Case Details | Project Type | Project Title | Locations | Applicant Name | Submission Date | Decision Date |
---|---|---|---|---|---|---|
MLA/2018/00001 Completed | Application - Minor removals | Retrieval of lost fishing gear from Plymouth | Constance, Ajax, Encourage, FS Poulmic, Glen Strathallan, HMT Abelard, HMT Elk, HMT Kingston Alalite, Hopper no.42, James Egan Layne, Nepaul, Rame barge, Rosehill, Rothesay, Scylla, Vectis, Viking princess | Fathoms Free | 01 Jan 2018 | 01 Jan 2018 |
MLA/2018/00002 Completed | Application - Other deposits | Blue shark filming | Blue shark filming on dead dolphin | Mr Charles Hood | 02 Jan 2018 | 01 Oct 2018 |
MLA/2018/00003/1 Completed | Application - Navigational dredging (maintenance) | Tides Reach Marina - Medina Estuary | Tides Reach Management Company | 02 Jan 2018 | 06 Nov 2023 | |
MLA/2018/00004 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Charles Lister | 03 Jan 2018 | 03 Jan 2018 | |
MLA/2018/00005 Completed | Application - Other works | Morecambe Outfall Site Investigation works | working area for trial holes | United Utilities | 03 Jan 2018 | 03 Apr 2018 |
MLA/2018/00006 Completed | Application - Maintenance of existing works | 136/090/Mayflower Pub, Rotherhithe, Thames | Mayflower pub, Rotherhythe | Haydn Evans Consulting Limited | 04 Jan 2018 | 26 Mar 2018 |
MLA/2018/00007 Completed | Application - Maintenance of existing structures or assets | Northney Marina - Hoist Dock Corrosion Protection | Northney Marina Hoist Dock | Marina Developments Limited | 05 Jan 2018 | 05 Jan 2018 |
MLA/2018/00008 Completed | Application - Maintenance of existing works | Navigator Terminal Thames - Dolphin 1 Temporary Repairs | Navigator Terminal Thames | Navigator Terminals Thames | 05 Jan 2018 | 06 Feb 2018 |
MLA/2018/00009 Completed | Application - Maintenance of existing structures or assets | Open Blasting at the OSP | OSP Blasting site | E.On Climate & Renewables Uk Rampion Offshore Wind Limited | 05 Jan 2018 | 05 Jan 2018 |
MLA/2018/00010 Completed | Application - Maintenance of existing structures or assets | Ferry Boat SPS Dittisham - manhole cover repair | Ferry Boat SPS | Hatchplan Limited | 08 Jan 2018 | 08 Jan 2018 |
MLA/2018/00011 Completed | Application - Other works | Mount Batten Ferry Pontoon Replacement | Mount Batten Ferry | Plymouth County Ccouncil | 08 Jan 2018 | 09 Mar 2018 |
MLA/2018/00012 Completed | Application - Maintenance of existing structures or assets | Bembridge Lane Beach, IOW | Bembridge Lane Beach | Beasley Christopher Limited | 09 Jan 2018 | 09 Jan 2018 |
MLA/2018/00013 Completed | Application - Maintenance of existing structures or assets | Duver Rd, Opp Boat House, IOW | Duver Road , Opp boat house Pub | Beasley Christopher Limited | 09 Jan 2018 | 09 Jan 2018 |
MLA/2018/00014/1 Completed | Application - Non-navigational clearance dredging | Long Curtain Moat shingle removal | Long Curtain Moat | Portsmouth City Council | 09 Jan 2018 | 18 Jan 2018 |
MLA/2018/00015 Completed | Application - Maintenance of existing structures or assets | Gravesend Town Pier - Timber Deck Repairs | Gravesend Town Pier | Gravesham Borough Council | 10 Jan 2018 | 10 Jan 2018 |
MLA/2018/00016 Completed | Application - Maintenance of existing structures or assets | Powders Quay repairs; Frenchmans Creek; Helford | Polygon | National Trust | 10 Jan 2018 | 10 Jan 2018 |
MLA/2018/00017 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Charles Lister) | 10 Jan 2018 | 10 Jan 2018 | |
MLA/2018/00018 Completed | Application - Maintenance of existing structures or assets | Worthing, The Esplanade | polygons_magic | Beasley Christopher Limited | 10 Jan 2018 | 10 Jan 2018 |
MLA/2018/00020 Completed | Application - Maintenance of existing works | South Wharf Quay Repairs | South Wharf - West End of Quay | Norfolk Marine | 11 Jan 2018 | 16 Feb 2018 |
MLA/2018/00021 Completed | Application - Maintenance of existing structures or assets | Hythe Promenade - Outfall protective grille replacemement | Hythe_Promenade | Southern Water Limited | 12 Jan 2018 | 12 Jan 2018 |
MLA/2018/00022 Completed | Application - Maintenance of existing structures or assets | Mousehole Harbour Emergency Manhole works | Mousehole MH 9318 | Glanville Services Limited | 12 Jan 2018 | 12 Jan 2018 |
MLA/2018/00023 Completed | Application - Beach maintenance activities | Hythe Promenade - Beach re-profiling using shingle removed from front of outfall | Hythe_Promenade | Southern Water Limited | 12 Jan 2018 | 12 Jan 2018 |
MLA/2018/00024 Completed | Application - Non-navigational clearance dredging | Hythe Promenade - Shingle clearance from in front of outfall using hand tools to replace protective grille | Hythe_Promenade | Southern Water Limited | 12 Jan 2018 | 12 Jan 2018 |
MLA/2018/00025/1 Completed | Application - Construction of new works | Lincolnshire Lakes Flood Defence Scheme | Installation of scour protection | North Lincolnshire Council | 12 Jan 2018 | 26 Mar 2019 |
MLA/2018/00026 Completed | Application - Construction of new works | Cobbs Quay Outfall 2018 | Outfall Pipe | Tms Maritime Ltd | 13 Jan 2018 | 28 Feb 2018 |
MLA/2018/00027 Completed | Application - Construction of new works | Installation of Boat Lift | Boat Lift Location Apt 1 Longrow South Shields | Mr Mark Turnbull | 14 Jan 2018 | 05 Apr 2018 |
MLA/2018/00028 Completed | Application - Construction of new works, Other removals | Nearshore Seaweed Cultivation of Native Species | Sustainable Seaweed Limited | 16 Jan 2018 | 24 Mar 2020 | |
MLA/2018/00029 Completed | Application - Maintenance of existing structures or assets | Virgina Quay | Virginia Quay E14 | Wph Limited | 17 Jan 2018 | 17 Jan 2018 |
MLA/2018/00031 Completed | Application - Construction of new works, Other works | Deacons Marina | Alteration to existing layout, Removal of access brow and walkway, New access and walkway point, Public Pontoon | Dean & Reddyhoff Limited | 17 Jan 2018 | 23 May 2018 |
MLA/2018/00032 Completed | Application - Maintenance of existing structures or assets | Outfall mesh - Long Curtain Moat | polygons_magic | Portsmouth City Council | 18 Jan 2018 | 18 Jan 2018 |
MLA/2018/00034 Completed | Application - Deposit of markers | Anchorsholme Buoy | Anchorsholme Buoy | United Utilities Water Plc | 19 Jan 2018 | 19 Jan 2018 |
MLA/2018/00035/2 Completed | Application - Construction of new works | Hull River Defence | Site 1, Site 2, Site 3, Site 4 | Bmmjv Ltd | 19 Jan 2018 | 26 Apr 2019 |
MLA/2018/00036 Completed | Application - Maintenance of existing structures or assets | Sea Place Tideflex Valve | polygons_magic | Beasley Christopher Limited | 19 Jan 2018 | 19 Jan 2018 |
MLA/2018/00038 Completed | Application - Construction of new works | Creation of slipway on shore at Bosalan, Restronguet Point, Cornwall | Boslan Slipway | Mr Tom Green | 20 Jan 2018 | 17 Apr 2018 |
MLA/2018/00039 Completed | Application - Other removals, Sampling | Rampion Offshore Wind Farm - Removal of Disused Outfall Grouped under: Rampion Offshore Wind Farm Showing 2 of 13 cases | Southern Water Disused Outfall | E.On Climate & Renewables Uk Rampion Offshore Wind Limited | 22 Jan 2018 | 30 Apr 2018 |
MLA/2018/00040/1 Completed | Application - Other deposits | Water Sculpture - GEOTN | Tyne Water Sculpture | Newcastlegateshead Initiative | 22 Jan 2018 | 19 Jun 2018 |
MLA/2018/00041 Completed | Application - Maintenance of existing structures or assets | Newhaven Swing Bridge - Control Tower Refurbishment | Newhaven Swing Bridge - Control Tower | East Sussex County Council | 23 Jan 2018 | 23 Jan 2018 |
MLA/2018/00042 Completed | Application - Maintenance of existing works | Composite Licence at London Array Offshore Wind Farm | HV1, HV2, HV3, HV4, SS1, SS2 | Blue Transmission London Array Limited | 23 Jan 2018 | 03 Dec 2020 |
MLA/2018/00043 Completed | Application - Deposit of markers | Arun YC yacht racing marks | Racing area | Arun Yacht Club Limited(The) | 23 Jan 2018 | 23 Jan 2018 |
MLA/2018/00044/1 Completed | Application - Maintenance of existing structures or assets | gabion repairs | east side fence, eastney cruising association | Eastney Cruising Association | 23 Jan 2018 | 03 May 2018 |
MLA/2018/00046 Completed | Application - Maintenance of existing structures or assets | Repair of MH8002 in the foreshore at Berril's Yard, Fowey to stop saline infiltration into the sewer system. | Access to work area and work area | South West Water Limited | 24 Jan 2018 | 24 Jan 2018 |
MLA/2018/00047 Completed | Application - Maintenance of existing structures or assets | Worthing - West Street | Worthing - West Street | Beasley Christopher Limited | 24 Jan 2018 | 24 Jan 2018 |
MLA/2018/00048 Completed | Application - Maintenance of existing structures or assets | Worthing 200m west of Brooklands | Worthing - 200m west of brooklands | Beasley Christopher Limited | 24 Jan 2018 | 24 Jan 2018 |
MLA/2018/00050 Completed | Application - Marine licence for the burial of human remains at sea | TYNE BURIAL SITE (TY193) | E Bush Ltd | 25 Jan 2018 | 25 Jan 2018 | |
MLA/2018/00051 Completed | Application - Maintenance of existing structures or assets | Worthing Steyne Gardens | Worthing steyne gardens | Beasley Christopher Limited | 25 Jan 2018 | 25 Jan 2018 |
MLA/2018/00052/1 Completed | Application - Construction of new works | Seahouses Main Pier | Concrete encasement - Seaward face of Main Pier, Concrete encasement - End of Main Pier, Concrete encasement - Inner face of Main Pier | Northumberland County Council | 26 Jan 2018 | 02 Sep 2019 |
MLA/2018/00053 Completed | Application - Maintenance of existing structures or assets | Installation of wooden stakes as part of an erosion plan to protect the main slipway at Emsworth Sailing Club and prevent further erosion of mud-land. | Emsworth Sailing Club | Emsworth Sailing Club | 27 Jan 2018 | 27 Jan 2018 |
MLA/2018/00054 Completed | Application - Maintenance of existing structures or assets | Worthing Wallace Avenue | worthing wallace ave | Beasley Christopher Limited | 28 Jan 2018 | 28 Jan 2018 |
MLA/2018/00055/1 Completed | Application - Construction of new works | Essex Yacht Club Limited - water pipe replacement | Essex Yacht Club Limited pipe | Essex Yacht Club,Limited | 29 Jan 2018 | 21 Dec 2018 |
MLA/2018/00056 Completed | Application - Maintenance of existing structures or assets | Queenborough South Marshes | Queenborough South Marshes | Beasley Christopher Limited | 30 Jan 2018 | 30 Jan 2018 |
MLA/2018/00057 Completed | Application - Maintenance of existing structures or assets | Newton Voss Tidal Path | Newton Voss Tidal Path | Devon County Council | 30 Jan 2018 | 30 Jan 2018 |
MLA/2018/00058 Completed | Application - Navigational dredging (capital) | OSL J1 Berth Approach Capital Dredge | OSL Berth 1 Approach | Oikos Storage Limited | 31 Jan 2018 | 12 Apr 2018 |
MLA/2018/00059 Completed | Application - Other removals | Removal of redundant hand rails, access platforms, crane beam and timber fenders from the Bradwell site outfall structure | Bradwell site outfall structure | Magnox Ltd | 01 Feb 2018 | 24 Apr 2018 |
MLA/2018/00060 Completed | Application - Maintenance of existing structures or assets | 5137 Northolt Avenue Culvert Repairs, Northolt Avenue, Plymouth | Northolt Culvert - Culvert Pipe, Downstream Tidal Estuary - Anticipated Max. Work Area | Plymouth City Council | 01 Feb 2018 | 01 Feb 2018 |
MLA/2018/00061 Completed | Application - Maintenance of existing structures or assets | Renovations and extension the Sail Loft, Whitford Yard, Fowey. | Whitford boat yard | Mr Ian Forrest | 01 Feb 2018 | 01 Feb 2018 |
MLA/2018/00062 Completed | Application - Construction of new works | HMNB Portsmouth QEC 2nd Berth | HMNB Portsmouth QEC 2nd Berth Sheer and Victory Jetties Work Area | Defence Infrastructure Organisation (Dio) | 02 Feb 2018 | 29 Jun 2018 |
MLA/2018/00063/1 Completed | Application - Navigational dredging (maintenance) | London Thamesport Maintenance Dredging Project | Thamesports_Project_Footprint | Thamesport London Ltd | 05 Feb 2018 | 14 Jun 2023 |
MLA/2018/00064 Completed | Application - Maintenance of existing structures or assets | Worthing 68 Marine Cresent | Worthing 68 marine cresent | Beasley Christopher Limited | 07 Feb 2018 | 07 Feb 2018 |
MLA/2018/00065 Completed | Application - Maintenance of existing structures or assets | Worthing Heene Terrace west | Worthing Heene Terrace West | Beasley Christopher Limited | 07 Feb 2018 | 07 Feb 2018 |
MLA/2018/00066 Completed | Application - Maintenance of existing structures or assets | Replacement of Flap Valve | polygons_magic | Beasley Christopher Limited | 07 Feb 2018 | 07 Feb 2018 |
MLA/2018/00067 Completed | Application - Minor removals | RAINHAM JETTY BERTH 3 | RAINHAM JETTY BERTH 3 | Land & Water Remediation Limited | 07 Feb 2018 | 07 Feb 2018 |
MLA/2018/00068 Completed | Application - Maintenance of existing structures or assets | Southwark River Wall Repairs | Bermonsey Beach Wall | F M Conway Limited | 07 Feb 2018 | 07 Feb 2018 |
