{include:Teesworks - keywords - menu} [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf|EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf]]:32: of Major Accident Hazards (COMAH) regimes. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf|EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf]]:71: Control of Major Accident Hazards Regulations 2015 (COMAH) for which, depending [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf|EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf]]:71: the HSE, as the competent authority for COMAH. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf|EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf]]:10:Control of Major Accident Hazards Sites (COMAH) pg 42 2 2 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf|EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf]]:54: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf|EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf]]:54: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf|EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf]]:54: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf|EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf]]:54: Status: Record Ceased To Be Supplied Under COMAH Regulations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf|EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf]]:54: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf|EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf]]:67:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf|EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf]]:114: subject to the 'Control of Major Accident Hazards' ('COMAH') Regulations 2015. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf|EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf]]:114: subject to stringent safety standards under COMAH. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf|EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf]]:115:6.2.1266.2.129 The Proposed Development is anticipated to be subject to the COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf|EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf]]:115: undertaking a MA&ND assessment within an EIA, regard has been had to the COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf|EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf]]:116: its operation including a COMAH licence and Environmental Permit, and these [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf|EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf]]:117:6.2.1376.2.140 As confirmed above, a COMAH licence application will be submitted to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf|EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf]]:117: Development and includes the COMAH and HSC applications. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001735-Redcar & Cleveland Borough Council - EN010103-001527-NZT-ExQ1-editable-version.pdf|EN010103-001735-Redcar & Cleveland Borough Council - EN010103-001527-NZT-ExQ1-editable-version.pdf]]:2:COMAH Control of Major Accidents and Hazards [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002069-NZT DCO 8.5 - Environment Agency SoCG (Tracked) August 2-22 (D6).pdf|EN010103-002069-NZT DCO 8.5 - Environment Agency SoCG (Tracked) August 2-22 (D6).pdf]]:10: Hazardous Substances Consent/COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002414-NZT DCO 5.10 - Other Consents and Licences - Oct 2022 D11 (Tracked).pdf|EN010103-002414-NZT DCO 5.10 - Other Consents and Licences - Oct 2022 D11 (Tracked).pdf]]:11: Accident Hazards Executive COMAH licence application to construction once the volumes of hazardous [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002414-NZT DCO 5.10 - Other Consents and Licences - Oct 2022 D11 (Tracked).pdf|EN010103-002414-NZT DCO 5.10 - Other Consents and Licences - Oct 2022 D11 (Tracked).pdf]]:11: (COMAH) be prepared for submission to substances to be stored on site are known. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:95: and Control of Major Accident Hazards (COMAH) Regulations (2015). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:95:9.7.120 A site Emergency Response Plan (prepared for Regulation 9 of the COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001788-NZT DCO 5.10 - Other Consents and Licences - June 2022 (Tracked).pdf|EN010103-001788-NZT DCO 5.10 - Other Consents and Licences - June 2022 (Tracked).pdf]]:12: Accident Hazards Executive COMAH licence application to construction once the volumes of hazardous [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001788-NZT DCO 5.10 - Other Consents and Licences - June 2022 (Tracked).pdf|EN010103-001788-NZT DCO 5.10 - Other Consents and Licences - June 2022 (Tracked).pdf]]:12: (COMAH) be prepared for submission to substances to be stored on site are known. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001587-NZT DCO 8.5 - Environment Agency SoCG - May 2022.pdf|EN010103-001587-NZT DCO 8.5 - Environment Agency SoCG - May 2022.pdf]]:10:  Hazardous Substances Consent/COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf|EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf]]:10: Regulations 1999 (COMAH). Parts of the complex are also within a [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf|EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf]]:10:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf|EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf]]:21:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf|EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf]]:11:Control of Major Accident Hazards Sites (COMAH) pg 56 5 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf|EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf]]:69: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf|EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf]]:69: Status: Record Ceased To Be Supplied Under COMAH Regulations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf|EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf]]:69: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf|EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf]]:69: Status: Record Ceased To Be Supplied Under COMAH Regulations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf|EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf]]:69: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf|EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf]]:69: Status: Record Ceased To Be Supplied Under COMAH Regulations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf|EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf]]:69: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf|EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf]]:69: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf|EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf]]:106:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf|EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf]]:83: and Control of Major Accident Hazards (COMAH) Regulations (2015). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf|EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf]]:83:9.7.106 A site Emergency Response Plan (prepared for Regulation 9 of the COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:169: Control of Major Accident Hazards (COMAH) to comply with the HSE’s land use planning [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:604:Application of COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:604:development is anticipated to be subject to the Control of Major Accident Hazards (COMAH) Regulations 2015’. In which case [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:604:you should be aware of the following particular requirements of COMAH: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:604: • Regulation 6 – notification: before a new COMAH establishment is constructed a notification containing prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:604: information relating to the establishment has to be submitted to the COMAH Competent Authority within a reasonable [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:604: https://www.hse.gov.uk/comah/notification/index.htm [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:604: • Regulation 8 – safety report: where the establishment’s inventory of COMAH dangerous substances will make it an [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:604: upper tier COMAH site preconstruction and pre-operational safety reports will be required within a reasonable time [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:604: of these activities cannot take place until the COMAH CA has fed back to the company the results of their assessment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:664: COMAH Site. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:1102:Application of COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:1102:the ‘proposed development is anticipated to be subject to the Control of Major Accident Hazards (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:1102:Regulations 2015’. In which case you should be aware of the following particular requirements of COMAH: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:1102: • Regulation 6 – notification: before a new COMAH establishment is constructed a notification [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:1102: containing prescribed information relating to the establishment has to be submitted to the COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:1102: 4 months. See: https://www.hse.gov.uk/comah/notification/index.htm [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:1102: • Regulation 8 – safety report: where the establishment’s inventory of COMAH dangerous [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:1102: substances will make it an upper tier COMAH site preconstruction and pre-operational safety [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:1102: activities cannot take place until the COMAH CA has fed back to the company the results of their [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002238-NZT DCO 8.5 - SoCG - Environment Agency September (Tracked) 2022 (D8).pdf|EN010103-002238-NZT DCO 8.5 - SoCG - Environment Agency September (Tracked) 2022 (D8).pdf]]:10: Hazardous Substances Consent/COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf|EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf]]:2:COMAH Control of Major Accidents and Hazards [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf|EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf]]:12: and hazards (COMAH) licence would be required. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf|EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf]]:59: the PCC Site which is subject to a COMAH licence and that the operator of this pipeline, South [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf|EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf]]:59: steelworks Infrastructure and make an application to revoke the COMAH licence. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf|EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf]]:59: Can STDC comment on the status of the COMAH licence and decommissioning activity, and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf|EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf]]:3: Hazard Management Plan) will be produced during the (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf|EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf]]:10:accidents and natural disasters lower tier or upper tier COMAH licence, will be 2005 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf|EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf]]:10: (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf|EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf]]:29: the legislative requirements set out in the Control of Control of Major Accident Hazards (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf|EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf]]:29: Hazards (COMAH) Regulations (2015). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf|EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf]]:29: Regulation 9 of the COMAH Regulations) will be in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf|EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf]]:52: • If required, a COMAH licence will be applied for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf|EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf]]:52: for COMAH Licence, if required for the operational [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002641-NZT DCO 8.37 - SoCG - North Sea Midstream Partners - Final - Nov 2022 (D13).pdf|EN010103-002641-NZT DCO 8.37 - SoCG - North Sea Midstream Partners - Final - Nov 2022 (D13).pdf]]:6: Hazards site and is operated in compliance with the COMAH Regulations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002641-NZT DCO 8.37 - SoCG - North Sea Midstream Partners - Final - Nov 2022 (D13).pdf|EN010103-002641-NZT DCO 8.37 - SoCG - North Sea Midstream Partners - Final - Nov 2022 (D13).pdf]]:10: it is classed as a COMAH site. Subject to these concerns, NSMP are supportive [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002237-NZT DCO 8.5 - SoCG - Environment Agency September (Clean) 2022 (D8).pdf|EN010103-002237-NZT DCO 8.5 - SoCG - Environment Agency September (Clean) 2022 (D8).pdf]]:10: Hazardous Substances Consent/COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002071-NZT DCO 8.37 - SoCG - North Sea Midstream Partners Deadline 6 Submission.pdf|EN010103-002071-NZT DCO 8.37 - SoCG - North Sea Midstream Partners Deadline 6 Submission.pdf]]:6: Hazards site and is operated in compliance with the COMAH Regulations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002071-NZT DCO 8.37 - SoCG - North Sea Midstream Partners Deadline 6 Submission.pdf|EN010103-002071-NZT DCO 8.37 - SoCG - North Sea Midstream Partners Deadline 6 Submission.pdf]]:10: it is classed as a COMAH site. Subject to these concerns, NSMP are not [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001154-NZT DCO 5.10 - Other Consents and Licences.pdf|EN010103-001154-NZT DCO 5.10 - Other Consents and Licences.pdf]]:10: Accident Hazards Executive COMAH licence application to construction once the volumes of hazardous [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001154-NZT DCO 5.10 - Other Consents and Licences.pdf|EN010103-001154-NZT DCO 5.10 - Other Consents and Licences.pdf]]:10: (COMAH) be prepared for submission to substances to be stored on site are known. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf|EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf]]:84: • Lower tier COMAH licence (if required); [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001197-NZT DCO 6.2.4 - ES Vol I Chapter 4 - Oct 2021.pdf|EN010103-001197-NZT DCO 6.2.4 - ES Vol I Chapter 4 - Oct 2021.pdf]]:17: their storage, under the Control of Major Accident Hazards (COMAH) and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001197-NZT DCO 6.2.4 - ES Vol I Chapter 4 - Oct 2021.pdf|EN010103-001197-NZT DCO 6.2.4 - ES Vol I Chapter 4 - Oct 2021.pdf]]:17: Hazardous Substance Consent and COMAH regimes respectively. All [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001197-NZT DCO 6.2.4 - ES Vol I Chapter 4 - Oct 2021.pdf|EN010103-001197-NZT DCO 6.2.4 - ES Vol I Chapter 4 - Oct 2021.pdf]]:22: authority for their storage, under the COMAH and Hazardous Substance [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001197-NZT DCO 6.2.4 - ES Vol I Chapter 4 - Oct 2021.pdf|EN010103-001197-NZT DCO 6.2.4 - ES Vol I Chapter 4 - Oct 2021.pdf]]:22: potentially COMAH Regulations due to storage of hazardous materials (see [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001197-NZT DCO 6.2.4 - ES Vol I Chapter 4 - Oct 2021.pdf|EN010103-001197-NZT DCO 6.2.4 - ES Vol I Chapter 4 - Oct 2021.pdf]]:23: Development will come under lower tier COMAH as a minimum, this will be [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001197-NZT DCO 6.2.4 - ES Vol I Chapter 4 - Oct 2021.pdf|EN010103-001197-NZT DCO 6.2.4 - ES Vol I Chapter 4 - Oct 2021.pdf]]:23:4.4.23 CO2 is not currently defined as a dangerous substance under The COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf|EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf]]:81: • Lower tier COMAH licence (if required); [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf|EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf]]:71:The scoping opinion outlines the Control of Major Accident Hazards (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002433-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf|EN010103-002433-Shepherd and Wedderburn LLP on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf]]:2: upper tier of the COMAH Regulations. Given the scale and importance of the Plant to the UK gas supply [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf|EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf]]:10:Control of Major Accident Hazards Sites (COMAH) pg 65 3 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf|EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf]]:77: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf|EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf]]:77: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf|EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf]]:77: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf|EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf]]:92:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf|EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf]]:10:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf|EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf]]:27:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000013-EN010103_Scoping Opinion.pdf|EN010103-000013-EN010103_Scoping Opinion.pdf]]:70:The scoping opinion outlines the Control of Major Accident Hazards (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000013-EN010103_Scoping Opinion.pdf|EN010103-000013-EN010103_Scoping Opinion.pdf]]:136:The EIA should include consideration of the COMAH Regulations (Control of Major [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf|EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf]]:78: • Lower tier COMAH licence (if required); [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf|EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf]]:5: by major process industry companies, including COMAH regulations. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf|EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf]]:10: the register maintained by the Health and Safety Executive (HSE) under the COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf|EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf]]:4: Hazard Management Plan) will be produced during the (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf|EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf]]:11:accidents and natural disasters lower tier or upper tier COMAH licence, will be 2005 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf|EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf]]:11: (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf|EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf]]:30: the legislative requirements set out in the Control of Control of Major Accident Hazards (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf|EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf]]:30: Hazards (COMAH) Regulations (2015). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf|EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf]]:30: Regulation 9 of the COMAH Regulations) will be in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf|EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf]]:52: • If required, a COMAH licence will be applied for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf|EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf]]:52: for COMAH Licence, if required for the operational [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf|EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf]]:82: • Lower tier COMAH licence (if required); [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf|EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf]]:24: is appointed by Kellas Midstream as COMAH Operator of the CATS Terminal and Pipeline Operator of the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf|EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf]]:87: process industry companies, including COMAH regulations. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf|EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf]]:91: Executive (HSE) under the COMAH Regulations. Parts of the Wilton complex are also within a secure, Draft DCO [[REP2-002]] are to allow the Applicants to carry out and operate the Proposed Development, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf|EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf]]:11:Control of Major Accident Hazards Sites (COMAH) pg 59 2 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf|EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf]]:72: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf|EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf]]:72: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf|EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf]]:101:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf|EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf]]:51: plant will be regulated under a Control of Major Accident Hazards (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf|EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf]]:53: requirements including an Environmental Permit and, if required, a COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000944-NZT DCO 6.3.35 ES Vol II Figure 10-9 Hazardous.pdf|EN010103-000944-NZT DCO 6.3.35 ES Vol II Figure 10-9 Hazardous.pdf]]:1: COMAH Site [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf|EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf]]:10:Control of Major Accident Hazards Sites (COMAH) pg 96 3 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf|EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf]]:108: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf|EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf]]:108: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf|EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf]]:108: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf|EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf]]:126:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001789-NZT DCO 5.10 - Other Consents and Licences - June 2022 (Clean).pdf|EN010103-001789-NZT DCO 5.10 - Other Consents and Licences - June 2022 (Clean).pdf]]:11: Accident Hazards Executive COMAH licence application to construction once the volumes of hazardous [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001789-NZT DCO 5.10 - Other Consents and Licences - June 2022 (Clean).pdf|EN010103-001789-NZT DCO 5.10 - Other Consents and Licences - June 2022 (Clean).pdf]]:11: (COMAH) be prepared for submission to substances to be stored on site are known. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:55: 1.9.2 compromise Control of Major Accident Hazards (“COMAH”) 1.9.2 It is unclear what this statement refers to within the project. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:55: facility, and it is unclear what COMAH elements are said to be [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:59: Regulations 2015 (the “COMAH Regulations”). Both of these low as reasonably practicable’). Chapter 22 of the Environmental [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:60: ensure such assessments remain valid it is crucial that additional Major Accident Hazards Regulations 2015 (the “COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:64: accordance with its duties under the COMAH Regulations; 5.3.3 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:64: the COMAH Regulations. Powers should not be exercised without [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:68: of Major Accident Hazards (“COMAH”) safety planning and give rise standards (PSR 1996) to maintain safety. Furthermore, whilst CO2 is [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:70: 2.3 Much of the Infrastructure in the existing pipe corridors 2.3 Noted. The Applicants understand the COMAH Regulations and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:70: of Major Accident Hazards Regulations 2015 (the “COMAH Nitriles to provide sufficient information in a timely manner to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:75: with their duties under the COMAH Regulations; and 4.4.3 carrying [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:103: 6. Control of Major Accident Hazards Regulations (COMAH) permit: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000005-EN010103_Scoping Report.pdf|EN010103-000005-EN010103_Scoping Report.pdf]]:31: of Major Accident Hazards (COMAH) regimes. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000005-EN010103_Scoping Report.pdf|EN010103-000005-EN010103_Scoping Report.pdf]]:70: Control of Major Accident Hazards Regulations 2015 (COMAH) for which, depending [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000005-EN010103_Scoping Report.pdf|EN010103-000005-EN010103_Scoping Report.pdf]]:70: the HSE, as the competent authority for COMAH. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001730-Written Representation (CATS North Sea Limited).pdf|EN010103-001730-Written Representation (CATS North Sea Limited).pdf]]:5: Kellas Midstream. Wood plc is appointed by Kellas Midstream as COMAH Operator of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002441-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf|EN010103-002441-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf]]:5: by major process industry companies, including COMAH regulations. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002441-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf|EN010103-002441-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf]]:13: under the COMAH Regulations. Parts of the Wilton Complex are also within a secure, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001714-South Tees Development Corporation - Responses to the ExA’s ExQ1.pdf|EN010103-001714-South Tees Development Corporation - Responses to the ExA’s ExQ1.pdf]]:14: gas pipeline crossing the PCC Site which is subject to a COMAH licence (Competent Authority HSE COMAH) regulatory inspector has [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001714-South Tees Development Corporation - Responses to the ExA’s ExQ1.pdf|EN010103-001714-South Tees Development Corporation - Responses to the ExA’s ExQ1.pdf]]:14: Infrastructure and make an application to revoke the COMAH licence. Can [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001714-South Tees Development Corporation - Responses to the ExA’s ExQ1.pdf|EN010103-001714-South Tees Development Corporation - Responses to the ExA’s ExQ1.pdf]]:14: STDC comment on the status of the COMAH licence and This now formally informs them of the change of status due [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001714-South Tees Development Corporation - Responses to the ExA’s ExQ1.pdf|EN010103-001714-South Tees Development Corporation - Responses to the ExA’s ExQ1.pdf]]:14: Development? step is for STDC to continue to remove the COMAH inventory [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001714-South Tees Development Corporation - Responses to the ExA’s ExQ1.pdf|EN010103-001714-South Tees Development Corporation - Responses to the ExA’s ExQ1.pdf]]:14: COMAH licence. The anticipation is that the land will cease [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001714-South Tees Development Corporation - Responses to the ExA’s ExQ1.pdf|EN010103-001714-South Tees Development Corporation - Responses to the ExA’s ExQ1.pdf]]:14: being a COMAH facility by August 2023. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002068-NZT DCO 8.5 - Environment Agency SoCG (Clean) August 2-22 (D6).pdf|EN010103-002068-NZT DCO 8.5 - Environment Agency SoCG (Clean) August 2-22 (D6).pdf]]:10: Hazardous Substances Consent/COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001725-DLA Piper UK LLP - Responses to the ExA’s ExQ1 1.pdf|EN010103-001725-DLA Piper UK LLP - Responses to the ExA’s ExQ1 1.pdf]]:2:COMAH Control of Major Accidents and Hazards [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001725-DLA Piper UK LLP - Responses to the ExA’s ExQ1 1.pdf|EN010103-001725-DLA Piper UK LLP - Responses to the ExA’s ExQ1 1.pdf]]:16: acquisition of rights by Net Zero Teesside suppression and to make most plants COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002413-NZT DCO 5.10 - Other Consents and Licences - Oct 2022 D11 (Clean).pdf|EN010103-002413-NZT DCO 5.10 - Other Consents and Licences - Oct 2022 D11 (Clean).pdf]]:13: Major Accident Executive required, COMAH licence of construction once the volumes of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002413-NZT DCO 5.10 - Other Consents and Licences - Oct 2022 D11 (Clean).pdf|EN010103-002413-NZT DCO 5.10 - Other Consents and Licences - Oct 2022 D11 (Clean).pdf]]:13: Hazards (COMAH) application to be prepared hazardous substances to be stored on [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001971-Shepherd and Wedderburn on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf|EN010103-001971-Shepherd and Wedderburn on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf]]:1: Processing Plant is classified as an Upper Tier Control of Major Accident Hazards (“COMAH”) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001971-Shepherd and Wedderburn on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf|EN010103-001971-Shepherd and Wedderburn on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf]]:3:2.6 The Gas Processing Plant is classified as an Upper Tier COMAH site and is operated in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001971-Shepherd and Wedderburn on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf|EN010103-001971-Shepherd and Wedderburn on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf]]:3: compliance with the COMAH Regulations 2015. Operational availability since start-up has been [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001971-Shepherd and Wedderburn on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf|EN010103-001971-Shepherd and Wedderburn on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf]]:3: need to shut down the Gas Processing Plant. As an Upper Tier COMAH site and given the Gas [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001971-Shepherd and Wedderburn on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf|EN010103-001971-Shepherd and Wedderburn on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf]]:5: COMAH site. Any works undertaken in the relevant Plots that contain pipelines supplying, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001971-Shepherd and Wedderburn on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf|EN010103-001971-Shepherd and Wedderburn on behalf of Teesside Gas & Liquids Processing and Teesside Gas Processing Plant Limited - Other- Affected Persons - CPO Land.pdf]]:5: Tier COMAH site, Plots 108, 103 and 106 are not an appropriate location for construction traffic [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf|EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf]]:19: hazards (COMAH) licence would be required. that information is being considered by the assigned permitting officer. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf|EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf]]:19: A COMAH licence will be applied for once the detailed design of the PCC has [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf|EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf]]:105: of their approval of any environmental permit application and COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf|EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf]]:107: part of their approval of any environmental permit application and COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf|EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf]]:108: Such studies would be undertaken to inform the COMAH licence application to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf|EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf]]:109: Document will be produced during the design process and that the HSE will be COMAH licence application once there is more certainty in the plant [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf|EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf]]:109: ii) How is its application secured through the DCO? the Other Consents and Licences document [[APP-077]], the COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf|EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf]]:109: (ii) As this MAPP is required for the COMAH licence, it is not secured [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf|EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf]]:110: pipeline crossing the PCC Site which is subject to a COMAH licence and that [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf|EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf]]:110: and make an application to revoke the COMAH licence. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf|EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf]]:110: Can STDC comment on the status of the COMAH licence and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf|EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf]]:10:Control of Major Accident Hazards Sites (COMAH) pg 34 2 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf|EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf]]:46: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf|EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf]]:46: Status: Record Ceased To Be Supplied Under COMAH Regulations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf|EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf]]:46: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf|EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf]]:60:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf|EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf]]:10:Control of Major Accident Hazards Sites (COMAH) pg 41 1 1 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf|EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf]]:53: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf|EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf]]:53: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf|EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf]]:80:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001159-NZT DCO 5.7 - Carbon Capture Readiness Assessment.pdf|EN010103-001159-NZT DCO 5.7 - Carbon Capture Readiness Assessment.pdf]]:2: COMAH Control of Major Accident Hazards Regulations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001159-NZT DCO 5.7 - Carbon Capture Readiness Assessment.pdf|EN010103-001159-NZT DCO 5.7 - Carbon Capture Readiness Assessment.pdf]]:5: Major Accident Hazard (‘COMAH’) licensing. This will be determined at the detailed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001159-NZT DCO 5.7 - Carbon Capture Readiness Assessment.pdf|EN010103-001159-NZT DCO 5.7 - Carbon Capture Readiness Assessment.pdf]]:34: Accident Hazards Regulations 1999 (as amended) (COMAH). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001159-NZT DCO 5.7 - Carbon Capture Readiness Assessment.pdf|EN010103-001159-NZT DCO 5.7 - Carbon Capture Readiness Assessment.pdf]]:35: COMAH licensing. This will be determined at the detailed design stage. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf|EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf]]:63: RCBC and STDC: COMAH classified site. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf|EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf]]:64: used to inform the subsequent COMAH application and the control [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf|EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf]]:83: • Lower tier COMAH licence (if required); [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001526-NZT-ExQ1.pdf|EN010103-001526-NZT-ExQ1.pdf]]:2:COMAH Control of Major Accidents and Hazards [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001526-NZT-ExQ1.pdf|EN010103-001526-NZT-ExQ1.pdf]]:12: and hazards (COMAH) licence would be required. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001526-NZT-ExQ1.pdf|EN010103-001526-NZT-ExQ1.pdf]]:58: the PCC Site which is subject to a COMAH licence and that the operator of this pipeline, South [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001526-NZT-ExQ1.pdf|EN010103-001526-NZT-ExQ1.pdf]]:58: steelworks Infrastructure and make an application to revoke the COMAH licence. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001526-NZT-ExQ1.pdf|EN010103-001526-NZT-ExQ1.pdf]]:58: Can STDC comment on the status of the COMAH licence and decommissioning activity, and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001844-DLA Piper UK LLP - Other- Comments on Applicants responses to ExA ExQ1, Statement of Commonality, other IP WRs and dDCO.pdf|EN010103-001844-DLA Piper UK LLP - Other- Comments on Applicants responses to ExA ExQ1, Statement of Commonality, other IP WRs and dDCO.pdf]]:8: COMAH risk assessments applicable to the apparatus and equipment in the Corridor place [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf|EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf]]:11:COMAH Control of Major Accident Hazards – Regulations to ensure that [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002267-NZT DCO 6.3.35 - ES Vol II Figure 10-9 Hazardous September 2022(D8).pdf|EN010103-002267-NZT DCO 6.3.35 - ES Vol II Figure 10-9 Hazardous September 2022(D8).pdf]]:1: COMAH Site [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf|EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf]]:13:while at the same time taking a specific, closer look • To transform and improve the working environment of 4. Ensure that, through redevelopment and inward COMAH (Control of Major Accident Hazards) Upper Tier [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf|EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf]]:45:275Kv system at Redcar, and from the underground a large network of critical industrial utility Infrastructure, maintenance costs associated with the current COMAH water drainage, and industrial water culverts. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf|EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf]]:54:Mercia Mudstone at 18-25m depth below ground, and the Steel House is in a previously landscaped area, to remove the hazardous (COMAH) materials contained. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf|EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf]]:60:COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf|EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf]]:60:substances on site as defined by the COMAH (Control (High Pressure Gas Pipeline) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf|EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf]]:60:(HSE and EA) that no viable COMAH scenarios exist to the South Gare access road, however it stops short [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf|EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf]]:60:on the site following work to reduce the COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf|EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf]]:60:The COMAH associated HSE consultation zones are [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf|EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf]]:60:Removal of other residual COMAH materials will be There will be opportunity to rationalise and exploit [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf|EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf]]:61:COMAH HSE CONSULTATION ZONES [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf|EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf]]:61: COMAH PLAN [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf|EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf]]:166:consideration of the optimal exit strategy for STDC contributing to the COMAH status. These works have now Zones, Free Trade Zones and Free Zones. The main tools [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf|EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf]]:173:basis, making Tier 3 interventions as necessary time, ultimately extending to demolition activities and addressing COMAH impacts. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf|EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf]]:111: 'Control of Major Accident Hazards' ('COMAH') Regulations 2015. These are aimed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf|EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf]]:111: safety standards under COMAH. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf|EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf]]:111:6.2.129 The Proposed Development is anticipated to be subject to the COMAH Regulations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf|EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf]]:111: assessment within an EIA, regard has been had to the COMAH Regulations and there [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf|EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf]]:113: its operation including a COMAH licence and Environmental Permit, and these [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf|EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf]]:114:6.2.140 As confirmed above, a COMAH licence application will be submitted to the HSE prior [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf|EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf]]:114: and includes the COMAH and HSC applications. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001954-Redcar and Cleveland Council - Revised Application Guide (clean and tracked versions).pdf|EN010103-001954-Redcar and Cleveland Council - Revised Application Guide (clean and tracked versions).pdf]]:2:COMAH Control of Major Accidents and Hazards [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf|EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf]]:10:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf|EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf]]:23:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000896-NZT DCO 6.2.4 ES Vol I Chapter 4 Proposed Development.pdf|EN010103-000896-NZT DCO 6.2.4 ES Vol I Chapter 4 Proposed Development.pdf]]:17: their storage, under the Control of Major Accident Hazards (COMAH) and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000896-NZT DCO 6.2.4 ES Vol I Chapter 4 Proposed Development.pdf|EN010103-000896-NZT DCO 6.2.4 ES Vol I Chapter 4 Proposed Development.pdf]]:17: Hazardous Substance Consent and COMAH regimes respectively. All [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000896-NZT DCO 6.2.4 ES Vol I Chapter 4 Proposed Development.pdf|EN010103-000896-NZT DCO 6.2.4 ES Vol I Chapter 4 Proposed Development.pdf]]:22: authority for their storage, under the COMAH and Hazardous Substance [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000896-NZT DCO 6.2.4 ES Vol I Chapter 4 Proposed Development.pdf|EN010103-000896-NZT DCO 6.2.4 ES Vol I Chapter 4 Proposed Development.pdf]]:22: potentially COMAH Regulations due to storage of hazardous materials (see [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000896-NZT DCO 6.2.4 ES Vol I Chapter 4 Proposed Development.pdf|EN010103-000896-NZT DCO 6.2.4 ES Vol I Chapter 4 Proposed Development.pdf]]:23: Development will come under lower tier COMAH as a minimum, this will be [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000896-NZT DCO 6.2.4 ES Vol I Chapter 4 Proposed Development.pdf|EN010103-000896-NZT DCO 6.2.4 ES Vol I Chapter 4 Proposed Development.pdf]]:23:4.4.23 CO2 is not currently defined as a dangerous substance under The COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf|EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf]]:4: Hazard Management Plan) will be produced during the (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf|EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf]]:11:accidents and natural disasters lower tier or upper tier COMAH licence, will be 2005 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf|EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf]]:11: (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf|EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf]]:30: the legislative requirements set out in the Control of Control of Major Accident Hazards (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf|EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf]]:30: Hazards (COMAH) Regulations (2015). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf|EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf]]:30: Regulation 9 of the COMAH Regulations) will be in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf|EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf]]:53: • If required, a COMAH licence will be applied for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf|EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf]]:53: for COMAH Licence, if required for the operational [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf|EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf]]:4:Development during the design process and the Health and Safety Executive will be consulted during the Regulations 2015 (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf|EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf]]:8:ES Chapters 4 - A Hazardous Substances Consent, and if necessary, a lower tier or upper tier COMAH licence, Hazardous Waste (England and Wales) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf|EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf]]:8: Regulations 2015 (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf|EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf]]:24:Water Resources, 14, ES Regulations (COSHH (2002) and Control of Major Accident Hazards (COMAH) Regulations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf|EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf]]:24:Assessment A site Emergency Response Plan (prepared for Regulation 9 of the COMAH Regulations) will (COMAH) Regulations (2015) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf|EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf]]:41:  If required, a COMAH licence will be applied for and held for the storage of any qualifying [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf|EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf]]:41: application for COMAH Licence, if required for the operational facility. The Construction [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001875-Redcar and Cleveland Borough Council.pdf|EN010103-001875-Redcar and Cleveland Borough Council.pdf]]:2:COMAH Control of Major Accidents and Hazards [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf|EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf]]:22:The EIA should include consideration of the COMAH Regulations (Control of Major [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf|EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf]]:10:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf|EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf]]:23:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf|EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf]]:10:Control of Major Accident Hazards Sites (COMAH) pg 64 1 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf|EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf]]:76: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf|EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf]]:95:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf|EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf]]:101: 'Control of Major Accident Hazards' ('COMAH') Regulations 2015. These are aimed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf|EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf]]:101: safety standards under COMAH. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf|EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf]]:102:6.2.127 The Proposed Development is anticipated to be subject to the COMAH Regulations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf|EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf]]:102: assessment within an EIA, regard has been had to the COMAH Regulations and there [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf|EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf]]:103: its operation including a COMAH licence and Environmental Permit, and these [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf|EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf]]:104:6.2.138 As confirmed above, a COMAH licence application will be submitted to the HSE prior [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf|EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf]]:104: and includes the COMAH and HSC applications. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf|EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf]]:11:Control of Major Accident Hazards Sites (COMAH) pg 88 3 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf|EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf]]:27: under the new Control of Major Accident Hazards Regulations (COMAH) after [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf|EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf]]:101: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf|EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf]]:101: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf|EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf]]:101: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf|EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf]]:114:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf|EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf]]:33: Control of Major Accident Hazards (COMAH) Regulations (2015) for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf|EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf]]:79: • Lower tier COMAH licence (if required); [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:2: Major Accident Hazards (COMAH) Regulations 2015 and the Environmental [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:3: assessment of matters covered by other regulatory regimes such as COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:3: COMAH Regulations. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:3:22.3.1 The COMAH Regulations (2015) define major accidents as: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:3: Hazards Regulations 2015 (COMAH), (HSE, 2015); and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:4: relating to the Control of Major Accident Hazards (COMAH) Regulations has [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:4: Environmental Risk Tolerability for COMAH Establishments (CDOIF, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:5: Tolerability for COMAH Establishments (CDOIF, 2017), which is a common [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:6: if-ALARP’ would generally require submission of a COMAH report (including [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:7:would be provided. HAZID, a HAZOP, a COMAH licence if relevant, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:7: with the Environmental Permit and COMAH licence, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:8: revoke the COMAH licence. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:8:Application of COMAH: The HSE refers to This advice provided by the HSE is noted. The [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:8:Regulation 6 and Regulation 8 of the COMAH potential need to comply with COMAH is included [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:9:Major Accident Hazards (COMAH) Regulations Development will be developed to comply with the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:11: operated under COMAH and Hazardous Substances Consents (HSC)), [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:13: be prepared to inform the application for COMAH Licence, if required for the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:13:22.5.7 As outlined previously, a COMAH Licence from the HSE and an [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:13: of the Proposed Development. It is assumed that a lower-tier COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:24: (COMAH) Regulations (HSE, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:32: COMAH installations or high acceptable and this position [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:32: includes COMAH installations be sited to prevent domino [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:32: COMAH facilities and lie within [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:33: COMAH Licence holders (see [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:40: regulated under the COMAH legislation. Consequently, they will have [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:41: with COMAH sites and operators of major pipelines in Hartlepool, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:41:22.8.5 It is a requirement of the COMAH Regulations that neighbouring upper tier [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:41: place for its operation including COMAH Licence and Environmental Permit, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:42: CDOIF (2017). Environmental Risk Tolerability for COMAH Establishments [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:43: HSE (2015). Control of Major Accident Hazards (COMAH) Regulations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:43: https://www.hse.gov.uk/comah/background/comah15.htm [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000888-NZT DCO 6.2.3 ES Vol I Chapter 3 Description of the Existing Environment.pdf|EN010103-000888-NZT DCO 6.2.3 ES Vol I Chapter 3 Description of the Existing Environment.pdf]]:12: application made to revoke the Control of Major Accident Hazards (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf|EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf]]:11:Control of Major Accident Hazards Sites (COMAH) pg 15 1 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf|EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf]]:28: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf|EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf]]:37:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:92: and Control of Major Accident Hazards (COMAH) Regulations (2015). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:92:9.7.120 A site Emergency Response Plan (prepared for Regulation 9 of the COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf|EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf]]:11:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf|EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf]]:43:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:180:COMAH BASF Plc, PO Box 62, Seal Sands, 1F317 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:180:COMAH Navigator Terminals Seal Sands Limited [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:180:COMAH Fine Organics Limited, Seal Sands, Seal Sands, 1F317 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:181:COMAH CF Fertilisers UK Limited, North Tees, 1F318 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:181:COMAH Wood Group Psn Limited, Seal Sands, 1G133 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:181:COMAH Vertellus Specialities UK Limited, Seal Sands, 1G133 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:181:COMAH Inter Terminals Seal Sands Limited, Seal Sands 1G133 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:181:COMAH Enron Power Operations Ltd, Seal Sands 1G133 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:181: Under COMAH Regulations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:182:COMAH Px (Tgpp) Limited, Teesside Gas Processing Plant, 1G133 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:182:COMAH Ineos Nitriles (UK) Limited, Seal Sands, Po 1G139 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:182:COMAH BOC BOC Limited, Tees Dock Road, Middlesbrough, 2C174 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:196:COMAH BOC Limited, Tees Dock Road, Middlesbrough, 2C174 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:197: Accident Hazards Sites (COMAH), Notification of Installations Handling [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:197: Discharge Consents, Pollution Incidents to Controlled Waters, COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:4: • Control of Major Accident Hazards (COMAH) Regulations (2015); [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:77: (COMAH) Regulations (2015). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:77:9.5.47 A site Emergency Response Plan (prepared for Regulation 9 of the COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:106: (COMAH). Sudbury: HSE Books. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:106: http://www.hse.gov.uk/comah/sragtech/techmeasspill.htm accessed January [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002588-NZT DCO 6.3.35 - ES Vol II Figure 10-9 Hazardous Nov 2022 (D12).pdf|EN010103-002588-NZT DCO 6.3.35 - ES Vol II Figure 10-9 Hazardous Nov 2022 (D12).pdf]]:1: COMAH Site [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:11:Control of Major Accident Hazards Sites (COMAH) pg 105 19 3 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:36: Details: Comah99. Organic Petro-Chemical Substance Containing Approximately 60% [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:118: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:118: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:118: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:118: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:118: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:118: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:118: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:118: Status: Record Ceased To Be Supplied Under COMAH Regulations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:118: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:118: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:118: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:119: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:119: Status: Record Ceased To Be Supplied Under COMAH Regulations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:119: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:119: Status: Record Ceased To Be Supplied Under COMAH Regulations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:119: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:119: Status: Record Ceased To Be Supplied Under COMAH Regulations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:119: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:119: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:119: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:119: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:119: Status: Record Ceased To Be Supplied Under COMAH Regulations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:119: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:119: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:119: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:120: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:120: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:120: Status: Record Ceased To Be Supplied Under COMAH Regulations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:215:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf|EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf]]:29: pipeline (ID 1), is a Major Accident Hazard or COMAH development. With [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002022-UK Health Security Agency's - Responses to the ExA's ExQ2.pdf|EN010103-002022-UK Health Security Agency's - Responses to the ExA's ExQ2.pdf]]:2:Major Accidents: Control of Major Accident Hazards Regulations 2015 (COMAH) (HSE, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002022-UK Health Security Agency's - Responses to the ExA's ExQ2.pdf|EN010103-002022-UK Health Security Agency's - Responses to the ExA's ExQ2.pdf]]:2:Tolerability for COMAH Establishments (CDOIF,2017); Chapter 4 of the Cabinet Office’s [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002022-UK Health Security Agency's - Responses to the ExA's ExQ2.pdf|EN010103-002022-UK Health Security Agency's - Responses to the ExA's ExQ2.pdf]]:2:including COMAH Licence and Environmental Permit, and these regulatory controls will [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002022-UK Health Security Agency's - Responses to the ExA's ExQ2.pdf|EN010103-002022-UK Health Security Agency's - Responses to the ExA's ExQ2.pdf]]:2:(HSE, 2021), and as the regulatory body for COMAH sites may be able to further advise on [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002022-UK Health Security Agency's - Responses to the ExA's ExQ2.pdf|EN010103-002022-UK Health Security Agency's - Responses to the ExA's ExQ2.pdf]]:2:COMAH Licence and Environmental Permit, and these regulatory controls will stipulate a [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002022-UK Health Security Agency's - Responses to the ExA's ExQ2.pdf|EN010103-002022-UK Health Security Agency's - Responses to the ExA's ExQ2.pdf]]:2:management of risks will also be assessed during the application for both the COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002022-UK Health Security Agency's - Responses to the ExA's ExQ2.pdf|EN010103-002022-UK Health Security Agency's - Responses to the ExA's ExQ2.pdf]]:3:COMAH site regulation, UKHSA will be consulted on the applicants’ proposed off-site [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf|EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf]]:3: Hazard Management Plan) will be produced during the (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf|EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf]]:10:accidents and natural disasters lower tier or upper tier COMAH licence, will be 2005 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf|EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf]]:10: (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf|EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf]]:29: the legislative requirements set out in the Control of Control of Major Accident Hazards (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf|EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf]]:29: Hazards (COMAH) Regulations (2015). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf|EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf]]:29: Regulation 9 of the COMAH Regulations) will be in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf|EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf]]:51: • If required, a COMAH licence will be applied for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf|EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf]]:51: for COMAH Licence, if required for the operational [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf|EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf]]:29: existing COMAH facilities and lie [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf|EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf]]:10:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf|EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf]]:46:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002636-NZT DCO 8.5 - EA SoCG - Final (signed) - Oct 2022 (D13).pdf|EN010103-002636-NZT DCO 8.5 - EA SoCG - Final (signed) - Oct 2022 (D13).pdf]]:10: Hazardous Substances Consent/COMAH [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001365-NZTDCO 6.3.35 Rev 2 ES Addendum Vol II Figure 10-9 Hazardous.pdf|EN010103-001365-NZTDCO 6.3.35 Rev 2 ES Addendum Vol II Figure 10-9 Hazardous.pdf]]:1: COMAH Site [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf|EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf]]:2:COMAH Control of Major Accident Hazards [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf|EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf]]:40: Accident Hazards’ (‘COMAH’) Regulations 1999. These are aimed at preventing major accidents [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000012-Scoping Opinion.pdf|EN010082-000012-Scoping Opinion.pdf]]:102:The EIA should include consideration of the COMAH Regulations (Control of Major [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000402-5.8 - Tees CCPP - Carbon Capture Readiness Statement - UPDATED - 15.05.18.pdf|EN010082-000402-5.8 - Tees CCPP - Carbon Capture Readiness Statement - UPDATED - 15.05.18.pdf]]:17: substances' under the Control of Major Accident Hazards Regulations 1999 (as amended) (COMAH). The [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000654-TEES Final Recommendation Report and Errata.pdf|EN010082-000654-TEES Final Recommendation Report and Errata.pdf]]:90: COMAH (Control of Major Accidents and Hazards Regulations 2015), as [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000654-TEES Final Recommendation Report and Errata.pdf|EN010082-000654-TEES Final Recommendation Report and Errata.pdf]]:90:4.19.3. Paragraph 15.8 of the ES states that the Project Site is within the COMAH [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf|EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf]]:28: COMAH Sites [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf|EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf]]:28:6.70 One active COMAH permit is registered within 1 km of the Project Site. This [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf|EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf]]:29: COMAH registration system. [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000214-EN010082-5.8-Carbon capture Readiness (CCR) Statement-Final-November 2017.pdf|EN010082-000214-EN010082-5.8-Carbon capture Readiness (CCR) Statement-Final-November 2017.pdf]]:17: substances’ under the Control of Major Accident Hazards Regulations 1999 (as amended) (COMAH). [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf|EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf]]:41: Hazards (COMAH) Regulations in proximity to the Project Site. The closest [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf|EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf]]:41: COMAH registered site is Ensus; their consultation zone is shown in [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf|EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf]]:44: particular safety management processes, such as COMAH, and management processes, such as COMAH, and safety zone restrictions [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000194-EN010082-6.3.4-ES Annex D1-Phase 1 Final-November 2017.pdf|EN010082-000194-EN010082-6.3.4-ES Annex D1-Phase 1 Final-November 2017.pdf]]:19:D4.2.3 COMAH Sites [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000194-EN010082-6.3.4-ES Annex D1-Phase 1 Final-November 2017.pdf|EN010082-000194-EN010082-6.3.4-ES Annex D1-Phase 1 Final-November 2017.pdf]]:19:D1.45 One active COMAH permit is registered within 1km of the Project Site. This is [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000194-EN010082-6.3.4-ES Annex D1-Phase 1 Final-November 2017.pdf|EN010082-000194-EN010082-6.3.4-ES Annex D1-Phase 1 Final-November 2017.pdf]]:19: D2, Chapter 6) is a result of inaccuracies in the COMAH registration system. [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000396-8 5 - Tees CCP - Applicant's Comments on Relevant Reps - FINAL (2).pdf|EN010082-000396-8 5 - Tees CCP - Applicant's Comments on Relevant Reps - FINAL (2).pdf]]:2:COMAH Control of Major Accident Hazards [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000396-8 5 - Tees CCP - Applicant's Comments on Relevant Reps - FINAL (2).pdf|EN010082-000396-8 5 - Tees CCP - Applicant's Comments on Relevant Reps - FINAL (2).pdf]]:13: Major Accident Hazards (COMAH) Regulations, the safety concerns would be addressed (Application Document Ref: 6.2.15). [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000396-8 5 - Tees CCP - Applicant's Comments on Relevant Reps - FINAL (2).pdf|EN010082-000396-8 5 - Tees CCP - Applicant's Comments on Relevant Reps - FINAL (2).pdf]]:14: (RSPs). In particular this consideration should be discharged under a management of Health Although the Project will not be a COMAH registered site, and therefore does not require a major accident prevention [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000396-8 5 - Tees CCP - Applicant's Comments on Relevant Reps - FINAL (2).pdf|EN010082-000396-8 5 - Tees CCP - Applicant's Comments on Relevant Reps - FINAL (2).pdf]]:14: and Safety at Work Regulations requirement to prepare a suitable and sufficient risk policy or a safety report for the operation of the power station under the COMAH regulations, it is within the [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000396-8 5 - Tees CCP - Applicant's Comments on Relevant Reps - FINAL (2).pdf|EN010082-000396-8 5 - Tees CCP - Applicant's Comments on Relevant Reps - FINAL (2).pdf]]:14: assessment for proposed activities, identifying hazards and taking appropriate measures to consultation zone of the adjacent Ensus plant (a COMAH facility). Our assessments of the risk of major accidents and [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf|EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf]]:31: Ensus, however as the Project is within a COMAH ‘consultation zone’, Ensus will be required to update their safety report and identify [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf|EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf]]:50: area possibly affected by a major accident at the Ensus facility. to Ensus a Tier 1 COMAH Site. Taking those factors into consideration then the areas where there are the highest concentration of [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf|EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf]]:72: the event of an accident or other Accident Hazards (COMAH) Regulations. Hazardous Substances Consent is [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf|EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf]]:86: these Consultation distances. The Applicant should limit set by the COMAH Regulations. The same applies [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000401-5.4 - Tees CCPP - Other Consents Licences - UPDATED - 10.05.18.pdf|EN010082-000401-5.4 - Tees CCPP - Other Consents Licences - UPDATED - 10.05.18.pdf]]:2:COMAH Control of Major Accident Hazards [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000401-5.4 - Tees CCPP - Other Consents Licences - UPDATED - 10.05.18.pdf|EN010082-000401-5.4 - Tees CCPP - Other Consents Licences - UPDATED - 10.05.18.pdf]]:6: Tier Control of Major Accident Hazards (‘COMAH’) licence are not required. Consents or licenses [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf|EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf]]:7:Control of Major Accident Hazards Sites (COMAH) pg 46 2 [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf|EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf]]:55: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf|EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf]]:55: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf|EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf]]:55: Status: Record Ceased To Be Supplied Under COMAH Regulations [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf|EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf]]:87:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf|EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf]]:90: COMAH (Control of Major Accidents and Hazards Regulations 2015), as [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf|EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf]]:90:4.19.3. Paragraph 15.8 of the ES states that the Project Site is within the COMAH [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:3: Accidents Hazard Regulations 2015 (as amended) ( ’COMAH Regulations’) for [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:4: a lower tier COMAH site. The natural gas is used almost as soon as it comes [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:4:15.7 COMAH does not apply as the natural gas pipeline and associated equipment [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:4: are not defined as storage under COMAH; only the Pipeline Safety [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:4: Regulations (1996) apply. The Project will therefore not be a COMAH [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:4: a safety report for the operation of the power station under the COMAH [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:8:Public Health The EIA should include consideration of the COMAH Regulations (Control of Major Accident Hazards). COMAH regulations [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:13: The Control of Major Accident Hazards Regulations 2015 (COMAH) [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:13:15.22 COMAH Regulations 2015 and subsequent amendments included within the [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:13:15.23 The COMAH Regulations 2015 implement the majority of the Seveso III [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:13: (1) ‘Major Accident’ is defined in the UK by the COMAH Regulation 2015; see section 15.3. [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:14: Control of Major Hazards Accident Regulations 2015 (COMAH) which define [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:15: Major Accident The COMAH 2015 regulations define a ‘major accident’ as an [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:15: • COMAH facilities within the Wilton International Site; [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:17: Hazards (COMAH) Regulations in proximity to the Project Site. The closest [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:17: COMAH registered site is Ensus; their consultation zone is shown in Figure [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:17: 15.1. Additionally other COMAH facilities have been identified and their [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:18:Figure 15.2 COMAH Facilities Consultation Zones Identified in the Study Area [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:25: Affected by nearby COMAH Operational personnel Injury or fatality to member Ensus is only COMAH plant COMAH case for Ensus will [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000219-EN010082-5.4-Other Consents and Licences-Final-November 2017.pdf|EN010082-000219-EN010082-5.4-Other Consents and Licences-Final-November 2017.pdf]]:2:COMAH Control of Major Accident Hazards [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000219-EN010082-5.4-Other Consents and Licences-Final-November 2017.pdf|EN010082-000219-EN010082-5.4-Other Consents and Licences-Final-November 2017.pdf]]:6: or a Lower Tier Control of Major Accident Hazards (‘COMAH’) licence are not required. Consents or [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000501-8.9 - Tees CCPP - Abbreviation List.pdf|EN010082-000501-8.9 - Tees CCPP - Abbreviation List.pdf]]:3: COMAH Control of Major Accident Hazard Regulations [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000501-8.9 - Tees CCPP - Abbreviation List.pdf|EN010082-000501-8.9 - Tees CCPP - Abbreviation List.pdf]]:3: COMAH Control of Major Accident Hazards [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf|EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf]]:107:which necessitate particular safety management processes, such as COMAH, [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf|EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf]]:130: COMAH Control of Major Accident Hazards [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf|EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf]]:104:The EIA should include consideration of the COMAH Regulations (Control of Major [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf|EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf]]:90: COMAH (Control of Major Accidents and Hazards Regulations 2015), as [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf|EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf]]:90:4.19.3. Paragraph 15.8 of the ES states that the Project Site is within the COMAH [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000019-Scoping Report.pdf|EN010082-000019-Scoping Report.pdf]]:105:which necessitate particular safety management processes, such as COMAH, [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000019-Scoping Report.pdf|EN010082-000019-Scoping Report.pdf]]:128: COMAH Control of Major Accident Hazards [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf|EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf]]:90: COMAH (Control of Major Accidents and Hazards Regulations 2015), as [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf|EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf]]:90:4.19.3. Paragraph 15.8 of the ES states that the Project Site is within the COMAH [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000596-5.4 - Tees CCPP - Other Consents & Licences - Rev 3 - FINAL.pdf|EN010082-000596-5.4 - Tees CCPP - Other Consents & Licences - Rev 3 - FINAL.pdf]]:2:COMAH Control of Major Accident Hazards [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000596-5.4 - Tees CCPP - Other Consents & Licences - Rev 3 - FINAL.pdf|EN010082-000596-5.4 - Tees CCPP - Other Consents & Licences - Rev 3 - FINAL.pdf]]:6: Tier Control of Major Accident Hazards (‘COMAH’) licence are not required. Consents or licenses [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:20: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:20:3.4.2 SSI UK Ltd and Corus UK Ltd are both located adjacent to the site, and are both COMAH sites. The [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:20: entire Wilton International site (Sembcorp) to the east is also classified as a COMAH site. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:44: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:105:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:128: Control of Major Accident Hazards Sites (COMAH) pg 41 2 [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:170: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:170: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:181:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:204: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:220:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:244: Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:253:Control of Major Accident Hazards Sites (COMAH) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf|TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf]]:113:The EIA should include consideration of the COMAH Regulations (Control of Major [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000689-York Potash Ltd (4).pdf|TR030002-000689-York Potash Ltd (4).pdf]]:8: one open gate). Also COMAH requirements require at least incorporated into the revised protective provisions for the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000689-York Potash Ltd (4).pdf|TR030002-000689-York Potash Ltd (4).pdf]]:13: i. COMAH requirements (such as the need to maintain [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000291-151123 TR030002 Explanatory note for Risk Assessment of the interaction of York Potash & CATS pipeline.pdf|TR030002-000291-151123 TR030002 Explanatory note for Risk Assessment of the interaction of York Potash & CATS pipeline.pdf]]:4:Control of Major Accident Hazards Regulations (COMAH) 2015(4) (regulations 5(1) and 5(2)) requires [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000291-151123 TR030002 Explanatory note for Risk Assessment of the interaction of York Potash & CATS pipeline.pdf|TR030002-000291-151123 TR030002 Explanatory note for Risk Assessment of the interaction of York Potash & CATS pipeline.pdf]]:8:reference to the principle of risk reduction and tolerability within the COMAH Regulations, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf|TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf]]:53: substantial. Further, as YP is aware, both SSI and Tata Steel UK operate Control of Major Accident Hazards (COMAH) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf|TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf]]:53: sites at Teesside. As such, the YP proposals must be such as to ensure that SSI’s regulatory obligations as a COMAH site [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf|TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf]]:56: Steel and SSI UK operate Control of Major Accident Hazards (COMAH) sites at Teesside. Tata Steel would wish to ensure [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf|TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf]]:56: that its regulatory obligations as a COMAH site are not unduly affected by the proposed York Potash proposals. Tata Steel [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:75: (COMAH), 2015(4) (Regulations 5(1) and 5(2))’ requires the operator [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:76: My understanding of the application of the COMAH Regulations is that [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:128: site and, because the steelworks are top-tier COMAH site, there would [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:143: Regulations (COMAH), 2015(4) (Regulations 5(1) and 5(2))’ requires [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:144: the principle of risk reduction and tolerability within the COMAH [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:213: COMAH Control of Major Accident Hazards Regulations [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000870-151216 TR030002 CATS Parties - Statement of difference and Young Lady Report.pdf.pdf:12: http://www.hse.gov.uk/comah/buncefield/fuel-storage-sites.pdf|fuel-storage-sites.pdf]] [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000739-TATA Steel UK Limited and Others.pdf|TR030002-000739-TATA Steel UK Limited and Others.pdf]]:3:1.5 The land has a top-tier COMAH designation. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000739-TATA Steel UK Limited and Others.pdf|TR030002-000739-TATA Steel UK Limited and Others.pdf]]:5:1.18 Being a top-tier COMAH site, YPL access would either require: [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000739-TATA Steel UK Limited and Others.pdf|TR030002-000739-TATA Steel UK Limited and Others.pdf]]:10:2.17 The relevant land is comprised in a top-tier COMAH designation. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000739-TATA Steel UK Limited and Others.pdf|TR030002-000739-TATA Steel UK Limited and Others.pdf]]:12: Sembcorp corridor. Bridge 22 passes over the Sembcorp corridor. This is a top-tier COMAH [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000739-TATA Steel UK Limited and Others.pdf|TR030002-000739-TATA Steel UK Limited and Others.pdf]]:14:2.58 As well as site security implications, due to the Site being a top-tier COMAH site this would [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf|TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf]]:2: which would leave only one open gate). Also COMAH requirements [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf|TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf]]:5: i. COMAH requirements (such as the need to maintain [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf|TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf]]:2: which would leave only one open gate). Also COMAH requirements [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf|TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf]]:5: i. COMAH requirements (such as the need to maintain [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf|TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf]]:111:The EIA should include consideration of the COMAH Regulations (Control of Major [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf|TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf]]:2: which would leave only one open gate). Also COMAH requirements [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf|TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf]]:5: i. COMAH requirements (such as the need to maintain [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:13:while at the same time taking a specific, closer look • To transform and improve the working environment of 4. Ensure that, through redevelopment and inward COMAH (Control of Major Accident Hazards) Upper Tier [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:45:275Kv system at Redcar, and from the underground a large network of critical industrial utility Infrastructure, maintenance costs associated with the current COMAH water drainage, and industrial water culverts. [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:54:Mercia Mudstone at 18-25m depth below ground, and the Steel House is in a previously landscaped area, to remove the hazardous (COMAH) materials contained. [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:60:COMAH [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:60:substances on site as defined by the COMAH (Control (High Pressure Gas Pipeline) [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:60:(HSE and EA) that no viable COMAH scenarios exist to the South Gare access road, however it stops short [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:60:on the site following work to reduce the COMAH [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:60:The COMAH associated HSE consultation zones are [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:60:Removal of other residual COMAH materials will be There will be opportunity to rationalise and exploit [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:61:COMAH HSE CONSULTATION ZONES [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:61: COMAH PLAN [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:166:consideration of the optimal exit strategy for STDC contributing to the COMAH status. These works have now Zones, Free Trade Zones and Free Zones. The main tools [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:173:basis, making Tier 3 interventions as necessary time, ultimately extending to demolition activities and addressing COMAH impacts. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:138: COMAH Control of Major Accident Hazards [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:147:Major Accident Hazards (COMAH) sites along the river. Pilotage is compulsory for all vessels carrying [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:149: • Proximity of the Project to vessels operating to and from high COMAH sites and carrying [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:190: COMAH site evacuation operations or [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:190: COMAH local evacuation [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:190: COMAH major area evacuation [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:198: COMAH sites. Navigator marine terminals and SABIC. On the south side [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:198: immediately adjacent is SABIC Teesport a lower tier COMAH site. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:198: high level COMAH site. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:198: COMAH sites in the event of a COMAH release (aware that Port [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:198: COMAH sites in the event of a COMAH release. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:200: COMAH Incidents [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:200: • Covered in the PD Port’s Emergency plan, COMAH berth [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:207: Traffic control failure. (COMAH); Adverse [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:207: declared but criteria not release (COMAH); Adverse [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:208: Project Project Cargo release (COMAH); Adverse [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:217: Tanker aground declared but criteria not (COMAH); Adverse [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:223: declared but criteria not small gas release (COMAH); Adverse [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:223: declared but criteria not (COMAH); Adverse international [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:224: Project small gas release (COMAH); Adverse [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:233: Tanker aground declared but criteria not (COMAH); Adverse international [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:239: operations. Traffic control gas release (COMAH); Adverse international [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:239: Tier 1 may be declared but gas release (COMAH); Adverse international [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:240: Project Cargo move party vessel / dredging criteria not necessarily met; gas release (COMAH); Adverse international [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:249: Tanker aground Result of avoiding action release (COMAH); Adverse international [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: Tanker Tanker gas release (COMAH); Adverse [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: visibility. Fire and criteria not necessarily met; (COMAH); Adverse international publicity. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: Cargo move (COMAH); Adverse international publicity. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:263: Tanker aground Reduced visibility. Result declared but criteria not release (COMAH); Adverse international [[this>Teesworks/Planning/R-2021-1096-CD/R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0102-A1-C01-South_Bank_Long_Section_Sheet_2_of_4.pdf|R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0102-A1-C01-South_Bank_Long_Section_Sheet_2_of_4.pdf]]:1: 5.00 1:750 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2021-1096-CD/R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0101-A1-C01-South_Bank_Long_Section_Sheet_1_of_4.pdf|R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0101-A1-C01-South_Bank_Long_Section_Sheet_1_of_4.pdf]]:1: 7.00 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2021-1096-CD/R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0203-A1-C02-South_Bank_Cross_Sections_Sheet_3_of_3.pdf|R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0203-A1-C02-South_Bank_Cross_Sections_Sheet_3_of_3.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2021-1096-CD/R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0103-A1-C01-South_Bank_Long_Section_Sheet_3_of_4.pdf|R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0103-A1-C01-South_Bank_Long_Section_Sheet_3_of_4.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2021-1096-CD/R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0303-A1-C01-South_Bank_Details_Sheet_3_of_4.pdf|R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0303-A1-C01-South_Bank_Details_Sheet_3_of_4.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2021-1096-CD/R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0302-A1-C02-South_Bank_Details_Sheet_2_of_4.pdf|R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0302-A1-C02-South_Bank_Details_Sheet_2_of_4.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2021-1096-CD/R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0201-A1-C01-South_Bank_Cross_Sections_Sheet_1_of_3.pdf|R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0201-A1-C01-South_Bank_Cross_Sections_Sheet_1_of_3.pdf]]:1:11.00 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2021-1096-CD/R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0104-A1-C01-South_Bank_Long_Section_Sheet_4_of_4.pdf|R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0104-A1-C01-South_Bank_Long_Section_Sheet_4_of_4.pdf]]:1: 6.00 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2021-1096-CD/R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0301-A1-C01-South_Bank_Details_Sheet_1_of_4.pdf|R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0301-A1-C01-South_Bank_Details_Sheet_1_of_4.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2021-1096-CD/R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0001-A1-C02-South_Bank_Key_Plan.pdf|R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0001-A1-C02-South_Bank_Key_Plan.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2021-1096-CD/R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0003-A1-C02-South_Bank_General_Arrangement_High_Tip_North.pdf|R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0003-A1-C02-South_Bank_General_Arrangement_High_Tip_North.pdf]]:1: TO FACILITATE INSPECTION AND 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2021-1096-CD/R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0202-A1-C02-South_Bank_Cross_Sections_Sheet_2_of_3.pdf|R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0202-A1-C02-South_Bank_Cross_Sections_Sheet_2_of_3.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2021-1096-CD/R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0002-A1-C02-South_Bank_General_Arrangement_High_Tip_West.pdf|R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0002-A1-C02-South_Bank_General_Arrangement_High_Tip_West.pdf]]:1: TW-SIZ-XX-JBAU-SB-00-DR-C-0301 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2021-1096-CD/R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0304-A1-C01-South_Bank_Details_Sheet_4_of_4.pdf|R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0304-A1-C01-South_Bank_Details_Sheet_4_of_4.pdf]]:1:DESIGNED BY OTHERS DESIGNED BY OTHERS 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2021-1096-CD/R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0004-A1-C02-South_Bank_General_Arrangement_Inner_Tidal_Channel.pdf|R-2021-1096-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0004-A1-C02-South_Bank_General_Arrangement_Inner_Tidal_Channel.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0515-CD/R-2022-0515-CD-R 2020 0357 OOM Decision Notice.pdf|R-2022-0515-CD-R 2020 0357 OOM Decision Notice.pdf]]:7:19. Parts of the site currently lie within COMAH inner consultation zones. Prior to [[this>Teesworks/Planning/R-2022-0515-CD/R-2022-0515-CD-R 2020 0357 OOM Decision Notice.pdf|R-2022-0515-CD-R 2020 0357 OOM Decision Notice.pdf]]:7: discussions must be undertaken with the HSE to establish any COMAH [[this>Teesworks/Planning/MLA_2022_00248/Additional Documents/CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:42: Specific pollutants The site is currently a COMAH site and heavily Yes [[this>Teesworks/Planning/MLA_2022_00248/Additional Documents/CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:45: contaminated COMAH site to ensure contaminated [[this>Teesworks/Planning/MLA_2022_00248/Additional Documents/CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:46: vigilance due to constructing on a COMAH site. Therefore [[this>Teesworks/Planning/MLA_2022_00248/Additional Documents/CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:47: a COMAH site, additional care will be necessary to ensure [[this>Teesworks/Planning/MLA_2022_00248/Additional Documents/CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:47: a COMAH site, additional care will be necessary to ensure [[this>Teesworks/Planning/MLA_2022_00248/Additional Documents/CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:52: Specific Direct The site is currently a COMAH site and heavily contaminated [[this>Teesworks/Planning/MLA_2022_00248/Additional Documents/CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:53: contaminated COMAH site to ensure contaminated land [[this>Teesworks/Planning/MLA_2022_00248/Additional Documents/CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:56: contaminated COMAH site to ensure contaminated [[this>Teesworks/Planning/R-2021-0422-CD/R-2021-0422-CD-Decision Notice (1).pdf|R-2021-0422-CD-Decision Notice (1).pdf]]:7:19. Parts of the site currently lie within COMAH inner consultation zones. Prior to [[this>Teesworks/Planning/R-2021-0422-CD/R-2021-0422-CD-Decision Notice (1).pdf|R-2021-0422-CD-Decision Notice (1).pdf]]:7: discussions must be undertaken with the HSE to establish any COMAH [[this>Teesworks/Planning/R-2021-0610-PND/R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf|R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf]]:6:A Process Hazard Review (PHR) will be carried out to assess the risks associated with remaining COMAH dangerous and hazardous substances on [[this>Teesworks/Planning/R-2021-0610-PND/R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf|R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf]]:11:Keltbray Decommissioning has recently completed demolition and site clearance on a live Teesside COMAH Petrochemical Plant. [[this>Teesworks/Planning/R-2021-0610-PND/R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf|R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf]]:12:Keltbray Decommissioning has recently completed demolition and site clearance on a live Teesside COMAH Petrochemical Plant. [[this>Teesworks/Planning/R-2022-0049-CD/R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0100-S3-P01-Knitting_Wife_Long_Sections_Sheet_1_of_4.pdf|R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0100-S3-P01-Knitting_Wife_Long_Sections_Sheet_1_of_4.pdf]]:1: COMAH site [[this>Teesworks/Planning/R-2022-0049-CD/R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0100-S3-P01-Knitting_Wife_Long_Sections_Sheet_1_of_4.pdf|R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0100-S3-P01-Knitting_Wife_Long_Sections_Sheet_1_of_4.pdf]]:1: COMAH site [[this>Teesworks/Planning/R-2022-0049-CD/R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0100-S3-P01-Knitting_Wife_Long_Sections_Sheet_1_of_4.pdf|R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0100-S3-P01-Knitting_Wife_Long_Sections_Sheet_1_of_4.pdf]]:1: COMAH site [[this>Teesworks/Planning/R-2022-0049-CD/R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0200-S3-P01-Knitting_Wife_Cross_Sections_Sheet_1_of_3.pdf|R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0200-S3-P01-Knitting_Wife_Cross_Sections_Sheet_1_of_3.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0049-CD/R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0102-S3-P01-Knitting_Wife_Long_Sections_Sheet_3_of_4.pdf|R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0102-S3-P01-Knitting_Wife_Long_Sections_Sheet_3_of_4.pdf]]:1: COMAH site [[this>Teesworks/Planning/R-2022-0049-CD/R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0102-S3-P01-Knitting_Wife_Long_Sections_Sheet_3_of_4.pdf|R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0102-S3-P01-Knitting_Wife_Long_Sections_Sheet_3_of_4.pdf]]:1: COMAH site [[this>Teesworks/Planning/R-2022-0049-CD/R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0102-S3-P01-Knitting_Wife_Long_Sections_Sheet_3_of_4.pdf|R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0102-S3-P01-Knitting_Wife_Long_Sections_Sheet_3_of_4.pdf]]:1: COMAH site [[this>Teesworks/Planning/R-2022-0049-CD/R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-HB-DR-C-0300-S3-P01-Holme_Beck_Details_Sheet_1_of_2.pdf|R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-HB-DR-C-0300-S3-P01-Holme_Beck_Details_Sheet_1_of_2.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0049-CD/R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0101-S3-P01-Knitting_Wife_Long_Sections_Sheet_2_of_4.pdf|R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0101-S3-P01-Knitting_Wife_Long_Sections_Sheet_2_of_4.pdf]]:1: COMAH site [[this>Teesworks/Planning/R-2022-0049-CD/R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0101-S3-P01-Knitting_Wife_Long_Sections_Sheet_2_of_4.pdf|R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0101-S3-P01-Knitting_Wife_Long_Sections_Sheet_2_of_4.pdf]]:1: COMAH site [[this>Teesworks/Planning/R-2022-0049-CD/R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0101-S3-P01-Knitting_Wife_Long_Sections_Sheet_2_of_4.pdf|R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0101-S3-P01-Knitting_Wife_Long_Sections_Sheet_2_of_4.pdf]]:1: COMAH site [[this>Teesworks/Planning/R-2022-0049-CD/R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-00-DR-C-0001-S3-P01-Key_Plan.pdf|R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-00-DR-C-0001-S3-P01-Key_Plan.pdf]]:1: SB 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0049-CD/R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0003-S3-P01-Knitting_Wife_Beck_Northern_Reach_GA.pdf|R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0003-S3-P01-Knitting_Wife_Beck_Northern_Reach_GA.pdf]]:1: PRECAST HEADWALL UNIT 78m LONG 2.7m x 1.5m CONCRETE 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0049-CD/R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0202-S3-P01-Knitting_Wife_Cross_Sections_Sheet_3_of_3.pdf|R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0202-S3-P01-Knitting_Wife_Cross_Sections_Sheet_3_of_3.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0049-CD/R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0201-S3-P01-Knitting_Wife_Cross_Sections_Sheet_2_of_3.pdf|R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0201-S3-P01-Knitting_Wife_Cross_Sections_Sheet_2_of_3.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0049-CD/R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0002-S3-P01-Knitting_Wife_Beck_Eastern_Reach_GA.pdf|R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0002-S3-P01-Knitting_Wife_Beck_Eastern_Reach_GA.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0049-CD/R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0103-S3-P01-Knitting_Wife_Long_Sections_Sheet_4_of_4.pdf|R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-KW-DR-C-0103-S3-P01-Knitting_Wife_Long_Sections_Sheet_4_of_4.pdf]]:1: UNIT WITH HANDRAIL 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0049-CD/R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-HB-DR-C-0301-S3-P01-Holme_Beck_Details_Sheet_2_of_2.pdf|R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-HB-DR-C-0301-S3-P01-Holme_Beck_Details_Sheet_2_of_2.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0049-CD/R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-HB-DR-C-0100-S3-P01-Holme_Beck_Sections.pdf|R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-HB-DR-C-0100-S3-P01-Holme_Beck_Sections.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0049-CD/R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-HB-DR-C-0002-S3-P01-Holme_Beck_GA.pdf|R-2022-0049-CD-TW-SIZ-XX-JBAU-DP-HB-DR-C-0002-S3-P01-Holme_Beck_GA.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0231-FF/R-2022-0231-FF-TW-SIZ-XX-JBAU-SB-00-DR-C-0001-A1-C02-South_Bank_Key_Plan.pdf|R-2022-0231-FF-TW-SIZ-XX-JBAU-SB-00-DR-C-0001-A1-C02-South_Bank_Key_Plan.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0231-FF/R-2022-0231-FF-TW-SIZ-XX-JBAU-SB-00-DR-C-0004-A1-C03-South_Bank_General_Arrangement_Inter_Tidal_Channel.pdf|R-2022-0231-FF-TW-SIZ-XX-JBAU-SB-00-DR-C-0004-A1-C03-South_Bank_General_Arrangement_Inter_Tidal_Channel.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0231-FF/R-2022-0231-FF-TW-SIZ-XX-JBAU-SB-00-DR-C-0104-A1-C01-South_Bank_Long_Section_Sheet_4_of_4.pdf|R-2022-0231-FF-TW-SIZ-XX-JBAU-SB-00-DR-C-0104-A1-C01-South_Bank_Long_Section_Sheet_4_of_4.pdf]]:1: 6.00 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-R 2020 0357 OOM Decision Notice.pdf|R-2022-0342-CD-R 2020 0357 OOM Decision Notice.pdf]]:7:19. Parts of the site currently lie within COMAH inner consultation zones. Prior to [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-R 2020 0357 OOM Decision Notice.pdf|R-2022-0342-CD-R 2020 0357 OOM Decision Notice.pdf]]:7: discussions must be undertaken with the HSE to establish any COMAH [[this>Teesworks/Planning/R-2023-0246-RMM/R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf|R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf]]:32:Oven Gas Main does run through the site and forms part of the COMAH [[this>Teesworks/Planning/R-2022-0354-CD/R-2022-0354-CD-R 2020 0357 OOM Decision Notice.pdf|R-2022-0354-CD-R 2020 0357 OOM Decision Notice.pdf]]:7:19. Parts of the site currently lie within COMAH inner consultation zones. Prior to [[this>Teesworks/Planning/R-2022-0354-CD/R-2022-0354-CD-R 2020 0357 OOM Decision Notice.pdf|R-2022-0354-CD-R 2020 0357 OOM Decision Notice.pdf]]:7: discussions must be undertaken with the HSE to establish any COMAH [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:8: COMAH Control of Major Accident Hazards [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:17:Major Accident Hazards (COMAH) sites along the river. Pilotage is compulsory for all vessels carrying [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:19: • Proximity of the Project to vessels operating to and from high COMAH sites and carrying [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:60: COMAH site evacuation operations or [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:60: COMAH local evacuation [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:60: COMAH major area evacuation [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:68: COMAH sites. Navigator marine terminals and SABIC. On the south side [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:68: immediately adjacent is SABIC Teesport a lower tier COMAH site. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:68: high level COMAH site. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:68: COMAH sites in the event of a COMAH release (aware that Port [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:68: COMAH sites in the event of a COMAH release. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:70: COMAH Incidents [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:70: • Covered in the PD Port’s Emergency plan, COMAH berth [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:77: Traffic control failure. (COMAH); Adverse [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:77: declared but criteria not release (COMAH); Adverse [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:78: Project Project Cargo release (COMAH); Adverse [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:87: Tanker aground declared but criteria not (COMAH); Adverse [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:93: declared but criteria not small gas release (COMAH); Adverse [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:93: declared but criteria not (COMAH); Adverse international [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:94: Project small gas release (COMAH); Adverse [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:103: Tanker aground declared but criteria not (COMAH); Adverse international [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:109: operations. Traffic control gas release (COMAH); Adverse international [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:109: Tier 1 may be declared but gas release (COMAH); Adverse international [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:110: Project Cargo move party vessel / dredging criteria not necessarily met; gas release (COMAH); Adverse international [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:119: Tanker aground Result of avoiding action release (COMAH); Adverse international [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: Tanker Tanker gas release (COMAH); Adverse [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: visibility. Fire and criteria not necessarily met; (COMAH); Adverse international publicity. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: Cargo move (COMAH); Adverse international publicity. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:133: Tanker aground Reduced visibility. Result declared but criteria not release (COMAH); Adverse international [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF]]:10: 2.2 Records of COMAH and NIHHS sites 3 0 0 2 [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF]]:67: Records of COMAH & NIHHS sites within 500m of the study site: 5 [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF]]:67: The following COMAH & NIHHS Authorisation records provided by the Health and Safety Executive are [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF]]:67: Steel Sahaviriya Steel Industries Uk Limited, Historical COMAH COMAH Upper [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF]]:67: COMAH Upper [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF]]:67: 272K 0 On Site Site Company Steel House, Trunk Road, Redcar, Current COMAH Site [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF]]:67: COMAH Upper [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix D1 Enviro Insight Report.PDF]]:67: 274L 500 S Petrochemical Manufacturing, Olefins Offices, Po Box 99, Current COMAH Site [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF]]:10: 2.2 Records of COMAH and NIHHS sites 2 0 5 0 [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF]]:44: Records of COMAH & NIHHS sites within 500m of the study site: 7 [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF]]:44: The following COMAH & NIHHS Authorisation records provided by the Health and Safety Executive are [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF]]:44: Steel Sahaviriya Steel Industries Uk Limited, Historical COMAH COMAH Upper [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF]]:44: COMAH Upper [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF]]:44: 67K 0 On Site Site Company Steel House, Trunk Road, Redcar, Current COMAH Site [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF]]:44: COMAH Upper [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF]]:44: 69L 92 SE Petrochemical Manufacturing, Olefins Offices, Po Box 99, Current COMAH Site [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF]]:44: COMAH Upper [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF]]:44: 70L 92 SE Petrochemical Grangetown, Teesport Storage, Current COMAH Site [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF]]:44: Ensus Uk COMAH Upper [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF]]:44: 71 244 SE Wilton International, Middlesbrough, Current COMAH Site [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF]]:45: COMAH Upper [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF|R-2019-0427-FFM-1 Appendix C1 Enviro Insight Report.PDF]]:45: 72 247 SE Polyurethanes Polyurethanes Area, Po Box 54, Current COMAH Site [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:46: Sites handling 2 7 One current COMAH Upper Tier Operator, South Tees Site Company Limited, that has [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:46: hazardous or taken over from the previous COMAH Upper Tier operator, SSI UK Limited. [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:46: COMAH or NIHHS) [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:60: Sites handling 3 3 Three COMAH & NIHHS sites within the area: [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:60: (inc COMAH or Operational Status: Historical NIHHS Site [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:60: Operational Status: Historical COMAH Site [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:60: Tier: COMAH Upper Tier Operator [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:60: Operational Status: Current COMAH Site [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:60: Tier: COMAH Upper Tier Operator [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:75: The site held a COMAH upper tier establishment classification associated with PAH in the Coke [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-R 2019 0427 FFM 8 8 2019.pdf|R-2019-0427-FFM-R 2019 0427 FFM 8 8 2019.pdf]]:2: COMAH upper tier establishment. The operator of the COMAH establishment is [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-R 2019 0427 FFM 8 8 2019.pdf|R-2019-0427-FFM-R 2019 0427 FFM 8 8 2019.pdf]]:2: that the site is no longer subject to the COMAH regulations. These [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:44: Sites handling 2 7 One current COMAH Upper Tier Operator, South Tees Site Company Limited, that has [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:44: hazardous or taken over from the previous COMAH Upper Tier operator, SSI UK Limited. [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:44: COMAH or NIHHS) [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:58: Sites handling 3 3 Three COMAH & NIHHS sites within the area: [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:58: (inc COMAH or Operational Status: Historical NIHHS Site [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:58: Operational Status: Historical COMAH Site [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:58: Tier: COMAH Upper Tier Operator [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:58: Operational Status: Current COMAH Site [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:58: Tier: COMAH Upper Tier Operator [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:73: The site held a COMAH upper tier establishment classification associated with PAH in the Coke [[this>Teesworks/Planning/R-2021-0473-ESM/R-2021-0473-ESM-Officer Report 0473.pdf|R-2021-0473-ESM-Officer Report 0473.pdf]]:11:be on the outline approval that limits development within COMAH inner [[this>Teesworks/Planning/R-2021-0676-FF/R-2021-0676-FF-ASQUITH R.pdf|R-2021-0676-FF-ASQUITH R.pdf]]:5:BOC’s operational site is also subject to Control of Major Accident Hazards (COMAH) [[this>Teesworks/Planning/R-2021-0624-NM/R-2021-0624-NM-Decision Notice 0357.pdf|R-2021-0624-NM-Decision Notice 0357.pdf]]:7:19. Parts of the site currently lie within COMAH inner consultation zones. Prior to [[this>Teesworks/Planning/R-2021-0624-NM/R-2021-0624-NM-Decision Notice 0357.pdf|R-2021-0624-NM-Decision Notice 0357.pdf]]:7: discussions must be undertaken with the HSE to establish any COMAH [[this>Teesworks/Planning/R-2022-0186-CD/R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0301-A1-C01-South_Bank_Details_Sheet_1_of_4.pdf|R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0301-A1-C01-South_Bank_Details_Sheet_1_of_4.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0186-CD/R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0303-A1-C01-South_Bank_Details_Sheet_3_of_4.pdf|R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0303-A1-C01-South_Bank_Details_Sheet_3_of_4.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0186-CD/R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0003-A1-C02-South_Bank_General_Arrangement_High_Tip_North.pdf|R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0003-A1-C02-South_Bank_General_Arrangement_High_Tip_North.pdf]]:1: TO FACILITATE INSPECTION AND 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0186-CD/R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0203-A1-C02-South_Bank_Cross_Sections_Sheet_3_of_3.pdf|R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0203-A1-C02-South_Bank_Cross_Sections_Sheet_3_of_3.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0186-CD/R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0103-A1-C01-South_Bank_Long_Section_Sheet_3_of_4.pdf|R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0103-A1-C01-South_Bank_Long_Section_Sheet_3_of_4.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0186-CD/R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0104-A1-C01-South_Bank_Long_Section_Sheet_4_of_4.pdf|R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0104-A1-C01-South_Bank_Long_Section_Sheet_4_of_4.pdf]]:1: 6.00 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0186-CD/R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0302-A1-C02-South_Bank_Details_Sheet_2_of_4.pdf|R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0302-A1-C02-South_Bank_Details_Sheet_2_of_4.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0186-CD/R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0304-A1-C01-South_Bank_Details_Sheet_4_of_4.pdf|R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0304-A1-C01-South_Bank_Details_Sheet_4_of_4.pdf]]:1:DESIGNED BY OTHERS DESIGNED BY OTHERS 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0186-CD/R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0202-A1-C02-South_Bank_Cross_Sections_Sheet_2_of_3.pdf|R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0202-A1-C02-South_Bank_Cross_Sections_Sheet_2_of_3.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0186-CD/R-2022-0186-CD-R 2020 0357 OOM Decision Notice.pdf|R-2022-0186-CD-R 2020 0357 OOM Decision Notice.pdf]]:7:19. Parts of the site currently lie within COMAH inner consultation zones. Prior to [[this>Teesworks/Planning/R-2022-0186-CD/R-2022-0186-CD-R 2020 0357 OOM Decision Notice.pdf|R-2022-0186-CD-R 2020 0357 OOM Decision Notice.pdf]]:7: discussions must be undertaken with the HSE to establish any COMAH [[this>Teesworks/Planning/R-2022-0186-CD/R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0201-A1-C01-South_Bank_Cross_Sections_Sheet_1_of_3.pdf|R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0201-A1-C01-South_Bank_Cross_Sections_Sheet_1_of_3.pdf]]:1:11.00 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0186-CD/R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0004-A1-C02-South_Bank_General_Arrangement_Inner_Tidal_Channel.pdf|R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0004-A1-C02-South_Bank_General_Arrangement_Inner_Tidal_Channel.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0186-CD/R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0001-A1-C02-South_Bank_Key_Plan.pdf|R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0001-A1-C02-South_Bank_Key_Plan.pdf]]:1: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0186-CD/R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0101-A1-C01-South_Bank_Long_Section_Sheet_1_of_4.pdf|R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0101-A1-C01-South_Bank_Long_Section_Sheet_1_of_4.pdf]]:1: 7.00 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0186-CD/R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0002-A1-C02-South_Bank_General_Arrangement_High_Tip_West.pdf|R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0002-A1-C02-South_Bank_General_Arrangement_High_Tip_West.pdf]]:1: TW-SIZ-XX-JBAU-SB-00-DR-C-0301 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0186-CD/R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0102-A1-C01-South_Bank_Long_Section_Sheet_2_of_4.pdf|R-2022-0186-CD-TW-SIZ-XX-JBAU-SB-00-DR-C-0102-A1-C01-South_Bank_Long_Section_Sheet_2_of_4.pdf]]:1: 5.00 1:750 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0205-SC/R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf|R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf]]:37: Control of Major Accident Hazards (COMAH) Regulations 201516 (see Table 5.1). Whilst [[this>Teesworks/Planning/R-2022-0205-SC/R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf|R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf]]:37:Table 5.1 Establishments covered by COMAH within 5 km of the Site 17 [[this>Teesworks/Planning/R-2022-0205-SC/R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf|R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf]]:37:https://notifications.hse.gov.uk/COMAH2015/Search.aspx [[Accessed June 2021]]. [[this>Teesworks/Planning/R-2022-0205-SC/R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf|R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf]]:37: HSE (no date) COMAH Public Information Record for Stockon on Tees [[online]]. Available at: COMAH 2015: Public Information Record [[this>Teesworks/Planning/R-2022-0205-SC/R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf|R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf]]:38: COMAH, as well as the Inner, Middle and Outer Zones from Major Accident Hazard [[this>Teesworks/Planning/R-2022-0205-SC/R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf|R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf]]:38: Installations Act, The Energy Act and the COMAH Regulations. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:47:48 4.6 Control of Major Accident Hazards (COMAH) 3 0 0 0 - [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:92:4.6 Control of Major Accident Hazards (COMAH) [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:92:Control of Major Accident Hazards (COMAH) sites. This data includes upper and lower tier sites, and includes a [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:92:historical archive of COMAH sites and Notification of Installations Handling Hazardous Substances (NIHHS) [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:92: D On site Sahaviriya Sahaviriya Steel Industries Uk Limited, Steel Historical COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:92: D On site South Tees South Tees Site Company Limited, Redcar, Current COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf|R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf]]:7:COMAH Control of Major Accident Hazards [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf|R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf]]:7:COMAH Control of Major Accident Hazards [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf|R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf]]:8:The SSI site holds a COMAH Upper Tier Establishment classification associated with the large quantities [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf|R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf]]:14: Layout of Teesside Works A199673 Corus Plan showing location and quantities of COMAH [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf|R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf]]:14: COMAH Substances [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf|R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf]]:14: COMAH Coke Oven Gas A122859 Corus Plan showing the Coke Oven Gas Main with a series [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf|R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf]]:24: COMAH Upper Tier Establishment, Entire SSI site at Redcar, Cleveland and Upper Tier classification upheld due to [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:39:48 4.6 Control of Major Accident Hazards (COMAH) 3 0 0 0 - [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:84:4.6 Control of Major Accident Hazards (COMAH) [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:84:Control of Major Accident Hazards (COMAH) sites. This data includes upper and lower tier sites, and includes a [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:84:historical archive of COMAH sites and Notification of Installations Handling Hazardous Substances (NIHHS) [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:84: D On site Sahaviriya Sahaviriya Steel Industries Uk Limited, Steel Historical COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:84: D On site South Tees South Tees Site Company Limited, Redcar, Current COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf|R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf]]:7:COMAH Control of Major Accident Hazards [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf|R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf]]:8:SSI2 holds a COMAH Upper Tier Establishment classification associated with the large quantities of PAH [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf|R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf]]:30: Control of Major Accidents Hazard Regulations 2015 (COMAH) [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf|R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf]]:30: COMAH Upper Tier Establishment, Entire SSI site at Redcar, Cleveland Upper Tier classification upheld [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf|R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf]]:30: the location of COMAH Substances [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-Appendix1.pdf|R-2021-1048-FFM-Appendix1.pdf]]:12:Corus Teesside is a Top Tier COMAH facility and as such there is a requirement to [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:39:48 4.6 Control of Major Accident Hazards (COMAH) 3 0 0 0 - [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:84:4.6 Control of Major Accident Hazards (COMAH) [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:84:Control of Major Accident Hazards (COMAH) sites. This data includes upper and lower tier sites, and includes a [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:84:historical archive of COMAH sites and Notification of Installations Handling Hazardous Substances (NIHHS) [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:84: D On site Sahaviriya Sahaviriya Steel Industries Uk Limited, Steel Historical COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:84: D On site South Tees South Tees Site Company Limited, Redcar, Current COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2021-0269-CD/R-2021-0269-CD-Decision Notice.pdf|R-2021-0269-CD-Decision Notice.pdf]]:7:19. Parts of the site currently lie within COMAH inner consultation zones. Prior to [[this>Teesworks/Planning/R-2021-0269-CD/R-2021-0269-CD-Decision Notice.pdf|R-2021-0269-CD-Decision Notice.pdf]]:7: discussions must be undertaken with the HSE to establish any COMAH [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-Phase II ESA.pdf|R-2021-0100-CD-Phase II ESA.pdf]]:10:process of being decommissioned but at the time of writing is still considered a top tier COMAH asset. [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:48: Sites handling 2 7 One current COMAH Upper Tier Operator, South Tees Site Company Limited, that has [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:48: hazardous or taken over from the previous COMAH Upper Tier operator, SSI UK Limited. [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:48: COMAH or NIHHS) [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:62: Sites handling 3 3 Three COMAH & NIHHS sites within the area: [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:62: (inc COMAH or Operational Status: Historical NIHHS Site [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:62: Operational Status: Historical COMAH Site [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:62: Tier: COMAH Upper Tier Operator [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:62: Operational Status: Current COMAH Site [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:62: Tier: COMAH Upper Tier Operator [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:77: The site held a COMAH upper tier establishment classification associated with PAH in the Coke [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:120: COMAH upper tier establishment. The operator of the COMAH establishment is [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:120: that the site is no longer subject to the COMAH regulations. These [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:330:The SSI site holds a COMAH Upper Tier Establishment classification associated with the large quantities [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:330:of PAH contained within the Coke Oven Gas Main which also applies to TS4. Other COMAH products [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:367:sources of contamination and fall under the COMAH regulations. The COMAH product inventory for [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:368:well as other materials. This is classified as a COMAH Hazardous Substance. Further details of this and [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:368:other COMAH and COMAH Substances are given in the SSI UK (IL) report ref. SSI UK SBCO 2016. [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:376:The SSI site holds a COMAH Upper Tier Establishment classification associated with the large quantities [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:381:were required. It should be noted that Heavy Fuel Oil for Combustion is a COMAH product. [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:388:products in a COMAH Substance, which is currently being stored on an area of hard standing west of the [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:417: “Jallop” – COMAH Hydrocarbons – TPH and PAH   Mod [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:423:  Review status with respect to COMAH designations relating to the site. [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:594: 4.3.3 COMAH ............................................................................................................................................... 