{TOC} Applications details - [[this>Teesworks/Planning/R-2020-0800-CD|R/2020/0800/CD]] Redcar and Cleveland Borough Council Planning (Development Management) APPLICATION NUMBER: [[R-2020-0800-CD-Officer Report|R-2020/0800/CD-Officer Report]] LOCATION: LAND AT AND ADJOINING ESTON ROAD INCLUDING GATEWAY JUNCTION OF A66 TO MIDDLESBROUGH ROAD EAST GRANGETOWN PROPOSAL: DISCHARGE OF CONDITION 3 (CEMP) OF PLANNING PERMISSION [[R-2020-0270-FFM-Officer Report|R-2020/0270/FFM-Officer Report]] FOR ENGINEERING OPERATIONS INCLUDING WIDENING OF ESTON ROAD, FORMATION OF NEW ROUNDABOUT AND INTERNAL ACCESS ROADS, WORKS TO ENHANCE HOLME BECK AND ASSOCIATED HARD AND SOFT LANDSCAPING WORKS ===== APPLICATION SITE ===== The application relates to the discharge of conditions relating to planning application [[R-2020-0270-FFM-Officer Report|R-2020/0270/FFM-Officer Report]] The planning permission sought consent for engineering operations including widening of Eston Road, formation of new roundabout and internal access roads, works to enhance Holme Beck and associated hard and soft landscaping works and was approved conditionally on 12/08/2020 ===== CONDITION DETAILS ===== The following information has been submitted for conditions 3 Construction Environmental Management Plan Rev A 21/12/2020 3 No development shall take place until a Construction Environmental Management Plan (CEMP) for the development has been submitted to and approved in writing by the Local Planning Authority. The approved CEMP shall be adhered to throughout the construction period. The CEMP shall set out and include the following details: i The method to be used to control the emission of dust, noise and vibration from construction works, including any details of any mitigation measures required; ii Measures to control the deposit of mud and debris on adjoining public highways iii Site fencing and security iv Temporary contractors’ buildings, plant, storage of materials, lighting and parking for site operatives v The use of temporary generators vi The arrangement or turning of vehicles within the site so that they may enter and leave in forward gear vii A risk assessment of construction activities with potentially damaging effects on local ecological receptors including any measures to protect those receptors during construction viii Roles and responsibilities for the implementation of the CEMP requirements and measures. REASON: In the interest of neighbour amenity, highways safety and protection of sites of ecological value in accordance with policies SD4 and N4 of the Redcar and Cleveland Local Plan. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as it relates to construction details which are often the first works on site and relate to site preparation. ===== CONSULTATION RESPONSES ===== ==== Environment Agency ==== No concerns on the submitted information ==== Natural England ==== No comment to make on the discharge of condition 3 ==== Redcar and Cleveland Borough Council (Development Engineers) ==== No objections ==== Redcar and Cleveland Borough Council (Strategic Transport) ==== No objections ==== Redcar and Cleveland Borough Council (Environmental Protection) (Nuisance) ==== No objections ===== PLANNING CONSIDERATIONS ===== As part of the proposed development a condition was imposed that required the submission of a Construction Environmental Managing Plan. The plan deals with a number of areas of interest including; highways matters, noise and vibration, air and water quality, contaminated land, cultural heritage and ecological matters. Due to the diverse nature of the document a number of internal and external consultees have been consulted on the submitted document. As detailed above none of the consultees have raised any objection with regard to the content of the document. Based on the consultees responses received the submitted document is considered suitable to discharge the condition. ===== RECOMMENDATION ===== Taking into account the content of the report the recommendation is to discharge condition 3 Case Officer Mr D Pedlow Principal Planning Officer David Pedlow 28 January 2021 Delegated Approval Signature Claire Griffiths Development Services Manager 29/01/2021