Case DetailsStatusProject TypeProject TitleLocationsApplicant NameSubmission DateDecision Date
MLP/2011/00004WithdrawnPre-Application (Screening Request) - ConstructionUnited Utilities Plc19 Apr 2011
MLP/2011/00005WithdrawnPre-Application (Screening Request) - ConstructionScarborough Borough Council21 Apr 2011
MLP/2011/00006CompletedPre-Application (Screening Request) - ConstructionNewcastle Ne1 Limited21 Apr 2011
MLP/2011/00007CompletedPre-Application (Screening Request) - Construction, Dredged Material Disposal, DredgingPd Teesport Limited21 Apr 201106 Jul 2011
MLP/2011/00008WithdrawnPre-Application (Screening Request) - ConstructionOpus International26 Apr 2011
MLP/2011/00012CompletedPre-Application (Screening Request) - Construction, Dredged Material DisposalUnited Utilities Plc16 May 201117 Aug 2011
MLP/2011/00015CompletedPre-Application (Scoping Request) - ConstructionScarborough Borough Council06 Jun 201129 Jul 2011
MLP/2011/00020WithdrawnPre-Application (Screening Request) - Construction, Dredged Material Disposal, DredgingMvb16 Jun 2011
MLP/2011/00022CompletedPre-Application (Screening Request) - ConstructionCanterbury City Council22 Jun 201109 Aug 2011
MLP/2011/00026CompletedPre-Application (Scoping Request) - Aggregate DredgingBritannia Aggregates Limited27 Jun 201119 Aug 2011
MLP/2011/00028CompletedPre-Application (Screening Request) - ConstructionHyder Consulting (Uk) Limited30 Jun 201129 Nov 2011
MLP/2011/00034CompletedPre-Application (Screening Request) - ConstructionNational Grid Electricity Transmission Plc13 Jul 201116 Sep 2011
MLP/2011/00035CompletedPre-Application (Screening Request) - ConstructionHalcrow Group Limited15 Jul 201112 Oct 2011
MLP/2011/00039WithdrawnPre-Application (Screening Request) - ConstructionEnvironment Agency28 Jul 2011
MLP/2011/00045CompletedPre-Application (Screening Request) - Dredged Material Disposal, DredgingSouth East England Development Agency03 Aug 201108 Nov 2011
MLP/2011/00048WithdrawnPre-Application (Screening Request) - ConstructionViridor Waste Kent Limited05 Aug 2011
MLP/2011/00049CompletedPre-Application (Screening Request) - Aggregate DredgingHanson Aggregates Marine Limited05 Aug 201128 Sep 2011
MLP/2011/00050CompletedPre-Application (Screening Request) - Aggregate DredgingTarmac Marine Dredging Limited05 Aug 201111 Nov 2011
MLP/2011/00051CompletedPre-Application (Screening Request) - Construction, Dredged Material Disposal, DredgingThe Royal Motor Yacht Club05 Aug 201130 Nov 2011
MLP/2011/00053WithdrawnPre-Application (Screening Request) - Aggregate DredgingMarine Biological Association09 Aug 2011
MLP/2011/00056CompletedPre-Application (Screening Request) - ConstructionViridor Waste Kent Limited16 Aug 201105 Dec 2011
MLP/2011/00059CompletedPre-Application (Screening Request) - ConstructionEnvironment Agency (Southern Region)22 Aug 201119 Oct 2011
MLP/2011/00065CompletedPre-Application (Scoping Request) - ConstructionEnvironment Agency (Warrington)01 Sep 201102 Nov 2011
MLP/2011/00068CompletedPre-Application (Screening Request) - Removals (inc. Grab Samples)York Potash Ltd09 Sep 201129 May 2012
MLP/2011/00071CompletedPre-Application (Screening Request) - ConstructionNational Grid Electricity Transmission Plc14 Sep 201120 Oct 2011
MLP/2011/00073CompletedPre-Application (Scoping Request) - Dredged Material Disposal, DredgingPort Of Sheerness Limited16 Sep 201111 Nov 2011
MLP/2011/00084CompletedPre-Application (Scoping Request) - Construction, Dredged Material Disposal, Removals (inc. Grab Samples)Pd Teesport Limited06 Oct 201114 Dec 2011
MLP/2011/00086CompletedPre-Application (Screening Request) - Construction, Removals (inc. Grab Samples)South Tyneside Council10 Oct 201106 Mar 2012
MLP/2011/00088CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingVolker Dredging Ltd14 Oct 201120 Dec 2011
MLP/2011/00089CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingNorthwood(Fareham)Limited14 Oct 201120 Dec 2011
MLP/2011/00093CompletedPre-Application (Scoping Request) - Construction, DredgingPort Of Sheerness Limited21 Oct 201119 Dec 2011
MLP/2011/00094CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingCemex Uk Marine Limited24 Oct 201118 Jan 2012
MLP/2011/00097CompletedPre-Application (Screening Request) - ConstructionSaudi Basic Industries Corporation25 Oct 201123 Dec 2011
MLP/2011/00100CompletedPre-Application (Screening Request) - ConstructionUnited Utilities Plc28 Oct 201109 Jan 2012
MLP/2011/00103CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingTarmac Marine Dredging Limited31 Oct 201113 Mar 2012
MLP/2011/00106CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingTarmac Marine Dredging Limited02 Nov 201104 Jul 2012
