance Dredging Protocol produced in 2010 and have established that +
-we do not hold the information requested.+
  
-Question 3: Please provide all information, including advice, +Cefas has undertaken extensive searches of its records, including historic case management databasesthe HPE document repository, and relevant team shared mailboxes. Following these searches, we have been unable to identify any records relating to Cefas advising on the original Tees Maintenance Dredging Protocol produced in 2010 and have established that we do not hold the information requested.
-correspondence, other communications, and meeting minutes related to PD +
-Ports on the most recent Maintenance Dredging Protocol you have been +
-consulted on.+
  
-The last time Cefas were consulted on and/or commented on the MDP document +==== 3. Last Consultation on MDP Update ====
-for the Tees was under MLA/2015/00088 in November 2015, the licence +
-application for the previous Tees maintenance disposal licence. This +
-advice is attached, and the reference to the MDP can be found in point 15. +
-Updates to the Tees MDP were submitted to the MMO throughout that licence +
-period but it does not appear that Cefas explicitly advised on any of +
-these updates. All Cefas advice provided for this licence can be found on +
-the MMO Public Register.+
  
-Under Regulation 12(4)(a) of the Environmental Information Regulations +Question 3: Please provide all information, including advice, correspondence, other communications, and meeting minutes related to PD Ports on the most recent Maintenance Dredging Protocol you have been 
-2004, a public authority may refuse a request where it does not hold the +consulted on.
-information requested. Following appropriate enquiries and searches of our +
-recordsCefas has determined that it does not hold the information +
-requested in Questions 1 and 2, and accordingly, the information is being +
-withheld under Regulation 12(4)(a) of the Environmental Information +
-Regulations 2004.+
  
-Public Interest Test+The last time Cefas were consulted on and/or commented on the MDP document for the Tees was under MLA/2015/00088 in November 2015, the licence application for the previous Tees maintenance disposal licence. This [[this>RiverTees/Planning/MLA_2015_00088/Consultations/20151118 MLA201500088 PD Teesport Tees and Hartelpool  maintenance dredge advice final.pdf|advice]] is attached, and the reference to the [[this>RiverTees/Planning/MLA_2015_00088/Additional Document/PB3308_101_304258_200215_Final.pdf|MDP]] can be found in point 15. Updates to the Tees MDP were submitted to the MMO throughout that licence period but it does not appear that Cefas explicitly advised on any of these updates. All Cefas advice provided for this licence can be found on the MMO Public Register.
  
-As Regulation 12(4)(a) is subject to the public interest testCefas +Under Regulation 12(4)(a) of the Environmental Information Regulations 2004, a public authority may refuse a request where it does not hold the information requested. Following appropriate enquiries and searches of our records, Cefas has determined that it does not hold the information requested in Questions 1 and 2, and accordingly, the information is being withheld under Regulation 12(4)(a) of the Environmental Information Regulations 2004.
-recognises the public interest in transparency regarding environmental +
-decision-making and dredging activities. However, there is no public +
-interest in requiring a public authority to disclose information that it +
-does not hold, and on balance, the public interest favours maintaining the +
-exception.+
  
-Handling your information: Our [1]Personal information charter explains +==== Public Interest Test ====
-how we treat your personal information.+
  
-Complaints: Under the regulations we are also required to point out that +As Regulation 12(4)(a) is subject to the public interest test, Cefas recognises the public interest in transparency regarding environmental decision-making and dredging activities. Howeverthere is no public interest in requiring a public authority to disclose information that it does not hold, and on balance, the public interest favours maintaining the exception.
-if you are unhappy with the service you have received in relation to your +
-request and wish to make a complaintyou should write to the Senior +
-Information Risk Owner (SIRO) at the below address, who will arrange for +
-an internal review of your case.+
  
-   +Handling your information: Our [1]Personal information charter explains how we treat your personal information.
  
