User Tools

Site Tools


mmo_-_mlas_-_2021

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
mmo_-_mlas_-_2021 [2024/09/15 20:14] – created nefcadminmmo_-_mlas_-_2021 [2026/04/06 08:33] (current) nefcadmin
Line 3: Line 3:
 [[this>MMO/21MLAs_240913.csv|Download 21MLAs_240913.csv]] [[this>MMO/21MLAs_240913.csv|Download 21MLAs_240913.csv]]
  
-<csv file="https://northeastfc.uk/MMO/21MLAs_240913.csv"></csv>+csv file="https://northeastfc.uk/MMO/21MLAs_240913.csv" /csv 
 + 
 +<datatables> 
 +^Case Details^Project Type^Project Title ^Locations ^Applicant Name^Submission Date^Decision Date^ 
 +|MLA/2021/00001 - Completed|Application - Construction of new works, Maintenance of existing works|Maintenance and addition to moorings|Bury Mooring area, Main Mooring Area|Marchwood Yacht Club|03 Jan 2021|04 Jan 2022| 
 +|MLA/2021/00003 - Completed|Application - Maintenance of existing structures or assets|Installation of cable under quay at Port of Tyne Bulk Terminal|TBT |Port Of Tyne|05 Jan 2021|05 Jan 2021| 
 +|MLA/2021/00004 - Completed|Application - Maintenance of existing structures or assets|Foreshore trial pit excavations, The Ness, Shaldon, Devon |Ness, Shaldon, Devon|Tda |05 Jan 2021|05 Jan 2021| 
 +|MLA/2021/00005 - Completed|Application - Other deposits|Studland Bay Eco-moorings |Studland Bay Moorings |The Seahorse Trust|05 Jan 2021|21 May 2021| 
 +|MLA/2021/00007 - Completed|Application - Maintenance of existing works |NDYC Slipway Maintenance and Minor Extension|North Devon yacht club slipway|North Devon Yacht Club|06 Jan 2021|21 Jul 2022| 
 +|MLA/2021/00009 - Completed|Application - Maintenance of existing structures or assets|Gateshead Millennium Bridge; End Supports; Glazed Canopies; Joint Sealant Replacement |South End Support, North End Support|Gateshead Council |07 Jan 2021|07 Jan 2021| 
 +|MLA/2021/00010/1 - Completed|Application - Construction of new works, Maintenance of existing works, Other works |Barnes Flood Alleviation Scheme |Elm Bank Outfall/ Culvert, White Hart Lane Outfall/ Culvert |Ch2m Hill United Kingdom|07 Jan 2021|02 Nov 2022| 
 +|MLA/2021/00011 - Completed|Application - Minor removals|Great Yarmouth EPOCH 2 Ground Investigation for New Flood Defence Wall|Ground Investigation Site Extent|Jba Bentley Limited |07 Jan 2021|07 Jan 2021| 
 +|MLA/2021/00012 - Completed|Application - Maintenance of existing structures or assets|South Ferriby Flood Alleviation Scheme - Parapet strengthening|Sluice parapet|Environment Agency|07 Jan 2021|07 Jan 2021| 
 +|MLA/2021/00013 - Completed|Application - Maintenance of existing works |Bedlington Viaduct|Bedlington Viaduct|Jba Consultants Limited |08 Jan 2021|04 Oct 2021| 
 +|MLA/2021/00014/2 - Completed|Application - Other works |Tamar Estuary (South Hooe) Habitat Creation Project |Tamar Embankment Breach |Environment Agency|08 Jan 2021|03 Oct 2022| 
 +|MLA/2021/00015 - Completed|Application - Maintenance of existing structures or assets|Hastings Denmark Place|Hastings Denmark Place|Beasley Christopher Limited |11 Jan 2021|11 Jan 2021| 
 +|MLA/2021/00016 - Completed|Application - Maintenance of existing structures or assets|Weymouth Harbour Walls E&9 - Repair Works |walls e&9 |Dorset Council|12 Jan 2021|12 Jan 2021| 
 +|MLA/2021/00017 - Completed|Application - Maintenance of existing structures or assets|Ernesettle Jetty Repair Works |Ernesettle Jetty|Pdp Green Consulting Ltd|11 Jan 2021|11 Jan 2021| 
 +|MLA/2021/00019 - Completed|Application - Maintenance of existing structures or assets|Hove Welbeck Avenue |Hove Welbeck Avenue |Beasley Christopher Limited |12 Jan 2021|12 Jan 2021| 
 +|MLA/2021/00020 - Completed|Application - Construction of new works |Marina Maintenance and Improvement Works|Phase 1, Phase 2, Phase 3 |Sailport Plc-Mayflower Marina |12 Jan 2021|24 Jan 2022| 
 +|MLA/2021/00021 - Withdrawn|Application - Disposal of dredged material|West Bay harbour dredging | |Dorset Council|12 Jan 2021| | 
 +|MLA/2021/00022 - Completed|Application - Maintenance of existing works |Replacement of existing timber quay heading/piling, Oulton Broad|Quay Heading North Landing, Oulton Broad|Dr Paul Roper |13 Jan 2021|13 Aug 2021| 
 +|MLA/2021/00023 - Completed|Application - Maintenance of existing structures or assets|Padstow Tidal gate|Padstow Tidal gate|Environment Agency|14 Jan 2021|14 Jan 2021| 
 +|MLA/2021/00024 - Completed|Application - Maintenance of existing structures or assets|A14 Orwell Bearing maint yr5 scheme pin 605626|Orwell|John Graham Construction Limited|15 Jan 2021|15 Jan 2021| 
 +|MLA/2021/00025/1 - Completed|Application - Construction of new works, Other deposits |Scylla fibre optic cable system installation|Scylla PLSE Route Corridor, Scylla Main Lay Route Corridor, Interconnector UK Crossing Pre Lay Concrete Mattress, Interconnector UK Crossing Post Lay Rock Berm |Eunetworks Fiber Uk Limited |17 Jan 2021|21 Mar 2022| 
 +|MLA/2021/00026 - Completed|Application - Construction of new works |Frederick Ward Way Public Realm Scheme Improvements |FWW-BeachArea-Slipway |C R Reynolds Ltd|18 Jan 2021|11 May 2022| 
 +|MLA/2021/00028 - Completed|Application - Construction of new works |New Wear Footbridge |New Wear Footbridge |Sunderland County Council Hendon|19 Jan 2021|26 Mar 2021| 
 +|MLA/2021/00030 - Completed|Application - Maintenance of existing structures or assets|Anchor Iron Wharf- Flood Wall Crack Monitoring|Anchor Iron Wharf |Ch2m Hill Europe Limited|19 Jan 2021|19 Jan 2021| 
 +|MLA/2021/00031 - Completed|Application - Maintenance of existing structures or assets|Bognor Regis sea Lane |Bognor Regis Sea Lane |Beasley Christopher Limited |20 Jan 2021|20 Jan 2021| 
 +|MLA/2021/00032/2 - Completed|Application - Construction of new works, Disposal of dredged material |Lydd Ranges Sea Defences Scheme |Lydd Ranges Sea Defence Scheme, Lydd Ranges (DV031) |J T Mackley & Co Ltd|20 Jan 2021|14 Aug 2023| 
 +|MLA/2021/00033 - Completed|Application - Maintenance of existing structures or assets|IOW Gurnard |IOW Gurnard |Beasley Christopher Limited |21 Jan 2021|21 Jan 2021| 
 +|MLA/2021/00034 - Completed|Application - Maintenance of existing structures or assets|IOW woodvale|IOW woodvale|Beasley Christopher Limited |21 Jan 2021|21 Jan 2021| 
 +|MLA/2021/00035 - Completed|Application - Non-navigational clearance dredging |Cleaning of Sewer Network Noss Mayo PL8 1EE |Plymouth Sound and Estuaries SAC Noss Mayo|Clear-Flow Limited|21 Jan 2021|21 Jan 2021| 
 +|MLA/2021/00036 - Completed|Application - Maintenance of existing works |Dubmill Point Repairing of Groynes|Site_Boundary |Cumbria County Council Highways Dep |21 Jan 2021|10 Jan 2022| 
 +|MLA/2021/00037 - Completed|Application - Construction of new works |Wight Hoist |Wight Hoist Site|Wight Shipyard Company Limited|22 Jan 2021|21 Dec 2021| 
 +|MLA/2021/00038 - Completed|Application - Maintenance of existing structures or assets|MAC0447 River Stour Viaduct, Manningtree|MAC0447_River Stour Viaduct |Amalgamated Construction Ltd|25 Jan 2021|25 Jan 2021| 
 +|MLA/2021/00039 - Completed|Application - Maintenance of existing structures or assets|Platform refurbishment at Ryde Pier Head station, Isle of Wight |magic_polygons|First Mtr South Western Trains Limited|25 Jan 2021|25 Jan 2021| 
 +|MLA/2021/00040 - Completed|Application - Maintenance of existing structures or assets|No 27-36 Clive Street River Wall|Clive Street no 26-37 |Southbay Civil Engineering Limited|25 Jan 2021|25 Jan 2021| 
 +|MLA/2021/00041/2 - Completed|Application - Maintenance of existing works |Drying Grid Renewal |Drying Grid |Padstow Harbour Commissioners |26 Jan 2021|23 Jan 2023| 
 +|MLA/2021/00042 - Completed|Application - Construction of new works |Telecoms Cable Crossing of the Yar Estuary, Isle of Wight |Indicative route, Yar crossing|Wightfibre Limited|26 Jan 2021|12 Aug 2021| 
 +|MLA/2021/00043 - Completed|Application - Other works |Great Yarmouth Operations and Maintenance Campus|Marine Ground Investiation Site |Norfolk County Council|27 Jan 2021|13 Oct 2021| 
 +|MLA/2021/00044 - Completed|Application - Maintenance of existing structures or assets|Beach maintenance |Waterside Holiday park|Waterside Holiday Group Limited |28 Jan 2021|28 Jan 2021| 
 +|MLA/2021/00045 - Completed|Application - Construction of new works |Mast Quay Phase II|Mast Quay Phase II|Opecprime Developments Ltd|28 Jan 2021|10 Dec 2021| 
 +|MLA/2021/00047/1 - Completed|Application - Construction of new works |Penketh and Whittle FRMS - Whittle Brook Tidal Outfall Works|Penketh and Whittle FRMS - Whittle Brook Tidal Outfall|Volker Stevin Ltd-Preston |28 Jan 2021|28 Sep 2022| 
 +|MLA/2021/00049 - Completed|Application - Maintenance of existing structures or assets|Waterman Steps Chelsea Embankment - Fender Replacement|Chelsea Embankment Waterman Steps |F M Conway Limited|29 Jan 2021|29 Jan 2021| 
 +|MLA/2021/00050 - Completed|Application - Maintenance of existing works, Other removals |Repair of Station CW intake wall structure|Heysham 1 Power Station excavation area |Edf Energy Nuclear Generation Limited |29 Jan 2021|30 Sep 2021| 
 +|MLA/2021/00051 - Completed|Application - Construction of new works |Isaac Cordal at Estuary 2021 festival |Chalkwell Beach Foreshore |Metal Culture Limited |29 Jan 2021|20 Apr 2021| 
 +|MLA/2021/00052 - Completed|Application - Construction of new works |Grace Hopper Telecommunications Cable System| |Google|29 Jan 2021|24 Jun 2021| 
 +|MLA/2021/00053 - Completed|Application - Other dredging|WAPPING POLICE STATION DREDGE |WAPPING POLICE STATION DREDGE |Land & Water Services Ltd |01 Feb 2021|23 Mar 2021| 
 +|MLA/2021/00054/5 - Completed|Application - Other deposits|Galloper Wind Farm Rectification of Failure of Cable Protection System on Cable A1L |A1L Cable Failure Area|Galloper Wind Farm Limited|01 Feb 2021|23 May 2022| 
 +|MLA/2021/00058 - Completed|Application - Maintenance of existing structures or assets|Bognor Regis Barrack Lane |Bognor Regis Barrack Lane |Beasley Christopher Limited |04 Feb 2021|04 Feb 2021| 
 +|MLA/2021/00060 - Completed|Application - Maintenance of existing structures or assets|No.s 4 & 5 Riverside Wharf, Littlehapton, west Sussex, BN17 5BZ |Riverside Wharf |Westley Building Contractors Limited|04 Feb 2021|04 Feb 2021| 
 +|MLA/2021/00061 - Completed|Application - Other dredging|Non-navigational clearance dredging, Ramsholt Reach, Deben Estuary Special Protection Area and Ramsar site|Dock Marsh, Bull Marsh|The Trustees Of The Adeane Bawdsey Settlement |05 Feb 2021|25 Jun 2021| 
 +|MLA/2021/00062 - Completed|Application - Minor removals|Fishing net removal from the wreck of the Northumberland|Buffer_150m (Northumberland Wreck)|Mr Daniel Pascoe|05 Feb 2021|05 Feb 2021| 
 +|MLA/2021/00064/1 - Completed|Application - Other works |Victoria Quay pontoon installation|Victoria Quay1|Uk Docks Royal Clarence Yard Ltd|05 Feb 2021|21 Jan 2022| 
 +|MLA/2021/00065 - Completed|Application - Other deposits|Cefas Acoustic Recorder Deployment for the Improvement of Regional Conservation Management of Cecateans |Replacement Blackhead, Two Alt, Three, Four, Five, St Austell Bay 2, Replacement Silvermine 2, One, Seven, Six|Cefas Plymouth|07 Feb 2021|25 Oct 2021| 
 +|MLA/2021/00066 - Completed|Application - Construction of new works |Bristol Community Hydro |HEP site area, Eel and lamprey pass area|Bristol Community Energy Ltd|08 Feb 2021|03 Nov 2021| 
 +|MLA/2021/00067 - Withdrawn|Application - Navigational dredging (capital) |Gillingham Pier Dredging| |Moore Project Management Solutions Llp|08 Feb 2021| | 
 +|MLA/2021/00068 - Completed|Application - Minor removals|East Beach, West Bay: safety removals |Area_of_works |Wessex Water Engineering Services Limited |09 Feb 2021|09 Feb 2021| 
 +|MLA/2021/00069 - Completed|Application - Maintenance of existing structures or assets|Replacment of 6 No Fender frames at South Shields Ferry Landing |South Shields Ferry Landing |Site And Offshore Specialists Ltd |09 Feb 2021|09 Feb 2021| 
 +|MLA/2021/00070 - Completed|Application - Maintenance of existing structures or assets|MAC0420 Oulton Swingbridge Maintenance|Oulton Swingbridge|Amalgamated Construction Ltd|10 Feb 2021|10 Feb 2021| 
 +|MLA/2021/00071 - Completed|Application - Construction of new works |CBC1 W21050 Parton to Harrington Sea Wall No 3|P-H No3 |Network Rail Ltd|10 Feb 2021|11 Aug 2021| 
