MMO - Marine Licences Public Register
Case Details | Project Type | Project Title | Locations | Applicant Name | Submission Date | Decision Date |
---|---|---|---|---|---|---|
MLA/2020/00001 Completed | Application - Other works | Sail the Wash - Pontoon Extension Scheme 2019/2021 Site 1 – South Quay, King’s Lynn, Norfolk | Site 1 - on the River Great Ouse at South Quay in King's Lynn, Norfolk | Fenland District Council | 02 Jan 2020 | 21 Aug 2020 |
MLA/2020/00002 Completed | Application - Other works | Sail the Wash - Pontoon Extension Scheme 2019/2021 Site 2 – CrossKeys Marina, Sutton Bridge, Lincolnshire | Site 2 - River Nene, Cross Keys Marina, Sutton Bridge, Lincolnshire | Fenland District Council | 02 Jan 2020 | 22 Feb 2021 |
MLA/2020/00005 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mamarine.Com Llp | 03 Jan 2020 | 03 Jan 2020 | |
MLA/2020/00006 Completed | Application - Construction of new works | Stour Sailing Club Pontoon Permanent Relocation Proposal | Stour Sailing Club Pontoon -new site | Stour Sailing Club | 03 Jan 2020 | 07 Oct 2020 |
MLA/2020/00007 Completed | Application - Maintenance of existing structures or assets | Brambles Gabion replacement/repair | Brambles Gabions | Mr Stephen Hucklesby | 04 Jan 2020 | 04 Jan 2020 |
MLA/2020/00008/2 Completed | Application - Construction of new works | Harbour Walkway | Harbour Walkway | Bristol City Council | 06 Jan 2020 | 18 Oct 2023 |
MLA/2020/00009 Completed | Application - Maintenance of existing structures or assets | London Bridge Bearing Replacement | London Bridge South Abutment | F M Conway Limited | 06 Jan 2020 | 06 Jan 2020 |
MLA/2020/00010 Completed | Application - Maintenance of existing structures or assets | Monks Ferry Slipway repairs | Monks Ferry Slipway | Wirral Council | 06 Jan 2020 | 06 Jan 2020 |
MLA/2020/00011/3 Completed | Application - Construction of new works | North Sea Fish Quay Protection Jetty | NSFQ | Port Of Tyne | 07 Jan 2020 | 18 Oct 2022 |
MLA/2020/00013 Withdrawn | Application - Decommissioning of works, Sampling | River Roach - 33kV Cable recovery | Uk Power Networks | 09 Jan 2020 | ||
MLA/2020/00014 Completed | Application - Maintenance of existing structures or assets | Teignmouth Pier Pile Brace Replacement | Pier Bracing | Tms Maritime Ltd | 10 Jan 2020 | 10 Jan 2020 |
MLA/2020/00015 Completed | Application - Maintenance of existing structures or assets | Tyne Crossing-Moray East Contract | National Grid Tyne Crossing Site | National Grid Plc | 10 Jan 2020 | 10 Jan 2020 |
MLA/2020/00016 Completed | Application - Maintenance of existing structures or assets | Network Rail - Eskmeals Viaduct (Cumbria) | Eskmeals Viaduct (Railway), nr Bootle, Cumbria | Network Rail Limited | 13 Jan 2020 | 13 Jan 2020 |
MLA/2020/00017 Completed | Application - Non-navigational clearance dredging | Weymarks Outfall Clearance | Weymarks_Outfall | Strutt And Parker(Farms),Limited | 13 Jan 2020 | 13 Jan 2020 |
MLA/2020/00018 Completed | Application - Maintenance of existing structures or assets | Centurion Finance( Lincoln) Ltd - Maintenance of Sea Wall at Vivian House, Newham Road, Truro, Cornwall TR1 2DP | Vivian House, Newham Road, Truro, cornwall TR1 2DP | Datson Consulting Limited | 13 Jan 2020 | 13 Jan 2020 |
MLA/2020/00019/1 Completed | Application - Sampling | SOWFL Nearshore Jack up Barge Borehole Site Investigation | Jack up Barge Survey Area | Sofia Offshore Wind Farm Limited | 14 Jan 2020 | 28 May 2020 |
MLA/2020/00020 Completed | Application - Other works | Aylestone Brook Outfall Alteration | Environment Agency – South West Reg | 15 Jan 2020 | 29 Jul 2020 | |
MLA/2020/00021/2 Completed | Application - Sampling | East Anglia ONE NORTH and TWO 2020 Geotechnical Investigation | EA1N_EA2ConsentBoundaries_Combined_CL_20200113 | Scottishpower Renewables (Uk) Limited | 15 Jan 2020 | 06 Apr 2021 |
MLA/2020/00023 Completed | Application - Other deposits | Constantine Bay Temporary Seawall Barrier | Constantine Temporary Barrier | Cornwall Council -Environment Service | 15 Jan 2020 | 17 Jan 2020 |
MLA/2020/00024 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mamarine.Com Llp | 16 Jan 2020 | 16 Jan 2020 | |
MLA/2020/00025 Completed | Application - Minor removals | Tower of London Foreshore | Tower of London Foreshore | Historic Royal Palaces | 16 Jan 2020 | 16 Jan 2020 |
MLA/2020/00027 Completed | Application - Decommissioning of works | Barmston Sea End Outfall | Barmston Beach | Environment Agency | 17 Jan 2020 | 13 May 2020 |
MLA/2020/00028 Completed | Application - Maintenance of existing structures or assets | Polkerris SPS -EDM | Polkerris SPS | May Gurney Limited | 17 Jan 2020 | 17 Jan 2020 |
MLA/2020/00029 Completed | Application - Beach maintenance activities | Management of shingle on the Landguard frontage | Landguard Peninsula | Port Of Felixstowe Limited | 17 Jan 2020 | 17 Jan 2020 |
MLA/2020/00030 Withdrawn | Application - Construction of new works | Creation of temporary coffer dam for demolition and construction of a replacement Oysterage with Office and Manager’s accommodation Oyster Farm, Quay Road, Port Navas, Constantine TR11 5RY | polygons_blocker | Duchy Of Cornwall Oyster Farm Limited | 20 Jan 2020 | |
MLA/2020/00031 Completed | Application - Other dredging | Area 515 Plough Trial | 515/1, 515/2 | Boskalis Westminster Ltd | 20 Jan 2020 | 14 May 2020 |
MLA/2020/00033 Completed | Application - Maintenance of existing structures or assets | Trenant Park Bridge Maintenance | TrenantPark | Network Rail Limited | 20 Jan 2020 | 20 Jan 2020 |
MLA/2020/00034 Completed | Application - Maintenance of existing structures or assets | Teignmouth Pier Pile Decking Removal/Replacement | Pier Decking | Tms Maritime Ltd | 21 Jan 2020 | 21 Jan 2020 |
MLA/2020/00035 Completed | Application - Disposal of dredged material, Navigational dredging (capital), Navigational dredging (maintenance) | UKSA Dredging and disposal | UKSA, NAB TOWER (WI060), HURST FORT (WI080) | United Kingdom Sailing Academy | 21 Jan 2020 | 10 Jun 2020 |
MLA/2020/00036 Completed | Application - Maintenance of existing structures or assets | Slipway clearance | Gunboat sheds slipway clearance | Gunboat Sheds Limited | 21 Jan 2020 | 21 Jan 2020 |
MLA/2020/00037 Completed | Application - Decommissioning of works | Northfleet Jetty Ship Unloading System Conveyor Demolition | Demolition of jetty | Port Of London Authority | 21 Jan 2020 | 28 Apr 2020 |
MLA/2020/00038 Completed | Application - Maintenance of existing works | Barking Riverside Development - Revetment Repairs Grouped under: Barking Riverside Development Showing 2 of 3 cases | All_Repairs_Polygon | Barking Riverside Limited | 22 Jan 2020 | 21 Oct 2021 |
MLA/2020/00040/1 Completed | Application - Construction of new works | Johnson Street CSO, Gateshead | Johnson_Street_Zone | Esh-Stantec | 22 Jan 2020 | 16 Nov 2020 |
MLA/2020/00042 Completed | Application - Maintenance of existing structures or assets | Maintenance on residential property to replace window over sailing tidal estuary | magic_polygons | Mr Peter Leach | 22 Jan 2020 | 22 Jan 2020 |
MLA/2020/00043 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mamarine.Com Llp | 23 Jan 2020 | 23 Jan 2020 | |
MLA/2020/00044 Completed | Application - Maintenance of existing structures or assets | Supermarine Slipway Inspection | Supermarine Slipway Inspection | Aecom Limited | 23 Jan 2020 | 23 Jan 2020 |
MLA/2020/00046 Completed | Application - Maintenance of existing structures or assets | Beacon House Jetty | Beacon House | Ms Emily Landau | 23 Jan 2020 | 23 Jan 2020 |
MLA/2020/00047 Completed | Application - Construction of new works | Assembly Pontoon | Assembly Harbour Walkway Pontoon | Temple Way (Devco) Ltd C/O Gardiner And Theobald | 24 Jan 2020 | 17 Nov 2021 |
MLA/2020/00048 Completed | Application - Maintenance of existing structures or assets | Repairs to Quay Wall - Fowey | Toby Lewis | 24 Jan 2020 | 24 Jan 2020 | |
MLA/2020/00049 Completed | Application - Deposit of markers | Response of Predators to Protection and Enhancement (ROPE) (ENG3420) | Acoustic tracking | University Of Plymouth | 24 Jan 2020 | 24 Jan 2020 |
MLA/2020/00050 Completed | Application - Other removals | Teignmouth Pier Managed Retreat | Teignmouth Pier Managed Retreat | Tms Maritime Ltd | 24 Jan 2020 | 19 May 2020 |
MLA/2020/00051/1 Completed | Application - Construction of new works | Rochester Outfall | Rochester Riverside 7 flap valves | Countryside Properties | 24 Jan 2020 | 22 Mar 2022 |
MLA/2020/00052 Completed | Application - Construction of new works, Maintenance of existing works | Shamrock Quay Pontoon Replacement & Reconfiguration | Shamrock Quay | Marina Developments | 24 Jan 2020 | 08 Sep 2020 |
MLA/2020/00053 Completed | Application - Beach maintenance activities | Black Rock to Southwick Beach Recycling | Brighton Recycling | Shoreham Port Authority | 27 Jan 2020 | 27 Jan 2020 |
MLA/2020/00054 Completed | Application - Other dredging | Crossness Jetty Dredging (operational) | Crossness Jetty | Thames Water Utilities | 27 Jan 2020 | 13 Aug 2020 |
MLA/2020/00055 Completed | Application - Deposit of markers | Arun Yacht Club yacht racing marks | Arun Yacht Club cruiser racing sea marks | Arun Yacht Club Limited(The) | 27 Jan 2020 | 27 Jan 2020 |
MLA/2020/00056 Completed | Application - Maintenance of existing structures or assets | ladder and timber bracket, replacement | Tate & Lyle export jetty | Wph Limited | 27 Jan 2020 | 27 Jan 2020 |
MLA/2020/00058/1 Completed | Application - Maintenance of existing works | Northey Island Conservation Adaptation Works | North Embankment, South Embankment | The National Trust -Bury St Edmunds | 28 Jan 2020 | 09 Dec 2021 |
MLA/2020/00059 Completed | Application - Other works | Project COLLECT - Marine soundscape recording experiment, University of Southampton | Acoustic recording Moored Buoy - Sandown Bay | University Of Southampton | 29 Jan 2020 | 21 May 2020 |
MLA/2020/00061/2 Completed | Application - Construction of new works | Infill of part of Boatyard Boundary Wall | Toms Boatyard | C. Toms And Son Limited | 30 Jan 2020 | 14 Jul 2021 |
MLA/2020/00062 Completed | Application - Maintenance of existing structures or assets | BAE Barrow South Quay Concrete Removal | South Quay Works | Bae Systems Submarines | 30 Jan 2020 | 30 Jan 2020 |
MLA/2020/00063 Completed | Application - Deposit of markers | Surface Marker Buoy | Surface Marker Buoy | National Grid Nemo Link Limited | 30 Jan 2020 | 30 Jan 2020 |
MLA/2020/00064 Completed | Application - Deposit of markers | Surface Marker Buoy | Surface Marker Buoy | National Grid Nemo Link Limited | 30 Jan 2020 | 30 Jan 2020 |
MLA/2020/00065 Completed | Application - Minor removals | Boreholes for the Poole Bay Coastal Defence Scheme | BH02, BH01, BH03, BH05, BH04 | Bournemouth Christchurch And Poole Council | 31 Jan 2020 | 31 Jan 2020 |
MLA/2020/00066 Withdrawn | Application - Other works | AC WORLD SERIES PONTOONS | Origin Sports Group | 01 Feb 2020 | ||
MLA/2020/00067 Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Cowes Yacht Haven Maintenance Dredging | NAB TOWER (WI060), HURST FORT (WI080), CYH North Basin, CYH South Basin | Cowes Yacht Haven Limited | 02 Feb 2020 | 21 May 2020 |
MLA/2020/00068 Completed | Application - Construction of new works | Manor Quay Pontoons | Manor Quay | City Of Sunderland County Council | 03 Feb 2020 | 28 Apr 2020 |
MLA/2020/00069 Completed | Application - Construction of new works, Other removals | Redevelopment of Regent Cinema | Regent Cinema | Redcar & Cleveland Borough Council | 04 Feb 2020 | 21 Sep 2020 |
MLA/2020/00070 Completed | Application - Maintenance of existing structures or assets | ST LEONARDS BO PEEP | ST LEONARDS BO PEEP | Beasley Christopher Limited | 05 Feb 2020 | 05 Feb 2020 |
MLA/2020/00071 Completed | Application - Maintenance of existing structures or assets | PRINCIPAL INSPECTION & INVESTIGATION TO SHEET PILING OF COMBWICH WHARF | Combwich wharf ALQ site investigations | Nnb Generation Company (Hpc) Limited | 05 Feb 2020 | 05 Feb 2020 |
MLA/2020/00072 Completed | Application - Construction of new works | Ocean Quay Marina Extension, Southampton | Ocean Quay Marina | Ocean Quay Investments Limited | 06 Feb 2020 | 14 Oct 2020 |
MLA/2020/00073/3 Completed | Application - Construction of new works | Tees Estuary IMMERSE Project | IMMERSE_Site_RedLineBoundary | Tees Rivers Charitable Trust | 07 Feb 2020 | 18 Oct 2022 |
MLA/2020/00074 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Charles Lister | 07 Feb 2020 | 07 Feb 2020 | |
MLA/2020/00075 Completed | Application - Construction of new works | Installation of 4 pontoon restraint piles for existing pontoon, Queenborough Harbour | Queenborough piles | Queenborough Harbour Trust C.I.C. | 10 Feb 2020 | 08 Apr 2020 |
MLA/2020/00077 Completed | Application - Maintenance of existing works | Mill Cottage retaining wall works, Wembury Beach, Wembury | Mill Cottage, Wembury | Nationa L Trust=Killerton House | 10 Feb 2020 | 20 Jan 2021 |