MLP/2011/00107CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingTarmac Marine Dredging Limited02 Nov 201126 Jun 2012
MLP/2011/00108CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingTarmac Marine Dredging Limited02 Nov 201121 Aug 2012
MLP/2011/00111WithdrawnPre-Application (Environmental Statement Review) - Aggregate DredgingTarmac Marine Dredging Ltd03 Nov 2011
MLP/2011/00112WithdrawnPre-Application (Environmental Statement Review) - Aggregate DredgingCemex Uk Marine Limited04 Nov 2011
MLP/2011/00113CompletedPre-Application (Scoping Request) - ConstructionRwe Npower Plc08 Nov 201117 Jan 2012
MLP/2011/00115CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingHanson Aggregates Marine Limited09 Nov 201102 Mar 2012
MLP/2011/00117CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingBritannia Aggregates Limited14 Nov 201123 Jul 2013
MLP/2011/00119CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingVolker Dredging Ltd17 Nov 201106 Mar 2012
MLP/2011/00121CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingCemex Uk Marine Limited18 Nov 201106 Mar 2012
MLP/2011/00122CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingHanson Aggregates Marine Limited18 Nov 201118 May 2012
MLP/2011/00125CompletedPre-Application (Scoping Request) - ConstructionHavant Borough Council24 Nov 201107 Feb 2012
MLP/2011/00132CompletedPre-Application (Screening Request) - ConstructionGwynt Y Mor Offshore Wind Farm Limited29 Nov 201130 Jan 2012
MLP/2011/00133CompletedPre-Application (Scoping Request) - ConstructionEnvironment Agency (Southern Region)29 Nov 201120 Jan 2012
MLP/2011/00136WithdrawnPre-Application (Environmental Statement Review) - Aggregate DredgingCemex Uk Marine Ltd05 Dec 2011
MLP/2011/00139CompletedPre-Application (Screening Request) - ConstructionScarborough Borough Council06 Dec 201116 Mar 2012
MLP/2011/00141CompletedPre-Application (Screening Request) - Dredged Material Disposal, DredgingAssociated British Ports, Southampton08 Dec 201127 Jan 2012
MLP/2011/00142CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingCemex Uk Marine Limited09 Dec 201114 Aug 2014
MLP/2011/00145CompletedPre-Application (Environmental Statement Review) - ConstructionEnvironment Agency (Tech Support)13 Dec 201111 Apr 2012
MLP/2011/00149CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingCemex Uk Marine Limited15 Dec 201112 Mar 2012
MLP/2011/00153CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingHanson Aggregates Marine Limited20 Dec 201130 Mar 2012
MLP/2011/00155CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingCemex Uk Marine Limited21 Dec 201112 Mar 2012
MLP/2011/00156CompletedPre-Application (Scoping Request) - Construction, DredgingKendall Bros. (Portsmouth) Limited22 Dec 201115 Mar 2012
MLP/2011/00157CompletedPre-Application (Scoping Request) - Aggregate DredgingCemex Uk Marine Limited23 Dec 201120 Apr 2012
MLP/2012/00001WithdrawnPre-Application (Environmental Statement Review) - Alternative Use of Dredged MaterialHarwich Haven Authority03 Jan 2012
MLP/2012/00002CompletedPre-Application (Screening Request) - ConstructionNetwork Rail Infrastructure Limited05 Jan 201201 May 2012
MLP/2012/00008CompletedPre-Application (Screening Request) - Construction, Removals (inc. Grab Samples)The Bristol Port Company16 Jan 201212 Apr 2012
MLP/2012/00010CompletedPre-Application (Scoping Request) - Dredged Material DisposalHarwich Haven Authority17 Jan 2012
MLP/2012/00012CompletedPre-Application (Scoping Request) - Alternative Use of Dredged Material, Construction, Dredged Material Disposal, Dredging, Removals (inc. Grab Samples)Hmnb Portsmouth20 Jan 201222 Mar 2012
MLP/2012/00016CompletedPre-Application (Screening Request) - Removals (inc. Grab Samples)Environment Agency24 Jan 201220 Apr 2012
MLP/2012/00020CompletedPre-Application (Screening Request) - ConstructionVolker Stevin27 Jan 201209 May 2012
MLP/2012/00022CompletedPre-Application (Screening Request) - ConstructionScarborough Borough Council02 Feb 201224 Apr 2012
MLP/2012/00027CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingCemex Uk Marine Limited13 Feb 201223 May 2012
MLP/2012/00030CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingVolker Dredging Ltd16 Feb 201226 Jun 2012
MLP/2012/00031CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingCemex Uk Marine Limited17 Feb 201226 Jun 2012
MLP/2012/00035CompletedPre-Application (Scoping Request) - Aggregate DredgingHanson Aggregates Marine Limited21 Feb 201216 May 2012
MLP/2012/00045CompletedPre-Application (Scoping Request) - Aggregate DredgingDeme Building Materials Limited06 Mar 201220 Jun 2012
MLP/2012/00046CompletedPre-Application (Environmental Statement Review) - ConstructionNational Grid Electricity Transmission Plc07 Mar 201217 Dec 2013
