{include:Teesworks - keywords - menu} [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf|EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf]]:13:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf|EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf]]:13:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf|EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf]]:13:Russian Map - Slice G [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf|EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf]]:14:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf|EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf]]:14:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf|EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf]]:14:Russian Map - Slice G [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf|EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf]]:17:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf|EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf]]:17:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf|EN010103-001098-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 7 EC1_G.pdf]]:17:Russian Map - Slice G [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf|EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf]]:85: demand following the COVID-19 pandemic, compounded by the Russian invasion of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf|EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf]]:12: quickly to the Russian sanctions put in place [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf|EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf]]:30:pursuing our strategic objectives – our risk dependence on Russian energy and developing [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:7:For information on the Russian-Ukrainian conflict and the situation of the Company at March 24, 2022, refer to Item 5. – 5.6 starting on [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:22:5.6 Russian-Ukrainian conflict - Situation of the Company at March 24, 2022 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:22:for managing its Russian related business: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:22:TotalEnergies is a minority shareholder in a number of non-state-owned Russian companies: Novatek (19.4%), Yamal LNG (20%), Arctic [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:23: Do not reverse the purpose of sanctions against Russia: do not unwarrantedly transfer value to Russian interests by [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:23:The current environment of European sanctions and Russian laws controlling foreign investments in Russia would prevent TotalEnergies [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:23:to find a non-Russian buyer for its minority interests in Russia. Abandoning these interests without consideration would enrich Russian [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:23:In accordance with the European Union's decisions to maintain at this stage Russian gas supplies, TotalEnergies continues to supply [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:23:Europe's governments consider that Russian gas is necessary. Contrary to oil, it is apparent that Europe's gas logistics capacities make it [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:23:difficult to refrain from importing Russian gas in the next two to three years without impacting the continent's energy supply. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:23:has unilaterally decided to no longer enter into or renew contracts to purchase Russian oil and petroleum products, in order to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:23:halt all its purchases of Russian oil and petroleum products as soon as possible and by the end of 2022 at the latest. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:23:TotalEnergies already announced that it halted all spot market trading since February 25, 2022, on Russian oil and petroleum products. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:23:This is also the case for spot trading transactions concerning Russian natural gas or liquefied natural gas. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:24:TotalEnergies has term contracts to purchase Russian oil and petroleum products that end, at the very latest, on December 31, 2022. These [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:24:They also concern Europe's gasoil supply, which is short of this product (around 12% of Russian gasoil imports in Europe in 2021). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:24:In close cooperation with the German government, TotalEnergies will terminate its Russian oil supply contracts for the Leuna refinery as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:24:terminate its Russian gasoil purchase contracts as soon as possible and by the end of 2022 at the latest. TotalEnergies will import petroleum [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:24:measures targeting Russian and Belarusian persons and entities, as well as the financial sector. The production and sale of gas and LNG [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:24:adopted as of the date hereof. Depending on the developments of the Russian-Ukrainian conflict and the measures that the European and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:24:Russian individuals and entities, as well as restrictions on investments, financings, exports and the re-exportation of certain goods towards [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:24:sanctions designate a number of Russian individuals and entities whose assets within the European Union are frozen and to whom it is [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:24:a ban on access to SWIFT for certain Russian institutions), and issued export restrictions in certain sectors or for certain types of goods [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:24:In addition, the restrictions and sanctions imposed by the EU authorities against the Russian financial sector make it more difficult for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:24:by the Russian authorities as of February 2022, financial flows to foreign shareholders are subject to the approval of the Russian Central [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:24:Bank. This restriction, and other countermeasures that may be issued by the Russian authorities in the future, could make it more difficult [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:24:granted by TotalEnergies. An analysis of the consequences of the Russian countermeasures is underway. Some Russian banks involved [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:24:processing of transactions involving them. The Russian lender financings to the Yamal LNG project are guaranteed by the export credit [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:24:tightening with the worsening Russian-Ukrainian conflict, TotalEnergies decided to no longer book proved reserves for the Arctic LNG 2 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:25:products and Liquefied Natural Gas of Russian origin into the United States, and prohibit US persons from making new investments in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:25:Russian energy projects, or from financing new investments in Russian energy projects by non-US companies. These sanctions do not [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:25:1 A Russian company listed on the Moscow and London stock exchanges and in which TotalEnergies held an interest of 19.4% as of December 31, 2021. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:125:Russian-Ukrainian conflict [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:125:measures targeting Russian and Belarusian persons and entities, as well as the financial sector. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:125:Depending on the developments of the Russian-Ukrainian conflict and the measures that the European and American authorities could be [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:187: (19.4% as of December 31, 2021), a Russian company listed on the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:197: (CNODC), a subsidiary of CNPC. TotalEnergies holds a 19.4% interest in PAO Novatek, a company incorporated under Russian law and listed in Moscow and London [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:205: – the award of a contract by KSC Group, a Russian rail systems cutting-edge R&D, notably provided by Saft. In September 2021, ACC [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:253:In addition to particularly heavy financial sanctions, the breaching of Russian individuals and entities, including various entities operating in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:254: measures targeting Russian and Belarusian persons and entities, as well asset management and that it will no longer provide capital for new [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:254: hereof. Depending on the developments of the Russian-Ukrainian conflict LNG 2 project under construction. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:254: (1) A Russian company listed in Moscow and London, in which TotalEnergies held a 19.4% stake as of December 31, 2021. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:256: (1) A Russian company listed in Moscow and London, in which TotalEnergies held a 19.4% interest as of December 31, 2021 (the maximum limit specified in the initial 2011 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:257:measures targeting Russian and Belarusian persons and entities, as well designate a number of Russian individuals and entities whose assets [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:257:the date hereof. Depending on the developments of the Russian- SWIFT for certain Russian institutions), and issued export restrictions in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:257:Russian individuals and entities, as well as restrictions on investments, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:258: against the Russian financial sector make it more difficult for financial [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:258: the Russian authorities as of February 2022, financial flows to foreign [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:258: shareholders are subject to the approval of the Russian Central Bank. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:258: worsening Russian-Ukrainian conflict, TotalEnergies decided to no longer [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:258: Russian authorities in the future, could make it more difficult for PAO [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:258: TotalEnergies. An analysis of the consequences of the Russian The United States has since 2014 adopted various economic sanctions, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:258: countermeasures is underway. Some Russian banks involved in the some of which target the company PAO Novatek(1), and the entities in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:258: of transactions involving them. The Russian lender financings to the providing financing for or other dealings in debt issued by such entities of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:258: American asset freeze lists: Vnesheconombank and Otkritie, whose and Liquefied Natural Gas of Russian origin into the United States, and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:258: outstanding amounts are €400 million and €385 million respectively and prohibit US persons from making new investments in Russian energy [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:258: Arctic LNG 2 replaced them with Gazprombank in accordance with the projects, or from financing new investments in Russian energy projects [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:258: (1) A Russian company listed on the Moscow and London stock exchanges and in which TotalEnergies held an interest of 19.4% as of December 31, 2021. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:307: Commission on Economics and Climate and the Global Commission – Ms. Marina Delendik, a Russian national, was designated by the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:2:DISRUPTION IN RUSSIAN GAS SUPPLIES TO EUROPE”, FEBRUARY 2022 ........................................................................................... 18 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:9: “The Potential Impact on the UK of a Disruption in Russian Gas Supplies to Europe”, Jack Sharples , Katja Yafimava , Jonathan Stern , Mike [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:18: “THE POTENTIAL IMPACT ON THE UK OF A DISRUPTION IN RUSSIAN GAS [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:48: in Russian Heading [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:48: The geopolitical tensions between Russia and Europe over the build-up of Russian troops on the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:48: Ukrainian border have generated concerns over the extent of Europe’s reliance on Russian natural gas. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:48: There are fears that the supply of Russian gas to Europe could be disrupted, although for the reasons [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:48: possible consequences for the UK if such a disruption in Russian supplies to Europe were to occur. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:48: We begin by considering the potential triggers for a disruption in Russian pipeline gas supplies to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:48: triggers. In the second section, we examine the level of UK dependency on Russian gas, and place this [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:48: dependency in the context of broader European dependence on Russian gas. In the third section, we [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:48: winter. As a consequence, UK concern over the potential for an interruption to Russian gas supplies to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:48: There are three potential reasons for a disruption in Russian gas supplies to Europe, each of which [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:48: carries different implications for the potential extent of curtailment of Russian gas supplies to Europe. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:49:The first is the possibility of European and American sanctions against Russian gas exports (similar to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:49:those imposed on Iranian oil exports1). At present such sanctions against the purchase of Russian gas [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:49:A second possibility is the Russian government responding to Western sanctions by suspending the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:49:sale of Russian gas to Europe, forcing Gazprom to breach its long-term contracts with its European [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:49:accounted for just over 6 per cent of Russian federal budget revenues in 2021, exports beyond the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:49:to the Russian federal budget. However, if the Russian government were to suspend natural gas exports [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:49:of all Russian hydrocarbons would doubt the reliability of such supplies and begin to seek alternatives. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:49:Given the large share of Russia in European gas imports, such a displacement of Russian supplies in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:49: Ministry of Finance of the Russian Federation, 2021. Ежемесячная информация об исполнении федерального бюджета. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:49: Ministry of Finance of the Russian Federation. (2021). Информация о дополнительных нефтегазовых доходах [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:50:pipelines that cross Ukraine to bring Russian gas to Europe. The two major pipelines that enter Ukraine [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:50:While the first scenario would suggest that all Russian gas flows to Europe remain as normal but that [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:50:Russian gas flows to Europe (both via pipelines and in the form of LNG), and the third scenario would [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:50:imply localised disruption only to the flow of Russian gas via Ukraine. These scenarios, and the possible [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:50:impact of a partial or complete curtailment of Russian gas supplies on the European market were [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:50:that we consider it unlikely that a physical curtailment of Russian pipeline supplies to Europe would [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:50:How dependent are Europe and the UK on Russian gas? [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:50:European supply and Russian LNG deliveries accounting for a further 4 per cent. 13 14 Therefore, natural [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:55:Overall, UK dependence on Russian gas supplies is limited. The UK has no direct pipeline connection [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:55:bcm) in 2021, meaning that Russian LNG accounted for 4 per cent of total UK gas supply in 2021. 37 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:55:However, any disruption in Russian pipeline gas deliveries to the European market would almost [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:56:How would the UK be impacted by a disruption in Russian gas supplies to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:56:As we discussed in the most recent OIES Quarterly Gas Review, 38 any disruption to Russian pipeline [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:56:would be lower than in 2021 (due to loss of Russian supply and the inability of other pipeline suppliers [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:58:were to be the situation when a disruption of Russian supplies to that market occurs, the only way to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:58:months.42 Therefore, even if a disruption in Russian supplies to North-Western Europe were to occur [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:58:grid operated at around two-thirds of capacity, a new record. If the interruption in Russian supplies to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:59:Western Europe, due to lower Russian flows to the region (particularly on the Yamal-Europe pipeline [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:59:NBP – is likely to persist as long as Russian physical flows to the region remain lower than usual. In [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:59:of a curtailment in Russian physical flows to North-Western Europe, with the UK importing more LNG [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:59:spot market to other European import terminals. For example, if a localised disruption in Russian gas [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:59:supplies to Europe via Ukraine impacted deliveries of Russian gas to northern Italy, prices on the Italian [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:59:was broader and affected Russian deliveries via non-Ukrainian routes as well, attempts to attract LNG [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:59:In such a