MLA/2018/00069 Completed | Application - Maintenance of existing works | HH HW JJ Tower Refurbishment | HH7 & HH8 Towers and oversail | Scottish And Southern Energy | 07 Feb 2018 | 18 Jul 2018 |
MLA/2018/00071 Completed | Application - Construction of new works | NEW CUTTER AND WORK BOAT BERTH AT RO RO 3 | New Cutter Boat Berth | Port Of Tyne Authority | 07 Feb 2018 | 11 May 2018 |
MLA/2018/00072 Completed | Application - Maintenance of existing structures or assets | ORE Catapult Blyth - Minor Works | ORE Catapult Minor Repair Works | Ore Catapult Development Services Limited | 07 Feb 2018 | 07 Feb 2018 |
MLA/2018/00073 Completed | Application - Minor removals | Ghost Fishing UK Project: Removal of ALDFG and Marine Litter from Wreck sites west of Weymouth | Buccaneer HMS [W49] [+1946], P-555 HMS [+1947], Frogner SS [+1918], UB-74 [+1918], Sidon HMS [+1957], Landrail HMS [+1906], Pomeranian SS [+1918], Salsette SS [+1917] | Ghost Fishing Uk | 08 Feb 2018 | 08 Feb 2018 |
MLA/2018/00074 Completed | Application - Minor removals | Ghost Fishing UK Project: Removal of ALDFG and Marine Litter from Wreck sites Falmouth Bay | Lady Of The Isles HMS [+1940], Andola SV [+1895], Bay of Panama SV [+1891], Caroni River MV [+1940], SS Epsilon, SS Mohegan, N. G. Petersen SS [+1918], Rock Island Bridge SS [+1920], Volnay | Ghost Fishing Uk | 08 Feb 2018 | 08 Feb 2018 |
MLA/2018/00075/1 Completed | Application - Construction of new works, Decommissioning of works | Royal Wharf Pier | Royal Wharf Site | Oxley Wharf Property 3 Limited | 09 Feb 2018 | 25 Sep 2018 |
MLA/2018/00077/1 Completed | Application - Maintenance of existing works | London Array Offshore Wind Farm Blade Maintenance Works | London Array Wind Farm Boundary | London Array Limited | 09 Feb 2018 | 01 Mar 2019 |
MLA/2018/00078 Completed | Application - Maintenance of existing structures or assets | Victoria Wharf Flood Defence Wall Repairs | Victoria Wharf | Moore Project Management Solutions Llp | 12 Feb 2018 | 12 Feb 2018 |
MLA/2018/00080 Completed | Application - Beach maintenance activities | Clearance of Slipway (MLA/2017/00302) | Riverbank Reinforcement | Cornwall Council | 14 Feb 2018 | 14 Feb 2018 |
MLA/2018/00081 Completed | Application - Deposit of markers | Buoys in Colwell Bay for The Hut Restaurant, it's customers and neighbours. | Colwell Bay | Aka Restaurants (Colwell) Ltd | 14 Feb 2018 | 14 Feb 2018 |
MLA/2018/00082/1 Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Buckler's Hard Maintenance Dredge | Buckler's Hard Yacht Harbour, NAB TOWER (WI060), HURST FORT (WI080), NEEDLES (WI090) | Beaulieu Enterprises Limited | 14 Feb 2018 | 02 Dec 2020 |
MLA/2018/00083 Completed | Application - Maintenance of existing works | ROYAL SOLENT YACHT CLUB JETTY STRENGTHENING | Metal Pile | Royal Solent Yacht Club | 14 Feb 2018 | 08 May 2019 |
MLA/2018/00084/1 Completed | Application - Maintenance of existing works | Asset Refurbishment Programme of Works Revetment Repairs Essex | 1057.01 Malyons Revetment Repairs, 1077.01 Creeksea | Jacksonhyder | 15 Feb 2018 | 28 Sep 2018 |
MLA/2018/00085 Completed | Application - Construction of new works | New Crew Facilities at RNLI Penlee, Newlyn | RNLI Penlee | Rnli Estates | 15 Feb 2018 | 01 May 2018 |
MLA/2018/00086 Completed | Application - Maintenance of existing structures or assets | Replacing 1 Steel pile | Essex Marina | Essex Marina | 15 Feb 2018 | 15 Feb 2018 |
MLA/2018/00087 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Charles Lister) | 16 Feb 2018 | 16 Feb 2018 | |
MLA/2018/00088 Completed | Application - Construction of new works | Greatham South Flood Alleviation Scheme (FAS) North West Habitat Creation | Greatham Creek Channel Breach Excavation | Environment Agency Leeds | 16 Feb 2018 | 05 Oct 2018 |
MLA/2018/00089 Completed | Application - Construction of new works | Wandle Wall | Wandle Wall | Frasers Property (Uk) Limited | 16 Feb 2018 | 13 Jun 2018 |
MLA/2018/00090 Completed | Application - Other deposits, Other removals | Nemo Link Cable Protection at KP90.4 | Nemo Link Cable Protection KP90.4 | National Grid Nemo Link Limited | 19 Feb 2018 | 15 Jun 2018 |
MLA/2018/00091 Completed | Application - Construction of new works, Maintenance of existing works, Other removals, Other works | Canal Basin Floodgate Replacement | Canal Basin Floodgate | Team2100 | 19 Feb 2018 | 07 Sep 2018 |
MLA/2018/00092 Completed | Application - Maintenance of existing structures or assets | Repair of dinghy launching slipway. | Buck Shore Beach, Swanage Sailing Club | Swanage Sailing Club | 20 Feb 2018 | 20 Feb 2018 |
MLA/2018/00093 Completed | Application - Maintenance of existing works | Wightlink Moorings Portsmouth | Wightlink | Wightlink Limited | 21 Feb 2018 | 16 May 2018 |
MLA/2018/00094 Completed | Application - Construction of new works, Decommissioning of works | The Folly Pontoon replacement, River Medina, IoW | The Folly Pontoon | Greene King Retailing Ltd | 21 Feb 2018 | 21 Aug 2018 |
MLA/2018/00095 Completed | Application - Construction of new works, Other works | East Runton Proposed Ramp Work | East Runton Ramp | North Norfolk District Council | 21 Feb 2018 | 06 Jun 2018 |
MLA/2018/00096 Completed | Application - Construction of new works | EXTENTION OF MARCHWOOD YACHTCLUB INSHORE UPSTREAM PONTOON | Marchwood Yacht Club | Marchwood Yacht Club | 22 Feb 2018 | 10 May 2018 |
MLA/2018/00097 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Britannia Shipping (Fao: Lister) | 22 Feb 2018 | 22 Feb 2018 | |
MLA/2018/00098 Completed | Application - Maintenance of existing structures or assets | Trinity Hospital Flood Defence Wall Remediation Works - Scaffolding | Trinity Hospital | Ch2m Hill Europe Limited | 23 Feb 2018 | 23 Feb 2018 |
MLA/2018/00099 Completed | Application - Maintenance of existing works | Warrington Cenothaph Works | Warrington Cenotaph Sheet Piling Area | Balfour Beatty | 23 Feb 2018 | 01 Aug 2018 |
MLA/2018/00100 Completed | Application - Non-navigational clearance dredging | Lot's Ait | Lot's Ait | Hither Green Developments Limited | 23 Feb 2018 | 23 Feb 2018 |
MLA/2018/00101 Completed | Application - Minor removals | Ghost Fishing UK Project: Removal of ALDFG and Marine Litter from Wreck sites and reefs from Plymouth to Portland | Eddystone Rocks, Hatt Rock, Glocliffe SS [+1917], Louis Sheid SS [+1939], James Fennell HMT [+1920], Royal Adelaide SV [+1872], Anworth, Minerva SS [+1917], Scaldis (+1974), Saint Dunstan HMS [+1917], Tracy [+2016], Ailsa Craig SS [+1918], Moidart SS [+1918], Baygitano SS [+1918], Heroine SV [+1852], Gibel Hamam SS [+1918], Nil Desperandum MFV [+1993], Radaas | SS [+1917], Galicia SS [+1917], Boma SS (I) [+1918], City of Swansea SS [+1917], Gefion SS [+1917], Lord Stewart SS [+1918], Bretagne SS [+1918], Trawl gear|, Dudley Rose SS [+1941], Sevilla SS [+1918], Northville SS [+1918], Unknown wreck, Girl Barbara [+1990], Les Mercenaires MFV [+2005], Dutch tug, Benton Castle HMT [+1916], Picton Castle HMS [+1917], Dryad SV [+1891], Newholm SS [+1917], Baychattan SS [+1917], Demetrios MV [+1992], Riversdale SS [+1917], Herzogin Cecilie SV [+1936], Soudan SS [+1887], Liberta SS [+1926], Skaala SS [+1917], Maine SS (II) [+1917], Oregon SV [+1890], Persier SS [+1945], Totnes Castle PSS [+1967], Untiring HMS (P-59) [+1957], Medoc SS (Half Way Wreck) [+1940], Eddystone Lighthouse (+1703), Foyle HMS (D 20) [+1917], Unicorn SS (Tile Boat) [+1923], Leen, Beatrice SV [+1988], Rosehill SS [+1917], James Eagan Layne SS [+1945], Scylla HMS (F71) [+2004], Breakwater South, Hands Deep | Ghost Fishing Uk | 25 Feb 2018 | 25 Feb 2018 |
MLA/2018/00102 Completed | Application - Construction of new works | Trinity Buoy Wharf Temporary Extension | Trinity Buoy Wharf | Thames Clippers | 27 Feb 2018 | 13 Feb 2019 |
MLA/2018/00103 Completed | Application - Construction of new works | Small Quay Lerryn | Small Quay, Lerryn | Mr Hugh Sinclair | 27 Feb 2018 | 18 May 2018 |
MLA/2018/00104 Completed | Application - Maintenance of existing structures or assets | Hythe opp Waitrose | Hythe opp waitrose | Beasley Christopher Limited | 28 Feb 2018 | 28 Feb 2018 |
MLA/2018/00105 Completed | Application - Maintenance of existing works | Portobello WTW Groyne Repair | Portobello Groyne Repair | Southern Water | 28 Feb 2018 | 06 Aug 2019 |
MLA/2018/00106 Completed | Application - Maintenance of existing structures or assets | Bembridge Lane, IOW | Bembridge Lane | Beasley Christopher Limited | 01 Mar 2018 | 01 Mar 2018 |
MLA/2018/00107 Completed | Application - Construction of new works | Relocation and installation of new access for the R.S. Hispaniola Restaurant Vessel | RS Hispaniola Temporary Access Steps, Ramp and Goods Lift | Bazalgette Tunnel Limited | 01 Mar 2018 | 14 May 2018 |
MLA/2018/00108 Completed | Application - Construction of new works, Other deposits, Other removals | Export cable Installation - Rampion Offshore Wind Farm Grouped under: Rampion Offshore Wind Farm Showing 2 of 13 cases | EC 4 corridor | Rampion Offshore Wind | 02 Mar 2018 | 24 May 2018 |
MLA/2018/00109 Completed | Application - Maintenance of existing works | Prospect Quay - Scour Damage | Prospect Mooring - T head berth | Prospect Moorings 2013 Limited | 02 Mar 2018 | 27 Jul 2018 |
MLA/2018/00110/2 Completed | Application - Maintenance of existing works | Huckers Bow Tidal Sluice Flood Defence Improvements | Huckers Bow Tidal Outfall | Bmm Jv Ltd | 05 Mar 2018 | 21 Mar 2019 |
MLA/2018/00111 Completed | Application - Disposal of dredged material | Clearance of Slipway | Riverbank reinforcement with dredged spoil from slipway | Captain Mark Killingback | 05 Mar 2018 | 13 Jan 2020 |
MLA/2018/00112 Completed | Application - Maintenance of existing structures or assets | Repairs to seawall revetment and out fall pipe | Waldegraves Holiday Park | Mr Graham Rampling | 05 Mar 2018 | 05 Mar 2018 |
MLA/2018/00113 Completed | Application - Maintenance of existing works, Other deposits | West of Duddon Sands OFTO O&M Marine Licence | Site 1 EOR0709 WDS Cable Repair Boundary | Wods Transmission Plc | 06 Mar 2018 | 17 Sep 2018 |
MLA/2018/00115/1 Completed | Application - Construction of new works | Proposed Pontoon and Lime Quay, Tregothnan Estate, St Micheal Penkivel | Lime Quay | Falmouth Estates Management Company Limited | 07 Mar 2018 | 22 Nov 2019 |
MLA/2018/00116 Completed | Application - Maintenance of existing structures or assets | South Sands Salcombe - manhole repairs | South Sands Salcombe Manholes | R&M Utility & Civil Engineering Services South West Limited | 08 Mar 2018 | 08 Mar 2018 |
MLA/2018/00118/1 Completed | Application - Disposal of dredged material, Navigational dredging (capital), Other deposits | Stone Beds at Green Port Hull Berth 1 | Green Port Hull Berth 1, Holme Channel Deep (HU056) | Abp | 08 Mar 2018 | 24 Sep 2018 |
MLA/2018/00119 Completed | Application - Other works | Foxfield Water Main Reinstatement | Area B (East of Estuary), Area A (West of Estuary) | United Utilities Water Plc | 09 Mar 2018 | 31 Jul 2018 |
MLA/2018/00120 Completed | Application - Maintenance of existing works | Replacement of existing jetty and launch hard facility. | Hook Farm | Mr Matthew Walton | 09 Mar 2018 | 02 Jul 2018 |
MLA/2018/00122 Withdrawn | Application - Other deposits | Pann’s East Quay Emergency Stabilisation Works | Sunderland County Council | 09 Mar 2018 | ||
MLA/2018/00123 Completed | Application - Maintenance of existing structures or assets | Surface Water Outfall Inspection West Street Worthing | West Street Worthing | Beasley Christopher Limited | 10 Mar 2018 | 10 Mar 2018 |
MLA/2018/00124 Completed | Application - Maintenance of existing structures or assets | Bexhill Sutton Place | Bexhill Sutton Place | Beasley Christopher Limited | 12 Mar 2018 | 12 Mar 2018 |
MLA/2018/00125 Completed | Application - Beach maintenance activities | Management of shingle on the Landguard Frontage | Landguard Peninsula, Suffolk | Port Of Felixstowe Limited | 12 Mar 2018 | 12 Mar 2018 |
MLA/2018/00126 Completed | Application - Maintenance of existing works | Queen's Wharf - Remedial Works | QUEENS WHARF | Mount Anvil Limited | 12 Mar 2018 | 27 Jul 2018 |
MLA/2018/00127 Completed | Application - Maintenance of existing structures or assets | Replacement of four worn out floats on our floating bridge leading to a pontoon. | Lobster Quay | Warsash Sailing | 12 Mar 2018 | 12 Mar 2018 |
MLA/2018/00128 Completed | Application - Maintenance of existing structures or assets | Cooden Beach | Cooden Beach | Beasley Christopher Limited | 13 Mar 2018 | 13 Mar 2018 |
MLA/2018/00129 Completed | Application - Other works | Deployment of bird deterrents at Burbo Extension Offshore Wind Farm | Burbo Extension Offshore Wind Farm | Orsted | 13 Mar 2018 | 16 May 2018 |
MLA/2018/00130 Completed | Application - Maintenance of existing structures or assets | Seaford Splash | Seaford Splash | Beasley Christopher Limited | 13 Mar 2018 | 13 Mar 2018 |
MLA/2018/00131 Completed | Application - Maintenance of existing structures or assets | Ashlett Creek 2 | Ashlett Creek 2 | Beasley Christopher Limited | 14 Mar 2018 | 14 Mar 2018 |
