Case Details | Project Type | Project Title | Locations | Applicant Name | Submission Date | Decision Date |
---|---|---|---|---|---|---|
MLA/2015/00001 - Completed | Application - Construction of new works | Construction of three groynes | Seagrove Bay off Pier Road, Seaview PO34 5BL | Mr Tim Farquhar | 03 Jan 2015 | 28 Apr 2015 |
MLA/2015/00002 - Completed | Application - Construction of new works | Linden House | Linden House Sailing Pontoon Replacement & Extension | London Corinthian Trust | 05 Jan 2015 | 16 Jun 2015 |
MLA/2015/00003 - Completed | Application - Maintenance of existing works | Reprovision of Small Boat Berthing Facilities at Fountain Lake Jetty berth 5, Portsmouth Naval Base | FLJ 5 | Bae Systems Plc | 06 Jan 2015 | 26 Feb 2015 |
MLA/2015/00004 - Completed | Application - Other works | Scaffold erection for the Installation of an Uprated Transformer on Fountain Lake Jetty | Scaffolding Site | Bae Systems Plc | 06 Jan 2015 | 16 Feb 2015 |
MLA/2015/00005 - Completed | Application - Construction of new works | Town Wall Set Back Wall and Drainage Outfall | Town Wall, Hartlepool | Hartlepool Borough Council | 06 Jan 2015 | 02 Jul 2015 |
MLA/2015/00006/1 - Completed | Application - Navigational dredging (maintenance) | Jurgens Jetty Annual Maintenance Dredge - Emergency License | Jurgens Jetty | Pura Foods Limited | 06 Jan 2015 | 25 Feb 2015 |
MLA/2015/00007 - Completed | Application - Wrecks and other archaeological remains | HMS Colossus Investigation 2015 | HMS Colossus | Mr Kevin Camidge | 06 Jan 2015 | 27 Apr 2015 |
MLA/2015/00008 - Completed | Application - Maintenance of existing works | Riverwall @ Rosebank, Holyport Road, SW6 | Rosebank river wall | Mbs Contracting Services Limited | 06 Jan 2015 | 08 Apr 2015 |
MLA/2015/00010/1 - Completed | Application - Construction of new works | Hull River Bridge MEB1250A | Hull Swing Bridge | Amalgamated Construction Ltd | 06 Jan 2015 | 01 Apr 2016 |
MLA/2015/00011/1 - Completed | Application - Maintenance of existing works | Thorn Sluice Refurbishment | Thorn Sluice TR0280562411 | Environment Agency | 07 Jan 2015 | 23 Sep 2015 |
MLA/2015/00012 - Completed | Application - Maintenance of existing works | Maintenance Replacement of 7 Nr Piles at the Pontoon Jetty, West Mersea | Pontoon jetty, West Mersea. | Colchester Borough Council | 07 Jan 2015 | 21 Jul 2015 |
MLA/2015/00013 - Completed | Application - Construction of new works | Burgh Island Causeway Apartments Sea Defences | Armour placement and protection of existing telecommunications cable. | B.I.C.F. Limited | 07 Jan 2015 | 15 Jul 2015 |
MLA/2015/00015 - Completed | Application - Use of tracers | Anchorsholme Dye Tracing (Rhodamine) | Dye Tracer release Location | United Utilities Plc | 08 Jan 2015 | 01 May 2015 |
MLA/2015/00016/4 - Completed | Application - Maintenance of existing works | RNLI South Division - Regional Licence for Low Impact Maintenance Works | Mudeford lifeboat Station, Bournemouth (Southbourme beach area), Bournemouth (Fisherman's Walk beach area), Bournemouth (Manor Steps beach Area), Bournemouth (Boscombe East beach Area), Bournemouth (Boscombe West Beach Area), Bournemouth (East Cliff Beach Area), Bournemouth (Bournemouth East Beach Area), Bournemouth (Bournemouth West Beach Area), Bournemouth (Durley Chine Beach Area), Bournemouth (Alum Chine Beach Area), Poole Lifeboat Station, Poole (RNLI Head Quarters), Poole Beach Lifeguard Area (Branksome Chine), Poole Beach Lifeguard Area (Canford Cliffs), Poole Beach Lifeguard Area (Shore Road), Poole Beach Lifeguard Area (Sandbanks), Swanage Lifeboat Station, Swanage Mooring, Weymouth Lifeboat Station (Pontoon Berth), Weymouth Lifeboat Station (ILB Slipway), Weymouth Beach Lifeguard Area, Greenhill Beach Lifeguard Area (West Dorset), Exmouth Lifeboat Station, ExmouthBeach Lifeguard Area, Teignmouth Lifeboat Station, Torbay Lifeboat Station, Salcombe Lifeboat Station (Pontoon Berth), Salcombe Lifeboat Station (ILB Launch Ramp), Plymouth Lifeboat Station, Tregonhawke Beach Lifeguard Area, Tregantle Beach Lifeguard Area, Looe Lifeboat Station, Fowey Lifeboat Station (Pontoon Berth), Fowey Lifeboat Station (ILB Davit Launch Area), Fowey Lifeboat Station (Refueling Pontoon), Falmouth Lifeboat Station, The Lizard Lifeboat Station, The Lizard Mooring (South Breasting Mooring), The Lizard Mooring (North Breasting Mooring), Penlee Lifeboat Station, Penlee Old Lifeboat Station, St. Mary's (Isles of Scilly) Lifeboat Station, Sennen Cove Lifeboat Station, Sennen Cove Beach Lifeguard Area, St. Ives Lifeboat Station, Chapel Porth Beach Lifeguard Area, St. Agnes Lifeboat Station, Crantock Beach Lifeguard Area, Constantine Beach Lifeguard Area, Padstow Lifeboat Station (Station boathouse & slipway), Padstow Moorings (Station), Rock Lifeboat Station, Sandymouth Beach Lifeguard Area, Clovelly Lifeboat Station, Appledore Lifeboat Station, Appledore Mooring (Main Mooring), Appledore Mooring (Reserve Mooring), Ilfracombe Lifeboat Station, Minehead Lifeboat Station (Station Slipway), Minehead Lifeboat Station (Recovery Anchors), Burnham-on-Sea Lifeboat Station (beach launch Area), Portishead Lifeboat Station (Launch ramps + beach routes) | Royal National Lifeboat Institution | 08 Jan 2015 | 12 May 2020 |
MLA/2015/00017 - Completed | Application - Other works | Rock Armour placement for North Haven Slipway | North Haven Ferry Slipway, Poole Harbour | The Bournemouth Swanage Motor Road And Ferry Compnay Inc | 09 Jan 2015 | 29 Apr 2015 |
MLA/2015/00018 - Completed | Application - Construction of new works | Weymouth Sailing Club Fixed Racing Marks | B, C, F, H, I, J, K, M, O, P, Q, R, T, X | Weymouth Sailing Club | 09 Jan 2015 | 14 Apr 2015 |
MLA/2015/00019 - Withdrawn | Application - Maintenance of existing works | Runcorn Viaduct North Spans | Runcorn Viaduct North Span | J. Murphy & Sons Limited | 12 Jan 2015 | |
MLA/2015/00020 - Completed | Application - Construction of new works | American Wall, Orford Ness. Temporary Works | American Wall, Orford Ness | Babcock International Group | 12 Jan 2015 | 11 May 2015 |
MLA/2015/00022/1 - Completed | Application - Construction of new works | Chatham Marina Extension | Chatham Marina | Marina Developments Limited | 13 Jan 2015 | 10 Feb 2016 |
MLA/2015/00023 - Completed | Application - Construction of new works | Walmer to Kingsdown Timber Groyne Replacement | Walmer to Kingsdown Timber Groyne Replacement | Dover District Council | 14 Jan 2015 | 15 Jul 2015 |
MLA/2015/00024/4 - Completed | Application - Maintenance of existing works | Routine Marine Structure Maintenance Work | Heysham 1 Power Station | Edf Energy Nuclear Generation Limited | 14 Jan 2015 | 26 Apr 2023 |
MLA/2015/00025/1 - Completed | Application - Other works | Shoeburyness Flood Defence Priority Works | SH-01, FO-03, FO-04, FO-05, FO-07, FO-11, FO-12 | Qinetiq | 15 Jan 2015 | 09 Aug 2016 |
MLA/2015/00026/2 - Completed | Application - Construction of new works | The RAM Brewery Quarter | RAM Quarter - Red Line Boundary | Greenland Ram (London) Limited | 16 Jan 2015 | 21 Apr 2017 |
MLA/2015/00027/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Port of Boston Maintenance Dredging & Disposal 2015 | Hob Hole Dredging Site, BOSTON 7 (HU170), The Dock | Port Of Boston Limited | 16 Jan 2015 | 03 Aug 2018 |
MLA/2015/00028/2 - Completed | Application - Construction of new works, Maintenance of existing works | Whitstable Harbour South Quay | Whitsable Harbour South Quay, Whitstable Harbour pontoon | Canterbury City Council | 19 Jan 2015 | 13 Feb 2017 |
MLA/2015/00029 - Completed | Application - Maintenance of existing works | HCA Chatham River dolphin's | Dolphin 1, Dolphin 2 | F M Conway Limited | 19 Jan 2015 | 13 Feb 2015 |
MLA/2015/00030 - Completed | Application - Other deposits | Cumbrian AWAC deployment | Sefton Mbc | 19 Jan 2015 | 01 May 2015 | |
MLA/2015/00031 - Completed | Application - Other deposits | Wave Hub Subsea Power Cable - Inshore Spanning Support and Protection Grouped under: Wave Hub Showing 3 of 10 cases | Inshore Cable Spanning Anomaly Rectification | Wave Hub Limited | 19 Jan 2015 | 11 Mar 2015 |
MLA/2015/00032/4 - Completed | Application - Disposal of dredged material, Other dredging | Clearance of Sea Water Intake at BAE Systems (Barrow-in-Furness) Grouped under: Dredge of Sea Water intake at BAE systems Showing 2 of 4 cases | SMITE Seawater Abstraction Point - Walney Channel, BARROW D (IS205) | Bae Systems Marine Limited | 20 Jan 2015 | 26 Jul 2016 |
MLA/2015/00034/1 - Completed | Application - Dredged Material Disposal, Dredging | Marina dredging | Davis's Boatyard Pontoon Berthing/Approach channel, SWANAGE BAY (WI110) | Davis'S Boatyard | 20 Jan 2015 | 30 Oct 2015 |
MLA/2015/00035/1 - Completed | Application - Navigational dredging (maintenance) | Burnham Yacht Harbour annual matenance dredge Grouped under: Burnham on Crouch Dredge Showing 2 of 2 cases | Burnham Yacht Harbour | Burnham Yacht Harbour Marina Limited | 20 Jan 2015 | 06 May 2015 |
MLA/2015/00036/1 - Completed | Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital), Other removals | Newhaven East Quay and Port Expansion Area | Red Line Boundary, Dredge Footprint, Disposal Ground | Newhaven | 20 Jan 2015 | 20 Sep 2016 |
MLA/2015/00037 - Completed | Application - Construction of new works | Riversmeet Boathouse, moorings | Riversmeet Quay | Mr Rob Sanders | 21 Jan 2015 | 23 Jun 2015 |
MLA/2015/00038 - Completed | Application - Maintenance of existing works | Haslar Bridge Rehabilitation Works | Haslar Bridge, Gosport | Hampshire County Council | 21 Jan 2015 | 02 Mar 2015 |
MLA/2015/00040/1 - Completed | Application - Construction of new works, Other deposits, Other removals | TARMOUNT HARD | Tarmount Hard | Sussex Yacht Club,Limited | 22 Jan 2015 | 16 Feb 2018 |
MLA/2015/00041 - Completed | Application - Construction of new works | Maybush Lane Outfall Extension Felixstowe | Central Felixstowe Beach Maybush Lane Outfall | Mr David Wheeler | 22 Jan 2015 | 13 May 2015 |
MLA/2015/00043 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Coop Funeral Services | 22 Jan 2015 | 28 Jan 2015 | |
MLA/2015/00044/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Bembridge Harbour Maintenance Dredging | Bembridge Main Area, Bembridge Sailing Club, NAB TOWER (WI060) | Bembridge Harbour Improvements Company Limited | 26 Jan 2015 | 04 Jun 2015 |
MLA/2015/00046/2 - Completed | Application - Construction of new works | Teesside Renewable Energy Plant - Surface Water Outfall | Teesside Renewable Energy Plant Headwall | Eco2 Ltd | 27 Jan 2015 | 07 Aug 2015 |
MLA/2015/00047 - Completed | Application - Construction of new works | Hythe Quay stabilisation, Maldon, Essex | Hythe Quay, Maldon, Essex, CM9 5HN | Maldon District Council | 28 Jan 2015 | 18 Sep 2015 |
MLA/2015/00048 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Charles Lister | 28 Jan 2015 | 10 Feb 2015 | |
MLA/2015/00049/1 - Completed | Application - Construction of new works | Cobden Bridge Riverside Wall | Cobden Bridge Riverside Wall | The Planning Bureau Limited | 29 Jan 2015 | 15 Feb 2016 |
MLA/2015/00050 - Completed | Application - Maintenance of existing works | RNLI Staithes & Runswick - Low Impact Maintenance Works (Fast Track Licence) | Area of Launch Ramp | Rnli | 29 Jan 2015 | 13 Feb 2015 |
MLA/2015/00051/2 - Completed | Application - Maintenance of existing works | Trenarren Rock Armour | Trenarren Sea Defence | Teignmouth Maritime Services Limited | 30 Jan 2015 | 27 Sep 2016 |
