{include:Teesworks - keywords - menu} [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:3:02.09 Utilities Infrastructure 05.04 North Industrial Zone Conceptual Massing Views 10.04 Rail Infrastructure 13.01 Introduction [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:3:03.03 Stakeholders and Interest Groups 07.01 South Industrial Zone Development Overview 11.05 Conceptual Energy Plans 13.10 Collaboration with Major Industrial Operators [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:96:5.04 Conceptual Massing Views (for illustrative purposes) [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:97:5.05 North Industrial Zone Illustrative Plan (Conceptual) [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:98:Plots sited in the NI Zone were initially conceptually sized based off of real-world facilities, these have [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:103:6.02 Northeast Industrial Zone Illustrative Plan (Conceptual) [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:111:been conceptually allocated for large contract fabrication, be retained for ongoing landfill operations and in time, [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:114: 7.04 South Industrial Zone Illustrative Plan (Conceptual) [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:121:8.02 Central Industrial Zone Illustrative Plan (Conceptual) [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:150:11.05 Conceptual Energy Plans [[this>Teesworks/1911South-Tees-Master-Plan-Nov-19.2.pdf|1911South-Tees-Master-Plan-Nov-19.2.pdf]]:150:Two conceptual energy plans have been created to Renewable Energy Waste Heat Energy Baseload Bioenergy Bioenergy [[this>Teesworks/Planning/R-2021-0674-NM/R-2021-0674-NM-DECISION NOTICE.pdf|R-2021-0674-NM-DECISION NOTICE.pdf]]:2: • a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/MLA_2020_00506/Consultations/EA MLA_2020_00506 22 February 2021 OFFICIAL.pdf|EA MLA_2020_00506 22 February 2021 OFFICIAL.pdf]]:4: • a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:46:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:46:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:54:2002 Conceptual model of estuary processes. ABPmer, 2002 [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:57: Conceptual model of estuary [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:588:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-34.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-34.pdf]]:2:12km offshore from the mouth of the Tees. Based upon a conceptual understanding that was developed [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-25.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-25.pdf]]:2:12km offshore from the mouth of the Tees. Based upon a conceptual understanding that was developed [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:46:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:46:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:54:2002 Conceptual model of estuary processes. ABPmer, 2002 [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:57: Conceptual model of estuary [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:588:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:250:6 Preliminary Conceptual Site Model and Qualitative Risk Assessment 21 [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:250:Table 6-3: Preliminary Conceptual Model 24 [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:253: • Provide an initial Conceptual Site Model (CSM) to identify and assess potential contaminant [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:273:6 Preliminary Conceptual Site Model and Qualitative Risk [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:276:Table 6-3: Preliminary Conceptual Model [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:114:pathways. These linkages are summarised in the Preliminary Conceptual Site Model and Qualitative Risk [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:114:Receptor-Linkage’ in the Preliminary Conceptual Site Model and Qualitative Risk Assessment gives an [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:122:where they are measured, they are referred back to a conceptual point 1 m away from the point of origin [[this>Teesworks/Planning/R-2021-0830-CD/R-2021-0830-CD-DECISION NOTICE 0684.pdf|R-2021-0830-CD-DECISION NOTICE 0684.pdf]]:2: • a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2022-0515-CD/R-2022-0515-CD-L05858-CLK-XX-XX-RP-GT-0005 P01.pdf|R-2022-0515-CD-L05858-CLK-XX-XX-RP-GT-0005 P01.pdf]]:10:conceptual ground model for the development plot which has been used to assess if the remedial [[this>Teesworks/Planning/R-2021-0422-CD/R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF|R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF]]:4:2.6 Conceptual Site Model .............................................................................................................. 7 [[this>Teesworks/Planning/R-2021-0422-CD/R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF|R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF]]:8:the conceptual site model (CSM) for the contract area in order to develop the final remediation [[this>Teesworks/Planning/R-2021-0422-CD/R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF|R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF]]:8:the conceptual site model, contaminant distribution and the requirements of the remediation strategy. [[this>Teesworks/Planning/R-2021-0422-CD/R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF|R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF]]:13:of the conceptual site model, contaminant distribution and the requirements of the remediation strategy. [[this>Teesworks/Planning/R-2021-0422-CD/R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF|R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF]]:13:2.6 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0422-CD/R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF|R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF]]:13:conceptual site model (CSM) based on ground investigation findings. The CSM identified a number of [[this>Teesworks/Planning/R-2021-0422-CD/R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF|R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF]]:14:Figure 3 - Conceptual Site Model [[this>Teesworks/Planning/R-2021-0422-CD/R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF|R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF]]:31:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2021-0422-CD/R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF|R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF]]:41: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2021-0422-CD/R-2021-0422-CD-0422.pdf|R-2021-0422-CD-0422.pdf]]:1:of the conceptual site model, contaminant distribution and the requirements of the [[this>Teesworks/Planning/R-2021-0422-CD/R-2021-0422-CD-0422.pdf|R-2021-0422-CD-0422.pdf]]:2:these data gaps, the Conceptual Site Model and Remediation Strategy shall be [[this>Teesworks/Planning/R-2021-0422-CD/R-2021-0422-CD-Officer Report 0422.pdf|R-2021-0422-CD-Officer Report 0422.pdf]]:2:of the conceptual site model, contaminant distribution and the requirements of the [[this>Teesworks/Planning/R-2021-0422-CD/R-2021-0422-CD-Officer Report 0422.pdf|R-2021-0422-CD-Officer Report 0422.pdf]]:3:these data gaps, the Conceptual Site Model and Remediation Strategy shall be [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:20:Based on the spread of the above observations the impacts are conceptualised to be related the South Bank [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:22:The detailed conceptualisation of the GE Plot is covered under the SBC environmental site assessment report [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:22:2021d). Following a review of the GE Plot data the conceptual site model is considered to be the same and as [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:30:have a significant potential to migrate onto site. The monitoring data is in line with this conceptualisation as [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:31:into account influencing factors (such as atmospheric pressure and weather conditions) and the conceptual site [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:41:• Review the conceptual site model (CSM) and assess if the conclusions relating to human health and [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-L05858-CLK-XX-XX-RP-GT-0002 Pile Risk Assessment .pdf|R-2022-0342-CD-L05858-CLK-XX-XX-RP-GT-0002 Pile Risk Assessment .pdf]]:3:4 Conceptual Site Model ............................................................................................................. 6 [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-L05858-CLK-XX-XX-RP-GT-0002 Pile Risk Assessment .pdf|R-2022-0342-CD-L05858-CLK-XX-XX-RP-GT-0002 Pile Risk Assessment .pdf]]:9:4 Conceptual Site Model [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-L05858-CLK-XX-XX-RP-GT-0002 Pile Risk Assessment .pdf|R-2022-0342-CD-L05858-CLK-XX-XX-RP-GT-0002 Pile Risk Assessment .pdf]]:10:A conceptual model has been developed based upon the known condition of the land. This seeks to [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-L05858-CLK-XX-XX-RP-GT-0002 Pile Risk Assessment .pdf|R-2022-0342-CD-L05858-CLK-XX-XX-RP-GT-0002 Pile Risk Assessment .pdf]]:10:identified which will include each source/pathway/receptor component of the conceptual model. The [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-L05858-CLK-XX-XX-RP-GT-0002 Pile Risk Assessment .pdf|R-2022-0342-CD-L05858-CLK-XX-XX-RP-GT-0002 Pile Risk Assessment .pdf]]:10:For the purposes of a piling risk assessment the conceptual model is characterised by identification of [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-L05858-CLK-XX-XX-RP-GT-0002 Pile Risk Assessment .pdf|R-2022-0342-CD-L05858-CLK-XX-XX-RP-GT-0002 Pile Risk Assessment .pdf]]:11:Table 5.2 provides a Preliminary Conceptual Model showing the hazard (source), pathway and receptor, [[this>Teesworks/Planning/R-2021-0296-NM/R-2021-0296-NM-STDC_HWY-ATK-HDG-PR_XS-DR-CD-000002_C01.pdf|R-2021-0296-NM-STDC_HWY-ATK-HDG-PR_XS-DR-CD-000002_C01.pdf]]:1: ESTON ROAD WIDENED RE-ALIGNED ARE CONCEPTUAL AND ARE SUBJECT TO CONTRACTOR [[this>Teesworks/Planning/R-2021-0296-NM/R-2021-0296-NM-STDC_HWY-ATK-HDG-PR_XS-DR-CD-000001_C01.pdf|R-2021-0296-NM-STDC_HWY-ATK-HDG-PR_XS-DR-CD-000001_C01.pdf]]:1: ESTON ROAD ARE CONCEPTUAL AND ARE SUBJECT TO CONTRACTOR [[this>Teesworks/Planning/R-2021-0296-NM/R-2021-0296-NM-STDC_HWY-ATK-HDG-PR_XS-DR-CD-000003_C01.pdf|R-2021-0296-NM-STDC_HWY-ATK-HDG-PR_XS-DR-CD-000003_C01.pdf]]:1: ARE CONCEPTUAL AND ARE SUBJECT TO CONTRACTOR [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf]]:5:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf]]:5:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 8_Underwater noise assessment.pdf|R-2020-0685-ESM-Appendix 8_Underwater noise assessment.pdf]]:4:where they are measured, they are referred back to a conceptual point 1 m away from the point of origin [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-EA R_2020_0685_ESM 4 March 2021 OFFICIAL.pdf|R-2020-0685-ESM-EA R_2020_0685_ESM 4 March 2021 OFFICIAL.pdf]]:2: • a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-OFFICER REPORT.pdf|R-2020-0685-ESM-OFFICER REPORT.pdf]]:9:• a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-OFFICER REPORT.pdf|R-2020-0685-ESM-OFFICER REPORT.pdf]]:27:• a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-OFFICER REPORT.pdf|R-2020-0685-ESM-OFFICER REPORT.pdf]]:98: • a conceptual model of the site indicating sources, pathways and [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:4:2002 Conceptual model of estuary processes. ABPmer, 2002 [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:7: Conceptual model of estuary [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-DECISION NOTICE.pdf|R-2020-0685-ESM-DECISION NOTICE.pdf]]:2: • a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:4:6 Preliminary Conceptual Site Model and Qualitative Risk Assessment 21 [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:4:Table 6-3: Preliminary Conceptual Model 24 [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:7: • Provide an initial Conceptual Site Model (CSM) to identify and assess potential contaminant [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:27:6 Preliminary Conceptual Site Model and Qualitative Risk [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:30:Table 6-3: Preliminary Conceptual Model [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:720:pathways. These linkages are summarised in the Preliminary Conceptual Site Model and Qualitative Risk [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:720:Receptor-Linkage’ in the Preliminary Conceptual Site Model and Qualitative Risk Assessment gives an [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf]]:1:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972. [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-60686_01 - Planning Statement - 28.06.19.pdf|R-2019-0427-FFM-60686_01 - Planning Statement - 28.06.19.pdf]]:22:6.24 The RS incorporates a conceptual model and environmental risk assessment to evaluate the [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-60686_01 - Planning Statement - 28.06.19.pdf|R-2019-0427-FFM-60686_01 - Planning Statement - 28.06.19.pdf]]:23: undertaken to better define and update the conceptual model. All phases of remediation works [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-MGE03867.pdf|R-2019-0427-FFM-MGE03867.pdf]]:1:The strategy also provides an overall conceptual model for the major potential [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-Officer report _R20190427FFM.pdf|R-2019-0427-FFM-Officer report _R20190427FFM.pdf]]:3:The strategy also provides an overall conceptual model for the major potential [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:3:3. Conceptual Model & Environmental Risk Assessment 81 [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:3:3.1 Conceptual Model 81 [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:6:  Conceptual Model and Environmental Risk Evaluation (Section 3); [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:38: Conceptual Site Model [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:38: The report presented a conceptual model, which identified the following potential contamination [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:81:3. Conceptual Model & Environmental Risk [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:81:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:81:3.1 Conceptual Model [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:3:3. Conceptual Model & Environmental Risk Assessment 79 [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:3:3.1 Conceptual Model 79 [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:6:  Conceptual Model and Environmental Risk Evaluation (Section 3); [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:36: Conceptual Site Model [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:36: The report presented a conceptual model, which identified the following potential contamination [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:79:3. Conceptual Model & Environmental Risk [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:79:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:79:3.1 Conceptual Model [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:82:The conceptual model does not consider risks to construction/ site maintenance workers on the basis that [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Environmental Risk Assessment.pdf|R-2021-0166-FFM-Environmental Risk Assessment.pdf]]:4:2 SUMMARY OF PRELIMINARY CONCEPTUAL SITE MODEL ................................ 3 [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Environmental Risk Assessment.pdf|R-2021-0166-FFM-Environmental Risk Assessment.pdf]]:4:2.3 Preliminary Conceptual Site Model ....................................................................................................4 [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Environmental Risk Assessment.pdf|R-2021-0166-FFM-Environmental Risk Assessment.pdf]]:5:5 UPDATED CONCEPTUAL SITE MODEL ............................................................... 27 [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Environmental Risk Assessment.pdf|R-2021-0166-FFM-Environmental Risk Assessment.pdf]]:7:source-pathway-receptor (SPR) linkages identified by the Site Condition Report within the conceptual site [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Environmental Risk Assessment.pdf|R-2021-0166-FFM-Environmental Risk Assessment.pdf]]:8:2 Summary of Preliminary Conceptual Site Model [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Environmental Risk Assessment.pdf|R-2021-0166-FFM-Environmental Risk Assessment.pdf]]:9:2.3 Preliminary Conceptual Site Model [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Environmental Risk Assessment.pdf|R-2021-0166-FFM-Environmental Risk Assessment.pdf]]:10: Figure 2: Preliminary Conceptual Site Model Area A [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Environmental Risk Assessment.pdf|R-2021-0166-FFM-Environmental Risk Assessment.pdf]]:11: Figure 3: Preliminary Conceptual Site Model Area B [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Environmental Risk Assessment.pdf|R-2021-0166-FFM-Environmental Risk Assessment.pdf]]:32:5 Updated Conceptual Site Model [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Environmental Risk Assessment.pdf|R-2021-0166-FFM-Environmental Risk Assessment.pdf]]:33: Figure 10: Update Conceptual Site Model foe SSI3 Area A [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Environmental Risk Assessment.pdf|R-2021-0166-FFM-Environmental Risk Assessment.pdf]]:34: Figure 10: Update Conceptual Site Model foe SSI3 Area B [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Geotechnical Risk Assessment .pdf|R-2021-0166-FFM-Geotechnical Risk Assessment .pdf]]:4:2 PRELIMINARY CONCEPTUAL SITE MODEL.......................................................... 3 [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Geotechnical Risk Assessment .pdf|R-2021-0166-FFM-Geotechnical Risk Assessment .pdf]]:4:2.3 Site Conceptualisation .........................................................................................................................4 [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Geotechnical Risk Assessment .pdf|R-2021-0166-FFM-Geotechnical Risk Assessment .pdf]]:4: Conceptual Site Model......................................................................................................................14 [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Geotechnical Risk Assessment .pdf|R-2021-0166-FFM-Geotechnical Risk Assessment .pdf]]:7:geotechnical development constraints identified by the site condition report within the conceptual site model [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Geotechnical Risk Assessment .pdf|R-2021-0166-FFM-Geotechnical Risk Assessment .pdf]]:8:2 Preliminary Conceptual Site Model [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Geotechnical Risk Assessment .pdf|R-2021-0166-FFM-Geotechnical Risk Assessment .pdf]]:9:2.3 Site Conceptualisation [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Geotechnical Risk Assessment .pdf|R-2021-0166-FFM-Geotechnical Risk Assessment .pdf]]:10: Figure 2: Updated Conceptual Site Model Area A [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Geotechnical Risk Assessment .pdf|R-2021-0166-FFM-Geotechnical Risk Assessment .pdf]]:11: Figure 3: Updated Conceptual Site Model Area B [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Geotechnical Risk Assessment .pdf|R-2021-0166-FFM-Geotechnical Risk Assessment .pdf]]:17: 3. Formation of conceptual site model and preliminary risk assessment; [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Geotechnical Risk Assessment .pdf|R-2021-0166-FFM-Geotechnical Risk Assessment .pdf]]:17: 5. Review of conceptual site model and risk assessment; [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Geotechnical Risk Assessment .pdf|R-2021-0166-FFM-Geotechnical Risk Assessment .pdf]]:17: 7. Final review of conceptual site model and risk assessment to determine the potential for future [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Geotechnical Risk Assessment .pdf|R-2021-0166-FFM-Geotechnical Risk Assessment .pdf]]:17:The methodology outlined above provides several opportunities to refine the conceptual site model and to [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Geotechnical Risk Assessment .pdf|R-2021-0166-FFM-Geotechnical Risk Assessment .pdf]]:17:of the conceptual site model and recommendations for mitigation methods. Due to the quantity of the slag [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Geotechnical Risk Assessment .pdf|R-2021-0166-FFM-Geotechnical Risk Assessment .pdf]]:19: Conceptual Site Model [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Ground Remediation Options Report.pdf|R-2021-0166-FFM-Ground Remediation Options Report.pdf]]:7:report and the development constraints identified by the geotechnical risk assessment within the conceptual [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Ground Remediation Options Report.pdf|R-2021-0166-FFM-Ground Remediation Options Report.pdf]]:9:The site condition report (SCR) developed a conceptual site model (CSM) based on ground investigation [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Ground Remediation Options Report.pdf|R-2021-0166-FFM-Ground Remediation Options Report.pdf]]:26:considered within the conceptual site model. [[this>Teesworks/Planning/R-2022-0494-FFM/R-2022-0494-FFM-21089271_1.pdf|R-2022-0494-FFM-21089271_1.pdf]]:4:2 SITE CONCEPTUALISATION................................................................................... 3 [[this>Teesworks/Planning/R-2022-0494-FFM/R-2022-0494-FFM-21089271_1.pdf|R-2022-0494-FFM-21089271_1.pdf]]:9:2 Site Conceptualisation [[this>Teesworks/Planning/R-2021-0855-CD/R-2021-0855-CD-ApplicationFormRedacted.pdf|R-2021-0855-CD-ApplicationFormRedacted.pdf]]:3: • a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2021-0855-CD/R-2021-0855-CD-61586_01 - Covering Leter - 05.10.21.PDF|R-2021-0855-CD-61586_01 - Covering Leter - 05.10.21.PDF]]:1: • a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2021-0855-CD/R-2021-0855-CD-Decision Notice.pdf|R-2021-0855-CD-Decision Notice.pdf]]:2: • a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2021-0855-CD/R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf|R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf]]:4: Scope and Objectives pathway-receptor approach to refine the existing conceptual site model (CSM); [[this>Teesworks/Planning/R-2021-0855-CD/R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf|R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf]]:6: changes have been made to the conceptual understanding of this area, and no additional [[this>Teesworks/Planning/R-2021-0855-CD/R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf|R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf]]:7: the Teesworks where Made Ground is a single source. However, first a detailed conceptual [[this>Teesworks/Planning/R-2021-0855-CD/R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf|R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf]]:9:Figure 4 – Conceptual Site Model – Cross Section [[this>Teesworks/Planning/R-2021-0855-CD/R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf|R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf]]:11:will help refine the present conceptual site model (CSM) and define potential risks posed to the River Tees by [[this>Teesworks/Planning/R-2021-0855-CD/R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf|R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf]]:23:down-gradient. Figure 4 includes a simplified profile of the geological conditions, alongside a conceptual [[this>Teesworks/Planning/R-2021-0855-CD/R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf|R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf]]:29:Based on the above assessment of contaminant distribution, the conceptual understanding of site sources [[this>Teesworks/Planning/R-2021-0855-CD/R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf|R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf]]:29:remains the same as the SBA DQRA; that the site can be conceptualised as comprising two sources to [[this>Teesworks/Planning/R-2021-0855-CD/R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf|R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf]]:29:primary water resource receptor (River Tees). As no changes have been made to the conceptual [[this>Teesworks/Planning/R-2021-0855-CD/R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf|R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf]]:30:reducing the flow of groundwater). The Made Ground source has therefore been conceptualised as the [[this>Teesworks/Planning/R-2021-0855-CD/R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf|R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf]]:30:conceptual review of any areas assessed in future needs to be undertaken. In particular, confirming sources, [[this>Teesworks/Planning/R-2021-0855-CD/R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf|R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf]]:42:conceptual model, such as the collection of additional site data, may result in changes to the SSAC defined [[this>Teesworks/Planning/R-2021-0855-CD/R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf|R-2021-0855-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02_SB_DQRA_Part1.pdf]]:43:where Made Ground is a single source. However, first a detailed conceptual review of any areas assessed in [[this>Teesworks/Planning/R-2021-0855-CD/R-2021-0855-CD-Officer report.pdf|R-2021-0855-CD-Officer report.pdf]]:1:• a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf|R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf]]:4:2 SITE CONCEPTUALISATION................................................................................... 