{include:Teesworks - keywords - menu} [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf|EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf]]:71: Document Ref. 6.2). Specifically, sound propagation associated with UXO explosions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf|EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf]]:72: to over 10km from the site of potential explosions (see Table 4Table 4.1). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf|EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf]]:72: explosive charges (where feasible) and the use of Acoustic Deterrent Devices (ADDs). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf|EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf]]:72: These standard JNCC Guidelines for explosions will be adopted for the Proposed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf|EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf]]:72:explosives. 10pp. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf|EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf]]:90: exposure level from underwater explosions in shallow water. The Journal of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf|EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf]]:125: 51. No explosives for blasting are to be used within 400 metres of any part of the CATS [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf|EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf]]:133: (c) the use of explosives within 400 metres of the Exolum operations; and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf|EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf]]:10:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf|EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf]]:67:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf|EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf]]:73: Document Ref. 6.2). Specifically, sound propagation associated with UXO explosions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf|EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf]]:73: to over 10km from the site of potential explosions (see Table 4Table 4.1). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf|EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf]]:74: explosive charges (where feasible) and the use of Acoustic Deterrent Devices (ADDs). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf|EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf]]:74: These standard JNCC Guidelines for explosions will be adopted for the Proposed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf|EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf]]:74:explosives. 10pp. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf|EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf]]:91: exposure level from underwater explosions in shallow water. The Journal of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf|EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf]]:114: explosive site. The Applicants have consulted the operators of the relevant sites and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf|EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf]]:114: fire/explosions, toxic exposure, noxious substances, storms, climate change, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf|EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf]]:115: environment from events such as explosion are relatively low. However, as the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf|EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf]]:116: Development include fires, explosions and the release of CO2. These incidents [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:96: • BS 5908: Fire and explosion precautions at premises handling flammable [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:96: explosion in chemical plants, chemical storage and similar premises [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:255:fields, which can cause blow outs, explosions, fires or other damage, in injury and material damage, chronic damage to health and environmental [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:255:major industrial accident such as fires, explosions, significant damage to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:273:impacting a sensitive natural environment(2). could be an explosion, a fire or a leak resulting in fatalities or bodily [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:277:explosion, fire, leakage of hazardous products or mass leakage that facilities operated by the Company, formal rules have been set out to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:283: and procedures for interventions in the event of leaks, fires or explosions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:290: Company recorded 4 Tier 1 or Tier 2 events due to acts of sabotage or more or less significant consequences (fires, explosions, injuries, etc.), as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:404: explosion, fire, leakage of hazardous products or mass leakage that might standards include applicable regulatory requirements and refer to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:405:Tier 2 losses of containment as defined by the American Petroleum of leaks, fires or explosions and that subsidiaries have to test these at [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:405: more or less significant consequences (fires, explosions, injuries, etc.), as TotalEnergies also continued to roll out its Incident Management System [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:449: electricity, explosion hazards (ATEX standard), transportation of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:595: To prevent the occurrence of a major industrial accident such as an explosion, fire, leakage of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:596: interventions in the event of leaks, fires or explosions and that subsidiaries have to test these at [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:599:ATEX: explosive atmosphere LNG: liquefied natural gas [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:278: • risks from spills fire, explosion; [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf|EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf]]:99:and/or license agreements, and impact on the environment and other hazardous materials, fires, explosions and water [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001729-Deadline 2 Response to First Written Questions (CATS North Sea Limited).pdf|EN010103-001729-Deadline 2 Response to First Written Questions (CATS North Sea Limited).pdf]]:2: (b) Restrictions on use of explosives for blasting should be restricted over a [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001020-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP.pdf|EN010103-001020-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP.pdf]]:22:Potential risks of explosion if [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001020-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP.pdf|EN010103-001020-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP.pdf]]:22:explosive gases were to accumulate  Best practice measures will be adopted during construction to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001020-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP.pdf|EN010103-001020-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP.pdf]]:34:  The standard JNCC mitigation measures for explosives, piling and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001979-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Tracked) August 2022 (D5).pdf|EN010103-001979-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Tracked) August 2022 (D5).pdf]]:22:Potential risks of explosion if [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001979-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Tracked) August 2022 (D5).pdf|EN010103-001979-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Tracked) August 2022 (D5).pdf]]:22:explosive gases were to accumulate • Best practice measures will be adopted during construction to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001979-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Tracked) August 2022 (D5).pdf|EN010103-001979-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Tracked) August 2022 (D5).pdf]]:38: • The standard JNCC mitigation measures for explosives, piling and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf|EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf]]:10:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf|EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf]]:21:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001052-NZT DCO 6.3.125 ES Vol II Figure 22-1 HSE Consultation Zones.pdf|EN010103-001052-NZT DCO 6.3.125 ES Vol II Figure 22-1 HSE Consultation Zones.pdf]]:1: HSE Explosive Safeguarding Zone [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf|EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf]]:11:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf|EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf]]:70: Hazardous Part B, Highly Reactive and Explosive Substance, Ethylene oxide, where [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf|EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf]]:106:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf|EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf]]:84: • BS 5908: Fire and explosion precautions at premises handling flammable [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf|EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf]]:84: explosion in chemical plants, chemical storage and similar premises [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:169: licensed explosive site (Ports licensed site No. required for the Proposed Development and will [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:201: dispersion/explosion/QRA studies or modelling [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:604:Explosives sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:604:The proposed development is in the vicinity of a licensed explosive site (Ports licensed site No43). The main site is at some [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:604:relation to the explosives berth. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:1070: dispersion/explosion/QRA studies or modelling been undertaken to inform blast / toxicity radii circles? [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:1102:Explosives sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:1102:The proposed development is in the vicinity of a licensed explosive site (Ports licensed site No43). The [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:1102:the proposed structures will lie in relation to the explosives berth. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:1231: EXPLOSIVE SAFEGUARDING ZONES [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:1234: EXPLOSIVE SAFEGUARDING ZONES [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:1237: EXPLOSIVE SAFEGUARDING ZONES [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf|EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf]]:26: • BS 5908: Fire and explosion precautions at [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf|EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf]]:26: and explosion in chemical plants, chemical storage [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf|EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf]]:35: explosives would occur with prior warning, at management; and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf|EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf]]:44: injury to marine mammals whilst using explosives [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf|EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf]]:74: explosives, piling and geophysical surveys (JNCC, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002651-SABIC Protective Provisions 1.pdf|EN010103-002651-SABIC Protective Provisions 1.pdf]]:8: 9. No explosives are to be used within the protected land. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf|EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf]]:123: 51. No explosives for blasting are to be used within 400 metres of any part of the CATS [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf|EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf]]:131: (c) the use of explosives within 400 metres of the Exolum operations; and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001339-NZTDCO 6.3.125 Rev 2 ES Addendum Vol II Figure 22-1 HSE Consultation Zones.pdf|EN010103-001339-NZTDCO 6.3.125 Rev 2 ES Addendum Vol II Figure 22-1 HSE Consultation Zones.pdf]]:1: HSE Explosive Safeguarding Zone [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf|EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf]]:66: 10km from the site of potential explosions. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf|EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf]]:67: mammals, sequencing of explosive charges (where feasible) and the use of Acoustic [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf|EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf]]:67:explosives. 10pp. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002652-Huntsman Protective Provisions.pdf|EN010103-002652-Huntsman Protective Provisions.pdf]]:7: 9. No explosives are to be used within the protected land. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:100: 32.—(1) Only when driven or part-driven pile foundations or detonation of explosives are [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:100: location, start and end date of impact pile driving / detonation of explosives to satisfy the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:100: (b) within 12 weeks of completion of impact pile driving / detonation of explosives, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:100: information on the locations and dates of impact pile driving / detonation of explosives to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:114: 32.—(1) Only when driven or part-driven pile foundations or detonation of explosives are [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:114: location, start and end dates of impact pile driving / detonation of explosives to satisfy the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:114: (b) within 12 weeks of completion of impact pile driving / detonation of explosives, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:114: information on the locations and dates of impact pile driving / detonation of explosives to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:141: 65.51. No explosives for blasting are to be used within 400 metres of any part of the CATS [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:149: (c) the use of explosives within 400 metres of the Exolum operations; and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:178: 194. No explosives are to be used within the protected land. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:220: 311. No explosives are to be used within the protected land. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf|EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf]]:10:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf|EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf]]:77: Hazardous Part B, Highly Reactive and Explosive Substance, Hydrogen, where amount [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf|EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf]]:92:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:41:proposition. damage to equipment from a fire or explosion, a from subsidiaries« and the percentage of emissions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:71:as well as fires, explosions or other personal and process safety incidents, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:103: Explosion or release at our facilities [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:228:Deepwater Horizon was deployed at the time of the 20 April 2010 explosion and fire and resulting oil spill (the Incident). Lawsuits and claims arising [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:228:The vast majority of post-explosion clean-up, medical monitoring and personal injury claims from individuals that either opted out of the Medical [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:228:In 2019, the federal district court in New Orleans determined in a series of proceedings that 923 plaintiffs had post-explosion clean-up, medical [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:349:damage to equipment from a fire or explosion, a community impact or The nearest equivalent measure on an IFRS basis for the group is profit or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf|EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf]]:10:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf|EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf]]:27:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf|EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf]]:69: Document Ref. 6.2). Specifically, sound propagation associated with UXO explosions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf|EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf]]:69: to over 10km from the site of potential explosions (see Table 4.1). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf|EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf]]:70: explosive charges (where feasible) and the use of Acoustic Deterrent Devices (ADDs). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf|EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf]]:70: These standard JNCC Guidelines for explosions will be adopted for the Proposed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf|EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf]]:70:explosives. 10pp. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf|EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf]]:86: exposure level from underwater explosions in shallow water. The Journal of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf|EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf]]:72: Document Ref. 6.2). Specifically, sound propagation associated with UXO explosions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf|EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf]]:73: to over 10km from the site of potential explosions (see Table 4Table 4.1). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf|EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf]]:73: explosive charges (where feasible) and the use of Acoustic Deterrent Devices (ADDs). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf|EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf]]:73: These standard JNCC Guidelines for explosions will be adopted for the Proposed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf|EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf]]:73:explosives. 10pp. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf|EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf]]:91: exposure level from underwater explosions in shallow water. The Journal of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf|EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf]]:27: • BS 5908: Fire and explosion precautions at [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf|EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf]]:27: and explosion in chemical plants, chemical storage [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf|EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf]]:36: explosives would occur with prior warning, at management; and Requirement 23 : UXO Clearance, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf|EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf]]:74: explosives, piling and geophysical surveys (JNCC, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf|EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf]]:120: 51. No explosives for blasting are to be used within 400 metres of any part of the CATS pipeline(s) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf|EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf]]:128: (c) the use of explosives within 400 metres of the Exolum operations; and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf|EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf]]:129: 51. No explosives for blasting are to be used within 400 metres of any part of the CATS [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf|EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf]]:137: (c) the use of explosives within 400 metres of the Exolum operations; and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf|EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf]]:11: underwater explosions is to use the methodology from Soloway and Dahl (2014), [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf|EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf]]:134: 51. No explosives for blasting are to be used within 400 metres of any part of the CATS pipeline(s) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf|EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf]]:142: (c) the use of explosives within 400 metres of the Exolum operations; and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf|EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf]]:71: Document Ref. 6.2). Specifically, sound propagation associated with UXO explosions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf|EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf]]:71: to over 10km from the site of potential explosions (see Table 4Table 4.1). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf|EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf]]:71: explosive charges (where feasible) and the use of Acoustic Deterrent Devices (ADDs). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf|EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf]]:71: These standard JNCC Guidelines for explosions will be adopted for the Proposed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf|EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf]]:71:explosives. 10pp. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf|EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf]]:89: exposure level from underwater explosions in shallow water. The Journal of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf|EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf]]:29: b) Restrictions on use of explosives for blasting should be restricted over a wider area than is [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf|EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf]]:11:Explosive Sites pg 59 2 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf|EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf]]:72: Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf|EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf]]:72: Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf|EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf]]:73: Hazardous Part B, Highly Reactive and Explosive Substance, Liquid Oxygen, where [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf|EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf]]:74: Hazardous Part B, Highly Reactive and Explosive Substance, Hydrogen, where amount [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf|EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf]]:101:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf|EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf]]:51:7.16.2 Major accidents are incidents such as fires and explosions that could result in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf|EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf]]:51: include fire, explosion, toxic release, high rainfall and storm surges from the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf|EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf]]:10:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf|EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf]]:126:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:242:• Explosion/Asphyxiation; [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:246:• Ground gas inhalation/explosion risk. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:282:The greatest hazards posed by methane are those of fire and explosion. The limits of flammability, i.e. the Lower [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:282:Explosion Limit (LEL) and Upper Explosion Limit (UEL), are 5% v/v and 15% v/v respectively. Where methane [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:282:concentrations are encountered between these two ranges there is the possibility of ignition/explosion. However, it is [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:282:can occur bringing it back to within explosive limits. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:287:Explosives 1,3-Dinitrobenzene mg/kg 82 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:291:Explosives 1,3-Dinitrobenzene mg/kg 82 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:295:Explosives 1,3-Dinitrobenzene mg/kg 82 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:299:Explosives 1,3-Dinitrobenzene mg/kg 82 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:303:Explosives 1,3-Dinitrobenzene mg/kg 82 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:307:Explosives 1,3-Dinitrobenzene mg/kg 82 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:311:Explosives 1,3-Dinitrobenzene mg/kg 82 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:315:Explosives 1,3-Dinitrobenzene mg/kg 82 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:325:Explosives 1,3-Dinitrobenzene µg/L 2#3 <1 <1 - <1 - <1 - <1 <1 <1 <1 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:329:Explosives 1,3-Dinitrobenzene µg/L 2#3 <1 - <1 <1 - - - - - <1 - [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:333:Explosives 1,3-Dinitrobenzene µg/L 2#3 12 0 <1 <1 0.5 0.5 0 0 0 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:337:Explosives 1,3-Dinitrobenzene µg/L <1 <1 - <1 - <1 - <1 <1 <1 <1 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:341:Explosives 1,3-Dinitrobenzene µg/L <1 - <1 <1 - - - - - <1 - [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:345:Explosives 1,3-Dinitrobenzene µg/L 12 0 <1 <1 0.5 0.5 0 0 0 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf|EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf]]:45: managed. Any use of controlled explosives would only be undertaken with prior [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:246: 6.2.1 The MMO note that the standard approach for the considering underwater explosions within shallow water. The findings of this [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:246: estimation of noise levels from underwater explosions is to report show that the influence of the bounded underwater wave guide is for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001730-Written Representation (CATS North Sea Limited).pdf|EN010103-001730-Written Representation (CATS North Sea Limited).pdf]]:10: (b) Restrictions on use of explosives for blasting should be restricted over a wider [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001730-Written Representation (CATS North Sea Limited).pdf|EN010103-001730-Written Representation (CATS North Sea Limited).pdf]]:21: 36” Gas Pipeline Explosion, North Texas June 7, 2010 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001730-Written Representation (CATS North Sea Limited).pdf|EN010103-001730-Written Representation (CATS North Sea Limited).pdf]]:24:4.3 Use of Explosives .................................................................................................... 7 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001730-Written Representation (CATS North Sea Limited).pdf|EN010103-001730-Written Representation (CATS North Sea Limited).pdf]]:29:4.3 Use of Explosives [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001730-Written Representation (CATS North Sea Limited).pdf|EN010103-001730-Written Representation (CATS North Sea Limited).pdf]]:29:Before a decision is made to use explosives for blasting within 400 metres of any part of a CATS [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001730-Written Representation (CATS North Sea Limited).pdf|EN010103-001730-Written Representation (CATS North Sea Limited).pdf]]:34: 36” Gas Pipeline Explosion, North Texas June 7, 2010 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001730-Written Representation (CATS North Sea Limited).pdf|EN010103-001730-Written Representation (CATS North Sea Limited).pdf]]:44: 36” Gas Pipeline Explosion, North Texas June 7, 2010 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:33: EVENTS transportation of hydrocarbons and derivatives by sea and land (i.e. fires, explosions, etc.) with damages on people [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:121: of residential customers to switch smoothly from one sup- explosions, blow-outs, fires, oil and gas spills from wells, pi- [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:121: cost of the energy bill. blowout, fire or explosion. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf|EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf]]:72: 10km from the site of potential explosions. