MMO - Marine Licences Public Register

Download 19MLAs-240913.csv

Case DetailsProject TypeProject TitleLocationsApplicant NameSubmission DateDecision Date
MLA/2019/00001
Completed
Application - Maintenance of existing structures or assetsProject Wall repairGweek Quay WallGweek Quay Limited03 Jan 201903 Jan 2019
MLA/2019/00002
Completed
Application - Maintenance of existing structures or assetsRNLI Bembridge - Pile Painting WorksBembridge Lifeboat StationR.N.L.I. (Trading) Limited07 Jan 201907 Jan 2019
MLA/2019/00003
Completed
Application - Construction of new worksPort of Poole Marina - minor reconfigurationArea 1i Port of Poole Marina.kmlPoole Harbour Commissioners07 Jan 201912 Mar 2019
MLA/2019/00004
Completed
Application - Maintenance of existing structures or assetsComponent Exchange - Gearbox replacement - location A03Location A03 - Sheringham Shoal Offshore WindfarmScira Offshore Energy Limited08 Jan 201908 Jan 2019
MLA/2019/00005
Completed
Application - Construction of new worksTeesside Avanced Manufacturing PlantTeesside Advanced Manufacturing Plant Surface Water OutfallPortland Consulting Engineers Limited08 Jan 201929 Nov 2019
MLA/2019/00006/1
Completed
Application - Construction of new worksLongview River WallLongview River WallMr Tony Coe08 Jan 201926 Sep 2019
MLA/2019/00007/1
Completed
Application - Other deposits, Other removalsRDG1-3/34 Richmond pile investigationBH 1, BH 2, BH 3, BH 4Geoffrey Osborne Limited10 Jan 201908 Oct 2019
MLA/2019/00008
Completed
Application - Decommissioning of worksTate & Lyle Sugarsexport jetty headTate & Lyle11 Jan 201904 Jun 2019
MLA/2019/00009
Completed
Application - Construction of new worksSwalecliffe Brook Outfall Improvement WorksSwalecliffe Brook OutfallCanterbury City Council12 Jan 201916 Dec 2021
MLA/2019/00010/1
Completed
Application - Construction of new worksNorth Sunderland Harbour StepsMiddle Pier embarkation stepsNorth Sunderland Harbour Commissioners14 Jan 201930 May 2019
MLA/2019/00011
Completed
Application - Maintenance of existing structures or assetsMotney HillMotneyBeasley Christopher Limited14 Jan 201914 Jan 2019
MLA/2019/00012
Completed
Application - Construction of new worksNew Cruise Liner Terminal Construction at Princes Jetty Site, Liverpool - Application for Marine Management LicenceLiverpool Cruise Terminal - Works Area, Cormorant PontoonLiverpool City Council-North Team15 Jan 201923 Apr 2021
MLA/2019/00013
Completed
Application - Minor removalsHullbridge Sea Defence RepairsHullbridgeEnvironment Agency15 Jan 201915 Jan 2019
MLA/2019/00014
Completed
Application - Construction of new worksProposed new Hoist Dock for Fairline YachtsFairline hoistFairline Yachts Ltd16 Jan 201914 Oct 2019
MLA/2019/00015
Completed
Application - Maintenance of existing structures or assetsScaffold erection at 28 Market StreetFish Strand Quay ScaffoldingIndidog Ltd16 Jan 201916 Jan 2019
MLA/2019/00016
Completed
Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital), Other removalsTyne Car Terminal Berth 3 ReconfigurationTCT3 Dredge, TCT3 RECONFIGURATION, SOUTER POINT (OUTER) (TY081), NORTH TYNE (TY070)Port Of Tyne Authority17 Jan 201902 Sep 2020
MLA/2019/00017
Completed
Application - Minor removalsIFA2 Interconnector - Temporary Investigative Trial PitsTrialHoleInvestigationAreaDaedalusBeachNational Grid Ifa 2 Limited17 Jan 201917 Jan 2019
MLA/2019/00018
Completed
Application - Maintenance of existing structures or assets3 Sea View Place, St Ives, CornwallScaffolding for 3 Sea View PlaceMrs Doreen Johns18 Jan 201918 Jan 2019
MLA/2019/00020/2
Completed
Application - Navigational dredging (capital)Rochester Wharf Berth DredgeRochester Wharf Dredge AreaHanson Aggregates Marine Limited22 Jan 201910 Jun 2021
MLA/2019/00021
Completed
Application - Maintenance of existing structures or assetsTrinity Hospital Flood Defence Wall Remediation Works - ScaffoldingTrinity HospitalCh2m Hill Europe Limited22 Jan 201922 Jan 2019
MLA/2019/00022
Completed
Application - Other worksBuckler's Hard - Reconfiguration of Marina and Mooring AssetsBuckler's HardBeaulieu Enterprises Limited22 Jan 201906 Jun 2019
MLA/2019/00023
Completed
Application - Maintenance of existing structures or assetsMaintenance Work and Increase in Wall Height to the Fleet Drain/Hessle Clough StructureHessle Clough Structure, Fleet DrainEast Riding Of Yorkshire Council24 Jan 201924 Jan 2019
MLA/2019/00024
Completed
Application - Non-navigational clearance dredgingJetting at 46 Sea LaneSea_Lane_OutfallSouthern Water Limited24 Jan 201924 Jan 2019
MLA/2019/00026
Completed
Application - Construction of new works, Decommissioning of works, Maintenance of existing worksPort of Felixstowe, Dooley Terminal - Upgrade to RORO 3 & 4Port of Felixstowe - Dooley Terminal, RORO 3 & 4The Felixstowe Dock And Railway Company25 Jan 201920 Aug 2019
MLA/2019/00027
Completed
Application - Maintenance of existing worksSouthern Water: 10-year licence for minor maintenance works on coastal outfallsAdur, Arun, Brighton and Hove, Canterbury, Chichester, Dartford, Dover, Eastbourne, Eastleigh, Fareham, Gosport, Gravesham, Hastings, Havant, Horsham, Isle of Wight, Lewes, Maidstone, Medway, New Forest, Portsmouth, Rother, Shepway, Southampton, Swale, Thanet, TonbridgeandMalling, Wealden, WorthingSouthern Water Ltd25 Jan 201928 Sep 2021
MLA/2019/00028
Completed
Application - Other worksThe installation of a houseboat on to a houseboat plot from where a larger houseboat,currently moored on the plot, will have been removedMrs Joanne Bryant26 Jan 201904 Nov 2020
MLA/2019/00029/6
Completed
Application - Sampling, Scientific instrumentsSizewell C Offshore Geotechnical Investigations 2019 - 2025IT1_01, IT1_02, IT1_03, IT1_04, IT1_05, IT1_06, IT1_07, IT2_01, IT2_02, IT2_03, IT2_04, OT_01, OT_02, OT_03, OT_04, OT_05, OT_06, OT_07, OT_08Nnb Generation Company (Szc) Ltd26 Jan 201922 Aug 2024
MLA/2019/00030
Completed
Application - Maintenance of existing worksHinkley Point B, Cooling Water forebay remediationHinkley Point B Cooling Water RemediationEdf Energy Nuclear Generation Limited28 Jan 201922 May 2019
MLA/2019/00031/4
Completed
Application - Construction of new worksDolphin Shipyard RedevelopmentDolphin BoatyardTorbay Boat Construction Company Limited28 Jan 201905 Apr 2023
MLA/2019/00032/1
Completed
Application - Construction of new worksScalloptech Limited - Commercial Pilot for Scallop Aquaculture ProductionScalloptech Limited Commercial Pilot Site RevisedScalloptech Limited28 Jan 201911 Jul 2023
MLA/2019/00034
Completed
Application - Non-navigational clearance dredgingTaunton Road Sewage Pumping StationTaunton Road SPSWessex Water Services Limited30 Jan 201930 Jan 2019
MLA/2019/00035
Completed
Application - Maintenance of existing structures or assetsBeach pump inletSouthwold North beachSouthwold Town Council31 Jan 201931 Jan 2019
MLA/2019/00036
Completed
Application - Maintenance of existing structures or assetsRefurbishment and Resurfacing of Slipway in Lowestoft Inner Harbour AreaLowestoft SlipwayAssociated British Ports.31 Jan 201931 Jan 2019
MLA/2019/00037
Completed
Application - Maintenance of existing worksQueen Anne Battery Wavescreen RepairsQueen Anne Battery MarinaMarina Developments Limited01 Feb 201909 Jul 2019
MLA/2019/00038
Completed
Application - Maintenance of existing structures or assetsSutton Harbour Lock Bridge re-paintingLock BridgeSutton Harbour Company Limited04 Feb 201904 Feb 2019
MLA/2019/00039
Completed
Application - Construction of new worksReplacement and extension of decking.Mixtow 1Mr Jonathan Allden04 Feb 201914 Aug 2019
MLA/2019/00040
Completed
Application - Construction of new works, Navigational dredging (capital)Swan Lane PierSWAN LANE PIERThames Leisure Limited04 Feb 201910 Jun 2019
MLA/2019/00041
Completed
Application - Beach maintenance activitiesShoreham to Southwick Beach RecyclingShoreham RecyclingShoreham Port Authority05 Feb 201905 Feb 2019
MLA/2019/00042
Completed
Application - Construction of new works, Maintenance of existing worksBerwick Harbour Alignment Structure ReplacementAlignment Structure Replacement, Timber Groyne RepairBerwick Harbour Commission05 Feb 201921 Oct 2019
MLA/2019/00044
Completed
Application - Maintenance of existing structures or assetsLocation & sampling of a buried surface water outfallBognor RegisBeasley Christopher Limited06 Feb 201906 Feb 2019
MLA/2019/00045
Completed
Application - Construction of new worksCBC2 W30150 Parton - Harrington Sea Walls No.5 (157998)Parton to Harrington No. 5 SiteNetwork Rail Limited06 Feb 201912 Apr 2019
MLA/2019/00046
Completed
Application - Maintenance of existing structures or assetsRenovations and extension the Sail Loft, Whitford Yard, Fowey.Whitford boat yardMr Ian Forrest06 Feb 201906 Feb 2019
MLA/2019/00048
Completed
Application - Construction of new worksRealignment of quay wall at Robertsons Boatyard, WoodbridgeQuay Wall Robertsons BoatyardRobertsons Of Woodbridge (Boat Builders) Limited07 Feb 201919 Jun 2019
MLA/2019/00049/1
Completed
Application - Maintenance of existing worksDudgeon OFTODudgeon Wind Farm Export CableTransmission Investment07 Feb 201904 Jan 2023
MLA/2019/00050
Completed
Application - Construction of new worksRBYC Pontoon ReplacementRoyal Burnham Yacht Club PontoonRoyal Burnham Yacht Club07 Feb 201921 Oct 2019
MLA/2019/00051
Completed
Application - Minor removalsØrsted Hornsea Project Four Intertidal Geotechnical SurveyHornsea Project Four - Geotechnical Study AreaOrsted Hornsea Project Four Limited07 Feb 201907 Feb 2019
MLA/2019/00052
Completed
Application - Minor removalsTrial pits to determine ground conditions for future barge landing to deliver historic landing craftTrial pit areaM L (Uk) Limited09 Feb 201909 Feb 2019
MLA/2019/00053
Completed
Application - Disposal of dredged material, Navigational dredging (capital)Portland Marina Pontoon DredgingDredge Area, SWANAGE BAY (WI110)Dean & Reddyhoff Limited11 Feb 201917 Feb 2021
MLA/2019/00054
Completed
Application - Maintenance of existing structures or assetsSutton Jetty maintenanceSutton JettySutton Harbour Company Limited11 Feb 201911 Feb 2019
MLA/2019/00055/4
Completed
Application - Disposal of dredged materialMaintenance Disposal Activities Port of DoverDOVER (DV010)Dover Harbour Board11 Feb 201915 Dec 2023
MLA/2019/00056/1
Completed
Application - Other dredgingGravel re-profiling at Gunnislake weir pool, River Tamar, CornwallGravel Bank, Gunnislake weir pool, CornwallLower Tamar Fishing Club Ltd11 Feb 201923 Nov 2021
MLA/2019/00057
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mr Britannia Shipping (Fao: Lister)12 Feb 201912 Feb 2019
MLA/2019/00058
Completed
Application - Construction of new worksMalpas Marine Pontoon ExtensionMalpas Marine proposed pontoon connectionCornwall Council -Harbour Office12 Feb 201928 Jan 2020
MLA/2019/00059
Completed
Application - Other worksSlipway ModificationHNYC SlipHooness Yacht Club12 Feb 201929 Apr 2019
MLA/2019/00060
Completed
Application - Maintenance of existing structures or assetsVictoria Embankment Lions HeadsVictoria Embankment Lions HeadsF M Conway Limited13 Feb 201913 Feb 2019
MLA/2019/00061
Completed
Application - Minor removalsSwalecliffe WTW - Ground InvestigationBorehole AreaSouthern Water Services Limited14 Feb 201914 Feb 2019
MLA/2019/00062
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mr Britannia Shipping (Fao: Lister)14 Feb 201914 Feb 2019
MLA/2019/00064
Completed
Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital)INEOS Dredging and pontoon installation, Camber Dock, PortsmouthDredge Area -Southampton water/Portsmouth OSPAR area, Pontoon Area, NAB TOWER (WI060), HURST FORT (WI080)Athena Racing Limited15 Feb 201901 Jul 2019
MLA/2019/00065
Completed
Application - Construction of new worksPontoon Installation at LowestoftLowestoft - Waveney Dock - Greater GabbardGreater Gabbard Offshore Wind -Leeds15 Feb 201922 Jul 2019
MLA/2019/00066/1
Completed
Application - Construction of new works, Decommissioning of works, Other dredgingWithernsea Long Sea Outfall Replacement EIAProposed Scheme Red Line BoundaryYorkshire Water Services Ltd.15 Feb 201927 Apr 2021