3 [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf|R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf]]:4:3 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE CONDITION [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf|R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf]]:5:3.8 Conceptual Site Model .......................................................................................................................29 [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf|R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf]]:8:The aim of this site condition reports is to use the available information to develop a conceptual site model for [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf|R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf]]:9:2 Site Conceptualisation [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf|R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf]]:25:3 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf|R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf]]:25:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf|R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf]]:35:3.8 Conceptual Site Model [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-Officer Report 1048.pdf|R-2021-1048-FFM-Officer Report 1048.pdf]]:4:- a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-Officer Report 1048.pdf|R-2021-1048-FFM-Officer Report 1048.pdf]]:11:The Preliminary Conceptual Site Model and Preliminary Qualitative Risk [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf|R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf]]:11: • Site Conceptual model specific to the Net Zero site and covering any off [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf|R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf]]:11: • The site conceptual model and risk assessment should take into [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf|R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf]]:22: ensure the most accurate and robust conceptual site model can be derived for the site. “ [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf|R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf]]:24: undertaken which clearly demonstrate the movement of in terms of the conceptual site model to identify consistency of behaviour within groundwater, plans need not [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf|R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf]]:25:Site Conceptual model specific to the Net Zero [[sic]] site and [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf|R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf]]:26:The site conceptual model and risk assessment should take Where preferential pathways are identified within the remediation area they will be appropriately managed [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf|R-2021-1048-FFM-63262 NZT - Response to EA - 06.05.22.pdf]]:31: (conceptualised as the source) and these conditions have existed for at least 50 years, and on the majority of [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf]]:2: report including schematic site conceptual model and Detailed Quantitative Risk Assessment (DQRA) – [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf]]:2: the most recent schematic site conceptual model and [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf]]:5: contamination has been observed within controlled review of the conceptual site model in Section 5. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf]]:7: schematic site conceptual model which highlights the most recent schematic site conceptual model and [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf]]:11: investigation interpretative report including schematic site conceptual [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-CO-ZZ-0486-01-Net_Zero_Rem_Clarification_EA.pdf]]:13:• The submitted information does not provide a schematic site conceptual [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:5:7 PRELIMINARY CONCEPTUAL SITE MODEL........................................................ 19 [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:7:• Development of a conceptual site model (CSM) in line with UK regulatory information. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:25:7 Preliminary Conceptual Site Model [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:25:geo-environmental conceptual site model (CSM). [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-EA_R20211048FFM_OFFICIAL_270122.pdf|R-2021-1048-FFM-EA_R20211048FFM_OFFICIAL_270122.pdf]]:3: investigation interpretative report including schematic site conceptual [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-EA_R20211048FFM_OFFICIAL_270122.pdf|R-2021-1048-FFM-EA_R20211048FFM_OFFICIAL_270122.pdf]]:5:• The submitted information does not provide a schematic site conceptual [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-EA_R20211048FFM_OFFICIAL_010722.pdf|R-2021-1048-FFM-EA_R20211048FFM_OFFICIAL_010722.pdf]]:1: - a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf|R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf]]:5:Preliminary Conceptual Site Model ................................................................................................. 5-4 [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf|R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf]]:16:The interpretive report and executive summary includes a conceptual site model as well as an [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf|R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf]]:30:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf|R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf]]:30:Preliminary Conceptual Site Model [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf|R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf]]:30:using a risk based approach. Risks are evaluated according to the site specific conceptual site model that [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf|R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf]]:31:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf|R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf]]:32:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf|R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf]]:33:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf|R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf]]:34:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-TW-SIZ-XX-JBAU-00-00-RP-EN-0001-S1-P02-NZT_FRA.pdf|R-2021-1048-FFM-TW-SIZ-XX-JBAU-00-00-RP-EN-0001-S1-P02-NZT_FRA.pdf]]:35: A desk study with a groundwater constraints assessment and conceptual model would be [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:5:7 PRELIMINARY CONCEPTUAL SITE MODEL ........................................................ 18 [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:7: Development of a conceptual site model (CSM) in line with UK regulatory information. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:24:7 Preliminary Conceptual Site Model [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:24:geo-environmental conceptual site model (CSM). [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf]]:4:2.6 Conceptual Site Model .............................................................................................................. 8 [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf]]:9:conceptual site model (CSM) for the contract area in order to develop the final remediation technology [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf]]:14:2.6 Conceptual Site Model [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf]]:14:wider landholding and is documented in Arcadis [[2018a]]. As part of this study a conceptual site model [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf]]:16: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf]]:33:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-02-Rem_Strat_NetZero.pdf]]:40: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf]]:8:3 Initial Conceptual Site Model ................................................................................................................... 25 [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf]]:8:5 Review of Conceptual Site Model ........................................................................................................... 42 [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf]]:9:Figure 9 Conceptual Site Model Cross Section [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf]]:13:conceptual understanding of the Site. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf]]:28:3 Initial Conceptual Site Model [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf]]:31:planned industrial development, this conceptualisation is likely a conservative assumption. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf]]:32:site and as such they have been retained here as the underlying conceptual model used in their development [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf]]:32:is consistent with the conceptual site model for this Site. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf]]:32: Grangetown Prairie Area, Former Steelworks, Redcar, Detailed Conceptual Site Model Review and Risk [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf]]:45:5 Review of Conceptual Site Model [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf]]:45:includes a simplified profile of the geological conditions, alongside a conceptual cross-section identifying [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf]]:53:have been conceptualised as presented in Figure 9. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf]]:61:defined using the Site investigation data available at the present time. Modifications to the conceptual model, [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-02-LWoW_DQRA.pdf]]:83: MADE GROUND CONCEPTUAL PHYSICAL [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:27: The source-pathway-receptor model is a conceptual risk model employed by 6 Alpha across all projects [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf]]:8:3 Initial Conceptual Site Model ................................................................................................................... 27 [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf]]:8:5 Review of Conceptual Site Model ........................................................................................................... 44 [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf]]:9:Figure 9 Conceptual Site Model Cross Section [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf]]:13:conceptual understanding of the Site. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf]]:30:3 Initial Conceptual Site Model [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf]]:33:planned industrial development, this conceptualisation is likely a conservative assumption. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf]]:34:site and as such they have been retained here as the underlying conceptual model used in their development [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf]]:34:is consistent with the conceptual site model for this Site. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf]]:34:3 Grangetown Prairie Area, Former Steelworks, Redcar, Detailed Conceptual Site Model Review and Risk [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf]]:47:5 Review of Conceptual Site Model [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf]]:47:includes a simplified profile of the geological conditions, alongside a conceptual cross-section identifying [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf]]:55:have been conceptualised as presented in Figure 9. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf]]:63:defined using the Site investigation data available at the present time. Modifications to the conceptual model, [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-03-LWoW_DQRA.pdf]]:88: MADE GROUND CONCEPTUAL PHYSICAL [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf|R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf]]:5:Preliminary Conceptual Site Model .................................................................................................. 5‐6 [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf|R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf]]:18: includes a conceptual site [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf|R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf]]:38:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf|R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf]]:38:Preliminary Conceptual Site Model [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf|R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf]]:38:using a risk based approach. Risks are evaluated according to the site specific conceptual site model that [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf|R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf]]:39: SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf|R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf]]:40:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf|R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf]]:41:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf|R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf]]:42:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf]]:8:5 Review of Conceptual Site Model ........................................................................................................... 31 [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf]]:8:Figure 6 Conceptual Site Model Cross Section [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf]]:11:including the existing conceptual site model, as a secondary line of supporting evidence for Site conditions. The [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf]]:12:conceptual understanding of the Site. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf]]:27:planned industrial development, this conceptualisation is likely a conservative assumption. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf]]:28:site and as such they have been retained here as the underlying conceptual model used in their development [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf]]:28:is consistent with the conceptual site model for this Site. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf]]:28: Grangetown Prairie Area, Former Steelworks, Redcar, Detailed Conceptual Site Model Review and Risk [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf]]:40:5 Review of Conceptual Site Model [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf]]:40:includes a simplified profile of the geological conditions, alongside a conceptual cross-section identifying [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf]]:48:have been conceptualised as presented in Figure 6. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf]]:56:defined using the Site investigation data available at the present time. Modifications to the conceptual model, [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0428-01-Net_Zero_DQRA.pdf]]:69: MADE GROUND CONCEPTUAL PHYSICAL [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-MGE04767 Cont Land Response.pdf|R-2021-1048-FFM-MGE04767 Cont Land Response.pdf]]:2:The Preliminary Conceptual Site Model and Preliminary Qualitative Risk Assessment [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:5:7 PRELIMINARY CONCEPTUAL SITE MODEL ........................................................ 18 [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:7: Development of a conceptual site model (CSM) in line with UK regulatory information. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:24:7 Preliminary Conceptual Site Model [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:24:geo-environmental conceptual site model (CSM). [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf]]:4:2.6 Conceptual Site Model .............................................................................................................. 8 [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf]]:9:conceptual site model (CSM) for the contract area in order to develop the final remediation technology [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf]]:14:2.6 Conceptual Site Model [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf]]:14:landholding and is documented in Arcadis [[2018a]]. As part of this study a conceptual site model (CSM) [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf]]:16:Figure 3 - Conceptual Site Model [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf]]:34:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0417-05-Rem_Strat_LWoW.pdf]]:43: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-COMPLIANCE OFFFICER REPORT.pdf|R-2021-0100-CD-COMPLIANCE OFFFICER REPORT.pdf]]:2:Detailed Conceptual Site Model Review and Risk Assessment (10035117-AUK-XX- [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-COMPLIANCE OFFFICER REPORT.pdf|R-2021-0100-CD-COMPLIANCE OFFFICER REPORT.pdf]]:2:Phase II Environmental Site Assessment – Addendum, Detailed Conceptual Site [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-COMPLIANCE OFFFICER REPORT.pdf|R-2021-0100-CD-COMPLIANCE OFFFICER REPORT.pdf]]:3:Following on from addendum report the Detailed Conceptual Site Model Review [[this>Teesworks/Planning/R-2021-0100-CD/b/COMPLIANCE OFFFICER REPORT.pdf|COMPLIANCE OFFFICER REPORT.pdf]]:2:Detailed Conceptual Site Model Review and Risk Assessment (10035117-AUK-XX- [[this>Teesworks/Planning/R-2021-0100-CD/b/COMPLIANCE OFFFICER REPORT.pdf|COMPLIANCE OFFFICER REPORT.pdf]]:2:Phase II Environmental Site Assessment – Addendum, Detailed Conceptual Site [[this>Teesworks/Planning/R-2021-0100-CD/b/COMPLIANCE OFFFICER REPORT.pdf|COMPLIANCE OFFFICER REPORT.pdf]]:3:Following on from addendum report the Detailed Conceptual Site Model Review [[this>Teesworks/Planning/R-2021-0100-CD/b/MGE04321 Cont Land.pdf|MGE04321 Cont Land.pdf]]:1:Phase II Environmental Site Assessment – Addendum, Detailed Conceptual Site [[this>Teesworks/Planning/R-2021-0100-CD/b/MGE04321 Cont Land.pdf|MGE04321 Cont Land.pdf]]:2: Following on from addendum report the Detailed Conceptual Site Model Review [[this>Teesworks/Planning/R-2021-0100-CD/b/Phase II ESA.pdf|Phase II ESA.pdf]]:4:2 SITE CONCEPTUALISATION................................................................................... 3 [[this>Teesworks/Planning/R-2021-0100-CD/b/Phase II ESA.pdf|Phase II ESA.pdf]]:5:3.8 Conceptual Site Model .......................................................................................................................29 [[this>Teesworks/Planning/R-2021-0100-CD/b/Phase II ESA.pdf|Phase II ESA.pdf]]:5:5 UPDATED CONCEPTUAL SITE MODEL ............................................................... 48 [[this>Teesworks/Planning/R-2021-0100-CD/b/Phase II ESA.pdf|Phase II ESA.pdf]]:7:conceptual site model (CSM) for the site and identify the significance of any source-pathway-receptor (SPR) [[this>Teesworks/Planning/R-2021-0100-CD/b/Phase II ESA.pdf|Phase II ESA.pdf]]:9:2 Site Conceptualisation [[this>Teesworks/Planning/R-2021-0100-CD/b/Phase II ESA.pdf|Phase II ESA.pdf]]:24:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model [[this>Teesworks/Planning/R-2021-0100-CD/b/Phase II ESA.pdf|Phase II ESA.pdf]]:35:3.8 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0100-CD/b/Phase II ESA.pdf|Phase II ESA.pdf]]:54:5 Updated Conceptual Site Model [[this>Teesworks/Planning/R-2021-0100-CD/b/Phase II ESA.pdf|Phase II ESA.pdf]]:72: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2021-0100-CD/b/Phase II ESA.pdf|Phase II ESA.pdf]]:74: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:24:further assessment. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:24:in groundwater cannot be ruled out. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:24:the Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in press. [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:25:assessment, this is being undertaken as part of a detailed conceptual model review and risk assessment, [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:25:identified above the WQS. A detailed conceptual site model review and risk assessment is being undertaken [[this>Teesworks/Planning/R-2021-0100-CD/b/STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:3:3. Conceptual Site Model 12 [[this>Teesworks/Planning/R-2021-0100-CD/b/STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:3:7. Updated Conceptual Model 32 [[this>Teesworks/Planning/R-2021-0100-CD/b/STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:5:Table 3-3 - Conceptual Site Model 15 [[this>Teesworks/Planning/R-2021-0100-CD/b/STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:5:Table 7-1 - Updated Conceptual Model 33 [[this>Teesworks/Planning/R-2021-0100-CD/b/STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:6: Conceptual Site Model based on knowledge of the scheme in line with LCRM; [[this>Teesworks/Planning/R-2021-0100-CD/b/STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:6: Conceptual Model based on results of investigation; and; [[this>Teesworks/Planning/R-2021-0100-CD/b/STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:12:3. Conceptual Site Model [[this>Teesworks/Planning/R-2021-0100-CD/b/STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:12:(LC:RM) [[13]] document. The assessment involves the development of a Conceptual Site Model (CSM) which [[this>Teesworks/Planning/R-2021-0100-CD/b/STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:15:Table 3-3 - Conceptual Site Model [[this>Teesworks/Planning/R-2021-0100-CD/b/STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:32:7. Updated Conceptual Model [[this>Teesworks/Planning/R-2021-0100-CD/b/STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:33:Table 7-1 - Updated Conceptual Model [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:1:Detailed Conceptual Site Model Review and Risk [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:3:Grangetown Prairie Area, Former Steelworks Redcar, Detailed Conceptual Site Model Review and Risk [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:5:7 REFINED CONCEPTUAL SITE MODEL................................................................. 18 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:6:Figure 6 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:7:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:8:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:8:presented provides the basis for the conceptual understanding of the Site. A large number of reports have [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:8:  Refinement of site conceptualisation based on-site specific data (geological and hydrogeological [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:9:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:10:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:10:ESA. The aim of the ESA was to use available information to develop a Conceptual Site Model (CSM) for the [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:11:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:12:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:13:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:14:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:15:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:16:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:17:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:18:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:19:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:20:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:21:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:22:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:23:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:24:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:24:7 Refined Conceptual Site Model [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:24:A Conceptual Site Model and a site-specific cross-section are presented on Figure 6. [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:25:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:26:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:27:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:28:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:36:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:37:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:38:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:39:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:40:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:41:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:42:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:42:is defined using the site investigation data available at the present time. Modifications to the conceptual model, [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:43:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/b/10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:44:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-MGE04321 Cont Land.pdf|R-2021-0100-CD-MGE04321 Cont Land.pdf]]:1:Phase II Environmental Site Assessment – Addendum, Detailed Conceptual Site [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-MGE04321 Cont Land.pdf|R-2021-0100-CD-MGE04321 Cont Land.pdf]]:2: Following on from addendum report the Detailed Conceptual Site Model Review [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:1:Detailed Conceptual Site Model Review and Risk [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:3:Grangetown Prairie Area, Former Steelworks Redcar, Detailed Conceptual Site Model Review and Risk [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:5:7 REFINED CONCEPTUAL SITE MODEL................................................................. 