MLA/2020/00078 Completed | Application - Construction of new works | Gear Quay Project | GEAR QUAY | David Christopher Bean | 10 Feb 2020 | 11 Feb 2021 |
MLA/2020/00079/1 Completed | Application - Alternative use of dredged material, Construction of new works, Disposal of dredged material, Other removals | Northern Gateway Container Terminal | TEES BAY C (TY150), Works No.1, Tees Upriver (TY157), Teesport dock and Tees Container Terminal (TY158) | Pd Teesport Limited | 11 Feb 2020 | 15 Dec 2023 |
MLA/2020/00081 Completed | Application - Maintenance of existing structures or assets | Battersea Jetty River Wall Repairs | Battersea Jetty Site | Battersea Power Station Development Company Limited | 11 Feb 2020 | 11 Feb 2020 |
MLA/2020/00082 Completed | Application - Maintenance of existing structures or assets | Repair to two footbridges on Warsash Causeway | Warsash Causeway Bridge Repairs | Aquascience Limited | 11 Feb 2020 | 11 Feb 2020 |
MLA/2020/00084 Completed | Application - Maintenance of existing structures or assets | Porthleven Food Festival Bridge | Porthleven | Ilow | 12 Feb 2020 | 12 Feb 2020 |
MLA/2020/00085 Completed | Application - Maintenance of existing structures or assets | Repair works to St Anne's Pier | St annes pier | J.Wareing & Son (Wrea Green) Limited | 12 Feb 2020 | 12 Feb 2020 |
MLA/2020/00086 Completed | Application - Construction of new works | Holly House Elevated Jetty | S Woodhams | Simon Woodhams | 12 Feb 2020 | 10 Jul 2020 |
MLA/2020/00087/2 Completed | Application - Maintenance of existing works | Urgent River Wall Repair Works, Frosts, Shoreham-by-Sea | Frosts River Wall Repairs | Shoreham Brighton Road Ltd | 13 Feb 2020 | 10 May 2024 |
MLA/2020/00088 Completed | Application - Construction of new works | Exmouth Sideshore Access (Beach Ramp) | Construction of beach ramp | Grenadier Exmouth Ltd | 14 Feb 2020 | 13 Nov 2020 |
MLA/2020/00089 Completed | Application - Maintenance of existing structures or assets | Lions Heads | Site 1 | F M Conway Limited | 14 Feb 2020 | 14 Feb 2020 |
MLA/2020/00091 Completed | Application - Maintenance of existing structures or assets | Jetty maintenance | GUNBOAT SHEDS | Gunboat Sheds Limited | 25 Feb 2020 | 25 Feb 2020 |
MLA/2020/00093 Completed | Application - Maintenance of existing structures or assets | Hammersmith Riverwalls Brickwork Repairs | Hammersmith Riverwalls Repair | F M Conway Limited | 20 Feb 2020 | 20 Feb 2020 |
MLA/2020/00094 Completed | Application - Construction of new works | Hilbre Island Post and Rail | Hilbre_Island_works | Wirral Council | 20 Feb 2020 | 12 Jun 2020 |
MLA/2020/00095/2 Completed | Application - Maintenance of existing works | Sheringham Shoal Windfarm Operation and Maintenance Activities - Generation | SHS_OWF | Scira Offshore Energy Limited | 21 Feb 2020 | 08 May 2024 |
MLA/2020/00096 Completed | Application - Maintenance of existing works | Sheringham Shoal Windfarm Operation and Maintenance Activities - Transmission | SHS_cable | Scira Offshore Energy Limited | 21 Feb 2020 | 14 Sep 2022 |
MLA/2020/00097/1 Completed | Application - Construction of new works | Fresh Wharf Pontoons | Fresh Wharf Pontoons site | Fresh Wharf Estates Limited | 21 Feb 2020 | 26 Jul 2022 |
MLA/2020/00098 Completed | Application - Maintenance of existing structures or assets | Purton RRAP to Little Hagloe Railway Sea Wall Maintenance | Purton RRAP to Little Hagloe Sea Wall Repairs Area 2020 | Ecovigour Limited | 21 Feb 2020 | 21 Feb 2020 |
MLA/2020/00099/1 Completed | Application - Disposal of dredged material | Newport Harbour Maintenance Dredge | NAB TOWER (WI060), HURST FORT (WI080) | Isle Of Wight Council | 22 Feb 2020 | 22 Jan 2021 |
MLA/2020/00100 Completed | Application - Deposit of markers | Salterns Road outer Buoy | Salterns Rd outer Buoy | Beasley Christopher Limited | 23 Feb 2020 | 23 Feb 2020 |
MLA/2020/00101 Completed | Application - Deposit of markers | Relay Binsted Buoy | Binstead Buoy | Beasley Christopher Limited | 23 Feb 2020 | 23 Feb 2020 |
MLA/2020/00103 Completed | Application - Other deposits | Duke Shore Wharf - Foreshore Reinstatement | Duke Shore Wharf - Foreshore Replenishment | Team2100 | 25 Feb 2020 | 02 Jun 2020 |
MLA/2020/00105 Completed | Application - Beach maintenance activities | Clearance of sand in harbour to allow better use of Landing Steps on West Pier, St Ives | St Ives Harbour | Mr Andrew Brigden | 26 Feb 2020 | 26 Feb 2020 |
MLA/2020/00106 Completed | Application - Maintenance of existing structures or assets | River Winster Tidal Flap Repairs | River Winster Tidal Flap | Amalgamated Construction Ltd | 27 Feb 2020 | 27 Feb 2020 |
MLA/2020/00108 Completed | Application - Maintenance of existing structures or assets | Repair of existing steps and creation of new steps into pool | Bude sea pool | Friends Of Bude Sea Pool | 27 Feb 2020 | 27 Feb 2020 |
MLA/2020/00109 Completed | Application - Alternative use of dredged material, Construction of new works, Maintenance of existing works, Other removals, Other works | The People's Project - Bramley-Moore Dock | Application Site | Everton Stadium Development Limited | 28 Feb 2020 | 19 Jul 2021 |
MLA/2020/00111/1 Completed | Application - Construction of new works | Hesketh Out Marsh East Predator Exclusion Area | Site 1 | Rspb | 28 Feb 2020 | 21 May 2021 |
MLA/2020/00113/1 Completed | Application - Construction of new works | Installation of 8 No. steel piles and associated works | Site 1 | Southend-On-Sea Borough Council | 01 Mar 2020 | 07 Oct 2021 |
MLA/2020/00114 Withdrawn | Application - Other deposits | Exercise Imber 3 – 727 Spray Evaluation | Oil Spill Response Limited | 02 Mar 2020 | ||
MLA/2020/00115/2 Completed | Application - Construction of new works | Brixham Time and Tide Bell by Sculptor Marcus Vergette | Brixham Time and Tide Bell | Brixham Time & Tide Bell Working Group | 02 Mar 2020 | 19 Dec 2022 |
MLA/2020/00116/1 Completed | Application - Maintenance of existing works, Other deposits | Hythe Ranges Coastal Protection Works | Hythe Ranges - marine works | Jt Mackley Ltd | 02 Mar 2020 | 02 Oct 2020 |
MLA/2020/00117 Completed | Application - Maintenance of existing structures or assets | Queenborough Creek Barrier - Silt Management System Maintenance | Queenborough Creek Barrier | Jacobs | 04 Mar 2020 | 04 Mar 2020 |
MLA/2020/00118 Completed | Application - Maintenance of existing structures or assets | Repairs to intake water pipes Weymouth Sea Life Aquarium | sea line 1 | Merlin Entertainments Limited | 04 Mar 2020 | 04 Mar 2020 |
MLA/2020/00119 Completed | Application - Maintenance of existing structures or assets | Pier Cellars Parapet to Harbour Sea Wall | Pier Cellars | Secretary Of State For Defence | 04 Mar 2020 | 04 Mar 2020 |
MLA/2020/00120 Completed | Application - Maintenance of existing structures or assets | Rotherhithe Street Bridge Timber Deck Replacement | Rotherhithe Street Timber Decking | F M Conway Limited | 04 Mar 2020 | 04 Mar 2020 |
MLA/2020/00121 Withdrawn | Application - Maintenance of existing works | Repair works to Sandquay facility and Jetty, Dartmouth | Sandquay, BRNC Dartmouth | Defence Infrastructure Ogranisation | 05 Mar 2020 | |
MLA/2020/00122 Completed | Application - Maintenance of existing works | Dolphin Quay Jetties - Ongoing Repair and Maintenance | Dolphin Quay Jetties | Victoria O'Connell | 06 Mar 2020 | 06 Jul 2020 |
MLA/2020/00123 Completed | Application - Maintenance of existing structures or assets | Beacon House - Jetty Repairs | Beacon House Jetty | Piers Shepherd | 08 Mar 2020 | 08 Mar 2020 |
MLA/2020/00124 Completed | Application - Maintenance of existing works | North Camber Dock, Portsmouth | North Camber Basin | Bae Systems Plc | 09 Mar 2020 | 23 Jul 2020 |
MLA/2020/00125 Completed | Application - Maintenance of existing structures or assets | Galloper Wind Turbine Generator (WTG) Replacement GN-D2B | 200309_GL_WTG_D2B_Marine_Licence_Application_ACT_WGS84 | Galloper Wind Farm Limited | 09 Mar 2020 | 09 Mar 2020 |
MLA/2020/00126 Completed | Application - Maintenance of existing structures or assets | Seaconn Wharf Wall Repairs | Seacon Wharf Site | Moore Project Management Solutions Llp | 09 Mar 2020 | 09 Mar 2020 |
MLA/2020/00130 Completed | Application - Deposit of markers | St Helens Duver | St Helens Duver | Beasley Christopher Limited | 10 Mar 2020 | 10 Mar 2020 |
MLA/2020/00131 Completed | Application - Maintenance of existing structures or assets | Medial Maintenance | Merchants Court, 22,Fore Street, Fowey, Cornwall. PL23 1AQ | Isan Engineering | 10 Mar 2020 | 10 Mar 2020 |
MLA/2020/00132 Completed | Application - Deposit of markers | Seagrove Nettlestone point Buoy | Nettlestone Point Buoy | Beasley Christopher Limited | 10 Mar 2020 | 10 Mar 2020 |
MLA/2020/00133 Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Royal Quays Marina Approach Dredge | Royal Quays Dredge, NORTH TYNE (TY070), SOUTER POINT (OUTER) (TY081) | North Tyneside Council | 11 Mar 2020 | 12 Jun 2020 |
MLA/2020/00134 Completed | Application - Maintenance of existing structures or assets | Bembridge Lane | Bembridge Lane | Beasley Christopher Limited | 11 Mar 2020 | 11 Mar 2020 |
MLA/2020/00135/1 Completed | Application - Other works | Replacement Pontoon Installation | Bouldnor, Yarmouth, Isle of Wight | Port La Salle Pontoon Group | 11 Mar 2020 | 24 Mar 2021 |
MLA/2020/00136 Completed | Application - Maintenance of existing structures or assets | Shotley Pier - Repair Works | Shotley Pier - Restoration Works | Shotley Heritage Charitable Community Benefit Society Ltd | 12 Mar 2020 | 12 Mar 2020 |
MLA/2020/00137 Completed | Application - Maintenance of existing structures or assets | Repairs to existing lagoon banks and maintenance of small pools and creeks | Hesketh Out Marsh saline lagoons | Rspb | 12 Mar 2020 | 12 Mar 2020 |
MLA/2020/00138 Completed | Application - Maintenance of existing works | Rockley Sands Viaduct - emergency scour works | Rockley Sands Viaduct - emergency scour works | Network Rail-Basingtock | 12 Mar 2020 | 13 Mar 2020 |
MLA/2020/00139 Completed | Application - Beach maintenance activities | Portreath Harbour - Clearance of sand | Portreath Harbour | Cornwall Council | 12 Mar 2020 | 12 Mar 2020 |
MLA/2020/00141 Completed | Application - Maintenance of existing works | Horsey Island Outer Bank Repairs | Horsey Island erosion repair | Devon Wildlife Trust | 16 Mar 2020 | 03 Sep 2020 |
MLA/2020/00142/2 Completed | Application - Construction of new works | Totland Pier extension and moorings | Totland Pier extension, Totland Pier Moorings | Totland Pier Ltd | 16 Mar 2020 | 14 Jul 2022 |
MLA/2020/00143 Completed | Application - Other works | Bransty to Parton Emergency | Bransty to Parton emergency works | Network Rail Infrastructure Limited | 17 Mar 2020 | 18 Mar 2020 |
MLA/2020/00144/2 Completed | Application - Navigational dredging (capital) | Dredging at Docklands Wharf, River Thames | Dredge area | S. Norton & Co Limited | 18 Mar 2020 | 08 Nov 2022 |
MLA/2020/00147 Completed | Application - Maintenance of existing structures or assets | Replacement of failed gabions in front of Cottage by the Lake, Chilling Lane, Warsash. SO31 9HF | Cottage by the Lake | Mr John Lewis | 23 Mar 2020 | 23 Mar 2020 |
MLA/2020/00148/1 Completed | Application - Maintenance of existing works, Other deposits | Pas Wharf Repairs | Pas Wharf | Devonport Royal Dockyard Limited | 24 Mar 2020 | 13 Nov 2020 |
MLA/2020/00149 Completed | Application - Maintenance of existing structures or assets | HPC Corallina Mitigation - Urgent Bund Repairs | Bund 13A, Bunds 15A and 15B | Nnb Generation Company (Hpc) Limited | 24 Mar 2020 | 24 Mar 2020 |
MLA/2020/00151 Completed | Application - Maintenance of existing structures or assets | Urgent minor works to replace 30 m fence below MHSW to fulfil Provision of Shelduck mitigation works HPC DCO Requirement J2: Shelduck Monitoring and Mitigation Scheme | HPC_J2_Mitigation_MMO_LicenceFence_Wood_200326 | Nnb Generation Company (Hpc) Limited | 26 Mar 2020 | 26 Mar 2020 |
MLA/2020/00152 Completed | Application - Maintenance of existing structures or assets | South Milton Sands Outflow pipe | Polygon | National Trust | 27 Mar 2020 | 27 Mar 2020 |
MLA/2020/00155 Completed | Application - Construction of new works | Seawick Sea Defence Improvement Scheme | Hutleys Gap, Secondary Area | Environment Agency | 01 Apr 2020 | 13 Aug 2020 |
MLA/2020/00157/2 Completed | Application - Construction of new works | Bay Wharf Pier | Bay Wharf Pier | Thamescraft Dry Docking Services Limited | 06 Apr 2020 | 12 Sep 2022 |
MLA/2020/00158 Completed | Application - Construction of new works | Remedial works to failing cliff, Penfoye, Lerryn, Cornwall | Penfoye north, Penfoye south | The Trustees Of The 10th Earl St Germans 1962 Settlement C/O Savills Uk Ltd | 06 Apr 2020 | 04 Jan 2021 |
MLA/2020/00160/2 Completed | Application - Construction of new works | East Hull Pumping Station (Holderness Flood Alleviation Scheme) | East_Hull_Red_Line | Jba Bentley Limited | 07 Apr 2020 | 13 Oct 2023 |