dramatic context – the substantial curtailment of all Russian pipeline gas flows to Europe at [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:61:If a disruption to Russian gas supplies to Europe were to occur, especially before the end of the present [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:61:in other European markets, despite the UK not being directly dependent on Russian pipeline gas [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:62:and potential impacts on Russian gas supplies to Europe, and by extension the impact on the UK, will [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:63:This paper began by setting out possible triggers for a disruption in Russian pipeline gas supplies to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:63:Nord Stream 2 through a curtailment of Russian supplies via Ukraine, to a complete cessation of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:63:Russian supplies to Europe. A key point is that the outbreak of a military conflict in Ukraine is highly [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:63:A second key point of this paper is that while the UK is seemingly removed from concerns over Russian [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:63:pipeline supply, and LNG imports, any disruption to Russian supplies to the European market will [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:63:event of a sustained curtailment in physical flows of Russian pipeline gas to North-Western Europe. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:63:peaks of its winter demand. Therefore, the tightening of the market due to a disruption in Russian [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:63:May 2017 and May 2021. If a military conflict does lead to a disruption of Russian supplies to Europe, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf|EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf]]:11:made swift decisions to stop trading Russian oil and investments into Russia and has started the process of exiting the company’s joint [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf|EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf]]:18:May. Demand rose while Opec and Russian supply remained in 4Q 2021. Refinery intake only rose by 4.5 million barrels per [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf|EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf]]:19:2021 when Russian pipeline supply via the Yamal-Europe route allowance prices was driven by several factors, including 1) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf|EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf]]:23:• Production 7 for 2022 is estimated to be around 2% above start the process of exiting our Russian joint ventures represent [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf|EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf]]:100:including certain incidents in 2021, see section 2.14 Safety, Russian businesses and will start the process of exiting its joint [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf|EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf]]:100: book value of Equinor’s Russian assets and lead to impairment. It [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf|EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf]]:105:trade restrictions and sanctions targeting Russian sectors, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf|EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf]]:326: Treasury of the Russian Federation - - - - - 99.1 1.4 99.1 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf|EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf]]:349:the United States; our intention to exit our Russian joint ventures; [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf|EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf]]:2: Russian Military Mapping Legends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf|EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf]]:2: Russian Map - Slice G [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf|EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf]]:11:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf|EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf]]:11:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf|EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf]]:11:Russian Map - Slice G [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf|EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf]]:13:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf|EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf]]:13:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf|EN010103-001070-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 17 EC2_G.pdf]]:13:Russian Map - Slice G [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001095-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 4 EC1_D.pdf|EN010103-001095-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 4 EC1_D.pdf]]:2: Russian Military Mapping Legends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001095-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 4 EC1_D.pdf|EN010103-001095-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 4 EC1_D.pdf]]:2: Russian Map - Slice D [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001095-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 4 EC1_D.pdf|EN010103-001095-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 4 EC1_D.pdf]]:15:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001095-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 4 EC1_D.pdf|EN010103-001095-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 4 EC1_D.pdf]]:15:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001095-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 4 EC1_D.pdf|EN010103-001095-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 4 EC1_D.pdf]]:15:Russian Map - Slice D [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001095-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 4 EC1_D.pdf|EN010103-001095-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 4 EC1_D.pdf]]:19:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001095-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 4 EC1_D.pdf|EN010103-001095-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 4 EC1_D.pdf]]:19:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001095-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 4 EC1_D.pdf|EN010103-001095-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 4 EC1_D.pdf]]:19:Russian Map - Slice D [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001072-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 19 EC2_I.pdf|EN010103-001072-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 19 EC2_I.pdf]]:2: Russian Military Mapping Legends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001072-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 19 EC2_I.pdf|EN010103-001072-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 19 EC2_I.pdf]]:2: Russian Map - Slice I [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001072-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 19 EC2_I.pdf|EN010103-001072-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 19 EC2_I.pdf]]:13:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001072-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 19 EC2_I.pdf|EN010103-001072-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 19 EC2_I.pdf]]:13:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001072-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 19 EC2_I.pdf|EN010103-001072-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 19 EC2_I.pdf]]:13:Russian Map - Slice I [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001072-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 19 EC2_I.pdf|EN010103-001072-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 19 EC2_I.pdf]]:15:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001072-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 19 EC2_I.pdf|EN010103-001072-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 19 EC2_I.pdf]]:15:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001072-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 19 EC2_I.pdf|EN010103-001072-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 19 EC2_I.pdf]]:15:Russian Map - Slice I [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf|EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf]]:2: Russian Military Mapping Legends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf|EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf]]:2: Russian Map - Slice C [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf|EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf]]:14:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf|EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf]]:14:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf|EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf]]:14:Russian Map - Slice C [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf|EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf]]:16:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf|EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf]]:16:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf|EN010103-001094-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 3 EC1_C.pdf]]:16:Russian Map - Slice C [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf|EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf]]:2: Russian Military Mapping Legends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf|EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf]]:2: Russian Map - Slice F [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf|EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf]]:14:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf|EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf]]:14:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf|EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf]]:14:Russian Map - Slice F [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf|EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf]]:15:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf|EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf]]:15:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf|EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf]]:15:Russian Map - Slice F [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf|EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf]]:19:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf|EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf]]:19:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf|EN010103-001097-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 6 EC1_F.pdf]]:19:Russian Map - Slice F [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf|EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf]]:2: Russian Military Mapping Legends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf|EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf]]:2: Russian Map - Slice B [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf|EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf]]:9:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf|EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf]]:9:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf|EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf]]:9:Russian Map - Slice B [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf|EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf]]:13:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf|EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf]]:13:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf|EN010103-001101-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 10 EC2_B.pdf]]:13:Russian Map - Slice B [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf|EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf]]:2: Russian Military Mapping Legends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf|EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf]]:2: Russian Map - Slice H [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf|EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf]]:14:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf|EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf]]:14:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf|EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf]]:14:Russian Map - Slice H [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf|EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf]]:15:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf|EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf]]:15:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf|EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf]]:15:Russian Map - Slice H [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf|EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf]]:17:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf|EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf]]:17:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf|EN010103-001071-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 18 EC2_H.pdf]]:17:Russian Map - Slice H [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:81:during 2015-2017. Kerry previously ran HR in bp’s Russian joint venture TNK-BP and settling Deepwater [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:164:that the group has significant influence over Rosneft Oil Company (Rosneft), a Russian oil and gas company is significant. As a consequence of this [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:164:Russian government. At 31 December 2020, Rosneftegaz held 40.4% (2019 50% plus one share) of the voting shares of Rosneft . IFRS identifies [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:195:on the London Stock Exchange. Rosneft’s largest shareholder is Rosneftegaz JSC (Rosneftegaz), which is wholly owned by the Russian government. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:195:other entities within Note 1 for further information. The group’s investment in Rosneft is a foreign operation whose functional currency is the Russian [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:195:the government of the Russian Federation. In consideration, Rosneft received shares equal to a 9.6% share of its own equity. The shares are held by a [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:196: retranslation of borrowings denominated in currencies other than the Russian rouble and designated as hedging instruments were recognized initially in other comprehensive income, and were [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:222: Principally foreign exchange effects relating to the Russian rouble. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:224: Principally foreign exchange effects relating to the Russian rouble. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:282:BP Russian Investments Lim ted Chertsey Road, Sunbury on Thames, Middlesex, TW16 7BP, Un ted Kingdom [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:282:BP Russian Ventures Lim ted Chertsey Road, Sunbury on Thames, Middlesex, TW16 7BP, Un ted Kingdom [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:285:Lim ted Liability Company BP Toplivnaya Kompaniab Novinskiy blvd.8, 17th floor, premises 11, 121099, Moscow, Russian Federation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:286:OOO BP STLb Novinskiy blvd.8, 18th floor, office 14, 121099, Moscow, Russian Federation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:292:Lensky Nefteprovod Lim ted Liability Company (20.00%) Pervomayskaya str, 32a, Republic of Saha (Yakytya), 678144, c ty of Lensk, Lenskiy region, Russian Federation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:298:Lim ted Liability Company TYNGD (20.00%)b Pervomayskaya street, 32A, 678144, Lensk, Sakha (Yakutiya) Republic, Russian Federation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:298:Lim ted Liability Company Yermak Neftegaz (49.00%)b Kosmodamianskaya nab, 52/3, 115035, Moscow, Russian Federation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:298:LLC "Kharampurneftegaz" (49.00%)b 629830 Yamalo-Nenetskiy Anatomy Region, c ty of Gubkinskiy, Russian Federation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:299:Rosneft Oil Company (19.75%) 26/1 Sofiyskaya Embankment, 115035, Moscow, Russian Federation, Russian Federation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:300:Srednelenskoye Limited Liability Company (49 00%) Kosmodamianskaya embarkment, 52 bldg 3, floor 9, un t 29, 115035, Moscow, Russian Federation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:322:Rosneft is the leading Russian refining company based on throughput. It • Sustainable development and social investment, including biodiversity. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:322:wholly owned by the Russian government. At 31 December 2020, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:322:by the government of the Russian Federation. In consideration, it received [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:327: inhibited ratification of the International Convention on Liability and the Russian economy (energy, finance and defence/military) and on [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:327: low sulphur emissions requirements while continuing to use higher provision of goods and services for Russian energy export pipelines. As of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:327: the sulphur oxides Emissions Control Areas established by the IMO. imposed Russian-related sanctions, which are broadly similar to existing [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:88:noted that there was evidence on the ground indicating the presence of complex cyanides (“Prussian Blue”/“Blue [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:239:Cyanide 150 mg/kg for industrial use (human health) boundary of the site indicates presence of complex cyanides (Prussian Blue / Blue [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:253:complex cyanides (Prussian Blue / Blue Billy). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:71:Stream underwater pipeline linking the Russian coast to the Turkish coast of the Black Sea. These assets generate a [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:129:out the possibility that wider sanctions targeting the Russian ply contracts [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:129:ted. Further sanctions imposed on Russia, Russian citizens Eni is currently party to a few long-term gas supply contracts [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:129:or Russian companies by the international community, such with state-owned companies of key producing Countries, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:129:as restrictions on purchases of Russian gas by European from where most of the gas supplies directed to Europe are [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:129:companies or measures restricting dealings with Russian sourced via pipeline (Russia, Algeria, Libya and Norway). The- [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf|EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf]]:8:TAKING We also decided to withdraw from involvement in all Russian [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf|EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf]]:8: Russian and Ukrainian colleagues worked together to respond to events. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf|EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf]]:8:Gazprom, a majority Russian-government-owned business, and related [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf|EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf]]:18:strengthen the balance sheet. to withdraw from our involvement in all Russian hydrocarbons in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf|EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf]]:25: recent Russian invasion of Ukraine, economic conditions, including inflation, and actions by major oil- against weak market prices. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf|EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf]]:28: in all Russian hydrocarbons, including crude oil, petroleum [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf|EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf]]:28: company will stop all spot purchases of Russian crude oil. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf|EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf]]:36: trade bans, designations of entities (including Russian banks and state-owned entities) and individuals increased focus on compliance and assurance. For example, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf|EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf]]:36: to financial systems. Export controls have also been introduced targeting Russian defence, aerospace, compliance with trade controls in high-risk areas such as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf|EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf]]:36: also implemented new sanctions against Belarus for its role in the Russian invasion. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf|EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf]]:164:Shell announced its intention to withdraw from its involvement in all Russian hydrocarbons in a phased manner, including shut its service stations, aviation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf|EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf]]:286:Subsequently, on March 8, 2022, Shell announced its intent to withdraw from its involvement in all Russian hydrocarbons, including crude oil, petroleum [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf|EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf]]:286:Russian crude oil. It will also shut its service stations, aviation fuels and lubricants operations in Russia. At the end of 2021, Shell had around $0.4 billion [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf|EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf]]:2: Russian Military Mapping Legends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf|EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf]]:2: Russian Map - Slice D [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf|EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf]]:9:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf|EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf]]:9:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf|EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf]]:9:Russian Map - Slice D [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf|EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf]]:12:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf|EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf]]:12:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf|EN010103-001066-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 13 EC2_D.pdf]]:12:Russian Map - Slice D [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf|EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf]]:2: Russian Military Mapping Legends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf|EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf]]:2: Russian Map - Slice H [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf|EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf]]:17:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf|EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf]]:17:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf|EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf]]:17:Russian Map - Slice H [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf|EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf]]:18:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf|EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf]]:18:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf|EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf]]:18:Russian Map - Slice H [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf|EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf]]:21:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf|EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf]]:21:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf|EN010103-001099-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 8 EC1_H.pdf]]:21:Russian Map - Slice H [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf|EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf]]:2: Russian Military Mapping Legends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf|EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf]]:2: Russian Map - Slice F [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf|EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf]]:17:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf|EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf]]:17:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf|EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf]]:17:Russian Map - Slice F [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf|EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf]]:18:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf|EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf]]:18:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf|EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf]]:18:Russian Map - Slice F [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf|EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf]]:21:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf|EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf]]:21:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf|EN010103-001069-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 16 EC2_F.pdf]]:21:Russian Map - Slice F [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf|EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf]]:2: Russian Military Mapping Legends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf|EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf]]:2: Russian Map - Slice B [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf|EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf]]:15:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf|EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf]]:15:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf|EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf]]:15:Russian Map - Slice B [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf|EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf]]:18:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf|EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf]]:18:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf|EN010103-001093-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 2 EC1_B.pdf]]:18:Russian Map - Slice B [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002029-Environment Agency - Comments on any other information submitted at Deadline 5.pdf|EN010103-002029-Environment Agency - Comments on any other information submitted at Deadline 5.pdf]]:7: clarification around the presence of cyanide (Prussian blue / blue billy) in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001068-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 15 EC2_E.pdf|EN010103-001068-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 15 EC2_E.pdf]]:2: Russian Military Mapping Legends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001068-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 15 EC2_E.pdf|EN010103-001068-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 15 EC2_E.pdf]]:2: Russian Map - Slice E [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001068-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 15 EC2_E.pdf|EN010103-001068-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 15 EC2_E.pdf]]:11:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001068-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 15 EC2_E.pdf|EN010103-001068-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 15 EC2_E.pdf]]:11:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001068-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 15 EC2_E.pdf|EN010103-001068-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 15 EC2_E.pdf]]:11:Russian Map - Slice E [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001068-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 15 EC2_E.pdf|EN010103-001068-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 15 EC2_E.pdf]]:13:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001068-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 15 EC2_E.pdf|EN010103-001068-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 15 EC2_E.pdf]]:13:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001068-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 15 EC2_E.pdf|EN010103-001068-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 15 EC2_E.pdf]]:13:Russian Map - Slice E [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf|EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf]]:2: Russian Military Mapping Legends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf|EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf]]:2: Russian Map - Slice A [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf|EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf]]:13:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf|EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf]]:13:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf|EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf]]:13:Russian Map - Slice A [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf|EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf]]:15:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf|EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf]]:15:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf|EN010103-001092-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 1 EC1_A.pdf]]:15:Russian Map - Slice A [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf|EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf]]:82: demand following the COVID-19 pandemic, compounded by the Russian invasion of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf|EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf]]:2: Russian Military Mapping Legends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf|EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf]]:2: Russian Map - Slice A [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf|EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf]]:14:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf|EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf]]:14:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf|EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf]]:14:Russian Map - Slice A [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf|EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf]]:17:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf|EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf]]:17:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf|EN010103-001100-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 9 EC2_A.pdf]]:17:Russian Map - Slice A [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf|EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf]]:2: Russian Military Mapping Legends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf|EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf]]:2: Russian Map - Slice E [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf|EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf]]:11:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf|EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf]]:11:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf|EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf]]:11:Russian Map - Slice E [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf|EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf]]:12:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf|EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf]]:12:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf|EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf]]:12:Russian Map - Slice E [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf|EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf]]:15:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf|EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf]]:15:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf|EN010103-001096-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 5 EC1_E.pdf]]:15:Russian Map - Slice E [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:6:For information on the Russian-Ukrainian conflict and the situation of the Company at March 24, 2022, refer to Item 5. – 5.6 starting on [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:21:5.6 Russian-Ukrainian conflict - Situation of the Company at March 24, 2022 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:21:for managing its Russian related business: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:21:TotalEnergies is a minority shareholder in a number of non-state-owned Russian companies: Novatek (19.4%), Yamal LNG (20%), Arctic [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:22: Do not reverse the purpose of sanctions against Russia: do not unwarrantedly transfer value to Russian interests by [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:22:The current environment of European sanctions and Russian laws controlling foreign investments in Russia would prevent TotalEnergies [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:22:to find a non-Russian buyer for its minority interests in Russia. Abandoning these interests without consideration would enrich Russian [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:22:In accordance with the European Union's decisions to maintain at this stage Russian gas supplies, TotalEnergies continues to supply [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:22:Europe's governments consider that Russian gas is necessary. Contrary to oil, it is apparent that Europe's gas logistics capacities make it [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:22:difficult to refrain from importing Russian gas in the next two to three years without impacting the continent's energy supply. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:22:has unilaterally decided to no longer enter into or renew contracts to purchase Russian oil and petroleum products, in order to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:22:halt all its purchases of Russian oil and petroleum products as soon as possible and by the end of 2022 at the latest. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:22:TotalEnergies already announced that it halted all spot market trading since February 25, 2022, on Russian oil and petroleum products. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:22:This is also the case for spot trading transactions concerning Russian natural gas or liquefied natural gas. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:23:TotalEnergies has term contracts to purchase Russian oil and petroleum products that end, at the very latest, on December 31, 2022. These [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:23:They also concern Europe's gasoil supply, which is short of this product (around 12% of Russian gasoil imports in Europe in 2021). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:23:In close cooperation with the German government, TotalEnergies will terminate its Russian oil supply contracts for the Leuna refinery as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:23:terminate its Russian gasoil purchase contracts as soon as possible and by the end of 2022 at the latest. TotalEnergies will import petroleum [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:23:measures targeting Russian and Belarusian persons and entities, as well as the financial sector. The production and sale of gas and LNG [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:23:adopted as of the date hereof. Depending on the developments of the Russian-Ukrainian conflict and the measures that the European and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:23:Russian individuals and entities, as well as restrictions on investments, financings, exports and the re-exportation of certain goods towards [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:23:sanctions designate a number of Russian individuals and entities whose assets within the European Union are frozen and to whom it is [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:23:a ban on access to SWIFT for certain Russian institutions), and issued export restrictions in certain sectors or for certain types of goods [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:23:In addition, the restrictions and sanctions imposed by the EU authorities against the Russian financial sector make it more difficult for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:23:by the Russian authorities as of February 2022, financial flows to foreign shareholders are subject to the approval of the Russian Central [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:23:Bank. This restriction, and other countermeasures that may be issued by the Russian authorities in the future, could make it more difficult [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:23:granted by TotalEnergies. An analysis of the consequences of the Russian countermeasures is underway. Some Russian banks involved [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:23:processing of transactions involving them. The Russian lender financings to the Yamal LNG project are guaranteed by the export credit [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:23:tightening with the worsening Russian-Ukrainian conflict, TotalEnergies decided to no longer book proved reserves for the Arctic LNG 2 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:24:products and Liquefied Natural Gas of Russian origin into the United States, and prohibit US persons from making new investments in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:24:Russian energy projects, or from financing new investments in Russian energy projects by non-US companies. These sanctions do not [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:24:1 A Russian company listed on the Moscow and London stock exchanges and in which TotalEnergies held an interest of 19.4% as of December 31, 2021. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:124:Russian-Ukrainian conflict [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:124:measures targeting Russian and Belarusian persons and entities, as well as the financial sector. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:124:Depending on the developments of the Russian-Ukrainian conflict and the measures that the European and American authorities could be [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:186: (19.4% as of December 31, 2021), a Russian company listed on the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:196: (CNODC), a subsidiary of CNPC. TotalEnergies holds a 19.4% interest in PAO Novatek, a company incorporated under Russian law and listed in Moscow and London [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:204: – the award of a contract by KSC Group, a Russian rail systems cutting-edge R&D, notably provided by Saft. In September 2021, ACC [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:252:In addition to particularly heavy financial sanctions, the breaching of Russian individuals and entities, including various entities operating in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:253: measures targeting Russian and Belarusian persons and entities, as well asset management and that it will no longer provide capital for new [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:253: hereof. Depending on the developments of the Russian-Ukrainian conflict LNG 2 project under construction. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:253: (1) A Russian company listed in Moscow and London, in which TotalEnergies held a 19.4% stake as of December 31, 2021. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:255: (1) A Russian company listed in Moscow and London, in which TotalEnergies held a 19.4% interest as of December 31, 2021 (the maximum limit specified in the initial 2011 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:256:measures targeting Russian and Belarusian persons and entities, as well designate a number of Russian individuals and entities whose assets [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:256:the date hereof. Depending on the developments of the Russian- SWIFT for certain Russian institutions), and issued export restrictions in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:256:Russian individuals and entities, as well as restrictions on investments, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:257: against the Russian financial sector make it more difficult for financial [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:257: the Russian authorities as of February 2022, financial flows to foreign [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:257: shareholders are subject to the approval of the Russian Central Bank. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:257: worsening Russian-Ukrainian conflict, TotalEnergies decided to no longer [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:257: Russian authorities in the future, could make it more difficult for PAO [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:257: TotalEnergies. An analysis of the consequences of the Russian The United States has since 2014 adopted various economic sanctions, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:257: countermeasures is underway. Some Russian banks involved in the some of which target the company PAO Novatek(1), and the entities in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:257: of transactions involving them. The Russian lender financings to the providing financing for or other dealings in debt issued by such entities of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:257: American asset freeze lists: Vnesheconombank and Otkritie, whose and Liquefied Natural Gas of Russian origin into the United States, and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:257: outstanding amounts are €400 million and €385 million respectively and prohibit US persons from making new investments in Russian energy [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:257: Arctic LNG 2 replaced them with Gazprombank in accordance with the projects, or from financing new investments in Russian energy projects [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:257: (1) A Russian company listed on the Moscow and London stock exchanges and in which TotalEnergies held an interest of 19.4% as of December 31, 2021. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:306: Commission on Economics and Climate and the Global Commission – Ms. Marina Delendik, a Russian national, was designated by the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:174:three secondary establishments in France, located in Lacq, Pau and Novatek (19.4% as of December 31, 2020), a Russian company listed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:186: (2) PAO Novatek is a company incorporated under Russian law and listed in Moscow and London in which TOTAL holds a 19.40% interest. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:235:economic sanctions have been adopted against certain Russian – the award or denial of exploration and production interests; [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:235:(1) A Russian company listed in Moscow and London, in which the Group held a 19.4% stake as of December 31, 2020, which is the maximum limit specified in the initial 2011 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:237:(1) A Russian company listed in Moscow and London, in which the Group held a 19.4% stake as of December 31, 2020 (the maximum limit specified in the initial 2011 agreement [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:238: A) Cuba Russian individuals and entities, as well as restrictions on investments, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:238: (4) A Russian company listed on the Moscow and London stock exchanges and in which the Group held an interest of 19.4% as of December 31, 2020. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:89:1975 (Russian) ~NGR E:457258 N:525136 at the south east end of the main Steel Works main building of ‘27.64’ at ~NGR E:456847 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:89:1975 (Russian) changed form a north west orientation to a west-northwest subdivision of the area with flooding of some compartments is [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:89:EC2_G_10000_Ordnance Survey orientation. The area formerly occupied by the Redcar Iron & shown in 1991 (Russian) and 1992 mapping with a landing [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:94:1975 (Russian) possibly relocated / extended Slag and Tar Macadam Works is [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:95:1991 (Russian) Later mapping dated 1991 shows ponded water within and north [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:97:1975 (Russian) of the works join the improved rail link to the Redcar Jetty. A [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:97:1975 (Russian) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:97:1975 (Russian) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:97:EC2_F_10000_Middlesbrough - Russian mapping of 1975 shows significant reclamation of land [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:97:1975 (Russian) south of the Site with railways extending onto the former Marshes [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:98:1991 (Russian) open-hearth blast furnace used for making iron and the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:98:EC2_G_10000_Middlesbrough - Russian mapping from 1991 shows expansion of the Teesside [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:98:1991 (Russian) On the basis of 1999 aerial photography provided by Landmark [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:99:1991 (Russian) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:101:1975 (Russian) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:102:1991 (Russian) by 1984. The pipeline north of the railway is shown by 1984 as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:103:1975 (Russian) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:106:1975 (Russian) N:523700. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:107: Russian mapping dating from 1975 shows flooding between [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:109:EC1_G_10000_Middlesbrough - Russian mapping of 1975 shows the fully reclaimed area east of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:110: Ordnance Survey mapping as Works although the Russian [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:116: terminates at ~NGR E:455322 N:524128. Russian mapping from [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:116: Russian mapping shows several jetties on the estuary. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:116:Plan - 1981 - 1985 mapped in 1985, is similar to the 1975 Russian mapping apart [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:117:1991 Russian mapping dating 1991 shows tanks at the Teesport [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:121:EC2_G_10000_Middlesbrough - Russian mapping from 1975 shows a transitional phase for the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:121: however Russian mapping of 1991 shows the area to have [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:126:EC2_C_10000_Middlesbrough - Russian mapping dating 1975 shows significant industrial [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:127: indicated in Russian mapping, as well as a branch entering the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:221: oxide generated from gas purification containing complex cyanide “Prussian [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf|EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf]]:12:made swift decisions to stop trading Russian oil and investments into Russia and has started the process of exiting the company’s joint [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf|EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf]]:19:May. Demand rose while Opec and Russian supply remained in 4Q 2021. Refinery intake only rose by 4.5 million barrels per [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf|EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf]]:20:2021 