18 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:6:Figure 6 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:7:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:8:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:8:presented provides the basis for the conceptual understanding of the Site. A large number of reports have [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:8:  Refinement of site conceptualisation based on-site specific data (geological and hydrogeological [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:9:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:10:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:10:ESA. The aim of the ESA was to use available information to develop a Conceptual Site Model (CSM) for the [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:11:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:12:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:13:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:14:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:15:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:16:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:17:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:18:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:19:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:20:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:21:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:22:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:23:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:24:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:24:7 Refined Conceptual Site Model [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:24:A Conceptual Site Model and a site-specific cross-section are presented on Figure 6. [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:25:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:26:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:27:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:28:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:36:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:37:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:38:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:39:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:40:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:41:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:42:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:42:is defined using the site investigation data available at the present time. Modifications to the conceptual model, [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:43:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment.pdf]]:44:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:24:further assessment. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:24:in groundwater cannot be ruled out. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:24:the Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in press. [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:25:assessment, this is being undertaken as part of a detailed conceptual model review and risk assessment, [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:25:identified above the WQS. A detailed conceptual site model review and risk assessment is being undertaken [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-Phase II ESA.pdf|R-2021-0100-CD-Phase II ESA.pdf]]:4:2 SITE CONCEPTUALISATION................................................................................... 3 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-Phase II ESA.pdf|R-2021-0100-CD-Phase II ESA.pdf]]:5:3.8 Conceptual Site Model .......................................................................................................................29 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-Phase II ESA.pdf|R-2021-0100-CD-Phase II ESA.pdf]]:5:5 UPDATED CONCEPTUAL SITE MODEL ............................................................... 48 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-Phase II ESA.pdf|R-2021-0100-CD-Phase II ESA.pdf]]:7:conceptual site model (CSM) for the site and identify the significance of any source-pathway-receptor (SPR) [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-Phase II ESA.pdf|R-2021-0100-CD-Phase II ESA.pdf]]:9:2 Site Conceptualisation [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-Phase II ESA.pdf|R-2021-0100-CD-Phase II ESA.pdf]]:24:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-Phase II ESA.pdf|R-2021-0100-CD-Phase II ESA.pdf]]:35:3.8 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-Phase II ESA.pdf|R-2021-0100-CD-Phase II ESA.pdf]]:54:5 Updated Conceptual Site Model [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-Phase II ESA.pdf|R-2021-0100-CD-Phase II ESA.pdf]]:72: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-Phase II ESA.pdf|R-2021-0100-CD-Phase II ESA.pdf]]:74: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:3:3. Conceptual Site Model 12 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:3:7. Updated Conceptual Model 32 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:5:Table 3-3 - Conceptual Site Model 15 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:5:Table 7-1 - Updated Conceptual Model 33 [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:6: Conceptual Site Model based on knowledge of the scheme in line with LCRM; [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:6: Conceptual Model based on results of investigation; and; [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:12:3. Conceptual Site Model [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:12:(LC:RM) [[13]] document. The assessment involves the development of a Conceptual Site Model (CSM) which [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:15:Table 3-3 - Conceptual Site Model [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:32:7. Updated Conceptual Model [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000001_C01.pdf]]:33:Table 7-1 - Updated Conceptual Model [[this>Teesworks/Planning/R-2021-0753-FFM/R-2021-0753-FFM-Arcadis - South Bank Strategy.pdf|R-2021-0753-FFM-Arcadis - South Bank Strategy.pdf]]:4:2.6 Conceptual Site Model .............................................................................................................. 4 [[this>Teesworks/Planning/R-2021-0753-FFM/R-2021-0753-FFM-Arcadis - South Bank Strategy.pdf|R-2021-0753-FFM-Arcadis - South Bank Strategy.pdf]]:8:the conceptual site model (CSM) for the contract area in order to develop the final remediation [[this>Teesworks/Planning/R-2021-0753-FFM/R-2021-0753-FFM-Arcadis - South Bank Strategy.pdf|R-2021-0753-FFM-Arcadis - South Bank Strategy.pdf]]:10:2.5 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0753-FFM/R-2021-0753-FFM-Arcadis - South Bank Strategy.pdf|R-2021-0753-FFM-Arcadis - South Bank Strategy.pdf]]:10:developed a conceptual site model (CSM) based on ground investigation findings. The CSM identified [[this>Teesworks/Planning/R-2021-0753-FFM/R-2021-0753-FFM-Arcadis - South Bank Strategy.pdf|R-2021-0753-FFM-Arcadis - South Bank Strategy.pdf]]:26:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:5:3. Conceptual Model & Environmental Risk Assessment 81 [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:5:3.1 Conceptual Model 81 [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:8:  Conceptual Model and Environmental Risk Evaluation (Section 3); [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:40: Conceptual Site Model [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:40: The report presented a conceptual model, which identified the following potential contamination [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:83:3. Conceptual Model & Environmental Risk [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:83:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:83:3.1 Conceptual Model [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:327:Preliminary Conceptual Site Model .................................................................................................. 5‐1 [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:404:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:404:Preliminary Conceptual Site Model [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:405:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:406: SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:407:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:408: SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:409:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:410: SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:411:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:413:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:415:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:417:SECTION 5 – PRELIMINARY CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:421:The table below describes the main risks highlighted by the conceptual site model and describes the [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:599: conceptual model of the site and its surroundings, and [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:600: • to collect data to reduce the uncertainties in the conceptual model presented within the [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:600:the conceptual site model for each area has been reviewed together with the source characteristics to [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:600: • resolve any uncertainties in the conceptual site model, and [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:603:conceptual model for the site detailed with the Supplementary Phase I Report (Ref. 4) and Supplementary [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:604: • confirm the ground and groundwater aspect within the conceptual site model. [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:604: • confirm the ground and groundwater aspect within the conceptual site model. [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:641: guidance, which in this case has involved development of a conceptual model [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:807:2. REDCAR SITE - CONCEPTUAL MODEL AN D RISK ASSESSMENT 4 [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:807: 2.5 Conceptual Site Model 6 [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:807:3. LACKENBY SITE - CONCEPTUAL MODEL AN D RISK ASSESSMENT 10 [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:807: 3.4 Conceptual Model 11 [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:807:4. CLEVELAND SITE - CONCEPTUAL MODEL AN D RISK [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:807: 4.5 Conceptual Site Model 16 [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:808:Figure 4 Conceptual Site Model, Redcar [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:808:Figure 7 Conceptual Site Model, Lackenby [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:808:Figure 10 Conceptual Site Model, Cleveland [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:809: development of a conceptual model for the three sites representing the relationship [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:811: conditions, a Conceptual Model identifying potential pollutant linkages and the [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:812: 2. REDCAR SITE - CONCEPTUAL MODEL AND RISK [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:814: 2.5 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:818: 3. LACKENBY SITE - CONCEPTUAL MODEL AND RISK [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:819: 3.4 Conceptual Model [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:819: Our Conceptual Site Model for the Lackenby Site is described below with a [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:822: 4. CLEVELAND SITE - CONCEPTUAL MODEL AND RISK [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:824: 4.5 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:824: Our Conceptual Site Model for the Cleveland Site is described below with a [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:838: Figure 4 Conceptual Site Model, Redcar [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:839: Figure 4 - Conceptual Site Model, [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:844: Figure 7 Conceptual Site Model, Lackenby [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:845: Figure 7 - Conceptual Site Model, [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:850: Figure 10 Conceptual Site Model, Cleveland [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:851: Figure 10 - Conceptual Site Model, [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:893:more uniform water table condition across other sites, local Summary Conceptual Site Model [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:898:Summary Conceptual Site Model migration of shallow groundwater and the SSSI. [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf|R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf]]:8: the baseline conditions. The Conceptual Site Model (CSM) presented in the Outline Remedial [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf|R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf]]:43: 5 CSM Conceptual Site Model [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf|R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf]]:31:G4.31 The conceptual understanding of the overall groundwater functioning of the site is for direct [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-Energy and Utilities Strategy.pdf|R-2020-0357-OOM-Energy and Utilities Strategy.pdf]]:10: The masterplan discusses conceptual energy plans based on renewable and natural [[this>Teesworks/Planning/R-2019-0767-OOM/b/2019s0951 - Energy Recovery Facility Environmental Statement.pdf|2019s0951 - Energy Recovery Facility Environmental Statement.pdf]]:131: The conceptual understanding of the overall groundwater functioning of the site is for [[this>Teesworks/Planning/R-2019-0767-OOM/R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf|R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf]]:131: The conceptual understanding of the overall groundwater functioning of the site is for [[this>Teesworks/Planning/R-2021-0725-CD/R-2021-0725-CD-SUDS AND RIVER RESTORATION PLAN AND SECTION 1 OF 3 (STDC_HWY-ATK-HDG-PR_XS-DR-CD-000001_C02).pdf|R-2021-0725-CD-SUDS AND RIVER RESTORATION PLAN AND SECTION 1 OF 3 (STDC_HWY-ATK-HDG-PR_XS-DR-CD-000001_C02).pdf]]:1: ESTON ROAD ARE CONCEPTUAL AND ARE SUBJECT TO CONTRACTOR [[this>Teesworks/Planning/R-2021-0725-CD/R-2021-0725-CD-SUDS AND RIVER RESTORATION PLAN AND SECTION 3 OF 3 (STDC_HWY-ATK-HDG-PR_XS-DR-CD-000003_C02).pdf|R-2021-0725-CD-SUDS AND RIVER RESTORATION PLAN AND SECTION 3 OF 3 (STDC_HWY-ATK-HDG-PR_XS-DR-CD-000003_C02).pdf]]:1: ARE CONCEPTUAL AND ARE SUBJECT TO CONTRACTOR [[this>Teesworks/Planning/R-2021-0725-CD/R-2021-0725-CD-SUDS AND RIVER RESTORATION PLAN AND SECTION 2 OF 3 (STDC_HWY-ATK-HDG-PR_XS-DR-CD-000002_C02).pdf|R-2021-0725-CD-SUDS AND RIVER RESTORATION PLAN AND SECTION 2 OF 3 (STDC_HWY-ATK-HDG-PR_XS-DR-CD-000002_C02).pdf]]:1: ESTON ROAD WIDENED RE-ALIGNED ARE CONCEPTUAL AND ARE SUBJECT TO CONTRACTOR [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf]]:4:2 SITE CONCEPTUALISATION................................................................................... 3 [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf]]:5:3.8 Conceptual Site Model .......................................................................................................................11 [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf]]:5:5 UPDATED CONCEPTUAL SITE MODEL ............................................................... 20 [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf]]:7:conceptual site model (CSM) for the site and identify the potential significance of any source-pathway-receptor [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf]]:9:2 Site Conceptualisation [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf]]:17:3.8 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf]]:26:5 Updated Conceptual Site Model [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf]]:33: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf]]:37: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:4:2 SITE CONCEPTUALISATION................................................................................... 3 [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:5:3.8 Conceptual Site Model ....................................................................................................................... 11 [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:5:5 UPDATED CONCEPTUAL SITE MODEL ............................................................... 20 [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:7:conceptual site model (CSM) for the site and identify the potential significance of any source-pathway-receptor [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:9:2 Site Conceptualisation [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:17:3.8 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:26:5 Updated Conceptual Site Model [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:33: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:37: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf]]:4:2.7 Conceptual Site Model .............................................................................................................. 6 [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf]]:7:the geotechnical risk assessment within the conceptual site model (CSM) for the contract area in order [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf]]:12:2.7 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf]]:12:The ESA for shallow soils developed a conceptual site model (CSM) based on ground investigation [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf]]:30:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf]]:40: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf]]:4:2 SITE CONCEPTUALISATION................................................................................... 3 [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf]]:5:3.9 Conceptual Site Model ....................................................................................................................... 17 [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf]]:5:5 UPDATED CONCEPTUAL SITE MODEL ............................................................... 31 [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf]]:7:conceptual site model (CSM) for the site and identify the potential significance of any source-pathway-receptor [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf]]:9:2 Site Conceptualisation [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf]]:17:Conceptual Site Model (CSM). [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf]]:23:3.9 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf]]:37:5 Updated Conceptual Site Model [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf]]:46: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf]]:47: Updated Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF]]:17: further site investigation and risk assessment in order to further inform the CSM (conceptual [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF]]:40: 5 CSM Conceptual Site Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:12: guidance, which in this case has involved development of a conceptual model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:179:2. REDCAR SITE - CONCEPTUAL MODEL AN D RISK ASSESSMENT 4 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:179: 2.5 Conceptual Site Model 6 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:179:3. LACKENBY SITE - CONCEPTUAL MODEL AN D RISK ASSESSMENT 10 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:179: 3.4 Conceptual Model 11 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:179:4. CLEVELAND SITE - CONCEPTUAL MODEL AN D RISK [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:179: 4.5 Conceptual Site Model 16 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:180:Figure 4 Conceptual Site Model, Redcar [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:180:Figure 7 Conceptual Site Model, Lackenby [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:180:Figure 10 Conceptual Site Model, Cleveland [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:181: development of a conceptual model for the three sites representing the relationship [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:183: conditions, a Conceptual Model identifying potential pollutant linkages and the [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:184: 2. REDCAR SITE - CONCEPTUAL MODEL AND RISK [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:186: 2.5 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:190: 3. LACKENBY SITE - CONCEPTUAL MODEL AND RISK [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:191: 3.4 Conceptual Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:191: Our Conceptual Site Model for the Lackenby Site is described below with a [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:194: 4. CLEVELAND SITE - CONCEPTUAL MODEL AND RISK [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:196: 4.5 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:196: Our Conceptual Site Model for the Cleveland Site is described below with a [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:210: Figure 4 Conceptual Site Model, Redcar [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:211: Figure 4 - Conceptual Site Model, [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:216: Figure 7 Conceptual Site Model, Lackenby [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:217: Figure 7 - Conceptual Site Model, [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:222: Figure 10 Conceptual Site Model, Cleveland [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:223: Figure 10 - Conceptual Site Model, [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:266:more uniform water table condition across other sites, local Summary Conceptual Site Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:271:Summary Conceptual Site Model migration of shallow groundwater and the SSSI. [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1415:2 SUMMARY OF PRELIMINARY CONCEPTUAL SITE MODEL ................................ 3 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1415:2.3 Preliminary Conceptual Site Model ....................................................................................................4 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1416:5 UPDATED CONCEPTUAL SITE MODEL ............................................................... 27 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1418:source-pathway-receptor (SPR) linkages identified by the Site Condition Report within the conceptual site [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1419:2 Summary of Preliminary Conceptual Site Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1420:2.3 Preliminary Conceptual Site Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1421: Figure 2: Preliminary Conceptual Site Model Area A [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1422: Figure 3: Preliminary Conceptual Site Model Area B [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1443:5 Updated Conceptual Site Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1444: Figure 10: Update Conceptual Site Model foe SSI3 Area A [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1445: Figure 10: Update Conceptual Site Model foe SSI3 Area B [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1489:2 SITE CONCEPTUALISATION ................................................................................... 3 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1489:3 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE CONDITION [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1490:3.9 Conceptual Site Model .......................................................................................................................27 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1490:4 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE CONDITION [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1490:4.9 Conceptual Site Model .......................................................................................................................39 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1494:The aim of this site condition reports is to use the available information to develop a conceptual site model for [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1495:2 Site Conceptualisation [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1511:3 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1511:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1519:3.9 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1521:4 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1521:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1531:4.9 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1587:2 PRELIMINARY CONCEPTUAL SITE MODEL.......................................................... 