MLA/2015/00052/1 - Completed | Application - Maintenance of existing works | DONG Energy Gunfleet Sands Demo (UK) Ltd - Operational Marine Licence for Cable Repair for Gunfleet Sands Demo Offshore Wind Farm Grouped under: Gunfleet Sands OWF 1, 2, 3 Showing 2 of 15 cases | Gunfleet Sands 3 Demo Wind Farm: Array Cable, Gunfleet Sands 3 Demo Wind Farm: Export Cable | Dong Energy Gunfleet Sands Demo (Uk) Ltd | 30 Jan 2015 | 22 Jan 2018 |
MLA/2015/00056 - Completed | Application - Other dredging | Dock Bridge (tidal Main Drain) desilitng project | Dock Bridge | Environment Agency (Warrington) | 03 Feb 2015 | 16 Mar 2015 |
MLA/2015/00057 - Completed | Application - Maintenance of existing works | Maintenance of Stone Road, Foreshore, Morecambe | Stone Road, Morecambe | Lancaster City Council | 04 Feb 2015 | 10 Mar 2015 |
MLA/2015/00058 - Completed | Application - Maintenance of existing works | Dock Wall Repairs, Eagle Wharf, Ipswich | Eagle Wharf, Ipswich Dock | Persimmon Homes (Essex) Limited | 04 Feb 2015 | 24 Apr 2015 |
MLA/2015/00059 - Completed | Application - Construction of new works, Other works | Woolverstone Marina Hoist Dock | Hoist Dock | Marina Developments Limited | 04 Feb 2015 | 07 Aug 2015 |
MLA/2015/00060 - Completed | Application - Maintenance of existing works | Bridlington Stormwater LSO Valve Replacement | Bridlington Stormwater LSO Diffuser Working Area | Yorkshire Water Services Limited | 05 Feb 2015 | 29 Apr 2015 |
MLA/2015/00061 - Completed | Application - Construction of new works | Middleton Wastewater Treatment Works Outfall - Diffuser modifications | Middleton Outfall | United Utilities | 06 Feb 2015 | 04 Jun 2015 |
MLA/2015/00063 - Completed | Application - Maintenance of existing works | Hartlepool SO5 - Steetley | Outfall | Northumbrian Water Limited | 06 Feb 2015 | 10 Jul 2015 |
MLA/2015/00065/4 - Completed | Application - Other dredging | Maintenance Dredging at HMNB Devonport Grouped under: HMNB Devonport Maintenance Dredging Showing 2 of 4 cases | HMNB Devonport | Defence Infrastructure Organisation | 08 Feb 2015 | 14 May 2020 |
MLA/2015/00066 - Completed | Application - Maintenance of existing works | Cambois SO3 | Outfall | Northumbrian Water Limited | 09 Feb 2015 | 07 Apr 2015 |
MLA/2015/00067 - Completed | Application - Other deposits, Other works | Slaughden Frontage Rock Groynes Grouped under: Sloughden Coastal Defence Showing 2 of 2 cases | Environment Agency | 09 Feb 2015 | 25 Mar 2015 | |
MLA/2015/00068/1 - Completed | Application - Construction of new works, Other works | Brent Swing Bridge Replacement | Brent Swing Bridge | Kent County Council | 09 Feb 2015 | 09 Sep 2016 |
MLA/2015/00069 - Completed | Application - Maintenance of existing works | Seaham SO1 | Outfall | Northumbrian Water Limited | 09 Feb 2015 | 31 Mar 2015 |
MLA/2015/00070/1 - Completed | Application - Maintenance of existing works | Trevone Sewage Pumping Station outfall leak repair Grouped under: Trevone Outfall Showing 2 of 2 cases | Trevone SPS Outfall | South West Water Authority | 09 Feb 2015 | 05 Mar 2015 |
MLA/2015/00072/3 - Completed | Application - Construction of new works, Other works | Orford Ness Repairs to Coastal Defences, Stoney Ditch and Pig Pail Sluice | Orford Ness - Pig Pail Sluice, Embankment to South of Kings Marsh Sluice, Stoney Ditch Embankment Works | The National Trust - Orfordness | 10 Feb 2015 | 30 Oct 2015 |
MLA/2015/00074 - Completed | Application - Maintenance of existing works | National Trust Sandbanks Jetty repairs | Sandbanks Jetty, North Haven, Poole Harbour. | National Trust Plc | 11 Feb 2015 | 08 Apr 2015 |
MLA/2015/00075 - Withdrawn | Application - Maintenance of existing works, Other deposits, Other removals | Soldiers Point Recharge and Repair Works | Soldier Point MMO | Environment Agency (Southern Region) | 11 Feb 2015 | |
MLA/2015/00077 - Completed | Application - Maintenance of existing works | Barrow Offshore Wind Farm (OWF) Export Cable Repair and Remediation | Barrow OWF Export Cable Corridor | Tc Barrow Ofto Limited | 16 Feb 2015 | 14 Aug 2015 |
MLA/2015/00079 - Completed | Application - Use of tracers | Dawlish Warren Dye tracing | Eastern Dredge Site, Southern dredge site | Environment Agency - South West Region | 16 Feb 2015 | 01 May 2015 |
MLA/2015/00080 - Completed | Application - Maintenance of existing works | Mersey Gateway Project | Mersey Gateway | Mersey Link | 16 Feb 2015 | 27 Feb 2015 |
MLA/2015/00082 - Completed | Application - Construction of new works | Feeder 9 River Humber Gas Pipeline Replacement Project: Phase 2 Ground Investigation | L17 Working Area | National Grid Grain Lng Ltd | 17 Feb 2015 | 27 May 2015 |
MLA/2015/00084 - Completed | Application - Maintenance of existing works | Network Rail- Ravenglass trial pit Grouped under: Canforth to Whitehaven line Showing 4 of 4 cases | Trial Pit 1, Trial Pit 2, Trial Pit 3 | Network Rail Limited | 17 Feb 2015 | 26 Jun 2015 |
MLA/2015/00085 - Completed | Application - Construction of new works | BEACH Phase 2 | Blyth Education and Community Hub | Blyth Harbour Commission | 17 Feb 2015 | 17 Jul 2015 |
MLA/2015/00086/2 - Completed | Application - Maintenance of existing works | Ormonde Offshore Wind Farm (OWF) Export Cable Repair and Remediation | Ormonde OWF Export Cable Corridor | Tc Ormonde Ofto Limited | 19 Feb 2015 | 01 May 2018 |
MLA/2015/00087 - Completed | Application - Maintenance of existing works | Network Rail - Leven Viaduct Trial Pit Grouped under: Canforth to Whitehaven line Showing 4 of 4 cases | Trial Pit 1, Trial Pit 2 | Network Rail Limited | 20 Feb 2015 | 30 Jun 2015 |
MLA/2015/00088/6 - Completed | Application - Disposal of dredged material | Tees and Hartlepool Maintenance Dredge Disposal | TEES BAY A (TY160) | Pd Teesport Limited | 20 Feb 2015 | 17 Jun 2022 |
MLA/2015/00089 - Completed | Application - Maintenance of existing works | Network Rail- Parton to Harrington Trial Pits Grouped under: Canforth to Whitehaven line Showing 4 of 4 cases | Trial Pit 1, Trial Pit 2 | Network Rail Limited | 20 Feb 2015 | 26 Jun 2015 |
MLA/2015/00090 - Completed | Application - Maintenance of existing works | Network Rail - Bransty to Parton Grouped under: Canforth to Whitehaven line Showing 4 of 4 cases | Trial Pit 1, Trial Pit 2 | Network Rail Limited | 20 Feb 2015 | 26 Jun 2015 |
MLA/2015/00091 - Completed | Application - Construction | River bank support and flood defence | Kingsmill Lake / Wheal Sophia | Mr Mat Windrum | 22 Feb 2015 | 15 Jun 2015 |
MLA/2015/00092/4 - Completed | Application - Maintenance of existing works | Great Yarmouth Tidal Defences - Phases 1B and 2 | Phase 1b, Phase 2 | Bam Nuttall Limited | 23 Feb 2015 | 22 Mar 2016 |
MLA/2015/00093 - Completed | Application - Maintenance of existing works | The Beeches, Restronguet Point - Slipway Repair | Slipway repair - The Beeches, Restronguet Point, Feock | Gilbert And Goode Limited | 23 Feb 2015 | 08 Apr 2015 |
MLA/2015/00094 - Completed | Application - Maintenance of existing works | RNLI Bembridge - Low Impact Maintenance Works (Fast Track) | Approach Walkway, Slipway and Groyne Area | Rnli | 24 Feb 2015 | 01 Jun 2015 |
MLA/2015/00095/5 - Completed | Application - Other works | London Array Ltd- Operational Marine Licence for Inter Array Cable Repair for London Array Offshore Wind Farm | London Array Limited | 24 Feb 2015 | 01 Feb 2022 | |
MLA/2015/00096/1 - Completed | Application - Construction of new works, Maintenance of existing works | Scalby Mills Short Sea Outfall Remidation Works Grouped under: Scarborough Outfalls - Corner Cafe and Scalby Mills CWOs Showing 2 of 3 cases | Scalby Mills Short Sea Outfall | J.N. Bentley Limited | 24 Feb 2015 | 03 Aug 2015 |
MLA/2015/00097/2 - Completed | Application - Sampling | Offshore Exploratory Boreholes | West Cumbria Mining Limited | 25 Feb 2015 | 23 Sep 2015 | |
MLA/2015/00098 - Completed | Application - Other dredging | Seaton Seal Wall replacement | Seaton Beach Cornwall | Cormac Solutions Ltd | 26 Feb 2015 | 27 May 2015 |
MLA/2015/00099 - Completed | Application - Navigational dredging (maintenance) | Amble Marina Dredge | Amble Marina Basin, AMBLE MARINA OUTFALL (TY022) | Amble Marina Limited | 26 Feb 2015 | 03 Aug 2015 |
MLA/2015/00100/1 - Completed | Application - Other works | RMB Stonehouse Camber Structural Remediation | RMB Stonehouse Camber Plymouth | Defence Infrastructure Organisation | 26 Feb 2015 | 03 Jun 2016 |
MLA/2015/00102 - Completed | Application - Construction of new works | Black Rabbit public house - replacement jetty with pontoon | New [replacement] jetty, The Black Rabbit Inn | Philips Surveyors Llp | 27 Feb 2015 | 26 May 2015 |
MLA/2015/00103 - Completed | Application - Maintenance of existing works | Ashton Avenue Bridge Refurbishment | Ashton Avenue Bridge | Bristol City Council | 27 Feb 2015 | 02 Jul 2015 |
MLA/2015/00104/2 - Completed | Application - Construction of new works, Maintenance of existing works, Other removals | Bankside Pier Extension Grouped under: Bankside Pier Extension Showing 2 of 3 cases | Bankside Pier Extension | London River Service Ltd | 27 Feb 2015 | 10 Feb 2016 |
MLA/2015/00105/2 - Completed | Application - Construction of new works, Other works | RNLI Torbay Pontoon Upgrade | Pontoon Upgrade | R.N.L.I. (Trading) Limited | 27 Feb 2015 | 24 Mar 2016 |
MLA/2015/00106/2 - Completed | Application - Other dredging | Robins Wharf, Northfleet | Robins Wharf, Northfleet, Kent | Armac Shipping Services Ltd | 02 Mar 2015 | 11 Feb 2019 |
MLA/2015/00107/1 - Completed | Application - Maintenance of existing works | Maintenance of the met mast on Kentish Flats Offshore Wind Farm | Kentish Flats Offshore Wind Farm | Vattenfall Wind Power Ltd | 02 Mar 2015 | 13 Apr 2015 |
MLA/2015/00108 - Completed | Application - Maintenance of existing works | Padstow SPS Outfall - 2 | Padstow SPS Outfall | South West Water Limited | 02 Mar 2015 | 25 Mar 2015 |
MLA/2015/00109 - Completed | Application - Other dredging | White Mountain, Dagenham - Maintanence Dredge | White Mountain Jetty, Dagenham | Armac Shipping Services Ltd | 03 Mar 2015 | 11 Jan 2016 |
MLA/2015/00110 - Completed | Application - Decommissioning of works | Removal of disused intake pipe, Bincleaves | Location of pipe | Qinetiq Limited | 03 Mar 2015 | 07 May 2015 |
MLA/2015/00111/2 - Completed | Application - Disposal of dredged material | Dredging Material Disposal at Maldon Saltings, TH062 Grouped under: Northey Island: North-west Embankment Repairs Showing 2 of 3 cases | Maldon Saltings 3 (TH064) | Northumbrian Water Limited | 03 Mar 2015 | 02 Feb 2017 |
MLA/2015/00112 - Completed | Application - Other removals | Eastcliff Outfall emergency safety works Grouped under: Outfall pipe adjacent to East Cliff, Teignmouth Showing 2 of 3 cases | Work area | South West Water Limited | 04 Mar 2015 | 09 Mar 2015 |
MLA/2015/00113 - Completed | Application - Maintenance of existing works | Shell Pier essential concrete pier repair works and installation of new 15m radar tower Grouped under: Shell Pier emergency works and new radar tower Showing 3 of 4 cases | Shell Pier | Bae Systems Plc | 04 Mar 2015 | 24 Apr 2015 |
MLA/2015/00114 - Completed | Application - Maintenance of existing works | RNLI Cromer - Low Impact Maintenance Works (Fast Track) | Area of pile maintenance works | Rnli Cromer | 05 Mar 2015 | 12 May 2015 |
MLA/2015/00115 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr John Lister | 05 Mar 2015 | 13 Mar 2015 | |
MLA/2015/00116 - Completed | Application - Construction of new works, Decommissioning of works, Maintenance of existing works, Navigational dredging (capital) | Trafalgar Dock, Southampton | Trafalgar Dock Application Area | Rpw (Southampton) Limited | 05 Mar 2015 | 20 Feb 2019 |