MLA/2019/00068/1
Completed
Application - Maintenance of existing worksRamsgate Port Pontoon RefurbishmentRamsgate PontoonVattenfall Wind Power Limited18 Feb 201921 Aug 2019
MLA/2019/00069
Completed
Application - Construction of new worksSouth Withernsea Coastal DefencesRed line boundaryEast Riding Of Yorkshire Council18 Feb 201905 Dec 2019
MLA/2019/00070
Completed
Application - Non-navigational clearance dredgingExmouth Marina Non-Navigational Dredging (no disposal)Exmouth MarinaExmouth Marina Ltd18 Feb 201918 Feb 2019
MLA/2019/00071
Completed
Application - Maintenance of existing structures or assetsPlaistow Wharf River Wall RepairsPlaistow WharfPort Of London Authority Limited18 Feb 201918 Feb 2019
MLA/2019/00072
Completed
Application - Maintenance of existing structures or assetsCanning Dock Fender Re-instatementCanning Fender LocationCanal And River Trust20 Feb 201920 Feb 2019
MLA/2019/00073
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Heysham 1 & 2 dredging activitiesMORECAMBE BAY B (IS200), Heysham Power Stations Harbour IntakeEdf Nuclear Generation Ltd-Hesham20 Feb 201927 Sep 2019
MLA/2019/00076
Completed
Application - Construction of new worksGreenwich Wharf, Draw Dock Tidal inletDraw Dock Tidal inletKeltbray Limited20 Feb 201915 Jan 2020
MLA/2019/00077
Completed
Application - Minor removalsLake Lothing Third Crossing - Marine Ground Investigation worksGround Investigation siteBam Nuttall Limited20 Feb 201920 Feb 2019
MLA/2019/00078/2
Completed
Application - Maintenance of existing worksRedbridge Viaduct Remediation WorksRedbridge Viaduct Remediation WorksHampshire County Council21 Feb 201918 Feb 2021
MLA/2019/00081/1
Completed
Application - Construction of new worksBarrier Garden Pier ExtensionBarrier Garden Pier ExtensionPort Of London Authority26 Feb 201924 Jun 2020
MLA/2019/00082
Completed
Application - Construction of new works, Other worksProposed Groyne Construction, Bembridge Coast Hotel, Fishermans Walk, Bembridge, Isle of Wightgroyne_4, groyne_5, groyne_6, access, compound, plant_compoundBourne Leisure Limited27 Feb 201926 Jul 2019
MLA/2019/00083
Completed
Application - Deposit of markersDeposit of 2 racing markers at Hythe and Saltwood Sailing Club CT21 6AWHythe and Saltwood Sailing ClubMr Anthony Elford27 Feb 201927 Feb 2019
MLA/2019/00084
Completed
Application - Maintenance of existing structures or assetsSlipway 3Slipway 3Falmouth Boat Construction Limited27 Feb 201927 Feb 2019
MLA/2019/00085
Completed
Application - Construction of new worksNewlyn Harbour Pontoon Fuelling project ENG 2372Newlyn Pontoon SystemNewlyn Pier And Harbour27 Feb 201912 Jul 2019
MLA/2019/00086
Completed
Application - Maintenance of existing structures or assetsFalmouth Marina Cill MaintenanceFalmouth Marina CillPremier Marinas (Falmouth) Limited27 Feb 201927 Feb 2019
MLA/2019/00087
Completed
Application - Maintenance of existing structures or assetsMurphy's Wharf Jetty Repairs Phase OneMurphy's WharfMoore Project Management Solutions Llp27 Feb 201927 Feb 2019
MLA/2019/00088
Completed
Application - Deposit of markersNew RLymYC Race MarkRLymYC "V"Royal Lymington Yacht Club Limited28 Feb 201928 Feb 2019
MLA/2019/00089/2
Completed
Application - Construction of new worksConstruction of a new taller precast sea wall with a recurve directly in front of the existing wall and improvements to promenade walkway above.Marine Parade Sea WallNetwork Rail Limited28 Feb 201910 Jul 2020
MLA/2019/00090
Completed
Application - Maintenance of existing structures or assetsMaintenance of waterside infrastructureHythe Marine ParkFairline Yachts Limited01 Mar 201901 Mar 2019
MLA/2019/00091
Completed
Application - Maintenance of existing structures or assetsFareham Sailing & Motorboat Club Visitors Pontoons Remedial WorksPontoons Remedial WorksFareham Sailing And Motorboat Club04 Mar 201904 Mar 2019
MLA/2019/00092/1
Completed
Application - Construction of new worksIslington Flood Risk Management Scheme (FRMS)New Islington Pumping StationKings Lynn Internal Drainage Board04 Mar 201928 Jan 2021
MLA/2019/00093
Completed
Application - Other depositsLincolnshire Time and Tide BellLincolnshire Time and Tide BellLincolnshire Time And Tide Bell Community Interest Company04 Mar 201929 May 2019
MLA/2019/00094
Completed
Application - Maintenance of existing structures or assetsHull Marina Essential MaintenanceHull MarinaHull City Council05 Mar 201905 Mar 2019
MLA/2019/00095/1
Completed
Application - Other deposits, Other removalsRampion Offshore Wind Farm - pre-emptive Export Cable RepairsExport Cable CorridorTc Rampion Ofto Limited05 Mar 201912 Jan 2022
MLA/2019/00096
Completed
Application - Maintenance of existing structures or assetsLiverpool South Dock trial panelsLiverpool South Dock WallBritish Waterways06 Mar 201906 Mar 2019
MLA/2019/00098
Completed
Application - Maintenance of existing structures or assetspile replacementpile locationRoyal Victoria Yacht Club07 Mar 201907 Mar 2019
MLA/2019/00099
Completed
Application - Deposit of markersArun Yacht Club yacht racing marksRacing areaArun Yacht Club07 Mar 201907 Mar 2019
MLA/2019/00100
Completed
Application - Construction of new worksRockabill Cable SystemLandfall installation - Southport. Horizontal directional drill (HDD) zone, Landfall installation - Southport, articulated pipe zone, Landfall installation - Southport, shallow draft vessel installation zone, Rockabill Main Lay vessel instatllation zoneRockabill Cable System Limited07 Mar 201921 Jun 2019
MLA/2019/00101
Completed
Application - Maintenance of existing structures or assetsUnion Chain BridgeUnion Chain BridgeNorthumberland County Council08 Mar 201908 Mar 2019
MLA/2019/00102/1
Completed
Application - Construction of new worksIncrease in Wall Height to the Fleet Drain/Hessle Clough StructureHessle Clough Structure, Fleet DrainEast Riding Of Yorkshire Council11 Mar 201907 Jul 2020
MLA/2019/00104
Completed
Application - Maintenance of existing structures or assetsPremier Marinas Swanwick - Mid Stream Pile Moorings Pontoon replacementPremier Marinas Pile MooringsPremier Marinas Limited11 Mar 201911 Mar 2019
MLA/2019/00105
Completed
Application - Maintenance of existing worksRepairs and modifications to vessel fender - River Blyth harbour entrance Southwold, SuffolkModification and repair of fender structureEast Suffolk Council12 Mar 201906 Nov 2019
MLA/2019/00106
Completed
Application - Construction of new worksKingarth Sea Defence for Existing Storm Water DischargeWorks areaJames Flynn12 Mar 201924 May 2019
MLA/2019/00107
Completed
Application - Maintenance of existing structures or assetsThanet OWF small scale maintenanceWind Turbine Generator F03Vattenfall Wind Power Ltd13 Mar 201913 Mar 2019
MLA/2019/00108
Completed
Application - Maintenance of existing structures or assetsMaintenance of LAL Wave Rider buoysLondon Array Offshore Wind FarmLondon Array Limited13 Mar 201913 Mar 2019
MLA/2019/00109
Completed
Application - Other worksCoastal Monitoring Wave Buoy NetworkNewbiggin, Whitby, Scarborough, Hornsea, Chapel Point, North Well, Blakeney Overfalls, Happisburgh, Lowestoft, Felixstowe, Goodwin Sands, Folkestone, Pevensey Bay, Seaford, Rustington, Bracklesham Bay, Hayling Island, Sandown Bay, Milford, Boscombe, Weymouth, Chesil, West Bay, Dawlish, Tor Bay, Start Bay, Looe Bay, Porthleven, Penzance, St Mary's Sound, Perranporth, Bideford Bay, Minehead, Weston Bay, Cleveleys, Morecambe BayNew Forest District Council13 Mar 201913 Jan 2020
MLA/2019/00110
Completed
Application - Other deposits, Other removalsApplication to use spud legs to temporarily site spud legged bargeForeshore at 3 Dugdale`s QuayMr Dean Richards13 Mar 201901 Oct 2020
MLA/2019/00111/2
Completed
Application - Other worksOutstrays Managed Realignment SchemeOutstraysEnvironment Agency Leeds14 Mar 201919 May 2022
MLA/2019/00112/2
Completed
Application - Other worksWelwick to Skeffling Managed Realignment SchemeWelwick to SkefflingEnvironment Agency Leeds14 Mar 201909 Jul 2024
MLA/2019/00114/1
Completed
Application - Maintenance of existing worksBembridge HouseboatsHouseboat LocationMrs Charlotte Edsell14 Mar 201927 May 2020
MLA/2019/00115
Completed
Application - Maintenance of existing structures or assetsBembridge Houseboatsmagic_polygonsPresent Locations14 Mar 201914 Mar 2019
MLA/2019/00116
Completed
Application - Decommissioning of works977 DCT DemolitionBerth 1Dover Harbour Board15 Mar 201906 May 2020
MLA/2019/00117
Completed
Application - Other deposits, Other dredgingThe beach landing of barge and safe discharge of cargo at Lee on SolentTM area at Daedalus SlipwayRobert Wynn & Sons Limited15 Mar 201931 May 2019
MLA/2019/00118
Completed
Application - Non-navigational clearance dredgingRemove of debris from outfallmagic_polygonsCumbria County Council18 Mar 201918 Mar 2019
MLA/2019/00119
Completed
Application - Maintenance of existing structures or assetsSlowhill copseslowhill copseBeasley Christopher Limited18 Mar 201918 Mar 2019
MLA/2019/00120
Completed
Application - Minor removalsRampion - recovery of various materials/debris6 rock bags NE of the Offshore Substation Platform, Rock bags on the North East corner of the OSP structure, Exposed cable and rock bag on Export Cable 2Rampion Limited19 Mar 201919 Mar 2019
MLA/2019/00122
Completed
Application - Maintenance of existing structures or assetsSD-001-015 Masthouse Terrace Pier Fender ReplacementMasthouse Terrace PierCanal & River Trust19 Mar 201919 Mar 2019
MLA/2019/00123/5
Completed
Application - Construction of new works, Other removalsDenver Mooring ReplacementDenver Lock - Existing Landing Stage, Denver Lock - New Landing StageJ.N. Bentley Limited19 Mar 201913 Jul 2020
MLA/2019/00124
Completed
Application - Maintenance of existing structures or assetsGalloper Wind Farm Generator Replacement D5MWTG GN-D5M - Area of workGalloper Wind Farm Limited20 Mar 201920 Mar 2019
MLA/2019/00125/1
Completed
Application - Construction of new works, Disposal of dredged material, Other removalsForeshore west of The Quay, Burnham-on-Crouch - temporary installation of four steel piles to assist salvage of houseboat, Llys-HeligWest of The Quay, Burnham-on-CrouchMr Howard Dawber20 Mar 201926 Jun 2020
MLA/2019/00126
Completed
Application - Minor removalsBore HoleJetty 1 operational lineVopak Terminal London B.V. Limited21 Mar 201921 Mar 2019
MLA/2019/00127
Completed
Application - Maintenance of existing structures or assetsYarmouth Swing Bridge RefurbishmentB106 Yarmouth BridgeRingway Island Roads Limited21 Mar 201921 Mar 2019
MLA/2019/00129
Completed
Application - Construction of new works, Decommissioning of worksMarsden Lifeguard Station and Redwell StepsRedwell StepsSouth Tyneside Council21 Mar 201923 Aug 2019
MLA/2019/00130/2
Completed
Application - Alternative use of dredged materialNorthey Island Saltmarsh ManagementNorthey Island (TH058)National Trust -Bury St. Edmunds21 Mar 201918 Jan 2024
MLA/2019/00131/4
Completed
Application - Construction of new works, Other removalsROW Pontoon Upgrade Works, Rampion Quay, NewhavenRampion Offshore Wind Operation and Maintenance FacilityE.On Climate & Renewables Uk Rampion Offshore Wind Limited22 Mar 201904 Jun 2024
MLA/2019/00132/1
Completed
Application - Maintenance of existing works, Other removalsThanet Offshore Wind Farm O&M Marine LicenceThanet O&M LicenceVattenfall Wind Power Ltd22 Mar 201923 Jan 2024
MLA/2019/00133
Completed
Application - Maintenance of existing structures or assetsSWRR Dawlish Beach WorksDawlish BeachBam Nuttall Limited22 Mar 201922 Mar 2019
MLA/2019/00134
Completed
Application - Maintenance of existing structures or assetsWarkworth RWPSWarkworth RWPSMott Macdonald Limited25 Mar 201925 Mar 2019
MLA/2019/00135/1
Completed
Application - Maintenance of existing worksUnion Chain BridgeUnion Chain BridgeNorthumberland County Council25 Mar 201929 Dec 2022
MLA/2019/00136
Completed
Application - Construction of new worksMast Quay Phase 2Opecprime Developments Ltd25 Mar 201930 Oct 2019
MLA/2019/00137/3
Completed
