Table of Contents

{TOC}

Applications details - R/2022/0411/CD

Redcar and Cleveland Borough Council

Planning (Development Management)

APPLICATION NUMBER: R/2022/0411/CD

LOCATION: LAND AT SOUTH TEES DEVELOPMENT CORPORATION EAST OF SMITHS DOCK ROAD AND WEST OF TEES DOCK ROAD SOUTH BANK

PROPOSAL: !PARTIALLY DISCHARGE CONDITION 18 (NOISE) OF OUTLINE PLANNING PERMISSION R-2020/0357/OOM-Officer Report FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO 418,000 SQM (GROSS) OF GENERAL INDUSTRY (USE CLASS B2) AND STORAGE OR DISTRIBUTION FACILITIES (USE CLASS B8) WITH OFFICE ACCOMMODATION (USE CLASS B1), HGV AND CAR PARKING AND ASSOCIATED INFRASTRUCTURE WORKS ALL MATTERS RESERVED OTHER THAN ACCESS

APPLICATION SITE

The application relates to the discharge of conditions relating to planning application R-2020/0357/OOM-Officer Report

The planning permission sought consent for outline planning permission for demolition of existing structures on site and the development of up to 418,000 sqm (gross) of general industry (Use Class B2) and storage or distribution facilities (Use Class B8) with office accommodation (Use Class B1), HGV and car parking and associated infrastructure works all matters reserved other than access and was approved conditionally on 03/12/2020.

The discharge relates to the partial discharge of condition 18 in so far as it relates to Phase 3 of the outline application (Reserved Matters for first end user SeAH Monopile Manufacturing Facility).

CONDITION DETAILS

The following information has been submitted for condition 18

18 In accordance with the phasing plan agreed through the discharge of condition 4, a further noise assessment on the impact of noise from construction works on nearby commercial operators shall be carried out and submitted to and approved by the Local Planning Authority. All mitigation measures included in paragraph F6.5 of Chapter F of the submitted Environmental Statement shall be adhered to during the construction of the development, or where relevant, those that are identified within the noise assessment.

REASON: In the interest of neighbour amenity and protect and to ensure that the development can be carried out safely without unacceptable risks to workers, or commercial neighbours.

South Industrial Monopile Facility Construction Noise Assessment (Ref 32435AC-001) April 2022 received by the Local Planning Authority on 28/04/22

CONSULTATION RESPONSES

Redcar and Cleveland Borough Council (Environmental Protection) (Nuisance)

The partial discharge of condition18 relates to the boundary line specified in figure 1.1 of the Construction Noise Assessment carried out by Hilson Moran reference: 32435-RP-AC-00.

Although there are a couple of typos in the report:

1. Logarithmic average of weekend ambient noise levels of 42dB LAeq was used as a representative ambient noise level in this assessment -50dB was actually used, and

2. Table 5.2 reports the level above ambient noise for South Tees Business Centre being 6 instead of 7, the report concludes that the predicted highest construction noise level at South Tees Business Centre is 57dBLAeq, 8h and 61dBLAeq, 8h at Trigiene and Metador offices. These levels fall below the lower cut-off construction noise threshold of 65dB, despite being more than 5dB above the pre-construction ambient noise level.

Therefore, the effects at the nearest commercial receptors would not be significant.

I therefore have no objections to the above proposal.

PLANNING CONSIDERATIONS

The information that has been submitted relates to the impact of noise from construction works on nearby commercial operators. The submitted information has been considered by the Council’s environmental protection team. Based on the information provided in so far as it relates to the proposed SeAH development, it is considered that the condition can be partially discharged.

RECOMMENDATION

Taking into account the content of the report the recommendation is to partially discharge condition18 of application R-2020/0357/OOM-Officer Report in so far as it relates to Phase 3 of the outline application (Reserved Matters for first end user SeAH Monopile Manufacturing Facility).

Case Officer

Mr D Pedlow

Principal Planning Officer

David Pedlow

13 June 2022

Delegated Approval Signature

Claire Griffiths

Development Services Manager

14/06/2022