Case DetailsProject Type Project Title Locations Applicant Name Submission DateDecision Date
MLA/2019/00001 - CompletedApplication - Maintenance of existing structures or assets Project Wall repair Gweek Quay Wall Gweek Quay Limited 03 Jan 201903 Jan 2019
MLA/2019/00002 - CompletedApplication - Maintenance of existing structures or assets RNLI Bembridge - Pile Painting WorksBembridge Lifeboat StationR.N.L.I. (Trading) Limited 07 Jan 201907 Jan 2019
MLA/2019/00003 - CompletedApplication - Construction of new worksPort of Poole Marina - minor reconfigurationArea 1i Port of Poole Marina.kmlPoole Harbour Commissioners07 Jan 201912 Mar 2019
MLA/2019/00004 - CompletedApplication - Maintenance of existing structures or assets Component Exchange - Gearbox replacement - location A03 Location A03 - Sheringham Shoal Offshore Windfarm Scira Offshore Energy Limited08 Jan 201908 Jan 2019
MLA/2019/00005 - CompletedApplication - Construction of new worksTeesside Avanced Manufacturing PlantTeesside Advanced Manufacturing Plant Surface Water Outfall Portland Consulting Engineers Limited08 Jan 201929 Nov 2019
MLA/2019/00006/1 - CompletedApplication - Construction of new worksLongview River Wall Longview River Wall Mr Tony Coe08 Jan 201926 Sep 2019
MLA/2019/00007/1 - CompletedApplication - Other deposits, Other removals RDG1-3/34 Richmond pile investigation BH 1, BH 2, BH 3, BH 4Geoffrey Osborne Limited 10 Jan 201908 Oct 2019
MLA/2019/00008 - CompletedApplication - Decommissioning of works Tate & Lyle Sugarsexport jetty head Tate & Lyle11 Jan 201904 Jun 2019
MLA/2019/00009 - CompletedApplication - Construction of new worksSwalecliffe Brook Outfall Improvement Works Swalecliffe Brook Outfall Canterbury City Council12 Jan 201916 Dec 2021
MLA/2019/00010/1 - CompletedApplication - Construction of new worksNorth Sunderland Harbour StepsMiddle Pier embarkation steps North Sunderland Harbour Commissioners 14 Jan 201930 May 2019
MLA/2019/00011 - CompletedApplication - Maintenance of existing structures or assets Motney Hill MotneyBeasley Christopher Limited14 Jan 201914 Jan 2019
MLA/2019/00012 - CompletedApplication - Construction of new worksNew Cruise Liner Terminal Construction at Princes Jetty Site, Liverpool - Application for Marine Management Licence Liverpool Cruise Terminal - Works Area, Cormorant Pontoon Liverpool City Council-North Team15 Jan 201923 Apr 2021
MLA/2019/00013 - CompletedApplication - Minor removals Hullbridge Sea Defence RepairsHullbridgeEnvironment Agency 15 Jan 201915 Jan 2019
MLA/2019/00014 - CompletedApplication - Construction of new worksProposed new Hoist Dock for Fairline Yachts Fairline hoistFairline Yachts Ltd16 Jan 201914 Oct 2019
MLA/2019/00015 - CompletedApplication - Maintenance of existing structures or assets Scaffold erection at 28 Market Street Fish Strand Quay ScaffoldingIndidog Ltd16 Jan 201916 Jan 2019
MLA/2019/00016 - CompletedApplication - Construction of new works, Disposal of dredged material, Navigational dredging (capital), Other removals Tyne Car Terminal Berth 3 Reconfiguration TCT3 Dredge, TCT3 RECONFIGURATION, SOUTER POINT (OUTER) (TY081), NORTH TYNE (TY070) Port Of Tyne Authority 17 Jan 201902 Sep 2020
MLA/2019/00017 - CompletedApplication - Minor removals IFA2 Interconnector - Temporary Investigative Trial PitsTrialHoleInvestigationAreaDaedalusBeach National Grid Ifa 2 Limited17 Jan 201917 Jan 2019
MLA/2019/00018 - CompletedApplication - Maintenance of existing structures or assets 3 Sea View Place, St Ives, Cornwall Scaffolding for 3 Sea View PlaceMrs Doreen Johns 18 Jan 201918 Jan 2019
MLA/2019/00020/2 - CompletedApplication - Navigational dredging (capital)Rochester Wharf Berth DredgeRochester Wharf Dredge Area Hanson Aggregates Marine Limited 22 Jan 201910 Jun 2021
MLA/2019/00021 - CompletedApplication - Maintenance of existing structures or assets Trinity Hospital Flood Defence Wall Remediation Works - Scaffolding Trinity HospitalCh2m Hill Europe Limited 22 Jan 201922 Jan 2019
MLA/2019/00022 - CompletedApplication - Other worksBuckler's Hard - Reconfiguration of Marina and Mooring Assets Buckler's HardBeaulieu Enterprises Limited 22 Jan 201906 Jun 2019
MLA/2019/00023 - CompletedApplication - Maintenance of existing structures or assets Maintenance Work and Increase in Wall Height to the Fleet Drain/Hessle Clough Structure Hessle Clough Structure, Fleet DrainEast Riding Of Yorkshire Council 24 Jan 201924 Jan 2019
MLA/2019/00024 - CompletedApplication - Non-navigational clearance dredgingJetting at 46 Sea LaneSea_Lane_OutfallSouthern Water Limited 24 Jan 201924 Jan 2019
MLA/2019/00026 - CompletedApplication - Construction of new works, Decommissioning of works, Maintenance of existing works Port of Felixstowe, Dooley Terminal - Upgrade to RORO 3 & 4 Port of Felixstowe - Dooley Terminal, RORO 3 & 4The Felixstowe Dock And Railway Company25 Jan 201920 Aug 2019
MLA/2019/00027 - CompletedApplication - Maintenance of existing worksSouthern Water: 10-year licence for minor maintenance works on coastal outfalls Adur, Arun, Brighton and Hove, Canterbury, Chichester, Dartford, Dover, Eastbourne, Eastleigh, Fareham, Gosport, Gravesham, Hastings, Havant, Horsham, Isle of Wight, Lewes, Maidstone, Medway, New Forest, Portsmouth, Rother, Shepway, Southampton, Swale, Thanet, TonbridgeandMalling, Wealden, Worthing Southern Water Ltd 25 Jan 201928 Sep 2021
MLA/2019/00028 - CompletedApplication - Other worksThe installation of a houseboat on to a houseboat plot from where a larger houseboat,currently moored on the plot, will have been removed Mrs Joanne Bryant26 Jan 201904 Nov 2020
MLA/2019/00029/6 - CompletedApplication - Sampling, Scientific instruments Sizewell C Offshore Geotechnical Investigations 2019 - 2025 IT1_01, IT1_02, IT1_03, IT1_04, IT1_05, IT1_06, IT1_07, IT2_01, IT2_02, IT2_03, IT2_04, OT_01, OT_02, OT_03, OT_04, OT_05, OT_06, OT_07, OT_08Nnb Generation Company (Szc) Ltd 26 Jan 201922 Aug 2024
MLA/2019/00030 - CompletedApplication - Maintenance of existing worksHinkley Point B, Cooling Water forebay remediationHinkley Point B Cooling Water Remediation Edf Energy Nuclear Generation Limited28 Jan 201922 May 2019
MLA/2019/00031/4 - CompletedApplication - Construction of new worksDolphin Shipyard RedevelopmentDolphin BoatyardTorbay Boat Construction Company Limited 28 Jan 201905 Apr 2023
MLA/2019/00032/1 - CompletedApplication - Construction of new worksScalloptech Limited - Commercial Pilot for Scallop Aquaculture Production Scalloptech Limited Commercial Pilot Site Revised Scalloptech Limited28 Jan 201911 Jul 2023
MLA/2019/00034 - CompletedApplication - Non-navigational clearance dredgingTaunton Road Sewage Pumping Station Taunton Road SPSWessex Water Services Limited30 Jan 201930 Jan 2019
MLA/2019/00035 - CompletedApplication - Maintenance of existing structures or assets Beach pump inletSouthwold North beach Southwold Town Council 31 Jan 201931 Jan 2019
MLA/2019/00036 - CompletedApplication - Maintenance of existing structures or assets Refurbishment and Resurfacing of Slipway in Lowestoft Inner Harbour AreaLowestoft Slipway Associated British Ports.31 Jan 201931 Jan 2019
MLA/2019/00037 - CompletedApplication - Maintenance of existing worksQueen Anne Battery Wavescreen Repairs Queen Anne Battery Marina Marina Developments Limited01 Feb 201909 Jul 2019
MLA/2019/00038 - CompletedApplication - Maintenance of existing structures or assets Sutton Harbour Lock Bridge re-paintingLock Bridge Sutton Harbour Company Limited 04 Feb 201904 Feb 2019
MLA/2019/00039 - CompletedApplication - Construction of new worksReplacement and extension of decking. Mixtow 1Mr Jonathan Allden 04 Feb 201914 Aug 2019
MLA/2019/00040 - CompletedApplication - Construction of new works, Navigational dredging (capital) Swan Lane PierSWAN LANE PIERThames Leisure Limited 04 Feb 201910 Jun 2019
MLA/2019/00041 - CompletedApplication - Beach maintenance activities Shoreham to Southwick Beach Recycling Shoreham RecyclingShoreham Port Authority05 Feb 201905 Feb 2019
MLA/2019/00042 - CompletedApplication - Construction of new works, Maintenance of existing works Berwick Harbour Alignment Structure Replacement Alignment Structure Replacement, Timber Groyne Repair Berwick Harbour Commission 05 Feb 201921 Oct 2019
MLA/2019/00044 - CompletedApplication - Maintenance of existing structures or assets Location & sampling of a buried surface water outfall Bognor RegisBeasley Christopher Limited06 Feb 201906 Feb 2019
MLA/2019/00045 - CompletedApplication - Construction of new worksCBC2 W30150 Parton - Harrington Sea Walls No.5 (157998) Parton to Harrington No. 5 Site Network Rail Limited 06 Feb 201912 Apr 2019
MLA/2019/00046 - CompletedApplication - Maintenance of existing structures or assets Renovations and extension the Sail Loft, Whitford Yard, Fowey.Whitford boat yardMr Ian Forrest 06 Feb 201906 Feb 2019
MLA/2019/00048 - CompletedApplication - Construction of new worksRealignment of quay wall at Robertsons Boatyard, Woodbridge Quay Wall Robertsons Boatyard Robertsons Of Woodbridge (Boat Builders) Limited 07 Feb 201919 Jun 2019
MLA/2019/00049/1 - CompletedApplication - Maintenance of existing worksDudgeon OFTODudgeon Wind Farm Export CableTransmission Investment07 Feb 201904 Jan 2023
MLA/2019/00050 - CompletedApplication - Construction of new worksRBYC Pontoon ReplacementRoyal Burnham Yacht Club PontoonRoyal Burnham Yacht Club 07 Feb 201921 Oct 2019
MLA/2019/00051 - CompletedApplication - Minor removals Ørsted Hornsea Project Four Intertidal Geotechnical SurveyHornsea Project Four - Geotechnical Study AreaOrsted Hornsea Project Four Limited07 Feb 201907 Feb 2019
MLA/2019/00052 - CompletedApplication - Minor removals Trial pits to determine ground conditions for future barge landing to deliver historic landing craftTrial pit areaM L (Uk) Limited 09 Feb 201909 Feb 2019
MLA/2019/00053 - CompletedApplication - Disposal of dredged material, Navigational dredging (capital)Portland Marina Pontoon DredgingDredge Area, SWANAGE BAY (WI110)Dean & Reddyhoff Limited 11 Feb 201917 Feb 2021
MLA/2019/00054 - CompletedApplication - Maintenance of existing structures or assets Sutton Jetty maintenanceSutton JettySutton Harbour Company Limited 11 Feb 201911 Feb 2019
MLA/2019/00055/4 - CompletedApplication - Disposal of dredged material Maintenance Disposal Activities Port of Dover DOVER (DV010) Dover Harbour Board11 Feb 201915 Dec 2023
MLA/2019/00056/1 - CompletedApplication - Other dredging Gravel re-profiling at Gunnislake weir pool, River Tamar, CornwallGravel Bank, Gunnislake weir pool, Cornwall Lower Tamar Fishing Club Ltd 11 Feb 201923 Nov 2021
MLA/2019/00057 - CompletedApplication - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mr Britannia Shipping (Fao: Lister)12 Feb 201912 Feb 2019
MLA/2019/00058 - CompletedApplication - Construction of new worksMalpas Marine Pontoon Extension Malpas Marine proposed pontoon connection Cornwall Council -Harbour Office 12 Feb 201928 Jan 2020
MLA/2019/00059 - CompletedApplication - Other worksSlipway ModificationHNYC Slip Hooness Yacht Club 12 Feb 201929 Apr 2019
MLA/2019/00060 - CompletedApplication - Maintenance of existing structures or assets Victoria Embankment Lions Heads Victoria Embankment Lions Heads F M Conway Limited 13 Feb 201913 Feb 2019
MLA/2019/00061 - CompletedApplication - Minor removals Swalecliffe WTW - Ground InvestigationBorehole Area Southern Water Services Limited14 Feb 201914 Feb 2019
MLA/2019/00062 - CompletedApplication - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mr Britannia Shipping (Fao: Lister)14 Feb 201914 Feb 2019
MLA/2019/00064 - CompletedApplication - Construction of new works, Disposal of dredged material, Navigational dredging (capital) INEOS Dredging and pontoon installation, Camber Dock, PortsmouthDredge Area -Southampton water/Portsmouth OSPAR area, Pontoon Area, NAB TOWER (WI060), HURST FORT (WI080) Athena Racing Limited15 Feb 201901 Jul 2019
MLA/2019/00065 - CompletedApplication - Construction of new worksPontoon Installation at Lowestoft Lowestoft - Waveney Dock - Greater GabbardGreater Gabbard Offshore Wind -Leeds 15 Feb 201922 Jul 2019
MLA/2019/00066/1 - CompletedApplication - Construction of new works, Decommissioning of works, Other dredgingWithernsea Long Sea Outfall Replacement EIA Proposed Scheme Red Line Boundary Yorkshire Water Services Ltd.15 Feb 201927 Apr 2021
