MMO - Marine Licences Public Register

Download 16MLAs-240913.csv

Case DetailsProject TypeProject TitleLocationsApplicant NameSubmission DateDecision Date
MLA/2016/00001
Completed
Application - Other depositsNorth Killingholme Toe Beam RepairsNorth KillingholmeEnvironment Agency04 Jan 201607 Feb 2017
MLA/2016/00002/4
Completed
Application - SamplingOffshore Exploratory BoreholesWCM Offshore boreholes phase 3West Cumbria Mining Limited04 Jan 201618 Oct 2017
MLA/2016/00004
Completed
Application - Maintenance of existing worksPetrel Pier (Gosport) - Pontoon ReplacementArea 1 (Petrel Pier)Bae Systems Marine Limited06 Jan 201629 Jan 2016
MLA/2016/00005/1
Completed
Application - Other worksEDF Energy - Hinkley Point 'B' Power station - Installation of Stop Gates for Cooling Water System Isolation in advance of planned 2016 outage.Hinkley Point 'B' Power Station - Stop Log/Coarse screen locationEdf Energy Nuclear Generation Limited07 Jan 201621 Jan 2016
MLA/2016/00006
Completed
Application - Construction of new works, Other removalsByways Slipway, Bouldnor, Isle of WightBouldnorMr Niall Dowling11 Jan 201610 Jun 2016
MLA/2016/00008
Completed
Application - Other depositsSovereign Harbour Emergency works to remove shingle bankSovereign Harbour Shingle Bank Removal 2016Premier Marinas (Eastbourne) Limited12 Jan 201620 Jan 2016
MLA/2016/00009
Completed
Application - Construction of new worksSt Anne's Wharf River WallSt Anne's WharfTcm Ltd12 Jan 201610 May 2016
MLA/2016/00010
Withdrawn
Application - Construction of new worksExtension to I Jetty at Universal Marina, River Hamble, SouthamptonJohn Willment Marine Limited13 Jan 2016
MLA/2016/00011
Completed
Application - Construction of new worksVarne Boat Club, Replacement SlipwayVarne Boat ClubVarne Boat Club Limited(The)14 Jan 201623 May 2016
MLA/2016/00013
Completed
Application - Clean-up dredging, Disposal of dredged materialMinehead Harbour Shinglre Bank removalMinehead Harbour, Disposal siteWest Somerset District Council15 Jan 201619 Feb 2016
MLA/2016/00014/4
Completed
Application - Disposal of dredged materialLincshore Beach Renourishment WorksMablethorpe to SkegnessEnvironment Agency15 Jan 201630 Jun 2020
MLA/2016/00015
Completed
Application - Maintenance of existing worksOld Swan BridgeOld Swan Spanning Over River ArunWsp Group Limited18 Jan 201604 Jul 2017
MLA/2016/00017/2
Completed
Application - Construction of new works, Disposal of dredged material, Other deposits, Other dredgingAnchorsholme Storm Water OutfallAnchorsholme outfall Working area, BARROW D (IS205)United Utilities Water Plc19 Jan 201623 Mar 2018
MLA/2016/00018/1
Completed
Application - Maintenance of existing worksLong Rock Sea Wall Interim RepairLong RockCormac Solutions Ltd20 Jan 201608 Jul 2016
MLA/2016/00019/1
Completed
Application - SamplingNorth West Cost Connections Geotchnical Survey 2016Tunnel_Route_Survey_CorridorNational Grid Commercial Holdings Limited21 Jan 201607 Apr 2016
MLA/2016/00020
Completed
Application - Construction of new worksARPW Old Beford Sluice Eel PassOld Bedford Eel PassEnvironment Agency21 Jan 201623 Feb 2016
MLA/2016/00021/1
Completed
Application - Construction of new worksBarrier Garden Pier ExtensionBarrier Garden Pier Extension SitePort Of London Authority21 Jan 201627 Sep 2016
MLA/2016/00022/4
Completed
Application - Other dredgingBLAKE BRIDGEBLAKE BRIDGESomerset County Council24 Jan 201630 Aug 2018
MLA/2016/00023/1
Completed
Application - Disposal of dredged materialPlacement of Maintenance Dredge Material Wells Harbour Grouped under: Wells Harbour dredge disposal Showing 2 of 6 casesWell Beneficial use site2 (HU156), Wells outer harbour site A (HU152), Wells Outer Harbour B1 (HU157), Wells outer harbour site C (HU154)Wells Harbour Commissioners25 Jan 201612 Jul 2016
MLA/2016/00024/2
Completed
Application - Clean-up dredgingWarkworth Harbour North Side Sand RelocationWarkworth Harbour North SideMr Simon Baxter25 Jan 201627 Jun 2019
MLA/2016/00025/3
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Esso Fawley Marine Terminal Maintenance Dredging and Disposal Licence RenewalNAB TOWER (WI060), FMT Dredge AreaEsso Petroleum Company,Limited26 Jan 201614 Oct 2019
MLA/2016/00027
Completed
Application - Maintenance of existing worksrebuild quay at 1 noss mayo1 The Point Noss MayoMrs Kathryn Barnett27 Jan 201613 May 2016
MLA/2016/00028/1
Completed
Application - Maintenance of existing worksNetwork Rail - Brantsy to PartonBranstyNetwork Rail Limited28 Jan 201619 Sep 2016
MLA/2016/00029
Completed
Application - Other removalsUK-Germany 6 Cable RecoveryUK-Germany 6 cable Recovery 20 meter CorridorBt Plc29 Jan 201629 Apr 2016
MLA/2016/00030
Completed
Application - Other worksPontoon installationTrinity Quay, Alicat Workboats LtdAlicat Workboats Limited29 Jan 201616 May 2016
MLA/2016/00031
Completed
Application - Maintenance of existing worksEskmeals Viaduct Re-railingEskmeals Viaduct LA19 5YGCarillion Plc29 Jan 201605 Feb 2016
MLA/2016/00033/1
Completed
Application - Construction of new works, Maintenance of existing worksGreater Gabbard Offshore Wind Farm (OWF) Export Cable Operations & Maintenance WorksBalfour Beatty Usl01 Feb 201609 Nov 2016
MLA/2016/00034/1
Completed
Application - Other worksGweek Boatyard Test PileIndicative Test Pile LocationGweek Quay Limited01 Feb 201604 Apr 2017
MLA/2016/00035/1
Completed
Application - Construction of new worksAddition of extended walkways to RNLI slipway at Sennen coveSennen Cove Lifeboat StationR.N.L.I. (Trading) Limited02 Feb 201618 Oct 2016
MLA/2016/00036/3
Completed
Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital)Portsmouth Heritage Pontoon and HMS Warrior Dredging and Construction WorksHeritage Pontoon, HMS Warrior, NAB TOWER (WI060)Portsmouth Naval Base Property Trust02 Feb 201606 May 2020
MLA/2016/00037
Completed
Application - Maintenance of existing worksThorn Sluice RefurbishmentThorn SluiceEnvironment Agency - South West Region03 Feb 201606 Apr 2016
MLA/2016/00038
Completed
Application - Maintenance of existing worksMaintenance painting part of external face of Canary Wharf Pier pontoon, LondonCanary Wharf Pier pontoonCanary Wharf Management Limited03 Feb 201615 Feb 2016
MLA/2016/00039
Completed
Application - Maintenance of existing worksMR3511 River MerseyMR3511 river MerseyJ. Murphy & Sons Limited03 Feb 201614 Mar 2016
MLA/2016/00042
Completed
Application - Other depositsDudgeon Offshore Wind Farm - waverider buoy installationBuoy locationDudgeon Offshore Wind Limited05 Feb 201625 Feb 2016
MLA/2016/00043/1
Completed
Application - Navigational dredging (maintenance)Essex Marina Removal of Silt Build UpEssex MarinaEssex Marina05 Feb 201622 Feb 2017
MLA/2016/00044
Completed
Application - Maintenance of existing worksCreek House Narrow Street London, E14 8BPCreek House, Narrow Street, London, E14 8BPMr Anthony Johncock08 Feb 201621 Mar 2016
MLA/2016/00045
Completed
Application - Construction of new worksPontoon extension to Harbour Master's Jetty, Warsash.Harbour Master's Jetty, warsashRiver Hamble Harbour Authority08 Feb 201610 May 2016
MLA/2016/00046
Completed
Application - Maintenance of existing worksDawlish, Teignmouth and Exe estuary seawall repairsDawlish, Teignmouth and Exe estuary seawallDyer And Butler08 Feb 201617 Aug 2016
MLA/2016/00047/2
Completed
Application - Maintenance of existing worksadd additional pile (pontoon C extension)Installation of 1No. Pile to existing pontoon extensionPontoon Berth Holders Two09 Feb 201609 Jun 2017
MLA/2016/00048
Completed
Application - Construction of new works, Other dredging, Other worksThe Garden BridgeGarden Bridge, Crown River Cruises new mooring location, Relocation of HQS WellingtonGarden Bridge Trust09 Feb 201629 Jul 2016
MLA/2016/00049
Completed
Application - Other dredging, Other removalsBurbo Bank Extension Debris ClearanceBurbo Bank Extension Offshore Wind Farm, Burbo Bank Extension OWF (IS135)Dong Energy Burbo Extension (Uk) Ltd09 Feb 201606 May 2016
MLA/2016/00050
Completed
Application - SamplingTrial pit within the back filled former outdoor pool.Tynemouth Outdoor PoolFriends Of Tynemouth Outdoor Pool10 Feb 201609 Mar 2016
MLA/2016/00051
Completed
Application - Maintenance of existing works, Other dredgingRNLI Selsey -Emergency Beach Re-Profiling of Launch RouteSelsey Inshore Lifeboat Launch Route (upper), Selsey Inshore Lifeboat Launch Route (Lower)Rnli10 Feb 201616 Feb 2016
MLA/2016/00052/2
Completed
Application - Construction of new worksCarbis Bay Hotel - Ocean Sports Centre and ApartmentsCarbis Bay Hotel2gh Water11 Feb 201616 Aug 2017
MLA/2016/00053
Completed
Application - Maintenance of existing worksCrescendo Court sea wall repairs and improvementsCrescendo Court TR11 2SZBarleycroft Limited11 Feb 201616 May 2016
MLA/2016/00055/3
Completed
Application - Construction of new worksOikos Deepwater Jetty (ODWJ) ProposalsODWJ ProposalsOikos Storage Limited11 Feb 201630 Nov 2017
MLA/2016/00056
Completed
Application - Maintenance of existing worksFlood Defence Wall RepairsJohn Day HouseMoore Project Management Solutions Llp11 Feb 201625 May 2016
MLA/2016/00058/1
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Hill Head Harbour Channel MaintenanceShingle Bank Removal Area, Shingle DepositHill Head Sailing Club14 Feb 201616 Aug 2017
MLA/2016/00059
Completed
Application - Maintenance of existing worksScaffoldingTides Reach Appartments, Egloshayle, Wadebridge, Cornwall PL27 6BWH&H Scaffolding (Sw) Limited15 Feb 201610 May 2016
MLA/2016/00060
Completed
Application - Maintenance of existing worksRNLI Fleetwood -Low Impact Maintenance Works to Pontoon Berth (Fast Track Licence)RNLI Fleetwood: Lifeboat PenRoyal National Lifeboat Institution15 Feb 201621 Mar 2016
MLA/2016/00061
Completed
Application - Maintenance of existing worksBrixham Marina Pile RepairBrixham Pile RepairMarina Developments Limited16 Feb 201611 Mar 2016
MLA/2016/00062/3
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Continuation of the Disposal of Maintenance Dredgings at ABP King's LynnWEST STONES (HU143)Associated British Ports Kings Lynn16 Feb 201602 Jun 2020
MLA/2016/00064/3
Completed
Application - Maintenance of existing worksCoastal Defence Reconstruction Works, Fort Cumberland, PortsmouthFort_Cumberland_MMO_Site_ExtentSouthern Water Services Limited17 Feb 201611 Sep 2017
MLA/2016/00065/2
Completed
Application - Construction of new worksBlyth West Quay StrengtheningWest QuayPort Of Blyth17 Feb 201620 Nov 2017
MLA/2016/00066
Completed
Application - Construction of new worksFairlight Cove Coast Protection Works Phase 3Construction AreaCanterbury City Council17 Feb 201629 Jul 2016
MLA/2016/00067/5
Completed
Application - Maintenance of existing worksMaintenance (component replacement) at Westermost Rough Offshore Wind FarmWestermost Rough Offshore Wind Farm siteDong Energy Power (Uk) Limited17 Feb 201609 May 2017
MLA/2016/00068
Completed
Application - Navigational dredging (maintenance)Tollesbury Marina Maintenance Dredging Grouped under: Tollesbury Marina Showing 2 of 2 casesTollesbury MarinaTollesbury Marina Llp18 Feb 201612 Jul 2016