MLA/2015/00117 - Completed | Application - Other removals | Dudgeon Offshore Wind Farm Grouped under: Dudgeon Offshore WInd Farm Showing 4 of 5 cases | Dudgeon OWF Consented Boundary, Dudgeon OWF Consented Corridor | Dudgeon Offshore Wind Limited | 06 Mar 2015 | 01 May 2015 |
MLA/2015/00118/2 - Completed | Application - Construction of new works, Navigational dredging (capital) | Swan Hunter - Dredging, Temporary Repository and Wet Dock Infill Grouped under: Swan Hunter Re-devlopment Showing 2 of 5 cases | Swan Hunter - Site of Proposed Works | North Tyneside Council | 06 Mar 2015 | 15 Jan 2016 |
MLA/2015/00119 - Completed | Application - Other removals | Key Diving Ltd Application for a Marine Licence | Key Diving Ltd | 08 Mar 2015 | 27 Jun 2019 | |
MLA/2015/00120/1 - Completed | Application - Maintenance of existing works | Thanet Offshore Wind Farm - Export Cable Repair Grouped under: Thanet Offshore Wind Farm Showing 2 of 6 cases | Location of proposed cable repair (Thanet OWF export cable) | Thanet Ofto Limited | 09 Mar 2015 | 01 Jul 2015 |
MLA/2015/00122 - Completed | Application - Construction of new works | Roa Island Jetty Reconstruction | Roa Island Jetty | Barrow Borough Council | 10 Mar 2015 | 28 May 2015 |
MLA/2015/00123/3 - Completed | Application - Scientific instruments | East Anglia ONE Site Investigation Works Grouped under: East Anglia ONE Offshore Windfarm Showing 2 of 7 cases | martlesham creek, river deben | East Anglia One Limited | 10 Mar 2015 | 28 Sep 2015 |
MLA/2015/00125 - Completed | Application - Maintenance of existing works | Tuckton Bridge Repair Works | Tuckton Bridge | Bournemouth Borough Council | 10 Mar 2015 | 01 Jun 2015 |
MLA/2015/00126/3 - Completed | Application - Construction of new works | Site X | Site X | Mclaughlin & Harvey Limited | 11 Mar 2015 | 22 Sep 2016 |
MLA/2015/00127 - Withdrawn | Application - Other works | Garden Bridge Geotechnical Investigation | Garden Bridge, London | Fugro Seacore Limited | 11 Mar 2015 | |
MLA/2015/00129 - Completed | Application - Other works | Falcon Wharf | Falcon Wharf 1 | Jeary Developments Limited | 11 Mar 2015 | 18 Jun 2015 |
MLA/2015/00131 - Completed | Application - Maintenance of existing works | Littlehampton Baltic & Norfolk Wharves Remedial Works Package | Harbour Side East, Littlehampton | Unimead Limited | 12 Mar 2015 | 20 Apr 2015 |
MLA/2015/00133 - Completed | Application - Construction of new works | Cloud 9 Marina Dartmouth | Dart Marina | Dart Marina Hotel Limited | 12 Mar 2015 | 05 Aug 2015 |
MLA/2015/00134 - Completed | Application - Construction of new works | Exeter Flood Defence Scheme (FDS) Phase 2 | Exeter FDS P2 | Environment Agency – South West Reg | 12 Mar 2015 | 07 Oct 2015 |
MLA/2015/00136 - Completed | Application - Maintenance of existing works | RNLI Barrow - Emergency Works Application for Slipway Repairs | Area of slipway | Rnli | 13 Mar 2015 | 17 Mar 2015 |
MLA/2015/00137/1 - Completed | Application - Construction of new works | RNLI Southend Atlantic 85 | RNLI Southend | R.N.L.I. (Trading) Limited | 16 Mar 2015 | 20 Nov 2015 |
MLA/2015/00138 - Completed | Application - Maintenance of existing works | Hope Cove repair to sea wall Grouped under: Hope Cove Showing 2 of 2 cases | Inner Hope Hope Cove | Devon County Council | 16 Mar 2015 | 08 Jul 2015 |
MLA/2015/00139 - Completed | Application - Other works | Hope Cove bed rock investigation Grouped under: Hope Cove Showing 2 of 2 cases | Hope Cove | Devon County Council | 16 Mar 2015 | 10 Jul 2015 |
MLA/2015/00140 - Completed | Application - Explosive substances or articles, Other removals | Rampion Offshore Wind Farm - UXO target removal Grouped under: Rampion Offshore Wind Farm Showing 2 of 13 cases | Rampion UXO | E.On Climate & Renewables Uk Rampion Offshore Wind Limited | 16 Mar 2015 | 15 Sep 2015 |
MLA/2015/00141/1 - Completed | Application - Construction of new works, Other works | Central Promenade Redevelopment | Central Promenade | North Tyneside Council | 16 Mar 2015 | 11 Jan 2017 |
MLA/2015/00142 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | John Lister | 17 Mar 2015 | 15 Apr 2015 | |
MLA/2015/00143 - Completed | Application - Construction of new works, Maintenance of existing works | Waters Edge, Bouldnor - Repair to Coastal Defence and Timber Jetty Works | Waters Edge Bouldnor Isle of Wight PO41 0XB, Small Timber Jetty | Graham Attrill Civil Engineering Limited | 17 Mar 2015 | 12 Nov 2015 |
MLA/2015/00144/3 - Variation Requested | Application - Alternative use of dredged material, Disposal of dredged material, Navigational dredging (maintenance) | Port of Ramsgate Maintenance Dredging | Ramsgate Harbour, Port Control (Sand Dredging), PEGWELL BAY (TH140), PEGWELL BAY B (TH135), DOVER (DV010) | Port Of Ramsgate | 17 Mar 2015 | 30 Jul 2024 |
MLA/2015/00146/5 - Completed | Application - Other removals | Proposed New Lifeboat Station at RNLI Selsey | RNLI Selsey Existing Lifeboat Station | R.N.L.I. (Trading) Limited | 18 Mar 2015 | 10 Aug 2017 |
MLA/2015/00149 - Completed | Application - Other deposits, Other removals | Rampion Offshore Wind Farm - Pre-construction removal/relocation of boulders Grouped under: Rampion Offshore Wind Farm Showing 2 of 13 cases | Rampion Boulder clearance | E.On Climate & Renewables Uk Rampion Offshore Wind Limited | 19 Mar 2015 | 15 Sep 2015 |
MLA/2015/00150 - Completed | Application - Construction of new works, Decommissioning of works | Works at No. 3 Jetty, North Tees | No. 3 Jetty, Impounding Basin | Sabic Uk Petrochemicals Limited | 19 Mar 2015 | 02 Jul 2015 |
MLA/2015/00151 - Completed | Application - Maintenance of existing works | Bermondsley Wall West | Bermondsey West Wall - SE16 4UB | Topbond Plc | 19 Mar 2015 | 11 Sep 2015 |
MLA/2015/00152 - Completed | Application - Maintenance of existing works | Rotherhithe Street | Rotherhithe Street | Topbond Plc | 19 Mar 2015 | 29 Jul 2015 |
MLA/2015/00154 - Completed | Application - Maintenance of existing works | Redcar SO3 | Outfall, Access | Northumbrian Water Limited | 20 Mar 2015 | 17 Sep 2015 |
MLA/2015/00155 - Completed | Application - Construction of new works | Proposed Bitumen Storage Facility, Vopak Terminal London, West Thurrock | Insulated import pipleine, West Thurrock | Vopak Terminal London B.V. Limited | 23 Mar 2015 | 23 Jul 2015 |
MLA/2015/00156/2 - Completed | Application - Other dredging | Embankment Dredging | Embankment Pier | London River Services Limited | 23 Mar 2015 | 08 Oct 2015 |
MLA/2015/00157/2 - Completed | Application - Construction of new works | Turnchapel Wharf - Pontoon Extension and Piles | Turnchapel Wharf Eastern Jetty, Turnchapel Wharf Pontoon Extension | Turnchapel Wharf Limited | 25 Mar 2015 | 15 Aug 2016 |
MLA/2015/00158 - Completed | Application - Decommissioning of works | Demolition at Callender Wharf, Church Manorway, Erith Kent | Callender Wharf, Erith, Kent. | Mr David Birthright | 25 Mar 2015 | 31 Jul 2015 |
MLA/2015/00161/4 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Offshore Technology Park Dredge | Maintenance Dredging | Shepherd Offshore Services Ltd. | 25 Mar 2015 | 14 Oct 2016 |
MLA/2015/00162 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr John Lister | 29 Mar 2015 | 13 Apr 2015 | |
MLA/2015/00163 - Completed | Application - Wrecks and other archaeological remains | London Protected Wreck site, Thames Estuary: Excavation of Material at Risk | 'London' designated wreck site | Cotswold Archaeology Limited | 30 Mar 2015 | 01 May 2015 |
MLA/2015/00165/2 - Completed | Application - Navigational dredging (maintenance) | Burnham Yacht Harbour annual matenance dredge Grouped under: Burnham on Crouch Dredge Showing 2 of 2 cases | Burnham Yacht Harbour Marina Basin | Burnham Yacht Harbour Marina Limited | 31 Mar 2015 | 18 Aug 2020 |
MLA/2015/00166 - Completed | Application - Maintenance of existing works | Maintenance of POG pontoons Portsmouth Harbour | Weevil Lake, Wicor Moorings | Civil Service Sailing Association Portsmouth Offsure Group | 31 Mar 2015 | 09 Jul 2015 |
MLA/2015/00167/1 - Completed | Application - Maintenance of existing works | Wilsonian Sailing Club - slipway repairs | Wilsonian Sailing Club slipway | Wilsonian Sailing Club | 31 Mar 2015 | 29 Apr 2015 |
MLA/2015/00168 - Completed | Application - Maintenance of existing works | Shell Pier installation of new 15m radar tower- linked to emergency repair licence MLA/2015/00113 Grouped under: Shell Pier emergency works and new radar tower Showing 3 of 4 cases | Shell pier | Bae Systems Plc | 01 Apr 2015 | 22 May 2015 |
MLA/2015/00169/1 - Completed | Application - Maintenance of existing works | Looe CSO Outfall | West Looe Quay Outfall | South West Water Limited | 02 Apr 2015 | 29 Jul 2015 |
MLA/2015/00170 - Completed | Application - Other removals | Clear loose rocks from slipway access at Praa Sands beach, Cornwall. | Praa Sands Beach, Cornwall | Rnli | 02 Apr 2015 | 02 Apr 2015 |
MLA/2015/00171 - Completed | Application - Use of tracers | Surface Mixed Layer Evolution at Submesoscales | Scotia Ridge, Southern Ocean | Plymouth University | 02 Apr 2015 | 15 Apr 2015 |
MLA/2015/00172/1 - Completed | Application - Use of tracers | Release of Rhodamine Dye Tracer | Mersey Estuary Near Eastham Sands | Centre For Research Into Environment And Health (Creh) Ltd | 02 Apr 2015 | 14 Dec 2015 |
MLA/2015/00173 - Completed | Application - Construction of new works | CBC1/151 - Drigg Viaduct | CBC1/151 Drigg Viaduct | Story Contracting Limited | 07 Apr 2015 | 05 Aug 2015 |
MLA/2015/00174 - Completed | Application - Other works | Porthleven Food & Music Festival 2015 | Porthleven Harbour | Porthleven Food & Music Festival | 07 Apr 2015 | 24 Apr 2015 |
MLA/2015/00175/1 - Completed | Application - Construction of new works | Scallop Nursery | Scallop Nursery Area | Scallop Ranch Ltd | 09 Apr 2015 | 06 Aug 2020 |
MLA/2015/00176/2 - Completed | Application - Construction of new works | Pontoon at Land opposite 62 Whitworth Cresant | Pontoon at 62 Whitworth Crescent | Mr Gordon Compton | 09 Apr 2015 | 17 Nov 2016 |
MLA/2015/00177 - Completed | Application - Construction of new works, Other deposits | PowerFrame | Bridge at Littlehampton Harbour., Littlehampton Harbour. | Saunders Energy Limited | 10 Apr 2015 | 20 Oct 2015 |
MLA/2015/00178/2 - Completed | Application - Construction of new works | LAND - Kimmeridge Bay | Kimmeridge Bay | The Landmark Trust (Auchinleck) Limited | 13 Apr 2015 | 16 May 2016 |
MLA/2015/00179/1 - Completed | Application - Maintenance of existing works | CBC1 Nethertown Embankment | Nethertown Embankment | Network Rail | 14 Apr 2015 | 28 Sep 2015 |
MLA/2015/00180 - Completed | Application - Construction of new works | New Concrete Slipway at Zeta Berth Underpass, Tapeley Park, Westleigh, Bideford, Devon, EX39 4NT | Zeta Berth underpass, Tapeley Park, Westleigh, Bideford, EX39 4NT | Simon Bastone Associates Ltd | 14 Apr 2015 | 07 Sep 2015 |
MLA/2015/00181 - Completed | Application - Maintenance of existing works | Repair of sea wall, Godolphin Arms. Marazion Cornwall | Sea Wall Godolphin Hotel Marazion | St Aubyn Estates | 14 Apr 2015 | 08 Jul 2015 |
MLA/2015/00182/2 - Completed | Application - Maintenance of existing works | Southend Pier Repairs and maintenance | Southend On Sea Borough Council | 16 Apr 2015 | 14 Jan 2022 | |
MLA/2015/00183 - Completed | Application - Disposal of dredged material, Navigational dredging (capital) | River Yar Capital Dredge - Yarmouth Harbour | River Yar Capital Dredge Zone, HURST FORT (WI080) | Yarmouth Harbour Commissioners (Iow) | 16 Apr 2015 | 04 Dec 2015 |