MLP/2012/00049CompletedPre-Application (Scoping Request) - Aggregate DredgingHanson Aggregates Marine Limited13 Mar 201225 May 2012
MLP/2012/00050CompletedPre-Application (Scoping Request) - Aggregate DredgingHanson Aggregates Marine Limited13 Mar 201222 Jun 2012
MLP/2012/00051CompletedPre-Application (Scoping Request) - Aggregate DredgingHanson Aggregates Marine Limited13 Mar 201220 Jun 2012
MLP/2012/00052CompletedPre-Application (Scoping Request) - Aggregate DredgingHanson Aggregates Marine Limited13 Mar 201215 Jun 2012
MLP/2012/00053CompletedPre-Application (Screening Request) - ConstructionEnvironment Agency16 Mar 201229 May 2012
MLP/2012/00054CompletedPre-Application (Screening Request) - ConstructionThames Water Utilities Limited20 Mar 201231 Jul 2012
MLP/2012/00056CompletedPre-Application (Screening Request) - Construction, DredgingA.V.Dawson Limited26 Mar 201213 Jul 2012
MLP/2012/00061CompletedPre-Application (Screening Request) - ConstructionEast Riding Of Yorkshire Council30 Mar 201222 Jun 2012
MLP/2012/00063CompletedPre-Application (Screening Request) - ConstructionScarborough Borough Council02 Apr 201230 May 2012
MLP/2012/00064CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingHanson Aggregates Marine Limited03 Apr 201209 Jul 2012
MLP/2012/00065CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingHanson Aggregates Marine Limited03 Apr 201206 Jul 2012
MLP/2012/00067CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingCemex Uk Marine Limited04 Apr 201213 Jul 2012
MLP/2012/00071CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingCemex Uk Marine Limited12 Apr 201226 Jun 2012
MLP/2012/00081CompletedPre-Application (Scoping Request) - Dredged Material Disposal, DredgingAssociated British Ports, Southampton23 Apr 201227 Jun 2012
MLP/2012/00082CompletedPre-Application (Scoping Request) - Alternative Use of Dredged Material, Construction, Dredged Material Disposal, DredgingPeel Ports Limited24 Apr 201211 Jul 2012
MLP/2012/00084CompletedPre-Application (Screening Request) - Construction, Dredged Material Disposal, DredgingHyder Consulting (Uk) Limited30 Apr 201203 Aug 2012
MLP/2012/00085CompletedPre-Application (Screening Request) - ConstructionScarborough Borough Council30 Apr 201213 Jul 2012
MLP/2012/00091CompletedPre-Application (Screening Request) - ConstructionJ. Murphy & Sons Limited02 May 201225 Jul 2012
MLP/2012/00097CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingCemex Uk Marine Limited09 May 201203 Aug 2012
MLP/2012/00099CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingCemex Uk Marine Limited10 May 201203 Aug 2012
MLP/2012/00105CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingHanson Aggregates Marine Limited15 May 201229 Aug 2012
MLP/2012/00111CompletedPre-Application (Screening Request) - Construction, Dredging, Miscellaneous DisposalEdf Energy Plc18 May 201225 May 2012
MLP/2012/00113CompletedPre-Application (Scoping Request) - Aggregate DredgingHanson Aggregates Marine Limited21 May 201215 Aug 2012
MLP/2012/00115CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingBritannia Aggregates Limited22 May 201220 Sep 2012
MLP/2012/00123CompletedPre-Application (Scoping Request) - Aggregate Dredging, Removals (inc. Grab Samples)Tarmac Marine Dredging Limited07 Jun 201205 Mar 2013
MLP/2012/00124CompletedPre-Application (Scoping Request) - Aggregate Dredging, Removals (inc. Grab Samples)Tarmac Marine Dredging Limited07 Jun 201221 Jan 2013
MLP/2012/00129CompletedPre-Application (Scoping Request) - Aggregate DredgingWestminster Gravels Limited13 Jun 201211 Sep 2012
MLP/2012/00133CompletedPre-Application (Screening Request) - Construction, Dredged Material Disposal, DredgingRoundset (Westingly) Ltd15 Jun 201229 Aug 2012
MLP/2012/00140CompletedPre-Application (Screening Request) - ConstructionEnvironment Agency21 Jun 201217 Oct 2012
MLP/2012/00144CompletedPre-Application (Screening Request) - ConstructionAssociated British Ports.27 Jun 201205 Sep 2012
MLP/2012/00148WithdrawnPre-Application (Screening Request) - ConstructionAble Uk Ltd04 Jul 2012
MLP/2012/00151CompletedPre-Application (Screening Request) - RenewablesOcean Energy Limited06 Jul 201231 Aug 2012
MLP/2012/00153CompletedPre-Application (Screening Request) - DredgingAble Uk Limited09 Jul 201228 Sep 2012
MLP/2012/00155CompletedPre-Application (Scoping Request) - ConstructionGateway Gas12 Jul 201220 Sep 2012
MLP/2012/00156CompletedPre-Application (Screening Request) - DredgingMarina Developments Limited13 Jul 201227 Sep 2012
MLP/2012/00158CompletedPre-Application (Screening Request) - ConstructionMarina Developments Limited18 Jul 201222 Aug 2012