3 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1587:2.3 Site Conceptualisation .........................................................................................................................4 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1587: Conceptual Site Model......................................................................................................................14 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1590:geotechnical development constraints identified by the site condition report within the conceptual site model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1591:2 Preliminary Conceptual Site Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1592:2.3 Site Conceptualisation [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1593: Figure 2: Updated Conceptual Site Model Area A [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1594: Figure 3: Updated Conceptual Site Model Area B [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1600: 3. Formation of conceptual site model and preliminary risk assessment; [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1600: 5. Review of conceptual site model and risk assessment; [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1600: 7. Final review of conceptual site model and risk assessment to determine the potential for future [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1600:The methodology outlined above provides several opportunities to refine the conceptual site model and to [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1600:of the conceptual site model and recommendations for mitigation methods. Due to the quantity of the slag [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1602: Conceptual Site Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1625:report and the development constraints identified by the geotechnical risk assessment within the conceptual [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1627:The site condition report (SCR) developed a conceptual site model (CSM) based on ground investigation [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1662:3. Conceptual Model & Environmental Risk Assessment 81 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1662:3.1 Conceptual Model 81 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1665:  Conceptual Model and Environmental Risk Evaluation (Section 3); [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1697: Conceptual Site Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1697: The report presented a conceptual model, which identified the following potential contamination [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1740:3. Conceptual Model & Environmental Risk [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1740:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1740:3.1 Conceptual Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1881:The strategy also provides an overall conceptual model for the major potential [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF]]:34:F4.35 The conceptual understanding of the overall groundwater functioning of the site is for direct [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:3:3. Conceptual Model & Environmental Risk Assessment 89 [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:3:3.1 Conceptual Model 89 [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:6:  Conceptual Model and Environmental Risk Evaluation (Section 3); [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:42: Conceptual Site Model [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:42: The report presented a conceptual model, which identified the following potential contamination [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:89:3. Conceptual Model & Environmental Risk [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:89:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:89:3.1 Conceptual Model [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:92:The conceptual model does not consider risks to construction/ site maintenance workers on the basis that [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-DXL-JBAU-00-00-C-RP-0001-S03-P01-FRA_and_Design_Justification.PDF|R-2020-0270-FFM-DXL-JBAU-00-00-C-RP-0001-S03-P01-FRA_and_Design_Justification.PDF]]:29: Outline the conceptual model, addressing The main site of interest is an open watercourse to the east [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf|R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf]]:5:7 CONCEPTUAL SITE MODEL AND RISK ASSESSMENT ..................................... 11 [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf|R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf]]:6:Figure 5: Conceptual Site Model and Risk Assessment [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf|R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf]]:17:7 Conceptual Site Model and Risk Assessment [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf|R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf]]:17:The Conceptual Site Model (CSM) and Environmental Risk Assessment for remediation works is presented [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf|R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf]]:32: Conceptual Site Model & Risk Assessment [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf|R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf]]:1:Please find below the outline requirements and conceptual design for the Water Treatment to support [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf|R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf]]:1:This document sets out the requirement for and conceptual design specification for a water treatment [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:4:2 SITE CONCEPTUALISATION ................................................................................... 3 [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:4:3 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE CONDITION [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:5:3.9 Conceptual Site Model .......................................................................................................................27 [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:5:4 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE CONDITION [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:5:4.9 Conceptual Site Model .......................................................................................................................39 [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:9:The aim of this site condition reports is to use the available information to develop a conceptual site model for [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:10:2 Site Conceptualisation [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:26:3 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:26:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:34:3.9 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:36:4 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:36:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:46:4.9 Conceptual Site Model [[this>Teesworks/Planning/R-2022-0355-FFM/R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:4:2.6 Conceptual Site Model .............................................................................................................. 7 [[this>Teesworks/Planning/R-2022-0355-FFM/R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:8:the conceptual site model (CSM) for the contract area in order to develop the final remediation [[this>Teesworks/Planning/R-2022-0355-FFM/R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:8:the conceptual site model, contaminant distribution and the requirements of the remediation strategy. [[this>Teesworks/Planning/R-2022-0355-FFM/R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:13:of the conceptual site model, contaminant distribution and the requirements of the remediation strategy. [[this>Teesworks/Planning/R-2022-0355-FFM/R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:13:2.6 Conceptual Site Model [[this>Teesworks/Planning/R-2022-0355-FFM/R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:13:conceptual site model (CSM) based on ground investigation findings. The CSM identified a number of [[this>Teesworks/Planning/R-2022-0355-FFM/R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:14:Figure 3 - Conceptual Site Model [[this>Teesworks/Planning/R-2022-0355-FFM/R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:31:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2022-0355-FFM/R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:41: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2021-0846-FFM/R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf|R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf]]:4:2.6 Conceptual Site Model .............................................................................................................. 4 [[this>Teesworks/Planning/R-2021-0846-FFM/R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf|R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf]]:8:the conceptual site model (CSM) for the contract area in order to develop the final remediation [[this>Teesworks/Planning/R-2021-0846-FFM/R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf|R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf]]:10:2.5 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0846-FFM/R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf|R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf]]:10:developed a conceptual site model (CSM) based on ground investigation findings. The CSM identified [[this>Teesworks/Planning/R-2021-0846-FFM/R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf|R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf]]:26:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF]]:24:further assessment. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF]]:24:in groundwater cannot be ruled out. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF]]:24:the Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in press. [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF]]:25:assessment, this is being undertaken as part of a detailed conceptual model review and risk assessment, [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF]]:25:identified above the WQS. A detailed conceptual site model review and risk assessment is being undertaken [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:4:2 SITE CONCEPTUALISATION................................................................................... 3 [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:5:3.8 Conceptual Site Model ....................................................................................................................... 29 [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:5:5 UPDATED CONCEPTUAL SITE MODEL ............................................................... 48 [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:7:conceptual site model (CSM) for the site and identify the significance of any source-pathway-receptor (SPR) [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:9:2 Site Conceptualisation [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:24:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:35:3.8 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:54:5 Updated Conceptual Site Model [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF]]:2: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF]]:4: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-officer report.pdf|R-2021-0439-CD-officer report.pdf]]:2:of the conceptual site model, contaminant distribution and the requirements of the [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-officer report.pdf|R-2021-0439-CD-officer report.pdf]]:3:these data gaps, the Conceptual Site Model and Remediation Strategy shall be [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-0439 Contam .pdf|R-2021-0439-CD-0439 Contam .pdf]]:1:of the conceptual site model, contaminant distribution and the requirements of the [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-0439 Contam .pdf|R-2021-0439-CD-0439 Contam .pdf]]:3:these data gaps, the Conceptual Site Model and Remediation Strategy shall be [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf|R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf]]:4:2.6 Conceptual Site Model .............................................................................................................. 5 [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf|R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf]]:8:the conceptual site model, contaminant distribution and the requirements of the remediation strategy. [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf|R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf]]:11:the conceptual site model, contaminant distribution and the requirements of the remediation strategy. [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf|R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf]]:11:2.6 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf|R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf]]:11:part of the South Bank Quay Area) developed a conceptual site model (CSM) based on ground [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf|R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf]]:12:Figure 3 - Conceptual Site Model [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf|R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf]]:32:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-DECISION NOTICE.pdf|R-2021-0943-CD-DECISION NOTICE.pdf]]:2: • a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:45: receptor approach to refine the existing conceptual site model (CSM); and, [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:47:  a conceptual model of the site indicating sources, pathways and [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:185: o a conceptual model of the site indicating [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:45: receptor approach to refine the existing conceptual site model (CSM); and, [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:47:  a conceptual model of the site indicating sources, pathways and [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:157: o a conceptual model of the site indicating [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:1:Detailed Conceptual Site Model Review and Risk [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:3:Grangetown Prairie Area, Former Steelworks Redcar, Detailed Conceptual Site Model Review and Risk [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:5:7 REFINED CONCEPTUAL SITE MODEL................................................................. 18 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:6:Figure 6 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:7:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:8:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:8:presented provides the basis for the conceptual understanding of the Site. A large number of reports have [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:8:  Refinement of site conceptualisation based on-site specific data (geological and hydrogeological [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:9:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:10:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:10:ESA. The aim of the ESA was to use available information to develop a Conceptual Site Model (CSM) for the [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:11:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:12:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:13:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:14:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:15:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:16:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:17:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:18:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:19:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:20:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:21:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:22:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:23:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:24:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:24:7 Refined Conceptual Site Model [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:24:A Conceptual Site Model and a site-specific cross-section are presented on Figure 6. [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:25:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:26:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:27:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:28:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:36:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:37:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:38:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:39:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:40:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:41:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:42:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:42:is defined using the site investigation data available at the present time. Modifications to the conceptual model, [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:43:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:44:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:24:further assessment. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:24:in groundwater cannot be ruled out. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:24:the Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in press. [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:25:assessment, this is being undertaken as part of a detailed conceptual model review and risk assessment, [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:25:identified above the WQS. A detailed conceptual site model review and risk assessment is being undertaken [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:3:3. Conceptual Model & Environmental Risk Assessment 89 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:3:3.1 Conceptual Model 89 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:6:  Conceptual Model and Environmental Risk Evaluation (Section 3); [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:42: Conceptual Site Model [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:42: The report presented a conceptual model, which identified the following potential contamination [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:89:3. Conceptual Model & Environmental Risk [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:89:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:89:3.1 Conceptual Model [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:92:The conceptual model does not consider risks to construction/ site maintenance workers on the basis that [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-EP CL.pdf|R-2020-0318-FFM-EP CL.pdf]]:1:Conceptual Site Model Review and Risk Assessment (Arcadis) and Outline [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-EP CL.pdf|R-2020-0318-FFM-EP CL.pdf]]:1:Conceptual Site Model Review and Risk assessment has indicated that, with the [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:4:2 SITE CONCEPTUALISATION................................................................................... 3 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:5:3.8 Conceptual Site Model .......................................................................................................................29 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:5:5 UPDATED CONCEPTUAL SITE MODEL ............................................................... 48 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:7:conceptual site model (CSM) for the site and identify the significance of any source-pathway-receptor (SPR) [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:9:2 Site Conceptualisation [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:24:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:35:3.8 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:54:5 Updated Conceptual Site Model [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:72: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:74: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-officer report.pdf|R-2020-0318-FFM-officer report.pdf]]:8:and Detailed Conceptual Site Model Review and Risk Assessment (Arcadis) [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-officer report.pdf|R-2020-0318-FFM-officer report.pdf]]:8:Detailed Conceptual Site Model Review and Risk assessment has indicated [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-officer report.pdf|R-2020-0318-FFM-officer report.pdf]]:13:Conceptual Site Model Review and Risk Assessment (Arcadis) and Outline [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-ROA and Remediation Strategy.PDF|R-2020-0318-FFM-ROA and Remediation Strategy.PDF]]:4:2.6 Conceptual Site Model.............................................................................................................. 7 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-ROA and Remediation Strategy.PDF|R-2020-0318-FFM-ROA and Remediation Strategy.PDF]]:7:geotechnical risk assessment within the conceptual site model (CSM) for the contract area in order to [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-ROA and Remediation Strategy.PDF|R-2020-0318-FFM-ROA and Remediation Strategy.PDF]]:13:2.6 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-ROA and Remediation Strategy.PDF|R-2020-0318-FFM-ROA and Remediation Strategy.PDF]]:13:The ESA developed a conceptual site model (CSM) based on ground investigation findings. The CSM [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-ROA and Remediation Strategy.PDF|R-2020-0318-FFM-ROA and Remediation Strategy.PDF]]:38:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf]]:4:2.6 Conceptual Site Model.............................................................................................................. 7 [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf]]:8:conceptual site model (CSM) for the contract area in order to develop the final remediation technology [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf]]:13:2.6 Conceptual Site Model [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf]]:13:and [[Arcadis 2021e]] (which form part of the South Bank Western Area) developed conceptual site [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf]]:14:Figure 3 - Conceptual Site Model [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf]]:31:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:4: Scope and Objectives pathway-receptor approach to refine the existing conceptual site model (CSM); [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:6: changes have been made to the conceptual understanding of this area, and no additional [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:7: the Teesworks where Made Ground is a single source. However, first a detailed conceptual [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:9:Figure 4 – Conceptual Site Model – Cross Section [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:11:will help refine the present conceptual site model (CSM) and define potential risks posed to the River Tees by [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:23:down-gradient. Figure 4 includes a simplified profile of the geological conditions, alongside a conceptual [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:29:Based on the above assessment of contaminant distribution, the conceptual understanding of site sources [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:29:remains the same as the SBA DQRA; that the site can be conceptualised as comprising two sources to [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:29:primary water resource receptor (River Tees). As no changes have been made to the conceptual [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:30:reducing the flow of groundwater). The Made Ground source has therefore been conceptualised as the [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:30:conceptual review of any areas assessed in future needs to be undertaken. In particular, confirming sources, [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:42:conceptual model, such as the collection of additional site data, may result in changes to the SSAC defined [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:43:where Made Ground is a single source. However, first a detailed conceptual review of any areas assessed in [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:80: MADE GROUND CONCEPTUAL PHYSICAL [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:4: Scope and Objectives pathway-receptor approach to refine the existing conceptual site model (CSM); [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:6: changes have been made to the conceptual understanding of this area, and no additional [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:7: the Teesworks where Made Ground is a single source. However, first a detailed conceptual [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:9:Figure 4 – Conceptual Site Model – Cross Section [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:11:will help refine the present conceptual site model (CSM) and define potential risks posed to the River Tees by [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:23:down-gradient. Figure 4 includes a simplified profile of the geological conditions, alongside a conceptual [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:29:Based on the above assessment of contaminant distribution, the conceptual understanding of site sources [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:29:remains the same as the SBA DQRA; that the site can be conceptualised as comprising two sources to [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:29:primary water resource receptor (River Tees). As no changes have been made to the conceptual [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:30:reducing the flow of groundwater). The Made Ground source has therefore been conceptualised as the [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:30:conceptual review of any areas assessed in future needs to be undertaken. In particular, confirming sources, [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:42:conceptual model, such as the collection of additional site data, may result in changes to the SSAC defined [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:43:where Made Ground is a single source. However, first a detailed conceptual review of any areas assessed in [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:80: MADE GROUND CONCEPTUAL PHYSICAL [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 2).pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 2).pdf]]:2: Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 2.