MLA/2016/00070
Completed
Application - Construction of new worksAmericas Cup World Series - PortsmouthAmericas Cup World Series - temporary PontoonTeamorigin Llp19 Feb 201615 Jun 2016
MLA/2016/00071
Completed
Application - Construction of new worksMiddleton Wastewater Treatment Works Outfall Marker PostMarker Post working areaUnited Utilities Water Plc19 Feb 201614 Jun 2016
MLA/2016/00072/1
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Maintenance dredging Dock Point Kings Lynn and Disposal site at HU143 10 year disposal licenceDock Point Kings Lynn, WEST STONES (HU143)Kings Lynn Conservancy Board22 Feb 201608 Jan 2020
MLA/2016/00074
Completed
Application - Construction of new worksWaldringfield Saltmarsh Restoration ProjectWaldringfield saltmarshWater Management Alliance Limited23 Feb 201616 May 2016
MLA/2016/00075
Completed
Application - Incineration of any substance or object at seaWalney Extension UXO ClearanceWOW03_04_UXOworkingArea_WGS84Dong Energy Walney Extension (Uk) Ltd24 Feb 201604 Aug 2016
MLA/2016/00077/5
Completed
Application - Maintenance of existing worksComponent exchanges (maintenance) at Burbo Bank offshore wind farm Grouped under: Burbo Bank offshore windfarm Showing 2 of 3 casesBurbo Bank OWFDong Energy Power (Uk) Limited25 Feb 201604 May 2017
MLA/2016/00078/3
Completed
Application - Maintenance of existing worksRiver Stour Power Station UnderbridgeRiver Stour Power Station UnderbridgeCostain Group Plc25 Feb 201631 Mar 2017
MLA/2016/00079/4
Completed
Application - Maintenance of existing worksComponent exchanges (maintenance) at Walney wind farms Grouped under: Maintenance (component replacement) Walney Showing 3 of 8 casesWalney 1 OWF, Walney 2 OWFDong Energy Power (Uk) Limited26 Feb 201609 Mar 2017
MLA/2016/00080
Completed
Application - Maintenance of existing worksGosshall Water Feed PlatformGosshall PlatformEnvironment Agency26 Feb 201626 May 2016
MLA/2016/00082/1
Completed
Application - Other removalsRyde Esplanade Canopy Removal Grouped under: Ryde Esplanade Canopy Support Structure Showing 2 of 2 casesRyde CanopyGeoffrey Osborne Limited26 Feb 201607 Jul 2016
MLA/2016/00083
Completed
Application - Maintenance of existing worksSouth Wharf Quay RepairsSouth Wharf - West End of QuayNorfolk Marine29 Feb 201623 May 2016
MLA/2016/00085/1
Completed
Application - Construction of new works, Maintenance of existing works, Other removalsHamble Yacht Services - Proposed New Hoist DockHoist Dock, Sheet Piled WallHys (Holdings) Limited02 Mar 201622 Feb 2017
MLA/2016/00087/2
Completed
Application - Maintenance of existing worksHumber Gateway Offshore Wind Farm (OWF) Export Cable Operations & Maintenance WorksHumber Gateway OWF export cable corridorBalfour Beatty Group Limited03 Mar 201602 Jun 2023
MLA/2016/00091/1
Completed
Application - Maintenance of existing worksCastle Beach, Falmouth - Sea Defence Wall RepairsCastle Beach, FalmouthCornwall Council04 Mar 201609 May 2016
MLA/2016/00093/2
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Maintenance Dredge of the area in and around Shepards Wharf Marina and Town Quay (Cowes) Grouped under: Maintenance Dredge of the area in and around Shepards Wharf Marina and Town Quay (Cowes) Showing 2 of 3 casesTown Quay Mooring Basin, Shepards Wharf Marina Zone 1 (2.0m BCD), Shepards Wharf Marina Zone 2 (1.5m BCD), Shepards Wharf Marina Zone 3 (3.0m BCD), NAB TOWER (WI060), HURST FORT (WI080)Cowes Harbour Commission07 Mar 201609 Feb 2017
MLA/2016/00094
Completed
Application - Other removalsVegetation removel - Thames river wall, HammersmithBlack Lion Lane (south)London Borough Of Hammersmith And Fulham07 Mar 201610 Nov 2016
MLA/2016/00095
Withdrawn
Application - Wrecks and other archaeological remainsSalvage of the SS Ballarat, the SS Briardene, and the SS VinoviaLodestone Marine Ventures Limited07 Mar 2016
MLA/2016/00098
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)RYS Jubilee Haven Grouped under: Maintenance Dredge of the area in and around Shepards Wharf Marina and Town Quay (Cowes) Showing 2 of 3 casesNAB TOWER (WI060), HURST FORT (WI080), RYS CowesRoyal Yacht Squadron07 Mar 201607 Jun 2016
MLA/2016/00099
Completed
Application - Construction of new worksPontoons Tug Boat Yard Grouped under: Wells Harbour dredge disposal Showing 2 of 6 casesPontoon Location Tug Boat YardWells Harbour Commissioners08 Mar 201624 Jun 2016
MLA/2016/00100
Completed
Application - Maintenance of existing worksBlake Bridge, Brigwater, TauntonBlake Bridge, Bridgwater, TauntonParsons Brinckerhoff Ltd09 Mar 201621 Apr 2016
MLA/2016/00101
Completed
Application - Maintenance of existing worksCaisson repair - Laira Rail BridgeLaira Rail Bridge, The Cattewater, PlymouthPlymouth City Council09 Mar 201611 Apr 2016
MLA/2016/00103/3
Completed
Application - Explosive substances or articles, Other deposits, Other removalsRampion Offshore Wind Farm Grouped under: Rampion Offshore Wind Farm Showing 4 of 13 casesRampion UXO clearance / boulder relocationE.On Climate & Renewables Uk Rampion Offshore Wind Limited09 Mar 201628 Mar 2018
MLA/2016/00104/3
Completed
Application - Other deposits, Other removalspotters leisure sea defence project, emergency workspotters sea defence projectRosebay Services10 Mar 201629 Apr 2016
MLA/2016/00107
Completed
Application - Construction of new worksReinstatement of existing collapsed river wallTarmac Cement And Lime Ltd15 Mar 201612 Apr 2017
MLA/2016/00108
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)SHOTLEY MARINA MAINTENANCE DREDGE 2016Shotley Marina Dredge Area, Shotley Marina Beach Replenishment AreaShotley Marina Limited15 Mar 201626 Aug 2016
MLA/2016/00109
Completed
Application - Other removalsGround Investigations for potential Stem Wave Mitigation StructureTrench locations (eastern end of HPC sea wall)Nnb Generation Company (Hpc) Limited15 Mar 201626 Apr 2016
MLA/2016/00110/3
Completed
Application - Other worksUse of bird deterrents at Burbo Offshore Wind FarmDONG Energy Burbo (UK) Ltd.Dong Energy Power (Uk) Limited15 Mar 201610 Mar 2020
MLA/2016/00111/4
Completed
Application - Maintenance of existing worksMaintenance activities at London Array wind farmLondonArray_WindFarmBoundary_TCE_20150520London Array Limited17 Mar 201605 Dec 2017
MLA/2016/00112
Completed
Application - Construction of new worksNewhaven Construction Base - Temporary Pontoon to support construction of RampionRampion Offshore Wind Farm Newhaven Construction Base - Temporary PontoonE.On Climate & Renewables Uk Rampion Offshore Wind Limited17 Mar 201624 Mar 2016
MLA/2016/00114
Completed
Application - Maintenance of existing worksMessack House water pipeline, CornwallMessack House & CreekMr David Halsey17 Mar 201612 Apr 2016
MLA/2016/00115
Completed
Application - Other worksRyde pier head station urgent track worksRyde Pier Head StationDyer And Butler Limited18 Mar 201621 Apr 2016
MLA/2016/00116
Completed
Application - Construction of new worksErosion control at the Lodge, SuttonThe LodgeMrs Margaret Millar18 Mar 201603 Jun 2016
MLA/2016/00117/2
Completed
Application - Wrecks and other archaeological remainsNorth Sea wreckMr Andrew Watson19 Mar 201612 Sep 2016
MLA/2016/00120/2
Completed
Application - Construction of new worksTQEZ RIF St Philips FootbridgeSt Philips FootbridgeBristol City Council22 Mar 201618 Dec 2018
MLA/2016/00121
Completed
Application - Construction of new works, Decommissioning of worksBattersea Power Station River Bus JettyBattersea RiverbusBattersea Power Station Development Company Limited24 Mar 201617 Aug 2016
MLA/2016/00122/3
Completed
Application - Construction of new works, Disposal of dredged material, Maintenance of existing works, Other deposits, Other dredging, Other removalsDawlish Warren Beach Management SchemeDawlish beach, Pole Sands Dredge SiteEnvironment Agency24 Mar 201628 Jun 2017
MLA/2016/00123
Completed
Application - Construction of new worksRobertsons Boatyard, Woodbridge - Creation of Additional HardstandingSite 1Robertsons Of Woodbridge (Boat Builders) Limited29 Mar 201625 Jan 2017
MLA/2016/00124
Completed
Application - Construction of new worksThird Solent Fibre Optic Telecoms CableGurnard Bay to Stone PointBritish Telecommunications Public Limited Company29 Mar 201617 Aug 2017
MLA/2016/00125
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Great Yarmouth inner harbour dredge disposalGreat Yarmouth Inner Harbour and the River Yare, GREAT YARMOUTH (HU150)Great Yarmouth Port Company Ltd29 Mar 201609 Dec 2016
MLA/2016/00126/1
Completed
Application - Maintenance of existing worksPlaidy CSO Outfall concrete repairs Grouped under: Plaidy CSO Outfall concrete repairs Showing 2 of 2 casesPlaidy CSO OutfallSouth West Water Limited29 Mar 201620 Feb 2017
MLA/2016/00127
Completed
Application - Other worksGreater Gabbard Offshore Wind Farm Met Mast IGMMX Removal of latticeGreater Gabbard Met Mast IGMMXGreater Gabbard Offshore Winds Limited31 Mar 201616 Jun 2016
MLA/2016/00128/1
Completed
Application - Other worksChapel Riverside Sea WallSea WallInland Homes Plc31 Mar 201628 Aug 2019
MLA/2016/00129
Completed
Application - Maintenance of existing worksLondon Array BRITNED CROSSING - REMEDIAL ROCK INSTALLATION0Blue Transmission London Array Limited31 Mar 201615 Jul 2016
MLA/2016/00130
Completed
Application - Maintenance of existing worksSwan Hunter Quay Wall RepairsSwan Hunter Quay Wall RepairsNorth Tyneside Council01 Apr 201611 Aug 2016
MLA/2016/00131
Completed
Application - Other depositsMarker BuoysHarbour Marker Buoys, Leisure zone special mark buoy, Construction site marker buoysDover Harbour Board01 Apr 201625 May 2016
MLA/2016/00132
Withdrawn
Application - Other removalsBransholme Storm Water Pumping StationYorkshire Water Services Limited04 Apr 2016
MLA/2016/00133/2
Completed
Application - Construction of new worksLiverpool 2Seaforth 1Peel Ports Limited04 Apr 201627 Oct 2016
MLA/2016/00134
Completed
Application - Maintenance of existing worksRNLI Selsey -Emergency Repairs to Roof CladdingSelsey - Station Roof RepairsRoyal National Lifeboat Institution04 Apr 201607 Apr 2016
MLA/2016/00135
Completed
Application - Other depositsHindu EngagementWeymouth BayRoyal Fleet Auxillary04 Apr 201611 May 2016
MLA/2016/00136/6
Completed
Application - Other deposits, Other removalsRampion Offshore Wind- Flotation pits Grouped under: Rampion Offshore Wind Farm Showing 4 of 13 casesDisposal site, CR1 FP1, CR1 FP2, CR1 FP3, CR2 FP1, CR2 FP2, CR2 FP3E.On Climate & Renewables Uk Rampion Offshore Wind Limited04 Apr 201623 Nov 2018
MLA/2016/00138/2
Completed
Application - Construction of new works, Maintenance of existing worksHastings Coastal Defence Works Stage 2Hastings Coastal Defence Works SiteCanterbury City Council06 Apr 201627 Jul 2018
MLA/2016/00139
Completed
Application - Maintenance of existing worksSouthbank River WallSouthbank River WallConcrete Repairs Limited06 Apr 201621 Jun 2016
MLA/2016/00140
Completed