MLA/2020/00161 Completed | Application - Maintenance of existing structures or assets | Sea Palling- Fisherman's ramp | Sea Palling Ramp | North Norfolk District Council | 07 Apr 2020 | 07 Apr 2020 |
MLA/2020/00162 Completed | Application - Maintenance of existing structures or assets | Replacement of a well screen suction pipe | Great Yarmouth Sea Life | Precision Pipework Limited | 07 Apr 2020 | 07 Apr 2020 |
MLA/2020/00163 Completed | Application - Deposit of markers | Brightlingsea Sailing Club racing marks licence application | Batemans (BSC), Pyefleet (CYC), Point Clear (BSC), Hills (BSC), Gazelet (BSC), Cocum (BSC), Beach (BSC), CVP (CYC) | Brightlingsea Sailing Club | 08 Apr 2020 | 08 Apr 2020 |
MLA/2020/00164/1 Completed | Application - Construction of new works | River Crossing at former ANL site at Bellingham Way, Aylesford. | HDD Working Area at River Medway, Adjacent to Former Aylesford Newprint Site, Aylesford, Kent | South Eastern Power Networks Plc | 09 Apr 2020 | 08 Jul 2022 |
MLA/2020/00165 Completed | Application - Minor removals | Scylla Cable System Survey | Scylla Corridor | Eunetworks Fiber Uk Limited | 14 Apr 2020 | 14 Apr 2020 |
MLA/2020/00166 Completed | Application - Construction of new works | Lowestoft Trawl Dock Pontoon Extension for Harbour Authority Pilot Vessels | Trawl Dock Area Lowestoft Outer Harbour | Associated British Ports-Lowestoft | 14 Apr 2020 | 14 Aug 2020 |
MLA/2020/00167 Completed | Application - Maintenance of existing structures or assets | Riverside Pavilion - River-wall Repairs | 10 Lower Thames Street, River-wall Repairs | Northern & Shell Plc | 15 Apr 2020 | 15 Apr 2020 |
MLA/2020/00168 Completed | Application - Construction of new works, Other works | Kings Parade Surface Water Outfall, New Brighton, Wallasey | working area | United Utilities Service Delivery | 15 Apr 2020 | 05 Oct 2020 |
MLA/2020/00169 Withdrawn | Application - Construction of new works, Decommissioning of works, Maintenance of existing works | Hornsea Project Two Offshore Wind Farm - Intertidal Vehicle Storage Area | Optimus Wind Limited | 15 Apr 2020 | ||
MLA/2020/00171 Completed | Application - Construction of new works | Mill Bay Lane, East Portlemouth Landslip | Mill Bay Lane, East Portlemouth Landslip | Devon County Council. | 17 Apr 2020 | 21 Apr 2020 |
MLA/2020/00172 Completed | Application - Maintenance of existing works | Hornsea Project One Inter-array cable repairs Grouped under: Hornsea Offshore Wind Farm Project One Showing 2 of 11 cases | Hornsea Project One | Hornsea 1 Ltd | 17 Apr 2020 | 19 Aug 2020 |
MLA/2020/00173 Completed | Application - Construction of new works | Amitié Telecommunications Cable System | AMITIE_S1_2_Final_UK_Route_Corridor_240919 | Apollo Submarine Cable System Limited | 17 Apr 2020 | 06 Jan 2021 |
MLA/2020/00174 Completed | Application - Construction of new works, Other dredging | CS Agreement 806091 | Hesketh Out Marsh West | Rspb | 21 Apr 2020 | 26 Jul 2021 |
MLA/2020/00176 Completed | Application - Construction of new works | RD30 Waren Mill MMO License Version 2 | Waren Mill Rock armour | Mott Macdonald Bentley Ltd | 23 Apr 2020 | 19 Jun 2020 |
MLA/2020/00177 Completed | Application - Maintenance of existing works | Rockley Sands Viaduct - emergency scour works | Rockley Sands Viaduct - emergency scour works | Network Rail Limited | 23 Apr 2020 | 24 Apr 2020 |
MLA/2020/00178 Completed | Application - Maintenance of existing works | Swan Quay River Wall Repair, Clive Street, North Shields | Site Location | E1w 3eu | 24 Apr 2020 | 17 Jul 2020 |
MLA/2020/00179 Completed | Application - Minor removals | Hornsea Project Four Offshore Wind Farm Geotechnical Survey 1A – Array and Offshore Funnel | HOW04_GT1a_A1.06, HOW04_GT1a_A1.10, HOW04_GT1a_A1.13, HOW04_GT1a_A1.15, HOW04_GT1a_A2.02, HOW04_GT1a_A2.05, HOW04_GT1a_A2.07, HOW04_GT1a_A2.09, HOW04_GT1a_A3.04, HOW04_GT1a_A3.05, HOW04_GT1a_A4.01, HOW04_GT1a_A4.02, HOW04_GT1a_A4.04, HOW04_GT1a_A4.07, HOW04_GT1a_ECR23, HOW04_GT1a_ECR24, HOW04_GT1a_ECR25, HOW04_GT1a_ECR26, HOW04_GT1a_ECR28 | Orsted Hornsea Project Four Limited | 24 Apr 2020 | 24 Apr 2020 |
MLA/2020/00180 Completed | Application - Minor removals | Hornsea Project Four Offshore Wind Farm Geotechnical Survey 1A – Export Cable Corridor | HOW04_GT1a_ECR04, HOW04_GT1a_ECR05, HOW04_GT1a_ECR06, HOW04_GT1a_ECR07, HOW04_GT1a_ECR09, HOW04_GT1a_ECR10, HOW04_GT1a_ECR11, HOW04_GT1a_ECR12, HOW04_GT1a_ECR13, HOW04_GT1a_ECR14, HOW04_GT1a_ECR15, HOW04_GT1a_ECR16, HOW04_GT1a_ECR17, HOW04_GT1a_ECR18, HOW04_GT1a_ECR19, HOW04_GT1a_ECR20, HOW04_GT1a_ECR21, HOW04_GT1a_ECR22, HOW04_GT1a_ECR27, HOW04_GT1a_ECR08 | Orsted Hornsea Project Four Limited | 27 Apr 2020 | 27 Apr 2020 |
MLA/2020/00181 Completed | Application - Construction of new works | Hempholme Lock Eel Pass | Tophill eel pass | Ward & Burke Ltd | 28 Apr 2020 | 13 Jan 2021 |
MLA/2020/00182 Completed | Application - Maintenance of existing structures or assets | Fairport Slipway Repairs | Fairport Slipway | Mark Keeling | 28 Apr 2020 | 28 Apr 2020 |
MLA/2020/00185/1 Completed | Application - Aggregate dredging | Application for Marine Aggregate Extraction Licence for Area 524 | Area 524 | Deme Building Materials Limited-Tavistock Square | 30 Apr 2020 | 14 Feb 2023 |
MLA/2020/00187 Completed | Application - Maintenance of existing works | Hamble Point Corrosion Protection | Hamble Point Marina - Corrosion Protection | Marina Developments | 05 May 2020 | 27 Aug 2020 |
MLA/2020/00188/1 Completed | Application - Construction of new works | Battersea Power Station - River Wall Capping | Battersea Power Station - River Wall Repairs | Battersea Project Phase 2 Development Company Limited | 06 May 2020 | 29 Apr 2021 |
MLA/2020/00189 Completed | Application - Maintenance of existing structures or assets | Emergency wingwall repairs - Canal Underbridge, near Looe, Cornwall | Canal_U_Site | Network Rail | 06 May 2020 | 06 May 2020 |
MLA/2020/00191 Completed | Application - Marine licence for the burial of human remains at sea | TYNE BURIAL SITE (TY193) | Co-Operative Funeralcare Limited | 07 May 2020 | 07 May 2020 | |
MLA/2020/00192 Completed | Application - Maintenance of existing structures or assets | Tarleton Lock 8 Maintenance & Lock Ladder Installation | Tarleton lock 8 | Canal & River Trust | 09 May 2020 | 09 May 2020 |
MLA/2020/00193/3 Completed | Application - Alternative use of dredged material, Construction of new works | Beach recharge and gabion construction, Wrabness beach, Stour Estuary, Essex. | Site A-B initial deposition site, Site C initial deposition site, Site A-B recharge site, Site C - recharge site, Site A gabion, Site B gabion, Site C - gabion | Balhaven Ltd | 11 May 2020 | 10 Nov 2021 |
MLA/2020/00194 Completed | Application - Maintenance of existing structures or assets | Emergency wingwall repairs (steel mesh) - Canal Underbridge, near Looe, Cornwall | Canal_U_Site | Network Rail | 13 May 2020 | 13 May 2020 |
MLA/2020/00196 Completed | Application - Construction of new works | Wallasey Embankment Toe Protection | Wallasey Embankment | Wirral Council | 14 May 2020 | 14 Jul 2021 |
MLA/2020/00197 Completed | Application - Non-navigational clearance dredging | Pacific Orca Major Component Exchange Project. Greater Gabbard Offshore Wind LTD | magic_polygons | Greater Gabbard Offshore Winds Limited | 14 May 2020 | 14 May 2020 |
MLA/2020/00198 Completed | Application - Maintenance of existing structures or assets | Maintenance of the cable protection installed at KP119.2 at the Nemolink cable | Cable Protection Maintenance Location | National Grid Nemo Link Limited | 14 May 2020 | 14 May 2020 |
MLA/2020/00199 Completed | Application - Construction of new works | Replacement of Quay Pontoon at Hamble Point Marina | Quay Pontoon - Pontoon Replacement | Marina Developments | 14 May 2020 | 05 Aug 2020 |
MLA/2020/00200 Completed | Application - Maintenance of existing works | Hythe Marina Village - Piling and Rock Armour Works | Hythe Marina Village - Basin, Hythe Marina Village - Rock Revetment | Marina Developments Limited | 18 May 2020 | 04 Dec 2020 |
MLA/2020/00201 Completed | Application - Maintenance of existing structures or assets | Maintenance of Rock armour at Polkirt Beach Portmellon Mevagissey PL26 6PH | Polkirt Beach Rock Armour | Mr Peter Bowker | 18 May 2020 | 18 May 2020 |
MLA/2020/00202 Completed | Application - Construction of new works | Repair of existing slipway and alteration and extension to create an external storage area | Lyme Regis Harbour Slipway | Dorset Council | 18 May 2020 | 29 Jan 2021 |
MLA/2020/00203 Completed | Application - Maintenance of existing structures or assets | Replacement of a single pile | magic_polygons | Mr Jason Gatenby | 19 May 2020 | 19 May 2020 |
MLA/2020/00204 Completed | Application - Maintenance of existing structures or assets | Like for like replacement jetty | Grey Thatch Landing Stage | Mr Marcus Evans | 19 May 2020 | 19 May 2020 |
MLA/2020/00205 Completed | Application - Maintenance of existing structures or assets | slipway repair. Commercial Road lowestoft | Caudwell Marine Slipway ABP Port Commercial Road Lowestoft | Caudwell Marine Limited | 19 May 2020 | 19 May 2020 |
MLA/2020/00206 Completed | Application - Construction of new works | Riverside Quay | Riverside Quay | Tms Maritime Ltd | 20 May 2020 | 25 Aug 2022 |
MLA/2020/00207 Completed | Application - Non-navigational clearance dredging | Neptune Major Component Exchange Project. Greater Gabbard Offshore Wind LTD - GAD03 | magic_polygons | Greater Gabbard Offshore Winds Limited | 20 May 2020 | 20 May 2020 |
MLA/2020/00208 Completed | Application - Maintenance of existing structures or assets | Saw Mills Track Renewal (Renewing 395yds of track) | Bodmin Pill Quay | Network Rail Limited | 20 May 2020 | 20 May 2020 |
MLA/2020/00209 Withdrawn | Application - Construction of new works | Club Bateau Construction of Moorings | Club Bateau | 21 May 2020 | ||
MLA/2020/00210 Completed | Application - Minor removals | The Moors at Arne Coastal Change Project | Arne Moors | May Gurney Limited | 23 May 2020 | 23 May 2020 |
MLA/2020/00211 Completed | Application - Construction of new works | Offham Cut River Bank | Offham Cut River Bank | Bam Nuttall Limited | 26 May 2020 | 06 Aug 2020 |
MLA/2020/00212 Completed | Application - Maintenance of existing structures or assets | Whitehaven Sea Wall Repair | Whitehaven Redness Point Repair | Network Rail Limited | 26 May 2020 | 26 May 2020 |
MLA/2020/00214 Withdrawn | Application - Construction of new works, Decommissioning of works | Port of Ramsgate Replacement of Berth 4/5 | Thanet District Council | 28 May 2020 | ||
MLA/2020/00215 Completed | Application - Minor removals | TH027 monitoring | IHHA116_SurveyArea_Ply_110618 | Thomson Unicomarine Limited | 01 Jun 2020 | 01 Jun 2020 |
MLA/2020/00216 Completed | Application - Construction of new works | Deptford Walls - Temporary Works | Deptford Walls Temporary Works | Jacobs Team2100 | 02 Jun 2020 | 02 Sep 2020 |
MLA/2020/00218 Completed | Application - Maintenance of existing structures or assets | Henn and Carew navigation aids project | Henn and Carew navigation aids | Babcock International Group Plc | 03 Jun 2020 | 03 Jun 2020 |
MLA/2020/00221 Completed | Application - Minor removals | Rampion - recovery of various construction materials / debris | 6 rock bags NE of the Offshore Substation Platform, Rock bags on the North East corner of the OSP structure, Exposed cable and rock bag on Export Cable 2 | E.On Climate & Renewables Uk Rampion Offshore Wind Limited | 04 Jun 2020 | 04 Jun 2020 |
MLA/2020/00222 Completed | Application - Non-navigational clearance dredging | Barking Power Station Cooling System Pump Test | Intake | Barking Power Limited | 04 Jun 2020 | 04 Jun 2020 |
MLA/2020/00223 Completed | Application - Non-navigational clearance dredging | removal of deposited silt from drainage channel on Hazelslack Marsh, Arnside, LA5 0HG | drainage channel - Hazelslack Marsh | Dallam Tower Estate | 05 Jun 2020 | 05 Jun 2020 |
MLA/2020/00224 Completed | Application - Construction of new works | Westward Ho! Slipway Extension | Westward Ho! Slipway Extension | Torridge District Council | 05 Jun 2020 | 17 Jul 2020 |
MLA/2020/00225/4 Completed | Application - Construction of new works | Dawlish Sea Wall Stage 2 - Coastguards Breakwater to Colonnades Breakwater, Dawlish | Dawlish Sea Wall Stage 2 | Network Rail-Bristol | 05 Jun 2020 | 23 Dec 2022 |
MLA/2020/00226 Completed | Application - Other deposits | Birdham Pool Repairs | Location A, Location B | Castle Marinas Limited | 07 Jun 2020 | 10 Nov 2020 |
MLA/2020/00227/1 Completed | Application - Construction of new works, Decommissioning of works, Maintenance of existing works | Thunderer Jetty Refurbishment | Thunderer Jetty Refurbishment | Stolthaven Dagenham Ltd | 07 Jun 2020 | 05 Aug 2022 |