 +|MLA/2021/00072 - Completed|Application - Construction of new works |Cliff House Wall, Torcross|Cliff House Wall|Devon County Council. |11 Feb 2021|07 Sep 2021| 
 +|MLA/2021/00073 - Completed|Application - Maintenance of existing works |0289 Canvey Island Bridge - Replacement of ICCP System|0289 Canvey Island Bridge |Essex County Council -Seax House|12 Feb 2021|20 May 2021| 
 +|MLA/2021/00075 - Completed|Application - Maintenance of existing works |Repairs/Replacements to Timber Supports; Dispose of and Replacement of 1200mm dia Cast Iron Outfall Pipe near the Worthing pier, across Steyne Gardens|Sea Outfall Cast Iron Pipe Across Steyne Gardens, Worthing|Cappagh Browne Ltd-Brighton |12 Feb 2021|10 May 2021| 
 +|MLA/2021/00077 - Completed|Application - Maintenance of existing works |Marine Licence Application for Repair, Replacement or Reburial Works on the Nearshore Cable Route |Hornsea One Intertidal Works Offshore From ExitPit. |Diamond Transmission Partners Hornsea One Limited |15 Feb 2021|22 May 2023| 
 +|MLA/2021/00078 - Completed|Application - Construction of new works, Other deposits |CrossChannel Fibre Project| |Crosslake Fibre Uk Ltd|16 Feb 2021|25 Aug 2021| 
 +|MLA/2021/00079 - Completed|Application - Maintenance of existing structures or assets|DRA1-5 River Aire Railway Bridge|DRA1-5 River Aire Railway Bridge|Amalgamated Construction Ltd|16 Feb 2021|16 Feb 2021| 
 +|MLA/2021/00080 - Completed|Application - Disposal of dredged material, Navigational dredging (maintenance) |Haslar Marina Maintenance Dredge|Haslar Dredge Area, NAB TOWER, HURST FORT |Boatfolk Marinas Ltd|17 Feb 2021|10 Sep 2021| 
 +|MLA/2021/00081 - Completed|Application - Deposit of markers|Beach Management Zoning - Sandown Bay | |Isle Of Wight Council |17 Feb 2021|17 Feb 2021| 
 +|MLA/2021/00082 - Completed|Application - Other deposits|Whitby Yacht Club Racing Marks Deployment |Mark A, Mark H, Mark P, Mark S, Mark W, Mark B, Mark C|Whitby Yacht Club |17 Feb 2021|15 Jun 2021| 
 +|MLA/2021/00084 - Completed|Application - Non-navigational clearance dredging |Shell Sumps Airlifting|Millennium Pier |Seatec Uk Limited |18 Feb 2021|18 Feb 2021| 
 +|MLA/2021/00085 - Completed|Application - Marine licence for the burial of human remains at sea | |NEEDLES (WI090) |Sandra Homewood Funerals (Oxford) Ltd |19 Feb 2021|19 Feb 2021| 
 +|MLA/2021/00086 - Completed|Application - Non-navigational clearance dredging |Wootton Slipway Repairs |50.724782 -1.2258516|Isle Of Wight Council |19 Feb 2021|19 Feb 2021| 
 +|MLA/2021/00087 - Completed|Application - Deposit of markers|Beach Management Zoning, Bembridge|Bembridge Site|Isle Of Wight Council |20 Feb 2021|20 Feb 2021| 
 +|MLA/2021/00088 - Completed|Application - Deposit of markers|Beach Management Zoning Colwell |Marker Buoys|Isle Of Wight Council |20 Feb 2021|20 Feb 2021| 
 +|MLA/2021/00089 - Completed|Application - Minor removals|RNLI Exmouth Ramp Extension, Ground Investigation |RNLI Exmouth|Wsp Limited |22 Feb 2021|22 Feb 2021| 
 +|MLA/2021/00091/1 - Variation Requested|Application - Disposal of dredged material, Navigational dredging (maintenance) |Maintenance Dredging at Hadrian Yard Wallsend |OGN Hadrian Yard - Area 32, Tyne River, NORTH TYNE (TY070), SOUTER POINT (OUTER) (TY081)|Smulders Projects Uk Limited|22 Feb 2021|19 Jan 2022| 
 +|MLA/2021/00092 - Completed|Application - Maintenance of existing structures or assets|Masthouse Terrace Pier - replacement of fenders |Masthouse Terrace Pier|Canal & River Trust |22 Feb 2021|22 Feb 2021| 
 +|MLA/2021/00093 - Completed|Application - Non-navigational clearance dredging |Wivenhoe Sailing Club Mainternace Dredging 2021 |WIVENHOE SAILING CLUB |Wivenhoe Sailing Club |22 Feb 2021|22 Feb 2021| 
 +|MLA/2021/00094/1 - Completed|Application - Construction of new works |West Thurrock Lagoon and Marshes SSSI Saltmarsh Restoration |West Thurrock Lagoon and Marshes SSSI Saltmarsh Restoration Works Boundary|Port Of London Authority|23 Feb 2021|28 Sep 2021| 
 +|MLA/2021/00096/1 - Completed|Application - Other deposits|Pevensey Bay Nearshore Monitoring |Site 1, Site 2, Site 3, Site 4|Partrac Ltd -Devon|24 Feb 2021|10 Aug 2023| 
 +|MLA/2021/00097 - Completed|Application - Construction of new works |Reconstruction of North Wave Screen, Lymington Harbour|North Wave Screen, Lymington Harbour|Lymington Harbour Commissioners |24 Feb 2021|09 Sep 2021| 
 +|MLA/2021/00098 - Completed|Application - Minor removals|Underwater obstruction - removal|Underwater obstruction for removal|Nnb Generation Company (Hpc) Limited|25 Feb 2021|25 Feb 2021| 
 +|MLA/2021/00099 - Completed|Application - Beach maintenance activities|Black Rock to Southwick Beach Recycling |Brighton Recycling|Shoreham Port Authority |25 Feb 2021|25 Feb 2021| 
 +|MLA/2021/00100 - Withdrawn|Application - Other works |Medway Headwall Replacement |Medway Headwall |Bam Nuttall Ltd |25 Feb 2021| | 
 +|MLA/2021/00101 - Completed|Application - Marine licence for the burial of human remains at sea | |NEEDLES (WI090) |Mamarine.Com Llp|25 Feb 2021|25 Feb 2021| 
 +|MLA/2021/00102 - Completed|Application - Deposit of markers|Deployment of guard buoy near Ryde Pier, Isle of Wight|P2001_Ryde_Pier_100m_Boundary |Partrac Limited |26 Feb 2021|26 Feb 2021| 
 +|MLA/2021/00103/2 - Completed|Application - Maintenance of existing works |Scheme of Maintenance for existing coastal defence at Dolphin Boathouse, Wootton Bridge, IW (northern frontage) |Dolphin Boathouse Maintenance Scheme|Mr Dave Callen|01 Mar 2021|07 Sep 2023| 
 +|MLA/2021/00104 - Completed|Application - Construction of new works |Replacement of domestic quay heading|Quay for renewal|Dr Graham Hunt|01 Mar 2021|11 Jan 2022| 
 +|MLA/2021/00105 - Completed|Application - Maintenance of existing works |Rock Park Bridge repair works |Rock Park Bridge|Devon County Council. |01 Mar 2021|12 Apr 2022| 
 +|MLA/2021/00107 - Completed|Application - Construction of new works |Pentalver Container Yard Expansion| |London Gateway Port Limited |01 Mar 2021|25 Jun 2021| 
 +|MLA/2021/00108 - Completed|Application - Marine licence for the burial of human remains at sea | |NEEDLES (WI090) |Mamarine.Com Llp|01 Mar 2021|01 Mar 2021| 
 +|MLA/2021/00109 - Completed|Application - Construction of new works |Barrow Docks Crane Relocation |Crane |Orsted-Barrow |02 Mar 2021|30 Sep 2021| 
 +|MLA/2021/00110 - Completed|Application - Maintenance of existing structures or assets|Arun Surface Water Abstraction - Screen replacement / eel screens |Arun_SWA_Eel_Screen_Replacement_River_Works_Area|Southern Water Limited|02 Mar 2021|02 Mar 2021| 
 +|MLA/2021/00111 - Completed|Application - Maintenance of existing structures or assets|Repairs to existing Royal Solent Yacht Club slipway - Removal and replacement of rotten and unsafe wooden planks on slipway with sustainable and hardwearing recycled plastic planks|Royal Solent Yacht Club Slipway |Royal Solent Yacht Club Limited |02 Mar 2021|02 Mar 2021| 
 +|MLA/2021/00112 - Completed|Application - Non-navigational clearance dredging |Investigation of archaeological anomaly with ROV and option to use dredge skim|SOF_T15_500x500_survey_polygon|Sofia Offshore Wind Farm Limited|03 Mar 2021|03 Mar 2021| 
 +|MLA/2021/00113 - Completed|Application - Maintenance of existing structures or assets|Replacement of pontoon bridges|Minor works |Barrow Offshore Wind Limited|03 Mar 2021|03 Mar 2021| 
 +|MLA/2021/00114 - Completed|Application - Maintenance of existing structures or assets|Hove opp Norman Rd|Hove opp Norman Rd|Beasley Christopher Limited |03 Mar 2021|03 Mar 2021| 
 +|MLA/2021/00115 - Completed|Application - Maintenance of existing structures or assets|Worthing west street|Worthing West Street|Beasley Christopher Limited |03 Mar 2021|03 Mar 2021| 
 +|MLA/2021/00116 - Completed|Application - Other deposits, Other removals, Other works |CIRCE North 2 |CIRCE NORTH2, Rock Placement, Mattress Placement, Route Clearance 1, Route Clearance 2, Route Clearance 3, Route Clearance 4, Route Clearance 5, Route Clearance 6|Zayo Group Uk Limited |03 Mar 2021|26 Oct 2021| 
 +|MLA/2021/00117 - Completed|Application - Beach maintenance activities|Re-distribution of sand in Harbour Basins.|Portreath Harbour |Cornwall Council|04 Mar 2021|04 Mar 2021| 
 +|MLA/2021/00118/1 - Completed|Application - Construction of new works |3rd Chalkwell Bay Sea Scouts Slipway, Davit & Boarding Pontoon|3rd Chalkwell Bay Slipway, Davit and Boarding Pontoon |3rd Chalkwell Bay Sea Scouts|05 Mar 2021|10 Sep 2021| 
 +|MLA/2021/00119 - Completed|Application - Other deposits|GRCF2020 Enabling large scale seagrass restoration supporting fisheries whilst sequestering carbon|St Marys Bay|National Marine Aquarium|05 Mar 2021|22 Feb 2022| 
 +|MLA/2021/00120 - Completed|Application - Minor removals|Removal of Pill box at Kelling Hard |Kelling Hard WW11 Pill Box|North Norfolk District Council|05 Mar 2021|05 Mar 2021| 
 +|MLA/2021/00121 - Completed|Application - Construction of new works |Methersgate Slipway | |Pac Farms Ltd |08 Mar 2021|08 Dec 2021| 
 +|MLA/2021/00122 - Completed|Application - Maintenance of existing structures or assets|Seaford splash point|Seaford splash point|Beasley Christopher Limited |08 Mar 2021|08 Mar 2021| 
 +|MLA/2021/00123/1 - Completed|Application - Alternative use of dredged material, Construction of new works, Decommissioning of works, Other dredging|Tower RNLI Floating Life Boat Station |Piling location 1, Piling location 2, Removals and construction site, Dredging box, Disposal site (Rainham Marshes) |Royal National Lifeboat Institution |09 Mar 2021|17 May 2022| 
 +|MLA/2021/00124 - Completed|Application - Construction of new works |Extension to Grove Place Boat Park pontoons |Grove Place extension |Falmouth Harbour Commissioners|09 Mar 2021|21 Jul 2021| 
 +|MLA/2021/00125 - Completed|Application - Construction of new works |Southbank Sailing Club Slipway Extension| |Intermarine Limited |10 Mar 2021|27 Jan 2022| 
 +|MLA/2021/00126 - Completed|Application - Construction of new works, Decommissioning of works, Other removals |Itchenor Sailing Club New Jetty and Pontoons|Itchenor Sailing Club Jetty |Itchenor Sailing Club |10 Mar 2021|09 Mar 2022| 
 +|MLA/2021/00127 - Completed|Application - Maintenance of existing structures or assets|Minor maintenance work at BOW hub.|Licensed area |Orsted Power Uk Ltd |11 Mar 2021|11 Mar 2021| 
 +|MLA/2021/00128 - Completed|Application - Maintenance of existing structures or assets|Resurfacing Existing Slipway|Salcombe Yacht Club Slipway |Salcombe Yacht Club |11 Mar 2021|11 Mar 2021| 
 +|MLA/2021/00129 - Completed|Application - Deposit of markers|Arun Yacht Club yacht racing marks|Arun Yacht Club cruiser racing sea marks|Arun Yacht Club Limited(The)|12 Mar 2021|12 Mar 2021| 
 +|MLA/2021/00131 - Completed|Application - Maintenance of existing structures or assets|Gosport Gillkicker point|Gillkicker point|Beasley Christopher Limited |15 Mar 2021|15 Mar 2021| 
 +|MLA/2021/00132 - Completed|Application - Maintenance of existing structures or assets|Ashlett Creek |Ashlett creek |Beasley Christopher Limited |15 Mar 2021|15 Mar 2021| 
 +|MLA/2021/00134 - Completed|Application - Maintenance of existing structures or assets|Sandymere Beach Access Maintenance|Sandymere Sleeper Walkway |Torridge District Council |15 Mar 2021|15 Mar 2021| 
 +|MLA/2021/00135/2 - Completed|Application - Maintenance of existing works |Stanford Wharf Nature Reserve - Remedial Works|Stanford Wharf Nature Reserve Remedial Works|London Gateway Port Ltd-Stanford|16 Mar 2021|21 Jun 2023| 
 +|MLA/2021/00136 - Completed|Application - Marine licence for the burial of human remains at sea | |NEEDLES (WI090) |Mamarine.Com Llp|16 Mar 2021|16 Mar 2021| 
 +|MLA/2021/00137 - Completed|Application - Construction of new works |Berth 7 Truck Park|Berth 7 Truck Park|London Gateway Port Ltd-Stanford|17 Mar 2021|25 Jun 2021| 
 +|MLA/2021/00138 - Completed|Application - Construction of new works |Deploy 'Versadock' pontoon system tethered to land by metal brace. Pontoon system to float up with the tide and rest on existing slipway at low tide|Broad street, Portsmouth|Mr George Pounds|17 Mar 2021|27 Jan 2022| 
 +|MLA/2021/00139 - Completed|Application - Maintenance of existing structures or assets|Manea Emergency Wheel Timbers |Manea Wheel Timbers |Network Rail Limited|18 Mar 2021|18 Mar 2021| 