MLA/2018/00132/1 Completed | Application - Other deposits | Estimating catchability of scallop dredges and TV survey efficiency | Site 3, Site 1, Site 2 | Cefas | 14 Mar 2018 | 04 Oct 2018 |
MLA/2018/00133 Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Bosham Quay Dredge | NAB TOWER (WI060), Bosham Quay | Chichester Harbour Conservancy. | 15 Mar 2018 | 31 May 2018 |
MLA/2018/00134 Completed | Application - Maintenance of existing structures or assets | Newton Ferrers Saline Outfall | Newton Ferrers | Glanville Cleansing Limited | 15 Mar 2018 | 15 Mar 2018 |
MLA/2018/00135 Completed | Application - Maintenance of existing structures or assets | Kentish Flats - Blade Exchange | UKF_EGWTG_WTG_LUKF003_v01_161120lm_4258_ExtUKFE01_Buf500m | Vattenfall Wind Power Ltd | 15 Mar 2018 | 15 Mar 2018 |
MLA/2018/00136 Completed | Application - Maintenance of existing works, Other removals | Marine licence - 10 year generic maintenance licence- Happisburgh | Happisburgh Marine License | North Norfolk District Council | 15 Mar 2018 | 12 Oct 2018 |
MLA/2018/00137/1 Completed | Application - Maintenance of existing works, Other removals | Marine licence - 10 year generic maintenance licence- Weybourne Beck outfall to Walcott | Marine_License2 | North Norfolk District Council | 15 Mar 2018 | 22 May 2019 |
MLA/2018/00138 Completed | Application - Maintenance of existing structures or assets | Langley Point | Langley Point | Beasley Christopher Limited | 16 Mar 2018 | 16 Mar 2018 |
MLA/2018/00142 Completed | Application - Maintenance of existing structures or assets | Pontoon preventative maintenance | Pontoon at Burnham on Crouch Sailing Club | Burnham On Crouch Sailing Club | 19 Mar 2018 | 19 Mar 2018 |
MLA/2018/00143 Completed | Application - Other removals | Holker Estate - flood defence embankment repairs | Sand extraction site | Holker Estates Co Ltd | 19 Mar 2018 | 30 Jul 2018 |
MLA/2018/00144 Completed | Application - Non-navigational clearance dredging | clearance of silt under pontoons | Doug Ashley Marine maintenance dredge | Mr James Douglas Ashley | 19 Mar 2018 | 19 Mar 2018 |
MLA/2018/00145 Completed | Application - Maintenance of existing structures or assets | HRSC Pontoon re-establishment of moorings following Storm damage | HRSC Pontoon Mooring Spread | Helford River Sailing Club | 20 Mar 2018 | 20 Mar 2018 |
MLA/2018/00146 Completed | Application - Other removals | Demolition of Little Susie and Xoron | Little susie and Xoron | Jpc Demolition Llp | 21 Mar 2018 | 17 Aug 2018 |
MLA/2018/00147 Completed | Application - Non-navigational clearance dredging | One off desilt of Broadfleet at Pilling | Broadfleet channel | Mr John Barton | 21 Mar 2018 | 21 Mar 2018 |
MLA/2018/00148 Completed | Application - Navigational dredging (capital) | RAINHAM JETTY BERTH 3 DREDGING | RAINHAM JETTY BERTH 3 | Land & Water Remediation Ltd | 23 Mar 2018 | 22 Aug 2018 |
MLA/2018/00149 Completed | Application - Maintenance of existing structures or assets | Event Bridge | Porthleven Food Festival Bridge | Arc Live Limited | 26 Mar 2018 | 26 Mar 2018 |
MLA/2018/00150 Completed | Application - Maintenance of existing works | Helford River Sailing Club Pontoon Pile replacement | Helford River Sailing Club Pontoon Pile Location | Falmouth Divers Limited | 26 Mar 2018 | 29 Mar 2018 |
MLA/2018/00151 Completed | Application - Minor removals | Borehole Sample | Navigator Terminal Thames | Vopak Terminal London B.V. Limited | 26 Mar 2018 | 26 Mar 2018 |
MLA/2018/00152 Completed | Application - Maintenance of existing structures or assets | Poole Bridge - remedials | Poole Bridge Approach Spans | Borough Of Poole | 26 Mar 2018 | 26 Mar 2018 |
MLA/2018/00153 Completed | Application - Minor removals | Sea Shepherd ALDFG (Ghostnet) removals in Liverpool Bay 1 | Sea Shepherd UK ALDFG and litter removals in Liverpool Bay area 1 | Sea Shepherd Uk | 26 Mar 2018 | 26 Mar 2018 |
MLA/2018/00154/1 Completed | Application - Maintenance of existing works, Other deposits | Greatham Beck | Greatham Beck- Dry Working Area | Amalgamated Construction | 27 Mar 2018 | 03 Sep 2018 |
MLA/2018/00155/1 Completed | Application - Maintenance of existing works | Race Bank Offshore Wind farm Operation and Maintenance for non cable activities - Generator assets | Race Bank Wind Farm | Dong Energy Rb (Uk) Limited | 27 Mar 2018 | 10 Jan 2020 |
MLA/2018/00157 Completed | Application - Maintenance of existing structures or assets | Sir John McDougall - Glengall Gardens River Wall Maintenance | Sir John McDougall - Glengall Gardens | Ch2m Hill Europe Limited | 28 Mar 2018 | 28 Mar 2018 |
MLA/2018/00158 Completed | Application - Maintenance of existing structures or assets | IE00897C Manea Bridge Works | Manea | Amalgamated Construction Ltd | 28 Mar 2018 | 28 Mar 2018 |
MLA/2018/00159 Completed | Application - Maintenance of existing structures or assets | Component Exchange - Gearbox replacement - location A03 | Gearbox replacement - Location A03 - Sheringham Shoal Offshore Windfarm | Scira Offshore Energy Limited | 28 Mar 2018 | 28 Mar 2018 |
MLA/2018/00161/1 Completed | Application - Construction of new works | Pipeline installation at Geo Specialty Chemicals, Hythe | Geo Outfall Pipeline | Geo Specialty Chemicals | 03 Apr 2018 | 09 Nov 2018 |
MLA/2018/00162 Completed | Application - Maintenance of existing structures or assets | Preparations and repainting of 44 WTG's and Offshore Substation | Area of painting works | Scira Offshore Energy Limited | 03 Apr 2018 | 03 Apr 2018 |
MLA/2018/00163 Completed | Application - Construction of new works | Outfall Bay Structure for the Stow Fen Pumping Station Replacement | Outfall Bay for the Replacement of Stow Fen Pumping Station | Downham And Stow Bardolph Idb | 03 Apr 2018 | 16 Jul 2018 |
MLA/2018/00165 Completed | Application - Maintenance of existing structures or assets | Sugar Quay - Jetty Works | Sugar Quay | Barratt London Limited | 04 Apr 2018 | 04 Apr 2018 |
MLA/2018/00166 Withdrawn | Application - Construction of new works | Mooring piles | BridgeMarsh Marina | Mr Ben Knill | 05 Apr 2018 | |
MLA/2018/00167 Completed | Application - Disposal of dredged material, Navigational dredging (capital) | Gosport Marina - Endeavour Quay Link Pontoon Dredge | NAB TOWER (WI060), Keel Pocket (dredge -1m), Link Pontoon (dredge -3.5m) | Premier Marinas (Gosport) Limited | 05 Apr 2018 | 22 Jun 2018 |
MLA/2018/00169 Completed | Application - Maintenance of existing structures or assets | Helford River Sailing Club Pontoon Pile Replacement | Helford River Sailing Club Pile Replacement location and access area | Mr John Lake | 05 Apr 2018 | 05 Apr 2018 |
MLA/2018/00170 Completed | Application - Minor removals | Exmouth Tidal Defence Scheme - Boreholes for geotechnical investigation | Exmouth TDS - Borehole locations | Environment Agency | 06 Apr 2018 | 06 Apr 2018 |
MLA/2018/00171 Completed | Application - Construction of new works, Other removals | Swanage Slipway Project | Swanage Slipway | Swanage Town Council | 06 Apr 2018 | 23 Aug 2018 |
MLA/2018/00172/1 Completed | Application - Disposal of dredged material | Port of Sunderland - disposal of maintenance dredged material | SUNDERLAND (TY090) | Port Of Sunderland | 09 Apr 2018 | 14 Nov 2018 |
MLA/2018/00173 Completed | Application - Maintenance of existing structures or assets | Emergency Quay wall repairs | Rubber Factory | Southbay Civil Engineering Limited | 09 Apr 2018 | 09 Apr 2018 |
MLA/2018/00174/1 Completed | Application - Aggregate dredging, Sampling | Area 254 - Marcon | Area 254 - Marcon | Tarmac Marine Dredging Ltd | 09 Apr 2018 | 27 Oct 2020 |
MLA/2018/00175/1 Completed | Application - Construction of new works, Maintenance of existing works, Other works | River wall repair and maintanence 26-37 Clive Street North Shields Grouped under: River wall repair 26-37 Clive Street North Shields Showing 2 of 2 cases | Clive Street 26-37 | Southbay Civils Engineering Limited | 10 Apr 2018 | 13 Nov 2019 |
MLA/2018/00176 Completed | Application - Maintenance of existing works | RNLI Selsey - Emergency Removal of Buried Obstruction | RNLI Selsey - Emergency Removal Works (April 18) | Rnli Division South | 11 Apr 2018 | 12 Apr 2018 |
MLA/2018/00177 Completed | Application - Beach maintenance activities | Clearance of sand in harbour to allow better use of Landing Steps on West Pier, St Ives | St Ives Harbour | Cornwall Council - Harbour Office | 11 Apr 2018 | 11 Apr 2018 |
MLA/2018/00179 Completed | Application - Construction of new works | Brighton Marina West Quay Pontoon | Brighton West Quay Pontoon | Premier Marinas (Brighton) Ltd | 12 Apr 2018 | 06 Jul 2018 |
MLA/2018/00180 Completed | Application - Maintenance of existing works | River wall emergency repair 26-37 Clive Street North Shields Grouped under: River wall repair 26-37 Clive Street North Shields Showing 2 of 2 cases | Clive Street 26-37 | Southbay Civils Engineering Limited | 12 Apr 2018 | 16 Apr 2018 |
MLA/2018/00181 Completed | Application - Maintenance of existing works | St Helens Mill Dam Footbridge Replacements (B320 and B321) | The Causeway | Ringway Island Roads | 13 Apr 2018 | 21 Aug 2018 |
MLA/2018/00182 Completed | Application - Maintenance of existing works | B160 Newport Quay Deck Replacement | Newport Quay Bridge | Ringway Island Roads Limited | 13 Apr 2018 | 06 Nov 2018 |
MLA/2018/00183 Completed | Application - Maintenance of existing works | Asset Refurbishment Programme of Works Revetment Repairs on the Blackwater | Mundon Creek, Rolls Farm site 1 | Jacksonhyder | 13 Apr 2018 | 15 Oct 2018 |
MLA/2018/00184 Withdrawn | Application - Other removals | Triton Knoll Wind Farm | Triton Knoll Offshore Wind Farm Ltd | 16 Apr 2018 | ||
MLA/2018/00185 Completed | Application - Maintenance of existing works | Pontoon change at Thunderbolt Pier | Thunderbolt Pier | Chatham Historic Dockyard Trust | 16 Apr 2018 | 14 Aug 2018 |
MLA/2018/00187 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mamarine.Com Llp | 17 Apr 2018 | 17 Apr 2018 | |
MLA/2018/00188 Completed | Application - Maintenance of existing structures or assets | URGENT REPAIRS TO ROOF AND TIMBER CLADDING DUE TO STORM DAMAGE | St ives Arts Club, Scaffolding | St Ives ( Cornwall ) Arts Club Society | 17 Apr 2018 | 17 Apr 2018 |
MLA/2018/00189 Completed | Application - Deposit of markers | Laying dinghy racing marks in Christchurch Harbour that remain in place for more than 28 days and are only removed for maintenance. | Christchurch Harbour fixed racing marks | Highcliffe Sailing Club | 18 Apr 2018 | 18 Apr 2018 |
MLA/2018/00190 Completed | Application - Construction of new works | proposed shellfish landing jetty | Oxen Cove proposed jetty | Tda | 18 Apr 2018 | 04 Feb 2019 |
MLA/2018/00191/1 Completed | Application - Maintenance of existing structures or assets | Crispins, Newton Ferrers | Bridgend | Mr Paul Pethick | 18 Apr 2018 | 26 Apr 2018 |
MLA/2018/00192 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Paul Steele | 19 Apr 2018 | 19 Apr 2018 | |
MLA/2018/00193/7 Completed | Application - Construction of new works | Deptford Creek Marine Works - Full | Deptford Creek Marine Works | Thames Tideway Tunnel Limited | 20 Apr 2018 | 14 Mar 2024 |
MLA/2018/00194/2 Completed | Application - Construction of new works, Decommissioning of works | Replacement Dolphin Navigator Terminals | Correct site of works | Navigator Terminals Thames | 20 Apr 2018 | 19 Mar 2019 |
MLA/2018/00195 Completed | Application - Construction of new works | West Quarries Recreation Site Landing Stage | West Quarries Recreation Site Landing Stage | River Recreation Cic | 20 Apr 2018 | 01 Apr 2019 |
MLA/2018/00196 Completed | Application - Maintenance of existing structures or assets | Eastern Jetty Fender Thrust Pile maintenance | Site 1 | Falmouth Petroleum Limited | 23 Apr 2018 | 23 Apr 2018 |
MLA/2018/00197 Completed | Application - Deposit of markers | Brightlingsea Sailing Club racing marks licence application | Batemans (BSC), Pyefleet (CYC), Point Clear (BSC), Hills (BSC), Gazelet (BSC), Cocum (BSC), Beach (BSC), CVP (CYC) | Brightlingsea Sailing Club | 24 Apr 2018 | 24 Apr 2018 |
MLA/2018/00198 Completed | Application - Maintenance of existing structures or assets | Jetty 1A Replacement Ethylene Loading Arm | North Tees Jetty 1A | Sabic Global Limited | 24 Apr 2018 | 24 Apr 2018 |
MLA/2018/00199 Completed | Application - Construction of new works | Victoria Breakwater improvement | Victoria Breakwater, Brixham | Torbay Council | 25 Apr 2018 | 16 Oct 2018 |
MLA/2018/00201 Completed | Application - Construction of new works, Other dredging | Intertidal Enhancement Works | Enderby Wharf | Enderby Wharf Llp | 25 Apr 2018 | 11 Mar 2019 |
MLA/2018/00202/1 Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Newhaven Harbour Maintenance Dredging Sediment Disposal | NEWHAVEN (WI010) | Newhaven Port & Properties Ltd | 25 Apr 2018 | 18 Oct 2021 |