MLA/2015/00184/1 - Completed | Application - Construction of new works | Walls Bridge Remedial Works | Walls Bridge Embankment | Network Rail Limited | 16 Apr 2015 | 06 Oct 2016 |
MLA/2015/00185 - Completed | Application - Construction of new works | Trafalgar Wharf, Portchester | Trafalgar Wharf Slipway | Magma Global Limited | 16 Apr 2015 | 24 Jun 2015 |
MLA/2015/00187 - Completed | Application - Construction of new works, Maintenance of existing works | New Union Wharf River Wall | Kingfisher Court, River Barge Close, Stewart Street E14 3HL | East Thames Group | 17 Apr 2015 | 16 Jul 2015 |
MLA/2015/00189/1 - Completed | Application - Construction of new works | Cliff Stabilisation at Porth re Planning Permission already granted | Former Paradise Cove Hotel | Living Quarter Properties (Porth) Limited | 20 Apr 2015 | 18 Dec 2015 |
MLA/2015/00190 - Completed | Application - Construction of new works | Holllows Mooring | Hollows | Morlandia Limited | 21 Apr 2015 | 23 Jun 2016 |
MLA/2015/00191/2 - Completed | Application - Construction of new works, Maintenance of existing works, Other works | Repair and extension to foreshore platform at Poyntz Croft, Salcombe | Poyntz Croft Foreshore Platform., Poyntz Croft Access Route for Construction Pant & Materials. | Teignmouth Maritime Services Limited | 22 Apr 2015 | 25 Aug 2016 |
MLA/2015/00192/1 - Completed | Application - Other dredging | Searton Sea wall repairs | Seaton Beach | Mr Simon Foster | 22 Apr 2015 | 14 May 2015 |
MLA/2015/00193/1 - Completed | Application - Construction of new works | Duckford, South Pool, Slipway alterations | Duckford, South Pool | Mr Robert Braithwaite | 23 Apr 2015 | 11 Sep 2015 |
MLA/2015/00194/1 - Completed | Application - Other works | Anchorsholme Site Investigations 2015 | Anchorsholme Site Investigations Working Area | United Utilities | 23 Apr 2015 | 11 Aug 2015 |
MLA/2015/00195/1 - Completed | Application - Maintenance of existing works | Greenway Quay Repair Works | Greenway Quay | National Trust Plc | 24 Apr 2015 | 01 Feb 2016 |
MLA/2015/00196 - Completed | Application - Maintenance of existing works | RNLI Western Super Mare - Emergency Licence for Mooring Works | Area of Rescue Mooring | Rnli | 24 Apr 2015 | 24 Apr 2015 |
MLA/2015/00197 - Completed | Application - Other removals | Redcar Beach debris removal | Redcar Beach | Environment Agency | 24 Apr 2015 | 01 Jun 2015 |
MLA/2015/00198 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr John Lister | 27 Apr 2015 | 30 Apr 2015 | |
MLA/2015/00199 - Completed | Application - Construction of new works | Arora Hotel, Greenwich | Outfall1, Arora Hotel, Greenwich, Outfall 2, Arora Hotel, Greenwich, Outfall 3, Arora Hotel, Greenwich | Balfour Beatty Plc | 28 Apr 2015 | 14 Aug 2015 |
MLA/2015/00201/3 - Completed | Application - Construction of new works | Westminster Pier Extension Grouped under: Bankside Pier Extension Showing 2 of 3 cases | Westminster Site | London River Services Limited | 29 Apr 2015 | 29 Apr 2016 |
MLA/2015/00202 - Completed | Application - Other works | Piling work a Lymington Yacht Haven | Lymington Yacht Haven | Lymington Yacht Haven Limited | 30 Apr 2015 | 10 Aug 2015 |
MLA/2015/00204 - Completed | Application - Sampling | EIA - Infilling of Intertidal Zone at Nissan Terminal, Tyne Dock | Intertidal Zone | Port Of Tyne Authority | 01 May 2015 | 21 Aug 2015 |
MLA/2015/00207 - Completed | Application - Construction of new works | Queen's Wharf and Riverside Studios | Queen's Wharf and Riverside Studios | Mount Anvil Limited | 05 May 2015 | 25 Jan 2016 |
MLA/2015/00208 - Completed | Application - Construction of new works, Maintenance of existing works | Norfolk House, High Street, Shoreham by Sea, West Sussex | Norfolk House, High Street, Shoreham by Sea, West Sussex | Riverside Living Limited | 05 May 2015 | 07 Aug 2015 |
MLA/2015/00209 - Completed | Application - Construction of new works | FLAG beach access ramps | Mundesley ramp, Rudram's Gap, Keswick, Sheringham timber ramp | North Norfolk District Council | 06 May 2015 | 16 Sep 2015 |
MLA/2015/00210 - Completed | Application - Marine licence for the burial of human remains at sea | NEWHAVEN (WI011) | Evershed Brothers Ltd | 06 May 2015 | 08 May 2015 | |
MLA/2015/00211 - Completed | Application - Other removals | Satchell Lane Fire Pump Removal | Satchell Lane Fire Pumps | Costain Group Plc | 06 May 2015 | 27 Jul 2015 |
MLA/2015/00212 - Completed | Application - Maintenance of existing works | Nr Eastcliffe Outfall - emergency replacement | Eastcliffe Outfall work area | South West Water Limited | 07 May 2015 | 23 Jun 2015 |
MLA/2015/00213 - Completed | Application - Maintenance of existing works | Survey and Repairs to Trafalgar Court Jetty, Wapping, London. E1W 3TF | Trafalgar Court Jetty, Wapping. E1W 3TF | Residential Management Group Limited | 07 May 2015 | 14 Jul 2015 |
MLA/2015/00214 - Completed | Application - Maintenance of existing works | Bellot Memorial River Wall- | Bellot River wall | Greenwich Hospital | 07 May 2015 | 01 Mar 2016 |
MLA/2015/00215/5 - Completed | Application - Construction of new works, Decommissioning of works, Disposal of dredged material, Navigational dredging (capital), Sampling | Thanckes Oil Fuel Depot Loading Facility and Tank Farm Fire Fighting Upgrade | Thanckes Oil Fuel Jetty | Defence Infrastructure Organisation (Dio) | 08 May 2015 | 12 Aug 2021 |
MLA/2015/00216/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Southsea Marina Maintenance Dredge of Marina Entrance | Southsea Marina Entrance Channel, NAB TOWER (WI060) | Premier Marinas (Southsea) Limited | 08 May 2015 | 01 Jun 2018 |
MLA/2015/00218 - Completed | Application - Maintenance of existing works | Emergency land retention and replacement of existing sea wall - 19 Old Coastguard Road, Poole, Dorset | Sea Wall - 19 Old Coastguard Road, Poole | Mr Robin Heffer | 08 May 2015 | 06 Aug 2015 |
MLA/2015/00219 - Completed | Application - Maintenance of existing works | Smugglers Lane Railway Underbridge | Railway Bridge | Amalgamated Construction Ltd | 11 May 2015 | 24 Jul 2015 |
MLA/2015/00220 - Completed | Application - Maintenance of existing works | Avon & Stour Viaduct Strengthening Works | Stour Viaduct | Geoffrey Osborne Limited | 11 May 2015 | 11 Sep 2015 |
MLA/2015/00222/4 - Completed | Application - Maintenance of existing works | Shaldon Bridge Remedial Works | Shaldon Bridge, River Teign, Devon | Devon County Council | 12 May 2015 | 04 Jul 2016 |
MLA/2015/00223/4 - Completed | Application - Construction of new works, Other works | St Marys Direct Seawater Intake | Seawater Intake | South West Water Limited | 12 May 2015 | 31 Oct 2023 |
MLA/2015/00224/2 - Completed | Application - Maintenance of existing works | Maintenance of Rock Park Bridge | Rock Park | Devon County Council | 12 May 2015 | 14 Oct 2016 |
MLA/2015/00225 - Completed | Application - Construction of new works | King Henry Dock | Mast Pond Dock - Woolwich SE18 5QJ | Primusbuild Ltd | 12 May 2015 | 12 Jan 2016 |
MLA/2015/00226/3 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Renewal of 3 year Dredging Licence | Bridlington Harbour, BRIDLINGTON A (HU015) | Bridlington Harbour Commissioners | 13 May 2015 | 23 Mar 2018 |
MLA/2015/00227 - Completed | Application - Maintenance of existing works | Putney Bridge | Putney Bridge | F M Conway Limited | 13 May 2015 | 23 Oct 2015 |
MLA/2015/00228/5 - Completed | Application - Alternative Use of Dredged Material, Construction, Dredging | Restoration of Inter Tidal Habitat and Construction of New Quay Wall | Gweek Quay Boatyard | Gweek Quay Limited | 13 May 2015 | 19 Sep 2018 |
MLA/2015/00229/4 - Completed | Application - Other removals | Race Bank Offshore Wind Farm - UXO Clearance 2015 Grouped under: Race Bank Offshore Wind Farm Showing 5 of 11 cases | Race Bank OWF | Dong Energy Rb (Uk) Limited | 14 May 2015 | 02 Feb 2017 |
MLA/2015/00230 - Completed | Application - Construction of new works | Installation of Blyth Bay Marker buoys | Blyth Harbour | Royal Northumberland Yacht Club | 14 May 2015 | 06 Jul 2015 |
MLA/2015/00231 - Completed | Application - Other removals | Burbo Bank Extension Offshore Wind Farm - Application for UXO Removal and/or Detonation | Burbo Bank Extension Offshore Wind Farm | Dong Energy Burbo Extension (Uk) Ltd | 15 May 2015 | 27 Nov 2015 |
MLA/2015/00232/1 - Completed | Application - Construction of new works | Sutton Bridge, Lincolnshire, PE12 9HQ - Marina and Commercial Mooring Installation 2015/16 | Sutton Bridge, Lincolnshire - Works Location | Fenland District Council | 18 May 2015 | 24 May 2016 |
MLA/2015/00233 - Completed | Application - Maintenance of existing works | Investigation & Emergency Repair work on Manhole 1002, Clifton Place, Salcombe | Manhole 1002, Clifton Place, Salcombe | South West Water Limited | 18 May 2015 | 02 Jun 2015 |
MLA/2015/00235 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr John Lister | 20 May 2015 | 27 May 2015 | |
MLA/2015/00236 - Completed | Application - Maintenance of existing works | Bournemouth to Weymouth Rail Line Repairs, Hole's Bay Causeway, Poole | Holes Bay Causeway | Network Rail Infrastructure Limited | 21 May 2015 | 27 Aug 2015 |
MLA/2015/00237/1 - Completed | Application - Other deposits, Other works | Scarborough Outfalls - Corner Cafe and Scalby Mills CWOs CCTV Surveys Grouped under: Scarborough Outfalls - Corner Cafe and Scalby Mills CWOs Showing 2 of 3 cases | Corner Café CWO | Yorkshire Water Limited | 21 May 2015 | 30 Mar 2016 |
MLA/2015/00238/1 - Completed | Application - Aggregate dredging, Sampling | Bedwyn Sands: Marine Aggregate Licence Renewal Area | Licence Area - England | Severn Sands Limited | 21 May 2015 | 20 May 2024 |
MLA/2015/00239/2 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Maintenance Dredging Disposal - Dover Harbour Board | Dover Harbour, emergency disposal site WSG84, DOVER (DV010) | Dover Harbour Board | 22 May 2015 | 19 Mar 2019 |
MLA/2015/00240 - Completed | Application - Other works | Slipway repair at Beacon Square,Emsworth | Slipway at end of Beacon Square, Emsworth, Hampshire PO10 7HU | Mr Adrian Fox | 22 May 2015 | 18 Jun 2015 |
MLA/2015/00241 - Completed | Application - Navigational dredging (maintenance) | Emergency Dredging Application at West India Dock | West India Dock Entrance | Canal & River Trust | 26 May 2015 | 29 May 2015 |
MLA/2015/00242 - Completed | Application - Maintenance of existing works | Trevone Sewage Pumping Station outfall repair Grouped under: Trevone Outfall Showing 2 of 2 cases | Trevone outfall | South West Water Limited | 27 May 2015 | 15 Oct 2015 |
MLA/2015/00243 - Completed | Application - Maintenance of existing works | Repair Slipway | Orford Sailing Club | Orford Sailing Club | 27 May 2015 | 11 Aug 2015 |
MLA/2015/00245 - Completed | Application - Scientific instruments | Walney Extension Offshore Wind Farm | WOW03_AnchorPenetrationArea_DE_20150515 | Dong Energy Walney Extension (Uk) Ltd | 29 May 2015 | 28 Aug 2015 |
MLA/2015/00248 - Completed | Application - Maintenance of existing works | Replacement of existing jetty | 3 The Paddock, 73 A Mudeford | Mrs Saron Rusden | 01 Jun 2015 | 03 Aug 2015 |
MLA/2015/00249 - Completed | Application - Maintenance of existing works | Sidmouth Outfall | Sidmouth Outfall | South West Water Limited | 03 Jun 2015 | 16 Jun 2015 |
MLA/2015/00250/2 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Maintenance Dredging and Disposal of Garston Approach Channel and Garston Docks | Associated British Ports Holdings Limited | 04 Jun 2015 | 12 Feb 2024 | |