MLA/2019/00068/1 - CompletedApplication - Maintenance of existing worksRamsgate Port Pontoon Refurbishment Ramsgate PontoonVattenfall Wind Power Limited18 Feb 201921 Aug 2019
MLA/2019/00069 - CompletedApplication - Construction of new worksSouth Withernsea Coastal Defences Red line boundary East Riding Of Yorkshire Council 18 Feb 201905 Dec 2019
MLA/2019/00070 - CompletedApplication - Non-navigational clearance dredgingExmouth Marina Non-Navigational Dredging (no disposal)Exmouth MarinaExmouth Marina Ltd 18 Feb 201918 Feb 2019
MLA/2019/00071 - CompletedApplication - Maintenance of existing structures or assets Plaistow Wharf River Wall Repairs Plaistow WharfPort Of London Authority Limited 18 Feb 201918 Feb 2019
MLA/2019/00072 - CompletedApplication - Maintenance of existing structures or assets Canning Dock Fender Re-instatementCanning Fender Location Canal And River Trust20 Feb 201920 Feb 2019
MLA/2019/00073 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance)Heysham 1 & 2 dredging activities MORECAMBE BAY B (IS200), Heysham Power Stations Harbour IntakeEdf Nuclear Generation Ltd-Hesham20 Feb 201927 Sep 2019
MLA/2019/00076 - CompletedApplication - Construction of new worksGreenwich Wharf, Draw Dock Tidal inletDraw Dock Tidal inlet Keltbray Limited 20 Feb 201915 Jan 2020
MLA/2019/00077 - CompletedApplication - Minor removals Lake Lothing Third Crossing - Marine Ground Investigation works Ground Investigation site Bam Nuttall Limited20 Feb 201920 Feb 2019
MLA/2019/00078/2 - CompletedApplication - Maintenance of existing worksRedbridge Viaduct Remediation Works Redbridge Viaduct Remediation Works Hampshire County Council 21 Feb 201918 Feb 2021
MLA/2019/00081/1 - CompletedApplication - Construction of new worksBarrier Garden Pier Extension Barrier Garden Pier Extension Port Of London Authority 26 Feb 201924 Jun 2020
MLA/2019/00082 - CompletedApplication - Construction of new works, Other works Proposed Groyne Construction, Bembridge Coast Hotel, Fishermans Walk, Bembridge, Isle of Wightgroyne_4, groyne_5, groyne_6, access, compound, plant_compoundBourne Leisure Limited 27 Feb 201926 Jul 2019
MLA/2019/00083 - CompletedApplication - Deposit of markers Deposit of 2 racing markers at Hythe and Saltwood Sailing Club CT21 6AW Hythe and Saltwood Sailing Club Mr Anthony Elford27 Feb 201927 Feb 2019
MLA/2019/00084 - CompletedApplication - Maintenance of existing structures or assets Slipway 3 Slipway 3 Falmouth Boat Construction Limited 27 Feb 201927 Feb 2019
MLA/2019/00085 - CompletedApplication - Construction of new worksNewlyn Harbour Pontoon Fuelling project ENG 2372Newlyn Pontoon System Newlyn Pier And Harbour27 Feb 201912 Jul 2019
MLA/2019/00086 - CompletedApplication - Maintenance of existing structures or assets Falmouth Marina Cill MaintenanceFalmouth Marina CillPremier Marinas (Falmouth) Limited 27 Feb 201927 Feb 2019
MLA/2019/00087 - CompletedApplication - Maintenance of existing structures or assets Murphy's Wharf Jetty Repairs Phase OneMurphy's WharfMoore Project Management Solutions Llp 27 Feb 201927 Feb 2019
MLA/2019/00088 - CompletedApplication - Deposit of markers New RLymYC Race MarkRLymYC “V”Royal Lymington Yacht Club Limited 28 Feb 201928 Feb 2019
MLA/2019/00089/2 - CompletedApplication - Construction of new worksConstruction of a new taller precast sea wall with a recurve directly in front of the existing wall and improvements to promenade walkway above.Marine Parade Sea WallNetwork Rail Limited 28 Feb 201910 Jul 2020
MLA/2019/00090 - CompletedApplication - Maintenance of existing structures or assets Maintenance of waterside infrastructure Hythe Marine Park Fairline Yachts Limited01 Mar 201901 Mar 2019
MLA/2019/00091 - CompletedApplication - Maintenance of existing structures or assets Fareham Sailing & Motorboat Club Visitors Pontoons Remedial Works Pontoons Remedial Works Fareham Sailing And Motorboat Club 04 Mar 201904 Mar 2019
MLA/2019/00092/1 - CompletedApplication - Construction of new worksIslington Flood Risk Management Scheme (FRMS) New Islington Pumping Station Kings Lynn Internal Drainage Board 04 Mar 201928 Jan 2021
MLA/2019/00093 - CompletedApplication - Other deposits Lincolnshire Time and Tide Bell Lincolnshire Time and Tide Bell Lincolnshire Time And Tide Bell Community Interest Company 04 Mar 201929 May 2019
MLA/2019/00094 - CompletedApplication - Maintenance of existing structures or assets Hull Marina Essential Maintenance Hull Marina Hull City Council05 Mar 201905 Mar 2019
MLA/2019/00095/1 - CompletedApplication - Other deposits, Other removals Rampion Offshore Wind Farm - pre-emptive Export Cable Repairs Export Cable Corridor Tc Rampion Ofto Limited05 Mar 201912 Jan 2022
MLA/2019/00096 - CompletedApplication - Maintenance of existing structures or assets Liverpool South Dock trial panels Liverpool South Dock Wall British Waterways06 Mar 201906 Mar 2019
MLA/2019/00098 - CompletedApplication - Maintenance of existing structures or assets pile replacementpile location Royal Victoria Yacht Club07 Mar 201907 Mar 2019
MLA/2019/00099 - CompletedApplication - Deposit of markers Arun Yacht Club yacht racing marksRacing area Arun Yacht Club07 Mar 201907 Mar 2019
MLA/2019/00100 - CompletedApplication - Construction of new worksRockabill Cable SystemLandfall installation - Southport. Horizontal directional drill (HDD) zone, Landfall installation - Southport, articulated pipe zone, Landfall installation - Southport, shallow draft vessel installation zone, Rockabill Main Lay vessel instatllation zone Rockabill Cable System Limited 07 Mar 201921 Jun 2019
MLA/2019/00101 - CompletedApplication - Maintenance of existing structures or assets Union Chain BridgeUnion Chain BridgeNorthumberland County Council08 Mar 201908 Mar 2019
MLA/2019/00102/1 - CompletedApplication - Construction of new worksIncrease in Wall Height to the Fleet Drain/Hessle Clough StructureHessle Clough Structure, Fleet DrainEast Riding Of Yorkshire Council 11 Mar 201907 Jul 2020
MLA/2019/00104 - CompletedApplication - Maintenance of existing structures or assets Premier Marinas Swanwick - Mid Stream Pile Moorings Pontoon replacement Premier Marinas Pile Moorings Premier Marinas Limited11 Mar 201911 Mar 2019
MLA/2019/00105 - CompletedApplication - Maintenance of existing worksRepairs and modifications to vessel fender - River Blyth harbour entrance Southwold, SuffolkModification and repair of fender structure East Suffolk Council 12 Mar 201906 Nov 2019
MLA/2019/00106 - CompletedApplication - Construction of new worksKingarth Sea Defence for Existing Storm Water Discharge Works areaJames Flynn12 Mar 201924 May 2019
MLA/2019/00107 - CompletedApplication - Maintenance of existing structures or assets Thanet OWF small scale maintenanceWind Turbine Generator F03Vattenfall Wind Power Ltd13 Mar 201913 Mar 2019
MLA/2019/00108 - CompletedApplication - Maintenance of existing structures or assets Maintenance of LAL Wave Rider buoys London Array Offshore Wind Farm London Array Limited 13 Mar 201913 Mar 2019
MLA/2019/00109 - CompletedApplication - Other worksCoastal Monitoring Wave Buoy NetworkNewbiggin, Whitby, Scarborough, Hornsea, Chapel Point, North Well, Blakeney Overfalls, Happisburgh, Lowestoft, Felixstowe, Goodwin Sands, Folkestone, Pevensey Bay, Seaford, Rustington, Bracklesham Bay, Hayling Island, Sandown Bay, Milford, Boscombe, Weymouth, Chesil, West Bay, Dawlish, Tor Bay, Start Bay, Looe Bay, Porthleven, Penzance, St Mary's Sound, Perranporth, Bideford Bay, Minehead, Weston Bay, Cleveleys, Morecambe Bay New Forest District Council13 Mar 201913 Jan 2020
MLA/2019/00110 - CompletedApplication - Other deposits, Other removals Application to use spud legs to temporarily site spud legged bargeForeshore at 3 Dugdale`s Quay Mr Dean Richards 13 Mar 201901 Oct 2020
MLA/2019/00111/2 - CompletedApplication - Other worksOutstrays Managed Realignment SchemeOutstrays Environment Agency Leeds 14 Mar 201919 May 2022
MLA/2019/00112/2 - CompletedApplication - Other worksWelwick to Skeffling Managed Realignment Scheme Welwick to SkefflingEnvironment Agency Leeds 14 Mar 201909 Jul 2024
MLA/2019/00114/1 - CompletedApplication - Maintenance of existing worksBembridge HouseboatsHouseboat LocationMrs Charlotte Edsell 14 Mar 201927 May 2020
MLA/2019/00115 - CompletedApplication - Maintenance of existing structures or assets Bembridge Houseboatsmagic_polygonsPresent Locations14 Mar 201914 Mar 2019
MLA/2019/00116 - CompletedApplication - Decommissioning of works 977 DCT DemolitionBerth 1 Dover Harbour Board15 Mar 201906 May 2020
MLA/2019/00117 - CompletedApplication - Other deposits, Other dredging The beach landing of barge and safe discharge of cargo at Lee on Solent TM area at Daedalus Slipway Robert Wynn & Sons Limited 15 Mar 201931 May 2019
MLA/2019/00118 - CompletedApplication - Non-navigational clearance dredgingRemove of debris from outfall magic_polygonsCumbria County Council 18 Mar 201918 Mar 2019
MLA/2019/00119 - CompletedApplication - Maintenance of existing structures or assets Slowhill copseslowhill copseBeasley Christopher Limited18 Mar 201918 Mar 2019
MLA/2019/00120 - CompletedApplication - Minor removals Rampion - recovery of various materials/debris6 rock bags NE of the Offshore Substation Platform, Rock bags on the North East corner of the OSP structure, Exposed cable and rock bag on Export Cable 2 Rampion Limited19 Mar 201919 Mar 2019
MLA/2019/00122 - CompletedApplication - Maintenance of existing structures or assets SD-001-015 Masthouse Terrace Pier Fender ReplacementMasthouse Terrace PierCanal & River Trust19 Mar 201919 Mar 2019
MLA/2019/00123/5 - CompletedApplication - Construction of new works, Other removalsDenver Mooring ReplacementDenver Lock - Existing Landing Stage, Denver Lock - New Landing Stage J.N. Bentley Limited 19 Mar 201913 Jul 2020
MLA/2019/00124 - CompletedApplication - Maintenance of existing structures or assets Galloper Wind Farm Generator Replacement D5MWTG GN-D5M - Area of work Galloper Wind Farm Limited 20 Mar 201920 Mar 2019
MLA/2019/00125/1 - CompletedApplication - Construction of new works, Disposal of dredged material, Other removalsForeshore west of The Quay, Burnham-on-Crouch - temporary installation of four steel piles to assist salvage of houseboat, Llys-Helig West of The Quay, Burnham-on-Crouch Mr Howard Dawber 20 Mar 201926 Jun 2020
MLA/2019/00126 - CompletedApplication - Minor removals Bore Hole Jetty 1 operational lineVopak Terminal London B.V. Limited 21 Mar 201921 Mar 2019
MLA/2019/00127 - CompletedApplication - Maintenance of existing structures or assets Yarmouth Swing Bridge Refurbishment B106 Yarmouth BridgeRingway Island Roads Limited 21 Mar 201921 Mar 2019
MLA/2019/00129 - CompletedApplication - Construction of new works, Decommissioning of worksMarsden Lifeguard Station and Redwell Steps Redwell Steps South Tyneside Council 21 Mar 201923 Aug 2019
MLA/2019/00130/2 - CompletedApplication - Alternative use of dredged materialNorthey Island Saltmarsh Management Northey Island (TH058)National Trust -Bury St. Edmunds 21 Mar 201918 Jan 2024
MLA/2019/00131/4 - CompletedApplication - Construction of new works, Other removalsROW Pontoon Upgrade Works, Rampion Quay, Newhaven Rampion Offshore Wind Operation and Maintenance FacilityE.On Climate & Renewables Uk Rampion Offshore Wind Limited 22 Mar 201904 Jun 2024
MLA/2019/00132/1 - CompletedApplication - Maintenance of existing works, Other removalsThanet Offshore Wind Farm O&M Marine LicenceThanet O&M LicenceVattenfall Wind Power Ltd22 Mar 201923 Jan 2024
MLA/2019/00133 - CompletedApplication - Maintenance of existing structures or assets SWRR Dawlish Beach WorksDawlish Beach Bam Nuttall Limited22 Mar 201922 Mar 2019
MLA/2019/00134 - CompletedApplication - Maintenance of existing structures or assets Warkworth RWPSWarkworth RWPSMott Macdonald Limited 25 Mar 201925 Mar 2019
MLA/2019/00135/1 - CompletedApplication - Maintenance of existing worksUnion Chain BridgeUnion Chain BridgeNorthumberland County Council25 Mar 201929 Dec 2022
MLA/2019/00136 - CompletedApplication - Construction of new worksMast Quay Phase 2 Opecprime Developments Ltd 25 Mar 201930 Oct 2019
MLA/2019/00137/3 - CompletedApplication - Construction of new works5 Knot House, 27 Tredenham Road, St Mawes - Sea Wall5 Knot PolygonPca Consulting Engineers Ltd 25 Mar 201924 Sep 2020