MLA/2018/00203 Completed | Application - Deposit of markers | REPAIR TO MARKERS - ISOLATED DANGER BEACON - POLLARD GROUND | POLLARD GROUND SEASALTER | Seasalter Shellfish (Whitstable) Ltd | 25 Apr 2018 | 25 Apr 2018 |
MLA/2018/00204 Completed | Application - Maintenance of existing structures or assets | Maintenance to existing outfall diffuser valves | Outfall pipe outlet location (activities centred on this point) | Falmouth Divers Limited | 26 Apr 2018 | 26 Apr 2018 |
MLA/2018/00205 Completed | Application - Other works | Penzance Promenade Trial Pits | Penzance Promenade | Cormac Solutions Limited | 26 Apr 2018 | 29 Jun 2018 |
MLA/2018/00206/1 Completed | Application - Navigational dredging (maintenance) | Maintenance Dredging around W Trout & Son Ltd Pontoons - Lat. 50*40'5500N, Lon 3*27'58.02W | W Trout & Son Ltd | W Trout & Son Limited | 27 Apr 2018 | 12 Nov 2020 |
MLA/2018/00207/1 Completed | Application - Maintenance of existing structures or assets | Manea Bridge | Manea | J. Murphy & Sons Limited | 27 Apr 2018 | 03 May 2018 |
MLA/2018/00208 Completed | Application - Other deposits | Barrow Offshore Wind Farm Rock Placement | Barrow_Windfarm_WGS84 | Orsted Power Uk Ltd | 30 Apr 2018 | 14 Aug 2018 |
MLA/2018/00209/1 Completed | Application - Construction of new works | Alterations to Twelve Quays Terminal | Twelve Quays Site | Peel Ports (Medway) Limited | 30 Apr 2018 | 05 Aug 2019 |
MLA/2018/00210 Completed | Application - Maintenance of existing structures or assets | Slipway repairs for Harbour House, 22 Greenacres, Birdham, Po20 7HL | Slipway repairs , Harbour house ,22 Greenacres, Birdham | Mr Andy Fitzgerald | 30 Apr 2018 | 30 Apr 2018 |
MLA/2018/00212/1 Completed | Application - Maintenance of existing works | Sheerness Asset Maintenance | Neptune Jetty | Team Van Oord | 30 Apr 2018 | 22 Mar 2019 |
MLA/2018/00213 Completed | Application - Other dredging | Excavation of sediment to investigate and repair failed soakaway under Porthminster beach | Porthminster | Cornwall Council -Environment Service | 30 Apr 2018 | 02 Jul 2018 |
MLA/2018/00214 Completed | Application - Construction of new works, Navigational dredging (capital) | Development of Standard Wharf | Standard Wharf Ltd | 01 May 2018 | 27 Oct 2022 | |
MLA/2018/00215 Completed | Application - Maintenance of existing works | Installation of two 323mm dia piles to prevent storm damage to existing leisure pontoon | Burnham on Crouch Sailing Club Pontoon | Burnham On Crouch Sailing Club | 01 May 2018 | 01 Aug 2018 |
MLA/2018/00216 Withdrawn | Application - Construction of new works | Natural Flood Management using Saltmarsh in Suffolk Estuaries | Sudbourne, Alde and Ore Estuary between Orford and Aldeburgh | Environmentagency | 02 May 2018 | |
MLA/2018/00217 Withdrawn | Application - Other deposits | Lincolnshire Time and Tide Bell | Time and Tide Bell, Beach, North End, Mablethorpe | Lincolnshire Time And Tide Bell Community Interest Company | 02 May 2018 | |
MLA/2018/00218 Completed | Application - Maintenance of existing structures or assets | Refurbishment of Two Rustic Timber Pole Groynes, below Eastcliff, Undertyne, Bembridge, IOW | Bembridge Groynes | Graham Attrill Civil Engineering Limited | 02 May 2018 | 02 May 2018 |
MLA/2018/00220 Completed | Application - Construction of new works | Works to sea wall at 69-73 Whitworth Crescent, Southampton. | 69-73 Whitworth Crescent, Southampton | Mr Jeremy Swadling | 03 May 2018 | 10 Jul 2018 |
MLA/2018/00221/1 Completed | Application - Construction of new works | Fresh Wharf River Wall and Temporary Moorings | Fresh Wharf River Works | Erith Contractors Ltd | 04 May 2018 | 31 Mar 2022 |
MLA/2018/00222/2 Completed | Application - Maintenance of existing works | A14 River Orwell Pier 10 CP | A14 River Orwell Bridge - Pier 10 | Kier Highways Limited | 04 May 2018 | 27 Aug 2019 |
MLA/2018/00223 Completed | Application - Disposal of dredged material, Maintenance of existing works, Other dredging | Grain Power Station Cooling Water Intake Maintenance. Site - Grain Power Station, Isle of Grain, Rochester, ME3 0AR | Cooling water intake structure dredging and maintenance works, SOUTH FALLS (TH070) | Uniper Uk Limited | 04 May 2018 | 06 Feb 2019 |
MLA/2018/00224 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr John Mckenzie | 04 May 2018 | 04 May 2018 | |
MLA/2018/00225 Completed | Application - Maintenance of existing structures or assets | Restoration of the Wreck Trail on the SS Bretagne - Centenary Celebration | Wreck site of the SS Bretagne | British Sub-Aqua Club | 05 May 2018 | 05 May 2018 |
MLA/2018/00226 Completed | Application - Maintenance of existing structures or assets | Resurfacing of slipway | Tregonce Barn Slipway | Mrs June Totman | 08 May 2018 | 08 May 2018 |
MLA/2018/00227 Completed | Application - Construction of new works, Other deposits | Fort Bovisand Cliff Stabilisation | 180406_07645_00001_SiteBoundary_digitised | Fort Bovisand Developments Ltd | 08 May 2018 | 15 May 2019 |
MLA/2018/00228 Completed | Application - Maintenance of existing structures or assets | Flat Cliffs - Temporary Access Platform for Installation of Cliff Drainage Works | Flat cliffs v4 | Scarborough Borough Council | 09 May 2018 | 09 May 2018 |
MLA/2018/00229 Completed | Application - Construction of new works | Coldharbour Outfall Extension | Outfall_Extension_Extent | Canterbury City Council | 11 May 2018 | 15 Aug 2018 |
MLA/2018/00230 Completed | Application - Construction of new works | RD30 Waren Mill STW | Waren Mill - Outfall, Waren Mill - Pipe Crossing | Mott Macdonald Bentley Limited | 11 May 2018 | 08 Aug 2018 |
MLA/2018/00231 Completed | Application - Maintenance of existing works | RNLI Selsey - Emergency Removal of Buried Obstruction (Phase 2) | RNLI Selsey - Emergency Removal Works | Rnli Estates | 14 May 2018 | 22 May 2018 |
MLA/2018/00232 Completed | Application - Minor removals | Subsea Drill Test Program | Blyth West Quay | Royal Ihc Limited | 14 May 2018 | 14 May 2018 |
MLA/2018/00233 Completed | Application - Construction of new works | Weymouth Marina Pontoons | Weymouth Pontoons | Dean & Reddyhoff Limited | 14 May 2018 | 28 Aug 2018 |
MLA/2018/00234/3 Variation Requested | Application - Disposal of dredged material, Navigational dredging (maintenance) | Maintenance Dredging at HMNB Devonport | Plymouth Deep (PL035), Dredge_Area_Indicative | Defence Infrastructure Organisation (Dio) | 15 May 2018 | 26 Oct 2022 |
MLA/2018/00235/3 Completed | Application - Decommissioning of works | Decommissioning of Meteorological Mast 1B | Meteorological Mast Working Area | East Anglia Offshore Wind Limited | 16 May 2018 | 24 Apr 2020 |
MLA/2018/00236 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Charles Lister) | 16 May 2018 | 16 May 2018 | |
MLA/2018/00237 Completed | Application - Maintenance of existing structures or assets | Redecoration of Applewharf, The Plains, Totnes, TQ9 5QL | Applewharf, The Plains, Totnes, TQ9 5QL | Applewharf Management Limited | 16 May 2018 | 16 May 2018 |
MLA/2018/00238 Completed | Application - Maintenance of existing works | RIVER WALL DEFENCE REMEDIATION – CLIFFE | Southern Eroded Section, Northern Eroded Section | Brett Aggregates Ltd | 16 May 2018 | 16 Jul 2018 |
MLA/2018/00239 Completed | Application - Maintenance of existing works | Low Level Concrete Pile Repair | Navigator Terminal Thames Jetty | Vopak Terminal London B.V. Ltd | 17 May 2018 | 23 Nov 2018 |
MLA/2018/00240 Completed | Application - Construction of new works | RD30 Waren Mill Sea Wall | Sea Wall | Mott Macdonald Bentley Limited | 18 May 2018 | 09 Aug 2018 |
MLA/2018/00242 Completed | Application - Construction of new works | Scotline New Quay Wall | Scotline New Quay Wall | Gdc Partnership Ltd | 19 May 2018 | 31 Oct 2018 |
MLA/2018/00243 Completed | Application - Decommissioning of works | Blyth Offshore Wind Farm Decommissioning Project | Blyth Decommissioning Site, North Turbine, South Turbine | E.On Climate & Renewables Uk Blyth Limited | 21 May 2018 | 18 Mar 2019 |
MLA/2018/00244 Completed | Application - Minor removals | Hambleton Flood Risk Management Scheme (Our ref. ENV0000064C) | Hambleton FRMS - Ground Investigations Area | Environment Agency | 21 May 2018 | 21 May 2018 |
MLA/2018/00245 Completed | Application - Maintenance of existing works | pile repairs, rail & bracing repairs and replacement and removal of debris under brighton palace pier | BRIGHTON PALACE PIER | Brighton Marine Palace & Pier Company (The) | 21 May 2018 | 20 Jun 2019 |
MLA/2018/00248 Completed | Application - Other deposits | Exercise Imber - 727 Spray Evaluation | Spray area | Oil Spill Response Limited | 23 May 2018 | 20 Jun 2018 |
MLA/2018/00251/1 Completed | Application - Other deposits | Spraying of Fresh Water from a B727 to simulate oil spill dispersant application exercise by Oil Spill Response Ltd | SD1 2018 Exercise Area | Oil Spill Response Limited | 23 May 2018 | 05 Oct 2018 |
MLA/2018/00253 Completed | Application - Maintenance of existing structures or assets | Downings Roads Moorings | DOWNINGSROAD | Tower Bridge Yacht And Boat Company Limited | 01 Jun 2018 | 01 Jun 2018 |
MLA/2018/00254 Completed | Application - Maintenance of existing structures or assets | Shell Bacton Outfall NDT | Shell Outfall NDT Area | Shell U.K. Limited | 01 Jun 2018 | 01 Jun 2018 |
MLA/2018/00255 Completed | Application - Marine licence for the burial of human remains at sea | TYNE BURIAL SITE (TY193) | Gordon Fletcher & Sons Limited | 04 Jun 2018 | 04 Jun 2018 | |
MLA/2018/00256 Completed | Application - Maintenance of existing structures or assets | Houghton Bridge repairs | Houghton Bridge | West Sussex County Council | 04 Jun 2018 | 04 Jun 2018 |
MLA/2018/00257 Withdrawn | Application - Disposal of dredged material, Other dredging, Other works | Mylor Yacht Harbour - Extension to the Existing Marina | Mylor Yacht Harbour Ltd | 04 Jun 2018 | ||
MLA/2018/00258 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr John Lister | 04 Jun 2018 | 04 Jun 2018 | |
MLA/2018/00259 Completed | Application - Maintenance of existing structures or assets | Replacement of existing sea defences on foreshore land | Warrens Foreshore | Mr Paul Cox | 04 Jun 2018 | 04 Jun 2018 |
MLA/2018/00260 Withdrawn | Application - Construction of new works | Bathurst Basin Bridge - Pontoon | Bristol City Council | 04 Jun 2018 | ||
MLA/2018/00261 Completed | Application - Maintenance of existing structures or assets | River Lune Viaduct Scour Protection | River Lune Viaduct | J. Murphy & Sons Limited | 05 Jun 2018 | 05 Jun 2018 |
MLA/2018/00262 Completed | Application - Maintenance of existing structures or assets | Paighton Pier Maintainence | Paighton Pier | Uk Industrial Services Ltd | 05 Jun 2018 | 05 Jun 2018 |
MLA/2018/00263 Completed | Application - Minor removals | Ghost Fishing UK Project: Removal of ALDFG and Marine Litter from Haybrook Bay to Mothercombe | Blackstone Point Area | Ghost Fishing Uk | 05 Jun 2018 | 05 Jun 2018 |
MLA/2018/00264 Completed | Application - Maintenance of existing structures or assets | Sea Wall and Structure Repairs | Sea Wall | Balfour Beatty Plc | 06 Jun 2018 | 06 Jun 2018 |
MLA/2018/00265 Completed | Application - Deposit of markers | Silloth Outfall Pipe Marker Buoy Replacement | Silloth Outfall Buoy | United Utilities Water Plc | 07 Jun 2018 | 07 Jun 2018 |
MLA/2018/00266 Completed | Application - Maintenance of existing structures or assets | Trippet Wall Repairs | Trippet | West Sussex County Council | 07 Jun 2018 | 07 Jun 2018 |
MLA/2018/00267 Completed | Application - Sampling | Lyme Regis - The Cobb - Ground Investigations | Ground investigation area - The Cobb | Jba Consulting Limited | 07 Jun 2018 | 15 Oct 2018 |
MLA/2018/00268 Completed | Application - Construction of new works, Maintenance of existing works | Northey Island South Embankment Works | Northey Island South Embankment | National Turst | 08 Jun 2018 | 16 Jan 2019 |
MLA/2018/00269 Completed | Application - Non-navigational clearance dredging | Silt removal | spittys point | Mr Peter Herbert | 10 Jun 2018 | 10 Jun 2018 |
MLA/2018/00270 Completed | Application - Maintenance of existing structures or assets | Race Bank Offshore Wind Farm : Removal of marine growth/guano from WTG access points | Race Bank Wind Farm | Dong Energy Rb (Uk) Limited | 11 Jun 2018 | 11 Jun 2018 |
MLA/2018/00271 Completed | Application - Maintenance of existing works | Darthaven Marina | Darthaven Marina | Darthaven Marina Limited | 11 Jun 2018 | 04 Dec 2018 |
MLA/2018/00272 Completed | Application - Construction of new works, Maintenance of existing works | Yacht Haven, Hayling Island, Hants | Yacht Haven Sea Defence 1, Yacht Haven Sea Defence 2, Yacht Haven Slipway, New pontoons | Alpine Homes Ltd | 12 Jun 2018 | 27 Jan 2023 |
MLA/2018/00273/1 Completed | Application - Construction of new works | East End Landing pontoon with two piles | East End slipway | Wells Harbour Commissioners | 12 Jun 2018 | 03 Oct 2018 |