-If you are not content with the outcome of the internal review, you have +Complaints: Under the regulations we are also required to point out that if you are unhappy with the service you have received in relation to your request and wish to make a complaint, you should write to the Senior Information Risk Owner (SIRO) at the below address, who will arrange for an internal review of your case. 
-the right to apply directly to the Information Commissioner for a +  
-decision. The Information Commissioner can be contacted at: +If you are not content with the outcome of the internal review, you have the right to apply directly to the Information Commissioner for a decision. The Information Commissioner can be contacted at: 
  
-Information Commissioner’s Office  +Information Commissioner’s Office \\ 
-Wycliffe House  +Wycliffe House \\ 
-Water Lane  +Water Lane \\ 
-Wilmslow  +Wilmslow \\ 
-Cheshire +Cheshire \\
 SK9 5AF  SK9 5AF 
  
 Kind regards, Kind regards,
  
-Sue Dale+Marine Data Coordinator \\ 
 +Science Data Team \\ 
 +Pakefield Road, Lowestoft, Suffolk, NR33 0HT, UK
  
-Marine Data Coordinator+Tackling global challenges through innovative science solutions
  
-Science Data Team+Follow us @CefasGovUK : [[https://linktr.ee/cefasgovuk|LinkTree]]
  
-Pakefield Road, Lowestoft, Suffolk, NR33 0HT, UK+===== Request for Clarification =====
  
-Tel: +44(0) 1502 524435| Email: [2][email address]+While I accept that you do not hold the information I requested, I do not understand your reasons for this.
  
-My working week is Monday to Thursday+Cefas's role in the development of Maintenance Dredging Protocols is explicitly defined in the 2007 Defra document [[https://webarchive.nationalarchives.gov.uk/ukgwa/20121031094143mp_/http://archive.defra.gov.uk/wildlife-pets/wildlife/protect/documents/mdp-cap.pdf|Maintenance Dredging and The Habitats Regulations 1994 - A Conservation Assessment Protocol for England]].
  
-Tackling global challenges through innovative science solutions+When I communicated with the Marine Management Organisation over Maintenance Dredging Protocols, I have been told that the MMO have no role in the oversight of dredging operations themselves as they are not the competent authority and so do not regulate any environmental impacts of the dredging operations. The MMO have stated however, they are the competent authority for the disposal of dredged material and so do advise / regulate environmental impacts of the disposal of dredged material. 
 + 
 +So I am now concerned that either I have asked the wrong questions or that the competent authorities (Statutory Harbour Authorities) are not seeking Cefas advice for dredging operations in the same way that the MMO are for disposal of dredged material.
  
-Follow us @CefasGovUK on: +I assume that I need to contact Defra to clarify how dredging operations are being overseen.
-[3]A black and pink logo Description automatically generated+
  
-══════════════════════════════════════════════════════════════════════════+===== Clarification =====
  
-This email and any attachments are intended for the named recipient only. +For the purposes of your Environmental Information Regulations (2004) requestwe can confirm the following:
-Its unauthorised use, distribution, disclosure, storage or copying is not +
-permitted. If you have received it in error, please destroy all copies and +
-notify the sender. In messages of a non-business nature, the views and +
-opinions expressed are the author's own and do not necessarily reflect +
-those of Cefas. Communications on Cefas’ computer systems may be monitored +
-and/or recorded to secure the effective operation of the system and for +
-other lawful purposes. All messages sent and received by the Centre for +
-Environment, Fisheries and Aquaculture Science may be monitored in line +
-with relevant [4]UK legislation .+
  
-References+We have reviewed the link you provided and do not agree that it designates Cefas as having an explicit role in reviewing Maintenance Dredging Protocols. The Marine and Fisheries Agency was a regulatory agency that preceded the MMO, and Cefas was never part of this agency.
  
-Visible links +Regarding your concern that "competent authorities (Statutory Harbour Authorities) are not seeking Cefas advice for dredging operations" we reiterate that there is no such requirement for this consultation, and no agreement or arrangement exists - or (to our knowledge) has ever existed - to enable this, outside of routine Marine Licensing advice coordinated through the MMO (and its predecessors).
-1. https://www.gov.uk/government/organisati... +
-2. mailto:[email%20address] +
-3. https://linktr.ee/cefasgovuk +
-4. https://www.gov.uk/government/organisati...+
  
 +We trust that this response, together with our comprehensive response to the duplicate request submitted directly to our Senior Advisor, clarifies Cefas' position regarding the issues raised.
 ====== Other Pages That Link To This Page ====== ====== Other Pages That Link To This Page ======
  
 {{backlinks>.}} {{backlinks>.}}
260906_cefas_eir_request_-_maintenance_dredging_protocol_consultations.1789592481.txt.gz · Last modified: by nefcadmin