MLA/2019/00138 - CompletedApplication - Non-navigational clearance dredgingBankside Pier DredgingBankside Pier Dredge BoxLondon River Services Limited26 Mar 201926 Mar 2019
MLA/2019/00139 - CompletedApplication - Maintenance of existing structures or assets Maintenance of Kinterbury outfall marker post Kinterbury OutfallTms Maritime Ltd 26 Mar 201926 Mar 2019
MLA/2019/00140 - CompletedApplication - Minor removals Ghost Fishing UK Project: Removal of ALDFG and Marine Litter from Wreck sites and Reefs South Cornwall & DevonEddystone Rocks, Hands Deep, Breakwater South, City of Westminster SS [+1923], Conqueror MFV (GY1364) [+1977], Primrose SS [+1906], Hellopes SS [+1911], Alice Marie SV [+1908], Vigrid SS [+1917], Heidrun SS [+1918], Anson HMS [+1807], San Antonio (St. Anthony) [+1527], Bellucia SS [+1917], City Of Ghent MV [+1955], Citrine MV [+1956], Carmarthen SS [+1917], Rock Island Bridge SS [+1920], Veritas SS [+1907], Bay of Panama SV [+1891], Volnay SS [+1917], Medina SS (+1883), N. G. Petersen SS [+1918], Mohegan SS [+1898], Stanwood SS [+1939], Caroni River MV [+1940], Epsilon SS [+1917], Hera SV [+1914], King Harry [+1936], Ardangorm SS [+1940], Eastfield SS [+1917], Kantoeng (part of) [+1937], Orchis SS [+1935], Lancaster SS, Rosehill SS [+1917], Unicorn SS (Tile Boat) [+1923], Scylla HMS (F71) [+2004], James Eagan Layne SS [+1945], Medoc SS (Half Way Wreck) [+1940], Elk HMT (FY4.24) [+1940], Poulmic MV [+1940], Abelard HMT (FY151) [+1916], Glen Strathallan SS [+1970], Mewstone cannons, Untiring HMS (P-59) [+1957], Totnes Castle PSS [+1967], Persier SS [+1945], Oregon SV [+1890], Maine SS (II) [+1917], Skaala SS [+1917], Soudan SS [+1887], Newholm SS [+1917]Ghost Fishing Uk 28 Mar 201928 Mar 2019
MLA/2019/00141 - CompletedApplication - Maintenance of existing structures or assets Millbay Marina - maintenance worksMillbayRLB_WGS_RH_20190328Millbay Marina Village Management Company Limited28 Mar 201928 Mar 2019
MLA/2019/00142 - CompletedApplication - Construction of new worksBarking Riverside Development (Foreshore Park works)Barking Riverside Foreshore Park East, Barking Riverside Foreshore Park WestBarking Riverside Limited29 Mar 201926 Aug 2021
MLA/2019/00143 - CompletedApplication - Non-navigational clearance dredgingLighterman's Wharf - bed re-grading Lighterman's WharfHither Green Developments Limited29 Mar 201929 Mar 2019
MLA/2019/00144 - CompletedApplication - Maintenance of existing structures or assets Lighterman's Wharf - Escape LadderLighterman's WharfHither Green Developments Limited29 Mar 201929 Mar 2019
MLA/2019/00145 - CompletedApplication - Minor removals Rockabill Cable SurveyRockabill_SurveyRockabill Cable System Limited 01 Apr 201901 Apr 2019
MLA/2019/00146 - WithdrawnApplication - Construction of new worksBrighton Marina Outer Harbour Development: Phases Two and Three The Outer Harbour Development Company Partnership Llp01 Apr 2019
MLA/2019/00147 - CompletedApplication - Construction of new worksRiver Hull+ Scheme - Angling PlatformsAngling Platforms 1, Angling Platforms 2Bmm Jv Limited.02 Apr 201909 Aug 2019
MLA/2019/00148 - CompletedApplication - Maintenance of existing structures or assets 1 Byker Pier1 Byker PierStp Construction Limited 03 Apr 201903 Apr 2019
MLA/2019/00149/2 - CompletedApplication - Maintenance of existing worksStrengthening of legs on Cromer PierCromer Pier North Norfolk District Council 03 Apr 201926 Aug 2021
MLA/2019/00150 - CompletedApplication - Aggregate dredging, Sampling Area 522522 Sub Area A, 522 Sub Area BCemex Uk Marine Ltd03 Apr 201903 Aug 2020
MLA/2019/00151 - CompletedApplication - Construction of new works, Disposal of dredged material, Navigational dredging (capital), Other removals Inter Terminals - Jetty 1 upgrade Proposed Dredge Footprint -Tees/Hartlepool, Proposed top side works, TEES BAY C (TY150) Inter Terminals Seal Sands Ltd 03 Apr 201913 Jun 2019
MLA/2019/00152 - CompletedApplication - Construction of new worksReplacement and Upgrade of Existing Downstream Dolphin on Berth 1 jetty dolphin Navigator Terminals Thames 04 Apr 201931 Jul 2019
MLA/2019/00153 - CompletedApplication - Maintenance of existing structures or assets Loop cutting of installed concrete mattresses Location 14.1, 15.1, 16.1 Location 14.1, 15.1, 16.1 National Grid Nemo Link Limited04 Apr 201904 Apr 2019
MLA/2019/00154 - CompletedApplication - Maintenance of existing structures or assets Loop cutting of installed concrete mattresses at Location 13B.1 Location 13B.1National Grid Nemo Link Limited04 Apr 201904 Apr 2019
MLA/2019/00155 - CompletedApplication - Maintenance of existing structures or assets Loop cutting of installed concrete mattresses at Location 2R.7Location 2R.7 National Grid Nemo Link Limited04 Apr 201904 Apr 2019
MLA/2019/00156/2 - CompletedApplication - Maintenance of existing works, Other removalsKentish Flats Offshore Wind Farm O&M Marine Licence Kentish Flats Array, Kentish Flats Export Cable Route Vattenfall Wind Power Ltd05 Apr 201926 Jan 2024
MLA/2019/00158/2 - CompletedApplication - Maintenance of existing works, Other removalsKentish Flats Extension Offshore Wind Farm O&M Marine Licence Kentish Flats Extension Array, Kentish Flats Extension Cable RouteVattenfall Wind Power Ltd05 Apr 201926 Jan 2024
MLA/2019/00159 - CompletedApplication - Other removals, Other worksLiminal by Wolfgang Buttressmagic_polygonsButtress Limited.05 Apr 201914 Jun 2019
MLA/2019/00160 - CompletedApplication - Maintenance of existing structures or assets Virginia Quay face refurbishmentVirginia Quay E14 Wph Limited05 Apr 201905 Apr 2019
MLA/2019/00161 - CompletedApplication - Maintenance of existing structures or assets Teignmouth Grand Pier Maintenance Teignmouth Pier Teignmouth Maritime Services Limited 05 Apr 201905 Apr 2019
MLA/2019/00162 - CompletedApplication - Construction of new worksPencalenick SchoolPoint F outfall pipeSpecial Partnership Trust06 Apr 201930 Jul 2019
MLA/2019/00163 - CompletedApplication - Construction of new worksNeptune Deep Water Test TankNeptune QuayShepherd Offshore Limited08 Apr 201917 Oct 2019
MLA/2019/00164 - CompletedApplication - Maintenance of existing structures or assets East Portelmouth CSOAgar Point, CSO, East Portlemouth. Salcombe, TQ8 8PFKier Limited 12 Apr 201912 Apr 2019
MLA/2019/00165 - CompletedApplication - Maintenance of existing structures or assets Fowey Harbour Office Exterior Maintenance Fowey Harbour OfficeFowey Harbour Commissioners09 Apr 201909 Apr 2019
MLA/2019/00166/2 - CompletedApplication - Construction of new works, Other deposits, Other removalsMiddleton Outfall Air Release PipeworkWorking areaUnited Utilities 09 Apr 201927 Sep 2019
MLA/2019/00167 - CompletedApplication - Deposit of markers Brightlingsea Sailing Club racing marks licence application Batemans (BSC), Pyefleet (CYC), Point Clear (BSC), Hills (BSC), Gazelet (BSC), Cocum (BSC), Beach (BSC), CVP (CYC)Brightlingsea Sailing Club 09 Apr 201909 Apr 2019
MLA/2019/00168 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance)Port of Workington Maintenance Dredging 2019 -2029 (Renewal)Dock -Derwent OSPAR area, Turning Basin -Derwent OSPAR area, Channel -Derwent OSPAR area, Bar/Wedge -Derwent OSPAR area, SOLWAY FIRTH, WORKINGTON ANCHORAGE, Catchpit Port Of Workington 10 Apr 201918 Oct 2019
MLA/2019/00170 - CompletedApplication - Maintenance of existing structures or assets Battersea Jetty BPS Jetty Battersea Power Station Development Company Limited10 Apr 201910 Apr 2019
MLA/2019/00171 - CompletedApplication - Maintenance of existing structures or assets Rampion Quay Brow Roller MaintenanceRampion Quay Temporary PontoonE.On Climate & Renewables Uk Rampion Offshore Wind Limited 11 Apr 201911 Apr 2019
MLA/2019/00172 - CompletedApplication - Maintenance of existing worksRiver Frontage Remediation Works at Offshore Renewable Energy CatapultOREC River Frontage Innovate Uk12 Apr 201912 Sep 2019
MLA/2019/00173 - CompletedApplication - Maintenance of existing worksChichester Yacht Club: New Piles, Replacement Pontoons, Bridge & Bridgeheads, Safety Boat berthing, Waterfront tidying and Maintenance. Chichester Yacht Club-work area Chichester Yacht Club12 Apr 201926 Nov 2019
MLA/2019/00174/3 - CompletedApplication - Minor removals Hornsea Offshore Wind Farm Project TwoHOW02_CableCorridorKP2toKP30_20190412 Optimus Wind Limited 12 Apr 201926 Apr 2019
MLA/2019/00175 - CompletedApplication - Maintenance of existing structures or assets Frindsbury Euro Wharf Repairs (Post-Dredge) Frindsbury_Wharf_Wall Hanson Aggregates Marine Limited 12 Apr 201912 Apr 2019
MLA/2019/00176 - WithdrawnApplication - Construction of new worksBattersea Coaling Jetty - Temporary Access BridgesBPS Jetty Battersea Power Station Development Company Limited12 Apr 2019
MLA/2019/00177/4 - CompletedApplication - Other deposits SISProtect System Test Site Pile_Locations_50m_Buffer_190423_WGS84_UTM31N Scottish Power Renewables15 Apr 201907 Jun 2021
MLA/2019/00178 - CompletedApplication - Maintenance of existing structures or assets Porthleven Food Festival Bridge Porthleven Food Festival Bridge Mr 15 Apr 201915 Apr 2019
MLA/2019/00179 - CompletedApplication - Marine licence for the burial of human remains at sea NEEDLES (WI090) Tapper And Son (Poole) Limited 17 Apr 201917 Apr 2019
MLA/2019/00180/1 - CompletedApplication - Maintenance of existing worksHamble jetty repainting Hamble_jettyBp Oil Uk Limited. 18 Apr 201917 Sep 2020
MLA/2019/00181/1 - CompletedApplication - Other worksCalstock Flood Defence Improvement and Habitat Creation SchemeCalstock Flood Defence Improvement and Habitat Creation Environment Agency - South West Region 18 Apr 201901 Oct 2020
MLA/2019/00182 - CompletedApplication - Marine licence for the burial of human remains at sea NEEDLES (WI090) Charles Lister 18 Apr 201918 Apr 2019
MLA/2019/00183 - CompletedApplication - Decommissioning of works Removal of old gas pipe in Pagham Harbour Pagham Harbour Gas Pipe I & G Contractors Limited19 Apr 201926 Jul 2019
MLA/2019/00184 - CompletedApplication - Disposal of dredged material Bembridge Harbour Maintenance Dredging - Disposal NAB TOWER (WI060) Bembridge Harbour Improvements Company Limited 21 Apr 201928 Jun 2019
MLA/2019/00186 - CompletedApplication - Construction of new worksThe slipway, 42 Waterside, New Jetty Installation Timber jettyRa Marine Limited25 Apr 201916 Dec 2019
MLA/2019/00187/1 - CompletedApplication - Construction of new worksErection of a Pontoon The Nab Pontoon & BridgeMr Gareth Helm 25 Apr 201913 Dec 2019
MLA/2019/00188 - CompletedApplication - Maintenance of existing structures or assets Flap Valve Replacement Doust Way Rochester Kent Doust Way Rochester Beasley Christopher Limited25 Apr 201925 Apr 2019
MLA/2019/00189 - CompletedApplication - Maintenance of existing structures or assets RNLI Lyme Regis - Slipway Works RNLI Lyme Regis slipway R.N.L.I. (Trading) Limited 26 Apr 201926 Apr 2019
MLA/2019/00190 - CompletedApplication - Minor removals Ghost Fishing UK Project: Removal of ALDFG and Marine Litter from Wreck sites West of PortlandChesil, Trawl gear, Elsa SS [+1918], Dudley Rose SS [+1941], Galicia SS [+1917], Kendal Castle SS [+1918], Emsstrom MV [+2013], Northville SS [+1918], Stryn SS [+1918], Sevilla SS [+1918], P̩ronne SS [+1917], Bretagne SS [+1918], Lord Stewart SS [+1918], Ursa SS [+1918], Empress Of India HMS [+1913], Heroine SV [+1852], Gibel Hamam SS [+1918], Avalanche SV [+1877], NB Unknown Wreck, Ailsa Craig SS [+1918], Moidart SS [+1918], Minerva SS [+1917], Ull SS [+1917], Salsette SS [+1917], Grane SS [+1918], Saint Dunstan HMS [+1917], Buccaneer HMS [W49] [+1946], Pomeranian SS [+1918], Tracy [+2016], Sidon HMS (P259) [+1955], Scaldis (+1974), Martha SS [+1918], Landrail HMS [+1906], Anworth, P-555 HMS [+1947], UB-74 [+1918], Frogner SS [+1918], Stancrest SS [+1937], Gripfast SS [+1942], Merchant Royal SS [+1946], Royal Adelaide SV [+1872], James Fennell HMT [+1920], Gertrude SS (+1894)Ghost Fishing Uk 26 Apr 201926 Apr 2019
MLA/2019/00191 - WithdrawnApplication - Other removals Galloper Offshore Wind Farm UXO Disposal - Export Cable Corridor Innogy Renewables Uk Ltd 26 Apr 2019
MLA/2019/00192 - WithdrawnApplication - Other removals Galloper Offshore Wind Farm UXO Disposal - Wind Farm Array Innogy Renewables Uk Ltd 26 Apr 2019