Application - Construction of new worksAlexandra Yacht Club Jetty H10842 Grouped under: Emergency making safe of Alexandra Yacht Club Jetty Showing 2 of 2 casesAlexandra Yacht Club Jetty WorksSouthend On Sea Borough Council07 Apr 201608 Jul 2016
MLA/2016/00141
Completed
Application - Construction of new worksWorkington Rail Transport HubWorkington Rail Transport Hub. (Outfall Pipe)Story Contracting Limited07 Apr 201623 Jun 2016
MLA/2016/00142/1
Completed
Application - Maintenance of existing worksPLOVER SCAR LIGHTHOUSEPlover Scar Lighthouse and Access TrackLancaster Port Commission07 Apr 201611 Jan 2017
MLA/2016/00143/2
Completed
Application - Disposal of dredged material, Other dredgingDisposal to Nab Tower W1060 of surplus sand and gravel used in the construction of East Cowes BreakwaterEast Cowes Breakwater Project - Surplus Material Site, NAB TOWER (WI060)Boskalis Westminster Ltd08 Apr 201619 Dec 2018
MLA/2016/00144
Completed
Application - Maintenance of existing worksTower Bridge bascule Re-decking and Approach Structure WaterproofingTower Bridge londonBam Nuttall Limited08 Apr 201618 Jul 2016
MLA/2016/00145
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Thames Estuary Channel Management - Medium TermKnock John, West Oaze, Black Deep, NORTH EDINBURGH CHANNEL (TH080)Port Of London Authority08 Apr 201606 Feb 2018
MLA/2016/00146
Completed
Application - Construction of new works, Other removalsDismantling and installation of scaffold access to the outfall structureSiteMagnox Limited12 Apr 201606 Jul 2016
MLA/2016/00147/3
Completed
Application - Maintenance of existing works, Other removalsWestermost Rough Offshore Wind Farm O&M Marine LicenceWestermost_Rough_Windfarm_WGS84Westermost Rough Limited12 Apr 201612 Feb 2020
MLA/2016/00148/4
Completed
Application - Maintenance of existing works, Other removalsBurbo Bank Offshore Wind Farm O&M Marine Licence Grouped under: Burbo Bank offshore windfarm Showing 2 of 3 casesBurbo_Bank_Windfarm_WGS84Dong Energy Burbo (Uk) Limited12 Apr 201603 Feb 2022
MLA/2016/00149/3
Completed
Application - Maintenance of existing works, Other removalsBarrow Offshore Wind Farm O&M Marine LicenceBarrow Offshore Wind FarmBarrow Offshore Wind Limited12 Apr 201629 Nov 2019
MLA/2016/00150/3
Completed
Application - Maintenance of existing works, Other removalsWest of Duddon Sands Offshore Wind Farm O&M Marine LicenceWest of Duddon Offshore WindfarmOrsted Westermost Rough Limited12 Apr 201625 Nov 2019
MLA/2016/00151/3
Completed
Application - Maintenance of existing works, Other removalsWalney 1&2 Offshore Wind Farms O&M Marine Licence Grouped under: Maintenance (component replacement) Walney Showing 3 of 8 casesWalney 1&2 Offshore Wind FarmsWalney (Uk) Offshore Windfarms Limited12 Apr 201610 Dec 2019
MLA/2016/00153
Completed
Application - Other worksBrixham Boatlift Pile ReplacementBrixham MarinaMarina Developments Limited12 Apr 201605 May 2016
MLA/2016/00154/2
Completed
Application - Other removalsRemoval of algal growth and/or guano on wind turbine structures at Gunfleet Sands for health and safety and corrosion protection Grouped under: Gunfleet Sands OWF 1, 2, 3 Showing 4 of 15 casesGunfleet Sands 2, Gunfleet Sands 1, Gunfleet Sands 3Dong Energy Power (Uk) Limited13 Apr 201631 Mar 2017
MLA/2016/00155/1
Completed
Application - Construction of new worksNew Hoist Dock for Berthon Boatyard, LymingtonBerthon Boat Company Limited(The)13 Apr 201621 Mar 2022
MLA/2016/00156
Completed
Application - Other worksRyde Esplanade Canopy Support Structure Grouped under: Ryde Esplanade Canopy Support Structure Showing 2 of 2 casesRyde Esaplnade CanopyGeoffrey Osborne Limited13 Apr 201614 Apr 2016
MLA/2016/00157
Completed
Application - Construction of new worksRock Revetment at Bakers Gap, FolkestoneRock Revetment at Bakers GapCanterbury City Council13 Apr 201620 Apr 2017
MLA/2016/00159
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Tapper And Son (Poole) Limited14 Apr 201620 Apr 2016
MLA/2016/00160/3
Completed
Application - Maintenance of existing worksWestermost Rough - Removal of algal growth and/or guanoWestermost Rough Offshore Wind Farm siteDong Energy Power (Uk) Limited14 Apr 201630 Mar 2017
MLA/2016/00162/2
Completed
Application - Maintenance of existing worksComponent exchanges (maintenance) at Barrow offshore wind farm and reomval of algal growth and/or guanoBarrow Offshore WindfarmBarrow Offshore Wind Limited14 Apr 201603 Mar 2017
MLA/2016/00163/2
Completed
Application - Other removalsRemoval of algal growth and/or guano on wind farm structures at Walney, West of Duddon Sands, and Burbo Bank Wind farm, for health and safety and corrosion protection Grouped under: Maintenance (component replacement) Walney Showing 3 of 8 casesWalney wind farm part 1, Walney wind farm part 2, West of Duddon Sands wind farm, Burbo Bank wind farmDong Energy Power (Uk) Limited15 Apr 201628 Apr 2017
MLA/2016/00165
Completed
Application - Maintenance of existing worksConstruction of concrete ring beam to replace rotting timber at foot of slipwayBrading Haven Yacht Club slipwayBrading Haven Yacht Club15 Apr 201608 Jun 2016
MLA/2016/00166
Completed
Application - Construction of new works151396 DS ProjectShakespeare BeachNetwork Rail Limited15 Apr 201612 Aug 2016
MLA/2016/00167/4
Completed
Application - Maintenance of existing works, Other removalsGunfleet Sands 1&2 Offshore Wind Farms O&M Marine Licence Grouped under: Gunfleet Sands OWF 1, 2, 3 Showing 4 of 15 casesGunfleet Sands 1&2 Offshore Wind FarmsGunfleet Sands Holding Ltd15 Apr 201613 Dec 2019
MLA/2016/00168/4
Completed
Application - Maintenance of existing works, Other removalsGunfleet Sands 3 Offshore Wind Farm O&M Marine Licence Grouped under: Gunfleet Sands OWF 1, 2, 3 Showing 4 of 15 casesGunfleet Sands 3 Offshore Wind FarmDong Energy Gunfleet Sands Demo (Uk) Ltd15 Apr 201616 Jan 2020
MLA/2016/00169
Completed
Application - Maintenance of existing worksMaintenance Works to Mulberry Quays FalmouthMulberry Quays FalmouthMulberry Quay Management Company Limited18 Apr 201611 Jul 2016
MLA/2016/00172
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mr John Lister19 Apr 201621 Apr 2016
MLA/2016/00175/7
Completed
Application - Construction of new worksAnchorsholme Coast Protection SchemeAnchorsholme Coast Protection SchemeBlackpool Borough Council20 Apr 201607 Jan 2022
MLA/2016/00176
Completed
Application - Maintenance of existing worksRMYC Panorama Road Tidal Flap Upgrade600mm Tidal FlapWessex Water Services Limited20 Apr 201616 Jun 2016
MLA/2016/00177
Completed
Application - Construction of new worksAlbany House MooringsWalkway structure over waterBellway Homes Limited20 Apr 201630 Aug 2016
MLA/2016/00179/2
Completed
Application - Other removalsBlyth Offshore Demonstration - UXO Clearance and DisposalBlyth Offshore DemonstratorBlyth Offshore Demonstrator Limited21 Apr 201627 Jun 2017
MLA/2016/00180/1
Completed
Application - Disposal of dredged materialDISPOSAL OF MATERIAL FROM WEYMOUTH HARBOUR DREDGINGSWANAGE BAY (WI110)Weymouth Harbour21 Apr 201617 Dec 2020
MLA/2016/00181/1
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)ABP Lowestoft - Maintenance dredge material disposalLOWESTOFT CIRCULAR NORTH (TH005)Abp Acquisitions Uk Limited21 Apr 201601 Aug 2018
MLA/2016/00182
Completed
Application - Maintenance of existing worksRNLI Barrow - Emergency Works Application for Repair to SlipwayRNLI Barrow: Boathouse, Slipway and Access JettyRnli Barrow21 Apr 201627 Apr 2016
MLA/2016/00183
Completed
Application - Maintenance of existing worksTideways, Creeksea, Burnham on Crouch, Essex, CM08PLtidewaysMr Roger Miles22 Apr 201630 Jun 2016
MLA/2016/00185
Completed
Application - Maintenance of existing worksLike for Like Replacement Sea DefenceMoorings, Westlands Estate, Birdham, Chichester, West Sussex PO20 7HJMr Malcolm Oliver25 Apr 201621 Jul 2016
MLA/2016/00186/1
Completed
Application - Maintenance of existing worksRebuilding first 48 metres of existing JettyHarlow (Blackwater) Sailing ClubHarlow (Blackwater) Sailing Club25 Apr 201626 Apr 2017
MLA/2016/00187
Completed
Application - Construction of new worksInstallation of a new 15 metre readar tower on Shell Pier, PortsmouthShell PierBae Systems Plc25 Apr 201611 May 2016
MLA/2016/00188
Completed
Application - Construction of new worksQueen's Wharf and Riverside StudiosQueen's Wharf and Riverside StudiosMount Anvil Limited26 Apr 201621 Jul 2016
MLA/2016/00189/1
Completed
Application - Other worksThames Tideway Tunnel (C450) Dormay Street riverwall replacement and associated worksDOrmay Street River Wall - Temporary Emergency WorksJackson Civil Engineering Group Limited27 Apr 201629 Jul 2016
MLA/2016/00190
Completed
Application - Decommissioning of worksRace Bank Met Mast DecommissioningRace Bank Met MastDong Energy Rb (Uk) Limited27 Apr 201621 Jul 2016
MLA/2016/00192
Completed
Application - Maintenance of existing worksEmergency making safe of Alexandra Yacht Club Jetty Grouped under: Emergency making safe of Alexandra Yacht Club Jetty Showing 2 of 2 casesAlexandra Yacht ClubSouthend On Sea Borough Council27 Apr 201620 May 2016
MLA/2016/00193/1
Completed
Application - Construction of new works, Decommissioning of worksRNLI Poole: Replacement of Floating BoathouseRNLI Poole Lifeboat StationR.N.L.I. (Trading) Limited28 Apr 201622 Aug 2017
MLA/2016/00195/1
Completed
Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital)Birdham Pool - Basin Dredge, Revetment and PontoonsBirdham Pool Dredge, Birdham Pool Construction, Birdham Pool Marina (WI042)Castle Marinas Limited29 Apr 201628 Jul 2017
MLA/2016/00196
Completed
Application - Construction of new worksProposed Boat House and Slipway - 50 Trefusis Road - Flushing - Falmouth - Cornwall TR11 5UB50 Trefusis Road, Flushing, falmouth TR11 5UBMr Geoff. Evans29 Apr 201629 Jul 2016
MLA/2016/00197
Completed
Application - Alternative use of dredged material, Navigational dredging (maintenance)Maintenance dredging, alternative use of dredged material (salt marsh replenishment)Area of south east salt marsh recharged by discharge location points one & two (a), Area of north west salt marsh recharged by discharge location point three (a), Area of south east salt marsh recharged by discharge location points one & two (b), Area of south east salt marsh recharged by discharge location points one & two (c), Area of north west salt marsh recharged by discharge location point three (b)Yacht Havens Limited29 Apr 201617 Jan 2017
MLA/2016/00198
Completed
Application - Maintenance of existing worksTIDEWAYS, FERRY LANE, CREEKSEA, BURNHAM ON CROUCH, ESSEX, CM0 8PLcreekseaMiles Water Engineering Ltd29 Apr 201629 Sep 2016
MLA/2016/00199
Completed
Application - Scientific instrumentsTrinity Hospital and Crowleys Wharf Trial pitsTrinity Hospital and Crowley's WharfEnvironment Agency29 Apr 201626 May 2016
MLA/2016/00200/1
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Dredge and disposal of Dredged MaterialsCommercial Dock and Navigable Channel, NOSES POINT (TY130)Seaham Harbour Dock Company30 Apr 201618 Feb 2021
MLA/2016/00202/1
Completed
Application - Other depositsMilford on Sea Beach RechargeMilford on Sea beach rechargeNew Forest District Council03 May 201621 Oct 2021