MLA/2015/00252/3 - Completed | Application - Disposal of dredged material | ABP Port of Ipswich Disposal Licence | RIVER ORWELL (ABP) (TH034) | Abport Limited | 04 Jun 2015 | 18 May 2022 |
MLA/2015/00254 - Completed | Application - Maintenance of existing works | Heybridge Sea Lock Gate Replacement Grouped under: Heybridge Sea Lock Gate Replacement Showing 2 of 4 cases | Heybridge Sea Lock | Essex & Suffolk Water | 05 Jun 2015 | 22 Jul 2015 |
MLA/2015/00255 - Completed | Application - Construction of new works, Other removals | Bembridge Sailing Club Proposed Boat Park - Marine licence extension | Bembridge Sailing Club | Bembridge Sailing Club | 05 Jun 2015 | 26 Oct 2015 |
MLA/2015/00259/2 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Newhaven Maintenance Dredging Disposal | NEWHAVEN (WI010) | Dave Collins-Williams | 09 Jun 2015 | 16 Aug 2016 |
MLA/2015/00260/1 - Completed | Application - Other deposits | PERMANENT RACING MARKS AT HYTHE AND SALTWOOD SAILING CLUB | Hythe and Saltwood Sailing Club | Hythe And Saltwood Sailing Club | 09 Jun 2015 | 13 Feb 2019 |
MLA/2015/00261 - Completed | Application - Maintenance of existing works | RNLI Fleetwood Emergency Licence for Pen Repairs | RNLI Fleetwood lifeboat pen | Rnli | 09 Jun 2015 | 12 Jun 2015 |
MLA/2015/00262/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Parkstone Yacht Club Haven Maintenance Dredge | PYC, SWANAGE BAY (WI110), BROWNSEA EXPERIMENTAL (WI111) | Parkstone Yacht Club (Haven) Limited | 10 Jun 2015 | 23 Oct 2015 |
MLA/2015/00263 - Completed | Application - Maintenance of existing works | Repairs to damaged/corroded quayside piles | IBL Hull Forge Wharf | Ibl Bulk Liquids | 10 Jun 2015 | 04 Nov 2015 |
MLA/2015/00264 - Completed | Application - Construction of new works | Floating Pontoons | Sutton Wharf Purdys Industrial Estate Roachall Way Rochford Essex SS4 1JU | Carter And Ward Of Wickford Limited | 10 Jun 2015 | 09 Nov 2015 |
MLA/2015/00265 - Withdrawn | Application - Construction of new works, Other removals | Bradwell Site Barrier Wall Access Installation | Bradwell Power Station | Magnox Limited | 11 Jun 2015 | |
MLA/2015/00266/1 - Completed | Application - Construction of new works, Maintenance of existing works | Three Mills River Wall Flood Defences | Three Mills Studios River Wall | Volker Stevin Limited | 11 Jun 2015 | 05 Aug 2019 |
MLA/2015/00269 - Completed | Application - Disposal of dredged material, Navigational dredging (capital) | Southern Water Southampton Berths | Portswood, Slowhill, Woolston, NAB TOWER (WI060) | Southern Water Services Limited | 12 Jun 2015 | 25 Sep 2015 |
MLA/2015/00270 - Completed | Application - Maintenance of existing works | Filey Brigg CWO Modification | Filey Brigg Cooling Water Outfall | Yorkshire Water Services Limited | 12 Jun 2015 | 20 Jul 2015 |
MLA/2015/00271/2 - Completed | Application - Construction of new works, Maintenance of existing works | Bournemouth Beach Management Scheme (BBMS) | Bournemouth Beach Management Scheme | Bournemouth Borough Council | 12 Jun 2015 | 21 Sep 2020 |
MLA/2015/00272/2 - Completed | Application - Navigational dredging (capital) | Dredging at Ormonde Pontoon, Ramsden Dock Grouped under: Ormonde Pontoon. Showing 2 of 3 cases | Ormonde Pontoon | Ormonde Energy Limited | 15 Jun 2015 | 30 Sep 2016 |
MLA/2015/00273 - Completed | Application - Construction of new works, Other removals | Brooklands Quay Private Slipway Extension | Brooklands Quay Slipway Extension and Mitigation | Mr Daniel Van Gelder | 18 Jun 2015 | 10 Sep 2015 |
MLA/2015/00274/3 - Completed | Application - Other removals | Race Bank Offshore Wind Farm - Boulder Relocation & Clearance Works Grouped under: Race Bank Offshore Wind Farm Showing 5 of 11 cases | Race Bank OWF | Dong Energy Rb (Uk) Limited | 19 Jun 2015 | 27 Jan 2017 |
MLA/2015/00275 - Completed | Application - Maintenance of existing works | Ash Tip River Wall | Ash Tip Site River Wall | Associated British Ports. | 21 Jun 2015 | 13 Oct 2015 |
MLA/2015/00276 - Completed | Application - Construction of new works, Navigational dredging (capital), Other removals | Enderby Wharf | Enderby Cruise Liner Terminal, Translocation area 1, Translocation area 2 | Enderby Wharf Limited | 22 Jun 2015 | 18 Dec 2015 |
MLA/2015/00277 - Completed | Application - Maintenance of existing works | Repairs to North West Wall Piles, Portsmouth Naval Base | North West Wall, HMNB Portsmouth | Bae Systems Ltd | 22 Jun 2015 | 17 Mar 2017 |
MLA/2015/00278/1 - Completed | Application - Maintenance of existing works | 'Lowlands' sea wall | 'Lowlands' Bohortha | Mrs Jennifer Anne Roebuck | 22 Jun 2015 | 09 May 2016 |
MLA/2015/00279 - Completed | Application - Maintenance of existing works | Heybridge Sea Lock Gate Replacement (Phase 2) Grouped under: Heybridge Sea Lock Gate Replacement Showing 2 of 4 cases | Heybridge Sea Lock | Essex & Suffolk Water | 23 Jun 2015 | 22 Sep 2015 |
MLA/2015/00281/2 - Completed | Application - Other works | Floating LiDAR Validation at East Anglia ONE site Grouped under: East Anglia ONE Offshore Windfarm Showing 2 of 7 cases | Floating LIDAR Validation at East Anglia ONE site | East Anglia One Limited | 24 Jun 2015 | 25 Nov 2015 |
MLA/2015/00282/2 - Completed | Application - Construction of new works | Pontoon for boat access, Wivenhoe, Colne Estuary | Wivenhoe pontoon & slipway | Wivenhoe Town Council | 25 Jun 2015 | 06 Apr 2016 |
MLA/2015/00283/1 - Completed | Application - Other dredging | Asset Recovery Programme, Package 1- Albert Dock and Dunston Culvert | Dunston Culvert outlet, Albert Dock | Environment Agency | 26 Jun 2015 | 22 Jul 2015 |
MLA/2015/00284/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Saxon Wharf - Maintenance Dredging | Saxon Wharf - Dredge Area (limits), NAB TOWER (WI060), HURST FORT (WI080), NEEDLES (WI090) | Marina Developments Limited | 29 Jun 2015 | 24 Oct 2016 |
MLA/2015/00285/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Hythe Marina Village (Approach Channel) - Maintenance Dredging | Hythe Marina Village (Approach Channel) - Maintenance Dregding, NAB TOWER (WI060), HURST FORT (WI080), NEEDLES (WI090) | Marina Developments Limited | 29 Jun 2015 | 27 Nov 2015 |
MLA/2015/00286/1 - Completed | Application - Removals (inc. Grab Samples) | Ulysses 1 (South) Submarine Telecommunications Cable Recovery | Ulysses 1 (South) | Verizon Uk Limited | 29 Jun 2015 | 07 Dec 2016 |
MLA/2015/00287/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Port Hamble Marina - Maintenance Dredging | Port Hamble Marina - Dredge Area (limits), NAB TOWER (WI060), HURST FORT (WI080), NEEDLES (WI090) | Marina Developments Limited | 30 Jun 2015 | 21 Mar 2022 |
MLA/2015/00288 - Completed | Application - Maintenance of existing works | Eastbourne Surface water outfall Tideflex installation | Fencing /groyne Polygon | Southern Water Limited | 30 Jun 2015 | 20 Oct 2015 |
MLA/2015/00289 - Completed | Application - Construction of new works | Felixstowe Pier redevelopment | Felixstowe Pier | Pier Amusements (Felixstowe) Ltd | 01 Jul 2015 | 13 Oct 2015 |
MLA/2015/00290/1 - Completed | Application - Maintenance of existing works | Lincs Offshore Wind Farm (OWF) Export Cable Repair and Remediation | Lincs OWF Export Cable | Transmission Investment | 01 Jul 2015 | 18 Apr 2016 |
MLA/2015/00291/1 - Completed | Application - Navigational dredging (capital) | OSL Jetty 1 Capital Dredge | Jetty 1 Berth | Oikos Storage Limited | 02 Jul 2015 | 13 Jul 2016 |
MLA/2015/00292 - Completed | Application - Construction of new works | Kinterbury Creek Bridge | Kinterbury_Creek_Bridge_Polygon | Plymouth City Council | 02 Jul 2015 | 28 Oct 2015 |
MLA/2015/00295/1 - Completed | Application - Maintenance of existing works | Victoria Place, Salcombe Emergency Manhole Repair | Victoria Place Salcombe working area, Clifton Place Manhole | South West Water Limited | 06 Jul 2015 | 04 Aug 2015 |
MLA/2015/00296 - Completed | Application - Maintenance of existing works | Maintenance and repainting of Fremington Viaduct steel deck | Fremington Viaduct | Devon County Council | 07 Jul 2015 | 16 Oct 2015 |
MLA/2015/00297 - Completed | Application - Other deposits, Other works | Slaughden Frontage Rock Toe Construction Grouped under: Sloughden Coastal Defence Showing 2 of 2 cases | Slaughden Beach - Rock delivery, stockpile & works area | Environment Agency-Southern Region | 07 Jul 2015 | 04 Nov 2015 |
MLA/2015/00298/1 - Completed | Application - Construction of new works, Maintenance of existing works, Other removals | New Fish Quay - Teignmouth | Fish_Quay A, Fish_Quay B, Fish_Quay C, Fish_Quay D, Fish_Quay E | Teignbridge District Council | 07 Jul 2015 | 01 Dec 2015 |
MLA/2015/00299 - Completed | Application - Maintenance of existing works | River Ouse/ Lewes - West Sussex | River Ouse/ Lewes | Beasley Christopher Limited | 08 Jul 2015 | 27 Aug 2015 |
MLA/2015/00300/2 - Completed | Application - Disposal of dredged material, Navigational dredging (capital) | Woolverstone Marina - A Pier Downstream (Capital Dredge) | A Pier Downstream - Dredging, RIVER ORWELL (ABP) (TH034) | Marina Developments Limited | 08 Jul 2015 | 07 Nov 2018 |
MLA/2015/00302 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Heysham 1 & 2 dredging activities | Heysham Power Stations Harbour Intake, MORECAMBE BAY B (IS200) | Edf Energy Nuclear Generation Limited | 09 Jul 2015 | 29 Sep 2016 |
MLA/2015/00303 - Completed | Application - Maintenance of existing works | 40-41 Market Street | 40-41 Market Street, Falmouth | Rtp Surveyors Limited | 09 Jul 2015 | 20 Aug 2015 |
MLA/2015/00305/1 - Completed | Application - Other removals | Race Bank Offshore Windfarm - Potential UXO Target Investigation Grouped under: Race Bank Offshore Wind Farm Showing 5 of 11 cases | Race Bank OWF | Dong Energy Rb (Uk) Limited | 13 Jul 2015 | 07 Sep 2015 |
MLA/2015/00307/2 - Completed | Application - Maintenance of existing works | Portsmouth Multi Modal Transport Interchange | Portsmouth Multi Modal Transport Interchange | Geoffrey Osborne Limited | 15 Jul 2015 | 18 Nov 2016 |
MLA/2015/00311/2 - Completed | Application - Construction of new works | Dudgeon Offshore Windfarm - Installation of Pontoon at Great Yarmouth Grouped under: Dudgeon Offshore WInd Farm Showing 4 of 5 cases | Pontoon Installation Site at Great Yarmouth Port | Dudgeon Offshore Wind Limited | 21 Jul 2015 | 08 Dec 2015 |
MLA/2015/00312 - Completed | Application - Construction of new works | Small quay,Lerryn | Lerryn Quay | Mr Hugh Sinclair | 21 Jul 2015 | 05 Aug 2016 |
MLA/2015/00313/1 - Completed | Application - Construction of new works | Happisburgh to Winterton Sea Defences Stage 3B Works, Phase 2 | Happisburgh to Winterton Sea Defences | Environment Agency | 21 Jul 2015 | 30 Nov 2015 |
MLA/2015/00314/1 - Completed | Application - Navigational dredging (maintenance) | Dredging Application at West India Dock | West India Dock Lock Entrances | Canal & River Trust | 22 Jul 2015 | 15 Aug 2022 |
MLA/2015/00315/1 - Completed | Application - Maintenance of existing works | Imperial Wharf | Imperial Wharf | Concrete Repairs Limited | 22 Jul 2015 | 22 Sep 2015 |
MLA/2015/00318 - Completed | Application - Wrecks and other archaeological remains | cargo off wk neppo | wk neppo | Mr Patrik Eeckhout | 23 Jul 2015 | 22 Dec 2015 |
MLA/2015/00319/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | C.RO Ports North Killingholme (Berths Nos. 1 to 6 plus approaches) | C.RO Ports North Killingholme (Berths 1 to 6 plus Approaches), Humber 3A | C.Ro Ports Killingholme Limited | 24 Jul 2015 | 23 Apr 2020 |