MLA/2020/00228 Completed | Application - Construction of new works | Extension of floating pontoon at Wadebridge | Pontoo Extension | Padstow Harbour Commissioners | 08 Jun 2020 | 09 Sep 2020 |
MLA/2020/00229 Completed | Application - Maintenance of existing structures or assets | Pipe replacement Heene Terrace Worthing | Heene Terrace (West) | Beasley Christopher Limited | 08 Jun 2020 | 08 Jun 2020 |
MLA/2020/00232 Completed | Application - Maintenance of existing structures or assets | Sea Wall Repairs | Sea Wall | Balfour Beatty Rail Limited | 10 Jun 2020 | 10 Jun 2020 |
MLA/2020/00233 Completed | Application - Maintenance of existing structures or assets | like for like replacement Hamble pontoon B18-B19 | Pontoon B18/B19 | Household Division Yacht Club | 11 Jun 2020 | 11 Jun 2020 |
MLA/2020/00235 Completed | Application - Maintenance of existing structures or assets | Repair of stone steps on Helford Passage passenger ferry landing jetty | Helfor Point, Helford, Manaccan Cornwall TR12 6JY | Cormac Solutions Limited | 12 Jun 2020 | 12 Jun 2020 |
MLA/2020/00236 Completed | Application - Other works | River Hull+ Scheme - Angling Platform Relocation | Angling Platforms | Bmm Jv Limited | 12 Jun 2020 | 04 Sep 2020 |
MLA/2020/00237/1 Completed | Application - Construction of new works | The Grove Pontoon | J Hek | Julian Hek | 14 Jun 2020 | 07 Apr 2022 |
MLA/2020/00238 Completed | Application - Aggregate dredging, Sampling | Area 529 Aggregate Extraction Licence | Area 529 | Sea Aggregates Limited | 15 Jun 2020 | 29 Jul 2022 |
MLA/2020/00239 Completed | Application - Maintenance of existing structures or assets | like for like replacement of existing berthing pontoons between piles HP 4-5 | berthing pontoon between piles HP 4-5 | Scott Radband | 15 Jun 2020 | 15 Jun 2020 |
MLA/2020/00240/2 Completed | Application - Other deposits | Floating Lidar Test Zone | NOAH_Consent_Zone | Offshore Renewable Energy Ltd | 16 Jun 2020 | 26 Jun 2023 |
MLA/2020/00241 Completed | Application - Maintenance of existing structures or assets | Anchor Iron Wharf- Flood Wall Crack Monitoring | Anchor Iron Wharf | Ch2m Hill United Kingdom | 17 Jun 2020 | 17 Jun 2020 |
MLA/2020/00242 Completed | Application - Maintenance of existing structures or assets | Cathodic Protection Upgrade | BP Oil Jetty 1 | Bp Oil Uk Limited | 18 Jun 2020 | 18 Jun 2020 |
MLA/2020/00243 Completed | Application - Beach maintenance activities | MOD Shoeburyness Hoseas Headway Access Improvement | MOD Shoeburyness Hoseas Headway | Qinetiq Limited | 18 Jun 2020 | 18 Jun 2020 |
MLA/2020/00244 Completed | Application - Maintenance of existing structures or assets | Brooklands Outfall Replacement | Brooklands outfall | Worthing Borough Council | 19 Jun 2020 | 19 Jun 2020 |
MLA/2020/00245 Completed | Application - Minor removals | Moriconium Quay Marina Wall | moriconium Quay | Quadrigy Engineering Ltd | 22 Jun 2020 | 22 Jun 2020 |
MLA/2020/00246 Completed | Application - Maintenance of existing structures or assets | Watchet Harbour - Splash Point Wall Maintenance Works | Splash Point Wall | Somerset West And Taunton Council | 23 Jun 2020 | 23 Jun 2020 |
MLA/2020/00247 Completed | Application - Maintenance of existing structures or assets | Rampion Pontoon panama and fender reinstatement/repairs | Rampion Quay Temporary Pontoon | Mr Christopher Donn | 23 Jun 2020 | 23 Jun 2020 |
MLA/2020/00248 Completed | Application - Minor removals | Equipment Testing Lowestoft Harbour Rev1 | Sample Site 1 | Geoforce Technical Services Limited | 23 Jun 2020 | 23 Jun 2020 |
MLA/2020/00249 Completed | Application - Other deposits, Other removals | Green Ocean Kelp Farm - Brixham | Macroalgae Farm | Green Ocean Farming | 23 Jun 2020 | 04 Nov 2021 |
MLA/2020/00250/2 Completed | Application - Construction of new works, Maintenance of existing works | Poole Bay Coastal Defence Scheme | Study_Area_20200513 | Bournemouth Christchurch And Poole Council | 23 Jun 2020 | 20 Sep 2023 |
MLA/2020/00251/2 Completed | Application - Other dredging | HMNB Portsmouth Entrance to Basin No.1 Silt Removal | Entrance to Basin No.1 Silt Removal | Kbs Maritime | 24 Jun 2020 | 26 Apr 2023 |
MLA/2020/00252 Completed | Application - Maintenance of existing structures or assets | Weed Removal from Fixed oil pollution prevention boom | Site 1 | Falmouth Petroleum Limited | 25 Jun 2020 | 25 Jun 2020 |
MLA/2020/00253 Completed | Application - Maintenance of existing structures or assets | EAWES3051-Sturgeon Lighting Columns and Lion Heads Mooring Ring Restoration Works | Victoria Embankment | F M Conway Limited | 26 Jun 2020 | 26 Jun 2020 |
MLA/2020/00255 Completed | Application - Disposal of dredged material, Navigational dredging (capital) | Capital Dredge in Ashlett Creek | Proposed_Dredge_Area_WGS84, NAB TOWER (WI060), HURST FORT (WI080) | Esso Petroleum Company,Limited | 29 Jun 2020 | 10 Sep 2021 |
MLA/2020/00256 Completed | Application - Non-navigational clearance dredging | River Bela channel clearance | River Bela - Heversham main drain outfall | Mr Julian Oston | 29 Jun 2020 | 29 Jun 2020 |
MLA/2020/00257 Completed | Application - Maintenance of existing structures or assets | QinetiQ Portland Grove Point maintenance and repair (July 2020 - July 2021 | Grove Point | Qinetiq Limited | 29 Jun 2020 | 29 Jun 2020 |
MLA/2020/00259 Completed | Application - Maintenance of existing structures or assets | Repairs to seawall revetment and out fall pipe | Waldegraves Holiday Park | Mr Graham Rampling | 29 Jun 2020 | 29 Jun 2020 |
MLA/2020/00260 Completed | Application - Construction of new works | Little Hayes Railway Embankment Protection | magic_polygons | The Environment Partnership (Tep) | 30 Jun 2020 | 13 May 2021 |
MLA/2020/00261 Completed | Application - Maintenance of existing structures or assets | Manea Wheel Timbers and Structural Surveys | Manea Worksite | Network Rail | 30 Jun 2020 | 30 Jun 2020 |
MLA/2020/00262/2 Completed | Application - Construction of new works, Incineration of any substance or object at sea, Maintenance of existing works, Other deposits, Other removals | GridLink Interconnector | GridLink Cable Corridor, Gridlink East Site (TH156), Gridlink West Site (TH157) | Gridlink Interconnector Ltd | 30 Jun 2020 | 19 Jun 2024 |
MLA/2020/00263 Completed | Application - Maintenance of existing structures or assets | Thames Tidal Gauge Hut Restoration | Thames Tidal Gauge Hut | F M Conway Limited | 01 Jul 2020 | 01 Jul 2020 |
MLA/2020/00264 Completed | Application - Construction of new works, Sampling | Project Aquarius | Glm Assets Bv | 01 Jul 2020 | 11 Nov 2020 | |
MLA/2020/00265 Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Davis's Boatyard - Maintenance Dredging Licence | SWANAGE BAY (WI110), Davis's Boatyard - Dredging Area | Davis'S Boatyard | 01 Jul 2020 | 07 Jan 2021 |
MLA/2020/00266 Completed | Application - Construction of new works | Watchet Harbour - Eastern Pier Wall Permanent Repairs | Eastern Pier Wall | Somerset West And Taunton Council | 02 Jul 2020 | 02 Sep 2020 |
MLA/2020/00267 Completed | Application - Maintenance of existing structures or assets | CBC1/W361440 Soutergate Embankment | Soutergate | Network Rail Infrastructure Limited | 03 Jul 2020 | 03 Jul 2020 |
MLA/2020/00268 Completed | Application - Maintenance of existing structures or assets | Furnace Way Viaduct Plain Track Renewals | AATK142_FurnaceWayWorkArea_TP_030720 | Thomson Ecology Limited | 03 Jul 2020 | 03 Jul 2020 |
MLA/2020/00269/1 Completed | Application - Other deposits | Pulsar | Sirius Pulsar | Siriusinsight.Ai | 06 Jul 2020 | 04 Jan 2021 |
MLA/2020/00270 Completed | Application - Minor removals | Bridlington Harbour Geotechnical Investigation Phase 1 | Bridlington Harbour (East) | Bridlington Harbour Commissioners | 06 Jul 2020 | 06 Jul 2020 |
MLA/2020/00271 Completed | Application - Construction of new works | Old Mill Creek surface water outfall improvements | Surface water outfall | South West Water Limited | 07 Jul 2020 | 21 Jul 2022 |
MLA/2020/00272 Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Maintenance Dredging at Solent Gateway Port in Marchwood | NAB TOWER (WI060), Marchwood Berths | Solent Gateway Limited | 07 Jul 2020 | 29 Oct 2020 |
MLA/2020/00273 Completed | Application - Maintenance of existing structures or assets | Spinney Jetty Repairs, Itchenor, Chichester Harbour | Spinney Jetty | Patricia Edmond | 07 Jul 2020 | 07 Jul 2020 |
MLA/2020/00274 Completed | Application - Maintenance of existing structures or assets | Grosvenor Road - Scaffold access towers | Grosvenor Road Scaffolding - one access tower at each end of the site | Jacobs | 08 Jul 2020 | 08 Jul 2020 |
MLA/2020/00275 Completed | Application - Minor removals | Concrete block removal | magic_polygons | Devon County Council | 08 Jul 2020 | 08 Jul 2020 |
MLA/2020/00276 Completed | Application - Construction of new works, Other works | NSSB Quay 1 Repairs | NSSB Quay 1 | A.V.Dawson Limited | 08 Jul 2020 | 13 Nov 2020 |
MLA/2020/00278 Completed | Application - Non-navigational clearance dredging | Silt removal from the granaries dock | The granaries dock | The Granaries Management Company Limited | 08 Jul 2020 | 08 Jul 2020 |
MLA/2020/00279 Completed | Application - Maintenance of existing structures or assets | Hartlepool Power Station - Forebay concrete repairs | Hartlepool Cooling Water Intake Forebay beam | Edf Energy Nuclear Generation Limited | 09 Jul 2020 | 09 Jul 2020 |
MLA/2020/00280/1 Completed | Application - Maintenance of existing works | BP Oil Jetty 1 Upgrade to infrastructure. | Jetty 1 Isle of Grain | Bp Oil Logistics Uk Limited | 09 Jul 2020 | 28 Oct 2021 |
MLA/2020/00281 Completed | Application - Maintenance of existing structures or assets | P2370 / Canary Wharf ferry terminal pontoon repairs | Canary Wharf ferry terminal | Constructex Limited | 09 Jul 2020 | 09 Jul 2020 |
MLA/2020/00282 Completed | Application - Decommissioning of works, Maintenance of existing works, Other works | Removal of 3 existing 'Dolphin' structures and replacement of boundary fence | MOD, Lower Camp, Poole Dolphins and Fence project | Defence Infrastructure Organisation | 09 Jul 2020 | 28 Sep 2020 |
MLA/2020/00284 Completed | Application - Maintenance of existing structures or assets | Red Funnel Terminal Refurbishment | RedFunnel_RH_20200708 | Red Funnel Limited | 10 Jul 2020 | 10 Jul 2020 |
MLA/2020/00288 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Charles Lister | 14 Jul 2020 | 14 Jul 2020 | |
MLA/2020/00289 Completed | Application - Construction of new works | Installation of boat launch ramp and 2 tubular steel piles | Site Location | Mr David Walsh | 14 Jul 2020 | 12 Jan 2021 |
MLA/2020/00290 Completed | Application - Minor removals | Removal and replacement of sunken oil spill donut | Hamble Oil Terminal Jetty Oil Boom | Bp Oil Uk Limited | 15 Jul 2020 | 15 Jul 2020 |
MLA/2020/00291 Completed | Application - Minor removals | Removal of discarded fishing gear | HOW02_FishingGearClearanceArea_20200715 | Optimus Wind Limited | 15 Jul 2020 | 15 Jul 2020 |
MLA/2020/00292 Completed | Application - Other works | Minor Amendment to Layout of Town Quay Fishing Boat Pontoon Moorings | Town Quay Fishing Pontoon Area | Lymington Harbour Commissioners | 16 Jul 2020 | 24 Sep 2020 |
MLA/2020/00294 Completed | Application - Non-navigational clearance dredging | Archaeological Investigation of the Mortar Wreck | MortarWreck | Bournemouth University | 19 Jul 2020 | 19 Jul 2020 |
MLA/2020/00295 Completed | Application - Construction of new works, Maintenance of existing works | Kings Fleet Saltmarsh Improvement Project | Kings Fleet outfall repair and saltmarsh improvement | East Suffolk Internal Drainage Board | 20 Jul 2020 | 18 Nov 2020 |
MLA/2020/00296 Completed | Application - Construction of new works | RBYC Pontoon Replacement | Royal Burnham Yacht Club Pontoon | Royal Burnham Yacht Club | 20 Jul 2020 | 18 Dec 2020 |
MLA/2020/00297 Completed | Application - Maintenance of existing structures or assets | Westminster Bridge Headway Beacons | Headway Beacon Maintenance | County Building Services Ltd | 21 Jul 2020 | 21 Jul 2020 |
MLA/2020/00299 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Charles Lister | 22 Jul 2020 | 22 Jul 2020 | |
MLA/2020/00301 Completed | Application - Maintenance of existing structures or assets | Vauxhall Bridge Maintenance project | Vauxhall Bridge Maintenance | Eurovia Infrastructure Limited | 23 Jul 2020 | 23 Jul 2020 |
MLA/2020/00302 Completed | Application - Alternative use of dredged material | Horsey Island Recharge Project | Horsey (TH230) | Rspb Maldon | 24 Jul 2020 | 17 Feb 2021 |
MLA/2020/00303 Completed | Application - Maintenance of existing structures or assets | Deanston Wharf River Wall Maintenance | Deanston Wharf | Ballymore Construction Services Limited | 27 Jul 2020 | 27 Jul 2020 |
MLA/2020/00304 Completed | Application - Maintenance of existing structures or assets | Replacement of Aids to Navigation | Sellafield Sea Lines Aids to navigation replacement | Sellafield Limited | 27 Jul 2020 | 27 Jul 2020 |