MLA/2016/00203/2
Completed
Application - Maintenance of existing worksNetwork Rail - Sellafield PitchingSellafield PitchingNetwork Rail Limited03 May 201615 Jun 2018
MLA/2016/00204/2
Completed
Application - SamplingSite Investigation at Nissan TerminalTyne Car Terminal RedevelopmentPort Of Tyne Authority04 May 201619 May 2017
MLA/2016/00205
Completed
Application - Maintenance of existing worksMillbank River Wall RepairsMillbank River Wall RepairsF.M. Conway Building And Maintenance Limited05 May 201614 Jun 2016
MLA/2016/00206
Completed
Application - Maintenance of existing worksGreater Gabbard Offshore Windfarm - Interarray Cable MaintenanceGreater Gabbard Offshore Wind FarmGreater Gabbard Offshore Winds Limited05 May 201630 Sep 2016
MLA/2016/00207/1
Completed
Application - Maintenance of existing worksOutfall repairs at Gunness and AlthorpeKeadby Outfall, Gunness OutfallSevern Trent Water Limited06 May 201605 Aug 2016
MLA/2016/00208/2
Completed
Application - Other removalsThe Salvage & recovery of remaining cargo from shipwrecks Alpha 1 to 6Flagship Marine Management Limited08 May 201628 Oct 2016
MLA/2016/00209/4
Completed
Application - Construction of new worksIFA2 Electricity InterconnectorNational Grid Ifa2 Ltd09 May 201613 Sep 2021
MLA/2016/00210/1
Completed
Application - Maintenance of existing worksCBC1 Br141 Eskmeals ViaductEskmeals viaductStory Contracting Limited10 May 201627 Sep 2017
MLA/2016/00211
Completed
Application - Other depositsIsle of Man to UK Interconnector Cable - Maintenance and RepairIOM Cable Route 1000m BufferManx Cable Company Limited11 May 201609 Aug 2018
MLA/2016/00212
Completed
Application - Maintenance of existing worksHeybridge Sea Lock Gate Replacement (Phase 2)Heybridge Sea Lock Gate ReplacementEssex & Suffolk Water11 May 201608 Aug 2016
MLA/2016/00214
Completed
Application - Construction of new worksTerminal Groyne Reconstruction, Cleethorpes.Terminal_Groyne_Site_AreaNorth East Lincolnshire Council13 May 201612 May 2017
MLA/2016/00215
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Mercury Yacht Harbour Grouped under: MDL Marinas Showing 2 of 3 casesMercury Yacht Harbour - Dredge Area (limits), NAB TOWER (WI060), HURST FORT (WI080), NEEDLES (WI090)Marina Developments Limited13 May 201614 Oct 2016
MLA/2016/00216/1
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Hamble Point Marina - Maintenance Dredging Grouped under: MDL Marinas Showing 2 of 3 casesHamble Point Marina - Dredge Area (limits), NAB TOWER (WI060), HURST FORT (WI080), NEEDLES (WI090)Marina Developments Limited13 May 201616 Aug 2017
MLA/2016/00219
Completed
Application - Construction of new worksInstallation of 2 steel piles and a timber mooring grid for a new mooring for a residential boat in the River Thames, including extracting an existing steel pile and levelling the existing campshed.Vertrouwen, The Hollows, Brentford TW8 0DZMorlandia Limited17 May 201620 Jan 2017
MLA/2016/00221
Completed
Application - Construction of new worksHumber Wind Farm Turbine Export Cable ClampsHumber Gateway Turbines J02, A10, B06 and D05E.On Climate & Renewables Uk Humber Wind Limited18 May 201611 Jul 2016
MLA/2016/00222/1
Completed
Application - Decommissioning of worksRemoval of some of the redundant structures at Phoenix Wharf, Rainham, EssexPhoenix WharfShanks Waste Management Limited18 May 201628 Feb 2019
MLA/2016/00224/3
Completed
Application - Maintenance of existing works, Navigational dredging (maintenance), Other removalsOrmonde Offshore Wind Farm O&M Marine LicenceOrmonde Offshore Wind Farm, Ormonde Pontoon Working AreaOrmonde Energy Limited19 May 201625 Jan 2024
MLA/2016/00225/1
Completed
Application - Construction of new works, Maintenance of existing works, Other dredgingGarston North Dock - Infilled entrance wall repairsInner Dock Wall, Outer Dock WallAssociated British Ports Holdings Limited19 May 201618 Aug 2016
MLA/2016/00226
Completed
Application - Maintenance of existing worksThamesmead - Gallions Reach River Wall RepairsGallions Reach LineTilfen Land19 May 201605 Jul 2016
MLA/2016/00227
Completed
Application - Aggregate dredgingGoodwin Sands Aggregate Dredging SchemeProposed Dredge AreaDover Harbour Board19 May 201626 Jul 2018
MLA/2016/00228
Completed
Application - Construction of new worksGreenodd Wastewater Pumping Station Temporary DewateringGreenodd Wastewater Pumping Station Dewatering AreaUnited Utilities Water Plc20 May 201603 Aug 2016
MLA/2016/00231
Completed
Application - Construction of new worksSheerness PipelineSheerness Port PipelineEcocem Ltd23 May 201607 Dec 2016
MLA/2016/00232
Completed
Application - Other removals, Other worksRepairs to landslip, Creek House, Restronguet Passagecreek house land slipSouth Western Mining & Tunnelling Ltd23 May 201627 Jun 2016
MLA/2016/00233
Completed
Application - Maintenance of existing worksPenketh Brook outfall refurbishmentPenketh Brook outfallEnvironment Agency23 May 201609 Aug 2016
MLA/2016/00234/4
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance), Other removalsMaintenance Dredge, Disposal at Sea and Removal of TBT, Neptune QuayNeptune Quay Current Dredge Pocket, SOUTER POINT (OUTER) (TY081), NORTH TYNE (TY070)Shepherd Offshore Ltd23 May 201621 May 2020
MLA/2016/00235
Completed
Application - Other dredgingRNLI Skegness - Emergency Works Application for Beach Re-ProfilingRNLI Skegness - Lifeboat Launch RouteRnli24 May 201625 May 2016
MLA/2016/00237/1
Completed
Application - Other worksWandle River Wall SI WorksWandle Weir River WallKumar Associates25 May 201615 Aug 2016
MLA/2016/00238
Completed
Application - Maintenance of existing worksBellot Memorial River Wall Repair WorksBellot Memorial River WallGreenwich Hospital25 May 201621 Dec 2016
MLA/2016/00239/1
Completed
Application - Construction of new worksReplacement downstream berth + accompanying demolition & removal works at the C.RO Ports Purfleet TerminalC.RO Ports Purfleet berthsPurfleet Real Estate Limited25 May 201611 Feb 2020
MLA/2016/00240
Completed
Application - Other depositsRiver Wall Protection of Exposed FootingsRiver Wall, Old Royal Naval CollegeThe Greenwich Foundation For The Old Royal Naval College26 May 201613 Oct 2016
MLA/2016/00241
Completed
Application - Maintenance of existing worksImperial Wharf, Gravesend, Cathodic Protection installationImperial Wharf, GravesendF M Conway Limited26 May 201621 Jun 2016
MLA/2016/00242/1
Completed
Application - Maintenance of existing worksMillennium Quay River Wall Repair WorksGlaisher Street, London. SE8 3EP.Knights Brown Construction Ltd26 May 201631 Oct 2017
MLA/2016/00243
Completed
Application - Maintenance of existing worksB110 Bridge 600m South of Yarmouth Mill - Deck ReplacementB110 BridgeRingway Island Roads Limited26 May 201623 May 2017
MLA/2016/00244
Completed
Application - Maintenance of existing worksInstallation of sea plug, into cooling water outfall, at Heysham B Power Station, and subsequent removalMiddleton Sands, around Red NabEdf Energy Nuclear Generation Limited26 May 201618 Jul 2016
MLA/2016/00245/1
Completed
Application - Maintenance of existing worksGunfleet Sands Offshore Wind Farm (OWF) Export Cable Repair and Remediation Grouped under: Gunfleet Sands OWF 1, 2, 3 Showing 4 of 15 casesGunfleet Sands OWF export cable corridorTc Gunfleet Sands Ofto Limited27 May 201614 Jul 2017
MLA/2016/00246/2
Completed
Application - Other dredging, Other works, Wrecks and other archaeological remainsDLR5461: Removal of the River Wandle Half Tide WeirRiver Wandle Half-Tide Weir Removal, Dredged AreaWandsworth Borough Council31 May 201613 Apr 2017
MLA/2016/00247
Completed
Application - Construction of new worksNew timber slipway (16mx2.4m approx.) on the foreshore adjacent Dolphin CottageSlipwayPamber Place Ltd01 Jun 201607 Jul 2016
MLA/2016/00248
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Paul Williams Independent Funeral Directors01 Jun 201609 Jun 2016
MLA/2016/00249
Completed
Application - SamplingLost Frontiers - DNA of North SeaCore1, Core2University Of St Andrews02 Jun 201611 Aug 2016
MLA/2016/00250/6
Completed
Application - Maintenance of existing works, Other deposits, Other dredging, Other worksHartlepool Nuclear Power Station - Routine Maintenance Activities LicenceHartlepool Power Station Intake location, Hartlepool Power Station Drumscreen and Forebay areasEdf Energy Nuclear Generation Limited03 Jun 201608 May 2024
MLA/2016/00251
Completed
Application - Construction of new works, Other depositsToe End Beach Stabilisation Scheme and future beach maintenanceRock armour, groyne replacement and timber wall, Beach maintenance areaMr John Bunn03 Jun 201623 Jan 2017
MLA/2016/00252
Completed
Application - Construction of new worksNewhaven Construction Base - new pontoon at RoRo2 BerthRo Ro 2E.On Climate & Renewables Uk Rampion Offshore Wind Limited06 Jun 201627 Jul 2016
MLA/2016/00254
Completed
Application - Maintenance of existing worksCreswell SO1Creswell SO1Northumbrian Water Limited07 Jun 201611 Aug 2016
MLA/2016/00255/2
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Haslar Marina Maintenance DredgeNAB TOWER (WI060), HURST FORT (WI080)Dean & Reddyhoff Limited08 Jun 201630 Jun 2017
MLA/2016/00256/1
Completed
Application - Construction of new worksGreatham South - NE SABIC Embankment Grouped under: Greatham Flood Alleviation Scheme Showing 2 of 4 casesMMO_Outline_1, MMO_Outline_2Environment Agency Leeds08 Jun 201626 Jul 2018
MLA/2016/00257
Completed
Application - Other worksTEIGNMOUTH SANDBANKTeignmouth Beach, Lifeboat LaneMr Greg Allen09 Jun 201610 Jun 2016
MLA/2016/00258
Completed
Application - Construction of new works, Maintenance of existing worksRuncorn ViaductRuncorn Viaduct Scaffold locationBuckingham Group Contracting Limited10 Jun 201614 Jul 2016
MLA/2016/00259/2
Completed
Application - Maintenance of existing worksNetwork Rail - Parton to Harrington Sea Walls No.2 & No.3Parton to Harrington Sea Wall No.2, Parton to Harrington Sea Wall No.3Network Rail Limited10 Jun 201607 Feb 2018
MLA/2016/00260/1
Completed
Application - Other depositsArtificial reef created with Reefball structures within Torbay's Harbour AuthorityARC-Marine Torbay Reef SiteArc-Marine Ltd13 Jun 201608 Jan 2018
MLA/2016/00261
Completed
Application - Maintenance of existing worksRenewal of Pontoon KPontoon KKemps Shipyard Limited13 Jun 201614 Feb 2017
MLA/2016/00262
Completed
Application - Construction of new worksThe Point, Teignmouth - Coastal Defence Wall ReplacementThe Point, Teignmouth - Coastal Defence Wall ReplacementTeignbridge District Council13 Jun 201613 Oct 2016
MLA/2016/00263/2
Completed
Application - Other dredgingSmall Scale Subsea Plough TrialsFiley SiteEngineering Technology Applications Limited14 Jun 201607 Feb 2017
MLA/2016/00265
Completed
Application - Maintenance of existing worksrefubishment to falmouth Tourist information centreFalmouth Tourist Information CentreCormac Solutions Ltd17 Jun 201601 Dec 2016
MLA/2016/00269/1
Completed