Application - Construction of new works5 Knot House, 27 Tredenham Road, St Mawes - Sea Wall5 Knot PolygonPca Consulting Engineers Ltd25 Mar 201924 Sep 2020
MLA/2019/00138
Completed
Application - Non-navigational clearance dredgingBankside Pier DredgingBankside Pier Dredge BoxLondon River Services Limited26 Mar 201926 Mar 2019
MLA/2019/00139
Completed
Application - Maintenance of existing structures or assetsMaintenance of Kinterbury outfall marker postKinterbury OutfallTms Maritime Ltd26 Mar 201926 Mar 2019
MLA/2019/00140
Completed
Application - Minor removalsGhost Fishing UK Project: Removal of ALDFG and Marine Litter from Wreck sites and Reefs South Cornwall & DevonEddystone Rocks, Hands Deep, Breakwater South, City of Westminster SS [+1923], Conqueror MFV (GY1364) [+1977], Primrose SS [+1906], Hellopes SS [+1911], Alice Marie SV [+1908], Vigrid SS [+1917], Heidrun SS [+1918], Anson HMS [+1807], San Antonio (St. Anthony) [+1527], Bellucia SS [+1917], City Of Ghent MV [+1955], Citrine MV [+1956], Carmarthen SS [+1917], Rock Island Bridge SS [+1920], Veritas SS [+1907], Bay of Panama SV [+1891], Volnay SS [+1917], Medina SS (+1883), N. G. Petersen SS [+1918], Mohegan SS [+1898], Stanwood SS [+1939], Caroni River MV [+1940], Epsilon SS [+1917], Hera SV [+1914], King Harry | [+1936], Ardangorm SS [+1940], Eastfield SS [+1917], Kantoeng (part of) [+1937], Orchis SS [+1935], Lancaster SS, Rosehill SS [+1917], Unicorn SS (Tile Boat) [+1923], Scylla HMS (F71) [+2004], James Eagan Layne SS [+1945], Medoc SS (Half Way Wreck) [+1940], Elk HMT (FY4.24) [+1940], Poulmic MV [+1940], Abelard HMT (FY151) [+1916], Glen Strathallan SS [+1970], Mewstone cannons, Untiring HMS (P-59) [+1957], Totnes Castle PSS [+1967], Persier SS [+1945], Oregon SV [+1890], Maine SS (II) [+1917], Skaala SS [+1917], Soudan SS [+1887], Newholm SS [+1917]Ghost Fishing Uk28 Mar 201928 Mar 2019
MLA/2019/00141
Completed
Application - Maintenance of existing structures or assetsMillbay Marina - maintenance worksMillbayRLB_WGS_RH_20190328Millbay Marina Village Management Company Limited28 Mar 201928 Mar 2019
MLA/2019/00142
Completed
Application - Construction of new worksBarking Riverside Development (Foreshore Park works)Barking Riverside Foreshore Park East, Barking Riverside Foreshore Park WestBarking Riverside Limited29 Mar 201926 Aug 2021
MLA/2019/00143
Completed
Application - Non-navigational clearance dredgingLighterman's Wharf - bed re-gradingLighterman's WharfHither Green Developments Limited29 Mar 201929 Mar 2019
MLA/2019/00144
Completed
Application - Maintenance of existing structures or assetsLighterman's Wharf - Escape LadderLighterman's WharfHither Green Developments Limited29 Mar 201929 Mar 2019
MLA/2019/00145
Completed
Application - Minor removalsRockabill Cable SurveyRockabill_SurveyRockabill Cable System Limited01 Apr 201901 Apr 2019
MLA/2019/00146
Withdrawn
Application - Construction of new worksBrighton Marina Outer Harbour Development: Phases Two and ThreeThe Outer Harbour Development Company Partnership Llp01 Apr 2019
MLA/2019/00147
Completed
Application - Construction of new worksRiver Hull+ Scheme - Angling PlatformsAngling Platforms 1, Angling Platforms 2Bmm Jv Limited.02 Apr 201909 Aug 2019
MLA/2019/00148
Completed
Application - Maintenance of existing structures or assets1 Byker Pier1 Byker PierStp Construction Limited03 Apr 201903 Apr 2019
MLA/2019/00149/2
Completed
Application - Maintenance of existing worksStrengthening of legs on Cromer PierCromer PierNorth Norfolk District Council03 Apr 201926 Aug 2021
MLA/2019/00150
Completed
Application - Aggregate dredging, SamplingArea 522522 Sub Area A, 522 Sub Area BCemex Uk Marine Ltd03 Apr 201903 Aug 2020
MLA/2019/00151
Completed
Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital), Other removalsInter Terminals - Jetty 1 upgradeProposed Dredge Footprint -Tees/Hartlepool, Proposed top side works, TEES BAY C (TY150)Inter Terminals Seal Sands Ltd03 Apr 201913 Jun 2019
MLA/2019/00152
Completed
Application - Construction of new worksReplacement and Upgrade of Existing Downstream Dolphin on Berth 1jetty dolphinNavigator Terminals Thames04 Apr 201931 Jul 2019
MLA/2019/00153
Completed
Application - Maintenance of existing structures or assetsLoop cutting of installed concrete mattresses Location 14.1, 15.1, 16.1Location 14.1, 15.1, 16.1National Grid Nemo Link Limited04 Apr 201904 Apr 2019
MLA/2019/00154
Completed
Application - Maintenance of existing structures or assetsLoop cutting of installed concrete mattresses at Location 13B.1Location 13B.1National Grid Nemo Link Limited04 Apr 201904 Apr 2019
MLA/2019/00155
Completed
Application - Maintenance of existing structures or assetsLoop cutting of installed concrete mattresses at Location 2R.7Location 2R.7National Grid Nemo Link Limited04 Apr 201904 Apr 2019
MLA/2019/00156/2
Completed
Application - Maintenance of existing works, Other removalsKentish Flats Offshore Wind Farm O&M Marine LicenceKentish Flats Array, Kentish Flats Export Cable RouteVattenfall Wind Power Ltd05 Apr 201926 Jan 2024
MLA/2019/00158/2
Completed
Application - Maintenance of existing works, Other removalsKentish Flats Extension Offshore Wind Farm O&M Marine LicenceKentish Flats Extension Array, Kentish Flats Extension Cable RouteVattenfall Wind Power Ltd05 Apr 201926 Jan 2024
MLA/2019/00159
Completed
Application - Other removals, Other worksLiminal by Wolfgang Buttressmagic_polygonsButtress Limited.05 Apr 201914 Jun 2019
MLA/2019/00160
Completed
Application - Maintenance of existing structures or assetsVirginia Quay face refurbishmentVirginia Quay E14Wph Limited05 Apr 201905 Apr 2019
MLA/2019/00161
Completed
Application - Maintenance of existing structures or assetsTeignmouth Grand Pier MaintenanceTeignmouth PierTeignmouth Maritime Services Limited05 Apr 201905 Apr 2019
MLA/2019/00162
Completed
Application - Construction of new worksPencalenick SchoolPoint F outfall pipeSpecial Partnership Trust06 Apr 201930 Jul 2019
MLA/2019/00163
Completed
Application - Construction of new worksNeptune Deep Water Test TankNeptune QuayShepherd Offshore Limited08 Apr 201917 Oct 2019
MLA/2019/00164
Completed
Application - Maintenance of existing structures or assetsEast Portelmouth CSOAgar Point, CSO, East Portlemouth. Salcombe, TQ8 8PFKier Limited12 Apr 201912 Apr 2019
MLA/2019/00165
Completed
Application - Maintenance of existing structures or assetsFowey Harbour Office Exterior MaintenanceFowey Harbour OfficeFowey Harbour Commissioners09 Apr 201909 Apr 2019
MLA/2019/00166/2
Completed
Application - Construction of new works, Other deposits, Other removalsMiddleton Outfall Air Release PipeworkWorking areaUnited Utilities09 Apr 201927 Sep 2019
MLA/2019/00167
Completed
Application - Deposit of markersBrightlingsea Sailing Club racing marks licence applicationBatemans (BSC), Pyefleet (CYC), Point Clear (BSC), Hills (BSC), Gazelet (BSC), Cocum (BSC), Beach (BSC), CVP (CYC)Brightlingsea Sailing Club09 Apr 201909 Apr 2019
MLA/2019/00168
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Port of Workington Maintenance Dredging 2019 -2029 (Renewal)Dock -Derwent OSPAR area, Turning Basin -Derwent OSPAR area, Channel -Derwent OSPAR area, Bar/Wedge -Derwent OSPAR area, SOLWAY FIRTH, WORKINGTON ANCHORAGE, CatchpitPort Of Workington10 Apr 201918 Oct 2019
MLA/2019/00170
Completed
Application - Maintenance of existing structures or assetsBattersea JettyBPS JettyBattersea Power Station Development Company Limited10 Apr 201910 Apr 2019
MLA/2019/00171
Completed
Application - Maintenance of existing structures or assetsRampion Quay Brow Roller MaintenanceRampion Quay Temporary PontoonE.On Climate & Renewables Uk Rampion Offshore Wind Limited11 Apr 201911 Apr 2019
MLA/2019/00172
Completed
Application - Maintenance of existing worksRiver Frontage Remediation Works at Offshore Renewable Energy CatapultOREC River FrontageInnovate Uk12 Apr 201912 Sep 2019
MLA/2019/00173
Completed
Application - Maintenance of existing worksChichester Yacht Club: New Piles, Replacement Pontoons, Bridge & Bridgeheads, Safety Boat berthing, Waterfront tidying and Maintenance.Chichester Yacht Club-work areaChichester Yacht Club12 Apr 201926 Nov 2019
MLA/2019/00174/3
Completed
Application - Minor removalsHornsea Offshore Wind Farm Project TwoHOW02_CableCorridorKP2toKP30_20190412Optimus Wind Limited12 Apr 201926 Apr 2019
MLA/2019/00175
Completed
Application - Maintenance of existing structures or assetsFrindsbury Euro Wharf Repairs (Post-Dredge)Frindsbury_Wharf_WallHanson Aggregates Marine Limited12 Apr 201912 Apr 2019
MLA/2019/00176
Withdrawn
Application - Construction of new worksBattersea Coaling Jetty - Temporary Access BridgesBPS JettyBattersea Power Station Development Company Limited12 Apr 2019
MLA/2019/00177/4
Completed
Application - Other depositsSISProtect System Test SitePile_Locations_50m_Buffer_190423_WGS84_UTM31NScottish Power Renewables15 Apr 201907 Jun 2021
MLA/2019/00178
Completed
Application - Maintenance of existing structures or assetsPorthleven Food Festival BridgePorthleven Food Festival BridgeMr15 Apr 201915 Apr 2019
MLA/2019/00179
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Tapper And Son (Poole) Limited17 Apr 201917 Apr 2019
MLA/2019/00180/1
Completed
Application - Maintenance of existing worksHamble jetty repaintingHamble_jettyBp Oil Uk Limited.18 Apr 201917 Sep 2020
MLA/2019/00181/1
Completed
Application - Other worksCalstock Flood Defence Improvement and Habitat Creation SchemeCalstock Flood Defence Improvement and Habitat CreationEnvironment Agency - South West Region18 Apr 201901 Oct 2020
MLA/2019/00182
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Charles Lister18 Apr 201918 Apr 2019
MLA/2019/00183
Completed
Application - Decommissioning of worksRemoval of old gas pipe in Pagham HarbourPagham Harbour Gas PipeI & G Contractors Limited19 Apr 201926 Jul 2019
MLA/2019/00184
Completed
Application - Disposal of dredged materialBembridge Harbour Maintenance Dredging - DisposalNAB TOWER (WI060)Bembridge Harbour Improvements Company Limited21 Apr 201928 Jun 2019
MLA/2019/00186
Completed
Application - Construction of new worksThe slipway, 42 Waterside, New Jetty InstallationTimber jettyRa Marine Limited25 Apr 201916 Dec 2019
MLA/2019/00187/1
Completed
Application - Construction of new worksErection of a PontoonThe Nab Pontoon & BridgeMr Gareth Helm25 Apr 201913 Dec 2019
MLA/2019/00188
Completed
Application - Maintenance of existing structures or assetsFlap Valve Replacement Doust Way Rochester KentDoust Way RochesterBeasley Christopher Limited25 Apr 201925 Apr 2019
MLA/2019/00189
Completed
Application - Maintenance of existing structures or assetsRNLI Lyme Regis - Slipway WorksRNLI Lyme Regis slipwayR.N.L.I. (Trading) Limited26 Apr 201926 Apr 2019
MLA/2019/00190
Completed
Application - Minor removalsGhost Fishing UK Project: Removal of ALDFG and Marine Litter from Wreck sites West of PortlandChesil, Trawl gear|, Elsa SS [+1918], Dudley Rose SS [+1941], Galicia SS [+1917], Kendal Castle SS [+1918], Emsstrom MV [+2013], Northville SS [+1918], Stryn SS [+1918], Sevilla SS [+1918], P̩ronne SS [+1917], Bretagne SS [+1918], Lord Stewart SS [+1918], Ursa SS [+1918], Empress Of India HMS [+1913], Heroine SV [+1852], Gibel Hamam SS [+1918], Avalanche SV [+1877], NB Unknown Wreck, Ailsa Craig SS [+1918], Moidart SS [+1918], Minerva SS [+1917], Ull SS [+1917], Salsette SS [+1917], Grane SS [+1918], Saint Dunstan HMS [+1917], Buccaneer HMS [W49] [+1946], Pomeranian SS [+1918], Tracy [+2016], Sidon HMS (P259) [+1955], Scaldis (+1974), Martha SS [+1918], Landrail HMS [+1906], Anworth, P-555 HMS [+1947], UB-74 [+1918], Frogner SS [+1918], Stancrest SS [+1937], Gripfast SS [+1942], Merchant Royal SS [+1946], Royal Adelaide SV [+1872], James Fennell HMT [+1920], Gertrude SS (+1894)Ghost Fishing Uk26 Apr 201926 Apr 2019
MLA/2019/00191
Withdrawn
Application - Other removalsGalloper Offshore Wind Farm UXO Disposal - Export Cable CorridorInnogy Renewables Uk Ltd26 Apr 2019
MLA/2019/00192
Withdrawn
Application - Other removalsGalloper Offshore Wind Farm UXO Disposal - Wind Farm ArrayInnogy Renewables Uk Ltd26 Apr 2019