 +|MLA/2021/00141 - Completed|Application - Maintenance of existing works |Aylesford River Wall|Aylesford Flood Wall|Byrnelooby Uk |19 Mar 2021|07 Feb 2022| 
 +|MLA/2021/00142 - Completed|Application - Non-navigational clearance dredging |Goodchild Marine Services maintenance dredging| |Goodchild Marine Services Limited |21 Mar 2021|21 Mar 2021| 
 +|MLA/2021/00143 - Completed|Application - Other deposits|Looe Bay ADCP Deployment|Looe_ADCP_buffer_2|Cornwall Council -Environment Service |22 Mar 2021|16 Sep 2021| 
 +|MLA/2021/00144/1 - Completed|Application - Maintenance of existing works |Boston Upstream Works - ground investigation|Boston upstream Works GI|Environment Agency-Jacobs |23 Mar 2021|21 Jun 2022| 
 +|MLA/2021/00146/1 - Completed|Application - Maintenance of existing works |Scour Repair and Protection |Hadrian Yard Wallsend - Port of Tyne Area 32. |Smulders Projects Uk Limited|24 Mar 2021|11 Oct 2022| 
 +|MLA/2021/00147 - Completed|Application - Maintenance of existing structures or assets|repairs to existing block wall|Priddys Hard|Quadrigy Engineering Ltd|24 Mar 2021|24 Mar 2021| 
 +|MLA/2021/00148 - Completed|Application - Maintenance of existing structures or assets|IOW Ryde Pier Renewal (Development) |IOW Ryde Pier |Osborne Infrastructure Limited|24 Mar 2021|24 Mar 2021| 
 +|MLA/2021/00149 - Completed|Application - Minor removals|IOW Ryde Pier Renewal (Development) |IOW Ryde Pier |Osborne Infrastructure Limited|24 Mar 2021|24 Mar 2021| 
 +|MLA/2021/00150 - Completed|Application - Beach maintenance activities|Shoreham Beach reprofiling|Shoreham Beach|Shoreham Port Authority |25 Mar 2021|25 Mar 2021| 
 +|MLA/2021/00151/2 - Completed|Application - Maintenance of existing works |Sheet Pile Wall Repairs |Hamble Sheet Pile Wall - Area |Bp Oil Uk Limited.|26 Mar 2021|18 Dec 2023| 
 +|MLA/2021/00152 - Completed|Application - Maintenance of existing structures or assets|Outfall pipe repairs|Lynemouth Power Limited - Outfall pipe|Lynemouth Power Limited |26 Mar 2021|26 Mar 2021| 
 +|MLA/2021/00153 - Completed|Application - Maintenance of existing structures or assets|Marine Parade Maintenance Works |Dawlish Beach |Bam Nuttall Limited |26 Mar 2021|26 Mar 2021| 
 +|MLA/2021/00154 - Withdrawn|Application - Construction of new works |Suffolk Seaweed Farm| |Suffolk Sea Farm Ltd|26 Mar 2021| | 
 +|MLA/2021/00155/2 - Completed|Application - Decommissioning of works|Rampion Offshore Wind Farm Met Mast Foundation Removal|Rampion Met Mast|Rampion Offshore Wind Ltd |29 Mar 2021|03 Apr 2024| 
 +|MLA/2021/00156 - Completed|Application - Maintenance of existing structures or assets|Beacon House Jetty Repairs|Beacon House Jetty|Piers Shepherd|30 Mar 2021|30 Mar 2021| 
 +|MLA/2021/00157 - Completed|Application - Construction of new works |Conservancy Wharf |Conservancy Wharf |Pd Teesport Limited |30 Mar 2021|24 Sep 2021| 
 +|MLA/2021/00158 - Completed|Application - Maintenance of existing structures or assets|ULGH5428 W/BW Earthwire Replacement BW19-BW27 |Towers BW25 and BW26|Wpd Telecoms Limited|30 Mar 2021|30 Mar 2021| 
 +|MLA/2021/00159 - Completed|Application - Clean-up dredging |Calor LPG Terminal Dredge 2021|Calor Dredge Site |Calor Gas Ltd-Canvey Terminal |31 Mar 2021|28 Sep 2021| 
 +|MLA/2021/00160 - Completed|Application - Maintenance of existing works |East Anglia ONE Operations and Maintenance Scour Protection and Cable Armouring for Generation Assets |East Anglia ONE boundary|East Anglia One Limited |31 Mar 2021|26 Aug 2022| 
 +|MLA/2021/00161 - Completed|Application - Maintenance of existing structures or assets|Public Footpath Fareham 97 Surfacing for England Coast Path establishment |Fareham Public Footpath 97|Hampshire County Council|31 Mar 2021|31 Mar 2021| 
 +|MLA/2021/00162 - Completed|Application - Minor removals|Dogger Bank A & B UXO investigation |Offshore_pUXO |Dogger Bank Wind Farm |31 Mar 2021|31 Mar 2021| 
 +|MLA/2021/00163 - Completed|Application - Minor removals|Dogger Bank A & B Nearshore UXO investigation |Nearshore_self_service_area |Dogger Bank Wind Farm |31 Mar 2021|31 Mar 2021| 
 +|MLA/2021/00165/1 - Completed|Application - Other works |4.To raise the existing sea defences to achieve flood protection for the 2070 sea level rise predictions projected by the Environment Agency. |Grey Thatch sea wall|Mr Marcus Evans |01 Apr 2021|27 Oct 2022| 
 +|MLA/2021/00167 - Completed|Application - Maintenance of existing structures or assets|Replacing weak pile in danger of collapsing |Tenth House hammerhead pontoon, New Road, Wootton Creek |Mrs Adriana Mattei|06 Apr 2021|06 Apr 2021| 
 +|MLA/2021/00168 - Completed|Application - Other deposits|London Array Offshore Wind Farm Scientific Deployment |London Array OWF|London Array Ltd|06 Apr 2021|22 Jul 2021| 
 +|MLA/2021/00169 - Completed|Application - Construction of new works, Decommissioning of works |Long View Pontoon |Long View Pontoon |Tony Coe|07 Apr 2021|10 Feb 2022| 
 +|MLA/2021/00170 - Completed|Application - Construction of new works |3982 - Ferry Cottage|Ferry Cottage steps site|Mr Piers Banfield |07 Apr 2021|12 Apr 2022| 
 +|MLA/2021/00171 - Completed|Application - Maintenance of existing structures or assets|Hesketh Out Marsh saline lagoons|Hesketh Out Marsh saline lagoons|Rspb|08 Apr 2021|08 Apr 2021| 
 +|MLA/2021/00172 - Completed|Application - Maintenance of existing structures or assets|Minor Repairs to the intertidal habitat enhancement on the bank of the River Yare |Repair_Location |Jba Bentley Limited |08 Apr 2021|08 Apr 2021| 
 +|MLA/2021/00173/1 - Completed|Application - Aggregate dredging, Sampling|Area 473|473_1, 473_2|Cemex Uk Marine Ltd |09 Apr 2021|06 Mar 2023| 
 +|MLA/2021/00174 - Completed|Application - Maintenance of existing structures or assets|Mill Meadow (PO18 8LY) - Domestic Sea Wall Repair |Sea Wall - Mill Meadow|Mr Daan Knottenbelt |10 Apr 2021|10 Apr 2021| 
 +|MLA/2021/00175 - Completed|Application - Maintenance of existing structures or assets|The Slip (PO18 8LZ) - Domestic Sea Wall Repair|Sea Wall - The Slip |Mr Nicholas Von Preussen|11 Apr 2021|11 Apr 2021| 
 +|MLA/2021/00177/1 - Completed|Application - Aggregate dredging, Sampling|Area 473|473_1, 473_2|Hanson Aggregates Ltd |12 Apr 2021|06 Mar 2023| 
 +|MLA/2021/00178 - Completed|Application - Minor removals|Lidl Distribution Centre Burts Wharf Refurbishment|Burts Wharf |Gps Marine And Civil Services Ltd |12 Apr 2021|12 Apr 2021| 
 +|MLA/2021/00179 - Completed|Application - Maintenance of existing structures or assets|Hazel Road Southampton|Hazel Road Southampton|Beasley Christopher Limited |12 Apr 2021|12 Apr 2021| 
 +|MLA/2021/00180/1 - Completed|Application - Construction of new works, Maintenance of existing works|Fawley Refinery Marine Terminal Export Line Routing Modification|Berth 6, Berth 7|Exxonmobil Chemical Limited |12 Apr 2021|21 Oct 2022| 
 +|MLA/2021/00181 - Completed|Application - Maintenance of existing structures or assets|Lidl Distribution Centre Burts Wharf Refurbishment|Burts Wharf |Gps Marine And Civil Services Ltd |12 Apr 2021|12 Apr 2021| 
 +|MLA/2021/00182 - Completed|Application - Marine licence for the burial of human remains at sea | |NEEDLES (WI090) |Mamarine.Com Llp|13 Apr 2021|13 Apr 2021| 
 +|MLA/2021/00183 - Completed|Application - Maintenance of existing structures or assets|Tilbury Fort Sheet Pile Repairs - Scaffold Access Towers|Tilbury Fort Working Area |Ch2m Hill United Kingdom|13 Apr 2021|13 Apr 2021| 
 +|MLA/2021/00184 - Completed|Application - Other deposits|Hullbridge Flood Defence Repairs|Hullbridge|Enviroment Agency Thorpe St Andrews |14 Apr 2021|09 Mar 2022| 
 +|MLA/2021/00185 - Completed|Application - Construction of new works |Tilbury Tunnel Head House Drainage|Tilbury Tunnel Head House Drainage, Tilbury Tunnel outfall (TH099)|National Grid Leeds |14 Apr 2021|28 Jul 2022| 
 +|MLA/2021/00186 - Completed|Application - Maintenance of existing structures or assets|Outfall lock gate - remove loose coach bolts, re-drill holes, insert resin and install new bolts|Spragger Clough |The Crown Estate|15 Apr 2021|15 Apr 2021| 
 +|MLA/2021/00188 - Completed|Application - Maintenance of existing structures or assets|MNC1753 - Culvert at Grange-Over-Sands|Culvert at Grange-Over-Sands|Amalgamated Construction Ltd|16 Apr 2021|16 Apr 2021| 
 +|MLA/2021/00189/1 - Completed|Application - Maintenance of existing works, Navigational dredging (maintenance)|Combwich Wharf Operational Marine Licence |Combwich Wharf|Nnb Generation Company (Hpc) Limited|16 Apr 2021|20 Jun 2024| 
 +|MLA/2021/00190/1 - Completed|Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital), Other deposits, Other dredging|Lowestoft Eastern Energy Facility | |Abp Lowestoft-Commercial Road |16 Apr 2021|17 Nov 2023| 
 +|MLA/2021/00191/1 - Completed|Application - Other deposits|Tees Seagrass Project |Seagrass Site 1, Seagrass Site 2, Seagrass Site 3, Seagrass Site 4, Seagrass Site 5 |Tees Rivers Charitable Trust|18 Apr 2021|29 Apr 2024| 
 +|MLA/2021/00193 - Completed|Application - Deposit of markers|Brightlingsea Sailing Club racing marks licence application |Batemans (BSC), Pyefleet (CYC), Point Clear (BSC), Hills (BSC), Gazelet (BSC), Cocum (BSC), Beach (BSC), CVP (CYC)|Brightlingsea Sailing Club|21 Apr 2021|21 Apr 2021| 
 +|MLA/2021/00195 - Completed|Application - Maintenance of existing structures or assets|Replacement of a single CPS on a inter-array cable at WOW04 |WOW04 B16 |Dong Energy Walney Extension (Uk) Ltd |23 Apr 2021|23 Apr 2021| 
 +|MLA/2021/00196 - Completed|Application - Maintenance of existing structures or assets|Surrey Wharf River-wall maintenance |Surrey Wharf Arundel|Wph Limited |27 Apr 2021|27 Apr 2021| 
 +|MLA/2021/00197 - Completed|Application - Decommissioning of works, Other deposits, Other removals|TAT14 Segment G & H Decommissioning |TAT14 Segment G, TAT14 Segment H|British Telecommunications Plc|27 Apr 2021|09 Feb 2022| 
 +|MLA/2021/00198 - Completed|Application - Maintenance of existing works |Boothferry Bridge Refurbishment |Jetty Beneath Bridge, Boothferry Bridge |East Riding Of Yorkshire Council|28 Apr 2021|14 Sep 2021| 
 +|MLA/2021/00199 - Completed|Application - Maintenance of existing structures or assets|Foulness Island - X5-Headway Refurbishment|Foulness island - X5 Headway - Works Location |Qinetiq Limited |28 Apr 2021|28 Apr 2021| 
 +|MLA/2021/00200 - Completed|Application - Maintenance of existing works |Cable Stabilisation Works |Race Bank Offshore Wind Farm|Race Bank Wind Farm Limited |28 Apr 2021|16 Sep 2021| 
 +|MLA/2021/00201 - Completed|Application - Maintenance of existing structures or assets|Canary Wharf Pier - Side Shell Repainting |Canary Wharf Pier |Canary Wharf Management Limited |28 Apr 2021|28 Apr 2021| 
 +|MLA/2021/00202/1 - Completed|Application - Disposal of dredged material|Mersey Channel and River Maintenance Dredge Disposal Renewal|MERSEY OF BROMBOROUGH2, SITE Z, MERSEY (MID-RIVER SITE), SITE Y (IS150) |Mersey Docks & Harbour Company|28 Apr 2021|09 May 2023| 
 +|MLA/2021/00204 - Completed|Application - Minor removals|HHLG Marine Boreholes |Groyne_200m_Buffer|Bcp Council |30 Apr 2021|30 Apr 2021| 
 +|MLA/2021/00205/1 - Completed|Application - Other works |Hurst Castle Urgent Repairs |Hurst Castle|English Heritage|30 Apr 2021|04 Feb 2022| 
 +|MLA/2021/00206/2 - Completed|Application - Construction of new works |London Gateway Port Berth 4 Development |Site 1|London Gateway Port Limited |30 Apr 2021|04 Jun 2024| 
 +|MLA/2021/00207/1 - Completed|Application - Construction of new works |Kinkerdale Beck, Teesport - Oil Containment Structure |Site Location |Pd Teesport Limited |04 May 2021|28 Jun 2024| 
 +|MLA/2021/00209 - Completed|Application - Minor removals|Artificial sandbank experiment on Littlestone Beach |LittleStoneExperimentNew|Mr Olivier Bourdin|04 May 2021|04 May 2021| 
 +|MLA/2021/00210 - Completed|Application - Maintenance of existing structures or assets|Ribble Viaduct|Ribble Viaduct|Network Rail|04 May 2021|04 May 2021| 
 +|MLA/2021/00213 - Withdrawn|Application - Construction of new works |Exceat Bridge Replacement |magic_polygons|East Sussex County Council-County Hall|05 May 2021| | 
 +|MLA/2021/00215/1 - Completed|Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital)|Teesport Ro-Ro No.2 Linkspan Replacement Works|Tees Dock Number 2 Ro Ro, TEES BAY C (TY150)|Pd Teesport Limited |06 May 2021|14 Apr 2022| 