MLA/2018/00274 Completed | Application - Maintenance of existing structures or assets | Old Mill, Dartmouth | Old Mill, Dartmouth | Glanville Cleansing Limited | 12 Jun 2018 | 12 Jun 2018 |
MLA/2018/00275 Completed | Application - Non-navigational clearance dredging | Hen Pens Sand Winning | Hen Pens, Foulshaw | Environment Agency | 12 Jun 2018 | 12 Jun 2018 |
MLA/2018/00276/1 Completed | Application - Decommissioning of works | Convoys Wharf Demolition and Removal of Pontoon Berth | Convoys Wharf | Herbosch-Kiere Marine Contractors Ltd. | 13 Jun 2018 | 21 Jun 2019 |
MLA/2018/00277/1 Completed | Application - Maintenance of existing works | 2017s6104 - Eels regulation compliance measures at Hempholme Lock | Hempholme Lock | Yorkshire Water Services Ltd | 13 Jun 2018 | 28 Mar 2019 |
MLA/2018/00279 Completed | Application - Maintenance of existing structures or assets | Old Bridge Street Retaining Wall Repair | Old Bridge Street Retaining Wall | Cormac Solutions Limited | 14 Jun 2018 | 14 Jun 2018 |
MLA/2018/00280 Completed | Application - Maintenance of existing structures or assets | King Henry's Wharf Flood Defence Wall Repairs | King Henry's Wharf | Moore Project Management Solutions Llp | 14 Jun 2018 | 14 Jun 2018 |
MLA/2018/00282 Completed | Application - Maintenance of existing works | RNLI Selsey - Emergency Relocation of Mooring | New swinging mooring | Rnli Division South | 15 Jun 2018 | 29 Jun 2018 |
MLA/2018/00283 Completed | Application - Non-navigational clearance dredging | Hundred End Gutter Desiltig | Hundred End Gutter Outfall Dredge | Environment Agency | 15 Jun 2018 | 15 Jun 2018 |
MLA/2018/00284 Completed | Application - Non-navigational clearance dredging | Crossens Tidal Outfall Channel | Crossens Tidal Outfall Dredge | Environment Agency | 15 Jun 2018 | 15 Jun 2018 |
MLA/2018/00285/2 Completed | Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital), Navigational dredging (maintenance) | East Cowes Lay-By Berth | NAB TOWER (WI060), Lay-by Berth Construction Area, HURST FORT (WI080) | Southampton Isle Of Wight And South Of England Royal Mail Steam Packet Company Limited | 15 Jun 2018 | 23 Jul 2019 |
MLA/2018/00287 Completed | Application - Maintenance of existing structures or assets | The Old Mill, Lee Bay | The Old Mill, Lee Bay | Taw & Torridge Scaffolding Ltd | 19 Jun 2018 | 19 Jun 2018 |
MLA/2018/00288 Completed | Application - Maintenance of existing structures or assets | Ocean Wharf 2 Flood Defence Repairs | Ocean Wharf 2 Flood Defence Repairs | Moore Project Management Solutions Llp | 19 Jun 2018 | 19 Jun 2018 |
MLA/2018/00289 Completed | Application - Construction of new works, Other deposits, Other removals | Sussex Yacht Club Slipway Infill | Sussex Yacht Club | Sussex Yacht Club,Limited | 20 Jun 2018 | 09 May 2019 |
MLA/2018/00290 Completed | Application - Maintenance of existing structures or assets | East Anglia Zone- Meteorological Mast 1B- Operations & Maintenance | EAOW Met Mast 1B | East Anglia Offshore Wind Limited | 20 Jun 2018 | 20 Jun 2018 |
MLA/2018/00291 Completed | Application - Maintenance of existing works | Spice Quay Fender Pile Replacement and Repair | Fender Pile Replacement or Repair | Langbourn Properties (Spice Quay) Ltd | 21 Jun 2018 | 23 Nov 2018 |
MLA/2018/00292 Completed | Application - Non-navigational clearance dredging | Sea Sanctuary - Waterside Barge Mooring Project | Waterside Quay, Penryn | Falmouth Divers Limited | 21 Jun 2018 | 21 Jun 2018 |
MLA/2018/00293 Withdrawn | Application - Construction of new works | Newlyn Harbour Work space Regeneration | Newlyn Pier And Harbour | 21 Jun 2018 | ||
MLA/2018/00294 Withdrawn | Application - Other works | Personal Water Craft Potoon | Brightlingsea Harbour Commissioners | 22 Jun 2018 | ||
MLA/2018/00295 Completed | Application - Construction of new works | Ebbsfleet Outfall | Outfall | Independent Water Networks Limited | 22 Jun 2018 | 02 Jul 2019 |
MLA/2018/00296 Withdrawn | Application - Construction of new works | Royal Dock tidal basin: pilot launch moorings | Grimsby pilot launch berths area | Associated British Port-Grimsby | 22 Jun 2018 | |
MLA/2018/00297 Completed | Application - Maintenance of existing structures or assets | Repair to the sea wall at Bosham Quay Meadow | Bosham Quay Meadow | National Trust (Enterprises) Limited (The) | 26 Jun 2018 | 26 Jun 2018 |
MLA/2018/00298 Completed | Application - Construction of new works | Hollows Mooring (previous licence granted: MLA/2015/00190) | Hollows | Morlandia Limited | 26 Jun 2018 | 13 Sep 2018 |
MLA/2018/00299 Completed | Application - Maintenance of existing works | Rebuilding final 24 metres of existing jetty | Harlow (Blackwater) Sailing Club | Harlow (Blackwater) Sailing Club | 26 Jun 2018 | 03 Oct 2018 |
MLA/2018/00300 Withdrawn | Application - Disposal of dredged material, Navigational dredging (capital) | Willington Quay Gut dredging existing mud banks | Mr Len Clarke | 26 Jun 2018 | ||
MLA/2018/00301/3 Completed | Application - Other works | Marine Licence Application for the Reconfiguration of Moorings at Town Quay, Lymington | Town Quay Works Area | Lymington Harbour Commissioners | 26 Jun 2018 | 23 Jun 2020 |
MLA/2018/00302/1 Completed | Application - Construction of new works | RNLI Portsmouth Slipway Works and Extension | RNLI_Portsmouth_Working_Area_Extent_20180622 | Rnli Estates | 26 Jun 2018 | 15 Apr 2019 |
MLA/2018/00303/1 Completed | Application - Other removals | Humber Gateway Offshore Wind Farm Marine Licence | Humber Gateway Offshore Wind Farm | Rwe Renewables Uk Wind Ltd | 27 Jun 2018 | 26 Apr 2021 |
MLA/2018/00304 Completed | Application - Other removals | Scroby Sands Offshore Wind Farm Operational Marine Licence | Scroby Sands | E.On Climate & Renewables Uk Offshore Wind Limited | 27 Jun 2018 | 26 Oct 2021 |
MLA/2018/00306 Completed | Application - Minor removals | Anchor Chain Removal from Area 460 | 460_licence_Area | Hanson Aggregates Marine Limited | 27 Jun 2018 | 27 Jun 2018 |
MLA/2018/00307/1 Completed | Application - Construction of new works | The construction of a slipway from the proposed watersports centre in Ilfracombe Harbour and the construction of a harbour wall. | Slipway, Wall | North Devon Council | 28 Jun 2018 | 17 Apr 2023 |
MLA/2018/00308 Completed | Application - Construction of new works | Queenborough Harbour pontoon extension | Pontoon extension | Queenborough Harbour Trust | 29 Jun 2018 | 19 Nov 2018 |
MLA/2018/00309 Completed | Application - Maintenance of existing works | Drake's Island Emergency jetty repairs | Drake's Island Jetty | Rotolok (Holdings) Limited | 02 Jul 2018 | 08 Aug 2018 |
MLA/2018/00310 Completed | Application - Construction of new works, Other removals | Royal Wharf phase 3 river wall | Royal Wharf Phase 3 River Wall, Tidal Terrace/Outfall Construction | Oxley Wharf Property 3 Limited | 02 Jul 2018 | 23 Nov 2018 |
MLA/2018/00311 Completed | Application - Construction of new works | Mudlark Pontoon and Piles, IOW | Mudlark Pontoons | Mr Andrew Finnamore | 02 Jul 2018 | 12 Oct 2018 |
MLA/2018/00312 Completed | Application - Marine licence for the burial of human remains at sea | NEWHAVEN (WI011) | H.D.Tribe Limited | 03 Jul 2018 | 03 Jul 2018 | |
MLA/2018/00313 Completed | Application - Construction of new works | Maribor Park, Woolwich, London | Maribor Park, Woolwich, London | Berkeley Homes (East Thames) Limited | 03 Jul 2018 | 14 Oct 2019 |
MLA/2018/00314 Completed | Application - Construction of new works | Woolwich Reach, Pier Road, London | Woolwich Reach, Pier Road, London | Higgins Construction Plc | 04 Jul 2018 | 25 Oct 2019 |
MLA/2018/00315 Completed | Application - Construction of new works | West Plain Marsh Habitat Restoration Project | Site_of_Interest | Holker Estates Co Ltd | 04 Jul 2018 | 16 Jan 2019 |
MLA/2018/00316 Completed | Application - Maintenance of existing structures or assets | Tom's Boatyard | Toms Boatyard | C. Toms And Son Limited | 04 Jul 2018 | 04 Jul 2018 |
MLA/2018/00317 Completed | Application - Maintenance of existing structures or assets | Royal Lymington Yacht Club Starting Platform | Starting Platform | Royal Lymington Yacht Club Limited | 05 Jul 2018 | 05 Jul 2018 |
MLA/2018/00318 Completed | Application - Maintenance of existing structures or assets | Hartlepool SO11 | Hartlepool SO11 | Northumbrian Water Limited | 05 Jul 2018 | 05 Jul 2018 |
MLA/2018/00320 Completed | Application - Maintenance of existing works | Weymouth Magnetic Open Sea Range | Weymouth Magnetic Open Sea range | Qinetiq Limited | 05 Jul 2018 | 09 Nov 2018 |
MLA/2018/00321 Completed | Application - Navigational dredging (capital), Other deposits | Berth 4 Rock Dredge, Battleship Wharf, Port of Blyth | Berth 4 Dredge Area 1, Berth 4 Dredge Area 2 | Port Of Blyth | 09 Jul 2018 | 13 Dec 2018 |
MLA/2018/00322 Completed | Application - Maintenance of existing works | St Saviours Dock Bridge strengthening works | St Saviours dock footbridge | F M Conway Limited | 09 Jul 2018 | 25 Oct 2018 |
MLA/2018/00323/1 Completed | Application - Aggregate dredging, Sampling | Bassurelle Extension | BX 458, BX 464 | Cemex Uk Marine Ltd | 09 Jul 2018 | 19 Oct 2023 |
MLA/2018/00324/1 Completed | Application - Maintenance of existing structures or assets | Parton to Bransty sea wall | MMO | Story Contracting Limited | 10 Jul 2018 | 12 Jul 2018 |
MLA/2018/00325 Completed | Application - Maintenance of existing structures or assets | Fleetwood Training Platform Maintenance | Fleetwood Training Platform | Blackpool And The Fylde College | 10 Jul 2018 | 10 Jul 2018 |
MLA/2018/00326 Completed | Application - Maintenance of existing structures or assets | Arpley Longitudinal Timbers | Arpley | Network Rail | 11 Jul 2018 | 11 Jul 2018 |
MLA/2018/00327 Completed | Application - Maintenance of existing structures or assets | B159 Little London Bridge Maintenance | Little London Bridge | Ringway Island Roads Limited | 11 Jul 2018 | 11 Jul 2018 |
MLA/2018/00328/1 Completed | Application - Construction of new works, Other removals | Denver mooring replacement | Denver Lock | J.N. Bentley Limited | 11 Jul 2018 | 19 Mar 2019 |
MLA/2018/00329 Completed | Application - Other removals | Sheet Pile Removal/ Cropping at Blyth Power Station Outfall | Metal Sheet Piles | Rwe Npower Plc | 12 Jul 2018 | 18 Oct 2018 |
MLA/2018/00330 Completed | Application - Maintenance of existing structures or assets | River Winster Tidal Flap Replacement | River Winster Tidal Flap | Amalgamated Construction Ltd | 13 Jul 2018 | 13 Jul 2018 |
MLA/2018/00331 Completed | Application - Maintenance of existing structures or assets | Newton Voss Tidal Path 2 | Newton Voss Tidal Path | Devon County Council | 13 Jul 2018 | 13 Jul 2018 |
MLA/2018/00332/3 Completed | Application - Maintenance of existing structures or assets | Coombe Quay | Mr Nick Haworth | 13 Jul 2018 | 16 Jul 2018 | |
MLA/2018/00335 Completed | Application - Maintenance of existing structures or assets | Porth Nanven Beach, Cot Valley, St Just, Penzance, TR19 7QH | Porth Nanven Beach | Glanville Cleansing Limited | 16 Jul 2018 | 16 Jul 2018 |
MLA/2018/00336 Completed | Application - Navigational dredging (maintenance) | Medway Approach Channel Water Injection Dredging | MAC Extent | Port Of Sheerness Limited. | 16 Jul 2018 | 19 Mar 2019 |
MLA/2018/00337 Completed | Application - Maintenance of existing structures or assets | London Eye Sub-structure Repainting | Coca Cola London Eye - Painting | I&C Limited | 16 Jul 2018 | 16 Jul 2018 |
MLA/2018/00338 Completed | Application - Maintenance of existing works | Nemo Link Cat 2 (& additional Cat 1) Remedial Works | Location 2R.1, Location 2R.2, Location 2R.3, Location 2R.4, Location 2R.5, Location 2R.6, Location 2R.7, Location 13B.1, Location 14.1, 15.1, 16.1 | National Grid Nemo Link Limited | 16 Jul 2018 | 19 Oct 2018 |
MLA/2018/00339/1 Completed | Application - Use of tracers | Proposal to release Rhodamine WT and biological tracers in the upper Fal Estuary | Dye release activity site | Cefas Weymouth | 18 Jul 2018 | 13 Nov 2018 |
MLA/2018/00340/1 Completed | Application - Other works | SHELLNESS EMERGENCY WORKS | Work Location | Team Van Oord | 18 Jul 2018 | 30 Oct 2018 |
MLA/2018/00341 Completed | Application - Maintenance of existing structures or assets | Waterhead Creek Stepping Stone maintenance | Waterhead_Creek_Stepping_Stones_July2018_region | Devon County Council | 18 Jul 2018 | 18 Jul 2018 |
MLA/2018/00342 Completed | Application - Other works | Race Bank Saltmarsh Restoration Works | Race Bank Landfall | Orsted Power Uk Ltd | 18 Jul 2018 | 20 Jul 2018 |
MLA/2018/00343 Completed | Application - Minor removals | Trial holes in rock armour revetment, Shipyards Estate, Shore Road, Hythe, Southampton | Revetment to Sea Wall, Shipyards Estate, Shore Road, Hythe, Southampton | Taylor Wimpey Uk Limited | 19 Jul 2018 | 19 Jul 2018 |
MLA/2018/00344 Completed | Application - Maintenance of existing structures or assets | Town Quay SPS, Fowey - Rising Main Repair. Undertaken from an existing South West Water chamber on the slipway adjacent to Town Quay, utilising an access tower to gain entry to the chamber. | South West Water Manhole SX12516631 on Slipway Adjacent Town Qay, Fowey | South West Water Limited | 19 Jul 2018 | 19 Jul 2018 |