MLA/2019/00193
Completed
Application - Minor removalsGhost Fishing UK Project: Removal of ALDFG and Marine Litter from Wreck sites East of PortlandPortland Harbour, Apache SS [+1917], U-322 [+1944], Hartlepool SS (main part) [+1940], Hartlepool SS (smaller part) [+1940], Black Hawk USAT (stern) [+1944], Valdes SS [+1917], Ethel SS [+1918], Elena R. SS [+1939], Binnendijk SS [+1939], British Inventor SS [+1940], Alex Van Opstal MV [+1939], Black Hawk USAT (fwd Section) [+1944], Railway line, Not Arfon (Holmtown), The Pin Wreck, Aeolian Sky MV [+1979], Iolanthe SS [+1918], Arfon HMT [+1917], Safari HMS (P211) [+1946], Kyarra HMHS [+1918], Carentan (Q005) [+1943], Castlereagh SS [+1925], Fleur de Lys MFV (DH 7) [+2000], Valentine tank Poole harbour, Valentine tank Poole bay [+1943], Start SS (UB-58) [+1917], Betsy Anna SS [+1926], Clan MacVey SS [+1918], Venezuela SS [+1918], Borgny SS [+1918]Ghost Fishing Uk26 Apr 201926 Apr 2019
MLA/2019/00194
Completed
Application - Maintenance of existing structures or assetsSlipway repair at Arbennek, Restronguet Point TR3 6RBArbennek slipwayMr Wayne Sheppard28 Apr 201928 Apr 2019
MLA/2019/00195
Completed
Application - Navigational dredging (maintenance)Gweek Classic Boatyard Dredging of Navigational ChannelMaintenance dredging of existing navigational channelGweek Quay Limited.28 Apr 201923 Apr 2020
MLA/2019/00196
Completed
Application - Maintenance of existing structures or assetsManea BridgeManea BridgeJ. Murphy & Sons Limited29 Apr 201929 Apr 2019
MLA/2019/00197
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mamarine.Com Llp29 Apr 201929 Apr 2019
MLA/2019/00198/3
Completed
Application - Construction of new works, Other depositsElmer Beach Management SchemeElmer Beach Management SchemeEnvironment Agency29 Apr 201919 Mar 2020
MLA/2019/00199/2
Completed
Application - Maintenance of existing worksOperation and Maintenance activities required over the lifetime of Galloper Wind Farm's Generation AssetsArray AreaGalloper Wind Farm Limited30 Apr 201931 Jul 2024
MLA/2019/00200
Completed
Application - Maintenance of existing structures or assetsToms Yard infillToms BoatyardC. Toms And Son Limited30 Apr 201930 Apr 2019
MLA/2019/00201
Completed
Application - Maintenance of existing structures or assetsWalton Pier Concrete Repair Programme 2019Walton PierMr Shane Swan30 Apr 201930 Apr 2019
MLA/2019/00202
Completed
Application - Maintenance of existing worksRNSA Haslar Pontoon refurbishmentHaslar PontoonRoyal Naval Sailing Association01 May 201902 Jul 2019
MLA/2019/00203/2
Completed
Application - Other worksLower Thames Crossing (Geotechnical Investigation Works)LTC GI Survey Area BoundaryAecom Limited01 May 201917 Feb 2021
MLA/2019/00204
Completed
Application - Construction of new works102 Panorama Road102 PanoramaMr Simon Bowden02 May 201930 Sep 2020
MLA/2019/00205
Completed
Application - Maintenance of existing structures or assetsSteps at Somerset House, FoweySomerset HouseMr Christopher Bird02 May 201902 May 2019
MLA/2019/00206
Completed
Application - Maintenance of existing worksemergency works at Moriconium Quay PooleMoriconium QuayMoriconium Quay Management Company Limited.02 May 201909 May 2019
MLA/2019/00207
Completed
Application - SamplingTurnchapel WharfTurnchapel WharfYacht Havens Limited03 May 201904 Dec 2019
MLA/2019/00208
Completed
Application - Marine licence for the burial of human remains at seaNEWHAVEN (WI011)Funeral Services Limited03 May 201903 May 2019
MLA/2019/00209
Completed
Application - Construction of new works, Decommissioning of works, Maintenance of existing worksPartial Dismantling of Scott Street Bridge & Scheme for Replacement Leafs, Enhancement & ConservationScott Street BridgeHull City Council.03 May 201927 Aug 2019
MLA/2019/00210
Completed
Application - Maintenance of existing structures or assetsThanet OWF small scale maintenanceThanet WTG D06Vattenfall Wind Power Ltd03 May 201903 May 2019
MLA/2019/00211/3
Completed
Application - Construction of new worksNew External Stairway to Foreshore, Underdeck, Cliff Road, SalcombeForeshore, Cliff Road, Salcombe, TQ8 8JQTeignmouth Maritime Services Ltd.03 May 201912 May 2020
MLA/2019/00213
Completed
Application - Construction of new worksCrown Pier ExtensionCrown PierCrown River Cruises Limited.04 May 201911 Feb 2020
MLA/2019/00214
Completed
Application - Maintenance of existing structures or assetsHMS Belfast - Corrosion Protection ReplacementHMS BelfastImperial War Museum Trading Company Limited07 May 201907 May 2019
MLA/2019/00216/1
Completed
Application - Other worksReplacement of Canal Underbridge, near Looe, CornwallCanal Underbridge and area of worksNetwork Rail Swindon09 May 201922 Oct 2020
MLA/2019/00217/2
Completed
Application - Navigational dredging (maintenance)Thamescraft Dry Docking DredgingThames Craft Dry Docking Dredging SiteThamescraft Dry Docking09 May 201914 Oct 2020
MLA/2019/00218
Completed
Application - Maintenance of existing structures or assetsHolloway Storm Relief Outfall Bekesbourne Tideflex Valve Minor MaintainenceBekesbourne tideflex ValveThames Water Limited09 May 201909 May 2019
MLA/2019/00219
Completed
Application - Minor removalsRetrieval of lost fishing gear PlymouthConstance, Ajax, Encourage, FS Poulmic, Glen Strathallan, HMT Abelard, HMT Elk, HMT Kingston Alalite, Hopper no.42, James Egan Layne, Nepaul, Rame barge, Rosehill, Rothesay, Scylla, Vectis, Viking princessFathoms Free10 May 201910 May 2019
MLA/2019/00220
Completed
Application - Other depositsD Day Museum LCT7074LCT7074M L (Uk) Limited10 May 201901 Jul 2019
MLA/2019/00221
Completed
Application - Maintenance of existing structures or assetsRaby Cote OutfallRaby Cote OutfallJ.N. Bentley Limited10 May 201910 May 2019
MLA/2019/00222/1
Completed
Application - Construction of new works, Maintenance of existing works, Other removals, Other worksDuke Shore Wharf - Permanent WorksDuke Shore WharfCh2m Hill Europe Limited10 May 201929 Oct 2020
MLA/2019/00223
Completed
Application - Minor removalsRetrieval of lost fishing gear FalmouthThe Lady of the Isles, The Stanwood, The Andromeda, The Epsilon, The Caroni River, The Bay of Panama, The Volnay, The MoheganFathoms Free10 May 201910 May 2019
MLA/2019/00224
Completed
Application - Minor removalsRetrieval of lost fishing gear PadstowThe Sphene, The SaphirFathoms Free10 May 201910 May 2019
MLA/2019/00226/1
Completed
Application - Minor removalsHornsea Offshore Wind Farm Project TwoHOW02_MMOLicenseArea_KP30toKP127_Orsted_20190429Optimus Wind Limited13 May 201922 May 2019
MLA/2019/00227
Withdrawn
Application - Construction of new worksInstallation of a discharge pipe and headwall on intertidal zone at Saqqara, Restronguet Point, Feock, CornwallSaqarra discharge pipe and headwallSpalding Associates (Environmental) Ltd14 May 2019
MLA/2019/00228/1
Completed
Application - Disposal of dredged materialDisposal of maintenance dredging material from the Harwich / Felixstowe Outer ChannelINNER GABBARD EAST (TH056)Harwich Haven Authority15 May 201920 Dec 2023
MLA/2019/00229
Completed
Application - Other dredgingClearance of Seawater Intake at BAE Systems (Barrow)SMITE Seawater Abstraction Point - Walney Channel -Lancashire CoastBae Systems Marine Limited.15 May 201905 Mar 2021
MLA/2019/00230
Completed
Application - Construction of new worksBerth 2 ImprovementsBerth 2Portsmouth City Council (Escp)16 May 201931 Oct 2019
MLA/2019/00231/1
Completed
Application - Maintenance of existing structures or assetsRepointing Qauyside wall as part of residential development on shoresideFaversham CreekNova (Kent) Limited16 May 201922 May 2019
MLA/2019/00233/1
Completed
Application - Other worksArundel Tidal Flood DefencesArundel_Site_RLBEnvironment Agency (Southern Region)16 May 201927 Mar 2020
MLA/2019/00234
Completed
Application - Minor removalsRiverside Pavilion - Under-Wharf InvestigationsSite_BoundaryNorthern & Shell Plc16 May 201916 May 2019
MLA/2019/00235
Completed
Application - Maintenance of existing structures or assetsRichmond Lock and Weir repaint 2019Richmond Lock and WeirPort Of London Authority17 May 201917 May 2019
MLA/2019/00236
Completed
Application - Construction of new worksCumbria Coastal Activities Centre SlipwayCumbria Activity Centre SlipwayWhitehaven Harbour Commissioners17 May 201915 Jul 2019
MLA/2019/00237
Completed
Application - Non-navigational clearance dredgingHundred End Gutter Dredge 19_20Hundred End Gutter Desilt 19_20Environment Agency22 May 201922 May 2019
MLA/2019/00238
Completed
Application - Maintenance of existing structures or assetsdolphin repairs Cory Energy Charltoncory energyWph Limited23 May 201923 May 2019
MLA/2019/00239/1
Completed
Application - Maintenance of existing worksIron Man Pile ReplacementCrosby Beach Iron Man Area BoundarySefton Mbc23 May 201909 Jun 2020
MLA/2019/00240/4
Completed
Application - Other dredgingMMO Application for renewel / Extension of licence L2014/00282BP Oil Terminal Jetty No1Bp Oil Uk Ltd24 May 201930 Aug 2024
MLA/2019/00241/2
Completed
Application - Other removalsHinkley Point C UXO ClearanceHPC Outfalls OS/01 and OS/02, HPC Intakes OS/11, OS/13, OS/21 and OS/23Nnb Generation Company (Hpc) Limited24 May 201922 Mar 2024
MLA/2019/00242
Completed
Application - Minor removalsHornsea Three Grab Samples: nearshore rerouteNearshore Reroute grab samplesOrsted28 May 201928 May 2019
MLA/2019/00244
Completed
Application - Deposit of markersLaying dinghy racing marks in Christchurch Harbour that remain in place for more than 28 days and are only removed for maintenance.Christchurch Harbour fixed racing marksHighcliffe Sailing Club Limited29 May 201929 May 2019
MLA/2019/00245
Completed
Application - Maintenance of existing structures or assetsHoughton Bridge repairsHoughton bridge RepairWest Sussex County Council29 May 201929 May 2019
MLA/2019/00247
Completed
Application - Non-navigational clearance dredgingRiver Dart Higher Ferry Slipway Maintenance DredgeRiver Dart Higher Ferry Slipway (Dartmouth side)Tms Maritime Ltd30 May 201930 May 2019
MLA/2019/00249
Withdrawn
Application - Construction of new worksFraser Range, PortsmouthProposed_Marine_Development_AreaInvestin Portsmouth Limited30 May 2019
MLA/2019/00250
Withdrawn
Application - Navigational dredging (capital)OSL Jetty 2 Capital DredgeJetty 2 Berth & ApproachOikos Storage Limited31 May 2019
MLA/2019/00251
Completed
Application - SamplingBradwell B Intertidal & Subtidal Benthic Ecology SurveysApem Ltd04 Jun 201928 Aug 2019
MLA/2019/00252
Completed
Application - Construction of new worksNorth Sunderland Harbour StepsNorth Sunderland Harbour StepsNorth Sunderland Harbour Commissioners04 Jun 201907 Aug 2019
MLA/2019/00253
Completed
Application - Maintenance of existing structures or assetsDawlish Sea Wall RepairsSea Wall RepairsBalfour Beatty Plc04 Jun 201904 Jun 2019
MLA/2019/00254
Completed
Application - Minor removalsHornsea Three Grab Samples: offshore rerouteOffshore reroute grab samplesOrsted04 Jun 201904 Jun 2019
MLA/2019/00255
Completed
Application - Construction of new worksConstruction of Slipway and JettySlipway and Jetty siteMr Jeremy Gardner05 Jun 201925 Sep 2019
MLA/2019/00256/1
Completed
Application - Maintenance of existing worksOperation and Maintenance activities required over the lifetime of Galloper Wind Farm's Transmission AssetsExport Cable CorridorDiamond Transmission Partners Galloper Limited05 Jun 201918 Nov 2022
MLA/2019/00257
Completed
Application - Construction of new works, Maintenance of existing works, Other removalsHaslar Marina Slipway and Office ExtensionSlipway, Office, Restaurant, IntertidalDean & Reddyhoff Limited06 Jun 201922 Nov 2019
MLA/2019/00258
Completed
Application - Minor removalsInvestigations to determine source of leaking sewageTrial hole areaR&M Utility & Civil Engineering Services South West Limited07 Jun 201907 Jun 2019
MLA/2019/00259
Completed
Application - Minor removalsBenmacdhui Project TA 65272 21818 Benmacdhui wreck, off East Yorkshire CoastBenmacdhuiMr Robin Melhuish07 Jun 201907 Jun 2019
MLA/2019/00260
Completed