16 [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:595:The Infrastructure Monitoring plan already in place through the SMS, EMS and COMAH will continue [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:609: 3. The Control Of Major Hazards Regulations 1999 (COMAH) [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:611:4.3.3 COMAH [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:611:Teesside Site is also a top tier COMAH site. An establishment report was submitted to the competent [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:611:With respect to the environment the following are included within the overall COMAH system: [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:611:Within the COMAH Regulations there is a requirement for emergency planning. Considering the [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:611:The Infrastructure Monitoring plan already in place through the SMS, EMS and COMAH will continue [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-EA R_2020_0357_OOM 29 October 2020 OFFICIAL.pdf|R-2020-0357-OOM-EA R_2020_0357_OOM 29 October 2020 OFFICIAL.pdf]]:7:COMAH – Advice to LPA/ Applicant [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-EA R_2020_0357_OOM 29 October 2020 OFFICIAL.pdf|R-2020-0357-OOM-EA R_2020_0357_OOM 29 October 2020 OFFICIAL.pdf]]:7:Parts of the development site also form part of a COMAH establishment. The COMAH [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-EA R_2020_0357_OOM 29 October 2020 OFFICIAL.pdf|R-2020-0357-OOM-EA R_2020_0357_OOM 29 October 2020 OFFICIAL.pdf]]:7:operator of this establishment is South Tees Site Company Limited. As the COMAH [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-EA R_2020_0357_OOM 29 October 2020 OFFICIAL.pdf|R-2020-0357-OOM-EA R_2020_0357_OOM 29 October 2020 OFFICIAL.pdf]]:7:operator they are keeping safe and arranging for safe removal of COMAH inventory of [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-EA R_2020_0357_OOM 29 October 2020 OFFICIAL.pdf|R-2020-0357-OOM-EA R_2020_0357_OOM 29 October 2020 OFFICIAL.pdf]]:7:COMAH regulations- see below) is subject to the COMAH regulations due to the [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-Planning Statement - July 2020.pdf|R-2020-0357-OOM-Planning Statement - July 2020.pdf]]:51: carry on indefinitely managing the area under the terms of its COMAH status. To return the [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-Decision Notice.pdf|R-2020-0357-OOM-Decision Notice.pdf]]:7:19. Parts of the site currently lie within COMAH inner consultation zones. Prior to [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-Decision Notice.pdf|R-2020-0357-OOM-Decision Notice.pdf]]:7: discussions must be undertaken with the HSE to establish any COMAH [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-Officer report.pdf|R-2020-0357-OOM-Officer report.pdf]]:13:COMAH – Advice to LPA/ Applicant [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-Officer report.pdf|R-2020-0357-OOM-Officer report.pdf]]:13:Parts of the development site also form part of a COMAH establishment. The [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-Officer report.pdf|R-2020-0357-OOM-Officer report.pdf]]:13:COMAH operator of this establishment is South Tees Site Company Limited. [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-Officer report.pdf|R-2020-0357-OOM-Officer report.pdf]]:13:As the COMAH operator they are keeping safe and arranging for safe removal [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-Officer report.pdf|R-2020-0357-OOM-Officer report.pdf]]:13:of COMAH inventory of dangerous substances. Demolition or removal of any [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-Officer report.pdf|R-2020-0357-OOM-Officer report.pdf]]:13:installation (as defined by the COMAH regulations- see below) is subject to [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-Officer report.pdf|R-2020-0357-OOM-Officer report.pdf]]:13:the COMAH regulations due to the presence of dangerous substances. [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-Officer report.pdf|R-2020-0357-OOM-Officer report.pdf]]:116:19. Parts of the site currently lie within COMAH inner consultation zones. [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-Officer report.pdf|R-2020-0357-OOM-Officer report.pdf]]:116: any COMAH restrictions which remain in place. Any building within the [[this>Teesworks/Planning/R-2019-0767-OOM/R-2019-0767-OOM-Appendix B Scoping Letter Request.pdf|R-2019-0767-OOM-Appendix B Scoping Letter Request.pdf]]:7:According to the STDC Master Plan, the site is located within an Inner COMAH [[this>Teesworks/Planning/R-2021-0831-CD/R-2021-0831-CD-DECISION NOTICE 0357.pdf|R-2021-0831-CD-DECISION NOTICE 0357.pdf]]:7:19. Parts of the site currently lie within COMAH inner consultation zones. Prior to [[this>Teesworks/Planning/R-2021-0831-CD/R-2021-0831-CD-DECISION NOTICE 0357.pdf|R-2021-0831-CD-DECISION NOTICE 0357.pdf]]:7: discussions must be undertaken with the HSE to establish any COMAH [[this>Teesworks/Planning/R-2023-0247-OOM/R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf|R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf]]:30:4.115 There are over 20 Control of Major Accident Hazard (COMAH) sites within 4 km of [[this>Teesworks/Planning/R-2023-0247-OOM/R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf|R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf]]:30: Limited, amongst others. The various establishments are notified as COMAH sites [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF]]:31: COMAH related risks would be removed during the demolition of the site. The main aspects are [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1705: Sites handling 2 7 One current COMAH Upper Tier Operator, South Tees Site Company Limited, that has [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1705: hazardous or taken over from the previous COMAH Upper Tier operator, SSI UK Limited. [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1705: COMAH or NIHHS) [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1719: Sites handling 3 3 Three COMAH & NIHHS sites within the area: [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1719: (inc COMAH or Operational Status: Historical NIHHS Site [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1719: Operational Status: Historical COMAH Site [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1719: Tier: COMAH Upper Tier Operator [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1719: Operational Status: Current COMAH Site [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1719: Tier: COMAH Upper Tier Operator [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1734: The site held a COMAH upper tier establishment classification associated with PAH in the Coke [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1884: COMAH upper tier establishment. The operator of the COMAH establishment is [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1884: that the site is no longer subject to the COMAH regulations. These [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1890:63 4.6 Control of Major Accident Hazards (COMAH) 2 0 3 2 - [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1950:4.6 Control of Major Accident Hazards (COMAH) [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1950:Control of Major Accident Hazards (COMAH) sites. This data includes upper and lower tier sites, and includes a [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1950:historical archive of COMAH sites and Notification of Installations Handling Hazardous Substances (NIHHS) [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1950: I On site Sahaviriya Sahaviriya Steel Industries Uk Limited, Steel Historical COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1950: I On site South Tees South Tees Site Company Limited, Redcar, Current COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1950: P 191m SE SABIC UK SABIC UK Petrochemicals Limited, Olefins Current COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1950: P 192m SE Sabic Uk Sabic Uk Petrochemicals Limited, Teesport, Historical COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1950: P 319m S Ensus UK Ensus UK Limited, Wilton, Middleway, Wilton Current COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1950: P 319m S Huntsman Huntsman Polyurethanes (UK) Limited, Current COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF]]:13: Control of Major Accident Hazards (‘COMAH’) Regulations. As such there is a risk that [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF]]:13: COMAH and HSE consultation zones will be reduced and Not Significant. [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF]]:36: 3 COMAH Control of Major Accident Hazards [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF]]:38: 5 Where necessary to comply with Control of Major Accident Hazards (‘COMAH’) and Health [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF]]:44: 8 COMAH Control of Major Accident Hazards [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter M - Mitigation and Monitoring - Dec 2020.PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter M - Mitigation and Monitoring - Dec 2020.PDF]]:8: Hazards (‘COMAH’) and Health and Safety Condition/Planning [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter M - Mitigation and Monitoring - Dec 2020.PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter M - Mitigation and Monitoring - Dec 2020.PDF]]:20: 11 COMAH – Control of Major Accident Hazards [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:51: Sites handling 2 7 One current COMAH Upper Tier Operator, South Tees Site Company Limited, that has [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:51: hazardous or taken over from the previous COMAH Upper Tier operator, SSI UK Limited. [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:51: COMAH or NIHHS) [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:68: Sites handling 3 3 Three COMAH & NIHHS sites within the area: [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:68: (inc COMAH or Operational Status: Historical NIHHS Site [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:68: Operational Status: Historical COMAH Site [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:68: Tier: COMAH Upper Tier Operator [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:68: Operational Status: Current COMAH Site [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:68: Tier: COMAH Upper Tier Operator [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:83: The site held a COMAH upper tier establishment classification associated with PAH in the Coke [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:15: COMAH Sites [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:15:2.5.5 The Application Site is currently located within an operational COMAH facility. This relates to [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:15: South Teesside Company Limited, a COMAH Upper Tier Operator. [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:47:37 4.6 Control of Major Accident Hazards (COMAH) 3 0 0 0 - [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:81:4.6 Control of Major Accident Hazards (COMAH) [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:81:Control of Major Accident Hazards (COMAH) sites. This data includes upper and lower tier sites, and includes a [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:81:historical archive of COMAH sites and Notification of Installations Handling Hazardous Substances (NIHHS) [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:81: A On site Sahaviriya Sahaviriya Steel Industries Uk Limited, Steel Historical COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:81: A On site South Tees South Tees Site Company Limited, Redcar, Current COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-230328 JER10061 Redcar Energy Centre LPA Letter Final Rev 2.pdf|R-2023-0339-CD-230328 JER10061 Redcar Energy Centre LPA Letter Final Rev 2.pdf]]:12:5.2 COMAH Sites [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-230328 JER10061 Redcar Energy Centre LPA Letter Final Rev 2.pdf|R-2023-0339-CD-230328 JER10061 Redcar Energy Centre LPA Letter Final Rev 2.pdf]]:12:The Assessment site is currently located within an operational COMAH facility. This relates to the South [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-230328 JER10061 Redcar Energy Centre LPA Letter Final Rev 2.pdf|R-2023-0339-CD-230328 JER10061 Redcar Energy Centre LPA Letter Final Rev 2.pdf]]:12:Teesside Company Limited, a COMAH Upper Tier Operator. [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf|R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf]]:12: COMAH Sites [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf|R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf]]:12:9.3.26 The Application Site is currently located within an operational COMAH facility. This relates to [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf|R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf]]:12: South Teesside Company Limited, a COMAH Upper Tier Operator. [[this>Teesworks/Planning/R-2022-0355-FFM/R-2022-0355-FFM-Officer report.pdf|R-2022-0355-FFM-Officer report.pdf]]:13:COMAH inner consultation zones. [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:10:process of being decommissioned but at the time of writing is still considered a top tier COMAH asset. [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-R 2020 0357 OOM Decision Notice.pdf|R-2021-0439-CD-R 2020 0357 OOM Decision Notice.pdf]]:7:19. Parts of the site currently lie within COMAH inner consultation zones. Prior to [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-R 2020 0357 OOM Decision Notice.pdf|R-2021-0439-CD-R 2020 0357 OOM Decision Notice.pdf]]:7: discussions must be undertaken with the HSE to establish any COMAH [[this>Teesworks/Planning/R-2022-0411-CD/R-2022-0411-CD-R 2020 0357 OOM Decision Notice.pdf|R-2022-0411-CD-R 2020 0357 OOM Decision Notice.pdf]]:7:19. Parts of the site currently lie within COMAH inner consultation zones. Prior to [[this>Teesworks/Planning/R-2022-0411-CD/R-2022-0411-CD-R 2020 0357 OOM Decision Notice.pdf|R-2022-0411-CD-R 2020 0357 OOM Decision Notice.pdf]]:7: discussions must be undertaken with the HSE to establish any COMAH [[this>Teesworks/Planning/R-2021-1077-CD/R-2021-1077-CD-R 2020 0357 OOM Decision Notice.pdf|R-2021-1077-CD-R 2020 0357 OOM Decision Notice.pdf]]:7:19. Parts of the site currently lie within COMAH inner consultation zones. Prior to [[this>Teesworks/Planning/R-2021-1077-CD/R-2021-1077-CD-R 2020 0357 OOM Decision Notice.pdf|R-2021-1077-CD-R 2020 0357 OOM Decision Notice.pdf]]:7: discussions must be undertaken with the HSE to establish any COMAH [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:51: Sites handling 2 7 One current COMAH Upper Tier Operator, South Tees Site Company Limited, that has [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:51: hazardous or taken over from the previous COMAH Upper Tier operator, SSI UK Limited. [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:51: COMAH or NIHHS) [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:68: Sites handling 3 3 Three COMAH & NIHHS sites within the area: [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:68: (inc COMAH or Operational Status: Historical NIHHS Site [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:68: Operational Status: Historical COMAH Site [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:68: Tier: COMAH Upper Tier Operator [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:68: Operational Status: Current COMAH Site [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:68: Tier: COMAH Upper Tier Operator [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:83: The site held a COMAH upper tier establishment classification associated with PAH in the Coke [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:10:process of being decommissioned but at the time of writing is still considered a top tier COMAH asset. [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-ROA and Remediation Strategy.PDF|R-2020-0318-FFM-ROA and Remediation Strategy.PDF]]:9:top tier COMAH asset. Overhead pylons run along the northern and eastern edge of the site and a [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-EA R_2020_0318_FFM 20 August 2020 OFFICIAL_.pdf|R-2020-0318-FFM-EA R_2020_0318_FFM 20 August 2020 OFFICIAL_.pdf]]:6:Oven Gas Main does run through the site and forms part of the COMAH [[this>Teesworks/Planning/R-2021-0924-CD/R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:42: Specific pollutants The site is currently a COMAH site and heavily Yes [[this>Teesworks/Planning/R-2021-0924-CD/R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:45: contaminated COMAH site to ensure contaminated [[this>Teesworks/Planning/R-2021-0924-CD/R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:46: vigilance due to constructing on a COMAH site. Therefore [[this>Teesworks/Planning/R-2021-0924-CD/R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:47: a COMAH site, additional care will be necessary to ensure [[this>Teesworks/Planning/R-2021-0924-CD/R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:47: a COMAH site, additional care will be necessary to ensure [[this>Teesworks/Planning/R-2021-0924-CD/R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:52: Specific Direct The site is currently a COMAH site and heavily contaminated [[this>Teesworks/Planning/R-2021-0924-CD/R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:53: contaminated COMAH site to ensure contaminated land [[this>Teesworks/Planning/R-2021-0924-CD/R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:56: contaminated COMAH site to ensure contaminated [[this>Teesworks/Planning/R-2021-0924-CD/R-2021-0924-CD-Decision Notice 0357.pdf|R-2021-0924-CD-Decision Notice 0357.pdf]]:7:19. Parts of the site currently lie within COMAH inner consultation zones. Prior to [[this>Teesworks/Planning/R-2021-0924-CD/R-2021-0924-CD-Decision Notice 0357.pdf|R-2021-0924-CD-Decision Notice 0357.pdf]]:7: discussions must be undertaken with the HSE to establish any COMAH [[this>Teesworks/Planning/R-2021-0729-CD/R-2021-0729-CD-Decision Notice.pdf|R-2021-0729-CD-Decision Notice.pdf]]:7:19. Parts of the site currently lie within COMAH inner consultation zones. Prior to [[this>Teesworks/Planning/R-2021-0729-CD/R-2021-0729-CD-Decision Notice.pdf|R-2021-0729-CD-Decision Notice.pdf]]:7: discussions must be undertaken with the HSE to establish any COMAH [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-SOL_23_P016_GLR Statement of Community Engagement Annex 1 - EIA Screening Response.pdf|R-2023-0291-ESM-SOL_23_P016_GLR Statement of Community Engagement Annex 1 - EIA Screening Response.pdf]]:2: (2016) and the Control of Major Accident Hazards – (COMAH) regulations (2015), we would strongly [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf|R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf]]:20: • Three Control of Major Accident Hazards (COMAH) sites, the closest of which is BOC Limited [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf|R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf]]:5:47 4.6 Control of Major Accident Hazards (COMAH) 1 0 3 0 - [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf|R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf]]:49:4.6 Control of Major Accident Hazards (COMAH) [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf|R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf]]:49:Control of Major Accident Hazards (COMAH) sites. This data includes upper and lower tier sites, and includes a [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf|R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf]]:49:historical archive of COMAH sites and Notification of Installations Handling Hazardous Substances (NIHHS) [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf|R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf]]:49: F 54m SE BOC Limited BOC Limited, Middlesbrough Tees Dock Road, Current COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf|R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf]]:49: K 188m SE Sahaviriya Sahaviriya Steel Industries Uk Limited, Steel Historical COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf|R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf]]:50: K 218m SE South Tees South Tees Site Company Limited, Redcar, Steel Current COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf|R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf]]:32:In the wider area three Control of Major Accident Hazards (COMAH) sites are identified, the [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-Officer Letter_R20220675SCP.pdf|R-2023-0291-ESM-Officer Letter_R20220675SCP.pdf]]:1: (2016) and the Control of Major Accident Hazards – (COMAH) regulations (2015), we would strongly [[this>Teesworks/Planning/R-2021-0905-CD/R-2021-0905-CD-Decision Notice.pdf|R-2021-0905-CD-Decision Notice.pdf]]:7:19. Parts of the site currently lie within COMAH inner consultation zones. Prior to [[this>Teesworks/Planning/R-2021-0905-CD/R-2021-0905-CD-Decision Notice.pdf|R-2021-0905-CD-Decision Notice.pdf]]:7: discussions must be undertaken with the HSE to establish any COMAH [[this>Teesworks/Planning/R-2022-0746-CD/R-2022-0746-CD-Decision Notice (4).pdf|R-2022-0746-CD-Decision Notice (4).pdf]]:7:19. Parts of the site currently lie within COMAH inner consultation zones. Prior to [[this>Teesworks/Planning/R-2022-0746-CD/R-2022-0746-CD-Decision Notice (4).pdf|R-2022-0746-CD-Decision Notice (4).pdf]]:7: discussions must be undertaken with the HSE to establish any COMAH [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-Decision Notice.pdf|R-2022-0096-CD-Decision Notice.pdf]]:7:19. Parts of the site currently lie within COMAH inner consultation zones. Prior to [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-Decision Notice.pdf|R-2022-0096-CD-Decision Notice.pdf]]:7: discussions must be undertaken with the HSE to establish any COMAH [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:138: COMAH Control of Major Accident Hazards [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:147:Major Accident Hazards (COMAH) sites along the river. Pilotage is compulsory for all vessels carrying [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:149: • Proximity of the Project to vessels operating to and from high COMAH sites and carrying [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:190: COMAH site evacuation operations or [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:190: COMAH local evacuation [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:190: COMAH major area evacuation [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:198: COMAH sites. Navigator marine terminals and SABIC. On the south side [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:198: immediately adjacent is SABIC Teesport a lower tier COMAH site. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:198: high level COMAH site. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:198: COMAH sites in the event of a COMAH release (aware that Port [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:198: COMAH sites in the event of a COMAH release. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:200: COMAH Incidents [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:200: • Covered in the PD Port’s Emergency plan, COMAH berth [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:207: Traffic control failure. (COMAH); Adverse [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:207: declared but criteria not release (COMAH); Adverse [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:208: Project Project Cargo release (COMAH); Adverse [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:217: Tanker aground declared but criteria not (COMAH); Adverse [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:223: declared but criteria not small gas release (COMAH); Adverse [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:223: declared but criteria not (COMAH); Adverse international [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:224: Project small gas release (COMAH); Adverse [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:233: Tanker aground declared but criteria not (COMAH); Adverse international [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:239: operations. Traffic control gas release (COMAH); Adverse international [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:239: Tier 1 may be declared but gas release (COMAH); Adverse international [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:240: Project Cargo move party vessel / dredging criteria not necessarily met; gas release (COMAH); Adverse international [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:249: Tanker aground Result of avoiding action release (COMAH); Adverse international [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: Tanker Tanker gas release (COMAH); Adverse [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: visibility. Fire and criteria not necessarily met; (COMAH); Adverse international publicity. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: Cargo move (COMAH); Adverse international publicity. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:263: Tanker aground Reduced visibility. Result declared but criteria not release (COMAH); Adverse international [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:8: COMAH Control of Major Accident Hazards [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:17:Major Accident Hazards (COMAH) sites along the river. Pilotage is compulsory for all vessels carrying [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:19: • Proximity of the Project to vessels operating to and from high COMAH sites and carrying [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:60: COMAH site evacuation operations or [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:60: COMAH local evacuation [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:60: COMAH major area evacuation [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:68: COMAH sites. Navigator marine terminals and SABIC. On the south side [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:68: immediately adjacent is SABIC Teesport a lower tier COMAH site. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:68: high level COMAH site. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:68: COMAH sites in the event of a COMAH release (aware that Port [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:68: COMAH sites in the event of a COMAH release. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:70: COMAH Incidents [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:70: • Covered in the PD Port’s Emergency plan, COMAH berth [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:77: Traffic control failure. (COMAH); Adverse [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:77: declared but criteria not release (COMAH); Adverse [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:78: Project Project Cargo release (COMAH); Adverse [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:87: Tanker aground declared but criteria not (COMAH); Adverse [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:93: declared but criteria not small gas release (COMAH); Adverse [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:93: declared but criteria not (COMAH); Adverse international [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:94: Project small gas release (COMAH); Adverse [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:103: Tanker aground declared but criteria not (COMAH); Adverse international [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:109: operations. Traffic control gas release (COMAH); Adverse international [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:109: Tier 1 may be declared but gas release (COMAH); Adverse international [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:110: Project Cargo move party vessel / dredging criteria not necessarily met; gas release (COMAH); Adverse international [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:119: Tanker aground Result of avoiding action release (COMAH); Adverse international [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: Tanker Tanker gas release (COMAH); Adverse [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: visibility. Fire and criteria not necessarily met; (COMAH); Adverse international publicity. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: Cargo move (COMAH); Adverse international publicity. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:133: Tanker aground Reduced visibility. Result declared but criteria not release (COMAH); Adverse international [[this>Teesworks/Planning/R-2021-0268-CD/R-2021-0268-CD-Decision Notice.pdf|R-2021-0268-CD-Decision Notice.pdf]]:7:19. Parts of the site currently lie within COMAH inner consultation zones. Prior to [[this>Teesworks/Planning/R-2021-0268-CD/R-2021-0268-CD-Decision Notice.pdf|R-2021-0268-CD-Decision Notice.pdf]]:7: discussions must be undertaken with the HSE to establish any COMAH [[this>Teesworks/Planning/R-2022-0526-CD/R-2022-0526-CD-R 2020 0357 OOM Decision Notice.pdf|R-2022-0526-CD-R 2020 0357 OOM Decision Notice.pdf]]:7:19. Parts of the site currently lie within COMAH inner consultation zones. Prior to [[this>Teesworks/Planning/R-2022-0526-CD/R-2022-0526-CD-R 2020 0357 OOM Decision Notice.pdf|R-2022-0526-CD-R 2020 0357 OOM Decision Notice.pdf]]:7: discussions must be undertaken with the HSE to establish any COMAH [[this>Teesworks/Planning/R-2022-0679-CD/R-2022-0679-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf|R-2022-0679-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf]]:50: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0679-CD/R-2022-0679-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf|R-2022-0679-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf]]:51: TW-SIZ-XX-JBAU-SB-00-DR-C-0301 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0679-CD/R-2022-0679-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf|R-2022-0679-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf]]:52: TO FACILITATE INSPECTION AND 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2020-0539-PND/R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF|R-2020-0539-PND-South Bank Wharf Riverside Buildings Demolition V1.1 reviewed.PDF]]:10:COMAH regulations and its COMAH Top Tier status, which include accounting for people as [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:57:48 4.6 Control of Major Accident Hazards (COMAH) 3 0 0 0 - [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:102:4.6 Control of Major Accident Hazards (COMAH) [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:102:Control of Major Accident Hazards (COMAH) sites. This data includes upper and lower tier sites, and includes a [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:102:historical archive of COMAH sites and Notification of Installations Handling Hazardous Substances (NIHHS) [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:102: D On site Sahaviriya Sahaviriya Steel Industries Uk Limited, Steel Historical COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:102: D On site South Tees South Tees Site Company Limited, Redcar, Current COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:39:48 4.6 Control of Major Accident Hazards (COMAH) 3 0 0 0 - [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:84:4.6 Control of Major Accident Hazards (COMAH) [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:84:Control of Major Accident Hazards (COMAH) sites. This data includes upper and lower tier sites, and includes a [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:84:historical archive of COMAH sites and Notification of Installations Handling Hazardous Substances (NIHHS) [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:84: D On site Sahaviriya Sahaviriya Steel Industries Uk Limited, Steel Historical COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:84: D On site South Tees South Tees Site Company Limited, Redcar, Current COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2022-0366-CD/R-2022-0366-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf|R-2022-0366-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf]]:50: 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0366-CD/R-2022-0366-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf|R-2022-0366-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf]]:51: TW-SIZ-XX-JBAU-SB-00-DR-C-0301 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2022-0366-CD/R-2022-0366-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf|R-2022-0366-CD-SeAH Drainage Strategy_SEA CLK ZZ EX ZZ TN C 0001.pdf]]:52: TO FACILITATE INSPECTION AND 5 COMAH site COMAH site COMAH site [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF]]:9:top tier COMAH asset. Overhead pylons run along the northern and eastern edge of the site and a [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:51: Sites handling 2 7 One current COMAH Upper Tier Operator, South Tees Site Company Limited, that has [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:51: hazardous or taken over from the previous COMAH Upper Tier operator, SSI UK Limited. [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:51: COMAH or NIHHS) [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:68: Sites handling 3 3 Three COMAH & NIHHS sites within the area: [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:68: (inc COMAH or Operational Status: Historical NIHHS Site [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:68: Operational Status: Historical COMAH Site [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:68: Tier: COMAH Upper Tier Operator [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:68: Operational Status: Current COMAH Site [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:68: Tier: COMAH Upper Tier Operator [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:83: The site held a COMAH upper tier establishment classification associated with PAH in the Coke [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:10:process of being decommissioned but at the time of writing is still considered a top tier COMAH asset. [[this>Teesworks/Planning/R-2022-0343-ESM/R-2022-0343-ESM-Officer report 0343.pdf|R-2022-0343-ESM-Officer report 0343.pdf]]:11:be on the outline approval that limits development within COMAH inner [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf|R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf]]:12: COMAH Sites [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf|R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf]]:12:9.3.26 The Application Site is currently located within an operational COMAH facility. This relates to [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf|R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf]]:12: South Teesside Company Limited, a COMAH Upper Tier Operator. [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:15: COMAH Sites [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:15:2.5.5 The Application Site is currently located within an operational COMAH facility. This relates to [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:15: South Teesside Company Limited, a COMAH Upper Tier Operator. [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:47:37 4.6 Control of Major Accident Hazards (COMAH) 3 0 0 0 - [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:81:4.6 Control of Major Accident Hazards (COMAH) [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:81:Control of Major Accident Hazards (COMAH) sites. This data includes upper and lower tier sites, and includes a [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:81:historical archive of COMAH sites and Notification of Installations Handling Hazardous Substances (NIHHS) [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:81: A On site Sahaviriya Sahaviriya Steel Industries Uk Limited, Steel Historical COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:81: A On site South Tees South Tees Site Company Limited, Redcar, Current COMAH COMAH Upper Tier [[this>Teesworks/Planning/R-2021-0465-FFM/R-2021-0465-FFM-Officer Report 0465.pdf|R-2021-0465-FFM-Officer Report 0465.pdf]]:10:COMAH inner consultation zones. [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HSE.pdf|R-2023-0179-SCP-HSE.pdf]]:1:Substances) Regulations 2015 and The Control of Major Accident Hazard (COMAH) Regulations 2015. Such major [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HSE.pdf|R-2023-0179-SCP-HSE.pdf]]:2:If hazardous substances planning consent is granted, early notification by the developer to HSE under the COMAH [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:2: COMAH Control of Major Accident Hazards [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:99: Accident Hazard (COMAH) Regulations 2015 and major accident hazard pipelines [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:99:6.1.223 The COMAH Regulations may be applicable to the Proposed Development and will [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:99: the relevant COMAH qualifying quantities. The aggregation calculation incorporates [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:100: Parts 1 and 2 of Schedule 1 of COMAH to determine whether the Regulations will [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:100: • Health and Safety Executive’s (HSE’s) COMAH 2015 Public Information Search [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:100:6.1.229 There are currently a number of COMAH regulated sites within the Study Area with [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:101: COMAH Installations, forming a ‘domino group’. These are groups of sites where the [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:102: criteria listed within the COMAH Regulations. This includes an event which causes [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:103: associated with the Proposed Development. Legislation including COMAH and PSR [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:104: outcome of the COMAH applicability aggregation calculation. [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:104: Hazardous Substances Consent, Pipelines Safety Regulations, COMAH, and [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:130: • Health and Safety Executive (2015). COMAH 2015 Public Information Search [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:130: [[online]]. Available at: https://notifications.hse.gov.uk/COMAH2015/search.aspx. [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:135: • The Control of Major Accident Hazard (COMAH) Regulations 2015 (SI 2015/483). [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-SCOPING OPINION DECISION.pdf|R-2023-0179-SCP-SCOPING OPINION DECISION.pdf]]:19:(COMAH) Regulations 2015. Such major accidents are of low likelihood but could have significant [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-SCOPING OPINION DECISION.pdf|R-2023-0179-SCP-SCOPING OPINION DECISION.pdf]]:20:under the COMAH Regulations will most likely be required, depending on the specific [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:19: considered a top tier COMAH asset. In addition, a section of Natural Gas Pipeline is noted to be [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:37: COMAH related risks would be removed during the demolition of the site. The main aspects are [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF]]:8: (‘COMAH’) and Health and Safety Executive (‘HSE’) Obligation. RCBC [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF]]:23: 12 COMAH – Control of Major Accident Hazards [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf|R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf]]:52: the time of writing this is in the process of being removed. This is considered a top tier COMAH [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF]]:38: 5 Where necessary to comply with Control of Major Accident Hazards (‘COMAH’) and Health [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF]]:45: 10 COMAH Control of Major Accident Hazards [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF]]:11: Control of Major Accident Hazards (‘COMAH’) Regulations. As such there is a risk that [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF]]:11: COMAH and HSE consultation zones will be reduced and Not Significant. [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF]]:34: 3 COMAH Control of Major Accident Hazards [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF]]:31: COMAH related risks would be removed during the demolition of the site. The main aspects are [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF]]:8: To comply with COMAH and HSE guidance, where Planning Applicant / RCBC [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF]]:23: 12 COMAH – Control of Major Accident Hazards [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF]]:37: 5 Where necessary to comply with Control of Major Accident Hazards (‘COMAH’) and Health [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF]]:43: 8 COMAH Control of Major Accident Hazards [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF]]:11: Control of Major Accident Hazards (‘COMAH’) Regulations. As such there is a risk that [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF]]:11: COMAH and HSE consultation zones will be reduced and Not Significant. [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF]]:34: 3 COMAH Control of Major Accident Hazards [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:51: Sites handling 2 7 One current COMAH Upper Tier Operator, South Tees Site Company Limited, that has [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:51: hazardous or taken over from the previous COMAH Upper Tier operator, SSI UK Limited. [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:51: COMAH or NIHHS) [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:68: Sites handling 3 3 Three COMAH & NIHHS sites within the area: [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:68: (inc COMAH or Operational Status: Historical NIHHS Site [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:68: Operational Status: Historical COMAH Site [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:68: Tier: COMAH Upper Tier Operator [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:68: Operational Status: Current COMAH Site [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:68: Tier: COMAH Upper Tier Operator [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:83: The site held a COMAH upper tier establishment classification associated with PAH in the Coke [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:13:while at the same time taking a specific, closer look 4. Ensure that, through redevelopment and inward COMAH (Control of Major Accident Hazards) Upper Tier [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:54: area. The ground conditions beneath the site initially Numerous conveyors and cranes are located throughout, the removal of hazardous (COMAH) materials. However, [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:60:COMAH [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:60:on site as defined by the COMAH (Control of Major (High Pressure Gas Pipeline) [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:60:no viable COMAH scenarios exist on the site following work to the South Gare access road, however it stops short [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:60:to reduce the COMAH substances Inventory. However, the [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:60:The COMAH associated HSE consultation zones are • SSI – High voltage underground cables [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:60:to the site. Removal of the residual COMAH inventory The Infrastructure Corridor contains several access [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:61:COMAH HSE CONSULTATION ZONES