MLA/2019/00193 - CompletedApplication - Minor removals Ghost Fishing UK Project: Removal of ALDFG and Marine Litter from Wreck sites East of PortlandPortland Harbour, Apache SS [+1917], U-322 [+1944], Hartlepool SS (main part) [+1940], Hartlepool SS (smaller part) [+1940], Black Hawk USAT (stern) [+1944], Valdes SS [+1917], Ethel SS [+1918], Elena R. SS [+1939], Binnendijk SS [+1939], British Inventor SS [+1940], Alex Van Opstal MV [+1939], Black Hawk USAT (fwd Section) [+1944], Railway line, Not Arfon (Holmtown), The Pin Wreck, Aeolian Sky MV [+1979], Iolanthe SS [+1918], Arfon HMT [+1917], Safari HMS (P211) [+1946], Kyarra HMHS [+1918], Carentan (Q005) [+1943], Castlereagh SS [+1925], Fleur de Lys MFV (DH 7) [+2000], Valentine tank Poole harbour, Valentine tank Poole bay [+1943], Start SS (UB-58) [+1917], Betsy Anna SS [+1926], Clan MacVey SS [+1918], Venezuela SS [+1918], Borgny SS [+1918]Ghost Fishing Uk 26 Apr 201926 Apr 2019
MLA/2019/00194 - CompletedApplication - Maintenance of existing structures or assets Slipway repair at Arbennek, Restronguet Point TR3 6RB Arbennek slipwayMr Wayne Sheppard28 Apr 201928 Apr 2019
MLA/2019/00195 - CompletedApplication - Navigational dredging (maintenance)Gweek Classic Boatyard Dredging of Navigational Channel Maintenance dredging of existing navigational channel Gweek Quay Limited.28 Apr 201923 Apr 2020
MLA/2019/00196 - CompletedApplication - Maintenance of existing structures or assets Manea BridgeManea BridgeJ. Murphy & Sons Limited 29 Apr 201929 Apr 2019
MLA/2019/00197 - CompletedApplication - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mamarine.Com Llp 29 Apr 201929 Apr 2019
MLA/2019/00198/3 - CompletedApplication - Construction of new works, Other depositsElmer Beach Management Scheme Elmer Beach Management Scheme Environment Agency 29 Apr 201919 Mar 2020
MLA/2019/00199/2 - CompletedApplication - Maintenance of existing worksOperation and Maintenance activities required over the lifetime of Galloper Wind Farm's Generation Assets Array AreaGalloper Wind Farm Limited 30 Apr 201931 Jul 2024
MLA/2019/00200 - CompletedApplication - Maintenance of existing structures or assets Toms Yard infillToms Boatyard C. Toms And Son Limited30 Apr 201930 Apr 2019
MLA/2019/00201 - CompletedApplication - Maintenance of existing structures or assets Walton Pier Concrete Repair Programme 2019Walton Pier Mr Shane Swan30 Apr 201930 Apr 2019
MLA/2019/00202 - CompletedApplication - Maintenance of existing worksRNSA Haslar Pontoon refurbishment Haslar PontoonRoyal Naval Sailing Association01 May 201902 Jul 2019
MLA/2019/00203/2 - CompletedApplication - Other worksLower Thames Crossing (Geotechnical Investigation Works)LTC GI Survey Area Boundary Aecom Limited01 May 201917 Feb 2021
MLA/2019/00204 - CompletedApplication - Construction of new works102 Panorama Road 102 PanoramaMr Simon Bowden02 May 201930 Sep 2020
MLA/2019/00205 - CompletedApplication - Maintenance of existing structures or assets Steps at Somerset House, FoweySomerset HouseMr Christopher Bird02 May 201902 May 2019
MLA/2019/00206 - CompletedApplication - Maintenance of existing worksemergency works at Moriconium Quay PooleMoriconium Quay Moriconium Quay Management Company Limited.02 May 201909 May 2019
MLA/2019/00207 - CompletedApplication - Sampling Turnchapel WharfTurnchapel WharfYacht Havens Limited 03 May 201904 Dec 2019
MLA/2019/00208 - CompletedApplication - Marine licence for the burial of human remains at sea NEWHAVEN (WI011)Funeral Services Limited 03 May 201903 May 2019
MLA/2019/00209 - CompletedApplication - Construction of new works, Decommissioning of works, Maintenance of existing works Partial Dismantling of Scott Street Bridge & Scheme for Replacement Leafs, Enhancement & Conservation Scott Street Bridge Hull City Council. 03 May 201927 Aug 2019
MLA/2019/00210 - CompletedApplication - Maintenance of existing structures or assets Thanet OWF small scale maintenanceThanet WTG D06Vattenfall Wind Power Ltd03 May 201903 May 2019
MLA/2019/00211/3 - CompletedApplication - Construction of new worksNew External Stairway to Foreshore, Underdeck, Cliff Road, Salcombe Foreshore, Cliff Road, Salcombe, TQ8 8JQTeignmouth Maritime Services Ltd.03 May 201912 May 2020
MLA/2019/00213 - CompletedApplication - Construction of new worksCrown Pier ExtensionCrown PierCrown River Cruises Limited. 04 May 201911 Feb 2020
MLA/2019/00214 - CompletedApplication - Maintenance of existing structures or assets HMS Belfast - Corrosion Protection ReplacementHMS Belfast Imperial War Museum Trading Company Limited07 May 201907 May 2019
MLA/2019/00216/1 - CompletedApplication - Other worksReplacement of Canal Underbridge, near Looe, Cornwall Canal Underbridge and area of works Network Rail Swindon 09 May 201922 Oct 2020
MLA/2019/00217/2 - CompletedApplication - Navigational dredging (maintenance)Thamescraft Dry Docking DredgingThames Craft Dry Docking Dredging SiteThamescraft Dry Docking09 May 201914 Oct 2020
MLA/2019/00218 - CompletedApplication - Maintenance of existing structures or assets Holloway Storm Relief Outfall Bekesbourne Tideflex Valve Minor Maintainence Bekesbourne tideflex ValveThames Water Limited 09 May 201909 May 2019
MLA/2019/00219 - CompletedApplication - Minor removals Retrieval of lost fishing gear Plymouth Constance, Ajax, Encourage, FS Poulmic, Glen Strathallan, HMT Abelard, HMT Elk, HMT Kingston Alalite, Hopper no.42, James Egan Layne, Nepaul, Rame barge, Rosehill, Rothesay, Scylla, Vectis, Viking princess Fathoms Free 10 May 201910 May 2019
MLA/2019/00220 - CompletedApplication - Other deposits D Day Museum LCT7074LCT7074 M L (Uk) Limited 10 May 201901 Jul 2019
MLA/2019/00221 - CompletedApplication - Maintenance of existing structures or assets Raby Cote Outfall Raby Cote Outfall J.N. Bentley Limited 10 May 201910 May 2019
MLA/2019/00222/1 - CompletedApplication - Construction of new works, Maintenance of existing works, Other removals, Other worksDuke Shore Wharf - Permanent WorksDuke Shore WharfCh2m Hill Europe Limited 10 May 201929 Oct 2020
MLA/2019/00223 - CompletedApplication - Minor removals Retrieval of lost fishing gear Falmouth The Lady of the Isles, The Stanwood, The Andromeda, The Epsilon, The Caroni River, The Bay of Panama, The Volnay, The Mohegan Fathoms Free 10 May 201910 May 2019
MLA/2019/00224 - CompletedApplication - Minor removals Retrieval of lost fishing gear PadstowThe Sphene, The SaphirFathoms Free 10 May 201910 May 2019
MLA/2019/00226/1 - CompletedApplication - Minor removals Hornsea Offshore Wind Farm Project TwoHOW02_MMOLicenseArea_KP30toKP127_Orsted_20190429Optimus Wind Limited 13 May 201922 May 2019
MLA/2019/00227 - WithdrawnApplication - Construction of new worksInstallation of a discharge pipe and headwall on intertidal zone at Saqqara, Restronguet Point, Feock, Cornwall Saqarra discharge pipe and headwall Spalding Associates (Environmental) Ltd14 May 2019
MLA/2019/00228/1 - CompletedApplication - Disposal of dredged material Disposal of maintenance dredging material from the Harwich / Felixstowe Outer Channel INNER GABBARD EAST (TH056)Harwich Haven Authority15 May 201920 Dec 2023
MLA/2019/00229 - CompletedApplication - Other dredging Clearance of Seawater Intake at BAE Systems (Barrow)SMITE Seawater Abstraction Point - Walney Channel -Lancashire Coast Bae Systems Marine Limited.15 May 201905 Mar 2021
MLA/2019/00230 - CompletedApplication - Construction of new worksBerth 2 ImprovementsBerth 2 Portsmouth City Council (Escp) 16 May 201931 Oct 2019
MLA/2019/00231/1 - CompletedApplication - Maintenance of existing structures or assets Repointing Qauyside wall as part of residential development on shoresideFaversham Creek Nova (Kent) Limited16 May 201922 May 2019
MLA/2019/00233/1 - CompletedApplication - Other worksArundel Tidal Flood DefencesArundel_Site_RLBEnvironment Agency (Southern Region) 16 May 201927 Mar 2020
MLA/2019/00234 - CompletedApplication - Minor removals Riverside Pavilion - Under-Wharf Investigations Site_Boundary Northern & Shell Plc 16 May 201916 May 2019
MLA/2019/00235 - CompletedApplication - Maintenance of existing structures or assets Richmond Lock and Weir repaint 2019 Richmond Lock and WeirPort Of London Authority 17 May 201917 May 2019
MLA/2019/00236 - CompletedApplication - Construction of new worksCumbria Coastal Activities Centre Slipway Cumbria Activity Centre Slipway Whitehaven Harbour Commissioners 17 May 201915 Jul 2019
MLA/2019/00237 - CompletedApplication - Non-navigational clearance dredgingHundred End Gutter Dredge 19_20 Hundred End Gutter Desilt 19_20 Environment Agency 22 May 201922 May 2019
MLA/2019/00238 - CompletedApplication - Maintenance of existing structures or assets dolphin repairs Cory Energy Charltoncory energy Wph Limited23 May 201923 May 2019
MLA/2019/00239/1 - CompletedApplication - Maintenance of existing worksIron Man Pile Replacement Crosby Beach Iron Man Area Boundary Sefton Mbc 23 May 201909 Jun 2020
MLA/2019/00240/4 - CompletedApplication - Other dredging MMO Application for renewel / Extension of licence L2014/00282BP Oil Terminal Jetty No1 Bp Oil Uk Ltd24 May 201930 Aug 2024
MLA/2019/00241/2 - CompletedApplication - Other removals Hinkley Point C UXO Clearance HPC Outfalls OS/01 and OS/02, HPC Intakes OS/11, OS/13, OS/21 and OS/23 Nnb Generation Company (Hpc) Limited 24 May 201922 Mar 2024
MLA/2019/00242 - CompletedApplication - Minor removals Hornsea Three Grab Samples: nearshore reroute Nearshore Reroute grab samplesOrsted 28 May 201928 May 2019
MLA/2019/00244 - CompletedApplication - Deposit of markers Laying dinghy racing marks in Christchurch Harbour that remain in place for more than 28 days and are only removed for maintenance. Christchurch Harbour fixed racing marks Highcliffe Sailing Club Limited29 May 201929 May 2019
MLA/2019/00245 - CompletedApplication - Maintenance of existing structures or assets Houghton Bridge repairs Houghton bridge RepairWest Sussex County Council 29 May 201929 May 2019
MLA/2019/00247 - CompletedApplication - Non-navigational clearance dredgingRiver Dart Higher Ferry Slipway Maintenance DredgeRiver Dart Higher Ferry Slipway (Dartmouth side)Tms Maritime Ltd 30 May 201930 May 2019
MLA/2019/00249 - WithdrawnApplication - Construction of new worksFraser Range, PortsmouthProposed_Marine_Development_AreaInvestin Portsmouth Limited30 May 2019
MLA/2019/00250 - WithdrawnApplication - Navigational dredging (capital)OSL Jetty 2 Capital DredgeJetty 2 Berth & ApproachOikos Storage Limited31 May 2019
MLA/2019/00251 - CompletedApplication - Sampling Bradwell B Intertidal & Subtidal Benthic Ecology Surveys Apem Ltd 04 Jun 201928 Aug 2019
MLA/2019/00252 - CompletedApplication - Construction of new worksNorth Sunderland Harbour StepsNorth Sunderland Harbour StepsNorth Sunderland Harbour Commissioners 04 Jun 201907 Aug 2019
MLA/2019/00253 - CompletedApplication - Maintenance of existing structures or assets Dawlish Sea Wall RepairsSea Wall RepairsBalfour Beatty Plc 04 Jun 201904 Jun 2019
MLA/2019/00254 - CompletedApplication - Minor removals Hornsea Three Grab Samples: offshore rerouteOffshore reroute grab samples Orsted 04 Jun 201904 Jun 2019
MLA/2019/00255 - CompletedApplication - Construction of new worksConstruction of Slipway and Jetty Slipway and Jetty siteMr Jeremy Gardner05 Jun 201925 Sep 2019
MLA/2019/00256/1 - CompletedApplication - Maintenance of existing worksOperation and Maintenance activities required over the lifetime of Galloper Wind Farm's Transmission Assets Export Cable Corridor Diamond Transmission Partners Galloper Limited 05 Jun 201918 Nov 2022
MLA/2019/00257 - CompletedApplication - Construction of new works, Maintenance of existing works, Other removals Haslar Marina Slipway and Office ExtensionSlipway, Office, Restaurant, Intertidal Dean & Reddyhoff Limited 06 Jun 201922 Nov 2019
MLA/2019/00258 - CompletedApplication - Minor removals Investigations to determine source of leaking sewageTrial hole area R&M Utility & Civil Engineering Services South West Limited07 Jun 201907 Jun 2019
MLA/2019/00259 - CompletedApplication - Minor removals Benmacdhui Project TA 65272 21818 Benmacdhui wreck, off East Yorkshire CoastBenmacdhuiMr Robin Melhuish07 Jun 201907 Jun 2019