 +|MLA/2021/00216 - Completed|Application - Marine licence for the burial of human remains at sea | |NEEDLES (WI090) |Mr Charles Lister |06 May 2021|06 May 2021| 
 +|MLA/2021/00217 - Completed|Application - Marine licence for the burial of human remains at sea | |NEEDLES (WI090) |Mr Charles Lister |06 May 2021|06 May 2021| 
 +|MLA/2021/00218 - Completed|Application - Deposit of markers|Installation of safety buoys at Colwell Bay, Isle of Wight PO40 9SB (Easting 432815, Northing 88187)|Safety buoys at Colwell Bay, Freshwater |Freshwater Parish Council |06 May 2021|06 May 2021| 
 +|MLA/2021/00219 - Completed|Application - Maintenance of existing structures or assets|Kirtling Street Cemex Jetty Fender Repairs|Cemex Jetty |Laing O'Rourke Construction Limited |19 May 2021|19 May 2021| 
 +|MLA/2021/00220 - Completed|Application - Disposal of dredged material, Navigational dredging (capital) |Dredge Deepening of NSSB Quay 2 and NSSB Quay 1 |NSSB Quay 1 and Quay 2, TEES BAY C (TY150)|A.V.Dawson Limited|07 May 2021|08 Dec 2021| 
 +|MLA/2021/00221/1 - Completed|Application - Disposal of dredged material, Navigational dredging (maintenance) |Portsmouth International Port Maintenanec Dredging and Berth 2 Works|Area A, Area B, Area C, Area D, Area E, Area F, Camber, NAB TOWER (WI060), HURST FORT (WI080) |Portsmouth International Port |08 May 2021|11 Nov 2022| 
 +|MLA/2021/00224 - Withdrawn|Application - Construction of new works |Hammersmith Temporary Ferry |Hammersmith Ferry |Uber Boats By Thames Clippers |10 May 2021| | 
 +|MLA/2021/00225 - Completed|Application - Maintenance of existing works |Broadmarsh Revetment Repair Scheme (Scheme HE Pin - 569741) |Broadmarsh Revetment Repair |Kier Highways Ltd |11 May 2021|11 Aug 2021| 
 +|MLA/2021/00226 - Completed|Application - Maintenance of existing structures or assets|Bembridge Southern Water outfall|Bembridge outfall |Beasley Christopher Limited |11 May 2021|11 May 2021| 
 +|MLA/2021/00229/3 - Completed|Application - Construction of new works |Great Yarmouth Port Operation and Maintenance Facility|Great Yarmouth Port Operation and Maintenance Facility|Norfolk County Council|14 May 2021|09 Aug 2024| 
 +|MLA/2021/00230 - Completed|Application - Minor removals|Boreholes for SI at Oxen Cove, Brixham|Oxen Cove, Brixham|Torbay Council|17 May 2021|17 May 2021| 
 +|MLA/2021/00231 - Completed|Application - Other deposits|Hull Wrapping Programme |3 Basin |Babcock International Group |17 May 2021|19 Oct 2021| 
 +|MLA/2021/00232 - Completed|Application - Construction of new works |Saving The REYC Chatham Branch|REYC Chatham Branch Jetty 1 |Royal Engineer Yacht Club Chatham |18 May 2021|14 Jun 2022| 
 +|MLA/2021/00234 - Completed|Application - Non-navigational clearance dredging |Barge Harbour Dredging| |Robertsons Boatyard |19 May 2021|19 May 2021| 
 +|MLA/2021/00235 - Completed|Application - Deposit of markers|Beach Management Zoning Totland Bay |Totland Bay Beach Management|Isle Of Wight Council |19 May 2021|19 May 2021| 
 +|MLA/2021/00236/1 - Completed|Application - Construction of new works |Avonmouth and Severnside Enterprise Area (ASEA) Ecology Mitigation and Flood Defence Scheme |GIS_401273_MMD_ASEA_Area2_HolesMouthOutfall_100m_Ply, GIS_401273_MMD_ASEA_Area2_KingsWestonOutfall_100m_Ply |Mott Macdonald Ltd-Bristol|21 May 2021|24 Jan 2023| 
 +|MLA/2021/00239/1 - Completed|Application - Construction of new works |Ryde Tramway Pier Redevelopment |Ryde Tramway Pier |Wightlink Limited |24 May 2021|15 Jul 2022| 
 +|MLA/2021/00240 - Completed|Application - Wrecks and other archaeological remains |SS Richard Montgomery Mast Reduction and Removal|SSRM|Department For Transport|25 May 2021|24 Jun 2022| 
 +|MLA/2021/00241 - Completed|Application - Deposit of markers|Hinkley Point Waverider Buoy|HP_Waverider_Buoy_BNG_Buffer_100m_Envelope_20210429_pg|Cefas Ltd |27 May 2021|27 May 2021| 
 +|MLA/2021/00242 - Completed|Application - Maintenance of existing structures or assets|Polruan and Milltown Woods Line Renewal and Maintenance Activities|Whole Project - Locations 1-3 |Network Rail Limited|27 May 2021|27 May 2021| 
 +|MLA/2021/00243 - Completed|Application - Maintenance of existing structures or assets|Repair of Barge Harbour Jetty | |Robertsons Boatyard |27 May 2021|27 May 2021| 
 +|MLA/2021/00244 - Completed|Application - Construction of new works |WAPPING POLICE PONTOON ICCP INSTALLATION|WAPPING POLICE PONTOON ICCP |Land And Water Services |28 May 2021|08 Dec 2021| 
 +|MLA/2021/00245 - Completed|Application - Maintenance of existing works |Hurlingham River Wall |Hurlingham River Wall |Sweco Uk Limited|28 May 2021|11 Jan 2022| 
 +|MLA/2021/00246 - Completed|Application - Maintenance of existing structures or assets|Sea Wall Repairs|Sea Wall|Balfour Beatty Rail Limited |03 Jun 2021|03 Jun 2021| 
 +|MLA/2021/00247 - Completed|Application - Construction of new works |Haslar Marina G Block improvements|G Block 1, G Block 2|Boatfolk Marinas Ltd|03 Jun 2021|02 Sep 2021| 
 +|MLA/2021/00248 - Completed|Application - Maintenance of existing structures or assets|Cromer West Seawall |Cromer Seawall|North Norfolk District Council|03 Jun 2021|03 Jun 2021| 
 +|MLA/2021/00249 - Completed|Application - Maintenance of existing works |Dunston Promenade River Wall; Remedial Works|Dunstion Promenade|Gateshead Council |04 Jun 2021|03 Dec 2021| 
 +|MLA/2021/00250 - Completed|Application - Maintenance of existing structures or assets|Locksway (Water) Footbridge (FB612) Re-painting |Locksway Road Footbridge|Colas Limited |04 Jun 2021|04 Jun 2021| 
 +|MLA/2021/00251 - Completed|Application - Maintenance of existing works |Walney Extension Array Cable Stabilisation|Walney Extension Offshore Wind Farm |Dong Energy Rb (Uk) Limited |04 Jun 2021|04 Oct 2021| 
 +|MLA/2021/00252 - Completed|Application - Maintenance of existing structures or assets|Little Hayes Farm ditch crossing|Ditch_Crossing|Taziker Industrial Limited|04 Jun 2021|04 Jun 2021| 
 +|MLA/2021/00253 - Completed|Application - Disposal of dredged material, Navigational dredging (capital) |Southampton Container Terminal Berth Access Dredge|Proposed Works, NAB TOWER (WI060), HURST FORT (WI080) |Associated British Ports, Southampton |04 Jun 2021|29 Nov 2021| 
 +|MLA/2021/00254 - Completed|Application - Marine licence for the burial of human remains at sea | |NEEDLES (WI090) |Mamarine.Com Llp|07 Jun 2021|07 Jun 2021| 
 +|MLA/2021/00255 - Completed|Application - Disposal of dredged material, Navigational dredging (capital) |Floating Dock Jetty (FDJ) dredging|Dredge area, NAB TOWER (WI060), HURST FORT (WI080)|Portsmouth International Port |07 Jun 2021|07 Dec 2021| 
 +|MLA/2021/00256 - Completed|Application - Maintenance of existing structures or assets|Cinnabar & Capital Wharf Repairs|Cinnabar and Capital Wharf|Moore Project Management Solutions Llp|07 Jun 2021|07 Jun 2021| 
 +|MLA/2021/00257 - Completed|Application - Other deposits|Galloper Wind Farm Array Cable Protection System Remediation|GWF cable protection|Galloper Wind Farm Limited|07 Jun 2021|09 Feb 2022| 
 +|MLA/2021/00258 - Completed|Application - Non-navigational clearance dredging |Pontoon dredging|magic_lines |The Woodbridge Boat Yard Limited|08 Jun 2021|08 Jun 2021| 
 +|MLA/2021/00259/1 - Completed|Application - Other deposits, Other removals|RNLI Tower - open water source heat pump|RNLI Tower Lifeboat Station |Royal National Lifeboat Institution |09 Jun 2021|02 Dec 2022| 
 +|MLA/2021/00263 - Completed|Application - Construction of new works |Construction of new Hoist Dock Facility at Victoria Quay in Portsmouth Harbour|victoria quay |Uk Docks Ltd|10 Jun 2021|27 Jan 2022| 
 +|MLA/2021/00264 - Completed|Application - Construction of new works, Other removals |Manaccan 16 Helford Point |Manaccan 16 Helford Point |Cormac Solutions Ltd|11 Jun 2021|28 Nov 2022| 
 +|MLA/2021/00265 - Completed|Application - Maintenance of existing structures or assets|Minor maintenance to existing pontoons at the end of my garden but within my property boundary|Jetty/Pontoon repairs 31 Eastoke Avenue, Hayling Island |Mr Roland Hopkins |11 Jun 2021|11 Jun 2021| 
 +|MLA/2021/00266/3 - Completed|Application - Maintenance of existing works |Burbo Bank Extension Array Cable Stabilisation|Burbo Bank Extension Offshore Wind Farm |Burbo Extension Ltd |11 Jun 2021|12 Aug 2024| 
 +|MLA/2021/00267/2 - Completed|Application - Construction of new works, Other removals |Watermans Park|watermans park|Watermans Riverside Limited |11 Jun 2021|13 Jun 2023| 
 +|MLA/2021/00268/2 - Completed|Application - Alternative use of dredged material, Other dredging |Maintenance Dredging of the Marine Lake at Weston-super-Mare and Sustainable Relocation (by Discharge) of Dredged Material to Weston Bay|Weston-super-Mare Marine Lake |North Somerset District Council |11 Jun 2021|21 Nov 2023| 
 +|MLA/2021/00270 - Completed|Application - Other deposits|Glysophate application to seawall structure | |Fylde Council |14 Jun 2021|10 Nov 2021| 
 +|MLA/2021/00271 - Completed|Application - Construction of new works |Bridle Footbridge Replacement |Site and work area|Lancashire County Council |14 Jun 2021|14 Jan 2022| 
 +|MLA/2021/00272 - Completed|Application - Other works |Pagham Harbour Church Norton Spit |Pagham Harbour|Planning Flood Defence Trust|14 Jun 2021|19 Oct 2021| 
 +|MLA/2021/00273 - Completed|Application - Maintenance of existing structures or assets|Race Bank CPS Bandage Solution|Race Bank Offshore Wind Farm|Dong Energy Rb (Uk) Limited |15 Jun 2021|15 Jun 2021| 
 +|MLA/2021/00274/2 - Completed|Application - Maintenance of existing works |Euro Wharf Sheet Pile Flap Valve Installation & Repair|Euro Wharf Sheet Pile Wall|Hanson Aggregates-Rochester |15 Jun 2021|21 Feb 2023| 
 +|MLA/2021/00275/1 - Completed|Application - Other deposits|Duddon Estuary pipeline remediation works |Duddon Estuary Pipeline Remediation Works |Northern Divers (Engineering) Limited |16 Jun 2021|24 Jan 2023| 
 +|MLA/2021/00276 - Completed|Application - Maintenance of existing structures or assets|Allington Lock Fenders|Allington Lock Fenders|Volker Stevin |16 Jun 2021|16 Jun 2021| 
 +|MLA/2021/00277 - Completed|Application - Maintenance of existing structures or assets|Replacement of Two Outhaul Posts|Outhaul posts |Royal Solent Yacht Club |16 Jun 2021|16 Jun 2021| 
 +|MLA/2021/00278 - Completed|Application - Non-navigational clearance dredging |Castle Park WSHP Dredging | |Bristol City Holdings Limited |16 Jun 2021|16 Jun 2021| 
 +|MLA/2021/00279 - Completed|Application - Maintenance of existing structures or assets|Hartlepool Power Station - Forebay concrete repairs |Hartlepool Cooling Water Intake Forebay beam|Edf Energy Nuclear Generation Limited |17 Jun 2021|17 Jun 2021| 
 +|MLA/2021/00280 - Completed|Application - Maintenance of existing structures or assets|Pageant Steps |Pageant Steps |Moore Project Management Solutions Llp|18 Jun 2021|18 Jun 2021| 
 +|MLA/2021/00281/1 - Completed|Application - Construction of new works, Decommissioning of works |Replacement Jetty - Upper Upnor |Upper Upnor New Jetty Location, Existing Jetty - Proposed demolition|Constructex Limited |18 Jun 2021|04 Jul 2024| 
 +|MLA/2021/00282 - Completed|Application - Non-navigational clearance dredging |Wind Enterprise -Component Exchange Project. Greater Gabbard Offshore Wind LTD|MISC_GreaterGabbardWorksArea_SSE_20210524 |Greater Gabbard Offshore Winds Limited|18 Jun 2021|18 Jun 2021| 
 +|MLA/2021/00283/1 - Completed|Application - Other deposits|Deployment and operation of Floating LiDAR buoys and metocean buoys |Survey Area_1 |Morgan Offshore Wind Limited|18 Jun 2021|27 Sep 2021| 
 +|MLA/2021/00284/1 - Completed|Application - Maintenance of existing works |Revetment Remediation, Shipyard Estate, Hythe |Proposed_Revetment_Area_160621_WGS84|Taylor Wimpey (Southern Counties) |21 Jun 2021|29 Sep 2023| 
 +|MLA/2021/00285 - Completed|Application - Maintenance of existing structures or assets|London Fire Brigade Pontoon |Site Location - LFB |London Fire Brigade Enterprises Limited |21 Jun 2021|21 Jun 2021| 
 +|MLA/2021/00287 - Completed|Application - Maintenance of existing structures or assets|A14 Orwell Bearing maint yr5 scheme pin 605626 (summer works) |Orwell|John Graham Construction Limited|21 Jun 2021|21 Jun 2021| 