MLA/2015/00320 - Completed | Application - Construction of new works | Thames Tideway Tunnel - Vessel Relocations (Blackfriars Lift and Stairs ) | Blackfriars Lift and Stairs | Volker Stevin Limited | 24 Jul 2015 | 27 Oct 2015 |
MLA/2015/00321 - Completed | Application - Construction of new works | Neptune Deep Water Test Tank | Neptune Quay | Shepherd Offshore Ltd | 24 Jul 2015 | 12 Feb 2016 |
MLA/2015/00322/1 - Completed | Application - Construction of new works, Navigational dredging (capital) | Ipswich Flood Defence Management Scheme: Tidal Barrier Works | Barrier Location - Planning Boundary | Environment Agency | 24 Jul 2015 | 13 Dec 2016 |
MLA/2015/00323 - Completed | Application - Construction of new works | Parkstone Yacht Club Haven Pontoon Alterations | PYC Pontoon | Parkstone Yacht Club (Haven) Limited | 25 Jul 2015 | 12 Nov 2015 |
MLA/2015/00324 - Withdrawn | Application - Construction of new works | Derrydown, Downderry | 12005 - Site Boundary | Mansion Developments South West Limited | 27 Jul 2015 | |
MLA/2015/00325/1 - Completed | Application - Maintenance of existing works | Church Street Car Park Quay Wall Strengthening | Site Scaffold Extents | Cormac Solutions Ltd | 27 Jul 2015 | 15 Mar 2016 |
MLA/2015/00326 - Completed | Application - Construction of new works | Extension of Car Storage Area adjacent HNT site, Tyne Dock, South Shields – Proposed Culverted Access & Drainage Outfall. | Site 1, Site 2 | Port Of Tyne | 28 Jul 2015 | 13 Oct 2015 |
MLA/2015/00327 - Completed | Application - Other works | Rising Tide - temporary sculptural installation at Nine elms Reach in London | Nine Elms Reach | Mr Nicholas Cambden | 28 Jul 2015 | 30 Aug 2015 |
MLA/2015/00328 - Completed | Application - Construction of new works, Other removals | C/S Ile de Sein Plough Trials | Lyme Bay | Alda Marine | 28 Jul 2015 | 03 Dec 2015 |
MLA/2015/00329 - Completed | Application - Marine licence for the burial of human remains at sea | NEWHAVEN (WI011) | G. Hogben & Sons Funeral Directors | 29 Jul 2015 | 06 Aug 2015 | |
MLA/2015/00330/1 - Completed | Application - Maintenance of existing works | Dungeness A discharge line cleaning | Dungeness A Outfall | Magnox Limited | 29 Jul 2015 | 25 Jan 2016 |
MLA/2015/00331 - Completed | Application - Disposal of dredged material | Burnley Wharf Silt Disposal | NAB TOWER (WI060) | Lafarge Tarmac Limited | 29 Jul 2015 | 02 Dec 2015 |
MLA/2015/00332 - Completed | Application - Maintenance of existing works | Pagham Harbour inland banks site 2 - The causeway | Pagham Harbour inland banks site 2 - The Causeway | Environment Agency (Southern Region) | 29 Jul 2015 | 03 Sep 2015 |
MLA/2015/00333/2 - Completed | Application - Maintenance of existing works | Dubmill Point | Site_Boundary | Cumbria County Council | 29 Jul 2015 | 28 Feb 2019 |
MLA/2015/00334/12 - Completed | Application - Disposal of dredged material, Maintenance of existing works, Navigational dredging (capital), Navigational dredging (maintenance) | Able Seaton Port berths, Holding Basin and Channel | Able Seaton Port Holding basin and Channel | Able Uk Ltd | 29 Jul 2015 | 09 Sep 2024 |
MLA/2015/00336/4 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Maintenance Dredging at HMNB Devonport Grouped under: HMNB Devonport Maintenance Dredging Showing 2 of 4 cases | Defence Infrastructure Organisation | 03 Aug 2015 | 04 Dec 2017 | |
MLA/2015/00337/1 - Completed | Application - Maintenance of existing works | Component exchanges (maintenance) at Walney wind farms Grouped under: Maintenance (component replacement) Walney Showing 3 of 8 cases | Walney 2 boundary | Dong Energy Power (Uk) Limited | 04 Aug 2015 | 12 Nov 2015 |
MLA/2015/00339 - Completed | Application - Construction of new works | Greenwich Creekside East- Reconstruction of the intertidal terrace wall | Greenwich Creekside East Parcel A | Essential Living (Greenwich) Ltd | 04 Aug 2015 | 03 Nov 2015 |
MLA/2015/00340/1 - Completed | Application - Disposal of dredged material | Galloper Wind Farm - Disposal Site Application Grouped under: Galloper Offshore Wind Farm Showing 3 of 5 cases | Galloper Wind Farm disposal site TH057 | Galloper Wind Farm Limited | 04 Aug 2015 | 02 Jun 2016 |
MLA/2015/00341/1 - Completed | Application - Other dredging | Galloper Wind Farm pre-sweeping Grouped under: Galloper Offshore Wind Farm Showing 3 of 5 cases | Galloper offshore wind farm and export cable corridor | Galloper Wind Farm Limited | 04 Aug 2015 | 08 Jun 2016 |
MLA/2015/00343 - Completed | Application - Marine licence for the burial of human remains at sea | Scilly Isles | Mr Stephen Dehnel | 05 Aug 2015 | 23 Oct 2015 | |
MLA/2015/00344/1 - Completed | Application - Maintenance of existing works | Component exchanges (maintenance) at Burbo Bank wind farms Grouped under: Maintenance (component replacement) Walney Showing 3 of 8 cases | Burbo Bank OWF | Dong Energy Power (Uk) Limited | 06 Aug 2015 | 14 Sep 2015 |
MLA/2015/00346 - Completed | Application - Maintenance of existing works | Southbank River Wall | Southbank River Wall | Concrete Repairs Limited | 06 Aug 2015 | 07 Sep 2015 |
MLA/2015/00347/1 - Completed | Application - Other deposits, Other removals | National Grid Humber Gas Pipelines - Contingency Maintenance Operations | Feeder 1, Feeder 9 | National Grid Gas Plc | 07 Aug 2015 | 27 Jun 2018 |
MLA/2015/00348 - Completed | Application - Maintenance of existing works | Seacombe Ferry Terminal Building - Soffit Repairs and Structural Strengthening | Seacombe Ferry Terminal and Landing Stage | Merseytravel Limited | 07 Aug 2015 | 01 Dec 2015 |
MLA/2015/00349/2 - Completed | Application - Construction of new works | Brighton Marina Outer Harbour Development: Phase 2 | Application area | Brighton Marina Company Limited(The) | 10 Aug 2015 | 24 Mar 2017 |
MLA/2015/00350/1 - Completed | Application - Navigational dredging (maintenance) | MAINTENANCE DREDGE ONLY | GRAIN LNG JETTY 8, GRAIN LNG JETTY 10 | National Grid Plc | 10 Aug 2015 | 09 Sep 2015 |
MLA/2015/00353/3 - Completed | Application - Other deposits | Castletown Regeneration Project | Underwater Curiosity Park | Agincare Limited | 13 Aug 2015 | 03 Oct 2017 |
MLA/2015/00354/1 - Completed | Application - Construction of new works, Decommissioning of works | Blyth Outfall Structure | Blyth Outfall | Rwe Dea Uk Sns Limited | 14 Aug 2015 | 29 Jul 2016 |
MLA/2015/00355 - Completed | Application - Navigational dredging (maintenance) | Torpoint Yacht marina dredging | Torpoint Yacht Marina Dredge Area, Disposal Site | Tms Maritime Ltd | 14 Aug 2015 | 17 Aug 2016 |
MLA/2015/00359 - Completed | Application - Other removals | Removal of WW2 Admiralty Scaffolding Exposed at Hordle Cliff, Hampshire | Admiralty_Scaffolding_Location_Area | New Forest District Council | 19 Aug 2015 | 08 Oct 2015 |
MLA/2015/00363 - Completed | Application - Construction of new works | Proposed Slipway - Land at the Clovers, IOW | The Clovers | Mr Rob Gorham | 21 Aug 2015 | 23 Feb 2016 |
MLA/2015/00364/2 - Completed | Application - Construction of new works | Proposed Fixed Jetty - Land at No 1, Waters Edge, Bouldnor | No 1, Waters Edge | Mr Tom Kemp | 21 Aug 2015 | 14 Sep 2016 |
MLA/2015/00365 - Withdrawn | Application - Other removals | Dudgon Offshore Wind Farm Grouped under: Dudgeon Offshore WInd Farm Showing 4 of 5 cases | Dudgeon Offshore Wind Limited | 21 Aug 2015 | ||
MLA/2015/00366/3 - Completed | Application - Construction of new works | Offshore Mast at Sandettie Bank | Offshore Location within TSS | Blue Wind Holdings | 23 Aug 2015 | 19 Sep 2018 |
MLA/2015/00368 - Completed | Application - Maintenance of existing works | Millbay Docks Flap Valves 2 - emergency works | Millbay Docks | South West Water Limited | 25 Aug 2015 | 04 Sep 2015 |
MLA/2015/00369/3 - Completed | Application - Other works | Exmouth Quicksand Pond - Orcombe Point emergency investigations Grouped under: Exmouth Quicksand Pond - Orcombe Point emergency investigations 2 Showing 2 of 2 cases | Exmouth Quicksand Ponds | South West Water Limited | 26 Aug 2015 | 11 Sep 2015 |
MLA/2015/00370/3 - Completed | Application - Construction of new works, Decommissioning of works, Other deposits, Other dredging | Wheatcroft Long Sea Outfall Replacement | Wheatcroft long sea outfall replacement | Yorkshire Water Services Limited | 27 Aug 2015 | 20 Jul 2016 |
MLA/2015/00371 - Completed | Application - Disposal of dredged material, Other deposits | Disposal of sediment and macroalgae from Ventnor Haven | Ventnor Harbour (WI087) | Isle Of Wight Council | 27 Aug 2015 | 22 Mar 2016 |
MLA/2015/00372 - Completed | Application - Construction of new works | Flood Defence Works, Mill Cottage, Antony Passage | Flood defence works adjacent to Mill Cottage | G & A Ventures Ltd | 27 Aug 2015 | 20 May 2016 |
MLA/2015/00373 - Withdrawn | Application - Construction of new works | Riverrun Pontoon and Jetty | Riverrun pontoon and Jetty | Mr Mark Fry | 27 Aug 2015 | |
MLA/2015/00374 - Completed | Application - Construction of new works, Other works | Wear Farm | Wear Farm | Dyer & Butler Ltd | 27 Aug 2015 | 19 Jan 2016 |
MLA/2015/00375 - Completed | Application - Construction of new works, Decommissioning of works, Navigational dredging (capital) | Royal Pier Waterfront, Southampton | Rpw (Southampton) Limited | 28 Aug 2015 | 20 Feb 2019 | |
MLA/2015/00379 - Completed | Application - Maintenance of existing works | Maltsters SPS Tuckenhay pipeline repair | Maltsters pipeline | South West Water Limited | 02 Sep 2015 | 24 Nov 2015 |
MLA/2015/00380 - Completed | Application - Disposal of dredged material, Navigational dredging (capital) | Hessle Wharf Dredging 2015 | Hessle Haven Quay, River HUMBER, HUMBER 4 (HU030) | Transwaste Limited | 03 Sep 2015 | 06 Feb 2017 |
MLA/2015/00381/2 - Completed | Application - Construction of new works, Decommissioning of works, Maintenance of existing works | GILLINGHAM PIER WORKS | Pontoon Area, Pier Head, Old Marina | Berkeley Homes (West London) Limited | 04 Sep 2015 | 09 Aug 2017 |
MLA/2015/00382/1 - Completed | Application - Maintenance of existing works | pier pile bases | Grand Pier Teignmouth | Grand Pier (Teignmouth) Limited | 07 Sep 2015 | 09 Feb 2016 |
MLA/2015/00383/4 - Completed | Application - Maintenance of existing works | Haslar Marina - Repair Works to Existing Breakwater | Haslar Marina Breakwater | Dean & Reddyhoff Limited | 07 Sep 2015 | 14 Feb 2017 |
MLA/2015/00384/1 - Completed | Application - Maintenance of existing works | Parton to Harrington Defences | Parton to Harrington | Network Rail | 08 Sep 2015 | 03 Oct 2016 |
MLA/2015/00386 - Completed | Application - Construction of new works | Scotswood Regeneration Surface Water Outfall | Scotswood Outfall | Newcastle City Council | 08 Sep 2015 | 01 Oct 2015 |
MLA/2015/00387/1 - Completed | Application - Construction of new works | Grimsby Slipways | Grimsby Slipways | Grimsby Fish Dock Enterprises Limited | 08 Sep 2015 | 15 Mar 2016 |
MLA/2015/00388/1 - Completed | Application - Disposal of dredged material | Dudgeon Offshore Wind Farm Grouped under: Dudgeon Offshore WInd Farm Showing 4 of 5 cases | DOWF disposal site HU147 | Dudgeon Offshore Wind Limited | 09 Sep 2015 | 10 Aug 2018 |
MLA/2015/00389 - Completed | Application - Other removals | Removal of mud from Dingy Pool | ACA Dingy pool | Adur Cruising Association | 09 Sep 2015 | 16 Oct 2015 |
MLA/2015/00390 - Withdrawn | Application - Alternative use of dredged material, Other works | Managed Breach of Shingle Spit at Pagham | Pagham Breach, Tern Island Compensation Habitat | Pagham Flood Defence Community Interest Company (Pfdcic). | 10 Sep 2015 | |