MLP/2012/00162CompletedPre-Application (Screening Request) - Construction, DredgingMvbjv23 Jul 201224 Jul 2012
MLP/2012/00164CompletedPre-Application (Screening Request) - ConstructionEnvironment Agency24 Jul 201231 Aug 2012
MLP/2012/00170WithdrawnPre-Application (Environmental Statement Review) - Construction, DredgingMvb29 Jul 2012
MLP/2012/00193CompletedPre-Application (Screening Request) - ConstructionUnited Utilities13 Aug 201229 Oct 2012
MLP/2012/00194CompletedPre-Application (Screening Request) - ConstructionBlackpool Borough Council13 Aug 201213 Dec 2012
MLP/2012/00197CompletedPre-Application (Screening Request) - ConstructionDevon County Council14 Aug 201209 Nov 2012
MLP/2012/00200CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingVolker Dredging Ltd16 Aug 201223 Nov 2012
MLP/2012/00209CompletedPre-Application (Scoping Request) - RenewablesTidal Energy Limited21 Aug 201220 Apr 2015
MLP/2012/00211CompletedPre-Application (Scoping Request) - ConstructionNational Grid Commercial Holdings Limited22 Aug 201210 Dec 2012
MLP/2012/00212CompletedPre-Application (Scoping Request) - Dredged Material DisposalGrouped under: Harwich dredge and disposal Showing 2 of 9 casesHarwich Haven Authority22 Aug 201221 Jan 2013
MLP/2012/00217CompletedPre-Application (Screening Request) - ConstructionRnli24 Aug 201202 Nov 2012
MLP/2012/00219CompletedPre-Application (Screening Request) - ConstructionWard Williams Holdings Limited31 Aug 201227 Nov 2012
MLP/2012/00223CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingDeme Building Materials Limited06 Sep 201211 Jan 2013
MLP/2012/00228CompletedPre-Application (Screening Request) - ConstructionDurham County Council11 Sep 201220 Nov 2012
MLP/2012/00243CompletedPre-Application (Screening Request) - Construction, Removals (inc. Grab Samples)Sea View Yacht Club Limited28 Sep 201220 Nov 2012
MLP/2012/00244CompletedPre-Application (Screening Request) - ConstructionWyre Borough Council01 Oct 201213 Nov 2012
MLP/2012/00246CompletedPre-Application (Screening Request) - ConstructionConnect Roads Limited03 Oct 201227 Nov 2012
MLP/2012/00253CompletedPre-Application (Screening Request) - ConstructionAble Uk Ltd10 Oct 201213 Nov 2012
MLP/2012/00254CompletedPre-Application (Screening Request) - Construction, DredgingAble Uk Ltd10 Oct 201213 Nov 2012
MLP/2012/00259CompletedPre-Application (Scoping Request) - Alternative Use of Dredged Material, Construction, Dredged Material Disposal, Dredging, Removals (inc. Grab Samples)Newhaven Port And Properties Ltd16 Oct 201218 Jan 2013
MLP/2012/00267CompletedPre-Application (Screening Request) - ConstructionNorthumberland County Council29 Oct 201218 Dec 2012
MLP/2012/00281CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingHanson Aggregates Marine Limited12 Nov 201207 Feb 2013
MLP/2012/00292CompletedPre-Application (Screening Request) - ConstructionSuffolk County Council20 Nov 201205 Mar 2013
MLP/2012/00305CompletedPre-Application (Environmental Statement Review) - ConstructionWard Williams Holdings Limited28 Nov 201221 May 2013
MLP/2012/00306CompletedPre-Application (Screening Request) - ConstructionMarina Developments Limited29 Nov 201222 Feb 2013
MLP/2012/00308CompletedPre-Application (Scoping Request) - Aggregate DredgingMarine Minerals Limited03 Dec 201225 Apr 2013
MLP/2012/00316CompletedPre-Application (Screening Request) - ConstructionNational Grid Electricity Transmission Plc12 Dec 201221 Feb 2013
MLP/2012/00319CompletedPre-Application (Screening Request) - ConstructionRnli18 Dec 201222 Feb 2013
MLP/2012/00321CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingBritannia Aggregates Limited19 Dec 201203 Apr 2013
MLP/2012/00322CompletedPre-Application (Scoping Request) - Aggregate DredgingGrouped under: Aggregate Area 488 Showing 2 of 6 casesCemex Uk Marine Limited20 Dec 201201 Feb 2013
MLP/2012/00323CompletedPre-Application (Scoping Request) - Aggregate Dredging, Removals (inc. Grab Samples)Tarmac Marine Dredging Limited20 Dec 201201 Feb 2013
MLP/2012/00324CompletedPre-Application (Screening Request) - ConstructionEnvironment Agency21 Dec 201204 Mar 2013
MLP/2012/00325CompletedPre-Application (Scoping Request) - Alternative Use of Dredged Material, Construction, DredgingMorgan Sindall Group Plc21 Dec 201230 Aug 2013
MLP/2012/00326CompletedPre-Application (Screening Request) - Construction, Dredged Material Disposal, DredgingHyder Consulting (Uk) Limited21 Dec 201227 Mar 2013
MLP/2012/00327CompletedPre-Application (Screening Request) - RenewablesWave Hub Limited22 Dec 201212 Apr 2013
MLP/2013/00001CompletedPre-Application (Screening Request) - ConstructionEnvironment Agency02 Jan 201322 Mar 2013