MLA/2019/00260 - CompletedApplication - Maintenance of existing structures or assets Northern Spire, Sunderland - River Bridge PaintworksNorthern SpireVictor Buyck Steel Construction Limited07 Jun 201907 Jun 2019
MLA/2019/00263 - CompletedApplication - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mamarine.Com Llp 10 Jun 201910 Jun 2019
MLA/2019/00264 - WithdrawnApplication - Other removals Sand Abstraction from Marazion Beach for agricultural Use Mr Anthony Laity 11 Jun 2019
MLA/2019/00265 - CompletedApplication - Minor removals De-risking the Dunwich Bank Wreck Site: CSMP Forward Plan Actions DunwichBankWGS84Wessex Archaeology Limited 11 Jun 201911 Jun 2019
MLA/2019/00267 - CompletedApplication - Maintenance of existing structures or assets Repairs to Fort Bovisand PiersFort Bovisand Piers Fort Bovisand Development Ltd12 Jun 201912 Jun 2019
MLA/2019/00268 - CompletedApplication - Marine licence for the burial of human remains at sea NEWHAVEN (WI011)Arthur C. Towner Limited 13 Jun 201913 Jun 2019
MLA/2019/00269 - CompletedApplication - Maintenance of existing structures or assets 57068 Bath Old Bridge blasting and painting 57068 Bath Old Bridge Bristol City Council 14 Jun 201914 Jun 2019
MLA/2019/00270 - CompletedApplication - Construction of new worksBoat Yard SPS CSO & Outfall, Malpas Boat Yard SPS CSO Glanville Cleansing Limited17 Jun 201926 Nov 2019
MLA/2019/00271 - CompletedApplication - Maintenance of existing structures or assets QinetiQ Portland Grove Point maintenance and repair (July 19 - July 20) Grove Point Qinetiq Limited17 Jun 201917 Jun 2019
MLA/2019/00273 - CompletedApplication - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mr Charles Lister18 Jun 201918 Jun 2019
MLA/2019/00274/2 - CompletedApplication - Construction of new worksAthena Pier Gps Marine Contractors Limited 18 Jun 201921 Jul 2021
MLA/2019/00275 - CompletedApplication - Construction of new worksDeal and Walmer Rock GroynesSandown Castle Groyne, Walmer Groyne 3, Walmer Groyne 2, Walmer Groyne 1Dover District Council 18 Jun 201906 Jan 2020
MLA/2019/00276 - CompletedApplication - Other deposits Floating LiDAR Validation Project FLiDAR 1 - F140, FLiDAR 2 - F150Axys Technologies Inc19 Jun 201904 Sep 2019
MLA/2019/00278 - CompletedApplication - Maintenance of existing structures or assets East Anglia Zone- Meteorological Mast 1B- Operations & MaintenanceEAOW Met Mast 1BEast Anglia Offshore Wind Limited21 Jun 201921 Jun 2019
MLA/2019/00279 - CompletedApplication - Other worksBridgwater Tidal Barrier Ground Investigation Works - Temporary PontoonsDunball Wharf Bam Nuttall Limited21 Jun 201904 Oct 2019
MLA/2019/00281 - CompletedApplication - Other deposits Leman Offshore Mooring Buoy Leman Mooring BuoyPerenco Uk Ltd-Norwich 21 Jun 201917 Dec 2019
MLA/2019/00283 - WithdrawnApplication - Navigational dredging (maintenance)Berth Leveling Operation at Murphys Wharf - Inner Berth Armac Shipping Services Limited23 Jun 2019
MLA/2019/00284 - CompletedApplication - Construction of new worksPeak Lane Outfall Extension Peak_Lane_MMO_Shapefile 1 Arun District Council25 Jun 201915 Oct 2019
MLA/2019/00285 - CompletedApplication - Maintenance of existing structures or assets Ribble Link - extension of existing channel markers Ribble Link Canal & River Trust25 Jun 201925 Jun 2019
MLA/2019/00286 - CompletedApplication - Sampling South Bank Wharf Site Investigation South Bank Wharf Site Investigation Able Uk Ltd26 Jun 201919 Sep 2019
MLA/2019/00287 - CompletedApplication - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mr Charles Lister26 Jun 201926 Jun 2019
MLA/2019/00288 - CompletedApplication - Disposal of dredged material, Navigational dredging (capital)Gosport Boatyard Maintenance Dredge Gosport Boat Yard Limited26 Jun 201919 Sep 2019
MLA/2019/00290 - CompletedApplication - Construction of new works, Other deposits, Other works Arun to Pagham Beach Management Plan: Scheme Three; Middleton-on-SeaTransport of Rock to Site, Construction SiteArun District Council28 Jun 201911 Oct 2019
MLA/2019/00291 - CompletedApplication - Maintenance of existing structures or assets Commodores hard commodores hard Marval Marine Services Limited 28 Jun 201928 Jun 2019
MLA/2019/00292/1 - CompletedApplication - Construction of new worksPontoon Extension Trawl Dock LowestoftTrawl Dock Area Lowestoft Outer Harbour Associated British Ports.28 Jun 201909 Mar 2020
MLA/2019/00293 - CompletedApplication - Maintenance of existing structures or assets Lee on the solent Beach RDLee on the solent Beach RDBeasley Christopher Limited29 Jun 201929 Jun 2019
MLA/2019/00294 - CompletedApplication - Maintenance of existing structures or assets Boston Boatyard Seaweed Removal Bostons BoatyardGreenbelt Group Limited29 Jun 201929 Jun 2019
MLA/2019/00295 - CompletedApplication - Marine licence for the burial of human remains at sea NEWHAVEN (WI011)Arthur C. Towner Limited 01 Jul 201901 Jul 2019
MLA/2019/00296 - CompletedApplication - Maintenance of existing worksMoriconium Quay - Poole Moriconium Quay Moriconium Quay Management Company Limited.01 Jul 201903 Jul 2019
MLA/2019/00297/1 - CompletedApplication - Construction of new worksRD30 Waren Mill STW Waren Mill STWMott Macdonald Bentley Ltd 01 Jul 201931 Mar 2020
MLA/2019/00298 - CompletedApplication - Maintenance of existing structures or assets Eastern Road Water Bridge Maintenance Works Eastern_Road_WaterbridgeColas Limited02 Jul 201902 Jul 2019
MLA/2019/00299 - CompletedApplication - Maintenance of existing structures or assets Discovery Square Quay Maintenance DSQL Falmouth National Maritime Museum Cornwall Trust02 Jul 201902 Jul 2019
MLA/2019/00300/3 - CompletedApplication - Maintenance of existing worksRestoration of existing stone quay, increase in height for flood defense and new slipway. Dinahs Side Mr James Campbell03 Jul 201912 Feb 2021
MLA/2019/00301 - CompletedApplication - Minor removals Borehole Site Investigation - Aggregate Berth - Port of RamsgatePort of Ramsgate - Aggregate Berth - Site Investigation Thanet District Council03 Jul 201903 Jul 2019
MLA/2019/00302 - CompletedApplication - Construction of new works, Maintenance of existing works Ashlett Creek Seawall Maintenance Ashlett Creek Seawall Maintenance Esso Petroleum Company Limited 03 Jul 201914 Oct 2019
MLA/2019/00303 - CompletedApplication - Maintenance of existing worksCBC1/W670350 Nethertown - St Bees Sea Walls Nethertown St BeesNetwork Rail Ltd 04 Jul 201928 Nov 2019
MLA/2019/00304 - CompletedApplication - Construction of new worksKing Point Marina - Installation of Pier A Walkway Pontoons and deposit of finger pontoonsKing Point Marina Sutton Harbour Services Limited05 Jul 201908 Oct 2019
MLA/2019/00306 - CompletedApplication - Minor removals Quay Wall Design Information - Marine Borehole InvestigationSite_Area___Borehole InvestigationLondon Gateway Port Limited08 Jul 201908 Jul 2019
MLA/2019/00307 - CompletedApplication - Construction of new works, Maintenance of existing works Hull River Defenceintervention 101L36 - Flood defence improvements, intervention 101L33 - Flood defence improvements, Interventions 201R45-49 - Flood defence improvementsBmmjv Ltd08 Jul 201903 Jan 2020
MLA/2019/00308 - CompletedApplication - Maintenance of existing structures or assets B317 North Fairlee Farm Footbridge maintenance worksB317 North Fairle FarmRingway Island Roads Limited 08 Jul 201908 Jul 2019
MLA/2019/00310 - CompletedApplication - Construction of new worksSlipway WallClosure WallPort Of Tyne Authority 10 Jul 201910 Oct 2019
MLA/2019/00311/3 - CompletedApplication - Construction of new worksReplacement Jetty - Sea Cadets LittlehamptonSea Cadets JettyLittlehampton Sea Cadets 11 Jul 201909 Aug 2023
MLA/2019/00312/7 - CompletedApplication - Maintenance of existing worksImprovements to the Gwelva Landing serving St Michel’s Mount and to the toe of the adjacent sea wallGwelva Landing, St. Michael's Mount The National Trust 11 Jul 201914 Sep 2023
MLA/2019/00313 - CompletedApplication - Maintenance of existing structures or assets Coquet eel pass improvements at Warkworth weirWarkworth weirNorthumberland Rivers Trust12 Jul 201912 Jul 2019
MLA/2019/00314 - CompletedApplication - Maintenance of existing structures or assets Quay wall repairDart Marina Residential EstateDartmouth Land Company (Management) Limited15 Jul 201915 Jul 2019
MLA/2019/00315 - CompletedApplication - Construction of new works, Other works Sutton Harbour - Public Walkway connection and Event pontoons Sutton Harbour - Public Events Pontoon Use, Pontoon Walkway Reconfiguration Sutton Harbour Company Limited 15 Jul 201914 Oct 2019
MLA/2019/00316/3 - CompletedApplication - Construction of new works, Other deposits, Other removalsSouthsea Coastal Flood and Erosion Risk Management Scheme Coastal Partners 15 Jul 201924 Apr 2024
MLA/2019/00317 - CompletedApplication - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mr Charles Lister16 Jul 201916 Jul 2019
MLA/2019/00318 - CompletedApplication - Maintenance of existing structures or assets Port of Tyne Penstock Valve RelocationProposed Penstock Valve LocationPort Of Tyne 16 Jul 201916 Jul 2019
MLA/2019/00319 - CompletedApplication - Other deposits America-Europe Connect (Uk) Ltd UK EAST Corridor to 12NM, CATS Crossing, NORPIPE Crossing, SLEIPNER to EASINGTON Crossing, SHEARWATER to BACTON CrossingAqua Comm16 Jul 201925 Jun 2020
MLA/2019/00320 - CompletedApplication - Construction of new worksHead Cragg Marsh Embankment Coastal Defence DesignKirkby Pool scour protectionStory Contracting Limited17 Jul 201929 Nov 2019
MLA/2019/00321/1 - CompletedApplication - Other deposits America-Europe Connect (Uk) Ltd Aqua Comm17 Jul 201921 Dec 2021
MLA/2019/00322 - CompletedApplication - Maintenance of existing structures or assets Repair of dangerous jetty to houseboat James Egan Layne, Pin Mill Jetty Captain Andrew Strachan18 Jul 201918 Jul 2019
MLA/2019/00323 - CompletedApplication - Maintenance of existing structures or assets Bexhill Promenade Bexhill Promenade Beasley Christopher Limited20 Jul 201920 Jul 2019
MLA/2019/00324 - CompletedApplication - Maintenance of existing structures or assets Repair works and replacement pile to sandbanks jettySandbanks Jetty Constructex Limited22 Jul 201922 Jul 2019
MLA/2019/00325 - CompletedApplication - Maintenance of existing structures or assets Refurbishment of PontoonSite Area Solent University Limited22 Jul 201922 Jul 2019
MLA/2019/00326 - CompletedApplication - Non-navigational clearance dredgingWorthing Outfall 885x Blockage ClearanceJetting LocationSouthern Water Services Limited22 Jul 201922 Jul 2019
MLA/2019/00327 - CompletedApplication - Maintenance of existing structures or assets Bedenham Pier Scaffolding Bedenham Pier Structural Integrity Survey areaDefence Infrastructure Organisation23 Jul 201923 Jul 2019
MLA/2019/00328 - CompletedApplication - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mamarine.Com Llp 23 Jul 201923 Jul 2019
MLA/2019/00329/1 - CompletedApplication - Sampling Hinkley Point C Sediment Sampling Intakes 21 and 23, Intakes 11 and 13, Outfalls and Flotation Pocket, FRS Outfall, Jetty Berth PocketNnb Generation Company-Hpc Bristol 23 Jul 201929 Jul 2020
MLA/2019/00330/2 - CompletedApplication - Maintenance of existing worksWear Farm Culvert RepairCulvert repairNetwork Rail Swindon 23 Jul 201915 Jan 2020
MLA/2019/00332 - CompletedApplication - Maintenance of existing structures or assets Alnmouth Sea Wall Repairs Alnmouth Sea Wall Northumberland Estates Limited 25 Jul 201925 Jul 2019
MLA/2019/00334 - WithdrawnApplication - Other deposits USBL Training Fugro Gb (North) Marine Ltd26 Jul 2019
MLA/2019/00335 - CompletedApplication - Maintenance of existing structures or assets Old Bridge Street Retaining Wall Repair Old Bridge Street Retaining WallCormac Solutions Limited 26 Jul 201926 Jul 2019
MLA/2019/00337 - CompletedApplication - Maintenance of existing structures or assets Saltash Sailing Club - Seawall Gabion Repairs Saltash Sailing Club - SE CornerSaltash Sailing Club 29 Jul 201929 Jul 2019
MLA/2019/00338 - CompletedApplication - Maintenance of existing worksThe Hard Interchange, PortsmouthThe HardPortsmouth City Council (Escp) 30 Jul 201909 Dec 2019
MLA/2019/00339 - CompletedApplication - Maintenance of existing structures or assets South Ferriby Flood Alleviation SchemeScaffolding footprint Environment Agency 31 Jul 201931 Jul 2019