MLA/2015/00391 - Completed | Application - Disposal of dredged material | Cattewater Maintenance dredging | RAME HEAD SOUTH (PL031) | Cattewater Harbour Commissioners | 10 Sep 2015 | 29 Feb 2016 |
MLA/2015/00392/2 - Completed | Application - Maintenance of existing works | Watch House, Lepe, Hampshire, SO45 1AD : Breakwater / slipway replacement | Watch House slipway and groynes, Lepe, Hampshire. | Bourne Valley Construction Services Limited | 14 Sep 2015 | 15 Apr 2016 |
MLA/2015/00393/2 - Completed | Application - Other deposits, Other removals | Placement of material on the beach in Rock, Cornwall | Rock Foreshore Renourishment Area | Padstow Harbour Commissioners | 16 Sep 2015 | 23 Aug 2018 |
MLA/2015/00394 - Completed | Application - Maintenance of existing works | Sunnycliffe Salcombe, Emergency blockage removal | Sunnycliff, Salcombe | South West Water Limited | 16 Sep 2015 | 23 Sep 2015 |
MLA/2015/00395 - Completed | Application - Maintenance of existing works | Refurbishment of Two Rustic Timber Pole Groynes below Eastcliff, Under Tyne Beach, Bembridge, Isle of Wight | Refurbish Groyne No.1, Refurbish Groyne No.2 | Mr Ian Cheshire | 17 Sep 2015 | 07 Oct 2015 |
MLA/2015/00396 - Completed | Application - Maintenance of existing works | EXTENSION OF THE SHEET PILING AT THE OUTER WEST BERTH | Extension of Sheet Piling at Outer West Berth | Ridham Sea Terminals Limited | 17 Sep 2015 | 05 May 2016 |
MLA/2015/00397 - Completed | Application - Maintenance of existing works | Wootton Bridge Repairs, November 2015 to January 2016 | Wootton Bridge | Ringway Island Roads Limited | 18 Sep 2015 | 20 Nov 2015 |
MLA/2015/00398/2 - Completed | Application - Other deposits | National Grid - Talus Removal and Associated Works from Aust Cliff and Causeway | Red_Line_Boundary_Tower_XL065 | Trant Engineering Ltd | 18 Sep 2015 | 03 Feb 2017 |
MLA/2015/00400 - Completed | Application - Maintenance of existing works | Coronation Road Tidal Flap Valve | Coronation Road | Wessex Water Authority | 21 Sep 2015 | 01 Feb 2016 |
MLA/2015/00402/1 - Completed | Application - Maintenance of existing works, Other removals | Re-construction of Pipewellgate River Wall 2015/16 | Pipewellgate River Wall | Gateshead Council | 22 Sep 2015 | 13 Apr 2016 |
MLA/2015/00403 - Completed | Application - Construction of new works | WSCC Drainage Appraisal - Rustington and Ferring | Rustington, Ferring | Opus International Consultants (Uk) Limited | 23 Sep 2015 | 22 Dec 2016 |
MLA/2015/00404 - Completed | Application - Construction of new works | Installation of pontoon | River Hamble close to Mercury Marina | Royal Air Force Yacht Club | 23 Sep 2015 | 26 Nov 2015 |
MLA/2015/00405 - Completed | Application - Disposal of dredged material | Disposal of Glasson Dock Maintenance Dredging | LUNE RIVER B (IS192) | Lancaster Port Commission | 23 Sep 2015 | 08 Jan 2016 |
MLA/2015/00407 - Completed | Application - Other deposits | River Hull Sunken and Abandoned Vessels Removal | Area for removals | East Riding Of Yorkshire Council | 24 Sep 2015 | 07 Sep 2016 |
MLA/2015/00408/1 - Completed | Application - Maintenance of existing works | Dove Marine Laboratory Seawater Intake | Cullercoats Bay | Newcastle University | 25 Sep 2015 | 14 Oct 2016 |
MLA/2015/00409 - Completed | Application - Maintenance of existing works | West Bay Footbridge West | West Bay Footbridge West | Dorset County Council | 25 Sep 2015 | 23 Dec 2015 |
MLA/2015/00411 - Completed | Application - Maintenance of existing works | Repair of river wall International Paint | International Paint Ltd | International Paint Limited | 29 Sep 2015 | 27 Oct 2015 |
MLA/2015/00412 - Completed | Application - Dredged Material Disposal, Dredging | Shotley Marina Maintenance Dredge 2015/16 | Shotley Marina Limited | 29 Sep 2015 | 19 Oct 2015 | |
MLA/2015/00414 - Completed | Application - Other works | Exmouth Quicksand Pond - Orcombe Point emergency investigations 2 Grouped under: Exmouth Quicksand Pond - Orcombe Point emergency investigations 2 Showing 2 of 2 cases | Exmouth Quicksand Ponds | South West Water Limited | 29 Sep 2015 | 30 Sep 2015 |
MLA/2015/00415 - Completed | Application - Construction of new works, Decommissioning of works, Other removals | 24 Church road, Mylor - pontoon and gangway installation | Pontoon Installation | Mr Tony Murtagh | 01 Oct 2015 | 12 Oct 2015 |
MLA/2015/00417 - Completed | Application - Other works | Scaffolding at 19 The warren, St Ives, Cornwall | 19 The warren, St Ives | Early Rise Scaffolding Limited | 07 Oct 2015 | 17 Oct 2015 |
MLA/2015/00419/2 - Completed | Application - Maintenance of existing works, Other works | Northey Island: North-west Embankment Repairs Grouped under: Northey Island: North-west Embankment Repairs Showing 2 of 3 cases | Northey Island North-west | The National Trust | 08 Oct 2015 | 30 Apr 2019 |
MLA/2015/00420/12 - Completed | Application - Construction of new works, Disposal of dredged material, Other works | Dover Western Revival Scheme (DWDR) | DOVER (DV010) | Dover Harbour Board | 08 Oct 2015 | 12 Jun 2024 |
MLA/2015/00422 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Maryport Harbour and Marina Maintenance Dredging | Senhouse Dock, Senhouse Approach, Outer Approach, Elizabeth Approach, Elizabeth Basin, Elizabeth Dock, MARYPORT HARBOUR DISPERSIVE SITE B (IS244) | Maryport Harbour And Marina Limited | 12 Oct 2015 | 04 May 2016 |
MLA/2015/00423/3 - Completed | Application - Other removals | Galloper Wind Farm UXO clearance | Galloper Wind Farm Boundary 1, Galloper Wind Farm Boundary 2, Galloper cable boundary 1, Galloper cable boundary 2 | Galloper Wind Farm Limited | 13 Oct 2015 | 29 Mar 2019 |
MLA/2015/00426/2 - Completed | Application - Disposal of dredged material, Navigational dredging (capital) | Thornham Marine Maintenance Dredge | Thornham, TRELOAR HOLE (WI046), NAB TOWER (WI060) | Thornham Marina Limited | 16 Oct 2015 | 25 Oct 2018 |
MLA/2015/00427 - Completed | Application - Maintenance of existing works | Shamrock Quay - Hoist Dock Corrosion Protection | Hoist Dock | Marina Developments Limited | 19 Oct 2015 | 14 Dec 2015 |
MLA/2015/00428/1 - Completed | Application - Maintenance of existing works | Ocean Village Marina - Corrosion Protection | Ocean Village Marina | Marina Developments Limited | 19 Oct 2015 | 10 Dec 2020 |
MLA/2015/00429 - Completed | Application - Construction of new works | Planned improvements to Wightlink Ltd car ferry service between Fishbourne and Portsmouth | Fishbourne | Wightlink Limited | 19 Oct 2015 | 15 Apr 2016 |
MLA/2015/00430 - Completed | Application - Construction of new works, Decommissioning of works | Shell Pier installation of additional 5m radar tower and platform with decommissioning of old Radar tower- linked to emergency repair licence MLA/2015/00113 and Licence MLA/2015/00168 Grouped under: Shell Pier emergency works and new radar tower Showing 3 of 4 cases | Shell pier | Bae Systems Plc | 20 Oct 2015 | 21 Jan 2016 |
MLA/2015/00431/1 - Completed | Application - Aggregate dredging, Sampling | Area 488 Grouped under: Aggregate Area 488 Showing 2 of 6 cases | North Owers 488 | Tarmac Marine Dredging Limited | 20 Oct 2015 | 15 Feb 2017 |
MLA/2015/00432/1 - Completed | Application - Aggregate dredging, Sampling | Area 453 Grouped under: Aggregate Area 488 Showing 2 of 6 cases | Area_453 | Cemex Uk Marine Limited | 21 Oct 2015 | 27 Jan 2017 |
MLA/2015/00433/2 - Completed | Application - Decommissioning of works | ABLE SEATON PORT QUAY 6 COFFERDAM REMOVAL | Able Seaton Port Quay 6 Cofferdam Removal | Able Uk Limited | 21 Oct 2015 | 14 Nov 2018 |
MLA/2015/00434/3 - Completed | Application - Maintenance of existing works | Replacement of Part of the Riverside Wall, Port of Workington | Port of Workington Riverside Wall | Cumbria County Council | 22 Oct 2015 | 11 Jan 2017 |
MLA/2015/00435 - Completed | Application - Maintenance of existing works | Runcorn Viaduct | Runcorn Viaduct Scaffold location | Buckingham Group Contracting Limited | 23 Oct 2015 | 07 Jan 2016 |
MLA/2015/00436 - Completed | Application - Construction of new works, Maintenance of existing works, Other removals | North Portsea Island CFERM Scheme Phase 2 - Great Salterns Quay and Milton Common | Milton_Common_Revetment, Great_Salterns_Quay | Eastern Solent Coastal Partnership | 23 Oct 2015 | 11 Mar 2016 |
MLA/2015/00437/4 - Completed | Application - Alternative use of dredged material | Eastbourne Beach Management 2016-2021 | Deposition Site | Eastbourne Borough Council | 26 Oct 2015 | 12 Aug 2022 |
MLA/2015/00438/2 - Completed | Application - Maintenance of existing works | Maintenance (component replacement) at Gunfleet Sands wind farm Grouped under: Gunfleet Sands OWF 1, 2, 3 Showing 2 of 15 cases | Gunfleet Sands offshore wind farm | Dong Energy Power (Uk) Limited | 26 Oct 2015 | 06 Jul 2016 |
MLA/2015/00439/5 - Completed | Application - Maintenance of existing works | Component exchanges (maintenance) at West of Duddon Sands wind farm | WDS01boundary_BNG | Dong Energy Power (Uk) Ltd | 29 Oct 2015 | 09 Mar 2017 |
MLA/2015/00440 - Completed | Application - Construction of new works | Swanage Water Park Anchors for Inflatables | Mr Robert Mulliner | 29 Oct 2015 | 26 Feb 2016 | |
MLA/2015/00442 - Completed | Application - Maintenance of existing works | Remedial works to Upper Upnor Jetty, Upper Upnor Chatham | Upper Upnor Jetty | Constructex Limited | 02 Nov 2015 | 06 May 2016 |
MLA/2015/00443 - Completed | Application - Maintenance of existing works | Brooklands Quay Private Dock Floor Replacement | Brooklands Quay Private Dock | Mr Daniel Van Gelder | 03 Nov 2015 | 02 Dec 2015 |
MLA/2015/00444/1 - Completed | Application - Maintenance of existing works | Remedial Works to Aust Jetty. Tower XL605 | Site_1 | Trant Engineering Ltd | 05 Nov 2015 | 22 Sep 2016 |
MLA/2015/00445/1 - Completed | Application - Maintenance of existing works | Component exchanges (maintenance) at Walney wind farms Grouped under: Maintenance (component replacement) Walney Showing 3 of 8 cases | Walney 2 boundary, Walney 1 boundary | Dong Energy Power (Uk) Limited | 06 Nov 2015 | 01 Mar 2016 |
MLA/2015/00446 - Completed | Application - Other works | Racing marks in the Solent | Position 1, Position 2, Position 3, Position 4, Position 5 | Cowes Week Limited | 06 Nov 2015 | 18 Dec 2015 |
MLA/2015/00447 - Completed | Application - Other deposits | Improvements in the robustness of shellfish mortality estimates | SiteA, SiteB, SiteC, SiteD | Cefas | 09 Nov 2015 | 12 May 2016 |
MLA/2015/00448 - Completed | Application - Other removals | Marine Growth Removal at Ormonde Pontoon, Ramsden Dock Grouped under: Ormonde Pontoon. Showing 2 of 3 cases | Site 1 | Ormonde Energy Limited | 10 Nov 2015 | 04 Dec 2015 |
MLA/2015/00449/1 - Completed | Application - Construction of new works | Newhaven Construction Base - Temporary Pontoon to support construction of Rampion Offshore Wind Farm | Rampion Offshore Wind Farm Newhaven Construction Base - Temporary Pontoon | E.On Climate & Renewables Uk Rampion Offshore Wind Limited | 11 Nov 2015 | 17 Mar 2016 |
MLA/2015/00450 - Completed | Application - Construction of new works | 3 Firs Lane, Poole | 3 Firs Lane Poole | Mr Richard Delisle | 12 Nov 2015 | 01 Feb 2016 |
MLA/2015/00452/5 - Completed | Application - Other dredging | Race Bank Offshore Wind Farm - Local Levelling and Disposal of Drill Arisings Grouped under: Race Bank Offshore Wind Farm Showing 5 of 11 cases | Race Bank Offshore Wind Farm | Dong Energy Rb (Uk) Limited | 13 Nov 2015 | 03 Oct 2017 |