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 2.pdf]]:2: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 2.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 2.pdf]]:3: Refined Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:4:2 Site Conceptualisation ............................................................................................................................... 4 [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:4:6 Refined Conceptual Site Model ............................................................................................................... 25 [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:6:written by 3rd parties) were reviewed and the information incorporated into the Conceptual Site Model. Data was [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:6:The conceptual site model and the relevant 3rd party reports are detailed in: [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:7:building in order to refine the conceptual site model previously developed for the site and undertake a generic [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:8:2 Site Conceptualisation [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:8:A detailed analysis of the site conceptualisation can be found in Arcadis 2018a [Redcar Steelworks-AUK-XX- [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:8:Table 1: Site Conceptualisation summary [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:11:Groundwater is present within the Made Ground and Superficial Deposits, and is conceptualised to be in the [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:12:off-site contaminant sources and generated a conceptual site model. [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:12:contamination, separate from the rail sidings source conceptualised in Arcadis 2018a. [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:13:Including the sources conceptualised in Arcadis 2018a, four main sources of contamination are conceptualised [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:13: footprint is conceptualised; and, [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:13: source at the former substation is conceptualised. [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:15: • Shallow groundwater has been identified within the Made Ground, this is conceptualised to be perched [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:15: are anticipated to be at least 5m thick, and the conceptualised upward head of water are thought to limit [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:17:3.7 Conceptual Site Model [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:25:Superficial Deposits (anticipated to be at least 5.0m thick) and conceptualised upward head of pressure which [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:26:Based on this conceptualisation, the risk posed from the exceedances of DWS for iron, boron, sulphate, and [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:28:atmospheric pressure and weather conditions) and the conceptual site model. This then allows a characteristic [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:29:6 Refined Conceptual Site Model [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:31:conceptualised attenuation, and dilution along the pathway, and the likely limited interaction between the [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:33:Arcadis (2020). Grangetown Prairie Area, Former Steelworks, Redcar: Detailed Conceptual Site Model [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-Arcadis - South Bank Strategy.pdf|R-2021-0713-CD-Arcadis - South Bank Strategy.pdf]]:4:2.6 Conceptual Site Model .............................................................................................................. 4 [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-Arcadis - South Bank Strategy.pdf|R-2021-0713-CD-Arcadis - South Bank Strategy.pdf]]:8:the conceptual site model (CSM) for the contract area in order to develop the final remediation [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-Arcadis - South Bank Strategy.pdf|R-2021-0713-CD-Arcadis - South Bank Strategy.pdf]]:10:2.5 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-Arcadis - South Bank Strategy.pdf|R-2021-0713-CD-Arcadis - South Bank Strategy.pdf]]:10:developed a conceptual site model (CSM) based on ground investigation findings. The CSM identified [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-Arcadis - South Bank Strategy.pdf|R-2021-0713-CD-Arcadis - South Bank Strategy.pdf]]:26:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf]]:4: environmental conditions underlying the site and to refine the Conceptual Site Model (CSM) [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf]]:8:Figure 2 – Conceptual Site Model – Cross Section [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf]]:11:site. This report will help refine the present conceptual site model (CSM) and define any potential risks posed [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf]]:12: refine the existing conceptual site model (CSM); and, [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf]]:18:gradient. Figure 2 includes a simplified profile of the geological conditions, alongside a conceptual cross- [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf]]:23:zone and aquifer have been conceptualised as presented in Figure 2. [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf]]:30:conceptual model, such as the collection of additional site data, may result in changes to the SSAC defined [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf]]:33: MADE GROUND CONCEPTUAL PHYSICAL [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:4: pathway-receptor approach to refine the existing conceptual site model (CSM); [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:6: changes have been made to the conceptual understanding of this area, and no additional [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:7: detailed conceptual review of any areas assessed in future needs to be undertaken. In [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:9:Figure 4 – Conceptual Site Model – Cross Section [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:11:will help refine the present conceptual site model (CSM) and define potential risks posed to the River Tees by [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:23:down-gradient. Figure 4 includes a simplified profile of the geological conditions, alongside a conceptual [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:29:Based on the above assessment of contaminant distribution, the conceptual understanding of site sources [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:29:remains the same as the SBA DQRA; that the site can be conceptualised as comprising two sources to [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:29:primary water resource receptor (River Tees). As no changes have been made to the conceptual [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:29:reducing the flow of groundwater). The Made Ground source has therefore been conceptualised as the [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:29:first a detailed conceptual review of any areas assessed in future needs to be undertaken. In particular, [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:39:conceptual model, such as the collection of additional site data, may result in changes to the SSAC defined [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:40:Redcar Steelworks site where Made Ground is a single source. However, first a detailed conceptual review of [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:65: MADE GROUND CONCEPTUAL PHYSICAL [[this>Teesworks/Planning/MLA_2020_00507/Consultations/EA MLA_2020_00507 22 February 2021 OFFICIAL.pdf|EA MLA_2020_00507 22 February 2021 OFFICIAL.pdf]]:4: • a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:46:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:46:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:54:2002 Conceptual model of estuary processes. ABPmer, 2002 [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:57: Conceptual model of estuary [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:588:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:250:6 Preliminary Conceptual Site Model and Qualitative Risk Assessment 21 [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:250:Table 6-3: Preliminary Conceptual Model 24 [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:253: • Provide an initial Conceptual Site Model (CSM) to identify and assess potential contaminant [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:273:6 Preliminary Conceptual Site Model and Qualitative Risk [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:276:Table 6-3: Preliminary Conceptual Model [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-10.pdf|MLA_2020_00507-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-10.pdf]]:2:12km offshore from the mouth of the Tees. Based upon a conceptual understanding that was developed [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:46:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:46:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:54:2002 Conceptual model of estuary processes. ABPmer, 2002 [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:57: Conceptual model of estuary [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:588:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:114:pathways. These linkages are summarised in the Preliminary Conceptual Site Model and Qualitative Risk [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:114:Receptor-Linkage’ in the Preliminary Conceptual Site Model and Qualitative Risk Assessment gives an [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:122:where they are measured, they are referred back to a conceptual point 1 m away from the point of origin [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:46:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:46:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:54:2002 Conceptual model of estuary processes. ABPmer, 2002 [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:57: Conceptual model of estuary [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:588:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-EA R_2020_0684_ESM 4 March 2021 OFFICIAL.pdf|R-2020-0684-ESM-EA R_2020_0684_ESM 4 March 2021 OFFICIAL.pdf]]:2: • a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf]]:5:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf]]:5:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-DECISION NOTICE.pdf|R-2020-0684-ESM-DECISION NOTICE.pdf]]:2: • a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 8_Underwater noise assessment.pdf|R-2020-0684-ESM-Appendix 8_Underwater noise assessment.pdf]]:4:where they are measured, they are referred back to a conceptual point 1 m away from the point of origin [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Officer Report 0684.pdf|R-2020-0684-ESM-Officer Report 0684.pdf]]:9:• a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Officer Report 0684.pdf|R-2020-0684-ESM-Officer Report 0684.pdf]]:27:• a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Officer Report 0684.pdf|R-2020-0684-ESM-Officer Report 0684.pdf]]:98: • a conceptual model of the site indicating sources, pathways and [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf]]:1:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:4:6 Preliminary Conceptual Site Model and Qualitative Risk Assessment 21 [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:4:Table 6-3: Preliminary Conceptual Model 24 [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:7: • Provide an initial Conceptual Site Model (CSM) to identify and assess potential contaminant [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:27:6 Preliminary Conceptual Site Model and Qualitative Risk [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:30:Table 6-3: Preliminary Conceptual Model [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:720:pathways. These linkages are summarised in the Preliminary Conceptual Site Model and Qualitative Risk [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:720:Receptor-Linkage’ in the Preliminary Conceptual Site Model and Qualitative Risk Assessment gives an [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:4:2002 Conceptual model of estuary processes. ABPmer, 2002 [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:7: Conceptual model of estuary [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-0405.pdf|R-2021-0405-FFM-0405.pdf]]:1:of the conceptual site model, contaminant distribution and the requirements of the [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-0405.pdf|R-2021-0405-FFM-0405.pdf]]:2:these data gaps, the Conceptual Site Model and Remediation Strategy shall be [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-OFFICER REPORT.pdf|R-2021-0405-FFM-OFFICER REPORT.pdf]]:6:accuracy of the conceptual site model, contaminant distribution and the [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-OFFICER REPORT.pdf|R-2021-0405-FFM-OFFICER REPORT.pdf]]:7:addressing these data gaps, the Conceptual Site Model and Remediation [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF|R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF]]:4:2.6 Conceptual Site Model .............................................................................................................. 5 [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF|R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF]]:8:the conceptual site model, contaminant distribution and the requirements of the remediation strategy. [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF|R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF]]:11:the conceptual site model, contaminant distribution and the requirements of the remediation strategy. [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF|R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF]]:11:2.6 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF|R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF]]:11:part of the South Bank Quay Area) developed a conceptual site model (CSM) based on ground [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF|R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF]]:12:Figure 3 - Conceptual Site Model [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF|R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF]]:32:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:5:7 PRELIMINARY CONCEPTUAL SITE MODEL........................................................ 20 [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:7:• Development of a conceptual site model (CSM) in line with Land Contamination Risk Management 2021). [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:26:7 Preliminary Conceptual Site Model [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:26:land contamination conceptual site model (CSM). [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:5:7 PRELIMINARY CONCEPTUAL SITE MODEL ........................................................ 18 [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:7: Development of a conceptual site model (CSM) in line with UK regulatory information. [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:24:7 Preliminary Conceptual Site Model [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:24:geo-environmental conceptual site model (CSM). [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:8:3 Initial Conceptual Site Model ................................................................................................................... 28 [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:8:5 Review of Conceptual Site Model ........................................................................................................... 45 [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:9:Figure 9 Conceptual Site Model Cross Section [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:15:conceptual understanding of the Site. [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:32:3 Initial Conceptual Site Model [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:35:planned industrial development, this conceptualisation is likely a conservative assumption. [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:36:site and as such they have been retained here as the underlying conceptual model used in their development [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:36:is consistent with the conceptual site model for this Site. [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:36:3 Grangetown Prairie Area, Former Steelworks, Redcar, Detailed Conceptual Site Model Review and Risk [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:49:5 Review of Conceptual Site Model [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:49:includes a simplified profile of the geological conditions, alongside a conceptual cross-section identifying [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:57:have been conceptualised as presented in Figure 9. [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:65:defined using the Site investigation data available at the present time. Modifications to the conceptual model, [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:105: MADE GROUND CONCEPTUAL PHYSICAL [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf]]:4:2.6 Conceptual Site Model .............................................................................................................. 9 [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf]]:10:conceptual site model (CSM) for the contract area in order to develop the final remediation technology [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf]]:15:2.6 Conceptual Site Model [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf]]:15:landholding and is documented in Arcadis [[2018a]]. As part of this study a conceptual site model (CSM) [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf]]:17:Figure 3 - Conceptual Site Model [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf]]:35:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf]]:49: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF]]:4:2.6 Conceptual Site Model.............................................................................................................. 7 [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF]]:7:geotechnical risk assessment within the conceptual site model (CSM) for the contract area in order to [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF]]:13:2.6 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF]]:13:The ESA developed a conceptual site model (CSM) based on ground investigation findings. The CSM [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF]]:38:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-Officer report.pdf|R-2021-0879-FF-Officer report.pdf]]:2:  Detailed Conceptual Site Model Review and Risk Assessment [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-63262 01 Dorman Long Training Centre Cover Letter 14.10.21.pdf|R-2021-0879-FF-63262 01 Dorman Long Training Centre Cover Letter 14.10.21.pdf]]:4:• Detailed Conceptual Site Model Review and Risk Assessment prepared by Arcadis. [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:3:3. Conceptual Model & Environmental Risk Assessment 89 [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:3:3.1 Conceptual Model 89 [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:6: Conceptual Model and Environmental Risk Evaluation (Section 3); [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:42: Conceptual Site Model [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:42: The report presented a conceptual model, which identified the following potential contamination [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:89:3. Conceptual Model & Environmental Risk [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:89:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:89:3.1 Conceptual Model [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:92:The conceptual model does not consider risks to construction/ site maintenance workers on the basis that [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:4:2 SITE CONCEPTUALISATION................................................................................... 3 [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:5:3.8 Conceptual Site Model ....................................................................................................................... 29 [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:5:5 UPDATED CONCEPTUAL SITE MODEL ............................................................... 48 [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:7:conceptual site model (CSM) for the site and identify the significance of any source-pathway-receptor (SPR) [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:9:2 Site Conceptualisation [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:24:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:35:3.8 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:54:5 Updated Conceptual Site Model [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF]]:2: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF]]:4: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF]]:24:further assessment. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF]]:24:in groundwater cannot be ruled out. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF]]:24:the Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in press. [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF]]:25:assessment, this is being undertaken as part of a detailed conceptual model review and risk assessment, [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF]]:25:identified above the WQS. A detailed conceptual site model review and risk assessment is being undertaken [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf|R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf]]:4: an outline Conceptual Site Model (CSM) detailing potential pollutant linkages associated with the [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Non Technical Summary.pdf|R-2020-0411-FFM-Non Technical Summary.pdf]]:26: extreme weather events. The conceptual surface water drainage strategy for the proposed [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 13 - Other Environmental Effects.pdf|R-2020-0411-FFM-Chapter 13 - Other Environmental Effects.pdf]]:4: extreme weather events. The conceptual surface water drainage strategy for the proposed [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf|R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf]]:2: conceptual surface water drainage strategy for the project has been designed to take into account [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf|R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf]]:22: example, future flood risk and resilience to extreme weather events. The conceptual surface water [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:3:3 OUTLINE CONCEPTUAL SITE MODEL ........................................................................................ 11 [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:3: 3.3 Outline Conceptual Site Model .............................................................................................. 12 [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:4:Table 10 – Outline Conceptual Site Model ................................................................................................. 13 [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:5:Outline Conceptual Site Model [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:7: • produce an outline Conceptual Site Model (CSM) detailing how any contamination may [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:17:3 OUTLINE CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:17:3.1.1 An outline conceptual site model (CSM) consists of an appraisal of the source-pathway-receptor [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:18:3.3 Outline Conceptual Site Model [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:19:Table 10 – Outline Conceptual Site Model [[this>Teesworks/Planning/R-2022-0176-CD/R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf|R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf]]:13: • a conceptual model of the Site indicating [[this>Teesworks/Planning/R-2022-0587-CD/R-2022-0587-CD-R 2020 0684 ESM DECISION NOTICE.pdf|R-2022-0587-CD-R 2020 0684 ESM DECISION NOTICE.pdf]]:2: • a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2021-0465-FFM/R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:4:2.6 Conceptual Site Model .............................................................................................................. 