 +|MLA/2021/00288 - Completed|Application - Maintenance of existing structures or assets|QinetiQ Portland Grove Point maintenance and repair (June 2021 - June 2022) |Grove Point |Qinetiq Limited |22 Jun 2021|22 Jun 2021| 
 +|MLA/2021/00290 - Completed|Application - Maintenance of existing structures or assets|Islington Wharf |Islington Wharf |Bolitho Estate|22 Jun 2021|22 Jun 2021| 
 +|MLA/2021/00292/1 - Completed|Application - Maintenance of existing works |Triton Knoll Offshore Wind Farm: Transmission Assets Operations and Maintenance |Triton Knoll Order Limits |Triton Knoll Ofto Limited |23 Jun 2021|26 Jan 2024| 
 +|MLA/2021/00293 - Completed|Application - Maintenance of existing structures or assets|General Maintenance Jetty Infrastructure And Associated Equipment 2021-2022 |Isle of Grain Jetty No 1|Bp Oil Uk Limited |23 Jun 2021|23 Jun 2021| 
 +|MLA/2021/00294 - Completed|Application - Construction of new works, Maintenance of existing works|Brunswick Wharf River Wall and Pontoon|Brunswick River Wall and Pontoon|Red Earth Bideford Limited|23 Jun 2021|20 Jul 2022| 
 +|MLA/2021/00295 - Completed|Application - Other deposits|Bantham harbour and estuary |magic_polygons|Bantham Estate|24 Jun 2021|30 May 2022| 
 +|MLA/2021/00296 - Completed|Application - Other works |Tyne Estuary Environmental Enhancements Phase 2 |Kingfisher Court, Dunston Staiths Inlet, Newcastle Quayside |Groundwork Ne & Cumbria |24 Jun 2021|17 Jan 2022| 
 +|MLA/2021/00298 - Completed|Application - Construction of new works |Coverack Coastal Defence Project|Proposed development|Cornwall Council-Bodmin |24 Jun 2021|09 Mar 2022| 
 +|MLA/2021/00299 - Completed|Application - Maintenance of existing structures or assets|Sharpness South Pier|Sharpness South Pier|Canal & River Trust |24 Jun 2021|24 Jun 2021| 
 +|MLA/2021/00300 - Completed|Application - Maintenance of existing works |Westermost Rough Offshore Windfarm Array Cable Stabilisation|Westermost Rough Offshore Wind Farm |Westermost Rough Ltd|25 Jun 2021|14 Oct 2021| 
 +|MLA/2021/00301 - Completed|Application - Non-navigational clearance dredging |Lytham Main Drain tidal desilt|Dock Bridge Tidal desilt|Environment Agency|28 Jun 2021|28 Jun 2021| 
 +|MLA/2021/00302 - Withdrawn|Application - Other deposits|Redcar Time And Tide Bell | |Redcar & Cleveland Bc Cleveland House |29 Jun 2021| | 
 +|MLA/2021/00303 - Completed|Application - Construction of new works |Ocean Business 2021 Pontoon |National Oceanography Centre|Diversified Communications Uk |29 Jun 2021|29 Sep 2021| 
 +|MLA/2021/00304 - Completed|Application - Decommissioning of works|Scroby Sands Met Mast Foundation Removal|Scroby Sands Met Mast |Rwe Renewables Uk Scroby Sands Limited|29 Jun 2021|23 Dec 2021| 
 +|MLA/2021/00305 - Completed|Application - Maintenance of existing structures or assets|Chalet No.1 Solent Breezes SO31 9HG Gabion Sea Defences |Chalet No. 1 Solent Breezes SO31 9HG - Gabion Sea Defence |Mr Terry Ralph|30 Jun 2021|30 Jun 2021| 
 +|MLA/2021/00306 - Completed|Application - Deposit of markers|BEEMS Work Package 7 Oceanographic Measurements. Wavebuoy |HP_Waverider_Buoy_BNG_2018_2020_buffer_100m_envelope_pg |Cefas Ltd |01 Jul 2021|01 Jul 2021| 
 +|MLA/2021/00308 - Completed|Application - Maintenance of existing structures or assets|Ryde Pier |Ryde Pier |Network Rail Limited|02 Jul 2021|02 Jul 2021| 
 +|MLA/2021/00309 - Completed|Application - Construction of new works |Outfall pipe and scour protection - Greenwich |Greenwich Dewatering Outfall|Riverlinx Cjv |02 Jul 2021|09 Mar 2022| 
 +|MLA/2021/00310 - Completed|Application - Construction of new works |RNLI Exmouth Launching Ramp |RNLI Exmouth|Rnli Poole|02 Jul 2021|16 Dec 2021| 
 +|MLA/2021/00312 - Completed|Application - Maintenance of existing works |Triton Knoll Offshore Wind Farm: Generation Assets Operation and Maintenance|Triton Knoll Order Limits |Triton Knoll Offshore Wind Farm Ltd |02 Jul 2021|18 Apr 2023| 
 +|MLA/2021/00313 - Completed|Application - Maintenance of existing structures or assets|Hazel Road Southampton|Hazel Road Southampton|Beasley Christopher Limited |03 Jul 2021|03 Jul 2021| 
 +|MLA/2021/00314/1 - Completed|Application - Construction of new works, Maintenance of existing works|Plaistow and Royal Primrose Wharves - Marine Piling |Plaistow and Royal Primrose Wharves |Gps Marine And Civil Sevices Ltd|05 Jul 2021|22 Jun 2022| 
 +|MLA/2021/00315 - Completed|Application - Minor removals|ADM Erith Jetties Refurbishment and Modifications - Ground investigation|ADM Erith |Archer Daniels Midland Erith Limited|21 Jul 2021|21 Jul 2021| 
 +|MLA/2021/00316 - Completed|Application - Maintenance of existing structures or assets|Replacement of single timber pile |lymington Yacht haven |Lymington Yacht Haven Limited |07 Jul 2021|07 Jul 2021| 
 +|MLA/2021/00317/1 - Completed|Application - Construction of new works, Maintenance of existing works|Naze north cliff stabilisation emergency works project|Naze north cliff and seawall|Naze Protection Society |08 Jul 2021|17 Mar 2023| 
 +|MLA/2021/00318 - Withdrawn|Application - Construction of new works |New England Farm, Snape, Jetty| |Mr Andrew Heald |08 Jul 2021| | 
 +|MLA/2021/00319 - Completed|Application - Maintenance of existing structures or assets|Deans lodge slipway refurbishment |deans lodge slipway |Mr Nick Haworth |09 Jul 2021|09 Jul 2021| 
 +|MLA/2021/00320 - Completed|Application - Construction of new works, Maintenance of existing works|Viking Energy Network Jarrow|DischargeConstructionActivity, AbstractionConstructionActivity|South Tyneside Council|11 Jul 2021|16 May 2022| 
 +|MLA/2021/00321 - Completed|Application - Marine licence for the burial of human remains at sea | |NEEDLES (WI090) |Charles Lister|12 Jul 2021|12 Jul 2021| 
 +|MLA/2021/00323 - Completed|Application - Other deposits|Celtic Interconnector (the UK elements of which are herein ‘the Proposed Development’). |Crossing 1, Crossing 2, Crossing 3, Crossing 4, Crossing 5, Crossing 6, Crossing 7, Crossing 8, Crossing 9, Crossing 10, Chalk substrate, Crossing 11 |Eirgrid Plc |13 Jul 2021|14 Sep 2022| 
 +|MLA/2021/00324/1 - Variation Requested|Application - Construction of new works |The TwinHub Floating Offshore Wind Demonstration Project|Wave Hub|Wave Hub Limited|16 Jul 2021|12 Jan 2022| 
 +|MLA/2021/00325 - Completed|Application - Disposal of dredged material, Navigational dredging (maintenance) |Fox's Marina Maintenance Dredge |Fox's Marina, RIVER ORWELL (ABP) (TH034)|Foxs Marina Ipswich Ltd-The Strand|16 Jul 2021|24 Oct 2022| 
 +|MLA/2021/00327 - Completed|Application - Disposal of dredged material, Navigational dredging (maintenance) |Island Harbour, IOW. Maintenance Dredging |Island Harbour, Island Harbour Dispose|Uavend Investments-Newport|19 Jul 2021|14 Jun 2022| 
 +|MLA/2021/00328 - Completed|Application - Other deposits, Other removals|Seaweed Farm, North Devon |Algapelago Marine - Farm Site, Bideford Bay |Algapelago Marine Limited |19 Jul 2021|18 May 2022| 
 +|MLA/2021/00330 - Completed|Application - Maintenance of existing structures or assets|J Clubb Jetty maintenance |J CLUBB LIMITED JETTY PIER|J Clubb Limited |19 Jul 2021|19 Jul 2021| 
 +|MLA/2021/00331 - Completed|Application - Construction of new works, Maintenance of existing works|Southampton Sea Cadets - repairs to slipway and additional pontoons.|Sea Cadets Pontoons, Sea Cadets Slipway |Southampton Sea Cadets|20 Jul 2021|23 Jun 2022| 
 +|MLA/2021/00333/2 - Completed|Application - Construction of new works, Maintenance of existing works|The Boathouse, Mill Hill, Stoke Gabriel |The Boathouse, Mill Hill, Stoke Gabriel |Mr Nigel Rogers |20 Jul 2021|29 Jun 2022| 
 +|MLA/2021/00334 - Completed|Application - Maintenance of existing structures or assets|Red Funnel Terminal Refurbishment |Red Funnel|Red Funnel Limited|21 Jul 2021|21 Jul 2021| 
 +|MLA/2021/00335/1 - Completed|Application - Construction of new works |Kingston Wharf - River wall replacement |River wall Replacement Works|P.M.C. Construction And Development Services Limited|21 Jul 2021|06 Dec 2022| 
 +|MLA/2021/00336 - Completed|Application - Maintenance of existing structures or assets|South Tyneside Council VENJ - Concrete Testing|Jarrow Staithes |Haskoning Uk Limited|21 Jul 2021|21 Jul 2021| 
 +|MLA/2021/00337 - Completed|Application - Non-navigational clearance dredging |Removal of silt from Local Authority slip way |Bank End Slipway|Torridge District Council |23 Jul 2021|23 Jul 2021| 
 +|MLA/2021/00338 - Withdrawn|Application - Construction of new works |Halls Jetty Pontoon | |Thames Side Services|23 Jul 2021| | 
 +|MLA/2021/00339/1 - Completed|Application - Other deposits|8" Condensate Pipeline Humber Crossing Rock Dump|8" Condensate Pipeline|Centrica Storage Limited|26 Jul 2021|05 May 2023| 
 +|MLA/2021/00340/1 - Completed|Application - Maintenance of existing works |Ridham Sea Terminal - Eastern Quay Maintenance Works|Eastern Quay, Ridham Sea Terminal |Brett Aggregates Ltd -Faversham |26 Jul 2021|16 Feb 2023| 
 +|MLA/2021/00341 - Completed|Application - Construction of new works |Great Yarmouth - New section of quay wall (WP14A Wall 122)|New Quay Wall |Jba Bentley Ltd-Peterborough|28 Jul 2021|07 Jan 2022| 
 +|MLA/2021/00342/1 - Completed|Application - Other deposits|Dogger Bank South Offshore Wind Project - metocean buoy installation|DBS West, DBS East|Rwe Npower|28 Jul 2021|19 May 2023| 
 +|MLA/2021/00343 - Completed|Application - Non-navigational clearance dredging |Ocean Berth Exolum Tyneside Grab Dredge |Exolum Tyneside Ltd - Ocean Berth |Inter Terminals Tyneside Limited|02 Aug 2021|02 Aug 2021| 
 +|MLA/2021/00344 - Completed|Application - Construction of new works |Elkins Boatyard - Berthing Arrangement Update |Elkins Boatyard Berthing|Elkins Boat Yard Limited|02 Aug 2021|14 Feb 2022| 
 +|MLA/2021/00345 - Completed|Application - Non-navigational clearance dredging |Hen Pens Sand Sand Winning|Hen Pens Sand Winning |Environment Agency|02 Aug 2021|02 Aug 2021| 
 +|MLA/2021/00347 - Completed|Application - Other works |Replacement of existing pontoon structures and addition of 12 square metres within the area of the whole structure|Weymouth Rowing Club Pontoon|Weymouth Rowing Club|03 Aug 2021|03 Dec 2021| 
 +|MLA/2021/00348 - Completed|Application - Maintenance of existing structures or assets|Foul Anchor Sluice - Replacement of outer doors |Foul Anchor Sluice|North Level District Internal Drainage Board|05 Aug 2021|05 Aug 2021| 
 +|MLA/2021/00349 - Completed|Application - Marine licence for the burial of human remains at sea | |NEWHAVEN (WI011)|H.D.Tribe Limited |08 Aug 2021|08 Aug 2021| 
 +|MLA/2021/00350 - Completed|Application - Minor removals|Langstone Coastal Defence GI Works|Langstone Broadscale GI Survey Area |Aecom Limited |11 Aug 2021|11 Aug 2021| 
 +|MLA/2021/00351 - Completed|Application - Maintenance of existing structures or assets|fender repair to wharf wall |Northumberland Wharf|Wph Limited |12 Aug 2021|12 Aug 2021| 
 +|MLA/2021/00352/1 - Completed|Application - Construction of new works |Mepal Gauging Station |Mepal Gauging Station transducer rack area|Jba Bentley Ltd-Peterborough|12 Aug 2021|11 Nov 2022| 
 +|MLA/2021/00353/2 - Completed|Application - Construction of new works |Preston & South Ribble Flood Risk Management Scheme - Phases 1 and 2|Phase 1 - revetment 2, Phase 1 - revetment 1, Phase 1 - revetment 3, Phase 2 - revetment 1|Environment Agency (Warrington) |13 Aug 2021|23 Feb 2024| 
 +|MLA/2021/00355 - Completed|Application - Maintenance of existing structures or assets|Repairs to existing lagoon banks and maintenance of small pools and creeks|Hesketh Out Marsh West repairs|Rspb|14 Aug 2021|14 Aug 2021| 
 +|MLA/2021/00356/1 - Completed|Application - Construction of new works |Small Scale Nearshore Kelp Farm Pilot Test Site |Test Site |Bsc (Southern) Limited|15 Aug 2021|11 Nov 2022| 
 +|MLA/2021/00357 - Completed|Application - Maintenance of existing structures or assets|Repairs to Northfleet Jetty |Northfleet Jetty|Apa Concrete Repairs Limited|17 Aug 2021|17 Aug 2021| 
 +|MLA/2021/00358 - Completed|Application - Maintenance of existing structures or assets|Recommendations to remove wooden buffers following Engineering Infrastructural Assessment |Spillers Mill |The Environment Partnership (Tep) Limited |05 Nov 2021|05 Nov 2021| 