MLA/2019/00341 - CompletedApplication - Maintenance of existing works, SamplingGeotechnical Investigations Bedenham Pier Bedenham Pier Site and Geotechnical InvestigationsDefence Infrastructure Organisation02 Aug 201913 Dec 2019
MLA/2019/00342 - CompletedApplication - Maintenance of existing structures or assets Single marina pile replacementRoyal Harwich Yacht Club Marina Royal Harwich Yacht Club Limited 02 Aug 201902 Aug 2019
MLA/2019/00343 - CompletedApplication - Maintenance of existing structures or assets Hartlepool SO11 MaintenaceHartlepool SO11 Northumbrian Water Limited 02 Aug 201902 Aug 2019
MLA/2019/00344 - CompletedApplication - Maintenance of existing structures or assets Hartland PointHartland Breakwater Crestmoor Construction Services Limited02 Aug 201902 Aug 2019
MLA/2019/00345 - CompletedApplication - Other worksChichester Marina - L Pontoon Reconfiguration Chichester Marina L Pontoon Premier Marinas Chichester 06 Aug 201906 Dec 2019
MLA/2019/00346/1 - CompletedApplication - Other deposits MARINEFF pilot oyster reefCalshot outfall University Of Southampton07 Aug 201917 Jun 2020
MLA/2019/00347 - CompletedApplication - Maintenance of existing structures or assets Groyne Repairs at Western Esplanade HoveWestern Esplanade Groyne RepairsMackley Construction Limited 07 Aug 201907 Aug 2019
MLA/2019/00348 - CompletedApplication - Minor removals Swalecliffe WTW - Revised Ground InvestigationSwalecliffe Borehole Area Southern Water Services Limited07 Aug 201907 Aug 2019
MLA/2019/00349 - CompletedApplication - Maintenance of existing structures or assets Hayle Bridge - Home bargainsSite 1Cairn Cross Civil Engineering Limited09 Aug 201909 Aug 2019
MLA/2019/00350 - CompletedApplication - Maintenance of existing structures or assets A379 Shaldon Bridge - Piers 2 and 3 foundation repairsPiers 2 and 3 Devon County Council 09 Aug 201909 Aug 2019
MLA/2019/00351/1 - CompletedApplication - Construction of new worksGreat Yarmouth Bioengineered Habitat EnhancementBioenginnering_Enhancement_Area Jba Bentley Limited13 Aug 201917 Dec 2019
MLA/2019/00352 - CompletedApplication - Maintenance of existing structures or assets Minor maintenance of the estuary wall and slipway at Marine House, ShaldonMarine HouseMr George Irvine 13 Aug 201913 Aug 2019
MLA/2019/00354 - CompletedApplication - Navigational dredging (maintenance)Maintenance Water Injection Dredging of the Former Fawley Power Station dredge_area_BNG_250607Fawley Waterside Limited 14 Aug 201926 Nov 2019
MLA/2019/00355 - CompletedApplication - Beach maintenance activities Combe Martin - Beach Maintenance - recyclingCoobe Beach recycling Combe Martin Water Watch 14 Aug 201914 Aug 2019
MLA/2019/00356 - CompletedApplication - Non-navigational clearance dredgingNeptune Major Component Exchange Project. Greater Gabbard Offshore Wind LTD Greater Gabbard Greater Gabbard Offshore Winds Limited 15 Aug 201915 Aug 2019
MLA/2019/00358 - CompletedApplication - Non-navigational clearance dredgingCory Ship Repair Services Limited Slipway Surveys Cory Ship Repair Services Limited, Wharf Road, Gravesend, DA12 2RUTeignmouth Maritime Services Limited 15 Aug 201915 Aug 2019
MLA/2019/00359 - CompletedApplication - Maintenance of existing structures or assets Cross Trees Jetty, Chichester Harbour Cross Trees Jetty Walter Womersley 16 Aug 201916 Aug 2019
MLA/2019/00360 - CompletedApplication - Construction of new worksMedway Yacht Club-Pontoon hammerhead extensionMedway Yacht Club Upnor Rochester-pontoonsMedway Yacht Club16 Aug 201909 Dec 2019
MLA/2019/00362 - CompletedApplication - Maintenance of existing structures or assets Maryport Seawall Groyne repairs (Stage 2) Site AThomas Armstrong (Construction) Limited19 Aug 201919 Aug 2019
MLA/2019/00363 - CompletedApplication - Maintenance of existing worksGreater Gabbard Offshore Wind Farm - Reinstatement of Safe Fishing Environment, Cable Protection and Scour Remediation worksProjectCorridor Equitix Management Services Limited19 Aug 201901 Jun 2020
MLA/2019/00364 - CompletedApplication - Maintenance of existing structures or assets Access steps for works vessels associated with Oxen Cove jetty construction Oxen Cove Brixham Torbay Council 19 Aug 201919 Aug 2019
MLA/2019/00365 - CompletedApplication - Construction of new worksBrownsea Island JLP Jetty BrownseaJohn Lewis Partnership 20 Aug 201915 Sep 2020
MLA/2019/00366 - CompletedApplication - Minor removals TH027 monitoringIHHA116_SurveyArea_Ply_110618 Thomson Unicomarine Limited20 Aug 201920 Aug 2019
MLA/2019/00368 - CompletedApplication - Maintenance of existing structures or assets Install 2no. stainless steel brackets to house portable man retrievable winch Spragger Clough Top-Lifting Limited22 Aug 201922 Aug 2019
MLA/2019/00369 - CompletedApplication - Maintenance of existing structures or assets Swanpool SWW reqiusition outfallSwanpool SWW outfallNijhuis H2ok Limited 22 Aug 201922 Aug 2019
MLA/2019/00370 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance)East Cowes Marina Maintenance DredgeEast Cowes Marina, NAB TOWER (WI060), HURST FORT (WI080)Dean & Reddyhoff Limited 25 Aug 201916 Dec 2019
MLA/2019/00371/2 - CompletedApplication - Disposal of dredged material, Navigational dredging (capital)Harwich Haven Approach Channel DeepeningHarwich Haven Dredge ChannelHarwich Haven Authority27 Aug 201911 Aug 2023
MLA/2019/00372 - CompletedApplication - Non-navigational clearance dredgingB19-204 - Non-operational Dredging of Burnham Wick Outfall ChannelBurnhamWickOutfall1 Environment Agency 27 Aug 201927 Aug 2019
MLA/2019/00373 - CompletedApplication - Maintenance of existing structures or assets Hurst Castle - Sae Defence RepairsHurst CastleThe English Heritage Trust 27 Aug 201927 Aug 2019
MLA/2019/00374 - CompletedApplication - Maintenance of existing structures or assets Abbotts Court Revetment Repairs Polygon Environment Agency 28 Aug 201928 Aug 2019
MLA/2019/00375 - WithdrawnApplication - Construction of new worksCentenary Quay Hoist and Associated Pontoons Oceanic (Woolston) Limited 28 Aug 2019
MLA/2019/00376 - CompletedApplication - Deposit of markers Deployment of x 5 Marker Buoys in the Blackwater Estuary, Essex M1, M2, M3, M4, M5Partrac Limited28 Aug 201928 Aug 2019
MLA/2019/00377 - CompletedApplication - Maintenance of existing worksPremier Marinas Southsea - Pile Replacement Programme Southsea Marina Premier Marinas (Southsea) Limited 28 Aug 201931 Jan 2020
MLA/2019/00379 - CompletedApplication - Construction of new worksConstruction of 4 timber groynes, timber slipway extension and habitat creation 4m x 4m Timber extension to existing concrete slipway, Installation of three 3m groynes and one 6m terminal groyneGraham Attrill Civil Engineering Limited 30 Aug 201929 May 2020
MLA/2019/00380 - CompletedApplication - Maintenance of existing structures or assets RIOW 3257 Cot Valley, St Just Porth Nanven BeachGlanville Cleansing Holdings (Sw) Limited30 Aug 201930 Aug 2019
MLA/2019/00381 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance)Shoreham Port Authority Maintenance Dredging Sediment DisposalSHOREHAM (WI031)Shoreham Port Authority30 Aug 201902 Dec 2019
MLA/2019/00382/1 - CompletedApplication - Decommissioning of works, Maintenance of existing worksRamsgate Port Pontoon Refurbishment Ramsgate Port Pontoon Vattenfall Wind Power Ltd30 Aug 201925 Feb 2020
MLA/2019/00383 - CompletedApplication - Minor removals SGN Fareham Creek Boreholes Site indicative areaScotia Gas Networks Limited02 Sep 201902 Sep 2019
MLA/2019/00384 - CompletedApplication - Maintenance of existing worksSwan Quay River Wall Repair, Clive Street, North ShieldsSite Location Acw Property Limited 02 Sep 201915 Dec 2019
MLA/2019/00385 - CompletedApplication - Maintenance of existing structures or assets Albert Bridge House Albert Bridge House Albert Bridge House Management Company Limited 03 Sep 201903 Sep 2019
MLA/2019/00386 - CompletedApplication - Maintenance of existing structures or assets Albion RiversideAlbert RiversideAlbion Riverside Residential Management Limited03 Sep 201903 Sep 2019
MLA/2019/00387 - CompletedApplication - Maintenance of existing structures or assets Waterside Point Waterside Point Waterside Point (Freehold) Ltd 03 Sep 201903 Sep 2019
MLA/2019/00388/1 - CompletedApplication - Maintenance of existing worksRiverside One River WallRiverside One Foster + Partners Limited03 Sep 201927 Jan 2020
MLA/2019/00389 - CompletedApplication - Other deposits Devon Kelp Farm Green Ocean Farming03 Sep 201924 Oct 2019
MLA/2019/00390 - CompletedApplication - Construction of new worksRibble Link - jetty constructionRibble Link - jetty areaCanal And Rivers Trust 04 Sep 201925 Nov 2019
MLA/2019/00391 - CompletedApplication - Decommissioning of works Brine/Seawater Pipe Removal & Capping Ringborough Farm Beach (Aldbrough Gas Storage)Sse Hornsea Ltd04 Sep 201931 Jan 2022
MLA/2019/00392 - CompletedApplication - Construction of new worksNorth Portsea Island FCERM scheme - Phase 4b: Eastern RoadNPI Phase 4b Eastern Road Eastern Solent Coastal Partnership 04 Sep 201903 Apr 2020
MLA/2019/00393 - CompletedApplication - Maintenance of existing structures or assets Hythe (Southampton) Sailing Club Jetty Refurbishmenthythe (Southampton) Sailing Club jettyHythe (Southampton) Sailing Club 05 Sep 201905 Sep 2019
MLA/2019/00395 - CompletedApplication - Construction of new worksNew Monks Farm Pumping StationNew Monks Farm Flood Alleviation Pumping StationThe Civil Engineering Practice 05 Sep 201926 Jun 2020
MLA/2019/00396 - WithdrawnApplication - Construction of new worksAggregate Plant at Frog IslandAggregate Terminal at Frog Island Walsh Recycling & Construction Solutions 05 Sep 2019
MLA/2019/00398 - CompletedApplication - Maintenance of existing structures or assets Par Docks, Cornwall - Mortar Repairs to Masonry Sea WallPar Docks, Cornwall Teignmouth Maritime Services Limited 06 Sep 201906 Sep 2019
MLA/2019/00399 - CompletedApplication - Maintenance of existing structures or assets River Lune Viaduct Scour Protection River Lune ViaductJ. Murphy & Sons Limited 09 Sep 201909 Sep 2019
MLA/2019/00400 - CompletedApplication - Maintenance of existing structures or assets Merchant Court - Riverside JettyMerchant CourtRendall & Rittner Limited27 Oct 202027 Oct 2020
MLA/2019/00401 - CompletedApplication - Other deposits Deployment of x5 guard buoys with seabed frames and x1 wave buoy in Blackwater Estuary, Essex M1, M2, M3, M4, M5, M6Bradwell Power Generation Company Ltd. 10 Sep 201919 Dec 2019
MLA/2019/00402 - CompletedApplication - Maintenance of existing structures or assets Chelsea Bridge Abutment Fender RenewalSite 1F M Conway Limited 13 Sep 201913 Sep 2019
MLA/2019/00403/1 - CompletedApplication - Construction of new worksHumber Hull Frontages - Victoria Pier Victoria_Pier_rlb_20190604Bam Nuttall Limited13 Sep 201902 Jun 2020
MLA/2019/00404 - CompletedApplication - Construction of new works, Other removalsHornsea Project Two Offshore Wind Farm - Offshore Boulder Relocation and Trial TrenchingArrayAreaCableCorridorOptimus Wind Limited 13 Sep 201931 Mar 2020
MLA/2019/00405 - CompletedApplication - Construction of new worksBattersea Power Station - Phase 2 Outfall BPS - Outfall & GabionBattersea Project Phase 2 Development Company Limited17 Sep 201904 Mar 2020
MLA/2019/00406 - CompletedApplication - Minor removals Removal of a damaged concrete mattress from the NemoLink installed cableMinorRemovalBoundaryNational Grid Nemo Link Limited17 Sep 201917 Sep 2019
MLA/2019/00407 - CompletedApplication - Non-navigational clearance dredgingProposed small marine dredging works around a slipway access to LANGSTONE HARBOUR FISHERMENS ASSOCIATIONLHFA TIDAL SLIPWAYLangstone Harbour Fishermens Assoc 18 Sep 201918 Sep 2019
MLA/2019/00408 - CompletedApplication - Disposal of dredged material, Navigational dredging (capital)PILOT STATION DREDGEPilot Station Dredge -TYNE, NORTH TYNE (TY070)Port Of Tyne Authority 19 Sep 201928 Nov 2019
MLA/2019/00409 - CompletedApplication - Other worksAshlett Sailing Club Jetty Replacement Ashlett Sailing Club 20 Sep 201906 Feb 2020
MLA/2019/00411 - CompletedApplication - Maintenance of existing structures or assets Laira Road Bridge Gas Pipe refurbishmentSite 1Taziker Industrial Limited 20 Sep 201920 Sep 2019
