Planning Application Details for - R-2022-0755-CD



Official consultation has expired





















Condition number
Condition Details

1
No phase of development shall take place until a Construction Environmental Management Plan (CEMP) for that phase of the development has been submitted to and approved in writing by the Local Planning Authority. The approved CEMP shall be adhered to throughout the construction period of that phase. The CEMP shall include details of any phasing of the approved works across the site and shall demonstrate how the mitigation measures set out in the Ecological Impact Assessment, INCA, dated November 2021 have been incorporated in the construction methods. The CEMP shall also include the following details: i The method to be used to control the emission of dust, noise and vibration from construction works, including any details of any mitigation measures required; ii Measures to control the deposit of mud and debris on adjoining public highways iii Site fencing and security iv Temporary contractors’ buildings, plant, storage of materials, lighting and parking for site operatives v The use of temporary generators vi The arrangement or turning of vehicles within the site so that they may enter and leave in forward gear vii A risk assessment of construction activities with potentially damaging effects on local ecological receptors including any measures to protect those receptors during construction viii Roles and responsibilities for the implementation of the CEMP requirements and measures. ix Measures to control invasive plant species x Measures to control surface water and other water generated as part of the works REASON: In the interest of neighbour amenity, highways safety and protection of sites of ecological value in accordance with policies SD4 and N4 of the Redcar and Cleveland Local Plan. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as it relates to construction details which are often the first works on site and relate to site preparation.
2
The development within the application boundary (with the exception of the areas outlined in Blue on the submitted 'Net Zero Data Gaps' plan - Plan Ref. No. 10035117-AUK[1]XX-XX-DR-ZZ-0508-01- Net_Zero_Plot_Data_Gaps) shall be implemented in accordance with the measures set out in the submitted Enabling Earthworks and Remediation Strategy Report (Report Ref: 10035117-AUK-XX-XXRP-ZZ-0417-03). That Remediation Strategy Report shall be subject to independent review through the National Quality Mark Scheme. Should that review result in amendments being necessary, a revised Strategy Report shall be submitted and approved by the local planning authority and development carried out in accordance with it. Reason To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers and other offsite receptors, in accordance with the Local Plan and the National Planning Policy Framework.



Name
Date Letter Sent
Expiry Date

Councillor S Jeffrey (SOUTH BANK)
14/09/2022
05/10/2022
Councillor Sandra Smith (SOUTH BANK)
14/09/2022
05/10/2022
Engineering Team (Highways)
14/09/2022
05/10/2022
Environmental Protection Team
14/09/2022
05/10/2022


No Neighbours Found For This Application


If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

Size
Date
Application Form
220kb 14/09/2022
Plans and Supporting Documentation
4410kb 14/09/2022
207kb 14/09/2022
13947kb 14/09/2022
126827kb 14/09/2022
106120kb 14/09/2022
101337kb 14/09/2022
963kb 14/09/2022
Consultee Responses
14kb 04/10/2022
14kb 04/10/2022