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf|EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf]]:72: propagation associated with UXO explosions was calculated using a semi-empirical [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf|EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf]]:73: to over 10km from the site of potential explosions (see Table 4Table 5.1). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf|EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf]]:73: marine mammals, sequencing of explosive charges (where feasible) and the use of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf|EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf]]:73: Acoustic Deterrent Devices (ADDs). These standard JNCC Guidelines for explosions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf|EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf]]:73:explosives. 10pp. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf|EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf]]:90: exposure level from underwater explosions in shallow water. The Journal of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf|EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf]]:30: parties, and safety lapses. If a major risk materialises, such as an explosion or hydrocarbon leak if an HSSE risk materialises, we avoid catastrophic [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf|EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf]]:30: could have a material adverse effect on our earnings, cash flows and financial condition. as a spill, toxic substances, fire or explosion). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf|EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf]]:3:Explosives 1,3-Dinitrobenzene mg/kg 82 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf|EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf]]:7:Explosives 1,3-Dinitrobenzene mg/kg 82 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf|EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf]]:11:Explosives 1,3-Dinitrobenzene mg/kg 82 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf|EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf]]:15:Explosives 1,3-Dinitrobenzene mg/kg 82 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf|EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf]]:19:Explosives 1,3-Dinitrobenzene mg/kg 82 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf|EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf]]:23:Explosives 1,3-Dinitrobenzene mg/kg 82 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf|EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf]]:27:Explosives 1,3-Dinitrobenzene mg/kg 82 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf|EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf]]:31:Explosives 1,3-Dinitrobenzene mg/kg 82 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf|EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf]]:41:Explosives 1,3-Dinitrobenzene µg/L 2#3 <1 <1 - <1 - <1 - <1 <1 <1 <1 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf|EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf]]:45:Explosives 1,3-Dinitrobenzene µg/L 2#3 <1 - <1 <1 - - - - - <1 - [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf|EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf]]:49:Explosives 1,3-Dinitrobenzene µg/L 2#3 12 0 <1 <1 0.5 0.5 0 0 0 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf|EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf]]:53:Explosives 1,3-Dinitrobenzene µg/L <1 <1 - <1 - <1 - <1 <1 <1 <1 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf|EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf]]:57:Explosives 1,3-Dinitrobenzene µg/L <1 - <1 <1 - - - - - <1 - [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf|EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf]]:61:Explosives 1,3-Dinitrobenzene µg/L 12 0 <1 <1 0.5 0.5 0 0 0 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf|EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf]]:67: 10km from the site of potential explosions. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf|EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf]]:68: mammals, sequencing of explosive charges (where feasible) and the use of Acoustic [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf|EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf]]:68:explosives. 10pp. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf|EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf]]:10:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf|EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf]]:60:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf|EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf]]:10:Explosive Sites pg 41 1 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf|EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf]]:53: Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf|EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf]]:80:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf|EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf]]:121: 51. No explosives for blasting are to be used within 400 metres of any part of the CATS [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf|EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf]]:129: (c) the use of explosives within 400 metres of the Exolum operations; and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf|EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf]]:6:Unexploded ordnance UXO dropped during 3 5 15 Explosion, injury or fatality Provision of detailed report [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf|EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf]]:12:Unexploded ordnance UXO dropped during 3 5 15 Explosion, injury or fatality Provision of detailed report [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf|EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf]]:18:Unexploded ordnance UXO dropped during 3 5 15 Explosion, injury or fatality Provision of detailed report [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf|EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf]]:24:Unexploded ordnance UXO dropped during 3 5 15 Explosion, injury or fatality Provision of detailed report [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf|EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf]]:30:Unexploded ordnance UXO dropped during WWII 3 5 15 Explosion, injury or fatality Provision of detailed report [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf|EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf]]:72: Document Ref. 6.2). Specifically, sound propagation associated with UXO explosions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf|EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf]]:73: to over 10km from the site of potential explosions (see Table 4Table 4.1). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf|EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf]]:73: explosive charges (where feasible) and the use of Acoustic Deterrent Devices (ADDs). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf|EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf]]:73: These standard JNCC Guidelines for explosions will be adopted for the Proposed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf|EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf]]:73:explosives. 10pp. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf|EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf]]:91: exposure level from underwater explosions in shallow water. The Journal of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf|EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf]]:3: fuel storage tanks the risk from explosive vapours could be acute, whereas [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf|EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf]]:66: 10km from the site of potential explosions. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf|EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf]]:67: mammals, sequencing of explosive charges (where feasible) and the use of Acoustic [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf|EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf]]:67:explosives. 10pp. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002498-NZT DCO 6.3.125 - ES Vol II Figure 22-1 HSE Consultation Zones Nov 2022 (D12).pdf|EN010103-002498-NZT DCO 6.3.125 - ES Vol II Figure 22-1 HSE Consultation Zones Nov 2022 (D12).pdf]]:1: HSE Explosive Safeguarding Zone [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf|EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf]]:30: manufacture of explosive ordnance [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf|EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf]]:31:UXB Unexploded Bombs – explosive weapons that are unexploded. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001978-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Clean) August 2022 (D5).pdf|EN010103-001978-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Clean) August 2022 (D5).pdf]]:22:Potential risks of explosion if [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001978-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Clean) August 2022 (D5).pdf|EN010103-001978-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Clean) August 2022 (D5).pdf]]:22:explosive gases were to accumulate • Best practice measures will be adopted during construction to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001978-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Clean) August 2022 (D5).pdf|EN010103-001978-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Clean) August 2022 (D5).pdf]]:35: • The standard JNCC mitigation measures for explosives, piling and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf|EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf]]:71: Document Ref. 6.2). Specifically, sound propagation associated with UXO explosions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf|EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf]]:71: to over 10km from the site of potential explosions (see Table 4.1). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf|EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf]]:71: explosive charges (where feasible) and the use of Acoustic Deterrent Devices (ADDs). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf|EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf]]:71:explosives. 10pp. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf|EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf]]:72: These standard JNCC Guidelines for explosions will be adopted for the Proposed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf|EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf]]:88: from underwater explosions in shallow water. The Journal of the Acoustical Society [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf|EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf]]:66: 10km from the site of potential explosions. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf|EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf]]:67: mammals, sequencing of explosive charges (where feasible) and the use of Acoustic [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf|EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf]]:67:explosives. 10pp. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf|EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf]]:68: 10km from the site of potential explosions. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf|EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf]]:69: mammals, sequencing of explosive charges (where feasible) and the use of Acoustic [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf|EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf]]:69:explosives. 10pp. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002309-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Clean) Oct 2022 (D9).pdf|EN010103-002309-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Clean) Oct 2022 (D9).pdf]]:22:Potential risks of explosion if [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002309-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Clean) Oct 2022 (D9).pdf|EN010103-002309-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Clean) Oct 2022 (D9).pdf]]:22:explosive gases were to accumulate • Best practice measures will be adopted during construction to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002309-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Clean) Oct 2022 (D9).pdf|EN010103-002309-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Clean) Oct 2022 (D9).pdf]]:37: • The standard JNCC mitigation measures for explosives, piling and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002521-NZT DCO 9.48 - Applicants' Comments on D11 Submissons - Nov 2022 (D12).pdf|EN010103-002521-NZT DCO 9.48 - Applicants' Comments on D11 Submissons - Nov 2022 (D12).pdf]]:27: pile foundations or detonation of explosives are [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002521-NZT DCO 9.48 - Applicants' Comments on D11 Submissons - Nov 2022 (D12).pdf|EN010103-002521-NZT DCO 9.48 - Applicants' Comments on D11 Submissons - Nov 2022 (D12).pdf]]:27: impact pile driving / detonation of explosives to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002521-NZT DCO 9.48 - Applicants' Comments on D11 Submissons - Nov 2022 (D12).pdf|EN010103-002521-NZT DCO 9.48 - Applicants' Comments on D11 Submissons - Nov 2022 (D12).pdf]]:27: explosives, information on the locations and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002521-NZT DCO 9.48 - Applicants' Comments on D11 Submissons - Nov 2022 (D12).pdf|EN010103-002521-NZT DCO 9.48 - Applicants' Comments on D11 Submissons - Nov 2022 (D12).pdf]]:27: explosives to satisfy the Marine Noise [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf|EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf]]:34: of the Installation from the released hydrocarbon (for example from fire or explosion), dispersants may [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf|EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf]]:52: Fire and explosion Topside vessels and pipework [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf|EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf]]:66: or explosion), approved dispersants may be used without prior guidance or approval [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf|EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf]]:111: and major accident pipelines and also in the vicinity of a licensed explosive site. The [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf|EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf]]:111: worst-case environmental consequences/effects (this includes fire/explosions, toxic [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf|EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf]]:112: events such as explosion are relatively low. However, as the concentration of CO2 in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf|EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf]]:113: Development include fires, explosions and the release of CO2. These incidents [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf|EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf]]:71: Document Ref. 6.2). Specifically, sound propagation associated with UXO explosions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf|EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf]]:71: to over 10km from the site of potential explosions (see Table 4.1). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf|EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf]]:71: explosive charges (where feasible) and the use of Acoustic Deterrent Devices (ADDs). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf|EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf]]:71: These standard JNCC Guidelines for explosions will be adopted for the Proposed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf|EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf]]:71:explosives. 10pp. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf|EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf]]:89: exposure level from underwater explosions in shallow water. The Journal of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002384-Marine Management Organistation - Comments on any other information submitted at Deadline 10.pdf|EN010103-002384-Marine Management Organistation - Comments on any other information submitted at Deadline 10.pdf]]:5: explosives are proposed to be used as part of the foundation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002384-Marine Management Organistation - Comments on any other information submitted at Deadline 10.pdf|EN010103-002384-Marine Management Organistation - Comments on any other information submitted at Deadline 10.pdf]]:5: detonation of explosives to satisfy the Marine Noise Registry’s [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002384-Marine Management Organistation - Comments on any other information submitted at Deadline 10.pdf|EN010103-002384-Marine Management Organistation - Comments on any other information submitted at Deadline 10.pdf]]:5: explosives, information on the locations and dates of impact pile [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002384-Marine Management Organistation - Comments on any other information submitted at Deadline 10.pdf|EN010103-002384-Marine Management Organistation - Comments on any other information submitted at Deadline 10.pdf]]:5: driving / detonation of explosives to satisfy the Marine Noise [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf|EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf]]:10:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf|EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf]]:23:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002131-NZT DCO 6.3.125 - ES Vol II Figure 22-1 HSE Consultation Zones August 2022 (D6).pdf|EN010103-002131-NZT DCO 6.3.125 - ES Vol II Figure 22-1 HSE Consultation Zones August 2022 (D6).pdf]]:1: HSE Explosive Safeguarding Zone [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf|EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf]]:31:The UK electricity transmission network is continuing with innovation Infrastructure risk prevention and manhole explosion prevention. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf|EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf]]:27: • BS 5908: Fire and explosion precautions at [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf|EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf]]:27: and explosion in chemical plants, chemical storage [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf|EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf]]:36: explosives would occur with prior warning, at management; and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf|EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf]]:45: injury to marine mammals whilst using explosives [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf|EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf]]:75: explosives, piling and geophysical surveys (JNCC, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf|EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf]]:22:  BS 5908: Fire and explosion precautions at premises handling flammable gases, liquids and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf|EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf]]:22: dusts. Code of practice for precautions against fire and explosion in chemical plants, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf|EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf]]:28:and Vibration any use of explosives would occur with prior warning, at appropriate times of day and taking Requirement 16: Construction [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf|EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf]]:35: marine mammals whilst using explosives (JNCC, 2010a) shall be adopted for the Proposed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf|EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf]]:61:  The standard JNCC mitigation measures for explosives, piling and geophysical surveys Environmental Management Plan [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf|EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf]]:10:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf|EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf]]:23:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf|EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf]]:10:Explosive Sites pg 64 1 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf|EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf]]:76: Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf|EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf]]:95:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001974-Exolum Seal Sands.pdf|EN010103-001974-Exolum Seal Sands.pdf]]:2: (c) the use of explosives within 400 metres of the Exolum operations; and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001974-Exolum Seal Sands.pdf|EN010103-001974-Exolum Seal Sands.pdf]]:7: (c) the use of explosives within 400 metres of the Exolum operations; and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf|EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf]]:101: and major accident pipelines and also in the vicinity of a licensed explosive site. The [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf|EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf]]:102: worst-case environmental consequences/effects (this includes fire/explosions, toxic [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf|EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf]]:102: events such as explosion are relatively low. However, as the concentration of CO2 in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf|EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf]]:103: Development include fires, explosions and the release of CO2. These incidents [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf|EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf]]:68: 10km from the site of potential explosions. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf|EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf]]:69: mammals, sequencing of explosive charges (where feasible) and the use of Acoustic [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf|EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf]]:69:explosives. 10pp. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf|EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf]]:11:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf|EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf]]:114:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:3: lead to asphyxiation, toxic exposure, fires and/or explosions. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:4: environment from events such as explosion are relatively low. However, as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:7:major accidents would be suitably assessed, fires/explosions, toxic exposure, noxious [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:9:Development (Gas Connection Corridor) is in of Explosive Safeguarding Zones provided by HSE [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:9:the vicinity of a licensed explosive site. indicates that this only affects the potential [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:11: pose a risk of fire, explosion or an industrial accident, such as chemical [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:14: • Fire or explosion including through disturbance of UXO; [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:17:C-1 Fire/ explosion and risk of Natural gas - disturbance of Risk of fire/ explosion and Consultation with appropriate Yes Yes [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:17: from third party supply Risk of fire/ explosion causes System (CATS) Pipeline and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:18: leading to fires/ explosions. public off site from fire/ will be installed at the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:18: explosions; and/ or irreversible construction site, including site [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:19: utilities leading to explosion. standard construction [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:20: explosions. warning lighting to be fitted to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:21:C-10 Domino effects from incidents Risk of accidental release of Fire/ explosion impact upon It is expected that existing Yes Yes [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:21: explosion at neighbouring of a CEMP at the Proposed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:22:O-1 Fire/explosion Natural gas – loss of Fire and/or explosion could Design of the natural gas Yes Yes [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:22: an explosion and/or flash fire radiant heat burns and impact (PSR) (HSE, 1996). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:22: burning back to a jet fire. injuries from explosions. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:22: explosion and/or fire. areas of unmade ground could Managing the storage [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:31:O-8 Domino effects from incidents Fire and/or explosion, toxic The location of the PCC is on Further details of the potential Yes Yes [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:32: explosions and toxic releases. there will be no consultation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:33:O-9 Domino effects to Fire and/or explosion, toxic Neighbouring facilities include The PCC has been Yes Yes [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:33: as a fire, explosion or toxic industrial operations so as to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:35:O-12 Terrorism/arson Fires, explosions. Fires and explosions at the Security measures will be Yes Yes [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:36: subsequent fires, explosions. of significant magnitude could have occurred in the area of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:36: subsequent fires, explosions. a major accident, harm to Proposed Development will [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:37: subsequent fires, explosions Proposed Development is located in an area which does [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf|EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf]]:41: fires, explosions and the release of CO2 gas. These incidents have an [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002310-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Tracked) Oct 2022 (D9).pdf|EN010103-002310-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Tracked) Oct 2022 (D9).pdf]]:22:Potential risks of explosion if [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002310-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Tracked) Oct 2022 (D9).pdf|EN010103-002310-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Tracked) Oct 2022 (D9).pdf]]:22:explosive gases were to accumulate • Best practice measures will be adopted during construction to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002310-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Tracked) Oct 2022 (D9).pdf|EN010103-002310-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Tracked) Oct 2022 (D9).pdf]]:37: • The standard JNCC mitigation measures for explosives, piling and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf|EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf]]:123: 51. No explosives for blasting are to be used within 400 metres of any part of the CATS [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf|EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf]]:131: (c) the use of explosives within 400 metres of the Exolum operations; and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf|EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf]]:11:Explosive Sites pg 15 1 1 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf|EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf]]:28: Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf|EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf]]:28: Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf|EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf]]:37:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:92: • BS 5908: Fire and explosion precautions at premises handling flammable [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:92: explosion in chemical plants, chemical storage and similar premises [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf|EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf]]:70: Document Ref. 6.2). Specifically, sound propagation associated with UXO explosions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf|EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf]]:70: to over 10km from the site of potential explosions (see Table 4.1). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf|EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf]]:71: explosive charges (where feasible) and the use of Acoustic Deterrent Devices (ADDs). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf|EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf]]:71: These standard JNCC Guidelines for explosions will be adopted for the Proposed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf|EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf]]:71:explosives. 10pp. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf|EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf]]:87: exposure level from underwater explosions in shallow water. The Journal of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf|EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf]]:123: 51. No explosives for blasting are to be used within 400 metres of any part of the CATS pipeline(s) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf|EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf]]:131: (c) the use of explosives within 400 metres of the Exolum operations; and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:254:fields, which can cause blow outs, explosions, fires or other damage, in injury and material damage, chronic damage to health and environmental [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:254:major industrial accident such as fires, explosions, significant damage to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:272:impacting a sensitive natural environment(2). could be an explosion, a fire or a leak resulting in fatalities or bodily [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:276:explosion, fire, leakage of hazardous products or mass leakage that facilities operated by the Company, formal rules have been set out to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:282: and procedures for interventions in the event of leaks, fires or explosions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:289: Company recorded 4 Tier 1 or Tier 2 events due to acts of sabotage or more or less significant consequences (fires, explosions, injuries, etc.), as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:403: explosion, fire, leakage of hazardous products or mass leakage that might standards include applicable regulatory requirements and refer to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:404:Tier 2 losses of containment as defined by the American Petroleum of leaks, fires or explosions and that subsidiaries have to test these at [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:404: more or less significant consequences (fires, explosions, injuries, etc.), as TotalEnergies also continued to roll out its Incident Management System [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:448: electricity, explosion hazards (ATEX standard), transportation of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:594: To prevent the occurrence of a major industrial accident such as an explosion, fire, leakage of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:595: interventions in the event of leaks, fires or explosions and that subsidiaries have to test these at [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:598:ATEX: explosive atmosphere LNG: liquefied natural gas [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:98: 32.—(1) Only when driven or part-driven pile foundations or detonation of explosives are [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:99: location, start and end date of impact pile driving / detonation of explosives to satisfy the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:99: (b) within 12 weeks of completion of impact pile driving / detonation of explosives, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:99: information on the locations and dates of impact pile driving / detonation of explosives to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:111: 32.—(1) Only when driven or part-driven pile foundations or detonation of explosives are [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:111: location, start and end dates of impact pile driving / detonation of explosives to satisfy the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:111: (b) within 12 weeks of completion of impact pile driving / detonation of explosives, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:111: information on the locations and dates of impact pile driving / detonation of explosives to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:136: 65. No explosives for blasting are to be used within 400 metres of any part of the CATS [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:144: (c) the use of explosives within 400 metres of the Exolum operations; and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:173: 194. No explosives are to be used within the protected land. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:213: 311. No explosives are to be used within the protected land. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf|EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf]]:21: • the standard JNCC mitigation measures for explosives, piling and geophysical surveys [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf|EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf]]:11:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf|EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf]]:43:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf|EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf]]:72: 10km from the site of potential explosions. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf|EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf]]:72: propagation associated with UXO explosions was calculated using a semi-empirical [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf|EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf]]:73: to over 10km from the site of potential explosions (see Table 4Table 4.1). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf|EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf]]:73: marine mammals, sequencing of explosive charges (where feasible) and the use of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf|EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf]]:73: Acoustic Deterrent Devices (ADDs). These standard JNCC Guidelines for explosions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf|EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf]]:73:explosives. 10pp. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf|EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf]]:90: from underwater explosions in shallow water. The Journal of the Acoustical Society [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:236: operations, which can cause blow outs, explosions, fires or other Ethical misconduct or non-compliance of the Group, its [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:236: a major industrial accident such as fires, explosions, significant damage criminal and civil proceedings and be damaging to its [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:251:3.6.2.1 Safety, health and the environment could be an explosion, a fire or a leak resulting in fatalities or bodily [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:255:an explosion, fire, leakage of hazardous products or mass leakage that [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:261:Supplier database. A brochure explaining these principles in detail is for interventions in the event of leaks, fires or explosions and to test them [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:266: or less significant consequences (fires, explosions, injuries, etc.), as defined by the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:364: Latin America 3.3 3.8 3.5 electricity, explosion hazards (ATEX standard), transportation of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:371:explosion, fire, leakage of hazardous products or mass leakage that identification of safety critical equipment for special monitoring, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:371:related to the Group’s industrial operations at each operated site subject or less significant consequences (fires, explosions, injuries, etc.), as defined by the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:371: explosions and to test these at regular intervals. The intervention teams at [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:490: To prevent the occurrence of a major industrial accident such as an explosion, fire, leakage of hazardous products [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:491: draw up plans and procedures for interventions in the event of leaks, fires or explosions and to test these at regular [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:189: Reactive and Explosive Substance, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:190: Explosive Substance, Liquid Oxygen, where [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:190: Explosive Substance, Hydrogen, where amount [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:196: Part B, Highly Reactive and Explosive [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:196: Part B, Highly Reactive and Explosive [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:219: synthetic ammonia for production of explosives during World War I, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:220: produce of petroleum refining. In 1959 a serious explosion occurred in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:230: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Mild n/a n/a [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:232: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Mild n/a n/a [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:233: 4. Explosion / Asphyxiation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:234: 4. Explosion / Asphyxiation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:235: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Minor n/a n/a [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:238:LRO) 4. Explosion / Asphyxiation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:239: 4. Explosion / Asphyxiation General Public (off-site) (1) None n/a n/a [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:240: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Minor n/a n/a [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:242: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Minor n/a n/a [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:248: of the ground it should be assumed that toxic, asphyxiating or explosive [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:248: development of explosive or oxygen deficient atmospheres in confined [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:261:Unexploded Unexploded bombs (UXB) remaining 3 5 15 Explosion, injury or fatality (site Provision of detailed report for site from [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:265:Unexploded Unexploded bombs (UXB) remaining 3 5 15 Explosion, injury or fatality (site Provision of detailed report for site from [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:268:Unexploded Unexploded bombs (UXB) remaining 3 5 15 Explosion, injury or fatality (site Provision of detailed report for site from [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:271:Unexploded Unexploded bombs (UXB) remaining 3 5 15 Explosion, injury or fatality (site Provision of detailed report for site from [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:275:Unexploded Unexploded bombs (UXB) remaining 3 5 15 Explosion, injury or fatality (site Provision of detailed report for site from [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:77: • BS 5908: Fire and explosion precautions at premises handling flammable [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:77: explosion in chemical plants, chemical storage and similar premises [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:11:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:130: Hazardous Part B, Highly Reactive and Explosive Substance, Ammonium nitrate in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:215:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf|EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf]]:100:and/or license agreements, and impact on the environment and other hazardous materials, fires, explosions and water [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:1:Table 14-8: Fish Sensitivity Thresholds for Fish for Explosions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:1:Table 14-10: Fish Impact Zones for UXO Explosions .......................................... 14-66 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:2:Table 14-15: Marine Mammal Impact Zones* For Explosions (UXO Detonation) 14-73 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:44:14.5.14 The standard JNCC mitigation measures for explosives and geophysical [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:63:14.6.73 The sound propagation for UXO explosions has been calculated using the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:64:UXO explosions – Impulsive 289 (peak) 10 Soloway and Dahl [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:66: explosions (e.g. UXO detonation) and continuous sound sources, which [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:66:14.6.84 With the exception of explosions, the only impulsive sound source generated [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:66:14.6.85 There are however, thresholds for explosions, shown in Table 14-8, which are [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:67:Table 14-8: Fish Sensitivity Thresholds for Fish for Explosions (UXO [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:68: Modelling Results and Assessment for Fish – Explosions (UXO [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:68: may occur as a result of explosions (Table 14-10). Predicted distances can [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:68:Table 14-10: Fish Impact Zones for UXO Explosions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:68: Standard JNCC mitigation measures for using explosives shall be applied in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:70: abandonment. In some circumstances, sound from explosions or some [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:71: circumstances, sound from explosions or military sonar, have been [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:75:Table 14-15: Marine Mammal Impact Zones* For Explosions (UXO Detonation) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:75: Potential impact zones determined on the basis of SPL to reflect only 1 pulse per explosion [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:75:14.6.118 The standard JNCC Guidelines for explosions (JNCC, 2010) shall be [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:76: explosions, JNCC, 2010) elsewhere, the effects to pinnipeds from underwater [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:119: mammals from using explosives. Peterborough: JNCC. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf|EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf]]:71: Document Ref. 6.2). Specifically, sound propagation associated with UXO explosions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf|EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf]]:71: to over 10km from the site of potential explosions (see Table 4.1). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf|EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf]]:72: explosive charges (where feasible) and the use of Acoustic Deterrent Devices (ADDs). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf|EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf]]:72: These standard JNCC Guidelines for explosions will be adopted for the Proposed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf|EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf]]:72:explosives. 10pp. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf|EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf]]:90: exposure level from underwater explosions in shallow water. The Journal of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002022-UK Health Security Agency's - Responses to the ExA's ExQ2.pdf|EN010103-002022-UK Health Security Agency's - Responses to the ExA's ExQ2.pdf]]:2:project. Common scenarios have been considered by the applicant, such as fire/explosions, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf|EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf]]:26: • BS 5908: Fire and explosion precautions at [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf|EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf]]:26: and explosion in chemical plants, chemical storage [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf|EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf]]:35: explosives would occur with prior warning, at management; and Condition 23 : UXO Clearance, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf|EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf]]:73: explosives, piling and geophysical surveys (JNCC, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf|EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf]]:27:C-1 Fire/ explosion Multiple manufactured hydrocarbon Asphyxiation risk and toxic effects Use of Sembcorp Safe Systems of Yes Yes [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf|EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf]]:29:O-9 Domino Fire and/or explosion, toxic Inside the tunnel, CO2 being heavier The proposed CO2 Gathering Yes Yes [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf|EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf]]:10:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf|EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf]]:46:Explosive Sites [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf|EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf]]:10: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Mild n/a n/a [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf|EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf]]:12: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Mild n/a n/a [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf|EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf]]:13: 4. Explosion / Asphyxiation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf|EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf]]:14: 4. Explosion / Asphyxiation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf|EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf]]:15: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Minor n/a n/a [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf|EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf]]:18: 4. Explosion / Asphyxiation General Public (off-site) (1) None n/a n/a [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf|EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf]]:20: 4. Explosion / Asphyxiation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf|EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf]]:20: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Minor n/a n/a [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf|EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf]]:22: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Minor n/a n/a [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000499-_DOC_40066269(1)_DEADLINE 2_ EM v2 (Formatted - Clean).pdf|EN010082-000499-_DOC_40066269(1)_DEADLINE 2_ EM v2 (Formatted - Clean).pdf]]:22: such as fire or explosion following loss of containment of natural gas, has [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000377-2.1 - Tees CCPP - Draft DCO with proposed change - tracked Rev 2.pdf|EN010082-000377-2.1 - Tees CCPP - Draft DCO with proposed change - tracked Rev 2.pdf]]:22:populations or major hazard installations, including fire or explosion following loss of [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000520-8.46 - DOC_140207101(1)_DCO changes summary.pdf|EN010082-000520-8.46 - DOC_140207101(1)_DCO changes summary.pdf]]:10: local populations or major hazard installations, including fire or explosion following loss of the proposed activities and taking appropriate measures to manage and control the risks, [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000496-_CONSENTORDER_40063542(1)_DEADLINE 2_ DCOv2.pdf|EN010082-000496-_CONSENTORDER_40063542(1)_DEADLINE 2_ DCOv2.pdf]]:21:populations or major hazard installations, including fire or explosion following loss of [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000551-8.54 - Explanatory Memorandum - Tracked (v3).pdf|EN010082-000551-8.54 - Explanatory Memorandum - Tracked (v3).pdf]]:24: hazards, such as fire or explosion following loss of containment of [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf|EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf]]:72: a loss of containment of natural gas and a subsequent explosion. To prevent this, [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf|EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf]]:72: before there was a risk of explosion. [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf|EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf]]:72: lower explosive limit by airflow from the forced ventilation system. Forced ventilation [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf|EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf]]:86: CCPP, with the potential to impact on local populations, gas and a subsequent explosion. To prevent this, the gas [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf|EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf]]:86: to vapour gas explosion, jet fire or flash fire. These may would be detected by installed gas detectors that provide [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf|EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf]]:86: Applicant should provide such information before the the gas system, before there was a risk of explosion. [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf|EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf]]:86: HSC would be required. diluted below the lower explosive limit by airflow from the [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000480-HSE D3 Submission.pdf|EN010082-000480-HSE D3 Submission.pdf]]:1:Major Hazards Policy – Chemicals & Land Use Planning I Chemicals, Explosives & Microbiological Hazards [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf|EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf]]:7:Explosive Sites [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf|EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf]]:87:Explosive Sites [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:7: explosion, jet fire or flash fire. These may in turn escalate to adjacent plant. HSE suggests that the Applicant This will be addressed [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:9: explosive incident. [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:10: containment may give rise to vapour gas explosion, jet fire or flash fire. These may in turn escalate to natural gas; [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:14: a ”major accident” as an occurrence such as a major emission, fire, or explosion [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:15: occurrence such as a major emission, fire, or explosion [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:16: to cause harm (for example a gas leak to ignite, causing an explosion with [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:20: the primary hazards of fire, explosion and fumes leading to a secondary toxic [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:20: or explosion. [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:22: of natural gas and a subsequent explosion. To prevent this, the gas turbines [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:22: lower explosive limit by airflow from the forced ventilation system. Forced [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:22:15.63 In the event that there is a larger gas leak that exceeds the lower explosive [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:22: was a risk of explosion. [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:23: Gas transmission pipelines Pipeline rupture Potential for fire / explosion Maintenance of an easement Line will only contain gas [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:25: Large gas leak Explosion or gas fire Injury or fatality to a GT design to include [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:25: Small gas leak causing gas Explosion or gas fire Injury or fatality to a GT design to include forced [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf|EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf]]:25: team or member of the below lower explosive limit [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000369-2.1 - Tees CCPP - Draft DCO with proposed change - clean Rev 2.pdf|EN010082-000369-2.1 - Tees CCPP - Draft DCO with proposed change - clean Rev 2.pdf]]:22:populations or major hazard installations, including fire or explosion following loss of [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000497-_DOC_40064625(1)_DEADLINE 2_ DCO showing changes.pdf|EN010082-000497-_DOC_40064625(1)_DEADLINE 2_ DCO showing changes.pdf]]:23:local populations or major hazard installations, including fire or explosion following loss of [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000144-EN010082-2.1-Draft Development Consent Order-Final-November 2017.pdf|EN010082-000144-EN010082-2.1-Draft Development Consent Order-Final-November 2017.pdf]]:20:hazard installations, including fire or explosion following loss of containment of natural gas, accompanied by [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000498-_DOC_40066241(1)_DEADLINE 2_ EM v2 (Formatted - Tracked).pdf|EN010082-000498-_DOC_40066241(1)_DEADLINE 2_ EM v2 (Formatted - Tracked).pdf]]:22: such as fire or explosion following loss of containment of natural gas, has [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000427-HSE Response to Deadline 2.pdf|EN010082-000427-HSE Response to Deadline 2.pdf]]:1:Land Use Planning Policy, Chemicals, Explosives & Microbiological Hazards Division, Health and Safety Executive. [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000475-The Applicant's Cover letter_Redacted.pdf|EN010082-000475-The Applicant's Cover letter_Redacted.pdf]]:3:gas containment may give rise to vapour cloud explosion, jet fire or flash fire. These may in turn [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000519-8.45 - CONSENTORDER_150335454(1)_DEADLINE 4_ DCOv3.pdf|EN010082-000519-8.45 - CONSENTORDER_150335454(1)_DEADLINE 4_ DCOv3.pdf]]:21:populations or major hazard installations, including fire or explosion following loss of [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000145-EN010082-2.2-Explanatory Memorandum-Final-November 2017.pdf|EN010082-000145-EN010082-2.2-Explanatory Memorandum-Final-November 2017.pdf]]:22: such as fire or explosion following loss of containment of natural gas, has [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf|EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf]]:66:Major Hazards Policy – Chemicals & Land Use Planning I Chemicals, Explosives & Microbiological Hazards Division I Health and Safety Executive. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:29:Ground,  Explosion risks through accumulation of gases in [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:44: Explosive Sites [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:105:Explosive Sites [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:128: Explosive Sites [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:171: Hazardous Part B, Highly Reactive and Explosive Substance, Hydrogen, where amount [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:181:Explosive Sites [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:204: Explosive Sites [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:220:Explosive Sites [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:244: Explosive Sites [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:253:Explosive Sites [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf|TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf]]:106: 14. No explosives should be used within the vicinity of the pipeline corridor. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf|TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf]]:130: and any breakout of molten metal may result in a large explosion. Further, there is potential for a [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf|TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf]]:130: there is a risk of breakouts of molten metal causing explosions [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf|TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf]]:140: The risk of breakouts from the torpedo wagons which may result in explosions. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf|TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf]]:141:Explosions are caused if the escaping metal comes into contact with confined moisture. This generates [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf|TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf]]:141:superheated steam which causes explosions throwing up molten metal and debris potentially 300m into [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf|TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf]]:141:the air if it cannot escape quickly. In practice explosions would result if molten metal landed on moist clay [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000872-York Potash Ltd 1.pdf|TR030002-000872-York Potash Ltd 1.pdf]]:29:immediately to form a jet fire or pool fire, or if there is delayed ignition, a vapour cloud explosion is [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:55: 2.2 H1 Explosive .............................................................................................................................. 