MLA/2020/00305 Completed | Application - Maintenance of existing structures or assets | Greenwich River Wall Remedial works 2020 | Greenwich river wall | Rsk Environment Limited | 28 Jul 2020 | 28 Jul 2020 |
MLA/2020/00306 Completed | Application - Disposal of dredged material | Lydd Emergency Works | Lydd Ranges Emergency Works | Environment Agency Neas | 29 Jul 2020 | 07 Aug 2020 |
MLA/2020/00307/1 Completed | Application - Maintenance of existing works | Hawkin's Point Proposed Bank Protection Scheme | Hawkin's Point | The Crown Estates-York | 30 Jul 2020 | 30 Oct 2020 |
MLA/2020/00308 Completed | Application - Other works | Wyre Beach Management Scheme Phase 2 - Ground Investigation Works | WBMS | Wyre Borough Council | 31 Jul 2020 | 14 Apr 2021 |
MLA/2020/00309 Completed | Application - Maintenance of existing structures or assets | Craigweil Land Drainage Outfall, Aldwick | work_area | Arun District Council | 31 Jul 2020 | 31 Jul 2020 |
MLA/2020/00312 Completed | Application - Maintenance of existing structures or assets | Taw Bridge Navigation Lighting | Taw Bridge | Wsp Uk Limited | 03 Aug 2020 | 03 Aug 2020 |
MLA/2020/00313 Completed | Application - Minor removals | De-risking the Dunwich Bank Wreck Site: CSMP Forward Plan Actions (re-application) | DunwichBankWGS84 | Wessex Archaeology Limited | 03 Aug 2020 | 03 Aug 2020 |
MLA/2020/00315 Completed | Application - Construction of new works | Alverstoke - small saltmarsh creation area | alverstoke_saltmarsh | Gosport Borough Council | 03 Aug 2020 | 03 Dec 2020 |
MLA/2020/00317 Completed | Application - Maintenance of existing structures or assets | Milltown Woods | Milltown Woods | Network Rail Infrastructure Limited | 04 Aug 2020 | 04 Aug 2020 |
MLA/2020/00318 Completed | Application - Maintenance of existing structures or assets | pontoon maintenance | Cove head pontoon maintenance | Cove Head Community Interest Company | 06 Aug 2020 | 06 Aug 2020 |
MLA/2020/00319 Completed | Application - Minor removals | Removal of discarded fishing gear | HOW02_FishingGearClearanceArea_20200729 | Optimus Wind Limited | 06 Aug 2020 | 06 Aug 2020 |
MLA/2020/00321 Completed | Application - Maintenance of existing structures or assets | Hamble Mooring Hook replacement | BP Hamble Jetty | Bp Oil Uk Limited | 06 Aug 2020 | 06 Aug 2020 |
MLA/2020/00323 Completed | Application - Maintenance of existing works | Reduced size slipway (enhancement) & works to sea wall at BAYLYS WHARF, BOSTON'S BOATYARD, BAYLYS ROAD ORESTON PLYMOUTH PL9 7NQ | BAYLYS WHARF | J Boston & Sons (Holdings) Limited | 07 Aug 2020 | 26 Jul 2021 |
MLA/2020/00325 Completed | Application - Maintenance of existing structures or assets | Mousehole Harbour - maintenance (replacement) of 5 No. existing South West Water sewer manhole covers and frames | Manhole cover and frame replacement | Glanville Cleansing Limited | 07 Aug 2020 | 07 Aug 2020 |
MLA/2020/00326 Completed | Application - Minor removals | Mousehole Harbour - trial pits to locate existing sewer assets | Mousehole trial pits | Glanville Cleansing Limited | 07 Aug 2020 | 07 Aug 2020 |
MLA/2020/00327 Completed | Application - Deposit of markers | Lyme Regis Sailing Club Ltd Fixed Marks | magic_polygons | Lyme Regis Sailing Club Limited | 09 Aug 2020 | 09 Aug 2020 |
MLA/2020/00328 Completed | Application - Construction of new works | Mousehole Harbour combined sewer replacement | Mousehole Harbour sewer replacement - work area | Glanville Cleansing Limited | 10 Aug 2020 | 27 Nov 2020 |
MLA/2020/00329 Completed | Application - Other deposits | National Network of Regional Coastal Monitoring Programmes - Rye Bay Directional Wave Buoy | Rye Wave Buoy | Channel Coastal Observatory | 11 Aug 2020 | 09 Dec 2020 |
MLA/2020/00330 Completed | Application - Construction of new works | clacton pier - rebuild corner of rides deck (destroyed in February '20 storm) | clacton pier ride deck corner rebuild | The Clacton Pier Company Ltd | 11 Aug 2020 | 13 Nov 2020 |
MLA/2020/00331 Completed | Application - Maintenance of existing structures or assets | Minor maintenance of existing assets on the jetty at Hamble Terminal | Hamble Jetty | Bp Oil Uk Limited | 11 Aug 2020 | 11 Aug 2020 |
MLA/2020/00332 Completed | Application - Navigational dredging (maintenance) | Blackfriars Pier Dredging | Blackfriars Pier Dredge Box | County Building Services Ltd | 11 Aug 2020 | 16 Nov 2020 |
MLA/2020/00333 Completed | Application - Maintenance of existing structures or assets | Harington Revetment Repaird | Hartington court | Hartington Court Residents Limited | 11 Aug 2020 | 11 Aug 2020 |
MLA/2020/00334 Completed | Application - Maintenance of existing structures or assets | Lifting - Equipment, Stores and associated items onto and off the jetty, fire pump platform, dolphins and buildings to maintain, repairs and upkeep of the structure and equipment | Hamble Oil Terminal Jetty and associated area | Bp Oil Uk Limited | 12 Aug 2020 | 12 Aug 2020 |
MLA/2020/00335 Completed | Application - Construction of new works | Yalton Kiln Landslip | Yalton Sea wall Polygon | Pca Consulting Engineers Ltd | 12 Aug 2020 | 18 Dec 2020 |
MLA/2020/00336 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mamarine.Com Llp | 13 Aug 2020 | 13 Aug 2020 | |
MLA/2020/00337 Completed | Application - Deposit of markers | New race mark 2 | Racing marker | Sussex Yacht Club,Limited | 13 Aug 2020 | 13 Aug 2020 |
MLA/2020/00338 Completed | Application - Marine licence for the burial of human remains at sea | NEWHAVEN (WI011) | Arnold Funeral Service Limited | 14 Aug 2020 | 14 Aug 2020 | |
MLA/2020/00339 Completed | Application - Deposit of markers | Project ROPE - Response Of Predators to Protection and Enhancement (ENG 3420) | OpenLayers_Feature_Vector_1 | University Of Plymouth | 16 Aug 2020 | 16 Aug 2020 |
MLA/2020/00340/1 Completed | Application - Construction of new works | Barking Riverside Pier Grouped under: Barking Riverside Development Showing 2 of 3 cases | New Thames Clipper Pier | Barking Riverside Ltd-Infrastructure | 17 Aug 2020 | 28 Feb 2022 |
MLA/2020/00341 Completed | Application - Construction of new works | Old Mill Creek, erosion control works | Distin's Boatyard | Tor Structural Engineers Ltd | 17 Aug 2020 | 13 Aug 2021 |
MLA/2020/00343 Completed | Application - Maintenance of existing structures or assets | Littlehampton LSO Lantern Replacement | Littlehampton LSO Buoy | Beasley Christopher Limited | 17 Aug 2020 | 17 Aug 2020 |
MLA/2020/00344/2 Completed | Application - Maintenance of existing works | Haslar Marina Repair Works | Hammerhead, Piles, Wave Screen | Boatfolk Marinas Ltd | 18 Aug 2020 | 02 Nov 2021 |
MLA/2020/00345 Completed | Application - Construction of new works | Melton boatyard, Deben Estuary – replacement and extension of pontoons | Melton BY finger pontoon location, Pontoon replacement, Pontoon extension | Melton Boatyard Limited | 19 Aug 2020 | 18 Dec 2020 |
MLA/2020/00346 Completed | Application - Navigational dredging (capital) | Dawson's No2 Dredging | Dawsons No2, TEES BAY C (TY150) | A.V.Dawson Limited | 20 Aug 2020 | 10 Nov 2021 |
MLA/2020/00347 Completed | Application - Maintenance of existing structures or assets | Wandsworth Bridge refurbishment | Wandsworth Bridge | Volkerlaser Ltd | 20 Aug 2020 | 20 Aug 2020 |
MLA/2020/00348 Completed | Application - Construction of new works | NSSB Quay 1 Extension | NSSB Extension New Quay | A.V.Dawson Limited | 20 Aug 2020 | 29 Jul 2022 |
MLA/2020/00350 Completed | Application - Non-navigational clearance dredging | De-risking the Dunwich Bank Wreck Site: CSMP Forward Plan Actions (re-application) | DunwichBankWGS84 | Wessex Archaeology Limited | 21 Aug 2020 | 21 Aug 2020 |
MLA/2020/00351 Completed | Application - Maintenance of existing structures or assets | Capital Wharf Wall Repairs | Capital Wharf | Moore Project Management Solutions Llp | 21 Aug 2020 | 21 Aug 2020 |
MLA/2020/00353 Completed | Application - Maintenance of existing structures or assets | Waterside Point | Waterside Point | Waterside Point (Freehold) Ltd | 24 Aug 2020 | 24 Aug 2020 |
MLA/2020/00354 Completed | Application - Maintenance of existing structures or assets | Scaffolding rear of 2 properties | Rear of falmouth spar shop | Mr Sam Bristow | 25 Aug 2020 | 25 Aug 2020 |
MLA/2020/00355 Completed | Application - Maintenance of existing structures or assets | Lock gate refurbishment at South Dock Marina | South Dock Lock | London Borough Of Southwark | 25 Aug 2020 | 25 Aug 2020 |
MLA/2020/00356 Completed | Application - Construction of new works | Watermans Park | Watermans Riverside Limited | 25 Aug 2020 | 19 Mar 2021 | |
MLA/2020/00357/1 Completed | Application - Construction of new works | Stones Boatyard cliff stabilisation | Working area | Devon County Council | 26 Aug 2020 | 05 Feb 2021 |
MLA/2020/00358 Completed | Application - Non-navigational clearance dredging | Old Sand Works creek restoration | Marshside Sands | Rspb | 26 Aug 2020 | 26 Aug 2020 |
MLA/2020/00359 Withdrawn | Application - Maintenance of existing works | Manningtree Flood Defence Embankment Protection | magic_polygons | Taziker Industrial Limited | 28 Aug 2020 | |
MLA/2020/00360 Completed | Application - Maintenance of existing structures or assets | Small scale beach replenishment works at Point Slipway | Point_slipway | Portsmouth City Council | 28 Aug 2020 | 28 Aug 2020 |
MLA/2020/00361 Completed | Application - Non-navigational clearance dredging | Slipway clearance | Robertson Slipway | Robertsons Boatyard | 28 Aug 2020 | 28 Aug 2020 |
MLA/2020/00362 Completed | Application - Other removals | Dogger Bank Wind Farm A & B | UXOClearanceAreaHDDExit_RH_20200814 | Dogger Bank Wind Farm | 28 Aug 2020 | 26 Feb 2021 |
MLA/2020/00363/1 Completed | Application - Maintenance of existing works | The re-furbishment of two public drainage manholes, and the re-construction of two others, and the replacement of two manhole covers in Newton Ferrers /Noss Mayo Creek | MH7804 MH8709 MH8710 MH8714 | South West Water-Sidmouth | 28 Aug 2020 | 16 Jul 2021 |
MLA/2020/00364 Completed | Application - Minor removals | Battersea Power Station - Ground Investigation | BPS - GI | Battersea Project Phase 2 Development Company Limited | 01 Sep 2020 | 01 Sep 2020 |
MLA/2020/00365 Completed | Application - Maintenance of existing structures or assets | Maintenance works to Spragger Clough | Spragger Clough | The Crown Estate | 01 Sep 2020 | 01 Sep 2020 |
MLA/2020/00366 Completed | Application - Maintenance of existing structures or assets | Hythe (Southampton) Sailing Club Jetty Refurbishment | Hythe (Southampton) Jetty | Mr Kenneth Endean | 01 Sep 2020 | 01 Sep 2020 |
MLA/2020/00368 Completed | Application - Maintenance of existing structures or assets | Foundation Core Sampling at Cockwood Harbour | Cockwood Harbour_Foundation Coring | Henderson Thomas Associates Ltd. | 02 Sep 2020 | 02 Sep 2020 |
MLA/2020/00369/2 Completed | Application - Disposal of dredged material, Navigational dredging (capital), Other deposits | Southampton Container Terminal: Deepening and Widening of Berth Pockets | Southampton Container Terminal, NAB TOWER (WI060), Southampton Container Terminal-second berth pocket | Associated British Ports, Southampton | 02 Sep 2020 | 20 Dec 2021 |
MLA/2020/00370 Completed | Application - Maintenance of existing structures or assets | Seacombe Ferry Terminal Maintenance | Seacombe Ferry Terminal Maintenance Works | Merseytravel Limited | 03 Sep 2020 | 03 Sep 2020 |
MLA/2020/00371 Completed | Application - Maintenance of existing structures or assets | Component Exchange (Generator) | WTG J01 Sheringham Shoal Windfarm | Equinor Uk Limited | 03 Sep 2020 | 03 Sep 2020 |
MLA/2020/00372 Completed | Application - Maintenance of existing structures or assets | Component Exchange (Gearbox) | WTG I06 Sheringham Shoal Windfarm | Equinor Uk Limited | 03 Sep 2020 | 03 Sep 2020 |
MLA/2020/00373 Completed | Application - Maintenance of existing structures or assets | Component Exchange (Gearbox) | WTG G01 Sheringham Shoal Windfarm | Equinor Uk Limited | 03 Sep 2020 | 03 Sep 2020 |
MLA/2020/00374 Completed | Application - Maintenance of existing structures or assets | A14 Orwell Bearing maint yr5 scheme pin 605626 | Orwell | John Graham Construction Limited | 03 Sep 2020 | 03 Sep 2020 |
MLA/2020/00375/3 Completed | Application - Maintenance of existing works | Friends of Mousehole Rock Pool | Mousehole Rock Pool | Friends Of Mousehole Rock Pool | 03 Sep 2020 | 29 Feb 2024 |
MLA/2020/00376/1 Completed | Application - Construction of new works | Haslar Marina Additional Berthing | Berth Extension | Boatfolk Marinas Ltd | 04 Sep 2020 | 31 May 2022 |
MLA/2020/00377 Completed | Application - Maintenance of existing structures or assets | SHOREHAM LSO BUOY CARDINAL MARKS | SHOREHAM LSO BUOY | Beasley Christopher Limited | 04 Sep 2020 | 04 Sep 2020 |