MLP/2013/00019CompletedPre-Application (Scoping Request) - Construction, Removals (inc. Grab Samples), RenewablesIsle Of Wight Council18 Jan 201319 Apr 2013
MLP/2013/00022CompletedPre-Application (Screening Request) - Construction, DredgingPremier Marinas (Southsea) Limited21 Jan 201328 Jun 2013
MLP/2013/00025CompletedPre-Application (Scoping Request) - Aggregate DredgingCemex Uk Marine Limited24 Jan 201330 Apr 2013
MLP/2013/00031CompletedPre-Application (Screening Request) - ConstructionHartlepool Borough Council31 Jan 201310 May 2013
MLP/2013/00034CompletedPre-Application (Screening Request) - ConstructionMrs Susan Simmonite04 Feb 201314 Feb 2013
MLP/2013/00035CompletedPre-Application (Environmental Statement Review) - ConstructionMrs Susan Simmonite04 Feb 201328 Mar 2013
MLP/2013/00038CompletedPre-Application (Screening Request) - ConstructionHoly Island Of Lindisfarne Community Development Trust06 Feb 201318 Mar 2013
MLP/2013/00041CompletedPre-Application (Screening Request) - ConstructionMr Alan Nesbitt07 Feb 201301 Mar 2013
MLP/2013/00044CompletedPre-Application (Screening Request) - ConstructionAssociated British Ports.08 Feb 201316 May 2013
MLP/2013/00049WithdrawnPre-Application (Screening Request) - Removals (inc. Grab Samples)Harwich Haven Authority15 Feb 2013
MLP/2013/00052CompletedPre-Application (Screening Request) - Construction, Dredged Material DisposalMiss Laura Morrish18 Feb 201307 May 2013
MLP/2013/00064CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingHanson Aggregates Limited28 Feb 201331 May 2013
MLP/2013/00068CompletedPre-Application (Screening Request) - ConstructionDean & Dyball Civil Engineering Limited06 Mar 201313 Mar 2013
MLP/2013/00070CompletedPre-Application (Scoping Request) - Construction, Dredged Material Disposal, DredgingHutchison Ports (Uk) Limited07 Mar 201308 May 2013
MLP/2013/00074CompletedPre-Application (Environmental Statement Review) - Construction, DredgingPort Of Tyne Public Limited Company08 Mar 201322 May 2013
MLP/2013/00077CompletedPre-Application (Scoping Request) - ConstructionRoamquest Limited13 Mar 201309 May 2013
MLP/2013/00078CompletedPre-Application (Screening Request) - ConstructionSunderland Point Community Association14 Mar 201329 Apr 2013
MLP/2013/00080CompletedPre-Application (Screening Request) - ConstructionMagnox Limited15 Mar 201314 Jun 2013
MLP/2013/00081CompletedPre-Application (Screening Request) - ConstructionNg Bailey It Services Limited18 Mar 201308 May 2013
MLP/2013/00084CompletedPre-Application (Screening Request) - ConstructionUnited Utilities Plc25 Mar 201315 May 2013
MLP/2013/00087CompletedPre-Application (Screening Request) - Removals (inc. Grab Samples)Syd Bishop & Sons (Demolition) Ltd27 Mar 201308 May 2013
MLP/2013/00088CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingHanson Aggregates Ltd28 Mar 201303 Jul 2013
MLP/2013/00090CompletedPre-Application (Screening Request) - Dredged Material Disposal, DredgingParsons Brinckerhoff02 Apr 201311 Jun 2013
MLP/2013/00091CompletedPre-Application (Scoping Request) - Aggregate Dredging, Removals (inc. Grab Samples)Grouped under: Area 500 Aggregates Dredge Showing 2 of 4 casesTarmac Marine Dredging Limited02 Apr 201301 Aug 2013
MLP/2013/00092CompletedPre-Application (Scoping Request) - ConstructionPhillips 66 Limited02 Apr 201331 May 2013
MLP/2013/00093CompletedPre-Application (Scoping Request) - Aggregate Dredging, Removals (inc. Grab Samples)Hanson Aggregates Marine Limited03 Apr 201325 Sep 2013
MLP/2013/00095CompletedPre-Application (Screening Request) - ConstructionArun District Council04 Apr 201319 Jul 2013
MLP/2013/00096WithdrawnPre-Application (Screening Request) - RenewablesTriton Knoll Offshore Wind Farm Limited08 Apr 2013
MLP/2013/00101CompletedPre-Application (Scoping Request) - Aggregate Dredging, Removals (inc. Grab Samples)Sea Aggregates Limited15 Apr 201319 Jun 2013
MLP/2013/00108CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingHanson Aggregates Marine Limited18 Apr 201308 Aug 2013
MLP/2013/00111CompletedPre-Application (Screening Request) - ConstructionMr Dave Wassell24 Apr 201304 Jun 2013
MLP/2013/00114CompletedPre-Application (Screening Request) - ConstructionEnvironment Agency (Warrington)30 Apr 201306 Jun 2013
MLP/2013/00115CompletedPre-Application (Screening Request) - ConstructionEast Devon District Council02 May 201307 Aug 2013
MLP/2013/00116CompletedPre-Application (Screening Request) - ConstructionBarrow Borough Council08 May 201307 Aug 2013
MLP/2013/00117CompletedPre-Application (Screening Request) - ConstructionSuffolk County Council08 May 201324 Jan 2014
MLP/2013/00128CompletedPre-Application (Screening Request) - ConstructionEnvironment Agency-Southern Region20 May 201330 Jul 2013