MLA/2018/00345 Completed | Application - Maintenance of existing structures or assets | Renovation of Slipway Steps | Repair to steps | Mr John Willcox-Jones | 20 Jul 2018 | 20 Jul 2018 |
MLA/2018/00346 Completed | Application - Maintenance of existing structures or assets | QinetiQ Portland Grove Point maintenance and repair | Grove Point range | Qinetiq Limited | 20 Jul 2018 | 20 Jul 2018 |
MLA/2018/00347 Completed | Application - Maintenance of existing structures or assets | Oldbury Power Station Revetment Repairs 2018 | Oldbury Revetments | Magnox Limited | 23 Jul 2018 | 23 Jul 2018 |
MLA/2018/00348 Completed | Application - Maintenance of existing structures or assets | MNC0236 - Railway Uderbridge 38A | MNC0236 - Underbridge 38A - River Mersey | Amalgamated Construction Ltd | 24 Jul 2018 | 24 Jul 2018 |
MLA/2018/00349 Completed | Application - Maintenance of existing structures or assets | Netley Sailing Club Slipway Minor Maintenance | Slipway_Boundary | Netley Sailing Club Ltd | 24 Jul 2018 | 24 Jul 2018 |
MLA/2018/00350 Completed | Application - Other deposits | 727 - Simulated oil spill spraying operations | Area 2 - Spray West, Area 1 - Spray East, Area 3 - Spray West, Area 7 - Spray South East, Area 8 - Spray South | Oil Spill Response Limited | 25 Jul 2018 | 18 Dec 2018 |
MLA/2018/00351 Completed | Application - Maintenance of existing structures or assets | Reinstatement of steel stepped access to Babbacombe Beach | Babbacombe Beach access steps | Torbay Development Agency | 26 Jul 2018 | 26 Jul 2018 |
MLA/2018/00352 Completed | Application - Non-navigational clearance dredging | Aldeburgh Yacht Club - Dredging around existing pontoon | Aldeburgh Yacht Club | Aldeburgh Yacht Club | 29 Jul 2018 | 29 Jul 2018 |
MLA/2018/00353 Completed | Application - Minor removals | Fairhaven to Church Scar Coast Protection Scheme | Fairhaven - Location 1 | Volker Stevin Limited | 29 Jul 2018 | 29 Jul 2018 |
MLA/2018/00354 Completed | Application - Minor removals | Fairhaven to Church Scar Coast Protection Scheme | Fairhaven - Location 2 | Volker Stevin Limited | 29 Jul 2018 | 29 Jul 2018 |
MLA/2018/00356 Completed | Application - Minor removals | soils investigation Thunderer Jetty Dagenham | thunderer jetty | Mr Andrew Taylor | 30 Jul 2018 | 30 Jul 2018 |
MLA/2018/00357 Completed | Application - Construction of new works | Salcombe, Fish Quay access bridge and fendering | Batson Creek - Pontoons and bridge | Salcombe Harbour | 30 Jul 2018 | 08 Nov 2018 |
MLA/2018/00358/1 Completed | Application - Construction of new works | A63 Castle Street Improvements, Princes Quay Footbridge | Princes Quay Footbridge | Highways England | 01 Aug 2018 | 07 May 2019 |
MLA/2018/00359 Completed | Application - Maintenance of existing structures or assets | Livermead Beach - guardrail repair | Livermead beach, Torquay | Torbay Council | 02 Aug 2018 | 02 Aug 2018 |
MLA/2018/00360 Completed | Application - Construction of new works | Protection of private property at Archbrook by gabions | Archbrook Embankment | Mr Edward Aldous | 03 Aug 2018 | 25 Oct 2018 |
MLA/2018/00361/3 Completed | Application - Other removals | cargo recovery from wrecks around the UK. Phase 1. | Marine Salvage Solutions | 07 Aug 2018 | 12 Jul 2022 | |
MLA/2018/00362/1 Completed | Application - Construction of new works | RNLI Exmouth Launching Ramp Extension | RNLI Exmouth | R.N.L.I. (Trading) Limited | 07 Aug 2018 | 31 Jul 2019 |
MLA/2018/00363 Completed | Application - Navigational dredging (capital) | Woolwich Ferry Life Extension - North inner berth capital dredging | North inner berth dredge area | Bam Nuttall Limited | 08 Aug 2018 | 18 Oct 2018 |
MLA/2018/00364/1 Completed | Application - Construction of new works | New External Stairway to Foreshore, Underdeck, Cliff Road, Salcombe | Foreshore, Cliff Road, Salcombe, TQ8 8JQ | Tms Maritime Ltd | 08 Aug 2018 | 12 Mar 2019 |
MLA/2018/00366 Completed | Application - Construction of new works | Installation of 100 headlines for cultivation of rope grown mussels | rope grown mussels | Fowey Sea Farms Ltd | 08 Aug 2018 | 11 Dec 2018 |
MLA/2018/00368 Completed | Application - Wrecks and other archaeological remains | Project Mercury | Mr Nigel Hodge | 08 Aug 2018 | 02 Mar 2020 | |
MLA/2018/00369 Completed | Application - Minor removals | Removal of Seatricity's Moorings at Wave Hub | Wave Hub, Cornwall | Seatricity Limited | 09 Aug 2018 | 09 Aug 2018 |
MLA/2018/00370 Completed | Application - Maintenance of existing structures or assets | North Kent Revetment works | Polygon | Environment Agency | 09 Aug 2018 | 09 Aug 2018 |
MLA/2018/00371 Completed | Application - Maintenance of existing structures or assets | North Shields Pedestrian Ferry Terminal Jetty Repairs | North Shields Ferry Terminal | G & B Civil Engineering Limited | 10 Aug 2018 | 10 Aug 2018 |
MLA/2018/00372 Completed | Application - Minor removals | Margate Harbour ground investigation | Margate Harbour | R.N.L.I. (Sales) Limited | 10 Aug 2018 | 10 Aug 2018 |
MLA/2018/00373/2 Completed | Application - Construction of new works, Decommissioning of works, Other deposits | Bacton to Walcott Coastal Management Scheme | Bacton to Walcott Beach Front | North Norfolk District Council | 13 Aug 2018 | 12 Jul 2019 |
MLA/2018/00374 Completed | Application - Other works | St Andrews Art Centre - Repair Works | St Andrews Art Centre | Colin Toms And Partners Llp | 13 Aug 2018 | 23 May 2019 |
MLA/2018/00375 Completed | Application - Non-navigational clearance dredging | B18-239 - Grange Outfall Operational Clearance | Grange_Outfall | Environment Agency | 13 Aug 2018 | 13 Aug 2018 |
MLA/2018/00377/1 Completed | Application - Maintenance of existing works | Additional piles to ensure safety of existing structures | Port Werburgh | Residential Marine Ltd. | 14 Aug 2018 | 06 Oct 2021 |
MLA/2018/00378 Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Hamble Yacht Services Maintenance Dredge | HYS Dredge Area, NAB TOWER (WI060), HURST FORT (WI080) | Hamble Yacht Services Limited | 15 Aug 2018 | 21 Dec 2018 |
MLA/2018/00380 Completed | Application - Maintenance of existing structures or assets | Blind Yeo Outfall Refurbishment - concrete revetment repairs | BY_resurface | Bmm Jv Limited | 15 Aug 2018 | 15 Aug 2018 |
MLA/2018/00381 Completed | Application - Maintenance of existing structures or assets | Blind Yeo Outfall Refurbishment - minor maintenance | BY_maint | Bmm Jv Limited | 15 Aug 2018 | 15 Aug 2018 |
MLA/2018/00382 Completed | Application - Construction of new works | Addition of pontoon sections to existing pontoon | 1 Vespasian and 71 Chafen Road Southampton SO18 1BD | Mr Gavin Webster | 15 Aug 2018 | 26 Jul 2019 |
MLA/2018/00383 Completed | Application - Maintenance of existing structures or assets | River Stour - Cattawade Creek - Wheel Timber Replacement | Cattawade Bridge | J. Murphy & Sons Limited | 17 Aug 2018 | 17 Aug 2018 |
MLA/2018/00385 Completed | Application - Disposal of dredged material, Other dredging | Race Bank Export Cable Protection Works | Orsted | 17 Aug 2018 | 06 Oct 2021 | |
MLA/2018/00386 Completed | Application - Construction of new works | LANTIVET MUSSELFARM | Westcountry Mussels Of Fowey Ltd | 18 Aug 2018 | 11 Dec 2018 | |
MLA/2018/00388 Completed | Application - Non-navigational clearance dredging | Whites Brook- De Silting | Whites Brook | Amalgamated Construction Ltd | 21 Aug 2018 | 21 Aug 2018 |
MLA/2018/00389 Completed | Application - Maintenance of existing structures or assets | Poole Harbour Tidal Flap | Poole Harbour Tidal Flap | Kingcombe Stonbury Limited | 21 Aug 2018 | 21 Aug 2018 |
MLA/2018/00390 Completed | Application - Maintenance of existing structures or assets | replacement ladders at strand quay | STRAND QUAY | Environment Agency | 21 Aug 2018 | 21 Aug 2018 |
MLA/2018/00391 Completed | Application - Construction of new works | rye harbour marine piling works | Harbour rd Moorings | Environment Agency | 21 Aug 2018 | 08 Feb 2019 |
MLA/2018/00392 Completed | Application - Minor removals | Holborn Enabling Works - Ground Investigation Stage Grouped under: Holborn Enabling Works - Ground Investigation Stage Showing 2 of 2 cases | Holborn Site ground investigation | South Tyneside Council | 21 Aug 2018 | 21 Aug 2018 |
MLA/2018/00393 Completed | Application - Construction of new works, Other deposits, Other works | Alma Bridge, Sidmouth | New Bridge site, Demolish existing bridge, Sandstone deposition | Devon County Council. | 22 Aug 2018 | 19 Mar 2019 |
MLA/2018/00394 Completed | Application - Construction of new works | Timber deck on existing stone quay | One Old Coastguards | Mr Charles Stewart | 22 Aug 2018 | 10 Sep 2019 |
MLA/2018/00395 Completed | Application - Construction of new works, Decommissioning of works | Dolphin Quay - Quay (Flood) Wall Replacement and Removal of Existing | Dolphin Quay | Minsted Properties Llp. | 23 Aug 2018 | 06 Mar 2019 |
MLA/2018/00396 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Britannia Shipping (Fao: Lister | 24 Aug 2018 | 24 Aug 2018 | |
MLA/2018/00397/1 Completed | Application - Construction of new works | Archway House Water Cooling Intake and Outfall | Digital London Limited | 24 Aug 2018 | 25 Nov 2019 | |
MLA/2018/00398 Completed | Application - Maintenance of existing works | Marine Parade, Shaldon. Highway Sea wall - Concrete Toe Protection Beam. | Marine Parade, Shaldon. Concrete Toe Protection Beam | Devon County Council, Engineering Design Group | 29 Aug 2018 | 18 Dec 2018 |
MLA/2018/00399 Completed | Application - Maintenance of existing structures or assets | Temporary timber works to reduce Salmon predation at Amble Half Tide Weir | Amble Half Tide Weir | Northumberland Rivers Trust | 30 Aug 2018 | 30 Aug 2018 |
MLA/2018/00401/1 Completed | Application - Navigational dredging (maintenance) | Tideway - Application for removal of Accretion at ALBEF | ALBEF Area of accretion | Flo | 31 Aug 2018 | 10 Dec 2018 |
MLA/2018/00403/1 Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Walney Extension pontoon/jetty dredging and disposal | Berth No.1 Pontoons, BARROW D (IS205), Lead in Jetty | Dong Energy Walney Extension (Uk) Ltd | 03 Sep 2018 | 15 Jul 2024 |
MLA/2018/00404 Completed | Application - Maintenance of existing structures or assets | Sea Wall Repairs | Lovers Walk, Alnmouth | Northumberland Estates | 05 Sep 2018 | 05 Sep 2018 |
MLA/2018/00405/5 Variation Requested | Application - Decommissioning of works, Maintenance of existing works, Other deposits | HOW02 Intertidal Access Ramp Marine Licence Grouped under: Hornsea Offshore Wind Farm Project Two Showing 2 of 10 cases | HOW02 Intertidal Working Area | Diamond Transmission Corporation Limited | 05 Sep 2018 | 06 Nov 2023 |
MLA/2018/00406 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Britannia Shipping Lister | 06 Sep 2018 | 06 Sep 2018 | |
MLA/2018/00407 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mamarine.Com Llp | 06 Sep 2018 | 06 Sep 2018 | |
MLA/2018/00408/1 Completed | Application - Navigational dredging (capital) | Dagenham Jetty upgrade for Cemex UK (dredging) | dagenham | Cemex Uk. | 07 Sep 2018 | 01 May 2020 |
MLA/2018/00409 Completed | Application - Sampling | Holborn Enabling Works - Ground Investigation Grouped under: Holborn Enabling Works - Ground Investigation Stage Showing 2 of 2 cases | Holborn Site ground investigation | South Tyneside Council | 10 Sep 2018 | 19 Nov 2018 |
MLA/2018/00410 Completed | Application - Construction of new works | Section 36 Application for Floating Wind at Wave Hub | Wave Hub, Cornwall | Wave Hub Limited | 10 Sep 2018 | 19 Nov 2020 |
MLA/2018/00411 Completed | Application - Beach maintenance activities | Brighton to Southwick Beach Recycling | Marina to Adur Recycling Site | Shoreham Port Authority | 11 Sep 2018 | 11 Sep 2018 |
MLA/2018/00413 Completed | Application - Maintenance of existing structures or assets | CN1601442 - Furniss Island Bridge Repair | Enys Quay Footbridge | Cormac Solutions Limited | 12 Sep 2018 | 12 Sep 2018 |
MLA/2018/00414 Completed | Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital) | Orwell Yacht Club - Capital navigational dredge, to accommodate floating pontoon, and disposal of dredgings | Orwell Yacht Club dredge site, Orwell Yacht Club disposal site - TH032 | Orwell Yacht Club | 12 Sep 2018 | 12 Dec 2018 |
MLA/2018/00415 Completed | Application - Maintenance of existing structures or assets | Repairs to stonework of retaining harbour wall to cottage wing of museum | Repairs to stonework of retaining harbour wall to cottage wing of museum | Captain Cook Memorial Museum | 12 Sep 2018 | 12 Sep 2018 |
MLA/2018/00416 Completed | Application - Maintenance of existing structures or assets | Repairs to river wall | River wall to the rear of Dunbar Wharf, 108-134 Narrow Street, Limehouse, London | Dunbar Wharf Management Company Limited | 14 Sep 2018 | 14 Sep 2018 |