MLA/2020/00378 Completed | Application - Maintenance of existing structures or assets | Replacement of broken slipway marker post | Robertsons Boatyard | Robertsons Boatyard | 04 Sep 2020 | 04 Sep 2020 |
MLA/2020/00379 Completed | Application - Maintenance of existing structures or assets | BOGNOR REGIS - REGIS CENTRE | BOGNOR REGIS - REGIS CENTRE | Beasley Christopher Limited | 06 Sep 2020 | 06 Sep 2020 |
MLA/2020/00380/1 Completed | Application - Other works | Nearshore Seaweed Cultivation of Native Species | Seaweed Farm | Aqua Botanika Ltd | 07 Sep 2020 | 25 Aug 2023 |
MLA/2020/00381 Completed | Application - Maintenance of existing structures or assets | 741 Penstock Survey and Test Anchors | 741 Penstock | Devonport Royal Dockyard Limited | 08 Sep 2020 | 08 Sep 2020 |
MLA/2020/00382 Completed | Application - Maintenance of existing structures or assets | Par Docks Revetment Maintenance, Par, Cornwall | Par Docks Revetment | Teignmouth Maritime Services Limited | 09 Sep 2020 | 09 Sep 2020 |
MLA/2020/00383 Completed | Application - Maintenance of existing structures or assets | Great Eastern Quays - Wall Type 2 Refurbishment and Ancillary works | Wall Type 2 Refurbishment Works | Galliford Try Partnerships Limited | 21 Oct 2020 | 21 Oct 2020 |
MLA/2020/00384 Completed | Application - Maintenance of existing works | Replacement of final effluent discharge pipe across foreshore in Salcombe Harbour , at Ditch End East Portlemouth Devon. | Ditch End East Portlemouth Salcombe and Kingsbridge Estuary | South West Water Authority | 11 Sep 2020 | 28 Jan 2021 |
MLA/2020/00385 Completed | Application - Maintenance of existing works | Hornsea Project One Helideck Guano Removal | HOW01_OWF_Boundary_WGS84 | Hornsea 1 Ltd | 11 Sep 2020 | 02 Dec 2020 |
MLA/2020/00386/2 Completed | Application - Construction of new works | Water Source Heat Pump - Castle Park Depot | CPD Abstraction Point A, CPD Discharge Point | Bristol City Council-Temple Street | 11 Sep 2020 | 06 Apr 2022 |
MLA/2020/00387 Completed | Application - Construction of new works | Aggregate Plant at Frog Island | Walsh Recycling & Construction Solutions | 11 Sep 2020 | 18 Aug 2021 | |
MLA/2020/00388 Completed | Application - Decommissioning of works | Fort Blockhouse - Removal of Piles from the seabed | Fort Blockhouse | Associated British Ports | 14 Sep 2020 | 21 Dec 2020 |
MLA/2020/00389 Completed | Application - Construction of new works | RNLI Cleethorpes LBS - New Lifeboat Station | Footprint of new lifeboat station and access route for construction, launch route and area of buoyage | Rnli | 14 Sep 2020 | 24 Mar 2021 |
MLA/2020/00390 Completed | Application - Minor removals | Lowestoft Flood Risk Management Project (FRMP) | Lowestoft FRMP GI | Balfour Beatty Civil Engineering Limited | 15 Sep 2020 | 15 Sep 2020 |
MLA/2020/00391 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mamarine.Com Llp | 15 Sep 2020 | 15 Sep 2020 | |
MLA/2020/00392 Completed | Application - Maintenance of existing structures or assets | Naze Tamarisk Short wall clay core repair | Naze Short wall repair | Mr David Eagle | 15 Sep 2020 | 15 Sep 2020 |
MLA/2020/00393 Completed | Application - Maintenance of existing works | 350 Sandbanks Road Wall Repairs | 344_350 Sandbanks | Hollington Agency Limited | 15 Sep 2020 | 22 Dec 2020 |
MLA/2020/00394 Completed | Application - Maintenance of existing structures or assets | Rottingdean Outfall Marker | Rottingdean | Beasley Christopher Limited | 15 Sep 2020 | 15 Sep 2020 |
MLA/2020/00395 Completed | Application - Maintenance of existing structures or assets | Folkestone Copt Point | Folkestone Copt point | Beasley Christopher Limited | 16 Sep 2020 | 16 Sep 2020 |
MLA/2020/00396 Completed | Application - Deposit of markers | Lower Heysham Marker Post | Lower Heysham marker post | United Utilities Water Plc | 16 Sep 2020 | 16 Sep 2020 |
MLA/2020/00397 Completed | Application - Maintenance of existing structures or assets | Repairs & Maintenance to hardstanding, shoreside curtilege: Friars House Yarmouth IOW | Friars House, High Street, Yarmouth, IOW | Mr James Charrington | 17 Sep 2020 | 17 Sep 2020 |
MLA/2020/00398 Completed | Application - Maintenance of existing structures or assets | Decking Repairs, Pointing Works & Decorations & Pointing Inspection | Magic_Polygons - St Katharines Docks | C.S. Hodges And Son Limited | 18 Sep 2020 | 18 Sep 2020 |
MLA/2020/00399 Completed | Application - Construction of new works, Other removals | Mast Quay Phase II – Emergency river wall repair works | River Wall Emergency Repair Works | Opecprime Developments Ltd | 18 Sep 2020 | 16 Oct 2020 |
MLA/2020/00400/1 Completed | Application - Construction of new works | TDEP New Quay Wall | TDEP Quay Wall | Port Of Tyne Authority | 18 Sep 2020 | 12 Jan 2023 |
MLA/2020/00401 Completed | Application - Maintenance of existing works | Emergency Works - Cable Exposure | Cable Protection Area | National Grid Nemo Link | 21 Sep 2020 | 17 Dec 2020 |
MLA/2020/00402 Completed | Application - Maintenance of existing structures or assets | Minor repointing to riverside wall. | Riverside Wharf | Mr Tim Jones | 21 Sep 2020 | 21 Sep 2020 |
MLA/2020/00403 Completed | Application - Construction of new works | new pontoons for Claudwell Marine at Lowestoft | lowestoft | Caudwell Marine Limited-Lowestoft | 23 Sep 2020 | 04 Jan 2021 |
MLA/2020/00404 Completed | Application - Other deposits | Pulsar2 | Pulsar2 | Siriusinsight.Ai | 23 Sep 2020 | 17 Jan 2022 |
MLA/2020/00405/1 Completed | Application - Construction of new works | Morden Wharf | Morden_Wharf_Site_Boundary | Ghl Cdl Morden Limited | 23 Sep 2020 | 17 Nov 2023 |
MLA/2020/00406 Completed | Application - Maintenance of existing works | Resurfacing of existing concrete sea wall at River Hamble Harbour Master's Office | Harbour Master's Office Sea Wall | River Hamble Harbour Authority | 23 Sep 2020 | 22 Jan 2021 |
MLA/2020/00407 Completed | Application - Maintenance of existing structures or assets | Marazion Marsh outfall maintenance | Marazion Marsh outfall | Cormac Ltd | 25 Sep 2020 | 25 Sep 2020 |
MLA/2020/00408 Completed | Application - Maintenance of existing structures or assets | Erecting and dismantling of scaffolding required to carry out maintenance and repairs of jetty and equipment | BP Hamble Jetty | Bp Oil Uk Limited | 25 Sep 2020 | 25 Sep 2020 |
MLA/2020/00409 Withdrawn | Application - Other deposits | Hurst Castle - Installation of Rock Armour Sea Protection and Beach Shingle Recharge | Hurst Castle Eastern Beach Sea Defence, Hurst Castle Central Wall Sea Defence | English Heritage Trust | 25 Sep 2020 | |
MLA/2020/00410 Completed | Application - Maintenance of existing structures or assets | Murphy's Wharf Jetty Repairs Phase 2 | Murphy's Wharf Jetty | Moore Project Management Solutions Llp | 27 Sep 2020 | 27 Sep 2020 |
MLA/2020/00411 Completed | Application - Maintenance of existing structures or assets | Kawasaki Track Renewal | Tamerton_Bridge | Network Rail Limited | 28 Sep 2020 | 28 Sep 2020 |
MLA/2020/00413 Completed | Application - Maintenance of existing structures or assets | Slipway Repair | Slipway Repair | H. Attrill & Sons (Isle Of Wight) Limited | 29 Sep 2020 | 29 Sep 2020 |
MLA/2020/00414 Completed | Application - Beach maintenance activities | Shoreham to Southwick Beach recycling | Shoreham Beach Recycling | Shoreham Port Authority | 30 Sep 2020 | 30 Sep 2020 |
MLA/2020/00415 Completed | Application - Other deposits | Royal Quays Marina - The Barrage Stabilisation Works | magic_polygons | North Tyneside Council | 30 Sep 2020 | 23 Oct 2020 |
MLA/2020/00417 Completed | Application - Construction of new works | Lower Otter Restoration Project | LORP_ds_RedLineBoundary_July2020 | Environment Agency | 30 Sep 2020 | 18 Mar 2022 |
MLA/2020/00418 Completed | Application - Maintenance of existing structures or assets | Shamrock Quay - Corrosion Protection | Shamrock Quay - Corrosion Protection | Marina Developments Limited | 01 Oct 2020 | 01 Oct 2020 |
MLA/2020/00419/1 Completed | Application - Other works | Tyne Estuary Environmental Enhancements | HebburnRiversideBoundary, PrinceConsortBoundary, RoyalQuaysMarinaBoundary, VikingSiteBoundary | Groundwork Ne & Cumbria | 01 Oct 2020 | 11 Jul 2022 |
MLA/2020/00420/1 Completed | Application - Sampling | Portsmouth City Council - Tipner West & Horsea Island East Near Shore Site Investigations | TW&HIE Near Shore Marine Ground Investigations | Portsmouth City Council | 01 Oct 2020 | 13 Oct 2021 |
MLA/2020/00421 Completed | Application - Construction of new works, Other works | Remove existing jetty and replace with floating pontoon at Wadebridge. | Wadebridge Boating Club | Wadebridge Boating Club | 01 Oct 2020 | 15 Jan 2021 |
MLA/2020/00422 Completed | Application - Minor removals | RNLI Weston-super-Mare Birnbeck Pier Geophysical Survey | PB9213_RHD_XX_ZZ_DR_0001_MMO | R.N.L.I. (Trading) Limited | 02 Oct 2020 | 02 Oct 2020 |
MLA/2020/00423 Completed | Application - Maintenance of existing structures or assets | RNLI Weston-super-Mare Birnbeck Pier Geophysical Survey | PB9213_RHD_XX_ZZ_DR_0001_MMO | R.N.L.I. (Trading) Limited | 02 Oct 2020 | 02 Oct 2020 |
MLA/2020/00424 Completed | Application - Construction of new works | West Bay Coastal Improvements - Parkdean Phase | Parkdean Caravan Park Embankment | Dorset Council | 02 Oct 2020 | 18 Dec 2020 |
MLA/2020/00425 Completed | Application - Non-navigational clearance dredging | ML Slipway | Slipway | M L (Uk) Dredging Limited | 02 Oct 2020 | 02 Oct 2020 |
MLA/2020/00426/1 Completed | Application - Construction of new works | Bridgwater Tidal Barrier | BTB_Site | Environment Agency -Bristol | 02 Oct 2020 | 05 Aug 2024 |
MLA/2020/00427 Completed | Application - Maintenance of existing structures or assets | Southampton Camberra Towers | Southampton camberra towers | Beasley Christopher Limited | 05 Oct 2020 | 05 Oct 2020 |
MLA/2020/00428 Completed | Application - Maintenance of existing structures or assets | Albion Riverside | Albion Riverside | Albion Riverside Residential Management Limited | 05 Oct 2020 | 05 Oct 2020 |
MLA/2020/00429 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mamarine.Com Llp | 06 Oct 2020 | 06 Oct 2020 | |
MLA/2020/00430 Completed | Application - Maintenance of existing structures or assets | Anchor Iron Wharf- Flood Wall Crack Monitoring | Anchor Iron Wharf | Ch2m Hill Europe Limited | 06 Oct 2020 | 06 Oct 2020 |
MLA/2020/00431 Completed | Application - Maintenance of existing structures or assets | 401026 - St Magnus Jetty | St Magnus Jetty | Mlm Consulting Engineers Limited | 09 Oct 2020 | 09 Oct 2020 |
MLA/2020/00433 Completed | Application - Maintenance of existing works | South Sands Saline Infiltration Salcombe (Ref 110160) | South Sands Saline Infiltration | South West Water-Sidmouth | 08 Oct 2020 | 30 Apr 2021 |
MLA/2020/00434 Completed | Application - Construction of new works | Brightlingsea Access Improvements | Heritage Quay and Pier, Ferry Landing Stage | Brightlingsea Harbour Commissioners | 09 Oct 2020 | 11 Mar 2021 |
MLA/2020/00435 Completed | Application - Maintenance of existing structures or assets | Malpas House , inspection and repairs to quay wall | magic_lines | A J Heard Builders Limited | 12 Oct 2020 | 12 Oct 2020 |
MLA/2020/00436 Completed | Application - Maintenance of existing structures or assets | Cycle Path Bridge Restoration | Cycle path bridge | Sharpham Trust(The) | 12 Oct 2020 | 12 Oct 2020 |
MLA/2020/00437 Completed | Application - Sampling | HMNB Devonport 8 and 9 Wharf Capital Dredge and Disposal Site Investigation | DredgeAreas_NY7 & NY9 | Naval Base Command Devonport | 14 Oct 2020 | 10 Aug 2021 |
MLA/2020/00438 Completed | Application - Maintenance of existing structures or assets | Oulton Swingbridge Maintenance | Oulton Swingbridge | Amalgamated Construction Ltd | 14 Oct 2020 | 14 Oct 2020 |
MLA/2020/00439 Completed | Application - Maintenance of existing structures or assets | Canary Wharf Pile Guide Maintenance | Canary Wharf ferry terminal | Constructex Limited | 14 Oct 2020 | 14 Oct 2020 |
MLA/2020/00440 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mamarine.Com Llp | 14 Oct 2020 | 14 Oct 2020 | |
MLA/2020/00441 Completed | Application - Deposit of markers | Single Surface Marker Buoy | Surface Marker Buoy Location | National Grid Nemo Link Limited | 15 Oct 2020 | 15 Oct 2020 |
MLA/2020/00442 Completed | Application - Maintenance of existing works | Removal of jetty section | Drakes Island Jetty | Guardian Industrial (Uk) Limited | 15 Oct 2020 | 17 Mar 2022 |
MLA/2020/00443 Completed | Application - Maintenance of existing structures or assets | Blyth SO2 | Blyth SO2 | Northumbrian Water Limited | 15 Oct 2020 | 15 Oct 2020 |
MLA/2020/00444 Completed | Application - Maintenance of existing structures or assets | Cresswell SO1 | Creswell SO1 | Northumbrian Water Limited | 15 Oct 2020 | 15 Oct 2020 |
MLA/2020/00445 Completed | Application - Minor removals | Lowestoft Harbour, silt clearance at pontoons | Lowestoft | Haydn Evans Consulting Limited | 16 Oct 2020 | 16 Oct 2020 |