Application - Construction of new worksHollicombe Cliffs Rock Armour Revetment SchemeHollicombe_rock_armour_area_MMOTorbay Council22 Jun 201608 Mar 2017
MLA/2016/00270
Completed
Application - Construction of new worksLand at Caldecott Road Oulton BroadLand at Caldecott Road Oulton BroadBadger Building (E.Anglia) Limited22 Jun 201605 Dec 2016
MLA/2016/00271
Completed
Application - Other worksInstallation of Submersible flowmeter on exisitng River Water intake pipesJurgens JettyPura Foods Limited22 Jun 201628 Sep 2017
MLA/2016/00273
Completed
Application - Construction of new worksBeacon of Light Outfall into the River Wear, SunderlandBoL Surface Water OutfallThe Beacon Of Light Limited23 Jun 201628 Oct 2016
MLA/2016/00274
Completed
Application - Other depositsHill Head Coastal Protection Project: Phase 1b Beach RechargeHill Head Beach Recharge 1Eastern Solent Coastal Partnership23 Jun 201618 Aug 2016
MLA/2016/00275/3
Completed
Application - Maintenance of existing worksGreater Gabbard Offshore Wind Farm - Operations and MaintenanceGreater Gabbard Offshore Wind Farm ArrayGreater Gabbard Offshore Wind Limited23 Jun 201625 Jan 2021
MLA/2016/00276
Completed
Application - Maintenance of existing worksSouth West Water - Salcombe Harbour HotelSewer ReplacementSouth West Water Limited24 Jun 201623 Sep 2016
MLA/2016/00278
Completed
Application - Construction of new worksRampion O&M Facility - Newhaven Grouped under: Rampion Offshore Wind Farm Showing 4 of 13 casesRampion O&ME.On Climate & Renewables Uk Rampion Offshore Wind Limited26 Jun 201601 Dec 2016
MLA/2016/00279/2
Completed
Application - Construction of new worksBoat LiftSite 1Amble Marina Limited27 Jun 201615 Aug 2017
MLA/2016/00280
Withdrawn
Application - Construction of new works, Maintenance of existing worksRadipole Pumping Station CSO improvement worksWessex Water Services Limited28 Jun 2016
MLA/2016/00281/1
Completed
Application - Maintenance of existing works, Other removalsRoutine maintenance, inspection and testing at Heysham 2 power stationLocation 1: Cooling water intake, Location 2: Cooling water discharge structure (surge chamber and shaft), Location 3: Marine Outfall, Location 4: Main surface water drain outfallEdf Energy Nuclear Generation Limited28 Jun 201628 Aug 2019
MLA/2016/00282/1
Completed
Application - Maintenance of existing worksNewton Ferrers SalineWorking Area 1, Working Area 2, Working Area 3South West Water Limited29 Jun 201606 Dec 2016
MLA/2016/00283
Completed
Application - Maintenance of existing worksWorks to Slipway at Tide End TR11 5LJTide End Trenarth Bridge Mawnan Smith Falmouth Cornwall TR11 5LJMr Stuart Powell29 Jun 201630 Aug 2016
MLA/2016/00284/1
Completed
Application - Decommissioning of worksDemolition of Pier and Brow known as Blackwall Pier, 1 Paul Julias Close, Blackwall way, London, E142EH. Marine Location, Bugsby Reach, River Thames, London.Blackwall PierMedtow Marine Limited30 Jun 201601 Mar 2017
MLA/2016/00285
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mr Charles Lister30 Jun 201614 Jul 2016
MLA/2016/00286
Completed
Application - Construction of new worksGrimsby Slipways New SlipwayNew Grimsby SlipwayGrimsby Fish Dock Enterprises Limited30 Jun 201629 Jul 2016
MLA/2016/00287
Completed
Application - Maintenance of existing worksSWW - Lanhydrock Road outfall maintenanceSurface Water Outfall MaintenanceSouth West Water Limited01 Jul 201629 Jul 2016
MLA/2016/00289
Completed
Application - Maintenance of existing worksRiver wall reconstruction 26-37 Clive Street North ShieldsSiteSouthbay Civil Engineering Limited04 Jul 201611 Oct 2016
MLA/2016/00290/1
Completed
Application - Navigational dredging (maintenance)Hanson Purfleet Jetty Maintenance DredgingHanson Aggregates Purfleet JettyHanson Quarry Products Europe Limited04 Jul 201615 Dec 2016
MLA/2016/00292
Completed
Application - Construction of new works, Other worksWoolwich Royal Arsenal Pier River TransportPiles areaThe Royal Borough Of Greenwich06 Jul 201604 Jan 2017
MLA/2016/00293
Completed
Application - Other depositsBeach Recharge, Eastoke Point, Hayling Island Coastal Defence WorksBeach_Recharge_HIHavant Borough Council06 Jul 201623 Dec 2016
MLA/2016/00294
Completed
Application - Maintenance of existing worksMaintenance and repainting of Fremington Viaduct steel deckFremington ViaductDevon County Council07 Jul 201629 Jul 2016
MLA/2016/00295
Completed
Application - Maintenance of existing worksShaldon Bridge lifting span re-painting worksShaldon Bridge lifting spanDevon County Council07 Jul 201612 Aug 2016
MLA/2016/00297/1
Completed
Application - Decommissioning of worksPomphlett Marine Loading Jetty, Plymouth, PL9-7HJ. Due to structural degradation of the facility it is proposed that it is dismantled.Pomphlett Marine Aggregate Loading ConveyorAggregate Industries Uk Ltd08 Jul 201620 Oct 2016
MLA/2016/00298/3
Completed
Application - Construction of new worksPlacement of piles to support pontoonArea encompassing piles, pontoons and access bridgeGweek Quay Limited12 Jul 201619 Sep 2018
MLA/2016/00300/1
Completed
Application - Construction of new worksED3, 8 and 9 Berth Deck to Deck Access Safety ImprovementsED3 Berth, ED8 Berth, ED9 BerthDover Harbour Board13 Jul 201608 Mar 2017
MLA/2016/00301
Completed
Application - SamplingKingston Marine Park Site InvestigationsRiver Medina - Kingston Marine Park Site Investigation BoundaryHomes And Communities Agency13 Jul 201604 Aug 2016
MLA/2016/00302
Completed
Application - Other removalsQinetiQ Site at St Thomas’ Head Kewstoke near Weston Super MareSt Thomas’ Head Kewstoke - Removal of trials frames and cable trays, St Thomas’ Head Kewstoke - Removal of pierQinetiq Group Plc13 Jul 201622 Dec 2016
MLA/2016/00303
Completed
Application - Construction of new worksMalojo Boat HouseSlipway at Malojo, Restronguet PointFrewfix Ltd14 Jul 201602 Dec 2016
MLA/2016/00304
Completed
Application - Construction of new worksBells and Mocketts Pumping StationBells and Mocketts Pumping StationMedway Internal Drainage Board19 Jul 201630 Jan 2017
MLA/2016/00305/1
Completed
Application - Construction of new works, Decommissioning of worksRunswick Bay Sewer Diversion facilitating sea defencesSewer ReplacementYorkshire Water Services Limited19 Jul 201615 Mar 2017
MLA/2016/00307
Completed
Application - Construction of new works, Maintenance of existing works, Other worksRenovations and extension the Sail Loft, Whitford Yard, Fowey.Whitford boat yardPhil Chapman Construction21 Jul 201601 Sep 2016
MLA/2016/00308
Completed
Application - Construction of new worksConcrete step blocks over 7 No. reconstructed timber groynes at Withernsea - 2016Groyne 13, Groyne 12, Groyne 11, Groyne 10, Groyne 9, Groyne 4, Groyne 3East Riding Of Yorkshire Council21 Jul 201626 Apr 2017
MLA/2016/00309
Completed
Application - Construction of new worksLong Rock Sea Wall Rock Armour Protection WorksRock ArmourCormac Solutions Ltd21 Jul 201623 May 2017
MLA/2016/00310
Completed
Application - Maintenance of existing worksQS06-07 R1052 Sandsend Beck Crossing and Associated WorksSandsend BeckYorkshire Water Services Ltd21 Jul 201614 Oct 2016
MLA/2016/00311
Completed
Application - Other depositsBrightlingsea Harbour Commissioners, Retaining Structure Site TrialMorgan's Marina, Town HardBrightlingsea Harbour Commissioners22 Jul 201618 Oct 2016
MLA/2016/00312/6
Completed
Application - Other removalsGround investigation (GI) works at Hinkley Point C to inform seawall design and buildHistoric Dry Dock, HPA Sea WallNnb Generation Company (Hpc) Limited22 Jul 201629 Mar 2018
MLA/2016/00313
Completed
Application - Maintenance of existing worksRepair of storm damaged piers to existing boathouse. Work to include the temporary removal of the super-structure, storage on site & subsequent rebuilding.BoathouseMr Nigel Chaplin25 Jul 201615 Aug 2016
MLA/2016/00315
Completed
Application - Incineration of any substance or object at sea, Maintenance of existing works, Other deposits, Other removalsFAB LinkUK Cable CorridorFab Link27 Jul 201615 Dec 2017
MLA/2016/00316
Completed
Application - Maintenance of existing worksArrowhead QuayArrowhead QuayEco World-Ballymore Arrowhead Quay Company Limited27 Jul 201623 Aug 2016
MLA/2016/00317/2
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Liverpool Channel and River disposal licenseMersey Approach Channel, Eastham Channel, River Mersey, Jetties and Cammell Lairds, MERSEY OF BROMBOROUGH2 (IS128), MERSEY (MID-RIVER SITE) (IS120), SITE Z (IS140)The Mersey Docks And Harbour Company Limited27 Jul 201613 May 2019
MLA/2016/00318
Completed
Application - Construction of new worksLadder for Kings Wharf O&M site (Burbo Bank Wind Farms)Ladder Installation AreaDong Energy Burbo Extension Holding Ltd28 Jul 201623 Sep 2016
MLA/2016/00319
Completed
Application - Maintenance of existing worksSouth West Water - Ship Inn, Noss MayoShip Inn, Noss Mayo (updated)South West Water Limited01 Aug 201619 Oct 2016
MLA/2016/00321
Completed
Application - Other worksSculptural InstallationRossall BeachInvisible Flock02 Aug 201614 Sep 2016
MLA/2016/00322
Completed
Application - Maintenance of existing worksPeruvian Wharf - Jetty and River Wall WorksPeruvian WharfBrett Aggregates Limited02 Aug 201617 Sep 2018
MLA/2016/00323
Completed
Application - Other removalsTurners Cove SluiceTurners Cove SluiceEnvironment Agency - South West Region03 Aug 201623 Aug 2016
MLA/2016/00324
Withdrawn
Application - Other depositsBurbo Bank Extension Mattress RemediationDong Energy Burbo Extension (Uk) Ltd03 Aug 2016
MLA/2016/00326
Completed
Application - Other dredgingGreat Ouse Tidal River Water Injection Dredging Pilot ProjectStowbridge Silt BankEnvironment Agency04 Aug 201626 Jan 2018
MLA/2016/00327/2
Completed
Application - Other worksTideway Trenching Trial WorksZone Alpha, Zone BravoHeron Wind Limited04 Aug 201607 Apr 2017
MLA/2016/00329
Completed
Application - Maintenance of existing worksHopton Groyne 6 ModificationHopton Groyne 6Mr Alastair Tindle04 Aug 201617 Aug 2017
MLA/2016/00330/1
Completed
Application - Maintenance of existing worksTrig Lane Flood defecne wall brick and concrete reapirs to match existingSite 1City Of London05 Aug 201602 Nov 2017
MLA/2016/00331/1
Completed
Application - Construction of new works, Other worksEnderby Wharf - Stormwater OutfallEnderby Wharf - Stormwater OutfallEnderby Wharf Llp08 Aug 201623 May 2018
MLA/2016/00332
Completed
Application - Maintenance of existing worksTrinity Pier, MillbayTrinity PierHomes And Communities Agency08 Aug 201602 Nov 2016
MLA/2016/00334/2
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Plymouth Yacht Haven - Maintenance DredgingPlymouth Yacht Haven, Plymouth Deep (PL035)Plymouth Yacht Haven Limited09 Aug 201622 Aug 2018
MLA/2016/00335/2
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Yacht Haven Quay - Maintenance DredgingYacht Haven Quay, Plymouth Deep (PL035)Yacht Haven Quay Limited09 Aug 201614 Sep 2018
MLA/2016/00336/1
Completed
Application - Construction of new works, Other removalsYarmouth Pier - Phase 2 Repair WorksYarmouth PierThe Yarmouth (Isle Of Wight) Harbour Commissioners10 Aug 201605 Dec 2017