when Russian pipeline supply via the Yamal-Europe route allowance prices was driven by several factors, including 1) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf|EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf]]:24:• Production 7 for 2022 is estimated to be around 2% above start the process of exiting our Russian joint ventures represent [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf|EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf]]:101:including certain incidents in 2021, see section 2.14 Safety, Russian businesses and will start the process of exiting its joint [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf|EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf]]:101: book value of Equinor’s Russian assets and lead to impairment. It [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf|EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf]]:106:trade restrictions and sanctions targeting Russian sectors, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf|EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf]]:327: Treasury of the Russian Federation - - - - - 99.1 1.4 99.1 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf|EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf]]:350:the United States; our intention to exit our Russian joint ventures; [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf|EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf]]:2: Russian Military Mapping Legends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf|EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf]]:2: Russian Map - Slice C [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf|EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf]]:15:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf|EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf]]:15:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf|EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf]]:15:Russian Map - Slice C [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf|EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf]]:19:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf|EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf]]:19:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf|EN010103-001102-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex C Part 11 EC2_C.pdf]]:19:Russian Map - Slice C [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf|EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf]]:5: Spent iron oxide generated from gas purification containing complex cyanide “Prussian Blue” may have been exported to a [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf|EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf]]:24: 1975 - • Ratten Lane and the two • Further commercial / Russian [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000194-EN010082-6.3.4-ES Annex D1-Phase 1 Final-November 2017.pdf|EN010082-000194-EN010082-6.3.4-ES Annex D1-Phase 1 Final-November 2017.pdf]]:12:1975 -  Ratten Lane and the two minor  Further commercial / industrial Russian [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf|EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf]]:104: Russian Military Mapping Legends [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf|EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf]]:104: Russian Map - Slice A [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf|EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf]]:111:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf|EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf]]:111:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf|EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf]]:111:Russian Map - Slice A [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf|EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf]]:115:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf|EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf]]:115:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf|EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf]]:115:Russian Map - Slice A [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:270: Russian Military Mapping Legends [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:270: Russian Map - Slice A [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:283:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:283:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:283:Russian Map - Slice A [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:287:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:287:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:287:Russian Map - Slice A [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:292: Russian Military Mapping Legends [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:292: Russian Map - Slice B [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:299:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:299:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:299:Russian Map - Slice B [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:302:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:302:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:302:Russian Map - Slice B [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:307: Russian Military Mapping Legends [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:307: Russian Map - Slice C [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:321:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:321:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:321:Russian Map - Slice C [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:322:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:322:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:322:Russian Map - Slice C [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:325:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:325:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:325:Russian Map - Slice C [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:330: Russian Military Mapping Legends [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:330: Russian Map - Slice D [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:343:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:343:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:343:Russian Map - Slice D [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:345:These maps were produced by the Russian military during the Cold War [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:345:They were produced by the Russians for the benefit of navigation, as well as [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:345:Russian Map - Slice D [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf|TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf]]:146: recent Russian threat to halt supplies of certain commodities to the West. The [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf|TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf]]:152: monopoly of the Russian/Ukrainian and Canadian producers [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Archaeology - DBA.pdf|R-2021-0166-FFM-Archaeology - DBA.pdf]]:10:Russian mapping 1:10,000 1975 [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix M - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix M - July 2020.pdf]]:5:Figure 10: Russian map 1975 ........................................................................................................................... 21 [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix M - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix M - July 2020.pdf]]:15:Russian mapping 1:10,000 1975 [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix M - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix M - July 2020.pdf]]:26:Figure 10: Russian map 1975 [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf|R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf]]:23: 28 Russian mapping 1:10,000 1975 [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf|R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf]]:23: 29 Russian mapping 1:10,000 1975 [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-Prairie Site, Desk Based Heritage Assessment.PDF|R-2020-0318-FFM-Prairie Site, Desk Based Heritage Assessment.PDF]]:13:Russian mapping 1:10,000 1975 [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-Prairie Site, Desk Based Heritage Assessment.PDF|R-2021-0879-FF-Prairie Site, Desk Based Heritage Assessment.PDF]]:13:Russian mapping 1:10,000 1975 [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:49: 19 pandemic, compounded by the Russian invasion of Ukraine. Much of the focus of [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF]]:25: 5 Russian mapping 1:10,000 1975 [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter K - Below Ground Heritage - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter K - Below Ground Heritage - Dec 2020.PDF]]:15:Russian mapping 1:10,000 1975 [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF]]:28: 20 Russian mapping 1:10,000 1975 [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-Metals Recovery Site, South Bank, Redcar DBA.PDF|R-2020-0465-FFM-Metals Recovery Site, South Bank, Redcar DBA.PDF]]:3:Figure 8: Russian map 1975 ............................................................................................................................. 17 [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-Metals Recovery Site, South Bank, Redcar DBA.PDF|R-2020-0465-FFM-Metals Recovery Site, South Bank, Redcar DBA.PDF]]:10:Russian mapping 1:10,000 1975 [[this>Teesworks/Planning/R-2020-0465-FFM/R-2020-0465-FFM-Metals Recovery Site, South Bank, Redcar DBA.PDF|R-2020-0465-FFM-Metals Recovery Site, South Bank, Redcar DBA.PDF]]:20:Figure 8: Russian map 1975