MLA/2020/00446 Completed | Application - Construction of new works, Disposal of dredged material, Other dredging | Iceni/Mercator subsea cable systems | Iceni cable corridor, Mercator Presweeping, Iceni Presweeping 1, Iceni Presweeping 2, Iceni Presweeping 3, Iceni Presweeping 4, Iceni Presweeping 5, Iceni Presweeping 6, Iceni Presweeping 7, Iceni Presweeping 8, Iceni Presweeping 9, Mercator Cable Corridor, Norfolk Vanguard East (HU215), EAOW3 (HU212), Iceni Disposal 1 (HU218), Iceni Disposal 2 (HU219), Mercator Disposal (TH081), Iceni Disposal 3 (HU220), Iceni Disposal 4 (HU221), Iceni Disposal 5 (HU222) | British Telecommunications Public Limited Company | 16 Oct 2020 | 01 Dec 2021 |
MLA/2020/00447 Completed | Application - Maintenance of existing structures or assets | Whitstable west beach | Whitstable west beach | Beasley Christopher Limited | 18 Oct 2020 | 18 Oct 2020 |
MLA/2020/00448 Completed | Application - Maintenance of existing structures or assets | Swalecliffe caravan park | Swalecliffe caravan park | Beasley Christopher Limited | 18 Oct 2020 | 18 Oct 2020 |
MLA/2020/00449 Completed | Application - Maintenance of existing structures or assets | MAPR37-3 River Trowse Swingbridge | Trowse Swingbridge | Amalgamated Construction Ltd | 19 Oct 2020 | 19 Oct 2020 |
MLA/2020/00450 Completed | Application - Deposit of markers | Sandwich & Pegwell Bay NNR marker buoys | sandwich_buoys | Kent Wildlife Trust | 19 Oct 2020 | 19 Oct 2020 |
MLA/2020/00451 Completed | Application - Maintenance of existing structures or assets | Gillingham the strand | Gillingham the Strand | Beasley Christopher Limited | 19 Oct 2020 | 19 Oct 2020 |
MLA/2020/00452/1 Completed | Application - Construction of new works | CEFAS Weymouth Seawater Intake Pipe Replacement | Replacement of CEFAS seawater intake pipe. | Jba Ltd -Haywards Heath | 19 Oct 2020 | 14 Dec 2021 |
MLA/2020/00453 Completed | Application - Maintenance of existing structures or assets | Vegetation management at Waterside, Curlew Drive 2020 | Curlew Drive | Mr Marcus Evans | 20 Oct 2020 | 20 Oct 2020 |
MLA/2020/00454 Completed | Application - Maintenance of existing structures or assets | Margate Harbour overflow | Margate sands overflow | Beasley Christopher Limited | 21 Oct 2020 | 21 Oct 2020 |
MLA/2020/00455 Completed | Application - Maintenance of existing structures or assets | Triton Knoll Demarcation Buoy and Boat Landing Cleaning | DemarcationBuoysPoly_5mBuff | Triton Knoll Offshore Wind Farm Limited | 21 Oct 2020 | 21 Oct 2020 |
MLA/2020/00456 Completed | Application - Aggregate dredging, Sampling | Area 461 - Renewal | _Area_461_licence_wgs84_poly | Volker Dredging Ltd-Canterbury | 21 Oct 2020 | 02 Dec 2021 |
MLA/2020/00457/1 Completed | Application - Construction of new works, Other removals | Removal of World War II Defences from Kessingland Beach | Kessingland Works Area | The Crown Estate | 21 Oct 2020 | 19 Jan 2022 |
MLA/2020/00458/1 Completed | Application - Construction of new works, Other deposits | NO-UK Fibre Optic Cable System | NO_UK_MHWS_to_TS, NORPIPE_Rock_Placement, Langeled_Rock_Placement, CATS_Rock_Placement, SEAL_Rock_Placement | No-Uk Com As | 21 Oct 2020 | 16 Feb 2022 |
MLA/2020/00459 Completed | Application - Maintenance of existing structures or assets | Worthing Aldsworth Avenue | Worthing Aldsworth Ave | Beasley Christopher Limited | 22 Oct 2020 | 22 Oct 2020 |
MLA/2020/00460 Completed | Application - Maintenance of existing structures or assets | Worthing Sea Place | Worthing Sea Place | Beasley Christopher Limited | 22 Oct 2020 | 22 Oct 2020 |
MLA/2020/00461 Completed | Application - Maintenance of existing structures or assets | Worthing The Esplanade | Worthing The Esplanade | Beasley Christopher Limited | 22 Oct 2020 | 22 Oct 2020 |
MLA/2020/00462 Completed | Application - Maintenance of existing structures or assets | Worthing Wallace Avenue | Worthing Wallace Avenue | Beasley Christopher Limited | 22 Oct 2020 | 22 Oct 2020 |
MLA/2020/00463 Completed | Application - Maintenance of existing structures or assets | Worthing West Street | Worthing West Street | Beasley Christopher Limited | 22 Oct 2020 | 22 Oct 2020 |
MLA/2020/00464 Completed | Application - Maintenance of existing structures or assets | Worthing Brooklands open space | Worthing Brooklands space | Beasley Christopher Limited | 22 Oct 2020 | 22 Oct 2020 |
MLA/2020/00468 Completed | Application - Maintenance of existing structures or assets | BEXHILL GRANADA FLATS | BEXHILL GRANADA FLATS | Beasley Christopher Limited | 25 Oct 2020 | 25 Oct 2020 |
MLA/2020/00469 Completed | Application - Maintenance of existing structures or assets | Bexhill Promenade | Bexhill Promenade | Beasley Christopher Limited | 25 Oct 2020 | 25 Oct 2020 |
MLA/2020/00470/3 Completed | Application - Construction of new works, Maintenance of existing works | Bridgemarsh Marina Refurbishment | Bridgemarsh Marina | Bridgemarsh Marina | 26 Oct 2020 | 16 May 2024 |
MLA/2020/00471 Completed | Application - Minor removals | Medway Headwall Geotechnical Investigations | Medway Headwall | Bam Nuttall Limited | 26 Oct 2020 | 26 Oct 2020 |
MLA/2020/00472 Completed | Application - Construction of new works | Sea Spray Gardens | SZ0385789609 | Wessex Water Services Limited | 26 Oct 2020 | 15 Dec 2020 |
MLA/2020/00473 Completed | Application - Other deposits | Electrical Cable for Haslar Pontoons | Electrical cable | Rnsa Moorings Limited | 27 Oct 2020 | 04 Feb 2021 |
MLA/2020/00474 Completed | Application - Maintenance of existing structures or assets | Trafalgar Wharf Revetment Repairs | Revetment | Trafalgar Wharf Limited | 27 Oct 2020 | 27 Oct 2020 |
MLA/2020/00475/2 Variation Requested | Application - Other deposits | Seaweed Aquaculture off the North Norfolk Coast | Norfolk Seaweed Sea Farm | Norfolk Seaweed Ltd | 27 Oct 2020 | 10 May 2024 |
MLA/2020/00476 Completed | Application - Maintenance of existing structures or assets | Brunel Green Revetment Clearance | Brunel Green Revetment | Cormac Solutions Limited | 27 Oct 2020 | 27 Oct 2020 |
MLA/2020/00477 Completed | Application - Maintenance of existing structures or assets | Worthing Heene terrace | Worthing Heene Terrace | Beasley Christopher Limited | 28 Oct 2020 | 28 Oct 2020 |
MLA/2020/00478 Completed | Application - Maintenance of existing structures or assets | Bognor Regis Albert Road | Bognor Regis Albert Road | Beasley Christopher Limited | 28 Oct 2020 | 28 Oct 2020 |
MLA/2020/00479 Completed | Application - Maintenance of existing structures or assets | BOGNOR REGIS Steyne Gardens | Bognor Regis Steyne Gardens | Beasley Christopher Limited | 28 Oct 2020 | 28 Oct 2020 |
MLA/2020/00480 Completed | Application - Construction of new works, Maintenance of existing works | River Fowey Bridge Deck Replacement | magic_polygons | R&W Rail | 28 Oct 2020 | 25 Jan 2021 |
MLA/2020/00481 Completed | Application - Construction of new works | Forton FCERM Scheme installation of tidal flaps and vertipools. | Forton_redline_intertidal | Coastal Partners | 28 Oct 2020 | 13 Apr 2021 |
MLA/2020/00482/1 Completed | Application - Maintenance of existing works | Marine Licence Application for Repair, Replacement or Reburial Works on the Nearshore Cable Route Grouped under: Hornsea Offshore Wind Farm Project One Showing 2 of 11 cases | HOW01_nearshore_works_area | Hornsea 1 Ltd | 29 Oct 2020 | 07 Mar 2023 |
MLA/2020/00483 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mamarine.Com Llp | 30 Oct 2020 | 30 Oct 2020 | |
MLA/2020/00484 Completed | Application - Maintenance of existing structures or assets | Shell Haven Terminal. Replacement of Marine Loading Arms | Shell Haven S Jetty | Shell Uk Oil Products Ltd | 30 Oct 2020 | 30 Oct 2020 |
MLA/2020/00485/1 Completed | Application - Other deposits, Sampling | Solent Oyster Restoration Project - Reef deployement | River Hamble site 1 (WI073), River Hamble site 2 (WI074), Langstone Harbour (WI063), Newtown Harbour (WI069) | Blue Marine Foundation | 30 Oct 2020 | 13 Feb 2023 |
MLA/2020/00487 Completed | Application - Maintenance of existing structures or assets | Hook Intermediate outer | Hook Intermediate outer | Beasley Christopher Limited | 01 Nov 2020 | 01 Nov 2020 |
MLA/2020/00488 Completed | Application - Maintenance of existing structures or assets | Fareham Cranleigh Rd | Fareham Cranleigh Rd | Beasley Christopher Limited | 01 Nov 2020 | 01 Nov 2020 |
MLA/2020/00489/2 Completed | Application - Incineration of any substance or object at sea | Sofia Offshore Wind Farm UXO Clearance | SOF_Campaign_2_KP10_array | Sofia Offshore Wind Farm Limited | 02 Nov 2020 | 19 Jul 2023 |
MLA/2020/00490 Completed | Application - Maintenance of existing structures or assets | Giblet Ore | Giblet Ore | Beasley Christopher Limited | 02 Nov 2020 | 02 Nov 2020 |
MLA/2020/00492/2 Completed | Application - Alternative use of dredged material | Liverpool Marina Maintenance Dredging - Sustainable Relocation of Dredged Material to the River Mersey | MERSEY (Liverpool Marina) (IS129) | Liverpool Marina | 02 Nov 2020 | 20 Mar 2024 |
MLA/2020/00493 Completed | Application - Maintenance of existing structures or assets | Lee on the Solent Drake Road | LEE ON THE SOLENT DRAKE ROAD | Beasley Christopher Limited | 02 Nov 2020 | 02 Nov 2020 |
MLA/2020/00494 Completed | Application - Maintenance of existing structures or assets | Lee on the Solent Richmond Road | LEE ON THE SOLENT RICHMOND ROAD | Beasley Christopher Limited | 02 Nov 2020 | 02 Nov 2020 |
MLA/2020/00495 Completed | Application - Maintenance of existing structures or assets | Lee on the Solent Queens Rd short outer | LEE ON THE SOLENT QUEENS RD SHORT OUTER | Beasley Christopher Limited | 02 Nov 2020 | 02 Nov 2020 |
MLA/2020/00496 Completed | Application - Maintenance of existing structures or assets | 151 Southampton Rd Portsmouth | 151 Southampton Rd Fareham | Beasley Christopher Limited | 03 Nov 2020 | 03 Nov 2020 |
MLA/2020/00497 Completed | Application - Navigational dredging (capital) | Maintenace Dredging at Red Lion Wharf, Northfleet | Red Lion wharf | Stema Shipping Uk Ltd | 03 Nov 2020 | 12 May 2021 |
MLA/2020/00499/4 Completed | Application - Construction of new works | 741 Penstock Dam Installation System | 741 Penstock - Full Site Area | Devonport Royal Dockyard Limited | 04 Nov 2020 | 31 Aug 2023 |
MLA/2020/00500/1 Completed | Application - Construction of new works, Other deposits, Other removals | Exolum Seal Sands Ltd - revetment repairs and deck works | Revetwork works area, Deck works area | Exolum Seal Sands Ltd | 04 Nov 2020 | 24 Feb 2021 |
MLA/2020/00501 Completed | Application - Maintenance of existing structures or assets | Millpool River Wall, Looe | Millpool River wall, Looe | Cormac Ltd | 04 Nov 2020 | 04 Nov 2020 |
MLA/2020/00502 Completed | Application - Maintenance of existing structures or assets | Esso Purfleet Fender Replacement | Esso Purfleet Jetty | Esso Petroleum Company,Limited | 04 Nov 2020 | 04 Nov 2020 |
MLA/2020/00503/1 Completed | Application - Maintenance of existing works | Emergency Works 2020 - Crosscanonby | magic_polygons | Cumbria County Council Highways Dep | 05 Nov 2020 | 28 Feb 2022 |
MLA/2020/00504/1 Completed | Application - Construction of new works | Imperial Wharf Marina Extension | Imperial Wharf Marina | Imperial Wharf Marina | 06 Nov 2020 | 05 Apr 2023 |
MLA/2020/00506/2 Completed | Application - Disposal of dredged material, Navigational dredging (capital), Other deposits, Other removals | South Bank Quay - Phase 1 Grouped under: South Bank Quay - Phase 1 and 2 Showing 2 of 3 cases | TEES BAY C (TY150), Tees Dock turning circle - dredge, Channel and berth - dredge and excavation, Demolition area, Berth pocket - rock placement | South Tees Development Corporation | 06 Nov 2020 | 28 Feb 2023 |
MLA/2020/00507 Completed | Application - Disposal of dredged material, Navigational dredging (capital), Other deposits, Other removals | South Bank Quay - Phase 2 Grouped under: South Bank Quay - Phase 1 and 2 Showing 2 of 3 cases | TEES BAY C (TY150), Demolition area, Channel and berth pocket - capital dredge, Berth pocket - rock placement | South Tees Development Corporation | 06 Nov 2020 | 25 Feb 2022 |
MLA/2020/00508 Completed | Application - Maintenance of existing structures or assets | Herne Bay opp central avenue | Herne Bay opp central avenue | Beasley Christopher Limited | 07 Nov 2020 | 07 Nov 2020 |
MLA/2020/00509 Completed | Application - Maintenance of existing structures or assets | Minor Works at Corys Wharf Jetty (Powell Duffryn) & Harrisons Wharf Jetty | Works at Corys Wharf Jetty (Powell Duffryn) | Thurrock Council | 09 Nov 2020 | 09 Nov 2020 |
MLA/2020/00510 Completed | Application - Other works | WEYMOUTH SAILING CLUB LEGACY PROJECT - USE OF WATER IN FRONT OF CLUBHOUSE | Weymouth Sailing Club Legacy Project | Weymouth Harbour | 10 Nov 2020 | 18 Mar 2021 |