Application - Maintenance of existing structures or assetsNorthern Spire, Sunderland - River Bridge PaintworksNorthern SpireVictor Buyck Steel Construction Limited07 Jun 201907 Jun 2019
MLA/2019/00263
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mamarine.Com Llp10 Jun 201910 Jun 2019
MLA/2019/00264
Withdrawn
Application - Other removalsSand Abstraction from Marazion Beach for agricultural UseMr Anthony Laity11 Jun 2019
MLA/2019/00265
Completed
Application - Minor removalsDe-risking the Dunwich Bank Wreck Site: CSMP Forward Plan ActionsDunwichBankWGS84Wessex Archaeology Limited11 Jun 201911 Jun 2019
MLA/2019/00267
Completed
Application - Maintenance of existing structures or assetsRepairs to Fort Bovisand PiersFort Bovisand PiersFort Bovisand Development Ltd12 Jun 201912 Jun 2019
MLA/2019/00268
Completed
Application - Marine licence for the burial of human remains at seaNEWHAVEN (WI011)Arthur C. Towner Limited13 Jun 201913 Jun 2019
MLA/2019/00269
Completed
Application - Maintenance of existing structures or assets57068 Bath Old Bridge blasting and painting57068 Bath Old BridgeBristol City Council14 Jun 201914 Jun 2019
MLA/2019/00270
Completed
Application - Construction of new worksBoat Yard SPS CSO & Outfall, MalpasBoat Yard SPS CSOGlanville Cleansing Limited17 Jun 201926 Nov 2019
MLA/2019/00271
Completed
Application - Maintenance of existing structures or assetsQinetiQ Portland Grove Point maintenance and repair (July 19 - July 20)Grove PointQinetiq Limited17 Jun 201917 Jun 2019
MLA/2019/00273
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mr Charles Lister18 Jun 201918 Jun 2019
MLA/2019/00274/2
Completed
Application - Construction of new worksAthena PierGps Marine Contractors Limited18 Jun 201921 Jul 2021
MLA/2019/00275
Completed
Application - Construction of new worksDeal and Walmer Rock GroynesSandown Castle Groyne, Walmer Groyne 3, Walmer Groyne 2, Walmer Groyne 1Dover District Council18 Jun 201906 Jan 2020
MLA/2019/00276
Completed
Application - Other depositsFloating LiDAR Validation ProjectFLiDAR 1 - F140, FLiDAR 2 - F150Axys Technologies Inc19 Jun 201904 Sep 2019
MLA/2019/00278
Completed
Application - Maintenance of existing structures or assetsEast Anglia Zone- Meteorological Mast 1B- Operations & MaintenanceEAOW Met Mast 1BEast Anglia Offshore Wind Limited21 Jun 201921 Jun 2019
MLA/2019/00279
Completed
Application - Other worksBridgwater Tidal Barrier Ground Investigation Works - Temporary PontoonsDunball WharfBam Nuttall Limited21 Jun 201904 Oct 2019
MLA/2019/00281
Completed
Application - Other depositsLeman Offshore Mooring BuoyLeman Mooring BuoyPerenco Uk Ltd-Norwich21 Jun 201917 Dec 2019
MLA/2019/00283
Withdrawn
Application - Navigational dredging (maintenance)Berth Leveling Operation at Murphys Wharf - Inner BerthArmac Shipping Services Limited23 Jun 2019
MLA/2019/00284
Completed
Application - Construction of new worksPeak Lane Outfall ExtensionPeak_Lane_MMO_Shapefile 1Arun District Council25 Jun 201915 Oct 2019
MLA/2019/00285
Completed
Application - Maintenance of existing structures or assetsRibble Link - extension of existing channel markersRibble LinkCanal & River Trust25 Jun 201925 Jun 2019
MLA/2019/00286
Completed
Application - SamplingSouth Bank Wharf Site InvestigationSouth Bank Wharf Site InvestigationAble Uk Ltd26 Jun 201919 Sep 2019
MLA/2019/00287
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mr Charles Lister26 Jun 201926 Jun 2019
MLA/2019/00288
Completed
Application - Disposal of dredged material, Navigational dredging (capital)Gosport Boatyard Maintenance DredgeGosport Boat Yard Limited26 Jun 201919 Sep 2019
MLA/2019/00290
Completed
Application - Construction of new works, Other deposits, Other worksArun to Pagham Beach Management Plan: Scheme Three; Middleton-on-SeaTransport of Rock to Site, Construction SiteArun District Council28 Jun 201911 Oct 2019
MLA/2019/00291
Completed
Application - Maintenance of existing structures or assetsCommodores hardcommodores hardMarval Marine Services Limited28 Jun 201928 Jun 2019
MLA/2019/00292/1
Completed
Application - Construction of new worksPontoon Extension Trawl Dock LowestoftTrawl Dock Area Lowestoft Outer HarbourAssociated British Ports.28 Jun 201909 Mar 2020
MLA/2019/00293
Completed
Application - Maintenance of existing structures or assetsLee on the solent Beach RDLee on the solent Beach RDBeasley Christopher Limited29 Jun 201929 Jun 2019
MLA/2019/00294
Completed
Application - Maintenance of existing structures or assetsBoston Boatyard Seaweed RemovalBostons BoatyardGreenbelt Group Limited29 Jun 201929 Jun 2019
MLA/2019/00295
Completed
Application - Marine licence for the burial of human remains at seaNEWHAVEN (WI011)Arthur C. Towner Limited01 Jul 201901 Jul 2019
MLA/2019/00296
Completed
Application - Maintenance of existing worksMoriconium Quay - PooleMoriconium QuayMoriconium Quay Management Company Limited.01 Jul 201903 Jul 2019
MLA/2019/00297/1
Completed
Application - Construction of new worksRD30 Waren Mill STWWaren Mill STWMott Macdonald Bentley Ltd01 Jul 201931 Mar 2020
MLA/2019/00298
Completed
Application - Maintenance of existing structures or assetsEastern Road Water Bridge Maintenance WorksEastern_Road_WaterbridgeColas Limited02 Jul 201902 Jul 2019
MLA/2019/00299
Completed
Application - Maintenance of existing structures or assetsDiscovery Square Quay MaintenanceDSQL FalmouthNational Maritime Museum Cornwall Trust02 Jul 201902 Jul 2019
MLA/2019/00300/3
Completed
Application - Maintenance of existing worksRestoration of existing stone quay, increase in height for flood defense and new slipway.Dinahs SideMr James Campbell03 Jul 201912 Feb 2021
MLA/2019/00301
Completed
Application - Minor removalsBorehole Site Investigation - Aggregate Berth - Port of RamsgatePort of Ramsgate - Aggregate Berth - Site InvestigationThanet District Council03 Jul 201903 Jul 2019
MLA/2019/00302
Completed
Application - Construction of new works, Maintenance of existing worksAshlett Creek Seawall MaintenanceAshlett Creek Seawall MaintenanceEsso Petroleum Company Limited03 Jul 201914 Oct 2019
MLA/2019/00303
Completed
Application - Maintenance of existing worksCBC1/W670350 Nethertown - St Bees Sea WallsNethertown St BeesNetwork Rail Ltd04 Jul 201928 Nov 2019
MLA/2019/00304
Completed
Application - Construction of new worksKing Point Marina - Installation of Pier A Walkway Pontoons and deposit of finger pontoonsKing Point MarinaSutton Harbour Services Limited05 Jul 201908 Oct 2019
MLA/2019/00306
Completed
Application - Minor removalsQuay Wall Design Information - Marine Borehole InvestigationSite_Area___Borehole InvestigationLondon Gateway Port Limited08 Jul 201908 Jul 2019
MLA/2019/00307
Completed
Application - Construction of new works, Maintenance of existing worksHull River Defenceintervention 101L36 - Flood defence improvements, intervention 101L33 - Flood defence improvements, Interventions 201R45-49 - Flood defence improvementsBmmjv Ltd08 Jul 201903 Jan 2020
MLA/2019/00308
Completed
Application - Maintenance of existing structures or assetsB317 North Fairlee Farm Footbridge maintenance worksB317 North Fairle FarmRingway Island Roads Limited08 Jul 201908 Jul 2019
MLA/2019/00310
Completed
Application - Construction of new worksSlipway WallClosure WallPort Of Tyne Authority10 Jul 201910 Oct 2019
MLA/2019/00311/3
Completed
Application - Construction of new worksReplacement Jetty - Sea Cadets LittlehamptonSea Cadets JettyLittlehampton Sea Cadets11 Jul 201909 Aug 2023
MLA/2019/00312/7
Completed
Application - Maintenance of existing worksImprovements to the Gwelva Landing serving St Michel’s Mount and to the toe of the adjacent sea wallGwelva Landing, St. Michael's MountThe National Trust11 Jul 201914 Sep 2023
MLA/2019/00313
Completed
Application - Maintenance of existing structures or assetsCoquet eel pass improvements at Warkworth weirWarkworth weirNorthumberland Rivers Trust12 Jul 201912 Jul 2019
MLA/2019/00314
Completed
Application - Maintenance of existing structures or assetsQuay wall repairDart Marina Residential EstateDartmouth Land Company (Management) Limited15 Jul 201915 Jul 2019
MLA/2019/00315
Completed
Application - Construction of new works, Other worksSutton Harbour - Public Walkway connection and Event pontoonsSutton Harbour - Public Events Pontoon Use, Pontoon Walkway ReconfigurationSutton Harbour Company Limited15 Jul 201914 Oct 2019
MLA/2019/00316/3
Completed
Application - Construction of new works, Other deposits, Other removalsSouthsea Coastal Flood and Erosion Risk Management SchemeCoastal Partners15 Jul 201924 Apr 2024
MLA/2019/00317
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mr Charles Lister16 Jul 201916 Jul 2019
MLA/2019/00318
Completed
Application - Maintenance of existing structures or assetsPort of Tyne Penstock Valve RelocationProposed Penstock Valve LocationPort Of Tyne16 Jul 201916 Jul 2019
MLA/2019/00319
Completed
Application - Other depositsAmerica-Europe Connect (Uk) LtdUK EAST Corridor to 12NM, CATS Crossing, NORPIPE Crossing, SLEIPNER to EASINGTON Crossing, SHEARWATER to BACTON CrossingAqua Comm16 Jul 201925 Jun 2020
MLA/2019/00320
Completed
Application - Construction of new worksHead Cragg Marsh Embankment Coastal Defence DesignKirkby Pool scour protectionStory Contracting Limited17 Jul 201929 Nov 2019
MLA/2019/00321/1
Completed
Application - Other depositsAmerica-Europe Connect (Uk) LtdAqua Comm17 Jul 201921 Dec 2021
MLA/2019/00322
Completed
Application - Maintenance of existing structures or assetsRepair of dangerous jetty to houseboat James Egan Layne, Pin MillJettyCaptain Andrew Strachan18 Jul 201918 Jul 2019
MLA/2019/00323
Completed
Application - Maintenance of existing structures or assetsBexhill PromenadeBexhill PromenadeBeasley Christopher Limited20 Jul 201920 Jul 2019
MLA/2019/00324
Completed
Application - Maintenance of existing structures or assetsRepair works and replacement pile to sandbanks jettySandbanks JettyConstructex Limited22 Jul 201922 Jul 2019
MLA/2019/00325
Completed
Application - Maintenance of existing structures or assetsRefurbishment of PontoonSite AreaSolent University Limited22 Jul 201922 Jul 2019
MLA/2019/00326
Completed
Application - Non-navigational clearance dredgingWorthing Outfall 885x Blockage ClearanceJetting LocationSouthern Water Services Limited22 Jul 201922 Jul 2019
MLA/2019/00327
Completed
Application - Maintenance of existing structures or assetsBedenham Pier ScaffoldingBedenham Pier Structural Integrity Survey areaDefence Infrastructure Organisation23 Jul 201923 Jul 2019
MLA/2019/00328
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mamarine.Com Llp23 Jul 201923 Jul 2019
MLA/2019/00329/1
Completed
Application - SamplingHinkley Point C Sediment SamplingIntakes 21 and 23, Intakes 11 and 13, Outfalls and Flotation Pocket, FRS Outfall, Jetty Berth PocketNnb Generation Company-Hpc Bristol23 Jul 201929 Jul 2020
MLA/2019/00330/2
Completed
Application - Maintenance of existing worksWear Farm Culvert RepairCulvert repairNetwork Rail Swindon23 Jul 201915 Jan 2020
MLA/2019/00332
Completed
Application - Maintenance of existing structures or assetsAlnmouth Sea Wall RepairsAlnmouth Sea WallNorthumberland Estates Limited25 Jul 201925 Jul 2019
MLA/2019/00334
Withdrawn
Application - Other depositsUSBL TrainingFugro Gb (North) Marine Ltd26 Jul 2019
MLA/2019/00335
Completed
Application - Maintenance of existing structures or assetsOld Bridge Street Retaining Wall RepairOld Bridge Street Retaining WallCormac Solutions Limited26 Jul 201926 Jul 2019
MLA/2019/00337
Completed
Application - Maintenance of existing structures or assetsSaltash Sailing Club - Seawall Gabion RepairsSaltash Sailing Club - SE CornerSaltash Sailing Club29 Jul 201929 Jul 2019
MLA/2019/00338
Completed
Application - Maintenance of existing worksThe Hard Interchange, PortsmouthThe HardPortsmouth City Council (Escp)30 Jul 201909 Dec 2019
MLA/2019/00339
Completed
Application - Maintenance of existing structures or assetsSouth Ferriby Flood Alleviation SchemeScaffolding footprintEnvironment Agency31 Jul 201931 Jul 2019