MLA/2016/00337/1
Completed
Application - Construction of new worksTorcross Sea Wall Emergency Works, DevonTorcross Sea DefenceEnvironment Agency – South West Reg11 Aug 201628 Nov 2016
MLA/2016/00338
Completed
Application - Construction of new worksNew Slipway at New Grimsby, Tresco, Isles of ScillyNew Slipway, New Grimsby, TrescoSymons Construction11 Aug 201620 Jan 2017
MLA/2016/00339
Completed
Application - Maintenance of existing worksGreenwich River Wall WorksGreenwich River WallRsk Environment Limited12 Aug 201629 Sep 2016
MLA/2016/00341/3
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)BP Oil UK Ltd - Hamble jetty and approaches Maintenance DredgingMagenta boundary, Blue boundary, Green area (emergency tugs), NAB TOWER (WI060)Bp Oil (Uk) Ltd15 Aug 201629 Sep 2017
MLA/2016/00342/2
Completed
Application - Construction of new worksWalney Extension Offshore Wind Farm Operations and Maintenance (O&M) FacilitiesLead-in Jetty, No 1 BerthDong Energy Walney Extension (Uk) Ltd15 Aug 201624 Aug 2017
MLA/2016/00344
Completed
Application - Incineration of any substance or object at sea, Other worksLondon 1666River Thames, 1666 LoadingArtichoke Trust16 Aug 201631 Aug 2016
MLA/2016/00345
Completed
Application - Maintenance of existing worksRiver Quay Repairs, Electra Business ParkElectra Quay Business ParkF M Conway Limited17 Aug 201618 Oct 2016
MLA/2016/00346
Completed
Application - Maintenance of existing worksProposed sea defence repairs at East ChidhamSite 1Ms Diana Beale18 Aug 201628 Sep 2016
MLA/2016/00347/2
Completed
Application - Maintenance of existing worksComponent Exchange (Main Bearing)Sheringham Shoal Wind FarmScira Offshore Energy Limited18 Aug 201616 Mar 2017
MLA/2016/00350
Completed
Application - Maintenance of existing works, Other removalsGrays BeachGrays BeachAnglian Water Services Ltd19 Aug 201628 Sep 2016
MLA/2016/00351
Completed
Application - Other depositsBurial at sea of ashesMiss Denise Richards19 Aug 201602 Sep 2016
MLA/2016/00352
Completed
Application - Maintenance of existing worksTeesside Offshore Wind Farm LtdTeesside Offshore Wind FarmTeesside Windfarm Limited19 Aug 201621 Sep 2016
MLA/2016/00353
Completed
Application - Maintenance of existing worksMasthouse Terrace Pier repairsMasthouse Terrace Pier, end of Napier Avenue, E14 3QECanal & River Trust19 Aug 201607 Dec 2016
MLA/2016/00354/1
Completed
Application - Maintenance of existing worksPlaidy CSO Outfall concrete repairs Grouped under: Plaidy CSO Outfall concrete repairs Showing 2 of 2 casesPlaidy CSO OutfallSouth West Water Limited22 Aug 201629 Dec 2016
MLA/2016/00355/5
Completed
Application - Disposal of dredged materialKendalls wharf aggregate washings silt disposalNAB TOWER (WI060)Aggregate Industries Uk Limited23 Aug 201627 Mar 2024
MLA/2016/00356
Completed
Application - Maintenance of existing worksSeathorne Promenade seawall foundation strengthening worksSeathorne foundation worksEast Riding Of Yorkshire Council23 Aug 201630 May 2017
MLA/2016/00357/3
Completed
Application - Navigational dredging (capital)Peruvian Wharf - Capital Dredge Works for Berthing PocketThames SeabedBrett Aggregates Limited24 Aug 201610 Aug 2018
MLA/2016/00358
Completed
Application - Construction of new worksDevelopment of Standard WharfStandard Warf Ltd25 Aug 201612 Oct 2016
MLA/2016/00359/1
Completed
Application - Maintenance of existing worksSteamer Quay flood defence repairsSteamerQuay_WallRepairsEnvironment Agency25 Aug 201624 Mar 2017
MLA/2016/00360
Completed
Application - Maintenance of existing worksWestermost Rough Offshore Wind Farm Export Cable Repair and RemediationWMR_exportcableTc Westermost Rough Ofto Limited26 Aug 201617 Mar 2017
MLA/2016/00361
Completed
Application - Alternative use of dredged materialBeach Management Plan : Selsey Shingle RechargeRecharge AreaChichester District Council26 Aug 201604 Nov 2016
MLA/2016/00362/7
Completed
Application - Alternative use of dredged material, Navigational dredging (maintenance)Dredging and Restoration of Brightlingsea HarbourBrightlingsea Dredging and Restoration, Restoration site 1 Borrow pits, Restoration site 2 Borrow pits, Restoration site 3 Borrow pits, Restoration site 4 Borrow pits, Restoration site 5 Borrow pits, Restoration site 6 Borrow pits, Restoration site 7 Borrow pits, restoration site 8 Borrow pits, restoration site 9 Borrow pits, Restoration site 10 Borrow pits, Restoration site 11 Borrow pits, Restoration site 12 Borrow pits, Restoration site 13 Borrow pits, Restoration site 14 Borrow pits, Restoration site 15 Borrow pits, Restoration site 16 Borrow pits, Restoration site 17 Borrow pits, Restoration site 18 Borrow pits, Restoration site 19 Borrow pits, Restoration site 20 Borrow pits, Restoration site 21 Borrow pits, Restoration site 22 Borrow pits, Restoration site Howlands, Restoration Site Howlands East, Restoration Site Howlands West, Restoration Site Cinderyeast West Point, Restoration Site CW Eastpoint, Restoration Site CW Northsite, Site Restoration CW WestpointBrightlingsea Harbour Commissioners30 Aug 201601 Feb 2022
MLA/2016/00363
Completed
Application - Construction of new worksLand Adjacent to Whitestrand car park, Fore Street, Salcombe, DevonSouth Hams District Council31 Aug 201617 Jan 2017
MLA/2016/00365
Completed
Application - Construction of new worksStone facing of a sea wallTregenver wall claddingJohn Coombs04 Sep 201605 Oct 2016
MLA/2016/00366/1
Completed
Application - Construction of new worksBlyth Offshore Wind Demonstrator Project Seabed Preparation and Scour Protection Works (Array 2)Blyth Offshore Demonstrator Array 2Blyth Offshore Demonstrator Limited06 Sep 201627 Jun 2017
MLA/2016/00367
Completed
Application - Maintenance of existing worksChilton Trinity STW Outfall - Flap Valve ReplacementChilton Trinity STW OutfallMr Craig Ryder07 Sep 201603 Oct 2016
MLA/2016/00368
Completed
Application - Construction of new worksPontoon attached to seawall at Salcombe Harbour Hotel, Salcombe Estuary, DevonPontoon location Salcombe Harbour HotelSalcombe Harbour Hotel Limited07 Sep 201620 Mar 2017
MLA/2016/00369
Completed
Application - Construction of new worksThe Deckhouse Brow PileThe Deckhouse Brow support pileRay Stewart08 Sep 201607 Oct 2016
MLA/2016/00370
Completed
Application - Maintenance of existing worksadd additional pile (pontoon C extension)Installation of 1 No. pile to existing pontoon C extensionPontoon Berth Holders Two08 Sep 201613 Sep 2016
MLA/2016/00371
Completed
Application - Navigational dredging (maintenance)West of Duddon Sands Pontoon Dredging Marine LicenceWest of Duddon Sands Offshore Wind Farm Pontoon areaDong Energy West Of Duddon Sands09 Sep 201615 Mar 2018
MLA/2016/00372/2
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Dredging Exmouth MarinaExmouth MarinaExmouth Marina Ltd10 Sep 201610 Sep 2020
MLA/2016/00373
Completed
Application - Maintenance of existing worksBRAEMAR QUAY REPAIRS NOSS MAYOBRAEMAR QUAY REPAIRS NOSS MAYOPolawn Bay Limited11 Sep 201626 Oct 2016
MLA/2016/00374
Completed
Application - Construction of new worksAlteration to hamble mooring L01-02between piles LO1 to LO2 in the hamble riverMr James Youngman11 Sep 201623 Jan 2017
MLA/2016/00375
Completed
Application - Construction of new worksRNLI Station Fowey, CornwallR.N.L.I. (Trading) Limited13 Sep 201601 Nov 2016
MLA/2016/00376
Completed
Application - Other removalsChilling - Removal of Derelict Outfall PipeLocation of Chilling OutfallNjp Environmental13 Sep 201617 Jan 2017
MLA/2016/00377
Completed
Application - Construction of new worksCRL PenzanceCRL Wharf Road, PenzanceChurchill Retirement Living Limited15 Sep 201624 Nov 2016
MLA/2016/00378
Withdrawn
Application - Construction of new worksMarine Terminal for importing cement at Frog Island, River Thames.S.Walsh & Sons Ltd16 Sep 2016
MLA/2016/00379
Completed
Application - Maintenance of existing worksRiver Wall repairCharltonCory Riverside Ltd19 Sep 201601 Feb 2017
MLA/2016/00380
Completed
Application - Maintenance of existing worksFolkestone Harbour temporary works to enable maintenance works to viaduct and swing bridgeFolkestone Harbour Viaduct and Swing BridgeFolkestone Harbour (Gp) Limited19 Sep 201607 Oct 2016
MLA/2016/00381/1
Completed
Application - Construction of new worksGosport Oil Fuel DepotGroundwater Migration Barrier, Pipe BridgeDefence Infrastructure Organisation20 Sep 201603 Oct 2018
MLA/2016/00382
Completed
Application - Other worksCalshot pontoon replacementCalshot PontoonHampshire County Council20 Sep 201609 Dec 2016
MLA/2016/00383/2
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Medway Approach Channel Maintenance LicenseSOUTH FALLS (TH070), INNER GABBARD (TH052), MAC ExtentPort Of Sheerness Limited20 Sep 201629 Mar 2023
MLA/2016/00384
Completed
Application - Construction of new worksOutfall and Scour ProtectionSugar QuayBarratt London20 Sep 201607 Feb 2017
MLA/2016/00385
Completed
Application - Construction of new worksFulham WharfFulham Wharf River WallBdw Trading Limited21 Sep 201615 Mar 2017
MLA/2016/00386/2
Completed
Application - Construction of new works, Disposal of dredged materialMersea Harbour and Tollesbury Wick Climate Change Adaptation Recharge ProjectPacking Marsh north, Packing_Marsh_Island, Cobmarsh_Island, Old_Hall, Tollesbury_Wick, Cobmarsh north-westThe Mersea Harbour Protection Trust21 Sep 201621 Jun 2021
MLA/2016/00387
Completed
Application - Maintenance of existing worksRNLI Barrow - Emergency Works Application for Slipway Grating RepairsRNLI Barrow: Boathouse, Slipway and Access JettyRoyal National Lifeboat Institution22 Sep 201630 Sep 2016
MLA/2016/00388/1
Completed
Application - Construction of new worksArun Sailing Club Dinghy Pen River WallArun Sailing ClubArun Sailing Club22 Sep 201613 Oct 2017
MLA/2016/00389
Completed
Application - Maintenance of existing worksCremyll View Mount Edgcumbe Sea Wall RepairMount Edgcumbe, Toll House Quay, Lower Lodge, Garden BatteryCormac Solutions Ltd22 Sep 201624 Feb 2017
MLA/2016/00390
Completed
Application - Wrecks and other archaeological remainsRecovery of engine from P-47 Thunderbolt 42-75116Seabed off Tanners Lane, Boldre, Hampshire.Mr Richard Reeves22 Sep 201617 Mar 2017
MLA/2016/00391
Completed
Application - Maintenance of existing worksRNLI Western Super Mare - Emergency Licence for Mooring InspectionMooring location and area of mooring activityRoyal National Lifeboat Institution26 Sep 201628 Sep 2016
MLA/2016/00392
Completed
Application - Construction of new works, Maintenance of existing worksTrafalgar Wharf Dry Stack PontoonsPontoon A, Pontoon BTrafalgar Wharf Limited27 Sep 201606 Nov 2018
MLA/2016/00393
Completed
Application - Maintenance of existing worksRECONSTRUCTION OF ATLANTIC HOTEL CSO & MINOR REPAIRS TO OTHER OUTFALLSATLANTIC HOTEL CSO, MERMAID INN OUTFALL, OLD TOWN BAY OUTFALLCouncil Of The Isles Of Scilly27 Sep 201619 Dec 2016
MLA/2016/00395
Completed
Application - Maintenance of existing worksRNLI Amble - Low Impact Maintenance Works to Pontoon Berth & Wave Screen (Fast Track Licence)Amble Pontoon Berth & PenRoyal National Lifeboat Institution04 Oct 201603 Nov 2016