 +|MLA/2021/00359 - Completed|Application - Maintenance of existing structures or assets|LITTLE RAVENSWELL RIVER WALL|River Dart Wall |Ciaran Mcclennon Building Contractors Limited |18 Aug 2021|18 Aug 2021| 
 +|MLA/2021/00360 - Completed|Application - Maintenance of existing structures or assets|Longrock Stream security screen |Longrock Stream security screen |Cormac Solutions Limited|18 Aug 2021|18 Aug 2021| 
 +|MLA/2021/00361 - Completed|Application - Maintenance of existing structures or assets|Captain Cook Museum External Repairs & Decoration |CAPTAIN COOK MEMORIAL MUSEUM|Captain Cook Memorial Museum|18 Aug 2021|18 Aug 2021| 
 +|MLA/2021/00362 - Completed|Application - Construction of new works |Application for the construction of a private jetty- Mast House, 95 Mudeford, Christchurch, BH23 3NJ|Mudeford jetty|Mr Andrew Headley |18 Aug 2021|19 Aug 2022| 
 +|MLA/2021/00363 - Completed|Application - Non-navigational clearance dredging |Barge Harbour dredging|Robertsons Barge Harbour|Robertsons Boatyard |19 Aug 2021|19 Aug 2021| 
 +|MLA/2021/00364 - Withdrawn|Application - Construction of new works |West Coast Main Life Extension: Gantry Replacements (PN84-PN85-PN86-PN87-PN89)| |Volkerrail Specialist Businesses|19 Aug 2021| | 
 +|MLA/2021/00365 - Completed|Application - Maintenance of existing structures or assets|Safety works Install Handrails and replace non slip strips to Gangplank |Mooring 11, River Arun, The Causeway, Arundel BN18 9LE, West Sussex |Mr Peter Bonsall|23 Aug 2021|23 Aug 2021| 
 +|MLA/2021/00366 - Completed|Application - Disposal of dredged material, Navigational dredging (maintenance) |Merlin Quay Maintenance Dredge|Merlin Quay |Merlin Real Estate Limited|25 Aug 2021|15 Jun 2022| 
 +|MLA/2021/00367 - Completed|Application - Maintenance of existing structures or assets|NEW BRIDGE BOWCOMBE CREEK REPOINTING|NEW BRIDGE BOWCOMBE CREEK REPOINTING|Devon County Council|25 Aug 2021|25 Aug 2021| 
 +|MLA/2021/00368/1 - Completed|Application - Other works |Wear Estuary Ecological Enhancement - Liebherr Slipway|Liebherr Slipway|Groundwork Ne & Cumbria |26 Aug 2021|20 May 2022| 
 +|MLA/2021/00369/1 - Completed|Application - Construction of new works |Urgent: Arun to Pagham Beach Management Plan Phase 4|Sheet Pile Wall works area|Arun District Council |26 Aug 2021|26 Jun 2023| 
 +|MLA/2021/00370 - Completed|Application - Maintenance of existing structures or assets|Drigg Viaduct Rerail/resleeper|Drigg Viaduct |Network Rail|09 Dec 2021|09 Dec 2021| 
 +|MLA/2021/00371 - Completed|Application - Maintenance of existing structures or assets|Riverside West Wall Repairs |Riverside West Wall Repair|Topbond Plc |27 Aug 2021|27 Aug 2021| 
 +|MLA/2021/00372/3 - Completed|Application - Maintenance of existing works, Other deposits, Other removals |Lancing beach soft sediment remediation works in the vicinity of Rampion Export Cable 4 |Lancing beach soft sediment A, Lancing beach soft sediment B|Rampion Offshore Wind Ltd |31 Aug 2021|03 Sep 2024| 
 +|MLA/2021/00373 - Completed|Application - Maintenance of existing structures or assets|Perranwharf Bridge Ground Investigation |Perran Wharf Bridge |Cormac Solutions Limited|01 Sep 2021|01 Sep 2021| 
 +|MLA/2021/00374 - Completed|Application - Minor removals|EA ONE North and EA TWO Sediment Sampling Survey (2021) |Site 1|East Anglia Two Limited |01 Sep 2021|01 Sep 2021| 
 +|MLA/2021/00375 - Completed|Application - Construction of new works |Old Swan Bridge - Arch 1 Strengthening, Removal of Existing Temporary Works Under Arch 1 and Masonry Repairs|Old Swan Bridge |West Sussex County Council|01 Sep 2021|08 Mar 2022| 
 +|MLA/2021/00376 - Withdrawn|Application - Construction of new works |Race Bank PowerBuoy | |Orsted Wind Power A/S |02 Sep 2021| | 
 +|MLA/2021/00377 - Completed|Application - Minor removals|Plaistow and Royal Primrose Wharves - 4 no. Trial Pits|Plaistow and Royal Primrose Wharves |Marine And Civil Services Ltd |02 Sep 2021|02 Sep 2021| 
 +|MLA/2021/00378 - Completed|Application - Maintenance of existing structures or assets|Dover Town Outfall|Dover Town Outfall|Beasley Christopher Limited |06 Sep 2021|06 Sep 2021| 
 +|MLA/2021/00379 - Completed|Application - Maintenance of existing structures or assets|Dover Town Outfall|Dover Town Hall |Beasley Christopher Limited |06 Sep 2021|06 Sep 2021| 
 +|MLA/2021/00380 - Completed|Application - Construction of new works |Cleavel Point Seasonal Pontoon|Cleavel Point |Activate Outdoors Limited |06 Sep 2021|19 Apr 2022| 
 +|MLA/2021/00381 - Completed|Application - Maintenance of existing structures or assets|Deal Dolphin|Deal Dolphin|Beasley Christopher Limited |06 Sep 2021|06 Sep 2021| 
 +|MLA/2021/00382 - Completed|Application - Minor removals|Trial pits at Meadfoot Beach, Torquay |Meadfoot Beach|Torbay Council|06 Sep 2021|06 Sep 2021| 
 +|MLA/2021/00384 - Completed|Application - Disposal of dredged material, Navigational dredging (maintenance) |Renewal of Dredging Licence for 5 years |BRIDLINGTON A (HU015), Bridlington Harbour Dredge Area|Bridlington Harbour Commissioners |08 Sep 2021|19 May 2022| 
 +|MLA/2021/00385 - Completed|Application - Maintenance of existing structures or assets|SALCOMBE - The provision and replacement of sewer hatch-boxes on the foreshore sewer and the subsequent CCTV surveying and cleansing of the sewer.|Hatchbox 1, Hatchbox 2, Hatchbox 3, Hatchbox 4|South West Water Limited|08 Sep 2021|08 Sep 2021| 
 +|MLA/2021/00386 - Completed|Application - Maintenance of existing structures or assets|Longrock Marazion Marsh Outfall Pipe Repairs|Longrock Marazion Marsh Outfall Pipe Repairs|Cormac Solutions Limited|09 Sep 2021|09 Sep 2021| 
 +|MLA/2021/00387 - Completed|Application - Construction of new works |Construction of a replacement Jetty at 43 Elms Avenue, Poole, BH148EE |43 Elms Avenue Jetty, Existing Slipway|Mr Stephen Govier |09 Sep 2021|29 Mar 2022| 
 +|MLA/2021/00388 - Completed|Application - Maintenance of existing structures or assets|lANGSTONE OPP SHIP INN|Langstone opp ship Inn|Beasley Christopher Limited |09 Sep 2021|09 Sep 2021| 
 +|MLA/2021/00389 - Completed|Application - Maintenance of existing structures or assets|Bognor Regis Blakes Road|Bognor Regis Blakes RD|Beasley Christopher Limited |09 Sep 2021|09 Sep 2021| 
 +|MLA/2021/00390/2 - Completed|Application - Construction of new works |Blue Anchor Coastal Protection Works|Blue Anchor Marine Licence Area |Somerset West And Taunton Council |10 Sep 2021|13 Apr 2023| 
 +|MLA/2021/00391 - Completed|Application - Construction of new works, Maintenance of existing works|West India Pier Recommissioning |West India Pier |Thames Marine Services Limited|10 Sep 2021|21 Dec 2021| 
 +|MLA/2021/00392/1 - Variation Requested|Application - Alternative use of dredged material |Saltfleet to Gibraltar Point Beach Management 2022 - 2031 |Mablethorpe to Skegness |Environment Agency|10 Sep 2021|27 May 2022| 
 +|MLA/2021/00393/1 - Completed|Application - Other removals|Ormesby Beck Intertidal Zone Restoration|Ormesby Beck|Bam Nutall Newcastle|13 Sep 2021|06 Feb 2023| 
 +|MLA/2021/00394 - Completed|Application - Minor removals|Brett Wharf Quay Wall SI|Brett Wharf SI|Solmek Limited|13 Sep 2021|13 Sep 2021| 
 +|MLA/2021/00395 - Completed|Application - Maintenance of existing structures or assets|Old Sun Wharf |Old Sun Wharf |Osw Freehold & Management Limited |16 Sep 2021|16 Sep 2021| 
 +|MLA/2021/00396 - Completed|Application - Maintenance of existing structures or assets|calshot outer |Calshot outer |Beasley Christopher Limited |14 Sep 2021|14 Sep 2021| 
 +|MLA/2021/00397 - Completed|Application - Maintenance of existing structures or assets|Gurnard outer |Gurnard outer |Beasley Christopher Limited |14 Sep 2021|14 Sep 2021| 
 +|MLA/2021/00398/1 - Completed|Application - Construction of new works |Isles of Scilly Dune & Coastal Flood Defence Scheme |Porthloo working area, Porth Mellon working area|Council Of The Isles Of Scilly|14 Sep 2021|28 Oct 2022| 
 +|MLA/2021/00399 - Completed|Application - Maintenance of existing structures or assets|Woodvale outer|Woodvale outer|Beasley Christopher Limited |14 Sep 2021|14 Sep 2021| 
 +|MLA/2021/00400 - Completed|Application - Maintenance of existing structures or assets|Great Eastern Quays - Wall type 2 Refurbishment and Ancillary works |Wall type 2 works and ancillary items |Galliford Try Partnerships Limited|14 Sep 2021|14 Sep 2021| 
 +|MLA/2021/00401 - Completed|Application - Maintenance of existing structures or assets|RIVER HOUSE |Jetty maintenance |Cutts Marine|14 Sep 2021|14 Sep 2021| 
 +|MLA/2021/00402 - Completed|Application - Maintenance of existing structures or assets|Ryde outer|Ryde outer|Beasley Christopher Limited |15 Sep 2021|15 Sep 2021| 
 +|MLA/2021/00403 - Completed|Application - Other deposits|Sofia UXO site investigations (no disposal) |Unexploded Ordnance (UXO) investigation area|Sofia Offshore Wind Farm Limited|15 Sep 2021|16 Sep 2021| 
 +|MLA/2021/00404 - Completed|Application - Maintenance of existing structures or assets|Binstead outer|Binstead outer|Beasley Christopher Limited |15 Sep 2021|15 Sep 2021| 
 +|MLA/2021/00405 - Completed|Application - Construction of new works, Decommissioning of works, Disposal of dredged material, Other works|Riverside Ro-Ro |TEES BAY A (TY160), Dolphin D1, Dolphin D2, Dolphin_D4 and D5, Approach bridge, platform, abutment|Pd Teesport Ltd |16 Sep 2021|22 Apr 2024| 
 +|MLA/2021/00406 - Completed|Application - Construction of new works |Boat Lifting Hoiste |Boat Lifting Hoiste |Mr Nigel Constantine|16 Sep 2021|20 Jul 2022| 
 +|MLA/2021/00407 - Completed|Application - Maintenance of existing structures or assets|Hythe (Southampton) Sailing Club Jetty Refurbishment|Hythe (Southampton) SC Jetty|Kenneth Endean|16 Sep 2021|16 Sep 2021| 
 +|MLA/2021/00408 - Completed|Application - Non-navigational clearance dredging |Slipway maintenance |Shamblers Yard|Wooden & Steel Ship Repairs Ltd |16 Sep 2021|16 Sep 2021| 
 +|MLA/2021/00409/1 - Variation Requested|Application - Construction of new works, Maintenance of existing works|The Port of Ramsgate Vessel Access Platform |Boat Landing Area |Vattenfall Wind Power Limited |17 Sep 2021|04 Mar 2022| 
 +|MLA/2021/00410/1 - Completed|Application - Construction of new works |20/20a Kingsmans Farm Road Pontoon Relocation |Foreshore adjacent 20/20a Kingsmans Farm Rd Land registry No. EX743024|Mr Rhett Butler |17 Sep 2021|29 Mar 2023| 
 +|MLA/2021/00412 - Completed|Application - Maintenance of existing structures or assets|Lee on the Solent Range House |LEE ON THE SOLENT RANGE HOUSE |Beasley Christopher Limited |21 Sep 2021|21 Sep 2021| 
 +|MLA/2021/00413/2 - Completed|Application - Other deposits, Other removals|Seaweed Farm St Austell Bay, Cornwall.|Updated seaweed farm site |West Country Mussels Of Fowey Limited |21 Sep 2021|03 May 2023| 
 +|MLA/2021/00414 - Completed|Application - Maintenance of existing structures or assets|Rottingdean Outfall Marker|Rottingdean |Beasley Christopher Limited |21 Sep 2021|21 Sep 2021| 
 +|MLA/2021/00415 - Completed|Application - Maintenance of existing works |Alpha Jetty, Cliffe - Northern Embankment Maintenance Works |Northern Embankment, Alpha Jetty, Cliffe|Robert Brett & Son-Faversham|22 Sep 2021|18 Jul 2022| 
 +|MLA/2021/00416 - Withdrawn|Application - Other removals|Demolition of three timber jetties on the River Ouse and removal of several timber mooring posts. |Jetty 1, Jetty 2, Jetty 3, Mooring post removal site|Sam Gilpin Demolition-Newton Abbot|23 Sep 2021| | 
 +|MLA/2021/00417 - Completed|Application - Maintenance of existing structures or assets|Shell Haven Terminal. Replacement of Marine Loading Arms 2021 |Shell Haven S Jetty |Shell U.K. Limited|24 Sep 2021|24 Sep 2021| 
 +|MLA/2021/00418 - Completed|Application - Maintenance of existing structures or assets|West India Dock Pier Reinstatement|West India Dock Pier|Thames Marine Services Limited|27 Sep 2021|27 Sep 2021| 
 +|MLA/2021/00419 - Completed|Application - Maintenance of existing structures or assets|Erection of Scaffolding for emergency roof repairs|Guy's Quay, Sutton Harbour|Sutton Harbour Holdings Plc |27 Sep 2021|27 Sep 2021| 