MLA/2018/00417 Completed | Application - Maintenance of existing works | London Array Offshore Wind Farm Array Cable Replacement | London Array Offshore Wind Farm - Cable Works | London Array Ltd | 14 Sep 2018 | 01 Feb 2019 |
MLA/2018/00418 Completed | Application - Alternative use of dredged material | Selsey Beach Management Plan: Selsey Shingle Recharge | Beach Replenishment Area | Chichester District Council. | 17 Sep 2018 | 21 Dec 2018 |
MLA/2018/00419 Completed | Application - Beach maintenance activities | Outfall jetting at Gilkicker lagoon | Fort_Gilkicker_working_area | Southern Water Limited | 17 Sep 2018 | 17 Sep 2018 |
MLA/2018/00420 Completed | Application - Maintenance of existing structures or assets | replacement of a small piece of pipe, Steephill Cove | Steephill_Cove_working_area | Southern Water Limited | 17 Sep 2018 | 17 Sep 2018 |
MLA/2018/00422 Completed | Application - Navigational dredging (capital) | River Hull+ Scheme | Arctic Corsair | Bmm Jv Limited. | 20 Sep 2018 | 28 Feb 2019 |
MLA/2018/00423 Completed | Application - Minor removals | TEC Geo-Environmental Sampling | Site Area | Rwe Npower Plc | 20 Sep 2018 | 20 Sep 2018 |
MLA/2018/00424 Completed | Application - Maintenance of existing structures or assets | Fairport House Fence repairs | Fairport | Mr Mark Keeling | 21 Sep 2018 | 21 Sep 2018 |
MLA/2018/00425 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Britannia Shipping | 21 Sep 2018 | 21 Sep 2018 | |
MLA/2018/00426 Completed | Application - Maintenance of existing structures or assets | Maryport Seawall Groyne repairs | Maryport Seawall Groyne Repairs | Thomas Armstrong (Construction) Limited | 21 Sep 2018 | 21 Sep 2018 |
MLA/2018/00427 Completed | Application - Maintenance of existing works | CBC1 W630675 Calder Viaduct and Approaches (145932) | Calder Viaduct | Network Rail Limited | 21 Sep 2018 | 17 Dec 2018 |
MLA/2018/00428 Completed | Application - Maintenance of existing works | Dunston Staiths | Dunston staiths | Tyne And Wear Building Preservation Trust | 24 Sep 2018 | 01 Apr 2019 |
MLA/2018/00431 Completed | Application - Maintenance of existing structures or assets | Bayards Cove Fort- Dartmouth | Bayards Cove Fort | South West Scaffolding Limited | 27 Sep 2018 | 27 Sep 2018 |
MLA/2018/00432/1 Completed | Application - Maintenance of existing works | CBC1 W16107 Leven Viaduct | Leven East, Leven West | Network Rail Ltd | 28 Sep 2018 | 01 Aug 2019 |
MLA/2018/00434 Completed | Application - Non-navigational clearance dredging | Rampside surface water & CSO outfall | Rampside_Outfall | Cumbria County Council | 28 Sep 2018 | 28 Sep 2018 |
MLA/2018/00435 Completed | Application - Disposal of dredged material | Axmouth Harbour Dredge Disposal Site | Seaton Disposal site | East Devon District Council | 28 Sep 2018 | 22 Mar 2019 |
MLA/2018/00436 Completed | Application - Wrecks and other archaeological remains | Battle of Britain hurricane excavation | Excavation site of hurricane aircraft | Mr Stephen Vizard | 30 Sep 2018 | 25 Feb 2019 |
MLA/2018/00437 Withdrawn | Application - Construction of new works, Other removals | Nearshore Seaweed Cultivation of Native Species | Sustainable Seaweed Limited | 01 Oct 2018 | ||
MLA/2018/00438 Completed | Application - Maintenance of existing structures or assets | Cromer Pier Substructure Maintenance | Cromer Pier | North Norfolk District Council | 01 Oct 2018 | 01 Oct 2018 |
MLA/2018/00439 Completed | Application - Maintenance of existing works | Peruvian Wharf - Jetty and River Wall Works | Peruvian Wharf | Brett Aggregates Limited | 01 Oct 2018 | 04 Dec 2018 |
MLA/2018/00440/2 Completed | Application - Maintenance of existing works, Other works | Exmouth TDS | Marine_License_LocationPlan_C_20180927, Marine_Licence_Location_Plan_A_20181001 | Environment Agency - South West Region | 03 Oct 2018 | 14 Jan 2021 |
MLA/2018/00441 Completed | Application - Minor removals | Millennium Quay Soil Investigation | Millennium Quay | Colin Toms And Partners Llp | 04 Oct 2018 | 04 Oct 2018 |
MLA/2018/00442 Completed | Application - Construction of new works | Weymouth Harbour Quay Wall D Strengthening | weymouth Harbour Quay Wall D Strengthening | Dorset Council | 05 Oct 2018 | 02 Apr 2019 |
MLA/2018/00443 Completed | Application - Other works | The provision of a temporary 300 mm diameter overland sewer rising main along the foreshore from Town Quay sewage pumping station to Caffa Mill car park, Fowey. | Temporary Over Forshore Pipeline Route and Working Area | South West Water Limited | 05 Oct 2018 | 09 Jan 2019 |
MLA/2018/00444/2 Completed | Application - Maintenance of existing works | Tuckett's Clyce | Tuckett's Clyce | Mr Nol Vincent | 05 Oct 2018 | 07 Jun 2019 |
MLA/2018/00445 Completed | Application - Maintenance of existing structures or assets | Brooklands 200m West | Brooklands 200m West | Beasley Christopher Limited | 06 Oct 2018 | 06 Oct 2018 |
MLA/2018/00446 Completed | Application - Maintenance of existing structures or assets | Removal of marine growth on WTG locations. | Sheringham Shoal Offshore windfarm | Scira Offshore Energy Limited | 08 Oct 2018 | 08 Oct 2018 |
MLA/2018/00447 Completed | Application - Construction of new works | Mooreing a Houseboat in Bembridge Harbour | Bembridge Harbour Plot17 | Mr Stephen Beill | 08 Oct 2018 | 20 Jan 2020 |
MLA/2018/00448 Completed | Application - Decommissioning of works | Bay Wharf Slipway Removal | Bay Wharf Slipway | Thamescraft Dry Docking | 08 Oct 2018 | 12 Feb 2019 |
MLA/2018/00449 Completed | Application - Construction of new works | River Hull+ Scheme | North Bridge, Crown Dock | Bmm Jv Limited. | 09 Oct 2018 | 23 May 2019 |
MLA/2018/00450/1 Completed | Application - Construction of new works | Three Shells Tidal Lagoon Decking | Decking , Actuator and Cable Route | Southend-On-Sea Borough Council | 10 Oct 2018 | 15 Jul 2019 |
MLA/2018/00451/1 Completed | Application - Construction of new works | Lower Steenbergs Yard | Lower Steenbergs Yard | Igloo | 12 Oct 2018 | 29 Nov 2019 |
MLA/2018/00452/3 Completed | Application - Maintenance of existing works | Jupiter Point Plymouth | Jupiter Point Pontoon | Carillion Amey | 12 Oct 2018 | 24 Jul 2020 |
MLA/2018/00453 Completed | Application - Maintenance of existing structures or assets | Landcross Viaduct Paint Defect Rectification | Landcross Viaduct | Devon County Council | 15 Oct 2018 | 15 Oct 2018 |
MLA/2018/00454 Completed | Application - Sampling | Subsea Drill - Test Program | Blyth West Quay | Ti Geosciences Ltd | 15 Oct 2018 | 15 Feb 2019 |
MLA/2018/00457 Completed | Application - Maintenance of existing structures or assets | Kingswear Slip Repair | Repair to slip wall and Tirfor mounting area | The Dartmouth-Kingswear Floating Bridge Company Limited | 18 Oct 2018 | 18 Oct 2018 |
MLA/2018/00458 Withdrawn | Application - Construction of new works | Static barge restaurant off pontoon off Church Street Car Park, Falmouth | Elliott-Cannon Associates Ltd | 18 Oct 2018 | ||
MLA/2018/00459 Completed | Application - Maintenance of existing structures or assets | Maintainance to existing Public Sewer Pipeline | Forde Road | R&M Utility & Civil Engineering Services South West Limited | 18 Oct 2018 | 18 Oct 2018 |
MLA/2018/00461 Completed | Application - Minor removals | Watchet Harbour East quay wall condition survey | Watchet Harbour East Quay | Pick Everard | 22 Oct 2018 | 22 Oct 2018 |
MLA/2018/00464/1 Completed | Application - Maintenance of existing works | Pier Point Jetty Repairs | Pier Point Jetty | Dylan Morgan | 23 Oct 2018 | 29 May 2019 |
MLA/2018/00466 Completed | Application - Maintenance of existing structures or assets | Coldharbour Moorings | Coldharbour | Royal Naval Sailing Association | 24 Oct 2018 | 24 Oct 2018 |
MLA/2018/00467/1 Variation Requested | Application - Disposal of dredged material | DISPOSAL AT SEA after maintenance dredging at the turning area. Lighterage Quay, Newham, Truro. Also dredging at Town Quay Truro. | FALMOUTH BAY (B) (PL075) | Cornwall Council -Harbour Office | 25 Oct 2018 | 14 Aug 2020 |
MLA/2018/00468 Completed | Application - Maintenance of existing structures or assets | South Milton Outfall Pipe Maintenance | South Milton Sands Outfall Pipe | National Trust | 25 Oct 2018 | 25 Oct 2018 |
MLA/2018/00469/1 Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Levington Saltmarsh restoration and beneficial use of dredgings project 2018 | Suffolk Yacht Harbour Dredge Area, Suffolk Yacht Harbour 1, Suffolk Yacht Harbour 2, Suffolk Yacht Harbour 3, Suffolk Yacht Harbour 4 | Suffolk Yacht Harbour. | 25 Oct 2018 | 08 Aug 2023 |
MLA/2018/00470 Completed | Application - Other removals | IFA2 Interconnector - Unexploded Ordnance Activities | DC Cables Redline, AC Cables Redline, X5037_Solent_Detonation_Zone | National Grid Ifa 2 Limited | 26 Oct 2018 | 09 May 2019 |
MLA/2018/00471 Completed | Application - Maintenance of existing structures or assets | Friars Goose WSC; Slipway Repairs | Friars Goose Slipway | Gateshead Council | 26 Oct 2018 | 26 Oct 2018 |
MLA/2018/00472 Completed | Application - Other works | Emergency Works Port of Garston | Repairs to the quay wall at Port of Garston | Associated British Ports. | 26 Oct 2018 | 31 Oct 2018 |
MLA/2018/00473 Completed | Application - Construction of new works | Fuelling Scheme at Tower Bridge | Fuelling Facility at Tower Bridge | Thames Marine Services Limited | 30 Oct 2018 | 14 Jan 2020 |
MLA/2018/00475 Completed | Application - Incineration of any substance or object at sea | Triton Knoll OWF Unexploded Ordnance Clearance | OrderLimitsExport | Triton Knoll Offshore Wind Farm Limited | 30 Oct 2018 | 13 Jun 2019 |
MLA/2018/00477 Completed | Application - Maintenance of existing structures or assets | Maintenance to existing public sewer (Combe Martin Sewage Outfall) | Combe Martin Bay | R&M Utility & Civil Engineering Services South West Limited | 31 Oct 2018 | 31 Oct 2018 |
MLA/2018/00478 Completed | Application - Construction of new works | The Crabpot, The Esplanade, Fowey | John Grimes Partnership Limited | 31 Oct 2018 | 06 May 2020 | |
MLA/2018/00479 Completed | Application - Maintenance of existing structures or assets | Nethertown sea defence. | Line 2 | Story Contracting Limited | 31 Oct 2018 | 31 Oct 2018 |
MLA/2018/00480 Completed | Application - Construction of new works | Enlargement of rowing pontoon and replacement piles and access ramp | Latymer Upper Boat House Rowing Pontoon | Latymer Upper School | 31 Oct 2018 | 26 Oct 2020 |
MLA/2018/00481 Completed | Application - Construction of new works | Improvements to Queen's Pier | Improvements to Queen's Pier - Marine Licence Application Area | Portland Harbour Authority Ltd | 01 Nov 2018 | 07 Feb 2019 |
MLA/2018/00482 Completed | Application - Maintenance of existing structures or assets | Prince of Wales Pier - Screening Chamber Refurb | SELECT | Kier Limited | 01 Nov 2018 | 01 Nov 2018 |
MLA/2018/00483 Completed | Application - Construction of new works, Decommissioning of works, Maintenance of existing works | Blyford Bridge Sluice Removal | Blyford Bridge | Jacksonhyder | 02 Nov 2018 | 09 Jan 2019 |
MLA/2018/00484/1 Completed | Application - Construction of new works | Proposed stone slipway at Prime Cellars | Prime Cellars, Fowey | Dr William Collinson | 02 Nov 2018 | 19 Aug 2020 |
MLA/2018/00485 Completed | Application - Disposal of dredged material, Other dredging | Clevedon Marine Lake: Return Silt to the Bristol Channel | De-silting Area, Disposal Area | Marine Lake Enthusiasts (Marlens) | 03 Nov 2018 | 18 Oct 2019 |
MLA/2018/00486 Completed | Application - Other works | Northfleet Jetty Ship Unloading System | Northfleet Jetty | Port Of London Authority | 05 Nov 2018 | 05 Apr 2019 |
MLA/2018/00487/3 Completed | Application - Construction of new works | TRIDENT-AQUASAIL™ TIDAL ENERGY TURBINE SYSTEM (PROOF OF CONCEPT TRIALS) | Yarmouth (Isle of Wight) Pier | Trident Renewable Energy Systems Limited | 06 Nov 2018 | 21 Sep 2023 |
MLA/2018/00488 Completed | Application - Construction of new works | Rebuilding the Pier at Withernsea (Seaside resort) | Viewing Platform | Withernsea Pier And Promenade Association Ltd | 07 Nov 2018 | 15 Apr 2019 |
MLA/2018/00489 Completed | Application - Maintenance of existing structures or assets | Woodside Ferry Pontoon Emergency Restraint Chains | Woodside Linkspan Work area | Merseytravel Limited | 08 Nov 2018 | 08 Nov 2018 |
MLA/2018/00490 Completed | Application - Construction of new works | Newhaven Port Access Road | Newhaven Mill Creek | Bam Nuttall Ltd | 08 Nov 2018 | 06 Jun 2019 |
MLA/2018/00491 Completed | Application - Non-navigational clearance dredging | Flushing of Pipelines to Prove Flow Path in Preparation for First Use | Bradwell Outfall Structure | Magnox Limited | 08 Nov 2018 | 08 Nov 2018 |
MLA/2018/00492 Completed | Application - Maintenance of existing structures or assets | RW 922 Installation of fenders | RW 922 Strengthening works | Thames Water Limited | 08 Nov 2018 | 08 Nov 2018 |