MLA/2019/00412 - CompletedApplication - Maintenance of existing structures or assets Beach House Quay, East Portlemouth wall repairs BHQ Pca Consulting Engineers Ltd 23 Sep 201923 Sep 2019
MLA/2019/00413 - CompletedApplication - Maintenance of existing structures or assets Berwick New Road - Footpath RepairBerwick New Road - Footpath Northumberland County Council23 Sep 201923 Sep 2019
MLA/2019/00415 - CompletedApplication - Maintenance of existing structures or assets River Umber Combe Martin Beach Wall RepairCombe Martin-River Wall Combe Martin Coastal Community Team24 Sep 201924 Sep 2019
MLA/2019/00416 - CompletedApplication - Maintenance of existing structures or assets Replacement steps at front of property, repointing, scaffold for building painting. Warfleet Boathouse Cottage, WarfleetMr David Fisher24 Sep 201924 Sep 2019
MLA/2019/00419 - CompletedApplication - Maintenance of existing structures or assets Maintenance Work and Increase in Wall Height to the Fleet Drain/Hessle Clough Structure Hessle Clough Structure, Fleet DrainEast Riding Of Yorkshire Council 27 Sep 201927 Sep 2019
MLA/2019/00420/1 - CompletedApplication - Construction of new works, Maintenance of existing works Marsh Dykes- Outfall Access ImprovementsLake 5 Sluice- Greenwich, Abbey Sluice- Thamesmead, Great Breach- Thamesmead, Crayford Sluice- Thamesmead Ch2m Hill United Kingdom 27 Sep 201910 Jun 2020
MLA/2019/00422 - CompletedApplication - Beach maintenance activities Shoreham to Southwick Beach Recycling Shoreham RecyclingShoreham Port Authority30 Sep 201930 Sep 2019
MLA/2019/00423 - CompletedApplication - Maintenance of existing structures or assets Detailed Jetty structural measurement surveyThames Oilport Jetty 5Morzine (U.K. Branch) Limited30 Sep 201930 Sep 2019
MLA/2019/00424 - CompletedApplication - Maintenance of existing structures or assets Thames Tideway - works to building adjacent to Cremorne Wharf Depot CREWD Laing O'Rourke Construction Limited01 Oct 201901 Oct 2019
MLA/2019/00425 - CompletedApplication - Other deposits America-Europe Connect (UK) Ltd Whitley Bay Stub Cable Corridor Aqua Comm01 Oct 201909 Jun 2022
MLA/2019/00426 - CompletedApplication - Maintenance of existing structures or assets Newhaven Swing Bridge - Matrix sign Newhaven Swing Bridge - control buildingCostain Limited02 Oct 201902 Oct 2019
MLA/2019/00427 - CompletedApplication - Construction of new worksProposed Private Timber Jetty at No 3, Waters Edge, Port La Salle, Yarmouth, Isle of WightNo.3 Waters EdgeMiss Dianne Thompson 03 Oct 201915 Apr 2020
MLA/2019/00428 - CompletedApplication - Construction of new worksEssex Embankments- Moverons Groyne Construction areaJeremy Benn Associates Limited 04 Oct 201907 Sep 2020
MLA/2019/00429/2 - CompletedApplication - Construction of new worksEastham Hydropower ProjectEastham LockWeaver Hydro Limited 08 Oct 201907 Jan 2022
MLA/2019/00430 - CompletedApplication - Minor removals Folkestone Warren West Beach Sea Defences Ground InvestigationFolkestone Warren West BeachBam Nuttall Limited08 Oct 201908 Oct 2019
MLA/2019/00431 - CompletedApplication - Maintenance of existing structures or assets Craster Sea Outfall Maintenance RepairCraster Sea Outfall Northumbrian Water Limited 08 Oct 201908 Oct 2019
MLA/2019/00432 - CompletedApplication - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mr Charles Lister09 Oct 201909 Oct 2019
MLA/2019/00433 - CompletedApplication - Maintenance of existing structures or assets London Eye Pier Bearing Refurbishment London Eye Pier Site Location London Eye Management Services Limited 03 Jan 202303 Jan 2023
MLA/2019/00434 - CompletedApplication - Maintenance of existing structures or assets Repairs to existing jetty pileRNLI Lifeboat Jetty Royal National Lifeboat Institution10 Oct 201910 Oct 2019
MLA/2019/00435 - CompletedApplication - Construction of new worksGabion Basket Headwall Installation GabionThe Wildlife & Wetlands Trust10 Oct 201912 Dec 2019
MLA/2019/00436 - CompletedApplication - Maintenance of existing structures or assets Installation and Use of the B.I.R.D System on the Offshore Substation Platform at Westermost Rough Offshore Wind Farm Westernmost_substation_wgs84Transmission Investment Llp10 Oct 201910 Oct 2019
MLA/2019/00437 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance)amble dredgingRNLI Amble - Area of Maintenance Dredge, NOSES POINT (TY130), BLYTH A + B (TY042) R.N.L.I. (Trading) Limited 10 Oct 201912 Feb 2020
MLA/2019/00438 - CompletedApplication - Maintenance of existing structures or assets Cromer Pier Sub-Structure Maintenance Cromer Pier North Norfolk District Council 11 Oct 201911 Oct 2019
MLA/2019/00440 - CompletedApplication - Non-navigational clearance dredgingDesilting works at Cake Pill Outfall, Mitchel Salt & Stupp Pill Outfall, and New Pill Outfall ASEA DesiltingEnvironment Agency 14 Oct 201914 Oct 2019
MLA/2019/00441 - CompletedApplication - Aggregate dredging Area 529 trial dredging 529 Sea Aggregates Limited 14 Oct 201929 Apr 2020
MLA/2019/00442 - CompletedApplication - Maintenance of existing structures or assets 127/353 Woolwich Arsenal river wall maintenance site 1Haydn Evans Consulting Limited 15 Oct 201915 Oct 2019
MLA/2019/00443 - CompletedApplication - Minor removals Tower Wharf Jetty GITower Wharf Seacon Group Limited 15 Oct 201915 Oct 2019
MLA/2019/00444 - CompletedApplication - Other removals, Other worksRampion Offshore Wind Farm - Pre-emptive array cable repairsRampion Offshore Wind FarmE.On Climate & Renewables Uk Rampion Offshore Wind Limited 16 Oct 201901 May 2020
MLA/2019/00445 - CompletedApplication - Maintenance of existing structures or assets LONDON RIVER HOUSE SCAFFOLDINGLONDON RIVER HOUSEPort Of London Authority Limited 16 Oct 201916 Oct 2019
MLA/2019/00447/1 - CompletedApplication - Disposal of dredged material DEEP WATER RELOCATION SITE (PORTLAND INNER HARBOUR) (PLACEMENT OF UP TO 120'000m3)Deep Water Relocation (PO111) Portland Harbour Authority Ltd 18 Oct 201930 Nov 2020
MLA/2019/00448 - CompletedApplication - Aggregate dredging, Sampling Area 531, North Bristol Deep Grouped under: Area 531 - North Bristol Deep extension Showing 2 of 4 cases Tarmac Marine Dredging Limited 18 Oct 201901 Apr 2021
MLA/2019/00449 - CompletedApplication - Maintenance of existing structures or assets Ropetackle OutfallRopetackle North OutfallP.M.C. Construction And Development Services Limited 22 Oct 201922 Oct 2019
MLA/2019/00450 - CompletedApplication - Maintenance of existing structures or assets REPLACEMENT OF STEEL MEMBERS AT ST ANNES PIER St Annes Pier J.Wareing & Son (Wrea Green) Limited 23 Oct 201923 Oct 2019
MLA/2019/00451/2 - CompletedApplication - Construction of new worksHQS Wellington Dolphin ReplacementHQS Wellington Bow, HQS Wellington SternThe Wellington Trust 24 Oct 201916 Sep 2020
MLA/2019/00452 - CompletedApplication - Maintenance of existing structures or assets Removal of dangerous sea wall Kittery Court Marcus Evans T/A Landmarc24 Oct 201924 Oct 2019
MLA/2019/00454 - CompletedApplication - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mamarine.Com Llp 24 Oct 201924 Oct 2019
MLA/2019/00455 - CompletedApplication - Minor removals Site Investigations Regent Cinema Regent Cinema Site Investigations Dunelm Geotechnical & Environmental Limited29 Oct 201929 Oct 2019
MLA/2019/00456 - CompletedApplication - Construction of new worksRNLI Weston-super-Mare Rnli Estates 29 Oct 201908 Apr 2021
MLA/2019/00457/1 - CompletedApplication - Aggregate dredging, Sampling Area 531, North Bristol Deep Grouped under: Area 531 - North Bristol Deep extension Showing 2 of 4 casesArea 531Hanson Aggregates Marine Limited 30 Oct 201904 May 2023
MLA/2019/00458 - CompletedApplication - Maintenance of existing structures or assets Western Riverside Transfer StationWestern_Riverside_shapefile Gps Marine Contractors Limited 30 Oct 201930 Oct 2019
MLA/2019/00459/1 - CompletedApplication - Disposal of dredged material, Navigational dredging (capital)Dredge at Tyne Dock Enterprise Park Port Of Tyne Authority 31 Oct 201914 Jun 2021
MLA/2019/00460 - CompletedApplication - Maintenance of existing structures or assets Sewer mainteance, forshore off Island Quay, SalcombeAdjacent Island House, Salcombe Glanville Cleansing Limited31 Oct 201931 Oct 2019
MLA/2019/00461 - CompletedApplication - Maintenance of existing structures or assets Walbrook WharfWalbrook_Wharf_shapefileGps Marine Contractors Limited 31 Oct 201931 Oct 2019
MLA/2019/00462/2 - CompletedApplication - Construction of new works46 Nine Elms Lane Temporary Wall Propping 46 Nine Elms Lane temporary wall propping Team2100 31 Oct 201907 May 2020
MLA/2019/00463 - CompletedApplication - Other deposits Blackwater ambient noise monitoring Bradwell_Noise_Lander_Deployment_Boundary Cefas04 Nov 201927 Jan 2020
MLA/2019/00464 - CompletedApplication - Other worksRemoval of above ground redundant gas mainMillom Redundant Main Balfour Beatty Plc 05 Nov 201904 Mar 2020
MLA/2019/00465 - CompletedApplication - Maintenance of existing worksWeymouth Bay RangeWeymouth Bay RangeQinetiq Limited05 Nov 201906 Feb 2020
MLA/2019/00467/1 - CompletedApplication - Construction of new works, Navigational dredging (capital) Sediment removal and installation of pontoons secured by pilesPile Installation, Pontoon, Captial Dredging Area Gweek Quay Limited.06 Nov 201917 Nov 2022
MLA/2019/00468 - CompletedApplication - Maintenance of existing structures or assets Worthing 68 marine cresent68 Marine cresent, Worthing Beasley Christopher Limited07 Nov 201907 Nov 2019
MLA/2019/00469/1 - CompletedApplication - Disposal of dredged material Teesside GasPortTEES BAY C (TY150)Pd Ports Limited 07 Nov 201910 Aug 2023
MLA/2019/00470 - CompletedApplication - Maintenance of existing structures or assets Hayling SeagroveHayling SeagroveBeasley Christopher Limited07 Nov 201907 Nov 2019
MLA/2019/00471 - CompletedApplication - Maintenance of existing structures or assets Bognor Regis Barrack Lane Bognor Regis Barrack Lane Beasley Christopher Limited07 Nov 201907 Nov 2019
MLA/2019/00472 - CompletedApplication - Other deposits `Emergency` Shingle Beach RechargeHurst Castle - Shingle Recharge English Heritage Trust 07 Nov 201930 Dec 2019
MLA/2019/00473 - CompletedApplication - Maintenance of existing structures or assets Lee on the solent Range house Lee on the solent Range House Beasley Christopher Limited08 Nov 201908 Nov 2019
MLA/2019/00474 - CompletedApplication - Maintenance of existing structures or assets Lee on the Solent Salterns Rd outer Lee on the solent Salterns Rd Outer Beasley Christopher Limited08 Nov 201908 Nov 2019
MLA/2019/00475 - CompletedApplication - Non-navigational clearance dredgingGreat Breach Urgent Works Great Breach Sluice Ch2m Hill United Kingdom 08 Nov 201908 Nov 2019
MLA/2019/00476 - CompletedApplication - Maintenance of existing structures or assets Ravenglass - Drigg plain line track renewalsRiver Mite viaduct, River Irt viaduct Thomson Ecology Limited08 Nov 201908 Nov 2019
MLA/2019/00477 - CompletedApplication - Non-navigational clearance dredgingClear accumulated silt from around the marina pontoons. Royal Harwich Yacht Club Marina Royal Harwich Yacht Club Limited 11 Nov 201911 Nov 2019
MLA/2019/00478 - CompletedApplication - Non-navigational clearance dredgingDesilting works at Chestle Pill Outfall and Cotteralls outfallChestle Pill Outfall and Cotteralls Outfall Environment Agency 12 Nov 201912 Nov 2019
MLA/2019/00479 - CompletedApplication - Maintenance of existing structures or assets WORTHING HEENE TERRACE WEST Worthing Heene Terrace West Beasley Christopher Limited13 Nov 201913 Nov 2019
MLA/2019/00480 - CompletedApplication - Maintenance of existing structures or assets MPS Wapping Repairs MPS Wapping Metropolitan Police Service13 Nov 201913 Nov 2019
MLA/2019/00482 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance)Falmouth Marina - Outer Basin Maintenance DredgeFALMOUTH BAY (B) (PL075), Falmouth Marina Outer Basin Premier Marinas Falmouth) Limited14 Nov 201913 May 2020
MLA/2019/00483 - CompletedApplication - Maintenance of existing structures or assets Lee on the Solent Salterns RD outer revised Salterns Rd outer Beasley Christopher Limited14 Nov 201914 Nov 2019
MLA/2019/00484 - CompletedApplication - Maintenance of existing worksDock Repair Lifting DockTitchmarsh Marina (Walton On-The-Naze) Limited 14 Nov 201914 May 2020
