{include:Teesworks - keywords - menu} [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf|EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf]]:27:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf|EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf]]:67: off, dispersion of suspended sediments and spillage risk in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf|EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf]]:5: ACCESS MAY BE TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf|EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf]]:17: the access land where public access may be temporarily suspended) to the extent [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf|EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf]]:18: (5) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf|EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf]]:18:access land) are suspended in relation to the access land specified in column (2) of Table 6 in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf|EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf]]:18:suspended) to the extent specified in column (3) of that Table 6. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf|EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf]]:18: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf|EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf]]:20:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf|EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf]]:26:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf|EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf]]:27:the undertaker takes temporary possession under this Order are suspended and unenforceable for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf|EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf]]:27: (5) Any person who suffers loss by the extinguishment or suspension of any private right or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf|EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf]]:32: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf|EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf]]:72: TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf|EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf]]:72:In the District of Redcar and Access land at South Gare Temporarily suspend access to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf|EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf]]:26: exercised and compensation is provided for in respect of the loss or suspension of any [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf|EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf]]:26: 3.4.10. Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the Countryside [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf|EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf]]:26: 3.4.11. Sub-paragraph (10) provides that the period of suspension lasts for the period of the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf|EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf]]:26: 3.4.12. The powers to suspend the rights of the public in relation to access land are required in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf|EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf]]:29: suspension of a private right of way has been deleted as this is dealt with in Article 26 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf|EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf]]:31: acquired; and (3) land is owned or leased by the undertaker. The Article also suspends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf|EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf]]:31: by the undertaker and also suspends private rights for as long as the undertaker is in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf|EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf]]:31: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights to only [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf|EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf]]:33: suspension of rights of a statutory undertaker (for example where land is being temporarily [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf|EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf]]:49: be temporarily suspended. See paragraphs 3.4.7 to 3.4.15. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf|EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf]]:51: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf|EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf]]:51: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf|EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf]]:51: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf|EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf]]:27:3.2.633.2.62 The SAC is a large macro-tidal coastal plain estuary with high suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf|EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf]]:71: run-off, dispersion of suspended sediments and spillage risk in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf|EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf]]:11:appropriate, extinguish or suspend any rights in the Wilton Land if the authorised project can [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf|EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf]]:11:or suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf|EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf]]:26: exercised and compensation is provided for in respect of the loss or suspension of any [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf|EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf]]:26: 3.4.10. Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the Countryside [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf|EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf]]:27: 3.4.11. Sub-paragraph (10) provides that the period of suspension lasts for the period of the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf|EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf]]:27: 3.4.12. The powers to suspend the rights of the public in relation to access land are required in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf|EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf]]:29: suspension of a private right of way has been deleted as this is dealt with in Article 26 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf|EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf]]:31: acquired; and (3) land is owned or leased by the undertaker. The Article also suspends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf|EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf]]:31: by the undertaker and also suspends private rights for as long as the undertaker is in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf|EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf]]:31: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights to only [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf|EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf]]:33: suspension of rights of a statutory undertaker (for example where land is being temporarily [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf|EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf]]:49: be temporarily suspended. See paragraphs 3.4.7 to 3.4.15. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002178-NZT DCO 8.30 - NTG SoCG - Sept 2022(D7) (Clean).pdf|EN010103-002178-NZT DCO 8.30 - NTG SoCG - Sept 2022(D7) (Clean).pdf]]:12: which it is proposed to extinguish or suspend easements, servitudes and other [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf|EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf]]:13: remain in force until they are withdrawn or suspended by the SoS.1 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf|EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf]]:45: suspended in the meantime. The relevant energy National Policy Statements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:82: Surface Water Quality – Suspended Fine Sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:82: suspended sediment concentrations would result in a temporary increase in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:83: element would occur due to suspended fine sediments, nor any non- [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:85:9.7.64 Increased suspended sediment concentrations from the construction works [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:87: Surface Water Quality – Suspended Fine Sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:87: due to suspended fine sediments, nor any non-compliance with WFD [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:88: Surface Water Quality – Suspended Fine Sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:88: anticipated due to suspended fine sediments, nor any non-compliance with [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:134:B.1.11 Suspended sediment concentrations are generally low in Tees Bay and in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:134: marine input is washed in with the flood tide, and often causes resuspension [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:134: suspended sediments and a variety of sources and sinks. Silts and muds are [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:134: readily transported as suspended sediment load and can remain in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:134: suspension for extended periods through the tidal cycle, while coarser sands [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:134: carried as bedload. Suspended sediment concentrations between 1500 and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:162:waterbodies based on its recorded salinity and suspended particulate matter concentration1. In this [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:162:case, Environment Agency data show an average of 8 mg/l suspended solids and normal salinity of 30 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:175:point B gives an average suspended solids concentration of 8.5 mg/l. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf|EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf]]:175: EQS value based on average suspended solids concentration of 8.5 mg/l recorded at Sample Point B and average salinity of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf|EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf]]:26: exercised and compensation is provided for in respect of the loss or suspension of any [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf|EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf]]:26: 3.4.10. Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the Countryside [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf|EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf]]:27: 3.4.11. Sub-paragraph (10) provides that the period of suspension lasts for the period of the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf|EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf]]:27: 3.4.12. The powers to suspend the rights of the public in relation to access land are required in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf|EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf]]:29: suspension of a private right of way has been deleted as this is dealt with in Article 26 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf|EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf]]:31: acquired; and (3) land is owned or leased by the undertaker. The Article also suspends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf|EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf]]:31: by the undertaker and also suspends private rights for as long as the undertaker is in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf|EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf]]:31: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights to only [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf|EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf]]:33: suspension of rights of a statutory undertaker (for example where land is being temporarily [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf|EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf]]:49: be temporarily suspended. See paragraphs 3.4.7 to 3.4.15. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001246-EA_NZT_OFFICIAL_171221_Redacted.pdf|EN010103-001246-EA_NZT_OFFICIAL_171221_Redacted.pdf]]:4:Suspended sediment concentrations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001246-EA_NZT_OFFICIAL_171221_Redacted.pdf|EN010103-001246-EA_NZT_OFFICIAL_171221_Redacted.pdf]]:4:In order to assess the suspended sediment concentrations impacts, we require [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001246-EA_NZT_OFFICIAL_171221_Redacted.pdf|EN010103-001246-EA_NZT_OFFICIAL_171221_Redacted.pdf]]:19:suspended sediments: where dredging and disposal is required, pre-construction [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001246-EA_NZT_OFFICIAL_171221_Redacted.pdf|EN010103-001246-EA_NZT_OFFICIAL_171221_Redacted.pdf]]:20:increased Suspended Sediment Concentrations (SSC), smothering and toxicity [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001586-NZT DCO 8.4 - MMO SoCG - May 2022.pdf|EN010103-001586-NZT DCO 8.4 - MMO SoCG - May 2022.pdf]]:10: vary, suspend or revoke a marine licence if it appears that any of its provisions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf|EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf]]:35: the impact upon the business plan. No GPR ability to sell assets, raise capital and suspend [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf|EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf]]:256:transmission services in the UK. Measures such as the suspension of debt [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:22: of its assets in Russia, and gradually suspend its activities in Russia, while assuring its workforce's safety. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:22:today. TotalEnergies has thus initiated the gradual suspension of its activities in Russia, while assuring its teams’ safety. Similarly, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:26:(Paris time), with a fixing of the closing price at 5:35 p.m. (Paris time). Euronext Paris may suspend or resume trading in a security listed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:35:director made in violation of these rules will be declared null and void and payment of the directors’ compensation will be suspended until [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:35:the board composition is compliant with the required quota (the suspension of the directors’ compensation will also be disclosed in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:192: temporarily suspended) 97 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:196:(2) Construction in Mozambique is currently suspended due to a case of force majeure (see the Africa section). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:213: and 2019. Operations have been suspended since 2020 due to the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:214:previous Abu Dhabi Marine Areas Ltd. (ADMA) offshore concession. The suspended from January to October 2020 for reasons of safety and lack [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:214:onshore areas, production was suspended on several occasions Kurdistan, which is in production. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:226:2.3.9 Wells in the process of being drilled (including wells temporarily suspended) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:257:EU economic sanctions were suspended(2). related to Iran carried out by TotalEnergies' companies in 2021. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:277: If the problem cannot be solved immediately, the work is suspended, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:287: suspended in April 2021 (see below), as well as impact on fishers’ TEPMA1 formalized the learnings from these studies and its approach [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:287: Despite the aggravation of the security situation and the suspension of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:288: VPSHR incident resolution Despite the sanitary and security context and the suspension of the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:289:suspension or dismissal). (compared to 99% in 2020). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:370: project in response to the Scotwind call for tender in Scotland – Decision of TotalEnergies and Chevron to suspend dividend [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:437: measures related to construction was temporarily suspended due to security [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:462: to subsidiaries in 101 countries with a response rate of 87%. This operations. These clauses continued to apply, despite the suspension of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:481:correspond to ‘contrats à durée indéterminée’ (CDI) and fixed-term persons who are under suspended contract (sabbatical, business [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:489: to maintain the final dividend for fiscal year 2019, as announced on 2020, it announced the suspension of share buybacks by the Corporation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:489: shares. It was also decided to suspend the dividend growth policy for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf|EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf]]:578: was temporarily suspended due to security problems [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:49:A second possibility is the Russian government responding to Western sanctions by suspending the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:49:to the Russian federal budget. However, if the Russian government were to suspend natural gas exports [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:49: OIES, November, and Yafimava and Fulwood (2021). German regulator’s decision to suspend Nord Stream 2 certification: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf|EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf]]:126:are currently suspended), five of them with integrated dedicated geological storage [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf|EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf]]:5: suspended gas injection at Gina Krog to export the gas. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf|EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf]]:34:Overview  Gas production from the Snøhvit field is suspended after [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf|EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf]]:52: Gas production from the Snøhvit field is suspended after the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf|EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf]]:63:Energy Management (BOEM) manages federal OCS leasing fines and even licence suspension and/or cancellation in case of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf|EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf]]:65:by the temporary 2020-rules will be 100% deductible in the gas activities allowing suspension of the federal duties and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf|EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf]]:77:where drilling or completion has been suspended pending further evaluation. A dry well is a well found to be incapable of producing [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf|EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf]]:253:Project which has finalized the development of 4 gas fields in central Algeria). Following suspension of activity after the terrorist attack at [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf|EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf]]:253:Equinor has filed a motion for clarification which had the effect of temporarily suspending the unfavourable decision and is currently [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf|EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf]]:39:containing less than 10 mg/l suspended particulate matter and with a salinity of 32 ppt. Environment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf|EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf]]:39:Agency data show an average of 8 mg/l suspended solids and normal salinity of 30 ppt at Tees Mouth [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf|EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf]]:48:suspended solids concentration of 8.5mg/l. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf|EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf]]:48: EQS value based on average suspended solids concentration of 8.5mg/l recorded at Sample Point B and average salinity of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf|EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf]]:57: extinguish or suspend any rights in land where the authorised project can reasonably and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf|EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf]]:57: suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001020-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP.pdf|EN010103-001020-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP.pdf]]:36: between the works and nest(s) and suspending vegetation clearance [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001979-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Tracked) August 2022 (D5).pdf|EN010103-001979-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Tracked) August 2022 (D5).pdf]]:43: between the works and nest(s) and suspending vegetation clearance [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002623-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12 1.pdf|EN010103-002623-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12 1.pdf]]:3: acquire, appropriate, extinguish or suspend any rights in the Sembcorp Pipeline [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002623-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12 1.pdf|EN010103-002623-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12 1.pdf]]:3: without such acquisition, appropriation, extinguishment or suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf|EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf]]:65: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf|EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf]]:65: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001239-South Tees Development Corporation - Relevant Representation to NZT DCO - 17.12.21.pdf|EN010103-001239-South Tees Development Corporation - Relevant Representation to NZT DCO - 17.12.21.pdf]]:13: STDC note that the Applicant is seeking to temporarily suspend access to the “area hatched [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf|EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf]]:71: Surface Water Quality – Suspended Fine Sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf|EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf]]:71: the Tees Coastal water body. Increased suspended sediment concentrations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf|EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf]]:71: element would occur due to suspended fine sediments, nor any non- [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf|EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf]]:73:9.7.52 Increased suspended sediment concentrations from the construction works [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf|EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf]]:75: Surface Water Quality – Suspended Fine Sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf|EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf]]:76: due to suspended fine sediments, nor any non-compliance with WFD [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf|EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf]]:77: Surface Water Quality – Suspended Fine Sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf|EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf]]:77: anticipated due to suspended fine sediments, nor any non-compliance with [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf|EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf]]:111:B.1.11 Suspended sediment concentrations are generally low in Tees Bay and in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf|EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf]]:111: marine input is washed in with the flood tide, and often causes resuspension [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf|EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf]]:111: suspended sediments and a variety of sources and sinks. Silts and muds are [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf|EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf]]:111: readily transported as suspended sediment load and can remain in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf|EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf]]:111: suspension for extended periods through the tidal cycle, while coarser sands [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf|EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf]]:111: carried as bedload. Suspended sediment concentrations between 1500 and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf|EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf]]:130: Total Suspended Solids (TSS) mg/l Polycyclic Aromatic Hydrocarbons µg/l [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf|EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf]]:133: Total Suspended Solids mg/l <10 18.4 26 12 24.8 13.2 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf|EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf]]:143:Total Suspended Solids mg/l <10 <10 16 26 12 15 23 <10 <10 18.4 26 12 24.8 13.2 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:663: sever, prevent or curtail access to its apparatus and/or extinguish/suspend its [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:689: the existing Redcar British Steel railway station (currently suspended).” We will support OGCI [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf|EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf]]:689: 16.2.16 of the Framework Travel Plan need to be updated to refer to the suspension of services [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf|EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf]]:26: exercised and compensation is provided for in respect of the loss or suspension of any [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf|EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf]]:26: 3.4.10. Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the Countryside [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf|EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf]]:27: 3.4.11. Sub-paragraph (10) provides that the period of suspension lasts for the period of the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf|EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf]]:27: 3.4.12. The powers to suspend the rights of the public in relation to access land are required in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf|EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf]]:29: suspension of a private right of way has been deleted as this is dealt with in Article 26 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf|EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf]]:31: acquired; and (3) land is owned or leased by the undertaker. The Article also suspends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf|EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf]]:31: by the undertaker and also suspends private rights for as long as the undertaker is in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf|EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf]]:31: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights to only [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf|EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf]]:33: suspension of rights of a statutory undertaker (for example where land is being temporarily [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf|EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf]]:50: be temporarily suspended. See paragraphs 3.4.7 to 3.4.15. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001972-North Tees CAH.pdf|EN010103-001972-North Tees CAH.pdf]]:2:8. If the Applicant seeks to acquire rights over the linkline Corridor and to extinguish or suspend [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:3: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 1005 to 1734 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:5: rights (including private rights of navigation over water) which it is proposed may be extinguished, suspended or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1235: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1235: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1236: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1237: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1238: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1239: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1240: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1241: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1242: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1243: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1244: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1245: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1246: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1247: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1248: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1249: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1250: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1251: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1252: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1253: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1254: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1255: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1256: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1257: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1258: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1259: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1260: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1261: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1262: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1263: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1264: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1265: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1266: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1451: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1452: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1453: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1454: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1455: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1456: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1457: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1458: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1459: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1460: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1461: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1462: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1463: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1464: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1465: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1466: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1467: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1468: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1469: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1470: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1471: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1472: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1473: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1474: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1475: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1476: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1477: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1478: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1479: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1480: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1481: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1482: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1483: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1484: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1485: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1486: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1487: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1488: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1489: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1490: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1491: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1492: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1493: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1494: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1495: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1496: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1497: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1498: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1499: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1500: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1501: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1502: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1503: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1504: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1505: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1506: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1507: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1508: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1509: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1510: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1511: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1512: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1513: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1514: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1515: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1516: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1517: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1518: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1519: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1520: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1521: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1522: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1523: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1524: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1525: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1526: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1527: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1528: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1529: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1530: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1531: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1532: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1533: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1534: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1535: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1536: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1537: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1538: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1539: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1540: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1541: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1542: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1543: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1544: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1545: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1546: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1547: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1548: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1549: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1550: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1551: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1552: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1553: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1554: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1555: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1556: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1557: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1558: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1559: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1560: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1561: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1562: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1563: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1564: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1565: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1566: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1567: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1568: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1569: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1570: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1571: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1572: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1573: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1574: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1575: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1576: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1577: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1578: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1579: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1580: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1581: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1582: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1583: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1584: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1585: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1586: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1587: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1588: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1589: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1590: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1591: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1592: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1593: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1594: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1595: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1596: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1597: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1598: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1599: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1600: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1601: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1602: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1603: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1604: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1605: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1606: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1607: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1608: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1609: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1610: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1611: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1612: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1613: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1614: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1615: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1616: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1617: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1618: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1619: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1620: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1621: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1622: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1623: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1624: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1625: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1626: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1627: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1628: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1629: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1630: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1631: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1632: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1633: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1634: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1635: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1636: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1637: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1638: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1639: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1640: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1641: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1642: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1643: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1644: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1645: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1646: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1647: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1648: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1649: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1650: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1651: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1652: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1653: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1654: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1655: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1656: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1657: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1658: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1659: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1660: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1661: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1662: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1663: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1664: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1665: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1666: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1667: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1668: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1669: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1670: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1671: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1672: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1673: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1674: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1675: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1676: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1677: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1678: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1679: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1680: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1681: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1682: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1683: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1684: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1685: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1686: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1687: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1688: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1689: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1690: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1691: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1692: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1693: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1694: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1695: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1696: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1697: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf|EN010103-001890-NZT DCO 3.1 - Book of Reference (Clean) July 2022 (D4).pdf]]:1698: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000908-NZT DCO 6.2.16 ES Vol I Chapter 16 Traffic and Transportation.pdf|EN010103-000908-NZT DCO 6.2.16 ES Vol I Chapter 16 Traffic and Transportation.pdf]]:42: British Steel railway station (currently suspended). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:3: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 1005 to 1734 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:5: rights (including private rights of navigation over water) which it is proposed may be extinguished, suspended or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1267: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1451: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1452: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1453: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1454: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1455: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1456: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1457: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1458: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1459: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1460: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1461: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1462: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1463: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1464: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1465: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1466: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1467: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1468: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1469: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1470: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1471: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1472: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1473: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1474: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1475: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1476: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1477: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1478: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1479: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1480: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1481: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1482: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1483: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1484: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1485: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1486: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1487: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1488: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1489: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1490: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1491: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1492: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1493: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1494: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1495: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1496: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1497: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1498: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1499: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1500: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1501: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1502: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1503: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1504: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1505: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1506: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1507: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1508: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1509: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1510: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1511: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1512: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1513: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1514: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1515: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1516: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1517: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1518: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1519: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1520: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1521: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1522: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1523: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1524: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1525: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1526: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1527: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1528: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1529: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1530: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1531: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1532: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1533: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1534: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1535: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1536: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1537: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1538: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1539: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1540: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1541: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1542: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1543: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1544: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1545: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1546: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1547: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1548: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1549: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1550: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1551: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1552: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1553: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1554: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1555: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1556: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1557: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1558: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1559: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1560: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1561: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1562: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1563: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1564: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1565: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1566: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1567: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1568: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1569: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1570: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1571: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1572: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1573: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1574: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1575: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1576: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1577: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1578: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1579: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1580: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1581: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1582: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1583: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1584: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1585: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1586: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1587: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1588: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1589: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1590: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1591: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1592: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1593: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1594: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1595: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1596: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1597: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1598: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1599: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1600: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1601: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1602: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1603: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1604: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1605: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1606: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1607: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1608: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1609: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1610: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1611: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1612: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1613: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1614: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1615: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1616: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1617: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1618: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1619: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1620: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1621: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1622: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1623: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1624: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1625: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1626: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1627: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1628: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1629: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1630: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1631: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1632: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1633: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1634: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1635: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1636: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1637: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1638: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1639: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1640: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1641: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1642: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1643: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1644: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1645: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1646: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1647: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1648: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1649: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1650: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1651: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1652: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1653: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1654: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1655: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1656: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1657: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1658: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1659: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1660: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1661: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1662: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1663: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1664: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1665: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1666: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1667: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1668: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1669: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1670: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1671: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1672: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1673: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1674: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1675: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1676: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1677: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1678: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1679: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1680: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1681: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1682: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1683: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1684: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1685: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1686: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1687: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1688: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1689: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1690: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1691: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1692: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1693: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1694: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1695: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1696: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1697: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1698: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1699: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1700: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1701: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1702: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1703: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1704: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1705: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1706: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1707: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1708: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1709: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1710: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1711: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1712: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1713: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1714: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1715: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1716: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1717: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1718: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1719: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1720: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1721: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1722: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1723: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1724: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1725: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1726: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1727: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1728: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1729: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1730: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1731: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1732: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1733: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1734: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1735: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1736: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf|EN010103-001891-NZT DCO 3.1 - Book of Reference (Tracked) July 2022 (D4).pdf]]:1737: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf|EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf]]:46: suspending vegetation clearance works within the area [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf|EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf]]:49: Steel railway station (currently suspended). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf|EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf]]:75: between the works and nest(s) and suspending [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf|EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf]]:50:containing less than 10 mg/l suspended particulate matter and with a salinity of 32 ppt. Environment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf|EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf]]:50:Agency data show an average of 8 mg/l suspended solids and normal salinity of 30 ppt at Tees Mouth [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf|EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf]]:59:suspended solids concentration of 8.5mg/l. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf|EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf]]:59: EQS value based on average suspended solids concentration of 8.5mg/l recorded at Sample Point B and average salinity of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf|EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf]]:199:waterbodies based on its recorded salinity and suspended particulate matter concentration 1. In this [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf|EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf]]:199:case, Environment Agency data show an average of 8 mg/l suspended solids and normal salinity of 30 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf|EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf]]:212:point B gives an average suspended solids concentration of 8.5 mg/l. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf|EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf]]:212: EQS value based on average suspended solids concentration of 8.5 mg/l recorded at Sample Point B and average salinity of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002651-SABIC Protective Provisions 1.pdf|EN010103-002651-SABIC Protective Provisions 1.pdf]]:10:appropriate, extinguish, suspend or override any rights of SABIC in the protected land if the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002651-SABIC Protective Provisions 1.pdf|EN010103-002651-SABIC Protective Provisions 1.pdf]]:11:appropriation, extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002651-SABIC Protective Provisions 1.pdf|EN010103-002651-SABIC Protective Provisions 1.pdf]]:11:suspend or override any rights of SABIC in the protected land relating to the pipelines or access to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001715-South Tees Development Corporation - Responses to comments on Relevant Representations.pdf|EN010103-001715-South Tees Development Corporation - Responses to comments on Relevant Representations.pdf]]:37: seeking to temporarily suspend access to the “area hatched green hatching referred to in the STDC relevant representation was [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001715-South Tees Development Corporation - Responses to comments on Relevant Representations.pdf|EN010103-001715-South Tees Development Corporation - Responses to comments on Relevant Representations.pdf]]:37: Coatham beach and sand dunes” however STDC believes that this access may be temporarily suspended) is now to beige [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf|EN010103-001857-9.5 - CA Schedule (Tracked) - June 2022(D3).pdf]]:3: be extinguished, suspended or interfered with under the Order. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf|EN010103-001578-NZT DCO 9.5 - Compulsory Acquisition Schedule - May 2022.pdf]]:3: be extinguished, suspended or interfered with under the Order. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf|EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf]]:5: ACCESS MAY BE TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf|EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf]]:17: the access land where public access may be temporarily suspended) to the extent [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf|EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf]]:18: (5) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf|EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf]]:18:access land) are suspended in relation to the access land specified in column (2) of Table 6 in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf|EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf]]:18:suspended) to the extent specified in column (3) of that Table 6. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf|EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf]]:18: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf|EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf]]:20:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf|EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf]]:26:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf|EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf]]:27:the undertaker takes temporary possession under this Order are suspended and unenforceable for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf|EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf]]:27: (5) Any person who suffers loss by the extinguishment or suspension of any private right or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf|EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf]]:32: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf|EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf]]:71: TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf|EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf]]:71:In the District of Redcar and Access land at South Gare Temporarily suspend access to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001505-Exolum-Seal-Sands-Ltd.pdf|EN010103-001505-Exolum-Seal-Sands-Ltd.pdf]]:1: any interference with, extinguishment or suspension of the land rights relating to its apparatus or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf|EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf]]:61: suspending vegetation clearance works on a localised basis within the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf|EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf]]:97: • Physical disturbance to habitats and species from increased suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf|EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf]]:4: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf|EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf]]:5: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf|EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf]]:6: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf|EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf]]:7: 142 it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf|EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf]]:8: Lighting Tower Capstan it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf|EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf]]:9: Con it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf|EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf]]:10: an it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf|EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf]]:11: 4.0m 4.3m it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf|EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf]]:12: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf|EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf]]:13: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf|EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf]]:14: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf|EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf]]:15: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf|EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf]]:16: 2.1m L Twr it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf|EN010103-000884-NZT DCO 4.3 Crown Land Plans.pdf]]:17: L Twr it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001975-NZT DCO 4.16.4 - Water Connection Plan August 2022(D5).pdf|EN010103-001975-NZT DCO 4.16.4 - Water Connection Plan August 2022(D5).pdf]]:1: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf|EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf]]:17: NTG is in breach or where there is a need to acquire or suspend third party rights. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf|EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf]]:18: may require the suspension or acquisition of such rights. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf|EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf]]:8: suspension, revocation and transfer of licence) of the Marine and Coastal Access Act [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf|EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf]]:8: the entirety of the MMO’s powers to revoke, suspend, transfer or vary a licence [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf|EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf]]:12: acquire or suspend third party rights. However, the Applicants consider that the draft [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf|EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf]]:13: of land, compulsorily or by agreement, and the creation, suspension or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf|EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf]]:15: can be extinguished or suspended, so as to facilitate the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf|EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf]]:26: extinguish or suspend rights over land, and to temporarily use land for the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf|EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf]]:41: compulsorily or by agreement, and the creation, suspension or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf|EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf]]:45: extinguished or suspended, so as to facilitate the construction and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf|EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf]]:47: matters to be suspended, overridden or extinguished within the Order Land [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf|EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf]]:90: suspension or extinguishment of private rights, is no more than is reasonably [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf|EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf]]:90: covenants and the suspension or extinguishment of private rights is justified. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf|EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf]]:26:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf|EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf]]:65: off, dispersion of suspended sediments and spillage risk in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf|EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf]]:12: land, compulsorily or by agreement, and the creation, suspension or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf|EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf]]:14: can be extinguished or suspended, so as to facilitate the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf|EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf]]:25: extinguish or suspend rights over land, and to temporarily use land for the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf|EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf]]:40: land, compulsorily or by agreement, and the creation, suspension or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf|EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf]]:44: extinguished or suspended, so as to facilitate the construction and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf|EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf]]:46: matters to be suspended, overridden or extinguished within the Order Land [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf|EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf]]:87: suspension or extinguishment of private rights, is no more than is reasonably [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf|EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf]]:87: covenants and the suspension or extinguishment of private rights is justified. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002734-Response from CATS North Sea Limited.pdf|EN010103-002734-Response from CATS North Sea Limited.pdf]]:3:extinguish, suspend or override any rights of CATS if the authorised development can reasonably and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002734-Response from CATS North Sea Limited.pdf|EN010103-002734-Response from CATS North Sea Limited.pdf]]:3:practicably be carried out without such acquisition, appropriation, extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002734-Response from CATS North Sea Limited.pdf|EN010103-002734-Response from CATS North Sea Limited.pdf]]:3:land) and 23 (power to override easements and other rights) to acquire, appropriate, extinguish, suspend or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf|EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf]]:26: exercised and compensation is provided for in respect of the loss or suspension of any [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf|EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf]]:26: 3.4.10. Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the Countryside [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf|EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf]]:27: 3.4.11. Sub-paragraph (10) provides that the period of suspension lasts for the period of the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf|EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf]]:27: 3.4.12. The powers to suspend the rights of the public in relation to access land are required in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf|EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf]]:29: suspension of a private right of way has been deleted as this is dealt with in Article 26 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf|EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf]]:31: also suspends private rights where the private right is inconsistent with a right being [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf|EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf]]:31: compulsorily acquired by the undertaker and also suspends private rights for as long as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf|EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf]]:31: Generating Station Order 2017. Sub-paragraph (4) limits the scope of the suspension of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf|EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf]]:33: for the suspension of rights of a statutory undertaker (for example where land is being [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf|EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf]]:49: be temporarily suspended. See paragraphs 3.4.7 to 3.4.15. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf|EN010103-001909-NZT DCO 9.5 - Compulsory Acquisition Schedule (Tracked) July 2022 (D4).pdf]]:4: be extinguished, suspended or interfered with under the Order. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf|EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf]]:32: that the NPS should be reviewed under s.6 before the application is determined, he may suspend the examination of that [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002652-Huntsman Protective Provisions.pdf|EN010103-002652-Huntsman Protective Provisions.pdf]]:10:appropriate, extinguish, suspend or override any rights of Huntsman in the protected land if the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002652-Huntsman Protective Provisions.pdf|EN010103-002652-Huntsman Protective Provisions.pdf]]:10:appropriation, extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002652-Huntsman Protective Provisions.pdf|EN010103-002652-Huntsman Protective Provisions.pdf]]:10:suspend or override any rights of Huntsman in the protected land relating to the pipelines or access [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf|EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf]]:31: exercised and compensation is provided for in respect of the loss or suspension of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf|EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf]]:31:3.4.10 Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf|EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf]]:31:3.4.11 Sub-paragraph (10) provides that the period of suspension lasts for the period of the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf|EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf]]:31:3.4.12 The powers to suspend the rights of the public in relation to access land are required [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf|EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf]]:34: to compensation for the extinguishment or suspension of a private right of way has [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf|EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf]]:36: undertaker. The Article also suspends private rights where the private right is [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf|EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf]]:36: suspends private rights for as long as the undertaker is in temporary possession of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf|EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf]]:36: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf|EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf]]:39: amended to allow for the suspension of rights of a statutory undertaker (for example [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf|EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf]]:57: Countryside and Rights of Way Act 2000 may be temporarily suspended. See [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:6: ACCESS MAY BE TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:18: the access land where public access may be temporarily suspended) to the extent [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:19: (5) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:19:access land) are suspended in relation to the access land specified in column (2) of Table 6 in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:19:suspended) to the extent specified in column (3) of that Table 6. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:19: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:21:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:27:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:27:the undertaker takes temporary possession under this Order are suspended and unenforceable for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:27: (5) Any person who suffers loss by the extinguishment or suspension of any private right or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:33: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:78: TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:78:In the District of Redcar and Access land at South Gare Temporarily suspend access to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:94: 7. The provisions of section 72 (variation, suspension, revocation and transfer) of the 2009 Act [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf|EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf]]:107: 7. The provisions of section 72 (variation, suspension, revocation and transfer) of the 2009 Act [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf]]:2: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf]]:3: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf]]:4: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf]]:5: 142a 142 it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf]]:6: 192 Lighting Tower Capstan it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf]]:7: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf]]:8: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf]]:9: 4.0m 4.3m it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf]]:10: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf]]:11: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf]]:12: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf]]:13: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf]]:14: 2.1m it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001442-NZT DCO 4.2 - Land Plans - Rev. 3.0 Apr 2022.pdf]]:15: L Twr it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf|EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf]]:71: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf|EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf]]:72: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf|EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf]]:72: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf|EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf]]:72: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001718-Redcar Bulk Terminal Limited - Responses to the ExA’s ExQ1.pdf|EN010103-001718-Redcar Bulk Terminal Limited - Responses to the ExA’s ExQ1.pdf]]:9: relation to which it is proposed to extinguish or suspend easements, servitudes and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:259:or completion of which, in the case of exploratory wells, has been suspended pending further drilling or evaluation. A dry well is one found to be [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:260:equity-accounted entities as of 31 December 2020. Suspended development wells and long-term suspended exploratory wells are also included in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf|EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf]]:334:had suspended the Scrip Programme in respect of those quarterly performed in accordance with its terms. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002235-NZT DCO 8.4 - MMO SoCG (Clean) - Sept 2022(D8).pdf|EN010103-002235-NZT DCO 8.4 - MMO SoCG (Clean) - Sept 2022(D8).pdf]]:10: vary, suspend or revoke a marine licence if it appears that any of its provisions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf|EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf]]:2: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf|EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf]]:3: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf|EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf]]:4: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf|EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf]]:5: 142a 142 it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf|EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf]]:6: 192 Lighting Tower Capstan it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf|EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf]]:7: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf|EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf]]:8: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf|EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf]]:9: 4.0m 4.3m it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf|EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf]]:10: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf|EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf]]:11: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf|EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf]]:12: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf|EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf]]:13: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf|EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf]]:14: 2.1m it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf|EN010103-002163-NZT DCO 4.3 - Crown Land Plans August 2022 (D6).pdf]]:15: L Twr it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002462-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf|EN010103-002462-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf]]:4: acquire, appropriate, extinguish or suspend any rights in the Sembcorp Pipeline [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002462-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf|EN010103-002462-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf]]:4: without such acquisition, appropriation, extinguishment or suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:3: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 1197 to 1654 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:5: rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in connection with the authorised [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1132: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1133: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1134: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1135: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1136: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1137: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1138: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1139: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1140: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1141: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1142: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1143: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1144: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1145: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1146: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1147: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1148: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1149: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1150: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1151: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1152: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1153: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1154: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1155: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1156: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1157: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1158: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1159: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1160: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1161: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1162: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1163: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1164: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1165: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1166: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1167: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1168: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1169: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1170: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1171: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1172: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1173: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1174: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1175: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1176: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1177: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1178: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1179: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1180: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1181: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1182: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1183: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1184: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1185: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1186: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1187: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1188: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1189: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1190: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1191: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1192: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1193: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1194: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1195: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1196: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1197: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1198: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1199: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1200: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1201: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1202: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1203: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1204: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1205: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1206: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1207: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1208: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1209: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1210: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1211: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1212: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1213: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1214: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1215: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1216: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1217: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1218: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1219: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1220: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1221: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1222: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1223: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1224: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1225: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1226: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1227: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1228: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1229: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1230: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1231: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1232: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1233: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1234: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1235: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1236: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1237: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1238: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1239: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1240: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1241: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1242: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1243: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1244: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1245: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1246: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1247: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1248: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1249: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1250: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1251: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1252: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1253: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1254: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1255: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1256: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1257: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1258: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1259: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1260: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1261: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1262: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1263: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1264: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1265: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1266: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1451: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1452: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1453: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1454: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1455: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1456: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1457: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1458: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1459: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1460: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1461: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1462: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1463: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1464: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1465: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1466: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1467: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1468: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1469: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1470: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1471: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1472: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1473: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1474: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1475: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1476: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1477: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1478: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1479: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1480: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1481: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1482: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1483: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1484: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1485: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1486: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1487: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1488: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1489: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1490: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1491: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1492: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1493: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1494: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1495: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1496: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1497: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1498: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1499: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1500: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1501: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1502: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1503: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1504: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1505: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1506: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1507: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1508: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1509: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1510: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1511: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1512: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1513: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1514: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1515: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1516: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1517: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1518: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1519: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1520: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1521: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1522: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1523: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1524: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1525: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1526: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1527: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1528: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1529: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1530: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1531: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1532: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1533: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1534: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1535: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1536: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1537: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1538: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1539: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1540: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1541: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1542: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1543: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1544: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1545: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1546: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1547: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1548: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1549: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1550: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1551: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1552: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1553: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1554: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1555: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1556: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1557: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1558: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1559: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1560: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1561: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1562: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1563: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1564: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1565: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1566: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1567: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1568: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1569: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1570: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1571: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf|EN010103-002739-Applicant NZT DCO 3.1 - Book of Reference (Tracked) - March 2023.pdf]]:1572: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf|EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf]]:27:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf|EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf]]:67: off, dispersion of suspended sediments and spillage risk in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf|EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf]]:12: suspension or extinguishment of, or interference with, interests in or rights over land, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf|EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf]]:13: private rights identified as affecting the land can be extinguished or suspended, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf|EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf]]:24: Application to acquire land, acquire or create rights over land, to extinguish or suspend [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf|EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf]]:38: suspension or extinguishment of, or interference with, interests in or rights over land, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf|EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf]]:42: identified as affecting the land can be extinguished or suspended, so as to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf|EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf]]:44: addition, the Applicants require certain matters to be suspended, overridden or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf|EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf]]:84: overriding of interests, rights and restrictive covenants and the suspension or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf|EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf]]:84: interests, rights and restrictive covenants and the suspension or extinguishment of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001605-NZT DCO 9.4 - APPENDIX 6 LATEST AUDITED ACCOUNTS – NATIONAL GRID CARBON LIMITED.pdf|EN010103-001605-NZT DCO 9.4 - APPENDIX 6 LATEST AUDITED ACCOUNTS – NATIONAL GRID CARBON LIMITED.pdf]]:148:prevailing on the dates of the transactions. At each reporting date, customers, in light of the suspension of debt collection activities and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf|EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf]]:27:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf|EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf]]:68: off, dispersion of suspended sediments and spillage risk in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf|EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf]]:12: extinguish or suspend the existing rights in it enjoyed by Sembcorp and its customers, it is [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf|EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf]]:14: and, in conjunction with the proposed powers to extinguish or suspend third party rights, would in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf|EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf]]:29:appropriate, extinguish or suspend any rights in the Wilton Land if the authorised project can [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf|EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf]]:29:or suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf|EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf]]:40: suspend the existing rights in it enjoyed by Sembcorp and its customers, it is incumbent upon them [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf|EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf]]:46: suspending vegetation clearance works within the area [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf|EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf]]:49: Steel railway station (currently suspended). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf|EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf]]:75: between the works and nest(s) and suspending [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf|EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf]]:2: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf|EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf]]:3: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf|EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf]]:4: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf|EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf]]:5: 142a 142 it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf|EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf]]:6: 192 Lighting Tower Capstan it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf|EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf]]:7: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf|EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf]]:8: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf|EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf]]:9: 4.0m 4.3m it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf|EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf]]:10: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf|EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf]]:11: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf|EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf]]:12: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf|EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf]]:13: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf|EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf]]:14: 2.1m it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf|EN010103-002162-NZT DCO 4.2 - Land Plans August 2022 (D6).pdf]]:15: L Twr it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf|EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf]]:13: land, compulsorily or by agreement, and the creation, suspension or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf|EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf]]:15: can be extinguished or suspended, so as to facilitate the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf|EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf]]:26: extinguish or suspend rights over land, and to temporarily use land for the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf|EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf]]:40: compulsorily or by agreement, and the creation, suspension or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf|EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf]]:44: extinguished or suspended, so as to facilitate the construction and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf|EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf]]:46: matters to be suspended, overridden or extinguished within the Order Land [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf|EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf]]:88: suspension or extinguishment of private rights, is no more than is reasonably [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf|EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf]]:88: covenants and the suspension or extinguishment of private rights is justified. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf|EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf]]:4: ACCESS MAY BE TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf|EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf]]:15: of the access land where public access may be temporarily suspended) to the extent [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf|EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf]]:16: (5) Any person who suffers loss by the suspension of any private right of way under this article is [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf|EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf]]:16:access land) are suspended in relation to the access land specified in column [[(2)]] of the table in Part [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf|EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf]]:16:suspended) to the extent specified in column [[(3)]] of that table. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf|EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf]]:16: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf|EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf]]:18:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf|EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf]]:24:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf|EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf]]:24:undertaker takes temporary possession under this Order are suspended and unenforceable for as long [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf|EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf]]:24: (5) Any person who suffers loss by the extinguishment or suspension of any private right or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf|EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf]]:30: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf|EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf]]:64: TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf|EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf]]:64: In the District of Redcar and Access land at South Gare Temporarily suspend access to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf|EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf]]:5: ACCESS MAY BE TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf|EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf]]:17: the access land where public access may be temporarily suspended) to the extent [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf|EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf]]:18: (5) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf|EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf]]:18:access land) are suspended in relation to the access land specified in column (2) of Table 6 in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf|EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf]]:18:suspended) to the extent specified in column (3) of that Table 6. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf|EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf]]:18: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf|EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf]]:20:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf|EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf]]:26:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf|EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf]]:27:the undertaker takes temporary possession under this Order are suspended and unenforceable for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf|EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf]]:27: (5) Any person who suffers loss by the extinguishment or suspension of any private right or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf|EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf]]:32: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf|EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf]]:74: TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf|EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf]]:74:In the District of Redcar and Access land at South Gare Temporarily suspend access to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf|EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf]]:89: 7. The provisions of section 72 (variation, suspension, revocation and transfer) of the 2009 Act [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf|EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf]]:101: 7. The provisions of section 72 (variation, suspension, revocation and transfer) of the 2009 Act [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf|EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf]]:13: shellfish to increased SSC [[Suspended Sediment Concentrations]] and deposition [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf|EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf]]:15: for preventing water pollution, spillage risk and the dispersion of suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf|EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf]]:18:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf|EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf]]:18:Berg, L. (1982). The effect of exposure to short-term pulses of suspended sediment on [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf|EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf]]:18:Berli, B.I. et al. (2014). Acute exposure to a common suspended sediment affects the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf|EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf]]:19:Elevated concentrations of suspended sediment can have the following physical effects on [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf|EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf]]:19: of particles, suspended sediment concentration, water velocity and gill dimensions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002356-NZT ISH5 S2.pdf|EN010103-002356-NZT ISH5 S2.pdf]]:7:suspend its operations until the issue is resolved. So there are a number of controls set within the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf|EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf]]:5: ACCESS MAY BE TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf|EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf]]:17: the access land where public access may be temporarily suspended) to the extent specified [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf|EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf]]:18: (5) Any person who suffers loss by the suspension of any private right of way under this article is [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf|EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf]]:18:access land) are suspended in relation to the access land specified in column (2) of Table 6 in Part 3 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf|EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf]]:18:of Schedule [[6]] (those parts of the access land where public access may be temporarily suspended) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf|EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf]]:18: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf|EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf]]:20:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf|EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf]]:26:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf|EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf]]:26:undertaker takes temporary possession under this Order are suspended and unenforceable for as long [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf|EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf]]:26: (5) Any person who suffers loss by the extinguishment or suspension of any private right or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf|EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf]]:32: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf|EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf]]:76: TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf|EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf]]:76: In the District of Redcar and Access land at South Gare Temporarily suspend access to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf|EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf]]:92: 7. The provisions of section 72 (variation, suspension, revocation and transfer) of the 2009 Act [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf|EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf]]:106: 7. The provisions of section 72 (variation, suspension, revocation and transfer) of the 2009 Act [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf|EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf]]:27:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf|EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf]]:67: off, dispersion of suspended sediments and spillage risk in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001187-NZT DCO 5.11 Indicative Lighting Strategy - Reprovided(2).pdf|EN010103-001187-NZT DCO 5.11 Indicative Lighting Strategy - Reprovided(2).pdf]]:26: and Darlington. Northern Rail suspended all services to and from the station on 14th [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf|EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf]]:25: acquisition rights where CNSL is in breach or where there is a need to acquire or suspend third party [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf|EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf]]:30: i) The Applicant has referred to the current draft Requirements Schedule including a There are also penalties (including suspension of payments) where minimum capture rates are [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf|EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf]]:30: neither of these provisions would require that the carbon dioxide captured from the generating or operation of the generating station in a way that would reduce or suspend a primary revenue [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf|EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf]]:54: 5.4 Under Section 122(3) of the 2008 Act an order granting development consent may include as rights – in order to be able to do that, and which may require the suspension or acquisition of such [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf|EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf]]:68: Infrastructure is vital to many of the manufacturing, distribution and industrial processes operating where NTG is in breach or where there is a need to acquire or suspend third party rights. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf|EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf]]:77: proposed to extinguish or suspend easements, servitudes and other private rights”; as is indicated on the Land any part of the Authorised Development that may impact RBT’s operations. As noted above, this also [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf|EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf]]:83: to be able to do that, and which may require the suspension or acquisition of such rights. The protective [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf|EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf]]:91: majority of the investment land within Wilton) in a manner that has enabled the continued safe, require the suspension or acquisition of such rights. The protective provisions which the Applicant will [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf|EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf]]:93: extinguish or suspend the existing rights in it enjoyed by Sembcorp and its customers, it is incumbent [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:2: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:3: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:4: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:5: 142a 142 it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:6: 192 Lighting Tower Capstan it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:7: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:8: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:9: 4.0m 4.3m it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:10: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:11: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:12: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:13: 2.1m it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002536-NZT DCO 4.3 - Crown Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:14: L Twr it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf|EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf]]:64: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf|EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf]]:65: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf|EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf]]:65: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf|EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf]]:65: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf|EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf]]:35:7.3.7 Potential significant adverse effects to water quality from suspended fine [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf|EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf]]:41: suspended sediment concentrations (i.e. turbidity) and deposition; [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002158-NZT DCO 4.16.3 - PCC Site Access Plan August 2022 (D6).pdf|EN010103-002158-NZT DCO 4.16.3 - PCC Site Access Plan August 2022 (D6).pdf]]:1: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:3:Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 1229 to 1661 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:5: (including private rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1230: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1230: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1231: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1232: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1233: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1234: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1235: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1236: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1237: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1238: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1239: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1240: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1241: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1242: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1243: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1244: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1245: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1246: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1247: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1248: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1249: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1250: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1251: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1252: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1253: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1254: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1255: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1256: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1257: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1258: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1259: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1260: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1261: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1262: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1263: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1264: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1265: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1266: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1451: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1452: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1453: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1454: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1455: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1456: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1457: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1458: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1459: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1460: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1461: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1462: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1463: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1464: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1465: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1466: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1467: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1468: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1469: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1470: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1471: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1472: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1473: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1474: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1475: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1476: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1477: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1478: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1479: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1480: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1481: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1482: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1483: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1484: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1485: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1486: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1487: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1488: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1489: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1490: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1491: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1492: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1493: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1494: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1495: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1496: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1497: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1498: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1499: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1500: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1501: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1502: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1503: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1504: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1505: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1506: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1507: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1508: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1509: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1510: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1511: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1512: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1513: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1514: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1515: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1516: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1517: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1518: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1519: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1520: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1521: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1522: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1523: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1524: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1525: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1526: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1527: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1528: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1529: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1530: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1531: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1532: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1533: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1534: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1535: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1536: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1537: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1538: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1539: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1540: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1541: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1542: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1543: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1544: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1545: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1546: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1547: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1548: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1549: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1550: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1551: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1552: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1553: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1554: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1555: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1556: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1557: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1558: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1559: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1560: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1561: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1562: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1563: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1564: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1565: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1566: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1567: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1568: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1569: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1570: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1571: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1572: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1573: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1574: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1575: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1576: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1577: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1578: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1579: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1580: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1581: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1582: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1583: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1584: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1585: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1586: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1587: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1588: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1589: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1590: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1591: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1592: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1593: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1594: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1595: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1596: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1597: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1598: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1599: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1600: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1601: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1602: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1603: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1604: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1605: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1606: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1607: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1608: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1609: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1610: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1611: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1612: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1613: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1614: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1615: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1616: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1617: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1618: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1619: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1620: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1621: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1622: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1623: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1624: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1625: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1626: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1627: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1628: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1629: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1630: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1631: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1632: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1633: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1634: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1635: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1636: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1637: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1638: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1639: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1640: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1641: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1642: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1643: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1644: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1645: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1646: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1647: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1648: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1649: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1650: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1651: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1652: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1653: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1654: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1655: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1656: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1657: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1658: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1659: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1660: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1661: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf|EN010103-001476-NZT DCO 3.1 - Book of Reference - Tracked - Apr 2022.pdf]]:1662: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf|EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf]]:5: ACCESS MAY BE TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf|EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf]]:15: parts of the access land where public access may be temporarily suspended) to the extent [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf|EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf]]:16: (5) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf|EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf]]:16:access land) are suspended in relation to the access land specified in column [[(2)]] of the table in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf|EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf]]:16:suspended) to the extent specified in column [[(3)]] of that table. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf|EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf]]:16: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf|EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf]]:18:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf|EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf]]:24:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf|EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf]]:24:the undertaker takes temporary possession under this Order are suspended and unenforceable for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf|EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf]]:24: (5) Any person who suffers loss by the extinguishment or suspension of any private right or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf|EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf]]:30: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf|EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf]]:64: TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf|EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf]]:64:In the District of Redcar and Access land at South Gare Temporarily suspend access to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf|EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf]]:99: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf|EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf]]:100: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf|EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf]]:100: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf|EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf]]:100: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf|EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf]]:100: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf|EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf]]:101: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf|EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf]]:101: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf|EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf]]:101: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:2: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:3: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:4: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:5: 142a 142 it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:6: 192 Lighting Tower Capstan it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:7: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:8: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:9: 4.0m 4.3m it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:10: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:11: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:12: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:13: 2.1m it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf|EN010103-002535-NZT DCO 4.2 - Land Plans Sheets 1-13 Nov 2022 (D12).pdf]]:14: L Twr it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf|EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf]]:240: controlled waters. considered that some or most of the PAH must be attached to suspended solids in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf|EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf]]:31: exercised and compensation is provided for in respect of the loss or suspension of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf|EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf]]:31:3.4.10 Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf|EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf]]:31:3.4.11 Sub-paragraph (10) provides that the period of suspension lasts for the period of the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf|EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf]]:31:3.4.12 The powers to suspend the rights of the public in relation to access land are required [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf|EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf]]:34: to compensation for the extinguishment or suspension of a private right of way has [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf|EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf]]:36: undertaker. The Article also suspends private rights where the private right is [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf|EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf]]:36: suspends private rights for as long as the undertaker is in temporary possession of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf|EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf]]:36: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf|EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf]]:39: amended to allow for the suspension of rights of a statutory undertaker (for example [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf|EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf]]:56: Countryside and Rights of Way Act 2000 may be temporarily suspended. See [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:23: consent, and, furthermore, that any person who suffers loss by the suspension of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:24: of the Access and Rights of Way Plans [[AS-150]]. The powers to suspend the rights of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:56: powers to extinguish, suspend or interfere with CFL’s rights and their application in order to execute the development if an [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:61: 2.10 The proposed powers include the ability to extinguish, suspend 2.10 The Applicants are in negotiations with CFL’s legal [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:64: extinguish, suspend or interfere with CFL’s rights. Such rights include [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:69: take powers to extinguish, suspend or interfere with INEOS’ rights Permanent Rights to Temporary Possession. The area and plots are [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:71: 2.5 The proposed powers include the ability to extinguish, suspend 2.5 As noted above, the Applicants are in negotiations with INEOS [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:74: extinguish, suspend or interfere with the rights in the land. Such [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:96: success of the marine enhancement measures. Suspended sediment mixed. Impacts from this small amount of dredging are anticipated [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:96: concentrations In order to assess the suspended sediment to be localised and minor and no additional mitigation is proposed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:97: Suspended sediment concentrations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:122: and the dispersion of suspended sediments: where dredging and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:122: from physical disturbance associated with increased Suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:124: Suspended sediment concentrations Issue: Section 14.6.32 lists the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:124: construction activities that have the potential to increase suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:125: There is potential for dredging’s to be re-suspended as a result of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:162: proposes to take powers to extinguish, suspend or interfere with Heads of Terms negotiations, the Applicants have proposed terms to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:163: restrictions in such land to be suspended, unenforceable or where restrictions in such land to be suspended, unenforceable or where [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:214: temporarily suspend access to the “area hatched green on sheets 1 referred to in the STDC relevant representation was an error in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:214: and sand dunes” however STDC believes that this footpath will be suspended) is now to beige hatching on sheets 1 – 3 of ARoW plans [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:251: of fish and shellfish to increased SSC [Suspended Sediment away from other projects where cumulative effects are expected. The [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:255: pollution, spillage risk and the dispersion of suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:270: Exolum therefore objects to any interference with, extinguishment or suspension of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf|EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf]]:273: suspend or interfere with EDF’s rights and impose new restrictions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002067-NZT DCO 8.4 - Marine Management Organisation SoCG (Tracked) August 2022 (D6).pdf|EN010103-002067-NZT DCO 8.4 - Marine Management Organisation SoCG (Tracked) August 2022 (D6).pdf]]:11: vary, suspend or revoke a marine licence if it appears that any of its provisions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001730-Written Representation (CATS North Sea Limited).pdf|EN010103-001730-Written Representation (CATS North Sea Limited).pdf]]:40: • Work shall be suspended and rescheduled during periods of severe or inclement weather. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002441-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf|EN010103-002441-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA.pdf]]:15: extinguish or suspend the existing rights in it enjoyed by Sembcorp and its customers, it is [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:10: Lucia Calvosa to market volatility, while the buy-back has been suspended. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:17: scenario, in order to adapt the dividend to market volatility; the share buy-back program is temporarily suspended. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:55:(b) Includes temporary suspended wells pending further evaluation. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:160:on the basis of internationally recognized principles and as- suspended on the Clough Creek-Tebidaba pipeline (52 km) due [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:163:TSP (Total Suspended Particulate) emissions 1.3 0.6 1.4 1.5 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:167:of circular economy models and/or sustainability initiatives; measures (attention status with clearance, suspension or rev- [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:176: PST: direct emissions of Total Suspended Particulates, finely divided solid or liquid material suspended in gaseous [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:204:reviewed to confirm that there is no indication that the (suspended exploration wells). If, at the end of this period, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:206:suspended on the balance sheet. In any case, all such for safety or environmental reasons, although not directly [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:228:incurred in respect to the commitments being formalized to the costs of suspended exploration wells pending final [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:228:for mineral concessions (€439 million). suspended wells are reported below: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:228:Costs for exploratory wells suspended - beginning of the year 1,246 1,101 1,263 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:228:Costs for exploratory wells suspended - end of the year 1,268 1,246 1,101 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:228:The following information relates to the stratification of the suspended wells pending final determination (ageing): [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:228:Costs capitalized and suspended for exploratory well [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:228:Costs capitalized for suspended wells [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:229:Suspended wells costs awaiting a final investment decision Congo, Egypt and Indonesia), none of which represented an [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:229:the project. The other suspended costs refer to several combinations or acquisition of individual properties. Unproved [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:232:the cost of unproved areas which are suspended pending a final The breakdown of exploration rights by type of asset was as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:267: year prison, with a suspended sentence. Eni Rewind crimes date back to 1991. In the proceeding there [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:268: near the coastal area adjacent to the site due to the former officials of the same District with suspension [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:269: was suspended in order to allow the continuation of stated. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:273: of the State Courts. Following a suspension period warning with which it would have identified Eni Rewind [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:273: will remain suspended until a decision made on relation to the site remediation interventions, and has [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:273: of the defendants, granted a suspension of the to the provisions issued by the Province. Access to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf|EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf]]:276: five-year limitation term would have been suspended Prosecutor’s Office of Prato, commenced in regard [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf|EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf]]:27:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf|EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf]]:70: run-off, dispersion of suspended sediments and spillage risk in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf|EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf]]:19:emissions, purposefully and profitably, in step with society. We are of employee resilience during 2020 when bonuses were suspended, the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf|EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf]]:30: loss or suspension of permits, loss of our licence to operate and loss of our ability to bid on mineral environmental damage. Our standards and governance [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf|EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf]]:57: activities in Russia since 2014, we have suspended our support to an application of SPDC JV for renewal. While SPDC JV is challenging [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf|EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf]]:57:Council Decision 2011/782/CFSP, Shell suspended all exploration that has one shallow-water licence (OML 144). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000817-NZT DCO - Section_55_Checklist (19.07.21).pdf|EN010103-000817-NZT DCO - Section_55_Checklist (19.07.21).pdf]]:25: numbered area shown on the Works suspended. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002003-NZT DCO 4.16.3 - PCC Site Access Plan August 2022(D5).pdf|EN010103-002003-NZT DCO 4.16.3 - PCC Site Access Plan August 2022(D5).pdf]]:1: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf|EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf]]:5: ACCESS MAY BE TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf|EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf]]:17: parts of the access land where public access may be temporarily suspended) to the extent [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf|EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf]]:17: (5) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf|EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf]]:17:access land) are suspended in relation to the access land specified in column [[(2)]] of the table in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf|EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf]]:17:suspended) to the extent specified in column [[(3)]] of that table. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf|EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf]]:17: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf|EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf]]:19:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf|EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf]]:26:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf|EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf]]:26:the undertaker takes temporary possession under this Order are suspended and unenforceable for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf|EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf]]:26: (5) Any person who suffers loss by the extinguishment or suspension of any private right or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf|EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf]]:32: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf|EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf]]:67: TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf|EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf]]:67:In the District of Redcar and Access land at South Gare Temporarily suspend access to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001616-NZT DCO 3.1a - Supplementary Book of Reference - May 2022.pdf|EN010103-001616-NZT DCO 3.1a - Supplementary Book of Reference - May 2022.pdf]]:3:Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 7 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001616-NZT DCO 3.1a - Supplementary Book of Reference - May 2022.pdf|EN010103-001616-NZT DCO 3.1a - Supplementary Book of Reference - May 2022.pdf]]:5: (including private rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001616-NZT DCO 3.1a - Supplementary Book of Reference - May 2022.pdf|EN010103-001616-NZT DCO 3.1a - Supplementary Book of Reference - May 2022.pdf]]:7: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001616-NZT DCO 3.1a - Supplementary Book of Reference - May 2022.pdf|EN010103-001616-NZT DCO 3.1a - Supplementary Book of Reference - May 2022.pdf]]:7:Supplamentary Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001725-DLA Piper UK LLP - Responses to the ExA’s ExQ1 1.pdf|EN010103-001725-DLA Piper UK LLP - Responses to the ExA’s ExQ1 1.pdf]]:19: extinguish or suspend any rights in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001725-DLA Piper UK LLP - Responses to the ExA’s ExQ1 1.pdf|EN010103-001725-DLA Piper UK LLP - Responses to the ExA’s ExQ1 1.pdf]]:20: extinguishment or suspension; and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:3:Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 1048 to 1449 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:5: (including private rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1049: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1049: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1050: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1051: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1052: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1053: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1054: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1055: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1056: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1057: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1058: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1059: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1060: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1061: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1062: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1063: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1064: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1065: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1066: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1067: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1068: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1069: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1070: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1071: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1072: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1073: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1074: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1075: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1076: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1077: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1078: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1079: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1080: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1081: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1082: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1083: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1084: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1085: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1086: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1087: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1088: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1089: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1090: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1091: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1092: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1093: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1094: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1095: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1096: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1097: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1098: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1099: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1100: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1101: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1102: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1103: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1104: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1105: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1106: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1107: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1108: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1109: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1110: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1111: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1112: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1113: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1114: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1115: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1116: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1117: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1118: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1119: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1120: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1121: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1122: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1123: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1124: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1125: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1126: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1127: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1128: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1129: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1130: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1131: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1132: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1133: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1134: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1135: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1136: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1137: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1138: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1139: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1140: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1141: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1142: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1143: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1144: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1145: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1146: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1147: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1148: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1149: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1150: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1151: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1152: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1153: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1154: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1155: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1156: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1157: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1158: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1159: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1160: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1161: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1162: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1163: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1164: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1165: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1166: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1167: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1168: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1169: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1170: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1171: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1172: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1173: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1174: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1175: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1176: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1177: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1178: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1179: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1180: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1181: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1182: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1183: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1184: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1185: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1186: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1187: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1188: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1189: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1190: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1191: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1192: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1193: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1194: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1195: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1196: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1197: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1198: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1199: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1200: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1201: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1202: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1203: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1204: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1205: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1206: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1207: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1208: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1209: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1210: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1211: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1212: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1213: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1214: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1215: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1216: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1217: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1218: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1219: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1220: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1221: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1222: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1223: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1224: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1225: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1226: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1227: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1228: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1229: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1230: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1231: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1232: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1233: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1234: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1235: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1236: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1237: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1238: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1239: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1240: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1241: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1242: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1243: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1244: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1245: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1246: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1247: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1248: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1249: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1250: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1251: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1252: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1253: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1254: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1255: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1256: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1257: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1258: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1259: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1260: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1261: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1262: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1263: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1264: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1265: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1266: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1267: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1268: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1269: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1270: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1271: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1272: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1273: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1274: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1275: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1276: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1277: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1278: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1279: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1280: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1281: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1282: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1283: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1284: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1285: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1286: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1287: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1288: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1289: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1290: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1291: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1292: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1293: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1294: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1295: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1296: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1297: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1298: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1299: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1300: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1301: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1302: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1303: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1304: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1305: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1306: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1307: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1308: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1309: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1310: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1311: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1312: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1313: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1314: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1315: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1316: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1317: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1318: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1319: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1320: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1321: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1322: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1323: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1324: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1325: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1326: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1327: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1328: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1329: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1330: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1331: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1332: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1333: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1334: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1335: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1336: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1337: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1338: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1339: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1340: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1341: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1342: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1343: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1344: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1345: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1346: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1347: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1348: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1349: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1350: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1351: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1352: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1353: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1354: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1355: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1356: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1357: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1358: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1359: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1360: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1361: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1362: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1363: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1364: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1365: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1366: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1367: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1368: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1369: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1370: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1371: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1372: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1373: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1374: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1375: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1376: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1377: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1378: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1379: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1380: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1381: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1382: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1383: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1384: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1385: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1386: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1387: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1388: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1389: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1390: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1391: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1392: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1393: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1394: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1395: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1396: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1397: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1398: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1399: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1400: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1401: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1402: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1403: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1404: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1405: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1406: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1407: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1408: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1409: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1410: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1411: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1412: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1413: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1414: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1415: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1416: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1417: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1418: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1419: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1420: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1421: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1422: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1423: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1424: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1425: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1426: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1427: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1428: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1429: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1430: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1431: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1432: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1433: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1434: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1435: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1436: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1437: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1438: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1439: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1440: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1441: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1442: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1443: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1444: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1445: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1446: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1447: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1448: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1449: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf|EN010103-001475-NZT DCO 3.1 - Book of Reference - Clean - Apr 2022.pdf]]:1450: Plot Number which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf|EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf]]:26:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf|EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf]]:66: run-off, dispersion of suspended sediments and spillage risk in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:172: BE TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:183: (11) Sections 72(7) and (8) of the 2009 Act (variation, suspension, revocation and transfer) do [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:186: (6) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:187:access land) are suspended in relation to any access land specified in column (1) of Part 4 of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:187: (3) The period of suspension under paragraph (2) lasts for the period of the temporary stopping [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:189:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:193:suspended and unenforceable or, where so notified by the undertaker, extinguished in so far as [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:193:the undertaker takes temporary possession under this Order are suspended and unenforceable, in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:193: (5) Any person who suffers loss by the extinguishment or suspension of any private right or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:198:public right of navigation over that part of the Driffield Navigation is suspended and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:198: (14) Any person who suffers loss as a result of the suspension of any private right of navigation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:198: (15) Not later than 28 days prior to the proposed commencement of any suspension of the public [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:198: (16) A notice given under paragraph (15) must provide details of the proposed suspension [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:198:particulars of the suspension to which the notice relates, and that suspension will take effect on the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:199:public right of navigation over that part of the Driffield Navigation is suspended and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:199: (14) Any person who suffers loss as a result of the suspension of any private right of navigation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:199: (15) Not later than 28 days prior to the proposed commencement of any suspension of the public [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:199: (16) A notice given under paragraph (15) must provide details of the proposed suspension [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:200:particulars of the suspension to which the notice relates, and that suspension will take effect on the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:200: (b) extinguish or suspend the rights of, or restrictions for the benefit of, or remove, relocate [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:232: SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:232:England Coastal Path Temporarily suspend access to the area shaded [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:333: 7. The provisions of section 72 (variation, suspension, revocation and transfer) of the 2009 Act [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf|EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf]]:358: 7. The provisions of section 72 (variation, suspension, revocation and transfer) of the 2009 Act [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf|EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf]]:44: simultaneously. to be dredged, this activity is considered highly unlikely to increase suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf|EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf]]:151: suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002179-NZT DCO 8.30 - NTG SoCG - Sept 2022(D7) (Tracked).pdf|EN010103-002179-NZT DCO 8.30 - NTG SoCG - Sept 2022(D7) (Tracked).pdf]]:12: suspend easements, servitudes and other private rights. In NTG’s view, there cannot [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf|EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf]]:26: exercised and compensation is provided for in respect of the loss or suspension of any [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf|EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf]]:27: 3.4.10. Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the Countryside [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf|EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf]]:27: 3.4.11. Sub-paragraph (10) provides that the period of suspension lasts for the period of the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf|EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf]]:27: 3.4.12. The powers to suspend the rights of the public in relation to access land are required in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf|EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf]]:29: suspension of a private right of way has been deleted as this is dealt with in Article 26 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf|EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf]]:31: acquired; and (3) land is owned or leased by the undertaker. The Article also suspends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf|EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf]]:31: by the undertaker and also suspends private rights for as long as the undertaker is in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf|EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf]]:31: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights to only [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf|EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf]]:33: suspension of rights of a statutory undertaker (for example where land is being temporarily [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf|EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf]]:50: be temporarily suspended. See paragraphs 3.4.7 to 3.4.15. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf|EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf]]:42: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf|EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf]]:45: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf|EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf]]:46: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf|EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf]]:46: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf|EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf]]:46: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf|EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf]]:46: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf|EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf]]:47: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf|EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf]]:47: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf|EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf]]:47: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf|EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf]]:47: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf|EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf]]:48: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf|EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf]]:48: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf|EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf]]:48: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf|EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf]]:5: ACCESS MAY BE TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf|EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf]]:17: parts of the access land where public access may be temporarily suspended) to the extent [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf|EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf]]:17: (5) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf|EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf]]:18:access land) are suspended in relation to the access land specified in column [[(2)]] of the table in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf|EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf]]:18:suspended) to the extent specified in column [[(3)]] of that table. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf|EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf]]:18: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf|EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf]]:20:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf|EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf]]:26:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf|EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf]]:26:the undertaker takes temporary possession under this Order are suspended and unenforceable for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf|EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf]]:26: (5) Any person who suffers loss by the extinguishment or suspension of any private right or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf|EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf]]:32: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf|EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf]]:68: TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf|EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf]]:68:In the District of Redcar and Access land at South Gare Temporarily suspend access to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf|EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf]]:29: exercised and compensation is provided for in respect of the loss or suspension of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf|EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf]]:30:3.4.10 Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf|EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf]]:30: provides that the period of suspension lasts for the period of the temporary stopping [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf|EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf]]:30:3.4.11 The powers to suspend the rights of the public in relation to access land are required [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf|EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf]]:32: to compensation for the extinguishment or suspension of a private right of way has [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf|EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf]]:35: undertaker. The Article also suspends private rights where the private right is [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf|EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf]]:35: suspends private rights for as long as the undertaker is in temporary possession of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf|EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf]]:35: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf|EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf]]:37: amended to allow for the suspension of rights of a statutory undertaker (for example [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf|EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf]]:54: Way Act 2000 may be temporarily suspended. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf|EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf]]:511: Suspended solids Glass or plastic 100 ISO 5667 3:2018 none 2 days [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf|EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf]]:515: The pH value of a soil suspension in water or a groundwater sample is determined electrometrically using a glass BS1377: Part 3: 1990 – Soils for Civil Engineering Purposes – Chemical and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf|EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf]]:515: The electrical conductance of a soil suspension in water or of a water sample is determined by voltammetry using Standard Methods for the Examination of water and Wastewater Part 2510B 21st [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf|EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf]]:515: salt e.g. the conductivity of topsoil is determined by preparing a suspension of the soil in saturated calcium [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf|EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf]]:516: Suspended matter is removed from a measured volume of sample by filtration under reduced pressure through a [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf|EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf]]:516: pre-treated, pre-weighed glass fibre filter paper. The paper is washed with deionised water to remove dissolved Suspended Solids: UKAS [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf|EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf]]:516: SCA Method ISBN 011 751957 X Suspended, Settleable and Total Dissolved Solids [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf|EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf]]:516: DETSC 2034 Suspended and Settleable Solids in Water salts and the total suspended matter is determined gravimetrically after drying at 105 ±5°C. Settleable solids are 5 mg/l [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf|EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf]]:516: determined by subtracting the solids left in suspension after settlement for 1 hour (or other agreed time) from the Settleable Solids: Not Accredited [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf|EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf]]:516: total suspended matter in the sample. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf|EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf]]:517: Water samples are pre-filtered to remove any suspended solids and evaporated in an oven at 180°C. The amount [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf|EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf]]:517: SCA Method ISBN 011 751957 X Suspended, Settleable and Total Dissolved Solids Total Dissolved Solids: UKAS [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf|EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf]]:517: The sample is shaken to ensure homogeneity of any suspended matter. The sample is then evaporated and the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf|EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf]]:517: filtration prior to analysis. Waters are filtered prior to analysis to remove any particulates in suspension. Soil: 0.2mg/kg [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf|EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf]]:518: suspension. The water soluble boron in the extract or filtrate reacts with azomethine–H to produce a yellow [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf|EN010103-001744-NZT DCO 9.8 Appendix GH.1.1a Factual Report Part 16 - June 2022.pdf]]:519: Waters are filtered prior to analysis to remove any particulates in suspension. The sugar in the filtrate reacts with [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002066-NZT DCO 8.4 - Marine Management Organisation SoCG (Clean) August 2022 (D6).pdf|EN010103-002066-NZT DCO 8.4 - Marine Management Organisation SoCG (Clean) August 2022 (D6).pdf]]:10: vary, suspend or revoke a marine licence if it appears that any of its provisions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf|EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf]]:40: that would not otherwise fall within the standard drafting and are not covered belonging to statutory undertakers, or to extinguish or suspend (or create [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf|EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf]]:40: iii) What consideration should the ExA give to such matters relating to 2. the suspension of “private rights and restrictions” over the Order land [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf|EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf]]:41: iii) The extinguishment and suspension of private rights must be taken into [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf|EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf]]:41: The extinguishment and suspension of private rights relating to apparatus is [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf|EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf]]:137: prevented or suspended for the long term or indefinitely. This will not include mitigating [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf|EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf]]:140:OGA or relevant technical regulator may decide to permanently suspend injection or, the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002624-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12 2.pdf|EN010103-002624-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12 2.pdf]]:4: acquire, appropriate, extinguish or suspend any rights in the Sembcorp Pipeline [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002624-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12 2.pdf|EN010103-002624-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12 2.pdf]]:4: without such acquisition, appropriation, extinguishment or suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf|EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf]]:13: land, compulsorily or by agreement, and the creation, suspension or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf|EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf]]:15: can be extinguished or suspended, so as to facilitate the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf|EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf]]:26: extinguish or suspend rights over land, and to temporarily use land for the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf|EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf]]:41: compulsorily or by agreement, and the creation, suspension or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf|EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf]]:45: extinguished or suspended, so as to facilitate the construction and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf|EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf]]:47: matters to be suspended, overridden or extinguished within the Order Land [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf|EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf]]:89: suspension or extinguishment of private rights, is no more than is reasonably [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf|EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf]]:89: covenants and the suspension or extinguishment of private rights is justified. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf|EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf]]:27:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf|EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf]]:68: off, dispersion of suspended sediments and spillage risk in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf|EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf]]:34: that changes to suspended sediment, for example, were to be considered within the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf|EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf]]:26:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf|EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf]]:65: off, dispersion of suspended sediments and spillage risk in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf]]:2: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf]]:3: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf]]:4: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf]]:5: 142a 142 it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf]]:6: 192 Lighting Tower Capstan it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf]]:7: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf]]:8: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf]]:9: 4.0m 4.3m it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf]]:10: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf]]:11: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf]]:12: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf]]:13: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf]]:14: 2.1m it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf|EN010103-001441-NZT DCO 4.3 - Crown Land Plans - Rev. 3.0 Apr 2022.pdf]]:15: L Twr it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf|EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf]]:26: exercised and compensation is provided for in respect of the loss or suspension of any [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf|EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf]]:26: 3.4.10. Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the Countryside [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf|EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf]]:27: 3.4.11. Sub-paragraph (10) provides that the period of suspension lasts for the period of the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf|EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf]]:27: 3.4.12. The powers to suspend the rights of the public in relation to access land are required in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf|EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf]]:29: suspension of a private right of way has been deleted as this is dealt with in Article 26 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf|EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf]]:31: acquired; and (3) land is owned or leased by the undertaker. The Article also suspends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf|EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf]]:31: by the undertaker and also suspends private rights for as long as the undertaker is in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf|EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf]]:31: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights to only [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf|EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf]]:33: suspension of rights of a statutory undertaker (for example where land is being temporarily [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf|EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf]]:49: be temporarily suspended. See paragraphs 3.4.7 to 3.4.15. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf|EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf]]:29:SSC Suspended Sediment Concentrations - the total value of both mineral [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf|EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf]]:29: and organic material carried in suspension by a river. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001978-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Clean) August 2022 (D5).pdf|EN010103-001978-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Clean) August 2022 (D5).pdf]]:38: between the works and nest(s) and suspending vegetation clearance [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf|EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf]]:27:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf|EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf]]:69: off, dispersion of suspended sediments and spillage risk in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf|EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf]]:26: exercised and compensation is provided for in respect of the loss or suspension of any [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf|EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf]]:26: 3.4.10. Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the Countryside [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf|EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf]]:27: 3.4.11. Sub-paragraph (10) provides that the period of suspension lasts for the period of the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf|EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf]]:27: 3.4.12. The powers to suspend the rights of the public in relation to access land are required in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf|EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf]]:29: suspension of a private right of way has been deleted as this is dealt with in Article 26 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf|EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf]]:31: acquired; and (3) land is owned or leased by the undertaker. The Article also suspends [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf|EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf]]:31: by the undertaker and also suspends private rights for as long as the undertaker is in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf|EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf]]:31: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights to only [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf|EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf]]:33: suspension of rights of a statutory undertaker (for example where land is being temporarily [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf|EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf]]:49: be temporarily suspended. See paragraphs 3.4.7 to 3.4.15. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf|EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf]]:5: ACCESS MAY BE TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf|EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf]]:16: parts of the access land where public access may be temporarily suspended) to the extent [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf|EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf]]:16: (5) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf|EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf]]:16:access land) are suspended in relation to the access land specified in column [[(2)]] of the table in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf|EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf]]:16:suspended) to the extent specified in column [[(3)]] of that table. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf|EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf]]:16: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf|EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf]]:18:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf|EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf]]:25:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf|EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf]]:25:the undertaker takes temporary possession under this Order are suspended and unenforceable for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf|EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf]]:25: (5) Any person who suffers loss by the extinguishment or suspension of any private right or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf|EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf]]:30: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf|EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf]]:64: TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf|EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf]]:64:In the District of Redcar and Access land at Coatham beach Temporarily suspend access to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf|EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf]]:26:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf|EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf]]:65: off, dispersion of suspended sediments and spillage risk in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002463-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 1.pdf|EN010103-002463-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 1.pdf]]:4: acquire, appropriate, extinguish or suspend any rights in the Sembcorp Pipeline [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002463-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 1.pdf|EN010103-002463-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 1.pdf]]:4: without such acquisition, appropriation, extinguishment or suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf|EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf]]:26:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf|EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf]]:67: off, dispersion of suspended sediments and spillage risk in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001888-CATS North Sea Limited.pdf|EN010103-001888-CATS North Sea Limited.pdf]]:2: where there is a need to acquire or suspend third party or the grid). The former [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001888-CATS North Sea Limited.pdf|EN010103-001888-CATS North Sea Limited.pdf]]:3: acquire or suspend third party rights. that study work is essen [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf|EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf]]:31: exercised and compensation is provided for in respect of the loss or suspension of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf|EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf]]:31:3.4.10 Sub-paragraph (9) of Article 13 provides for the suspension of section 2 of the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf|EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf]]:31:3.4.11 Sub-paragraph (10) provides that the period of suspension lasts for the period of the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf|EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf]]:31:3.4.12 The powers to suspend the rights of the public in relation to access land are required [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf|EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf]]:34: to compensation for the extinguishment or suspension of a private right of way has [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf|EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf]]:36: undertaker. The Article also suspends private rights where the private right is [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf|EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf]]:36: suspends private rights for as long as the undertaker is in temporary possession of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf|EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf]]:36: Order 2017. Sub-paragraph (4) limits the scope of the suspension of existing rights [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf|EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf]]:39: amended to allow for the suspension of rights of a statutory undertaker (for example [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf|EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf]]:56: Countryside and Rights of Way Act 2000 may be temporarily suspended. See [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:3: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 124 to 1735 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:5: rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in connection with the authorised [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1204: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1204: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1205: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1206: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1207: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1208: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1209: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1210: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1211: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1212: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1213: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1214: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1215: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1216: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1217: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1218: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1219: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1220: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1221: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1222: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1223: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1224: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1225: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1226: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1227: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1228: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1229: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1230: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1231: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1232: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1233: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1234: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1235: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1236: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1237: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1238: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1239: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1240: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1241: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1242: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1243: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1244: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1245: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1246: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1247: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1248: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1249: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1250: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1251: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1252: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1253: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1254: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1255: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1256: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1257: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1258: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1259: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1260: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1261: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1262: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1263: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1264: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1265: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1266: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1451: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1452: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1453: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1454: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1455: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1456: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1457: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1458: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1459: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1460: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1461: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1462: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1463: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1464: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1465: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1466: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1467: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1468: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1469: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1470: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1471: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1472: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1473: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1474: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1475: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1476: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1477: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1478: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1479: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1480: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1481: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1482: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1483: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1484: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1485: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1486: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1487: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1488: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1489: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1490: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1491: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1492: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1493: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1494: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1495: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1496: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1497: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1498: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1499: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1500: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1501: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1502: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1503: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1504: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1505: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1506: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1507: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1508: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1509: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1510: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1511: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1512: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1513: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1514: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1515: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1516: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1517: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1518: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1519: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1520: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1521: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1522: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1523: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1524: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1525: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1526: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1527: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1528: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1529: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1530: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1531: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1532: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1533: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1534: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1535: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1536: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1537: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1538: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1539: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1540: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1541: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1542: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1543: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1544: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1545: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1546: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1547: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1548: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1549: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1550: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1551: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1552: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1553: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1554: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1555: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1556: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1557: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1558: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1559: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1560: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1561: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1562: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1563: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1564: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1565: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1566: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1567: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1568: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1569: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1570: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1571: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1572: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1573: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1574: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1575: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1576: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1577: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1578: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1579: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1580: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1581: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1582: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1583: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1584: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1585: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1586: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1587: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1588: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1589: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1590: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1591: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1592: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1593: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1594: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1595: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1596: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1597: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1598: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1599: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1600: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1601: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1602: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1603: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1604: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1605: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1606: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1607: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1608: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1609: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1610: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1611: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1612: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1613: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1614: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1615: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1616: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1617: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1618: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1619: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1620: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1621: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1622: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1623: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1624: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1625: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1626: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1627: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1628: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1629: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1630: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1631: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1632: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1633: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1634: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1635: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1636: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1637: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1638: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1639: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1640: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1641: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1642: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1643: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1644: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1645: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1646: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1647: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1648: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1649: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1650: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1651: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1652: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1653: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1654: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1655: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1656: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1657: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1658: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1659: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1660: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1661: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1662: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1663: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1664: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1665: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1666: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1667: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1668: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1669: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1670: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf|EN010103-002047-NZT DCO 3.1 - Book of Reference (Clean) August 2022 (D6).pdf]]:1671: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002548-NZT DCO 4.16.2 - Parking Plan - Nov 2022 (D12).pdf|EN010103-002548-NZT DCO 4.16.2 - Parking Plan - Nov 2022 (D12).pdf]]:1: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:3:Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 8 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:5: (including private rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1206: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1206: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1207: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1208: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1209: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1210: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1211: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1212: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1213: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1214: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1215: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1216: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1217: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1218: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1219: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1220: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1221: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1222: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1223: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1224: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1225: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1226: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1227: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1228: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1229: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1230: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1231: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1232: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1233: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1234: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1235: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1236: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1237: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1238: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1239: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1240: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1241: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1242: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1243: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1244: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1245: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1246: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1247: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1248: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1249: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1250: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1251: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1252: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1253: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1254: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1255: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1256: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1257: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1258: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1259: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1260: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1261: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1262: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1263: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1264: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1265: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1266: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1451: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1452: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1453: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1454: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1455: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1456: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1457: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1458: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1459: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1460: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1461: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1462: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1463: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1464: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1465: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1466: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1467: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1468: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1469: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1470: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1471: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1472: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1473: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1474: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1475: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1476: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1477: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1478: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1479: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1480: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1481: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1482: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1483: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1484: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1485: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1486: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1487: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1488: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1489: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1490: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1491: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1492: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1493: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1494: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1495: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1496: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1497: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1498: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1499: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1500: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1501: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1502: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1503: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1504: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1505: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1506: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1507: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1508: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1509: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1510: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1511: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1512: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1513: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1514: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1515: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1516: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1517: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1518: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1519: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1520: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1521: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1522: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1523: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1524: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1525: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1526: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1527: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1528: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1529: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1530: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1531: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1532: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1533: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1534: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1535: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1536: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1537: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1538: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1539: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1540: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1541: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1542: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1543: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1544: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1545: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1546: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1547: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1548: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1549: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1550: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1551: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1552: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1553: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1554: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1555: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1556: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1557: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1558: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1559: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1560: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1561: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1562: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1563: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1564: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1565: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1566: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1567: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1568: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1569: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1570: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1571: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1572: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1573: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1574: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1575: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1576: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1577: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1578: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1579: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1580: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1581: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1582: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1583: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1584: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1585: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1586: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1587: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1588: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1589: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1590: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1591: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1592: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1593: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1594: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1595: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1596: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1597: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1598: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1599: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1600: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1601: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1602: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1603: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1604: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1605: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1606: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1607: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1608: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1609: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1610: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1611: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1612: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1613: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1614: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1615: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1616: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1617: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1618: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1619: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1620: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1621: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1622: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1623: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1624: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1625: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1626: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1627: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1628: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1629: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1630: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1631: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1632: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1633: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1634: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1635: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1636: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1637: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1638: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1639: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1640: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1641: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1642: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf|EN010103-001790-NZT DCO 3.1 - Book of Reference - June 2022 (Tracked).pdf]]:1643: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002309-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Clean) Oct 2022 (D9).pdf|EN010103-002309-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Clean) Oct 2022 (D9).pdf]]:41: between the works and nest(s) and suspending vegetation clearance [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002157-NZT DCO 4.16.2 - Parking Plan August 2022 (D6).pdf|EN010103-002157-NZT DCO 4.16.2 - Parking Plan August 2022 (D6).pdf]]:1: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001776-NZT DCO 9.8 - Appendix GEN.1.2 Position Statement Hornsea Project Four and BP - June 2022.pdf|EN010103-001776-NZT DCO 9.8 - Appendix GEN.1.2 Position Statement Hornsea Project Four and BP - June 2022.pdf]]:42:periods of suspended injection). Monitoring costs, which are a typically small fraction (<2 %) [[6]] of full- [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001120-NZT DCO 6.4.36 ES Vol III Appendix 16A Transportation Assessment Part 1.pdf|EN010103-001120-NZT DCO 6.4.36 ES Vol III Appendix 16A Transportation Assessment Part 1.pdf]]:12: Darlington. Northern Rail suspended all services to and from the station on [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf|EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf]]:10:  Establish onshore support requirements 4 Muster as necessary and suspend all work permits.  ERP [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf|EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf]]:12: they are withdrawn or suspended by the SoS.1 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf|EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf]]:43: confirmed that the current National Policy Statements were not being suspended in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf|EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf]]:41:3.63 The closure of the steelworks marked the suspension and possible cessation of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf|EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf]]:27:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf|EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf]]:67: off, dispersion of suspended sediments and spillage risk in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:3:Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 845 to 1238 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:5: (including private rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:845: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:845: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:846: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:847: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:848: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:849: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:850: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:851: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:852: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:853: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:854: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:855: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:856: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:857: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:858: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:859: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:860: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:861: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:862: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:863: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:864: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:865: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:866: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:867: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:868: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:869: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:870: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:871: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:872: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:873: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:874: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:875: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:876: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:877: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:878: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:879: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:880: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:881: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:882: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:883: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:884: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:885: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:886: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:887: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:888: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:889: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:890: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:891: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:892: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:893: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:894: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:895: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:896: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:897: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:898: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:899: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:900: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:901: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:902: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:903: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:904: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:905: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:906: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:907: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:908: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:909: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:910: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:911: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:912: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:913: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:914: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:915: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:916: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:917: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:918: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:919: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:920: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:921: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:922: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:923: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:924: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:925: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:926: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:927: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:928: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:929: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:930: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:931: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:932: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:933: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:934: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:935: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:936: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:937: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:938: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:939: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:940: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:941: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:942: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:943: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:944: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:945: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:946: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:947: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:948: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:949: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:950: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:951: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:952: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:953: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:954: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:955: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:956: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:957: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:958: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:959: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:960: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:961: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:962: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:963: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:964: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:965: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:966: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:967: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:968: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:969: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:970: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:971: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:972: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:973: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:974: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:975: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:976: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:977: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:978: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:979: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:980: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:981: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:982: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:983: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:984: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:985: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:986: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:987: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:988: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:989: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:990: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:991: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:992: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:993: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:994: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:995: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:996: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:997: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:998: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:999: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1000: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1001: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1002: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1003: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1004: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1005: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1006: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1007: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1008: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1009: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1010: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1011: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1012: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1013: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1014: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1015: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1016: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1017: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1018: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1019: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1020: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1021: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1022: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1023: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1024: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1025: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1026: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1027: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1028: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1029: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1030: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1031: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1032: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1033: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1034: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1035: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1036: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1037: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1038: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1039: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1040: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1041: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1042: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1043: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1044: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1045: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1046: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1047: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1048: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1049: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1050: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1051: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1052: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1053: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1054: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1055: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1056: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1057: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1058: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1059: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1060: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1061: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1062: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1063: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1064: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1065: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1066: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1067: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1068: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1069: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1070: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1071: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1072: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1073: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1074: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1075: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1076: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1077: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1078: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1079: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1080: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1081: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1082: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1083: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1084: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1085: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1086: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1087: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1088: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1089: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1090: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1091: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1092: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1093: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1094: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1095: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1096: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1097: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1098: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1099: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1100: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1101: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1102: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1103: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1104: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1105: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1106: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1107: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1108: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1109: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1110: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1111: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1112: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1113: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1114: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1115: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1116: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1117: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1118: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1119: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1120: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1121: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1122: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1123: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1124: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1125: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1126: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1127: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1128: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1129: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1130: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1131: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1132: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1133: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1134: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1135: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1136: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1137: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1138: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1139: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1140: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1141: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1142: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1143: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1144: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1145: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1146: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1147: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1148: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1149: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1150: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1151: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1152: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1153: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1154: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1155: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1156: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1157: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1158: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1159: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1160: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1161: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1162: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1163: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1164: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1165: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1166: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1167: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1168: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1169: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1170: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1171: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1172: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1173: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1174: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1175: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1176: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1177: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1178: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1179: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1180: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1181: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1182: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1183: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1184: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1185: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1186: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1187: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1188: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1189: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1190: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1191: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1192: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1193: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1194: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1195: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1196: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1197: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1198: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1199: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1200: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1201: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1202: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1203: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1204: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1205: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1206: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1207: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1208: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1209: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1210: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1211: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1212: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1213: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1214: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1215: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1216: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1217: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1218: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1219: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1220: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1221: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1222: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1223: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1224: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1225: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1226: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1227: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1228: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1229: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1230: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1231: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1232: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1233: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1234: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1235: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1236: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1237: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf|EN010103-001179-NZT DCO 3.1 - Book of Reference final.pdf]]:1238: which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf|EN010103-001782-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Clean).pdf]]:3: be extinguished, suspended or interfered with under the Order. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002515-NZT DCO 8.30 - NTG SoCG (Clean) - Nov 2022 D12.pdf|EN010103-002515-NZT DCO 8.30 - NTG SoCG (Clean) - Nov 2022 D12.pdf]]:13: sought could be removed in relation to which it is proposed to extinguish or suspend [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002635-NZT DCO 8.4 - MMO SoCG - Final (signed) - Nov 2022 (D13).pdf|EN010103-002635-NZT DCO 8.4 - MMO SoCG - Final (signed) - Nov 2022 (D13).pdf]]:10: vary, suspend or revoke a marine licence if it appears that any of its provisions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002516-NZT DCO 8.30 - NTG SoCG (Tracked) - Nov 2022 D12.pdf|EN010103-002516-NZT DCO 8.30 - NTG SoCG (Tracked) - Nov 2022 D12.pdf]]:14: to which it is proposed to extinguish or suspend easements, servitudes and other [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001786-NZT DCO 8.30 - NTL, NTLL and NTRL SoCG - June 2022 (Clean).pdf|EN010103-001786-NZT DCO 8.30 - NTL, NTLL and NTRL SoCG - June 2022 (Clean).pdf]]:12: in relation to which it is proposed to extinguish or suspend easements, servitudes [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf|EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf]]:18: now resumed. In the US, the suspension of debt collection and customer [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf|EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf]]:20:customers may have faced, suspending debt collection and customer of heat. While gas clearly has a role to play for many years to come, we [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf|EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf]]:35: • finance: monitoring of cash flow levels, review and where necessary suspension of customer collection [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf|EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf]]:36: Scenario 7 – The result of a ‘Hard Brexit’ in the UK. ability to sell assets, raise capital and suspend or reduce the payment of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf|EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf]]:138: retail customers, in light of the suspension of debt collection activities [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf|EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf]]:235:RIPUC for approval of a long-term contract for output from an continued settlement negotiations and have been granted a suspension [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf|EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf]]:237:operators for transmission services in the UK. The suspension of debt collection [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf|EN010103-001908-NZT DCO 9.5 - Compulsory Acquisition Schedule (Clean) July 2022 (D4).pdf]]:4: be extinguished, suspended or interfered with under the Order. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:3: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 1197 to 1654 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:5: rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in connection with the authorised [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1132: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1133: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1134: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1135: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1136: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1137: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1138: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1139: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1140: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1141: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1142: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1143: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1144: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1145: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1146: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1147: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1148: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1149: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1150: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1151: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1152: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1153: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1154: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1155: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1156: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1157: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1158: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1159: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1160: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1161: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1162: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1163: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1164: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1165: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1166: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1167: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1168: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1169: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1170: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1171: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1172: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1173: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1174: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1175: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1176: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1177: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1178: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1179: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1180: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1181: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1182: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1183: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1184: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1185: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1186: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1187: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1188: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1189: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1190: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1191: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1192: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1193: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1194: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1195: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1196: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1197: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1198: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1199: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1200: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1201: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1202: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1203: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1204: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1205: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1206: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1207: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1208: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1209: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1210: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1211: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1212: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1213: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1214: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1215: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1216: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1217: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1218: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1219: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1220: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1221: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1222: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1223: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1224: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1225: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1226: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1227: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1228: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1229: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1230: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1231: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1232: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1233: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1234: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1235: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1236: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1237: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1238: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1239: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1240: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1241: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1242: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1243: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1244: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1245: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1246: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1247: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1248: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1249: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1250: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1251: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1252: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1253: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1254: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1255: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1256: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1257: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1258: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1259: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1260: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1261: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1262: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1263: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1264: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1265: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1266: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1451: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1452: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1453: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1454: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1455: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1456: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1457: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1458: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1459: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1460: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1461: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1462: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1463: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1464: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1465: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1466: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1467: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1468: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1469: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1470: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1471: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1472: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1473: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1474: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1475: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1476: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1477: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1478: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1479: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1480: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1481: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1482: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1483: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1484: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1485: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1486: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1487: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1488: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1489: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1490: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1491: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1492: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1493: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1494: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1495: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1496: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1497: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1498: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1499: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1500: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1501: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1502: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1503: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1504: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1505: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1506: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1507: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1508: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1509: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1510: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1511: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1512: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1513: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1514: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1515: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1516: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1517: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1518: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1519: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1520: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1521: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1522: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1523: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1524: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1525: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1526: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1527: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1528: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1529: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1530: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1531: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1532: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1533: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1534: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1535: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1536: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1537: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1538: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1539: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1540: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1541: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1542: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1543: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1544: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1545: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1546: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1547: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1548: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1549: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1550: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1551: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1552: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1553: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1554: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1555: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1556: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1557: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1558: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1559: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1560: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1561: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1562: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1563: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1564: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1565: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1566: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1567: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1568: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1569: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1570: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1571: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf|EN010103-002530-NZT DCO 3.1 - Book of Reference (Clean) Nov 2022 (D12).pdf]]:1572: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:3: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 1197 to 1654 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:5: rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in connection with the authorised [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1132: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1133: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1134: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1135: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1136: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1137: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1138: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1139: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1140: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1141: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1142: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1143: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1144: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1145: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1146: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1147: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1148: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1149: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1150: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1151: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1152: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1153: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1154: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1155: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1156: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1157: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1158: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1159: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1160: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1161: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1162: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1163: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1164: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1165: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1166: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1167: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1168: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1169: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1170: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1171: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1172: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1173: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1174: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1175: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1176: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1177: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1178: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1179: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1180: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1181: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1182: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1183: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1184: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1185: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1186: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1187: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1188: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1189: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1190: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1191: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1192: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1193: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1194: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1195: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1196: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1197: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1198: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1199: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1200: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1201: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1202: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1203: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1204: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1205: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1206: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1207: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1208: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1209: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1210: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1211: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1212: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1213: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1214: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1215: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1216: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1217: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1218: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1219: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1220: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1221: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1222: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1223: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1224: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1225: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1226: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1227: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1228: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1229: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1230: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1231: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1232: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1233: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1234: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1235: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1236: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1237: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1238: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1239: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1240: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1241: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1242: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1243: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1244: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1245: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1246: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1247: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1248: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1249: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1250: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1251: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1252: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1253: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1254: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1255: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1256: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1257: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1258: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1259: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1260: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1261: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1262: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1263: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1264: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1265: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1266: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1451: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1452: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1453: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1454: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1455: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1456: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1457: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1458: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1459: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1460: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1461: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1462: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1463: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1464: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1465: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1466: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1467: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1468: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1469: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1470: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1471: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1472: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1473: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1474: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1475: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1476: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1477: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1478: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1479: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1480: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1481: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1482: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1483: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1484: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1485: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1486: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1487: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1488: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1489: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1490: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1491: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1492: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1493: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1494: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1495: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1496: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1497: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1498: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1499: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1500: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1501: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1502: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1503: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1504: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1505: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1506: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1507: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1508: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1509: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1510: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1511: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1512: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1513: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1514: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1515: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1516: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1517: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1518: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1519: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1520: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1521: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1522: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1523: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1524: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1525: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1526: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1527: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1528: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1529: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1530: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1531: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1532: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1533: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1534: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1535: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1536: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1537: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1538: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1539: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1540: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1541: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1542: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1543: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1544: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1545: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1546: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1547: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1548: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1549: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1550: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1551: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1552: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1553: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1554: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1555: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1556: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1557: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1558: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1559: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1560: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1561: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1562: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1563: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1564: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1565: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1566: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1567: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1568: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1569: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1570: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1571: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf|EN010103-002744-Applicant NZT DCO 3.1 - Book of Reference (Clean) - March 2023.pdf]]:1572: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf|EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf]]:47: suspending vegetation clearance works within the area [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf|EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf]]:50: Steel railway station (currently suspended). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf|EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf]]:76: between the works and nest(s) and suspending [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf|EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf]]:36: nest(s) and suspending vegetation clearance works within the area until any young had [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf|EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf]]:38: (currently suspended). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf|EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf]]:62: nest(s) and suspending vegetation clearance works within the area until any young had Requirement 16: Construction [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001719-Redcar Bulk Terminal Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001719-Redcar Bulk Terminal Limited - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:6: relation to which it is proposed to extinguish or suspend easements, servitudes and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf|EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf]]:68: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf|EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf]]:69: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf|EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf]]:69: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf|EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf]]:69: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf|EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf]]:41: not being suspended in the meantime. The relevant energy National Policy [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf|EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf]]:5: ACCESS MAY BE TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf|EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf]]:15: parts of the access land where public access may be temporarily suspended) to the extent [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf|EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf]]:16: (5) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf|EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf]]:16:access land) are suspended in relation to the access land specified in column [[(2)]] of the table in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf|EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf]]:16:suspended) to the extent specified in column [[(3)]] of that table. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf|EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf]]:16: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf|EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf]]:18:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf|EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf]]:24:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf|EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf]]:25:the undertaker takes temporary possession under this Order are suspended and unenforceable for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf|EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf]]:25: (5) Any person who suffers loss by the extinguishment or suspension of any private right or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf|EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf]]:30: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf|EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf]]:64: TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf|EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf]]:64:In the District of Redcar and Access land at South Gare Temporarily suspend access to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf|EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf]]:26:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf|EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf]]:67: off, dispersion of suspended sediments and spillage risk in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000883-NZT DCO 4.2 Land Plans.pdf|EN010103-000883-NZT DCO 4.2 Land Plans.pdf]]:4: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000883-NZT DCO 4.2 Land Plans.pdf|EN010103-000883-NZT DCO 4.2 Land Plans.pdf]]:5: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000883-NZT DCO 4.2 Land Plans.pdf|EN010103-000883-NZT DCO 4.2 Land Plans.pdf]]:6: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000883-NZT DCO 4.2 Land Plans.pdf|EN010103-000883-NZT DCO 4.2 Land Plans.pdf]]:7: 142 it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000883-NZT DCO 4.2 Land Plans.pdf|EN010103-000883-NZT DCO 4.2 Land Plans.pdf]]:8: Lighting Tower Capstan it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000883-NZT DCO 4.2 Land Plans.pdf|EN010103-000883-NZT DCO 4.2 Land Plans.pdf]]:9: Con it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000883-NZT DCO 4.2 Land Plans.pdf|EN010103-000883-NZT DCO 4.2 Land Plans.pdf]]:10: anH it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000883-NZT DCO 4.2 Land Plans.pdf|EN010103-000883-NZT DCO 4.2 Land Plans.pdf]]:11: 4.0m 4.3m it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000883-NZT DCO 4.2 Land Plans.pdf|EN010103-000883-NZT DCO 4.2 Land Plans.pdf]]:12: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000883-NZT DCO 4.2 Land Plans.pdf|EN010103-000883-NZT DCO 4.2 Land Plans.pdf]]:13: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000883-NZT DCO 4.2 Land Plans.pdf|EN010103-000883-NZT DCO 4.2 Land Plans.pdf]]:14: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000883-NZT DCO 4.2 Land Plans.pdf|EN010103-000883-NZT DCO 4.2 Land Plans.pdf]]:15: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000883-NZT DCO 4.2 Land Plans.pdf|EN010103-000883-NZT DCO 4.2 Land Plans.pdf]]:16: 2.1m L Twr it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000883-NZT DCO 4.2 Land Plans.pdf|EN010103-000883-NZT DCO 4.2 Land Plans.pdf]]:17: L Twr it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf|EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf]]:13: the creation, suspension or extinguishment of, or interference with, interests in or rights [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf|EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf]]:14: private rights identified as affecting the land can be extinguished or suspended, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf|EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf]]:25: Application to acquire land, acquire or create rights over land, to extinguish or suspend [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf|EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf]]:39: suspension or extinguishment of, or interference with, interests in or rights over land, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf|EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf]]:43: identified as affecting the land can be extinguished or suspended, so as to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf|EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf]]:44: addition, the Applicants require certain matters to be suspended, overridden or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf|EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf]]:85: overriding of interests, rights and restrictive covenants and the suspension or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf|EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf]]:85: interests, rights and restrictive covenants and the suspension or extinguishment of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:3: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 1197 to 1654 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:5: rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in connection with the authorised [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1200: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1200: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1201: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1202: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1203: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1204: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1205: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1206: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1207: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1208: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1209: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1210: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1211: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1212: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1213: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1214: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1215: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1216: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1217: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1218: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1219: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1220: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1221: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1222: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1223: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1224: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1225: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1226: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1227: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1228: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1229: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1230: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1231: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1232: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1233: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1234: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1235: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1236: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1237: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1238: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1239: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1240: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1241: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1242: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1243: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1244: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1245: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1246: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1247: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1248: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1249: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1250: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1251: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1252: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1253: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1254: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1255: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1256: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1257: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1258: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1259: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1260: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1261: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1262: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1263: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1264: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1265: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1266: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1451: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1452: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1453: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1454: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1455: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1456: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1457: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1458: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1459: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1460: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1461: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1462: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1463: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1464: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1465: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1466: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1467: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1468: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1469: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1470: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1471: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1472: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1473: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1474: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1475: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1476: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1477: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1478: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1479: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1480: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1481: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1482: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1483: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1484: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1485: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1486: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1487: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1488: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1489: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1490: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1491: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1492: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1493: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1494: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1495: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1496: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1497: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1498: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1499: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1500: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1501: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1502: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1503: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1504: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1505: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1506: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1507: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1508: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1509: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1510: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1511: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1512: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1513: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1514: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1515: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1516: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1517: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1518: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1519: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1520: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1521: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1522: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1523: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1524: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1525: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1526: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1527: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1528: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1529: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1530: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1531: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1532: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1533: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1534: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1535: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1536: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1537: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1538: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1539: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1540: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1541: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1542: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1543: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1544: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1545: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1546: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1547: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1548: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1549: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1550: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1551: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1552: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1553: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1554: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1555: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1556: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1557: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1558: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1559: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1560: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1561: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1562: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1563: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1564: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1565: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1566: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1567: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1568: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1569: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1570: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1571: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1572: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1573: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1574: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1575: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1576: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1577: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1578: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1579: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1580: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1581: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1582: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1583: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1584: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1585: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1586: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1587: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1588: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1589: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1590: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1591: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1592: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1593: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1594: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1595: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1596: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1597: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1598: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1599: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1600: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1601: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1602: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1603: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1604: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1605: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1606: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1607: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1608: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1609: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1610: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1611: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1612: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1613: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1614: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1615: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1616: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1617: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1618: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1619: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1620: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1621: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1622: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1623: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1624: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1625: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1626: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1627: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1628: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1629: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1630: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1631: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1632: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1633: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1634: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1635: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1636: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1637: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1638: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1639: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1640: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1641: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1642: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1643: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1644: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1645: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1646: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1647: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1648: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1649: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1650: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1651: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1652: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1653: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1654: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1655: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1656: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1657: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1658: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf|EN010103-002531-NZT DCO 3.1 - Book of Reference (Tracked) Nov 2022 (D12).pdf]]:1659: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf|EN010103-001781-NZT DCO 9.5 - Compulsory Acquisition Schedule - June 2022 (Tracked).pdf]]:3: be extinguished, suspended or interfered with under the Order. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002310-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Tracked) Oct 2022 (D9).pdf|EN010103-002310-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Tracked) Oct 2022 (D9).pdf]]:41: between the works and nest(s) and suspending vegetation clearance [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf|EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf]]:5: ACCESS MAY BE TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf|EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf]]:17: the access land where public access may be temporarily suspended) to the extent [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf|EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf]]:18: (5) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf|EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf]]:18:access land) are suspended in relation to the access land specified in column (2) of Table 6 in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf|EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf]]:18:suspended) to the extent specified in column (3) of that Table 6. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf|EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf]]:18: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf|EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf]]:20:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf|EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf]]:26:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf|EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf]]:27:the undertaker takes temporary possession under this Order are suspended and unenforceable for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf|EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf]]:27: (5) Any person who suffers loss by the extinguishment or suspension of any private right or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf|EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf]]:32: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf|EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf]]:70: TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf|EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf]]:70:In the District of Redcar and Access land at South Gare Temporarily suspend access to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:79: Surface Water Quality – Suspended Fine Sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:79: suspended sediment concentrations would result in a temporary increase in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:79: element would occur due to suspended fine sediments, nor any non- [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:81:9.7.64 Increased suspended sediment concentrations from the construction works [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:83: Surface Water Quality – Suspended Fine Sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:84: due to suspended fine sediments, nor any non-compliance with WFD [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:84: Surface Water Quality – Suspended Fine Sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:85: anticipated due to suspended fine sediments, nor any non-compliance with [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:128:B.1.11 Suspended sediment concentrations are generally low in Tees Bay and in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:128: marine input is washed in with the flood tide, and often causes resuspension [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:128: suspended sediments and a variety of sources and sinks. Silts and muds are [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:128: readily transported as suspended sediment load and can remain in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:128: suspension for extended periods through the tidal cycle, while coarser sands [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:128: carried as bedload. Suspended sediment concentrations between 1500 and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:156:waterbodies based on its recorded salinity and suspended particulate matter concentration1. In this [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:156:case, Environment Agency data show an average of 8 mg/l suspended solids and normal salinity of 30 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:169:point B gives an average suspended solids concentration of 8.5 mg/l. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf|EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf]]:169: EQS value based on average suspended solids concentration of 8.5 mg/l recorded at Sample Point B and average salinity of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf|EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf]]:4: it i6 proposed lo etrinoui6h or suspend eagements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf|EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf]]:5: it i6 propo6ed to efinguish or suspend ea6emenb. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf|EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf]]:6: o or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf|EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf]]:8: or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf|EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf]]:12: il is proposed lo exlinguish or suspend easoments, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf|EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf]]:14: o it is proposed to €xlingui6h or suspend easem€nls, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf|EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf]]:18: it is prcposed lo extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf|EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf]]:20: 47 521 | | it is proposed to eninguish or suspend easenents, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf|EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf]]:21: it is proposed to extinguish or suspend easement6, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf|EN010103-001887-Redcar Bulk Terminal Limited - Responses to comments on WRs.pdf]]:22: il is prcposed lo exlinguish or suspend e€sements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf|EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf]]:27:3.2.62 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf|EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf]]:68: off, dispersion of suspended sediments and spillage risk in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001155-NZT DCO 5.11 - Indicative Lighting Strategy.pdf|EN010103-001155-NZT DCO 5.11 - Indicative Lighting Strategy.pdf]]:26: and Darlington. Northern Rail suspended all services to and from the station on 14th [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf|EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf]]:5: ACCESS MAY BE TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf|EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf]]:17: [[6]] (those parts of the access land where public access may be temporarily suspended) to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf|EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf]]:18: (5) Any person who suffers loss by the suspension of any private right of way under this article is [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf|EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf]]:18:access land) are suspended in relation to the access land specified in column[[ (2)]] of the table of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf|EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf]]:18:temporarily suspended) to the extent specified in column[[ (3)]] of that tableTable 6. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf|EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf]]:18: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf|EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf]]:20:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf|EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf]]:26:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf|EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf]]:26:undertaker takes temporary possession under this Order are suspended and unenforceable for as long [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf|EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf]]:26: (5) Any person who suffers loss by the extinguishment or suspension of any private right or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf|EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf]]:32: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf|EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf]]:70: TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf|EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf]]:70: In the District of Redcar and Access land at South Gare Temporarily suspend access to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:21: of its assets in Russia, and gradually suspend its activities in Russia, while assuring its workforce's safety. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:21:today. TotalEnergies has thus initiated the gradual suspension of its activities in Russia, while assuring its teams’ safety. Similarly, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:25:(Paris time), with a fixing of the closing price at 5:35 p.m. (Paris time). Euronext Paris may suspend or resume trading in a security listed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:34:director made in violation of these rules will be declared null and void and payment of the directors’ compensation will be suspended until [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:34:the board composition is compliant with the required quota (the suspension of the directors’ compensation will also be disclosed in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:191: temporarily suspended) 97 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:195:(2) Construction in Mozambique is currently suspended due to a case of force majeure (see the Africa section). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:212: and 2019. Operations have been suspended since 2020 due to the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:213:previous Abu Dhabi Marine Areas Ltd. (ADMA) offshore concession. The suspended from January to October 2020 for reasons of safety and lack [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:213:onshore areas, production was suspended on several occasions Kurdistan, which is in production. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:225:2.3.9 Wells in the process of being drilled (including wells temporarily suspended) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:256:EU economic sanctions were suspended(2). related to Iran carried out by TotalEnergies' companies in 2021. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:276: If the problem cannot be solved immediately, the work is suspended, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:286: suspended in April 2021 (see below), as well as impact on fishers’ TEPMA1 formalized the learnings from these studies and its approach [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:286: Despite the aggravation of the security situation and the suspension of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:287: VPSHR incident resolution Despite the sanitary and security context and the suspension of the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:288:suspension or dismissal). (compared to 99% in 2020). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:369: project in response to the Scotwind call for tender in Scotland – Decision of TotalEnergies and Chevron to suspend dividend [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:436: measures related to construction was temporarily suspended due to security [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:461: to subsidiaries in 101 countries with a response rate of 87%. This operations. These clauses continued to apply, despite the suspension of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:480:correspond to ‘contrats à durée indéterminée’ (CDI) and fixed-term persons who are under suspended contract (sabbatical, business [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:488: to maintain the final dividend for fiscal year 2019, as announced on 2020, it announced the suspension of share buybacks by the Corporation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:488: shares. It was also decided to suspend the dividend growth policy for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf|EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf]]:577: was temporarily suspended due to security problems [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:5: ACCESS MAY BE TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:17: the access land where public access may be temporarily suspended) to the extent [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:17: (5) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:18:access land) are suspended in relation to the access land specified in column (2) of Table 6 in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:18:suspended) to the extent specified in column (3) of that Table 6. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:18: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:20:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:26:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:26:the undertaker takes temporary possession under this Order are suspended and unenforceable for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:26: (5) Any person who suffers loss by the extinguishment or suspension of any private right or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:32: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:76: TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:77:In the District of Redcar and Access land at South Gare Temporarily suspend access to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:92: 7. The provisions of section 72 (variation, suspension, revocation and transfer) of the 2009 Act [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf|EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf]]:104: 7. The provisions of section 72 (variation, suspension, revocation and transfer) of the 2009 Act [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf|EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf]]:17: changes in Suspended Sediment in the Final CEMP. For Surface Water, Flood Risk and Water Resources specifically, key [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf|EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf]]:20: species from increased suspended sediment includes: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf|EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf]]:26: • increases in Suspended Sediment • the Environmental & Social Impact Assessment (ESIA) process will include a formal public [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf|EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf]]:31: • Increase in Suspended Sediment Concentrations and associated [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf|EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf]]:31: Suspended Sediment Concentrations (i.e. Turbidity) and Deposition [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf|EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf]]:35: Suspended Sediment Concentrations (i.e. Turbidity) and Deposition [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf|EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf]]:47: increased suspended sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf|EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf]]:58: injection of dense-phase CO2 into the from increased suspended soundscape, including the harbour [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002002-NZT DCO 4.16.2 - Parking Plan August 2022(D5).pdf|EN010103-002002-NZT DCO 4.16.2 - Parking Plan August 2022(D5).pdf]]:1: 295 it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:28: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:146:Obligation: Suspension); [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:166:to the DPA or CCUS Programme DPAs (including the annulment, invalidation, suspension, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:167: suspension or replacement of any prior decision pursuant to such rules); [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:174:"Suspension CO2 Capture Rate" means fifty per cent. (50%); [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:174:"Suspension CO2 Capture Rate Breach" has the meaning given to that term in Condition [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:174:22.9 (Failure to comply with Minimum CO2 Capture Rate Obligation: Suspension); [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:176: Suspension); [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:204:Suspension of Payments (Annual NDC Test Obligation breach) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:204: elect to suspend payment of any amounts which would otherwise be payable by the DPA [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:204: Annual NDC Test Obligation, provided that, prior to effecting any such suspension, the DPA [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:204: Counterparty shall notify the Generator of: (i) its intention to suspend payment of any such [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:204: amounts; and (ii) the date from which it proposes to effect such suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:205:7.9 Without prejudice to the DPA Counterparty's right to suspend payments pursuant to Condition [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:205: 7.2 (Suspension of Payments (Annual NDC Test Obligation breach)), if the Generator fails to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:206:Suspension of Payments (Annual NDC Test Access Right breach) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:206: Annual NDC Test Access Right, the DPA Counterparty may elect to suspend payment of any [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:206: effecting any such suspension, the DPA Counterparty shall notify the Generator of: (i) its [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:206: intention to suspend payment of any such amounts; and (ii) the date from which it proposes to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:206: effect such suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:231: (i) Conditions 7.2 (Suspension of Payments (Annual NDC Test Obligation breach)), [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:231: 7.13 (Suspension of Payments (Annual NDC Test Access Right breach)), [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:231: comply with Minimum CO2 Capture Rate Obligation: Suspension), Condition [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:231: 23.6 (Suspension of Payments (Failure to provide Declaration Capacity Data)), [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:231: Obligation: Suspension); or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:231: (ii) Conditions 24.6 (Suspension of Payments), 24.9 (Suspension of Payments [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:235: (i) Conditions 7.2 (Suspension of Payments (Annual NDC Test Obligation breach)), [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:235: 7.13 (Suspension of Payments (Annual NDC Test Access Right breach)), [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:235: to comply with Minimum CO2 Capture Rate Obligation: Suspension), Condition [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:235: 23.6 (Suspension of Payments (Failure to provide Declaration Capacity Data)), [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:235: Obligation: Suspension); or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:235: (ii) Conditions 24.6 (Suspension of Payments), 24.9 (Suspension of Payments [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:250: elect to suspend payment of any amounts which would otherwise be payable by the DPA [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:250: Metering Schematic Obligation, provided that, prior to effecting any such suspension, the DPA [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:250: Counterparty shall notify the Generator of: (i) its intention to suspend payment of any such [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:250: amounts; and (ii) the date from which it proposes to effect such suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:251: Metering Access Right, the DPA Counterparty may elect to suspend payment of any amounts [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:251: such suspension, the DPA Counterparty shall notify the Generator of: (i) its intention to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:251: suspend payment of any such amounts; and (ii) the date from which it proposes to effect such [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:251: suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:252: to suspend payment of any amounts which would otherwise be payable by the DPA [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:252: SCADA Systems Obligation, provided that, prior to effecting any such suspension, the DPA [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:252: Counterparty shall notify the Generator of: (i) its intention to suspend payment of any such [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:252: amounts; and (ii) the date from which it proposes to effect such suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:254:Failure to comply with Minimum CO2 Capture Rate Obligation: Suspension [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:254: Capture Rate Average is less than the Suspension CO2 Capture Rate for either three (3) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:254: consecutive AP Billing Periods (a "Suspension CO2 Capture Rate Breach"), then the DPA [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:254: Counterparty may at any time following the occurrence of such breach, elect to suspend [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:254: that, prior to effecting any such suspension, the DPA Counterparty shall notify the Generator [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:254: of: (i) its intention to suspend payment of any such amounts; and (ii) the date from which it [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:254: proposes to effect such suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:254: on the Availability of Capture that is achieved during the suspension period) but for the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:257:Suspension of Payments (Failure to provide Declaration Capacity Data) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:257: suspend payment of any amounts which would otherwise be payable by the DPA Counterparty [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:257: Obligation, provided that, prior to effecting any such suspension, the DPA Counterparty shall [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:257: notify the Generator of: (i) its intention to suspend payment of any such amounts; and (ii) the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:257: date from which it proposes to effect such suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:258: Declaration Access Right, the DPA Counterparty may elect to suspend payment of any [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:258: effecting any such suspension, the DPA Counterparty shall notify the Generator of: (i) its [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:258: intention to suspend payment of any such amounts; and (ii) the date from which it proposes to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:258: effect such suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:263:Suspension of Payments [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:263: (A) suspend payment of any amount(s) which would otherwise be payable by the DPA [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:263: (B) notify the Generator of any suspension as soon as reasonably practicable. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:263: Interest)) has been repaid in full to the granter, any suspension under Condition 24.6 shall [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:263:Suspension of Payments (Failure to Provide Information) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:263: (A) suspend payment of any amount(s) which would otherwise be payable by the DPA [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:263: (B) notify the Generator of any suspension as soon as reasonably practicable. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:263: requested pursuant to Condition 24.5(B)(ii), any suspension under Condition 24.9 shall cease [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:265: (C) subject to Condition 24.15, the suspension under Condition 24.6(A) shall cease and the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:288: or suspends payment pursuant to Conditions 20.2 (Failure to comply with compliance of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:288: Obligations), 22.9 (Failure to comply with Minimum CO2 Capture Rate Obligation: Suspension), [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:288: 23.6 (Suspension of Payments (Failure to provide Declaration Capacity Data)) or 23.13 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:298: (B) provide either Party the right to suspend or terminate its obligations under the DPA, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:305:Failure to comply with T&S Prolonged Unavailability Procedure Obligation: Suspension [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:306: the DPA Counterparty may elect to suspend payment of any amounts which would otherwise [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:306: effecting any such suspension, the DPA Counterparty shall notify the Generator of: (i) its [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:306: intention to suspend payment of any such amounts; and (ii) the date from which it proposes to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:306: effect such suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:313: reduced by any payments which the DPA Counterparty has suspended in accordance with [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:313: Suspension) and not subsequently paid to the Generator in accordance with Condition 22.9 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:313: (Failure to comply with Minimum CO2 Capture Rate Obligation: Suspension). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:381: (B) the suspension or withholding (as applicable) by the DPA Counterparty of payments [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:381: Obligation: Suspension), 23.6 (Suspension of Payments (Failure to provide Declaration [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:381: to comply with T&S Prolonged Unavailability Procedure Obligation: Suspension) of the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:386: shall not amend, waive or suspend the provisions of the Contract and the rights of the DPA [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:390:5.1 Suspension of Rights and Remedial Action [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:392: (ii) such breach would, save for the terms of Clause 5.1 (Suspension of Rights and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:586: Suspension of payments _________________________________________________ 29 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:609:Suspension of payments [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:609:In the October 2021 update we set out that the DPA Counterparty may suspend Payments [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:609: suspension. Where a Generator fails to lift the suspension and the DPA Counterparty [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:609: terminates the DPA then all suspend payments shall be withheld (although the value of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:609: the suspended payments will be set off against the Termination Payment that the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:609:The DPA Counterparty may also suspend payments where the Generator: [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:609:In all cases, the payments that can be suspended must relate to the period of breach and the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:609:DPA Counterparty must notify the Generator of the intention to suspend payments before such [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:609:payment suspension takes effect. In all cases, a Generator has the opportunity to rectify the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:616:suspend payments under the DPA Contract if the Generator’s Achieved and Declared CO₂ [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:616:may be suspended. Further detail on these provisions is set out in condition 24 of the draft [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:618: (which, assuming that payments had not been suspended for any other reason, would [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:618: £15,500 (which, assuming that payments had not been suspended for any other reason, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:625:then the DPA Counterparty may, after notifying the Generator, elect to suspend payments of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:625:pay any amounts which were suspended, without interest, to the Generator. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:628:unpaid amounts which the DPA Counterparty has suspended. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf|EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf]]:629:the CfD AR4, has been adapted to take into account the additional suspension rights and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002236-NZT DCO 8.4 - MMO SoCG (Tracked) - Sept 2022(D8).pdf|EN010103-002236-NZT DCO 8.4 - MMO SoCG (Tracked) - Sept 2022(D8).pdf]]:10: vary, suspend or revoke a marine licence if it appears that any of its provisions [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001785-NZT DCO 8.30 - NTL, NTLL and NTRL SoCG - June 2022 (Tracked).pdf|EN010103-001785-NZT DCO 8.30 - NTL, NTLL and NTRL SoCG - June 2022 (Tracked).pdf]]:12: in relation to which it is proposed to extinguish or suspend easements, servitudes [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002622-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12.pdf|EN010103-002622-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12.pdf]]:3: acquire, appropriate, extinguish or suspend any rights in the Sembcorp Pipeline [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002622-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12.pdf|EN010103-002622-DLA Piper UK LLP - Comments on any other information submitted at Deadline 12.pdf]]:3: without such acquisition, appropriation, extinguishment or suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf]]:4: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf]]:5: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf]]:6: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf]]:7: 142 it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf]]:8: Lighting Tower Capstan it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf]]:9: Con it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf]]:10: an it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf]]:11: 4.0m 4.3m it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf]]:12: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf]]:13: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf]]:14: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf]]:15: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf]]:16: 2.1m L Twr it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001216-NZT DCO 4.2 - Land Plans - Oct 2021 Rev.2.0.pdf]]:17: L Twr it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf|EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf]]:27:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf|EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf]]:70: run-off, dispersion of suspended sediments and spillage risk in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf|EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf]]:5: ACCESS MAY BE TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf|EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf]]:15: parts of the access land where public access may be temporarily suspended) to the extent [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf|EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf]]:16: (5) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf|EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf]]:16:access land) are suspended in relation to the access land specified in column [[(2)]] of the table in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf|EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf]]:16:suspended) to the extent specified in column [[(3)]] of that table. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf|EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf]]:16: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf|EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf]]:18:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf|EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf]]:24:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf|EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf]]:24:the undertaker takes temporary possession under this Order are suspended and unenforceable for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf|EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf]]:24: (5) Any person who suffers loss by the extinguishment or suspension of any private right or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf|EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf]]:30: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf|EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf]]:64: TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf|EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf]]:64:In the District of Redcar and Access land at South Gare Temporarily suspend access to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002001-NZT DCO 4.16.1 - AIL Access Route Plan August 2022(D5).pdf|EN010103-002001-NZT DCO 4.16.1 - AIL Access Route Plan August 2022(D5).pdf]]:1: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:24:(Paris time), with a fixing of the closing price at 5:35 p.m. (Paris time). Euronext Paris may suspend or resume trading in a security listed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:33:made in violation of these rules will be declared null and void and payment of the directors’ compensation will be suspended until the board [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:33:composition is compliant with the required quota (the suspension of the directors’ compensation will also be disclosed in the management [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:83: TOTAL SE announced the suspension of its buyback programme. The Company had previously announced a $2 billion share buyback target for 2020 in a 60 $/b environment and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:183: suspended) 73 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:187:2020, onshore construction work of the project has been suspended. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:188: Elk and Antelope fields located on Block PRL-15 before being suspended market. In 2020, these LNG trading activities represented a volume of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:199:Blocks were respectively reduced to 38% and 40% after government areas, production was suspended on several occasions between July [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:199: December 2019. Production at the Waha fields was suspended from [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:201:On the Azero exploration license (50%, operator), the drilling of the were suspended in 2019 (no well drilled in 2020 compared to three wells [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:213:2.3.9 Wells in the process of being drilled (including wells temporarily suspended) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:216: start-up of the La Mède biorefinery mid-2019 completed the conversion was made early December 2020 to suspend operations at the loss- [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:238: and most EU economic sanctions were suspended(2). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:255: If the problem cannot be solved immediately, the work is suspended, by the ISM (International Safety Management) code of the IMO [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:264: issues in the workplace organized in partnership with Convivencia include verbal reminders, written warnings, suspension or dismissal). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:401:project to convert the site into a “zero-crude” platform as announced lockdown, TDR decided to suspend, for the second quarter of 2020, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:410: i.e., persons who are under suspended contract (sabbatical, business [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:416:to suspend the dividend growth policy for 2020 and thus set the first shares in an amount of $0.55 billion in the first quarter of 2020, it [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:416:interim dividend for fiscal year 2020 at €0.66 per share, at the same level announced the suspension of share buybacks by the Company on [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:419: prices, TOTAL SE announced the suspension of its buyback program. The Company had previously announced a $2 billion share buyback target for 2020 in a $60/b environment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf|EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf]]:483: In the context of the COVID-19 pandemic and since the start of the lockdown, TDR decided to suspend, for the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf|EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf]]:4: ACCESS MAY BE TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf|EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf]]:16: parts of the access land where public access may be temporarily suspended) to the extent [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf|EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf]]:16: (5) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf|EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf]]:16:access land) are suspended in relation to the access land specified in column [[(2)]] of the table in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf|EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf]]:16:suspended) to the extent specified in column [[(3)]] of that table. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf|EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf]]:16: (10) The period of suspension under paragraph (9) lasts for the period of the temporary stopping [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf|EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf]]:18:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf|EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf]]:24:the compulsory acquisition of rights or imposition of restrictions under this Order are suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf|EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf]]:25:the undertaker takes temporary possession under this Order are suspended and unenforceable for [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf|EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf]]:25: (5) Any person who suffers loss by the extinguishment or suspension of any private right or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf|EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf]]:30: (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf|EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf]]:66: TEMPORARILY SUSPENDED [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf|EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf]]:66:In the District of Redcar and Access land at South Gare Temporarily suspend access to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:22: suspended floor slabs be adopted within sufficient clearance provided to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf|EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf]]:35: suspended fine-grained material transported by meltwater flowing into lakes [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:19:suspended within subsurface (Appendix 9C, ES Volume III, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:19:of suspended contaminants, the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:23: suspended solids, heavy metals and hydrocarbons). Only 50% efficiency [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:42:9.4.27 Suspended sediment concentrations are generally low in Tees Bay and in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:42: marine input is washed in with the flood tide, and often causes resuspension [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:42: suspended sediments and a variety of sources and sinks. Silts and muds are [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:42: readily transported as suspended sediment load and can remain in [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:42: suspension for extended periods through the tidal cycle, while coarser sands [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:42: carried as bedload. Suspended sediment concentrations between 1500 and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:74: levels of total suspended solids (e.g. iron corrosive products) and have the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:79: Surface Water Quality – Suspended Fine Sediments [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:79: Tees Coastal waterbody. Increased suspended sediment concentrations [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:80: increased suspended solids and turbidity, which would remain in suspension [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:80:9.6.10 In light of this, the release of suspended sediment and subsequent deposition [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:81: suspended sediment in runoff would be negligible with the mitigation [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:85: suspended solids, metals and hydrocarbons) for the High Pollution Hazard [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:85: hydrocarbons but passes the assessment for total suspended solids and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:86: Suspended Metals Hydrocarbons [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf|EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf]]:99:suspended fine Coastal Waterbody (Tees (temporary) implementation of the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf]]:4: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf]]:5: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf]]:6: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf]]:7: 142 it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf]]:8: Lighting Tower Capstan it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf]]:9: Con it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf]]:10: an it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf]]:11: 4.0m 4.3m it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf]]:12: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf]]:13: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf]]:14: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf]]:15: it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf]]:16: 2.1m L Twr it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf|EN010103-001217-NZT DCO 4.3 - Crown Land Plans - Oct 2021 Rev.2.0.pdf]]:17: L Twr it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:109: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:109: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:109: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:109: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:110: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:110: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:110: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf|EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf]]:110: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf|EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf]]:6: suspended gas injection at Gina Krog to export the gas. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf|EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf]]:35:Overview  Gas production from the Snøhvit field is suspended after [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf|EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf]]:53: Gas production from the Snøhvit field is suspended after the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf|EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf]]:64:Energy Management (BOEM) manages federal OCS leasing fines and even licence suspension and/or cancellation in case of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf|EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf]]:66:by the temporary 2020-rules will be 100% deductible in the gas activities allowing suspension of the federal duties and [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf|EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf]]:78:where drilling or completion has been suspended pending further evaluation. A dry well is a well found to be incapable of producing [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf|EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf]]:254:Project which has finalized the development of 4 gas fields in central Algeria). Following suspension of activity after the terrorist attack at [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf|EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf]]:254:Equinor has filed a motion for clarification which had the effect of temporarily suspending the unfavourable decision and is currently [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:45: runoff, spillage risk and the dispersion of suspended sediments are outlined [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:49:and Species from Increased Suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:56: Suspended Sediment Concentrations (i.e. Turbidity) and Deposition [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:56: suspended sediment concentrations (SSC) (i.e. turbidity) and create a [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:57: turbidity, which would remain in suspension for longer than coarser substrates [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:57:14.6.40 In light of this, the release of suspended sediment and subsequent deposition [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:58: that exhibit low sensitivity to disturbance and increased suspended sediments [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:58: gravel, suspended particulate material will rapidly resettle to the seabed. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:61: which filter-feeders sift suspended particles from the water) when exposed to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:104: Suspended Sediment Concentrations (i.e. Turbidity) and Deposition [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:109: Increased Suspended Sediment Concentrations (i.e. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:109: potential to increase suspended sediment concentrations (SSC) (i.e. turbidity) [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:110:14.10.19 An increase in SSC can cause increased deposition as suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf|EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf]]:110:14.10.20 In general, the release of suspended sediment and subsequent [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001418-Eversheds Sutherland on behalf of EDF.pdf|EN010103-001418-Eversheds Sutherland on behalf of EDF.pdf]]:4: extinguish, suspend or interfere with EDF’s rights and impose new restrictions on such land. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf|EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf]]:67: • physical disturbance to habitats and species from increased suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf|EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf]]:68: species from increased suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf|EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf]]:68: species from increased suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf|EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf]]:70: species from increased suspended [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf|EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf]]:73: Suspended Sediment Concentrations (i.e. Turbidity) and Deposition [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001126-NZT DCO 6.4.37 ES Vol III Appendix 16B Framework Construction Worker Travel Plan.pdf|EN010103-001126-NZT DCO 6.4.37 ES Vol III Appendix 16B Framework Construction Worker Travel Plan.pdf]]:6: Northern Rail suspended all services to and from the station on 14 December [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf|EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf]]:27:3.2.63 The SAC is a large macro-tidal coastal plain estuary with high suspended sediment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf|EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf]]:67: off, dispersion of suspended sediments and spillage risk in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001771-NZT DCO 9.8 - Appendix GH.1.2 Foundations Options Report - June 2022.pdf|EN010103-001771-NZT DCO 9.8 - Appendix GH.1.2 Foundations Options Report - June 2022.pdf]]:26:For medium and high threat structures, suspended ground floor slabs may be required to mitigate against heave [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001771-NZT DCO 9.8 - Appendix GH.1.2 Foundations Options Report - June 2022.pdf|EN010103-001771-NZT DCO 9.8 - Appendix GH.1.2 Foundations Options Report - June 2022.pdf]]:30:combination with raft foundations and a suspended floor slab for medium threat structures. However, there may be [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001771-NZT DCO 9.8 - Appendix GH.1.2 Foundations Options Report - June 2022.pdf|EN010103-001771-NZT DCO 9.8 - Appendix GH.1.2 Foundations Options Report - June 2022.pdf]]:47: Could be adopted with raft foundations and / or suspended floor slabs. Advancing stone columns through significant depths of made ground may be problematic. Pre-boring may mitigate risk of Adequate Design. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001617-NZT DCO 4.4a - Additional Land Plan - May 2022.pdf|EN010103-001617-NZT DCO 4.4a - Additional Land Plan - May 2022.pdf]]:1: which it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf|EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf]]:45: suspending vegetation clearance works within the area [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf|EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf]]:48: Steel railway station (currently suspended). [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf|EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf]]:74: between the works and nest(s) and suspending [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:3:Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 8 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:5: rights (including private rights of navigation over water) which it is proposed may be extinguished, suspended or [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1034: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1034: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1035: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1036: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1037: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1038: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1039: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1040: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1041: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1042: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1043: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1044: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1045: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1046: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1047: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1048: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1049: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1050: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1051: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1052: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1053: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1054: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1055: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1056: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1057: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1058: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1059: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1060: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1061: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1062: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1063: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1064: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1065: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1066: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1067: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1068: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1069: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1070: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1071: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1072: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1073: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1074: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1075: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1076: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1077: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1078: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1079: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1080: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1081: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1082: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1083: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1084: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1085: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1086: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1087: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1088: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1089: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1090: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1091: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1092: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1093: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1094: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1095: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1096: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1097: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1098: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1099: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1100: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1101: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1102: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1103: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1104: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1105: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1106: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1107: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1108: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1109: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1110: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1111: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1112: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1113: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1114: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1115: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1116: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1117: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1118: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1119: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1120: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1121: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1122: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1123: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1124: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1125: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1126: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1127: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1128: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1129: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1130: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1131: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1132: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1133: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1134: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1135: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1136: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1137: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1138: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1139: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1140: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1141: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1142: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1143: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1144: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1145: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1146: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1147: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1148: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1149: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1150: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1151: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1152: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1153: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1154: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1155: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1156: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1157: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1158: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1159: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1160: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1161: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1162: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1163: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1164: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1165: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1166: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1167: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1168: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1169: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1170: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1171: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1172: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1173: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1174: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1175: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1176: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1177: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1178: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1179: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1180: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1181: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1182: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1183: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1184: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1185: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1186: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1187: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1188: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1189: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1190: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1191: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1192: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1193: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1194: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1195: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1196: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1197: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1198: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1199: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1200: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1201: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1202: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1203: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1204: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1205: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1206: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1207: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1208: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1209: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1210: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1211: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1212: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1213: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1214: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1215: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1216: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1217: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1218: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1219: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1220: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1221: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1222: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1223: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1224: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1225: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1226: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1227: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1228: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1229: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1230: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1231: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1232: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1233: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1234: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1235: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1236: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1237: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1238: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1239: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1240: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1241: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1242: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1243: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1244: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1245: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1246: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1247: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1248: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1249: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1250: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1251: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1252: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1253: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1254: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1255: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1256: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1257: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1258: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1259: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1260: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1261: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1262: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1263: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1264: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1265: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1266: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf|EN010103-001791-NZT DCO 3.1 - Book of Reference - June 2022 (Clean).pdf]]:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf|EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf]]:40:containing less than 10 mg/l suspended particulate matter and with a salinity of 32 ppt. Environment [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf|EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf]]:40:Agency data show an average of 8 mg/l suspended solids and normal salinity of 30 ppt at Tees Mouth [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf|EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf]]:49:suspended solids concentration of 8.5mg/l. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf|EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf]]:49: EQS value based on average suspended solids concentration of 8.5mg/l recorded at Sample Point B and average salinity of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf|EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf]]:189:waterbodies based on its recorded salinity and suspended particulate matter concentration 1. In this [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf|EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf]]:189:case, Environment Agency data show an average of 8 mg/l suspended solids and normal salinity of 30 [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf|EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf]]:202:point B gives an average suspended solids concentration of 8.5 mg/l. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf|EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf]]:202: EQS value based on average suspended solids concentration of 8.5 mg/l recorded at Sample Point B and average salinity of [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:3: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished Page 1005 124 to [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:5: rights of navigation over water) which it is proposed may be extinguished, suspended or interfered with in connection with the authorised [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1258: Part 3 – Easements or other private rights proposed to be interfered with, suspended or extinguished [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1258: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1259: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1260: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1261: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1262: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1263: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1264: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1265: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1266: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1267: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1268: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1269: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1270: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1271: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1272: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1273: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1274: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1275: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1276: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1277: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1278: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1279: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1280: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1281: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1282: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1283: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1284: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1285: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1286: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1287: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1288: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1289: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1290: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1291: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1292: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1293: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1294: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1295: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1296: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1297: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1298: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1299: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1300: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1301: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1302: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1303: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1304: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1305: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1306: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1307: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1308: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1309: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1310: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1311: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1312: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1313: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1314: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1315: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1316: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1317: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1318: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1319: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1320: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1321: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1322: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1323: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1324: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1325: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1326: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1327: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1328: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1329: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1330: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1331: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1332: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1333: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1334: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1335: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1336: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1337: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1338: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1339: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1340: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1341: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1342: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1343: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1344: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1345: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1346: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1347: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1348: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1349: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1350: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1351: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1352: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1353: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1354: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1355: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1356: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1357: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1358: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1359: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1360: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1361: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1362: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1363: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1364: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1365: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1366: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1367: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1368: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1369: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1370: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1371: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1372: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1373: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1374: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1375: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1376: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1377: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1378: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1379: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1380: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1381: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1382: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1383: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1384: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1385: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1386: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1387: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1388: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1389: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1390: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1391: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1392: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1393: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1394: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1395: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1396: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1397: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1398: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1399: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1400: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1401: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1402: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1403: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1404: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1405: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1406: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1407: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1408: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1409: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1410: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1411: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1412: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1413: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1414: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1415: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1416: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1417: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1418: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1419: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1420: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1421: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1422: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1423: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1424: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1425: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1426: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1427: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1428: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1429: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1430: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1431: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1432: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1433: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1434: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1435: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1436: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1437: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1438: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1439: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1440: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1441: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1442: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1443: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1444: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1445: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1446: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1447: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1448: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1449: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1450: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1451: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1452: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1453: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1454: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1455: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1456: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1457: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1458: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1459: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1460: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1461: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1462: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1463: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1464: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1465: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1466: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1467: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1468: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1469: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1470: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1471: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1472: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1473: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1474: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1475: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1476: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1477: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1478: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1479: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1480: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1481: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1482: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1483: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1484: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1485: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1486: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1487: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1488: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1489: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1490: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1491: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1492: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1493: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1494: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1495: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1496: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1497: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1498: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1499: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1500: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1501: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1502: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1503: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1504: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1505: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1506: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1507: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1508: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1509: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1510: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1511: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1512: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1513: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1514: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1515: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1516: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1517: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1518: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1519: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1520: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1521: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1522: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1523: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1524: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1525: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1526: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1527: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1528: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1529: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1530: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1531: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1532: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1533: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1534: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1535: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1536: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1537: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1538: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1539: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1540: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1541: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1542: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1543: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1544: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1545: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1546: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1547: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1548: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1549: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1550: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1551: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1552: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1553: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1554: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1555: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1556: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1557: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1558: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1559: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1560: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1561: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1562: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1563: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1564: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1565: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1566: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1567: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1568: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1569: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1570: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1571: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1572: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1573: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1574: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1575: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1576: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1577: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1578: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1579: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1580: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1581: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1582: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1583: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1584: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1585: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1586: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1587: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1588: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1589: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1590: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1591: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1592: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1593: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1594: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1595: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1596: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1597: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1598: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1599: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1600: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1601: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1602: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1603: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1604: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1605: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1606: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1607: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1608: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1609: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1610: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1611: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1612: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1613: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1614: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1615: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1616: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1617: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1618: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1619: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1620: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1621: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1622: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1623: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1624: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1625: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1626: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1627: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1628: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1629: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1630: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1631: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1632: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1633: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1634: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1635: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1636: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1637: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1638: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1639: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1640: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1641: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1642: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1643: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1644: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1645: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1646: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1647: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1648: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1649: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1650: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1651: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1652: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1653: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1654: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1655: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1656: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1657: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1658: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1659: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1660: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1661: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1662: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1663: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1664: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1665: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1666: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1667: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1668: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1669: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1670: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1671: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1672: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1673: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1674: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1675: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1676: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1677: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1678: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1679: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1680: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1681: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1682: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1683: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1684: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1685: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1686: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1687: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1688: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1689: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1690: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1691: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1692: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1693: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1694: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1695: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1696: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1697: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1698: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1699: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1700: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1701: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1702: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1703: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1704: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1705: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1706: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1707: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1708: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1709: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1710: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1711: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1712: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1713: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1714: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1715: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1716: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1717: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1718: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1719: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1720: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1721: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1722: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1723: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1724: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1725: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1726: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1727: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1728: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1729: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1730: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1731: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1732: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1733: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1734: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1735: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1736: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf|EN010103-002048-NZT DCO 3.1 - Book of Reference (Tracked) August 2022 (D6).pdf]]:1737: Land Plot which it is proposed shall be extinguished, suspended or interfered with. See regulation 7 (1)(c) of the Infrastructure Planning (Applications: Prescribed [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf|EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf]]:31: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf|EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf]]:34: off, dispersion of suspended sediments and spillage risk in the [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf|EN010103-001856-9.5 - CA Schedule (Clean) - June 2022(D3).pdf]]:3: be extinguished, suspended or interfered with under the Order. [[this>Infrastructure/projects/north-east/the-net-zero-teesside-project/EN010103-002159-NZT DCO 4.16.4 - Water Connection Plan August 2022 (D6).pdf|EN010103-002159-NZT DCO 4.16.4 - Water Connection Plan August 2022 (D6).pdf]]:1: 496 518 it is proposed to extinguish or suspend easements, [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf|EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf]]:60: contamination must be suspended, additional investigation and assessment must be carried out, and a written [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000499-_DOC_40066269(1)_DEADLINE 2_ EM v2 (Formatted - Clean).pdf|EN010082-000499-_DOC_40066269(1)_DEADLINE 2_ EM v2 (Formatted - Clean).pdf]]:17:Contaminated land and be suspended if contaminated land or groundwater is encountered in [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000377-2.1 - Tees CCPP - Draft DCO with proposed change - tracked Rev 2.pdf|EN010082-000377-2.1 - Tees CCPP - Draft DCO with proposed change - tracked Rev 2.pdf]]:15:that contamination must be suspended, additional investigation and assessment must be carried [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000654-TEES Final Recommendation Report and Errata.pdf|EN010082-000654-TEES Final Recommendation Report and Errata.pdf]]:174:that contamination must be suspended, additional investigation and assessment must be carried [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000576-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Clean).pdf|EN010082-000576-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Clean).pdf]]:31: works and nest(s) and suspending works within the area until [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf|EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf]]:43: (e.g. from paints), an increase in total suspended solids from sediment [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf|EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf]]:48:soils (Made suspended load programme during [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf|EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf]]:60: hydrocarbons or volatile organic compounds, an increase in total suspended [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000496-_CONSENTORDER_40063542(1)_DEADLINE 2_ DCOv2.pdf|EN010082-000496-_CONSENTORDER_40063542(1)_DEADLINE 2_ DCOv2.pdf]]:14:that contamination must be suspended, additional investigation and assessment must be carried [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000210-EN010082-6.3.20-ES Annex L-CEMP-Final-November 2017.pdf|EN010082-000210-EN010082-6.3.20-ES Annex L-CEMP-Final-November 2017.pdf]]:12: suspending works within the area [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000404-6.3.19 - Tees CCPP - Annex L CEMP - UPDATED.pdf|EN010082-000404-6.3.19 - Tees CCPP - Annex L CEMP - UPDATED.pdf]]:29: the works and nest(s) and suspending works within the [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000551-8.54 - Explanatory Memorandum - Tracked (v3).pdf|EN010082-000551-8.54 - Explanatory Memorandum - Tracked (v3).pdf]]:19:Contaminated land and suspended if contaminated land or groundwater is encountered in [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000583-8.63 - Tees CCPP - Draft DCO - Tracked - Version 6.pdf|EN010082-000583-8.63 - Tees CCPP - Draft DCO - Tracked - Version 6.pdf]]:15:that contamination must be suspended, additional investigation and assessment must be carried [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated).pdf|EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated).pdf]]:15: vicinity of that contamination must be suspended, additional investigation and assessmen t mu s t [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000515-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Clean v3.pdf|EN010082-000515-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Clean v3.pdf]]:30: works and nest(s) and suspending works within the area until [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000516-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Tracked v3.pdf|EN010082-000516-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Tracked v3.pdf]]:32: and suspending works within the area until any young had [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated) (2).pdf|EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated) (2).pdf]]:15: vicinity of that contamination must be suspended, additional investigation and assessmen t mu s t [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf|EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf]]:49: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf|EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf]]:50: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf|EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf]]:50: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf|EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf]]:50: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf|EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf]]:50: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf|EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf]]:174:that contamination must be suspended, additional investigation and assessment must be carried [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000524-_DOC_150670236(1)_DEADLINE 4_ DCO (Validated).pdf|EN010082-000524-_DOC_150670236(1)_DEADLINE 4_ DCO (Validated).pdf]]:14:that contamination must be suspended, additional investigation and assessment must be carried [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000369-2.1 - Tees CCPP - Draft DCO with proposed change - clean Rev 2.pdf|EN010082-000369-2.1 - Tees CCPP - Draft DCO with proposed change - clean Rev 2.pdf]]:15:that contamination must be suspended, additional investigation and assessment must be carried [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000497-_DOC_40064625(1)_DEADLINE 2_ DCO showing changes.pdf|EN010082-000497-_DOC_40064625(1)_DEADLINE 2_ DCO showing changes.pdf]]:15:that contamination must be suspended, additional investigation and assessment must be carried [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000589-2.1 - Tees CCPP - Draft Development Consent Order – Final (Version 7).pdf|EN010082-000589-2.1 - Tees CCPP - Draft Development Consent Order – Final (Version 7).pdf]]:15:that contamination must be suspended, additional investigation and assessment must be carried [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000316-TEES - Final Rule 6 letter.pdf|EN010082-000316-TEES - Final Rule 6 letter.pdf]]:26: suspended or interfered with. Given the existence of an easement, [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000554-8.51 - Draft DCO - Clean (v5).pdf|EN010082-000554-8.51 - Draft DCO - Clean (v5).pdf]]:15:that contamination must be suspended, additional investigation and assessment must be carried [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000144-EN010082-2.1-Draft Development Consent Order-Final-November 2017.pdf|EN010082-000144-EN010082-2.1-Draft Development Consent Order-Final-November 2017.pdf]]:14:suspended, additional investigation and assessment must be carried out, and a written scheme detailing how [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated) (3).pdf|EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated) (3).pdf]]:15: vicinity of that contamination must be suspended, additional investigation and assessmen t mu s t [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000552-8.53 - Explanatory Memorandum - Clean (v3).pdf|EN010082-000552-8.53 - Explanatory Memorandum - Clean (v3).pdf]]:18:Contaminated land and be suspended if contaminated land or groundwater is encountered in [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000398-8 7 - Tees CCPP - Written Summary of Oral Case (ISH 10 04 18) - FINAL.pdf|EN010082-000398-8 7 - Tees CCPP - Written Summary of Oral Case (ISH 10 04 18) - FINAL.pdf]]:13: which it is proposed shall be extinguished, suspended or interfered with. Given the existence of an [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000537-8.47 - Tees CCPP - Draft DCO - Clean (v4).pdf|EN010082-000537-8.47 - Tees CCPP - Draft DCO - Clean (v4).pdf]]:15:that contamination must be suspended, additional investigation and assessment must be carried [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000595-8.71 - Tees CCPP - Explanatory Memorandum - Tracked (Version 4).pdf|EN010082-000595-8.71 - Tees CCPP - Explanatory Memorandum - Tracked (Version 4).pdf]]:20:Contaminated land and suspended if contaminated land or groundwater is encountered in [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000577-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Tracked).pdf|EN010082-000577-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Tracked).pdf]]:31: works and nest(s) and suspending works within the area until [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000137-s51 advice to applicant following the withdrawal of application.pdf|EN010082-000137-s51 advice to applicant following the withdrawal of application.pdf]]:4: proposed shall be extinguished, suspended or interfered with. Sembcorp confirms there are [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000498-_DOC_40066241(1)_DEADLINE 2_ EM v2 (Formatted - Tracked).pdf|EN010082-000498-_DOC_40066241(1)_DEADLINE 2_ EM v2 (Formatted - Tracked).pdf]]:17:Contaminated land and be suspended if contaminated land or groundwater is encountered in [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated) (1).pdf|EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated) (1).pdf]]:15: vicinity of that contamination must be suspended, additional investigation and assessmen t mu s t [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000594-8.69 - Draft Development Consent Order - Tracked (Version 7).pdf|EN010082-000594-8.69 - Draft Development Consent Order - Tracked (Version 7).pdf]]:15:contamination must be suspended, additional investigation and assessment must be carried out, and [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000538-8.48 - Tees CCPP - Draft DCO - Tracked (v4).pdf|EN010082-000538-8.48 - Tees CCPP - Draft DCO - Tracked (v4).pdf]]:15:that contamination must be suspended, additional investigation and assessment must be carried [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000558-6.3.20 - Annex L CEMP Clean v4 - 22.08.18.pdf|EN010082-000558-6.3.20 - Annex L CEMP Clean v4 - 22.08.18.pdf]]:30: works and nest(s) and suspending works within the area until [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000519-8.45 - CONSENTORDER_150335454(1)_DEADLINE 4_ DCOv3.pdf|EN010082-000519-8.45 - CONSENTORDER_150335454(1)_DEADLINE 4_ DCOv3.pdf]]:14:that contamination must be suspended, additional investigation and assessment must be carried [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000145-EN010082-2.2-Explanatory Memorandum-Final-November 2017.pdf|EN010082-000145-EN010082-2.2-Explanatory Memorandum-Final-November 2017.pdf]]:16:Contaminated land and to be suspended if contaminated land or groundwater is encountered [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000557-6.3.20 - Tees CCPP - Annex L CEMP Tracked v4 - 22.08.18.pdf|EN010082-000557-6.3.20 - Tees CCPP - Annex L CEMP Tracked v4 - 22.08.18.pdf]]:30: works and nest(s) and suspending works within the area until [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf|EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf]]:174:that contamination must be suspended, additional investigation and assessment must be carried [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf|EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf]]:174:that contamination must be suspended, additional investigation and assessment must be carried [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000553-8.52 - Draft DCO - Tracked (v5).pdf|EN010082-000553-8.52 - Draft DCO - Tracked (v5).pdf]]:15:contamination must be suspended, additional investigation and assessment must be carried out, and [[this>Infrastructure/projects/north-east/tees-ccpp/EN010082-000582-8.62 - Tees CCPP - Draft DCO - Clean - Version 6.pdf|EN010082-000582-8.62 - Tees CCPP - Draft DCO - Clean - Version 6.pdf]]:15:that contamination must be suspended, additional investigation and assessment must be carried [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000828-Document 2.1F - YPL Land Plan Inset 3 - Rev v4.pdf|TR030002-000828-Document 2.1F - YPL Land Plan Inset 3 - Rev v4.pdf]]:1: to suspend and/or interfere with easements and/or other private rights and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:19:2.6.5 Under the open quay structure, the quay and access bridge structures would be suspended deck [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:20: create the stable slope beneath the quay for the open suspended deck option. As part of the Phase 2 [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:21: berth pocket and stable slope beneath the quay for the open suspended deck option. For the solid [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:87: on suspended sediment concentration in the water column during capital dredging, sediment deposition [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:87: Suspended sediment concentration in the water column during capital dredging [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:87:10.3.26 As illustrated within Figures 10.6 to 10.8, predicted mean concentration increases of suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:87: simulations show that an area of elevated suspended sediment concentration, in the range of 10mg/l to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:88: activity. The plume dispersion modelling predicted no average increase in suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:89: Figure 10.6 Predicted mean increase in depth averaged suspended sediment concentrations above [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:89: suspended sediment concentrations within the water column. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:90: Figure 10.7 Predicted mean increase in depth averaged suspended sediment concentrations above [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:91: Figure 10.8 Predicted mean increase in depth averaged suspended sediment concentrations above [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:100:10.4.8 The suspension and dispersion of sediment during capital dredging would temporarily affect water [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:100: modelling work undertaken has predicted that there would be no increase in suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:100: that suspended sediment concentrations would not be impacted at the estuary mouth and, therefore, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:100: suspension and dispersion of sediment during capital dredging. This would reduce the spatial extent of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:127: Under such circumstances, the effect would be a greater increase in suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:128:11.4.18 Increased suspended sediment concentrations have the potential to effect fish populations (which [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:128: movement away from the zone of increased suspended sediment concentration. However, the effect of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:128: low potential for suspended sediment arising from maintenance dredging to interact with a sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:128:11.4.22 Mitigation measures to limit the suspension and subsequent deposition of sediment during capital [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf|TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf]]:128: into a sealed barge) for dredging of unconsolidated material to minimise resuspension in the water [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:9:  A suspended reinforced concrete deck of approximately 530m length, constructed on approximately [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:89: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:89: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:89: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:167: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf|TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf]]:167: Suspended: Not Supplied [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000808-Document 2.1L - YPL Land Plan Inset 9 - Rev v4.pdf|TR030002-000808-Document 2.1L - YPL Land Plan Inset 9 - Rev v4.pdf]]:1: to suspend and/or interfere with easements and/or other private rights and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000808-Document 2.1L - YPL Land Plan Inset 9 - Rev v4.pdf|TR030002-000808-Document 2.1L - YPL Land Plan Inset 9 - Rev v4.pdf]]:1: to temporarily suspend and/or interfere with easements and/or other private [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf|TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf]]:8: required to create a stable slope beneath the quay for the open suspended deck option. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000818-Document 2.1K - YPL Land Plan Inset 8 - Rev v4.pdf|TR030002-000818-Document 2.1K - YPL Land Plan Inset 8 - Rev v4.pdf]]:1: to suspend and/or interfere with easements and/or other private rights and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf|TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf]]:30: "dredging" means using any device to move material (whether or not suspended in water) from [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf|TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf]]:36: (3) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf|TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf]]:37:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf|TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf]]:55: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf|TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf]]:82: (a) suspended deck structures comprised of a reinforced concrete deck supported by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf|TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf]]:105:acquire appropriate, extinguish or suspend any rights or covenants in the pipeline corridor or [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf|TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf]]:105:without such creation, acquisition, appropriation, extinguishment or suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf|TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf]]:108:acquire appropriate, extinguish or suspend any rights or covenants in respect of any protected asset [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf|TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf]]:108:acquisition, appropriation, extinguishment or suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf|TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf]]:119: injurious matter in suspension or otherwise. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf|TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf]]:132:timetabled trains are suspended whilst the work is undertaken (abnormal possessions). In addition [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf|TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf]]:136:part of the crane or suspended load could fall onto the tracks or supporting structures. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf|TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf]]:150:part of the crane or suspended load could fall onto the tracks or supporting structures. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000748-Document 8.3 Appendix 5 - Shipping Notes Part 2.pdf|TR030002-000748-Document 8.3 Appendix 5 - Shipping Notes Part 2.pdf]]:2: Open form of berth construction (piled suspended deck) vessel movements due to movements associated with precast [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000748-Document 8.3 Appendix 5 - Shipping Notes Part 2.pdf|TR030002-000748-Document 8.3 Appendix 5 - Shipping Notes Part 2.pdf]]:14: operations would be suspended as required to allow the passage of river traffic as deemed necessary by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000748-Document 8.3 Appendix 5 - Shipping Notes Part 2.pdf|TR030002-000748-Document 8.3 Appendix 5 - Shipping Notes Part 2.pdf]]:37: beam and plank units, e.g. failure of suspended deck) forms of construction indicates that the 5,000DWT coaster which will unload at the Contractors compound on [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000603-Doc 2.1M - YPL Land Plan Inset 10 Rev v1.pdf|TR030002-000603-Doc 2.1M - YPL Land Plan Inset 10 Rev v1.pdf]]:1: suspend and/or interfere with easements and/or other private rights and to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000603-Doc 2.1M - YPL Land Plan Inset 10 Rev v1.pdf|TR030002-000603-Doc 2.1M - YPL Land Plan Inset 10 Rev v1.pdf]]:1: temporarily suspend and/or interfere with easements and/or other private rights [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:21:4.1.3 Under the open quay structure option, the quay and access bridge structures would be suspended deck [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000460-Section 3 App 3.1 Waste management.pdf|TR030002-000460-Section 3 App 3.1 Waste management.pdf]]:22: create the stable slope beneath the quay for the open suspended deck option. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000471-Section 7 App 7.1 Benthic and sediment sampling strategy.pdf|TR030002-000471-Section 7 App 7.1 Benthic and sediment sampling strategy.pdf]]:3:either piling techniques supporting an open suspended deck structure or construction of a combi- [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000471-Section 7 App 7.1 Benthic and sediment sampling strategy.pdf|TR030002-000471-Section 7 App 7.1 Benthic and sediment sampling strategy.pdf]]:3:to create the berthing area. For the suspended deck option, some dredging would also be [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000471-Section 7 App 7.1 Benthic and sediment sampling strategy.pdf|TR030002-000471-Section 7 App 7.1 Benthic and sediment sampling strategy.pdf]]:4:the stable slope beneath the quay for the open suspended deck option. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000471-Section 7 App 7.1 Benthic and sediment sampling strategy.pdf|TR030002-000471-Section 7 App 7.1 Benthic and sediment sampling strategy.pdf]]:4:the berth pocket and stable slope beneath the quay for the open suspended deck option. For [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000471-Section 7 App 7.1 Benthic and sediment sampling strategy.pdf|TR030002-000471-Section 7 App 7.1 Benthic and sediment sampling strategy.pdf]]:7:(for the open suspended deck option), six vibrocores will be taken and two vibrocores will be [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000798-Document 2.1I - YPL Land Plan Inset 6 - Rev v4.pdf|TR030002-000798-Document 2.1I - YPL Land Plan Inset 6 - Rev v4.pdf]]:1: to suspend and/or interfere with easements and/or other private rights and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000412-ExA Second Round Questions.pdf|TR030002-000412-ExA Second Round Questions.pdf]]:17:nesting platforms could be provided beneath the suspended deck of the quay (if [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000479-Section 10 App 10.2 Terrestrial ecology survey reports.pdf|TR030002-000479-Section 10 App 10.2 Terrestrial ecology survey reports.pdf]]:97:floors have a suspended ceiling and the building is in a poor state. Broken windows [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000785-Document 2.1C - YPL Land Plan Sheet 3 - Rev v4.pdf|TR030002-000785-Document 2.1C - YPL Land Plan Sheet 3 - Rev v4.pdf]]:1: suspend and/or interfere with easements and/or other private rights and to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000785-Document 2.1C - YPL Land Plan Sheet 3 - Rev v4.pdf|TR030002-000785-Document 2.1C - YPL Land Plan Sheet 3 - Rev v4.pdf]]:1: temporarily suspend and/or interfere with easements and/or other private rights [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000604-Doc 2.1N - YPL Land Plan Inset 11 Rev v1.pdf|TR030002-000604-Doc 2.1N - YPL Land Plan Inset 11 Rev v1.pdf]]:1: suspend and/or interfere with easements and/or other private rights and to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000801-Document 6.8B - Governance Tracker.pdf|TR030002-000801-Document 6.8B - Governance Tracker.pdf]]:7:11 Care would be taken to prevent run-off of waters that may contain suspended solids or fuels. Construction Environmental Management Plan [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000801-Document 6.8B - Governance Tracker.pdf|TR030002-000801-Document 6.8B - Governance Tracker.pdf]]:8: The re-suspension of sediment caused by CSD can be reduced through optimising the cutter speed, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000801-Document 6.8B - Governance Tracker.pdf|TR030002-000801-Document 6.8B - Governance Tracker.pdf]]:9: box would prevent significant release of suspended sediments during dewatering of placed dredged [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000788-Document 2.1N(i) - YPL Land Plan Inset 11(i) (Northern Route) - Rev v4.pdf|TR030002-000788-Document 2.1N(i) - YPL Land Plan Inset 11(i) (Northern Route) - Rev v4.pdf]]:1: to suspend and/or interfere with easements and/or other private rights and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf|TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf]]:6: "dredging" means using any device to move material (whether or not suspended in water) from [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf|TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf]]:13: (3) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf|TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf]]:14:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf|TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf]]:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf|TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf]]:51: (a) suspended deck structures comprised of a reinforced concrete deck supported by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf|TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf]]:86:appropriate, extinguish, suspend or override any rights in the protected land if the authorised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf|TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf]]:86:extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf|TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf]]:86:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf|TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf]]:90: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of any [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf|TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf]]:90: appropriation, extinguishment or suspension; and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf|TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf]]:101: injurious matter in suspension or otherwise. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000813-Document 6.11A - Outline Ecological Management Plan.pdf|TR030002-000813-Document 6.11A - Outline Ecological Management Plan.pdf]]:6: Use of an enclosed grab to dredge the contaminated sediment (thereby minimising resuspension of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000813-Document 6.11A - Outline Ecological Management Plan.pdf|TR030002-000813-Document 6.11A - Outline Ecological Management Plan.pdf]]:6: overflowing and discharge of water containing suspended sediment into the estuary). [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000470-Section 6 App 6.4 CEMP.pdf|TR030002-000470-Section 6 App 6.4 CEMP.pdf]]:18:10 Care would be taken to prevent run-off of waters that may contain suspended solids or fuels. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000470-Section 6 App 6.4 CEMP.pdf|TR030002-000470-Section 6 App 6.4 CEMP.pdf]]:19: The re-suspension of sediment caused by CSD can be reduced through optimising the cutter speed, swing velocity and suction discharge, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000470-Section 6 App 6.4 CEMP.pdf|TR030002-000470-Section 6 App 6.4 CEMP.pdf]]:19: significant release of suspended sediments during dewatering of placed dredged material. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000598-Doc 2.1H - YPL Land Plan Inset 5 Rev v1.pdf|TR030002-000598-Doc 2.1H - YPL Land Plan Inset 5 Rev v1.pdf]]:1: suspend and/or interfere with easements and/or other private rights and to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000696-PD Teesport Limited 1.pdf|TR030002-000696-PD Teesport Limited 1.pdf]]:8: matter in suspension or otherwise. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000459-ES Section 24 References.pdf|TR030002-000459-ES Section 24 References.pdf]]:5:Land J and Bray R N, 1998, Acoustic measurement of suspended solids for monitoring of dredging and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf|TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf]]:16:2.28 The purpose of the MHF is to convert the mineral suspended in [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf|TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf]]:18: suspended quay, or a continuous quay as described in Section 3.6 [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf|TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf]]:31: should the suspended deck structure for the quay be chosen, but [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf|TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf]]:42: also the potential for the SoS to suspend consideration of an [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf|TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf]]:93: environment and designated sites (water quality, suspended sediment concentration SSC) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf|TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf]]:12: scheme on the suspended sediment concentration in the water column during capital dredging, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf|TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf]]:12: Suspended sediment concentration in the water column during capital dredging [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf|TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf]]:12: extent of sediment plume. Predicted mean concentration increases of suspended sediment outside the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf|TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf]]:12: an area of elevated suspended sediment concentration, in the range of 10mg/l to 50mg/l above [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf|TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf]]:13: suspended sediment concentrations within the water column. However, the sediment transport [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf|TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf]]:13: dredging activity. The plume dispersion modelling predicted no average increase in suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf|TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf]]:23:10.4.9 The suspension and dispersion of sediment during capital dredging would temporarily affect water [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf|TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf]]:23: modelling work undertaken has predicted that there would be no increase in suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf|TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf]]:23: that suspended sediment concentrations would not be affected at the estuary mouth and, therefore, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf|TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf]]:30: Under such circumstances, the effect would be a greater increase in suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf|TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf]]:31:11.3.11 Increased suspended sediment concentrations have the potential to effect fish populations (which [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf|TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf]]:31: movement away from the zone of increased suspended sediment concentration. However, the effect of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf|TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf]]:31: but the short term and localised nature of peaks in suspended sediment arising during dredging would [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf|TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf]]:31: dredging be undertaken elsewhere in the Tees estuary, there is a low potential for suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf|TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf]]:31:11.3.16 Mitigation measures to limit the suspension and subsequent deposition of sediment during capital [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf|TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf]]:31: into a sealed barge) for dredging of unconsolidated material to minimise resuspension in the water [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf|TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf]]:32:11.3.17 The effect of sediment suspension on feeding birds (terns) in the nearshore zone associated with the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf|TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf]]:32: due to either suspended sediments or habitat change. Consequently, no significant in combination [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf|TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf]]:79:should be considered beneath the suspended deck of the quay (should an open quay structure be [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf|TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf]]:97:platforms for shags beneath the suspended deck should be considered, along with the other [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000566-Doc 7.1 Planning Statement.pdf|TR030002-000566-Doc 7.1 Planning Statement.pdf]]:5: construction comprising a suspended deck supported by piles and a [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000566-Doc 7.1 Planning Statement.pdf|TR030002-000566-Doc 7.1 Planning Statement.pdf]]:36: construction comprising a suspended deck supported by piles and a [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000566-Doc 7.1 Planning Statement.pdf|TR030002-000566-Doc 7.1 Planning Statement.pdf]]:66: terms of increases in total suspended solid concentrations of materials [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000566-Doc 7.1 Planning Statement.pdf|TR030002-000566-Doc 7.1 Planning Statement.pdf]]:66: concentration of total suspended solids as a result of the dredging and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000566-Doc 7.1 Planning Statement.pdf|TR030002-000566-Doc 7.1 Planning Statement.pdf]]:72: suspended. This would be accessed via three approach bridges. This [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000566-Doc 7.1 Planning Statement.pdf|TR030002-000566-Doc 7.1 Planning Statement.pdf]]:90: suspension of contaminants or due to accidental spills and leaks. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000566-Doc 7.1 Planning Statement.pdf|TR030002-000566-Doc 7.1 Planning Statement.pdf]]:104: Suspended deck structure comprising a reinforced concrete deck [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000832-Document 2.1N(ii) - YPL Land Plan Inset 11(ii) (Southern Route) - Rev v4.pdf|TR030002-000832-Document 2.1N(ii) - YPL Land Plan Inset 11(ii) (Southern Route) - Rev v4.pdf]]:1: to suspend and/or interfere with easements and/or other private rights and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000832-Document 2.1N(ii) - YPL Land Plan Inset 11(ii) (Southern Route) - Rev v4.pdf|TR030002-000832-Document 2.1N(ii) - YPL Land Plan Inset 11(ii) (Southern Route) - Rev v4.pdf]]:1: to temporarily suspend and/or interfere with easements and/or other private [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf|TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf]]:15:Reduce sediment resuspension [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf|TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf]]:25:  There is a possibility that an increase in suspended solids in the water column [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf|TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf]]:36:  Potential impacts on chemical concentrations of the water column associated with re-suspending [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf|TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf]]:37: fish which may experience a temporary deterioration in water quality due to re-suspension of sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf|TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf]]:37: dredging, resulting in rapid dispersion of suspended sediment. The installation of the new quay will [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf|TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf]]:41: release suspended solids which contain high back hoe dredging fitted with an enclosed grab. physico-chemical status of are already built into the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf|TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf]]:45:Potential The potential release of suspended solids In general, sediment plumes induced by dredging are Given that the potential changes are unlikely to be [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf|TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf]]:45:suspended present a barrier to migratory fish. usually has the capacity to accommodate an to be compliant with the WFD requirements. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf|TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf]]:45:on biological suspended sediment are only expected on a short [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf|TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf]]:45: conditions of high suspended sediment, as [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000253-Regulation 24 Transboundary Screening document (5).pdf|TR030002-000253-Regulation 24 Transboundary Screening document (5).pdf]]:3: through an increase in suspended sediments due to the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000860-151216 TR030002 York Potash Ltd - Document 6.11B - Outline Ecological Management Plan.pdf|TR030002-000860-151216 TR030002 York Potash Ltd - Document 6.11B - Outline Ecological Management Plan.pdf]]:7: Use of an enclosed grab to dredge the contaminated sediment (thereby minimising resuspension of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000860-151216 TR030002 York Potash Ltd - Document 6.11B - Outline Ecological Management Plan.pdf|TR030002-000860-151216 TR030002 York Potash Ltd - Document 6.11B - Outline Ecological Management Plan.pdf]]:7: overflowing and discharge of water containing suspended sediment into the estuary). [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf|TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf]]:7: "dredging" means using any device to move material (whether or not suspended in water) from [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf|TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf]]:13: (3) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf|TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf]]:14:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf|TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf]]:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf|TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf]]:50: (a) suspended deck structures comprised of a reinforced concrete deck supported by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf|TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf]]:75:appropriate, extinguish or suspend any rights in the pipeline corridor if the authorised development [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf|TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf]]:75:extinguishment or suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf|TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf]]:86: injurious matter in suspension or otherwise. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000599-Doc 2.1I - YPL Land Plan Inset 6 Rev v1.pdf|TR030002-000599-Doc 2.1I - YPL Land Plan Inset 6 Rev v1.pdf]]:1: suspend and/or interfere with easements and/or other private rights and to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000710-York Potash Limited (Document 6.8A).pdf|TR030002-000710-York Potash Limited (Document 6.8A).pdf]]:8:11 Care would be taken to prevent run-off of waters that may contain suspended solids or fuels. Construction Environmental Management Plan [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000710-York Potash Limited (Document 6.8A).pdf|TR030002-000710-York Potash Limited (Document 6.8A).pdf]]:9: The re-suspension of sediment caused by CSD can be reduced through optimising the cutter speed, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000710-York Potash Limited (Document 6.8A).pdf|TR030002-000710-York Potash Limited (Document 6.8A).pdf]]:10: box would prevent significant release of suspended sediments during dewatering of placed dredged [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf|TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf]]:12: appropriate, extinguish, suspend or override any rights in the protected land if the authorised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf|TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf]]:12: extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf|TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf]]:12: acquire, appropriate, extinguish, suspend or override any rights in the protected land relating to pipes [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000597-Doc 2.1G - YPL Land Plan Inset 4 Rev v1.pdf|TR030002-000597-Doc 2.1G - YPL Land Plan Inset 4 Rev v1.pdf]]:1: suspend and/or interfere with easements and/or other private rights and to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000600-Doc 2.1J - YPL Land Plan Inset 7 Rev v1.pdf|TR030002-000600-Doc 2.1J - YPL Land Plan Inset 7 Rev v1.pdf]]:1: suspend and/or interfere with easements and/or other private rights and to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000590-Doc 2.1 - YPL Land Plan Key Plan Rev v1.pdf|TR030002-000590-Doc 2.1 - YPL Land Plan Key Plan Rev v1.pdf]]:1: suspend and/or interfere with easements and/or other private rights and to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000590-Doc 2.1 - YPL Land Plan Key Plan Rev v1.pdf|TR030002-000590-Doc 2.1 - YPL Land Plan Key Plan Rev v1.pdf]]:1: temporarily suspend and/or interfere with easements and/or other private rights [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000591-Doc 2.1A - YPL Land Plan Sheet 1 Rev v1.pdf|TR030002-000591-Doc 2.1A - YPL Land Plan Sheet 1 Rev v1.pdf]]:1: suspend and/or interfere with easements and/or other private rights and to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000725-York Potash Limited (Document 6.10).pdf|TR030002-000725-York Potash Limited (Document 6.10).pdf]]:19:5 Care would be taken to prevent run-off of waters that may contain suspended solids or fuels. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000453-ES Section 18 Infrastructure.pdf|TR030002-000453-ES Section 18 Infrastructure.pdf]]:15: water quality by temporarily increasing total suspended solid concentrations within the water column. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000453-ES Section 18 Infrastructure.pdf|TR030002-000453-ES Section 18 Infrastructure.pdf]]:15: increase in total suspended solid concentrations within the water abstracted from the estuary could [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000453-ES Section 18 Infrastructure.pdf|TR030002-000453-ES Section 18 Infrastructure.pdf]]:15: would remain unrestricted, with peaks in total suspended solid concentrations expected on a short term [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000453-ES Section 18 Infrastructure.pdf|TR030002-000453-ES Section 18 Infrastructure.pdf]]:15: discussed within Section 5, show that mean increases in the concentration of total suspended solids [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000453-ES Section 18 Infrastructure.pdf|TR030002-000453-ES Section 18 Infrastructure.pdf]]:15: that is suspended during capital dredging using a CSD or backhoe. Furthermore, it is proposed that an [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000453-ES Section 18 Infrastructure.pdf|TR030002-000453-ES Section 18 Infrastructure.pdf]]:16: increases in the concentration of total suspended sediment (in the region of 10mg/l to 20mg/l above [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000453-ES Section 18 Infrastructure.pdf|TR030002-000453-ES Section 18 Infrastructure.pdf]]:16: due to increased suspended sediment would be temporary in nature. Based on the above, the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf|TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf]]:15:appropriate, extinguish, suspend or override any rights in the protected land if the authorised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf|TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf]]:15:appropriation, extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf|TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf]]:15:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000861-SABIC UK Petrochemicals Limited.PDF|TR030002-000861-SABIC UK Petrochemicals Limited.PDF]]:20:appropriate, extinguish, suspend or override any rights in the protected land if the authorised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000861-SABIC UK Petrochemicals Limited.PDF|TR030002-000861-SABIC UK Petrochemicals Limited.PDF]]:20:appropriation, extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000861-SABIC UK Petrochemicals Limited.PDF|TR030002-000861-SABIC UK Petrochemicals Limited.PDF]]:21:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000861-SABIC UK Petrochemicals Limited.PDF|TR030002-000861-SABIC UK Petrochemicals Limited.PDF]]:53:appropriate, extinguish, suspend or override any rights in the protected land if the authorised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000861-SABIC UK Petrochemicals Limited.PDF|TR030002-000861-SABIC UK Petrochemicals Limited.PDF]]:53:appropriation, extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000861-SABIC UK Petrochemicals Limited.PDF|TR030002-000861-SABIC UK Petrochemicals Limited.PDF]]:53:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000830-Document 2.1J(i) - YPL Land Plan Inset 7(i) (Northern Route) - Rev v4.pdf|TR030002-000830-Document 2.1J(i) - YPL Land Plan Inset 7(i) (Northern Route) - Rev v4.pdf]]:1: to suspend and/or interfere with easements and/or other private rights and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000769-York Potash Ltd (2).pdf|TR030002-000769-York Potash Ltd (2).pdf]]:7: "dredging" means using any device to move material (whether or not suspended in water) from [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000769-York Potash Ltd (2).pdf|TR030002-000769-York Potash Ltd (2).pdf]]:13: (3) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000769-York Potash Ltd (2).pdf|TR030002-000769-York Potash Ltd (2).pdf]]:14:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000769-York Potash Ltd (2).pdf|TR030002-000769-York Potash Ltd (2).pdf]]:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000769-York Potash Ltd (2).pdf|TR030002-000769-York Potash Ltd (2).pdf]]:49: (a) suspended deck structures comprised of a reinforced concrete deck supported by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000769-York Potash Ltd (2).pdf|TR030002-000769-York Potash Ltd (2).pdf]]:72:appropriate, extinguish or suspend any rights in the pipeline corridor if the authorised development [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000769-York Potash Ltd (2).pdf|TR030002-000769-York Potash Ltd (2).pdf]]:72:extinguishment or suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000769-York Potash Ltd (2).pdf|TR030002-000769-York Potash Ltd (2).pdf]]:75:appropriate, extinguished or suspend any rights over a protected asset if the authorised development [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000769-York Potash Ltd (2).pdf|TR030002-000769-York Potash Ltd (2).pdf]]:75:extinguishment or suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000769-York Potash Ltd (2).pdf|TR030002-000769-York Potash Ltd (2).pdf]]:82: injurious matter in suspension or otherwise. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000797-Document 2.1H - YPL Land Plan Inset 5 - Rev v4.pdf|TR030002-000797-Document 2.1H - YPL Land Plan Inset 5 - Rev v4.pdf]]:1: to suspend and/or interfere with easements and/or other private rights and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF|TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF]]:20:appropriate, extinguish, suspend or override any rights in the protected land if the authorised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF|TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF]]:20:appropriation, extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF|TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF]]:21:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF|TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF]]:53:appropriate, extinguish, suspend or override any rights in the protected land if the authorised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF|TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF]]:53:appropriation, extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF|TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF]]:53:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000689-York Potash Ltd (4).pdf|TR030002-000689-York Potash Ltd (4).pdf]]:25:and 25 of this Order to acquire, appropriate, extinguish, suspend or override any rights in the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000689-York Potash Ltd (4).pdf|TR030002-000689-York Potash Ltd (4).pdf]]:25:appropriation, extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000689-York Potash Ltd (4).pdf|TR030002-000689-York Potash Ltd (4).pdf]]:25:to acquire, appropriate, extinguish, suspend or override any rights in the protected land relating to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000689-York Potash Ltd (4).pdf|TR030002-000689-York Potash Ltd (4).pdf]]:38:appropriate, extinguish, suspend or override any rights in the protected land if the authorised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000689-York Potash Ltd (4).pdf|TR030002-000689-York Potash Ltd (4).pdf]]:38:extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000689-York Potash Ltd (4).pdf|TR030002-000689-York Potash Ltd (4).pdf]]:38:to acquire, appropriate, extinguish, suspend or override any rights in the protected land relating to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000689-York Potash Ltd (4).pdf|TR030002-000689-York Potash Ltd (4).pdf]]:43: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of any [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000689-York Potash Ltd (4).pdf|TR030002-000689-York Potash Ltd (4).pdf]]:43: without such creation, acquisition, appropriation, extinguishment or suspension.; and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000689-York Potash Ltd (4).pdf|TR030002-000689-York Potash Ltd (4).pdf]]:49: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of any [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000689-York Potash Ltd (4).pdf|TR030002-000689-York Potash Ltd (4).pdf]]:49: without such creation, acquisition, appropriation, extinguishment or suspension; and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000736-Redcar and Cleveland Borough Council (Local Impact Report).pdf|TR030002-000736-Redcar and Cleveland Borough Council (Local Impact Report).pdf]]:4: of the River Tees or (b) of open construction comprising a suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000461-Section 3 App 3.2 Option study report.pdf|TR030002-000461-Section 3 App 3.2 Option study report.pdf]]:49: Figure A3.11 Option E was inspired by suspension bridges and consisted of one A frame on [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000422-Doc 5.1 Statement of Reasons.pdf|TR030002-000422-Doc 5.1 Statement of Reasons.pdf]]:5: will be interfered with/suspended/extinguished, the land over which [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000422-Doc 5.1 Statement of Reasons.pdf|TR030002-000422-Doc 5.1 Statement of Reasons.pdf]]:38: b. An open quay comprising suspended deck structures [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf|TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf]]:5:The increase in suspended sediment should be assessed in terms of the potential barrier to fish migration and behavioural Section 11 [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf|TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf]]:24: be re-suspended into the water column. Hence, the construction phase would result in temporary [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf|TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf]]:24: below therefore relates to the potential impact associated with the resuspension of non-contaminated [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf|TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf]]:24:11.5.4 The re-suspension of sediment as a consequence of the proposed dredging could also potentially affect [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf|TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf]]:25: minimise the resuspension of sediment into the water column (assuming best operational practice is [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf|TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf]]:25: anticipated to rapidly dilute and disperse temporarily increased suspended sediment concentrations. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf|TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf]]:25:11.5.12 Limiting re-suspension of sediment during TSHD can be achieved through the following measures: [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf|TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf]]:26:11.5.14 The re-suspension of sediment caused by CSD can be reduced through optimising the cutter speed, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf|TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf]]:47:Effects on fish High Low Minor adverse Limiting resuspension during TSHD can be ac [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf|TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf]]:5:“dredging” means using any device to move material (whether or not suspended in water) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf|TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf]]:11: (10) Section 72(7) and (8) (variation, suspension, revocation and transfer) of the 2009 Act does [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf|TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf]]:12: (3) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf|TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf]]:13:as free as may be practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf|TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf]]:28: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf|TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf]]:43: (a) suspended deck structures comprised of a reinforced concrete deck supported by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf|TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf]]:74:appropriate, extinguish, suspend or override any rights in the protected land if the authorised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf|TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf]]:74:appropriation, extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf|TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf]]:75:appropriate, extinguish, suspend or override any rights in the protected land relating to the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf|TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf]]:79: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf|TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf]]:79: acquisition, appropriation, extinguishment or suspension; or [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf|TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf]]:88: injurious matter in suspension or otherwise. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000253-Regulation 24 Transboundary Screening document.pdf|TR030002-000253-Regulation 24 Transboundary Screening document.pdf]]:3: through an increase in suspended sediments due to the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000564-Doc 6.8 Governance Tracker.pdf|TR030002-000564-Doc 6.8 Governance Tracker.pdf]]:8:10 Care would be taken to prevent run-off of waters that may contain suspended solids or fuels. CEMP Requirement 6 [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000564-Doc 6.8 Governance Tracker.pdf|TR030002-000564-Doc 6.8 Governance Tracker.pdf]]:9: The re-suspension of sediment caused by CSD can be reduced through optimising the cutter speed, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000564-Doc 6.8 Governance Tracker.pdf|TR030002-000564-Doc 6.8 Governance Tracker.pdf]]:10: box would prevent significant release of suspended sediments during dewatering of placed dredged [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000722-York Potash Limited 4.pdf|TR030002-000722-York Potash Limited 4.pdf]]:10:  re-suspension of sediment during capital dredging and piling; [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000722-York Potash Limited 4.pdf|TR030002-000722-York Potash Limited 4.pdf]]:11:  limiting re-suspension of sediment during trailing suction hopper dredging can be achieved [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000722-York Potash Limited 4.pdf|TR030002-000722-York Potash Limited 4.pdf]]:11:  resuspension of sediment during cutter suction dredging can be reduced through [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000722-York Potash Limited 4.pdf|TR030002-000722-York Potash Limited 4.pdf]]:11:5.7. Silt curtains are proposed within Bran Sands lagoon to prevent dispersion of suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF|TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF]]:20:appropriate, extinguish, suspend or override any rights in the protected land if the authorised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF|TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF]]:20:appropriation, extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF|TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF]]:21:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF|TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF]]:53:appropriate, extinguish, suspend or override any rights in the protected land if the authorised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF|TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF]]:53:appropriation, extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF|TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF]]:53:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000738-York Potash Limited 3.pdf|TR030002-000738-York Potash Limited 3.pdf]]:9:  re-suspension of sediment during capital dredging and piling; [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000738-York Potash Limited 3.pdf|TR030002-000738-York Potash Limited 3.pdf]]:10:  limiting re-suspension of sediment during trailing suction hopper dredging can be achieved [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000738-York Potash Limited 3.pdf|TR030002-000738-York Potash Limited 3.pdf]]:10:  resuspension of sediment during cutter suction dredging can be reduced through [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000738-York Potash Limited 3.pdf|TR030002-000738-York Potash Limited 3.pdf]]:10:4.7. Silt curtains are proposed within Bran Sands lagoon to prevent dispersion of suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000806-Document 2.1E - YPL Land Plan Inset 2 - Rev v4.pdf|TR030002-000806-Document 2.1E - YPL Land Plan Inset 2 - Rev v4.pdf]]:1: to suspend and/or interfere with easements and/or other private rights and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000817-Document 2.1D - YPL Land Plan Inset 1 - Rev v4.pdf|TR030002-000817-Document 2.1D - YPL Land Plan Inset 1 - Rev v4.pdf]]:1: 1 to suspend and/or interfere with easements and/or other private rights and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf|TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf]]:13: This would be a suspended structure located [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf|TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf]]:34:2014 apply to the High Court for the suspension or quashing of the has not been complied with, may, within 6 weeks of 11 September IF THE ORDER IS MADE, the stopping up will be authorised only in [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf|TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf]]:34:Order or of any provision included. 2014 apply to the High Court for the suspension or quashing of the order to enable development as permitted by Coventry City Council [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf|TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf]]:34:2014 apply to the High Court for the suspension or quashing of the ANY PERSON MAY OBJECT to the making of the proposed order REGULATION 4 INFRASTRUCTURE PLANNING (APPLICATIONS: [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf|TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf]]:34:2014 apply to the High Court for the suspension or quashing of the commencing on 11 September 2014, and may be obtained, free of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf|TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf]]:41: calibration, validation, increase in suspended sediment data. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf|TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf]]:41: The MMO agrees that increasing the suspended sediment concentrations by 10-50mg/l would be temporary in nature and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf|TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf]]:41: short lived, however the increase in suspended sediment should be assessed in terms of the potential barrier to fish [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000410-ExA First Round Questions.pdf|TR030002-000410-ExA First Round Questions.pdf]]:37:suspended deck of the quay (if the open quay structure is proposed). This design [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf|TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf]]:15:• Work shall be suspended and rescheduled during periods of severe or inclement weather. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf|TR030002-000847-York Potash Ltd - Constructability Notes - BP CATS Pipeline Southern Route.pdf]]:21:than suspended by rigging which is inherently less stable [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001855-Development Consent Order as made by the Secretary of State.pdf|TR030002-001855-Development Consent Order as made by the Secretary of State.pdf]]:5:“dredging” means using any device to move material (whether or not suspended in water) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001855-Development Consent Order as made by the Secretary of State.pdf|TR030002-001855-Development Consent Order as made by the Secretary of State.pdf]]:10: (10) Section 72(7) and (8) (variation, suspension, revocation and transfer) of the 2009 Act does [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001855-Development Consent Order as made by the Secretary of State.pdf|TR030002-001855-Development Consent Order as made by the Secretary of State.pdf]]:12: (3) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001855-Development Consent Order as made by the Secretary of State.pdf|TR030002-001855-Development Consent Order as made by the Secretary of State.pdf]]:13:as free as may be practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001855-Development Consent Order as made by the Secretary of State.pdf|TR030002-001855-Development Consent Order as made by the Secretary of State.pdf]]:27: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001855-Development Consent Order as made by the Secretary of State.pdf|TR030002-001855-Development Consent Order as made by the Secretary of State.pdf]]:43: (a) suspended deck structures comprised of a reinforced concrete deck supported by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001855-Development Consent Order as made by the Secretary of State.pdf|TR030002-001855-Development Consent Order as made by the Secretary of State.pdf]]:77:appropriate, extinguish, suspend or override any rights in the protected land if the authorised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001855-Development Consent Order as made by the Secretary of State.pdf|TR030002-001855-Development Consent Order as made by the Secretary of State.pdf]]:77:appropriation, extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001855-Development Consent Order as made by the Secretary of State.pdf|TR030002-001855-Development Consent Order as made by the Secretary of State.pdf]]:77:appropriate, extinguish, suspend or override any rights in the protected land relating to the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001855-Development Consent Order as made by the Secretary of State.pdf|TR030002-001855-Development Consent Order as made by the Secretary of State.pdf]]:82: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001855-Development Consent Order as made by the Secretary of State.pdf|TR030002-001855-Development Consent Order as made by the Secretary of State.pdf]]:82: acquisition, appropriation, extinguishment or suspension; or [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001855-Development Consent Order as made by the Secretary of State.pdf|TR030002-001855-Development Consent Order as made by the Secretary of State.pdf]]:91: injurious matter in suspension or otherwise. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000732-DEA UK SNS Limited (Written Representation).pdf|TR030002-000732-DEA UK SNS Limited (Written Representation).pdf]]:15: Complex are symbiotic and suspension in production of the Cracker (for example) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf|TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf]]:6: "dredging" means using any device to move material (whether or not suspended in water) from [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf|TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf]]:13: (3) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf|TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf]]:14:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf|TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf]]:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf|TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf]]:51: (a) suspended deck structures comprised of a reinforced concrete deck supported by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf|TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf]]:84:appropriate, extinguish, suspend or override any rights in the protected land if the authorised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf|TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf]]:84:extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf|TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf]]:84:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf|TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf]]:88: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of any [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf|TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf]]:88: appropriation, extinguishment or suspension; and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf|TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf]]:97: injurious matter in suspension or otherwise. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:62: considered. This would be likely to increase temporary suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:96: include suspended sediment concentration in the water column during [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:97:6.6.19 To avoid contamination as a result of suspended sediment, the silts [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:97: nesting platforms for shags could be provided beneath the suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:105: Plans show land over which rights would be interfered with, suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:129: Steel-making at the Redcar site was subsequently suspended and SSI [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:221:"dredging" means using any device to move material (whether or not suspended in water) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:228: (3) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:229:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:244: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:261: (a) suspended deck structures comprised of a reinforced concrete deck supported by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:295:appropriate, extinguish, suspend or override any rights in the protected land if the authorised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:295:appropriation, extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:295:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:299: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:299: acquisition, appropriation, extinguishment or suspension; and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-001856-Examining Authority’s Recommendation Report.pdf|TR030002-001856-Examining Authority’s Recommendation Report.pdf]]:309: injurious matter in suspension or otherwise. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000726-York Potash Limited (Document 6.11).pdf|TR030002-000726-York Potash Limited (Document 6.11).pdf]]:6: Use of an enclosed grab to dredge the contaminated sediment (thereby minimising resuspension of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000726-York Potash Limited (Document 6.11).pdf|TR030002-000726-York Potash Limited (Document 6.11).pdf]]:7: overflowing and discharge of water containing suspended sediment into the estuary). [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf|TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf]]:7: "dredging" means using any device to move material (whether or not suspended in water) from [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf|TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf]]:14: (3) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf|TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf]]:15:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf|TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf]]:30: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf|TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf]]:52: (a) suspended deck structures comprised of a reinforced concrete deck supported by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf|TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf]]:85:and 25 of this Order to acquire, appropriate, extinguish, suspend or override any rights in the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf|TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf]]:85:appropriation, extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf|TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf]]:85:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf|TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf]]:89: 4.(a)create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of any [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf|TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf]]:89: appropriation, extinguishment or suspension.; and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf|TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf]]:99: injurious matter in suspension or otherwise. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf|TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf]]:21: of this Order to-acquire, appropriate, extinguish, suspend or override any rights in the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf|TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf]]:21: rightsacquisition, appropriation, extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf|TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf]]:21: to acquire, appropriate, extinguish, suspend or override any rights in the protected land [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf|TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf]]:26: (a) creat e, acquire, appropriate, extinguish or suspend any right s or covenant s in respect of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf|TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf]]:26: acquisit ion, appropriat ion, ext inguishment or suspension .; and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf|TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf]]:7: "dredging" means using any device to move material (whether or not suspended in water) from [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf|TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf]]:14: (3) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf|TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf]]:15:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf|TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf]]:30: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf|TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf]]:52: (a) suspended deck structures comprised of a reinforced concrete deck supported by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf|TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf]]:84:appropriate, extinguish, suspend or override any rights in the protected land if the authorised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf|TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf]]:84:extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf|TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf]]:85:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf|TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf]]:89: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of any [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf|TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf]]:89: appropriation, extinguishment or suspension; and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf|TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf]]:98: injurious matter in suspension or otherwise. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000711-Applicants Response to First Questions.pdf|TR030002-000711-Applicants Response to First Questions.pdf]]:70: secured and delivered through the DCO considered unlikely that sediment that is suspended by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000711-Applicants Response to First Questions.pdf|TR030002-000711-Applicants Response to First Questions.pdf]]:105: with the capital dredging required for the sediment resuspension during the dredging activity) and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000711-Applicants Response to First Questions.pdf|TR030002-000711-Applicants Response to First Questions.pdf]]:105: proposed development. the potential for interaction between sediment suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000711-Applicants Response to First Questions.pdf|TR030002-000711-Applicants Response to First Questions.pdf]]:105: combination with the capital dredging suspended during maintenance would be within the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000711-Applicants Response to First Questions.pdf|TR030002-000711-Applicants Response to First Questions.pdf]]:113: suspended deck of the quay (if the open solid quay structure. This was discussed as a possible [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf|TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf]]:12: Complex are symbiotic and suspension in production of the Cracker (for example) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000253-Regulation 24 Transboundary Screening document (3).pdf|TR030002-000253-Regulation 24 Transboundary Screening document (3).pdf]]:3: through an increase in suspended sediments due to the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000831-Document 2.1M - YPL Land Plan Inset 10 - Rev v4.pdf|TR030002-000831-Document 2.1M - YPL Land Plan Inset 10 - Rev v4.pdf]]:1: to suspend and/or interfere with easements and/or other private rights and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000831-Document 2.1M - YPL Land Plan Inset 10 - Rev v4.pdf|TR030002-000831-Document 2.1M - YPL Land Plan Inset 10 - Rev v4.pdf]]:1: to temporarily suspend and/or interfere with easements and/or other private [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf|TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf]]:6: "dredging" means using any device to move material (whether or not suspended in water) from [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf|TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf]]:13: (3) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf|TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf]]:14:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf|TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf]]:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf|TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf]]:53: (a) suspended deck structures comprised of a reinforced concrete deck supported by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf|TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf]]:79:appropriate, extinguish or suspend any rights in the pipeline corridor if the authorised development [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf|TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf]]:79:extinguishment or suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf|TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf]]:84:to acquire, appropriate, extinguish, suspend or override any rights in the protected land which are [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf|TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf]]:88:this Order create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf|TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf]]:88:without such creation, acquisition, appropriation, extinguishment or suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf|TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf]]:88:appropriate, extinguished or suspend any rights over a protected asset if the authorised development [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf|TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf]]:88:extinguishment or suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf|TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf]]:96: injurious matter in suspension or otherwise. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000829-Document 2.1G - YPL Land Plan Inset 4 - Rev v4.pdf|TR030002-000829-Document 2.1G - YPL Land Plan Inset 4 - Rev v4.pdf]]:1: to suspend and/or interfere with easements and/or other private rights and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000739-TATA Steel UK Limited and Others.pdf|TR030002-000739-TATA Steel UK Limited and Others.pdf]]:13: coke to be built up in advance so that the haulage operation could be suspended, This would [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000672-Doc 6.1 Consultation Statement Appendices - 10 to 21.pdf|TR030002-000672-Doc 6.1 Consultation Statement Appendices - 10 to 21.pdf]]:36: metres in width. This would allow for the suspended structure located location of the quay platform would be [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000593-Doc 2.1C - YPL Land Plan Sheet 3 Rev v1.pdf|TR030002-000593-Doc 2.1C - YPL Land Plan Sheet 3 Rev v1.pdf]]:1: suspend and/or interfere with easements and/or other private rights and to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000593-Doc 2.1C - YPL Land Plan Sheet 3 Rev v1.pdf|TR030002-000593-Doc 2.1C - YPL Land Plan Sheet 3 Rev v1.pdf]]:1: temporarily suspend and/or interfere with easements and/or other private rights [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:8: TSS Total Suspended Solids [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:29: 1. A suspended reinforced concrete deck approximately 524m long and 28m wide, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:29:A suspended reinforced concrete deck would be formed with steel tubular piles to be [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:29:Indicative cross sections of the suspended deck quay and the continuous quay [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:31:Figure 3.3 Indicative cross section of the suspended quay deck option [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:34: suspended deck or the continuous quay) would require the employment of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:43:In general, suspended sediment concentrations are low within the estuary and within [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:43:events. In general, the suspended sediment concentrations appear to be dominated by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:43:downstream. In the vicinity of the proposed scheme, suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:43:40mg/l to 80mg/l. In terms of the tidal sequence, the highest suspended sediment levels [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:43:occur close to high water. After storm periods, higher concentrations of suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:44: currents, vessel induced forces and resuspension of material by dredging operations. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:44: quay structure, berth pocket and deepened approach channel (the suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:45: additional drag force of the piles on the flow (for the suspended deck option) and the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:45: For the open, suspended deck structure, with a minor change to the configuration of the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:46: footprints of elevated suspended sediment concentrations and deposition arising from [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:55: The potential exists for sediment disturbance / re-suspension during dredging of the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:55: terminal itself (e.g. through the installation of piles). The disturbance and re-suspension [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:55: quality within the Tees estuary, due to increased concentrations of suspended solids [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:56:Increased suspended sediment concentration due to maintenance dredging [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:56:increase in suspended sediment concentration. It is anticipated that this would be [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:61:For the suspended deck quay option, the installation of approximately 500 tubular piles [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:61:suspended sediment during dredging and deposition following dredging [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:61:An increase in the total suspended sediment (TSS) concentration in the water column [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:62:the seabed at the locations where sediment settles out of suspension. Dredging is also [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:62:assessments within the Tees) is unlikely to have a prolonged effect on suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:67: resources for birds, in particular terns, through increased total suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:73: through temporarily increasing total suspended solids concentrations. At high levels [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:73: and/or for prolonged periods of time, an increase in suspended sediment concentration [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:89: Tees estuary (the suspended deck option would be expected to have a more localised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:92: • Potential impact on existing water abstraction processes – total suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:106: • Increased total suspended solids may affect food resources for • Use of hydrodynamic and sedime [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf|TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf]]:110:waves, tides and suspended mud concentrations in Tees Bay. EX 1938 [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000596-Doc 2.1F - YPL Land Plan Inset 3 Rev v1.pdf|TR030002-000596-Doc 2.1F - YPL Land Plan Inset 3 Rev v1.pdf]]:1: suspend and/or interfere with easements and/or other private rights and to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf|TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf]]:16: appropriate, extinguish, suspend or override any rights in the protected land if the authorised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf|TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf]]:16: extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf|TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf]]:16: acquire, appropriate, extinguish, suspend or override any rights in the protected land relating to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000253-Regulation 24 Transboundary Screening document (4).pdf|TR030002-000253-Regulation 24 Transboundary Screening document (4).pdf]]:3: through an increase in suspended sediments due to the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000448-ES Section 13 Air quality.pdf|TR030002-000448-ES Section 13 Air quality.pdf]]:8: materials and resuspension of settled materials, and, therefore, a wide range of site preparation and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000771-York Potash Ltd (3).pdf|TR030002-000771-York Potash Ltd (3).pdf]]:7: "dredging" means using any device to move material (whether or not suspended in water) from [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000771-York Potash Ltd (3).pdf|TR030002-000771-York Potash Ltd (3).pdf]]:13: (3) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000771-York Potash Ltd (3).pdf|TR030002-000771-York Potash Ltd (3).pdf]]:14:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000771-York Potash Ltd (3).pdf|TR030002-000771-York Potash Ltd (3).pdf]]:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000771-York Potash Ltd (3).pdf|TR030002-000771-York Potash Ltd (3).pdf]]:49: (a) suspended deck structures comprised of a reinforced concrete deck supported by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000771-York Potash Ltd (3).pdf|TR030002-000771-York Potash Ltd (3).pdf]]:72:appropriate, extinguish or suspend any rights in the pipeline corridor if the authorised development [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000771-York Potash Ltd (3).pdf|TR030002-000771-York Potash Ltd (3).pdf]]:72:extinguishment or suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000771-York Potash Ltd (3).pdf|TR030002-000771-York Potash Ltd (3).pdf]]:75:acquire appropriate, extinguished or use or acquire newsuspend any rights over a protected asset [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000771-York Potash Ltd (3).pdf|TR030002-000771-York Potash Ltd (3).pdf]]:75:conditionsacquisition, appropriation, extinguishment or suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000771-York Potash Ltd (3).pdf|TR030002-000771-York Potash Ltd (3).pdf]]:82: injurious matter in suspension or otherwise. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000799-Document 6.12A - Mitigation and Monitoring Strategy - Rev 4.pdf|TR030002-000799-Document 6.12A - Mitigation and Monitoring Strategy - Rev 4.pdf]]:31:should be considered beneath the suspended deck of the quay (should an open quay structure be [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000799-Document 6.12A - Mitigation and Monitoring Strategy - Rev 4.pdf|TR030002-000799-Document 6.12A - Mitigation and Monitoring Strategy - Rev 4.pdf]]:47:platforms for shags beneath the suspended deck should be considered, along with the other [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000253-Regulation 24 Transboundary Screening document (2).pdf|TR030002-000253-Regulation 24 Transboundary Screening document (2).pdf]]:3: through an increase in suspended sediments due to the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000595-Doc 2.1E - YPL Land Plan Inset 2 Rev v1.pdf|TR030002-000595-Doc 2.1E - YPL Land Plan Inset 2 Rev v1.pdf]]:1: suspend and/or interfere with easements and/or other private rights and to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf|TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf]]:15:• Work shall be suspended and rescheduled during periods of severe or inclement weather. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf|TR030002-000846-York Potash Ltd - Constructability Notes - BP CATS Pipeline Northern Route.pdf]]:21:than suspended by rigging which is inherently less stable [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000594-Doc 2.1D - YPL Land Plan Inset 1 Rev v1.pdf|TR030002-000594-Doc 2.1D - YPL Land Plan Inset 1 Rev v1.pdf]]:1: 1 suspend and/or interfere with easements and/or other private rights and to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf|TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf]]:23:9.5.1 As discussed in Section 5.5, the proposed capital dredging would cause suspension of fine sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf|TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf]]:24: suspended sediment concentration resulting from the use of this dredging plant is presented in Section [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf|TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf]]:24:9.5.2 The potential effect of dredging using a CSD and TSHD on suspended sediment concentration in the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf|TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf]]:24: suspended sediment likely. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf|TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf]]:24:9.5.3 It is predicted that increased suspended sediment concentrations for the duration of capital dredging [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf|TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf]]:42:resource due to outlined below. Limiting re-suspension during TSHD c [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf|TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf]]:42: Re-suspension of sediment during CSD can be reduce [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000443-ES Section 8 Marine ecology.pdf|TR030002-000443-ES Section 8 Marine ecology.pdf]]:10:intertidal habitat to be lost. For the suspended would be minimised. This will be would create a larger footprint, a area a [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000443-ES Section 8 Marine ecology.pdf|TR030002-000443-ES Section 8 Marine ecology.pdf]]:11: that is suspended by the current from t [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000443-ES Section 8 Marine ecology.pdf|TR030002-000443-ES Section 8 Marine ecology.pdf]]:18: suspended from a surface buoy which in turn was anchored by a weight resting on the seabed via a [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000443-ES Section 8 Marine ecology.pdf|TR030002-000443-ES Section 8 Marine ecology.pdf]]:48: Potential impacts to marine ecology from increased total suspended sediment during dredging [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000443-ES Section 8 Marine ecology.pdf|TR030002-000443-ES Section 8 Marine ecology.pdf]]:48: Sediment resuspension [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000443-ES Section 8 Marine ecology.pdf|TR030002-000443-ES Section 8 Marine ecology.pdf]]:48: suspended into the water column, dispersed and deposited onto the seabed. Hence, the construction [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000443-ES Section 8 Marine ecology.pdf|TR030002-000443-ES Section 8 Marine ecology.pdf]]:48: phase would result in increases in the total suspended sediment (TSS) concentrations of the water [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000443-ES Section 8 Marine ecology.pdf|TR030002-000443-ES Section 8 Marine ecology.pdf]]:49: the potential impact to marine ecology associated with the resuspension of uncontaminated sediment. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000443-ES Section 8 Marine ecology.pdf|TR030002-000443-ES Section 8 Marine ecology.pdf]]:49: feeding apparatus (e.g. filter feeding molluscs). In addition, high concentrations of suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000443-ES Section 8 Marine ecology.pdf|TR030002-000443-ES Section 8 Marine ecology.pdf]]:49: basis during Phase 1 and Phase 2. During dredging, suspended sediment would rapidly disperse away [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000443-ES Section 8 Marine ecology.pdf|TR030002-000443-ES Section 8 Marine ecology.pdf]]:49: receptors from increased concentrations of suspended sediment and sediment deposition following [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000443-ES Section 8 Marine ecology.pdf|TR030002-000443-ES Section 8 Marine ecology.pdf]]:49: discussed in Section 5.5, a backhoe dredger is considered likely to minimise the resuspension of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000443-ES Section 8 Marine ecology.pdf|TR030002-000443-ES Section 8 Marine ecology.pdf]]:49: increased concentrations of suspended sediment within the water column due to dredging using a [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000443-ES Section 8 Marine ecology.pdf|TR030002-000443-ES Section 8 Marine ecology.pdf]]:49: suspended sediment is greatest for a TSHD during low river flow and spring tide conditions. On [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000443-ES Section 8 Marine ecology.pdf|TR030002-000443-ES Section 8 Marine ecology.pdf]]:50:8.5.23 As discussed above, a proportion of the sediment that is dredged would be disturbed, re-suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000443-ES Section 8 Marine ecology.pdf|TR030002-000443-ES Section 8 Marine ecology.pdf]]:50:8.5.26 No average increase in suspended sediment concentration is shown over the intertidal for any of the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000443-ES Section 8 Marine ecology.pdf|TR030002-000443-ES Section 8 Marine ecology.pdf]]:50:8.5.28 The controls outlined within Section 7.5 with regard to minimising suspended sediment load during [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000443-ES Section 8 Marine ecology.pdf|TR030002-000443-ES Section 8 Marine ecology.pdf]]:61: below. Limiting re-suspension during TSHD can be ac [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000443-ES Section 8 Marine ecology.pdf|TR030002-000443-ES Section 8 Marine ecology.pdf]]:61:suspended during Low Low Negligible Reduction of sediment plumes during backhoe dredgin [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000443-ES Section 8 Marine ecology.pdf|TR030002-000443-ES Section 8 Marine ecology.pdf]]:61: Re-suspension of sediment during CSD can be reduce [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf|TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf]]:10:the proposed construction options for the berth. One option is based on forming a suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000821-Document 2.1B(i) - YPL Land Plan Sheet 2(i) (Northern Route) - Rev v4.pdf|TR030002-000821-Document 2.1B(i) - YPL Land Plan Sheet 2(i) (Northern Route) - Rev v4.pdf]]:1: suspend and/or interfere with easements and/or other private rights and to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000253-Regulation 24 Transboundary Screening document (1).pdf|TR030002-000253-Regulation 24 Transboundary Screening document (1).pdf]]:3: through an increase in suspended sediments due to the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf|TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf]]:7: structure. Under the open quay option, the quay and access bridge would be suspended deck [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf|TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf]]:15: suspension of sediment as a result of capital and maintenance dredging and piling, and deterioration of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf|TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf]]:16: increase in suspended sediment would not occur over the intertidal for any of the potential dredge [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf|TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf]]:32: increased suspended sediment concentration arising from capital dredging for other projects (should [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf|TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf]]:32: would be additive, with an overall combined increase in suspended sediment concentration where the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf|TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf]]:32:3.12.3 The dispersion of suspended sediment and deposition on the seabed during capital dredging has the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf|TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf]]:40: x Increase of suspended solids. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf|TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf]]:41: levels of suspended solids and/ or leachates from Made Ground have the potential to enter local [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf|TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf]]:47: in suspended solids, and as a result of leaks/spillages from machinery. However, the decommissioning [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf|TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf]]:17:2.2.6 For the open quay option, the quay and access bridge structures would be suspended deck structures [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf|TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf]]:35: SUSPENDED DECK [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf|TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf]]:38: be required to create the stable slope beneath the quay for the open suspended deck option. As part of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf|TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf]]:38: the berth pocket and stable slope beneath the quay for the open suspended deck option. For the solid [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf|TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf]]:81: effect on feeding terns due to increased suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000792-Document 2.1B(ii) - YPL Land Plan Sheet 2(ii) (Southern Route) - Rev v4.pdf|TR030002-000792-Document 2.1B(ii) - YPL Land Plan Sheet 2(ii) (Southern Route) - Rev v4.pdf]]:1: suspend and/or interfere with easements and/or other private rights and to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000792-Document 2.1B(ii) - YPL Land Plan Sheet 2(ii) (Southern Route) - Rev v4.pdf|TR030002-000792-Document 2.1B(ii) - YPL Land Plan Sheet 2(ii) (Southern Route) - Rev v4.pdf]]:1: temporarily suspend and/or interfere with easements and/or other private rights [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:6: TSS Total Suspended Solids [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:27: 1. A suspended reinforced concrete deck approximately 524m long and 28m wide, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:27:A suspended reinforced concrete deck would be formed with steel tubular piles to be [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:27:Indicative cross sections of the suspended deck quay and the continuous quay [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:29:Figure 3.3 Indicative cross section of the suspended quay deck option [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:32: suspended deck or the continuous quay) would require the employment of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:41:In general, suspended sediment concentrations are low within the estuary and within [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:41:events. In general, the suspended sediment concentrations appear to be dominated by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:41:downstream. In the vicinity of the proposed scheme, suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:41:40mg/l to 80mg/l. In terms of the tidal sequence, the highest suspended sediment levels [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:41:occur close to high water. After storm periods, higher concentrations of suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:42: currents, vessel induced forces and resuspension of material by dredging operations. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:42: quay structure, berth pocket and deepened approach channel (the suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:43: additional drag force of the piles on the flow (for the suspended deck option) and the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:43: For the open, suspended deck structure, with a minor change to the configuration of the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:44: footprints of elevated suspended sediment concentrations and deposition arising from [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:53: The potential exists for sediment disturbance / re-suspension during dredging of the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:53: terminal itself (e.g. through the installation of piles). The disturbance and re-suspension [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:53: quality within the Tees estuary, due to increased concentrations of suspended solids [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:54:Increased suspended sediment concentration due to maintenance dredging [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:54:increase in suspended sediment concentration. It is anticipated that this would be [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:59:For the suspended deck quay option, the installation of approximately 500 tubular piles [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:59:suspended sediment during dredging and deposition following dredging [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:59:An increase in the total suspended sediment (TSS) concentration in the water column [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:60:the seabed at the locations where sediment settles out of suspension. Dredging is also [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:60:assessments within the Tees) is unlikely to have a prolonged effect on suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:65: resources for birds, in particular terns, through increased total suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:71: through temporarily increasing total suspended solids concentrations. At high levels [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:71: and/or for prolonged periods of time, an increase in suspended sediment concentration [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:87: Tees estuary (the suspended deck option would be expected to have a more localised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:90: • Potential impact on existing water abstraction processes – total suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:104: • Increased total suspended solids may affect food resources for • Use of hydrodynamic and sedime [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf|TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf]]:108:waves, tides and suspended mud concentrations in Tees Bay. EX 1938 [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000826-York Potash Ltd (2).pdf|TR030002-000826-York Potash Ltd (2).pdf]]:25: suspended deck of the quay (if the open quay [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000826-York Potash Ltd (2).pdf|TR030002-000826-York Potash Ltd (2).pdf]]:46:timetabled trains are suspended whilst the work is undertaken (abnormal possessions). In addition [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000826-York Potash Ltd (2).pdf|TR030002-000826-York Potash Ltd (2).pdf]]:47:part of the crane or suspended load could fall onto the tracks or supporting structures. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000826-York Potash Ltd (2).pdf|TR030002-000826-York Potash Ltd (2).pdf]]:58:part of the crane or suspended load could fall onto the tracks or supporting structures. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000782-151104 TR030002 Natural England Response to ExA's second round of questions.pdf|TR030002-000782-151104 TR030002 Natural England Response to ExA's second round of questions.pdf]]:16:beneath the suspended deck of the quay (if the open quay [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000782-151104 TR030002 Natural England Response to ExA's second round of questions.pdf|TR030002-000782-151104 TR030002 Natural England Response to ExA's second round of questions.pdf]]:16:was not a mitigation measure for which the HRA had to rely on suspended deck of the quay (should an open quay structure be [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf|TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf]]:12: Complex are symbiotic and suspension in production of the Cracker (for example) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf|TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf]]:16: appropriate, extinguish, suspend or override any rights in the protected land if the authorised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf|TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf]]:16: extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf|TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf]]:16: acquire, appropriate, extinguish, suspend or override any rights in the protected land relating to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000807-Document 2.1J(ii) - YPL Land Plan Inset 7(ii) (Southern Route) - Rev v4.pdf|TR030002-000807-Document 2.1J(ii) - YPL Land Plan Inset 7(ii) (Southern Route) - Rev v4.pdf]]:1: to suspend and/or interfere with easements and/or other private rights and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000807-Document 2.1J(ii) - YPL Land Plan Inset 7(ii) (Southern Route) - Rev v4.pdf|TR030002-000807-Document 2.1J(ii) - YPL Land Plan Inset 7(ii) (Southern Route) - Rev v4.pdf]]:1: to temporarily suspend and/or interfere with easements and/or other private [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf|TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf]]:6: "dredging" means using any device to move material (whether or not suspended in water) from [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf|TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf]]:13: (3) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf|TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf]]:14:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf|TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf]]:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf|TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf]]:51: (a) suspended deck structures comprised of a reinforced concrete deck supported by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf|TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf]]:84:and 25 of this Order to acquire, appropriate, extinguish, suspend or override any rights in the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf|TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf]]:84:appropriation, extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf|TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf]]:84:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf|TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf]]:89: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of any [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf|TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf]]:89: appropriation, extinguishment or suspension.; and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf|TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf]]:99: injurious matter in suspension or otherwise. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf|TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf]]:14:2.28 The purpose of the MHF is to convert the mineral suspended in [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf|TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf]]:16: suspended quay, or a continuous quay as described in Section 3.6 [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf|TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf]]:29: should the suspended deck structure for the quay be chosen, but [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf|TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf]]:40: also the potential for the SoS to suspend consideration of an [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf|TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf]]:91: environment and designated sites (water quality, suspended sediment concentration SSC) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf|TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf]]:31: transport for the polyhalite was for the mineral to be suspended in slurry, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000275-P D Teesport Limited.pdf|TR030002-000275-P D Teesport Limited.pdf]]:8: injurious matter in suspension or otherwise. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000457-ES Section 22 Offshore disposal of dredged material.pdf|TR030002-000457-ES Section 22 Offshore disposal of dredged material.pdf]]:1: quality (i.e. increase in suspended sediment concentration and dispersion from the disposal site). [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000457-ES Section 22 Offshore disposal of dredged material.pdf|TR030002-000457-ES Section 22 Offshore disposal of dredged material.pdf]]:2:22.2.7 Figure 22-1 shows the maximum excess (i.e. increased) suspended sediment concentration predicted [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000457-ES Section 22 Offshore disposal of dredged material.pdf|TR030002-000457-ES Section 22 Offshore disposal of dredged material.pdf]]:3: Figure 22-1 Maximum depth-average excess suspended sediment concentration from sediment released [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000457-ES Section 22 Offshore disposal of dredged material.pdf|TR030002-000457-ES Section 22 Offshore disposal of dredged material.pdf]]:5: site. Storm waves may bring this material into near-bed suspension, but the low tidal current speeds [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000802-Document 2.1A - YPL Land Plan Sheet 1 - Rev v4.pdf|TR030002-000802-Document 2.1A - YPL Land Plan Sheet 1 - Rev v4.pdf]]:1: suspend and/or interfere with easements and/or other private rights and to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000704-Applicant response to First Questions - Appendix 6.pdf|TR030002-000704-Applicant response to First Questions - Appendix 6.pdf]]:14: suspended deck structures comprised of a reinforced concrete deck supported by driven steel tubular [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000754-Document 4.1A Draft DCO (Clean).pdf|TR030002-000754-Document 4.1A Draft DCO (Clean).pdf]]:7: "dredging" means using any device to move material (whether or not suspended in water) from [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000754-Document 4.1A Draft DCO (Clean).pdf|TR030002-000754-Document 4.1A Draft DCO (Clean).pdf]]:13: (3) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000754-Document 4.1A Draft DCO (Clean).pdf|TR030002-000754-Document 4.1A Draft DCO (Clean).pdf]]:14:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000754-Document 4.1A Draft DCO (Clean).pdf|TR030002-000754-Document 4.1A Draft DCO (Clean).pdf]]:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000754-Document 4.1A Draft DCO (Clean).pdf|TR030002-000754-Document 4.1A Draft DCO (Clean).pdf]]:49: (a) suspended deck structures comprised of a reinforced concrete deck supported by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000754-Document 4.1A Draft DCO (Clean).pdf|TR030002-000754-Document 4.1A Draft DCO (Clean).pdf]]:72:appropriate, extinguish or suspend any rights in the pipeline corridor if the authorised development [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000754-Document 4.1A Draft DCO (Clean).pdf|TR030002-000754-Document 4.1A Draft DCO (Clean).pdf]]:72:extinguishment or suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000754-Document 4.1A Draft DCO (Clean).pdf|TR030002-000754-Document 4.1A Draft DCO (Clean).pdf]]:82: injurious matter in suspension or otherwise. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000592-Doc 2.1B - YPL Land Plan Sheet 2 Rev v1.pdf|TR030002-000592-Doc 2.1B - YPL Land Plan Sheet 2 Rev v1.pdf]]:1: suspend and/or interfere with easements and/or other private rights and to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000676-Doc 7.2 - Summary of Proposals Document.pdf|TR030002-000676-Doc 7.2 - Summary of Proposals Document.pdf]]:12: metres in width. This would allow for the suspended structure located location of the quay platform would be [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:1: decommissioning of the conveyor to influence suspended sediment levels in Dabholm Gut). Proposed [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:7:and suspended sediment concentrations (SSC) and designated sites should be presented in the EIA. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:9: where ESQs do not exist (for example, for the assessment of suspended solid concentrations). [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:20: Re-suspension of sediment during dredging and piling [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:20:7.5.3 The above construction phase activities have the potential to cause disturbance and re-suspension of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:20: sediments and release them into the water column as a plume. This would increase the suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:20: Additionally, increases in suspended sediment concentrations could give rise to high oxygen demands, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:21: on suspended sediment concentrations (with the exception of an enclosed grab due to the negligible [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:21:7.5.7 The sediment plume simulations for the backhoe dredger predict that an area of elevated suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:21: total suspended solids in the range of 10mg/l to 50mg/l above background in the channel, 500m either [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:21: dredger, at up to 500mg/l of suspended sediment. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:21: suspended sediment concentrations above those normally experienced in the estuary, albeit within a [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:22:Figure 7-3 Simulated average increase in suspended sediment concentration from backhoe dredging in [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:23:Figure 7-4 Simulated average increase in suspended sediment concentration from CSD dredging in spring [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:24: suspended sediment in the range of 10mg/l to 50mg/l above background may be anticipated in the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:24: predicted in the immediate area of the dredger, at up to 200mg/l of suspended sediment. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:24: re-suspension of sediment into the water column. The proposed use of an enclosed grab for the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:24: Figure 7-5 Simulated average increase in suspended sediment concentrations from TSHD dredging in spring [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:25: suspended solids are only expected on a short term basis. No increase in suspended sediment is [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:25: construction of the port terminal, would result in re-suspension of bed sediments. This effect, however, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:25: nature. Consequently, the potential impact on water quality associated with the increase in suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:25:7.5.18 There are a number of controls that would be implemented to ensure that the suspended sediment load [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:25:7.5.19 Limiting re-suspension of sediment during TSHD can be achieved through the following good practice [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:26:7.5.21 The re-suspension of sediment caused by CSD can be reduced through optimising the cutter speed, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:27: suspended sediment concentrations from runoff. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:27: reduction in water quality within Bran Sands lagoon would be due to increased suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:27: concentrations only during deposition. The reduction in water quality from increased suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:27: it is inevitable that water within the lagoon would experience a temporary increase in suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:27: suspension due to tidal exchange with the Tees. Based on the above, it is considered that the lagoon [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:27: is of low sensitivity with respect to changes in suspended sediment concentration. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:27: suspended sediment are likely to be experienced across the full width of the lagoon. It is considered [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:28: Increased suspended sediment concentration due to maintenance dredging [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:28: to increased suspended sediment concentrations from maintenance dredging. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:30: Increased suspended sediment concentrations during removal of conveyor system [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:30: would be no impact on suspended sediment concentration during decommissioning. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:31: These impacts include re-suspension of suspended sediment as a result of capital and maintenance [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:32:Re-suspension of sediment during Low Low Negligible None required. However controls would be imple [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:32:dredging and piling outlined below. Limiting re-suspension during TS [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:32: Re-suspension of sediment during CSD can be r [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:32:Increased suspended sediment Low Low Negligible None required [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000442-ES Section 7 Marine sediment and water quality.pdf|TR030002-000442-ES Section 7 Marine sediment and water quality.pdf]]:33:Increased suspended sediment No impact None required [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000765-Document 8.4 Applicants Responses to Other Responses to ExA Q1.pdf|TR030002-000765-Document 8.4 Applicants Responses to Other Responses to ExA Q1.pdf]]:10:suspended deck structure (should that be the selected quay [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:5:deposition of fine material greater outside the boundary of the disposal areas. The suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:6:The dispersion of suspended solids released into Dabholm Gut at Teesport is predicted to be [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:6:similar after the development. The centre of the plume of suspended particles is predicted to be [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:7: 4.3.4 Sensitivity to sediment resuspension.................................................... 29 [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:11:Figure 4.20 Sensitivity of accretion predictions to resuspension processes in the Estuary [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:11:Figure 5.14 Depth-averaged suspended particle concentrations. Existing layout, spring tide, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:11:Figure 5.17 Depth-averaged suspended particle concentrations. Existing layout, spring tide, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:11:Figure 5.20 Depth-averaged suspended particle concentrations. Existing layout, neap tide, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:12:Figure 5.23 Depth-averaged suspended particle concentrations. Existing layout, neap tide, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:12:Figure 5.26 Depth-averaged suspended particle concentrations. Proposed layout, spring tide, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:12:Figure 5.29 Depth-averaged suspended particle concentrations, proposed layout, spring tide, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:12:Figure 5.32 Depth-averaged suspended particle concentrations. Proposed layout, neap tide, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:12:Figure 5.35 Depth-averaged suspended particle concentrations. Proposed layout, neap tide, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:13: the construction phase are the suspension of sediment into the water column during the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:33: vessel induced forces and resuspension by dredging operations. These last two were [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:33: system from offshore can be resuspended and moved further upstream into the estuary. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:34: resuspension of material from the sea bed during storm events. The coarser material, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:34: stress generated by the tidal currents on the seabed, and suspended load as sand is [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:34: they generate a stirring effect that enhances the suspension of sand from the seabed, and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:35: model that simulates the advection and dispersion of suspended sediment due to the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:40: during the flood tide having being resuspended from the sea bed in Tees Bay. Once [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:40: circulation present possibly with resuspension by dredging activities or large vessel [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:40: HR Wallingford (1989b) attempted a correlation between suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:41:4.3.4 Sensitivity to sediment resuspension [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:42: great enough to re-suspend material allowing further transport with tidally or density [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:42: driven currents. The barrage studies concluded that further resuspension of bed material [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:42: 5th spring tide without enhanced resuspension as 30.9 m3/tide and the predicted infill [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:42: with enhanced resuspension as 32.1 m3/tide. This result confirms the ability of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:43: resuspension within the estuary and so the increases are concentrated more in the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:45: dispersion, deposition and resuspension of the fine sediment within the Tees Estuary [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:45: the water column and calculates areas in which suspended particles may settle on the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:45: The deposition and resuspension of particles at the seabed are modelled by assuming [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:45: simulates the increase of suspended sediment concentrations over the back ground [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:46: Measurements of suspended solids concentrations close (~2.25km away) to the disposal [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:46: bed suspended solids concentrations was clearly demonstrated to be associated with [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:46: generate a sediment source that remains available for resuspension by smaller waves for [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:47: of fine material and the associated short term elevations in suspended solids [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:47: discharge, as well as the action of the dredger itself will lead to increases in suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:47: time series of suspended concentration and depth of deposition were also extracted. The [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:48: predicted to increase suspended sediment concentrations by 500mg/l in the immediate [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:48: reclamation. Increases in suspended sediment concentrations above those occurring [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:48: approach channel on suspended sediment concentrations over Seal Sands and in the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:52: establish a repeating pattern of the extents of suspended particle distributions. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:52: suspended particle concentrations at four states of tide; peak flood, HW, peak ebb and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:52: On the spring tide, low flow condition (Figure 5.14), the suspended solids plume leaves [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:52: these deposits are re-suspended at times of relatively high current speeds. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:53: changes in suspended particle distributions between the two flow cases, with less [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:53: suspended particles is much reduced relative to the equivalent spring tide simulation [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:53: Qualitatively, the simulated suspended and deposited particle distributions for the spring [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:53: that the high suspended particle concentrations in the core of the plume are close to the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:53: plume simulations for suspended particles released into Dabholm Gut, within the area of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:54: On the whole, the model predictions indicate that the distributions of suspended and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:54: the plume of suspended particles tends to be closer to the east bank of the River Tees [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:59: The suspended fine sediment concentrations increases were predicted to be less than [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:60: considering the variation in the number of storm event bringing material into suspension [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:60: The dispersion of suspended solids released into Dabholm Gut at Teesport is predicted [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:60: to be of the whole similar after the development. The core of the plume of suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:61: waves, tides and suspended mud concentrations in Tees Bay. EX 1938. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:160:Figure 4.20 Sensitivity of accretion predictions to resuspension processes in the Estuary [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf|TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf]]:174: Gut Suspended solids [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000602-Doc 2.1L - YPL Land Plan Inset 9 Rev v1.pdf|TR030002-000602-Doc 2.1L - YPL Land Plan Inset 9 Rev v1.pdf]]:1: suspend and/or interfere with easements and/or other private rights and to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000602-Doc 2.1L - YPL Land Plan Inset 9 Rev v1.pdf|TR030002-000602-Doc 2.1L - YPL Land Plan Inset 9 Rev v1.pdf]]:1: temporarily suspend and/or interfere with easements and/or other private rights [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf|TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf]]:25:appropriate, extinguish, suspend or override any rights in the protected land if the authorised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf|TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf]]:25:extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf|TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf]]:25:acquire, appropriate, extinguish, suspend or override any rights in the protected land relating to the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf|TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf]]:45:appropriate, extinguish, suspend or override any rights in the protected land if the authorised development [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf|TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf]]:45:suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf|TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf]]:45:acquire, appropriate, extinguish, suspend or override any rights in the protected land relating to the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf|TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf]]:39:timetabled trains are suspended whilst the work is undertaken (abnormal possessions). In addition [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf|TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf]]:41:part of the crane or suspended load could fall onto the tracks or supporting structures. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf|TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf]]:51:part of the crane or suspended load could fall onto the tracks or supporting structures. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf|TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf]]:56:no part of the crane or suspended load could fall onto the roads or supporting structures. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000437-ES Section 3 Project description_1 of 2.pdf|TR030002-000437-ES Section 3 Project description_1 of 2.pdf]]:30: create the stable slope beneath the quay for the open suspended deck option. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000437-ES Section 3 Project description_1 of 2.pdf|TR030002-000437-ES Section 3 Project description_1 of 2.pdf]]:31: SUSPENDED DECK [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000437-ES Section 3 Project description_1 of 2.pdf|TR030002-000437-ES Section 3 Project description_1 of 2.pdf]]:34: made predictions of sediment suspension and dispersion using each dredge method, with the impact [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000437-ES Section 3 Project description_1 of 2.pdf|TR030002-000437-ES Section 3 Project description_1 of 2.pdf]]:34: the worst case predictions (in terms of predicted increases is suspended sediment concentrations and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000857-151216 TR030002 York Potash Ltd - Document 6.10A - Outline Construction Environmental Management Plan.pdf|TR030002-000857-151216 TR030002 York Potash Ltd - Document 6.10A - Outline Construction Environmental Management Plan.pdf]]:19:5 Care would be taken to prevent run-off of waters that may contain suspended solids or fuels. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000249-York Potash_RIES_25 Nov 2015.pdf|TR030002-000249-York Potash_RIES_25 Nov 2015.pdf]]:20: platforms for shags could be provided beneath the suspended deck of the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000249-York Potash_RIES_25 Nov 2015.pdf|TR030002-000249-York Potash_RIES_25 Nov 2015.pdf]]:24: and prey availability. Potential impacts include suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000249-York Potash_RIES_25 Nov 2015.pdf|TR030002-000249-York Potash_RIES_25 Nov 2015.pdf]]:24:4.33 To avoid contamination as a result of suspended sediment, the silts would [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000249-York Potash_RIES_25 Nov 2015.pdf|TR030002-000249-York Potash_RIES_25 Nov 2015.pdf]]:37: Potential impacts include suspended sediment concentration in the water column during capital dredging, sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000249-York Potash_RIES_25 Nov 2015.pdf|TR030002-000249-York Potash_RIES_25 Nov 2015.pdf]]:37: To avoid contamination as a result of suspended sediment, the silts would be dredged using an enclosed grab [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000351-Section 55 Checklist.pdf|TR030002-000351-Section 55 Checklist.pdf]]:17: proposed to suspend and/or interfere with easements and/or other private [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000351-Section 55 Checklist.pdf|TR030002-000351-Section 55 Checklist.pdf]]:17: temporarily suspend and/or interfere with easements and/or other private rights [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000701-Environment Agency.pdf|TR030002-000701-Environment Agency.pdf]]:15:  re-suspension of sediment during capital dredging and piling; [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000701-Environment Agency.pdf|TR030002-000701-Environment Agency.pdf]]:16:  limiting re-suspension of sediment during trailing suction hopper dredging can be achieved [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000701-Environment Agency.pdf|TR030002-000701-Environment Agency.pdf]]:16:  resuspension of sediment during cutter suction dredging can be reduced through [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000701-Environment Agency.pdf|TR030002-000701-Environment Agency.pdf]]:16:5.7. Silt curtains are proposed within Bran Sands lagoon to prevent dispersion of suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000434-ES Contents_index.pdf|TR030002-000434-ES Contents_index.pdf]]:13: flow conditions a) average increase in suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000434-ES Contents_index.pdf|TR030002-000434-ES Contents_index.pdf]]:13: flow conditions a) average increase in suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000434-ES Contents_index.pdf|TR030002-000434-ES Contents_index.pdf]]:13: river flow conditions a) average increase in suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000434-ES Contents_index.pdf|TR030002-000434-ES Contents_index.pdf]]:14: flow conditions a) average increase in suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000434-ES Contents_index.pdf|TR030002-000434-ES Contents_index.pdf]]:14: flow conditions a) average increase in suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000434-ES Contents_index.pdf|TR030002-000434-ES Contents_index.pdf]]:14: river flow conditions a) average increase in suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000434-ES Contents_index.pdf|TR030002-000434-ES Contents_index.pdf]]:16:Figure 7-3 Simulated average increase in suspended sediment concentration from [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000434-ES Contents_index.pdf|TR030002-000434-ES Contents_index.pdf]]:16:Figure 7-4 Simulated average increase in suspended sediment concentration from [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000434-ES Contents_index.pdf|TR030002-000434-ES Contents_index.pdf]]:16:Figure 7-5 Simulated average increase in suspended sediment concentrations from [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000434-ES Contents_index.pdf|TR030002-000434-ES Contents_index.pdf]]:31:Figure 22-1 Maximum depth-average excess suspended sediment concentration [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf|TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf]]:6: "dredging" means using any device to move material (whether or not suspended in water) from [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf|TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf]]:13: (3) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf|TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf]]:14:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf|TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf]]:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf|TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf]]:50: (a) suspended deck structures comprised of a reinforced concrete deck supported by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf|TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf]]:80:to acquire, appropriate, extinguish, suspend or override any rights in the protected land which are [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf|TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf]]:83:acquire, appropriate, extinguish or suspend any rights or covenants in respect of any protected asset [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf|TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf]]:83:acquisition, appropriation, extinguishment or suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf|TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf]]:90: injurious matter in suspension or otherwise. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:10:Table 25.3 Summary of results of the predictive modelling of suspended sediment concentration [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:116:6.4.23 When the export of spoil is suspended, product grade polyhalite would be exported off-site at the rate of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:167: incorporating best practice in design for removal of suspended solids and other contaminants. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:251: suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:252:25.3.2 Suspended sediment concentrations are typically low within the estuary and Tees Bay. The highest [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:252: storm events. In general, the suspended sediment concentrations appear to be dominated by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:252:25.3.3 In the middle to lower reaches of the estuary, suspended sediment concentrations are, for the most [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:252: highest suspended sediment levels occur close to high water. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:252: resuspension of material from the sea bed during storm events. The coarser material, mostly sand, is [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:252: Dispersion of suspended sediment and deposition on the seabed during capital dredging [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:252: quiescent areas or when tidal currents slow around slack water can be re-suspended as current speeds [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:253: presents a summary of the results of the predictive modelling of suspended sediment concentration and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:253:25.4.4 In all cases, the maximum increase in suspended sediment concentration in the water column is [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:253: suspended sediment is predicted at the location of the proposed terminal. This is due to the fact that [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:253: the modelling incorporated run-off of water with a high suspended sediment load, representing the de- [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:254:Table 26-3 Summary of results of the predictive modelling of suspended sediment concentration and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:254:Predicted increase in suspended sediment concentration (upper) and deposition onto the seabed (lower) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:255:Predicted increase in suspended sediment concentration (upper) and deposition onto the seabed (lower) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:256:Predicted increase in suspended sediment concentration (upper) and deposition onto the seabed (lower) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:257:  effect of increases in suspended sediments during maintenance dredging on food resources of SPA [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:268: suspended sediment  QEII Berth [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:268: of the estuary (as discussed within the impact assessment below) where suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:268: the tidal sequence, the highest suspended sediment levels occur close to high water. This baseline [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:269: Potential for cumulative increase in suspended sediment concentration during capital and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:269: impact would be a greater increase in suspended sediment concentration than predicted for the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:269: resuspension in the water column. This requirement is specified because of the elevated concentration [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:269: suction dredger or backhoe dredger (the implications of both types of dredger on suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:270:26.4.6 It is concluded that the predicted suspended sediment concentration generated by capital dredging for [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:270: undertaken elsewhere in the Tees estuary, there is a low potential for suspended sediment arising from [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:270:26.4.10 In terms of dispersion of suspended sediment during dredging, the EIA studies for the Harbour facilities [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:274:27.4.7 The mitigation described in Section 26 with regard to limiting suspended sediment increase and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:274: dispersion during capital dredging is also relevant here (i.e. sediment suspension and dispersion is [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:274: additive effect on suspended sediment concentration within the zone of interaction. Suspended [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:274: zone of increased suspended sediment concentration. However, the effect of a combined plume (in the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:275:27.4.10 The mitigation described in Section 27 with regard to limiting suspended sediment increase and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:278: increased suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:279: Potential effect on waterbird feeding resource due to increased suspended sediment during [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:279: occur, with movement away from the zone of increased suspended sediment concentration. However, [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf|TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf]]:279:28.4.2 The mitigation described in Section 27 with regard to limiting suspended sediment increase and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000458-ES Section 23 Impact interrelationships.pdf|TR030002-000458-ES Section 23 Impact interrelationships.pdf]]:3: sediment re-suspension from [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000661-Doc 3.9C - Indicative Section Open Quay Construction.pdf|TR030002-000661-Doc 3.9C - Indicative Section Open Quay Construction.pdf]]:1: SUSPENDED DECK [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000758-Document 6.12 Mitigation and Monitoring Strategy.pdf|TR030002-000758-Document 6.12 Mitigation and Monitoring Strategy.pdf]]:32:should be considered beneath the suspended deck of the quay (should an open quay structure be [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000758-Document 6.12 Mitigation and Monitoring Strategy.pdf|TR030002-000758-Document 6.12 Mitigation and Monitoring Strategy.pdf]]:48:platforms for shags beneath the suspended deck should be considered, along with the other [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf|TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf]]:16: appropriate, extinguish, suspend or override any rights in the protected land if the authorised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf|TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf]]:16: extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf|TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf]]:16: acquire, appropriate, extinguish, suspend or override any rights in the protected land relating to [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:4:calibration, validation, increase in suspended sediment data. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:9:5.4.14 In general, suspended sediment concentrations are low within the estuary and within Tees Bay. The [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:9: values are also attributed to either high rainfall or storm events. In general, the suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:9:5.4.15 In the vicinity of the proposed scheme, suspended sediment concentrations are, for the most part, less [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:9: suspended sediment levels occur close to high water. After storm periods, higher concentrations of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:9: suspended sediment have been noted around the Shell Jetty, but with little penetration further up the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:10: concentrations in Tees Bay are raised by the resuspension of material from the sea bed during storm [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:10: wave induced currents, vessel induced forces and resuspension of material by dredging operations. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:11:5.5.7 The simulations for the CSD predict that mean elevated suspended sediment concentration increases [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:11:5.5.8 The simulation results for the backhoe dredger predict that an area of elevated suspended sediment [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:11:5.5.9 The simulations for the TSHD show that an area of elevated suspended sediment concentration, in the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:11: up to 200mg/l of suspended sediment. Fine sediment deposition is predicted to be a maximum of a few [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:11:5.5.10 During simulations for all dredge methods, no average increase in suspended sediment concentration [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:12: a) average increase in suspended sediment concentration b) deposition after 3 tides of dredging [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:13:a) average increase in suspended sediment concentration b) deposition after 3 tides of dredging [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:14:a) average increase in suspended sediment concentration b) deposition after 3 tides of dredging [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:15:a) average increase in suspended sediment concentration b) deposition after 3 tides of dredging [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:16:a) average increase in suspended sediment concentration b) deposition after 3 tides of dredging [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:18:a) average increase in suspended sediment concentration b) deposition after 3 tides of dredging [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:23: significant source of this fine material is marine sources. Fine sediment moved into suspension during [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:33: CSD x Mean elevated suspended sediment concentration increases above [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:33: Backhoe dredger x An area of elevated suspended sediment concentrations in the range of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:33: TSHD x An area of elevated suspended sediment concentration, in the range of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf|TR030002-000440-ES Section 5 Hydrodynamic and sedimentary regime.pdf]]:33: suspended sediment. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000512-Doc 6.6 App 6.2 In combination HGV.pdf|TR030002-000512-Doc 6.6 App 6.2 In combination HGV.pdf]]:4:Shafts Suspension gear Suspension gear 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF|TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF]]:5:"dredging" means using any device to move material (whether or not suspended in water) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF|TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF]]:12: (3) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF|TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF]]:13:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF|TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF]]:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF|TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF]]:51: (a) suspended deck structures comprised of a reinforced concrete deck supported by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF|TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF]]:84:appropriate, extinguish, suspend or override any rights in the protected land if the authorised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF|TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF]]:84:appropriation, extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF|TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF]]:84:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF|TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF]]:88: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF|TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF]]:88: suspension; and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF|TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF]]:96: injurious matter in suspension or otherwise. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf|TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf]]:7: "dredging" means using any device to move material (whether or not suspended in water) [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf|TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf]]:11: (3) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf|TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf]]:13:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf|TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf]]:24: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf|TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf]]:33: (a) suspended deck structures comprised of a reinforced concrete deck supported by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf|TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf]]:61: injurious matter in suspension or otherwise. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000698-Natural England 1.pdf|TR030002-000698-Natural England 1.pdf]]:37:beneath the suspended deck of the quay (if the open quay structure is of artificial nesting platforms for shags beneath a suspended deck [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf|TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf]]:6: "dredging" means using any device to move material (whether or not suspended in water) from [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf|TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf]]:13: (3) Any person who suffers loss by the suspension of any private right of way under this article [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf|TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf]]:14:practicable from gravel, soil or other solid substance, oil or matter in suspension. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf|TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf]]:29: (i) a suspended deck supported by piles and a revetment on a re-graded slope on the south [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf|TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf]]:51: (a) suspended deck structures comprised of a reinforced concrete deck supported by [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf|TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf]]:84:appropriate, extinguish, suspend or override any rights in the protected land if the authorised [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf|TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf]]:84:extinguishment, suspension or override. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf|TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf]]:84:Order to acquire, appropriate, extinguish, suspend or override any rights in the protected land [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf|TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf]]:88: (a) create, acquire, appropriate, extinguish or suspend any rights or covenants in respect of any [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf|TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf]]:88: appropriation, extinguishment or suspension; and [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf|TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf]]:97: injurious matter in suspension or otherwise. [[this>Infrastructure/projects/north-east/york-potash-harbour-facilities-order/TR030002-000601-Doc 2.1K - YPL Land Plan Inset 8 Rev v1.pdf|TR030002-000601-Doc 2.1K - YPL Land Plan Inset 8 Rev v1.pdf]]:1: suspend and/or interfere with easements and/or other private rights and to [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:7: 9.2.1 Increase in suspended sediment concentrations and increased [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:7: 9.2.2 Resuspension of contaminants during capital dredging 267 [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:7: re-mobilisation of suspended solids 270 [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:7: 9.3.1 Periodic increases in suspended sediment concentrations and [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:7: resuspended by capital dredging within intertidal areas 294 [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:8: resuspended by capital dredging within subtidal areas 296 [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:8: from an increase in suspended sediment concentrations and [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:8: 11.2.5 Effect of increased suspended sediments on the food resource for [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:9: increases in suspended sediment concentrations (SSC) due to [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:14:3.4 Quay wall suspended deck 76 [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:15:9.3 Time histories of suspended solids concentrations in Seaton Channel 266 [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:24:SSC Suspended sediment concentration [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:28:Plankton Organisms suspended in the water column and [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:51: suspended solids exceed consent. [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:52: • Recommends looking at dissolved oxygen issues caused by re suspension of sediments during the dredging. [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:103: • A piled suspended deck structure [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:103: gravity wall structures, different types of suspended deck structures and different [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:103: • A suspended reinforced concrete deck on bored reinforced concrete piles formed [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:118: suspended concrete deck. These forms of construction are shown in Figures 3.2 and [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:118: example, for the suspended concrete deck option extensive piling would be required [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:118: and wave climate would be similar in that, although the suspended concrete deck [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:118: suspended concrete deck structure would be slightly lower than for the mass [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:118: concrete gravity wall, however for the piled suspended deck it would be necessary to [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:118: 4. Piling for the suspended concrete deck quay structure would be bored concrete piles [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:122: water quality of the Tees Estuary in terms of increases in suspended sediments and [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:124: Tees Estuary associated with the resuspension of suspended solids. The dredging [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:129: of negligible significance associated with the re-suspension of contaminated [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:131: Bathing Waters Directive and that in general background suspended solids [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:131: into the water during capital dredging most is predicted to fall out of suspension [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:132: suspended solids in the water column impacting on feeding resources are predicted [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:133: construction phase is mainly a result of the increase in suspended solids [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:137: river channel, seabed sediments will become re-suspended and dispersed [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:138: an impact of minor adverse significance associated with the re-suspension of [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:185: are associated with the increase in suspended sediment concentrations in the [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:192: 1. In general, suspended sediment concentrations are low within the estuary and [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:192: high rainfall or storm events. In general, the suspended sediment [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:192: of the proposed development (i.e. in the Tees Dock area) suspended sediment [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:192: from 40-80mg/l. In terms of the tidal sequence, the highest suspended sediment [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:192: suspended sediment have been noted around the Shell Jetty, but with little [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:193: driven currents, wave induced currents, vessel induced forces and resuspension [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:193: resuspended and moved further upstream into the estuary. [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:193: concentrations in Tees Bay are raised by the resuspension of material from the [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:195: d) Losses of suspended sediment are inevitable at the dredging face or draghead, [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:196: remain in suspension, forming a sediment plume. The plume from the overspill [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:196: discharge is an order of magnitude greater than sediment resuspension from the [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:196: plumes of suspended fine sediment. Importantly the TSHD will result in a [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:196: simulate the dispersion, deposition and resuspension of the released sediment [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:196: and calculates areas in which suspended particles may settle on the bed, either [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:196: walk technique. The deposition and resuspension of particles at the seabed are [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:199: CSD in terms of predicted peak concentration of suspended sediments and peak [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:202: is predicted to increase suspended sediment concentrations by 500mg/l in the [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:202: of the run-off from the reclamation. Increases in suspended sediment [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:202: suspended sediment concentrations over Seal Sands and in the Seaton [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:203: wave action occurred it would be expected to be resuspended. A similar [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:203: suspended sediment concentrations and deposition at Bran Sands and North [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:225: transport model that simulates the advection and dispersion of suspended [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:226: the flood tide period having been resuspended from the seabed in Tees Bay (i.e. [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:226: resuspension and upstream movement as a result of agitation by dredging [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:227: 1. The dispersion of suspended solids released into Dabholm Gut through licensed [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:227: 2. The model predictions indicate that the distributions of suspended and deposited [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:227: that following the proposed development the core of the plume of suspended [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:228: • Increased import of fine sediments resuspended in Tees Bay; [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:237: 1. The capital dredging will resuspend seabed sediments and enable sediment to [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:237: the dredge head and the overflow of water (containing suspended sediments) [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:256: deposition on Seal Sands. As the tide rises, suspended material is carried in the [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:256: settle). Some of this material will subsequently be resuspended and [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:257: the potential for dilution and re-suspension following deposition, it is unlikely that [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:278: that may contain suspended solids, fuels to other contaminants and [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:282: 1. The capital dredging will result in the suspension of sediment into the water [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:293:9.2.1 Increase in suspended sediment concentrations and increased turbidity during [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:293: passage of light rays through the water caused by the presence of suspended [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:294: 2. In general, suspended solids concentrations are low within the Tees estuary and [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:294: Tees Bay. Background suspended solid levels in the vicinity to the proposed [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:294: predicted to occur during spring tides with potentially greater suspended solid [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:294: 3. The effect of capital dredging on suspended sediment concentration has been [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:294: 4. When the CSD is located in the Tees Dock turning circle, peak suspended [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:294: of the dredger; however, effects on suspended sediment concentrations are very [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:294: located in the area of the proposed quay wall, peak concentrations of suspended [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:294: dredging in the Tees Dock turning circle. Suspended sediment concentrations [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:294: reclamation show that peak increases in suspended sediment concentrations of [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:294: suspended sediment concentration arising during the dredging in the lower [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:294: channel and the effect of run-off from the reclamation of suspended sediment [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:295:Figure 9.3 Time histories of suspended solids concentrations in Seaton [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:296: conditions. All other locations demonstrate lower peak increases in suspended [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:296: 8. For both types of dredger (CSD and TSHD), peak suspended solids [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:296: suspended sediment concentrations reduce to less than 50mg/l above [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:296: 9. Since there are no environment quality standards relating to suspended solids [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:296: for the Tees estuary, the impact of the increase in suspended solids [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:296: 11. It can, therefore, be concluded that the predicted suspended solids [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:296: 12. Given the above, the potential impact associated with the increase in suspended [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:296:9.2.2 Resuspension of contaminants during capital dredging [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:296: 1. The resuspension of sediments as described in Section 9.2.1 also has the [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:296: potential resuspension of contaminants focuses on the effect of capital dredging [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:298: of detection. Re-suspension of contaminated sediment with high concentrations [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:298: suspended solids during resuspension and will occur. This is also likely to be [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:299: of suspended solids [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:299: 1. The resuspension of sediment as a consequence of the proposed capital [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:299: operational) phases. In addition, peaks in suspended solids concentrations are [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:299: 3. Given the above, the resuspension of suspended solids as a result of the [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:301:9.3.1 Periodic increases in suspended sediment concentrations and increased [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:303: is resuspended by higher current speeds either side of slack water. [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:323:10.2.2 Potential smothering effect caused by sedimentation of material resuspended by [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:323: disturbed and re-suspended into the water column, dispersed and deposited [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:325:10.2.4 Potential smothering effect caused by sedimentation of material resuspended by [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:325: resuspended and dispersed as tidal current increase. It is expected, however, [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:325: tolerant to some degree, to elevations in near-bed suspended sediment [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:325: increase in suspended sediment concentrations and turbidity [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:325: 1. The amount of suspended sediment in the water column can influence the depth [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:325: levels and/or for prolonged periods of time, an increase in suspended sediment [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:325: suspended sediment concentrations that are predicted beyond the immediate [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:325: estuarine environment (and therefore tolerance to elevations in suspended [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:326: which would not have a prolonged effect on suspended sediment [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:326: 3. Particularly large increases in suspended sediment concentrations are predicted [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:326: suspended sediment concentrations in these areas does not represent an [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:326: suspended sediment concentrations is considered to be of negligible [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:326: 1. Section 7 describes the potential impacts associated with the resuspension and [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:326: the reclamation, sediments within this area will not be resuspended in the water [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:327: of the peaks of suspended solids, mean that it is unlikely that dissolved oxygen [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:351:11.2.5 Effect of increased suspended sediments on the food resource for terns [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:351: predicted to cause an increase in the peak suspended sediment concentrations [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:351: the dredger. In Tees Bay, increases in suspended sediment concentrations [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:352: fish away from the areas of increased suspended sediment concentrations. [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:352: the basis of the localised area affected by increased suspended concentrations [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:354: d) Increased import of fine sediments resuspended in Tees Bay; [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:356: through increasing the suspended sediment concentration of the water column [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:369: suspended sediment concentrations (SSC) due to dredging and dewatering of [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:369: 1. The construction phase will result in increases in the suspended sediment [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:369: characteristics of the change in suspended solids concentrations (SSC) are fully [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:370: dredger (see Section 9.2). Peak suspended solid concentrations in the main [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:370: concentrations of suspended solids decrease significantly outside of the [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:370: suspended solids also occurs when the dredger is located in the main channel [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:370: adjacent to North Gare Sands, however suspended solid concentrations are [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:370: significant elevations in suspended sediment concentrations are predicted to [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:370: suspended sediment concentrations throughout the course of the capital [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:370: adopted, the overall impact on fish species due to elevations in suspended [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:370: arise as a result of the resuspension of contaminated sediments during capital [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:371: discussed in Section 9.2, the resuspension of sediments in the water column is [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:371: exchange), combined with the short term nature of the increases in suspended [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:373: the deposition of fine sediment that is suspended and dispersed during capital [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:407: 3. One possible form of construction is a piled suspended concrete deck. The [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:436: • Resuspension of road dust, particularly on unmade roads; [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:455: l/s/m length. . Due to the proposed construction of a suspended deck over the [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:455: be prevented. The suspended deck would absorb and deflect the waves rather [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:456: with the loading arm deck at +6.00mOD and a suspended roadway between at [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:460: settled out of suspension in the immediate vicinity of the dredger. No impact on [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:460: 2. In the vicinity of the Corus abstraction, suspended solid concentrations are not [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:460: Again, gross solids will have settled out of suspension within the vicinity of the [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:478: 4. Measurements of suspended solids concentrations close (approximately 2.25km [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:478: during neaps. However, the major influence on near bed suspended solids [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:478: sediment source that remains available for resuspension by smaller waves for 3- [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:488: of maintenance dredgings and there will be a negligible effect on suspended [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:492:Increased suspended sediment Peak increases in suspended sediment concentrations of None required It is not appropriate to assess [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:495:Increase in suspended solid Minor adverse None possible Minor adverse [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:496:Resuspension of chemical Minor adverse None possible Minor adverse [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:496:mobilisation of suspended [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:496:result of resuspending [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:496:suspended solids [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:497:material resuspended by capital [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:497:material resuspended by capital [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:497:suspended solids [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:499:Effect of increased suspended Negligible None required Negligible [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:501:increases in suspended dredging to occur during the [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:510: the disposal site boundary. Suspended solids concentrations [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:518:waters species should not deviate result in an increase in suspended required [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:526: 15. RPS (2005) concludes that the dredging would result in increases in suspended [[this>RiverTees/Planning/EIA_2017_00041/Additional Documents/NGCT_Final_ES at KK with figs.pdf|NGCT_Final_ES at KK with figs.pdf]]:539:waves, tides and suspended mud concentrations in Tees Bay. EX 1938. [[this>RiverTees/Planning/EIA_2017_00041/Response Documents/20171212 EIA Scoping Response Teesport Extension Final.pdf|20171212 EIA Scoping Response Teesport Extension Final.pdf]]:5: suspended sediments from the dredging activities. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:20:Settling basins will allow suspended sediment to settle out from the mudstone reclamation slurry. Overflow [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:20:water from the reclamation will then pass through silt traps to limit the amount of suspended sediment [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:20: of suspended sediment into the river. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:40: • A piled suspended deck structure. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:40:the anchored combi-piled wall from a technical perspective. A piled suspended deck structure could also [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:57: • Sediment regime (including background levels of suspended sediment and sources of suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:57:sediment deposition with limited natural re-suspension, an average of approximately 1 million m 3 of material [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:58:dispersion, deposition and resuspension of released sediment in the Tees estuary. A 3D flow model was [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:59:6.3.1 Increase in suspended sediment concentrations and deposition resulting [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:59:The modelling predicts that the largest rise in peak suspended sediment concentrations (SSC) above [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:59:this zone, it is predicted that the concentrations of suspended solids will be significantly less (approximately [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:60:material would settle on Seal Sands. Some resuspension is also anticipated. A similar scenario is predicted [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:60:for deposition in Seaton Channel. The dredging is predicted to have little influence on suspended solid [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:67:This is because fine material will be released into suspension, some of which will then settle in the various [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:72: dispersion of suspended sand due to the effects of both tidal currents and wave stirring. Simulations [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:86:become deposited following re-suspension into the water column (see Figure 7.2). The results of the particle [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:91:suspension of sediments and release them into the water column as a plume. This would increase the TSS [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:91:to the potential resuspension of sediments from a turbidity perspective only (on the basis that the sediment [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:91:In general, suspended solids concentrations are low within the Tees estuary and Tees Bay. Background [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:91:suspended solid levels in the vicinity of the proposed scheme are, for the most part, less than 20mg/l with [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:91:to occur during spring tides with potentially greater suspended solid concentrations occurring during high [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:91:further afield (along the tidal axis) compared to dredging in the Tees Dock turning circle. Suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:92:It can, therefore, be concluded that the predicted suspended solids concentrations generated by dredging [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:92:Given the above, the potential impact to water quality associated with the increase in suspended solids in [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:93:demonstrates the nature of the deposition on Seal Sands. As the tide rises, suspended material is carried [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:93:be resuspended and redistributed by tidal currents on the following tide given that it will not be consolidated [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:95:Limiting re-suspension of sediment during TSHD can be achieved through the following good practice [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:95:The re-suspension of sediment caused by CSD can be reduced through optimising the cutter speed, swing [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:95:The resuspension of sediment as a consequence of the proposed capital dredging could potentially affect [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:96:nature of the peaks in suspended solids predicted by the hydrodynamic modelling, the potential impact on [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:98:area than this but some of this material is resuspended by higher current speeds either side of slack water. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:104: • Impacts on marine ecology from increases suspended sediment during capital dredging and [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:128:9.5.2 Potential impacts to marine ecology from increased total suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:128:Sediment resuspension [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:128:During capital dredging, a proportion of the material that is dredged would be disturbed and re-suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:128:on the potential impact to marine ecology associated with the resuspension of non-contaminated sediment [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:128:filter feeding molluscs). In addition, high concentrations of suspended sediment may impact on fish through [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:128:Background suspended solid levels in the vicinity of the proposed scheme are, for the most part, less then [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:128:For both types of dredger (CSD and TSHD), peak suspended solids concentrations (i.e. up to 500mg/l above [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:128:in suspended sediment. This information is presented below. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:129:be of low sensitivity to increases in suspended sediment. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:129:resistance and resilience to changes in suspended sediment, and low sensitivity (to changes in suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:129:Given the temporary and localised nature of the predicted increase in suspended sediment, in addition to [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:129:the low sensitivity of the key species present in the estuary to increased suspended sediment, an impact of [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:129:Smothering caused by sedimentation of material resuspended by capital dredging within intertidal [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:129:During the capital dredging a proportion of the material that is dredged would be disturbed and re-suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:130:Smothering caused by sedimentation of material resuspended by capital dredging within subtidal [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:130:5mm). This deposition occurs over the slack water period and would be subsequently resuspended and [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:156:As discussed in Section 6, the proposed capital dredge and reclamation process would cause suspension [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:156:prey due to the resuspension of sediment which contains concentrations of contaminants in excess of Action [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:156:impacts to little tern foraging ability as a result of increased suspended sediments during the construction [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:158:and re-suspension of sediment (Cook and Burton, 2010). Common tern have been reported to have a high [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:159:To reduce the impact associated with the predicted increase in suspended sediments, the use of a TSHD [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:159:For the CSD, the most significant impact in terms of producing suspended solids is the overflow from the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:159:and tending to be more confined to the shallower waters. Mitigation of the suspended sediment generated [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:164: • increased import of fine sediments resuspended in Tees Bay; [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:168: • Impacts caused by increased suspended sediment during capital dredging and dewatering during [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:187:12.5.2 Potential impacts on shellfish and fish caused by increases in suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:187:located in the Tees Dock turning circle or in the area of the proposed quay wall, concentrations of suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:187:in suspended solids also occurs when the dredger is located in the main channel adjacent to North Gare [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:188:For the CSD, the most significant impact in terms of producing suspended solids is the overflow from the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:188:suspended into the water column. Hence, the construction phase would result in temporary increases in [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:188:assessment presented below relates to the potential impact on fish due to the resuspension of non- [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:189:The re-suspension of sediment as a consequence of the proposed dredging could also potentially affect [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:189:It has also been reported that dredging activities often generate no more increased suspended sediments [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:189:floods and large tides can increase suspended sediments over much larger areas, for longer periods that [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:189:fish (Forewind, 2014). For lethal effects to occur, concentrations of suspended sediment have to be on the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:189:Peak suspended solid concentrations in the main channel are predicted to be significantly affected by the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:189:wall, concentrations of suspended solids decrease significantly outside of the immediate vicinity of the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:189:decrease in suspended solids also occurs when the dredger is located in the main channel adjacent to North [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:189:Gare Sands, however suspended solid concentrations are predicted to remain above natural variation both [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:189:high sensitivity of resident and migratory fish in the Tees to increases in suspended sediment, an overall [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:190:the Tees to increased suspended sediment. Based on the information available on MarLIN for the dominant [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:190:‘tolerant’ and ‘not sensitive’ to increases in suspended sediment. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:190:The controls outlined in Section 7 with regard to minimising suspended sediment load during dredging are [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:221:at +6.00mOD and a suspended roadway between at +8.00mOD. The slag embankment has a slope of 1 in [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:226:increase in total suspended solid concentrations could impact upon the processes for which the water is [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:226:settled out of suspension in the immediate vicinity of the dredger (see Section 6 for further detail). No [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:226:In the vicinity of the Corus abstraction and the Tees Bulk Handling abstraction, suspended solid [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:226:quality in the vicinity of the abstraction point due to increased suspended sediment would be temporary in [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:256: Increase in suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:256:sensitive to smothering or increases in suspended sediment. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:259:disturbance and increased suspended sediments on migratory fish). [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:266: • dispersion of suspended sediment during capital dredging and deposition; [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:266:Dispersion of suspended sediment and deposition on the seabed during capital dredging [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:266:immediately after the period of construction. This is because fine material will be released into suspension, [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:267:A review of all EIA studies for the above projects highlights that the maximum increase in suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:267:resulting in a significantly reduced concentration of suspended sediment beyond the source of the plume. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:267:increase with no long-term accumulation on the seabed at the initial point of deposition. The suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:267:Figure 27.1 Predicted increase in suspended sediment concentration (left) and deposition on the seabed [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:268:Figure 27.3 Predicted increase in suspended sediment concentration (left) and deposition on the seabed [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:269:Mitigation measures to limit the suspension of sediment and subsequent deposition of sediment during [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:269:sealed barge) for dredging of unconsolidated material to minimise resuspension in the water column. This [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:271:Potential for cumulative increase in suspended sediment during capital and maintenance dredging [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:271:peak suspended sediment above those normally experienced in the estuary (this effect would be additive). [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:274:Potential effect on waterbird feeding resource due to increased suspended sediment during capital [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:298:Reductions in water quality due to resuspension of sediment [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:298:interest features of the pSPA and Ramsar site is therefore via an increase in suspended sediment within [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:298:Figures 6.2 to 6.4 indicate that the magnitude of the effect (i.e. increased suspended sediment) is likely to [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:298:To reduce the impact associated with the predicted increase in suspended sediments, the use of a TSHD [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:299:For the CSD, the most significant impact in terms of producing suspended solids is the overflow from the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:299:the shallower waters. Mitigation of the suspended sediment generated by reducing the size of the dredger, [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:302:from the area of increased suspended sediment. It should be noted, however, that the effect of the combined [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:303:the potential for the re-suspension of contaminated sediment and subsequent deposition over other areas [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:303:The effect of sediment suspension on feeding birds (terns) in the nearshore zone associated with the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:303:species was predicted due to either suspended sediments or habitat change. As outlined in Section 12, the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:303:Given the conclusions of the Dogger Bank A and B assessment (i.e. no significant effect on suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:303:with any effect confined to the footprint of the proposed dredge. The predicted increase in suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:317:(25) A programme of monitoring of dissolved oxygen and suspended solid [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:317:until a scheme for water column monitoring (water quality) and suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:342: 1. In general, suspended sediment concentrations are low within the estuary and [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:342: high rainfall or storm events. In general, the suspended sediment [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:342: of the proposed development (i.e. in the Tees Dock area) suspended sediment [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:342: from 40-80mg/l. In terms of the tidal sequence, the highest suspended sediment [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:342: suspended sediment have been noted around the Shell Jetty, but with little [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:343: driven currents, wave induced currents, vessel induced forces and resuspension [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:343: resuspended and moved further upstream into the estuary. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:343: concentrations in Tees Bay are raised by the resuspension of material from the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:345: d) Losses of suspended sediment are inevitable at the dredging face or draghead, [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:346: remain in suspension, forming a sediment plume. The plume from the overspill [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:346: discharge is an order of magnitude greater than sediment resuspension from the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:346: plumes of suspended fine sediment. Importantly the TSHD will result in a [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:346: simulate the dispersion, deposition and resuspension of the released sediment [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:346: and calculates areas in which suspended particles may settle on the bed, either [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:346: walk technique. The deposition and resuspension of particles at the seabed are [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:349: CSD in terms of predicted peak concentration of suspended sediments and peak [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:352: is predicted to increase suspended sediment concentrations by 500mg/l in the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:352: of the run-off from the reclamation. Increases in suspended sediment [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:352: suspended sediment concentrations over Seal Sands and in the Seaton [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:353: wave action occurred it would be expected to be resuspended. A similar [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:353: suspended sediment concentrations and deposition at Bran Sands and North [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:375: transport model that simulates the advection and dispersion of suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:376: the flood tide period having been resuspended from the seabed in Tees Bay (i.e. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:376: resuspension and upstream movement as a result of agitation by dredging [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:377: 1. The dispersion of suspended solids released into Dabholm Gut through licensed [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:377: 2. The model predictions indicate that the distributions of suspended and deposited [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:377: that following the proposed development the core of the plume of suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:378: • Increased import of fine sediments resuspended in Tees Bay; [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:391:Quay construction would entail either a mass concrete gravity wall or a piled suspended concrete deck. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:391:the suspended concrete deck quay structure would be bored concrete piles formed within steel tubes. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:400:a sealed barge to minimise re-suspension of sediment into the water column. No such requirements [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:404:minimise the resuspension of sediment into the water column. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:424:loading into a sealed barge to minimise re-suspension of sediment into the water column. No such [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:496:with grain size (Witbaard et al. 2019). High levels of fine or suspended sediments may impact A. islandica growth [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:511:the proposed construction options for the berth. One option is based on forming a suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:634:been used to simulate dispersion, deposition and suspension of released sediment in the Tees estuary. A [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:636:The deposition of fine sediment resuspended by the dredging process is not anticipated to impact on the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:636:The construction phase will result in increases in the suspended sediment concentration of the water [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:636:of sediment plumes during dredging was modelled. The largest rise in peak suspended sediment [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:636:It is predicted that the increase in suspended solid concentrations arising during capital dredging would be [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:636:undertaken to inform the EIA has predicted that peak suspended solid concentrations in the main channel [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:636:circle or in the area of the proposed quay wall, concentrations of suspended solids decrease significantly [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:636:the vessel. This significant decrease in suspended solids also occurs when the dredger is located in the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:636:main channel adjacent to North Gare Sands, however suspended solid concentrations are predicted to [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:637:sediment is anticipated to fall out of suspension within the immediate vicinity of the dredger, particularly in [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:637:to increases in suspended sediment concentrations, the effects are short term and will only occur during [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:658: Could affect water clarity, temperature, During the reclamation process, settling basins will allow suspended sediment to settle out this water body [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT(2).pdf|IBPB8270R001F01_EIA REPORT(2).pdf]]:658: patterns continuously for longer than a spring pass through silt traps to limit the amount of suspended sediment discharged to the river. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/20220302_EIA_Consent_Decision_Response MLA202000079.pdf|20220302_EIA_Consent_Decision_Response MLA202000079.pdf]]:14:quality associated with the increase in suspension, dispersion, remobilisation and [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/20220302_EIA_Consent_Decision_Response MLA202000079.pdf|20220302_EIA_Consent_Decision_Response MLA202000079.pdf]]:14:redistribution of suspended solids would lead residual impacts of negligible [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/20220302_EIA_Consent_Decision_Response MLA202000079.pdf|20220302_EIA_Consent_Decision_Response MLA202000079.pdf]]:15: and suspended solid concentrations monitoring. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/20220302_EIA_Consent_Decision_Response MLA202000079.pdf|20220302_EIA_Consent_Decision_Response MLA202000079.pdf]]:15: monitoring and suspended sediment monitoring. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/20220302_EIA_Consent_Decision_Response MLA202000079.pdf|20220302_EIA_Consent_Decision_Response MLA202000079.pdf]]:22:suspended sediment concentrations (SSC) would have any significant impact on [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/20220302_EIA_Consent_Decision_Response MLA202000079.pdf|20220302_EIA_Consent_Decision_Response MLA202000079.pdf]]:22: • Impacts caused by increased suspended sediment during capital dredging [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/20220302_EIA_Consent_Decision_Response MLA202000079.pdf|20220302_EIA_Consent_Decision_Response MLA202000079.pdf]]:25:Tees is considered to be low and the impact to shellfish from increased suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:20:Settling basins will allow suspended sediment to settle out from the mudstone reclamation slurry. Overflow [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:20:water from the reclamation will then pass through silt traps to limit the amount of suspended sediment [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:20: of suspended sediment into the river. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:40: • A piled suspended deck structure. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:40:the anchored combi-piled wall from a technical perspective. A piled suspended deck structure could also [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:57: • Sediment regime (including background levels of suspended sediment and sources of suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:57:sediment deposition with limited natural re-suspension, an average of approximately 1 million m 3 of material [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:58:dispersion, deposition and resuspension of released sediment in the Tees estuary. A 3D flow model was [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:59:6.3.1 Increase in suspended sediment concentrations and deposition resulting [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:59:The modelling predicts that the largest rise in peak suspended sediment concentrations (SSC) above [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:59:this zone, it is predicted that the concentrations of suspended solids will be significantly less (approximately [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:60:material would settle on Seal Sands. Some resuspension is also anticipated. A similar scenario is predicted [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:60:for deposition in Seaton Channel. The dredging is predicted to have little influence on suspended solid [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:67:This is because fine material will be released into suspension, some of which will then settle in the various [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:72: dispersion of suspended sand due to the effects of both tidal currents and wave stirring. Simulations [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:86:become deposited following re-suspension into the water column (see Figure 7.2). The results of the particle [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:91:suspension of sediments and release them into the water column as a plume. This would increase the TSS [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:91:to the potential resuspension of sediments from a turbidity perspective only (on the basis that the sediment [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:91:In general, suspended solids concentrations are low within the Tees estuary and Tees Bay. Background [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:91:suspended solid levels in the vicinity of the proposed scheme are, for the most part, less than 20mg/l with [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:91:to occur during spring tides with potentially greater suspended solid concentrations occurring during high [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:91:further afield (along the tidal axis) compared to dredging in the Tees Dock turning circle. Suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:92:It can, therefore, be concluded that the predicted suspended solids concentrations generated by dredging [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:92:Given the above, the potential impact to water quality associated with the increase in suspended solids in [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:93:demonstrates the nature of the deposition on Seal Sands. As the tide rises, suspended material is carried [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:93:be resuspended and redistributed by tidal currents on the following tide given that it will not be consolidated [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:95:Limiting re-suspension of sediment during TSHD can be achieved through the following good practice [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:95:The re-suspension of sediment caused by CSD can be reduced through optimising the cutter speed, swing [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:95:The resuspension of sediment as a consequence of the proposed capital dredging could potentially affect [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:96:nature of the peaks in suspended solids predicted by the hydrodynamic modelling, the potential impact on [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:98:area than this but some of this material is resuspended by higher current speeds either side of slack water. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:104: • Impacts on marine ecology from increases suspended sediment during capital dredging and [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:128:9.5.2 Potential impacts to marine ecology from increased total suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:128:Sediment resuspension [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:128:During capital dredging, a proportion of the material that is dredged would be disturbed and re-suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:128:on the potential impact to marine ecology associated with the resuspension of non-contaminated sediment [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:128:filter feeding molluscs). In addition, high concentrations of suspended sediment may impact on fish through [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:128:Background suspended solid levels in the vicinity of the proposed scheme are, for the most part, less then [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:128:For both types of dredger (CSD and TSHD), peak suspended solids concentrations (i.e. up to 500mg/l above [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:128:in suspended sediment. This information is presented below. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:129:be of low sensitivity to increases in suspended sediment. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:129:resistance and resilience to changes in suspended sediment, and low sensitivity (to changes in suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:129:Given the temporary and localised nature of the predicted increase in suspended sediment, in addition to [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:129:the low sensitivity of the key species present in the estuary to increased suspended sediment, an impact of [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:129:Smothering caused by sedimentation of material resuspended by capital dredging within intertidal [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:129:During the capital dredging a proportion of the material that is dredged would be disturbed and re-suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:130:Smothering caused by sedimentation of material resuspended by capital dredging within subtidal [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:130:5mm). This deposition occurs over the slack water period and would be subsequently resuspended and [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:156:As discussed in Section 6, the proposed capital dredge and reclamation process would cause suspension [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:156:prey due to the resuspension of sediment which contains concentrations of contaminants in excess of Action [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:156:impacts to little tern foraging ability as a result of increased suspended sediments during the construction [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:158:and re-suspension of sediment (Cook and Burton, 2010). Common tern have been reported to have a high [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:159:To reduce the impact associated with the predicted increase in suspended sediments, the use of a TSHD [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:159:For the CSD, the most significant impact in terms of producing suspended solids is the overflow from the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:159:and tending to be more confined to the shallower waters. Mitigation of the suspended sediment generated [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:164: • increased import of fine sediments resuspended in Tees Bay; [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:168: • Impacts caused by increased suspended sediment during capital dredging and dewatering during [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:187:12.5.2 Potential impacts on shellfish and fish caused by increases in suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:187:located in the Tees Dock turning circle or in the area of the proposed quay wall, concentrations of suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:187:in suspended solids also occurs when the dredger is located in the main channel adjacent to North Gare [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:188:For the CSD, the most significant impact in terms of producing suspended solids is the overflow from the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:188:suspended into the water column. Hence, the construction phase would result in temporary increases in [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:188:assessment presented below relates to the potential impact on fish due to the resuspension of non- [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:189:The re-suspension of sediment as a consequence of the proposed dredging could also potentially affect [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:189:It has also been reported that dredging activities often generate no more increased suspended sediments [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:189:floods and large tides can increase suspended sediments over much larger areas, for longer periods that [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:189:fish (Forewind, 2014). For lethal effects to occur, concentrations of suspended sediment have to be on the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:189:Peak suspended solid concentrations in the main channel are predicted to be significantly affected by the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:189:wall, concentrations of suspended solids decrease significantly outside of the immediate vicinity of the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:189:decrease in suspended solids also occurs when the dredger is located in the main channel adjacent to North [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:189:Gare Sands, however suspended solid concentrations are predicted to remain above natural variation both [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:189:high sensitivity of resident and migratory fish in the Tees to increases in suspended sediment, an overall [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:190:the Tees to increased suspended sediment. Based on the information available on MarLIN for the dominant [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:190:‘tolerant’ and ‘not sensitive’ to increases in suspended sediment. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:190:The controls outlined in Section 7 with regard to minimising suspended sediment load during dredging are [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:221:at +6.00mOD and a suspended roadway between at +8.00mOD. The slag embankment has a slope of 1 in [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:226:increase in total suspended solid concentrations could impact upon the processes for which the water is [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:226:settled out of suspension in the immediate vicinity of the dredger (see Section 6 for further detail). No [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:226:In the vicinity of the Corus abstraction and the Tees Bulk Handling abstraction, suspended solid [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:226:quality in the vicinity of the abstraction point due to increased suspended sediment would be temporary in [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:256: Increase in suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:256:sensitive to smothering or increases in suspended sediment. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:259:disturbance and increased suspended sediments on migratory fish). [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:266: • dispersion of suspended sediment during capital dredging and deposition; [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:266:Dispersion of suspended sediment and deposition on the seabed during capital dredging [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:266:immediately after the period of construction. This is because fine material will be released into suspension, [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:267:A review of all EIA studies for the above projects highlights that the maximum increase in suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:267:resulting in a significantly reduced concentration of suspended sediment beyond the source of the plume. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:267:increase with no long-term accumulation on the seabed at the initial point of deposition. The suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:267:Figure 27.1 Predicted increase in suspended sediment concentration (left) and deposition on the seabed [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:268:Figure 27.3 Predicted increase in suspended sediment concentration (left) and deposition on the seabed [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:269:Mitigation measures to limit the suspension of sediment and subsequent deposition of sediment during [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:269:sealed barge) for dredging of unconsolidated material to minimise resuspension in the water column. This [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:271:Potential for cumulative increase in suspended sediment during capital and maintenance dredging [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:271:peak suspended sediment above those normally experienced in the estuary (this effect would be additive). [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:274:Potential effect on waterbird feeding resource due to increased suspended sediment during capital [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:298:Reductions in water quality due to resuspension of sediment [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:298:interest features of the pSPA and Ramsar site is therefore via an increase in suspended sediment within [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:298:Figures 6.2 to 6.4 indicate that the magnitude of the effect (i.e. increased suspended sediment) is likely to [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:298:To reduce the impact associated with the predicted increase in suspended sediments, the use of a TSHD [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:299:For the CSD, the most significant impact in terms of producing suspended solids is the overflow from the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:299:the shallower waters. Mitigation of the suspended sediment generated by reducing the size of the dredger, [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:302:from the area of increased suspended sediment. It should be noted, however, that the effect of the combined [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:303:the potential for the re-suspension of contaminated sediment and subsequent deposition over other areas [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:303:The effect of sediment suspension on feeding birds (terns) in the nearshore zone associated with the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:303:species was predicted due to either suspended sediments or habitat change. As outlined in Section 12, the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:303:Given the conclusions of the Dogger Bank A and B assessment (i.e. no significant effect on suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:303:with any effect confined to the footprint of the proposed dredge. The predicted increase in suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:317:(25) A programme of monitoring of dissolved oxygen and suspended solid [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:317:until a scheme for water column monitoring (water quality) and suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:342: 1. In general, suspended sediment concentrations are low within the estuary and [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:342: high rainfall or storm events. In general, the suspended sediment [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:342: of the proposed development (i.e. in the Tees Dock area) suspended sediment [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:342: from 40-80mg/l. In terms of the tidal sequence, the highest suspended sediment [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:342: suspended sediment have been noted around the Shell Jetty, but with little [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:343: driven currents, wave induced currents, vessel induced forces and resuspension [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:343: resuspended and moved further upstream into the estuary. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:343: concentrations in Tees Bay are raised by the resuspension of material from the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:345: d) Losses of suspended sediment are inevitable at the dredging face or draghead, [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:346: remain in suspension, forming a sediment plume. The plume from the overspill [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:346: discharge is an order of magnitude greater than sediment resuspension from the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:346: plumes of suspended fine sediment. Importantly the TSHD will result in a [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:346: simulate the dispersion, deposition and resuspension of the released sediment [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:346: and calculates areas in which suspended particles may settle on the bed, either [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:346: walk technique. The deposition and resuspension of particles at the seabed are [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:349: CSD in terms of predicted peak concentration of suspended sediments and peak [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:352: is predicted to increase suspended sediment concentrations by 500mg/l in the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:352: of the run-off from the reclamation. Increases in suspended sediment [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:352: suspended sediment concentrations over Seal Sands and in the Seaton [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:353: wave action occurred it would be expected to be resuspended. A similar [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:353: suspended sediment concentrations and deposition at Bran Sands and North [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:375: transport model that simulates the advection and dispersion of suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:376: the flood tide period having been resuspended from the seabed in Tees Bay (i.e. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:376: resuspension and upstream movement as a result of agitation by dredging [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:377: 1. The dispersion of suspended solids released into Dabholm Gut through licensed [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:377: 2. The model predictions indicate that the distributions of suspended and deposited [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:377: that following the proposed development the core of the plume of suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:378: • Increased import of fine sediments resuspended in Tees Bay; [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:391:Quay construction would entail either a mass concrete gravity wall or a piled suspended concrete deck. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:391:the suspended concrete deck quay structure would be bored concrete piles formed within steel tubes. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:400:a sealed barge to minimise re-suspension of sediment into the water column. No such requirements [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:404:minimise the resuspension of sediment into the water column. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:424:loading into a sealed barge to minimise re-suspension of sediment into the water column. No such [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:496:with grain size (Witbaard et al. 2019). High levels of fine or suspended sediments may impact A. islandica growth [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:511:the proposed construction options for the berth. One option is based on forming a suspended [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:634:been used to simulate dispersion, deposition and suspension of released sediment in the Tees estuary. A [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:636:The deposition of fine sediment resuspended by the dredging process is not anticipated to impact on the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:636:The construction phase will result in increases in the suspended sediment concentration of the water [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:636:of sediment plumes during dredging was modelled. The largest rise in peak suspended sediment [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:636:It is predicted that the increase in suspended solid concentrations arising during capital dredging would be [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:636:undertaken to inform the EIA has predicted that peak suspended solid concentrations in the main channel [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:636:circle or in the area of the proposed quay wall, concentrations of suspended solids decrease significantly [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:636:the vessel. This significant decrease in suspended solids also occurs when the dredger is located in the [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:636:main channel adjacent to North Gare Sands, however suspended solid concentrations are predicted to [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:637:sediment is anticipated to fall out of suspension within the immediate vicinity of the dredger, particularly in [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:637:to increases in suspended sediment concentrations, the effects are short term and will only occur during [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:658: Could affect water clarity, temperature, During the reclamation process, settling basins will allow suspended sediment to settle out this water body [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/IBPB8270R001F01_EIA REPORT.pdf|IBPB8270R001F01_EIA REPORT.pdf]]:658: patterns continuously for longer than a spring pass through silt traps to limit the amount of suspended sediment discharged to the river. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/PB8270-RHD-ZZ-XX-RP-Z-0002.pdf|PB8270-RHD-ZZ-XX-RP-Z-0002.pdf]]:8: • A piled suspended deck structure. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/PB8270-RHD-ZZ-XX-RP-Z-0002.pdf|PB8270-RHD-ZZ-XX-RP-Z-0002.pdf]]:8:A piled suspended deck structure could also be an appropriate option from a technical perspective and [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/PB8270-RHD-ZZ-XX-RP-Z-0002.pdf|PB8270-RHD-ZZ-XX-RP-Z-0002.pdf]]:10:dispersion, deposition and resuspension of released sediment in the Tees estuary during the construction [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/PB8270-RHD-ZZ-XX-RP-Z-0002.pdf|PB8270-RHD-ZZ-XX-RP-Z-0002.pdf]]:10:The largest rise in peak suspended sediment concentrations above background concentrations is predicted [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/PB8270-RHD-ZZ-XX-RP-Z-0002.pdf|PB8270-RHD-ZZ-XX-RP-Z-0002.pdf]]:10:the predicted increases in concentrations of suspended sediment above background are significantly less. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/PB8270-RHD-ZZ-XX-RP-Z-0002.pdf|PB8270-RHD-ZZ-XX-RP-Z-0002.pdf]]:11:a temporary basis due to increased suspended sediment concentrations. [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/PB8270-RHD-ZZ-XX-RP-Z-0002.pdf|PB8270-RHD-ZZ-XX-RP-Z-0002.pdf]]:11:suspension of sediments as a result of dredging or runoff from the reclamation. In addition, the following [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/PB8270-RHD-ZZ-XX-RP-Z-0002.pdf|PB8270-RHD-ZZ-XX-RP-Z-0002.pdf]]:13:and migratory fish due to the resuspension of sediments. The adoption of the mitigation measures outlined [[this>RiverTees/Planning/MLA_2020_00079/Additional Documents/PB8270-RHD-ZZ-XX-RP-Z-0002.pdf|PB8270-RHD-ZZ-XX-RP-Z-0002.pdf]]:17:suspended sediment than predicted for the NGCT alone, but with the same predicted spatial extent of the [[this>RiverTees/Planning/MLA_2020_00079/Response Documents/Licence Document (Marine).pdf|Licence Document (Marine).pdf]]:21:being taken. This can include variation, revocation or suspension of the licence, [[this>RiverTees/Planning/MLA_2020_00079/Response Documents/Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf|Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf]]:14:quality associated with the increase in suspension, dispersion, remobilisation and [[this>RiverTees/Planning/MLA_2020_00079/Response Documents/Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf|Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf]]:14:redistribution of suspended solids would lead residual impacts of negligible [[this>RiverTees/Planning/MLA_2020_00079/Response Documents/Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf|Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf]]:15: and suspended solid concentrations monitoring. [[this>RiverTees/Planning/MLA_2020_00079/Response Documents/Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf|Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf]]:15: monitoring and suspended sediment monitoring. [[this>RiverTees/Planning/MLA_2020_00079/Response Documents/Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf|Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf]]:22:suspended sediment concentrations (SSC) would have any significant impact on [[this>RiverTees/Planning/MLA_2020_00079/Response Documents/Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf|Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf]]:22: • Impacts caused by increased suspended sediment during capital dredging [[this>RiverTees/Planning/MLA_2020_00079/Response Documents/Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf|Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf]]:25:Tees is considered to be low and the impact to shellfish from increased suspended [[this>RiverTees/Planning/MLA_2020_00079/Response Documents/Decision Letter (Marine).pdf|Decision Letter (Marine).pdf]]:2:fail to comply with all the conditions in the licence we may vary, suspend or revoke your [[this>RiverTees/Planning/MLA_2020_00079/Response Documents/Decision Letter (Marine).pdf|Decision Letter (Marine).pdf]]:2:suspending or revoking the licence. Our terms and conditions relating to charging can [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Licence Document (Marine)-20.pdf|MLA_2021_00215-Licence Document (Marine)-20.pdf]]:7:suspended deck structure detailed above, requiring the [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Licence Document (Marine)-20.pdf|MLA_2021_00215-Licence Document (Marine)-20.pdf]]:7:will be installed between the bankseat and suspended [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Licence Document (Marine)-20.pdf|MLA_2021_00215-Licence Document (Marine)-20.pdf]]:8:time as the tubular piles required for the new suspended [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Licence Document (Marine)-20.pdf|MLA_2021_00215-Licence Document (Marine)-20.pdf]]:16:being taken. This can include variation, revocation or suspension of the licence, [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Licence Document (Marine)-16.pdf|MLA_2021_00215-Licence Document (Marine)-16.pdf]]:5:disposal of dredged materials, a new suspended deck structure and new sheet pile [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Licence Document (Marine)-16.pdf|MLA_2021_00215-Licence Document (Marine)-16.pdf]]:6: further back from its current location. A new suspended [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Licence Document (Marine)-16.pdf|MLA_2021_00215-Licence Document (Marine)-16.pdf]]:6:Methodology Suspended deck structure [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Licence Document (Marine)-16.pdf|MLA_2021_00215-Licence Document (Marine)-16.pdf]]:6: The suspended deck will be a piled structure with a [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Licence Document (Marine)-16.pdf|MLA_2021_00215-Licence Document (Marine)-16.pdf]]:6: at the back of the new suspended deck structure to retain [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Licence Document (Marine)-16.pdf|MLA_2021_00215-Licence Document (Marine)-16.pdf]]:7:suspended deck quay structure will be formed of [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Licence Document (Marine)-16.pdf|MLA_2021_00215-Licence Document (Marine)-16.pdf]]:7:suspended deck structure detailed above, requiring the [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Licence Document (Marine)-16.pdf|MLA_2021_00215-Licence Document (Marine)-16.pdf]]:7:bankseat and suspended deck structure in dry conditions. [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Licence Document (Marine)-16.pdf|MLA_2021_00215-Licence Document (Marine)-16.pdf]]:8:at the back of the new suspended deck structure, and [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Licence Document (Marine)-16.pdf|MLA_2021_00215-Licence Document (Marine)-16.pdf]]:8:in the new bankseat and suspended deck. The anchored [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Licence Document (Marine)-16.pdf|MLA_2021_00215-Licence Document (Marine)-16.pdf]]:9: time as the tubular piles required for the new suspended [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Licence Document (Marine)-16.pdf|MLA_2021_00215-Licence Document (Marine)-16.pdf]]:16:being taken. This can include variation, revocation or suspension of the licence, [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Decision Letter (Marine)-19.pdf|MLA_2021_00215-Decision Letter (Marine)-19.pdf]]:1:suspended deck structure initially proposed and licensed under L/2021/00325/1. [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-TG Notice 13.8-3.pdf|MLA_2021_00215-TG Notice 13.8-3.pdf]]:1: no waiting at any time restrictions on following roads in Skinningrove:- further back from its current location. A new suspended deck is proposed to be constructed, [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Decision Letter (Marine)-14.pdf|MLA_2021_00215-Decision Letter (Marine)-14.pdf]]:1:Additionally, a new suspended deck will be built, along with new sheet piles to [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Decision Letter (Marine)-14.pdf|MLA_2021_00215-Decision Letter (Marine)-14.pdf]]:1:fail to comply with all the conditions in the licence we may vary, suspend or revoke your [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Decision Letter (Marine)-14.pdf|MLA_2021_00215-Decision Letter (Marine)-14.pdf]]:2:suspending or revoking the licence. Our terms and conditions relating to charging can [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-APPLICATION-FORM.pdf|MLA_2021_00215-APPLICATION-FORM.pdf]]:2:(and disposal of dredged materials), a new suspended deck structure and new sheet [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-APPLICATION-FORM.pdf|MLA_2021_00215-APPLICATION-FORM.pdf]]:12:2). A new suspended deck is proposed to be built, along with new sheet piles to replace [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:7:dredged materials), a new suspended deck structure and new sheet pile walls. [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:10:bankseat located 25m further back from its current location (Figure 2). A new suspended deck is proposed [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:10: 1. Construction of suspended deck structure to replace existing quay wall; [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:11: FOR SUSPENDED DECK [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:12: FOR SUSPENDED DECK STRUCTURE [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:12: BANKSEAT AND SUSPENDED DECK STRUCTURE [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:12: FOR SUSPENDED DECK STRUCTURE FOR SUSPENDED DECK STRUCTURE [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:13:2.3.1 Suspended deck structure [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:13:The suspended deck will be a piled structure with a reinforced concrete deck constructed within the footprint [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:13:A sheet piled wall will be installed at the back of the new suspended deck structure to retain material behind [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:14:The new crosshead beams and deck for the new suspended deck quay structure will be formed of both pre- [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:14:The new bankseat will be a similar construction to the suspended deck structure detailed above, requiring [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:14:new sheet pile wall will be installed between the bankseat and suspended deck structure in dry conditions [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:14:It is anticipated that a sheet piled wall will be required at the back of the new suspended deck structure, and [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:14:also an anchored sheet pile wall will be required to tie in the new bankseat and suspended deck. The [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:16:suspended deck structure, in dry conditions prior to the removal of the existing fronting sheet pile wall. The [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:17: NEW SUSPENDED DECK [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:33:Sediment re-suspension caused by grab-dredging can be reduced in the following ways: [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:33:The literature indicates that the suspended sediment plume induced by a clamshell bucket under estuarine [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:33:sediment to be resuspended however, due to the consolidated nature of these geological features this will [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:33:that would be resuspended by the dredging activities would be small in scale and localised, settling out of [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:33:suspension within 100m of the dredging activity, indicating that any potential impacts to water quality would [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:34:new structures will have an open piled/suspended deck structure and as such will not reduce in flood [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:36:environmentally sensitive technique, such as a clamshell dredger or similar, to minimise resuspension of [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:36:sediment that would be resuspended by the dredging activities would be small in scale. The literature also [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:36:indicates that the effect would be highly localised, settling out of suspension within 100m of the dredging [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:40:minimise the volume of this sediment which could be suspended into the water column and redistributed. [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:40:would be potentially released and resuspended by the dredging activities would be small in scale and [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:40:localised, settling out of suspension within 100m of the dredging activity (Bohlen, 1978). It is therefore [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:40:to within Tees Dock. As such no significant impact on marine mammals from the potential resuspension of [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:41:Waste Framework Directive (2008/98/EC). Some of the arisings from the excavation for the suspended [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:47:Dock and will involve the replacement of the existing Number 2 Ro-Ro pontoon, a new suspended deck, [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:47:including some limited percussive piling, to install the piles required to support the new suspended deck [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:48:Bohlen, W. F. (1978). Factors governing the distribution of dredge-resuspended sediments. Proceedings of [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:52:  Construction of suspended deck structure to replace existing quay wall; [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:58: • Construction of suspended deck structure to replace existing quay wall; [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:67: availability • Common resuspended. Potential impacts due to suspended sediment are [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:67: predicted to fall out of suspension within 100m of the dredging [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:69:and consists of two main activities – the installation of piles to support the new suspended deck structure, [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:72: • Reduce sediment resuspension; [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:74: modified for the same limited resuspension of sediment, and once completed the maintenance dredge requirement will slightly maintenance [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:74: Standards Directive be resuspended and redistributed [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:75: cycle (about 14 days)? followed by 6 hours of augering and on port operations, and will not be suspended during this [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:75: resuspension of sediment the deposits which are considered to be suspended during regular [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:76: day) and temporary (piling will take resuspended by the dredging [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:76: suspended during this [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:76: the proposed scheme, at the end of settling out of suspension within [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:76: suspended during regular [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:78: • Reduce sediment resuspension; [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:78:The proposed scheme would cause the resuspension of sediment through the capital dredging activity [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:78:reduce the volume of sediment that will be suspended and it is therefore predicted that SSCs will be [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:79:In order to minimise the volume of the unconsolidated material that is suspended during the dredging [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:79:been designed to minimise the resuspension of sediment during the dredging activity, specifically when the [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:79:indicates that the suspended sediment plume induced by a clamshell bucket under estuarine conditions is [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:79:that would be resuspended by the dredging activities would be small in scale and highly localised, settling [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf|MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf]]:79:out of suspension within 100m of the dredging activity, indicating that any potential impacts to water quality [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-TG Notice 20.8-2.pdf|MLA_2021_00215-TG Notice 20.8-2.pdf]]:1:further back from its current location. A new suspended deck is proposed to be constructed, [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf|MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf]]:1:a combi wall in the place of the proposed suspended deck structure which constitutes a change to the [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf|MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf]]:1:compares the methodology with the methodology for the suspended deck structure set out in the Marine [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf|MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf]]:1:installation is presented below. It is proposed that this methodology should replace that of the suspended [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf|MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf]]:2:Table 3.1 below presents a comparison between the methodology for the suspended deck structure [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf|MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf]]:2: Suspended deck structure instead of the suspended deck structure, within the footprint [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf|MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf]]:2: The suspended deck will be a piled structure with a reinforced of the solid dock structure. [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf|MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf]]:2: solid dock structure. The structure will be supported by steel suspended deck structure is once completed the structure will [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf|MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf]]:2: suspended deck structure to retain material behind the anchors will be installed behind the combi wall. The combi [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf|MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf]]:2: same as for the suspended deck structure a mix of pre- [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf|MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf]]:2: The new crosshead beams and deck for the new suspended The new crosshead beams and deck for the new combi wall [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf|MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf]]:3: back of the new suspended deck structure, and also an [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf|MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf]]:3: bankseat and suspended deck. The anchored sheet pile wall The proposed combi-wall structure means that the sheet piled [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf|MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf]]:3: will comprise a front wall anchored with tie rods at wall to the back of the suspended deck structure is no longer [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf|MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf]]:4:underneath the suspended deck reducing the waste generated during the scheme. All other elements of [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf|MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf]]:5: EXISTING SUSPENDED DECK SW SW SW SW [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf|MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf]]:5: SUSPENDED DECK AS PER EXISITNG [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf|MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf]]:7: SUSPENDED DECK [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf|MLA_2021_00215-PB5051-RHD-ZZ-NT-Z-3500-Tees Dock Ro Ro 2 - Combi Wall Update-18.pdf]]:7: SUSPENDED DECK TO TIE INTO EXISTING SUSPENDED [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:7:dredged materials), a new suspended deck structure and new sheet pile walls. [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:10:bankseat located 25m further back from its current location (Figure 2). A new suspended deck is proposed [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:10: 1. Construction of suspended deck structure to replace existing quay wall; [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:11: FOR SUSPENDED DECK [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:12: FOR SUSPENDED DECK STRUCTURE [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:12: BANKSEAT AND SUSPENDED DECK STRUCTURE [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:12: FOR SUSPENDED DECK STRUCTURE FOR SUSPENDED DECK STRUCTURE [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:13:2.3.1 Suspended deck structure [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:13:The suspended deck will be a piled structure with a reinforced concrete deck constructed within the footprint [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:13:A sheet piled wall will be installed at the back of the new suspended deck structure to retain material behind [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:14:The new crosshead beams and deck for the new suspended deck quay structure will be formed of both pre- [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:14:The new bankseat will be a similar construction to the suspended deck structure detailed above, requiring [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:14:new sheet pile wall will be installed between the bankseat and suspended deck structure in dry conditions [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:14:It is anticipated that a sheet piled wall will be required at the back of the new suspended deck structure, and [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:14:also an anchored sheet pile wall will be required to tie in the new bankseat and suspended deck. The [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:16:suspended deck structure, in dry conditions prior to the removal of the existing fronting sheet pile wall. The [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:17: NEW SUSPENDED DECK [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:33:Sediment re-suspension caused by grab-dredging can be reduced in the following ways: [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:33:The literature indicates that the suspended sediment plume induced by a clamshell bucket under estuarine [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:33:sediment to be resuspended however, due to the consolidated nature of these geological features this will [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:33:that would be resuspended by the dredging activities would be small in scale and localised, settling out of [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:33:suspension within 100m of the dredging activity, indicating that any potential impacts to water quality would [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:34:new structures will have an open piled/suspended deck structure and as such will not reduce in flood [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:36:environmentally sensitive technique, such as a clamshell dredger or similar, to minimise resuspension of [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:36:sediment that would be resuspended by the dredging activities would be small in scale. The literature also [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:36:indicates that the effect would be highly localised, settling out of suspension within 100m of the dredging [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:40:minimise the volume of this sediment which could be suspended into the water column and redistributed. [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:40:would be potentially released and resuspended by the dredging activities would be small in scale and [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:40:localised, settling out of suspension within 100m of the dredging activity (Bohlen, 1978). It is therefore [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:40:to within Tees Dock. As such no significant impact on marine mammals from the potential resuspension of [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:41:Waste Framework Directive (2008/98/EC). Some of the arisings from the excavation for the suspended [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:47:Dock and will involve the replacement of the existing Number 2 Ro-Ro pontoon, a new suspended deck, [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:47:including some limited percussive piling, to install the piles required to support the new suspended deck [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:48:Bohlen, W. F. (1978). Factors governing the distribution of dredge-resuspended sediments. Proceedings of [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:52:  Construction of suspended deck structure to replace existing quay wall; [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:58: • Construction of suspended deck structure to replace existing quay wall; [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:67: availability • Common resuspended. Potential impacts due to suspended sediment are [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:67: predicted to fall out of suspension within 100m of the dredging [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:69:and consists of two main activities – the installation of piles to support the new suspended deck structure, [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:72: • Reduce sediment resuspension; [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:74: modified for the same limited resuspension of sediment, and once completed the maintenance dredge requirement will slightly maintenance [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:74: Standards Directive be resuspended and redistributed [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:75: cycle (about 14 days)? followed by 6 hours of augering and on port operations, and will not be suspended during this [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:75: resuspension of sediment the deposits which are considered to be suspended during regular [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:76: day) and temporary (piling will take resuspended by the dredging [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:76: suspended during this [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:76: the proposed scheme, at the end of settling out of suspension within [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:76: suspended during regular [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:78: • Reduce sediment resuspension; [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:78:The proposed scheme would cause the resuspension of sediment through the capital dredging activity [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:78:reduce the volume of sediment that will be suspended and it is therefore predicted that SSCs will be [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:79:In order to minimise the volume of the unconsolidated material that is suspended during the dredging [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:79:been designed to minimise the resuspension of sediment during the dredging activity, specifically when the [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:79:indicates that the suspended sediment plume induced by a clamshell bucket under estuarine conditions is [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:79:that would be resuspended by the dredging activities would be small in scale and highly localised, settling [[this>RiverTees/Planning/MLA_2021_00215_1/MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf|MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf]]:79:out of suspension within 100m of the dredging activity, indicating that any potential impacts to water quality [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/501 - Water FD MASTER.pdf|501 - Water FD MASTER.pdf]]:6: Estuarine Ecology and the resuspension of contaminated sediments. These impacts [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:2:the lower parts of the channel. Suspended sediment concentrations, sediment dispersion and sedimentation [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:2:sedimentation. The model results indicate that the suspended sediment concentrations can exceed 1000 mg/l [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:3:5.1.2.1 Suspended sediment 27 [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:5:Suspended sediment concentrations, sediment dispersion and sedimentation from the suggested [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:5:The model results indicate that the suspended sediment concentrations can exceed 1000 mg/l for [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:6:column suspended sediment concentrations due to the dredging activity, which is done in co [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:15:SSFATE is a versatile suspended sediment computer modelling system based on the concept of [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:15:series plots of suspended sediment concentrations, and the spatial distribution of sediment [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:16:transport, dispersion, and settling of suspended dredged material released to the water column as [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:22:and areas of deposition and erosion where compared to measured data (suspended material) from [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:23:Sand will tend to stay where it falls out of suspension. This is also the view expressed in /2/, [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:23:where it is found that re-suspension of sediments “does not take place in the Tees to any great [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:23:0.5 mg/l (average) in Seaton Channel. If one assumes that the suspended sediment grain size [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:23:distribution “mirrors” the sediment distribution, and based on a median suspended sediment [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:23:relatively fast out of suspension. This is known not to reflect the true processes in the Tees [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:24: in suspension [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:25:To determine suspended sediment plumes resulting from the dredging activities, a numerical [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:25:equilibrium suspended plume is established by the end of two days of dredging. Simulations [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:29: - Modelling erosion (resuspension), particle transport and sedimentation; [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:29: to the water column (dissolved state) due to resuspension into to water column. Generally [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:29: - The modelling shall also consider the suspended sediment concentrations in light of the [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:30:Teesmouth consist mainly of sand /1/, /2/, /7/. Finer fractions stay in suspension longer and are [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:31:patterns influencing the suspension of sediments in the Tees bay, from decreased maintenance [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:31:dredging resulting in less suspended sediment, or from a combination of these possibilities. [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:31:5.1.2.1 Suspended sediment [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:31:Suspended sediment is of high importance in the Tees estuary as little re-suspension of settled [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:31:sediments occurs /2/. Carriage in suspension is thus the main pathway where sediments may [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:31:adsorbed/entrained pollutants. Data on suspended sediment cover 26 sampling points as shown [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:31:in Figure 5-1. Median suspended sediment concentrations in the period 2003-2004 are shown in [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:31:Figure 5-2 and Figure 5-3. The data show rather large variations in the suspended sediment [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:31:traffic will have a great influence on the suspended sediment concentration due to erosion by [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:31:which have increased the concentrations of suspended sediments, affecting the sediment [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:31:Based on data from throughout 2003 and early 2004 /7/ the median amount of suspended [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:32:Figure 5-1 Sampling locations for suspended sediment. Data from EA [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:32:(chart 9 and 10 in /2/). The silt and clay are re-suspended by activities like shipping and [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:33:means that deposited sediment will tend to stay where it falls out of suspension unless the [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:33:sediment is disturbed some other way (dredging, shipping). Suspended sediments concentrations [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:33:lists some controlling factors regarding suspended sediment and sediment transport. See also [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:33: Median suspended sediment (mg/l) [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:33:Figure 5-2 Suspended sediment concentrations mg/l (medians) [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:34: Median suspended sediment (mg/l) [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:34:Figure 5-3 Suspended sediment sampling (medians) [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:45:The suspended sediment concentration of sand (at T=210) along Seaton Channel, through Tees [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:45:main source is the estuary and that sand gradually falls out of suspension. [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:46:Figure below for Scenario 8. It is seen that the concentration of suspended sand varies greatly [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:47:The suspended sediment concentration of silt/clay (at T=210 hrs) along Seaton Channel, through [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:48:Figure below for Scenario 8. It is seen that the concentration of suspended sand varies greatly [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:50:water flow and sediment suspension such as storms, waves, traffic and dredging will produce a [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:51:suspends sediments that are transported to other areas. Throughout the scenarios the shear stress [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:52:Figure 5-25 Differences in suspended sand and clay concentrations (mg/l) between [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:53:from the sea with incoming tides when already suspended by waves, in fact 90 % of siltation [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:54: undercurrent) and re-suspension by dredging and shipping activities [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:55: - Suspended solids samples hourly for two days, at 1 m intervals to the bottom [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:56:distribution and quality, suspended sediment, temperature, salinity, tidal elevation and water [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:57:SSFATE provides several type of output. These include animations of suspended sediment [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:57:picture of the suspended sediment plume showing the maximum concentrations computed [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:57:in this area, the plume is of limited extent. It can be seen that maximum total suspended sediment [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:58:Figure 7-1 Maximum total suspended sediment concentrations (mg/l) for backhoe at [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:59:Figure 7-3 Maximum total suspended sediment concentrations (mg/l) for backhoe at [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:59:deposition. For dredging during a spring tide, Figure 7-7 displays the suspended sediment plume [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:65:Figure 7-17 and Figure 7-19 show the maximum concentration of suspended sediment plumes [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:65:dredging line. The spring tide suspended sediment plume extents all the way to the boundary of [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:67:interaction doesn’t significantly increase the maximum concentrations of the suspended sediment [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:78:the sedimentation pattern may change. Suspended sediment is in reality not only introduced by [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:78:above, produce far higher concentrations of suspended sediment that, dependent on the tidal [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:78:“continuous operation” /2/, so higher concentrations of suspended sediment may be expected [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:78:As the sedimentation potential increases, the suspended sediments not considered in the [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:79:size fractions SSFATE computations realistically represent suspended sediment plumes that will [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:79:total suspended sediment concentrations can exceed 1000 mg/l for the backhoe dredge, but are [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:79:suspended sediment plumes when the backhoe is operating in Area #1. However, some [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:79:tide, suspended sediments can be transported out to the sea as a result of the hopper dredge [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:80:simultaneously, there will be little interaction of the suspended sediment plumes when the [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:80:interaction doesn’t significantly increase the maximum concentrations of the suspended sediment [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:80:suspended material. Experiments with marine fish have shown that demersal fish are more [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:83: of sediment resuspension characteristics of selected dredges,” Technical Report HL-89- [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1a - DNV Report Rev1 2004.pdf|Appendix 16.1a - DNV Report Rev1 2004.pdf]]:84:/28/ More, P.G. 1977. Inorganic particulate suspension in the sea and their effects on marine [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:42:f) Re-suspension of contaminated sediment [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:43: suspension. [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:43: contaminants. Re-suspension of contaminants caused by dredging could [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:117:the lower parts of the channel. Suspended sediment concentrations, sediment dispersion and sedimentation [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:117:sedimentation. The model results indicate that the suspended sediment concentrations can exceed 1000 mg/l [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:118:5.1.2.1 Suspended sediment 27 [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:120:Suspended sediment concentrations, sediment dispersion and sedimentation from the suggested [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:120:The model results indicate that the suspended sediment concentrations can exceed 1000 mg/l for [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:121:column suspended sediment concentrations due to the dredging activity, which is done in co [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:130:SSFATE is a versatile suspended sediment computer modelling system based on the concept of [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:130:series plots of suspended sediment concentrations, and the spatial distribution of sediment [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:131:transport, dispersion, and settling of suspended dredged material released to the water column as [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:137:and areas of deposition and erosion where compared to measured data (suspended material) from [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:138:Sand will tend to stay where it falls out of suspension. This is also the view expressed in /2/, [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:138:where it is found that re-suspension of sediments “does not take place in the Tees to any great [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:138:0.5 mg/l (average) in Seaton Channel. If one assumes that the suspended sediment grain size [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:138:distribution “mirrors” the sediment distribution, and based on a median suspended sediment [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:138:relatively fast out of suspension. This is known not to reflect the true processes in the Tees [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:139: in suspension [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:140:To determine suspended sediment plumes resulting from the dredging activities, a numerical [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:140:equilibrium suspended plume is established by the end of two days of dredging. Simulations [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:144: - Modelling erosion (resuspension), particle transport and sedimentation; [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:144: to the water column (dissolved state) due to resuspension into to water column. Generally [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:144: - The modelling shall also consider the suspended sediment concentrations in light of the [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:145:Teesmouth consist mainly of sand /1/, /2/, /7/. Finer fractions stay in suspension longer and are [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:146:patterns influencing the suspension of sediments in the Tees bay, from decreased maintenance [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:146:dredging resulting in less suspended sediment, or from a combination of these possibilities. [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:146:5.1.2.1 Suspended sediment [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:146:Suspended sediment is of high importance in the Tees estuary as little re-suspension of settled [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:146:sediments occurs /2/. Carriage in suspension is thus the main pathway where sediments may [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:146:adsorbed/entrained pollutants. Data on suspended sediment cover 26 sampling points as shown [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:146:in Figure 5-1. Median suspended sediment concentrations in the period 2003-2004 are shown in [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:146:Figure 5-2 and Figure 5-3. The data show rather large variations in the suspended sediment [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:146:traffic will have a great influence on the suspended sediment concentration due to erosion by [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:146:which have increased the concentrations of suspended sediments, affecting the sediment [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:146:Based on data from throughout 2003 and early 2004 /7/ the median amount of suspended [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:147:Figure 5-1 Sampling locations for suspended sediment. Data from EA [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:147:(chart 9 and 10 in /2/). The silt and clay are re-suspended by activities like shipping and [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:148:means that deposited sediment will tend to stay where it falls out of suspension unless the [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:148:sediment is disturbed some other way (dredging, shipping). Suspended sediments concentrations [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:148:lists some controlling factors regarding suspended sediment and sediment transport. See also [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:148: Median suspended sediment (mg/l) [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:148:Figure 5-2 Suspended sediment concentrations mg/l (medians) [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:149: Median suspended sediment (mg/l) [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:149:Figure 5-3 Suspended sediment sampling (medians) [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:160:The suspended sediment concentration of sand (at T=210) along Seaton Channel, through Tees [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:160:main source is the estuary and that sand gradually falls out of suspension. [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:161:Figure below for Scenario 8. It is seen that the concentration of suspended sand varies greatly [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:162:The suspended sediment concentration of silt/clay (at T=210 hrs) along Seaton Channel, through [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:163:Figure below for Scenario 8. It is seen that the concentration of suspended sand varies greatly [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:165:water flow and sediment suspension such as storms, waves, traffic and dredging will produce a [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:166:suspends sediments that are transported to other areas. Throughout the scenarios the shear stress [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:167:Figure 5-25 Differences in suspended sand and clay concentrations (mg/l) between [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:168:from the sea with incoming tides when already suspended by waves, in fact 90 % of siltation [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:169: undercurrent) and re-suspension by dredging and shipping activities [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:170: - Suspended solids samples hourly for two days, at 1 m intervals to the bottom [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:171:distribution and quality, suspended sediment, temperature, salinity, tidal elevation and water [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:172:SSFATE provides several type of output. These include animations of suspended sediment [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:172:picture of the suspended sediment plume showing the maximum concentrations computed [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:172:in this area, the plume is of limited extent. It can be seen that maximum total suspended sediment [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:173:Figure 7-1 Maximum total suspended sediment concentrations (mg/l) for backhoe at [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:174:Figure 7-3 Maximum total suspended sediment concentrations (mg/l) for backhoe at [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:174:deposition. For dredging during a spring tide, Figure 7-7 displays the suspended sediment plume [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:180:Figure 7-17 and Figure 7-19 show the maximum concentration of suspended sediment plumes [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:180:dredging line. The spring tide suspended sediment plume extents all the way to the boundary of [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:182:interaction doesn’t significantly increase the maximum concentrations of the suspended sediment [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:193:the sedimentation pattern may change. Suspended sediment is in reality not only introduced by [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:193:above, produce far higher concentrations of suspended sediment that, dependent on the tidal [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:193:“continuous operation” /2/, so higher concentrations of suspended sediment may be expected [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:193:As the sedimentation potential increases, the suspended sediments not considered in the [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:194:size fractions SSFATE computations realistically represent suspended sediment plumes that will [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:194:total suspended sediment concentrations can exceed 1000 mg/l for the backhoe dredge, but are [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:194:suspended sediment plumes when the backhoe is operating in Area #1. However, some [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:194:tide, suspended sediments can be transported out to the sea as a result of the hopper dredge [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:195:simultaneously, there will be little interaction of the suspended sediment plumes when the [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:195:interaction doesn’t significantly increase the maximum concentrations of the suspended sediment [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:195:suspended material. Experiments with marine fish have shown that demersal fish are more [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:198: of sediment resuspension characteristics of selected dredges,” Technical Report HL-89- [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/3 EIS Appendices (3).pdf|3 EIS Appendices (3).pdf]]:199:/28/ More, P.G. 1977. Inorganic particulate suspension in the sea and their effects on marine [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1b - DNV Addendum Report 2005.pdf|Appendix 16.1b - DNV Addendum Report 2005.pdf]]:3:9 SUSPENDED SEDIMENT AND DISSOLVED OXYGEN..................................... 16 [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1b - DNV Addendum Report 2005.pdf|Appendix 16.1b - DNV Addendum Report 2005.pdf]]:7:in suspension locally (this again being entrained by our CW system) and potentially increase [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1b - DNV Addendum Report 2005.pdf|Appendix 16.1b - DNV Addendum Report 2005.pdf]]:10:suspended. [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1b - DNV Addendum Report 2005.pdf|Appendix 16.1b - DNV Addendum Report 2005.pdf]]:10:British Energy should be invited to comment on what concentrations of suspended sediments are [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1b - DNV Addendum Report 2005.pdf|Appendix 16.1b - DNV Addendum Report 2005.pdf]]:11:show the suspended sediment concentration and deposition for the modelled scenarios i.e. when [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1b - DNV Addendum Report 2005.pdf|Appendix 16.1b - DNV Addendum Report 2005.pdf]]:11:The hopper dredge will generate by far the largest suspended sediment concentration and [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1b - DNV Addendum Report 2005.pdf|Appendix 16.1b - DNV Addendum Report 2005.pdf]]:11:the max suspended sediment concentration and deposition when using a hopper dredge after two [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1b - DNV Addendum Report 2005.pdf|Appendix 16.1b - DNV Addendum Report 2005.pdf]]:11:The suspended sediment concentration and the deposition rate are for all sediment fractions [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1b - DNV Addendum Report 2005.pdf|Appendix 16.1b - DNV Addendum Report 2005.pdf]]:12:transported longer than the coarser fraction which will fall out of suspension relatively fast, the [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1b - DNV Addendum Report 2005.pdf|Appendix 16.1b - DNV Addendum Report 2005.pdf]]:13:be spread to Seal Sand by the fine fraction of the suspended sediment, but as nothing is known [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1b - DNV Addendum Report 2005.pdf|Appendix 16.1b - DNV Addendum Report 2005.pdf]]:16:The suspended sediment levels are presented in the DNV Report 2004-1387 figs 7-1, 7-3, 7-5, 7- [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1b - DNV Addendum Report 2005.pdf|Appendix 16.1b - DNV Addendum Report 2005.pdf]]:16:suspended sediment concentration is presented and discussed in Chapter 5.1.2.1. [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1b - DNV Addendum Report 2005.pdf|Appendix 16.1b - DNV Addendum Report 2005.pdf]]:18:9 SUSPENDED SEDIMENT AND DISSOLVED OXYGEN [[this>RiverTees/Planning/MLA_2015_00334/Additional Documents/Appendix 16.1b - DNV Addendum Report 2005.pdf|Appendix 16.1b - DNV Addendum Report 2005.pdf]]:18:The presence of suspended sediments in the water column has little effect on the dissolved [[this>RiverTees/Planning/MLA_2015_00334/Response Documents/Licence Document (Marine).pdf|Licence Document (Marine).pdf]]:16:being taken. This can include variation, revocation or suspension of the licence, [[this>RiverTees/Planning/MLA_2015_00334/Response Documents/Decision Letter (Marine).pdf|Decision Letter (Marine).pdf]]:2:You should ensure that methods are employed to minimise re-suspension of sediment [[this>RiverTees/Planning/MLA_2015_00334/Response Documents/Decision Letter (Marine).pdf|Decision Letter (Marine).pdf]]:2:suspended in the event that the Licence Holder fails to make full payment of the final [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1141-MLA.2020.00506.2 SBQ MLV2 FIR 19 Response.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1141-MLA.2020.00506.2 SBQ MLV2 FIR 19 Response.pdf]]:2: is likely to compare with the suspended sediment concentrations and plumes modelled within the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1141-MLA.2020.00506.2 SBQ MLV2 FIR 19 Response.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1141-MLA.2020.00506.2 SBQ MLV2 FIR 19 Response.pdf]]:2: proposed to minimise the resuspension of contaminated sediments. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1141-MLA.2020.00506.2 SBQ MLV2 FIR 19 Response.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1141-MLA.2020.00506.2 SBQ MLV2 FIR 19 Response.pdf]]:3:3.3 Suspended sediment concentrations [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1141-MLA.2020.00506.2 SBQ MLV2 FIR 19 Response.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1141-MLA.2020.00506.2 SBQ MLV2 FIR 19 Response.pdf]]:3:Effects’ (document reference PC1084-RHD-SB-EN-NT-EV-1141) for a commentary on the suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1141-MLA.2020.00506.2 SBQ MLV2 FIR 19 Response.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1141-MLA.2020.00506.2 SBQ MLV2 FIR 19 Response.pdf]]:3:The scheduling of the activities helps to mitigate the risk of resuspension of the contaminated sediments. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-20220512_MLA_2020_00506_1_variation_HRA_FINAL.pdf|MLA_2020_00506-20220512_MLA_2020_00506_1_variation_HRA_FINAL.pdf]]:6: suspended solids confined to coastal habitats, away from the main estuary channel. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-20220512_MLA_2020_00506_1_variation_HRA_FINAL.pdf|MLA_2020_00506-20220512_MLA_2020_00506_1_variation_HRA_FINAL.pdf]]:6: suspended sediments during dredging represents a very localised, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-20220512_MLA_2020_00506_1_variation_HRA_FINAL.pdf|MLA_2020_00506-20220512_MLA_2020_00506_1_variation_HRA_FINAL.pdf]]:7: suspended solids [[this>Teesworks/Planning/MLA_2020_00506/PC1084-RHD-SB-EN-NT-EV-1127 MLA.2020.00506.R8 Response to Consultation Comments on Scheme of Monitoring.pdf|PC1084-RHD-SB-EN-NT-EV-1127 MLA.2020.00506.R8 Response to Consultation Comments on Scheme of Monitoring.pdf]]:4: impacts (e.g., increased suspended sediment concentrations, poor [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-20221017_MLA_2020_00506_variation 2_HRA_FINAL.pdf|MLA_2020_00506-20221017_MLA_2020_00506_variation 2_HRA_FINAL.pdf]]:6: suspended solids confined to coastal habitats, away from the main estuary channel. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-20221017_MLA_2020_00506_variation 2_HRA_FINAL.pdf|MLA_2020_00506-20221017_MLA_2020_00506_variation 2_HRA_FINAL.pdf]]:6: suspended sediments during dredging represents a very localised, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-20221017_MLA_2020_00506_variation 2_HRA_FINAL.pdf|MLA_2020_00506-20221017_MLA_2020_00506_variation 2_HRA_FINAL.pdf]]:7: suspended solids [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf|20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf]]:2: suspended sediment brought in from the sea. Short term peaks in suspended sediment (during [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf|20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf]]:3: are presented principally as changes in suspended sediment concentration (SSC), the principal [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf|20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf]]:4: In coastal process terms, the temporary suspension itself is indeed probably of minor [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-EN-NT-EV-1127 MLA.2020.00506.R8 Response to Consultation Comments on Scheme of Monitoring.pdf|PC1084-RHD-SB-EN-NT-EV-1127 MLA.2020.00506.R8 Response to Consultation Comments on Scheme of Monitoring.pdf]]:4: impacts (e.g., increased suspended sediment concentrations, poor [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf|20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf]]:6:UWN from piling or SSC from dredging) whilst waiting in refuges areas. The effects of suspended [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf|20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf]]:6:to environmentally relevant, suspended sediment-generated turbidities. [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf|20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf]]:6:Elevated concentrations of suspended sediment can have the following physical effects on all life [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf|20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf]]:6: suspended sediment concentration, water velocity and gill dimensions (Appleby and [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf|20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf]]:7: v. Re-suspension of sediments causes nutrient enrichment promoting the formation of algal [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf|20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf]]:7: vi. Resuspension of sediments resulting from dredging can smother organisms and hinder [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf|20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf]]:7:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine an estuarine fish [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf|20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf]]:7:Bash, J., Berman, C. and Bolton, S. (2001). Effects of Turbidity and Suspended Solids on Salmonids. [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf|20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf]]:7:Berg, L. (1982). The effect of exposure to short-term pulses of suspended sediment on the behaviour of [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf|20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf]]:7:Berli, B.I. et al. (2014). Acute exposure to a common suspended sediment affects the swimming performance [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf|20220615 MLA2020005061 L2021003331 Tees South Bank (phase 1) Revised Scheme of Monitoring Review Fisheries advice FINAL.pdf]]:7:Gilmour, J. (1999). Experimental investigation into the effects of suspended sediment on fertilisation, larval [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf|MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf]]:8:Changes in suspended Bird Species. Yes Tern foraging may be inhibited by a decrease in water clarity caused [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf|MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf]]:8: pSPA: suspended sediments during dredging represents a very localised, [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf|MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf]]:8: • Common Tern (B) temporary and short-term disturbance, with any suspended sediment [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf|MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf]]:9: the effects of the proposed scheme may increase suspended [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf|MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf]]:18: • Pied avocet (B) suspended sediments during dredging represents a very localised, [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf|MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf]]:18: • Ruff (NB) temporary and short-term disturbance, with any suspended [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf|MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf]]:20: Changes in suspended sediment (water clarity) submitted with this application. Licence application [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf|MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf]]:21:changes in suspended sediments (water clarity). [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf|MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf]]:22: suspended Common tern, Breeding excavation of the foreshore, and the works at low tide will significantly [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf|MLA202000506 and MLA202000507 Draft HRA phase 1 and 2.pdf]]:24: Changes in suspended sediment (water clarity) submitted with this application. Licence application [[this>Teesworks/Planning/MLA_2020_00506/Consultations/338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf|338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf]]:4: To restrict suspended sediment plumes to one side of the estuary at a time, and [[this>Teesworks/Planning/MLA_2020_00506/Consultations/338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf|338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf]]:6: To restrict suspended sediment plumes to one side of the estuary at a time, in [[this>Teesworks/Planning/MLA_2020_00506/Consultations/338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf|338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf]]:7: works must be suspended. Once temperatures have not reached zero degrees [[this>Teesworks/Planning/MLA_2020_00506/Consultations/338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf|338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf]]:9: suspended sediment [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-EN-NT-EV-1124 Updated Scheme of Monitoring - May 2022.pdf|PC1084-RHD-SB-EN-NT-EV-1124 Updated Scheme of Monitoring - May 2022.pdf]]:1:dredging associated with the South Bank Quay project that sediment suspended within the dredging [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-EN-NT-EV-1124 Updated Scheme of Monitoring - May 2022.pdf|PC1084-RHD-SB-EN-NT-EV-1124 Updated Scheme of Monitoring - May 2022.pdf]]:2:is carried in suspension by the prevailing currents (for finer-grained sediment fractions). Near surface [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-EN-NT-EV-1124 Updated Scheme of Monitoring - May 2022.pdf|PC1084-RHD-SB-EN-NT-EV-1124 Updated Scheme of Monitoring - May 2022.pdf]]:2:Figure 2.1 Maximum enhanced suspended solids concentrations (near surface layer) arising from dredging [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-EN-NT-EV-1124 P03 South Bank Phase 1 Scheme of Monitoring.pdf|PC1084-RHD-SB-EN-NT-EV-1124 P03 South Bank Phase 1 Scheme of Monitoring.pdf]]:2:maximum enhanced areas of suspended sediment concentrations from the dredge) were selected based [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-EN-NT-EV-1124 P03 South Bank Phase 1 Scheme of Monitoring.pdf|PC1084-RHD-SB-EN-NT-EV-1124 P03 South Bank Phase 1 Scheme of Monitoring.pdf]]:3:The EIA Report (Royal HaskoningDHV, 2020) predicted that sediment suspended within the dredging [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-EN-NT-EV-1124 P03 South Bank Phase 1 Scheme of Monitoring.pdf|PC1084-RHD-SB-EN-NT-EV-1124 P03 South Bank Phase 1 Scheme of Monitoring.pdf]]:3:after this if it is carried in suspension by the prevailing currents (for finer-grained sediment fractions) (Royal [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-EN-NT-EV-1124 P03 South Bank Phase 1 Scheme of Monitoring.pdf|PC1084-RHD-SB-EN-NT-EV-1124 P03 South Bank Phase 1 Scheme of Monitoring.pdf]]:3:Figure 1 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from dredging activities during [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-EN-NT-EV-1124 P03 South Bank Phase 1 Scheme of Monitoring.pdf|PC1084-RHD-SB-EN-NT-EV-1124 P03 South Bank Phase 1 Scheme of Monitoring.pdf]]:4:Figure 2 Maximum enhanced suspended sediment concentrations (near-surface layer) arising from dredging activities [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA (2).pdf|MLA202000506 and MLA202000507 Draft HRA (2).pdf]]:8:suspended solids by the proposed dredge. The occurrence of almost daily [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA (2).pdf|MLA202000506 and MLA202000507 Draft HRA (2).pdf]]:8: • Common Tern (B) suspended sediments during dredging represents a very localised, [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA (2).pdf|MLA202000506 and MLA202000507 Draft HRA (2).pdf]]:8: temporary and short-term disturbance, with any suspended sediment [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA (2).pdf|MLA202000506 and MLA202000507 Draft HRA (2).pdf]]:9: the effects of the proposed scheme may increase suspended [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA (2).pdf|MLA202000506 and MLA202000507 Draft HRA (2).pdf]]:18: • Common Tern (B) suspended sediments during dredging represents a very localised, [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA (2).pdf|MLA202000506 and MLA202000507 Draft HRA (2).pdf]]:18: temporary and short-term disturbance, with any suspended [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA (2).pdf|MLA202000506 and MLA202000507 Draft HRA (2).pdf]]:20: Changes in suspended sediment (water clarity) submitted with this application. Licence application [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA (2).pdf|MLA202000506 and MLA202000507 Draft HRA (2).pdf]]:22: from suspended sediment. [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA (2).pdf|MLA202000506 and MLA202000507 Draft HRA (2).pdf]]:23:changes in suspended sediments (water clarity). [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA (2).pdf|MLA202000506 and MLA202000507 Draft HRA (2).pdf]]:26:suspended passage) and excavation works of the dock [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA (2).pdf|MLA202000506 and MLA202000507 Draft HRA (2).pdf]]:26: localised increase in suspended half of the river cross section, to prevent [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA (2).pdf|MLA202000506 and MLA202000507 Draft HRA (2).pdf]]:27: Changes in suspended sediment (water clarity) submitted with this application. Licence application [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA (2).pdf|MLA202000506 and MLA202000507 Draft HRA (2).pdf]]:29: from suspended sediment. [[this>Teesworks/Planning/MLA_2020_00506/Consultations/EA MLA_2020_00506 v2 29 June 2021 OFFICIAL.pdf|EA MLA_2020_00506 v2 29 June 2021 OFFICIAL.pdf]]:2:are realised in respect to elevated concentrations of suspended solids. [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf]]:3: i. Changes in marine water quality (i.e. increased suspended sediment) due to dredging [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf]]:6: season (e.g. salmon), as a result of increased suspended sediment concentrations, poor water [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf]]:7: suspended sediment concentrations and the extent of the plume across the river channel will be [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf]]:7: conditions are present (Sigler et al., 1984; Bash et al., 2001). The effects of suspended sediment [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf]]:7: relevant, suspended sediment-generated turbidities. [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf]]:12:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine an estuarine [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf]]:12:Bash, J., Berman, C. and Bolton, S. (2001). Effects of Turbidity and Suspended Solids on Salmonids. [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf]]:12:Berg, L. (1982). The effect of exposure to short-term pulses of suspended sediment on the behaviour [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf]]:12:Berli, B.I. et al. (2014). Acute exposure to a common suspended sediment affects the swimming [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf]]:12:Gilmour, J. (1999). Experimental investigation into the effects of suspended sediment on fertilisation, [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf]]:14:Elevated concentrations of suspended sediment can have the following physical effects on all life stage [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf]]:14: suspended sediment concentration, water velocity and gill dimensions (Appleby and Scarratt, [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf]]:15: v. Re-suspension of sediments causes nutrient enrichment promoting the formation of algal [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf]]:15: vi. Resuspension of sediments resulting from dredging can smother organisms and hinder [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:2: To restrict suspended sediment [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:2:potential monitoring of suspended solid concentrations (hereafter “SSC”) and associated active [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:2:dredging associated with the South Bank project that sediment suspended within the dredging plumes will [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:3:in suspension by the prevailing currents (for finer-grained sediment fractions) (Royal HaskoningDHV, [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:3:Figure 2-1 Maximum enhanced suspended solids concentrations (near surface layer) arising from dredging activities during Phase [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:4:maximum concentrations of suspended solids for all projects are predicted to be localised to the dredging [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:5:In terms of the baseline suspended solids, concentrations are generally low within the estuary and within [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:5:the tidal sequence, the highest suspended sediment levels occur close to high water. After storm periods, [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:5:higher concentrations of suspended sediment have been noted around the Shell Jetty, but with little [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:6:being The Effects of Turbidity and Suspended Sediments on ESA-Listed Species from Projects Occurring [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:6:in the analysis of projects that generate suspended sediments. Concentrations in the literature are not, [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:7:in a laboratory as the water sample has to be filtered to determine the dry weight of suspended solids per [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:8: • Site 1: this site would reflect concentrations of suspended solids on the east side of the channel. [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:8: • Site 2: this site would reflect concentrations of suspended solids on the west side of the channel. [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:10: 4. NOAA Fisheries (2018) The effects of turbidity and suspended sediments on ESA-Listed [[this>Teesworks/Planning/MLA_2020_00506/Consultations/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:11: 8. Wilber DH, Clarke, DG. 2001. Biological effects of suspended sediments: a review of suspended [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf|20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf]]:1: 5.2. The effects of turbidity and suspended sediments on ESA-Listed Species from Projects [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf|20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf]]:2: (e.g., increased suspended sediment concentrations, poor water quality and underwater [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf|20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf]]:3: oxygen, turbidity and suspended sediment concentrations (SSC) levels falls outside my [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf|20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf]]:3: • Site 1: this site would reflect concentrations of suspended solids on the east side of the [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf|20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf]]:4: • Site 2: this site would reflect concentrations of suspended solids on the west side of the [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf|20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf]]:5: effects occurred in adult fish during 24 hours of exposure to suspended sediment up to 1,000 [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf|20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf]]:6: been acknowledged that suspended sediment will fall to the riverbed within the dredged areas [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf|20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf]]:9:Reason: To restrict suspended sediment plumes to one side of the estuary at a time, in order to [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf|20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf]]:10:UWN from piling or SSC from dredging) whilst waiting in refuges areas. The effects of suspended [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf|20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf]]:10:to environmentally relevant, suspended sediment-generated turbidities. [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf|20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf]]:10:Elevated concentrations of suspended sediment can have the following physical effects on all life [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf|20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf]]:10: suspended sediment concentration, water velocity and gill dimensions (Appleby and [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf|20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf]]:11: v. Re-suspension of sediments causes nutrient enrichment promoting the formation of algal [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf|20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf]]:11: vi. Resuspension of sediments resulting from dredging can smother organisms and hinder [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf|20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf]]:11:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine an estuarine fish [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf|20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf]]:11:Bash, J., Berman, C. and Bolton, S. (2001). Effects of Turbidity and Suspended Solids on Salmonids. [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf|20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf]]:11:Berg, L. (1982). The effect of exposure to short-term pulses of suspended sediment on the behaviour of [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf|20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf]]:11:Berli, B.I. et al. (2014). Acute exposure to a common suspended sediment affects the swimming performance [[this>Teesworks/Planning/MLA_2020_00506/Consultations/20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf|20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf]]:11:Gilmour, J. (1999). Experimental investigation into the effects of suspended sediment on fertilisation, larval [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA_2020_00506_1 South Bank Wharf Variation Response FINAL 392938.pdf|MLA_2020_00506_1 South Bank Wharf Variation Response FINAL 392938.pdf]]:3:licenced activities then any piling works must be suspended. Once temperatures have not reached [[this>Teesworks/Planning/MLA_2020_00506/Consultations/338486 - 338489, NE formal response to SBW MLA, 29.01.21 (1).pdf|338486 - 338489, NE formal response to SBW MLA, 29.01.21 (1).pdf]]:4: To restrict suspended sediment plumes to one side of the estuary at a time, and [[this>Teesworks/Planning/MLA_2020_00506/Consultations/338486 - 338489, NE formal response to SBW MLA, 29.01.21 (1).pdf|338486 - 338489, NE formal response to SBW MLA, 29.01.21 (1).pdf]]:6: To restrict suspended sediment plumes to one side of the estuary at a time, in [[this>Teesworks/Planning/MLA_2020_00506/Consultations/338486 - 338489, NE formal response to SBW MLA, 29.01.21 (1).pdf|338486 - 338489, NE formal response to SBW MLA, 29.01.21 (1).pdf]]:7: works must be suspended. Once temperatures have not reached zero degrees [[this>Teesworks/Planning/MLA_2020_00506/Consultations/338486 - 338489, NE formal response to SBW MLA, 29.01.21 (1).pdf|338486 - 338489, NE formal response to SBW MLA, 29.01.21 (1).pdf]]:9: suspended sediment [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA.pdf|MLA202000506 and MLA202000507 Draft HRA.pdf]]:8:suspended solids by the proposed dredge. The occurrence of almost daily [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA.pdf|MLA202000506 and MLA202000507 Draft HRA.pdf]]:8: • Common Tern (B) suspended sediments during dredging represents a very localised, [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA.pdf|MLA202000506 and MLA202000507 Draft HRA.pdf]]:8: temporary and short-term disturbance, with any suspended sediment [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA.pdf|MLA202000506 and MLA202000507 Draft HRA.pdf]]:9: the effects of the proposed scheme may increase suspended [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA.pdf|MLA202000506 and MLA202000507 Draft HRA.pdf]]:18: • Common Tern (B) suspended sediments during dredging represents a very localised, [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA.pdf|MLA202000506 and MLA202000507 Draft HRA.pdf]]:18: temporary and short-term disturbance, with any suspended [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA.pdf|MLA202000506 and MLA202000507 Draft HRA.pdf]]:19: Changes in suspended sediment (water clarity) submitted with this application. Licence application [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA.pdf|MLA202000506 and MLA202000507 Draft HRA.pdf]]:22:changes in suspended sediments (water clarity). [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA.pdf|MLA202000506 and MLA202000507 Draft HRA.pdf]]:25:suspended passage) and excavation works of the dock [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA.pdf|MLA202000506 and MLA202000507 Draft HRA.pdf]]:25: localised increase in suspended half of the river cross section, to prevent [[this>Teesworks/Planning/MLA_2020_00506/Consultations/MLA202000506 and MLA202000507 Draft HRA.pdf|MLA202000506 and MLA202000507 Draft HRA.pdf]]:26: Changes in suspended sediment (water clarity) submitted with this application. Licence application [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:32: • Suspended deck. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:32:A piled suspended deck structure would be technically feasible, however this option would require more [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:32:suspended deck option also reduces the potential for the incorporation of environmental enhancement [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:32:such as ‘verti-pools’. The suspended deck also offers reduced future flexibility compared to the combi-piled [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:32:suspended deck should STDC seek to increase the load rating of the quay in the future. The suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:53: as stop start thresholds for parameters such as suspended sediment and 13 and Section 7 [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:54:1989 between waves, tides and suspended mud HR Wallingford, 1989 [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:57: and suspended mud concentrations [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:60: predict movement of suspended sediment from the proposed dredging and disposal activities by [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:81:Suspended sediment concentrations [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:81:In general, suspended sediment concentrations (SSCs) are low within the estuary and within Tees Bay. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:81:the highest suspended sediment levels occur close to high water. After storm periods, higher concentrations [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:81:of suspended sediment have been noted around the Shell Jetty, but with little penetration further up the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:81: Suspended sediment concentrations (mg/l) [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:84:concentrations in Tees Bay are raised by the re-suspension of material from the seabed during storm events. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:84:induced currents, vessel induced forces and re-suspension by dredging operations. These last two were [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:84:be re-suspended and moved further upstream into the estuary. Inputs to the system can be summarised [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:85: when concentrations in Tees Bay are raised by the resuspension of material from the seabed during [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:91:changes in bed thickness when the suspended sediment falls from the plume to become deposited on the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:110:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:110:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents (for [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:112:material will become re-suspended by tidal currents or dredged during maintenance campaigns of the river [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:113:re-suspended by tidal currents or will be removed during maintenance dredging campaigns of the river [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:118:as some material falls relatively quickly to the sea bed whilst the material remaining in suspension starts to [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:118:transport it in suspension in the water column in the appropriate direction of dispersion (i.e. to the north- [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:122:relatively quickly to the sea bed whilst the material remaining in suspension starts to further disperse in [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:131:and all sediment particles suspended in the water column will eventually settle to the river or seabed, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:131:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:141:maintenance dredging is likely to be due to the low levels of suspended sediment measured in this reach of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:143: including stop / start thresholds for parameters such as suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:156:In general, suspended sediment concentrations are low within the estuary and within Tees Bay. The highest [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:156:downstream. In the vicinity of the proposed scheme (i.e. in the Tees Dock area) suspended solid [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:156:within the estuary) and analysed in the laboratory for suspended sediment concentrations. The results [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:156:this period, concentrations of suspended sediment were very low. It should be noted however, that the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:156:Table 7.8 Suspended sediment concentrations recorded at Transect T8 in July 2020 [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:156: Suspended sediment concentrations (mg/l) [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:157:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:158:Figure 7. 3 Plume of suspended sediment concentrations arising from dredging activities during Stage 2 [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:160:Figure 7. 5 Plume of suspended sediment concentrations arising from dredging activities during Stage [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:161:Figure 7.6 Plume of enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:161:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:162:Figure 7.7 Timeseries of changes in suspended sediment concentrations at water quality monitoring [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:162:Only point 3 (Smiths Dock – Figure 7.2) experiences elevated levels of suspended solids and only during [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:164: Calculated loss of sediment derived using indicative values for the mass of sediment resuspended per m 3 of dredged material in CIRIA guidance (John et al., 1999) in kg/m3. Worst case S-Factor for [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:166: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:166:Dock water quality monitoring point (point 3) could experience elevated levels of suspended solid [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:167:As these works progress, there is the potential for sediment to be suspended when working in and around [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:167:the riverbed. However, any increases in suspended solids concentrations are likely to be highly localised [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:191: • Impacts on marine ecology from increased suspended sediment during capital dredging and [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:210:9.5.2 Effects of increased suspended sediment concentrations during dredging [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:210:will disturb sediment, which will result in localised and short-term increases in suspended sediment [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:210:ecology as a result of increased concentrations of suspended sediment within the water column (i.e. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:210:resuspended sediment which does not contain elevations beyond Action Level 2). The dredged sediment [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:210:filter feeding molluscs). In addition, high concentrations of suspended sediment may impact on fish through [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:210:Mean background suspended solid levels in the vicinity of the proposed scheme (based on metocean [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:211:during spring tides (Section 7.4.2). These are considerably lower than suspended sediment concentrations [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:211:For both types of dredger (backhoe and TSHD), peak suspended solids concentrations are predicted in the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:211:suspended sediment concentrations depending on the stage of dredging (as described in Section 6). In all [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:211:importance (where information is available) to increases in suspended sediment. This information is [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:211:S. spinulosa relies on suspended particles for its tube growth. Increased suspended sediment [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:211:to increases in suspended sediment concentrations, according to this sensitivity review. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:211:sediment likely gets resuspended regularly, and where accretion rates and moderate to high. A. islandica [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:211:resilience and is not sensitive to changes in suspended solids (Tyler-Walters & Sabatini, 2017). [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:211:the proposed dredge is considered to be of low sensitivity to increases in suspended sediment. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:212:resistance and resilience to changes in suspended sediment and was reported to be not sensitive (to [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:212:changes in suspended sediment) (De-Bastos, 2016). As such, for the purposes of this assessment, the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:212:Given the temporary and localised nature of the predicted increase in suspended sediment, in addition to [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:212:the low/very low sensitivity of the key species present in the estuary to increased suspended sediment, an [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:212:During the capital dredging a proportion of the material that is dredged would be disturbed and re-suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:212:is 32.5ha. This is expected to cause a very limited extent of suspended sediment concentrations, and [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:212:Some of the sediment that is suspended as a result of the dredging activities will be deposited to the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:212:suspension by the prevailing currents (for finer-grained sediment fractions) (Section 6). The modelling [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:212:carried out on this, as reported in Section 6, indicates that much of the resuspended sediment is deposited [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:213:and any species of conservation importance (where information is available) to increases in suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:213:A sudden smothering of 5cm of sediment would temporarily suspend the feeding and respiration of A. alba [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:240:Infrastructure and placement of rock into the berth pocket) would result in an increase in suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:240:relied upon solely. Therefore, any increases in suspended sediments during dredging or other activities will [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:240:disturbance and temporary loss of seabed habitat; increased suspended sediment concentrations and [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:297:tern species as a result of increased suspended sediments during the construction phase. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:297:and re-suspension of sediment (Cook and Burton, 2010). However, common terns typically only dive to 1m [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:298:in suspension from the point of release. Most falls within the dredged areas, whilst deposition elsewhere is [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:309: thresholds for parameters such as suspended sediment and [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:318:dredging, is provided in Section 6. The peak suspended sediment concentration within the Tees during the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:319:of suspended sediments are predicted to decrease significantly with increased distance from the dredging [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:478:to the seabed whilst the material remaining in suspension starts to further disperse in spatial extent. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:478:longer, until the subsequent ebb or flood phase of the tide starts to transport it in suspension in the water [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:482: Increase in suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:482:sensitive to smothering or increases in suspended sediment. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:488:The offshore disposal of dredged material would temporarily increase the suspended sediment [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:488:relied upon solely. Therefore, any increases in suspended sediments will have a negligible impact on [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:488:temporary loss of seabed habitat, increased suspended sediment concentrations and sediment re- [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:490:disturbance and increased suspended sediments on migratory fish). [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:500: • dispersion of suspended sediment during capital dredging and deposition at the offshore disposal [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:500:(increased suspended sediment concentrations) are relevant to the CIA. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:500:Dispersion of suspended sediment and deposition on the seabed during capital dredging [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:500:immediately after the period of construction. This is because fine material will be released into suspension, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:501:27.3 presents a summary of the results of the predictive modelling of suspended sediment concentration [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:501:A review of all EIA studies for the above projects highlights that the maximum increase in suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:501:resulting in a significantly reduced concentration of suspended sediment beyond the source of the plume. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:503: • effect of increases in suspended sediments during maintenance dredging on food resources of SPA [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:503:Mitigation measures to limit the suspension of sediment and subsequent deposition of sediment during [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:503:into a sealed barge) for dredging of unconsolidated material to minimise resuspension in the water column. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:506: • dispersion of suspended sediment during marine works, dredging and disposal; and, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:513:into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension in the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:526: 24.Reduce sediment resuspension [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:528: suspended solids [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:528: The installation and presence of the rock impacted is less than suspended solids [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:532:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:532:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:534:Figure 28.4 Timeseries of changes in suspended sediment concentrations at water quality monitoring [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:534:Only water quality monitoring point WQ3 (Smiths Dock) shows elevated levels of suspended solid [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:534:The resuspension of sediment could also potentially affect dissolved oxygen levels in the water. This is due [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:535: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:535:increases in suspended solids concentrations above baseline (up to 85mg/l which decreases to baseline [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:535:suspended solids when in close proximity to the dredger. As a result, a non-temporary deterioration in water [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:537:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:537:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents for [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:538:An increase in suspended sediment in the water column may lead to physiological effects in finfish, including [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:538:to increased suspended solids is low, according to the MarLIN sensitivity scoring index. Mobile species [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:539: Reduce sediment resuspension disposal activities currently ongoing. Disposal would be [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:541: Reduce sediment resuspension [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:542: Reduce sediment resuspension [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:545:maximum concentrations of suspended solids are localised to the dredging activity and quickly disperse [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:549:suspended sediment thus reducing the risk of significant water quality effects. Mitigation measures to [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:572:river dredging are characterised by a short-lived localised increase in suspended sediment concentrations [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:584:low, with any effect confined to the footprint of the proposed dredge. The predicted increase in suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:584:loading into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:588:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine and estuarine fish [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf]]:592:HR Wallingford (1989a). Tees Weir Feasibility Study - Correlation between waves, tides and suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-34.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-34.pdf]]:2:that the most important potential coastal process impact would be changes in suspended sediment plumes, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-34.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-34.pdf]]:2:suspended sediment plumes; that being each disposal within the licensed disposal site being released at [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-34.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-34.pdf]]:16:suspended sediment from any stage of the dredging). It is important to note that this type of figure does [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-22UK1862_SouthBankTees_NRA_Addendum_Issue_01-50.pdf|MLA_2020_00506-22UK1862_SouthBankTees_NRA_Addendum_Issue_01-50.pdf]]:9:operations temporarily suspended. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-25.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-25.pdf]]:2:that the most important potential coastal process impact would be changes in suspended sediment plumes, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-25.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-25.pdf]]:2:suspended sediment plumes; that being each disposal within the licensed disposal site being released at [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-25.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-25.pdf]]:16:suspended sediment from any stage of the dredging). It is important to note that this type of figure does [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-EN-SB-ME-EV-1144-MLA.2022.00506.2 South Bank Quay FIR 20 Response.pdf|MLA_2020_00506-PC1084-RHD-EN-SB-ME-EV-1144-MLA.2022.00506.2 South Bank Quay FIR 20 Response.pdf]]:6:Cefas fisheries advisors have raised concerns in relation to impacts on fish from increased suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-EN-SB-ME-EV-1144-MLA.2022.00506.2 South Bank Quay FIR 20 Response.pdf|MLA_2020_00506-PC1084-RHD-EN-SB-ME-EV-1144-MLA.2022.00506.2 South Bank Quay FIR 20 Response.pdf]]:6:additional dredged material is likely to compare with the suspended sediment concentrations and plumes [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-EN-SB-ME-EV-1144-MLA.2022.00506.2 South Bank Quay FIR 20 Response.pdf|MLA_2020_00506-PC1084-RHD-EN-SB-ME-EV-1144-MLA.2022.00506.2 South Bank Quay FIR 20 Response.pdf]]:7:comparison of the suspended sediment concentrations and plumes modelled within the original EIA, with [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-EN-SB-ME-EV-1144-MLA.2022.00506.2 South Bank Quay FIR 20 Response.pdf|MLA_2020_00506-PC1084-RHD-EN-SB-ME-EV-1144-MLA.2022.00506.2 South Bank Quay FIR 20 Response.pdf]]:7:Please provide a side-by-side comparison of the suspended sediment concentrations and plumes [[this>Teesworks/Planning/MLA_2020_00506/PC1084-RHD-SB-EN-NT-EV-1124 Updated Scheme of Monitoring - May 2022.pdf|PC1084-RHD-SB-EN-NT-EV-1124 Updated Scheme of Monitoring - May 2022.pdf]]:1:dredging associated with the South Bank Quay project that sediment suspended within the dredging [[this>Teesworks/Planning/MLA_2020_00506/PC1084-RHD-SB-EN-NT-EV-1124 Updated Scheme of Monitoring - May 2022.pdf|PC1084-RHD-SB-EN-NT-EV-1124 Updated Scheme of Monitoring - May 2022.pdf]]:2:is carried in suspension by the prevailing currents (for finer-grained sediment fractions). Near surface [[this>Teesworks/Planning/MLA_2020_00506/PC1084-RHD-SB-EN-NT-EV-1124 Updated Scheme of Monitoring - May 2022.pdf|PC1084-RHD-SB-EN-NT-EV-1124 Updated Scheme of Monitoring - May 2022.pdf]]:2:Figure 2.1 Maximum enhanced suspended solids concentrations (near surface layer) arising from dredging [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf]]:4:Figure 3-5 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf]]:4:Figure 3-6 Maximum enhanced suspended sediment concentrations (near-surface layer)arising [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf]]:4:Figure 3-7 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf]]:4:Figure 3-8 Maximum enhanced suspended sediment concentrations (near-surface layer) arising [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf]]:4:Figure 3-11 Maximum enhanced suspended sediment concentrations (near-bed layer) arising [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf]]:4:Figure 3-12 Maximum enhanced suspended sediment concentrations (near-bed layer) arising [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf]]:4:Figure 3-13 Maximum enhanced suspended sediment concentrations (near-bed layer) arising [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf]]:5: movement of suspended sediment from the proposed dredging and disposal activities by coupling with [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf]]:9:South Bank Wharf development project that was undertaken to investigate the suspended sediment [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf]]:10:The sediment dispersion model has been setup with four layers in order to differentiate between suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf]]:17: Figure 3-5 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from dredging activities under the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf]]:18:Figure 3-6 Maximum enhanced suspended sediment concentrations (near-surface layer)arising from dredging activities under the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf]]:19:Figure 3-7 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from dredging activities under the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf]]:20: Figure 3-8 Maximum enhanced suspended sediment concentrations (near-surface layer) arising from dredging activities under the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf]]:23: Figure 3-11 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from disposal activities under the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf]]:24: Figure 3-12 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from disposal activities under the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf]]:25: Figure 3-13 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from disposal activities under the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf]]:29:plumes will disperse under wave and current action and all sediment particles suspended in the water [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:3:topic areas, I note that the Applicant considers that only potential increases in suspended sediment and effects upon water quality are likely [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:4:The reason for this is that increases in suspended sediment concentration in the water column and plumes of suspended sediment created [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:4:is likely that greater concentrations of non-consolidated finer sediments, such as clay, will remain suspended in the water column for longer [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:4:fisheries advisors raised concerns in relation to impacts on fish from increased suspended sediment concentrations repeatedly during [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:4:discussion of how the additional dredged material is likely to compare with the suspended sediment concentrations and plumes modelled [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:4:boundary has the potential to cause the resuspension of contaminated sediments. In particular, where consolidated clay is removed, organic [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:4:organic contaminants and materials (Kemp et al., 2011). Such increases in bioavailability of contaminants through resuspension of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:4:the resuspension of contaminated sediments. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:5:suspended sediment into the water column, thus it may be likely that greater concentrations of suspended sediments are observed as a [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:5:result of this method. Suspended sediment is of concern in relation to fish receptors for the reasons outlined in comment 20 above, and in [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:5:However, elevated suspended sediment concentrations also have the potential to deplete levels of dissolved oxygen (DO) in the water [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:7: suspended sediment concentrations and plumes modelled within the original EIA. The MMO do not require additional modelling at this [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:7: in proximity to the contaminated material boundary is proposed to minimise the resuspension of contaminated sediments. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:8: Increased suspended sediment concentration (SSC) can affect an organism’s filter-feeding mechanisms and its ability to respire and excrete. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:9:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine and estuarine fish and shellfish with special reference [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:9:Berg, L. (1982). The effect of exposure to short-term pulses of suspended sediment on the behaviour of juvenile salmonids. In: Hartman, G.F. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:9:Gilmour, J. (1999). Experimental investigation into the effects of suspended sediment on fertilisation, larval survival and settlement in a [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:9:Goldes, S.A., Ferguson, H.W., Moccia, R.D. and Daoust, P.Y., (1988). Histological effects of the inert suspended clay kaolin on the gills of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:11:again upon their return to the sea after spawning. Elevated concentrations of suspended sediment resulting from dredging and disposal of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:11: depends on size and shape of particles, suspended sediment concentration, water velocity and gill dimensions (Appleby and Scarratt, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:12:V. Re-suspension of sediments causes nutrient enrichment promoting the formation of algal blooms, causing a reduction in water quality [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf|MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf]]:12:VI. Resuspension of sediments resulting from dredging can smother organisms and hinder growth, feeding and survival rates (Gilmour [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:3:2.2.3 Suspended solid concentrations 10 [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:3:3.2.2 Effects of increased suspended sediment concentrations during dredging on marine species and [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:11:the re-suspension of sediment as the material is removed. An enclosed grab results in virtually no release [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:13:values (Environment Agency. 2019). The assessment uses the predicted concentrations of suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:14:2.2.3 Suspended solid concentrations [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:14:The tool requires the input of predicted suspended solids concentrations arising from the dredge plume. For [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:14:levels of suspended solids over baseline during Stage 2 of the proposed dredging schedule, when the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:15:Figure 2.2 Stage 2 dredging results for suspended solids concentrations when dredger is located on the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:15:Figure 2.3 shows the predicted suspended solid concentrations at selected water quality monitoring points [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:15:85mg/l is transitory and only predicted to occur once during this period, a more representative suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:16:Figure 2.3 Time series of changes in suspended sediment concentrations at water quality monitoring [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:16:achieved when suspended sediment concentrations reduce to 31mg/l (see maximum acceptable sediment [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:16:uplift column in Appendix 2). It can be seen in Figure 2.2 that the suspended sediment plume is predicted [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:16:to be relatively localised to the dredging activity and suspended sediment concentrations reduce to typically [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:16:when suspended solid concentrations reach the predicted peak at 85mg/l, EQS failure is possible. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:16:Concentrations of fluoranthene are only predicted to reach EQS when suspended solids concentrations [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:17:concentrations of suspended solids; rather, they are predicted to remain in close proximity to the dredging [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:24:and capital dredging, effects from increased suspended sediment concentrations, and effects from [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:25: increased suspended sediment “Effects of smothering following [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:25: physical removal of Changes in suspended sediment Smothering [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:26: increased suspended sediment “Effects of smothering following [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:26: physical removal of Changes in suspended sediment Smothering [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:27:3.2.2 Effects of increased suspended sediment concentrations during dredging [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:27:microscopic stages of the seaweeds during recruitment can be affected by changes in suspended solids, at [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:27:the benchmark used for the sensitivity assessment. This benchmark for changes in suspended solids is “a [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:27:suspended sediment during dredging is expected to be in the form of a narrow plume within the river, which [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:27:suspended sediment concentrations to a level that will change the WFD scale for one year (the benchmark [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:27:Although the intertidal fucoid biotopes are of medium sensitivity to changes to suspended sediments, the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:28:receptors from increased suspended sediments remains at negligible significance. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:229: suspension is measured using a Jenway Model 3510 pH meter fitted with a combination pH [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf]]:319: resuspension through expulsion of loose pseudofaeces directly into the water column [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_Cefas_comments_for_action_RFI_19.pdf|MLA_2020_00506-MLA_2020_00506_2_Cefas_comments_for_action_RFI_19.pdf]]:3: suspended sediment concentrations during previous consultations, and I noted in my previous [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_Cefas_comments_for_action_RFI_19.pdf|MLA_2020_00506-MLA_2020_00506_2_Cefas_comments_for_action_RFI_19.pdf]]:3: suspended sediment concentrations and plumes modelled within the original EIA, in order for [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA_2020_00506_2_Cefas_comments_for_action_RFI_19.pdf|MLA_2020_00506-MLA_2020_00506_2_Cefas_comments_for_action_RFI_19.pdf]]:3: and I would ask the Applicant to please provide a side-by-side comparison of the suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:32: • Suspended deck. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:32:A piled suspended deck structure would be technically feasible, however this option would require more [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:32:suspended deck option also reduces the potential for the incorporation of environmental enhancement [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:32:such as ‘verti-pools’. The suspended deck also offers reduced future flexibility compared to the combi-piled [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:32:suspended deck should STDC seek to increase the load rating of the quay in the future. The suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:53: as stop start thresholds for parameters such as suspended sediment and 13 and Section 7 [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:54:1989 between waves, tides and suspended mud HR Wallingford, 1989 [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:57: and suspended mud concentrations [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:60: predict movement of suspended sediment from the proposed dredging and disposal activities by [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:81:Suspended sediment concentrations [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:81:In general, suspended sediment concentrations (SSCs) are low within the estuary and within Tees Bay. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:81:the highest suspended sediment levels occur close to high water. After storm periods, higher concentrations [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:81:of suspended sediment have been noted around the Shell Jetty, but with little penetration further up the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:81: Suspended sediment concentrations (mg/l) [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:84:concentrations in Tees Bay are raised by the re-suspension of material from the seabed during storm events. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:84:induced currents, vessel induced forces and re-suspension by dredging operations. These last two were [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:84:be re-suspended and moved further upstream into the estuary. Inputs to the system can be summarised [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:85: when concentrations in Tees Bay are raised by the resuspension of material from the seabed during [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:91:changes in bed thickness when the suspended sediment falls from the plume to become deposited on the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:110:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:110:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents (for [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:112:material will become re-suspended by tidal currents or dredged during maintenance campaigns of the river [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:113:re-suspended by tidal currents or will be removed during maintenance dredging campaigns of the river [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:118:as some material falls relatively quickly to the sea bed whilst the material remaining in suspension starts to [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:118:transport it in suspension in the water column in the appropriate direction of dispersion (i.e. to the north- [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:122:relatively quickly to the sea bed whilst the material remaining in suspension starts to further disperse in [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:131:and all sediment particles suspended in the water column will eventually settle to the river or seabed, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:131:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:141:maintenance dredging is likely to be due to the low levels of suspended sediment measured in this reach of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:143: including stop / start thresholds for parameters such as suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:156:In general, suspended sediment concentrations are low within the estuary and within Tees Bay. The highest [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:156:downstream. In the vicinity of the proposed scheme (i.e. in the Tees Dock area) suspended solid [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:156:within the estuary) and analysed in the laboratory for suspended sediment concentrations. The results [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:156:this period, concentrations of suspended sediment were very low. It should be noted however, that the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:156:Table 7.8 Suspended sediment concentrations recorded at Transect T8 in July 2020 [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:156: Suspended sediment concentrations (mg/l) [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:157:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:158:Figure 7. 3 Plume of suspended sediment concentrations arising from dredging activities during Stage 2 [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:160:Figure 7. 5 Plume of suspended sediment concentrations arising from dredging activities during Stage [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:161:Figure 7.6 Plume of enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:161:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:162:Figure 7.7 Timeseries of changes in suspended sediment concentrations at water quality monitoring [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:162:Only point 3 (Smiths Dock – Figure 7.2) experiences elevated levels of suspended solids and only during [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:164: Calculated loss of sediment derived using indicative values for the mass of sediment resuspended per m 3 of dredged material in CIRIA guidance (John et al., 1999) in kg/m3. Worst case S-Factor for [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:166: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:166:Dock water quality monitoring point (point 3) could experience elevated levels of suspended solid [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:167:As these works progress, there is the potential for sediment to be suspended when working in and around [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:167:the riverbed. However, any increases in suspended solids concentrations are likely to be highly localised [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:191: • Impacts on marine ecology from increased suspended sediment during capital dredging and [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:210:9.5.2 Effects of increased suspended sediment concentrations during dredging [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:210:will disturb sediment, which will result in localised and short-term increases in suspended sediment [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:210:ecology as a result of increased concentrations of suspended sediment within the water column (i.e. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:210:resuspended sediment which does not contain elevations beyond Action Level 2). The dredged sediment [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:210:filter feeding molluscs). In addition, high concentrations of suspended sediment may impact on fish through [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:210:Mean background suspended solid levels in the vicinity of the proposed scheme (based on metocean [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:211:during spring tides (Section 7.4.2). These are considerably lower than suspended sediment concentrations [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:211:For both types of dredger (backhoe and TSHD), peak suspended solids concentrations are predicted in the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:211:suspended sediment concentrations depending on the stage of dredging (as described in Section 6). In all [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:211:importance (where information is available) to increases in suspended sediment. This information is [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:211:S. spinulosa relies on suspended particles for its tube growth. Increased suspended sediment [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:211:to increases in suspended sediment concentrations, according to this sensitivity review. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:211:sediment likely gets resuspended regularly, and where accretion rates and moderate to high. A. islandica [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:211:resilience and is not sensitive to changes in suspended solids (Tyler-Walters & Sabatini, 2017). [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:211:the proposed dredge is considered to be of low sensitivity to increases in suspended sediment. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:212:resistance and resilience to changes in suspended sediment and was reported to be not sensitive (to [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:212:changes in suspended sediment) (De-Bastos, 2016). As such, for the purposes of this assessment, the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:212:Given the temporary and localised nature of the predicted increase in suspended sediment, in addition to [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:212:the low/very low sensitivity of the key species present in the estuary to increased suspended sediment, an [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:212:During the capital dredging a proportion of the material that is dredged would be disturbed and re-suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:212:is 32.5ha. This is expected to cause a very limited extent of suspended sediment concentrations, and [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:212:Some of the sediment that is suspended as a result of the dredging activities will be deposited to the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:212:suspension by the prevailing currents (for finer-grained sediment fractions) (Section 6). The modelling [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:212:carried out on this, as reported in Section 6, indicates that much of the resuspended sediment is deposited [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:213:and any species of conservation importance (where information is available) to increases in suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:213:A sudden smothering of 5cm of sediment would temporarily suspend the feeding and respiration of A. alba [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:240:Infrastructure and placement of rock into the berth pocket) would result in an increase in suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:240:relied upon solely. Therefore, any increases in suspended sediments during dredging or other activities will [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:240:disturbance and temporary loss of seabed habitat; increased suspended sediment concentrations and [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:297:tern species as a result of increased suspended sediments during the construction phase. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:297:and re-suspension of sediment (Cook and Burton, 2010). However, common terns typically only dive to 1m [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:298:in suspension from the point of release. Most falls within the dredged areas, whilst deposition elsewhere is [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:309: thresholds for parameters such as suspended sediment and [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:318:dredging, is provided in Section 6. The peak suspended sediment concentration within the Tees during the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:319:of suspended sediments are predicted to decrease significantly with increased distance from the dredging [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:478:to the seabed whilst the material remaining in suspension starts to further disperse in spatial extent. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:478:longer, until the subsequent ebb or flood phase of the tide starts to transport it in suspension in the water [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:482: Increase in suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:482:sensitive to smothering or increases in suspended sediment. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:488:The offshore disposal of dredged material would temporarily increase the suspended sediment [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:488:relied upon solely. Therefore, any increases in suspended sediments will have a negligible impact on [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:488:temporary loss of seabed habitat, increased suspended sediment concentrations and sediment re- [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:490:disturbance and increased suspended sediments on migratory fish). [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:500: • dispersion of suspended sediment during capital dredging and deposition at the offshore disposal [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:500:(increased suspended sediment concentrations) are relevant to the CIA. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:500:Dispersion of suspended sediment and deposition on the seabed during capital dredging [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:500:immediately after the period of construction. This is because fine material will be released into suspension, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:501:27.3 presents a summary of the results of the predictive modelling of suspended sediment concentration [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:501:A review of all EIA studies for the above projects highlights that the maximum increase in suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:501:resulting in a significantly reduced concentration of suspended sediment beyond the source of the plume. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:503: • effect of increases in suspended sediments during maintenance dredging on food resources of SPA [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:503:Mitigation measures to limit the suspension of sediment and subsequent deposition of sediment during [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:503:into a sealed barge) for dredging of unconsolidated material to minimise resuspension in the water column. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:506: • dispersion of suspended sediment during marine works, dredging and disposal; and, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:513:into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension in the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:526: 24.Reduce sediment resuspension [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:528: suspended solids [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:528: The installation and presence of the rock impacted is less than suspended solids [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:532:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:532:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:534:Figure 28.4 Timeseries of changes in suspended sediment concentrations at water quality monitoring [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:534:Only water quality monitoring point WQ3 (Smiths Dock) shows elevated levels of suspended solid [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:534:The resuspension of sediment could also potentially affect dissolved oxygen levels in the water. This is due [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:535: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:535:increases in suspended solids concentrations above baseline (up to 85mg/l which decreases to baseline [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:535:suspended solids when in close proximity to the dredger. As a result, a non-temporary deterioration in water [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:537:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:537:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents for [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:538:An increase in suspended sediment in the water column may lead to physiological effects in finfish, including [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:538:to increased suspended solids is low, according to the MarLIN sensitivity scoring index. Mobile species [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:539: Reduce sediment resuspension disposal activities currently ongoing. Disposal would be [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:541: Reduce sediment resuspension [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:542: Reduce sediment resuspension [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:545:maximum concentrations of suspended solids are localised to the dredging activity and quickly disperse [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:549:suspended sediment thus reducing the risk of significant water quality effects. Mitigation measures to [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:572:river dredging are characterised by a short-lived localised increase in suspended sediment concentrations [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:584:low, with any effect confined to the footprint of the proposed dredge. The predicted increase in suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:584:loading into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:588:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine and estuarine fish [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:592:HR Wallingford (1989a). Tees Weir Feasibility Study - Correlation between waves, tides and suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-Licence Document (Marine).pdf|MLA_2020_00506-Licence Document (Marine).pdf]]:16: To restrict suspended sediment plumes to one side of the estuary at a time, in order to reduce loss of tern foraging habitat. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-Licence Document (Marine).pdf|MLA_2020_00506-Licence Document (Marine).pdf]]:20:being taken. This can include variation, revocation or suspension of the licence, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:9:demonstrates that the trajectory of suspended sediment is influenced predominantly by river and tidal [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:14: • Effects of increased suspended sediment concentrations during dredging; and [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:15:5.2.2 Effects of increased suspended sediment concentrations during dredging [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:15:concentration of suspended sediment would be between 100-200 mg/L within the immediate vicinity of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:15:cases, the modelling indicates that sediments suspended as a result of dredging activities is predicted to [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:15:suspended sediment concentrations. In light of this, as well as considering the temporary and localised [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:15:nature of the predicted increase in suspended sediment concentrations, the EIA Report concludes an [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:15:effect of negligible significance with regard to increased suspended sediment concentrations. Therefore, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:15:benthic receptors due to deposition of suspended sediments caused by dredging and disposal activities. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:15:This is because of the temporary and localised nature of the predicted increase in suspended sediment [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:15:excavators, the volume of suspended sediment associated with the dredging of this material is expected [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:16:sensitivity of species within the Tees estuary to changes in suspended sediment concentrations, it is [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:16:temporarily suspend the feeding and respiration of this species, it would be able to relocate to its [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:34:Figure 3-5 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:34:Figure 3-6 Maximum enhanced suspended sediment concentrations (near-surface layer)arising [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:34:Figure 3-7 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:34:Figure 3-8 Maximum enhanced suspended sediment concentrations (near-surface layer) arising [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:34:Figure 3-11 Maximum enhanced suspended sediment concentrations (near-bed layer) arising [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:34:Figure 3-12 Maximum enhanced suspended sediment concentrations (near-bed layer) arising [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:34:Figure 3-13 Maximum enhanced suspended sediment concentrations (near-bed layer) arising [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:35: movement of suspended sediment from the proposed dredging and disposal activities by coupling with [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:39:South Bank Wharf development project that was undertaken to investigate the suspended sediment [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:40:The sediment dispersion model has been setup with four layers in order to differentiate between suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:47: Figure 3-5 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from dredging activities under the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:48:Figure 3-6 Maximum enhanced suspended sediment concentrations (near-surface layer)arising from dredging activities under the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:49:Figure 3-7 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from dredging activities under the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:50: Figure 3-8 Maximum enhanced suspended sediment concentrations (near-surface layer) arising from dredging activities under the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:53: Figure 3-11 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from disposal activities under the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:54: Figure 3-12 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from disposal activities under the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:55: Figure 3-13 Maximum enhanced suspended sediment concentrations (near-bed layer) arising from disposal activities under the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf]]:59:plumes will disperse under wave and current action and all sediment particles suspended in the water [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf|MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf]]:8:suspended solids by the proposed dredge. The occurrence of almost daily [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf|MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf]]:8: • Common Tern (B) suspended sediments during dredging represents a very localised, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf|MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf]]:8: temporary and short-term disturbance, with any suspended sediment [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf|MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf]]:9: the effects of the proposed scheme may increase suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf|MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf]]:18: • Common Tern (B) suspended sediments during dredging represents a very localised, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf|MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf]]:18: temporary and short-term disturbance, with any suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf|MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf]]:19: Changes in suspended sediment (water clarity) submitted with this application. Licence application [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf|MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf]]:22:changes in suspended sediments (water clarity). [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf|MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf]]:25:suspended passage) and excavation works of the dock [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf|MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf]]:25: localised increase in suspended half of the river cross section, to prevent [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf|MLA_2020_00506-MLA202000506 and MLA202000507 Final HRA .pdf]]:26: Changes in suspended sediment (water clarity) submitted with this application. Licence application [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1137-MLA.2020.00506.2 South Bank Quay Marine Licence Variation 2 RFI 17-66.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1137-MLA.2020.00506.2 South Bank Quay Marine Licence Variation 2 RFI 17-66.pdf]]:1: 2. Will the removal of bank material via dredging change the level of suspended sediment compared [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1137-MLA.2020.00506.2 South Bank Quay Marine Licence Variation 2 RFI 17-66.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1137-MLA.2020.00506.2 South Bank Quay Marine Licence Variation 2 RFI 17-66.pdf]]:3:current OSPAR line. It is considered that the only potential increases in suspended sediment and effects [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1137-MLA.2020.00506.2 South Bank Quay Marine Licence Variation 2 RFI 17-66.pdf|MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1137-MLA.2020.00506.2 South Bank Quay Marine Licence Variation 2 RFI 17-66.pdf]]:5:3 Suspended Sediment Levels [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-Licence Document (Marine)-45.pdf|MLA_2020_00506-Licence Document (Marine)-45.pdf]]:15: To restrict suspended sediment plumes to one side of the estuary at a time, in order to reduce loss of tern foraging habitat. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-Licence Document (Marine)-45.pdf|MLA_2020_00506-Licence Document (Marine)-45.pdf]]:18:being taken. This can include variation, revocation or suspension of the licence, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-Decision Letter (Marine)-43.pdf|MLA_2020_00506-Decision Letter (Marine)-43.pdf]]:1:fail to comply with all the conditions in the licence we may vary, suspend or revoke your [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-Decision Letter (Marine)-43.pdf|MLA_2020_00506-Decision Letter (Marine)-43.pdf]]:2:suspending or revoking the licence. Our terms and conditions relating to charging can [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-Decision Letter (Marine)-43.pdf|MLA_2020_00506-Decision Letter (Marine)-43.pdf]]:4: Suspended sediment concentrations [[this>Teesworks/Planning/MLA_2020_00506/Return/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:2: To restrict suspended sediment [[this>Teesworks/Planning/MLA_2020_00506/Return/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:2:potential monitoring of suspended solid concentrations (hereafter “SSC”) and associated active [[this>Teesworks/Planning/MLA_2020_00506/Return/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:2:dredging associated with the South Bank project that sediment suspended within the dredging plumes will [[this>Teesworks/Planning/MLA_2020_00506/Return/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:3:in suspension by the prevailing currents (for finer-grained sediment fractions) (Royal HaskoningDHV, [[this>Teesworks/Planning/MLA_2020_00506/Return/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:3:Figure 2-1 Maximum enhanced suspended solids concentrations (near surface layer) arising from dredging activities during Phase [[this>Teesworks/Planning/MLA_2020_00506/Return/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:4:maximum concentrations of suspended solids for all projects are predicted to be localised to the dredging [[this>Teesworks/Planning/MLA_2020_00506/Return/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:5:In terms of the baseline suspended solids, concentrations are generally low within the estuary and within [[this>Teesworks/Planning/MLA_2020_00506/Return/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:5:the tidal sequence, the highest suspended sediment levels occur close to high water. After storm periods, [[this>Teesworks/Planning/MLA_2020_00506/Return/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:5:higher concentrations of suspended sediment have been noted around the Shell Jetty, but with little [[this>Teesworks/Planning/MLA_2020_00506/Return/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:6:being The Effects of Turbidity and Suspended Sediments on ESA-Listed Species from Projects Occurring [[this>Teesworks/Planning/MLA_2020_00506/Return/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:6:in the analysis of projects that generate suspended sediments. Concentrations in the literature are not, [[this>Teesworks/Planning/MLA_2020_00506/Return/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:7:in a laboratory as the water sample has to be filtered to determine the dry weight of suspended solids per [[this>Teesworks/Planning/MLA_2020_00506/Return/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:8: • Site 1: this site would reflect concentrations of suspended solids on the east side of the channel. [[this>Teesworks/Planning/MLA_2020_00506/Return/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:8: • Site 2: this site would reflect concentrations of suspended solids on the west side of the channel. [[this>Teesworks/Planning/MLA_2020_00506/Return/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:10: 4. NOAA Fisheries (2018) The effects of turbidity and suspended sediments on ESA-Listed [[this>Teesworks/Planning/MLA_2020_00506/Return/PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf|PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf]]:11: 8. Wilber DH, Clarke, DG. 2001. Biological effects of suspended sediments: a review of suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-Licence Document (Marine)-58.pdf|MLA_2020_00506-Licence Document (Marine)-58.pdf]]:16: To restrict suspended sediment plumes to one side of the estuary at a time, in order to reduce loss of tern foraging habitat. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-Licence Document (Marine)-58.pdf|MLA_2020_00506-Licence Document (Marine)-58.pdf]]:19:being taken. This can include variation, revocation or suspension of the licence, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf]]:11:localised increase in suspended sediment concentrations by the order of a few hundred mg/l at the point of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf]]:12:A potential impact on water quality has been identified due to the resuspension of sediment, principally as [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf]]:12:relatively limited areas of high suspended solids concentrations, which only occur for a matter of hours at a [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf]]:12:time before the suspended sediment concentrations return to baseline values. No significant impacts are [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf]]:12:resuspension of sediments. Such measures include dredging in long strips to ensure the plume is located [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf]]:13:and capital dredging, increased suspended sediment concentrations and increased sediment deposition. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf]]:13:ecological receptors as a result of increased suspended sediment concentrations or sediment deposition [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf]]:15:Impacts on fish resources within the subtidal area, as a result of increased suspended sediment, would only [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf]]:15:Other water quality issues, such as a reduction in dissolved oxygen or suspension of contaminants, are not [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:61:The re-calibrated 3D Tees Estuary Tidal Model will be used to predict movement of suspended sediment [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:61:(in particular the effect of resuspension and dispersion of sediment during dredging and disposal activities). [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:92: 7.3 Suspended Sediment Conversion .....................................................................................................20 [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:108:7.3 Suspended Sediment Conversion [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:117: Suspended P1983.04.06.D08 - Suspended Solids Lab Results_Spring 24072020 [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:117: Solids P1983.04.06.D09 - Suspended Solids Lab Results_Neap 30072020 [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:137:Figure 5.5: Maximum enhanced suspended sediment concentrations arising from dredging [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:137:Figure 5.6: Maximum enhanced suspended sediment concentrations arising from dredging [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:137:Figure 5.7: Maximum enhanced suspended sediment concentrations arising from dredging [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:137:Figure 5.8: Maximum enhanced suspended sediment concentrations arising from dredging [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:137:Figure 5.9: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:137:Figure 5.10: Maximum enhanced suspended sediment concentrations (near-surface layer) arising [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:137:Figure 5.12: Maximum enhanced suspended sediment concentrations (near-bed layer) arising [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:139: movement of suspended sediment from the proposed dredging and disposal activities by coupling with [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:191:investigate the suspended sediment transport effects of the proposed dredging of the channel and the berth [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:192:The sediment dispersion model has been setup with 4 layers in order to differentiate between suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:200:disposal activities. Note that all the modelling plots in following sections show the elevations in suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:201: Figure 5.5: Maximum enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:202: Figure 5.6: Maximum enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:203: Figure 5.7: Maximum enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:204: Figure 5.8: Maximum enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:205: Figure 5.9: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from dredging activities [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:206: Figure 5.10: Maximum enhanced suspended sediment concentrations (near-surface layer) arising from dredging activities [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:209: Figure 5.12: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from disposal activities [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:210:and all sediment particles suspended in the water column will eventually settle to the river or sea bed, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:211:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:173: Significant operation temporarily suspended). These hazards and associated risk [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:173: 9 - 10 High permanently suspended). These hazards and associated risk control [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:190: injury immediate area within site suspension of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:207: and explosion. term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:207: short-term disruption to term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:207: and disembarkation suspension of commercial [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:208: term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:208: taking additional risks short-term disruption to Temporary suspension of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:208: Reduced visibility. Fire short-term disruption to term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:209: short-term disruption to Temporary suspension of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:209: Cargo Traffic control failure. short-term disruption to Long-term suspension of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:209: Vessel taking additional risks short-term disruption to Temporary suspension of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:213: 3rd party vessel / environmental amenity; suspension of operations or [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:214: dredging operations. Fire suspension of commercial [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:215: Tanker berth 3rd party vessel / suspension of operations or [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:215: 3rd party vessel / suspension of operations or [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:217: General not necessarily met; Bad Medium-term suspension of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:217: Project not necessarily met; Bad Medium-term suspension of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:217: short-term disruption to term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:218: 3rd party vessel / term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:218: 3rd party vessel / term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:223: short-term disruption to suspension of operations, prolonged [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:223: necessarily met; Very publicity. Long-term suspension of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:223: necessarily met; Very publicity. Temporary suspension of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:224: suspension of operations, prolonged [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:224: Temporary suspension of commercial [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:224: term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:225: necessarily met; Very publicity. Temporary suspension of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:225: Cargo control failure. short-term disruption to term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:225: Vessel Temporary suspension of commercial [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:229: avoiding action with environmental amenity; term suspension of operations or [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:230: 3rd party vessel. Fire suspension of commercial activities [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:231: Tanker term suspension of operations or [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:231: publicity. Medium-term suspension [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:232: Cargo Vessel visibility. Result of Very short-term disruption suspension of operations or [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:233: General Power Cables. not necessarily met; Bad Medium-term suspension of in vicinity of overhead cables; [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:233: Project Power Cables. not necessarily met; Bad Medium-term suspension of in vicinity of overhead cables; [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:233: necessarily met; Very publicity. Long-term suspension of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:234: avoiding action with suspension of operations, prolonged [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:234: avoiding action with suspension of operations, prolonged [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:236: large vessel moving in services with ensuing loss within site. Temporary suspension of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:239: failure. Reduced visibility. publicity. Long-term suspension of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:239: criteria not necessarily met; publicity. Long-term suspension of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:240: Pilot boarding and suspension of commercial activities and/or [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:240: operations. Traffic control Very short-term disruption publicity. Long-term suspension of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:240: additional risks during suspension of commercial activities and/or [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:241: Vessel suspension of operations, prolonged [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:241: Dredgers) Temporary suspension of commercial [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:241: Project Cargo operations. Traffic control Very short-term disruption suspension of operations, prolonged [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:242: Vessel additional risks during suspension of commercial activities and/or [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:245: with 3rd party vessel / environmental amenity; suspension of operations or prolonged [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:246: short-term disruption to Temporary suspension of commercial [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:247: berth - Tanker berth publicity. Medium-term suspension of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:247: General Cargo publicity. Medium-term suspension of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:249: Cables. weather. Reduced visibility. necessarily met; Bad local term suspension of operations or prolonged [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:249: - Project Cargo Cables. weather. Reduced visibility. necessarily met; Bad local term suspension of operations or prolonged [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:249: with 3rd party vessel / publicity. Long-term suspension of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:250: Vessel criteria not necessarily met; international publicity. Long-term suspension [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:250: criteria not necessarily met; international publicity. Long-term suspension [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: suspension of operations, prolonged [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: explosion. Very short-term disruption to Long-term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: disembarkation Very short-term disruption to Temporary suspension of commercial [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: Long-term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:256: additional risks during Very short-term disruption to Temporary suspension of commercial [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:256: Cargo Vessel necessarily met; Very short- Long-term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:256: Workboat regional publicity. Temporary suspension [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:256: Project Cargo move control failure. Reduced Very short-term disruption to Long-term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:257: Vessel additional risks during Very short-term disruption to Temporary suspension of commercial [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:260: of avoiding action with Medium-term suspension of operations or [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:260: of avoiding action with necessarily met; Very short- regional publicity. Temporary suspension [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:261: berth Reduced visibility. Result Medium-term suspension of operations or [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:261: of avoiding action with suspension of operations or prolonged [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:262: berth Reduced visibility. Result Medium-term suspension of operations or [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:262: criteria not necessarily met; Medium-term suspension of operations or [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:262: criteria not necessarily met; Medium-term suspension of operations or [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:263: of avoiding action with necessarily met; Very short- publicity. Long-term suspension of [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:263: Vessel of avoiding action with necessarily met; Very short- suspension of operations, prolonged [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:263: of avoiding action with necessarily met; Very short- suspension of operations, prolonged [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:265: moving in the port services with ensuing loss of site. Temporary suspension of operations [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:385:entering it or could affect fish migrating through the See comments in water quality below. There may be temporary sediment resuspension but [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:386: and temporary. Any sediment resuspension is unlikely to last more than a few hours per [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:386:consider if: It disturbs sediment with contaminants temporary. Any sediment resuspension is unlikely to last more than a few hours per pile. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:386:above Cefas Action Level 1 Significant resuspension of contamination is therefore not predicted. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-NE formal response to SBW MLA, 29.01.21 (1)-12.pdf|MLA_2020_00506-NE formal response to SBW MLA, 29.01.21 (1)-12.pdf]]:4: To restrict suspended sediment plumes to one side of the estuary at a time, and [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-NE formal response to SBW MLA, 29.01.21 (1)-12.pdf|MLA_2020_00506-NE formal response to SBW MLA, 29.01.21 (1)-12.pdf]]:6: To restrict suspended sediment plumes to one side of the estuary at a time, in [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-NE formal response to SBW MLA, 29.01.21 (1)-12.pdf|MLA_2020_00506-NE formal response to SBW MLA, 29.01.21 (1)-12.pdf]]:7: works must be suspended. Once temperatures have not reached zero degrees [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-NE formal response to SBW MLA, 29.01.21 (1)-12.pdf|MLA_2020_00506-NE formal response to SBW MLA, 29.01.21 (1)-12.pdf]]:9: suspended sediment [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:3:2.2.3 Suspended solid concentrations 10 [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:3:3.2.2 Effects of increased suspended sediment concentrations during dredging on marine species and [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:11:the re-suspension of sediment as the material is removed. An enclosed grab results in virtually no release [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:13:values (Environment Agency. 2019). The assessment uses the predicted concentrations of suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:14:2.2.3 Suspended solid concentrations [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:14:The tool requires the input of predicted suspended solids concentrations arising from the dredge plume. For [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:14:levels of suspended solids over baseline during Stage 2 of the proposed dredging schedule, when the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:15:Figure 2.2 Stage 2 dredging results for suspended solids concentrations when dredger is located on the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:15:Figure 2.3 shows the predicted suspended solid concentrations at selected water quality monitoring points [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:15:85mg/l is transitory and only predicted to occur once during this period, a more representative suspended [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:16:Figure 2.3 Time series of changes in suspended sediment concentrations at water quality monitoring [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:16:achieved when suspended sediment concentrations reduce to 31mg/l (see maximum acceptable sediment [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:16:uplift column in Appendix 2). It can be seen in Figure 2.2 that the suspended sediment plume is predicted [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:16:to be relatively localised to the dredging activity and suspended sediment concentrations reduce to typically [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:16:when suspended solid concentrations reach the predicted peak at 85mg/l, EQS failure is possible. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:16:Concentrations of fluoranthene are only predicted to reach EQS when suspended solids concentrations [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:17:concentrations of suspended solids; rather, they are predicted to remain in close proximity to the dredging [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:24:and capital dredging, effects from increased suspended sediment concentrations, and effects from [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:25: increased suspended sediment “Effects of smothering following [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:25: physical removal of Changes in suspended sediment Smothering [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:26: increased suspended sediment “Effects of smothering following [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:26: physical removal of Changes in suspended sediment Smothering [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:27:3.2.2 Effects of increased suspended sediment concentrations during dredging [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:27:microscopic stages of the seaweeds during recruitment can be affected by changes in suspended solids, at [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:27:the benchmark used for the sensitivity assessment. This benchmark for changes in suspended solids is “a [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:27:suspended sediment during dredging is expected to be in the form of a narrow plume within the river, which [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:27:suspended sediment concentrations to a level that will change the WFD scale for one year (the benchmark [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:27:Although the intertidal fucoid biotopes are of medium sensitivity to changes to suspended sediments, the [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:28:receptors from increased suspended sediments remains at negligible significance. [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:229: suspension is measured using a Jenway Model 3510 pH meter fitted with a combination pH [[this>Teesworks/Planning/MLA_2020_00506/MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf|MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf]]:319: resuspension through expulsion of loose pseudofaeces directly into the water column [[this>Teesworks/Planning/R-2022-0816-FFM/R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf|R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf]]:21: a driven scaffold frame, so as to form a suspended walkway, or on top of a compression- [[this>Teesworks/Planning/R-2022-0816-FFM/R-2022-0816-FFM-TSWX-JBAC-SWD-XX-RP-CE-0001-S1-P03-Steel_House_Park_&_Ride_FRA (2).pdf|R-2022-0816-FFM-TSWX-JBAC-SWD-XX-RP-CE-0001-S1-P03-Steel_House_Park_&_Ride_FRA (2).pdf]]:19: Hazard Indices of 0.7 for Suspended Solids, 0.6 for Metals and 0.7 for hydrocarbons. [[this>Teesworks/Planning/R-2022-0816-FFM/R-2022-0816-FFM-TSWX-JBAC-SWD-XX-RP-CE-0001-S1-P03-Steel_House_Park_&_Ride_FRA (2).pdf|R-2022-0816-FFM-TSWX-JBAC-SWD-XX-RP-CE-0001-S1-P03-Steel_House_Park_&_Ride_FRA (2).pdf]]:19: Permeable paving provides pollution mitigation indices of 0.7 for Suspended Solids, 0.6 for [[this>Teesworks/Planning/R-2022-0816-FFM/R-2022-0816-FFM-20220909 Steel House PandR TA Issue.pdf|R-2022-0816-FFM-20220909 Steel House PandR TA Issue.pdf]]:7:provides a connection to Redcar British Steel railway station. Services at the station have been suspended [[this>Teesworks/Planning/R-2022-0816-FFM/R-2022-0816-FFM-20220909 Steel House PandR TA Issue.pdf|R-2022-0816-FFM-20220909 Steel House PandR TA Issue.pdf]]:10:but services at the station have been suspended since 2019. As part of the emerging Transport Strategy for [[this>Teesworks/Planning/MLA_2022_00248/Additional Documents/Environmental Statement, Chapter G Water Management and Flooding Section 6 mitigation.pdf|Environmental Statement, Chapter G Water Management and Flooding Section 6 mitigation.pdf]]:3: sediments in surface would be retained within the site, remove silt and other suspended solids, as [[this>Teesworks/Planning/MLA_2022_00248/Additional Documents/CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:38: result in increased sediment suspension, potentially [[this>Teesworks/Planning/MLA_2022_00248/Additional Documents/CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:44: caused by increases in suspended sediment, reduced [[this>Teesworks/Planning/MLA_2022_00248/Additional Documents/CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:44: suspended sediment causing increases in nutrients [[this>Teesworks/Planning/MLA_2022_00248/Additional Documents/CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:45: sediment suspension in the water body, potentially [[this>Teesworks/Planning/MLA_2022_00248/Additional Documents/CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:45: resulting in localised increases in nutrients suspended [[this>Teesworks/Planning/MLA_2022_00248/Additional Documents/CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:53: growth (Appendix A), therefore any suspended silt is not [[this>Teesworks/Planning/MLA_2022_00248/Additional Documents/CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:53: caused by increases in suspended sediment, [[this>Teesworks/Planning/MLA_2022_00248/Additional Documents/CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:54: Adverse impacts may also result from suspended [[this>Teesworks/Planning/MLA_2022_00248/Additional Documents/TW-SIZ-XX-JBAU-SB-00-RP-EN-0011-S4-P01-HRA.pdf|TW-SIZ-XX-JBAU-SB-00-RP-EN-0011-S4-P01-HRA.pdf]]:16: flood bank could temporarily cause the suspension of sediments in the channel. Contamination caused by the removal undertaken as part of the [[this>Teesworks/Planning/MLA_2022_00248/Additional Documents/TW-SIZ-XX-JBAU-SB-00-RP-EN-0011-S4-P01-HRA.pdf|TW-SIZ-XX-JBAU-SB-00-RP-EN-0011-S4-P01-HRA.pdf]]:16: Common tern Sterna suspension of sediments in the channel. Contamination caused by the removal of the estuarine bank will be temporary alone. [[this>Teesworks/Planning/MLA_2022_00248/Additional Documents/TW-SIZ-XX-JBAU-SB-00-RP-EN-0011-S4-P01-HRA.pdf|TW-SIZ-XX-JBAU-SB-00-RP-EN-0011-S4-P01-HRA.pdf]]:17: flood bank could temporarily cause the suspension of sediments in the channel. Contamination caused by the removal undertaken as part of the [[this>Teesworks/Planning/MLA_2022_00248/Additional Documents/TW-SIZ-XX-JBAU-SB-00-RP-EN-0011-S4-P01-HRA.pdf|TW-SIZ-XX-JBAU-SB-00-RP-EN-0011-S4-P01-HRA.pdf]]:23: tide to limit suspension of silt. [[this>Teesworks/Planning/MLA_2022_00248/MLA_2022_00248-APPLICATION-FORM.pdf|MLA_2022_00248-APPLICATION-FORM.pdf]]:13:suspension of silt into the tidal River Tees. All excavated material will be disposed at the [[this>Teesworks/Planning/MLA_2022_00248/MLA_2022_00248-APPLICATION-FORM.pdf|MLA_2022_00248-APPLICATION-FORM.pdf]]:14:turbid due to the movement and velocity of the water. Suspended silt is not anticipated [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:40:It is understood that a ground bearing slab is to be used and that a suspended floor slab is not a desired option [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:40:(the costs to pile the suspended slab are likely to be very high). As such, the designers will need to ensure [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:43:As such, if a piled suspended floor slab solution is not proposed, a ground bearing slab should be designed to [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:651: Suspended solids Glass or plastic 100 ISO 5667 3:2018 none 2 days [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:655: The pH value of a soil suspension in water or a groundwater sample is determined electrometrically using a glass BS1377: Part 3: 1990 – Soils for Civil Engineering Purposes – Chemical and [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:655: The electrical conductance of a soil suspension in water or of a water sample is determined by voltammetry using Standard Methods for the Examination of water and Wastewater Part 2510B 21st [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:655: salt e.g. the conductivity of topsoil is determined by preparing a suspension of the soil in saturated calcium [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:656: Suspended matter is removed from a measured volume of sample by filtration under reduced pressure through a [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:656: pre-treated, pre-weighed glass fibre filter paper. The paper is washed with deionised water to remove dissolved Suspended Solids: UKAS [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:656: SCA Method ISBN 011 751957 X Suspended, Settleable and Total Dissolved Solids [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:656: DETSC 2034 Suspended and Settleable Solids in Water salts and the total suspended matter is determined gravimetrically after drying at 105 ±5°C. Settleable solids are 5 mg/l [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:656: determined by subtracting the solids left in suspension after settlement for 1 hour (or other agreed time) from the Settleable Solids: Not Accredited [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:656: total suspended matter in the sample. [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:657: Water samples are pre-filtered to remove any suspended solids and evaporated in an oven at 180°C. The amount [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:657: SCA Method ISBN 011 751957 X Suspended, Settleable and Total Dissolved Solids Total Dissolved Solids: UKAS [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:657: The sample is shaken to ensure homogeneity of any suspended matter. The sample is then evaporated and the [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:657: filtration prior to analysis. Waters are filtered prior to analysis to remove any particulates in suspension. Soil: 0.2mg/kg [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:658: suspension. The water soluble boron in the extract or filtrate reacts with azomethine–H to produce a yellow [[this>Teesworks/Planning/R-2022-0342-CD/R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf|R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf]]:659: Waters are filtered prior to analysis to remove any particulates in suspension. The sugar in the filtrate reacts with [[this>Teesworks/Planning/R-2023-0246-RMM/R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf|R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf]]:21: could be deposited by vehicles leaving the ERF site and re-suspended by [[this>Teesworks/Planning/R-2023-0246-RMM/R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf|R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf]]:32: deposited by vehicles leaving the ERF site and re-suspended by vehicles [[this>Teesworks/Planning/R-2023-0246-RMM/R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf|R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf]]:107: attenuation pond will also help reduce suspended [[this>Teesworks/Planning/R-2023-0246-RMM/R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf|R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf]]:108: other suspended solids, as well as capture any spills/oil and grease, prior to [[this>Teesworks/Planning/R-2022-0779-CD/R-2022-0779-CD-Sep 22 - CEMP - Steel House Park and Ride Relocation of stockpile mounds.pdf|R-2022-0779-CD-Sep 22 - CEMP - Steel House Park and Ride Relocation of stockpile mounds.pdf]]:24: • use of silt traps used to capture suspended solids; [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf|R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf]]:11:localised increase in suspended sediment concentrations by the order of a few hundred mg/l at the point of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf|R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf]]:12:A potential impact on water quality has been identified due to the resuspension of sediment, principally as [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf|R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf]]:12:relatively limited areas of high suspended solids concentrations, which only occur for a matter of hours at a [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf|R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf]]:12:time before the suspended sediment concentrations return to baseline values. No significant impacts are [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf|R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf]]:12:resuspension of sediments. Such measures include dredging in long strips to ensure the plume is located [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf|R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf]]:13:and capital dredging, increased suspended sediment concentrations and increased sediment deposition. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf|R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf]]:13:ecological receptors as a result of increased suspended sediment concentrations or sediment deposition [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf|R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf]]:15:Impacts on fish resources within the subtidal area, as a result of increased suspended sediment, would only [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf|R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf]]:15:Other water quality issues, such as a reduction in dissolved oxygen or suspension of contaminants, are not [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:2: including stop / start thresholds for parameters such as suspended [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:15:In general, suspended sediment concentrations are low within the estuary and within Tees Bay. The highest [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:15:downstream. In the vicinity of the proposed scheme (i.e. in the Tees Dock area) suspended solid [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:15:within the estuary) and analysed in the laboratory for suspended sediment concentrations. The results [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:15:this period, concentrations of suspended sediment were very low. It should be noted however, that the [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:15:Table 7.8 Suspended sediment concentrations recorded at Transect T8 in July 2020 [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:15: Suspended sediment concentrations (mg/l) [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:16:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:17:Figure 7. 3 Plume of suspended sediment concentrations arising from dredging activities during Stage 2 [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:19:Figure 7. 5 Plume of suspended sediment concentrations arising from dredging activities during Stage [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:20:Figure 7.6 Plume of enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:20:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:21:Figure 7.7 Timeseries of changes in suspended sediment concentrations at water quality monitoring [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:21:Only point 3 (Smiths Dock – Figure 7.2) experiences elevated levels of suspended solids and only during [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:23: Calculated loss of sediment derived using indicative values for the mass of sediment resuspended per m 3 of dredged material in CIRIA guidance (John et al., 1999) in kg/m3. Worst case S-Factor for [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:25: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:25:Dock water quality monitoring point (point 3) could experience elevated levels of suspended solid [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:26:As these works progress, there is the potential for sediment to be suspended when working in and around [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:26:the riverbed. However, any increases in suspended solids concentrations are likely to be highly localised [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:5: 24.Reduce sediment resuspension [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:7: suspended solids [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:7: The installation and presence of the rock impacted is less than suspended solids [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:11:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:11:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:13:Figure 28.4 Timeseries of changes in suspended sediment concentrations at water quality monitoring [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:13:Only water quality monitoring point WQ3 (Smiths Dock) shows elevated levels of suspended solid [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:13:The resuspension of sediment could also potentially affect dissolved oxygen levels in the water. This is due [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:14: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:14:increases in suspended solids concentrations above baseline (up to 85mg/l which decreases to baseline [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:14:suspended solids when in close proximity to the dredger. As a result, a non-temporary deterioration in water [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:16:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:16:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents for [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:17:An increase in suspended sediment in the water column may lead to physiological effects in finfish, including [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:17:to increased suspended solids is low, according to the MarLIN sensitivity scoring index. Mobile species [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:18: Reduce sediment resuspension disposal activities currently ongoing. Disposal would be [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:20: Reduce sediment resuspension [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:21: Reduce sediment resuspension [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:24:maximum concentrations of suspended solids are localised to the dredging activity and quickly disperse [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:28:suspended sediment thus reducing the risk of significant water quality effects. Mitigation measures to [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf]]:1:to the seabed whilst the material remaining in suspension starts to further disperse in spatial extent. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf]]:1:longer, until the subsequent ebb or flood phase of the tide starts to transport it in suspension in the water [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf]]:5: Increase in suspended [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf]]:5:sensitive to smothering or increases in suspended sediment. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf]]:11:The offshore disposal of dredged material would temporarily increase the suspended sediment [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf]]:11:relied upon solely. Therefore, any increases in suspended sediments will have a negligible impact on [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf]]:11:temporary loss of seabed habitat, increased suspended sediment concentrations and sediment re- [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-OFFICER REPORT.pdf|R-2020-0685-ESM-OFFICER REPORT.pdf]]:17:took place; suspended sediment concentrations, sediment sources and [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-OFFICER REPORT.pdf|R-2020-0685-ESM-OFFICER REPORT.pdf]]:19:An assessment has also been made of suspended sediment concentrations. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-OFFICER REPORT.pdf|R-2020-0685-ESM-OFFICER REPORT.pdf]]:19:suspended solid concentrations, for the most part, are less than 20mg/l with [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-OFFICER REPORT.pdf|R-2020-0685-ESM-OFFICER REPORT.pdf]]:20:period, concentrations of suspended sediment were very low as illustrated in [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-OFFICER REPORT.pdf|R-2020-0685-ESM-OFFICER REPORT.pdf]]:21:It is acknowledged that there is the potential for sediment to be suspended [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-OFFICER REPORT.pdf|R-2020-0685-ESM-OFFICER REPORT.pdf]]:21:increases in suspended solids concentrations are likely to be highly localised [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-OFFICER REPORT.pdf|R-2020-0685-ESM-OFFICER REPORT.pdf]]:28:  Impacts on marine ecology from increased suspended sediment during [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-OFFICER REPORT.pdf|R-2020-0685-ESM-OFFICER REPORT.pdf]]:30:suspended sediment concentrations during dredging on marine species and [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-OFFICER REPORT.pdf|R-2020-0685-ESM-OFFICER REPORT.pdf]]:30:habitats, effects of increased suspended sediment concentrations during [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-OFFICER REPORT.pdf|R-2020-0685-ESM-OFFICER REPORT.pdf]]:30:increase in suspended sediment concentrations. Matters relating to this have [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-OFFICER REPORT.pdf|R-2020-0685-ESM-OFFICER REPORT.pdf]]:30:predicted increase in suspended sediment, in addition to the low/very low [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-OFFICER REPORT.pdf|R-2020-0685-ESM-OFFICER REPORT.pdf]]:30:sensitivity of the key species present in the estuary to increased suspended [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-OFFICER REPORT.pdf|R-2020-0685-ESM-OFFICER REPORT.pdf]]:32:With regard to suspended sediment concentrations no mitigation measures [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-OFFICER REPORT.pdf|R-2020-0685-ESM-OFFICER REPORT.pdf]]:35:in suspended sediments during dredging or other activities will have a [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 4_Metocean survey report.pdf|R-2020-0685-ESM-Appendix 4_Metocean survey report.pdf]]:5: 7.3 Suspended Sediment Conversion .....................................................................................................20 [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 4_Metocean survey report.pdf|R-2020-0685-ESM-Appendix 4_Metocean survey report.pdf]]:21:7.3 Suspended Sediment Conversion [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 4_Metocean survey report.pdf|R-2020-0685-ESM-Appendix 4_Metocean survey report.pdf]]:30: Suspended P1983.04.06.D08 - Suspended Solids Lab Results_Spring 24072020 [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 4_Metocean survey report.pdf|R-2020-0685-ESM-Appendix 4_Metocean survey report.pdf]]:30: Solids P1983.04.06.D09 - Suspended Solids Lab Results_Neap 30072020 [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf|R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf]]:2:entering it or could affect fish migrating through the See comments in water quality below. There may be temporary sediment resuspension but [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf|R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf]]:3: and temporary. Any sediment resuspension is unlikely to last more than a few hours per [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf|R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf]]:3:consider if: It disturbs sediment with contaminants temporary. Any sediment resuspension is unlikely to last more than a few hours per pile. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf|R-2020-0685-ESM-Appendix 16_WFD scoping tables.pdf]]:3:above Cefas Action Level 1 Significant resuspension of contamination is therefore not predicted. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:7:Figure 5.5: Maximum enhanced suspended sediment concentrations arising from dredging [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:7:Figure 5.6: Maximum enhanced suspended sediment concentrations arising from dredging [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:7:Figure 5.7: Maximum enhanced suspended sediment concentrations arising from dredging [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:7:Figure 5.8: Maximum enhanced suspended sediment concentrations arising from dredging [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:7:Figure 5.9: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:7:Figure 5.10: Maximum enhanced suspended sediment concentrations (near-surface layer) arising [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:7:Figure 5.12: Maximum enhanced suspended sediment concentrations (near-bed layer) arising [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:9: movement of suspended sediment from the proposed dredging and disposal activities by coupling with [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:61:investigate the suspended sediment transport effects of the proposed dredging of the channel and the berth [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:62:The sediment dispersion model has been setup with 4 layers in order to differentiate between suspended [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:70:disposal activities. Note that all the modelling plots in following sections show the elevations in suspended [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:71: Figure 5.5: Maximum enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:72: Figure 5.6: Maximum enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:73: Figure 5.7: Maximum enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:74: Figure 5.8: Maximum enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:75: Figure 5.9: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from dredging activities [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:76: Figure 5.10: Maximum enhanced suspended sediment concentrations (near-surface layer) arising from dredging activities [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:79: Figure 5.12: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from disposal activities [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:80:and all sediment particles suspended in the water column will eventually settle to the river or sea bed, [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:81:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:1: • Impacts on marine ecology from increased suspended sediment during capital dredging and [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:20:9.5.2 Effects of increased suspended sediment concentrations during dredging [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:20:will disturb sediment, which will result in localised and short-term increases in suspended sediment [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:20:ecology as a result of increased concentrations of suspended sediment within the water column (i.e. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:20:resuspended sediment which does not contain elevations beyond Action Level 2). The dredged sediment [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:20:filter feeding molluscs). In addition, high concentrations of suspended sediment may impact on fish through [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:20:Mean background suspended solid levels in the vicinity of the proposed scheme (based on metocean [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:21:during spring tides (Section 7.4.2). These are considerably lower than suspended sediment concentrations [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:21:For both types of dredger (backhoe and TSHD), peak suspended solids concentrations are predicted in the [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:21:suspended sediment concentrations depending on the stage of dredging (as described in Section 6). In all [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:21:importance (where information is available) to increases in suspended sediment. This information is [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:21:S. spinulosa relies on suspended particles for its tube growth. Increased suspended sediment [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:21:to increases in suspended sediment concentrations, according to this sensitivity review. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:21:sediment likely gets resuspended regularly, and where accretion rates and moderate to high. A. islandica [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:21:resilience and is not sensitive to changes in suspended solids (Tyler-Walters & Sabatini, 2017). [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:21:the proposed dredge is considered to be of low sensitivity to increases in suspended sediment. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:22:resistance and resilience to changes in suspended sediment and was reported to be not sensitive (to [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:22:changes in suspended sediment) (De-Bastos, 2016). As such, for the purposes of this assessment, the [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:22:Given the temporary and localised nature of the predicted increase in suspended sediment, in addition to [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:22:the low/very low sensitivity of the key species present in the estuary to increased suspended sediment, an [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:22:During the capital dredging a proportion of the material that is dredged would be disturbed and re-suspended [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:22:is 32.5ha. This is expected to cause a very limited extent of suspended sediment concentrations, and [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:22:Some of the sediment that is suspended as a result of the dredging activities will be deposited to the [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:22:suspension by the prevailing currents (for finer-grained sediment fractions) (Section 6). The modelling [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:22:carried out on this, as reported in Section 6, indicates that much of the resuspended sediment is deposited [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:23:and any species of conservation importance (where information is available) to increases in suspended [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:23:A sudden smothering of 5cm of sediment would temporarily suspend the feeding and respiration of A. alba [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:43: Significant operation temporarily suspended). These hazards and associated risk [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:43: 9 - 10 High permanently suspended). These hazards and associated risk control [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:60: injury immediate area within site suspension of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:77: and explosion. term suspension of operations, [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:77: short-term disruption to term suspension of operations, [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:77: and disembarkation suspension of commercial [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:78: term suspension of operations, [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:78: taking additional risks short-term disruption to Temporary suspension of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:78: Reduced visibility. Fire short-term disruption to term suspension of operations, [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:79: short-term disruption to Temporary suspension of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:79: Cargo Traffic control failure. short-term disruption to Long-term suspension of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:79: Vessel taking additional risks short-term disruption to Temporary suspension of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:83: 3rd party vessel / environmental amenity; suspension of operations or [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:84: dredging operations. Fire suspension of commercial [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:85: Tanker berth 3rd party vessel / suspension of operations or [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:85: 3rd party vessel / suspension of operations or [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:87: General not necessarily met; Bad Medium-term suspension of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:87: Project not necessarily met; Bad Medium-term suspension of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:87: short-term disruption to term suspension of operations, [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:88: 3rd party vessel / term suspension of operations, [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:88: 3rd party vessel / term suspension of operations, [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:93: short-term disruption to suspension of operations, prolonged [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:93: necessarily met; Very publicity. Long-term suspension of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:93: necessarily met; Very publicity. Temporary suspension of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:94: suspension of operations, prolonged [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:94: Temporary suspension of commercial [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:94: term suspension of operations, [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:95: necessarily met; Very publicity. Temporary suspension of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:95: Cargo control failure. short-term disruption to term suspension of operations, [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:95: Vessel Temporary suspension of commercial [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:99: avoiding action with environmental amenity; term suspension of operations or [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:100: 3rd party vessel. Fire suspension of commercial activities [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:101: Tanker term suspension of operations or [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:101: publicity. Medium-term suspension [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:102: Cargo Vessel visibility. Result of Very short-term disruption suspension of operations or [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:103: General Power Cables. not necessarily met; Bad Medium-term suspension of in vicinity of overhead cables; [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:103: Project Power Cables. not necessarily met; Bad Medium-term suspension of in vicinity of overhead cables; [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:103: necessarily met; Very publicity. Long-term suspension of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:104: avoiding action with suspension of operations, prolonged [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:104: avoiding action with suspension of operations, prolonged [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:106: large vessel moving in services with ensuing loss within site. Temporary suspension of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:109: failure. Reduced visibility. publicity. Long-term suspension of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:109: criteria not necessarily met; publicity. Long-term suspension of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:110: Pilot boarding and suspension of commercial activities and/or [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:110: operations. Traffic control Very short-term disruption publicity. Long-term suspension of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:110: additional risks during suspension of commercial activities and/or [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:111: Vessel suspension of operations, prolonged [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:111: Dredgers) Temporary suspension of commercial [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:111: Project Cargo operations. Traffic control Very short-term disruption suspension of operations, prolonged [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:112: Vessel additional risks during suspension of commercial activities and/or [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:115: with 3rd party vessel / environmental amenity; suspension of operations or prolonged [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:116: short-term disruption to Temporary suspension of commercial [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:117: berth - Tanker berth publicity. Medium-term suspension of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:117: General Cargo publicity. Medium-term suspension of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:119: Cables. weather. Reduced visibility. necessarily met; Bad local term suspension of operations or prolonged [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:119: - Project Cargo Cables. weather. Reduced visibility. necessarily met; Bad local term suspension of operations or prolonged [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:119: with 3rd party vessel / publicity. Long-term suspension of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:120: Vessel criteria not necessarily met; international publicity. Long-term suspension [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:120: criteria not necessarily met; international publicity. Long-term suspension [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: suspension of operations, prolonged [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: explosion. Very short-term disruption to Long-term suspension of operations, [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: disembarkation Very short-term disruption to Temporary suspension of commercial [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: Long-term suspension of operations, [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:126: additional risks during Very short-term disruption to Temporary suspension of commercial [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:126: Cargo Vessel necessarily met; Very short- Long-term suspension of operations, [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:126: Workboat regional publicity. Temporary suspension [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:126: Project Cargo move control failure. Reduced Very short-term disruption to Long-term suspension of operations, [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:127: Vessel additional risks during Very short-term disruption to Temporary suspension of commercial [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:130: of avoiding action with Medium-term suspension of operations or [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:130: of avoiding action with necessarily met; Very short- regional publicity. Temporary suspension [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:131: berth Reduced visibility. Result Medium-term suspension of operations or [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:131: of avoiding action with suspension of operations or prolonged [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:132: berth Reduced visibility. Result Medium-term suspension of operations or [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:132: criteria not necessarily met; Medium-term suspension of operations or [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:132: criteria not necessarily met; Medium-term suspension of operations or [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:133: of avoiding action with necessarily met; Very short- publicity. Long-term suspension of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:133: Vessel of avoiding action with necessarily met; Very short- suspension of operations, prolonged [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:133: of avoiding action with necessarily met; Very short- suspension of operations, prolonged [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:135: moving in the port services with ensuing loss of site. Temporary suspension of operations [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:3: as stop start thresholds for parameters such as suspended sediment and 13 and Section 7 [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:4:1989 between waves, tides and suspended mud HR Wallingford, 1989 [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:7: and suspended mud concentrations [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:10: predict movement of suspended sediment from the proposed dredging and disposal activities by [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:31:Suspended sediment concentrations [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:31:In general, suspended sediment concentrations (SSCs) are low within the estuary and within Tees Bay. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:31:the highest suspended sediment levels occur close to high water. After storm periods, higher concentrations [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:31:of suspended sediment have been noted around the Shell Jetty, but with little penetration further up the [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:31: Suspended sediment concentrations (mg/l) [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:34:concentrations in Tees Bay are raised by the re-suspension of material from the seabed during storm events. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:34:induced currents, vessel induced forces and re-suspension by dredging operations. These last two were [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:34:be re-suspended and moved further upstream into the estuary. Inputs to the system can be summarised [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:35: when concentrations in Tees Bay are raised by the resuspension of material from the seabed during [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:41:changes in bed thickness when the suspended sediment falls from the plume to become deposited on the [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:60:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:60:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents (for [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:62:material will become re-suspended by tidal currents or dredged during maintenance campaigns of the river [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:63:re-suspended by tidal currents or will be removed during maintenance dredging campaigns of the river [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:68:as some material falls relatively quickly to the sea bed whilst the material remaining in suspension starts to [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:68:transport it in suspension in the water column in the appropriate direction of dispersion (i.e. to the north- [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:72:relatively quickly to the sea bed whilst the material remaining in suspension starts to further disperse in [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:81:and all sediment particles suspended in the water column will eventually settle to the river or seabed, [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:81:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:91:maintenance dredging is likely to be due to the low levels of suspended sediment measured in this reach of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf]]:28:tern species as a result of increased suspended sediments during the construction phase. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf]]:28:and re-suspension of sediment (Cook and Burton, 2010). However, common terns typically only dive to 1m [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf]]:29:in suspension from the point of release. Most falls within the dredged areas, whilst deposition elsewhere is [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf|R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf]]:24: structures and capital dredging, increased suspended sediment concentrations and increased [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf|R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf]]:24: increased suspended sediment concentrations or sediment deposition during construction. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf|R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf]]:26:5.29 Impacts on fish resources within the subtidal area, as a result of increased suspended sediment, [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf|R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf]]:26:5.34 Adverse impacts may be expected as a result of temporary increases in suspended solids [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf|R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf]]:26:5.35 Other water quality issues, such as a reduction in dissolved oxygen or suspension of [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf|R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf]]:30: potential impact on water quality has been identified due to the resuspension of sediment, [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf|R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf]]:30: Additionally, sediment plume modelling shows relatively limited areas of high suspended solids [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf|R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf]]:30: concentrations, which only occur for a matter of hours at a time before the suspended sediment [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf|R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf]]:30: process to minimise the potential for resuspension of sediments. Such measures include [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf]]:24:Infrastructure and placement of rock into the berth pocket) would result in an increase in suspended [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf]]:24:relied upon solely. Therefore, any increases in suspended sediments during dredging or other activities will [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf]]:24:disturbance and temporary loss of seabed habitat; increased suspended sediment concentrations and [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf]]:1:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine and estuarine fish [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf]]:5:HR Wallingford (1989a). Tees Weir Feasibility Study - Correlation between waves, tides and suspended [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf]]:18: • Suspended deck. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf]]:18:A piled suspended deck structure would be technically feasible, however this option would require more [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf]]:18:suspended deck option also reduces the potential for the incorporation of environmental enhancement [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf]]:18:such as ‘verti-pools’. The suspended deck also offers reduced future flexibility compared to the combi-piled [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf]]:18:suspended deck should STDC seek to increase the load rating of the quay in the future. The suspended [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:1:disturbance and increased suspended sediments on migratory fish). [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:11: • dispersion of suspended sediment during capital dredging and deposition at the offshore disposal [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:11:(increased suspended sediment concentrations) are relevant to the CIA. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:11:Dispersion of suspended sediment and deposition on the seabed during capital dredging [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:11:immediately after the period of construction. This is because fine material will be released into suspension, [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:12:27.3 presents a summary of the results of the predictive modelling of suspended sediment concentration [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:12:A review of all EIA studies for the above projects highlights that the maximum increase in suspended [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:12:resulting in a significantly reduced concentration of suspended sediment beyond the source of the plume. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:14: • effect of increases in suspended sediments during maintenance dredging on food resources of SPA [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:14:Mitigation measures to limit the suspension of sediment and subsequent deposition of sediment during [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:14:into a sealed barge) for dredging of unconsolidated material to minimise resuspension in the water column. [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:17: • dispersion of suspended sediment during marine works, dredging and disposal; and, [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:24:into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension in the [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf]]:22:river dredging are characterised by a short-lived localised increase in suspended sediment concentrations [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf]]:34:low, with any effect confined to the footprint of the proposed dredge. The predicted increase in suspended [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf]]:34:loading into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf|R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf]]:11:The re-calibrated 3D Tees Estuary Tidal Model will be used to predict movement of suspended sediment [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf|R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf]]:11:(in particular the effect of resuspension and dispersion of sediment during dredging and disposal activities). [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf]]:3: thresholds for parameters such as suspended sediment and [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf]]:12:dredging, is provided in Section 6. The peak suspended sediment concentration within the Tees during the [[this>Teesworks/Planning/R-2020-0685-ESM/R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf|R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf]]:13:of suspended sediments are predicted to decrease significantly with increased distance from the dredging [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-60686_01 - Planning Statement - 28.06.19.pdf|R-2019-0427-FFM-60686_01 - Planning Statement - 28.06.19.pdf]]:22: runoff from the mounds could result in elevated levels of suspended sediment. A number of [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf]]:20:ponds, which will be contribute to the removal of suspended sediment from the surface water discharge from [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf]]:21:attenuation pond, which will be contribute to the removal of suspended sediment from the surface water [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf]]:21:contribute to the removal of suspended sediment from the surface water discharge from these sites. [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf]]:22:exposes storage mounds are anticipated to result in elevated levels of suspended sediment. It is considered [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf|R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf]]:22:Channel or the Knitting Wife Beck. In addition, it is anticipated that higher level of suspended sediment may [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Environmental Risk Assessment.pdf|R-2021-0166-FFM-Environmental Risk Assessment.pdf]]:25:sediment suspension as samples were filtered on the second monitoring round. The TPH and PAH [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Geotechnical Risk Assessment .pdf|R-2021-0166-FFM-Geotechnical Risk Assessment .pdf]]:24:suggest that suspended flor slabs will be more appropriate. [[this>Teesworks/Planning/R-2021-0166-FFM/R-2021-0166-FFM-Geotechnical Risk Assessment .pdf|R-2021-0166-FFM-Geotechnical Risk Assessment .pdf]]:27:Ground beams and floor slabs would need to be suspended. [[this>Teesworks/Planning/R-2022-0205-SC/R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf|R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf]]:5: Increased suspended sediment concentrations (SSC) 42 [[this>Teesworks/Planning/R-2022-0205-SC/R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf|R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf]]:42:Increased suspended sediment concentrations (SSC) [[this>Teesworks/Planning/R-2022-0205-SC/R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf|R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf]]:42: 6.2.3 There is potential for temporary increases in SSC and turbidity due to suspension, [[this>Teesworks/Planning/R-2022-0205-SC/R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf|R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf]]:42: resuspension and deposition of sediments and potentially formation of sediment plumes [[this>Teesworks/Planning/R-2022-0205-SC/R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf|R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf]]:42: 6.2.4 The Site is located in the tidally-influenced stretch of the estuary where most suspended [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf|R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf]]:977: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters) [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf|R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf]]:977: The electrical conductance of a soil suspension in water or [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf|R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf]]:977: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf|R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf]]:979: Suspended matter is removed from a measured volume of [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf|R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf]]:979: Suspended Solids: [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf|R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf]]:979: Suspended and the total suspended matter is determined gravimetrically [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf|R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf]]:979:DETSC Suspended, Settleable and Total MCERTS(Waters)- [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf|R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf]]:979: left in suspension after settlement for 1 hour (or other [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf|R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf]]:979: agreed time) from the total suspended matter in the [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf|R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf]]:980: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf|R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf]]:980: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf|R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf]]:980:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf|R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf]]:982: Water Soluble particulates in suspension. contamination on former gasworks and [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf|R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf]]:983: particulates in suspension. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf|R-2021-1048-FFM-4153 & 4154 Area A Former Steelworks Redcar Contract 1 & 2 (Area A) (Final report).pdf]]:1005: Suspended solids Glass or plastic 100 CIP 2 Tech Spec none 5 days [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf|R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf]]:31: Oils and Suspended solids [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-Appendix1.pdf|R-2021-1048-FFM-Appendix1.pdf]]:10: and no-one stands beneath suspended equipment. [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf|R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf]]:7:piles designed to mitigate the effects of expansion and potentially suspended floors. Lightly loaded [[this>Teesworks/Planning/R-2021-1048-FFM/R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf|R-2021-1048-FFM-GEO_STDCO_GEOENVIRONMENTALSUMMARYREPORT(002)sm.pdf]]:38:  Reinforced concrete cast in situ floor slab (suspended, non‐suspended or raft) with at least [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf]]:65:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf]]:70: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters) [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf]]:70: The electrical conductance of a soil suspension in water or [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf]]:70: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf]]:72: Suspended matter is removed from a measured volume of [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf]]:72: Suspended Solids: [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf]]:72: Suspended and the total suspended matter is determined gravimetrically [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf]]:72:DETSC Suspended, Settleable and Total MCERTS(Waters)- [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf]]:72: left in suspension after settlement for 1 hour (or other [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf]]:72: agreed time) from the total suspended matter in the [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf]]:73: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf]]:73: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf]]:73:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf]]:75: Water Soluble particulates in suspension. contamination on former gasworks and [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000005_App_B-2_Part2.pdf]]:76: particulates in suspension. [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1347:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1352: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters) [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1352: The electrical conductance of a soil suspension in water or [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1352: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1354: Suspended matter is removed from a measured volume of [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1354: Suspended Solids: [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1354: Suspended and the total suspended matter is determined gravimetrically [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1354:DETSC Suspended, Settleable and Total MCERTS(Waters)- [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1354: left in suspension after settlement for 1 hour (or other [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1354: agreed time) from the total suspended matter in the [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1355: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1355: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1355:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1357: Water Soluble particulates in suspension. contamination on former gasworks and [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2021-0100-CD-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1358: particulates in suspension. [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf]]:48:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf]]:53: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters) [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf]]:53: The electrical conductance of a soil suspension in water or [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf]]:53: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf]]:55: Suspended matter is removed from a measured volume of [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf]]:55: Suspended Solids: [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf]]:55: Suspended and the total suspended matter is determined gravimetrically [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf]]:55:DETSC Suspended, Settleable and Total MCERTS(Waters)- [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf]]:55: left in suspension after settlement for 1 hour (or other [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf]]:55: agreed time) from the total suspended matter in the [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf]]:56: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf]]:56: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf]]:56:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf]]:58: Water Soluble particulates in suspension. contamination on former gasworks and [[this>Teesworks/Planning/R-2021-0100-CD/R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf|R-2021-0100-CD-STDC_HWY-ATK-HGT-PR-RP-CE-000004_App_B-1_Part12.pdf]]:59: particulates in suspension. [[this>Teesworks/Planning/R-2021-0067-CD/R-2021-0067-CD-Jan 20212366 CEMP Metals Recovery Processing Area.pdf|R-2021-0067-CD-Jan 20212366 CEMP Metals Recovery Processing Area.pdf]]:26: • use of silt traps used to capture suspended solids; [[this>Teesworks/Planning/R-2021-0753-FFM/R-2021-0753-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf|R-2021-0753-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf]]:20:ponds, which will be contribute to the removal of suspended sediment from the surface water discharge from [[this>Teesworks/Planning/R-2021-0753-FFM/R-2021-0753-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf|R-2021-0753-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf]]:21:attenuation pond, which will be contribute to the removal of suspended sediment from the surface water [[this>Teesworks/Planning/R-2021-0753-FFM/R-2021-0753-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf|R-2021-0753-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf]]:21:contribute to the removal of suspended sediment from the surface water discharge from these sites. [[this>Teesworks/Planning/R-2021-0753-FFM/R-2021-0753-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf|R-2021-0753-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf]]:22:exposes storage mounds are anticipated to result in elevated levels of suspended sediment. It is considered [[this>Teesworks/Planning/R-2021-0753-FFM/R-2021-0753-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf|R-2021-0753-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf]]:22:Channel or the Knitting Wife Beck. In addition, it is anticipated that higher level of suspended sediment may [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:133:of settling ponds are present in the southern section of the site; formerly an aqueous suspension of [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:534: trial pit etc. Should the excavation become unsafe, operations shall be suspended until [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:597:streams that feed the SLEMS to deposit out of suspension prior to discharge from the Installation. The [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:605:suspended solids that are dredged from the channels. The sample locations shall be investigated using a [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:605:condition of land at the location of the suspended solid drying beds where no pollution prevention [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:605:perched water at the location of the suspended solid drying beds where no pollution prevention measures [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:651: 16 ü Iron ore (in suspended matter load in controlled waters. Pyrite in [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:706: 8 migration via wind or suspended in steam to [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf]]:726: E ü Heavy metals, suspended solids, carbon. [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf|R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf]]:15: present in the southern section of the site; formerly an aqueous suspension of BOS oxide was [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter O - July 2020.pdf|R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter O - July 2020.pdf]]:10: consideration of design features to remove silt and other suspended [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter O - July 2020.pdf|R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter O - July 2020.pdf]]:15: of design features to remove silt and other suspended solids, as well as capture any spills/oil [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf|R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf]]:9: onto the public road network where it may be deposited and then re-suspended by vehicles [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf|R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf]]:37:G5.7 The potential for pollution of surface water is principally when high levels of suspended solids [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf|R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf]]:41: sediments in within the site, or suspended solids, as well as capture [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf|R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf]]:50: sediment suspended solids, as well as capture any magnitude of change and so [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf|R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf]]:52: contaminants and remove silt and other suspended solids, as well from residual impacts. [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-TGN(E) 304 - Development near NG assets.pdf|R-2020-0357-OOM-TGN(E) 304 - Development near NG assets.pdf]]:7: impact on National Grid tunnel assets then we reserve the right to suspend the piling works. [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix F - July 2020.pdf|R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix F - July 2020.pdf]]:3: suspension when dry due to small [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-Planning Statement - July 2020.pdf|R-2020-0357-OOM-Planning Statement - July 2020.pdf]]:38: consider the effects of construction, demolition, trackout (dust deposited or resuspended by [[this>Teesworks/Planning/R-2020-0357-OOM/R-2020-0357-OOM-TGN 287_Third party guidance for working near NGET equipment.pdf|R-2020-0357-OOM-TGN 287_Third party guidance for working near NGET equipment.pdf]]:6: This section includes a brief description of some of the hazards Length of suspension [[this>Teesworks/Planning/R-2019-0767-OOM/R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf|R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf]]:134: suspended sediment release on or adjacent to the proposed development. This [[this>Teesworks/Planning/R-2019-0767-OOM/R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf|R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf]]:135: The potential for pollution of surface water is principally when high levels of suspended [[this>Teesworks/Planning/R-2019-0767-OOM/R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf|R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf]]:135: The potential for pollution of surface water is principally when high levels of suspended [[this>Teesworks/Planning/R-2019-0767-OOM/R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf|R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf]]:139: increased suspended solids, as well as capture any spills/oil [[this>Teesworks/Planning/R-2019-0767-OOM/R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf|R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf]]:143: contaminants silt and other suspended solids, as well as capture from residual impacts. [[this>Teesworks/Planning/R-2019-0767-OOM/R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf|R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf]]:144: contaminants adverse silt and other suspended solids, as well as capture from residual impacts. [[this>Teesworks/Planning/R-2019-0767-OOM/R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf|R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf]]:252: suspended solids, as well as capture any spills/oil and grease, prior to discharge. [[this>Teesworks/Planning/R-2019-0767-OOM/R-2019-0767-OOM-officer report.pdf|R-2019-0767-OOM-officer report.pdf]]:52: increased suspended sediment release on or adjacent to the proposed [[this>Teesworks/Planning/R-2019-0767-OOM/R-2019-0767-OOM-officer report.pdf|R-2019-0767-OOM-officer report.pdf]]:52:Surface water quality could be impacted by suspended solids entering the [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:324:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:329: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters) [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:329: The electrical conductance of a soil suspension in water or [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:329: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:331: Suspended matter is removed from a measured volume of [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:331: Suspended Solids: [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:331: Suspended and the total suspended matter is determined gravimetrically [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:331:DETSC Suspended, Settleable and Total MCERTS(Waters)- [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:331: left in suspension after settlement for 1 hour (or other [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:331: agreed time) from the total suspended matter in the [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:332: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:332: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:332:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:334: Water Soluble particulates in suspension. contamination on former gasworks and [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf]]:335: particulates in suspension. [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf]]:43:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf]]:48: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters) [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf]]:48: The electrical conductance of a soil suspension in water or [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf]]:48: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf]]:50: Suspended matter is removed from a measured volume of [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf]]:50: Suspended Solids: [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf]]:50: Suspended and the total suspended matter is determined gravimetrically [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf]]:50:DETSC Suspended, Settleable and Total MCERTS(Waters)- [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf]]:50: left in suspension after settlement for 1 hour (or other [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf]]:50: agreed time) from the total suspended matter in the [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf]]:51: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf]]:51: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf]]:51:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf]]:53: Water Soluble particulates in suspension. contamination on former gasworks and [[this>Teesworks/Planning/R-2020-0743-CD/R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf|R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part2.pdf]]:54: particulates in suspension. [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:4:5.21.5 Platforms suspended by Crane ............................................................................................................................. 50 [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:44:Platform Procedure (AA426 51) and Safe use of Crane Suspended Work Platforms (AA426 52). [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:50:5.21.5 Platforms suspended by Crane [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:50:Crane suspended work platforms can only be used where other means of reaching an elevated work [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:50:Use of crane suspended work platforms requires HZI Site Management authorisation in writing. [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:50:When the carriage of personnel by crane suspended work platform is required, and subject to HZI [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:50:restriction/approval, the crane suspended work platforms must be suitably tested by an authorised [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:50:All sides of the crane suspended work platform shall be enclosed by a top guard rail, 1.1 meters high and [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:50:The floor of the crane suspended work platform shall have a solid non-slip surface with drain points to [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:50:Four independent sling wires shall be used for lifting the crane suspended work platform. All wire ropes and [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:50:All persons using the crane suspended work platform must be secured by a safety harness fixed to the [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:50:All cranes used for lifting crane suspended work platforms must be fitted with anti-two block devices to [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:51:For additional info on Platforms suspended by Crane please refer to Doc. No. AA426 52. [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:53:Safe means of promptly rescuing a fallen worker or a worker suspended by fall arrest shall be available at all [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:54:If there is any doubt about the security of any anchorage, suspension points or ties for a scaffold e.g. strength of [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:58:Strict cable management shall be enforced. Cables should be suspended off the ground by a minimum of 2 [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:65:worker suspended by fall arrest shall be available at all times. [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134151_1_CPP.pdf|R-2023-0224-CD-50134151_1_CPP.pdf]]:67: AA 426 52 Safe Use of Crane Suspended Work Platforms X [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-50134216_1_CEMP.pdf|R-2023-0224-CD-50134216_1_CEMP.pdf]]:14: Contaminants off- ensure that silt and other suspended solids and contaminants are not [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf|R-2023-0224-CD-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf]]:14: promoting the settlement of suspended siltation from the water. [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf|R-2023-0224-CD-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf]]:14:be provided across the surface water drainage network to intercept suspended silt close to [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf|R-2023-0224-CD-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf]]:14:to aid in the treatment of surface water by providing opportunity for suspended silt to settle, [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf|R-2023-0224-CD-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf]]:16:connections) shall be cast iron and, where appropriate shall be suspended from the above [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-ECL.007.04.01CEMP-ANNEX.4 Issue 2 COMPRESSED.pdf|R-2023-0224-CD-ECL.007.04.01CEMP-ANNEX.4 Issue 2 COMPRESSED.pdf]]:9: as repeatedly disobeying the HGV routing strategy will be suspended/banned from [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-ECL.007.04.01CEMP-ANNEX.4 Issue 2 COMPRESSED.pdf|R-2023-0224-CD-ECL.007.04.01CEMP-ANNEX.4 Issue 2 COMPRESSED.pdf]]:14: this plan and to be supported by the suspension/banning of any vehicle [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-ECL.007.04.01CEMP-ANNEX.2 Issue 2 COMPRESSED.pdf|R-2023-0224-CD-ECL.007.04.01CEMP-ANNEX.2 Issue 2 COMPRESSED.pdf]]:9: as repeatedly disobeying the HGV routing strategy will be suspended/banned from [[this>Teesworks/Planning/R-2023-0224-CD/R-2023-0224-CD-ECL.007.04.01CEMP-ANNEX.2 Issue 2 COMPRESSED.pdf|R-2023-0224-CD-ECL.007.04.01CEMP-ANNEX.2 Issue 2 COMPRESSED.pdf]]:14: this plan and to be supported by the suspension/banning of any vehicle [[this>Teesworks/Planning/R-2023-0247-OOM/R-2023-0247-OOM-TV_BAF_Heritage_Statement_Part_1of2.pdf|R-2023-0247-OOM-TV_BAF_Heritage_Statement_Part_1of2.pdf]]:25: by fast flowing water and clays that settle out of suspension during overbank [[this>Teesworks/Planning/R-2023-0247-OOM/R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf|R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf]]:147: attenuation pond will also help reduce suspended [[this>Teesworks/Planning/R-2023-0247-OOM/R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf|R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf]]:148: other suspended solids, as well as capture any spills/oil and grease, prior to [[this>Teesworks/Planning/R-2023-0247-OOM/R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf|R-2023-0247-OOM-TV_BAF_Shadow_HRA.pdf]]:20: could be deposited by vehicles leaving the site and re-suspended by [[this>Teesworks/Planning/R-2023-0247-OOM/R-2023-0247-OOM-TV_BAF_Air_Quality_Assessment.pdf|R-2023-0247-OOM-TV_BAF_Air_Quality_Assessment.pdf]]:11: where it may be deposited and then re-suspended by vehicles using the network. This arises when [[this>Teesworks/Planning/R-2023-0247-OOM/R-2023-0247-OOM-TV_BAF_Air_Quality_Assessment.pdf|R-2023-0247-OOM-TV_BAF_Air_Quality_Assessment.pdf]]:29: prone to suspension when dry due to small particle size), > 10 heavy earth [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:22: 16 ü Iron ore (in suspended matter load in controlled waters. Pyrite in [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:77: 8 migration via wind or suspended in steam to [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:97: E ü Heavy metals, suspended solids, carbon. [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1381: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters) [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1381: The electrical conductance of a soil suspension in water or [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1381: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1383: Suspended matter is removed from a measured volume of [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1383: Suspended Solids: [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1383: Suspended and the total suspended matter is determined gravimetrically [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1383:DETSC Suspended, Settleable and Total MCERTS(Waters)- [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1383: left in suspension after settlement for 1 hour (or other [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1383: agreed time) from the total suspended matter in the [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1384: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1384: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1384:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1386: Water Soluble particulates in suspension. contamination on former gasworks and [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1387: particulates in suspension. [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1409: Suspended solids Glass or plastic 100 CIP 2 Tech Spec none 5 days [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1436:sediment suspension as samples were filtered on the second monitoring round. The TPH and PAH [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1569: Water treatment separates suspended [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1607:suggest that suspended flor slabs will be more appropriate. [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1610:Ground beams and floor slabs would need to be suspended. [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf|R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf]]:1638:complete removal and weathering, use of suspended floors, and installation of piles isolated from potential [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf|R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf]]:12: suspended since 2019. [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf|R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf]]:39: silt and other suspended solids, as well as capture any spills/oil and grease, prior to [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF]]:12: suspended since 2019. [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter M - Mitigation and Monitoring - Dec 2020.PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter M - Mitigation and Monitoring - Dec 2020.PDF]]:15: to remove silt and other suspended solids, [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF]]:43: primarily when high levels of suspended solids and/or leachates from Made Ground have the [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF]]:46: remove silt and other suspended solids, as well as capture any spills/oil and [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF]]:48:Kinkerdale Beck sediments in surface retained within the site. The remove silt and other suspended solids, as [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF]]:55: and sediment suspended solids, as well as [[this>Teesworks/Planning/R-2020-0820-ESM/R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF|R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF]]:56: contaminants other suspended solids, as Not Significant [[this>Teesworks/Planning/R-2020-0270-FFM/R-2020-0270-FFM-EA R_2020_0270_FFM 26 June 2020 OFFICIAL.pdf|R-2020-0270-FFM-EA R_2020_0270_FFM 26 June 2020 OFFICIAL.pdf]]:2:0004). This would further reduce flow rates and aid the removal of suspended solids and [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Decision.pdf|R-2021-0432-FFM-Decision.pdf]]:2: time trigger) until such time as a scheme to treat and remove suspended [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf|R-2021-0432-FFM-10035118-AUK-XX-XX-RP-ZZ-0250-02-EP_Deployment - Supporting Information.pdf]]:15:  Water Treatment Plant to remove free phase hydrocarbons and suspended sediments. [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Off Rep.pdf|R-2021-0432-FFM-Off Rep.pdf]]:2:time trigger) until such time as a scheme to treat and remove suspended [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Off Rep.pdf|R-2021-0432-FFM-Off Rep.pdf]]:9: suspended solids and possible contamination from surface water run-off [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf|R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf]]:2:were present, the water did not contain suspended solids or contamination associated with the [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf|R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf]]:2:suspended solids. [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf|R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf]]:3:suspended solids and contaminants associated with the suspended solids. [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf|R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf]]:3:It should be considered that the water quality including chemical parameters, suspended solids and [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf|R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf]]:3:Suspended solids max 250 mg/l [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf|R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf]]:4: • Dewatering Pumps: pump(s) shall be required to uplift water and suspended sediments from [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf|R-2021-0432-FFM-10035117-AUK-XX-XX-SP-ZZ-0258-P1-Water Treatment Prairie Excavations -Se....pdf]]:5: remaining suspended particles which may remain in the water and prevent them from fouling [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-170988 - Prairie WTP - OM Manual_Issued.pdf|R-2021-0432-FFM-170988 - Prairie WTP - OM Manual_Issued.pdf]]:7: is to reduce the concentration of suspended solids in the aqueous phase. T2 is fitted [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-170988 - Prairie WTP - OM Manual_Issued.pdf|R-2021-0432-FFM-170988 - Prairie WTP - OM Manual_Issued.pdf]]:8: in reverse direction thus expanding the bed and forcing out trapped suspended solids. [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-170988 - Prairie WTP - OM Manual_Issued.pdf|R-2021-0432-FFM-170988 - Prairie WTP - OM Manual_Issued.pdf]]:14: processed, particularly the concentration of suspended solids. [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-170988 - Prairie WTP - OM Manual_Issued.pdf|R-2021-0432-FFM-170988 - Prairie WTP - OM Manual_Issued.pdf]]:17: removal of silts is more labour intensive. The water quality and level of suspended [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-170988 - Prairie WTP - OM Manual_Issued.pdf|R-2021-0432-FFM-170988 - Prairie WTP - OM Manual_Issued.pdf]]:20: suspended solids are filtered by the sand and accumulate within the top layer of the [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-170988 - Prairie WTP - OM Manual_Issued.pdf|R-2021-0432-FFM-170988 - Prairie WTP - OM Manual_Issued.pdf]]:20: suspended solids on the outlet of the sand filter. Sample taps are fitted to the sand [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF|R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF]]:1088: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters) [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF|R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF]]:1088: The electrical conductance of a soil suspension in water or [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF|R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF]]:1088: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF|R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF]]:1090: Suspended matter is removed from a measured volume of [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF|R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF]]:1090: Suspended Solids: [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF|R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF]]:1090: Suspended and the total suspended matter is determined gravimetrically [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF|R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF]]:1090:DETSC Suspended, Settleable and Total MCERTS(Waters)- [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF|R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF]]:1090: left in suspension after settlement for 1 hour (or other [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF|R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF]]:1090: agreed time) from the total suspended matter in the [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF|R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF]]:1091: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF|R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF]]:1091: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF|R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF]]:1091:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF|R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF]]:1093: Water Soluble particulates in suspension. contamination on former gasworks and [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF|R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF]]:1094: particulates in suspension. [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF|R-2021-0432-FFM-4155 The Former SSI Steelworks, Redcar - Contract 3 (Final Report).PDF]]:1116: Suspended solids Glass or plastic 100 CIP 2 Tech Spec none 5 days [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-EA R_2021_0432_FFM 15 July 2021 OFFICIAL .pdf|R-2021-0432-FFM-EA R_2021_0432_FFM 15 July 2021 OFFICIAL .pdf]]:1:trigger) until such time as a scheme to treat and remove suspended solids and possible [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-T1909 SOUTH TEEES DEVELOPMENT CORPORATION_Prairie Trade Effluent Consent.pdf|R-2021-0432-FFM-T1909 SOUTH TEEES DEVELOPMENT CORPORATION_Prairie Trade Effluent Consent.pdf]]:5: Suspended Solids dried at 105°C 200 - [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-T1909 SOUTH TEEES DEVELOPMENT CORPORATION_Prairie Trade Effluent Consent.pdf|R-2021-0432-FFM-T1909 SOUTH TEEES DEVELOPMENT CORPORATION_Prairie Trade Effluent Consent.pdf]]:5: Settled Suspended Solids dried at 200 - [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-T1909 SOUTH TEEES DEVELOPMENT CORPORATION_Prairie Trade Effluent Consent.pdf|R-2021-0432-FFM-T1909 SOUTH TEEES DEVELOPMENT CORPORATION_Prairie Trade Effluent Consent.pdf]]:6: reference card, demonstrating gross suspended solid removal. [[this>Teesworks/Planning/R-2021-0432-FFM/R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF|R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF]]:84: Water treatment separates suspended [[this>Teesworks/Planning/R-2023-0339-CD/R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:10: both an oil refinery and chemical plant. Refining was suspended in 2009, however, the site continues to [[this>Teesworks/Planning/R-2021-0846-FFM/R-2021-0846-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf|R-2021-0846-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf]]:20:ponds, which will be contribute to the removal of suspended sediment from the surface water discharge from [[this>Teesworks/Planning/R-2021-0846-FFM/R-2021-0846-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf|R-2021-0846-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf]]:21:attenuation pond, which will be contribute to the removal of suspended sediment from the surface water [[this>Teesworks/Planning/R-2021-0846-FFM/R-2021-0846-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf|R-2021-0846-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf]]:21:contribute to the removal of suspended sediment from the surface water discharge from these sites. [[this>Teesworks/Planning/R-2021-0846-FFM/R-2021-0846-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf|R-2021-0846-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf]]:22:exposes storage mounds are anticipated to result in elevated levels of suspended sediment. It is considered [[this>Teesworks/Planning/R-2021-0846-FFM/R-2021-0846-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf|R-2021-0846-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01 Drainage Strategy.pdf]]:22:Channel or the Knitting Wife Beck. In addition, it is anticipated that higher level of suspended sediment may [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:93:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:98: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters) [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:98: The electrical conductance of a soil suspension in water or [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:98: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:100: Suspended matter is removed from a measured volume of [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:100: Suspended Solids: [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:100: Suspended and the total suspended matter is determined gravimetrically [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:100:DETSC Suspended, Settleable and Total MCERTS(Waters)- [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:100: left in suspension after settlement for 1 hour (or other [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:100: agreed time) from the total suspended matter in the [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:101: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:101: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:101:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:103: Water Soluble particulates in suspension. contamination on former gasworks and [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:104: particulates in suspension. [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:22:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:27: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters) [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:27: The electrical conductance of a soil suspension in water or [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:27: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:29: Suspended matter is removed from a measured volume of [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:29: Suspended Solids: [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:29: Suspended and the total suspended matter is determined gravimetrically [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:29:DETSC Suspended, Settleable and Total MCERTS(Waters)- [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:29: left in suspension after settlement for 1 hour (or other [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:29: agreed time) from the total suspended matter in the [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:30: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:30: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:30:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:32: Water Soluble particulates in suspension. contamination on former gasworks and [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:33: particulates in suspension. [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:110:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:115: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters) [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:115: The electrical conductance of a soil suspension in water or [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:115: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:117: Suspended matter is removed from a measured volume of [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:117: Suspended Solids: [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:117: Suspended and the total suspended matter is determined gravimetrically [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:117:DETSC Suspended, Settleable and Total MCERTS(Waters)- [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:117: left in suspension after settlement for 1 hour (or other [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:117: agreed time) from the total suspended matter in the [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:118: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:118: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:118:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:120: Water Soluble particulates in suspension. contamination on former gasworks and [[this>Teesworks/Planning/R-2020-0730-CD/R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:121: particulates in suspension. [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-ECL.007.04.01CEMP-ANNEX.4 Issue 2 COMPRESSED.pdf|R-2023-0253-RMM-ECL.007.04.01CEMP-ANNEX.4 Issue 2 COMPRESSED.pdf]]:9: as repeatedly disobeying the HGV routing strategy will be suspended/banned from [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-ECL.007.04.01CEMP-ANNEX.4 Issue 2 COMPRESSED.pdf|R-2023-0253-RMM-ECL.007.04.01CEMP-ANNEX.4 Issue 2 COMPRESSED.pdf]]:14: this plan and to be supported by the suspension/banning of any vehicle [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf|R-2023-0253-RMM-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf]]:14: promoting the settlement of suspended siltation from the water. [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf|R-2023-0253-RMM-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf]]:14:be provided across the surface water drainage network to intercept suspended silt close to [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf|R-2023-0253-RMM-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf]]:14:to aid in the treatment of surface water by providing opportunity for suspended silt to settle, [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf|R-2023-0253-RMM-212018-DC-RP-C-01_P07-Drainage Strategy Report COMPRESSED.pdf]]:16:connections) shall be cast iron and, where appropriate shall be suspended from the above [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-ECL.007.04.01CEMP-ANNEX.2 Issue 2 COMPRESSED.pdf|R-2023-0253-RMM-ECL.007.04.01CEMP-ANNEX.2 Issue 2 COMPRESSED.pdf]]:9: as repeatedly disobeying the HGV routing strategy will be suspended/banned from [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-ECL.007.04.01CEMP-ANNEX.2 Issue 2 COMPRESSED.pdf|R-2023-0253-RMM-ECL.007.04.01CEMP-ANNEX.2 Issue 2 COMPRESSED.pdf]]:14: this plan and to be supported by the suspension/banning of any vehicle [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:4:5.21.5 Platforms suspended by Crane ............................................................................................................................. 50 [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:44:Platform Procedure (AA426 51) and Safe use of Crane Suspended Work Platforms (AA426 52). [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:50:5.21.5 Platforms suspended by Crane [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:50:Crane suspended work platforms can only be used where other means of reaching an elevated work [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:50:Use of crane suspended work platforms requires HZI Site Management authorisation in writing. [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:50:When the carriage of personnel by crane suspended work platform is required, and subject to HZI [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:50:restriction/approval, the crane suspended work platforms must be suitably tested by an authorised [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:50:All sides of the crane suspended work platform shall be enclosed by a top guard rail, 1.1 meters high and [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:50:The floor of the crane suspended work platform shall have a solid non-slip surface with drain points to [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:50:Four independent sling wires shall be used for lifting the crane suspended work platform. All wire ropes and [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:50:All persons using the crane suspended work platform must be secured by a safety harness fixed to the [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:50:All cranes used for lifting crane suspended work platforms must be fitted with anti-two block devices to [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:51:For additional info on Platforms suspended by Crane please refer to Doc. No. AA426 52. [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:53:Safe means of promptly rescuing a fallen worker or a worker suspended by fall arrest shall be available at all [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:54:If there is any doubt about the security of any anchorage, suspension points or ties for a scaffold e.g. strength of [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:58:Strict cable management shall be enforced. Cables should be suspended off the ground by a minimum of 2 [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:65:worker suspended by fall arrest shall be available at all times. [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134151_1_CPP.pdf|R-2023-0253-RMM-50134151_1_CPP.pdf]]:67: AA 426 52 Safe Use of Crane Suspended Work Platforms X [[this>Teesworks/Planning/R-2023-0253-RMM/R-2023-0253-RMM-50134216_1_CEMP.pdf|R-2023-0253-RMM-50134216_1_CEMP.pdf]]:14: Contaminants off- ensure that silt and other suspended solids and contaminants are not [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:28:structures and capital dredging, increased suspended sediment concentrations and increased sediment [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:28:ecological receptors as a result of increased suspended sediment concentrations or sediment deposition [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:29:areas. Impacts on fish resources within the subtidal area, as a result of increased suspended sediment, [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:29:Adverse impacts may be expected as a result of temporary increases in suspended sediment during [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:29:or suspension of contaminants, are not considered to have any significant impact on resident or [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:51: a short-lived localised increase in suspended sediment concentrations by the order of a few hundred [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:51: A potential impact on water quality has been identified due to the resuspension of sediment, [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:51: plume modelling shows relatively limited areas of high suspended solids concentrations, which only [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:51: occur for a matter of hours at a time before the suspended sediment concentrations return to [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:51: does not predict long term and large scale extends of elevated concentrations of suspended solids; [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:61:resuspension of contaminants during dredging [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:105: suspensions or pending prosecutions [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:166: and surface deposit-feeder, whose feeding activities result in sediment resuspension through GS13, GS15, GS21, GS24, GS26) [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:169: addition, as detailed in the EIA Report it is predicted that suspended [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:170: within sediments to other areas of the Tees (due to resuspension of [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:170: suspended sediment during dredging, which will minimise the risk of [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:170: suspended sediment would likely re-settle in areas close to the [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf]]:184: quality due to resuspension water quality monitoring scheme has been [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:28:structures and capital dredging, increased suspended sediment concentrations and increased sediment [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:28:ecological receptors as a result of increased suspended sediment concentrations or sediment deposition [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:29:areas. Impacts on fish resources within the subtidal area, as a result of increased suspended sediment, [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:29:Adverse impacts may be expected as a result of temporary increases in suspended sediment during [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:29:or suspension of contaminants, are not considered to have any significant impact on resident or [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:51: a short-lived localised increase in suspended sediment concentrations by the order of a few hundred [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:51: A potential impact on water quality has been identified due to the resuspension of sediment, [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:51: plume modelling shows relatively limited areas of high suspended solids concentrations, which only [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:51: occur for a matter of hours at a time before the suspended sediment concentrations return to [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:51: does not predict long term and large scale extends of elevated concentrations of suspended solids; [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:61:resuspension of contaminants during dredging [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:105: suspensions or pending prosecutions [[this>Teesworks/Planning/R-2021-0943-CD/R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf|R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf]]:156: quality due to resuspension water quality monitoring scheme has been [[this>Teesworks/Planning/R-2022-0411-CD/R-2022-0411-CD-32435-HM-AC-RP-01_00 ISSUE.pdf|R-2022-0411-CD-32435-HM-AC-RP-01_00 ISSUE.pdf]]:13: • It has been assumed that internal office space has hard suspended ceiling. [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1347:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1352: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters) [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1352: The electrical conductance of a soil suspension in water or [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1352: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1354: Suspended matter is removed from a measured volume of [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1354: Suspended Solids: [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1354: Suspended and the total suspended matter is determined gravimetrically [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1354:DETSC Suspended, Settleable and Total MCERTS(Waters)- [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1354: left in suspension after settlement for 1 hour (or other [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1354: agreed time) from the total suspended matter in the [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1355: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1355: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1355:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1357: Water Soluble particulates in suspension. contamination on former gasworks and [[this>Teesworks/Planning/R-2020-0318-FFM/R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf|R-2020-0318-FFM-10035117-AUK-XX-XX-RP-ZZ-0117-01-Prairie_ESA_Addendum.pdf]]:1358: particulates in suspension. [[this>Teesworks/Planning/R-2021-0924-CD/R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:38: result in increased sediment suspension, potentially [[this>Teesworks/Planning/R-2021-0924-CD/R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:44: caused by increases in suspended sediment, reduced [[this>Teesworks/Planning/R-2021-0924-CD/R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:44: suspended sediment causing increases in nutrients [[this>Teesworks/Planning/R-2021-0924-CD/R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:45: sediment suspension in the water body, potentially [[this>Teesworks/Planning/R-2021-0924-CD/R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:45: resulting in localised increases in nutrients suspended [[this>Teesworks/Planning/R-2021-0924-CD/R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:53: growth (Appendix A), therefore any suspended silt is not [[this>Teesworks/Planning/R-2021-0924-CD/R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:53: caused by increases in suspended sediment, [[this>Teesworks/Planning/R-2021-0924-CD/R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf|R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf]]:54: Adverse impacts may also result from suspended [[this>Teesworks/Planning/R-2023-0291-ESM/R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf|R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf]]:17: remove suspended sediment before discharge to surface water or to ground. If oil is observed in the [[this>Teesworks/Planning/R-2020-0799-CD/R-2020-0799-CD-Nov 2020 - 2383 - CEMP - Prairie Phase 2 Works Prairie Rev 2 (1).pdf|R-2020-0799-CD-Nov 2020 - 2383 - CEMP - Prairie Phase 2 Works Prairie Rev 2 (1).pdf]]:23: • use of silt traps used to capture suspended solids; [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf]]:70: Suspended solids Glass or plastic 100 ISO 5667 3:2018 none 2 days [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf]]:74: The pH value of a soil suspension in water or a groundwater sample is determined electrometrically using a glass BS1377: Part 3: 1990 – Soils for Civil Engineering Purposes – Chemical and [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf]]:74: The electrical conductance of a soil suspension in water or of a water sample is determined by voltammetry using Standard Methods for the Examination of water and Wastewater Part 2510B 21st [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf]]:74: salt e.g. the conductivity of topsoil is determined by preparing a suspension of the soil in saturated calcium [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf]]:75: Suspended matter is removed from a measured volume of sample by filtration under reduced pressure through a [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf]]:75: pre-treated, pre-weighed glass fibre filter paper. The paper is washed with deionised water to remove dissolved Suspended Solids: UKAS [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf]]:75: SCA Method ISBN 011 751957 X Suspended, Settleable and Total Dissolved Solids [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf]]:75: DETSC 2034 Suspended and Settleable Solids in Water salts and the total suspended matter is determined gravimetrically after drying at 105 ±5°C. Settleable solids are 5 mg/l [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf]]:75: determined by subtracting the solids left in suspension after settlement for 1 hour (or other agreed time) from the Settleable Solids: Not Accredited [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf]]:75: total suspended matter in the sample. [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf]]:76: Water samples are pre-filtered to remove any suspended solids and evaporated in an oven at 180°C. The amount [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf]]:76: SCA Method ISBN 011 751957 X Suspended, Settleable and Total Dissolved Solids Total Dissolved Solids: UKAS [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf]]:76: The sample is shaken to ensure homogeneity of any suspended matter. The sample is then evaporated and the [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf]]:76: filtration prior to analysis. Waters are filtered prior to analysis to remove any particulates in suspension. Soil: 0.2mg/kg [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf]]:77: suspension. The water soluble boron in the extract or filtrate reacts with azomethine–H to produce a yellow [[this>Teesworks/Planning/R-2022-0237-CD/R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf|R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 13.pdf]]:78: Waters are filtered prior to analysis to remove any particulates in suspension. The sugar in the filtrate reacts with [[this>Teesworks/Planning/MLA_2020_00507/Consultations/338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf|338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf]]:4: To restrict suspended sediment plumes to one side of the estuary at a time, and [[this>Teesworks/Planning/MLA_2020_00507/Consultations/338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf|338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf]]:6: To restrict suspended sediment plumes to one side of the estuary at a time, in [[this>Teesworks/Planning/MLA_2020_00507/Consultations/338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf|338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf]]:7: works must be suspended. Once temperatures have not reached zero degrees [[this>Teesworks/Planning/MLA_2020_00507/Consultations/338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf|338486 - 338489, NE formal response to SBW MLA, 29.01.21.pdf]]:9: suspended sediment [[this>Teesworks/Planning/MLA_2020_00507/Consultations/20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf|20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf]]:2: suspended sediment brought in from the sea. Short term peaks in suspended sediment (during [[this>Teesworks/Planning/MLA_2020_00507/Consultations/20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf|20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf]]:3: are presented principally as changes in suspended sediment concentration (SSC), the principal [[this>Teesworks/Planning/MLA_2020_00507/Consultations/20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf|20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf]]:4: In coastal process terms, the temporary suspension itself is indeed probably of minor [[this>Teesworks/Planning/MLA_2020_00507/Consultations/20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf]]:3: i. Changes in marine water quality (i.e. increased suspended sediment) due to dredging [[this>Teesworks/Planning/MLA_2020_00507/Consultations/20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf]]:6: season (e.g. salmon), as a result of increased suspended sediment concentrations, poor water [[this>Teesworks/Planning/MLA_2020_00507/Consultations/20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf]]:7: suspended sediment concentrations and the extent of the plume across the river channel will be [[this>Teesworks/Planning/MLA_2020_00507/Consultations/20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf]]:7: conditions are present (Sigler et al., 1984; Bash et al., 2001). The effects of suspended sediment [[this>Teesworks/Planning/MLA_2020_00507/Consultations/20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf]]:7: relevant, suspended sediment-generated turbidities. [[this>Teesworks/Planning/MLA_2020_00507/Consultations/20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf]]:12:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine an estuarine [[this>Teesworks/Planning/MLA_2020_00507/Consultations/20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf]]:12:Bash, J., Berman, C. and Bolton, S. (2001). Effects of Turbidity and Suspended Solids on Salmonids. [[this>Teesworks/Planning/MLA_2020_00507/Consultations/20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf]]:12:Berg, L. (1982). The effect of exposure to short-term pulses of suspended sediment on the behaviour [[this>Teesworks/Planning/MLA_2020_00507/Consultations/20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf]]:12:Berli, B.I. et al. (2014). Acute exposure to a common suspended sediment affects the swimming [[this>Teesworks/Planning/MLA_2020_00507/Consultations/20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf]]:12:Gilmour, J. (1999). Experimental investigation into the effects of suspended sediment on fertilisation, [[this>Teesworks/Planning/MLA_2020_00507/Consultations/20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf]]:14:Elevated concentrations of suspended sediment can have the following physical effects on all life stage [[this>Teesworks/Planning/MLA_2020_00507/Consultations/20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf]]:14: suspended sediment concentration, water velocity and gill dimensions (Appleby and Scarratt, [[this>Teesworks/Planning/MLA_2020_00507/Consultations/20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf]]:15: v. Re-suspension of sediments causes nutrient enrichment promoting the formation of algal [[this>Teesworks/Planning/MLA_2020_00507/Consultations/20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf|20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf]]:15: vi. Resuspension of sediments resulting from dredging can smother organisms and hinder [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf]]:11:localised increase in suspended sediment concentrations by the order of a few hundred mg/l at the point of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf]]:12:A potential impact on water quality has been identified due to the resuspension of sediment, principally as [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf]]:12:relatively limited areas of high suspended solids concentrations, which only occur for a matter of hours at a [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf]]:12:time before the suspended sediment concentrations return to baseline values. No significant impacts are [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf]]:12:resuspension of sediments. Such measures include dredging in long strips to ensure the plume is located [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf]]:13:and capital dredging, increased suspended sediment concentrations and increased sediment deposition. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf]]:13:ecological receptors as a result of increased suspended sediment concentrations or sediment deposition [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf]]:15:Impacts on fish resources within the subtidal area, as a result of increased suspended sediment, would only [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf]]:15:Other water quality issues, such as a reduction in dissolved oxygen or suspension of contaminants, are not [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:32: • Suspended deck. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:32:A piled suspended deck structure would be technically feasible, however this option would require more [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:32:suspended deck option also reduces the potential for the incorporation of environmental enhancement [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:32:such as ‘verti-pools’. The suspended deck also offers reduced future flexibility compared to the combi-piled [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:32:suspended deck should STDC seek to increase the load rating of the quay in the future. The suspended [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:53: as stop start thresholds for parameters such as suspended sediment and 13 and Section 7 [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:54:1989 between waves, tides and suspended mud HR Wallingford, 1989 [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:57: and suspended mud concentrations [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:60: predict movement of suspended sediment from the proposed dredging and disposal activities by [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:81:Suspended sediment concentrations [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:81:In general, suspended sediment concentrations (SSCs) are low within the estuary and within Tees Bay. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:81:the highest suspended sediment levels occur close to high water. After storm periods, higher concentrations [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:81:of suspended sediment have been noted around the Shell Jetty, but with little penetration further up the [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:81: Suspended sediment concentrations (mg/l) [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:84:concentrations in Tees Bay are raised by the re-suspension of material from the seabed during storm events. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:84:induced currents, vessel induced forces and re-suspension by dredging operations. These last two were [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:84:be re-suspended and moved further upstream into the estuary. Inputs to the system can be summarised [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:85: when concentrations in Tees Bay are raised by the resuspension of material from the seabed during [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:91:changes in bed thickness when the suspended sediment falls from the plume to become deposited on the [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:110:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:110:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents (for [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:112:material will become re-suspended by tidal currents or dredged during maintenance campaigns of the river [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:113:re-suspended by tidal currents or will be removed during maintenance dredging campaigns of the river [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:118:as some material falls relatively quickly to the sea bed whilst the material remaining in suspension starts to [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:118:transport it in suspension in the water column in the appropriate direction of dispersion (i.e. to the north- [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:122:relatively quickly to the sea bed whilst the material remaining in suspension starts to further disperse in [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:131:and all sediment particles suspended in the water column will eventually settle to the river or seabed, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:131:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:141:maintenance dredging is likely to be due to the low levels of suspended sediment measured in this reach of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:143: including stop / start thresholds for parameters such as suspended [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:156:In general, suspended sediment concentrations are low within the estuary and within Tees Bay. The highest [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:156:downstream. In the vicinity of the proposed scheme (i.e. in the Tees Dock area) suspended solid [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:156:within the estuary) and analysed in the laboratory for suspended sediment concentrations. The results [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:156:this period, concentrations of suspended sediment were very low. It should be noted however, that the [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:156:Table 7.8 Suspended sediment concentrations recorded at Transect T8 in July 2020 [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:156: Suspended sediment concentrations (mg/l) [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:157:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:158:Figure 7. 3 Plume of suspended sediment concentrations arising from dredging activities during Stage 2 [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:160:Figure 7. 5 Plume of suspended sediment concentrations arising from dredging activities during Stage [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:161:Figure 7.6 Plume of enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:161:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:162:Figure 7.7 Timeseries of changes in suspended sediment concentrations at water quality monitoring [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:162:Only point 3 (Smiths Dock – Figure 7.2) experiences elevated levels of suspended solids and only during [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:164: Calculated loss of sediment derived using indicative values for the mass of sediment resuspended per m 3 of dredged material in CIRIA guidance (John et al., 1999) in kg/m3. Worst case S-Factor for [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:166: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:166:Dock water quality monitoring point (point 3) could experience elevated levels of suspended solid [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:167:As these works progress, there is the potential for sediment to be suspended when working in and around [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:167:the riverbed. However, any increases in suspended solids concentrations are likely to be highly localised [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:191: • Impacts on marine ecology from increased suspended sediment during capital dredging and [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:210:9.5.2 Effects of increased suspended sediment concentrations during dredging [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:210:will disturb sediment, which will result in localised and short-term increases in suspended sediment [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:210:ecology as a result of increased concentrations of suspended sediment within the water column (i.e. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:210:resuspended sediment which does not contain elevations beyond Action Level 2). The dredged sediment [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:210:filter feeding molluscs). In addition, high concentrations of suspended sediment may impact on fish through [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:210:Mean background suspended solid levels in the vicinity of the proposed scheme (based on metocean [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:211:during spring tides (Section 7.4.2). These are considerably lower than suspended sediment concentrations [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:211:For both types of dredger (backhoe and TSHD), peak suspended solids concentrations are predicted in the [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:211:suspended sediment concentrations depending on the stage of dredging (as described in Section 6). In all [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:211:importance (where information is available) to increases in suspended sediment. This information is [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:211:S. spinulosa relies on suspended particles for its tube growth. Increased suspended sediment [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:211:to increases in suspended sediment concentrations, according to this sensitivity review. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:211:sediment likely gets resuspended regularly, and where accretion rates and moderate to high. A. islandica [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:211:resilience and is not sensitive to changes in suspended solids (Tyler-Walters & Sabatini, 2017). [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:211:the proposed dredge is considered to be of low sensitivity to increases in suspended sediment. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:212:resistance and resilience to changes in suspended sediment and was reported to be not sensitive (to [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:212:changes in suspended sediment) (De-Bastos, 2016). As such, for the purposes of this assessment, the [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:212:Given the temporary and localised nature of the predicted increase in suspended sediment, in addition to [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:212:the low/very low sensitivity of the key species present in the estuary to increased suspended sediment, an [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:212:During the capital dredging a proportion of the material that is dredged would be disturbed and re-suspended [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:212:is 32.5ha. This is expected to cause a very limited extent of suspended sediment concentrations, and [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:212:Some of the sediment that is suspended as a result of the dredging activities will be deposited to the [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:212:suspension by the prevailing currents (for finer-grained sediment fractions) (Section 6). The modelling [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:212:carried out on this, as reported in Section 6, indicates that much of the resuspended sediment is deposited [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:213:and any species of conservation importance (where information is available) to increases in suspended [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:213:A sudden smothering of 5cm of sediment would temporarily suspend the feeding and respiration of A. alba [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:240:Infrastructure and placement of rock into the berth pocket) would result in an increase in suspended [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:240:relied upon solely. Therefore, any increases in suspended sediments during dredging or other activities will [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:240:disturbance and temporary loss of seabed habitat; increased suspended sediment concentrations and [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:297:tern species as a result of increased suspended sediments during the construction phase. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:297:and re-suspension of sediment (Cook and Burton, 2010). However, common terns typically only dive to 1m [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:298:in suspension from the point of release. Most falls within the dredged areas, whilst deposition elsewhere is [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:309: thresholds for parameters such as suspended sediment and [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:318:dredging, is provided in Section 6. The peak suspended sediment concentration within the Tees during the [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:319:of suspended sediments are predicted to decrease significantly with increased distance from the dredging [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:478:to the seabed whilst the material remaining in suspension starts to further disperse in spatial extent. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:478:longer, until the subsequent ebb or flood phase of the tide starts to transport it in suspension in the water [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:482: Increase in suspended [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:482:sensitive to smothering or increases in suspended sediment. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:488:The offshore disposal of dredged material would temporarily increase the suspended sediment [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:488:relied upon solely. Therefore, any increases in suspended sediments will have a negligible impact on [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:488:temporary loss of seabed habitat, increased suspended sediment concentrations and sediment re- [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:490:disturbance and increased suspended sediments on migratory fish). [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:500: • dispersion of suspended sediment during capital dredging and deposition at the offshore disposal [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:500:(increased suspended sediment concentrations) are relevant to the CIA. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:500:Dispersion of suspended sediment and deposition on the seabed during capital dredging [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:500:immediately after the period of construction. This is because fine material will be released into suspension, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:501:27.3 presents a summary of the results of the predictive modelling of suspended sediment concentration [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:501:A review of all EIA studies for the above projects highlights that the maximum increase in suspended [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:501:resulting in a significantly reduced concentration of suspended sediment beyond the source of the plume. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:503: • effect of increases in suspended sediments during maintenance dredging on food resources of SPA [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:503:Mitigation measures to limit the suspension of sediment and subsequent deposition of sediment during [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:503:into a sealed barge) for dredging of unconsolidated material to minimise resuspension in the water column. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:506: • dispersion of suspended sediment during marine works, dredging and disposal; and, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:513:into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension in the [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:526: 24.Reduce sediment resuspension [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:528: suspended solids [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:528: The installation and presence of the rock impacted is less than suspended solids [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:532:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:532:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:534:Figure 28.4 Timeseries of changes in suspended sediment concentrations at water quality monitoring [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:534:Only water quality monitoring point WQ3 (Smiths Dock) shows elevated levels of suspended solid [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:534:The resuspension of sediment could also potentially affect dissolved oxygen levels in the water. This is due [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:535: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:535:increases in suspended solids concentrations above baseline (up to 85mg/l which decreases to baseline [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:535:suspended solids when in close proximity to the dredger. As a result, a non-temporary deterioration in water [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:537:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:537:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents for [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:538:An increase in suspended sediment in the water column may lead to physiological effects in finfish, including [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:538:to increased suspended solids is low, according to the MarLIN sensitivity scoring index. Mobile species [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:539: Reduce sediment resuspension disposal activities currently ongoing. Disposal would be [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:541: Reduce sediment resuspension [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:542: Reduce sediment resuspension [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:545:maximum concentrations of suspended solids are localised to the dredging activity and quickly disperse [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:549:suspended sediment thus reducing the risk of significant water quality effects. Mitigation measures to [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:572:river dredging are characterised by a short-lived localised increase in suspended sediment concentrations [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:584:low, with any effect confined to the footprint of the proposed dredge. The predicted increase in suspended [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:584:loading into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:588:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine and estuarine fish [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf]]:592:HR Wallingford (1989a). Tees Weir Feasibility Study - Correlation between waves, tides and suspended [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:61:The re-calibrated 3D Tees Estuary Tidal Model will be used to predict movement of suspended sediment [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:61:(in particular the effect of resuspension and dispersion of sediment during dredging and disposal activities). [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:92: 7.3 Suspended Sediment Conversion .....................................................................................................20 [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:108:7.3 Suspended Sediment Conversion [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:117: Suspended P1983.04.06.D08 - Suspended Solids Lab Results_Spring 24072020 [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:117: Solids P1983.04.06.D09 - Suspended Solids Lab Results_Neap 30072020 [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:137:Figure 5.5: Maximum enhanced suspended sediment concentrations arising from dredging [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:137:Figure 5.6: Maximum enhanced suspended sediment concentrations arising from dredging [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:137:Figure 5.7: Maximum enhanced suspended sediment concentrations arising from dredging [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:137:Figure 5.8: Maximum enhanced suspended sediment concentrations arising from dredging [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:137:Figure 5.9: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:137:Figure 5.10: Maximum enhanced suspended sediment concentrations (near-surface layer) arising [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:137:Figure 5.12: Maximum enhanced suspended sediment concentrations (near-bed layer) arising [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:139: movement of suspended sediment from the proposed dredging and disposal activities by coupling with [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:191:investigate the suspended sediment transport effects of the proposed dredging of the channel and the berth [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:192:The sediment dispersion model has been setup with 4 layers in order to differentiate between suspended [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:200:disposal activities. Note that all the modelling plots in following sections show the elevations in suspended [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:201: Figure 5.5: Maximum enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:202: Figure 5.6: Maximum enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:203: Figure 5.7: Maximum enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:204: Figure 5.8: Maximum enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:205: Figure 5.9: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from dredging activities [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:206: Figure 5.10: Maximum enhanced suspended sediment concentrations (near-surface layer) arising from dredging activities [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:209: Figure 5.12: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from disposal activities [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:210:and all sediment particles suspended in the water column will eventually settle to the river or sea bed, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf]]:211:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-10.pdf|MLA_2020_00507-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-10.pdf]]:2:that the most important potential coastal process impact would be changes in suspended sediment plumes, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-10.pdf|MLA_2020_00507-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-10.pdf]]:2:suspended sediment plumes; that being each disposal within the licensed disposal site being released at [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-10.pdf|MLA_2020_00507-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-10.pdf]]:16:suspended sediment from any stage of the dredging). It is important to note that this type of figure does [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-Decision Letter (Marine)-16.pdf|MLA_2020_00507-Decision Letter (Marine)-16.pdf]]:1:fail to comply with all the conditions in the licence we may vary, suspend or revoke your [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-Decision Letter (Marine)-16.pdf|MLA_2020_00507-Decision Letter (Marine)-16.pdf]]:2:suspending or revoking the licence. Our terms and conditions relating to charging can [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-Decision Letter (Marine)-16.pdf|MLA_2020_00507-Decision Letter (Marine)-16.pdf]]:3: Suspended sediment concentrations [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:32: • Suspended deck. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:32:A piled suspended deck structure would be technically feasible, however this option would require more [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:32:suspended deck option also reduces the potential for the incorporation of environmental enhancement [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:32:such as ‘verti-pools’. The suspended deck also offers reduced future flexibility compared to the combi-piled [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:32:suspended deck should STDC seek to increase the load rating of the quay in the future. The suspended [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:53: as stop start thresholds for parameters such as suspended sediment and 13 and Section 7 [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:54:1989 between waves, tides and suspended mud HR Wallingford, 1989 [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:57: and suspended mud concentrations [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:60: predict movement of suspended sediment from the proposed dredging and disposal activities by [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:81:Suspended sediment concentrations [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:81:In general, suspended sediment concentrations (SSCs) are low within the estuary and within Tees Bay. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:81:the highest suspended sediment levels occur close to high water. After storm periods, higher concentrations [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:81:of suspended sediment have been noted around the Shell Jetty, but with little penetration further up the [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:81: Suspended sediment concentrations (mg/l) [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:84:concentrations in Tees Bay are raised by the re-suspension of material from the seabed during storm events. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:84:induced currents, vessel induced forces and re-suspension by dredging operations. These last two were [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:84:be re-suspended and moved further upstream into the estuary. Inputs to the system can be summarised [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:85: when concentrations in Tees Bay are raised by the resuspension of material from the seabed during [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:91:changes in bed thickness when the suspended sediment falls from the plume to become deposited on the [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:110:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:110:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents (for [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:112:material will become re-suspended by tidal currents or dredged during maintenance campaigns of the river [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:113:re-suspended by tidal currents or will be removed during maintenance dredging campaigns of the river [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:118:as some material falls relatively quickly to the sea bed whilst the material remaining in suspension starts to [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:118:transport it in suspension in the water column in the appropriate direction of dispersion (i.e. to the north- [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:122:relatively quickly to the sea bed whilst the material remaining in suspension starts to further disperse in [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:131:and all sediment particles suspended in the water column will eventually settle to the river or seabed, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:131:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:141:maintenance dredging is likely to be due to the low levels of suspended sediment measured in this reach of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:143: including stop / start thresholds for parameters such as suspended [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:156:In general, suspended sediment concentrations are low within the estuary and within Tees Bay. The highest [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:156:downstream. In the vicinity of the proposed scheme (i.e. in the Tees Dock area) suspended solid [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:156:within the estuary) and analysed in the laboratory for suspended sediment concentrations. The results [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:156:this period, concentrations of suspended sediment were very low. It should be noted however, that the [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:156:Table 7.8 Suspended sediment concentrations recorded at Transect T8 in July 2020 [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:156: Suspended sediment concentrations (mg/l) [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:157:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:158:Figure 7. 3 Plume of suspended sediment concentrations arising from dredging activities during Stage 2 [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:160:Figure 7. 5 Plume of suspended sediment concentrations arising from dredging activities during Stage [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:161:Figure 7.6 Plume of enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:161:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:162:Figure 7.7 Timeseries of changes in suspended sediment concentrations at water quality monitoring [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:162:Only point 3 (Smiths Dock – Figure 7.2) experiences elevated levels of suspended solids and only during [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:164: Calculated loss of sediment derived using indicative values for the mass of sediment resuspended per m 3 of dredged material in CIRIA guidance (John et al., 1999) in kg/m3. Worst case S-Factor for [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:166: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:166:Dock water quality monitoring point (point 3) could experience elevated levels of suspended solid [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:167:As these works progress, there is the potential for sediment to be suspended when working in and around [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:167:the riverbed. However, any increases in suspended solids concentrations are likely to be highly localised [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:191: • Impacts on marine ecology from increased suspended sediment during capital dredging and [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:210:9.5.2 Effects of increased suspended sediment concentrations during dredging [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:210:will disturb sediment, which will result in localised and short-term increases in suspended sediment [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:210:ecology as a result of increased concentrations of suspended sediment within the water column (i.e. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:210:resuspended sediment which does not contain elevations beyond Action Level 2). The dredged sediment [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:210:filter feeding molluscs). In addition, high concentrations of suspended sediment may impact on fish through [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:210:Mean background suspended solid levels in the vicinity of the proposed scheme (based on metocean [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:211:during spring tides (Section 7.4.2). These are considerably lower than suspended sediment concentrations [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:211:For both types of dredger (backhoe and TSHD), peak suspended solids concentrations are predicted in the [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:211:suspended sediment concentrations depending on the stage of dredging (as described in Section 6). In all [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:211:importance (where information is available) to increases in suspended sediment. This information is [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:211:S. spinulosa relies on suspended particles for its tube growth. Increased suspended sediment [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:211:to increases in suspended sediment concentrations, according to this sensitivity review. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:211:sediment likely gets resuspended regularly, and where accretion rates and moderate to high. A. islandica [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:211:resilience and is not sensitive to changes in suspended solids (Tyler-Walters & Sabatini, 2017). [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:211:the proposed dredge is considered to be of low sensitivity to increases in suspended sediment. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:212:resistance and resilience to changes in suspended sediment and was reported to be not sensitive (to [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:212:changes in suspended sediment) (De-Bastos, 2016). As such, for the purposes of this assessment, the [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:212:Given the temporary and localised nature of the predicted increase in suspended sediment, in addition to [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:212:the low/very low sensitivity of the key species present in the estuary to increased suspended sediment, an [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:212:During the capital dredging a proportion of the material that is dredged would be disturbed and re-suspended [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:212:is 32.5ha. This is expected to cause a very limited extent of suspended sediment concentrations, and [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:212:Some of the sediment that is suspended as a result of the dredging activities will be deposited to the [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:212:suspension by the prevailing currents (for finer-grained sediment fractions) (Section 6). The modelling [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:212:carried out on this, as reported in Section 6, indicates that much of the resuspended sediment is deposited [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:213:and any species of conservation importance (where information is available) to increases in suspended [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:213:A sudden smothering of 5cm of sediment would temporarily suspend the feeding and respiration of A. alba [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:240:Infrastructure and placement of rock into the berth pocket) would result in an increase in suspended [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:240:relied upon solely. Therefore, any increases in suspended sediments during dredging or other activities will [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:240:disturbance and temporary loss of seabed habitat; increased suspended sediment concentrations and [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:297:tern species as a result of increased suspended sediments during the construction phase. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:297:and re-suspension of sediment (Cook and Burton, 2010). However, common terns typically only dive to 1m [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:298:in suspension from the point of release. Most falls within the dredged areas, whilst deposition elsewhere is [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:309: thresholds for parameters such as suspended sediment and [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:318:dredging, is provided in Section 6. The peak suspended sediment concentration within the Tees during the [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:319:of suspended sediments are predicted to decrease significantly with increased distance from the dredging [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:478:to the seabed whilst the material remaining in suspension starts to further disperse in spatial extent. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:478:longer, until the subsequent ebb or flood phase of the tide starts to transport it in suspension in the water [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:482: Increase in suspended [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:482:sensitive to smothering or increases in suspended sediment. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:488:The offshore disposal of dredged material would temporarily increase the suspended sediment [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:488:relied upon solely. Therefore, any increases in suspended sediments will have a negligible impact on [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:488:temporary loss of seabed habitat, increased suspended sediment concentrations and sediment re- [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:490:disturbance and increased suspended sediments on migratory fish). [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:500: • dispersion of suspended sediment during capital dredging and deposition at the offshore disposal [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:500:(increased suspended sediment concentrations) are relevant to the CIA. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:500:Dispersion of suspended sediment and deposition on the seabed during capital dredging [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:500:immediately after the period of construction. This is because fine material will be released into suspension, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:501:27.3 presents a summary of the results of the predictive modelling of suspended sediment concentration [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:501:A review of all EIA studies for the above projects highlights that the maximum increase in suspended [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:501:resulting in a significantly reduced concentration of suspended sediment beyond the source of the plume. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:503: • effect of increases in suspended sediments during maintenance dredging on food resources of SPA [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:503:Mitigation measures to limit the suspension of sediment and subsequent deposition of sediment during [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:503:into a sealed barge) for dredging of unconsolidated material to minimise resuspension in the water column. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:506: • dispersion of suspended sediment during marine works, dredging and disposal; and, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:513:into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension in the [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:526: 24.Reduce sediment resuspension [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:528: suspended solids [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:528: The installation and presence of the rock impacted is less than suspended solids [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:532:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:532:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:534:Figure 28.4 Timeseries of changes in suspended sediment concentrations at water quality monitoring [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:534:Only water quality monitoring point WQ3 (Smiths Dock) shows elevated levels of suspended solid [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:534:The resuspension of sediment could also potentially affect dissolved oxygen levels in the water. This is due [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:535: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:535:increases in suspended solids concentrations above baseline (up to 85mg/l which decreases to baseline [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:535:suspended solids when in close proximity to the dredger. As a result, a non-temporary deterioration in water [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:537:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:537:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents for [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:538:An increase in suspended sediment in the water column may lead to physiological effects in finfish, including [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:538:to increased suspended solids is low, according to the MarLIN sensitivity scoring index. Mobile species [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:539: Reduce sediment resuspension disposal activities currently ongoing. Disposal would be [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:541: Reduce sediment resuspension [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:542: Reduce sediment resuspension [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:545:maximum concentrations of suspended solids are localised to the dredging activity and quickly disperse [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:549:suspended sediment thus reducing the risk of significant water quality effects. Mitigation measures to [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:572:river dredging are characterised by a short-lived localised increase in suspended sediment concentrations [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:584:low, with any effect confined to the footprint of the proposed dredge. The predicted increase in suspended [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:584:loading into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:588:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine and estuarine fish [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf|MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf]]:592:HR Wallingford (1989a). Tees Weir Feasibility Study - Correlation between waves, tides and suspended [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:173: Significant operation temporarily suspended). These hazards and associated risk [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:173: 9 - 10 High permanently suspended). These hazards and associated risk control [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:190: injury immediate area within site suspension of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:207: and explosion. term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:207: short-term disruption to term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:207: and disembarkation suspension of commercial [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:208: term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:208: taking additional risks short-term disruption to Temporary suspension of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:208: Reduced visibility. Fire short-term disruption to term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:209: short-term disruption to Temporary suspension of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:209: Cargo Traffic control failure. short-term disruption to Long-term suspension of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:209: Vessel taking additional risks short-term disruption to Temporary suspension of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:213: 3rd party vessel / environmental amenity; suspension of operations or [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:214: dredging operations. Fire suspension of commercial [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:215: Tanker berth 3rd party vessel / suspension of operations or [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:215: 3rd party vessel / suspension of operations or [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:217: General not necessarily met; Bad Medium-term suspension of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:217: Project not necessarily met; Bad Medium-term suspension of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:217: short-term disruption to term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:218: 3rd party vessel / term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:218: 3rd party vessel / term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:223: short-term disruption to suspension of operations, prolonged [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:223: necessarily met; Very publicity. Long-term suspension of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:223: necessarily met; Very publicity. Temporary suspension of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:224: suspension of operations, prolonged [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:224: Temporary suspension of commercial [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:224: term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:225: necessarily met; Very publicity. Temporary suspension of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:225: Cargo control failure. short-term disruption to term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:225: Vessel Temporary suspension of commercial [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:229: avoiding action with environmental amenity; term suspension of operations or [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:230: 3rd party vessel. Fire suspension of commercial activities [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:231: Tanker term suspension of operations or [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:231: publicity. Medium-term suspension [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:232: Cargo Vessel visibility. Result of Very short-term disruption suspension of operations or [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:233: General Power Cables. not necessarily met; Bad Medium-term suspension of in vicinity of overhead cables; [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:233: Project Power Cables. not necessarily met; Bad Medium-term suspension of in vicinity of overhead cables; [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:233: necessarily met; Very publicity. Long-term suspension of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:234: avoiding action with suspension of operations, prolonged [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:234: avoiding action with suspension of operations, prolonged [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:236: large vessel moving in services with ensuing loss within site. Temporary suspension of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:239: failure. Reduced visibility. publicity. Long-term suspension of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:239: criteria not necessarily met; publicity. Long-term suspension of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:240: Pilot boarding and suspension of commercial activities and/or [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:240: operations. Traffic control Very short-term disruption publicity. Long-term suspension of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:240: additional risks during suspension of commercial activities and/or [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:241: Vessel suspension of operations, prolonged [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:241: Dredgers) Temporary suspension of commercial [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:241: Project Cargo operations. Traffic control Very short-term disruption suspension of operations, prolonged [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:242: Vessel additional risks during suspension of commercial activities and/or [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:245: with 3rd party vessel / environmental amenity; suspension of operations or prolonged [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:246: short-term disruption to Temporary suspension of commercial [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:247: berth - Tanker berth publicity. Medium-term suspension of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:247: General Cargo publicity. Medium-term suspension of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:249: Cables. weather. Reduced visibility. necessarily met; Bad local term suspension of operations or prolonged [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:249: - Project Cargo Cables. weather. Reduced visibility. necessarily met; Bad local term suspension of operations or prolonged [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:249: with 3rd party vessel / publicity. Long-term suspension of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:250: Vessel criteria not necessarily met; international publicity. Long-term suspension [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:250: criteria not necessarily met; international publicity. Long-term suspension [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: suspension of operations, prolonged [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: explosion. Very short-term disruption to Long-term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: disembarkation Very short-term disruption to Temporary suspension of commercial [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:255: Long-term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:256: additional risks during Very short-term disruption to Temporary suspension of commercial [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:256: Cargo Vessel necessarily met; Very short- Long-term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:256: Workboat regional publicity. Temporary suspension [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:256: Project Cargo move control failure. Reduced Very short-term disruption to Long-term suspension of operations, [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:257: Vessel additional risks during Very short-term disruption to Temporary suspension of commercial [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:260: of avoiding action with Medium-term suspension of operations or [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:260: of avoiding action with necessarily met; Very short- regional publicity. Temporary suspension [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:261: berth Reduced visibility. Result Medium-term suspension of operations or [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:261: of avoiding action with suspension of operations or prolonged [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:262: berth Reduced visibility. Result Medium-term suspension of operations or [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:262: criteria not necessarily met; Medium-term suspension of operations or [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:262: criteria not necessarily met; Medium-term suspension of operations or [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:263: of avoiding action with necessarily met; Very short- publicity. Long-term suspension of [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:263: Vessel of avoiding action with necessarily met; Very short- suspension of operations, prolonged [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:263: of avoiding action with necessarily met; Very short- suspension of operations, prolonged [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:265: moving in the port services with ensuing loss of site. Temporary suspension of operations [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:385:entering it or could affect fish migrating through the See comments in water quality below. There may be temporary sediment resuspension but [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:386: and temporary. Any sediment resuspension is unlikely to last more than a few hours per [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:386:consider if: It disturbs sediment with contaminants temporary. Any sediment resuspension is unlikely to last more than a few hours per pile. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf|MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf]]:386:above Cefas Action Level 1 Significant resuspension of contamination is therefore not predicted. [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-Licence Document (Marine)-14.pdf|MLA_2020_00507-Licence Document (Marine)-14.pdf]]:14: To restrict suspended sediment plumes to one side of the estuary at a time, in order to reduce loss of tern foraging [[this>Teesworks/Planning/MLA_2020_00507/MLA_2020_00507-Licence Document (Marine)-14.pdf|MLA_2020_00507-Licence Document (Marine)-14.pdf]]:17:being taken. This can include variation, revocation or suspension of the licence, [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:32: • Suspended deck. [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:32:A piled suspended deck structure would be technically feasible, however this option would require more [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:32:suspended deck option also reduces the potential for the incorporation of environmental enhancement [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:32:such as ‘verti-pools’. The suspended deck also offers reduced future flexibility compared to the combi-piled [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:32:suspended deck should STDC seek to increase the load rating of the quay in the future. The suspended [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:53: as stop start thresholds for parameters such as suspended sediment and 13 and Section 7 [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:54:1989 between waves, tides and suspended mud HR Wallingford, 1989 [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:57: and suspended mud concentrations [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:60: predict movement of suspended sediment from the proposed dredging and disposal activities by [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:81:Suspended sediment concentrations [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:81:In general, suspended sediment concentrations (SSCs) are low within the estuary and within Tees Bay. [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:81:the highest suspended sediment levels occur close to high water. After storm periods, higher concentrations [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:81:of suspended sediment have been noted around the Shell Jetty, but with little penetration further up the [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:81: Suspended sediment concentrations (mg/l) [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:84:concentrations in Tees Bay are raised by the re-suspension of material from the seabed during storm events. [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:84:induced currents, vessel induced forces and re-suspension by dredging operations. These last two were [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:84:be re-suspended and moved further upstream into the estuary. Inputs to the system can be summarised [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:85: when concentrations in Tees Bay are raised by the resuspension of material from the seabed during [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:91:changes in bed thickness when the suspended sediment falls from the plume to become deposited on the [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:110:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:110:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents (for [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:112:material will become re-suspended by tidal currents or dredged during maintenance campaigns of the river [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:113:re-suspended by tidal currents or will be removed during maintenance dredging campaigns of the river [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:118:as some material falls relatively quickly to the sea bed whilst the material remaining in suspension starts to [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:118:transport it in suspension in the water column in the appropriate direction of dispersion (i.e. to the north- [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:122:relatively quickly to the sea bed whilst the material remaining in suspension starts to further disperse in [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:131:and all sediment particles suspended in the water column will eventually settle to the river or seabed, [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:131:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:141:maintenance dredging is likely to be due to the low levels of suspended sediment measured in this reach of [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:143: including stop / start thresholds for parameters such as suspended [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:156:In general, suspended sediment concentrations are low within the estuary and within Tees Bay. The highest [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:156:downstream. In the vicinity of the proposed scheme (i.e. in the Tees Dock area) suspended solid [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:156:within the estuary) and analysed in the laboratory for suspended sediment concentrations. The results [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:156:this period, concentrations of suspended sediment were very low. It should be noted however, that the [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:156:Table 7.8 Suspended sediment concentrations recorded at Transect T8 in July 2020 [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:156: Suspended sediment concentrations (mg/l) [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:157:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:158:Figure 7. 3 Plume of suspended sediment concentrations arising from dredging activities during Stage 2 [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:160:Figure 7. 5 Plume of suspended sediment concentrations arising from dredging activities during Stage [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:161:Figure 7.6 Plume of enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:161:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:162:Figure 7.7 Timeseries of changes in suspended sediment concentrations at water quality monitoring [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:162:Only point 3 (Smiths Dock – Figure 7.2) experiences elevated levels of suspended solids and only during [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:164: Calculated loss of sediment derived using indicative values for the mass of sediment resuspended per m 3 of dredged material in CIRIA guidance (John et al., 1999) in kg/m3. Worst case S-Factor for [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:166: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:166:Dock water quality monitoring point (point 3) could experience elevated levels of suspended solid [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:167:As these works progress, there is the potential for sediment to be suspended when working in and around [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:167:the riverbed. However, any increases in suspended solids concentrations are likely to be highly localised [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:191: • Impacts on marine ecology from increased suspended sediment during capital dredging and [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:210:9.5.2 Effects of increased suspended sediment concentrations during dredging [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:210:will disturb sediment, which will result in localised and short-term increases in suspended sediment [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:210:ecology as a result of increased concentrations of suspended sediment within the water column (i.e. [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:210:resuspended sediment which does not contain elevations beyond Action Level 2). The dredged sediment [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:210:filter feeding molluscs). In addition, high concentrations of suspended sediment may impact on fish through [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:210:Mean background suspended solid levels in the vicinity of the proposed scheme (based on metocean [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:211:during spring tides (Section 7.4.2). These are considerably lower than suspended sediment concentrations [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:211:For both types of dredger (backhoe and TSHD), peak suspended solids concentrations are predicted in the [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:211:suspended sediment concentrations depending on the stage of dredging (as described in Section 6). In all [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:211:importance (where information is available) to increases in suspended sediment. This information is [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:211:S. spinulosa relies on suspended particles for its tube growth. Increased suspended sediment [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:211:to increases in suspended sediment concentrations, according to this sensitivity review. [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:211:sediment likely gets resuspended regularly, and where accretion rates and moderate to high. A. islandica [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:211:resilience and is not sensitive to changes in suspended solids (Tyler-Walters & Sabatini, 2017). [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:211:the proposed dredge is considered to be of low sensitivity to increases in suspended sediment. [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:212:resistance and resilience to changes in suspended sediment and was reported to be not sensitive (to [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:212:changes in suspended sediment) (De-Bastos, 2016). As such, for the purposes of this assessment, the [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:212:Given the temporary and localised nature of the predicted increase in suspended sediment, in addition to [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:212:the low/very low sensitivity of the key species present in the estuary to increased suspended sediment, an [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:212:During the capital dredging a proportion of the material that is dredged would be disturbed and re-suspended [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:212:is 32.5ha. This is expected to cause a very limited extent of suspended sediment concentrations, and [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:212:Some of the sediment that is suspended as a result of the dredging activities will be deposited to the [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:212:suspension by the prevailing currents (for finer-grained sediment fractions) (Section 6). The modelling [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:212:carried out on this, as reported in Section 6, indicates that much of the resuspended sediment is deposited [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:213:and any species of conservation importance (where information is available) to increases in suspended [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:213:A sudden smothering of 5cm of sediment would temporarily suspend the feeding and respiration of A. alba [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:240:Infrastructure and placement of rock into the berth pocket) would result in an increase in suspended [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:240:relied upon solely. Therefore, any increases in suspended sediments during dredging or other activities will [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:240:disturbance and temporary loss of seabed habitat; increased suspended sediment concentrations and [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:297:tern species as a result of increased suspended sediments during the construction phase. [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:297:and re-suspension of sediment (Cook and Burton, 2010). However, common terns typically only dive to 1m [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:298:in suspension from the point of release. Most falls within the dredged areas, whilst deposition elsewhere is [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:309: thresholds for parameters such as suspended sediment and [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:318:dredging, is provided in Section 6. The peak suspended sediment concentration within the Tees during the [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:319:of suspended sediments are predicted to decrease significantly with increased distance from the dredging [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:478:to the seabed whilst the material remaining in suspension starts to further disperse in spatial extent. [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:478:longer, until the subsequent ebb or flood phase of the tide starts to transport it in suspension in the water [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:482: Increase in suspended [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:482:sensitive to smothering or increases in suspended sediment. [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:488:The offshore disposal of dredged material would temporarily increase the suspended sediment [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:488:relied upon solely. Therefore, any increases in suspended sediments will have a negligible impact on [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:488:temporary loss of seabed habitat, increased suspended sediment concentrations and sediment re- [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:490:disturbance and increased suspended sediments on migratory fish). [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:500: • dispersion of suspended sediment during capital dredging and deposition at the offshore disposal [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:500:(increased suspended sediment concentrations) are relevant to the CIA. [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:500:Dispersion of suspended sediment and deposition on the seabed during capital dredging [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:500:immediately after the period of construction. This is because fine material will be released into suspension, [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:501:27.3 presents a summary of the results of the predictive modelling of suspended sediment concentration [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:501:A review of all EIA studies for the above projects highlights that the maximum increase in suspended [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:501:resulting in a significantly reduced concentration of suspended sediment beyond the source of the plume. [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:503: • effect of increases in suspended sediments during maintenance dredging on food resources of SPA [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:503:Mitigation measures to limit the suspension of sediment and subsequent deposition of sediment during [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:503:into a sealed barge) for dredging of unconsolidated material to minimise resuspension in the water column. [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:506: • dispersion of suspended sediment during marine works, dredging and disposal; and, [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:513:into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension in the [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:526: 24.Reduce sediment resuspension [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:528: suspended solids [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:528: The installation and presence of the rock impacted is less than suspended solids [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:532:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:532:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:534:Figure 28.4 Timeseries of changes in suspended sediment concentrations at water quality monitoring [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:534:Only water quality monitoring point WQ3 (Smiths Dock) shows elevated levels of suspended solid [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:534:The resuspension of sediment could also potentially affect dissolved oxygen levels in the water. This is due [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:535: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:535:increases in suspended solids concentrations above baseline (up to 85mg/l which decreases to baseline [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:535:suspended solids when in close proximity to the dredger. As a result, a non-temporary deterioration in water [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:537:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:537:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents for [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:538:An increase in suspended sediment in the water column may lead to physiological effects in finfish, including [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:538:to increased suspended solids is low, according to the MarLIN sensitivity scoring index. Mobile species [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:539: Reduce sediment resuspension disposal activities currently ongoing. Disposal would be [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:541: Reduce sediment resuspension [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:542: Reduce sediment resuspension [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:545:maximum concentrations of suspended solids are localised to the dredging activity and quickly disperse [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:549:suspended sediment thus reducing the risk of significant water quality effects. Mitigation measures to [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:572:river dredging are characterised by a short-lived localised increase in suspended sediment concentrations [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:584:low, with any effect confined to the footprint of the proposed dredge. The predicted increase in suspended [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:584:loading into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:588:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine and estuarine fish [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf|R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf]]:592:HR Wallingford (1989a). Tees Weir Feasibility Study - Correlation between waves, tides and suspended [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-EA R_2020_0371_SCP 14 August 2020 OFFICIAL.pdf|R-2020-0371-SCP-EA R_2020_0371_SCP 14 August 2020 OFFICIAL.pdf]]:5:stop start thresholds for parameters such as suspended sediment and dissolved oxygen [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf|R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf]]:11:The re-calibrated 3D Tees Estuary Tidal Model will be used to predict movement of suspended sediment [[this>Teesworks/Planning/R-2020-0371-SCP/R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf|R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf]]:11:(in particular the effect of resuspension and dispersion of sediment during dredging and disposal activities). [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 4_Metocean survey report.pdf|R-2020-0684-ESM-Appendix 4_Metocean survey report.pdf]]:5: 7.3 Suspended Sediment Conversion .....................................................................................................20 [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 4_Metocean survey report.pdf|R-2020-0684-ESM-Appendix 4_Metocean survey report.pdf]]:21:7.3 Suspended Sediment Conversion [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 4_Metocean survey report.pdf|R-2020-0684-ESM-Appendix 4_Metocean survey report.pdf]]:30: Suspended P1983.04.06.D08 - Suspended Solids Lab Results_Spring 24072020 [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 4_Metocean survey report.pdf|R-2020-0684-ESM-Appendix 4_Metocean survey report.pdf]]:30: Solids P1983.04.06.D09 - Suspended Solids Lab Results_Neap 30072020 [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf]]:3: thresholds for parameters such as suspended sediment and [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf]]:12:dredging, is provided in Section 6. The peak suspended sediment concentration within the Tees during the [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf]]:13:of suspended sediments are predicted to decrease significantly with increased distance from the dredging [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf|R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf]]:11:The re-calibrated 3D Tees Estuary Tidal Model will be used to predict movement of suspended sediment [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf|R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf]]:11:(in particular the effect of resuspension and dispersion of sediment during dredging and disposal activities). [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:1: • Impacts on marine ecology from increased suspended sediment during capital dredging and [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:20:9.5.2 Effects of increased suspended sediment concentrations during dredging [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:20:will disturb sediment, which will result in localised and short-term increases in suspended sediment [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:20:ecology as a result of increased concentrations of suspended sediment within the water column (i.e. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:20:resuspended sediment which does not contain elevations beyond Action Level 2). The dredged sediment [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:20:filter feeding molluscs). In addition, high concentrations of suspended sediment may impact on fish through [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:20:Mean background suspended solid levels in the vicinity of the proposed scheme (based on metocean [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:21:during spring tides (Section 7.4.2). These are considerably lower than suspended sediment concentrations [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:21:For both types of dredger (backhoe and TSHD), peak suspended solids concentrations are predicted in the [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:21:suspended sediment concentrations depending on the stage of dredging (as described in Section 6). In all [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:21:importance (where information is available) to increases in suspended sediment. This information is [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:21:S. spinulosa relies on suspended particles for its tube growth. Increased suspended sediment [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:21:to increases in suspended sediment concentrations, according to this sensitivity review. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:21:sediment likely gets resuspended regularly, and where accretion rates and moderate to high. A. islandica [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:21:resilience and is not sensitive to changes in suspended solids (Tyler-Walters & Sabatini, 2017). [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:21:the proposed dredge is considered to be of low sensitivity to increases in suspended sediment. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:22:resistance and resilience to changes in suspended sediment and was reported to be not sensitive (to [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:22:changes in suspended sediment) (De-Bastos, 2016). As such, for the purposes of this assessment, the [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:22:Given the temporary and localised nature of the predicted increase in suspended sediment, in addition to [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:22:the low/very low sensitivity of the key species present in the estuary to increased suspended sediment, an [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:22:During the capital dredging a proportion of the material that is dredged would be disturbed and re-suspended [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:22:is 32.5ha. This is expected to cause a very limited extent of suspended sediment concentrations, and [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:22:Some of the sediment that is suspended as a result of the dredging activities will be deposited to the [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:22:suspension by the prevailing currents (for finer-grained sediment fractions) (Section 6). The modelling [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:22:carried out on this, as reported in Section 6, indicates that much of the resuspended sediment is deposited [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:23:and any species of conservation importance (where information is available) to increases in suspended [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf]]:23:A sudden smothering of 5cm of sediment would temporarily suspend the feeding and respiration of A. alba [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf|R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf]]:11:localised increase in suspended sediment concentrations by the order of a few hundred mg/l at the point of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf|R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf]]:12:A potential impact on water quality has been identified due to the resuspension of sediment, principally as [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf|R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf]]:12:relatively limited areas of high suspended solids concentrations, which only occur for a matter of hours at a [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf|R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf]]:12:time before the suspended sediment concentrations return to baseline values. No significant impacts are [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf|R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf]]:12:resuspension of sediments. Such measures include dredging in long strips to ensure the plume is located [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf|R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf]]:13:and capital dredging, increased suspended sediment concentrations and increased sediment deposition. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf|R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf]]:13:ecological receptors as a result of increased suspended sediment concentrations or sediment deposition [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf|R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf]]:15:Impacts on fish resources within the subtidal area, as a result of increased suspended sediment, would only [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf|R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf]]:15:Other water quality issues, such as a reduction in dissolved oxygen or suspension of contaminants, are not [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:1:disturbance and increased suspended sediments on migratory fish). [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:11: • dispersion of suspended sediment during capital dredging and deposition at the offshore disposal [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:11:(increased suspended sediment concentrations) are relevant to the CIA. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:11:Dispersion of suspended sediment and deposition on the seabed during capital dredging [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:11:immediately after the period of construction. This is because fine material will be released into suspension, [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:12:27.3 presents a summary of the results of the predictive modelling of suspended sediment concentration [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:12:A review of all EIA studies for the above projects highlights that the maximum increase in suspended [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:12:resulting in a significantly reduced concentration of suspended sediment beyond the source of the plume. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:14: • effect of increases in suspended sediments during maintenance dredging on food resources of SPA [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:14:Mitigation measures to limit the suspension of sediment and subsequent deposition of sediment during [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:14:into a sealed barge) for dredging of unconsolidated material to minimise resuspension in the water column. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:17: • dispersion of suspended sediment during marine works, dredging and disposal; and, [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf]]:24:into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension in the [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:43: Significant operation temporarily suspended). These hazards and associated risk [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:43: 9 - 10 High permanently suspended). These hazards and associated risk control [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:60: injury immediate area within site suspension of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:77: and explosion. term suspension of operations, [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:77: short-term disruption to term suspension of operations, [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:77: and disembarkation suspension of commercial [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:78: term suspension of operations, [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:78: taking additional risks short-term disruption to Temporary suspension of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:78: Reduced visibility. Fire short-term disruption to term suspension of operations, [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:79: short-term disruption to Temporary suspension of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:79: Cargo Traffic control failure. short-term disruption to Long-term suspension of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:79: Vessel taking additional risks short-term disruption to Temporary suspension of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:83: 3rd party vessel / environmental amenity; suspension of operations or [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:84: dredging operations. Fire suspension of commercial [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:85: Tanker berth 3rd party vessel / suspension of operations or [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:85: 3rd party vessel / suspension of operations or [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:87: General not necessarily met; Bad Medium-term suspension of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:87: Project not necessarily met; Bad Medium-term suspension of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:87: short-term disruption to term suspension of operations, [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:88: 3rd party vessel / term suspension of operations, [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:88: 3rd party vessel / term suspension of operations, [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:93: short-term disruption to suspension of operations, prolonged [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:93: necessarily met; Very publicity. Long-term suspension of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:93: necessarily met; Very publicity. Temporary suspension of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:94: suspension of operations, prolonged [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:94: Temporary suspension of commercial [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:94: term suspension of operations, [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:95: necessarily met; Very publicity. Temporary suspension of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:95: Cargo control failure. short-term disruption to term suspension of operations, [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:95: Vessel Temporary suspension of commercial [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:99: avoiding action with environmental amenity; term suspension of operations or [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:100: 3rd party vessel. Fire suspension of commercial activities [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:101: Tanker term suspension of operations or [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:101: publicity. Medium-term suspension [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:102: Cargo Vessel visibility. Result of Very short-term disruption suspension of operations or [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:103: General Power Cables. not necessarily met; Bad Medium-term suspension of in vicinity of overhead cables; [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:103: Project Power Cables. not necessarily met; Bad Medium-term suspension of in vicinity of overhead cables; [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:103: necessarily met; Very publicity. Long-term suspension of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:104: avoiding action with suspension of operations, prolonged [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:104: avoiding action with suspension of operations, prolonged [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:106: large vessel moving in services with ensuing loss within site. Temporary suspension of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:109: failure. Reduced visibility. publicity. Long-term suspension of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:109: criteria not necessarily met; publicity. Long-term suspension of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:110: Pilot boarding and suspension of commercial activities and/or [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:110: operations. Traffic control Very short-term disruption publicity. Long-term suspension of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:110: additional risks during suspension of commercial activities and/or [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:111: Vessel suspension of operations, prolonged [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:111: Dredgers) Temporary suspension of commercial [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:111: Project Cargo operations. Traffic control Very short-term disruption suspension of operations, prolonged [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:112: Vessel additional risks during suspension of commercial activities and/or [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:115: with 3rd party vessel / environmental amenity; suspension of operations or prolonged [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:116: short-term disruption to Temporary suspension of commercial [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:117: berth - Tanker berth publicity. Medium-term suspension of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:117: General Cargo publicity. Medium-term suspension of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:119: Cables. weather. Reduced visibility. necessarily met; Bad local term suspension of operations or prolonged [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:119: - Project Cargo Cables. weather. Reduced visibility. necessarily met; Bad local term suspension of operations or prolonged [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:119: with 3rd party vessel / publicity. Long-term suspension of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:120: Vessel criteria not necessarily met; international publicity. Long-term suspension [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:120: criteria not necessarily met; international publicity. Long-term suspension [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: suspension of operations, prolonged [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: explosion. Very short-term disruption to Long-term suspension of operations, [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: disembarkation Very short-term disruption to Temporary suspension of commercial [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:125: Long-term suspension of operations, [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:126: additional risks during Very short-term disruption to Temporary suspension of commercial [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:126: Cargo Vessel necessarily met; Very short- Long-term suspension of operations, [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:126: Workboat regional publicity. Temporary suspension [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:126: Project Cargo move control failure. Reduced Very short-term disruption to Long-term suspension of operations, [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:127: Vessel additional risks during Very short-term disruption to Temporary suspension of commercial [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:130: of avoiding action with Medium-term suspension of operations or [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:130: of avoiding action with necessarily met; Very short- regional publicity. Temporary suspension [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:131: berth Reduced visibility. Result Medium-term suspension of operations or [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:131: of avoiding action with suspension of operations or prolonged [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:132: berth Reduced visibility. Result Medium-term suspension of operations or [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:132: criteria not necessarily met; Medium-term suspension of operations or [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:132: criteria not necessarily met; Medium-term suspension of operations or [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:133: of avoiding action with necessarily met; Very short- publicity. Long-term suspension of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:133: Vessel of avoiding action with necessarily met; Very short- suspension of operations, prolonged [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:133: of avoiding action with necessarily met; Very short- suspension of operations, prolonged [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf|R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf]]:135: moving in the port services with ensuing loss of site. Temporary suspension of operations [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:7:Figure 5.5: Maximum enhanced suspended sediment concentrations arising from dredging [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:7:Figure 5.6: Maximum enhanced suspended sediment concentrations arising from dredging [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:7:Figure 5.7: Maximum enhanced suspended sediment concentrations arising from dredging [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:7:Figure 5.8: Maximum enhanced suspended sediment concentrations arising from dredging [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:7:Figure 5.9: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:7:Figure 5.10: Maximum enhanced suspended sediment concentrations (near-surface layer) arising [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:7:Figure 5.12: Maximum enhanced suspended sediment concentrations (near-bed layer) arising [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:9: movement of suspended sediment from the proposed dredging and disposal activities by coupling with [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:61:investigate the suspended sediment transport effects of the proposed dredging of the channel and the berth [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:62:The sediment dispersion model has been setup with 4 layers in order to differentiate between suspended [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:70:disposal activities. Note that all the modelling plots in following sections show the elevations in suspended [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:71: Figure 5.5: Maximum enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:72: Figure 5.6: Maximum enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:73: Figure 5.7: Maximum enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:74: Figure 5.8: Maximum enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:75: Figure 5.9: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from dredging activities [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:76: Figure 5.10: Maximum enhanced suspended sediment concentrations (near-surface layer) arising from dredging activities [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:79: Figure 5.12: Maximum enhanced suspended sediment concentrations (near-bed layer) arising from disposal activities [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:80:and all sediment particles suspended in the water column will eventually settle to the river or sea bed, [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf|R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf]]:81:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Officer Report 0684.pdf|R-2020-0684-ESM-Officer Report 0684.pdf]]:17:took place; suspended sediment concentrations, sediment sources and [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Officer Report 0684.pdf|R-2020-0684-ESM-Officer Report 0684.pdf]]:19:An assessment has also been made of suspended sediment concentrations. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Officer Report 0684.pdf|R-2020-0684-ESM-Officer Report 0684.pdf]]:19:suspended solid concentrations, for the most part, are less than 20mg/l with [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Officer Report 0684.pdf|R-2020-0684-ESM-Officer Report 0684.pdf]]:20:period, concentrations of suspended sediment were very low as illustrated in [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Officer Report 0684.pdf|R-2020-0684-ESM-Officer Report 0684.pdf]]:21:It is acknowledged that there is the potential for sediment to be suspended [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Officer Report 0684.pdf|R-2020-0684-ESM-Officer Report 0684.pdf]]:21:increases in suspended solids concentrations are likely to be highly localised [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Officer Report 0684.pdf|R-2020-0684-ESM-Officer Report 0684.pdf]]:28: Impacts on marine ecology from increased suspended sediment during [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Officer Report 0684.pdf|R-2020-0684-ESM-Officer Report 0684.pdf]]:29:suspended sediment concentrations during dredging on marine species and [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Officer Report 0684.pdf|R-2020-0684-ESM-Officer Report 0684.pdf]]:30:habitats, effects of increased suspended sediment concentrations during [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Officer Report 0684.pdf|R-2020-0684-ESM-Officer Report 0684.pdf]]:30:increase in suspended sediment concentrations. Matters relating to this have [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Officer Report 0684.pdf|R-2020-0684-ESM-Officer Report 0684.pdf]]:30:predicted increase in suspended sediment, in addition to the low/very low [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Officer Report 0684.pdf|R-2020-0684-ESM-Officer Report 0684.pdf]]:30:sensitivity of the key species present in the estuary to increased suspended [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Officer Report 0684.pdf|R-2020-0684-ESM-Officer Report 0684.pdf]]:32:With regard to suspended sediment concentrations no mitigation measures [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Officer Report 0684.pdf|R-2020-0684-ESM-Officer Report 0684.pdf]]:34:in suspended sediments during dredging or other activities will have a [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:2: including stop / start thresholds for parameters such as suspended [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:15:In general, suspended sediment concentrations are low within the estuary and within Tees Bay. The highest [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:15:downstream. In the vicinity of the proposed scheme (i.e. in the Tees Dock area) suspended solid [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:15:within the estuary) and analysed in the laboratory for suspended sediment concentrations. The results [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:15:this period, concentrations of suspended sediment were very low. It should be noted however, that the [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:15:Table 7.8 Suspended sediment concentrations recorded at Transect T8 in July 2020 [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:15: Suspended sediment concentrations (mg/l) [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:16:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:17:Figure 7. 3 Plume of suspended sediment concentrations arising from dredging activities during Stage 2 [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:19:Figure 7. 5 Plume of suspended sediment concentrations arising from dredging activities during Stage [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:20:Figure 7.6 Plume of enhanced suspended sediment concentrations arising from dredging activities [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:20:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:21:Figure 7.7 Timeseries of changes in suspended sediment concentrations at water quality monitoring [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:21:Only point 3 (Smiths Dock – Figure 7.2) experiences elevated levels of suspended solids and only during [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:23: Calculated loss of sediment derived using indicative values for the mass of sediment resuspended per m 3 of dredged material in CIRIA guidance (John et al., 1999) in kg/m3. Worst case S-Factor for [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:25: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:25:Dock water quality monitoring point (point 3) could experience elevated levels of suspended solid [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:26:As these works progress, there is the potential for sediment to be suspended when working in and around [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_7. Marine sediment and water quality.pdf]]:26:the riverbed. However, any increases in suspended solids concentrations are likely to be highly localised [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf]]:22:river dredging are characterised by a short-lived localised increase in suspended sediment concentrations [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf]]:34:low, with any effect confined to the footprint of the proposed dredge. The predicted increase in suspended [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf]]:34:loading into a sealed barge) will be used for dredging of unconsolidated material to minimise resuspension [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf|R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf]]:2:entering it or could affect fish migrating through the See comments in water quality below. There may be temporary sediment resuspension but [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf|R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf]]:3: and temporary. Any sediment resuspension is unlikely to last more than a few hours per [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf|R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf]]:3:consider if: It disturbs sediment with contaminants temporary. Any sediment resuspension is unlikely to last more than a few hours per pile. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf|R-2020-0684-ESM-Appendix 16_WFD scoping tables.pdf]]:3:above Cefas Action Level 1 Significant resuspension of contamination is therefore not predicted. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf]]:1:Appleby, J.P. and Scarratt, D.J. (1989). Physical effects of suspended solids on marine and estuarine fish [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf]]:5:HR Wallingford (1989a). Tees Weir Feasibility Study - Correlation between waves, tides and suspended [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:5: 24.Reduce sediment resuspension [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:7: suspended solids [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:7: The installation and presence of the rock impacted is less than suspended solids [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:11:severity of effect on suspended solid concentrations within the Tees, hydrodynamic modelling was [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:11:To investigate potential levels of suspended solid concentrations at the WFD water quality monitoring points [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:13:Figure 28.4 Timeseries of changes in suspended sediment concentrations at water quality monitoring [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:13:Only water quality monitoring point WQ3 (Smiths Dock) shows elevated levels of suspended solid [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:13:The resuspension of sediment could also potentially affect dissolved oxygen levels in the water. This is due [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:14: • The calculations assume that all sediment remains in suspension. In reality, it is likely that some [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:14:increases in suspended solids concentrations above baseline (up to 85mg/l which decreases to baseline [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:14:suspended solids when in close proximity to the dredger. As a result, a non-temporary deterioration in water [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:16:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:16:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents for [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:17:An increase in suspended sediment in the water column may lead to physiological effects in finfish, including [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:17:to increased suspended solids is low, according to the MarLIN sensitivity scoring index. Mobile species [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:18: Reduce sediment resuspension disposal activities currently ongoing. Disposal would be [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:20: Reduce sediment resuspension [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:21: Reduce sediment resuspension [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:24:maximum concentrations of suspended solids are localised to the dredging activity and quickly disperse [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_28. Water Framework Directive compliance assessment.pdf]]:28:suspended sediment thus reducing the risk of significant water quality effects. Mitigation measures to [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf]]:1:to the seabed whilst the material remaining in suspension starts to further disperse in spatial extent. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf]]:1:longer, until the subsequent ebb or flood phase of the tide starts to transport it in suspension in the water [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf]]:5: Increase in suspended [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf]]:5:sensitive to smothering or increases in suspended sediment. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf]]:11:The offshore disposal of dredged material would temporarily increase the suspended sediment [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf]]:11:relied upon solely. Therefore, any increases in suspended sediments will have a negligible impact on [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_26. Offshore disposal of dredged material.pdf]]:11:temporary loss of seabed habitat, increased suspended sediment concentrations and sediment re- [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf]]:28:tern species as a result of increased suspended sediments during the construction phase. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf]]:28:and re-suspension of sediment (Cook and Burton, 2010). However, common terns typically only dive to 1m [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf]]:29:in suspension from the point of release. Most falls within the dredged areas, whilst deposition elsewhere is [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf|R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf]]:24: structures and capital dredging, increased suspended sediment concentrations and increased [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf|R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf]]:24: increased suspended sediment concentrations or sediment deposition during construction. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf|R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf]]:26:5.29 Impacts on fish resources within the subtidal area, as a result of increased suspended sediment, [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf|R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf]]:26:5.34 Adverse impacts may be expected as a result of temporary increases in suspended solids [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf|R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf]]:26:5.35 Other water quality issues, such as a reduction in dissolved oxygen or suspension of [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf|R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf]]:30: potential impact on water quality has been identified due to the resuspension of sediment, [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf|R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf]]:30: Additionally, sediment plume modelling shows relatively limited areas of high suspended solids [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf|R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf]]:30: concentrations, which only occur for a matter of hours at a time before the suspended sediment [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf|R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf]]:30: process to minimise the potential for resuspension of sediments. Such measures include [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf]]:18: • Suspended deck. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf]]:18:A piled suspended deck structure would be technically feasible, however this option would require more [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf]]:18:suspended deck option also reduces the potential for the incorporation of environmental enhancement [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf]]:18:such as ‘verti-pools’. The suspended deck also offers reduced future flexibility compared to the combi-piled [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_3. Description of the proposed scheme.pdf]]:18:suspended deck should STDC seek to increase the load rating of the quay in the future. The suspended [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf]]:24:Infrastructure and placement of rock into the berth pocket) would result in an increase in suspended [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf]]:24:relied upon solely. Therefore, any increases in suspended sediments during dredging or other activities will [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf]]:24:disturbance and temporary loss of seabed habitat; increased suspended sediment concentrations and [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:3: as stop start thresholds for parameters such as suspended sediment and 13 and Section 7 [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:4:1989 between waves, tides and suspended mud HR Wallingford, 1989 [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:7: and suspended mud concentrations [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:10: predict movement of suspended sediment from the proposed dredging and disposal activities by [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:31:Suspended sediment concentrations [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:31:In general, suspended sediment concentrations (SSCs) are low within the estuary and within Tees Bay. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:31:the highest suspended sediment levels occur close to high water. After storm periods, higher concentrations [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:31:of suspended sediment have been noted around the Shell Jetty, but with little penetration further up the [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:31: Suspended sediment concentrations (mg/l) [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:34:concentrations in Tees Bay are raised by the re-suspension of material from the seabed during storm events. [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:34:induced currents, vessel induced forces and re-suspension by dredging operations. These last two were [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:34:be re-suspended and moved further upstream into the estuary. Inputs to the system can be summarised [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:35: when concentrations in Tees Bay are raised by the resuspension of material from the seabed during [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:41:changes in bed thickness when the suspended sediment falls from the plume to become deposited on the [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:60:Sediment suspended within the dredging plumes will fall to the riverbed, either soon after disturbance or [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:60:time within a few minutes to a few hours after this if it is carried in suspension by the prevailing currents (for [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:62:material will become re-suspended by tidal currents or dredged during maintenance campaigns of the river [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:63:re-suspended by tidal currents or will be removed during maintenance dredging campaigns of the river [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:68:as some material falls relatively quickly to the sea bed whilst the material remaining in suspension starts to [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:68:transport it in suspension in the water column in the appropriate direction of dispersion (i.e. to the north- [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:72:relatively quickly to the sea bed whilst the material remaining in suspension starts to further disperse in [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:81:and all sediment particles suspended in the water column will eventually settle to the river or seabed, [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:81:falls relatively rapidly to the bed, with only the finer proportions being retained in suspension, becoming [[this>Teesworks/Planning/R-2020-0684-ESM/R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf|R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf]]:91:maintenance dredging is likely to be due to the low levels of suspended sediment measured in this reach of [[this>Teesworks/Planning/R-2022-0526-CD/R-2022-0526-CD-AQIA_FINAL.pdf|R-2022-0526-CD-AQIA_FINAL.pdf]]:39: public road network, where it may be deposited and then re-suspended by [[this>Teesworks/Planning/R-2022-0755-CD/R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf|R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf]]:26:  use of silt traps used to capture suspended solids; [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:93:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:98: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters) [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:98: The electrical conductance of a soil suspension in water or [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:98: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:100: Suspended matter is removed from a measured volume of [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:100: Suspended Solids: [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:100: Suspended and the total suspended matter is determined gravimetrically [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:100:DETSC Suspended, Settleable and Total MCERTS(Waters)- [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:100: left in suspension after settlement for 1 hour (or other [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:100: agreed time) from the total suspended matter in the [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:101: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:101: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:101:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:103: Water Soluble particulates in suspension. contamination on former gasworks and [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part6.PDF]]:104: particulates in suspension. [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:110:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:115: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters) [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:115: The electrical conductance of a soil suspension in water or [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:115: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:117: Suspended matter is removed from a measured volume of [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:117: Suspended Solids: [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:117: Suspended and the total suspended matter is determined gravimetrically [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:117:DETSC Suspended, Settleable and Total MCERTS(Waters)- [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:117: left in suspension after settlement for 1 hour (or other [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:117: agreed time) from the total suspended matter in the [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:118: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:118: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:118:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:120: Water Soluble particulates in suspension. contamination on former gasworks and [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0117-02-Prairie_ESA_Addendum_Part5.PDF]]:121: particulates in suspension. [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:22:Suspended solids Glass or plastic 100 EPA 160.2 2540D none 1 week [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:27: The pH value of a soil suspension in water or a BS1377: Part 3: 1990 – Soils for Civil Waters) [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:27: The electrical conductance of a soil suspension in water or [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:27: of topsoil is determined by preparing a suspension of the BS3882:2007 Specification for Topsoil [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:29: Suspended matter is removed from a measured volume of [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:29: Suspended Solids: [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:29: Suspended and the total suspended matter is determined gravimetrically [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:29:DETSC Suspended, Settleable and Total MCERTS(Waters)- [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:29: left in suspension after settlement for 1 hour (or other [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:29: agreed time) from the total suspended matter in the [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:30: Water samples are pre-filtered to remove any suspended SCA Method ISBN 011 751957 X [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:30: solids and evaporated in an oven at 180°C. The amount of Suspended, Settleable and Total [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:30:DETSC Formaldehyde in particulates in suspension. spectrophotometry – Method 3500, Soil: 0.2mg/kg [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:32: Water Soluble particulates in suspension. contamination on former gasworks and [[this>Teesworks/Planning/R-2021-0879-FF/R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF|R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part6.PDF]]:33: particulates in suspension. [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 1.2 Statement of Expertise - formatted.pdf|R-2020-0411-FFM-Appendix 1.2 Statement of Expertise - formatted.pdf]]:6: monitoring of NO2 using diffusion tubes, monitoring of suspended and deposited dust from [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 8.2 Outline Drainage Strategy.pdf|R-2020-0411-FFM-Appendix 8.2 Outline Drainage Strategy.pdf]]:6: presented by each area. SuDS features would be suitably designed to reduce total suspended [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 8.3 WFD.pdf|R-2020-0411-FFM-Appendix 8.3 WFD.pdf]]:15: include water quality impacts (e.g. elevated suspended sediments, release of contaminants, [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 8.3 WFD.pdf|R-2020-0411-FFM-Appendix 8.3 WFD.pdf]]:18: presented by each area. SuDS features would be suitably designed to reduce total suspended [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 8.3 WFD.pdf|R-2020-0411-FFM-Appendix 8.3 WFD.pdf]]:22: presented by each area. SuDS features would be suitably designed to reduce total suspended [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 11 Air Quality.pdf|R-2020-0411-FFM-Chapter 11 Air Quality.pdf]]:10: suspended (i.e. airborne) dust is deposition. The rate of deposition depends largely on the size of [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 11 Air Quality.pdf|R-2020-0411-FFM-Chapter 11 Air Quality.pdf]]:10: determine the distance it travels and how long it stays suspended in the air before it settles out [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 11 Air Quality.pdf|R-2020-0411-FFM-Chapter 11 Air Quality.pdf]]:10: • PM10 particles, those up to 10 µm in diameter, remain suspended in the air for long periods [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 11 Air Quality.pdf|R-2020-0411-FFM-Chapter 11 Air Quality.pdf]]:10:11.2.39 Concentration-based limit values and objectives have been set for the PM10 suspended particle [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 11 Air Quality.pdf|R-2020-0411-FFM-Chapter 11 Air Quality.pdf]]:33: considered Suspended particulate [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 2 Project Description.pdf|R-2020-0411-FFM-Chapter 2 Project Description.pdf]]:2: refinery was both an oil refinery and chemical plant. Refining was suspended in 2009, [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 2 Project Description.pdf|R-2020-0411-FFM-Chapter 2 Project Description.pdf]]:24: River Tees to the west. Silty water will be treated to allow suspended solids to [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Non Technical Summary.pdf|R-2020-0411-FFM-Non Technical Summary.pdf]]:19: excavation, wheel washing, and dust and mud on site. Suspended sediments can reach surface [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf|R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf]]:18: water will be treated to allow suspended solids to settle out before disposal. Treatment is [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf|R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf]]:21: construction phase to ensure no discharge of pollutants or increase in suspended sediment [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf|R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf]]:13: refinery was both an oil refinery and chemical plant. Refining was suspended in 2009, [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf|R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf]]:20: suspended, such as Christmas and Easter when public holiday combine with weekend. [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf|R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf]]:9: Site. The refinery was both an oil refinery and chemical plant and refining was suspended in [[this>Teesworks/Planning/R-2020-0411-FFM/R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf|R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf]]:10: both an oil refinery and chemical plant. Refining was suspended in 2009, however, the site continues to [[this>Teesworks/Planning/R-2022-0587-CD/R-2022-0587-CD-SBQ1-DCL-CIV-SBKXX-CA-CE-000006 (1).pdf|R-2022-0587-CD-SBQ1-DCL-CIV-SBKXX-CA-CE-000006 (1).pdf]]:84:Suspended access The Work at Height Regulations INDG367- Inspecting fall arrest equipment made from [[this>Teesworks/Planning/R-2021-0728-PND/R-2021-0728-PND-Demolition of Dorman Long Tower.pdf|R-2021-0728-PND-Demolition of Dorman Long Tower.pdf]]:23: 9. Work in low light levels. Various injures from unseen Med Small teams of operatives Med Med Either suspend work Low [[this>Teesworks/Planning/R-2023-0179-SCP/R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf|R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf]]:117: number of delays, including a fire and a temporary suspension due to the COVID-19 [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF]]:17: suspended solids, as well as capture [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf|R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf]]:12: have been suspended since 2019. [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf|R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf]]:42: silt and other suspended solids, as well as capture any spills/oil and grease, prior to [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF]]:11: have been suspended since 2019. [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF]]:42: for pollution of surface water is primarily when high levels of suspended solids and/or leachates [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF]]:45: remove silt and other suspended solids, as well as capture any spills/oil and grease, [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF]]:47:Holme Beck Culvert, sediments in surface retained within the site. The remove silt and other suspended solids, as [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF]]:53: and sediment suspended solids, as well [[this>Teesworks/Planning/R-2020-0819-ESM/R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF|R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF]]:54: and sediment suspended solids, as well [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:454:Total Suspended Solids # <10 82 41 21 58 <10 mg/l TM37/PM0 [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:466: SMEWW 2540E:1999 22nd Edition. Gravimetric determination of Total Suspended [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:466: Solids (TSS) and Volatile Suspended Solids (VSS). Sample is filtered through a 1.5um [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:472:Total Suspended Solids # 19 64 42 <10 mg/l TM37/PM0 [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:483: SMEWW 2540E:1999 22nd Edition. Gravimetric determination of Total Suspended [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:483: Solids (TSS) and Volatile Suspended Solids (VSS). Sample is filtered through a 1.5um [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:489:Total Suspended Solids 69 60 16 91 12 68 24 <10 mg/l TM37/PM0 [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:501: SMEWW 2540E:1999 22nd Edition. Gravimetric determination of Total Suspended [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:501: Solids (TSS) and Volatile Suspended Solids (VSS). Sample is filtered through a 1.5um [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:507:Total Suspended Solids 69 60 16 91 12 68 24 <10 mg/l TM37/PM0 [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:519: SMEWW 2540E:1999 22nd Edition. Gravimetric determination of Total Suspended [[this>Teesworks/Planning/R-2023-0277-CD/R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf|R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf]]:519: Solids (TSS) and Volatile Suspended Solids (VSS). Sample is filtered through a 1.5um [[this>Teesworks/Planning/R-2021-0906-CD/R-2021-0906-CD-Condition 4 Discharge Cover Letter.pdf|R-2021-0906-CD-Condition 4 Discharge Cover Letter.pdf]]:1:as a scheme to treat and remove suspended solids and possible contamination from surface water run-off [[this>Teesworks/Planning/R-2021-0906-CD/R-2021-0906-CD-Condition 4 Discharge Cover Letter.pdf|R-2021-0906-CD-Condition 4 Discharge Cover Letter.pdf]]:1:treatment and removal of suspended solids and possible contamination. [[this>Teesworks/Planning/R-2021-0906-CD/R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf|R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf]]:4: time trigger) until such time as a scheme to treat and remove suspended [[this>Teesworks/Planning/R-2021-0906-CD/R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf|R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf]]:4:and removals of suspended solids and possible contamination. [[this>Teesworks/Planning/R-2021-0906-CD/R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf|R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf]]:4: suspended solids in the aqueous phase. The clarified water from this tank flows via [[this>Teesworks/Planning/R-2021-0906-CD/R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf|R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf]]:5: process will remove any remaining finer suspended particles which may remain in [[this>Teesworks/Planning/R-2021-0906-CD/R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf|R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf]]:18: is to reduce the concentration of suspended solids in the aqueous phase. T2 is fitted [[this>Teesworks/Planning/R-2021-0906-CD/R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf|R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf]]:19: in reverse direction thus expanding the bed and forcing out trapped suspended solids. [[this>Teesworks/Planning/R-2021-0906-CD/R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf|R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf]]:25: processed, particularly the concentration of suspended solids. [[this>Teesworks/Planning/R-2021-0906-CD/R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf|R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf]]:28: removal of silts is more labour intensive. The water quality and level of suspended [[this>Teesworks/Planning/R-2021-0906-CD/R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf|R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf]]:31: suspended solids are filtered by the sand and accumulate within the top layer of the [[this>Teesworks/Planning/R-2021-0906-CD/R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf|R-2021-0906-CD-TSWK-STDC-LAC-ZZ-DO-PL-0001.pdf]]:31: suspended solids on the outlet of the sand filter. Sample taps are fitted to the sand [[this>Teesworks/Planning/R-2021-0906-CD/R-2021-0906-CD-Agent email.pdf|R-2021-0906-CD-Agent email.pdf]]:1:the submission of a scheme to treat and remove suspended solids and possible contamination from surface water [[this>Teesworks/Planning/R-2021-0906-CD/R-2021-0906-CD-Agent email.pdf|R-2021-0906-CD-Agent email.pdf]]:1:suspended solids collects in the downstream excavation during construction, this will be removed via a vacuum tanker [[this>Teesworks/Planning/R-2021-0906-CD/R-2021-0906-CD-Agent email.pdf|R-2021-0906-CD-Agent email.pdf]]:1:suspended solids via a series of filters and discharge the waters via NWL trade effluent consent manhole 7902. No [[this>Teesworks/Planning/R-2021-0906-CD/R-2021-0906-CD-Decision Notice 0906.pdf|R-2021-0906-CD-Decision Notice 0906.pdf]]:2: time trigger) until such time as a scheme to treat and remove suspended solids [[this>Teesworks/Planning/R-2021-0906-CD/R-2021-0906-CD-Officer Report 0906.pdf|R-2021-0906-CD-Officer Report 0906.pdf]]:1:time trigger) until such time as a scheme to treat and remove suspended solids and [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF]]:46: potential for pollution of surface water is primarily when high levels of suspended solids and/or [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF]]:51: remove silt and other suspended solids, as well as capture any spills/oil and grease, [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF]]:53:Gill Beck, Dabholm Beck, sediments in surface retained within the site. The remove silt and other suspended solids, [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF]]:61: and sediment suspended solids, as well as [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF]]:62: contaminants Not Significant other suspended solids, as Not Significant [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF]]:16: suspended solids, as well as [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF]]:7: currently suspended, is located on the boundary of the site, just to the south east of the [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF]]:10: extent of the site, where services have been suspended since 2019; the South Bank Station, to [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF]]:14: station. Services at the station have been suspended since 2019. As part of the [[this>Teesworks/Planning/R-2020-0822-ESM/R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF|R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF]]:20:have been suspended since 2019. As part of the emerging Transport Strategy for [[this>Teesworks/Planning/R-2023-0227-CD/R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf|R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf]]:20: could be deposited by vehicles leaving the ERF site and re-suspended by [[this>Teesworks/Planning/R-2023-0227-CD/R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf|R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf]]:31: deposited by vehicles leaving the ERF site and re-suspended by vehicles