MLA/2019/00341
Completed
Application - Maintenance of existing works, SamplingGeotechnical Investigations Bedenham PierBedenham Pier Site and Geotechnical InvestigationsDefence Infrastructure Organisation02 Aug 201913 Dec 2019
MLA/2019/00342
Completed
Application - Maintenance of existing structures or assetsSingle marina pile replacementRoyal Harwich Yacht Club MarinaRoyal Harwich Yacht Club Limited02 Aug 201902 Aug 2019
MLA/2019/00343
Completed
Application - Maintenance of existing structures or assetsHartlepool SO11 MaintenaceHartlepool SO11Northumbrian Water Limited02 Aug 201902 Aug 2019
MLA/2019/00344
Completed
Application - Maintenance of existing structures or assetsHartland PointHartland BreakwaterCrestmoor Construction Services Limited02 Aug 201902 Aug 2019
MLA/2019/00345
Completed
Application - Other worksChichester Marina - L Pontoon ReconfigurationChichester Marina L PontoonPremier Marinas Chichester06 Aug 201906 Dec 2019
MLA/2019/00346/1
Completed
Application - Other depositsMARINEFF pilot oyster reefCalshot outfallUniversity Of Southampton07 Aug 201917 Jun 2020
MLA/2019/00347
Completed
Application - Maintenance of existing structures or assetsGroyne Repairs at Western Esplanade HoveWestern Esplanade Groyne RepairsMackley Construction Limited07 Aug 201907 Aug 2019
MLA/2019/00348
Completed
Application - Minor removalsSwalecliffe WTW - Revised Ground InvestigationSwalecliffe Borehole AreaSouthern Water Services Limited07 Aug 201907 Aug 2019
MLA/2019/00349
Completed
Application - Maintenance of existing structures or assetsHayle Bridge - Home bargainsSite 1Cairn Cross Civil Engineering Limited09 Aug 201909 Aug 2019
MLA/2019/00350
Completed
Application - Maintenance of existing structures or assetsA379 Shaldon Bridge - Piers 2 and 3 foundation repairsPiers 2 and 3Devon County Council09 Aug 201909 Aug 2019
MLA/2019/00351/1
Completed
Application - Construction of new worksGreat Yarmouth Bioengineered Habitat EnhancementBioenginnering_Enhancement_AreaJba Bentley Limited13 Aug 201917 Dec 2019
MLA/2019/00352
Completed
Application - Maintenance of existing structures or assetsMinor maintenance of the estuary wall and slipway at Marine House, ShaldonMarine HouseMr George Irvine13 Aug 201913 Aug 2019
MLA/2019/00354
Completed
Application - Navigational dredging (maintenance)Maintenance Water Injection Dredging of the Former Fawley Power Stationdredge_area_BNG_250607Fawley Waterside Limited14 Aug 201926 Nov 2019
MLA/2019/00355
Completed
Application - Beach maintenance activitiesCombe Martin - Beach Maintenance - recyclingCoobe Beach recyclingCombe Martin Water Watch14 Aug 201914 Aug 2019
MLA/2019/00356
Completed
Application - Non-navigational clearance dredgingNeptune Major Component Exchange Project. Greater Gabbard Offshore Wind LTDGreater GabbardGreater Gabbard Offshore Winds Limited15 Aug 201915 Aug 2019
MLA/2019/00358
Completed
Application - Non-navigational clearance dredgingCory Ship Repair Services Limited Slipway SurveysCory Ship Repair Services Limited, Wharf Road, Gravesend, DA12 2RUTeignmouth Maritime Services Limited15 Aug 201915 Aug 2019
MLA/2019/00359
Completed
Application - Maintenance of existing structures or assetsCross Trees Jetty, Chichester HarbourCross Trees JettyWalter Womersley16 Aug 201916 Aug 2019
MLA/2019/00360
Completed
Application - Construction of new worksMedway Yacht Club-Pontoon hammerhead extensionMedway Yacht Club Upnor Rochester-pontoonsMedway Yacht Club16 Aug 201909 Dec 2019
MLA/2019/00362
Completed
Application - Maintenance of existing structures or assetsMaryport Seawall Groyne repairs (Stage 2)Site AThomas Armstrong (Construction) Limited19 Aug 201919 Aug 2019
MLA/2019/00363
Completed
Application - Maintenance of existing worksGreater Gabbard Offshore Wind Farm - Reinstatement of Safe Fishing Environment, Cable Protection and Scour Remediation worksProjectCorridorEquitix Management Services Limited19 Aug 201901 Jun 2020
MLA/2019/00364
Completed
Application - Maintenance of existing structures or assetsAccess steps for works vessels associated with Oxen Cove jetty constructionOxen Cove BrixhamTorbay Council19 Aug 201919 Aug 2019
MLA/2019/00365
Completed
Application - Construction of new worksBrownsea Island JLP JettyBrownseaJohn Lewis Partnership20 Aug 201915 Sep 2020
MLA/2019/00366
Completed
Application - Minor removalsTH027 monitoringIHHA116_SurveyArea_Ply_110618Thomson Unicomarine Limited20 Aug 201920 Aug 2019
MLA/2019/00368
Completed
Application - Maintenance of existing structures or assetsInstall 2no. stainless steel brackets to house portable man retrievable winchSpragger CloughTop-Lifting Limited22 Aug 201922 Aug 2019
MLA/2019/00369
Completed
Application - Maintenance of existing structures or assetsSwanpool SWW reqiusition outfallSwanpool SWW outfallNijhuis H2ok Limited22 Aug 201922 Aug 2019
MLA/2019/00370
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)East Cowes Marina Maintenance DredgeEast Cowes Marina, NAB TOWER (WI060), HURST FORT (WI080)Dean & Reddyhoff Limited25 Aug 201916 Dec 2019
MLA/2019/00371/2
Completed
Application - Disposal of dredged material, Navigational dredging (capital)Harwich Haven Approach Channel DeepeningHarwich Haven Dredge ChannelHarwich Haven Authority27 Aug 201911 Aug 2023
MLA/2019/00372
Completed
Application - Non-navigational clearance dredgingB19-204 - Non-operational Dredging of Burnham Wick Outfall ChannelBurnhamWickOutfall1Environment Agency27 Aug 201927 Aug 2019
MLA/2019/00373
Completed
Application - Maintenance of existing structures or assetsHurst Castle - Sae Defence RepairsHurst CastleThe English Heritage Trust27 Aug 201927 Aug 2019
MLA/2019/00374
Completed
Application - Maintenance of existing structures or assetsAbbotts Court Revetment RepairsPolygonEnvironment Agency28 Aug 201928 Aug 2019
MLA/2019/00375
Withdrawn
Application - Construction of new worksCentenary Quay Hoist and Associated PontoonsOceanic (Woolston) Limited28 Aug 2019
MLA/2019/00376
Completed
Application - Deposit of markersDeployment of x 5 Marker Buoys in the Blackwater Estuary, EssexM1, M2, M3, M4, M5Partrac Limited28 Aug 201928 Aug 2019
MLA/2019/00377
Completed
Application - Maintenance of existing worksPremier Marinas Southsea - Pile Replacement ProgrammeSouthsea MarinaPremier Marinas (Southsea) Limited28 Aug 201931 Jan 2020
MLA/2019/00379
Completed
Application - Construction of new worksConstruction of 4 timber groynes, timber slipway extension and habitat creation4m x 4m Timber extension to existing concrete slipway, Installation of three 3m groynes and one 6m terminal groyneGraham Attrill Civil Engineering Limited30 Aug 201929 May 2020
MLA/2019/00380
Completed
Application - Maintenance of existing structures or assetsRIOW 3257 Cot Valley, St JustPorth Nanven BeachGlanville Cleansing Holdings (Sw) Limited30 Aug 201930 Aug 2019
MLA/2019/00381
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Shoreham Port Authority Maintenance Dredging Sediment DisposalSHOREHAM (WI031)Shoreham Port Authority30 Aug 201902 Dec 2019
MLA/2019/00382/1
Completed
Application - Decommissioning of works, Maintenance of existing worksRamsgate Port Pontoon RefurbishmentRamsgate Port PontoonVattenfall Wind Power Ltd30 Aug 201925 Feb 2020
MLA/2019/00383
Completed
Application - Minor removalsSGN Fareham Creek BoreholesSite indicative areaScotia Gas Networks Limited02 Sep 201902 Sep 2019
MLA/2019/00384
Completed
Application - Maintenance of existing worksSwan Quay River Wall Repair, Clive Street, North ShieldsSite LocationAcw Property Limited02 Sep 201915 Dec 2019
MLA/2019/00385
Completed
Application - Maintenance of existing structures or assetsAlbert Bridge HouseAlbert Bridge HouseAlbert Bridge House Management Company Limited03 Sep 201903 Sep 2019
MLA/2019/00386
Completed
Application - Maintenance of existing structures or assetsAlbion RiversideAlbert RiversideAlbion Riverside Residential Management Limited03 Sep 201903 Sep 2019
MLA/2019/00387
Completed
Application - Maintenance of existing structures or assetsWaterside PointWaterside PointWaterside Point (Freehold) Ltd03 Sep 201903 Sep 2019
MLA/2019/00388/1
Completed
Application - Maintenance of existing worksRiverside One River WallRiverside OneFoster + Partners Limited03 Sep 201927 Jan 2020
MLA/2019/00389
Completed
Application - Other depositsDevon Kelp FarmGreen Ocean Farming03 Sep 201924 Oct 2019
MLA/2019/00390
Completed
Application - Construction of new worksRibble Link - jetty constructionRibble Link - jetty areaCanal And Rivers Trust04 Sep 201925 Nov 2019
MLA/2019/00391
Completed
Application - Decommissioning of worksBrine/Seawater Pipe Removal & CappingRingborough Farm Beach (Aldbrough Gas Storage)Sse Hornsea Ltd04 Sep 201931 Jan 2022
MLA/2019/00392
Completed
Application - Construction of new worksNorth Portsea Island FCERM scheme - Phase 4b: Eastern RoadNPI Phase 4b Eastern RoadEastern Solent Coastal Partnership04 Sep 201903 Apr 2020
MLA/2019/00393
Completed
Application - Maintenance of existing structures or assetsHythe (Southampton) Sailing Club Jetty Refurbishmenthythe (Southampton) Sailing Club jettyHythe (Southampton) Sailing Club05 Sep 201905 Sep 2019
MLA/2019/00395
Completed
Application - Construction of new worksNew Monks Farm Pumping StationNew Monks Farm Flood Alleviation Pumping StationThe Civil Engineering Practice05 Sep 201926 Jun 2020
MLA/2019/00396
Withdrawn
Application - Construction of new worksAggregate Plant at Frog IslandAggregate Terminal at Frog IslandWalsh Recycling & Construction Solutions05 Sep 2019
MLA/2019/00398
Completed
Application - Maintenance of existing structures or assetsPar Docks, Cornwall - Mortar Repairs to Masonry Sea WallPar Docks, CornwallTeignmouth Maritime Services Limited06 Sep 201906 Sep 2019
MLA/2019/00399
Completed
Application - Maintenance of existing structures or assetsRiver Lune Viaduct Scour ProtectionRiver Lune ViaductJ. Murphy & Sons Limited09 Sep 201909 Sep 2019
MLA/2019/00400
Completed
Application - Maintenance of existing structures or assetsMerchant Court - Riverside JettyMerchant CourtRendall & Rittner Limited27 Oct 202027 Oct 2020
MLA/2019/00401
Completed
Application - Other depositsDeployment of x5 guard buoys with seabed frames and x1 wave buoy in Blackwater Estuary, EssexM1, M2, M3, M4, M5, M6Bradwell Power Generation Company Ltd.10 Sep 201919 Dec 2019
MLA/2019/00402
Completed
Application - Maintenance of existing structures or assetsChelsea Bridge Abutment Fender RenewalSite 1F M Conway Limited13 Sep 201913 Sep 2019
MLA/2019/00403/1
Completed
Application - Construction of new worksHumber Hull Frontages - Victoria PierVictoria_Pier_rlb_20190604Bam Nuttall Limited13 Sep 201902 Jun 2020
MLA/2019/00404
Completed
Application - Construction of new works, Other removalsHornsea Project Two Offshore Wind Farm - Offshore Boulder Relocation and Trial TrenchingArrayAreaCableCorridorOptimus Wind Limited13 Sep 201931 Mar 2020
MLA/2019/00405
Completed
Application - Construction of new worksBattersea Power Station - Phase 2 OutfallBPS - Outfall & GabionBattersea Project Phase 2 Development Company Limited17 Sep 201904 Mar 2020
MLA/2019/00406
Completed
Application - Minor removalsRemoval of a damaged concrete mattress from the NemoLink installed cableMinorRemovalBoundaryNational Grid Nemo Link Limited17 Sep 201917 Sep 2019
MLA/2019/00407
Completed
Application - Non-navigational clearance dredgingProposed small marine dredging works around a slipway access to LANGSTONE HARBOUR FISHERMENS ASSOCIATIONLHFA TIDAL SLIPWAYLangstone Harbour Fishermens Assoc18 Sep 201918 Sep 2019
MLA/2019/00408
Completed
Application - Disposal of dredged material, Navigational dredging (capital)PILOT STATION DREDGEPilot Station Dredge -TYNE, NORTH TYNE (TY070)Port Of Tyne Authority19 Sep 201928 Nov 2019
MLA/2019/00409
Completed
Application - Other worksAshlett Sailing Club Jetty ReplacementAshlett Sailing Club20 Sep 201906 Feb 2020
MLA/2019/00411
Completed
Application - Maintenance of existing structures or assetsLaira Road Bridge Gas Pipe refurbishmentSite 1Taziker Industrial Limited20 Sep 201920 Sep 2019
MLA/2019/00412