MLP/2013/00133CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingDeme Building Materials Nv23 May 201320 Aug 2013
MLP/2013/00144CompletedPre-Application (Screening Request) - Dredged Material Disposal, DredgingLymington Harbour Commissioners07 Jun 201318 Jul 2013
MLP/2013/00145CompletedPre-Application (Screening Request) - ConstructionTendring District Council07 Jun 201330 Aug 2013
MLP/2013/00146CompletedPre-Application (Scoping Request) - Aggregate DredgingWestminster Gravels Limited10 Jun 201319 Aug 2013
MLP/2013/00147CompletedPre-Application (Screening Request) - ConstructionBt Group Plc12 Jun 201323 Sep 2013
MLP/2013/00150CompletedPre-Application (Scoping Request) - ConstructionFolkestone Harbour Company Limited13 Jun 201330 Jul 2013
MLP/2013/00151CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingCemex Uk Marine Limited18 Jun 201327 Sep 2013
MLP/2013/00164CompletedPre-Application (Screening Request) - ConstructionCornwall Council08 Jul 201306 Sep 2013
MLP/2013/00165CompletedPre-Application (Screening Request) - Construction, Removals (inc. Grab Samples)Grouped under: Exeter Flood Defence Showing 3 of 5 casesEnvironment Agency - South West Region09 Jul 201312 Sep 2013
MLP/2013/00168CompletedPre-Application (Screening Request) - ConstructionGrouped under: Brighton Marina Master Case Showing 3 of 10 casesThe Brighton Marina Company Ltd19 Jul 201309 Sep 2013
MLP/2013/00180CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingCemex Uk Marine Limited30 Jul 201314 Oct 2013
MLP/2013/00183CompletedPre-Application (Environmental Statement Review) - ConstructionMerseylink01 Aug 201303 Oct 2013
MLP/2013/00189CompletedPre-Application (Environmental Statement Review) - Construction, Removals (inc. Grab Samples)St George Central London Limited08 Aug 201328 Oct 2013
MLP/2013/00201CompletedPre-Application (Screening Request) - Construction, Dredged Material Disposal, DredgingAceteach Construction Ltd03 Sep 201311 Nov 2013
MLP/2013/00205CompletedPre-Application (Screening Request) - ConstructionEnvironment Agency10 Sep 201306 Dec 2013
MLP/2013/00207CompletedPre-Application (Screening Request) - Aggregate DredgingHanson Aggregates Marine Limited11 Sep 201323 Oct 2013
MLP/2013/00221CompletedPre-Application (Screening Request) - ConstructionNorth Tyneside Council27 Sep 201326 Nov 2013
MLP/2013/00222CompletedPre-Application (Screening Request) - ConstructionStockvale Limited27 Sep 201304 Dec 2013
MLP/2013/00225CompletedPre-Application (Screening Request) - ConstructionRedrow Homes Limited01 Oct 201309 Dec 2013
MLP/2013/00227CompletedPre-Application (Screening Request) - Construction, Removals (inc. Grab Samples)Grouped under: Exeter Flood Defence Showing 3 of 5 casesEnvironment Agency - South West Region14 Oct 201318 Oct 2013
MLP/2013/00238CompletedPre-Application (Environmental Statement Review) - Construction, Removals (inc. Grab Samples)Kier Construction30 Oct 201306 Dec 2013
MLP/2013/00242CompletedPre-Application (Scoping Request) - ConstructionEast Devon District Council05 Nov 201324 Jan 2014
MLP/2013/00247CompletedPre-Application (Screening Request) - ConstructionHutchison Whampoa Properties (Europe) Limited08 Nov 201317 Jan 2014
MLP/2013/00264CompletedPre-Application (Screening Request) - Construction, Removals (inc. Grab Samples)Environment Agency27 Nov 201313 May 2014
MLP/2013/00270CompletedPre-Application (Scoping Request) - ConstructionNational Grid International Limited03 Dec 201319 Feb 2014
MLP/2013/00278CompletedPre-Application (Environmental Statement Review) - Aggregate DredgingCemex Uk Marine Limited09 Dec 201326 Feb 2014
MLP/2013/00279CompletedPre-Application (Scoping Request) - ConstructionTransport For London09 Dec 201320 Mar 2014
MLP/2013/00281CompletedPre-Application (Screening Request) - ConstructionLondon Legacy Development Corporation11 Dec 201324 Feb 2014
MLP/2013/00283CompletedPre-Application (Screening Request) - RenewablesCammell Laird Shiprepairers & Shipbuilders Limited13 Dec 201324 Jan 2014
MLP/2013/00285CompletedPre-Application (Screening Request) - Dredged Material DisposalAble Uk Limited19 Dec 201319 Dec 2013
MLP/2014/00006CompletedPre-Application (Environmental Statement Review) - Dredged Material DisposalHarwich Haven Authority13 Jan 201405 Apr 2016
MLP/2014/00011CompletedPre-Application (Screening Request) - ConstructionMr Alastair Tindle17 Jan 201417 Feb 2014
MLP/2014/00016CompletedPre-Application (Scoping Request) - ConstructionLinden Homes Southern Ltd26 Jan 201407 Mar 2014
MLP/2014/00020CompletedPre-Application (Screening Request) - Alternative Use of Dredged Material, Construction, DredgingHampstead Homes (London) Ltd29 Jan 201411 Apr 2014
MLP/2014/00025CompletedPre-Application (Screening Request) - ConstructionThe Crown Estate31 Jan 201418 Mar 2014