7 [[this>Teesworks/Planning/R-2021-0465-FFM/R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:8:the conceptual site model (CSM) for the contract area in order to develop the final remediation [[this>Teesworks/Planning/R-2021-0465-FFM/R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:8:the conceptual site model, contaminant distribution and the requirements of the remediation strategy. [[this>Teesworks/Planning/R-2021-0465-FFM/R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:13:of the conceptual site model, contaminant distribution and the requirements of the remediation strategy. [[this>Teesworks/Planning/R-2021-0465-FFM/R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:13:2.6 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0465-FFM/R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:13:conceptual site model (CSM) based on ground investigation findings. The CSM identified a number of [[this>Teesworks/Planning/R-2021-0465-FFM/R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:14:Figure 3 - Conceptual Site Model [[this>Teesworks/Planning/R-2021-0465-FFM/R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:31:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2021-0465-FFM/R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:41: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:3: CSM Conceptual Site Model [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:65: Site. A conceptual site model (CSM) will be developed for the land potentially [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:4: 1 Appendix H1: Grangetown Prairie Area, Former Steelworks, Redcar, Detailed Conceptual [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:10: baseline conditions. The Conceptual Site Model (CSM) presented in the Detailed Conceptual [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:10: 1 Grangetown Prairie Area, Former Steelworks, Redcar, Detailed Conceptual Site Model [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:16: Detailed Conceptual Site Model and Risk Assessment [[Arcadis 2020 H1]] and the Remediation [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:17:H3.17 The Detailed Conceptual Site Model and Risk Assessment [[Arcadis 2020 Appendix H1]] [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:31: Arcadis 2020) is provided on Figure 4 within the Arcadis Detailed Conceptual Site Model [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:31: Conceptual Site Model Review and Risk Assessment [[A rcadis 2020 H1]]. Concentrations of PAH [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:35: subsequent Detailed Conceptual Site Model Review and Risk Assessment [Arcadis 2020 [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:35: subsequent Detailed Conceptual Site Model Review and Risk Assessment [Arcadis 2020 [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:46: 5 CSM Conceptual Site Model [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF]]:34:G4.35 The conceptual understanding of the overall groundwater functioning of the site is for direct [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF]]:36:G4.45 The conceptual understanding of the overall groundwater functioning of the site is for direct [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF]]:9: Groundsure report have been used to establish the baseline conditions. The Conceptual Site [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF]]:40: 3 CSM Conceptual Site Model [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:3:3. Conceptual Model & Environmental Risk Assessment 89 [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:3:3.1 Conceptual Model 89 [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:6:  Conceptual Model and Environmental Risk Evaluation (Section 3); [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:42: Conceptual Site Model [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:42: The report presented a conceptual model, which identified the following potential contamination [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:89:3. Conceptual Model & Environmental Risk [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:89:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:89:3.1 Conceptual Model [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:92:The conceptual model does not consider risks to construction/ site maintenance workers on the basis that [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF|R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF]]:4:2 SITE CONCEPTUALISATION................................................................................... 3 [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF|R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF]]:5:3.8 Conceptual Site Model .......................................................................................................................11 [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF|R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF]]:5:5 UPDATED CONCEPTUAL SITE MODEL ............................................................... 20 [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF|R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF]]:7:conceptual site model (CSM) for the site and identify the potential significance of any source-pathway-receptor [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF|R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF]]:9:2 Site Conceptualisation [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF|R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF]]:17:3.8 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF|R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF]]:26:5 Updated Conceptual Site Model [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF|R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF]]:33: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF|R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF]]:34: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:3:02.10 Watercourses and Flood Mapping 05.04 North Industrial Zone Conceptual Massing Views 10.04 Rail Infrastructure 13.02 Adoption of the Master Plan [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:3:03.01 Master Planning Process 07 South Industrial Zone 11.05 Conceptual Energy Plans [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:94:5.04 Conceptual Massing Views (for illustrative purposes) [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:95:5.05 North Industrial Zone Illustrative Plan (Conceptual) [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:96:Plots sited in the NI Zone have been conceptually sized based off of real-world facilities. While plot sizes represented [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:101:6.02 Northeast Industrial Zone Illustrative Plan (Conceptual) [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:108: from the proximity to the river afforded by the SIZ and from been conceptually allocated for large contract fabrication, could accommodate photovoltaic arrays, wind turbines [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:110: 7.04 South Industrial Zone Illustrative Plan (Conceptual) [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:117:8.02 Central Industrial Zone Illustrative Plan (Conceptual) [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:146:11.05 Conceptual Energy Plans [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:146:Two conceptual energy plans have been created to Renewable Energy Waste Heat Energy Baseload Bioenergy Bioenergy 0-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]:1418:source-pathway-receptor (SPR) linkages identified by the Site Condition Report within the conceptual site [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1419:2 Summary of Preliminary Conceptual Site Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1420:2.3 Preliminary Conceptual Site Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1421: Figure 2: Preliminary Conceptual Site Model Area A [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1422: Figure 3: Preliminary Conceptual Site Model Area B [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1443:5 Updated Conceptual Site Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1444: Figure 10: Update Conceptual Site Model foe SSI3 Area A [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1445: Figure 10: Update Conceptual Site Model foe SSI3 Area B [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1489:2 SITE CONCEPTUALISATION ................................................................................... 3 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1489:3 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE CONDITION [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1490:3.9 Conceptual Site Model .......................................................................................................................27 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1490:4 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE CONDITION [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1490:4.9 Conceptual Site Model .......................................................................................................................39 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1494:The aim of this site condition reports is to use the available information to develop a conceptual site model for [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1495:2 Site Conceptualisation [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1511:3 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1511:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1519:3.9 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1521:4 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1521:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1531:4.9 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1587:2 PRELIMINARY CONCEPTUAL SITE MODEL.......................................................... 3 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1587:2.3 Site Conceptualisation .........................................................................................................................4 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1587: Conceptual Site Model......................................................................................................................14 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1590:geotechnical development constraints identified by the site condition report within the conceptual site model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1591:2 Preliminary Conceptual Site Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1592:2.3 Site Conceptualisation [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1593: Figure 2: Updated Conceptual Site Model Area A [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1594: Figure 3: Updated Conceptual Site Model Area B [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1600: 3. Formation of conceptual site model and preliminary risk assessment; [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1600: 5. Review of conceptual site model and risk assessment; [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1600: 7. Final review of conceptual site model and risk assessment to determine the potential for future [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1600:The methodology outlined above provides several opportunities to refine the conceptual site model and to [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1600:of the conceptual site model and recommendations for mitigation methods. Due to the quantity of the slag [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1602: Conceptual Site Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1625:report and the development constraints identified by the geotechnical risk assessment within the conceptual [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1627:The site condition report (SCR) developed a conceptual site model (CSM) based on ground investigation [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1662:3. Conceptual Model & Environmental Risk Assessment 81 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1662:3.1 Conceptual Model 81 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1665:  Conceptual Model and Environmental Risk Evaluation (Section 3); [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1697: Conceptual Site Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1697: The report presented a conceptual model, which identified the following potential contamination [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1740:3. Conceptual Model & Environmental Risk [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1740:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1740:3.1 Conceptual Model [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1881:The strategy also provides an overall conceptual model for the major potential [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF]]:34:F4.35 The conceptual understanding of the overall groundwater functioning of the site is for direct [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:3:3. Conceptual Model & Environmental Risk Assessment 89 [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:3:3.1 Conceptual Model 89 [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:6:  Conceptual Model and Environmental Risk Evaluation (Section 3); [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:42: Conceptual Site Model [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:42: The report presented a conceptual model, which identified the following potential contamination [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:89:3. Conceptual Model & Environmental Risk [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:89:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:89:3.1 Conceptual Model [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:92:The conceptual model does not consider risks to construction/ site maintenance workers on the basis that [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-DXL-JBAU-00-00-C-RP-0001-S03-P01-FRA_and_Design_Justification.PDF|R-2020-0270-FFM-DXL-JBAU-00-00-C-RP-0001-S03-P01-FRA_and_Design_Justification.PDF]]:29: Outline the conceptual model, addressing The main site of interest is an open watercourse to the east [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf|R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf]]:5:7 CONCEPTUAL SITE MODEL AND RISK ASSESSMENT ..................................... 11 [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf|R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf]]:6:Figure 5: Conceptual Site Model and Risk Assessment [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf|R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf]]:17:7 Conceptual Site Model and Risk Assessment [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf|R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf]]:17:The Conceptual Site Model (CSM) and Environmental Risk Assessment for remediation works is presented [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf|R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf]]:32: Conceptual Site Model & Risk Assessment [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf|R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf]]:1:Please find below the outline requirements and conceptual design for the Water Treatment to support [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf|R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf]]:1:This document sets out the requirement for and conceptual design specification for a water treatment [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:4:2 SITE CONCEPTUALISATION ................................................................................... 3 [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:4:3 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE CONDITION [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:5:3.9 Conceptual Site Model .......................................................................................................................27 [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:5:4 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE CONDITION [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:5:4.9 Conceptual Site Model .......................................................................................................................39 [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:9:The aim of this site condition reports is to use the available information to develop a conceptual site model for [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:10:2 Site Conceptualisation [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:26:3 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:26:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:34:3.9 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:36:4 CONCEPTUAL SITE MODEL AND ENVIRONMENTAL SITE [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:36:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:46:4.9 Conceptual Site Model [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:3:3 OUTLINE CONCEPTUAL SITE MODEL ........................................................................................ 11 [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:3: 3.3 Outline Conceptual Site Model .............................................................................................. 12 [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:4:Table 10 – Outline Conceptual Site Model ................................................................................................. 13 [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:5:Outline Conceptual Site Model [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:7: • produce an outline Conceptual Site Model (CSM) detailing how any contamination may [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:17:3 OUTLINE CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:17:3.1.1 An outline conceptual site model (CSM) consists of an appraisal of the source-pathway-receptor [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:18:3.3 Outline Conceptual Site Model [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:19:Table 10 – Outline Conceptual Site Model [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-230328 JER10061 Redcar Energy Centre LPA Letter Final Rev 2.pdf|R-2023-0339-CD-230328 JER10061 Redcar Energy Centre LPA Letter Final Rev 2.pdf]]:17:The updated conceptual model produced by Solmek following the ground investigation assigned the [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf|R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf]]:4: an outline Conceptual Site Model (CSM) detailing potential pollutant linkages associated with the [[this>Teesworks/Planning/R-2022-0355-FFM/R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:4:2.6 Conceptual Site Model .............................................................................................................. 7 [[this>Teesworks/Planning/R-2022-0355-FFM/R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:8:the conceptual site model (CSM) for the contract area in order to develop the final remediation [[this>Teesworks/Planning/R-2022-0355-FFM/R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:8:the conceptual site model, contaminant distribution and the requirements of the remediation strategy. [[this>Teesworks/Planning/R-2022-0355-FFM/R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:13:of the conceptual site model, contaminant distribution and the requirements of the remediation strategy. [[this>Teesworks/Planning/R-2022-0355-FFM/R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:13:2.6 Conceptual Site Model [[this>Teesworks/Planning/R-2022-0355-FFM/R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:13:conceptual site model (CSM) based on ground investigation findings. The CSM identified a number of [[this>Teesworks/Planning/R-2022-0355-FFM/R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:14:Figure 3 - Conceptual Site Model [[this>Teesworks/Planning/R-2022-0355-FFM/R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:31:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2022-0355-FFM/R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:41: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2021-0846-FFM/R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf|R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf]]:4:2.6 Conceptual Site Model .............................................................................................................. 4 [[this>Teesworks/Planning/R-2021-0846-FFM/R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf|R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf]]:8:the conceptual site model (CSM) for the contract area in order to develop the final remediation [[this>Teesworks/Planning/R-2021-0846-FFM/R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf|R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf]]:10:2.5 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0846-FFM/R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf|R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf]]:10:developed a conceptual site model (CSM) based on ground investigation findings. The CSM identified [[this>Teesworks/Planning/R-2021-0846-FFM/R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf|R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf]]:26:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF]]:24:further assessment. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF]]:24:in groundwater cannot be ruled out. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF]]:24:the Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in press. [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF]]:25:assessment, this is being undertaken as part of a detailed conceptual model review and risk assessment, [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF]]:25:identified above the WQS. A detailed conceptual site model review and risk assessment is being undertaken [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:4:2 SITE CONCEPTUALISATION................................................................................... 3 [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:5:3.8 Conceptual Site Model ....................................................................................................................... 29 [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:5:5 UPDATED CONCEPTUAL SITE MODEL ............................................................... 48 [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:7:conceptual site model (CSM) for the site and identify the significance of any source-pathway-receptor (SPR) [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:9:2 Site Conceptualisation [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:24:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:35:3.8 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:54:5 Updated Conceptual Site Model [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF]]:2: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF]]:4: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-officer report.pdf|R-2021-0439-CD-officer report.pdf]]:2:of the conceptual site model, contaminant distribution and the requirements of the [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-officer report.pdf|R-2021-0439-CD-officer report.pdf]]:3:these data gaps, the Conceptual Site Model and Remediation Strategy shall be [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-0439 Contam .pdf|R-2021-0439-CD-0439 Contam .pdf]]:1:of the conceptual site model, contaminant distribution and the requirements of the [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-0439 Contam .pdf|R-2021-0439-CD-0439 Contam .pdf]]:3:these data gaps, the Conceptual Site Model and Remediation Strategy shall be [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf|R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf]]:4:2.6 Conceptual Site Model .............................................................................................................. 5 [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf|R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf]]:8:the conceptual site model, contaminant distribution and the requirements of the remediation strategy. [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf|R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf]]:11:the conceptual site model, contaminant distribution and the requirements of the remediation strategy. [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf|R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf]]:11:2.6 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf|R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf]]:11:part of the South Bank Quay Area) developed a conceptual site model (CSM) based on ground [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf|R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf]]:12:Figure 3 - Conceptual Site Model [[this>Teesworks/Planning/R-2021-0439-CD/R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf|R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf]]:32:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf|R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf]]:250: source-pathway-receptor conceptual model, which highlights whether there is any potential pathway [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-P20-1004 Grangetown Prairie shadow HRA.pdf|R-2023-0253-RMM-P20-1004 Grangetown Prairie shadow HRA.pdf]]:11: source-pathway-receptor conceptual model, which highlights whether there is any potential pathway [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-DECISION NOTICE.pdf|R-2021-0943-CD-DECISION NOTICE.pdf]]:2: • a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:45: receptor approach to refine the existing conceptual site model (CSM); and, [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:47:  a conceptual model of the site indicating sources, pathways and [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:185: o a conceptual model of the site indicating [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:45: receptor approach to refine the existing conceptual site model (CSM); and, [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:47:  a conceptual model of the site indicating sources, pathways and [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:157: o a conceptual model of the site indicating [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:1:Detailed Conceptual Site Model Review and Risk [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:3:Grangetown Prairie Area, Former Steelworks Redcar, Detailed Conceptual Site Model Review and Risk [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:5:7 REFINED CONCEPTUAL SITE MODEL................................................................. 