 +|MLA/2021/00420/1 - Completed|Application - Maintenance of existing works |Martello Marine Ltd - Slipway Extension |Martello Marine Ltd Rye Boatyard|Martello Developments Ltd |28 Sep 2021|15 May 2023| 
 +|MLA/2021/00421 - Completed|Application - Maintenance of existing structures or assets|Inspection and minor maintenance of Dungeness A Intake and Outfall Pipelines|Dungeness A outfall and intake area |Magnox Limited|28 Sep 2021|28 Sep 2021| 
 +|MLA/2021/00422/1 - Completed|Application - Construction of new works |Royal Quays Marina Improvement Works|Royal Quays A1, Royal Quays A2, Royal Quays B1, Royal Quays B2|Boatfolk Marinas Ltd|29 Sep 2021|07 Nov 2023| 
 +|MLA/2021/00423 - Completed|Application - Construction of new works |Portsmouth Harbour Station Berthing Upgrades|Wightlink Fendering, Wightlink mooring dolphin and access bridge|Wightlink Limited |29 Sep 2021|25 Apr 2022| 
 +|MLA/2021/00424/1 - Completed|Application - Disposal of dredged material|Deepening of Berths 8 and 9, Port of Felixstowe |INNER GABBARD EAST (TH056)|Felixstowe Dock And Railway Company |29 Sep 2021|21 Apr 2023| 
 +|MLA/2021/00426 - Completed|Application - Marine licence for the burial of human remains at sea | |NEEDLES (WI090) |Mamarine.Com Llp|01 Oct 2021|01 Oct 2021| 
 +|MLA/2021/00427 - Completed|Application - Construction of new works |Installation of Floating Pontoons at Brigham and Cowan Docks|South Shields Marina|M-Technic Limited |01 Oct 2021|05 Apr 2022| 
 +|MLA/2021/00428 - Completed|Application - Maintenance of existing works |Dawsmere Pumping Station Outfall refurbishment|Outfall |South Holland Internal Drainage Board |01 Oct 2021|16 Mar 2022| 
 +|MLA/2021/00430 - Completed|Application - Non-navigational clearance dredging |Dock Marsh sluice clearance, Ramsholt, Deben Estuary SSSI/SPA/Ramsar site |Dock Marsh outfall|The Trustees Of The Adeane Bawdsey Settlement |01 Oct 2021|01 Oct 2021| 
 +|MLA/2021/00431/1 - Completed|Application - Maintenance of existing works |London Bridge City River Wall |London Bridge City River Wall |Sweco Uk Ipswich|04 Oct 2021|20 Mar 2024| 
 +|MLA/2021/00432/1 - Completed|Application - Maintenance of existing works |Maintenance and Structural Alteration Works to Fawley Refinery Sea Water Pump House |Fawley cofferdam|Constructex Limited |04 Oct 2021|04 Oct 2022| 
 +|MLA/2021/00433 - Completed|Application - Construction of new works |Hardway Sailing Club pontoons |Hardway Pontoons|Hardway-Sailing Club|04 Oct 2021|09 Dec 2022| 
 +|MLA/2021/00434 - Completed|Application - Disposal of dredged material, Navigational dredging (maintenance) |Newhaven Harbour Maintenance Dredging Sediment Disposal |NEWHAVEN|Newhaven Port & Properties Ltd|04 Oct 2021|31 Jan 2022| 
 +|MLA/2021/00435 - Completed|Application - Maintenance of existing structures or assets|Triton Knoll Demarcation Buoy and Boat Landing Cleaning |DemarcationBuoysPoly_5mBuff |Triton Knoll Offshore Wind Farm Limited |05 Oct 2021|05 Oct 2021| 
 +|MLA/2021/00436 - Completed|Application - Non-navigational clearance dredging |Deben Yacht Club dinghy slipway clearance |DYC dredging area |Mr Michael Sheppard |05 Oct 2021|05 Oct 2021| 
 +|MLA/2021/00437 - Completed|Application - Disposal of dredged material, Navigational dredging (capital), Navigational dredging (maintenance)|Leamouth Wharf Dredge |Dredge site - Leamouth Wharf, NAB TOWER (WI060) |Cemex Uk Ltd -Belvedier |06 Oct 2021|17 Feb 2022| 
 +|MLA/2021/00439 - Completed|Application - Marine licence for the burial of human remains at sea | |NEWHAVEN (WI011)|Barnes & Hicks Limited|07 Oct 2021|07 Oct 2021| 
 +|MLA/2021/00440 - Completed|Application - Minor removals|Wouldham Embankment Repairs - Ground Investigations |Wouldham_Site_Area|Environment Agency|07 Oct 2021|07 Oct 2021| 
 +|MLA/2021/00441 - Completed|Application - Maintenance of existing structures or assets|Vipers Quay - jetty repair|Vipers Quay jetty |Mr Andrew Scott |08 Oct 2021|08 Oct 2021| 
 +|MLA/2021/00442 - Completed|Application - Disposal of dredged material, Navigational dredging (maintenance) |Great Yarmouth Third Crossing Waiting Facility Maintenance Dredging |GREAT YARMOUTH (HU150), Dredge Area |Norfolk County Council|08 Oct 2021|08 Apr 2022| 
 +|MLA/2021/00443 - Completed|Application - Minor removals|St Annes Seawall Ground Investigation |Site 1|Jacobs Engineering U.K. Limited |11 Oct 2021|11 Oct 2021| 
 +|MLA/2021/00444/1 - Completed|Application - Disposal of dredged material, Navigational dredging (maintenance) |Royal Southern YC - Maintenance Dredging in Winter 2022 |RSrnYC_Maintenance_Dredge_Area_Border, NAB TOWER (WI060)|Royal Southern Yacht Club Limited |12 Oct 2021|08 Feb 2023| 
 +|MLA/2021/00445/1 - Completed|Application - Other removals|Victoria Stone Wharf|Victoria Stone Wharf|Marine And Civil Services Ltd |13 Oct 2021|27 Jul 2022| 
 +|MLA/2021/00447 - Completed|Application - Maintenance of existing works |Inter-array Cable Replacement |Race Bank Offshore Wind Farm|Race Bank Wind Farm Limited |18 Oct 2021|12 Feb 2024| 
 +|MLA/2021/00448 - Completed|Application - Construction of new works |Dover Harbour Board - Outer Wave Screen |Outer Wave Wall |Dover Harbour Board |19 Oct 2021|20 Jul 2022| 
 +|MLA/2021/00449 - Completed|Application - Marine licence for the burial of human remains at sea | |NEEDLES (WI090) |Mamarine.Com Llp|19 Oct 2021|19 Oct 2021| 
 +|MLA/2021/00450 - Completed|Application - Decommissioning of works|Wave Hub Site – Seatricity Anchor block removal |Wave Hub - Seatricity Central Anchor Block|Celtic Sea Power|20 Oct 2021|27 Jan 2022| 
 +|MLA/2021/00451 - Completed|Application - Maintenance of existing structures or assets|9 Dock Entrance Repairs |9 Dock_1|Babcock International Limited |20 Oct 2021|20 Oct 2021| 
 +|MLA/2021/00452 - Completed|Application - Maintenance of existing structures or assets|31 Market Street, Falmouth|31 Market Street|Yelverton Properties Limited|20 Oct 2021|20 Oct 2021| 
 +|MLA/2021/00453 - Completed|Application - Maintenance of existing works |3716 - Dinah's Side - Pipework|Dinah's Side water pipeline |Mr James Campbell |21 Oct 2021|31 Jan 2022| 
 +|MLA/2021/00454 - Completed|Application - Maintenance of existing works |Repair work to pier in Dittisham|Dittisham Pier|Landmarc|21 Oct 2021|19 Dec 2022| 
 +|MLA/2021/00455 - Completed|Application - Construction of new works |Sustainable and Resilient Coastal Cities (SARCC) - Vertipools and piling habitats |Westcliff Beach Viewing Platform, Leigh Port|Southend-On-Sea Borough Council |22 Oct 2021|13 Apr 2022| 
 +|MLA/2021/00456/1 - Variation Requested|Application - Navigational dredging (maintenance) |Maintenance Dredge of Shiplift at Solent Gateway Port in Marchwood|Marchwood Shiplift Dredge Area, Marchwood Shiplift Disposal Area (WI076)|Solent Gateway-Sea Mounting Centre|25 Oct 2021|19 May 2022| 
 +|MLA/2021/00457 - Completed|Application - Construction of new works |West Mersea Floating Pontoon works, West Mersea, Essex|West Mersea Floating Hammerhead Pontoon |Colchester Borough Council-Rowan House|25 Oct 2021|27 Jul 2022| 
 +|MLA/2021/00458/1 - Completed|Application - Construction of new works |Willoughby Road Mooring |Mooring_site|Nomad Property Ltd|26 Oct 2021|17 Jan 2023| 
 +|MLA/2021/00459 - Completed|Application - Construction of new works, Maintenance of existing works|TEAM2100 - Deptford Walls - Wall Repair Works |Deptford Walls Permanent Repairs|Jacobs Team2100 |27 Oct 2021|24 Mar 2022| 
 +|MLA/2021/00460 - Completed|Application - Construction of new works |Aldingham beck culvert outfall|Aldingham Beck Culvert Outfall|Metcalfe Plant Hire Ltd.|27 Oct 2021|25 May 2022| 
 +|MLA/2021/00461 - Completed|Application - Maintenance of existing works |Hornsea Project Two Helideck Guano Removal|HOW02_MMO_MarineLicenseArray_WGS84_20211026 |Optimus Wind Limited|28 Oct 2021|03 Feb 2022| 
 +|MLA/2021/00462 - Completed|Application - Deposit of markers|P00006882 AECOM - Mersey & Sankey Salinity Monitoring |Buoy monitoring upstream|Apem Ltd|28 Oct 2021|28 Oct 2021| 
 +|MLA/2021/00463 - Completed|Application - Maintenance of existing structures or assets|Hove opposite King Alfred Leisure |Hove opp King Alfred leisue |Beasley Christopher Limited |01 Nov 2021|01 Nov 2021| 
 +|MLA/2021/00464 - Completed|Application - Maintenance of existing structures or assets|BAE Barrow South Quay Concrete Removal|South and West Quay works |Bae Systems Submarines|01 Nov 2021|01 Nov 2021| 
 +|MLA/2021/00465 - Completed|Application - Construction of new works, Other deposits, Other dredging |Hemsby rock berm scheme |Hemsby rock berm activity area (nearshore delivery corridors to be determined)|Great Yarmouth Borough Council|01 Nov 2021|14 Mar 2023| 
 +|MLA/2021/00466 - Completed|Application - Deposit of markers|Marker buoy placement: Ormonde Dropped Object |Area 1|Ormonde Energy Limited|01 Nov 2021|01 Nov 2021| 
 +|MLA/2021/00467 - Completed|Application - Beach maintenance activities|Shoreham to Southwick beach recycling |shoreham to southwick shingle transfer|Shoreham Port Authority |02 Nov 2021|02 Nov 2021| 
 +|MLA/2021/00468 - Completed|Application - Maintenance of existing works |Saltfleet Haven Rationalisation Project |Pumping Station & Transformer House, Silt Flushing System |Lindsey Marsh Drainage Board|02 Nov 2021|30 Mar 2022| 
 +|MLA/2021/00469 - Completed|Application - Construction of new works |Retention of Jetty, Highfield |Highfield, Lower Swanwick |Clive & Victoria Nightingale|02 Nov 2021|01 Feb 2022| 
 +|MLA/2021/00470 - Completed|Application - Maintenance of existing structures or assets|Barge Harbour marker and mooring posts|Robertsons Barge Harbour|Robertsons Boatyard |03 Nov 2021|03 Nov 2021| 
 +|MLA/2021/00471 - Completed|Application - Maintenance of existing structures or assets|Island House, 25 Lower Street, Dartmouth. TQ6 9AN |Island House, 25 Lower Street, Dartmouth. TQ6 9AN |Saint Petrox Trust Lands|10 Jan 2022|10 Jan 2022| 
 +|MLA/2021/00472 - Completed|Application - Aggregate dredging, Sampling|458/464 West Bassurelle |Area 458, Area 464|Tarmac Marine Dredging Ltd|04 Nov 2021|21 Nov 2022| 
 +|MLA/2021/00473 - Completed|Application - Aggregate dredging, Sampling|Area 458/464|Area 458, Area 464|Cemex Uk Marine Ltd |04 Nov 2021|21 Nov 2022| 
 +|MLA/2021/00474 - Withdrawn|Application - Other removals|Nemo Link Saltmarsh Remediation Works | |National Grid Nemo Link Limited |04 Nov 2021| | 
 +|MLA/2021/00475/1 - Completed|Application - Maintenance of existing works |Redbridge Causeway Remediation Works, Southampton (Work Package 3)|Redbridge Causeway WP3 Site Boundary|Hampshire County Council|05 Nov 2021|05 Jan 2024| 
 +|MLA/2021/00477/1 - Completed|Application - Construction of new works |BEACH Esk - Whitehall Landing |Whitehall Landing |Groundwork Ne & Cumbria |08 Nov 2021|04 Jul 2022| 
 +|MLA/2021/00478 - Completed|Application - Maintenance of existing structures or assets|Weymouth Walls E&9 Repair Works |walls e&9 |Dorset Council|09 Nov 2021|09 Nov 2021| 
 +|MLA/2021/00479/1 - Completed|Application - Maintenance of existing works |Walney Island Causeway Remedials|Walney Causeway |Cumbria County Council Carlisle |11 Nov 2021|14 Apr 2023| 
 +|MLA/2021/00480 - Completed|Application - Sampling|Hornsea Three Geotechnical Survey (2022)|Hornsea Three Geotechnical Survey Area|Orsted Hornsea Three|11 Nov 2021|27 Jan 2022| 
 +|MLA/2021/00481 - Completed|Application - Maintenance of existing structures or assets|Anchor Iron Wharf Repairs, North Greenwich|Anchor Iron Wharf |Morden College|12 Nov 2021|12 Nov 2021| 
 +|MLA/2021/00483 - Completed|Application - Construction of new works |Great Yarmouth - New Flood Defence Quay Wall (WP10 Wall 112)|New quay wall |Jba Bentley Limited |15 Nov 2021|12 May 2022| 
 +|MLA/2021/00484 - Completed|Application - Maintenance of existing structures or assets|External Steel Walkway Repair |Walkway |Babcock Marine (Devonport) Limited|16 Nov 2021|16 Nov 2021| 
 +|MLA/2021/00485 - Completed|Application - Maintenance of existing structures or assets|Replacement of mooring riser chains with Eco Friendly Sealite Synthetic Mooring strops|Studland Bay Bankes Arms Moorings |Mrs Pippa Lightbown |16 Nov 2021|16 Nov 2021| 
 +|MLA/2021/00486 - Completed|Application - Minor removals|Rock Sewage Pumping station- sea wall trial pits|Rock SPS - Trial pitting area |Teignmouth Maritime Services Limited|16 Nov 2021|16 Nov 2021| 