MLA/2016/00399
Completed
Application - Maintenance of existing worksFowey Sewer Rehabilitation - Caffa MillSewer RehabilitationSouth West Water Limited06 Oct 201612 Jan 2017
MLA/2016/00400/1
Completed
Application - Construction of new worksPlymouth Bathing Waters – Cattedown Surface Water Separation SchemeCattedown Surface Water Separation Outfall 1, Cattedown Surface Water Separation Outfall 2South West Water Limited06 Oct 201631 Mar 2017
MLA/2016/00401
Completed
Application - Construction of new works, Other removals, Other worksSlipway Repairs at Saqqara, Restronguet Point, Truro, TR3 6RBSaqqara Slipway, Restronguet Point, TR3 6RBMr William Brown07 Oct 201607 Dec 2016
MLA/2016/00403/1
Completed
Application - Disposal of dredged material, Navigational dredging (capital)Portsmouth International Port – Floating Dock Jetty Capital DredgePortsmouth -Floating Dock Jetty, Disposal Site - Nab Tower Disposal SitePortsmouth City Council07 Oct 201602 Dec 2016
MLA/2016/00404/1
Completed
Application - Disposal of dredged materialSpoil ground use Mounts BayMOUNTS BAY (PL100)Newlyn Pier & Harbour Commissioners10 Oct 201619 Oct 2017
MLA/2016/00405
Completed
Application - Maintenance of existing worksGerman Tunnel, Workington Slag BankGerman Tunnel, Workington Slag BankThomas Armstrong (Construction) Limited10 Oct 201613 Apr 2017
MLA/2016/00406
Completed
Application - Maintenance of existing worksBurbo Bank Offshore Wind Farm - O&M Marine Licence for Export Cable Repair/Remediation ActivitiesBBW01 Array and Export Cable BoundaryDong Energy Burbo (Uk) Limited10 Oct 201608 Mar 2018
MLA/2016/00407/2
Variation Requested
Application - Other depositsManagement of excess sand build up across the shoreline of West Wittering BeachWork areaWest Wittering Estate Plc11 Oct 201630 Jul 2024
MLA/2016/00408
Completed
Application - Maintenance of existing worksHinkley Point B Nuclear Power Station - routine marine activities licenceForebay, Drumscreen areas, HPB, Cooling Water Intake Caisson, Outfall, Seal Pit (Syphon recovery chamber)Edf Energy Nuclear Generation Limited11 Oct 201628 Nov 2016
MLA/2016/00409
Completed
Application - Navigational dredging (capital)Berth 1 WID Clearance Channel & Transit ApproachBerth 1, Oikos Terminal, Jetty 1 Transit ApproachOikos Storage Limited11 Oct 201608 Dec 2016
MLA/2016/00411
Completed
Application - Construction of new worksHamford Water, Walton-on-the-Naze | Surface Water Outfall HeadwallTaylor Wimpey Developments Limited12 Oct 201611 Jan 2017
MLA/2016/00412/2
Completed
Application - Maintenance of existing worksWeybourne - Refurbishment of unlighted Beacon/Support Structure (Local Aid to Navigation)Weybourne BeaconNorth Norfolk District Council14 Oct 201610 Oct 2018
MLA/2016/00413
Completed
Application - Construction of new worksTrial hole investigation for drainage outfall replacements at Rustington and Ferring, West SussexRustington, FerringOpus International Consultants (Uk) Limited14 Oct 201631 Oct 2016
MLA/2016/00414
Completed
Application - Navigational dredging (maintenance)Tollesbury Marina Spring 2017 Grouped under: Tollesbury Marina Showing 2 of 2 casesTollesbury MarinaTollesbury Marina Llp14 Oct 201628 Feb 2017
MLA/2016/00415/1
Completed
Application - Decommissioning of works, Maintenance of existing works#1 Coldharbour, Isle House wall remediation and foreshore protection works1 ColdharbourEnvironment Agency14 Oct 201605 May 2017
MLA/2016/00417/1
Completed
Application - Maintenance of existing worksYorkshire Water Services - Long term maintenance and repair marine licenceStaithes LSO CWO, Runswick Bay LSO CWO, Sandsend LSO CWO, Whitby LSO CWO, Robin Hoods Bay LSO CWO, Jacksons Bay CWO, Scalby Mills SPS SSO CWO, Scarborough STW LSO CWO, Corner Cafe CWO, Toll House CWO, Wheatcroft SSO CWO, Wheatcroft LSO CWO, Filey Brigg LSO CWO, Coble Landing CWO, Flamborough Village LSO CWO, Limekiln Lane CWO, Sands Lane Brid CWO, Bridlington SSO CWO, Hornsea SSO CWO, Belgrave CWO, Mappleton CWO, Withernsea LSO CWO, Bridlington LSO CWO, Hornsea Storm CWO, Hornsea LSO CWOYorkshire Water Services Limited17 Oct 201613 Nov 2017
MLA/2016/00418/1
Completed
Application - Construction of new worksPontoon Berth S88 Port SolentPort Solent MarinaMr Shane Dance18 Oct 201624 Oct 2017
MLA/2016/00419
Completed
Application - Other worksMussel mitigation - Drumscreen scaffold slidesSizewell B Power StationEdf Energy Nuclear Generation Limited20 Oct 201610 Nov 2016
MLA/2016/00420
Withdrawn
Application - Maintenance of existing worksReplacing Existing Piles for our Jetty with like for like as the existing Piles are very wasted at the bottomBarry Field20 Oct 2016
MLA/2016/00421
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Southampton Boat Show Maintenance DredgeNAB TOWER (WI060), HURST FORT (WI080), NEEDLES (WI090), Soton HarbourSouthampton International Boat Show Limited21 Oct 201627 Feb 2017
MLA/2016/00424
Completed
Application - Maintenance of existing worksBattery Rock Coastal AccessBattery Rocks Sea AccessCornwall Council21 Oct 201603 Jan 2017
MLA/2016/00425
Completed
Application - Construction of new worksPaull Sea DefenceNew Revetment, Earth bund heightening area 1East Riding Of Yorkshire Council21 Oct 201601 Jun 2017
MLA/2016/00426
Completed
Application - Maintenance of existing worksDrumscreen MaintenanceDrumscreensEdf Energy Nuclear Generation Limited24 Oct 201628 Oct 2016
MLA/2016/00427/1
Completed
Application - Construction of new worksScaffolding for Site Investigation works for proposed Shadwell Basin Outdoor Activity Centre SlipwayScaffold LocationVolker Stevin Limited24 Oct 201616 Dec 2016
MLA/2016/00428
Completed
Application - Maintenance of existing worksCourt Bridge Concrete RepairsCourt BridgeWest Sussex County Council25 Oct 201623 Nov 2016
MLA/2016/00429
Completed
Application - Maintenance of existing worksPoole Harbour (Holes Bay) Sea Defence Repairs Easter 2017Poole Harbour (Hole's Bay) Sea Defence Repairs Easter 2017Geoffrey Osborne Limited25 Oct 201601 Mar 2017
MLA/2016/00430/1
Completed
Application - Other depositsNational Grid Proposed Blyth Converter Station, Surface Water Outfallland south of the proposed converter station, to the east of East Sleekburn, NorthumberlandNational Grid Nsn Link Limited26 Oct 201620 Oct 2017
MLA/2016/00431
Completed
Application - Other worksFal River Floating CafeKing Harry Steam27 Oct 201604 Nov 2016
MLA/2016/00432
Completed
Application - Construction of new worksPontoon Installation at Lowestoft DocksLowestoft - Trawl DockGreater Gabbard Offshore Winds Limited27 Oct 201619 Jan 2017
MLA/2016/00433/5
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Maintenance Dredging at Kendalls WharfNAB TOWER (WI060), Kendalls WharfKendall Bros. (Portsmouth) Limited28 Oct 201617 Aug 2021
MLA/2016/00434/1
Completed
Application - Maintenance of existing worksMaldon 2 Tier Wall The GranariesMaldon two tier wall the granariesEnvironment Agency28 Oct 201621 Apr 2017
MLA/2016/00435
Completed
Application - Maintenance of existing worksRK Marine Pile ReplacementRK Marine PileR K Marine28 Oct 201618 Nov 2016
MLA/2016/00436/2
Completed
Application - Construction of new works, Other removals, Other worksNorth Portsea Island Flood and Coastal Erosion Scheme Phase 3 - Tipner LakePlanning_site_boundary2Portsmouth City Council28 Oct 201611 Sep 2018
MLA/2016/00437
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Beneficial Use Of Dredged Spoil, Blue Lagoon, Poole HarbourBlue Lagoon 1 (Wl12), Blue Lagoon 2 (Wl13), ChannelLilliput Sailing Club30 Oct 201621 Feb 2017
MLA/2016/00438/1
Completed
Application - SamplingSwan Hunter Steel Quay Ground InvestigationBorehole 1, Borehole 2, Borehole 3, Borehole 4, Borehole 5, Borehole 6North Tyneside Council01 Nov 201621 Aug 2017
MLA/2016/00439/1
Completed
Application - Maintenance of existing worksLindisfarne causeway ditchingHoly Island CausewayNorthumberland County Council03 Nov 201612 Dec 2016
MLA/2016/00440
Completed
Application - Navigational dredging (maintenance)Maintenance Water Injection Dredging of the Former Fawley Power StationSouthampton Water Seabed Site 1Fawley Waterside Limited03 Nov 201627 Jan 2017
MLA/2016/00441/2
Completed
Application - Construction of new worksFairhaven to Church Scar Coast Protection SchemeFairhaven to Church ScarFlyde Borough Council03 Nov 201620 Sep 2019
MLA/2016/00442/1
Completed
Application - Other removalsRemoving damaged sections from disused Southern Water outfall pipeline Grouped under: Rampion Offshore Wind Farm Showing 4 of 13 casesDisused Southern Water Pipe - damaged end of pipe 5 6, Disused Southern Water Pipe - damaged area 3 4, Disused Southern Water Pipe - damaged area 1 2E.On Climate & Renewables Uk Rampion Offshore Wind Limited04 Nov 201611 Apr 2017
MLA/2016/00443
Completed
Application - Maintenance of existing worksJetty repair and replacementJettyMulti Service Marine04 Nov 201602 Aug 2017
MLA/2016/00445/2
Completed
Application - Maintenance of existing worksBlue Transmission London Array Ltd. - Marine Licence for scour protection works at the London Array/BritNed CrossingBlue Transmission London Array Limited04 Nov 201615 Nov 2016
MLA/2016/00446/3
Variation Requested
Application - Clean-up dredging, Disposal of dredged materialCCYC Marina maintenance dredgeNAB TOWER (WI060), CCYC marinaCowes Corinthian Yacht Club Limited04 Nov 201620 Dec 2023
MLA/2016/00449
Completed
Application - Other removals, Sampling, Scientific instrumentsHermitage Steam WharfHermitage Steam WharfEnvironment Agency07 Nov 201622 Dec 2016
MLA/2016/00451/1
Completed
Application - Maintenance of existing worksMarsh Mills ResillienceMarsh MillsKier Limited08 Nov 201628 Apr 2017
MLA/2016/00453
Completed
Application - Construction of new worksNew Providence Wharf PierTransport For London11 Nov 201608 Mar 2019
MLA/2016/00454
Completed
Application - Other removals, Sampling, Scientific instruments46 Nine Elms Lane46 Nine Elms LaneEnvironment Agency11 Nov 201622 Dec 2016
MLA/2016/00455
Completed
Application - Construction of new worksGwelva Landing upgradeGwelva LandingNational Trust Plc11 Nov 201620 Feb 2017
MLA/2016/00456
Withdrawn
Application - Maintenance of existing worksNetwork Rail - Parton to Harrington Sea Wall No.5Network Rail Limited14 Nov 2016
MLA/2016/00457
Completed
Application - Other depositsBlyth Offshore Demonstrator – Temporary Deployment of Waverider BuoyWaverider Buoy LocationBlyth Offshore Demonstrator Limited15 Nov 201620 Dec 2016
MLA/2016/00458/1
Completed
Application - Construction of new works, Other removalsEast Face step extensionIlfracombe HarbourIlfracombe Harbour Authority15 Nov 201612 Apr 2017
MLA/2016/00460
Completed
Application - Construction of new worksKingsweir revetment repairsKingsweir revetment repairsTms Maritime Ltd16 Nov 201627 Mar 2017
MLA/2016/00461
Withdrawn
Application - Other worksFal River Floating CafeKing Harry Steam16 Nov 2016
MLA/2016/00462
Completed
Application - Construction of new worksFoxfield Water Main DiversionFoxfield Main Diversion Rev 3United Utilities17 Nov 201605 Jun 2017