MLA/2020/00511 Completed | Application - Maintenance of existing works | Suffolk Yacht Harbour | East Pier Slope, East Pier Head – Return Wall | Suffolk Yacht Harbour Limited | 10 Nov 2020 | 27 Jul 2022 |
MLA/2020/00512 Completed | Application - Non-navigational clearance dredging | Component Exchange Project. Greater Gabbard Offshore Wind LTD | 0.00000000000 | Greater Gabbard Offshore Winds Limited | 04 Dec 2020 | 04 Dec 2020 |
MLA/2020/00513/4 Completed | Application - Construction of new works | Holborn Enabling Works | Holborn Enabling Works | South Tyneside Council | 12 Nov 2020 | 05 Aug 2024 |
MLA/2020/00515 Completed | Application - Maintenance of existing works, Other removals | Thames Oilport Jetty Maintenance Works | Jetty 5, Jetty 4, Jetty 3, Jetty 2, Jetty 1 | Morzine Limited | 12 Nov 2020 | 12 Feb 2021 |
MLA/2020/00516 Completed | Application - Construction of new works | Duke Meadow Footbridge | Duke Meadow | Knights Brown Construction Ltd | 12 Nov 2020 | 03 Jun 2021 |
MLA/2020/00517 Completed | Application - Aggregate dredging, Sampling | Area 481 - Inner Dowsing - Renewal | Area_481/1, Area_481/2 | Van Oord Uk Ltd | 13 Nov 2020 | 30 Sep 2022 |
MLA/2020/00518/1 Completed | Application - Maintenance of existing works | Re piling of Fambridge Yacht Haven Ltd | West Pontoon, East Pontoon | Yacht Havens Limited | 13 Nov 2020 | 24 May 2022 |
MLA/2020/00519 Completed | Application - Aggregate dredging, Sampling | Area 481 - Inner Dowsing | Area 481/1, Area 481/2 | Tarmac Marine Dredging Ltd | 13 Nov 2020 | 30 Sep 2022 |
MLA/2020/00520 Completed | Application - Construction of new works | Humber International Terminal berth 2: adaptation for car carriers | Site of works for Humber International Terminal berth 2 adaptation project | Associated British Ports-Immingham | 16 Nov 2020 | 26 Oct 2022 |
MLA/2020/00521 Completed | Application - Minor removals | Terras Level Crossing Upgrade | Terras Level Crossing | Network Rail Limited | 16 Nov 2020 | 16 Nov 2020 |
MLA/2020/00523 Completed | Application - Maintenance of existing works, Navigational dredging (maintenance) | Beccles Yacht Station Maintenance | Beccles Yacht Station MMO site extents polygon | Beccles Fenland Charity Trust | 17 Nov 2020 | 09 Aug 2021 |
MLA/2020/00525/2 Completed | Application - Other deposits | Scientific assessment of ecologically enhanced scour protection | Crouch_MMO_eco_reef_trial_polygon | Exo Environmental Ltd | 17 Nov 2020 | 19 Jun 2024 |
MLA/2020/00526 Completed | Application - Construction of new works | Dinyan Foreshore, Port Navas Creek | Dinyan, Port Navas, Falmouth, TR11 5RJ | Mr Stephen Vinall | 17 Nov 2020 | 13 Apr 2021 |
MLA/2020/00527/1 Completed | Application - Maintenance of existing works | Lazy Days Boatyard, Wootton Creek, Isle of Wight. Replacement/Re-arrangement of mooring pontoons | Lazy Days Boatyard, Wootton, Isle of Wight | Peter Child | 18 Nov 2020 | 15 Dec 2021 |
MLA/2020/00528 Completed | Application - Construction of new works, Other removals | Mixtow Pontoon Project - Replacement of and extension to existing pontoons/trot moorings | Mixtow - work area, Pontoon delivery site | Fowey Harbour Commissioners | 20 Nov 2020 | 10 Mar 2021 |
MLA/2020/00529 Completed | Application - Other deposits | Subhub Tidal Platform & Turbine Performance Trials at Yarmouth | QED___Option_3 | Qed Naval Ltd | 20 Nov 2020 | 14 Sep 2022 |
MLA/2020/00530/3 Completed | Application - Construction of new works, Maintenance of existing works | Tilbury Dual Function Lock Gates | Tilbury Dual Function Lock Gates | Jacobs Engineering Ltd Team2100 | 20 Nov 2020 | 29 Nov 2022 |
MLA/2020/00532 Completed | Application - Maintenance of existing structures or assets | Thameswalk Riverwall Repairs | Thameslink Riverwalk | Southbay Civil Engineering Limited | 23 Nov 2020 | 23 Nov 2020 |
MLA/2020/00533 Completed | Application - Construction of new works | Project Neptune Natural Revetment | Fish dock (Fish Quay, Klondike Quay and Suspended Quay) | Associated British Ports Holdings Limited | 24 Nov 2020 | 25 Jun 2021 |
MLA/2020/00534 Completed | Application - Maintenance of existing structures or assets | Bognor Regis Norfolk street | Bognor Regis Norfolk street | Beasley Christopher Limited | 25 Nov 2020 | 25 Nov 2020 |
MLA/2020/00536/1 Variation Requested | Application - Maintenance of existing works | Bedenham Pier Refurbishment Project | Bedenham Pier | Defence Infrastructure Organisation-Murray Lane | 25 Nov 2020 | 20 Jan 2022 |
MLA/2020/00537 Completed | Application - Maintenance of existing structures or assets | meeching boat yard slipway repairs | meeching boat yard | Mr Michael Swann | 25 Nov 2020 | 25 Nov 2020 |
MLA/2020/00538/1 Completed | Application - Construction of new works, Other removals | Pier House, Pier Road, Seaview - Replacement Sea Wall | Pier House, Seaview,IOW | Mr Simon Gray | 27 Nov 2020 | 01 Apr 2022 |
MLA/2020/00539 Completed | Application - Maintenance of existing structures or assets | Peter Leonards Slipway | Slipway | Peter Leonard Marine | 27 Nov 2020 | 27 Nov 2020 |
MLA/2020/00540 Completed | Application - Maintenance of existing structures or assets | 3 Mills River Wall Repairs | 3 Mills River Wall | Southbay Civil Engineering Limited | 27 Nov 2020 | 27 Nov 2020 |
MLA/2020/00541 Completed | Application - Maintenance of existing works | Cargreen Yacht Club Causeway Renovation | Cargreen | Cargreen Yacht Club Limited | 27 Nov 2020 | 04 Mar 2022 |
MLA/2020/00542/3 Completed | Application - Other deposits | LIFE Recreation ReMEDIES Jennycliff Seagrass Restoration | Planting Area 1, Planting Area 2 | National Marine Aquarium | 30 Nov 2020 | 05 Jun 2023 |
MLA/2020/00543 Completed | Application - Maintenance of existing works | MAPR37 5- River Deben | MAPR37-5_River Deben | Amco Giffen | 30 Nov 2020 | 09 Mar 2021 |
MLA/2020/00545 Completed | Application - Maintenance of existing structures or assets | Deal Downs Sailing Club | Deal - Downs Sailing Club | Beasley Christopher Limited | 02 Dec 2020 | 02 Dec 2020 |
MLA/2020/00546 Completed | Application - Maintenance of existing structures or assets | Repointing Qauyside wall as part of residential development on shoreside | Abbey Wharf | Nova (Kent) Limited | 02 Dec 2020 | 02 Dec 2020 |
MLA/2020/00548 Completed | Application - Maintenance of existing structures or assets | Slit removal from slip way and craning bay, Pontoon replacement. | Penpol slip way, Crane bay and Pontoons. | Butler Traditional Wooden Boats Limited | 03 Dec 2020 | 03 Dec 2020 |
MLA/2020/00549 Completed | Application - Maintenance of existing structures or assets | Hove Medina Terrace | Hove Medina Terrace | Beasley Christopher Limited | 03 Dec 2020 | 03 Dec 2020 |
MLA/2020/00550 Completed | Application - Deposit of markers | Sandon Dock Outfall marker buoy | Sandon Dock Outfall Marker Buoy | United Utilities Water Plc | 03 Dec 2020 | 03 Dec 2020 |
MLA/2020/00551 Completed | Application - Other removals | Berth 6 Stern dolphin reduction | Demolition Area | Dover Harbour Board | 04 Dec 2020 | 15 Apr 2021 |
MLA/2020/00553 Completed | Application - Maintenance of existing structures or assets | Flushing Sailing Club | Flushing Sailing Club | Fox Construction Solutions Limited | 07 Dec 2020 | 07 Dec 2020 |
MLA/2020/00554 Completed | Application - Maintenance of existing structures or assets | Reinstating fallen pile to support existing pontoon | Tenth House, New Road, Wootton Bridge, PO334HY (Wootton Creek) | Ms Adriana Mattei | 07 Dec 2020 | 07 Dec 2020 |
MLA/2020/00555 Completed | Application - Minor removals | Artificial sandbank experiment on Tregantle Beach | 1 m x 2 m Pit Will Be In This Area | Mr Olivier Bourdin | 07 Dec 2020 | 07 Dec 2020 |
MLA/2020/00556 Completed | Application - Maintenance of existing structures or assets | Sovereign Wharf Repairs | Sovereign Wharf | Moore Project Management Solutions Llp | 07 Dec 2020 | 07 Dec 2020 |
MLA/2020/00557 Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mamarine.Com Llp | 08 Dec 2020 | 08 Dec 2020 | |
MLA/2020/00558 Completed | Application - Deposit of markers | Laying dinghy racing marks in Christchurch Harbour that remain in place for more than 28 days and are only removed for maintenance. | Christchurch Harbour fixed racing marks | Highcliffe Sailing Club Limited | 08 Dec 2020 | 08 Dec 2020 |
MLA/2020/00559 Completed | Application - Deposit of markers | Workington outfall marker buoy chain replacement | Workington outfall marker buoy | United Utilities Water Plc | 08 Dec 2020 | 08 Dec 2020 |
MLA/2020/00560 Completed | Application - Deposit of markers | Seascale Outfall Marker Buoy | Seascales Outfall Marker Buoy | United Utilities Water Plc | 08 Dec 2020 | 08 Dec 2020 |
MLA/2020/00561 Completed | Application - Deposit of markers | Anchorsholme outfall marker buoy | Anchorsholme outfall marker buoy | United Utilities Water Plc | 09 Dec 2020 | 09 Dec 2020 |
MLA/2020/00562 Completed | Application - Minor removals | INT2019-083 Southbank Sailing Club Slipway Extension | Southbank Sailing Club Slipway | Intermarine Limited | 09 Dec 2020 | 09 Dec 2020 |
MLA/2020/00564 Completed | Application - Decommissioning of works | Decommissioning of Easton Broad Outfall, Suffolk | Polygon | Environment Agency-Ipswich | 10 Dec 2020 | 11 Mar 2022 |
MLA/2020/00567 Completed | Application - Maintenance of existing structures or assets | River Mite viaduct plain line track renewals | AATK142_RiverMiteWorkArea_TP_101220_WGS84 | Thomson Ecology Limited | 10 Dec 2020 | 10 Dec 2020 |
MLA/2020/00570/1 Completed | Application - Other deposits | Channel navigation buoy wave sensor calibration | Channel Waverider and Guard Buoys | Met Office-Exeter | 11 Dec 2020 | 08 Jun 2023 |
MLA/2020/00571 Completed | Application - Other deposits, Other removals | Drill Test | Drill Test in East Anglia 3 Offshore Wind Farm | Scottishpower Renewables (Uk) Limited | 11 Dec 2020 | 11 May 2022 |
MLA/2020/00572 Completed | Application - Navigational dredging (maintenance) | Ribble Link Dredging | magic_lines | Canal & River Trust 3 | 14 Dec 2020 | 11 Mar 2021 |
MLA/2020/00573 Completed | Application - Maintenance of existing structures or assets | Millbank Riverwall | Millbank River wall | F M Conway Limited | 14 Dec 2020 | 14 Dec 2020 |
MLA/2020/00574 Completed | Application - Maintenance of existing works | Cotehele Intertidal Habitat Creation Project | Cotehele | National Trust-Cotehele | 14 Dec 2020 | 10 Aug 2021 |
MLA/2020/00575 Completed | Application - Maintenance of existing structures or assets | P11692 Brunswick Dock Lock Gate | Brunswick Lock Gate, Liverpool Docks | British Waterways | 14 Dec 2020 | 14 Dec 2020 |
MLA/2020/00576 Completed | Application - Construction of new works | Lymington shores, Bridge Road, Lymington, SO41 9BZ | Redrow Homes Ltd-Basingstoke | 14 Dec 2020 | 23 Sep 2021 | |
MLA/2020/00578 Completed | Application - Maintenance of existing structures or assets | Allington Lock Gauge Boards | Allington Lock Gauge Boards | Jba-Consulting Ltd | 15 Dec 2020 | 15 Dec 2020 |
MLA/2020/00579/1 Completed | Application - Maintenance of existing works | Dynamic Bend Stiffener (DBS) Installation Works | London Array DBS Installation Works | London Array Limited | 15 Dec 2020 | 30 Sep 2021 |
MLA/2020/00580/1 Completed | Application - Sampling | Hornsea Three Geotechnical Survey (2021) | Orsted | 17 Dec 2020 | 08 Apr 2021 | |
MLA/2020/00581/1 Completed | Application - Incineration of any substance or object at sea | Dogger Bank A Array Site & Dogger Bank A and B Export Cable & Offshore Platform UXO Clearance | UXOClearanceArea_RH_20201216 | Dogger Bank Wind Farm | 17 Dec 2020 | 30 Jul 2021 |
MLA/2020/00582 Completed | Application - Other deposits | Deployment LIDAR buoys for measurements in SEP and DEP | SEP Lidar, DEP Lidar | Equinor Uk Limited | 18 Dec 2020 | 27 Apr 2021 |
MLA/2020/00583 Completed | Application - Other deposits, Other removals | Green Ocean Kelp Farm: Portland | Portland Harbour Seaweed Farm | Green Ocean Farming | 18 Dec 2020 | 09 Dec 2021 |
MLA/2020/00585 Completed | Application - Other deposits, Other removals | Licence to deposit and remove pre-seeded seaweed ropes within an active licensed aquaculture site. | Licensed site L/2015/00333/1 St Austell Bay | Mr Gary Rawle | 21 Dec 2020 | 19 Apr 2021 |
MLA/2020/00586 Completed | Application - Maintenance of existing works | Furzey Island Breakwater Repairs | Furzey Island | Perenco Uk Limited | 22 Dec 2020 | 25 May 2021 |
MLA/2020/00587 Completed | Application - Maintenance of existing structures or assets | River Lock 8 Repairs | River Lock 8 | Canal & River Trust | 22 Dec 2020 | 22 Dec 2020 |
MLA/2020/00588 Completed | Application - Decommissioning of works | Disinvestment of redundant mooring Dolphin (BTH1-DOLP-004) | Dolphin Disinvestment | Navigator Terminals Thames B.V. Ltd. | 24 Dec 2020 | 22 Mar 2021 |
MLA/2020/00589 Completed | Application - Maintenance of existing works | Sea Wall refurbishment 39 Hill Head Road PO14 3JJ | 39 Hill Head Road | A.V.B. (Hillhead) Limited | 28 Dec 2020 | 27 Jul 2021 |