13 [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:61:H1 Explosive Not appropriate for silt [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:68: “Explosive”: substances and preparations which may explode under the effect of flame or [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:68: H1 Explosive [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:69:2.2 H1 Explosive [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:69: considered as an explosive for the hazardous property to apply. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:70: (REACH) (known as the ‘Test methods for REACH’). Tests for explosive can be found in [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:70: Section A14: Explosive Properties. The approach in WM2 is to take a worst-case desk top [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:70: extreme risk of explosion by shock, friction, fire or other sources of ignition, then the waste is [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:70: considered explosive, unless test methods (carried out in accordance with Section A14) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:70: demonstrate that the waste as a whole is not explosive. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:70: explosive, given it has existed in a marine environment. There has been no indication of any [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:70: site history that would give rise to suspect contamination by explosive substances at [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:70: concentrations that would render the silt explosive. On this basis, the assessment against H1 [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:70: as explosive or having explosive properties. If there is any unexploded ordinance within the silt [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:70: fact that there are no specific explosive substances within the silt at concentrations that give [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:79:• R1 Explosive when dry [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:79:• R4 Forms very sensitive explosive metal compounds [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:79:• R5 Heating may cause explosion [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:79:• R6 Explosive with or without contact with air [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:79:• R16 Explosive when mixed with oxidising material [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:79:• R18 In use may form flammable/explosive vapour-air mixture [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:79:• R19 May form explosive peroxides [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:79:• R44 Risk of explosion if heated under confinement [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:83:H1 Explosive Not appropriate for a soil [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:87:H1 Explosive [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000479-Section 10 App 10.2 Terrestrial ecology survey reports.pdf|TR030002-000479-Section 10 App 10.2 Terrestrial ecology survey reports.pdf]]:71:Acer pseudoplatanus. Because of the risk of fire and explosion photography is not [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000801-Document 6.8B - Governance Tracker.pdf|TR030002-000801-Document 6.8B - Governance Tracker.pdf]]:16:  Avoid explosive blasting, using appropriate manual or mechanical alternatives where [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf|TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf]]:83: 12. No explosives shouldmust be used within the vicinityprotected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000470-Section 6 App 6.4 CEMP.pdf|TR030002-000470-Section 6 App 6.4 CEMP.pdf]]:25:  Avoid explosive blasting, using appropriate manual or mechanical alternatives where possible. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf|TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf]]:213: and there will be noise from explosions. I support plan to realign Swindale [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf|TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf]]:72:degrades. Methane can present a risk of fire and explosion. Carbon dioxide can present a risk of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf|TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf]]:76: 11.14. No explosives should be used within the vicinity of the pipes without prior consultation [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000710-York Potash Limited (Document 6.8A).pdf|TR030002-000710-York Potash Limited (Document 6.8A).pdf]]:17:  Avoid explosive blasting, using appropriate manual or mechanical alternatives where [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf|TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf]]:9:11. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000725-York Potash Limited (Document 6.10).pdf|TR030002-000725-York Potash Limited (Document 6.10).pdf]]:23:  Avoid explosive blasting, using appropriate manual or mechanical alternatives where possible. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf|TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf]]:12: 12. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000861-SABIC UK Petrochemicals Limited.PDF|TR030002-000861-SABIC UK Petrochemicals Limited.PDF]]:17: 12. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000861-SABIC UK Petrochemicals Limited.PDF|TR030002-000861-SABIC UK Petrochemicals Limited.PDF]]:50: 12. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000769-York Potash Ltd (2).pdf|TR030002-000769-York Potash Ltd (2).pdf]]:73: 14. No explosives should be used within the vicinity of the pipeline corridor. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF|TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF]]:17: 12. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF|TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF]]:50: 12. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000689-York Potash Ltd (4).pdf|TR030002-000689-York Potash Ltd (4).pdf]]:22: 11. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000689-York Potash Ltd (4).pdf|TR030002-000689-York Potash Ltd (4).pdf]]:34: 11. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf|TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf]]:71: 12. No explosives are to be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000564-Doc 6.8 Governance Tracker.pdf|TR030002-000564-Doc 6.8 Governance Tracker.pdf]]:16:  Avoid explosive blasting, using appropriate manual or mechanical alternatives where [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF|TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF]]:17: 12. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF|TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF]]:50: 12. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf|TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf]]:36: Explosives [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf|TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf]]:36: The proposed York Potash Harbour Facilities development does not impinge on the separation distances of explosives [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001855-Development Consent Order as made by the Secretary of State.pdf|TR030002-001855-Development Consent Order as made by the Secretary of State.pdf]]:73: 12. No explosives are to be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000732-DEA UK SNS Limited (Written Representation).pdf|TR030002-000732-DEA UK SNS Limited (Written Representation).pdf]]:26: 6.13.15 Paragraph 11 provides a restriction on the use of explosives “in the vicinity of the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000732-DEA UK SNS Limited (Written Representation).pdf|TR030002-000732-DEA UK SNS Limited (Written Representation).pdf]]:26: envisage no circumstance in which explosives could or should be used anywhere near [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000732-DEA UK SNS Limited (Written Representation).pdf|TR030002-000732-DEA UK SNS Limited (Written Representation).pdf]]:26: consider that the use of explosives should be prohibited. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf|TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf]]:80: 12. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:291: 12. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf|TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf]]:82: 11.12. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf|TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf]]:17:11. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf|TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf]]:81: 12. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf|TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf]]:23: 6.13.15 Paragraph 11 provides a restriction on the use of explosives “in the vicinity of the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf|TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf]]:23: envisage no circumstance in which explosives could or should be used anywhere near [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf|TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf]]:23: consider that the use of explosives should be prohibited. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000735-Applicant response to First Questions - Appendix 4.pdf|TR030002-000735-Applicant response to First Questions - Appendix 4.pdf]]:25: structure. The risk of an explosive or asphyxiating atmosphere [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf|TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf]]:81: 24.11. No explosives shouldmust be used within the vicinity of the pipeline corridorprotected [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf|TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf]]:13:11. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000448-ES Section 13 Air quality.pdf|TR030002-000448-ES Section 13 Air quality.pdf]]:27: x Avoid explosive blasting, using appropriate manual or mechanical alternatives. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000771-York Potash Ltd (3).pdf|TR030002-000771-York Potash Ltd (3).pdf]]:73: 14. No explosives should be used within the vicinity of the pipeline corridor. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000868-CATS Parties - young lady report.pdf|TR030002-000868-CATS Parties - young lady report.pdf]]:50: loss of buoyancy due to gas aerated water, or by fire or explosion, and result in an [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf|TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf]]:26:injury or fatality are primarily based on studies of blast injury at close range to explosives with an [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf|TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf]]:45:Bebb A H and Wright H C. (1953). Injury to animals from underwater explosions. Medical [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf|TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf]]:45:Bebb A H and Wright H C. (1954a). Lethal conditions from underwater explosion blast. RNP [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf|TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf]]:45:Bebb A H and Wright H C. (1954b). Protection from underwater explosion blast. III. Animal [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf|TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf]]:45:Bebb A H and Wright H C. (1955). Underwater explosion blast data from the Royal Navy [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000826-York Potash Ltd (2).pdf|TR030002-000826-York Potash Ltd (2).pdf]]:43: and any breakout of molten metal may result in a large explosion. Further, there is potential for a [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000826-York Potash Ltd (2).pdf|TR030002-000826-York Potash Ltd (2).pdf]]:43:• there is a risk of breakouts of molten metal causing explosions [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000826-York Potash Ltd (2).pdf|TR030002-000826-York Potash Ltd (2).pdf]]:51:• The risk of breakouts from the torpedo wagons which may result in explosions. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000826-York Potash Ltd (2).pdf|TR030002-000826-York Potash Ltd (2).pdf]]:51:Explosions are caused if the escaping metal comes into contact with confined moisture. This generates [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000826-York Potash Ltd (2).pdf|TR030002-000826-York Potash Ltd (2).pdf]]:51:superheated steam which causes explosions throwing up molten metal and debris potentially 300m into [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000826-York Potash Ltd (2).pdf|TR030002-000826-York Potash Ltd (2).pdf]]:51:the air if it cannot escape quickly. In practice explosions would result if molten metal landed on moist clay [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf|TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf]]:23: 6.13.15 Paragraph 11 provides a restriction on the use of explosives “in the vicinity of the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf|TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf]]:23: envisage no circumstance in which explosives could or should be used anywhere near [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf|TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf]]:23: consider that the use of explosives should be prohibited. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf|TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf]]:13:11. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf|TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf]]:81: 10.12. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf|TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf]]:70:degrades. Methane can present a risk of fire and explosion. Carbon dioxide can present a risk of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000670-Doc 6.1 Consultation Statement - Main Text.pdf|TR030002-000670-Doc 6.1 Consultation Statement - Main Text.pdf]]:70: explosives licensed site at Tees Port. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000756-Document 8.3 Appendix 5 - Shipping Notes Part 3.pdf|TR030002-000756-Document 8.3 Appendix 5 - Shipping Notes Part 3.pdf]]:16: Gas leaks – Explosion risk [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000754-Document 4.1A Draft DCO (Clean).pdf|TR030002-000754-Document 4.1A Draft DCO (Clean).pdf]]:73: 14. No explosives should be used within the vicinity of the pipeline corridor. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf|TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf]]:106: • To dilute and remove toxic and/or, explosive gases that may be present in the strata [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf|TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf]]:113: • Gas inrush resulting in asphyxia and/ or an explosion. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf|TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf]]:191: 1991) at Boulby Mine and in certain areas can outburst with explosive force as the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf|TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf]]:22: 12. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf|TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf]]:42: 12. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf|TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf]]:37: and any breakout of molten metal may result in a large explosion. Further, there is potential for a [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf|TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf]]:37:• there is a risk of breakouts of molten metal causing explosions [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf|TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf]]:44:• The risk of breakouts from the torpedo wagons which may result in explosions. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf|TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf]]:45:Explosions are caused if the escaping metal comes into contact with confined moisture. This generates [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf|TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf]]:45:superheated steam which causes explosions throwing up molten metal and debris potentially 300m into [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf|TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf]]:45:the air if it cannot escape quickly. In practice explosions would result if molten metal landed on moist clay [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000857-151216 TR030002 York Potash Ltd - Document 6.10A - Outline Construction Environmental Management Plan.pdf|TR030002-000857-151216 TR030002 York Potash Ltd - Document 6.10A - Outline Construction Environmental Management Plan.pdf]]:24:  Avoid explosive blasting, using appropriate manual or mechanical alternatives where possible. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf|TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf]]:77: 11. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf|TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf]]:53: explosive force as the seam is mined. Where faulting is present in an [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf|TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf]]:13:11. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000512-Doc 6.6 App 6.2 In combination HGV.pdf|TR030002-000512-Doc 6.6 App 6.2 In combination HGV.pdf]]:2:Sinking Explosives Explosives 0 0 0 0 0 0 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000512-Doc 6.6 App 6.2 In combination HGV.pdf|TR030002-000512-Doc 6.6 App 6.2 In combination HGV.pdf]]:7:Sinking Explosives Explosives 0 0 0 0 0 0 0 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 0 0 0 0 0 0 0 0 0 0 0 0 0 [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000512-Doc 6.6 App 6.2 In combination HGV.pdf|TR030002-000512-Doc 6.6 App 6.2 In combination HGV.pdf]]:9:Shaft Explosives Explosives 0 0 0 0 0 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000512-Doc 6.6 App 6.2 In combination HGV.pdf|TR030002-000512-Doc 6.6 App 6.2 In combination HGV.pdf]]:11:Sinking Explosives Explosives 0 0 0 0 0 0 0 8 8 8 8 8 8 8 8 8 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF|TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF]]:81: 11. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf|TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf]]:54: 11.No explosives should be used within the vicinity of the pipes without prior consultation with [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf|TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf]]:80: 12. No explosives must be used within the protected land. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf|TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf]]:21:Professional experience − Gas leak, gas explosion (industry, onshore) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf|TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf]]:21: hazardous materials (toxic, flammable, explosive) > 2009 to date (Netherlands). [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf|TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf]]:21:− National Safety Board: fire at Chemie-Pack, explosion at Business case opportunities and employability in the field of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf|TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf]]:22:2015 Lecturer at Copla NL (Safety, Fire and Explosion). [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf|TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf]]:25:temperature, and fire and explosion safety. defined risk acceptance criteria, and evaluate mitigation [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf|TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf]]:25:the completed installation, but also the risks during evacuation and rescue analysis (EERA), fire and explosion [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf|TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf]]:26:■ Preparing explosion safety documents in compliance [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf|TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf]]:26: toxic and flammable gasses, fires and explosions, using [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf|TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf]]:27:The effects of incidents will range from toxic clouds to fire n toxic and flammable materials, fires and explosions, and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf|TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf]]:27:radiation and explosions. Fires can include pool fires, tank the size of and concentrations in a toxic cloud released [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf|TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf]]:27:vapour explosions). n liquid, forming a pool and evaporating slowly over time [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf|TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf]]:28:n explosions in confined areas (eg, an offshore platform) planning and transport and water. [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:6: 8.1.4 Explosive site 231 [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:260:8.1.4 Explosive site [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:260: 1. The site of the existing TCT 1 is noted to store explosive materials. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:527:injury or fatality are primarily based on studies of blast injury at close range to explosives with an [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:546:Bebb A H and Wright H C. (1953). Injury to animals from underwater explosions. Medical [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:546:Bebb A H and Wright H C. (1954a). Lethal conditions from underwater explosion blast. RNP [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:546:Bebb A H and Wright H C. (1954b). Protection from underwater explosion blast. III. Animal [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:546:Bebb A H and Wright H C. (1955). Underwater explosion blast data from the Royal Navy [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:527:injury or fatality are primarily based on studies of blast injury at close range to explosives with an [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:546:Bebb A H and Wright H C. (1953). Injury to animals from underwater explosions. Medical [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:546:Bebb A H and Wright H C. (1954a). Lethal conditions from underwater explosion blast. RNP [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:546:Bebb A H and Wright H C. (1954b). Protection from underwater explosion blast. III. Animal [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:546:Bebb A H and Wright H C. (1955). Underwater explosion blast data from the Royal Navy [[this>RiverTees/Planning/MLA_2020_00079/Response Documents/Licence Document (Marine).pdf|Licence Document (Marine).pdf]]:16:5.2.8 Information on the expected location, start and end dates of impact pile driving/detonation of explosives must be [[this>RiverTees/Planning/MLA_2020_00079/Response Documents/Licence Document (Marine).pdf|Licence Document (Marine).pdf]]:18:5.2.17 The exact locations and dates of impact pile driving/detonation of explosives must be submitted to the Marine Noise [[this>RiverTees/Planning/MLA_2020_00079/Response Documents/Licence Document (Marine).pdf|Licence Document (Marine).pdf]]:18: pile driving/detonation of explosives carried out in the previous year within 12 weeks of completion of impact pile driving/ [[this>RiverTees/Planning/MLA_2020_00079/Response Documents/Licence Document (Marine).pdf|Licence Document (Marine).pdf]]:18: detonation of explosives. [[this>RiverTees/Planning/MLA_2020_00079/Response Documents/Returns.pdf|Returns.pdf]]:3: of explosives must be submitted to the Marine Noise Registry, in order to satisfy the [[this>RiverTees/Planning/MLA_2020_00079/Response Documents/Returns.pdf|Returns.pdf]]:4:Open The exact locations and dates of impact pile driving/detonation of explosives must be [[this>RiverTees/Planning/MLA_2020_00079/Response Documents/Returns.pdf|Returns.pdf]]:4: explosives carried out in the previous year within 12 weeks of completion of impact pile [[this>RiverTees/Planning/MLA_2020_00079/Response Documents/Returns.pdf|Returns.pdf]]:4: driving/detonation of explosives.The MMO must be notified of the successful submission [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:44: a) From explosions, spillages e.g. oil and ballast discharge, fires or from the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:35: • Use of explosives. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:393: • Avoid explosive blasting, using appropriate manual or mechanical alternatives. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:35: • Use of explosives. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:393: • Avoid explosive blasting, using appropriate manual or mechanical alternatives. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:283: accumulation in Explosion Low Risk however, no other buildings will be constructed on [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:171: fire and explosion, except where they can be a consequence of a navigation hazard. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:207: and explosion. term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:207: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:207: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:208: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:208: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:208: and explosion. services with ensuing loss prolonged restrictions, and/or [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:209: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:209: and explosion. of revenue. restrictions, and/or termination [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:209: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:210: explosion. of revenue. revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:210: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:210: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:211: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:211: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:211: operation) explosion. services with ensuing loss [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:212: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:212: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:212: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:213: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:213: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:213: and explosion. to services with ensuing disruption to commercial [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:214: and explosion. activities and/or prolonged [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:214: and explosion. services with ensuing loss revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:214: and explosion. minor disruption to commercial [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:215: and explosion. services with ensuing loss revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:215: and explosion. disruption to commercial [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:215: and explosion. disruption to commercial [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:216: and explosion. revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:216: and explosion. of revenue. disruption to commercial [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:216: and explosion. revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:217: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:218: and explosion. termination of commercial [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:218: and explosion. services with ensuing loss revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:218: and explosion. termination of commercial [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:219: and explosion. services with ensuing loss revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:219: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:219: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:220: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:220: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:220: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:221: explosion. ensuing loss of revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:221: explosion. ensuing loss of revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:223: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:223: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:223: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:224: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:224: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:224: and explosion. services with ensuing loss [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:225: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:225: and explosion. of revenue. termination of commercial activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:225: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:226: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:226: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:226: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:227: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:227: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:227: explosion. services with ensuing loss commercial activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:228: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:228: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:228: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:229: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:229: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:229: and explosion. to services with ensuing disruption to commercial activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:230: and explosion. and/or prolonged restrictions. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:230: explosion. services with ensuing loss [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:230: and explosion. to commercial activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:231: explosion. services with ensuing loss [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:231: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:231: and explosion. commercial activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:232: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:232: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:232: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:233: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:234: and explosion. commercial activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:234: explosion. services with ensuing loss [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:234: and explosion. commercial activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:235: explosion. services with ensuing loss [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:235: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:235: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:236: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:236: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:236: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:237: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:237: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:239: Fire and explosion. operations, prolonged restrictions, and/or [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:239: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:240: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:240: Fire and explosion. of revenue. termination of commercial activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:240: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:241: Fire and explosion. services with ensuing loss of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:241: Fire and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:241: Fire and explosion. of revenue. commercial activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:242: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:242: Dredgers) visibility. Fire and explosion. with ensuing loss of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:242: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:243: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:243: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:243: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:244: operation) Fire and explosion. term disruption to services disruption to commercial activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:244: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:244: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:244: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:245: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:245: and explosion. with ensuing loss of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:245: and explosion. to services with ensuing loss activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:246: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:246: and explosion. services with ensuing loss of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:246: and explosion. activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:247: and explosion. to services with ensuing loss [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:247: and explosion. to services with ensuing loss [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:247: and explosion. to services with ensuing loss [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:248: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:248: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:248: and explosion. with ensuing loss of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:249: and explosion. termination of commercial activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:250: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:250: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:250: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:251: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:251: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:251: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:252: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:252: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:252: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:253: Fire and explosion. revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:253: Fire and explosion. revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: explosion. term disruption to services [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: explosion. Very short-term disruption to Long-term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: explosion. revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:256: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:256: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:256: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:256: explosion. revenue. of commercial activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:257: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:257: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:257: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:257: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:258: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:258: and explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:258: operation) explosion. services with ensuing loss of activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:258: explosion. revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:259: explosion. revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:259: explosion. revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:259: explosion. revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:259: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:260: explosion. commercial activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:260: explosion. with ensuing loss of revenue. restrictions. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:260: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:260: explosion. with ensuing loss of revenue. commercial activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:261: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:261: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:261: explosion. commercial activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:261: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:262: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:262: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:263: explosion. with ensuing loss of revenue. termination of commercial activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:263: explosion. with ensuing loss of revenue. commercial activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:263: explosion. services with ensuing loss of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:263: explosion. with ensuing loss of revenue. commercial activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:264: explosion. services with ensuing loss of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:264: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:264: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:264: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:265: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:265: explosion. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:265: Fire and explosion. services with ensuing loss of loss of revenue. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:265: Fire and explosion. services with ensuing loss of loss of revenue. [[this>Teesworks/Planning/R-2021-0610-PND/R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf|R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf]]:9:● Gas Holder Controlled Explosive Demolition [[this>Teesworks/Planning/R-2021-0610-PND/R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf|R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf]]:13:Case Study – Controlled Explosive Demolition – Various Projects [[this>Teesworks/Planning/R-2021-0610-PND/R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf|R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf]]:13:Controlled Explosive Demolition is a highly efficient and safety proven method for demolition of large structures. The Keltbray Decommissioning [[this>Teesworks/Planning/R-2021-0610-PND/R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf|R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf]]:14:demolition, with the exception of controlled explosive demolition on the Gasholder. [[this>Teesworks/Planning/R-2021-0610-PND/R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf|R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf]]:19: Methodology - Heavy Demolition Machine Methodology – Controlled Explosive Demolition [[this>Teesworks/Planning/R-2021-0610-PND/R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf|R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf]]:22:Demolition Stage 8 Area of highest potential risk of explosive atmosphere to be carried out as final phase of the works. [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:28:addition, TB17 goes on to reference a concept of an “explosion risk threshold” (as defined by Boltze and de [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:29: Pressure ranges period during difference during Explosion Risk [[this>Teesworks/Planning/R-2023-0246-RMM/R-2023-0246-RMM-20230420_MOD_Response_Letter.pdf|R-2023-0246-RMM-20230420_MOD_Response_Letter.pdf]]:1:explosives storage sites, air weapon ranges, and technical sites or training resources such as the [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf]]:1: • Use of explosives. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:41: fire and explosion, except where they can be a consequence of a navigation hazard. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:77: and explosion. term suspension of operations, [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:77: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:77: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:78: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:78: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:78: and explosion. services with ensuing loss prolonged restrictions, and/or [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:79: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:79: and explosion. of revenue. restrictions, and/or termination [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:79: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:80: explosion. of revenue. revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:80: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:80: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:81: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:81: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:81: operation) explosion. services with ensuing loss [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:82: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:82: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:82: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:83: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:83: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:83: and explosion. to services with ensuing disruption to commercial [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:84: and explosion. activities and/or prolonged [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:84: and explosion. services with ensuing loss revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:84: and explosion. minor disruption to commercial [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:85: and explosion. services with ensuing loss revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:85: and explosion. disruption to commercial [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:85: and explosion. disruption to commercial [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:86: and explosion. revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:86: and explosion. of revenue. disruption to commercial [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:86: and explosion. revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:87: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:88: and explosion. termination of commercial [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:88: and explosion. services with ensuing loss revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:88: and explosion. termination of commercial [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:89: and explosion. services with ensuing loss revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:89: Fire and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:89: Fire and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:90: Fire and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:90: Fire and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:90: Fire and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:91: explosion. ensuing loss of revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:91: explosion. ensuing loss of revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:93: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:93: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:93: Fire and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:94: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:94: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:94: and explosion. services with ensuing loss [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:95: Fire and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:95: and explosion. of revenue. termination of commercial activities. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:95: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:96: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:96: Fire and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:96: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:97: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:97: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:97: explosion. services with ensuing loss commercial activities. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:98: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:98: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:98: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:99: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:99: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:99: and explosion. to services with ensuing disruption to commercial activities. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:100: and explosion. and/or prolonged restrictions. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:100: explosion. services with ensuing loss [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:100: and explosion. to commercial activities. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:101: explosion. services with ensuing loss [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:101: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:101: and explosion. commercial activities. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:102: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:102: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:102: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:103: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:104: and explosion. commercial activities. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:104: explosion. services with ensuing loss [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:104: and explosion. commercial activities. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:105: explosion. services with ensuing loss [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:105: Fire and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:105: Fire and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:106: Fire and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:106: Fire and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:106: Fire and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:107: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:107: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:109: Fire and explosion. operations, prolonged restrictions, and/or [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:109: Fire and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:110: Fire and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:110: Fire and explosion. of revenue. termination of commercial activities. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:110: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:111: Fire and explosion. services with ensuing loss of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:111: Fire and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:111: Fire and explosion. of revenue. commercial activities. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:112: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:112: Dredgers) visibility. Fire and explosion. with ensuing loss of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:112: Fire and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:113: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:113: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:113: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:114: operation) Fire and explosion. term disruption to services disruption to commercial activities. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:114: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:114: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:114: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:115: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:115: and explosion. with ensuing loss of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:115: and explosion. to services with ensuing loss activities. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:116: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:116: and explosion. services with ensuing loss of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:116: and explosion. activities. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:117: and explosion. to services with ensuing loss [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:117: and explosion. to services with ensuing loss [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:117: and explosion. to services with ensuing loss [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:118: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:118: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:118: and explosion. with ensuing loss of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:119: and explosion. termination of commercial activities. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:120: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:120: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:120: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:121: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:121: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:121: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:122: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:122: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:122: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:123: Fire and explosion. revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:123: Fire and explosion. revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: explosion. term disruption to services [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: explosion. Very short-term disruption to Long-term suspension of operations, [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: explosion. revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:126: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:126: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:126: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:126: explosion. revenue. of commercial activities. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:127: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:127: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:127: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:127: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:128: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:128: and explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:128: operation) explosion. services with ensuing loss of activities. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:128: explosion. revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:129: explosion. revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:129: explosion. revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:129: explosion. revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:129: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:130: explosion. commercial activities. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:130: explosion. with ensuing loss of revenue. restrictions. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:130: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:130: explosion. with ensuing loss of revenue. commercial activities. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:131: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:131: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:131: explosion. commercial activities. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:131: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:132: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:132: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:133: explosion. with ensuing loss of revenue. termination of commercial activities. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:133: explosion. with ensuing loss of revenue. commercial activities. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:133: explosion. services with ensuing loss of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:133: explosion. with ensuing loss of revenue. commercial activities. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:134: explosion. services with ensuing loss of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:134: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:134: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:134: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:135: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:135: explosion. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:135: Fire and explosion. services with ensuing loss of loss of revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:135: Fire and explosion. services with ensuing loss of loss of revenue. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf]]:16: • Avoid explosive blasting, using appropriate manual or mechanical alternatives. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:37: accumulation in Explosion Low Risk however, no other buildings will be constructed on [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:46: explosive Closest NIHHS is a historical site located 85m southeast of the area. [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:60: explosive substances Company: British Steel Corporation Ltd [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:86: Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:86: Landfills Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:89: asphyxiation) and ‘Moderate to Very High’ to onsite and offsite properties (e.g. explosion). Given [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf]]:212: Part 2A, if value or major damage to Explosion, causing building [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:44: explosive Closest NIHHS is a historical site located 85m southeast of the area. [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:58: explosive substances Company: British Steel Corporation Ltd [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:84: Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:84: Landfills Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:87: asphyxiation) and ‘Moderate to Very High’ to onsite and offsite properties (e.g. explosion). Given [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf]]:210: Part 2A, if value or major damage to Explosion, causing building [[this>Teesworks/Planning/R-2023-0300-DCO/R-2023-0300-DCO-NSIP(1).pdf|R-2023-0300-DCO-NSIP(1).pdf]]:1:advice for Explosives, as HSE Explosive Unit requested further information and we have not received that for them [[this>Teesworks/Planning/R-2023-0300-DCO/R-2023-0300-DCO-NSIP(1).pdf|R-2023-0300-DCO-NSIP(1).pdf]]:3:Explosives sites [[this>Teesworks/Planning/R-2023-0300-DCO/R-2023-0300-DCO-NSIP(1).pdf|R-2023-0300-DCO-NSIP(1).pdf]]:3:being developed at the location. This was requested by CEMHD7 Inspector of Explosives – Mr David Myrtle. [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Environmental Risk Assessment.pdf|R-2021-0166-FFM-Environmental Risk Assessment.pdf]]:31:explosion due to build-up of hazardous ground gases in confined spaces such as service runs and plant rooms, [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf|R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf]]:24:was used at all exploratory locations which involved drilling into natural superficial deposits. An explosive [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf|R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf]]:33: confined spaces leading to asphyxiation and/or explosion is considered potentially active. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-Earthworks Specification.pdf|R-2021-1048-FFM-Earthworks Specification.pdf]]:26:The Contractor shall not use explosives without the written permission of the Overseeing Organisation. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:47:49 4.7 Regulated explosive sites 0 0 0 0 - [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:93:4.7 Regulated explosive sites [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:93:Explosives Regulations 2005 (MSER). The last update to this data was in April 2011. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:327: Figure Four - WWII High Explosive Bomb Density [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:328: AA Anti-Aircraft NEQ Net Explosive Quantity [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:328: AXO Abandoned Explosive Ordnance PM Parachute Mine [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:328: EO Explosive Ordnance UXB Unexploded Bomb [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:328: EOC Explosive Ordnance Clearance UXO Unexploded Ordnance [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:328: EOD Explosive Ordnance Disposal V Weapons Vergeltungswaffen – Vengeance [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:328: HE High Explosive [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:328: LE Low Explosive [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:334: 6. Historic UXO information provided by 33 Engineer Regiment (Explosive Ordnance Disposal) at Carver Barracks, [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:334: resulting from war fighting activities (also known as the Explosive Remnants of War (ERW)). [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:334: artillery and tank projectiles, explosives, LSA and SAA). Thousands of tonnes of these munitions were used for the [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:334: The most common type of UXO discovered today in the UK is the aerially delivered high explosive (HE) bomb, which [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:337: • The removal of a “legacy artillery projectile” (potentially containing explosives), found in a scrap sorting area [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:337: (subsequently documented as non-explosive. It is considered likely to be an inert training munition); [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:337: Freeport Entrance, on the 13th July 2021 (subsequently documented as non-explosive); [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:344: possibility of explosive ordnance encounter and are a vital part of the general safety [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:352: Figure Four - WWII High Explosive Bomb Density [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf|R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf]]:27:minimise the risk of explosion. The pipeline is an extremely sensitive asset. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf|R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf]]:77: Act contains no scope for considering Explosion, causing building collapse (can [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:39:49 4.7 Regulated explosive sites 0 0 0 0 - [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:85:4.7 Regulated explosive sites [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:85:Explosives Regulations 2005 (MSER). The last update to this data was in April 2011. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:319: Figure Four - WWII High Explosive Bomb Density [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:320: AA Anti-Aircraft NEQ Net Explosive Quantity [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:320: AXO Abandoned Explosive Ordnance PM Parachute Mine [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:320: EO Explosive Ordnance UXB Unexploded Bomb [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:320: EOC Explosive Ordnance Clearance UXO Unexploded Ordnance [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:320: EOD Explosive Ordnance Disposal V Weapons Vergeltungswaffen – Vengeance [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:320: HE High Explosive [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:320: LE Low Explosive [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:326: 6. Historic UXO information provided by 33 Engineer Regiment (Explosive Ordnance Disposal) at Carver Barracks, [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:326: resulting from war fighting activities (also known as the Explosive Remnants of War (ERW)). [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:326: artillery and tank projectiles, explosives, LSA and SAA). Thousands of tonnes of these munitions were used for the [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:326: The most common type of UXO discovered today in the UK is the aerially delivered high explosive (HE) bomb, which [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:329: • The removal of a “legacy artillery projectile” (potentially containing explosives), found in a scrap sorting area [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:329: (subsequently documented as non-explosive. It is considered likely to be an inert training munition); [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:329: Freeport Entrance, on the 13th July 2021 (subsequently documented as non-explosive); [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:336: possibility of explosive ordnance encounter and are a vital part of the general safety [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf]]:344: Figure Four - WWII High Explosive Bomb Density [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:8: Explosive Quantity (NEQ) UXO – such as High Explosive bombs and/or Land Service Ammunition; such [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:15: 5.2 WWII High Explosive Bombing Density ....................................................................................... 14 [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:15: 5.4 WWII High Explosive Bomb Strikes ............................................................................................. 15 [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:17:Appendix 5 WWII High Explosive Bomb Density [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:18:Annex C Explosives and Detonation Effects [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:19:AXO Abandoned Explosive Ordnance LP-HC Low Probability-High [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:19:Bgl Below Ground Level NEQ Net Explosive Quantity [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:19:EOD Explosive Ordnance Disposal TNT Trinitrotoluene [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:19:ERW Explosive Remnants of War UXB Unexploded Bomb [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:19:HE High Explosive WWII World War Two [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:20: • Unexploded Ordnance (UXO) – any munition with an explosive or chemical fill that failed to initiate [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:24: (Abandoned Explosive Ordnance (AXO)) and ordnance resulting from war fighting activities (also [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:24: known as the Explosive Remnants of War (ERW)). [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:24: common type of UXO discovered in the UK today is the aerially delivered High Explosive (HE) bomb, [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:24: bomb storage (including HE bombs, naval shells, artillery and tank projectiles, explosives, LSA and SAA). [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:25: The explosive or chemical fill within UXO rarely becomes inert or loses its effectiveness with age, but [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:25: the explosive fill may change or crystallise over time - increasing the high explosive’s sensitivity to a [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:28: high explosive effects, but also in defining what degree of UXO risk might be tolerated (if any). For [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:29: • BP, Document Reference GP 04-81, Explosive Remnants of War Risk Mitigation Strategy for [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:33: The consequences of an unplanned UXO initiation are a function of the mass of high explosives in the [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:33: UXO (effectively, their Net Explosive Quantity (NEQ)), and their proximity to and robustness of, [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:33: The mass of high explosives and their surface effects can generally be either estimated or accurately [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:33: explosive events in particular. Generally, personnel are very vulnerable to high explosive [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:33: Further detailed information, detailing both the effects of high explosive detonation events and the [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:35:5.2 WWII High Explosive Bombing Density [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:36:5.4 WWII High Explosive Bomb Strikes [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:53: – such as High Explosive bombs and/or Land Service Ammunition; such risks are considered [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:61: The briefings (aka Tool Box Briefs), are essential when there is a possibility of explosive ordnance [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:72: o Consequence; of UXO initiation, which is driven by the Net (High) Explosive [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:74:Appendix 5 – WWII High Explosive Bomb Density [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:102: 1. Reid, W.D., 1996, The response of surface ships to underwater explosions; [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:102: 2. Szturomski, B., 2015, The effect of an underwater explosion on a ship. Scientific Journal of [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:103:Annex C - Explosives and Detonation Effects [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:103: Explosives can be categorised into two broad categories designed to be either detonating or high [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:103: explosives or deflagrating or low explosives. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:103: This annex describes the classification of explosives, the generic design of the explosives train and the [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:103:Classification of Explosives [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:103:Detonating or High Explosives [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:103: of a high-pressure shock wave. These explosives detonate at velocities ranging from 1,000m/s to [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:103: 9,000m/s and may be subdivided into two explosives classes, differentiated by their respective [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:103: sensitivity or ease with which an explosive may be ignited or initiated: [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:103: • Primary Explosives – are extremely sensitive to impact, friction, sparks, flames or other [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:103: them unsuitable to use as a base explosive i.e. main-fill explosive in military ordnance. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:103: • Secondary Explosives – are relatively insensitive to impact, friction, sparks, flame or other [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:103: and/or burnt in bulk. Dynamite, TNT, RDX and HMX are classed as secondary high explosives, [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:103: which are commonly used as base explosives in military ordnance. Pentaerythritol tetranitrate [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:103: (PETN) is the benchmark compound for comparative purposes, with those explosives that are [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:103: more sensitive to initiation than PETN classified as primary explosives. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:103:Deflagrating or Low Explosives [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:103: A low explosive is usually a mixture of a combustible substance and an oxidant that decomposes [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:104: normal conditions, low explosives undergo deflagration at rates that vary from a few centimetres per [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:104: Deflagration processes of low explosives are easier to control than the detonations of high explosive, [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:104: In general, explosive ordnance items, such as bombs or sea mines tend to have the following basic [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:104: manufactured from aluminium. The case shatters during detonation of the high explosive fill, [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:104: • Main Charge – the main charge makes up most of the explosive mass of the ordnance item [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:104: comprising a high explosive fill with a relatively low sensitivity to initiation; [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:104: • Booster – a secondary high explosive booster charge is used to ignite the main charge [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:104: component and comprises a more sensitive, albeit smaller quantity of high explosive; [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:104: • Fuze – a small quantity, high explosive charge is usually incorporated into the device which is [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:104: sensitive to initiation. The fuze acts as the primary explosive which is used to ignite the [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:104: An explosive chain reaction is therefore started when the sufficient energy (kinetic, electrical, or [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:104: chemical) is generated to initiate the explosive content of the fuze, which in turn detonates the booster [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:104: and finally the main charge. These components form the explosive train of the ordnance device. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:105: UXO is any munition, weapon delivery system or ordnance item that contains explosives, propellants, [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:105: minimal risk compared to other high explosive content UXO, although SAA may explode if subjected [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:106: comprise either an explosive, chemical, smoke, illumination, or inert/training fill. Projectiles may also [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:107: Landmines are an explosive device typically shallow buried or concealed on the ground and used to [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:107: stabilising fins. The metal casing contains the explosive or chemical fill and may be compartmentalised. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:107: Bomb types include high explosive, incendiary, chemical, training, and concrete. As UXO, they present [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:109: The other property that an item of UXO has which classifies it from benign debris, is the explosive [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF|R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF]]:109:Visual Detection – Explosive Ordnance Disposal (EOD) Engineer [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-EMAIL.pdf|R-2021-1048-FFM-EMAIL.pdf]]:2:explosion, it could result in the loss of the gas supply to local communities. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-EMAIL.pdf|R-2021-1048-FFM-EMAIL.pdf]]:2:  The use of explosives within 30m of low/medium pressure mains and 250m of intermediate [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-EMAIL.pdf|R-2021-1048-FFM-EMAIL.pdf]]:5:Carrying out explosions, pilings, boring or [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf|R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf]]:77: Act contains no scope for considering Explosion, causing building collapse (can [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-Appendix1.pdf|R-2021-1048-FFM-Appendix1.pdf]]:19:services explosion/fire identified. If present in the vicinity of the borehole all [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-Appendix1.pdf|R-2021-1048-FFM-Appendix1.pdf]]:20:underground explosion/fire Inspection of all available service plans. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-Appendix1.pdf|R-2021-1048-FFM-Appendix1.pdf]]:23: explosion/fire remain vigilant and excavation should be avoided where there is [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-Appendix1.pdf|R-2021-1048-FFM-Appendix1.pdf]]:23:services explosion/fire 2. Visual inspection including where possible lifting of [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:39:49 4.7 Regulated explosive sites 0 0 0 0 - [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:85:4.7 Regulated explosive sites [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:85:Explosives Regulations 2005 (MSER). The last update to this data was in April 2011. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:319: Figure Four - WWII High Explosive Bomb Density [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:320: AA Anti-Aircraft NEQ Net Explosive Quantity [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:320: AXO Abandoned Explosive Ordnance PM Parachute Mine [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:320: EO Explosive Ordnance UXB Unexploded Bomb [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:320: EOC Explosive Ordnance Clearance UXO Unexploded Ordnance [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:320: EOD Explosive Ordnance Disposal V Weapons Vergeltungswaffen – Vengeance [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:320: HE High Explosive [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:320: LE Low Explosive [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:326: 6. Historic UXO information provided by 33 Engineer Regiment (Explosive Ordnance Disposal) at Carver Barracks, [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:326: resulting from war fighting activities (also known as the Explosive Remnants of War (ERW)). [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:326: artillery and tank projectiles, explosives, LSA and SAA). Thousands of tonnes of these munitions were used for the [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:326: The most common type of UXO discovered today in the UK is the aerially delivered high explosive (HE) bomb, which [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:329: • The removal of a “legacy artillery projectile” (potentially containing explosives), found in a scrap sorting area [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:329: (subsequently documented as non-explosive. It is considered likely to be an inert training munition); [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:329: Freeport Entrance, on the 13th July 2021 (subsequently documented as non-explosive); [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:336: possibility of explosive ordnance encounter and are a vital part of the general safety [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:344: Figure Four - WWII High Explosive Bomb Density [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-Phase II ESA.pdf|R-2021-0100-CD-Phase II ESA.pdf]]:33: confined spaces leading to asphyxiation and/or explosion is considered potentially active. [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:48: explosive Closest NIHHS is a historical site located 85m southeast of the area. [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:62: explosive substances Company: British Steel Corporation Ltd [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:88: Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:88: Landfills Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:91: asphyxiation) and ‘Moderate to Very High’ to onsite and offsite properties (e.g. explosion). Given [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:114: Part 2A, if value or major damage to Explosion, causing building [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:389:gases poses a potential explosive and asphyxiant risk, whilst an acidic pH poses a potential risk to buried [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:422: levels; potentially an explosive and/or Include ground gas protection measures within [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:459: explosive Human health ‐ √ Severe Moderate High Futu [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:467: explosive Human health ‐ √ Severe Low Moderate Very [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:469: Act contains no scope for considering Explosion, causing building collapse (can also [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:531: Explosion / Electric Arcing etc. resulting from contact with [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf|R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf]]:8: potential for explosive ground gas accumulation are also highlighted with the built environment [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf|R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf]]:27: health (e.g. asphyxiation) as well as onsite and offsite properties (e.g. explosion). Given the [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf|R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf]]:36: 3 Avoid explosive blasting, using appropriate manual or mechanical alternatives; and [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-Planning Statement - July 2020.pdf|R-2020-0357-OOM-Planning Statement - July 2020.pdf]]:44: geomorphological significance, geotechnical constraints and the potential for explosive ground [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-TGN 287_Third party guidance for working near NGET equipment.pdf|R-2020-0357-OOM-TGN 287_Third party guidance for working near NGET equipment.pdf]]:9:high-voltage conductors within 30m of the seat of explosive detonated at a particular time). that isn’t – touch, the charge can equalise such as deer fences, metal palisade fencing, [[this>Teesworks/Planning/R-2021-0057-VC/R-2021-0057-VC-email.pdf|R-2021-0057-VC-email.pdf]]:13: 36” Gas Pipeline Explosion, North Texas June 7, 2010 [[this>Teesworks/Planning/R-2021-0057-VC/R-2021-0057-VC-NGN.pdf|R-2021-0057-VC-NGN.pdf]]:5:Carrying out explosions, pilings, boring or [[this>Teesworks/Planning/R-2021-0057-VC/R-2021-0057-VC-NGN.pdf|R-2021-0057-VC-NGN.pdf]]:6:explosion, it could result in the loss of the gas supply to local communities. [[this>Teesworks/Planning/R-2021-0057-VC/R-2021-0057-VC-NGN.pdf|R-2021-0057-VC-NGN.pdf]]:6:  The use of explosives within 30m of low/medium pressure mains and 250m of intermediate [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf]]:15: confined spaces leading to asphyxiation and/or explosion is considered potentially active. [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:15: confined spaces leading to asphyxiation and/or explosion is considered potentially active. [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf]]:10:all exploratory locations which involved drilling into natural superficial deposits. An explosive ordnance [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf]]:21: in confined spaces leading to asphyxiation and/or explosion is considered potentially active. [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:4:5.25 Explosives .............................................................................................................................. 52 [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:4:5.43 Working in Explosive Atmospheres ........................................................................................ 63 [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:12:CoSHH Fire & Explosion All chemicals to be recorded on the CoSHH Register [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:12:Hot Works Fire & Explosion Task specific RAMS [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:38:operation, heavy and critical lifting, hot work activities when risk of explosion or not in green field. [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:41:explosion proof where applicable. Powered hand tools used in confined spaces should, where possible, be [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:52:5.25 Explosives [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:52:Use of explosives or bursting equipment shall be avoided where possible. However, for structures greater [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:52:than 1.5m in sectional dimension, the Contractor may use explosives or any safe methods to complete the [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:61:assessment of fire or explosion and if necessary, work controlled using a hot work permit. [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:63:5.43 Working in Explosive Atmospheres [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:63:During the commissioning or operation phase there might be areas considered with explosive atmosphere. For [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-ECL. 007.04.01CEMP-ANNEX.1 Issue 2.pdf|R-2023-0224-CD-ECL. 007.04.01CEMP-ANNEX.1 Issue 2.pdf]]:8:  explosive; [[this>Teesworks/Planning/R-2023-0247-OOM/R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf|R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf]]:19: asphyxiating/explosi Enclosed spaces on the site are anticipated to be divided into above-ground space within the BA building and above-ground office spaces. [[this>Teesworks/Planning/R-2023-0247-OOM/R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf|R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf]]:19: risk of accumulation of asphyxiating/explosive ground gases and vapours may be present, though the structure of any below ground [[this>Teesworks/Planning/R-2023-0247-OOM/R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf|R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf]]:25: asphyxiating/explosive gases/vapours in enclosed spaces; and [[this>Teesworks/Planning/R-2023-0247-OOM/R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf|R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf]]:37: asphyxiating/explosive [[this>Teesworks/Planning/R-2023-0247-OOM/R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf|R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf]]:38: present a risk of accumulation of asphyxiating/explosive ground gases and vapours. [[this>Teesworks/Planning/R-2023-0247-OOM/R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf|R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf]]:30: Substances and Explosive Atmospheres Regulations 2002 (DSEAR) and [[this>Teesworks/Planning/R-2023-0247-OOM/R-2023-0247-OOM-EA_R20230247OOM_OFFICIAL_180423.pdf|R-2023-0247-OOM-EA_R20230247OOM_OFFICIAL_180423.pdf]]:2:and explosion. Carbon dioxide can present a risk of asphyxiation or suffocation. The [[this>Teesworks/Planning/R-2021-0316-VC/R-2021-0316-VC-1400007002.pdf|R-2021-0316-VC-1400007002.pdf]]:5:Carrying out explosions, pilings, boring or [[this>Teesworks/Planning/R-2021-0316-VC/R-2021-0316-VC-1400007002.pdf|R-2021-0316-VC-1400007002.pdf]]:6:explosion, it could result in the loss of the gas supply to local communities. [[this>Teesworks/Planning/R-2021-0316-VC/R-2021-0316-VC-1400007002.pdf|R-2021-0316-VC-1400007002.pdf]]:6: • The use of explosives within 30m of low/medium pressure mains and 250m of intermediate [[this>Teesworks/Planning/R-2021-0316-VC/R-2021-0316-VC-CAT-PPI-PRC-019.pdf|R-2021-0316-VC-CAT-PPI-PRC-019.pdf]]:10: 36” Gas Pipeline Explosion, North Texas June 7, 2010 [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF]]:11: potential for explosive ground gas accumulation are also highlighted with the built environment [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF]]:29: well as onsite and offsite properties (e.g. explosion). Based on available data, no volatile [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF]]:31: therefore considered to be explosion from UXO, land instability and risk from contamination. [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF]]:32: main risk from explosions is to Construction Workers and off-site human health receptors. [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1442:explosion due to build-up of hazardous ground gases in confined spaces such as service runs and plant rooms, [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1517: confined spaces leading to asphyxiation and/or explosion is considered potentially active. [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1528: confined spaces leading to asphyxiation and/or explosion is considered potentially active. [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1705: explosive Closest NIHHS is a historical site located 85m southeast of the area. [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1719: explosive substances Company: British Steel Corporation Ltd [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1745: Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1745: Landfills Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1748: asphyxiation) and ‘Moderate to Very High’ to onsite and offsite properties (e.g. explosion). Given [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1871: Part 2A, if value or major damage to Explosion, causing building [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1890:64 4.7 Regulated explosive sites 0 0 0 0 - [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1951:4.7 Regulated explosive sites [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1951:Explosives Regulations 2005 (MSER). The last update to this data was in April 2011. [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf|R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf]]:49: from explosions is to construction workers and off site human health receptors. [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF]]:13: accidents associated with the hazardous installations, including explosions, could have [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF]]:40: explosions of ignition to flammable [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF]]:41: Landslide explosions Infrastructure and harm to [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF]]:41: Fire and/or Natural gas – Fire and/or explosion could Not N/A N/A [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF]]:41: explosion loss of gas result in significant harm, up relevant. [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF]]:41: explosions. [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-a) Stay safe near our pipes.pdf|R-2020-0270-FFM-a) Stay safe near our pipes.pdf]]:3:Carrying out explosions, pilings, boring or [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:6: asphyxiation) and ‘Moderate to Very High’ to onsite and offsite properties (e.g. explosion). Given [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:51: explosive Closest NIHHS is a historical site located 85m southeast of the area. [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:68: explosive substances Company: British Steel Corporation Ltd [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:94: Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:94: Landfills Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:220: Part 2A, if value or major damage to Explosion, causing building [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-b) Important Safety Guidance (002).pdf|R-2020-0270-FFM-b) Important Safety Guidance (002).pdf]]:1:explosion, it could result in the loss of the gas supply to local communities. [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-b) Important Safety Guidance (002).pdf|R-2020-0270-FFM-b) Important Safety Guidance (002).pdf]]:1: • The use of explosives within 30m of low/medium pressure mains and 250m of intermediate [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:32: confined spaces leading to asphyxiation and/or explosion is considered potentially active. [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:43: confined spaces leading to asphyxiation and/or explosion is considered potentially active. [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:19: Explosive risks ✓ Current and Future site users [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:47:38 4.7 Regulated explosive sites 0 0 0 0 - [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:82:4.7 Regulated explosive sites [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:82:Explosives Regulations 2005 (MSER). The last update to this data was in April 2011. [[this>Teesworks/Planning/R-2021-0846-FFM/R-2021-0846-FFM-Lighting Solutions.pdf|R-2021-0846-FFM-Lighting Solutions.pdf]]:15:A place in which an explosive atmosphere consisting of a [[this>Teesworks/Planning/R-2021-0846-FFM/R-2021-0846-FFM-Lighting Solutions.pdf|R-2021-0846-FFM-Lighting Solutions.pdf]]:15:A place in which an explosive atmosphere consisting of [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:33: confined spaces leading to asphyxiation and/or explosion is considered potentially active. [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-ECL. 007.04.01CEMP-ANNEX.1 Issue 2.pdf|R-2023-0253-RMM-ECL. 007.04.01CEMP-ANNEX.1 Issue 2.pdf]]:8:  explosive; [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:4:5.25 Explosives .............................................................................................................................. 