MLA/2018/00493 Completed | Application - Maintenance of existing structures or assets | Cutting and removal of end section of discharge pipe | Bradwell Site Outfall Structure | Magnox Limited | 08 Nov 2018 | 08 Nov 2018 |
MLA/2018/00495 Completed | Application - Beach maintenance activities | Moving sand on the beach | Exmouth seafront | Stuart Line Cruises | 10 Nov 2018 | 10 Nov 2018 |
MLA/2018/00496 Completed | Application - Non-navigational clearance dredging | Grange Outfall Operational Clearance | Grange_Outfall | J D Mee | 12 Nov 2018 | 12 Nov 2018 |
MLA/2018/00497 Completed | Application - Construction of new works | Fishersgate South - Emergency Protection Works | Fishersgate South Terminal | Shoreham Port Authority | 12 Nov 2018 | 23 Jan 2019 |
MLA/2018/00498 Completed | Application - Other works | Beach House Quay - Emergency Wall Repair | BHQ3 | Pca Consulting Engineers Ltd | 13 Nov 2018 | 16 Nov 2018 |
MLA/2018/00499/1 Completed | Application - Construction of new works | Fulham Football Club Riverside Stand Redevelopment 2017 | Fulham FC Riverside Permanent & Temporary Works | Fulham Stadium Limited | 13 Nov 2018 | 18 Jun 2020 |
MLA/2018/00500 Completed | Application - Maintenance of existing structures or assets | SWRR Dawlish Beach Works | Dawlish Beach | Bam Nuttall Limited | 14 Nov 2018 | 14 Nov 2018 |
MLA/2018/00501 Completed | Application - Construction of new works | Triton Knoll Offshore Wind Farm; Boulder Clearance and Seabed Preparation | OrderLimitsExport | Triton Knoll Offshore Wind Farm Ltd | 14 Nov 2018 | 10 May 2019 |
MLA/2018/00502/2 Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Port of Boston Maintenance and Disposal 2018 | BOSTON 7 (HU170), Port of Boston Dredging Area, Berths and Swinging Area. River Witham, Hob Hole Dredging Site. River Witham, The Dock. River Witham | Port Of Boston Limited | 14 Nov 2018 | 01 Mar 2023 |
MLA/2018/00503/3 Completed | Application - Incineration of any substance or object at sea, Other deposits, Other removals, Wrecks and other archaeological remains | Hornsea Project Two Offshore Wind Farm - Offshore UXO Inspection and Clearance Grouped under: Hornsea Offshore Wind Farm Project Two Showing 2 of 10 cases | HOW02_AFLandCableCorridorBoundary_20181115_WGS84 | Optimus Wind Limited | 16 Nov 2018 | 15 Sep 2022 |
MLA/2018/00505 Completed | Application - Maintenance of existing works | Replacement of a bridge, pontoon and access jetty | Arun Shipyard Moorings | Osborne Of Arun Group (Management) Limited | 16 Nov 2018 | 29 Jan 2019 |
MLA/2018/00506 Completed | Application - Other deposits, Other removals, Sampling | Sustainable Seaweed Farming, Southwest England. | Proposed site: seaweed farm | Biome Algae Ltd | 18 Nov 2018 | 27 Feb 2020 |
MLA/2018/00507 Completed | Application - Maintenance of existing structures or assets | Billingham Beck Water Line for CF | Billingham Bridge | Rainham Industrial Services Limited | 19 Nov 2018 | 19 Nov 2018 |
MLA/2018/00508 Withdrawn | Application - Other works | Hessle Foreshore | Construction Marine Limited | 22 Nov 2018 | ||
MLA/2018/00509 Completed | Application - Maintenance of existing structures or assets | Refurbishment of steps along Newton & Noss Footpath No 20 | Newton & Noss FP20 Steps | Devon County Council | 22 Nov 2018 | 22 Nov 2018 |
MLA/2018/00510 Completed | Application - Construction of new works | New Union Wharf, Phase 4 | New Union Wharf, Phase 4 | Hill Partnerships Limited | 22 Nov 2018 | 12 Mar 2019 |
MLA/2018/00512 Completed | Application - Maintenance of existing structures or assets | Janes Creek Flap Valve Repairs | jane | Beasley Christopher Limited | 23 Nov 2018 | 23 Nov 2018 |
MLA/2018/00514 Completed | Application - Maintenance of existing structures or assets | Royal Dart Hotel Masonry Buttress Repair | Royal Dart Apartments Kingswear | Teignmouth Maritime Services Limited | 25 Nov 2018 | 25 Nov 2018 |
MLA/2018/00516 Completed | Application - Maintenance of existing structures or assets | Hullbridge Sea Defence Repairs | Hullbridge | Environment Agency | 27 Nov 2018 | 27 Nov 2018 |
MLA/2018/00518 Completed | Application - Construction of new works | re-Build of Mooring No 11, River Arun, Arundel, BN18 9JG | Arun Mooring 11 | Mr Peter Bonsall | 27 Nov 2018 | 21 Oct 2019 |
MLA/2018/00519 Completed | Application - Maintenance of existing structures or assets | A379 Shaldon Bridge - Foundation Stabilisation Repairs | A379 Shaldon Bridge - Foundation Stabilisation Repairs | Devon County Council | 28 Nov 2018 | 28 Nov 2018 |
MLA/2018/00520 Withdrawn | Application - Construction of new works | Installation of Access Pontoons from the Foreshore to the main pontoon area | Parkstone Bay Marina | Frederick C.Mitchell & Sons Limited | 28 Nov 2018 | |
MLA/2018/00521 Completed | Application - Maintenance of existing structures or assets | Race Bank Internal Cable Inspection - Ancillary Scaffolding - K05 | RoW Array - K05 (53 14.619 N, 0 52.633 E) | Dong Energy Rb (Uk) Limited | 28 Nov 2018 | 28 Nov 2018 |
MLA/2018/00522/1 Completed | Application - Navigational dredging (maintenance) | White Mountain, Dagenham - Maintenance Dredge | White Mountain Jetty, Dagenham | Armac Shipping Services Ltd | 29 Nov 2018 | 06 Jul 2020 |
MLA/2018/00524 Withdrawn | Application - Maintenance of existing works | 3177.03 Grand Sluice | Jacksonhyder | 30 Nov 2018 | ||
MLA/2018/00525 Completed | Application - Maintenance of existing works | Falmouth Marina Pile Replacement Programme | Falmouth Marina - Pile locations on separate attachment | Premier Marinas (Falmouth) Ltd | 03 Dec 2018 | 07 Mar 2019 |
MLA/2018/00526 Completed | Application - Maintenance of existing structures or assets | Handford and Horseshoe Sluice Repairs | Handford Sluice | Jacksonhyder | 03 Dec 2018 | 03 Dec 2018 |
MLA/2018/00527 Completed | Application - Construction of new works | The View, Porth | The View, Porth | Living Quarter Properties (Porth) Ltd | 03 Dec 2018 | 28 Jul 2022 |
MLA/2018/00528/3 Variation Requested | Application - Construction of new works, Other works | Pontoon Replacement & Reconfiguration, Torquay, Torbay | Torquay | Marina Developments Ltd | 04 Dec 2018 | 20 Jul 2020 |
MLA/2018/00529 Completed | Application - Maintenance of existing structures or assets | Lock Gate refurbishment at South Dock Marina | South Dock Lock | London Borough Of Southwark | 04 Dec 2018 | 04 Dec 2018 |
MLA/2018/00530 Completed | Application - Non-navigational clearance dredging | project 8 windserver | project 8 windserver | Greater Gabbard Offshore Winds Limited | 04 Dec 2018 | 04 Dec 2018 |
MLA/2018/00531/1 Completed | Application - Disposal of dredged material, Navigational dredging (capital), Navigational dredging (maintenance) | Neptune Energy Park Dredge Pocket Extensions | Northern Extension-Tyne, Southern Extension-Tyne | Shepherd Offshore Services Limitied | 05 Dec 2018 | 23 Feb 2021 |
MLA/2018/00532 Completed | Application - Maintenance of existing structures or assets | Southwark Riverwalls Brickwork Corner Repairs | 2NO Brickwork Corners | F M Conway Limited | 05 Dec 2018 | 05 Dec 2018 |
MLA/2018/00533 Completed | Application - Beach maintenance activities | Portwrinkle - re-distribution of sand within harbour | Portwrinkle Harbour | Cornwall Council | 05 Dec 2018 | 05 Dec 2018 |
MLA/2018/00534 Completed | Application - Maintenance of existing structures or assets | Trafalgar Wharf Revetment Repairs | TW Revetment | Trafalgar Wharf Limited | 06 Dec 2018 | 06 Dec 2018 |
MLA/2018/00535 Withdrawn | Application - Construction of new works | Church Drawdock Slipway Extension | Church Drawdock Slipway Extension | Golden Tours | 07 Dec 2018 | |
MLA/2018/00536/12 Variation Requested | Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital), Other removals | Isle of Man Ferry Terminal | SITE Z (IS140), SITE Y (IS150), Work Area, Dredge Area -Mersey, Bird Pontoon Area, MERSEY (MID-RIVER SITE) (IS120) | Isle Of Man Government | 08 Dec 2018 | 06 Nov 2023 |
MLA/2018/00537 Completed | Application - Construction of new works | Medina Park Footbridge Replacement (B322) | Medina Park Footbridge | Ringway Island Roads Ltd | 10 Dec 2018 | 17 Apr 2019 |
MLA/2018/00538 Completed | Application - Construction of new works | Southsea Marina - Crane Base Piles | Boom Crane Piling Area | Premier Marinas (Southsea) Ltd | 10 Dec 2018 | 07 Mar 2019 |
MLA/2018/00539 Completed | Application - Non-navigational clearance dredging | Taunton Road Sewage Pumping Station | Taunton Road SPS | Wessex Water Services Limited | 11 Dec 2018 | 11 Dec 2018 |
MLA/2018/00540 Completed | Application - Construction of new works | Ocean Business 2019 Pontoon | Empress Dock Southampton | Diversified Communications Uk | 12 Dec 2018 | 05 Mar 2019 |
MLA/2018/00542/2 Completed | Application - Maintenance of existing works | Jubilee Bridge Painting Works | Jubilee Bridge | Story Contracting Limited | 13 Dec 2018 | 30 Sep 2021 |
MLA/2018/00543 Completed | Application - Marine licence for the burial of human remains at sea | NEWHAVEN (WI011) | Arthur C. Towner Limited | 13 Dec 2018 | 13 Dec 2018 | |
MLA/2018/00544/1 Completed | Application - Maintenance of existing structures or assets | Rochester Bridge - Balustrade investigation & foreshore litter clearance | Rochester Bridge | F M Conway Limited | 13 Dec 2018 | 14 Dec 2018 |
MLA/2018/00545/1 Completed | Application - Other deposits, Other removals | Dungeness B Power Station, beach nourishment- extension to existing activities at borrow pit. | Dungeness Beach Feed, Dungerness Shingle Ridge disposal site | Edf Energy Nuclear Generation Ltd | 13 Dec 2018 | 06 Dec 2021 |
MLA/2018/00546 Completed | Application - Other works | Beach House Quay - Emergency Wall Repair - Escalated Works | BHQ3 | Pca Consulting Engineers Ltd | 14 Dec 2018 | 19 Dec 2018 |
MLA/2018/00547 Completed | Application - Maintenance of existing works | Keadby TAO Trent Side Outfall Refurbishment | River Trent Outfall | Environment Agency Leeds | 17 Dec 2018 | 20 May 2019 |
MLA/2018/00548 Completed | Application - Maintenance of existing structures or assets | Dudgdale Quay maintenance | 3 Dugdale`s Quay | Mr Dean Richards | 17 Dec 2018 | 17 Dec 2018 |
MLA/2018/00549 Completed | Application - Construction of new works, Other removals | RNLI Plymouth Upgrade Works | RNLI Plymouth Upgrade Works | Royal National Lifeboat Institution | 17 Dec 2018 | 06 Mar 2020 |
MLA/2018/00550/1 Completed | Application - Maintenance of existing works | East Anglia ONE Operations and Maintenance for Transmission Assets | EAONE_WTG_ArrayCable_OffshoreECC_boundary | East Anglia One Limited | 18 Dec 2018 | 16 Dec 2022 |
MLA/2018/00551 Completed | Application - Maintenance of existing works | East Anglia ONE Operations and Maintenance for Generation Assets | East Anglia One wind farm | East Anglia One Limited | 18 Dec 2018 | 24 Apr 2020 |
MLA/2018/00553 Completed | Application - Other removals | Removal of Marine Growth | Sheringham Shoal Offshore Windfarm | Scira Offshore Energy Limited | 20 Dec 2018 | 18 Apr 2019 |
MLA/2018/00554 Completed | Application - Maintenance of existing structures or assets | Denmark Place Outfall Extension | Denmark Place Hastings | Beasley Christopher Limited | 20 Dec 2018 | 20 Dec 2018 |
MLA/2018/00555 Completed | Application - Construction of new works, Disposal of dredged material | Hartlepool approach channel | TEES BAY C (TY150), Underwater retaining wall | Pd Teesport Limited | 21 Dec 2018 | 03 Oct 2019 |
MLA/2018/00556 Completed | Application - Construction of new works | Provision of permanent piles for seasonal pontoon adjacent to The Cobb, Lyme Regis | The Cobb, Lyme Regis | West Dorset District Council | 21 Dec 2018 | 07 Aug 2019 |
MLA/2018/00557 Completed | Application - Construction of new works | West Bay Coastal Improvements | West Beach, East Beach, Parkdean Caravan Park | Environment Agency – South West Reg | 21 Dec 2018 | 24 Apr 2019 |
MLA/2018/00558 Completed | Application - Construction of new works | Installation of marina pontoons at Walton Yacht Basin | magic_polygons | Walton & Frinton Yacht Trust | 21 Dec 2018 | 21 Mar 2019 |
MLA/2018/00559 Completed | Application - Construction of new works | HQS Wellington Dolphin Replacement | HQS Wellington Dolphin Replacement | The Wellington Trust | 21 Dec 2018 | 18 Apr 2019 |
MLA/2018/00560/3 Completed | Application - Other works | Emergency quay wall repair Port of Ipswich | Emergency works location | Associated British Ports-Ipswich | 21 Dec 2018 | 13 Aug 2020 |
MLA/2018/00561 Completed | Application - Construction of new works | Looe Island Jetty Extension | Looe Island Jetty | Cornwall Trust For Nature Conservation Ltd(The) | 22 Dec 2018 | 30 Apr 2019 |
MLA/2018/00562 Completed | Application - Minor removals | VicDeep A, B & C | VicDeep A, B and C | Hanson Quarry Products Europe Limited | 28 Dec 2018 | 28 Dec 2018 |
MLA/2018/00563 Completed | Application - Minor removals | VicDeep D & E | VicDeep D and E | Hanson Quarry Products Europe Limited | 28 Dec 2018 | 28 Dec 2018 |