Completed
Application - Maintenance of existing structures or assetsBeach House Quay, East Portlemouth wall repairsBHQPca Consulting Engineers Ltd23 Sep 201923 Sep 2019
MLA/2019/00413
Completed
Application - Maintenance of existing structures or assetsBerwick New Road - Footpath RepairBerwick New Road - FootpathNorthumberland County Council23 Sep 201923 Sep 2019
MLA/2019/00415
Completed
Application - Maintenance of existing structures or assetsRiver Umber Combe Martin Beach Wall RepairCombe Martin-River WallCombe Martin Coastal Community Team24 Sep 201924 Sep 2019
MLA/2019/00416
Completed
Application - Maintenance of existing structures or assetsReplacement steps at front of property, repointing, scaffold for building painting.Warfleet Boathouse Cottage, WarfleetMr David Fisher24 Sep 201924 Sep 2019
MLA/2019/00419
Completed
Application - Maintenance of existing structures or assetsMaintenance Work and Increase in Wall Height to the Fleet Drain/Hessle Clough StructureHessle Clough Structure, Fleet DrainEast Riding Of Yorkshire Council27 Sep 201927 Sep 2019
MLA/2019/00420/1
Completed
Application - Construction of new works, Maintenance of existing worksMarsh Dykes- Outfall Access ImprovementsLake 5 Sluice- Greenwich, Abbey Sluice- Thamesmead, Great Breach- Thamesmead, Crayford Sluice- ThamesmeadCh2m Hill United Kingdom27 Sep 201910 Jun 2020
MLA/2019/00422
Completed
Application - Beach maintenance activitiesShoreham to Southwick Beach RecyclingShoreham RecyclingShoreham Port Authority30 Sep 201930 Sep 2019
MLA/2019/00423
Completed
Application - Maintenance of existing structures or assetsDetailed Jetty structural measurement surveyThames Oilport Jetty 5Morzine (U.K. Branch) Limited30 Sep 201930 Sep 2019
MLA/2019/00424
Completed
Application - Maintenance of existing structures or assetsThames Tideway - works to building adjacent to Cremorne Wharf DepotCREWDLaing O'Rourke Construction Limited01 Oct 201901 Oct 2019
MLA/2019/00425
Completed
Application - Other depositsAmerica-Europe Connect (UK) LtdWhitley Bay Stub Cable CorridorAqua Comm01 Oct 201909 Jun 2022
MLA/2019/00426
Completed
Application - Maintenance of existing structures or assetsNewhaven Swing Bridge - Matrix signNewhaven Swing Bridge - control buildingCostain Limited02 Oct 201902 Oct 2019
MLA/2019/00427
Completed
Application - Construction of new worksProposed Private Timber Jetty at No 3, Waters Edge, Port La Salle, Yarmouth, Isle of WightNo.3 Waters EdgeMiss Dianne Thompson03 Oct 201915 Apr 2020
MLA/2019/00428
Completed
Application - Construction of new worksEssex Embankments- MoveronsGroyne Construction areaJeremy Benn Associates Limited04 Oct 201907 Sep 2020
MLA/2019/00429/2
Completed
Application - Construction of new worksEastham Hydropower ProjectEastham LockWeaver Hydro Limited08 Oct 201907 Jan 2022
MLA/2019/00430
Completed
Application - Minor removalsFolkestone Warren West Beach Sea Defences Ground InvestigationFolkestone Warren West BeachBam Nuttall Limited08 Oct 201908 Oct 2019
MLA/2019/00431
Completed
Application - Maintenance of existing structures or assetsCraster Sea Outfall Maintenance RepairCraster Sea OutfallNorthumbrian Water Limited08 Oct 201908 Oct 2019
MLA/2019/00432
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mr Charles Lister09 Oct 201909 Oct 2019
MLA/2019/00433
Completed
Application - Maintenance of existing structures or assetsLondon Eye Pier Bearing RefurbishmentLondon Eye Pier Site LocationLondon Eye Management Services Limited03 Jan 202303 Jan 2023
MLA/2019/00434
Completed
Application - Maintenance of existing structures or assetsRepairs to existing jetty pileRNLI Lifeboat JettyRoyal National Lifeboat Institution10 Oct 201910 Oct 2019
MLA/2019/00435
Completed
Application - Construction of new worksGabion Basket Headwall InstallationGabionThe Wildlife & Wetlands Trust10 Oct 201912 Dec 2019
MLA/2019/00436
Completed
Application - Maintenance of existing structures or assetsInstallation and Use of the B.I.R.D System on the Offshore Substation Platform at Westermost Rough Offshore Wind FarmWesternmost_substation_wgs84Transmission Investment Llp10 Oct 201910 Oct 2019
MLA/2019/00437
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)amble dredgingRNLI Amble - Area of Maintenance Dredge, NOSES POINT (TY130), BLYTH A + B (TY042)R.N.L.I. (Trading) Limited10 Oct 201912 Feb 2020
MLA/2019/00438
Completed
Application - Maintenance of existing structures or assetsCromer Pier Sub-Structure MaintenanceCromer PierNorth Norfolk District Council11 Oct 201911 Oct 2019
MLA/2019/00440
Completed
Application - Non-navigational clearance dredgingDesilting works at Cake Pill Outfall, Mitchel Salt & Stupp Pill Outfall, and New Pill OutfallASEA DesiltingEnvironment Agency14 Oct 201914 Oct 2019
MLA/2019/00441
Completed
Application - Aggregate dredgingArea 529 trial dredging529Sea Aggregates Limited14 Oct 201929 Apr 2020
MLA/2019/00442
Completed
Application - Maintenance of existing structures or assets127/353 Woolwich Arsenal river wall maintenancesite 1Haydn Evans Consulting Limited15 Oct 201915 Oct 2019
MLA/2019/00443
Completed
Application - Minor removalsTower Wharf Jetty GITower WharfSeacon Group Limited15 Oct 201915 Oct 2019
MLA/2019/00444
Completed
Application - Other removals, Other worksRampion Offshore Wind Farm - Pre-emptive array cable repairsRampion Offshore Wind FarmE.On Climate & Renewables Uk Rampion Offshore Wind Limited16 Oct 201901 May 2020
MLA/2019/00445
Completed
Application - Maintenance of existing structures or assetsLONDON RIVER HOUSE SCAFFOLDINGLONDON RIVER HOUSEPort Of London Authority Limited16 Oct 201916 Oct 2019
MLA/2019/00447/1
Completed
Application - Disposal of dredged materialDEEP WATER RELOCATION SITE (PORTLAND INNER HARBOUR) (PLACEMENT OF UP TO 120'000m3)Deep Water Relocation (PO111)Portland Harbour Authority Ltd18 Oct 201930 Nov 2020
MLA/2019/00448
Completed
Application - Aggregate dredging, SamplingArea 531, North Bristol Deep Grouped under: Area 531 - North Bristol Deep extension Showing 2 of 4 casesTarmac Marine Dredging Limited18 Oct 201901 Apr 2021
MLA/2019/00449
Completed
Application - Maintenance of existing structures or assetsRopetackle OutfallRopetackle North OutfallP.M.C. Construction And Development Services Limited22 Oct 201922 Oct 2019
MLA/2019/00450
Completed
Application - Maintenance of existing structures or assetsREPLACEMENT OF STEEL MEMBERS AT ST ANNES PIERSt Annes PierJ.Wareing & Son (Wrea Green) Limited23 Oct 201923 Oct 2019
MLA/2019/00451/2
Completed
Application - Construction of new worksHQS Wellington Dolphin ReplacementHQS Wellington Bow, HQS Wellington SternThe Wellington Trust24 Oct 201916 Sep 2020
MLA/2019/00452
Completed
Application - Maintenance of existing structures or assetsRemoval of dangerous sea wallKittery CourtMarcus Evans T/A Landmarc24 Oct 201924 Oct 2019
MLA/2019/00454
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mamarine.Com Llp24 Oct 201924 Oct 2019
MLA/2019/00455
Completed
Application - Minor removalsSite Investigations Regent CinemaRegent Cinema Site InvestigationsDunelm Geotechnical & Environmental Limited29 Oct 201929 Oct 2019
MLA/2019/00456
Completed
Application - Construction of new worksRNLI Weston-super-MareRnli Estates29 Oct 201908 Apr 2021
MLA/2019/00457/1
Completed
Application - Aggregate dredging, SamplingArea 531, North Bristol Deep Grouped under: Area 531 - North Bristol Deep extension Showing 2 of 4 casesArea 531Hanson Aggregates Marine Limited30 Oct 201904 May 2023
MLA/2019/00458
Completed
Application - Maintenance of existing structures or assetsWestern Riverside Transfer StationWestern_Riverside_shapefileGps Marine Contractors Limited30 Oct 201930 Oct 2019
MLA/2019/00459/1
Completed
Application - Disposal of dredged material, Navigational dredging (capital)Dredge at Tyne Dock Enterprise ParkPort Of Tyne Authority31 Oct 201914 Jun 2021
MLA/2019/00460
Completed
Application - Maintenance of existing structures or assetsSewer mainteance, forshore off Island Quay, SalcombeAdjacent Island House, SalcombeGlanville Cleansing Limited31 Oct 201931 Oct 2019
MLA/2019/00461
Completed
Application - Maintenance of existing structures or assetsWalbrook WharfWalbrook_Wharf_shapefileGps Marine Contractors Limited31 Oct 201931 Oct 2019
MLA/2019/00462/2
Completed
Application - Construction of new works46 Nine Elms Lane Temporary Wall Propping46 Nine Elms Lane temporary wall proppingTeam210031 Oct 201907 May 2020
MLA/2019/00463
Completed
Application - Other depositsBlackwater ambient noise monitoringBradwell_Noise_Lander_Deployment_BoundaryCefas04 Nov 201927 Jan 2020
MLA/2019/00464
Completed
Application - Other worksRemoval of above ground redundant gas mainMillom Redundant MainBalfour Beatty Plc05 Nov 201904 Mar 2020
MLA/2019/00465
Completed
Application - Maintenance of existing worksWeymouth Bay RangeWeymouth Bay RangeQinetiq Limited05 Nov 201906 Feb 2020
MLA/2019/00467/1
Completed
Application - Construction of new works, Navigational dredging (capital)Sediment removal and installation of pontoons secured by pilesPile Installation, Pontoon, Captial Dredging AreaGweek Quay Limited.06 Nov 201917 Nov 2022
MLA/2019/00468
Completed
Application - Maintenance of existing structures or assetsWorthing 68 marine cresent68 Marine cresent, WorthingBeasley Christopher Limited07 Nov 201907 Nov 2019
MLA/2019/00469/1
Completed
Application - Disposal of dredged materialTeesside GasPortTEES BAY C (TY150)Pd Ports Limited07 Nov 201910 Aug 2023
MLA/2019/00470
Completed
Application - Maintenance of existing structures or assetsHayling SeagroveHayling SeagroveBeasley Christopher Limited07 Nov 201907 Nov 2019
MLA/2019/00471
Completed
Application - Maintenance of existing structures or assetsBognor Regis Barrack LaneBognor Regis Barrack LaneBeasley Christopher Limited07 Nov 201907 Nov 2019
MLA/2019/00472
Completed
Application - Other deposits`Emergency` Shingle Beach RechargeHurst Castle - Shingle RechargeEnglish Heritage Trust07 Nov 201930 Dec 2019
MLA/2019/00473
Completed
Application - Maintenance of existing structures or assetsLee on the solent Range houseLee on the solent Range HouseBeasley Christopher Limited08 Nov 201908 Nov 2019
MLA/2019/00474
Completed
Application - Maintenance of existing structures or assetsLee on the Solent Salterns Rd outerLee on the solent Salterns Rd OuterBeasley Christopher Limited08 Nov 201908 Nov 2019
MLA/2019/00475
Completed
Application - Non-navigational clearance dredgingGreat Breach Urgent WorksGreat Breach SluiceCh2m Hill United Kingdom08 Nov 201908 Nov 2019
MLA/2019/00476
Completed
Application - Maintenance of existing structures or assetsRavenglass - Drigg plain line track renewalsRiver Mite viaduct, River Irt viaductThomson Ecology Limited08 Nov 201908 Nov 2019
MLA/2019/00477
Completed
Application - Non-navigational clearance dredgingClear accumulated silt from around the marina pontoons.Royal Harwich Yacht Club MarinaRoyal Harwich Yacht Club Limited11 Nov 201911 Nov 2019
MLA/2019/00478
Completed
Application - Non-navigational clearance dredgingDesilting works at Chestle Pill Outfall and Cotteralls outfallChestle Pill Outfall and Cotteralls OutfallEnvironment Agency12 Nov 201912 Nov 2019
MLA/2019/00479
Completed
Application - Maintenance of existing structures or assetsWORTHING HEENE TERRACE WESTWorthing Heene Terrace WestBeasley Christopher Limited13 Nov 201913 Nov 2019
MLA/2019/00480
Completed
Application - Maintenance of existing structures or assetsMPS Wapping RepairsMPS WappingMetropolitan Police Service13 Nov 201913 Nov 2019
MLA/2019/00482
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Falmouth Marina - Outer Basin Maintenance DredgeFALMOUTH BAY (B) (PL075), Falmouth Marina Outer BasinPremier Marinas Falmouth) Limited14 Nov 201913 May 2020
MLA/2019/00483
Completed
Application - Maintenance of existing structures or assetsLee on the Solent Salterns RD outer revisedSalterns Rd outerBeasley Christopher Limited14 Nov 201914 Nov 2019
MLA/2019/00484
Completed
Application - Maintenance of existing worksDock RepairLifting DockTitchmarsh Marina (Walton On-The-Naze) Limited14 Nov 201914 May 2020
