Applications details - R/2021/0397/PND

Redcar and Cleveland Borough Council Planning (Development Management)

APPLICATION NUMBER: R-2021/0397/PND-Officer Report

LOCATION: FORMER REDCAR STEEL WORKS SOUTH BANK COKE OVENS REDCAR

PROPOSAL: PRIOR NOTIFICATION FOR DEMOLITION OF SOUTH BANK COKE OVENS BATTERY PLANT AND ASSOCIATED STRUCTURES AND ANCILLARY BUILDINGS

APPLICATION SITE AND DESCRIPTION

The application seeks prior approval for the demolition of South Bank Coke

Oven Battery Plant at the former Redcar Steel Works, South Bank, Redcar.

The buildings are functionally obsolete and are no longer required for their intended purpose. The site has been identified as one of a number of opportunities to clear assets in advance of future redevelopment, in line with Teesworks aspirations for the wider site area as set out in its Regeneration Master Plan.

PROPOSAL

The applicant has provided the following description in a supporting letter outlining the works that are intended to take place.

The application seeks prior approval for the demolition and deconstruction of the following:

Within the submission is a plan SBCO-ATK-SBK-ZZ-DR-C-0001 Rev P01 that illustrates the location of these various buildings and structures.

It is noted that within the supporting documentation the Dorman Long tower is specifically referenced as being excluded from the demolition project and the red line site boundary. The application therefore does not consider the demolition of the Dorman Long Tower.

The application has been accompanied by an outline method statement with regard to the demolition process. Within this a summary of the general scope of works has been provided. The summary is as follows;

In terms of the restoration of the site the submitted documentation details this as; following the completion of the demolition works, the processing and removal of all arisings and the area is clear, all surface areas will be cleanedoff level with adjacent surface area levels and any remaining trip hazards will be cut flush with the surrounding ground level. Remaining stumps / rebar will be cut flush with ground level using oxy / propane hot cutting equipment.

CONSIDERATION OF PLANNING ISSUES

The proposal to demolish the South Bank Coke Ovens has the potential to fall within the definition of Schedule 2 Development as specified in the Town and Country Planning (Environmental Impact Assessment) Regulations 2017.

The applicant in their submission has considered the potential impacts of the development with regard to whether the demolition would constitute EIA development. The supporting letter details the following;

The Demolition Method Statement which has been prepared and accompanied the Prior Approval application includes the following mitigation:

1. Measures to ensure the safety of demolition workers and humans in the surrounding area, including from the risk of hazards or major accidents and from contaminated materials within the buildings;

2. Dust management measures, which will ensure no significant effects from dust on human health or ecological receptors and thus no likely significant air quality impacts;

3. Tertiary noise and vibration mitigation measures, which will ensure no significant noise and vibration effects on human receptors in the area;

4. Pollution control measures to ensure no likely significant effects on the water environment or soils/ground conditions or any ecological receptors in the area.

In addition to the mitigation set out in the Demolition Method Statement and set out above, the following mitigation is also proposed.

5. Requirement to demolish the buildings outwith the breeding bird season or

Furthermore, the development of the original buildings is likely to have removed any potential archaeological remains. Therefore the demolition works, including the removal of building foundations is unlikely to give rise to any effects on archaeology.

It is considered that through the demolition method statement and the mitigation measures that fall outside of this that the proposed demolition works would not result in significant environmental impacts that would require the works to be supported by an EIA with the significance not being beyond the local area.

Prior Approval for demolition deals only with the method of demolition and the after care of the site and this issue is examined below.

The proposed structures to be demolished are considered to be in a location surrounded other industrial buildings and structures. While the demolition and clearance of the site will leave an empty part to the site, it is considered that their removal would not have a significantly detrimental impact upon the surrounding area either with regard to general amenity or visual appearance and will allow for future development of this site and the wider STDC site.

Contact has previously been made with Natural England with regard to any impacts on the ecology from demolition of buildings of this scale in comparable locations. Advice has been given that based on the information provided there is no objection to the works.

The proposed method of demolition and retention of the site thereafter is considered to be acceptable given the location of the site and the potential development that will take place at the site in future years.

RECOMMENDATION

Taking into account the content of the report the recommendation is to:

PRIOR APPROVAL NOT REQUIRED

Case Officer

Mr D Pedlow

Principal Planning Officer

David Pedlow

9 June 2021

Delegated Approval Signature

Claire Griffiths

Development Services Manager

09/06/2021