MLP/2014/00026CompletedPre-Application (Screening Request) - ConstructionNorthumberland County Council31 Jan 201410 Mar 2014
MLP/2014/00027CompletedPre-Application (Screening Request) - ConstructionNetwork Rail Limited31 Jan 201401 May 2014
MLP/2014/00030CompletedPre-Application (Scoping Request) - RenewablesMinesto Uk Limited07 Feb 201418 Jul 2014
MLP/2014/00045CompletedPre-Application (Scoping Request) - Dredged Material Disposal, DredgingGrouped under: Harwich dredge and disposal Showing 2 of 9 casesHarwich Haven Authority26 Feb 201421 May 2014
MLP/2014/00056CompletedPre-Application (Screening Request) - ConstructionRspb18 Mar 201403 Jul 2014
MLP/2014/00060CompletedPre-Application (Scoping Request) - ConstructionMiss Laura Morrish19 Mar 201411 Jul 2014
MLP/2014/00062CompletedPre-Application (Screening Request) - Construction, Dredged Material Disposal, DredgingPort Of Tyne Authority20 Mar 201401 Jul 2014
MLP/2014/00064CompletedPre-Application (Screening Request) - ConstructionSomerset County Council25 Mar 201411 Apr 2014
MLP/2014/00076CompletedPre-Application (Screening Request) - ConstructionGrouped under: Exeter Flood Defence Showing 3 of 5 casesEnvironment Agency - South West Region04 Apr 201429 May 2014
MLP/2014/00080CompletedPre-Application (Screening Request) - ConstructionCrest Nicholson Operations Limited09 Apr 201401 Jul 2014
MLP/2014/00097CompletedPre-Application (Scoping Request) - ConstructionLand Use Consultants24 Apr 201402 Jun 2014
MLP/2014/00104CompletedPre-Application (Screening Request) - ConstructionNewcastle City Council25 Apr 201412 Jun 2014
MLP/2014/00107CompletedPre-Application (Screening Request) - ConstructionGrouped under: Brighton Marina Master Case Showing 3 of 10 casesBrighton Marina Company Limited(The)30 Apr 201418 Jul 2014
MLP/2014/00115CompletedPre-Application (Screening Request) - ConstructionHartlepool Borough Council08 May 201418 Jul 2014
MLP/2014/00124CompletedPre-Application (Screening Request) - ConstructionBallymore Properties Ltd13 May 201414 Jul 2014
MLP/2014/00143CompletedPre-Application (Screening Request) - ConstructionGrouped under: Brighton Marina Master Case Showing 3 of 10 casesBrighton Marina Company Limited(The)28 May 201424 Jun 2014
MLP/2014/00148CompletedPre-Application (Screening Request) - ConstructionNorthumberland County Council30 May 201427 Oct 2015
MLP/2014/00159CompletedPre-Application (Screening Request) - ConstructionUnited Utilities12 Jun 201402 Sep 2014
MLP/2014/00170CompletedPre-Application (Screening Request) - ConstructionBrierely Groom24 Jun 201429 Aug 2014
MLP/2014/00175CompletedPre-Application (Environmental Statement Review) - ConstructionGoodman25 Jun 201428 Aug 2014
MLP/2014/00177CompletedPre-Application (Scoping Request) - ConstructionEnvironment Agency26 Jun 201429 Sep 2014
MLP/2014/00181CompletedPre-Application (Screening Request) - ConstructionEastern Solent Coastal Partnership30 Jun 201422 Aug 2014
MLP/2014/00184CompletedPre-Application (Screening Request) - ConstructionMmc Developments Limited02 Jul 201413 Oct 2014
MLP/2014/00190CompletedPre-Application (Screening Request) - Removals (inc. Grab Samples)Mr Robert Telford08 Jul 201417 Oct 2014
MLP/2014/00201CompletedPre-Application (Scoping Request) - ConstructionShire Oak Energy17 Jul 201413 Oct 2014
MLP/2014/00208CompletedPre-Application (Screening Request) - ConstructionHartlepool Borough Council24 Jul 201418 Sep 2014
MLP/2014/00210CompletedPre-Application (Scoping Request) - Alternative Use of Dredged Material, Construction, Dredging, Removals (inc. Grab Samples)Environment Agency – South West Reg25 Jul 201421 Dec 2015
MLP/2014/00211CompletedPre-Application (Screening Request) - Construction, Dredged Material Disposal, DredgingBae Systems28 Jul 201414 Nov 2014
MLP/2014/00214CompletedPre-Application (Screening Request) - ConstructionHistoric Royal Palaces29 Jul 201423 Sep 2014
MLP/2014/00226CompletedPre-Application (Screening Request) - DredgingGrouped under: Swan Hunter Re-devlopment Showing 2 of 5 casesNorth Tyneside Council18 Aug 201420 Oct 2014
MLP/2014/00228CompletedPre-Application (Scoping Request) - Alternative Use of Dredged Material, Construction, Dredged Material DisposalHavant Borough Council19 Aug 201416 Sep 2016
MLP/2014/00238CompletedPre-Application (Screening Request) - ConstructionAssociated British Ports05 Sep 201407 Nov 2014
MLP/2014/00242CompletedPre-Application (Screening Request) - ConstructionSeaham Marina09 Sep 201419 Nov 2014
MLP/2014/00244CompletedPre-Application (Screening Request) - ConstructionMr Peter John Polley11 Sep 201406 Nov 2014
MLP/2014/00255CompletedPre-Application (Scoping Request) - Construction, DredgingLondon River Services Limited19 Sep 201405 Dec 2014