52 [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:4:5.43 Working in Explosive Atmospheres ........................................................................................ 63 [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:12:CoSHH Fire & Explosion All chemicals to be recorded on the CoSHH Register [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:12:Hot Works Fire & Explosion Task specific RAMS [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:38:operation, heavy and critical lifting, hot work activities when risk of explosion or not in green field. [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:41:explosion proof where applicable. Powered hand tools used in confined spaces should, where possible, be [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:52:5.25 Explosives [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:52:Use of explosives or bursting equipment shall be avoided where possible. However, for structures greater [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:52:than 1.5m in sectional dimension, the Contractor may use explosives or any safe methods to complete the [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:61:assessment of fire or explosion and if necessary, work controlled using a hot work permit. [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:63:5.43 Working in Explosive Atmospheres [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:63:During the commissioning or operation phase there might be areas considered with explosive atmosphere. For [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-20230420_MOD_Response_Letter.pdf|R-2023-0253-RMM-20230420_MOD_Response_Letter.pdf]]:1:explosives storage sites, air weapon ranges, and technical sites or training resources such as the [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:48: • The site must be cleared to ensure there is nothing that could cause fire or explosion. [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:68: • Avoid explosive blasting, using appropriate manual or mechanical alternatives. [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:101:materials H1 – Explosive [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:197: • Avoid explosive blasting, using appropriate [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:48: • The site must be cleared to ensure there is nothing that could cause fire or explosion. [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:68: • Avoid explosive blasting, using appropriate manual or mechanical alternatives. [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:101:materials H1 – Explosive [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:169: • Avoid explosive blasting, using appropriate [[this>Teesworks/Planning/R-2021-0397-PND/R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF|R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF]]:22:Remote Demolition or Explosive Demolition of the Battery Bunker, Battery Chimney & Associated [[this>Teesworks/Planning/R-2021-0397-PND/R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF|R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF]]:22: machine or explosive demolition activities. [[this>Teesworks/Planning/R-2020-0598-FF/R-2020-0598-FF-email.pdf|R-2020-0598-FF-email.pdf]]:11: 36” Gas Pipeline Explosion, North Texas June 7, 2010 [[this>Teesworks/Planning/R-2020-0598-FF/R-2020-0598-FF-Northern Gas.pdf|R-2020-0598-FF-Northern Gas.pdf]]:4:Carrying out explosions, pilings, boring or [[this>Teesworks/Planning/R-2020-0598-FF/R-2020-0598-FF-Northern Gas.pdf|R-2020-0598-FF-Northern Gas.pdf]]:6:explosion, it could result in the loss of the gas supply to local communities. [[this>Teesworks/Planning/R-2020-0598-FF/R-2020-0598-FF-Northern Gas.pdf|R-2020-0598-FF-Northern Gas.pdf]]:6:  The use of explosives within 30m of low/medium pressure mains and 250m of intermediate [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:6: asphyxiation) and ‘Moderate to Very High’ to onsite and offsite properties (e.g. explosion). Given [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:51: explosive Closest NIHHS is a historical site located 85m southeast of the area. [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:68: explosive substances Company: British Steel Corporation Ltd [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:94: Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:94: Landfills Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:220: Part 2A, if value or major damage to Explosion, causing building [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Phase II ESA.PDF|R-2020-0318-FFM-Phase II ESA.PDF]]:33: confined spaces leading to asphyxiation and/or explosion is considered potentially active. [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf|R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf]]:26: occupants and Site users through asphyxiation or explosion. The risk to future occupants and Site users [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf|R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf]]:5:48 4.7 Regulated explosive sites 0 0 0 0 - [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf|R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf]]:50:4.7 Regulated explosive sites [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf|R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf]]:50:Explosives Regulations 2005 (MSER). The last update to this data was in April 2011. [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 2 Appendix 14.1 E. PRA Methodology.pdf|R-2023-0291-ESM-ES Vol 2 Appendix 14.1 E. PRA Methodology.pdf]]:3: Catastrophic damage to buildings or property (e.g. explosion causing building collapse). Ecological system [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf|R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf]]:16: (f)for the production of explosives. [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:15: confined spaces leading to asphyxiation and/or explosion is considered potentially active. [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf]]:28:dioxide, which present an explosion and asphyxiation risk. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:35: • Use of explosives. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:393: • Avoid explosive blasting, using appropriate manual or mechanical alternatives. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:283: accumulation in Explosion Low Risk however, no other buildings will be constructed on [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:35: • Use of explosives. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:393: • Avoid explosive blasting, using appropriate manual or mechanical alternatives. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:171: fire and explosion, except where they can be a consequence of a navigation hazard. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:207: and explosion. term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:207: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:207: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:208: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:208: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:208: and explosion. services with ensuing loss prolonged restrictions, and/or [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:209: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:209: and explosion. of revenue. restrictions, and/or termination [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:209: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:210: explosion. of revenue. revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:210: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:210: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:211: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:211: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:211: operation) explosion. services with ensuing loss [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:212: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:212: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:212: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:213: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:213: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:213: and explosion. to services with ensuing disruption to commercial [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:214: and explosion. activities and/or prolonged [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:214: and explosion. services with ensuing loss revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:214: and explosion. minor disruption to commercial [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:215: and explosion. services with ensuing loss revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:215: and explosion. disruption to commercial [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:215: and explosion. disruption to commercial [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:216: and explosion. revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:216: and explosion. of revenue. disruption to commercial [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:216: and explosion. revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:217: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:218: and explosion. termination of commercial [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:218: and explosion. services with ensuing loss revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:218: and explosion. termination of commercial [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:219: and explosion. services with ensuing loss revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:219: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:219: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:220: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:220: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:220: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:221: explosion. ensuing loss of revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:221: explosion. ensuing loss of revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:223: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:223: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:223: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:224: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:224: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:224: and explosion. services with ensuing loss [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:225: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:225: and explosion. of revenue. termination of commercial activities. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:225: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:226: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:226: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:226: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:227: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:227: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:227: explosion. services with ensuing loss commercial activities. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:228: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:228: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:228: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:229: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:229: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:229: and explosion. to services with ensuing disruption to commercial activities. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:230: and explosion. and/or prolonged restrictions. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:230: explosion. services with ensuing loss [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:230: and explosion. to commercial activities. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:231: explosion. services with ensuing loss [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:231: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:231: and explosion. commercial activities. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:232: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:232: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:232: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:233: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:234: and explosion. commercial activities. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:234: explosion. services with ensuing loss [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:234: and explosion. commercial activities. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:235: explosion. services with ensuing loss [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:235: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:235: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:236: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:236: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:236: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:237: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:237: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:239: Fire and explosion. operations, prolonged restrictions, and/or [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:239: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:240: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:240: Fire and explosion. of revenue. termination of commercial activities. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:240: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:241: Fire and explosion. services with ensuing loss of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:241: Fire and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:241: Fire and explosion. of revenue. commercial activities. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:242: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:242: Dredgers) visibility. Fire and explosion. with ensuing loss of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:242: Fire and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:243: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:243: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:243: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:244: operation) Fire and explosion. term disruption to services disruption to commercial activities. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:244: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:244: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:244: and explosion. of revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:245: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:245: and explosion. with ensuing loss of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:245: and explosion. to services with ensuing loss activities. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:246: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:246: and explosion. services with ensuing loss of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:246: and explosion. activities. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:247: and explosion. to services with ensuing loss [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:247: and explosion. to services with ensuing loss [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:247: and explosion. to services with ensuing loss [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:248: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:248: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:248: and explosion. with ensuing loss of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:249: and explosion. termination of commercial activities. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:250: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:250: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:250: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:251: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:251: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:251: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:252: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:252: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:252: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:253: Fire and explosion. revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:253: Fire and explosion. revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: explosion. term disruption to services [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: explosion. Very short-term disruption to Long-term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: explosion. revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:256: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:256: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:256: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:256: explosion. revenue. of commercial activities. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:257: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:257: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:257: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:257: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:258: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:258: and explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:258: operation) explosion. services with ensuing loss of activities. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:258: explosion. revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:259: explosion. revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:259: explosion. revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:259: explosion. revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:259: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:260: explosion. commercial activities. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:260: explosion. with ensuing loss of revenue. restrictions. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:260: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:260: explosion. with ensuing loss of revenue. commercial activities. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:261: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:261: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:261: explosion. commercial activities. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:261: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:262: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:262: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:263: explosion. with ensuing loss of revenue. termination of commercial activities. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:263: explosion. with ensuing loss of revenue. commercial activities. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:263: explosion. services with ensuing loss of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:263: explosion. with ensuing loss of revenue. commercial activities. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:264: explosion. services with ensuing loss of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:264: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:264: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:264: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:265: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:265: explosion. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:265: Fire and explosion. services with ensuing loss of loss of revenue. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:265: Fire and explosion. services with ensuing loss of loss of revenue. [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:35: • Use of explosives. [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:393: • Avoid explosive blasting, using appropriate manual or mechanical alternatives. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf]]:1: • Use of explosives. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:41: fire and explosion, except where they can be a consequence of a navigation hazard. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:77: and explosion. term suspension of operations, [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:77: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:77: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:78: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:78: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:78: and explosion. services with ensuing loss prolonged restrictions, and/or [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:79: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:79: and explosion. of revenue. restrictions, and/or termination [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:79: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:80: explosion. of revenue. revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:80: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:80: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:81: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:81: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:81: operation) explosion. services with ensuing loss [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:82: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:82: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:82: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:83: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:83: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:83: and explosion. to services with ensuing disruption to commercial [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:84: and explosion. activities and/or prolonged [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:84: and explosion. services with ensuing loss revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:84: and explosion. minor disruption to commercial [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:85: and explosion. services with ensuing loss revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:85: and explosion. disruption to commercial [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:85: and explosion. disruption to commercial [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:86: and explosion. revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:86: and explosion. of revenue. disruption to commercial [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:86: and explosion. revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:87: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:88: and explosion. termination of commercial [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:88: and explosion. services with ensuing loss revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:88: and explosion. termination of commercial [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:89: and explosion. services with ensuing loss revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:89: Fire and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:89: Fire and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:90: Fire and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:90: Fire and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:90: Fire and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:91: explosion. ensuing loss of revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:91: explosion. ensuing loss of revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:93: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:93: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:93: Fire and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:94: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:94: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:94: and explosion. services with ensuing loss [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:95: Fire and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:95: and explosion. of revenue. termination of commercial activities. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:95: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:96: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:96: Fire and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:96: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:97: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:97: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:97: explosion. services with ensuing loss commercial activities. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:98: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:98: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:98: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:99: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:99: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:99: and explosion. to services with ensuing disruption to commercial activities. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:100: and explosion. and/or prolonged restrictions. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:100: explosion. services with ensuing loss [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:100: and explosion. to commercial activities. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:101: explosion. services with ensuing loss [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:101: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:101: and explosion. commercial activities. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:102: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:102: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:102: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:103: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:104: and explosion. commercial activities. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:104: explosion. services with ensuing loss [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:104: and explosion. commercial activities. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:105: explosion. services with ensuing loss [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:105: Fire and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:105: Fire and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:106: Fire and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:106: Fire and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:106: Fire and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:107: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:107: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:109: Fire and explosion. operations, prolonged restrictions, and/or [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:109: Fire and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:110: Fire and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:110: Fire and explosion. of revenue. termination of commercial activities. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:110: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:111: Fire and explosion. services with ensuing loss of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:111: Fire and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:111: Fire and explosion. of revenue. commercial activities. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:112: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:112: Dredgers) visibility. Fire and explosion. with ensuing loss of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:112: Fire and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:113: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:113: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:113: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:114: operation) Fire and explosion. term disruption to services disruption to commercial activities. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:114: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:114: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:114: and explosion. of revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:115: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:115: and explosion. with ensuing loss of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:115: and explosion. to services with ensuing loss activities. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:116: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:116: and explosion. services with ensuing loss of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:116: and explosion. activities. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:117: and explosion. to services with ensuing loss [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:117: and explosion. to services with ensuing loss [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:117: and explosion. to services with ensuing loss [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:118: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:118: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:118: and explosion. with ensuing loss of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:119: and explosion. termination of commercial activities. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:120: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:120: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:120: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:121: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:121: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:121: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:122: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:122: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:122: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:123: Fire and explosion. revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:123: Fire and explosion. revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: explosion. term disruption to services [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: explosion. Very short-term disruption to Long-term suspension of operations, [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: explosion. revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:126: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:126: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:126: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:126: explosion. revenue. of commercial activities. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:127: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:127: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:127: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:127: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:128: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:128: and explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:128: operation) explosion. services with ensuing loss of activities. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:128: explosion. revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:129: explosion. revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:129: explosion. revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:129: explosion. revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:129: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:130: explosion. commercial activities. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:130: explosion. with ensuing loss of revenue. restrictions. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:130: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:130: explosion. with ensuing loss of revenue. commercial activities. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:131: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:131: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:131: explosion. commercial activities. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:131: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:132: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:132: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:133: explosion. with ensuing loss of revenue. termination of commercial activities. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:133: explosion. with ensuing loss of revenue. commercial activities. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:133: explosion. services with ensuing loss of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:133: explosion. with ensuing loss of revenue. commercial activities. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:134: explosion. services with ensuing loss of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:134: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:134: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:134: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:135: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:135: explosion. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:135: Fire and explosion. services with ensuing loss of loss of revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:135: Fire and explosion. services with ensuing loss of loss of revenue. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf|R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf]]:37: accumulation in Explosion Low Risk however, no other buildings will be constructed on [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf]]:16: • Avoid explosive blasting, using appropriate manual or mechanical alternatives. [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:57:49 4.7 Regulated explosive sites 0 0 0 0 - [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:103:4.7 Regulated explosive sites [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:103:Explosives Regulations 2005 (MSER). The last update to this data was in April 2011. [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:337: Figure Four - WWII High Explosive Bomb Density [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:338: AA Anti-Aircraft NEQ Net Explosive Quantity [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:338: AXO Abandoned Explosive Ordnance PM Parachute Mine [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:338: EO Explosive Ordnance UXB Unexploded Bomb [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:338: EOC Explosive Ordnance Clearance UXO Unexploded Ordnance [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:338: EOD Explosive Ordnance Disposal V Weapons Vergeltungswaffen – Vengeance [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:338: HE High Explosive [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:338: LE Low Explosive [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:344: 6. Historic UXO information provided by 33 Engineer Regiment (Explosive Ordnance Disposal) at Carver Barracks, [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:344: resulting from war fighting activities (also known as the Explosive Remnants of War (ERW)). [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:344: artillery and tank projectiles, explosives, LSA and SAA). Thousands of tonnes of these munitions were used for the [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:344: The most common type of UXO discovered today in the UK is the aerially delivered high explosive (HE) bomb, which [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:347: • The removal of a “legacy artillery projectile” (potentially containing explosives), found in a scrap sorting area [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:347: (subsequently documented as non-explosive. It is considered likely to be an inert training munition); [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:347: Freeport Entrance, on the 13th July 2021 (subsequently documented as non-explosive); [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:354: possibility of explosive ordnance encounter and are a vital part of the general safety [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf]]:362: Figure Four - WWII High Explosive Bomb Density [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:39:49 4.7 Regulated explosive sites 0 0 0 0 - [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:85:4.7 Regulated explosive sites [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:85:Explosives Regulations 2005 (MSER). The last update to this data was in April 2011. [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:319: Figure Four - WWII High Explosive Bomb Density [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:320: AA Anti-Aircraft NEQ Net Explosive Quantity [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:320: AXO Abandoned Explosive Ordnance PM Parachute Mine [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:320: EO Explosive Ordnance UXB Unexploded Bomb [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:320: EOC Explosive Ordnance Clearance UXO Unexploded Ordnance [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:320: EOD Explosive Ordnance Disposal V Weapons Vergeltungswaffen – Vengeance [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:320: HE High Explosive [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:320: LE Low Explosive [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:326: 6. Historic UXO information provided by 33 Engineer Regiment (Explosive Ordnance Disposal) at Carver Barracks, [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:326: resulting from war fighting activities (also known as the Explosive Remnants of War (ERW)). [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:326: artillery and tank projectiles, explosives, LSA and SAA). Thousands of tonnes of these munitions were used for the [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:326: The most common type of UXO discovered today in the UK is the aerially delivered high explosive (HE) bomb, which [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:329: • The removal of a “legacy artillery projectile” (potentially containing explosives), found in a scrap sorting area [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:329: (subsequently documented as non-explosive. It is considered likely to be an inert training munition); [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:329: Freeport Entrance, on the 13th July 2021 (subsequently documented as non-explosive); [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:336: possibility of explosive ordnance encounter and are a vital part of the general safety [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf|R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf]]:344: Figure Four - WWII High Explosive Bomb Density [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:6: asphyxiation) and ‘Moderate to Very High’ to onsite and offsite properties (e.g. explosion). Given [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:51: explosive Closest NIHHS is a historical site located 85m southeast of the area. [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:68: explosive substances Company: British Steel Corporation Ltd [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:94: Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood Moderate [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf]]:94: Landfills Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood Moderate [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF]]:33: confined spaces leading to asphyxiation and/or explosion is considered potentially active. [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 2).pdf|R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 2).pdf]]:3: halogenated hydrocarbon d biphenyls s and metal metal Explosives [[this>Teesworks/Planning/R-2021-0589-PND/R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF|R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF]]:22:Remote & Explosive Demolition of the BOS Plant [[this>Teesworks/Planning/R-2021-0589-PND/R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF|R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF]]:22: explosive demolition activities. [[this>Teesworks/Planning/R-2021-0589-PND/R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF|R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF]]:22: ground floor level to assist with the explosive demolition of the main building. [[this>Teesworks/Planning/R-2021-0589-PND/R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF|R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF]]:22: • Prior to the explosive demolition, a series of structured pre-weakening cut will be made using [[this>Teesworks/Planning/R-2021-0589-PND/R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF|R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF]]:22: hot works to the support column to aid the explosive demolition. [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf|R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf]]:15:12.4.17 It is considered that any construction accidents and/or disasters (explosion or similar) would not [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf|R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf]]:18:12.5.30 It is considered that any operational accidents and/or disasters (explosion or similar) would not [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 11 Air Quality.pdf|R-2020-0411-FFM-Chapter 11 Air Quality.pdf]]:21: • Avoid explosive blasting, using appropriate manual or mechanical alternatives. [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf|R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf]]:29: is that it is assumed that the demolition of the REC by explosives or particularly noisy measures [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf|R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf]]:34: Noise Demolition by explosives to be avoided during the [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:19: Explosive risks ✓ Current and Future site users [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:47:38 4.7 Regulated explosive sites 0 0 0 0 - [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:82:4.7 Regulated explosive sites [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:82:Explosives Regulations 2005 (MSER). The last update to this data was in April 2011. [[this>Teesworks/Planning/R-2022-0731-CD/R-2022-0731-CD-STDC_HWY-ATK-ELS-PR-DR-LL-000001_C01.PDF|R-2022-0731-CD-STDC_HWY-ATK-ELS-PR-DR-LL-000001_C01.PDF]]:1: - Corrosive, explosive or flammable. [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-COMMENTS Kirsty email.pdf|R-2021-0728-PND-COMMENTS Kirsty email.pdf]]:2:the building is intended to be taken down by using explosives that will send harmful dust into the air. During [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-COMMENTS Kirsty email.pdf|R-2021-0728-PND-COMMENTS Kirsty email.pdf]]:3:been undertaken. As the building is intended to be taken down by using explosives [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-COMMENTS Gregory R.pdf|R-2021-0728-PND-COMMENTS Gregory R.pdf]]:2:elements has been undertaken. As the building is intended to be taken down by using explosives [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-COMMENTS Gregory R.pdf|R-2021-0728-PND-COMMENTS Gregory R.pdf]]:2:4. Is it intended to halt all train services during the explosion/s? Using steel containers to shield [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:1: Method Statement for the Controlled Explosive [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:1:Explosives Engineers: Precision Demolition Company Ltd [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:4: for the use of the controlled explosive demolition of the Dorman Long Tower [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:7: • The explosion displacing material in pre-determined directions. [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:7: fly due to the controlled explosion. Ricochet debris is less of a concern. [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:7:2.4 The exclusion zone for material displaced by the explosion is a factor of the [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:12: directed by the explosive engineer. [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:12: bunker by explosives (already considered under section A). This is to include [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:13:3.18 Place the required explosives, stem and connect them together using [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:13:3.19 All explosive materials will be placed on the day that they are delivered to the [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:13: site. No unplaced explosives will be stored on the site overnight. [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:13:3.20 The quantity of explosives required for each shot hole is based on the ratio of [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:13: the volume of concrete to be displaced with respect to explosive charge [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:13: concrete section is achieved. The explosives engineer will also consider a [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:19:4.2 In accordance with the recommendations of BS5607, Safe Use of Explosives [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:19:4.3 Prior to the explosive engineer approaching the structure the non-electric [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:19: explosives engineer will carry out a check on main line connectors from the [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:19: firing point to the charge positions. This will enable the explosives engineer [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:19: to identify the failed element(s) of the explosives system. Failed connectors [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:19: checked to establish if any explosive charges have failed to have detonated. [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:19: explosives. [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:19: • Any attempt to detonate the remaining explosive charges may necessitate [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:19: an increased exclusion zone due to loss of protection / explosive charge [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:19: effectively displaced by the explosive charges. The location of such supports [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:19: explosively or mechanically in consideration of the safest means available. [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:20: misfire has occurred then the explosives engineer is to carefully inspect the [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:20: the explosives engineer to carefully spread out the debris from the area of the [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:20: miss fire so that this can be further inspected by the explosives engineer. [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:20:4.14 Only once the explosives engineer is satisfied that all explosives have been [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:22: 6. Placement of explosives Injury and damage from High All property and personnel Med High Correct and careful handling of Med [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:22: premature detonation due to (3) around work area (2) (6) explosives in accordance with BS (3) [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:22: explosives Machine movements to be supervised [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:22: Adsorption of NG by explosives engineers when in close [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:22: compounds proximity to explosive charges. Use [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:23: 11. Detonation of Explosives Noise, Dust, Flying debris / High All personnel within exclusion Med High Personnel out side of the exclusion Med [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:24: appropriate explosive charge weight. [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:24: 13. Plugging explosively charged Cut, trapped and grazed Med Explosives engineers Med High When stemming shot holes with clay Med [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:26:6.4 The work on site will be carried out by an assistant explosive engineer [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:26: the job and handling explosives in a suitable manner. [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:26: n) Assist the Explosives Engineer with the transport of explosives, [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:27:6.5 The Assistant Explosives Engineer will be a person who has been trained [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:27: in the handling of explosives. They will also be trained to operate Mobile [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:27: of 2 years’ experience of working within the explosives demolition [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:28:Method Statement for the Controlled Explosive Demolition of Dorman Long [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Officer Report(1).pdf|R-2021-0728-PND-Officer Report(1).pdf]]:2: Impact on health of dust from explosion [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Officer Report(1).pdf|R-2021-0728-PND-Officer Report(1).pdf]]:2:Company Ltd who are the explosives engineers on behalf of the demolition [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Officer Report(1).pdf|R-2021-0728-PND-Officer Report(1).pdf]]:3:of the tower. The tower is to be demolished by way of controlled explosion. [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Officer Report(1).pdf|R-2021-0728-PND-Officer Report(1).pdf]]:4:directed by the explosive engineer. [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Officer Report(1).pdf|R-2021-0728-PND-Officer Report(1).pdf]]:4:bunker by explosives (already considered under section A). This is to include [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Officer Report(1).pdf|R-2021-0728-PND-Officer Report(1).pdf]]:5:Place the required explosives, stem and connect them together using [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Officer Report(1).pdf|R-2021-0728-PND-Officer Report(1).pdf]]:5:All explosive materials will be placed on the day that they are delivered to the [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Officer Report(1).pdf|R-2021-0728-PND-Officer Report(1).pdf]]:5:site. No unplaced explosives will be stored on the site overnight. [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Officer Report(1).pdf|R-2021-0728-PND-Officer Report(1).pdf]]:5:The quantity of explosives required for each shot hole is based on the ratio of [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Officer Report(1).pdf|R-2021-0728-PND-Officer Report(1).pdf]]:5:the volume of concrete to be displaced with respect to explosive charge [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Officer Report(1).pdf|R-2021-0728-PND-Officer Report(1).pdf]]:5:concrete section is achieved. The explosives engineer will also consider a [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf|R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf]]:2: the building is intended to be taken down by using explosives [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf|R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf]]:2: 4. Is it intended to halt all train services during the explosion/s? [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HSE.pdf|R-2023-0179-SCP-HSE.pdf]]:2:5. The development is not located within a safeguarding zone of an explosives site licensed under the Explosives [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HSE.pdf|R-2023-0179-SCP-HSE.pdf]]:2:Chemicals Explosives Microbiological Hazards Division 5B [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:101: the sites to each other. These risks include, but are not limited to: fire, explosion, [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:103: could result in a fire and/ or explosion. [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:105: fire and explosion. These are credible accident scenarios which have a low [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:147: Ordnance (UXO) Potential for a major construction incident such as fire or explosion to have an impact at neighbouring [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:147: Explosion Y The accidental release of flammable substances could result in an explosion if the gas accumulates prior to [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:147: internal explosion or deflagration. These scenarios could result in significant harm to people onsite and [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-SCOPING OPINION DECISION.pdf|R-2023-0179-SCP-SCOPING OPINION DECISION.pdf]]:21:5. The development is not located within a safeguarding zone of an explosives site licensed [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-SCOPING OPINION DECISION.pdf|R-2023-0179-SCP-SCOPING OPINION DECISION.pdf]]:21:under the Explosives Regulations 2014 or the Dangerous Goods in Harbour Area Regulations [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-Consultee Response - CATS Pipeline(1).pdf|R-2023-0179-SCP-Consultee Response - CATS Pipeline(1).pdf]]:11: 36” Gas Pipeline Explosion, North Texas June 7, 2010 [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:10: explosive ground gas accumulation are also highlighted with the built environment identified as [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:34: properties (e.g. explosion). Vapour inhalation of volatile contaminants has been assessed [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-VOL 2 CHAPTER H.pdf|R-2020-0819-ESM-VOL 2 CHAPTER H.pdf]]:37: therefore considered to be explosion from UXO, land instability and risk from contamination. [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf|R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf]]:52: geomorphological significance, geotechnical constraints and the potential for explosive ground [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF]]:39: explosions Infrastructure. Lightning could [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF]]:40: e/Seismic explosions accident and damage to site [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF]]:40: Fire and/or Natural gas – loss Fire and/or explosion could Not N/A N/A [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF]]:40: explosion of gas from result in significant harm, up to relevant. [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF]]:40: impact injuries from explosions. [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF]]:11: accidents associated with the hazardous installations, including explosions, could have [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF]]:43: explosions and cause [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF]]:44: ic event. explosions of significant [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF]]:9: potential for explosive ground gas accumulation are also highlighted with the built environment [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF]]:29: well as onsite and offsite properties (e.g. explosion). Based on available data, no volatile [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF]]:31: therefore considered to be explosion from UXO, land instability and risk from contamination. [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF]]:32: main risk from explosions is to Construction Workers and off-site human health receptors. [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF]]:11: accidents associated with the hazardous installations, including explosions, could have [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:6: asphyxiation) and ‘Moderate to Very High’ to onsite and offsite properties (e.g. explosion). Given [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:51: explosive Closest NIHHS is a historical site located 85m southeast of the area. [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:68: explosive substances Company: British Steel Corporation Ltd [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:94: Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:94: Landfills Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF|R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF]]:220: Part 2A, if value or major damage to Explosion, causing building [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF|R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF]]:15: confined spaces leading to asphyxiation and/or explosion is considered potentially active.