MLA/2019/00485
Completed
Application - Construction of new works, Other removalsLand Between the Bridges, West Quay Road, PooleLand Between the BridgesReuben & Morgan Limited14 Nov 201926 Aug 2022
MLA/2019/00486
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mr Charles Lister15 Nov 201915 Nov 2019
MLA/2019/00487
Completed
Application - Beach maintenance activitiesMovement of windblown sand on Porthmeor beach, St Ives, CornwallPorthmeorCornwall Council15 Nov 201915 Nov 2019
MLA/2019/00488/4
Variation Requested
Application - Construction of new works, Disposal of dredged material, Other deposits, Other dredgingNeuConnect: GB Offshore SchemeNeuConnect_PRC_GB_200902, Presweeping, Cable Route Corridor UK Territorial Waters, Cable Operation and Maintenance, NeuConnect Disposal Site 1 (TH059), NeuConnect Disposal Site 2 (TH067), NeuConnect South Site (TH068), NeuConnect Lower Mid Site (TH069), NeuConnect Upper Mid Site (TH074), NeuConnect North Site (HU224), EAOW3 (HU212)Neuconnect Britain Ltd15 Nov 201926 Apr 2024
MLA/2019/00489
Completed
Application - Maintenance of existing structures or assetsBlade ExchangeKentish Flats Array SiteVattenfall Wind Power Ltd18 Nov 201918 Nov 2019
MLA/2019/00490
Completed
Application - Construction of new worksEbbsfleet Storm Water OutfallWhitecliffe Storm Water OutfallIndependent Water Networks Limited18 Nov 201913 Aug 2020
MLA/2019/00491
Completed
Application - Maintenance of existing structures or assetsVegetation management at Waterside, Curlew DriveCurlew DriveMarcus Evans T/A Landmarc19 Nov 201919 Nov 2019
MLA/2019/00492
Completed
Application - Maintenance of existing structures or assetsRiver Itchen Railway Bridge Track Timber ReplacementRiver Itchen Railway Bridge E15/2Network Rail20 Nov 201920 Nov 2019
MLA/2019/00494
Completed
Application - Construction of new worksWicormarine - Link PontoonWicormarine Connecting PontoonWicormarine Limited22 Nov 201912 Mar 2020
MLA/2019/00495
Completed
Application - Navigational dredging (maintenance)Dredging the approach to Canning Half Tide DockCanning half tide dock approachCanal And Rivers Trust22 Nov 201910 Jan 2020
MLA/2019/00496
Completed
Application - Navigational dredging (maintenance)Increase dredge box depth from bi-annual Dredge to new target level 13mtrs.Berth 1 operational lineNavigator Terminals Thames26 Nov 201926 Mar 2020
MLA/2019/00497/1
Completed
Application - Construction of new works, Other removalsThames Side West – River Wall WorksActivity Site 1 - Obstruction Removal, Activity Site 2 - Construction, Activity Site 3 - Construction RemovalsSilvertown Homes Limited26 Nov 201907 Oct 2022
MLA/2019/00498
Completed
Application - Minor removalsCoastguard to ColonnadeC2C GIBam Nuttall Limited26 Nov 201926 Nov 2019
MLA/2019/00499/1
Variation Requested
Application - Construction of new works, Maintenance of existing works, Other removalsQuay Wall Replacement, Sparkes Marina, Chichester HarbourSparkes Quay WallMarina Developments Ltd27 Nov 201903 Nov 2020
MLA/2019/00500
Completed
Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital)Proposed small scale dredging, installation of 'versa-dock' and pontoon with associated piles.SWANAGE BAY (WI110), Dredge and Installation LocationSandbanks Yacht Company Limited27 Nov 201917 Apr 2020
MLA/2019/00501
Completed
Application - Construction of new worksFlood Defence WallFlood wall and working areaJba Bentley Limited27 Nov 201911 Mar 2020
MLA/2019/00502/2
Completed
Application - Construction of new worksLa Crevette (Halftide House) seawall plinthLa CrevetteMr Matt Yeoman27 Nov 201908 Feb 2021
MLA/2019/00503
Completed
Application - Maintenance of existing structures or assetsMPS WappingMPS WappingMetropolitan Police Service28 Nov 201928 Nov 2019
MLA/2019/00504
Completed
Application - Other depositsUSBL Training - Deployment and recovery of acoustic transpondersBarn PoolFugro Gb (North) Marine Ltd28 Nov 201909 Mar 2020
MLA/2019/00505
Completed
Application - Maintenance of existing structures or assetsRepairs to Pas Wharf, HMNB DevonportPas WharfBabcock International Group Plc28 Nov 201928 Nov 2019
MLA/2019/00506
Completed
Application - Maintenance of existing structures or assetsTriton Knoll Demarcation Buoy and Boat Landing CleaningDemarcationBuoysPoly_5mBuffTriton Knoll Offshore Wind Farm Limited28 Nov 201928 Nov 2019
MLA/2019/00507
Completed
Application - Maintenance of existing structures or assetsDEAL - DOWNS SAILING CLUBDEAL - DOWNS SAILING CLUBBeasley Christopher Limited28 Nov 201928 Nov 2019
MLA/2019/00508
Completed
Application - Maintenance of existing structures or assetsTrinity Buoy Wharf River Wall Minor Maintenance Repairs 2019Trinity Buoy Wharf River WallUrban Space Management (Tbw) Limited29 Nov 201929 Nov 2019
MLA/2019/00509/2
Completed
Application - Construction of new worksGosport Sea Wall RepairsGosport Sea Wall RepairsMinistry Of Defence29 Nov 201929 Sep 2020
MLA/2019/00510
Completed
Application - Maintenance of existing structures or assetsHartlepool SO5-SO7 Outfall grille repairsSO5 + SO7Northumbrian Water Limited02 Dec 201902 Dec 2019
MLA/2019/00511
Completed
Application - Maintenance of existing structures or assetsNorth Shields Pedestrian Ferry Terminal RepairsNorth Shields Pedestrian Ferry TerminalG & B Civil Engineering Limited03 Dec 201903 Dec 2019
MLA/2019/00512
Completed
Application - Maintenance of existing worksCBC1 W6158 Meathop EmbankmentCBC1 W61580 Meathop EmbankmentNetwork Rail Ltd03 Dec 201912 May 2020
MLA/2019/00513
Completed
Application - Maintenance of existing structures or assetsGreat Breach Urgent WorksGreat Breach SluiceCh2m Hill United Kingdom03 Dec 201903 Dec 2019
MLA/2019/00514/1
Completed
Application - Maintenance of existing worksWalney Extension Transmission Assets O&MMMO_Application_ExpCab_Corridor_WGS84_20191203Orsted Power Uk Ltd03 Dec 201904 Jun 2020
MLA/2019/00515/1
Completed
Application - Maintenance of existing worksEsso Purfleet Jetty FendersEsso_1_Purfleet_shapefileEsso Petroleum Company,Limited03 Dec 201902 Dec 2020
MLA/2019/00516
Completed
Application - Maintenance of existing structures or assetsQueen Anne's Battery Mooring Pile MaintenanceQueen Anne's Battery MarinaMarina Developments Limited05 Dec 201905 Dec 2019
MLA/2019/00518
Completed
Application - Maintenance of existing worksWestmere Pumping Station Sluice OutfallWestmere sluice outfallSouth Holland Internal Drainage Board05 Dec 201923 Apr 2020
MLA/2019/00519
Completed
Application - Maintenance of existing worksFleet Haven Pumping Station OutfallSouth Holland Internal Drainage Board05 Dec 201927 May 2020
MLA/2019/00521
Completed
Application - Construction of new works, Disposal of dredged material, Maintenance of existing works, Navigational dredging (maintenance)Marina pontoon maintenance and upgrade.Amble Marina works area, AMBLE MARINA OUTFALL (TY022)Amble Marina Limited08 Dec 201903 Sep 2020
MLA/2019/00522
Completed
Application - Maintenance of existing structures or assetsAlbert Bridge - Fender RenewalAlbert bridgeF M Conway Limited09 Dec 201909 Dec 2019
MLA/2019/00523
Completed
Application - Maintenance of existing structures or assetsNorthfleet Jetty hoist maintenanceHoist locationPort Of London Authority10 Dec 201910 Dec 2019
MLA/2019/00524
Completed
Application - Beach maintenance activitiesExmouth Beach PullbackExmouth BeachEast Devon District Council Camperdown10 Dec 201910 Dec 2019
MLA/2019/00525
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)King Point Marina - Maintenance DredgePlymouth Deep (PL035), King Point MarinaSutton Harbour Company10 Dec 201916 Sep 2021
MLA/2019/00526
Completed
Application - Beach maintenance activitiesBlack Rock to Shoreham Port - Shingle recyclingBlack RockBrighton And Hove City Council Hove10 Dec 201910 Dec 2019
MLA/2019/00527
Completed
Application - Maintenance of existing structures or assetsLynemouth Power Station Outfall Pipe Structure and Void RepairsLynemouth Power Limited Outfall Pipe StructureLynemouth Power Limited11 Dec 201911 Dec 2019
MLA/2019/00528
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mamarine.Com Llp12 Dec 201912 Dec 2019
MLA/2019/00529
Completed
Application - Maintenance of existing structures or assetsMaintenance (replacement) of 2 No. existing South West Water sewer manhole covers and frames at Newton Ferrers, DevonManhole frame and cover replacement (2 subsite locations)Glanville Cleansing Limited12 Dec 201912 Dec 2019
MLA/2019/00531/1
Completed
Application - Maintenance of existing worksMillennium Quay River Wall RepairsMillennium Quay River Wall RepairMillennium Quay Residents Association13 Dec 201906 Oct 2020
MLA/2019/00532/1
Completed
Application - Construction of new works, Maintenance of existing worksTrinity Buoy wharf Strengthening PilesDownstream Pile, Upstream PileThames Clipper Limited13 Dec 201914 Aug 2020
MLA/2019/00533
Completed
Application - Construction of new worksWaveney Intake Eel ScreensWaveneyInterserve Project Services Ltd13 Dec 201917 Mar 2020
MLA/2019/00534
Completed
Application - Maintenance of existing structures or assetsResurface slipwaySlipway Waterings BoatyardSam Heard16 Dec 201916 Dec 2019
MLA/2019/00536
Completed
Application - Construction of new worksWhitegates East Pontoon UpgradeWightgates PontoonsCowes Harbour Commissioners17 Dec 201928 Apr 2021
MLA/2019/00537
Completed
Application - Construction of new worksHowley WeirHowley WeirH2o Power Ltd17 Dec 201916 Mar 2020
MLA/2019/00538
Completed
Application - Maintenance of existing structures or assetsPile replacementTitchmarsh Marina LtdTitchmarsh Marina (Walton On-The-Naze) Limited18 Dec 201918 Dec 2019
MLA/2019/00540/2
Completed
Application - Other depositsEast Anglia TWO Floating LiDAR Buoy DeploymentScottishpower Renewables19 Dec 201925 Nov 2020
MLA/2019/00541/1
Completed
Application - Construction of new worksTower Wharf JettyTower WharfSeacon Terminals Limited19 Dec 201919 Oct 2021
MLA/2019/00542
Completed
Application - Maintenance of existing structures or assetsHMS Belfast Bearing and Dolphin Maintenance WorksHMS BelfastImperial War Museum Trading Company Limited19 Dec 201919 Dec 2019
MLA/2019/00543
Completed
Application - Maintenance of existing worksNemoLink O&M Remedial WorksLocations 5 & 6, Locations 8 & 9, Location 2, Location 3, Location 4, Location 7, Location 10, Location 11, Location 12National Grid Nemo Link19 Dec 201930 Sep 2021
MLA/2019/00544
Completed
Application - Other removalsPort of Garston Sheet pile removal and wall reinstatementworks locationAssociated British Ports Garston20 Dec 201904 Jun 2020
MLA/2019/00546/1
Completed
Application - Construction of new worksDagenham Jetty Feeder ConveyorHanson_Dagenham_Conveyor_Shape_filesHanson Aggregates Marine Limited20 Dec 201922 Feb 2021
MLA/2019/00547/1
Completed
Application - Maintenance of existing worksOrford Ness River Wall Maintenance ProjectOrford Ness River WallsThe National Trust -Bury St Edmunds20 Dec 201920 Jun 2022
MLA/2019/00548
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mr Charles Lister20 Dec 201920 Dec 2019
MLA/2019/00549
Completed
Application - Disposal of dredged material, Other dredgingTriton Knoll Sandwave Clearance - outwith SACSandwave Clearance (outside SAC), Triton Knoll Disposal Site B (HU219)Triton Knoll Offshore Wind Farm Limited23 Dec 201917 Jul 2020
MLA/2019/00550/1
Completed
Application - Construction of new worksFalmouth Haven Reconfiguration & Small boat berthing facilityFalmouth Haven MarinaFalmouth Harbour Commissioners23 Dec 201910 Dec 2020
MLA/2019/00551
Withdrawn
Application - Disposal of dredged material, Other dredgingTriton Knoll Sandwave Clearance - IDRBNR SACTriton Knoll Offshore Wind Farm Limited23 Dec 2019
MLA/2019/00552
Completed
Application - Maintenance of existing structures or assetsRottingdean SW Outfall repairsRottingdean OutfallBeasley Christopher Limited28 Dec 201928 Dec 2019
MLA/2019/00553
Completed
Application - Maintenance of existing structures or assetsMarske NZ64221701Marske NZ64221701Northumbrian Water Limited31 Dec 201931 Dec 2019

MMO - Marine Licences Public Register