MLP/2014/00262CompletedPre-Application (Screening Request) - Alternative Use of Dredged Material, Construction, Dredged Material Disposal, DredgingA&P24 Sep 201410 Oct 2014
MLP/2014/00263CompletedPre-Application (Screening Request) - Aggregate Dredging, ConstructionEnvironment Agency29 Sep 201401 May 2015
MLP/2014/00266CompletedPre-Application (Screening Request) - ConstructionEnvironment Agency30 Sep 201419 Dec 2014
MLP/2014/00271CompletedPre-Application (Scoping Request) - Construction, Dredged Material Disposal, DredgingEsso Petroleum Company Limited01 Oct 201425 Feb 2015
MLP/2014/00274CompletedPre-Application (Screening Request) - Construction, Removals (inc. Grab Samples)Rnli02 Oct 201406 Nov 2014
MLP/2014/00281CompletedPre-Application (Screening Request) - Construction, Removals (inc. Grab Samples)Premier Marinas (Hamble) Limited06 Oct 201407 Jan 2015
MLP/2014/00286CompletedPre-Application (Screening Request) - ConstructionQinetiq10 Oct 201408 Dec 2014
MLP/2014/00290CompletedPre-Application (Screening Request) - ConstructionKent County Council14 Oct 201421 Jan 2015
MLP/2014/00291CompletedPre-Application (Screening Request) - ConstructionMrs Merle Leeds15 Oct 201412 Dec 2014
MLP/2014/00318CompletedPre-Application (Screening Request) - ConstructionLancashire County Council06 Nov 201402 Dec 2014
MLP/2014/00325CompletedPre-Application (Environmental Statement Review) - Aggregate Dredging, Removals (inc. Grab Samples)Grouped under: Area 500 Aggregates Dredge Showing 2 of 4 casesHanson Aggregates Marine Limited10 Nov 201410 Feb 2015
MLP/2014/00326WithdrawnPre-Application (Screening Request) - Construction, Dredged Material Disposal, DredgingGrouped under: Swan Hunter Re-devlopment Showing 2 of 5 casesCapita Property And Infrastructure10 Nov 2014
MLP/2014/00328CompletedPre-Application (Screening Request) - ConstructionPortland Harbour Authority Ltd10 Nov 201403 Feb 2015
MLP/2014/00333CompletedPre-Application (Environmental Statement Review) - Aggregate Dredging, Removals (inc. Grab Samples)Grouped under: Aggregate Area 488 Showing 2 of 6 casesCemex Uk Marine Limited14 Nov 201417 Feb 2015
MLP/2014/00345CompletedPre-Application (Scoping Request) - ConstructionOikos Storage Limited20 Nov 201415 May 2015
MLP/2014/00347CompletedPre-Application (Screening Request) - ConstructionUk Docks Limited23 Nov 201427 Jul 2015
MLP/2014/00378CompletedPre-Application (Screening Request) - ConstructionNorth Tyneside Council18 Dec 201430 Mar 2015
MLP/2014/00382CompletedPre-Application (Scoping Request) - ConstructionMouchel Limited22 Dec 201401 Oct 2015
MLP/2014/00383CompletedPre-Application (Environmental Statement Review) - RenewablesWave Hub Limited23 Dec 201411 Mar 2015
MLP/2015/00001CompletedPre-Application (Screening Request) - Alternative Use of Dredged Material, Construction, Dredged Material DisposalDover Harbour Board05 Jan 201507 Apr 2015
MLP/2015/00020CompletedPre-Application (Screening Request) - ConstructionYorkshire Water Services Limited14 Jan 201515 May 2015
MLP/2015/00022CompletedPre-Application (Scoping Request) - Construction, Dredged Material DisposalUnited Utilities Plc14 Jan 201523 Jun 2015
MLP/2015/00035WithdrawnPre-Application (Scoping Request) - ConstructionEnvironment Agency26 Jan 2015
MLP/2015/00046CompletedPre-Application (Screening Request) - ConstructionGreenland Ram (London) Limited03 Feb 201514 Apr 2015
MLP/2015/00047CompletedPre-Application (Screening Request) - ConstructionEnvironment Agency (Southern Region)03 Feb 201514 May 2015
MLP/2015/00051CompletedPre-Application (Screening Request) - Construction, Dredged Material Disposal, Removals (inc. Grab Samples)Bournemouth Borough Council05 Feb 201521 May 2015
MLP/2015/00063CompletedPre-Application (Screening Request) - ConstructionQuay Marinas Limited13 Feb 201524 Mar 2015
MLP/2015/00067CompletedPre-Application (Screening Request) - ConstructionPort Clarence Energy Ltd.17 Feb 201527 Mar 2015
MLP/2015/00072CompletedPre-Application (Screening Request) - Alternative Use of Dredged Material, Construction, Dredged Material Disposal, Dredging, Removals (inc. Grab Samples)Gweek Quay Limited23 Feb 201528 May 2015
MLP/2015/00095CompletedPre-Application (Screening Request) - ConstructionThe Planning Bureau Limited17 Mar 201522 May 2015
MLP/2015/00118CompletedPre-Application (Screening Request) - ConstructionSabic Uk Petrochemicals Limited07 Apr 201529 Apr 2015
MLP/2015/00124CompletedPre-Application (Screening Request) - ConstructionLondon Borough Of Hounslow16 Apr 201510 Jun 2015
MLP/2015/00135CompletedPre-Application (Screening Request) - Dredged Material DisposalPd Teesport Limited07 May 201510 Jul 2015