MLA/2016/00463/1
Completed
Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital), Other removalsGalloper O&M Facility, HarwichINNER GABBARD EAST (TH056), Galloper O&M Facility Rev 1Galloper Wind Farm18 Nov 201611 Mar 2019
MLA/2016/00464
Completed
Application - Construction of new worksProposed pontoon Royal London Yacht ClubThe Parade CowesRoyal London Yacht Club18 Nov 201627 Apr 2017
MLA/2016/00465
Completed
Application - Construction of new worksShadwell Basin Outdoor Activity Centre SlipwayShadwell Slipway BoundaryShadwell Basin Outdoor Activity Centre18 Nov 201617 Feb 2017
MLA/2016/00466
Completed
Application - Construction of new worksRNLI Station Fowey, CornwallFowey RNLI stationR.N.L.I. (Trading) Limited21 Nov 201607 Dec 2016
MLA/2016/00467/1
Completed
Application - Maintenance of existing worksThe Causeway - maintenance ofOsea Island CausewayMr Nigel Frieda21 Nov 201613 Oct 2020
MLA/2016/00468
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mr Charles Lister21 Nov 201623 Nov 2016
MLA/2016/00469
Completed
Application - Maintenance of existing worksRNLI New Brighton - Repair to Damaged Recovery AnchorNew Brighton Recovery AnchorRnli21 Nov 201624 Nov 2016
MLA/2016/00471
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Emsworth Yacht Harbour Maintenance DredgeEmsworth Yacht Harbour, TRELOAR HOLE (WI046), NAB TOWER (WI060)Emsworth Yacht Harbour Limited24 Nov 201621 Feb 2017
MLA/2016/00472
Completed
Application - Maintenance of existing worksEmergency Repair Works to the North Shields Ferry LandingNorth Shields Ferry LandingNexus24 Nov 201625 Nov 2016
MLA/2016/00473
Completed
Application - Maintenance of existing worksEmergency stabilisation of existing coastal defence groyneCleveleys Groyne ZeroWyre Council24 Nov 201616 Jun 2017
MLA/2016/00474/2
Completed
Application - Construction of new works, Decommissioning of worksWirral Docks Bridges ReplacementTower Road BirkenheadMott Macdonald Limited24 Nov 201624 Jul 2017
MLA/2016/00475/2
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Maintenance Dredge Licence - Interterminals Tyneside Ocean Berth, River TyneNORTH TYNE (TY070), SOUTER POINT (OUTER) (TY081), Interterminals Tyneside Ltd - Ocean berthInter Terminals Tyneside Limited25 Nov 201631 Mar 2022
MLA/2016/00476/1
Completed
Application - Maintenance of existing worksBrownsea Castle Jetty RepairsBrownsea Castle JettyHurst Peirce & Malcolm Llp25 Nov 201608 Feb 2017
MLA/2016/00477
Completed
Application - Construction of new worksReplacement of removed jetty with walkway and pontoonsMrs Fay Class25 Nov 201626 Jan 2017
MLA/2016/00478/3
Completed
Application - Disposal of dredged material, Navigational dredging (capital)Dredging the Approach Channel to Lowestoft HarbourLOWESTOFT CIRCULAR NORTH (TH005), Lowestoft Approach ChannelAssociated British Ports.26 Nov 201611 Jun 2024
MLA/2016/00479/1
Completed
Application - Construction of new worksHMS Calliope PontoonsHMS CalliopeBgp Consulting Limited28 Nov 201628 Jun 2017
MLA/2016/00481
Completed
Application - Other depositsCarbon Capture and Storage experiments in carbon doixide leakage detection in a marine environmentLeakage siteFugro Geoconsulting Limited28 Nov 201603 Mar 2017
MLA/2016/00482/2
Completed
Application - Construction of new worksHamilton Dock, LowestoftHamilton DockAssociated British Ports.28 Nov 201619 Sep 2017
MLA/2016/00484
Completed
Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital), Navigational dredging (maintenance)RNSA - Alliance, Haslar Pontoon & HornetAlliance, Haslar Pontoon, Hornet, NAB TOWER (WI060), HURST FORT (WI080)Royal Naval Sailing Association29 Nov 201628 Apr 2017
MLA/2016/00485/1
Completed
Application - Maintenance of existing worksBlake Bridge, Bridgwater, Somerset.Blake Bridge, Bridgwater, SomersetWsp Limited30 Nov 201609 Jan 2019
MLA/2016/00486
Completed
Application - Maintenance of existing worksMEPR44 Goole Swing BridgeGoole Swing Bridge, River HumberAmalgamated Construction Ltd30 Nov 201622 May 2017
MLA/2016/00487
Completed
Application - Maintenance of existing worksPiling Works, Pontoon A, Emsworth Yacht HarbourEmsworth Yacht HarbourEmsworth Yacht Harbour Limited01 Dec 201628 Feb 2017
MLA/2016/00490
Completed
Application - Construction of new works, Other removalsPortsmouth Sailing Club Camber Dock WorksPSC Crane, PSC BrowPortsmouth Sailing Club03 Dec 201606 Mar 2017
MLA/2016/00491
Completed
Application - Construction of new works, Decommissioning of works, Other worksWoolverstone Marina Hoist DockHoist DockMarina Developments Limited05 Dec 201621 Mar 2017
MLA/2016/00492/3
Completed
Application - Construction of new works, Maintenance of existing workspile replacement within Marina footprint and adjacent to Yard wall together with replacement pontoon units to yard wallBerthon Marina, LymingtonBerthon Boat Company Limited(The)05 Dec 201629 Jan 2021
MLA/2016/00494
Completed
Application - Construction of new works, Other worksWhitley Bay Central Promenade Coastal Defence SchemeWhitley Bay Central PromenadeNorth Tyneside Council06 Dec 201604 Apr 2017
MLA/2016/00495/1
Completed
Application - Construction of new works, Maintenance of existing worksPontoon Replacement, Refurbishment & Reconfiguration, and Piling, Ocean Village, Southampton.Untitled PolygonMarina Developments Limited06 Dec 201629 Jun 2017
MLA/2016/00496
Completed
Application - Maintenance of existing worksQuay Pontoon Pile Replacement (Hamble Point Marina)Quay Pontoon Pile ReplacementMarina Developments Limited08 Dec 201620 Dec 2016
MLA/2016/00497/1
Completed
Application - Other dredgingNorth Shields Ferry Landing Clearance DredgingNexus North Shields Clearance DredgingSouthbay Civil Engineering Limited08 Dec 201606 Mar 2017
MLA/2016/00498
Completed
Application - Construction of new worksMiddleton Wastewater Treatment Works Marker PostMarker Post working areaUnited Utilities Water Plc08 Dec 201626 Jan 2017
MLA/2016/00499/3
Completed
Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital)Berth 9 Container Yard, Port of FelixstoweINNER GABBARD (TH052), Berth 9 Reclamation WorksHutchison Ports (Uk) Limited09 Dec 201616 May 2018
MLA/2016/00500
Completed
Application - Other depositsCustom House Quay small boat facilityCustom House Quay small boat facilityFalmouth Harbour Commissioners12 Dec 201615 Mar 2017
MLA/2016/00501/2
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Hythe Marine Park Maintenance DredgeArea D, Area E, Area E2, Area F, Area F1, Area J, Area K, Area L, Area M, NAB TOWER (WI060), HURST FORT (WI080), NEEDLES (WI090)Aew Uk Core Plus Property Fund12 Dec 201612 May 2023
MLA/2016/00502
Completed
Application - Maintenance of existing worksSouthwark river wall repairs135 Rotherhithe St, London SE16 - to - 43 William Square, London SE16 5XJF M Conway Limited12 Dec 201625 Oct 2017
MLA/2016/00503
Completed
Application - Other deposits, SamplingNorth West Cost Connection Geotchnical Survey 2017National Grid Commercial Holdings Limited12 Dec 201631 May 2018
MLA/2016/00504
Completed
Application - Maintenance of existing worksNethertown Wastewater Pumping Station OutfallNethertown Wastewater Pumping Station OutfallUnited Utilities Water Plc13 Dec 201623 Mar 2017
MLA/2016/00505
Completed
Application - Construction of new worksPort Clarence Erosion Protection WorksPort Clarence EmbankmentEnvironment Agency Leeds13 Dec 201603 Mar 2017
MLA/2016/00506/1
Completed
Application - Construction of new worksArrowhead Quay OutfallsArrowhead QuayEco World-Ballymore Arrowhead Quay Company Limited13 Dec 201624 Aug 2017
MLA/2016/00507/1
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Bedhampton Approach Channel and Berth Maintenance DredgeBedhampton Outer Area, Bedhampton Inner Area, NAB TOWER (WI060)Tarmac Limited14 Dec 201604 Aug 2017
MLA/2016/00508
Completed
Application - Construction of new works, Maintenance of existing worksNetwork Rail CP5 42 & 43 Cumbrian Coastal Protection WorksHead of Workington Harbour, Derwent ViaductNetwork Rail Limited14 Dec 201612 Jan 2018
MLA/2016/00509
Completed
Application - Disposal of dredged materialLeamouth Wharf Silt DisposalNAB TOWER (WI060)Cemex Uk14 Dec 201620 Mar 2017
MLA/2016/00511
Withdrawn
Application - Other worksWalney Offshore Wind Farm Anchor handling TrialsDeepocean14 Dec 2016
MLA/2016/00515
Completed
Application - Other worksACP2 TrialsACP2 trials siteDeepocean 1 Uk Limited15 Dec 201624 Jan 2017
MLA/2016/00516
Completed
Application - Construction of new worksNew 14" Jetty Gasoline Import LineNavigator Terminals Thames16 Dec 201625 May 2017
MLA/2016/00517/1
Completed
Application - Construction of new works, Decommissioning of worksOffshore wind operations and maintenance expansion project, Royal Dock, GrimsbyNo 1 quay pontoon, Royal Dock, Coaling Jetty, Royal DockAssociated British Ports.16 Dec 201609 Jun 2017
MLA/2016/00518
Completed
Application - Construction of new worksOcean Business pontoonOcean Business -Empress DockDiversified Communications Limited19 Dec 201602 Mar 2017
MLA/2016/00519
Completed
Application - Construction of new works, Other depositsGreatham South - INOVYN Grouped under: Greatham Flood Alleviation Scheme Showing 2 of 4 casesBreach Site, Creek Dredge Disposal 1, Creek Dredge Disposal 2Environment Agency Leeds19 Dec 201607 Sep 2018
MLA/2016/00520
Completed
Application - Navigational dredging (capital)NuStar Jetty 1 Capital Dredge, Grays, ThamesNuStar Jetty 1 Dredge UPDATED (2017)Nustar Corporation L.P.20 Dec 201625 Aug 2017
MLA/2016/00521
Completed
Application - Construction of new works, Decommissioning of worksKing Point Marina Wave ProtectionKing Point Marina Wave ProtectionLand & Water Services Ltd21 Dec 201624 Apr 2017
MLA/2016/00522
Completed
Application - Construction of new worksTorridge EstuaryTorridge Estuary - Chircombe Field WallEnvironment Agency - South West Region21 Dec 201608 Mar 2017
MLA/2016/00523
Completed
Application - Maintenance of existing worksRNLI Harwich Lifeboat Station - Low Impact Maintenance Works to Boathouse & Pontoon Berth (Fast Track Licence)Harwich Lifeboat StationR.N.L.I. (Trading) Limited21 Dec 201627 Mar 2017
MLA/2016/00524/1
Completed
Application - Maintenance of existing worksRegency Quay River Wall RepairsRegency QuayRegency Quay Residents Company Limited22 Dec 201607 Jun 2017
MLA/2016/00525
Completed
Application - Construction of new worksC405/CARRR/ENV/MMO/006 CARRR RW 922 StrengtheningRW 922 Strengthening worksPeter Brett Associates22 Dec 201623 Feb 2017
MLA/2016/00526/1
Completed
Application - Aggregate dredging, SamplingArea 526 Grouped under: Area 526 Showing 2 of 4 casesArea 526 (English)Hanson Aggregates Marine Limited23 Dec 201601 Jun 2023
MLA/2016/00527/2
Completed
Application - Aggregate dredging, SamplingArea 526 Grouped under: Area 526 Showing 2 of 4 casesArea 526 (English)Cemex Uk Marine23 Dec 201601 Jun 2023
MLA/2016/00528
Completed
Application - Maintenance of existing worksDuke Shore WharfDuke Shore WharfEnvironment Agency23 Dec 201616 Jan 2017

MMO - Marine Licences Public Register