MLA/2015/00453 - Completed | Application - Other works | Chain Locker refurbishment | The Chain Locker & Shipwrights, Quay Street, Falmouth, TR11 3HH | Blacknoll Limited | 16 Nov 2015 | 15 Nov 2016 |
MLA/2015/00454 - Completed | Application - Other works | CEFOW - Clean Energy From Ocean Waves Grouped under: Wave Hub Showing 3 of 10 cases | CEFOW - Clean Energy From Ocean Waves | Fortum Energy Ltd | 16 Nov 2015 | 30 Mar 2016 |
MLA/2015/00455/2 - Completed | Application - Alternative use of dredged material, Construction of new works, Other dredging | Plantation Wharf Wave Break | Plantation Wharf | Mso Marine | 18 Nov 2015 | 16 Mar 2016 |
MLA/2015/00456 - Completed | Application - Construction of new works | Salcombe Flood Alliviation | Normandy Way Quay Wall, Clifton Place Slipway | Pell Frischmann Consultants Limited | 18 Nov 2015 | 05 Feb 2016 |
MLA/2015/00457/8 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Poole Harbour Maintenance Dredging and Disposal | SWANAGE BAY (WI110), BROWNSEA EXPERIMENTAL (WI111) | Poole Harbour Commissioners | 18 Nov 2015 | 08 Mar 2022 |
MLA/2015/00458/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Port of Barrow maintenance dredging disposal licence. Grouped under: Dredge of Sea Water intake at BAE systems Showing 2 of 4 cases | Barrow channel dredge area, BARROW D (IS205) | Associated British Ports. | 18 Nov 2015 | 09 Jan 2017 |
MLA/2015/00460 - Completed | Application - Construction of new works | Installation of Wave Hub Cable Tail Extensions Grouped under: Wave Hub Showing 3 of 10 cases | Wave Hub Cable Tail Extension Installation Site, Offshore of North Coast of Cornwall | Wave Hub Limited | 23 Nov 2015 | 22 Feb 2016 |
MLA/2015/00462 - Completed | Application - Maintenance of existing works | Thanet Offshore Wind Farm (OWF) Export Cable Operation & Maintenance Works Grouped under: Thanet Offshore Wind Farm Showing 2 of 6 cases | Thanet Export Cables | Balfour Beatty | 24 Nov 2015 | 03 Feb 2017 |
MLA/2015/00463 - Completed | Application - Construction of new works, Maintenance of existing works | Maud Foster | Maud Foster | Jba Bentley Limited | 24 Nov 2015 | 31 Mar 2016 |
MLA/2015/00464/4 - Completed | Application - Maintenance of existing works | Poole Bridge Approach Spans | Poole Bridge Approach Spans | Borough Of Poole Council | 27 Nov 2015 | 23 Aug 2017 |
MLA/2015/00465/1 - Completed | Application - Other removals | Sand Abstraction From Marazion Beach for Agricultural Use | Marazion beach | Mr Anthony Laity | 30 Nov 2015 | 01 Feb 2019 |
MLA/2015/00466 - Completed | Application - Maintenance of existing works | Marina Refurbishment - St Katharine Docks | St Katharine Docks | Skd Marina Limited | 30 Nov 2015 | 11 May 2016 |
MLA/2015/00467/1 - Completed | Application - Other removals | Recovery of submerged Rampion Met Mast on the Sussex coast | Rampion Meterological Mast | E.On Climate & Renewables Uk Rampion Offshore Wind Limited | 30 Nov 2015 | 15 Nov 2016 |
MLA/2015/00468/5 - Completed | Application - Construction of new works | Shoreham Adur Tidal Walls | Reach E2, Reach E1, Reach E3, Reach W1, Reach W2, Reach W3, Reach W4, Reach W5, Reach W6, Reach W7 | Environment Agency (Southern Region) | 30 Nov 2015 | 27 Nov 2017 |
MLA/2015/00469 - Completed | Application - Maintenance of existing works | Greenwich River Wall Works | Greenwich River Wall | Rsk Environment Limited | 01 Dec 2015 | 11 Jan 2016 |
MLA/2015/00471 - Completed | Application - Construction of new works | Chantry Cottages flood defence works - Dutch River | Chantry Cottages flood protection works - Dutch River, Goole | Environment Agency Leeds | 01 Dec 2015 | 26 Feb 2016 |
MLA/2015/00472/4 - Completed | Application - Other deposits | Race Bank Offshore Wind Farm - Offshore Export Cable Installation Tool Trials Grouped under: Race Bank Offshore Wind Farm Showing 5 of 11 cases | Export Cable Installation Tool Trials | Dong Energy Rb (Uk) Limited | 01 Dec 2015 | 21 Feb 2018 |
MLA/2015/00473/1 - Completed | Application - Construction of new works | Iron Ore Quay Fender Replacement Phase 2 | IOQ Fenders | Port Of Tyne Authority | 02 Dec 2015 | 01 Apr 2016 |
MLA/2015/00474 - Completed | Application - Construction | Bridge Road Widening | Bridge Road Countess Wear Bridge, Flood Relief Channel | Devon County Council | 02 Dec 2015 | 29 Apr 2016 |
MLA/2015/00475/1 - Completed | Application - Other works | Moorside Offshore Site Characterisation | Indicative_Offshore_Investigation_Boundary | Nu-Gen Ltd | 03 Dec 2015 | 27 Sep 2016 |
MLA/2015/00476 - Completed | Application - Construction of new works | Charlton Riverside Thames Path Missing Link Phase 1 | Missing Link Phase 1 | Royal Borough Of Greenwich | 03 Dec 2015 | 05 Oct 2017 |
MLA/2015/00478 - Completed | Application - Other removals | Galloper Wind Farm telecomms cable removal Grouped under: Galloper Offshore Wind Farm Showing 3 of 5 cases | Galloper_ECR_Boundary_1, Galloper_ECR_Boundary_2, Galloper_WF_Boundary_1, Galloper_WF_Boundary_2 | Galloper Wind Farm Limited | 03 Dec 2015 | 20 Jun 2016 |
MLA/2015/00479/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Port of Workington Maintenance Dredging 2016 -2018 | Dock, Turning Basin, Channel, Bar/Wedge, SOLWAY FIRTH (IS240), WORKINGTON ANCHORAGE (IS241) | Port Of Workington | 03 Dec 2015 | 24 May 2019 |
MLA/2015/00480/2 - Completed | Application - Maintenance of existing works | Leven Viaduct | Leven East, Leven West | Network Rail Property Limited | 04 Dec 2015 | 05 Sep 2018 |
MLA/2015/00481/1 - Completed | Application - Decommissioning of works | Medmerry Groyne Safety Works | Medmerry Groynes leading from Medmerry to Bracklesham., Medmerry groyne work to the east of Medmerry | Environment Agency | 07 Dec 2015 | 01 Feb 2019 |
MLA/2015/00482/2 - Completed | Application - Construction of new works | Tregenver sea wall | tregenver | Mr John Coombs | 07 Dec 2015 | 30 Jun 2016 |
MLA/2015/00483 - Completed | Application - Other works | Wallasea Island Wild Coast Project (Cell 5 Regulated Tidal Exchange Lagoon) | Existing sluice and 50m length of channel in Defra Realignment | Rspb Sales Limited | 08 Dec 2015 | 12 Apr 2016 |
MLA/2015/00485 - Completed | Application - Maintenance of existing works | RNLI Hartlepool - Low Impact Maintenance Works to Pontoon Berth (Fast Track Licence) | RNLI Hartlepool - Area of Tracked machine working (dredge activity) | Royal National Lifeboat Institution | 09 Dec 2015 | 01 Feb 2016 |
MLA/2015/00486 - Completed | Application - Maintenance of existing works | RNLI Blyth - Low Impact Maintenance Works to Pontoon Berth (Fast Track Licence) | RNLI Blyth Pontoon berth | Royal National Lifeboat Institution | 09 Dec 2015 | 15 Jan 2016 |
MLA/2015/00487/1 - Completed | Application - Disposal of dredged material | Disposal of maintenance dredging material from the Harwich / Felixstowe Outer Channel | INNER GABBARD EAST (TH056) | Harwich Haven Authority | 09 Dec 2015 | 16 May 2019 |
MLA/2015/00488/1 - Completed | Application - Maintenance of existing works | Network Rail - Ravenglass and River Mite | Ravenglass and River Mite | Network Rail Limited | 09 Dec 2015 | 29 Sep 2016 |
MLA/2015/00489 - Completed | Application - Maintenance of existing works | Greenergy Plymouth Tank Farm, Cattedown Sea Wall Maintenance and Repairs | 12276_Sea_Wall_Work_Area | Greenergy Terminals Limited | 11 Dec 2015 | 02 Mar 2016 |
MLA/2015/00490 - Completed | Application - Construction of new works, Maintenance of existing works | Pile Replacement and Trioka Gate Project | Royal Norfolk & Suffolk Yacht Club | Royal Norfolk & Suffolk Yacht Club | 11 Dec 2015 | 11 Mar 2016 |
MLA/2015/00491/4 - Completed | Application - Aggregate dredging, Sampling | Areas 500/1-4 Grouped under: Area 500 Aggregates Dredge Showing 2 of 4 cases | 500/3, 500/1, 500/4, 500/2 | Tarmac Marine Dredging Limited | 11 Dec 2015 | 08 Jul 2024 |
MLA/2015/00492 - Completed | Application - Aggregate dredging, Sampling | Area 500, West of the Isle of Wight Grouped under: Area 500 Aggregates Dredge Showing 2 of 4 cases | Area 500/6, Area 500/2, Area 500/1, Area 500/5 | Hanson Aggregates Marine Limited | 11 Dec 2015 | 17 Jan 2017 |
MLA/2015/00493 - Withdrawn | Application - Construction of new works | Reinstate The Margaret Smith Wreck Buoy & Racing Mark. | Margret Smith Wreck/No.7 Buoy | Royal Solent Yacht Club | 14 Dec 2015 | |
MLA/2015/00494/1 - Completed | Application - Decommissioning of works, Other dredging | Maintenance Dredge at WD Close, Wallsend, Newcastle. Grouped under: Swan Hunter Re-devlopment Showing 2 of 5 cases | Area B | North Tyneside Council | 14 Dec 2015 | 29 Jul 2016 |
MLA/2015/00496 - Completed | Application - Maintenance of existing works | RNLI Berwick Upon Tweed, Emergency Licence for Repairs to Launch Slipway | boathouse and slipway | Rnli | 15 Dec 2015 | 17 Dec 2015 |
MLA/2015/00498/1 - Completed | Application - Other works | Conservation offshore pile foundation approach bridge C.RO Ports Purfleet Terminal | Approach bridge | C.Ro Ports London Limited | 17 Dec 2015 | 10 May 2016 |
MLA/2015/00499/7 - Completed | Application - Disposal of dredged material, Navigational dredging (capital) | Berths 6 and 7, Trinity Terminal, Port of Felixstowe | Berths 6 and 7, INNER GABBARD EAST (TH056) | Hutchison Ports (Uk) Limited | 18 Dec 2015 | 24 Feb 2022 |
MLA/2015/00500/3 - Completed | Application - Maintenance of existing works | Shoreham Viaduct Maintenance Works Phase 2 | Shoreham Viaduct | Bam Nuttall Limited | 18 Dec 2015 | 11 Oct 2017 |
MLA/2015/00501/2 - Completed | Application - Disposal of dredged material, Other dredging | Maintenance Dredging around Cleveland Potash Outfalls - Boulby. For disposal. | CLEVELAND POTASH OUTFALL (TY181) | Cleveland Potash Limited | 18 Dec 2015 | 21 Jun 2024 |
MLA/2015/00502 - Completed | Application - Decommissioning of works, Maintenance of existing works | The Wash Tide Gauge (WTG) | Wash Tide Gauge (including scour protection) | Environment Agency | 18 Dec 2015 | 16 May 2016 |
MLA/2015/00503 - Completed | Application - Maintenance of existing works, Other removals | Potton Island Sluices - Urgent Works | Sluice P1, Sluice P3, Sluice P4, Sluice P5 | Qinetiq | 21 Dec 2015 | 04 Mar 2016 |
MLA/2015/00504 - Completed | Application - Maintenance of existing works | Repair of Swimming Pool, Westward Ho! | Westward Ho! Rock Pool | Torridge District Council | 21 Dec 2015 | 22 Feb 2016 |
MLA/2015/00505 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr John Lister | 22 Dec 2015 | 23 Dec 2015 | |
MLA/2015/00506 - Completed | Application - Other deposits | Dart Marina Test Anchors | Hole 1, Hole 2 | Dart Marina Limited | 22 Dec 2015 | 15 Feb 2016 |
MLA/2015/00507 - Completed | Application - Marine licence for the burial of human remains at sea | NEWHAVEN (WI011) | H.D.Tribe Ltd | 22 Dec 2015 | 23 Dec 2015 | |
MLA/2015/00508/1 - Completed | Application - Construction of new works, Maintenance of existing works | Berberis Quay | Berberis Quay | Mr James Ashwell | 23 Dec 2015 | 30 Sep 2016 |
MLA/2015/00509 - Completed | Application - Maintenance of existing works | Stopham Bridge Refurbishment Works | Stopham Bridge | West Sussex County Council | 23 Dec 2015 | 13 Jan 2020 |
MLA/2015/00510 - Completed | Application - Maintenance of existing works | Nr Eastcliffe Outfall - replacement of outfall Grouped under: Outfall pipe adjacent to East Cliff, Teignmouth Showing 2 of 3 cases | Nr Eastcliff Outfall work area | South West Water Limited | 23 Dec 2015 | 18 Feb 2016 |
MLA/2015/00511 - Completed | Application - Construction of new works | Southsea Promenade/ Seawall emergency repairs | SOuthsea | Portsmouth City Council | 29 Dec 2015 | 29 Dec 2015 |