MLA/2019/00485 - CompletedApplication - Construction of new works, Other removalsLand Between the Bridges, West Quay Road, Poole Land Between the BridgesReuben & Morgan Limited14 Nov 201926 Aug 2022
MLA/2019/00486 - CompletedApplication - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mr Charles Lister15 Nov 201915 Nov 2019
MLA/2019/00487 - CompletedApplication - Beach maintenance activities Movement of windblown sand on Porthmeor beach, St Ives, CornwallPorthmeor Cornwall Council 15 Nov 201915 Nov 2019
MLA/2019/00488/4 - Variation RequestedApplication - Construction of new works, Disposal of dredged material, Other deposits, Other dredgingNeuConnect: GB Offshore SchemeNeuConnect_PRC_GB_200902, Presweeping, Cable Route Corridor UK Territorial Waters, Cable Operation and Maintenance, NeuConnect Disposal Site 1 (TH059), NeuConnect Disposal Site 2 (TH067), NeuConnect South Site (TH068), NeuConnect Lower Mid Site (TH069), NeuConnect Upper Mid Site (TH074), NeuConnect North Site (HU224), EAOW3 (HU212) Neuconnect Britain Ltd 15 Nov 201926 Apr 2024
MLA/2019/00489 - CompletedApplication - Maintenance of existing structures or assets Blade ExchangeKentish Flats Array SiteVattenfall Wind Power Ltd18 Nov 201918 Nov 2019
MLA/2019/00490 - CompletedApplication - Construction of new worksEbbsfleet Storm Water Outfall Whitecliffe Storm Water Outfall Independent Water Networks Limited 18 Nov 201913 Aug 2020
MLA/2019/00491 - CompletedApplication - Maintenance of existing structures or assets Vegetation management at Waterside, Curlew DriveCurlew DriveMarcus Evans T/A Landmarc19 Nov 201919 Nov 2019
MLA/2019/00492 - CompletedApplication - Maintenance of existing structures or assets River Itchen Railway Bridge Track Timber ReplacementRiver Itchen Railway Bridge E15/2 Network Rail 20 Nov 201920 Nov 2019
MLA/2019/00494 - CompletedApplication - Construction of new worksWicormarine - Link PontoonWicormarine Connecting PontoonWicormarine Limited22 Nov 201912 Mar 2020
MLA/2019/00495 - CompletedApplication - Navigational dredging (maintenance)Dredging the approach to Canning Half Tide Dock Canning half tide dock approach Canal And Rivers Trust 22 Nov 201910 Jan 2020
MLA/2019/00496 - CompletedApplication - Navigational dredging (maintenance)Increase dredge box depth from bi-annual Dredge to new target level 13mtrs. Berth 1 operational lineNavigator Terminals Thames 26 Nov 201926 Mar 2020
MLA/2019/00497/1 - CompletedApplication - Construction of new works, Other removalsThames Side West – River Wall Works Activity Site 1 - Obstruction Removal, Activity Site 2 - Construction, Activity Site 3 - Construction RemovalsSilvertown Homes Limited 26 Nov 201907 Oct 2022
MLA/2019/00498 - CompletedApplication - Minor removals Coastguard to Colonnade C2C GIBam Nuttall Limited26 Nov 201926 Nov 2019
MLA/2019/00499/1 - Variation RequestedApplication - Construction of new works, Maintenance of existing works, Other removals Quay Wall Replacement, Sparkes Marina, Chichester Harbour Sparkes Quay Wall Marina Developments Ltd27 Nov 201903 Nov 2020
MLA/2019/00500 - CompletedApplication - Construction of new works, Disposal of dredged material, Navigational dredging (capital) Proposed small scale dredging, installation of 'versa-dock' and pontoon with associated piles.SWANAGE BAY (WI110), Dredge and Installation Location Sandbanks Yacht Company Limited27 Nov 201917 Apr 2020
MLA/2019/00501 - CompletedApplication - Construction of new worksFlood Defence WallFlood wall and working area Jba Bentley Limited27 Nov 201911 Mar 2020
MLA/2019/00502/2 - CompletedApplication - Construction of new worksLa Crevette (Halftide House) seawall plinth La Crevette Mr Matt Yeoman 27 Nov 201908 Feb 2021
MLA/2019/00503 - CompletedApplication - Maintenance of existing structures or assets MPS Wapping MPS Wapping Metropolitan Police Service28 Nov 201928 Nov 2019
MLA/2019/00504 - CompletedApplication - Other deposits USBL Training - Deployment and recovery of acoustic transpondersBarn Pool Fugro Gb (North) Marine Ltd28 Nov 201909 Mar 2020
MLA/2019/00505 - CompletedApplication - Maintenance of existing structures or assets Repairs to Pas Wharf, HMNB DevonportPas Wharf Babcock International Group Plc28 Nov 201928 Nov 2019
MLA/2019/00506 - CompletedApplication - Maintenance of existing structures or assets Triton Knoll Demarcation Buoy and Boat Landing Cleaning DemarcationBuoysPoly_5mBuff Triton Knoll Offshore Wind Farm Limited28 Nov 201928 Nov 2019
MLA/2019/00507 - CompletedApplication - Maintenance of existing structures or assets DEAL - DOWNS SAILING CLUB DEAL - DOWNS SAILING CLUB Beasley Christopher Limited28 Nov 201928 Nov 2019
MLA/2019/00508 - CompletedApplication - Maintenance of existing structures or assets Trinity Buoy Wharf River Wall Minor Maintenance Repairs 2019Trinity Buoy Wharf River Wall Urban Space Management (Tbw) Limited 29 Nov 201929 Nov 2019
MLA/2019/00509/2 - CompletedApplication - Construction of new worksGosport Sea Wall RepairsGosport Sea Wall RepairsMinistry Of Defence29 Nov 201929 Sep 2020
MLA/2019/00510 - CompletedApplication - Maintenance of existing structures or assets Hartlepool SO5-SO7 Outfall grille repairs SO5 + SO7 Northumbrian Water Limited 02 Dec 201902 Dec 2019
MLA/2019/00511 - CompletedApplication - Maintenance of existing structures or assets North Shields Pedestrian Ferry Terminal Repairs North Shields Pedestrian Ferry Terminal G & B Civil Engineering Limited03 Dec 201903 Dec 2019
MLA/2019/00512 - CompletedApplication - Maintenance of existing worksCBC1 W6158 Meathop Embankment CBC1 W61580 Meathop EmbankmentNetwork Rail Ltd 03 Dec 201912 May 2020
MLA/2019/00513 - CompletedApplication - Maintenance of existing structures or assets Great Breach Urgent Works Great Breach Sluice Ch2m Hill United Kingdom 03 Dec 201903 Dec 2019
MLA/2019/00514/1 - CompletedApplication - Maintenance of existing worksWalney Extension Transmission Assets O&MMMO_Application_ExpCab_Corridor_WGS84_20191203Orsted Power Uk Ltd03 Dec 201904 Jun 2020
MLA/2019/00515/1 - CompletedApplication - Maintenance of existing worksEsso Purfleet Jetty Fenders Esso_1_Purfleet_shapefile Esso Petroleum Company,Limited 03 Dec 201902 Dec 2020
MLA/2019/00516 - CompletedApplication - Maintenance of existing structures or assets Queen Anne's Battery Mooring Pile Maintenance Queen Anne's Battery Marina Marina Developments Limited05 Dec 201905 Dec 2019
MLA/2019/00518 - CompletedApplication - Maintenance of existing worksWestmere Pumping Station Sluice Outfall Westmere sluice outfall South Holland Internal Drainage Board05 Dec 201923 Apr 2020
MLA/2019/00519 - CompletedApplication - Maintenance of existing worksFleet Haven Pumping Station Outfall South Holland Internal Drainage Board05 Dec 201927 May 2020
MLA/2019/00521 - CompletedApplication - Construction of new works, Disposal of dredged material, Maintenance of existing works, Navigational dredging (maintenance)Marina pontoon maintenance and upgrade. Amble Marina works area, AMBLE MARINA OUTFALL (TY022) Amble Marina Limited 08 Dec 201903 Sep 2020
MLA/2019/00522 - CompletedApplication - Maintenance of existing structures or assets Albert Bridge - Fender RenewalAlbert bridge F M Conway Limited 09 Dec 201909 Dec 2019
MLA/2019/00523 - CompletedApplication - Maintenance of existing structures or assets Northfleet Jetty hoist maintenanceHoist locationPort Of London Authority 10 Dec 201910 Dec 2019
MLA/2019/00524 - CompletedApplication - Beach maintenance activities Exmouth Beach PullbackExmouth Beach East Devon District Council Camperdown 10 Dec 201910 Dec 2019
MLA/2019/00525 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance)King Point Marina - Maintenance DredgePlymouth Deep (PL035), King Point MarinaSutton Harbour Company 10 Dec 201916 Sep 2021
MLA/2019/00526 - CompletedApplication - Beach maintenance activities Black Rock to Shoreham Port - Shingle recycling Black RockBrighton And Hove City Council Hove10 Dec 201910 Dec 2019
MLA/2019/00527 - CompletedApplication - Maintenance of existing structures or assets Lynemouth Power Station Outfall Pipe Structure and Void Repairs Lynemouth Power Limited Outfall Pipe StructureLynemouth Power Limited11 Dec 201911 Dec 2019
MLA/2019/00528 - CompletedApplication - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mamarine.Com Llp 12 Dec 201912 Dec 2019
MLA/2019/00529 - CompletedApplication - Maintenance of existing structures or assets Maintenance (replacement) of 2 No. existing South West Water sewer manhole covers and frames at Newton Ferrers, Devon Manhole frame and cover replacement (2 subsite locations) Glanville Cleansing Limited12 Dec 201912 Dec 2019
MLA/2019/00531/1 - CompletedApplication - Maintenance of existing worksMillennium Quay River Wall RepairsMillennium Quay River Wall Repair Millennium Quay Residents Association13 Dec 201906 Oct 2020
MLA/2019/00532/1 - CompletedApplication - Construction of new works, Maintenance of existing works Trinity Buoy wharf Strengthening PilesDownstream Pile, Upstream PileThames Clipper Limited 13 Dec 201914 Aug 2020
MLA/2019/00533 - CompletedApplication - Construction of new worksWaveney Intake Eel ScreensWaveney Interserve Project Services Ltd13 Dec 201917 Mar 2020
MLA/2019/00534 - CompletedApplication - Maintenance of existing structures or assets Resurface slipway Slipway Waterings BoatyardSam Heard16 Dec 201916 Dec 2019
MLA/2019/00536 - CompletedApplication - Construction of new worksWhitegates East Pontoon Upgrade Wightgates Pontoons Cowes Harbour Commissioners17 Dec 201928 Apr 2021
MLA/2019/00537 - CompletedApplication - Construction of new worksHowley Weir Howley Weir H2o Power Ltd17 Dec 201916 Mar 2020
MLA/2019/00538 - CompletedApplication - Maintenance of existing structures or assets Pile replacementTitchmarsh Marina Ltd Titchmarsh Marina (Walton On-The-Naze) Limited 18 Dec 201918 Dec 2019
MLA/2019/00540/2 - CompletedApplication - Other deposits East Anglia TWO Floating LiDAR Buoy Deployment Scottishpower Renewables 19 Dec 201925 Nov 2020
MLA/2019/00541/1 - CompletedApplication - Construction of new worksTower Wharf Jetty Tower Wharf Seacon Terminals Limited 19 Dec 201919 Oct 2021
MLA/2019/00542 - CompletedApplication - Maintenance of existing structures or assets HMS Belfast Bearing and Dolphin Maintenance Works HMS Belfast Imperial War Museum Trading Company Limited19 Dec 201919 Dec 2019
MLA/2019/00543 - CompletedApplication - Maintenance of existing worksNemoLink O&M Remedial Works Locations 5 & 6, Locations 8 & 9, Location 2, Location 3, Location 4, Location 7, Location 10, Location 11, Location 12 National Grid Nemo Link19 Dec 201930 Sep 2021
MLA/2019/00544 - CompletedApplication - Other removals Port of Garston Sheet pile removal and wall reinstatement works locationAssociated British Ports Garston 20 Dec 201904 Jun 2020
MLA/2019/00546/1 - CompletedApplication - Construction of new worksDagenham Jetty Feeder ConveyorHanson_Dagenham_Conveyor_Shape_filesHanson Aggregates Marine Limited 20 Dec 201922 Feb 2021
MLA/2019/00547/1 - CompletedApplication - Maintenance of existing worksOrford Ness River Wall Maintenance ProjectOrford Ness River Walls The National Trust -Bury St Edmunds20 Dec 201920 Jun 2022
MLA/2019/00548 - CompletedApplication - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mr Charles Lister20 Dec 201920 Dec 2019
MLA/2019/00549 - CompletedApplication - Disposal of dredged material, Other dredging Triton Knoll Sandwave Clearance - outwith SAC Sandwave Clearance (outside SAC), Triton Knoll Disposal Site B (HU219)Triton Knoll Offshore Wind Farm Limited23 Dec 201917 Jul 2020
MLA/2019/00550/1 - CompletedApplication - Construction of new worksFalmouth Haven Reconfiguration & Small boat berthing facility Falmouth Haven Marina Falmouth Harbour Commissioners 23 Dec 201910 Dec 2020
MLA/2019/00551 - WithdrawnApplication - Disposal of dredged material, Other dredging Triton Knoll Sandwave Clearance - IDRBNR SAC Triton Knoll Offshore Wind Farm Limited23 Dec 2019
MLA/2019/00552 - CompletedApplication - Maintenance of existing structures or assets Rottingdean SW Outfall repairsRottingdean Outfall Beasley Christopher Limited28 Dec 201928 Dec 2019
MLA/2019/00553 - CompletedApplication - Maintenance of existing structures or assets Marske NZ64221701 Marske NZ64221701 Northumbrian Water Limited 31 Dec 201931 Dec 2019