18 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:6:Figure 6 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:7:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:8:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:8:presented provides the basis for the conceptual understanding of the Site. A large number of reports have [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:8:  Refinement of site conceptualisation based on-site specific data (geological and hydrogeological [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:9:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:10:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:10:ESA. The aim of the ESA was to use available information to develop a Conceptual Site Model (CSM) for the [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:11:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:12:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:13:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:14:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:15:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:16:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:17:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:18:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:19:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:20:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:21:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:22:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:23:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:24:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:24:7 Refined Conceptual Site Model [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:24:A Conceptual Site Model and a site-specific cross-section are presented on Figure 6. [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:25:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:26:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:27:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:28:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:36:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:37:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:38:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:39:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:40:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:41:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:42:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:42:is defined using the site investigation data available at the present time. Modifications to the conceptual model, [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:43:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0088-01-Prairie_Risk Assessment (1).pdf]]:44:Detailed Conceptual Site Model Review and Risk Assessment - 10035117 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:24:further assessment. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:24:in groundwater cannot be ruled out. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:24:the Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in press. [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:25:assessment, this is being undertaken as part of a detailed conceptual model review and risk assessment, [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:25:identified above the WQS. A detailed conceptual site model review and risk assessment is being undertaken [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:3:3. Conceptual Model & Environmental Risk Assessment 89 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:3:3.1 Conceptual Model 89 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:6:  Conceptual Model and Environmental Risk Evaluation (Section 3); [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:42: Conceptual Site Model [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:42: The report presented a conceptual model, which identified the following potential contamination [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:89:3. Conceptual Model & Environmental Risk [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:89:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:89:3.1 Conceptual Model [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:92:The conceptual model does not consider risks to construction/ site maintenance workers on the basis that [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-EP CL.pdf|R-2020-0318-FFM-EP CL.pdf]]:1:Conceptual Site Model Review and Risk Assessment (Arcadis) and Outline [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-EP CL.pdf|R-2020-0318-FFM-EP CL.pdf]]:1:Conceptual Site Model Review and Risk assessment has indicated that, with the [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:4:2 SITE CONCEPTUALISATION................................................................................... 3 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:5:3.8 Conceptual Site Model .......................................................................................................................29 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:5:5 UPDATED CONCEPTUAL SITE MODEL ............................................................... 48 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:7:conceptual site model (CSM) for the site and identify the significance of any source-pathway-receptor (SPR) [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:9:2 Site Conceptualisation [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:24:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:35:3.8 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:54:5 Updated Conceptual Site Model [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:72: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:74: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-officer report.pdf|R-2020-0318-FFM-officer report.pdf]]:8:and Detailed Conceptual Site Model Review and Risk Assessment (Arcadis) [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-officer report.pdf|R-2020-0318-FFM-officer report.pdf]]:8:Detailed Conceptual Site Model Review and Risk assessment has indicated [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-officer report.pdf|R-2020-0318-FFM-officer report.pdf]]:13:Conceptual Site Model Review and Risk Assessment (Arcadis) and Outline [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-ROA and Remediation Strategy.PDF|R-2020-0318-FFM-ROA and Remediation Strategy.PDF]]:4:2.6 Conceptual Site Model.............................................................................................................. 7 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-ROA and Remediation Strategy.PDF|R-2020-0318-FFM-ROA and Remediation Strategy.PDF]]:7:geotechnical risk assessment within the conceptual site model (CSM) for the contract area in order to [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-ROA and Remediation Strategy.PDF|R-2020-0318-FFM-ROA and Remediation Strategy.PDF]]:13:2.6 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-ROA and Remediation Strategy.PDF|R-2020-0318-FFM-ROA and Remediation Strategy.PDF]]:13:The ESA developed a conceptual site model (CSM) based on ground investigation findings. The CSM [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-ROA and Remediation Strategy.PDF|R-2020-0318-FFM-ROA and Remediation Strategy.PDF]]:38:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf|R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf]]:3:Development of a Conceptual Site Model [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf|R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf]]:3: humans, ecosystems, buildings, etc.). Based on this information a Conceptual Site Model (CSM) has been [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf|R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf]]:3: pollutants' and 'significant pollutant linkages' within a 'contaminant-pathway-receptor' conceptual [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf|R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf]]:31:14.125. The Conceptual Site Model and preliminary risk assessment has identified potential sources of [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf|R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf]]:5:The Conceptual Site Model (CSM) and preliminary risk assessment has identified potential sources [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf|R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf]]:8:7.1 Conceptual site model 36 [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf|R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf]]:9:  Development of a Conceptual Site Model (CSM) and Preliminary Environmental Risk [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf|R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf]]:37:7.1 Conceptual site model [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf|R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf]]:37:The Conceptual Site Model (CSM) and plausible contaminant linkages are defined below based on [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf|R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf]]:41:The Conceptual Site Model and preliminary risk assessment has identified potential sources of [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-SOL_23_P016_GLR ES Vol 3 Exec Summary.pdf|R-2023-0291-ESM-SOL_23_P016_GLR ES Vol 3 Exec Summary.pdf]]:20:11.2. The Conceptual Site Model and preliminary risk assessment has identified potential sources of [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf]]:4:2.6 Conceptual Site Model.............................................................................................................. 7 [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf]]:8:conceptual site model (CSM) for the contract area in order to develop the final remediation technology [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf]]:13:2.6 Conceptual Site Model [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf]]:13:and [[Arcadis 2021e]] (which form part of the South Bank Western Area) developed conceptual site [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf]]:14:Figure 3 - Conceptual Site Model [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf]]:31:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:4: Scope and Objectives pathway-receptor approach to refine the existing conceptual site model (CSM); [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:6: changes have been made to the conceptual understanding of this area, and no additional [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:7: the Teesworks where Made Ground is a single source. However, first a detailed conceptual [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:9:Figure 4 – Conceptual Site Model – Cross Section [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:11:will help refine the present conceptual site model (CSM) and define potential risks posed to the River Tees by [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:23:down-gradient. Figure 4 includes a simplified profile of the geological conditions, alongside a conceptual [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:29:Based on the above assessment of contaminant distribution, the conceptual understanding of site sources [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:29:remains the same as the SBA DQRA; that the site can be conceptualised as comprising two sources to [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:29:primary water resource receptor (River Tees). As no changes have been made to the conceptual [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:30:reducing the flow of groundwater). The Made Ground source has therefore been conceptualised as the [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:30:conceptual review of any areas assessed in future needs to be undertaken. In particular, confirming sources, [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:42:conceptual model, such as the collection of additional site data, may result in changes to the SSAC defined [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:43:where Made Ground is a single source. However, first a detailed conceptual review of any areas assessed in [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA - Detailed Quantitative Risk Assessment - South Bank.pdf]]:80: MADE GROUND CONCEPTUAL PHYSICAL [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:4: Scope and Objectives pathway-receptor approach to refine the existing conceptual site model (CSM); [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:6: changes have been made to the conceptual understanding of this area, and no additional [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:7: the Teesworks where Made Ground is a single source. However, first a detailed conceptual [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:9:Figure 4 – Conceptual Site Model – Cross Section [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:11:will help refine the present conceptual site model (CSM) and define potential risks posed to the River Tees by [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:23:down-gradient. Figure 4 includes a simplified profile of the geological conditions, alongside a conceptual [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:29:Based on the above assessment of contaminant distribution, the conceptual understanding of site sources [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:29:remains the same as the SBA DQRA; that the site can be conceptualised as comprising two sources to [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:29:primary water resource receptor (River Tees). As no changes have been made to the conceptual [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:30:reducing the flow of groundwater). The Made Ground source has therefore been conceptualised as the [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:30:conceptual review of any areas assessed in future needs to be undertaken. In particular, confirming sources, [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:42:conceptual model, such as the collection of additional site data, may result in changes to the SSAC defined [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:43:where Made Ground is a single source. However, first a detailed conceptual review of any areas assessed in [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0331-02-SB_DQRA.pdf]]:80: MADE GROUND CONCEPTUAL PHYSICAL [[this>Teesworks/Planning/R-2022-0096-CD/R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 2).pdf|R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 2).pdf]]:2: Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 2.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 2.pdf]]:2: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 2.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 2.pdf]]:3: Refined Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:4:2 Site Conceptualisation ............................................................................................................................... 4 [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:4:6 Refined Conceptual Site Model ............................................................................................................... 25 [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:6:written by 3rd parties) were reviewed and the information incorporated into the Conceptual Site Model. Data was [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:6:The conceptual site model and the relevant 3rd party reports are detailed in: [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:7:building in order to refine the conceptual site model previously developed for the site and undertake a generic [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:8:2 Site Conceptualisation [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:8:A detailed analysis of the site conceptualisation can be found in Arcadis 2018a [Redcar Steelworks-AUK-XX- [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:8:Table 1: Site Conceptualisation summary [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:11:Groundwater is present within the Made Ground and Superficial Deposits, and is conceptualised to be in the [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:12:off-site contaminant sources and generated a conceptual site model. [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:12:contamination, separate from the rail sidings source conceptualised in Arcadis 2018a. [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:13:Including the sources conceptualised in Arcadis 2018a, four main sources of contamination are conceptualised [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:13: footprint is conceptualised; and, [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:13: source at the former substation is conceptualised. [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:15: • Shallow groundwater has been identified within the Made Ground, this is conceptualised to be perched [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:15: are anticipated to be at least 5m thick, and the conceptualised upward head of water are thought to limit [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:17:3.7 Conceptual Site Model [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:25:Superficial Deposits (anticipated to be at least 5.0m thick) and conceptualised upward head of pressure which [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:26:Based on this conceptualisation, the risk posed from the exceedances of DWS for iron, boron, sulphate, and [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:28:atmospheric pressure and weather conditions) and the conceptual site model. This then allows a characteristic [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:29:6 Refined Conceptual Site Model [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:31:conceptualised attenuation, and dilution along the pathway, and the likely limited interaction between the [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:33:Arcadis (2020). Grangetown Prairie Area, Former Steelworks, Redcar: Detailed Conceptual Site Model [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-Arcadis - South Bank Strategy.pdf|R-2021-0713-CD-Arcadis - South Bank Strategy.pdf]]:4:2.6 Conceptual Site Model .............................................................................................................. 4 [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-Arcadis - South Bank Strategy.pdf|R-2021-0713-CD-Arcadis - South Bank Strategy.pdf]]:8:the conceptual site model (CSM) for the contract area in order to develop the final remediation [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-Arcadis - South Bank Strategy.pdf|R-2021-0713-CD-Arcadis - South Bank Strategy.pdf]]:10:2.5 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-Arcadis - South Bank Strategy.pdf|R-2021-0713-CD-Arcadis - South Bank Strategy.pdf]]:10:developed a conceptual site model (CSM) based on ground investigation findings. The CSM identified [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-Arcadis - South Bank Strategy.pdf|R-2021-0713-CD-Arcadis - South Bank Strategy.pdf]]:26:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf]]:4: environmental conditions underlying the site and to refine the Conceptual Site Model (CSM) [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf]]:8:Figure 2 – Conceptual Site Model – Cross Section [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf]]:11:site. This report will help refine the present conceptual site model (CSM) and define any potential risks posed [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf]]:12: refine the existing conceptual site model (CSM); and, [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf]]:18:gradient. Figure 2 includes a simplified profile of the geological conditions, alongside a conceptual cross- [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf]]:23:zone and aquifer have been conceptualised as presented in Figure 2. [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf]]:30:conceptual model, such as the collection of additional site data, may result in changes to the SSAC defined [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0270-01-SBA_DQRA.pdf]]:33: MADE GROUND CONCEPTUAL PHYSICAL [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:4: pathway-receptor approach to refine the existing conceptual site model (CSM); [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:6: changes have been made to the conceptual understanding of this area, and no additional [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:7: detailed conceptual review of any areas assessed in future needs to be undertaken. In [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:9:Figure 4 – Conceptual Site Model – Cross Section [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:11:will help refine the present conceptual site model (CSM) and define potential risks posed to the River Tees by [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:23:down-gradient. Figure 4 includes a simplified profile of the geological conditions, alongside a conceptual [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:29:Based on the above assessment of contaminant distribution, the conceptual understanding of site sources [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:29:remains the same as the SBA DQRA; that the site can be conceptualised as comprising two sources to [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:29:primary water resource receptor (River Tees). As no changes have been made to the conceptual [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:29:reducing the flow of groundwater). The Made Ground source has therefore been conceptualised as the [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:29:first a detailed conceptual review of any areas assessed in future needs to be undertaken. In particular, [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:39:conceptual model, such as the collection of additional site data, may result in changes to the SSAC defined [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:40:Redcar Steelworks site where Made Ground is a single source. However, first a detailed conceptual review of [[this>Teesworks/Planning/R-2021-0713-CD/R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf|R-2021-0713-CD-10035117-AUK-XX-XX-RP-ZZ-0331-01-SB_DQRA.pdf]]:65: MADE GROUND CONCEPTUAL PHYSICAL [[this>Teesworks/Planning/MLA_2020_00507/Consultations/EA MLA_2020_00507 22 February 2021 OFFICIAL.pdf|EA MLA_2020_00507 22 February 2021 OFFICIAL.pdf]]:4: • a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:46:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:46:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:54:2002 Conceptual model of estuary processes. ABPmer, 2002 [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:57: Conceptual model of estuary [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:588:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:250:6 Preliminary Conceptual Site Model and Qualitative Risk Assessment 21 [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:250:Table 6-3: Preliminary Conceptual Model 24 [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:253: • Provide an initial Conceptual Site Model (CSM) to identify and assess potential contaminant [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:273:6 Preliminary Conceptual Site Model and Qualitative Risk [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:276:Table 6-3: Preliminary Conceptual Model [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-10.pdf|MLA_2020_00507-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-10.pdf]]:2:12km offshore from the mouth of the Tees. Based upon a conceptual understanding that was developed [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:46:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:46:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:54:2002 Conceptual model of estuary processes. ABPmer, 2002 [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:57: Conceptual model of estuary [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:588:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:114:pathways. These linkages are summarised in the Preliminary Conceptual Site Model and Qualitative Risk [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:114:Receptor-Linkage’ in the Preliminary Conceptual Site Model and Qualitative Risk Assessment gives an [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:122:where they are measured, they are referred back to a conceptual point 1 m away from the point of origin [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:46:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:46:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:54:2002 Conceptual model of estuary processes. ABPmer, 2002 [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:57: Conceptual model of estuary [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:588:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-EA R_2020_0684_ESM 4 March 2021 OFFICIAL.pdf|R-2020-0684-ESM-EA R_2020_0684_ESM 4 March 2021 OFFICIAL.pdf]]:2: • a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf]]:5:used herein is based on the ‘source-pathway-receptor’ conceptual model process used to provide a [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf]]:5:the effect-receptor interactions, impact pathways, and potential impact significance. The conceptual [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-DECISION NOTICE.pdf|R-2020-0684-ESM-DECISION NOTICE.pdf]]:2: • a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 8_Underwater noise assessment.pdf|R-2020-0684-ESM-Appendix 8_Underwater noise assessment.pdf]]:4:where they are measured, they are referred back to a conceptual point 1 m away from the point of origin [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Officer Report 0684.pdf|R-2020-0684-ESM-Officer Report 0684.pdf]]:9:• a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Officer Report 0684.pdf|R-2020-0684-ESM-Officer Report 0684.pdf]]:27:• a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Officer Report 0684.pdf|R-2020-0684-ESM-Officer Report 0684.pdf]]:98: • a conceptual model of the site indicating sources, pathways and [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf]]:1:ABPmer (2002). Tees Entrance Channel Study. Conceptual Model of Estuary Processes. Report R.972. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:4:6 Preliminary Conceptual Site Model and Qualitative Risk Assessment 21 [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:4:Table 6-3: Preliminary Conceptual Model 24 [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:7: • Provide an initial Conceptual Site Model (CSM) to identify and assess potential contaminant [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:27:6 Preliminary Conceptual Site Model and Qualitative Risk [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:30:Table 6-3: Preliminary Conceptual Model [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:720:pathways. These linkages are summarised in the Preliminary Conceptual Site Model and Qualitative Risk [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:720:Receptor-Linkage’ in the Preliminary Conceptual Site Model and Qualitative Risk Assessment gives an [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:4:2002 Conceptual model of estuary processes. ABPmer, 2002 [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:7: Conceptual model of estuary [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-0405.pdf|R-2021-0405-FFM-0405.pdf]]:1:of the conceptual site model, contaminant distribution and the requirements of the [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-0405.pdf|R-2021-0405-FFM-0405.pdf]]:2:these data gaps, the Conceptual Site Model and Remediation Strategy shall be [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-OFFICER REPORT.pdf|R-2021-0405-FFM-OFFICER REPORT.pdf]]:6:accuracy of the conceptual site model, contaminant distribution and the [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-OFFICER REPORT.pdf|R-2021-0405-FFM-OFFICER REPORT.pdf]]:7:addressing these data gaps, the Conceptual Site Model and Remediation [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF|R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF]]:4:2.6 Conceptual Site Model .............................................................................................................. 5 [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF|R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF]]:8:the conceptual site model, contaminant distribution and the requirements of the remediation strategy. [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF|R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF]]:11:the conceptual site model, contaminant distribution and the requirements of the remediation strategy. [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF|R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF]]:11:2.6 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF|R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF]]:11:part of the South Bank Quay Area) developed a conceptual site model (CSM) based on ground [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF|R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF]]:12:Figure 3 - Conceptual Site Model [[this>Teesworks/Planning/R-2021-0405-FFM/R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF|R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF]]:32:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:5:7 PRELIMINARY CONCEPTUAL SITE MODEL........................................................ 20 [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:7:• Development of a conceptual site model (CSM) in line with Land Contamination Risk Management 2021). [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:26:7 Preliminary Conceptual Site Model [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:26:land contamination conceptual site model (CSM). [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:5:7 PRELIMINARY CONCEPTUAL SITE MODEL ........................................................ 18 [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:7: Development of a conceptual site model (CSM) in line with UK regulatory information. [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:24:7 Preliminary Conceptual Site Model [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:24:geo-environmental conceptual site model (CSM). [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:8:3 Initial Conceptual Site Model ................................................................................................................... 28 [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:8:5 Review of Conceptual Site Model ........................................................................................................... 45 [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:9:Figure 9 Conceptual Site Model Cross Section [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:15:conceptual understanding of the Site. [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:32:3 Initial Conceptual Site Model [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:35:planned industrial development, this conceptualisation is likely a conservative assumption. [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:36:site and as such they have been retained here as the underlying conceptual model used in their development [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:36:is consistent with the conceptual site model for this Site. [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:36:3 Grangetown Prairie Area, Former Steelworks, Redcar, Detailed Conceptual Site Model Review and Risk [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:49:5 Review of Conceptual Site Model [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:49:includes a simplified profile of the geological conditions, alongside a conceptual cross-section identifying [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:57:have been conceptualised as presented in Figure 9. [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:65:defined using the Site investigation data available at the present time. Modifications to the conceptual model, [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0428-04-LWoW_DQRA.pdf]]:105: MADE GROUND CONCEPTUAL PHYSICAL [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf]]:4:2.6 Conceptual Site Model .............................................................................................................. 9 [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf]]:10:conceptual site model (CSM) for the contract area in order to develop the final remediation technology [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf]]:15:2.6 Conceptual Site Model [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf]]:15:landholding and is documented in Arcadis [[2018a]]. As part of this study a conceptual site model (CSM) [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf]]:17:Figure 3 - Conceptual Site Model [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf]]:35:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0417-06-Rem_Strat_LWoW(1).pdf]]:49: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF]]:4:2.6 Conceptual Site Model.............................................................................................................. 7 [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF]]:7:geotechnical risk assessment within the conceptual site model (CSM) for the contract area in order to [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF]]:13:2.6 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF]]:13:The ESA developed a conceptual site model (CSM) based on ground investigation findings. The CSM [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0066-01-Prairie ROA and Strategy.PDF]]:38:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-Officer report.pdf|R-2021-0879-FF-Officer report.pdf]]:2:  Detailed Conceptual Site Model Review and Risk Assessment [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-63262 01 Dorman Long Training Centre Cover Letter 14.10.21.pdf|R-2021-0879-FF-63262 01 Dorman Long Training Centre Cover Letter 14.10.21.pdf]]:4:• Detailed Conceptual Site Model Review and Risk Assessment prepared by Arcadis. [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:3:3. Conceptual Model & Environmental Risk Assessment 89 [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:3:3.1 Conceptual Model 89 [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:6: Conceptual Model and Environmental Risk Evaluation (Section 3); [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:42: Conceptual Site Model [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:42: The report presented a conceptual model, which identified the following potential contamination [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:89:3. Conceptual Model & Environmental Risk [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:89:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:89:3.1 Conceptual Model [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:92:The conceptual model does not consider risks to construction/ site maintenance workers on the basis that [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:4:2 SITE CONCEPTUALISATION................................................................................... 3 [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:5:3.8 Conceptual Site Model ....................................................................................................................... 29 [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:5:5 UPDATED CONCEPTUAL SITE MODEL ............................................................... 48 [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:7:conceptual site model (CSM) for the site and identify the significance of any source-pathway-receptor (SPR) [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:9:2 Site Conceptualisation [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:24:This section summarises the findings of Section 2 in the form of a geo-environmental conceptual site model [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:35:3.8 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:54:5 Updated Conceptual Site Model [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF]]:2: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part2.PDF]]:4: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF]]:24:further assessment. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF]]:24:in groundwater cannot be ruled out. The Arcadis Detailed Conceptual Site Model and Risk Assessment report, [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF]]:24:the Arcadis Detailed Conceptual Site Model and Risk Assessment report, currently in press. [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF]]:25:assessment, this is being undertaken as part of a detailed conceptual model review and risk assessment, [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part1.PDF]]:25:identified above the WQS. A detailed conceptual site model review and risk assessment is being undertaken [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf|R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf]]:4: an outline Conceptual Site Model (CSM) detailing potential pollutant linkages associated with the [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Non Technical Summary.pdf|R-2020-0411-FFM-Non Technical Summary.pdf]]:26: extreme weather events. The conceptual surface water drainage strategy for the proposed [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 13 - Other Environmental Effects.pdf|R-2020-0411-FFM-Chapter 13 - Other Environmental Effects.pdf]]:4: extreme weather events. The conceptual surface water drainage strategy for the proposed [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf|R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf]]:2: conceptual surface water drainage strategy for the project has been designed to take into account [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf|R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf]]:22: example, future flood risk and resilience to extreme weather events. The conceptual surface water [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:3:3 OUTLINE CONCEPTUAL SITE MODEL ........................................................................................ 11 [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:3: 3.3 Outline Conceptual Site Model .............................................................................................. 12 [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:4:Table 10 – Outline Conceptual Site Model ................................................................................................. 13 [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:5:Outline Conceptual Site Model [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:7: • produce an outline Conceptual Site Model (CSM) detailing how any contamination may [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:17:3 OUTLINE CONCEPTUAL SITE MODEL [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:17:3.1.1 An outline conceptual site model (CSM) consists of an appraisal of the source-pathway-receptor [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:18:3.3 Outline Conceptual Site Model [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:19:Table 10 – Outline Conceptual Site Model [[this>Teesworks/Planning/R-2022-0176-CD/R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf|R-2022-0176-CD-2015-10 Section 36 Consent (Conditions) (12).pdf]]:13: • a conceptual model of the Site indicating [[this>Teesworks/Planning/R-2022-0587-CD/R-2022-0587-CD-R 2020 0684 ESM DECISION NOTICE.pdf|R-2022-0587-CD-R 2020 0684 ESM DECISION NOTICE.pdf]]:2: • a conceptual model of the site indicating sources, pathways and receptors [[this>Teesworks/Planning/R-2021-0465-FFM/R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:4:2.6 Conceptual Site Model .............................................................................................................. 7 [[this>Teesworks/Planning/R-2021-0465-FFM/R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:8:the conceptual site model (CSM) for the contract area in order to develop the final remediation [[this>Teesworks/Planning/R-2021-0465-FFM/R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:8:the conceptual site model, contaminant distribution and the requirements of the remediation strategy. [[this>Teesworks/Planning/R-2021-0465-FFM/R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:13:of the conceptual site model, contaminant distribution and the requirements of the remediation strategy. [[this>Teesworks/Planning/R-2021-0465-FFM/R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:13:2.6 Conceptual Site Model [[this>Teesworks/Planning/R-2021-0465-FFM/R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:13:conceptual site model (CSM) based on ground investigation findings. The CSM identified a number of [[this>Teesworks/Planning/R-2021-0465-FFM/R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:14:Figure 3 - Conceptual Site Model [[this>Teesworks/Planning/R-2021-0465-FFM/R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:31:material considered within the conceptual site model. [[this>Teesworks/Planning/R-2021-0465-FFM/R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf|R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf]]:41: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:3: CSM Conceptual Site Model [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:65: Site. A conceptual site model (CSM) will be developed for the land potentially [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:4: 1 Appendix H1: Grangetown Prairie Area, Former Steelworks, Redcar, Detailed Conceptual [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:10: baseline conditions. The Conceptual Site Model (CSM) presented in the Detailed Conceptual [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:10: 1 Grangetown Prairie Area, Former Steelworks, Redcar, Detailed Conceptual Site Model [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:16: Detailed Conceptual Site Model and Risk Assessment [[Arcadis 2020 H1]] and the Remediation [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:17:H3.17 The Detailed Conceptual Site Model and Risk Assessment [[Arcadis 2020 Appendix H1]] [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:31: Arcadis 2020) is provided on Figure 4 within the Arcadis Detailed Conceptual Site Model [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:31: Conceptual Site Model Review and Risk Assessment [[A rcadis 2020 H1]]. Concentrations of PAH [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:35: subsequent Detailed Conceptual Site Model Review and Risk Assessment [Arcadis 2020 [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:35: subsequent Detailed Conceptual Site Model Review and Risk Assessment [Arcadis 2020 [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:46: 5 CSM Conceptual Site Model [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF]]:34:G4.35 The conceptual understanding of the overall groundwater functioning of the site is for direct [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:3: conceptual site model (CSM). The specific objectives of this GQRA comprised: [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:6:3 Conceptual Site Model ............................................................................................................................. 18 [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:6:5 Review of Conceptual Site Model ........................................................................................................... 28 [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:7:Figure 6 Conceptual Site Model Cross Section [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:10:Conceptual Site Model (CSM) to identify if changes to the Remedial Strategy adopted for the wider Site are [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:11:the basis for the conceptual understanding of the Site. [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:11:beneath these additional areas are in line with the current site-wide conceptual site model (CSM). The specific [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:20:3 Conceptual Site Model [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:23:planned industrial development, this conceptualisation is likely a conservative assumption. [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:24:site and as such they have been retained here as the underlying conceptual model used in their development [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:24:is consistent with the conceptual site model for this Site. [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:24:3 Grangetown Prairie Area, Former Steelworks, Redcar, Detailed Conceptual Site Model Review and Risk [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:30:5 Review of Conceptual Site Model [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:30:6 includes a simplified profile of the geological conditions, alongside a conceptual cross-section identifying [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:42: MADE GROUND CONCEPTUAL PHYSICAL [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF]]:36:G4.45 The conceptual understanding of the overall groundwater functioning of the site is for direct [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF]]:9: Groundsure report have been used to establish the baseline conditions. The Conceptual Site [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF]]:40: 3 CSM Conceptual Site Model [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:3:3. Conceptual Model & Environmental Risk Assessment 89 [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:3:3.1 Conceptual Model 89 [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:6:  Conceptual Model and Environmental Risk Evaluation (Section 3); [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:42: Conceptual Site Model [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:42: The report presented a conceptual model, which identified the following potential contamination [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:89:3. Conceptual Model & Environmental Risk [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:89:The following section presents the Conceptual Model (CM) and Environmental Risk Assessment established [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:89:3.1 Conceptual Model [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:92:The conceptual model does not consider risks to construction/ site maintenance workers on the basis that [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF|R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF]]:4:2 SITE CONCEPTUALISATION................................................................................... 3 [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF|R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF]]:5:3.8 Conceptual Site Model .......................................................................................................................11 [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF|R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF]]:5:5 UPDATED CONCEPTUAL SITE MODEL ............................................................... 20 [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF|R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF]]:7:conceptual site model (CSM) for the site and identify the potential significance of any source-pathway-receptor [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF|R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF]]:9:2 Site Conceptualisation [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF|R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF]]:17:3.8 Conceptual Site Model [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF|R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF]]:26:5 Updated Conceptual Site Model [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF|R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF]]:33: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF|R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF]]:34: Outline Conceptual Site Model - Commercial Industrial End Use [[this>Teesworks/Planning/R-2023-0227-CD/R-2023-0227-CD-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf|R-2023-0227-CD-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf]]:3:5 Conceptual Site Model ....................................................................................................................................... 9 [[this>Teesworks/Planning/R-2023-0227-CD/R-2023-0227-CD-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf|R-2023-0227-CD-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf]]:3: 5.1 Conceptual site model ............................................................................................................................. 9 [[this>Teesworks/Planning/R-2023-0227-CD/R-2023-0227-CD-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf|R-2023-0227-CD-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf]]:9: 5 Conceptual Site Model [[this>Teesworks/Planning/R-2023-0227-CD/R-2023-0227-CD-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf|R-2023-0227-CD-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf]]:9: 5.1 Conceptual site model [[this>Teesworks/Planning/R-2023-0227-CD/R-2023-0227-CD-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf|R-2023-0227-CD-TV_ERF_Air_Quality_Dioxin_Pathway_Intake_Assessment.pdf]]:10: Figure 1: Conceptual Site Model – Exposure Pathways [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:3:02.10 Watercourses and Flood Mapping 05.04 North Industrial Zone Conceptual Massing Views 10.04 Rail Infrastructure 13.02 Adoption of the Master Plan [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:3:03.01 Master Planning Process 07 South Industrial Zone 11.05 Conceptual Energy Plans [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:94:5.04 Conceptual Massing Views (for illustrative purposes) [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:95:5.05 North Industrial Zone Illustrative Plan (Conceptual) [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:96:Plots sited in the NI Zone have been conceptually sized based off of real-world facilities. While plot sizes represented [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:101:6.02 Northeast Industrial Zone Illustrative Plan (Conceptual) [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:108: from the proximity to the river afforded by the SIZ and from been conceptually allocated for large contract fabrication, could accommodate photovoltaic arrays, wind turbines [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:110: 7.04 South Industrial Zone Illustrative Plan (Conceptual) [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:117:8.02 Central Industrial Zone Illustrative Plan (Conceptual) [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:146:11.05 Conceptual Energy Plans [[this>Teesworks/171019South-Tees-Master-Plan-19-Nov-17.pdf|171019South-Tees-Master-Plan-19-Nov-17.pdf]]:146:Two conceptual energy plans have been created to Renewable Energy Waste Heat Energy Baseload Bioenergy Bioenergy