 +|MLA/2021/00487 - Completed|Application - Maintenance of existing structures or assets|Blackfriars bridge refurbishment works|Main Works Area |F M Conway Limited|17 Nov 2021|17 Nov 2021| 
 +|MLA/2021/00488 - Completed|Application - Maintenance of existing structures or assets|LONGROCK BEACH ACCESS RAMP REPAIRS|Longrock Beach Access |Cormac Solutions Limited|17 Nov 2021|17 Nov 2021| 
 +|MLA/2021/00489/1 - Completed|Application - Other deposits|LIFE Recreation ReMEDIES Solent Seagrass Restoration|Solent|National Marine Aquarium|18 Nov 2021|22 Nov 2022| 
 +|MLA/2021/00490 - Completed|Application - Maintenance of existing structures or assets|MAC0464 - Reedham Swingbridge Survey|magic_polygons|Amalgamated Construction Ltd|02 Dec 2021|02 Dec 2021| 
 +|MLA/2021/00491 - Completed|Application - Maintenance of existing structures or assets|Canvey Island LPG Import Terminal (Calor Gas) - Jetty & Approach Road Remedial Works|Canvey Island LPG Terminal - Jetty & Approach |Frankham Consultancy Group Limited|19 Nov 2021|19 Nov 2021| 
 +|MLA/2021/00492 - Completed|Application - Maintenance of existing structures or assets|New Grimsby Sewage Pump Station, Tresco, CSO Pipe Minor Repairs |polygon |May Gurney Limited|22 Nov 2021|22 Nov 2021| 
 +|MLA/2021/00493 - Completed|Application - Maintenance of existing structures or assets|Combined Sewer Overflows (CSO) Clearance|Acton SR - CS01X, Stamford Brook SR - CS02X, nLL1 Brook Green - CS37X, North West SR - CS03X, Hammersmith PS - CS04X, West Putney - CS05X, Frogmore SR (Bell Ln) - CS07A, Frogmore SR (Buckhold Rd) - CS07B, Jews Row (Wandle Valley SR) - CS08A, Jews Row (Falconbrook SR) - CS08B, Falconbrook PS - CS09X, Lots Road PS - CS10X, Church St - CS11X, Queen St - CS12X, Smith St (ML) - CS13A, Smith St (SR) - CS13B, Western PS - CS15X, Kings Scholars Pond - CS18X, Grosvenor Ditch - CS21X, Horseferry - CS39X, Wood St - CS40X, Northumberland St - CS23X, Savoy St - CS24X, Norfolk St - CS25X, Essex St - CS26X, Goswell St - CS41X, Pauls Pier - CS42X, Battle Bridge - CS43X, Beer Ln - CS44X, Iron Gate - CS45X, London Bridge - CS55X, Shad Thames PS - CS28X, Nightingale Ln - CS46X, Union Wharf - CS47X, Wapping Dock - CS48X, Cole Stairs - CS49X, Bell Wharf - CS50X, Ratcliffe - CS51X, Holloway SR - CS30X, Blackwall Sewer - CS52X, Earl PS - CS31X, Deptford SR - CS32A, Deptford Creek - CS32B, Greenwich PS - CS33X, Abbey Mills PS - CS35X, Isle of Dogs PS - CS56X, Canning Town PS - CS57X, Charlton SR - CS34X, Henley Rd - CS53X, Tideway CSO - CS81X|Thames Water Limited|22 Nov 2021|22 Nov 2021| 
 +|MLA/2021/00495 - Completed|Application - Construction of new works |1203610 FCF-09 Donna Nook - MMO Licence for 3D Target for Military Training Purposes|3D Target |Ladmarc Support Services|22 Nov 2021|17 Mar 2022| 
 +|MLA/2021/00496 - Completed|Application - Other removals|Seaweed and sea vegetables farming and harvest| |Efal Ltd|23 Nov 2021|13 May 2022| 
 +|MLA/2021/00497/1 - Completed|Application - Maintenance of existing works, Sampling |A47 Great Ouse bridge refurbishment |A47 River Great Ouse bridge area|Highways England Company Limited|23 Nov 2021|23 Dec 2022| 
 +|MLA/2021/00498 - Completed|Application - Maintenance of existing works |Upgrading of mooring for Trinity|LV Trinity|Fellowship Afloat Charitable Trust|24 Nov 2021|27 May 2022| 
 +|MLA/2021/00499 - Completed|Application - Maintenance of existing structures or assets|Bexhill Beaulieu Road |Bexhill Beaulieu Road |Beasley Christopher Limited |24 Nov 2021|24 Nov 2021| 
 +|MLA/2021/00500 - Completed|Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital)|River Tyne Restoration Facility |Construction of the Confined Disposal Facility, Navigational dredge area|Newcastle Upon Tyne City Council|24 Nov 2021|05 May 2023| 
 +|MLA/2021/00501 - Completed|Application - Maintenance of existing structures or assets|Bexhill Clock Tower |Bexhill Clock Tower |Beasley Christopher Limited |25 Nov 2021|25 Nov 2021| 
 +|MLA/2021/00502 - Completed|Application - Maintenance of existing structures or assets|Fareham Quay Street |Fareham Quay Street |Beasley Christopher Limited |25 Nov 2021|25 Nov 2021| 
 +|MLA/2021/00503 - Completed|Application - Maintenance of existing structures or assets|Waldringfield Sailing Club, Slipway A repairs |Waldringfield Slipway A |Waldringfield Sailing Club|25 Nov 2021|25 Nov 2021| 
 +|MLA/2021/00504 - Completed|Application - Construction of new works |Pasco’s Boatyard - Sea Defences |Pasco's Sea Defence |Pasco'S Boatyard|26 Nov 2021|30 Oct 2023| 
 +|MLA/2021/00505 - Completed|Application - Deposit of markers|Downs Sailing Club - Deployment of Racing Marks |Downs sailing club racing marks |Downs Sailing Club|26 Nov 2021|26 Nov 2021| 
 +|MLA/2021/00507 - Completed|Application - Maintenance of existing structures or assets|Newhaven Fort Road|Newhaven Fort Road|Beasley Christopher Limited |29 Nov 2021|29 Nov 2021| 
 +|MLA/2021/00508 - Completed|Application - Maintenance of existing structures or assets|Lime Kilns CSO Ground Investigation |polygon |May Gurney Limited|29 Nov 2021|29 Nov 2021| 
 +|MLA/2021/00509/2 - Completed|Application - Other removals|Dogger Bank A and B Array Site Unexploded Ordnance Investigation|DBB UXO investigation area, DBA UXO investigation area|Dogger Bank Wind Farm |30 Nov 2021|29 Mar 2023| 
 +|MLA/2021/00510 - Completed|Application - Maintenance of existing structures or assets|Hayling Is opp Sea grove Avenue |Hayling Is opp Sea Grove Avenue |Beasley Christopher Limited |30 Nov 2021|30 Nov 2021| 
 +|MLA/2021/00511 - Completed|Application - Construction of new works |O&M Shed|O&M Shed|Cordwell Leisure Development Ltd|30 Nov 2021|08 Mar 2022| 
 +|MLA/2021/00512 - Completed|Application - Maintenance of existing structures or assets|Baltic Wharf Jetty - Concrete Investigation |Baltic Wharf|Baltic Distribution Limited |02 Dec 2021|02 Dec 2021| 
 +|MLA/2021/00513 - Completed|Application - Maintenance of existing structures or assets|Repair and maintenance to slip at Foundry Dock|Foundry quay|Mrs Marcia Fuller |02 Dec 2021|02 Dec 2021| 
 +|MLA/2021/00514 - Completed|Application - Maintenance of existing structures or assets|MAC00453 Trowse Swing Bridge|MAC0453 Trowse Swingbridge|Amalgamated Construction Ltd|02 Dec 2021|02 Dec 2021| 
 +|MLA/2021/00515 - Completed|Application - Maintenance of existing works |Shell Barking - River Rodding wall repairs|Shell Barking IG11 8BU|Toureen Contactors Ltd|02 Dec 2021|08 Aug 2023| 
 +|MLA/2021/00516 - Completed|Application - Construction of new works, Maintenance of existing works|North Haven Yacht Club repair works |NHYC T section, NHYC Access jetty |North Haven Yacht Club|03 Dec 2021|14 Sep 2022| 
 +|MLA/2021/00518 - Completed|Application - Navigational dredging (capital), Navigational dredging (maintenance)|Purfleet Berth Dredge |Purfleet Berth Dredge Area, Purfleet Berth Adjacent Site Dredge Area|Hanson Cement |03 Dec 2021|24 Mar 2022| 
 +|MLA/2021/00523 - Completed|Application - Maintenance of existing structures or assets|Culvert headwall repair |Newtown Salt Works feeding ponds|National Trust (Enterprises) Limited (The)|07 Dec 2021|07 Dec 2021| 
 +|MLA/2021/00524 - Withdrawn|Application - Other removals|CIRCE North 2 UXO Clearance | |Zayo Group Uk Ltd-St Katherines Way |07 Dec 2021| | 
 +|MLA/2021/00526 - Completed|Application - Maintenance of existing structures or assets|Brunel Green Gabions|Brunel Green Gabions|Cormac Solutions Limited|08 Dec 2021|08 Dec 2021| 
 +|MLA/2021/00527 - Completed|Application - Construction of new works |Island House, Chiswick - New Pontoon|Island House, Chiswick|Jason Gissing |08 Dec 2021|11 Mar 2022| 
 +|MLA/2021/00528 - Completed|Application - Construction of new works |Brett Wharf Quay Works|Brett Wharf |Edrri Brett Wharf Gateshead Sarl|08 Dec 2021|22 Sep 2022| 
 +|MLA/2021/00529 - Completed|Application - Deposit of markers|Laying dinghy racing marks in Christchurch Harbour that remain in place for more than 28 days and are only removed for maintenance. |Christchurch Harbour fixed racing marks |Highcliffe Sailing Club Limited |16 Jan 2022|16 Jan 2022| 
 +|MLA/2021/00530 - Completed|Application - Disposal of dredged material, Navigational dredging (maintenance) |RNSA Moorings maintenance dredging|Alliance, Dolphin, Haslar Pontoon, Coldharbour, NAB TOWER (WI060) |Rnsa Moorings Limited |09 Dec 2021|07 Apr 2022| 
 +|MLA/2021/00531 - Completed|Application - Maintenance of existing structures or assets|Kitley Dam|magic_polygons|Mr James Bastard|09 Dec 2021|09 Dec 2021| 
 +|MLA/2021/00532 - Completed|Application - Construction of new works |Brooksend Outfall Extension |Brooksend Outfall |Canterbury City Council |09 Dec 2021|21 Jul 2022| 
 +|MLA/2021/00533 - Completed|Application - Maintenance of existing structures or assets|Pile Replacement|Site 1|Amble Marina Limited|10 Dec 2021|10 Dec 2021| 
 +|MLA/2021/00534 - Completed|Application - Other removals|Hornsea Three Marine Debris Removal Campaign|NNSSR SAC AoS, NNSSR SAC AoSearch, WNNC SAC AoS, WNNC SAC AoSearch|Orsted Hornsea Three|10 Dec 2021|17 May 2022| 
 +|MLA/2021/00535 - Completed|Application - Maintenance of existing structures or assets|Littlehampton Hendon Avenue |Littlehampton Hendon Ave|Beasley Christopher Limited |13 Dec 2021|13 Dec 2021| 
 +|MLA/2021/00536/1 - Completed|Application - Maintenance of existing works |Dynamic Bend Stiffener (DBS) Installation Works |London Array Dynamic Bend Stiffener Installation Works|London Array Ltd|13 Dec 2021|12 Sep 2023| 
 +|MLA/2021/00538 - Withdrawn|Application - Construction of new works |Bawdsey Manor Coast Protection Works|Bawdsey Manor coastal protection|Pgl Travel Ltd Bawdsey Manor|14 Dec 2021| | 
 +|MLA/2021/00539 - Completed|Application - Maintenance of existing works |Fieldgate Quay, Colchester|Fieldgate Quay, Colchester|Breheny Civil Engineering |14 Dec 2021|09 May 2022| 
 +|MLA/2021/00540 - Completed|Application - Construction of new works |Southend Inner Pier Head Café |Southend Pier Café|Southend On Sea Borough Council |14 Dec 2021|13 May 2022| 
 +|MLA/2021/00541/1 - Completed|Application - Maintenance of existing works |Holehaven Creek Gas Pipeline Protection |Holehaven Creek |Marine And Civil Services Ltd |15 Dec 2021|10 May 2024| 
 +|MLA/2021/00542 - Completed|Application - Maintenance of existing structures or assets|Sunseeker Shipyard quay wall repairs|Site 1|Sunseeker International Limited |15 Dec 2021|15 Dec 2021| 
 +|MLA/2021/00543 - Completed|Application - Maintenance of existing structures or assets|Scaffolding works at Fort Cumberland coastal defence|Fort Cumberland Scaffolding |Southern Water Limited|15 Dec 2021|15 Dec 2021| 
 +|MLA/2021/00544 - Completed|Application - Maintenance of existing structures or assets|KSLES Culvert Inspection Programme - EM0312 Asset 106537|Asset 106537|Amalgamated Construction Ltd|16 Dec 2021|16 Dec 2021| 
 +|MLA/2021/00545 - Completed|Application - Non-navigational clearance dredging |Wellington Dock Culvert Closure |Wellington Dock Culvert |Dover Harbour Board |18 Jan 2022|18 Jan 2022| 
 +|MLA/2021/00546 - Completed|Application - Other removals|Dogger Bank C Wind Farm UXO Investigation |Dogger Bank C UXO Investigation Area|Equinor Uk Limited|17 Dec 2021|27 Apr 2022| 
 +|MLA/2021/00547 - Completed|Application - Maintenance of existing structures or assets|West Coast Main Life Extension: Gantry Replacements (PN84-PN85-PN86-PN87-PN89)|West Coast Main Life Extension: Gantry Replacements (PN84-PN85-PN86-PN87-PN89)|Volkerrail Specialist Businesses Limited|17 Dec 2021|17 Dec 2021| 
 +|MLA/2021/00548 - Completed|Application - Disposal of dredged material|DEEP WATER RELOCATION SITE - EXTENSION (PORTLAND INNER HARBOUR) (PLACEMENT OF UP TO 100'000m3)|Portland Harbour Deep Water Relocation (PO112)|Portland Harbour Authority Limited|20 Dec 2021|24 May 2022| 
 +|MLA/2021/00549 - Completed|Application - Non-navigational clearance dredging |Plaistow and Royal Primrose Wharves |Plaistow and Royal Primrose Wharves |Gps Marine And Civil Services Ltd |21 Dec 2021|21 Dec 2021| 
 +|MLA/2021/00550 - Completed|Application - Maintenance of existing structures or assets|KSLES Culvert Inspection Programme - EM0312 Asset 96922 |Asset 96922 |Amalgamated Construction Ltd|22 Dec 2021|22 Dec 2021| 
 +|MLA/2021/00551 - Withdrawn|Application - Construction of new works, Other works|Marine works associated with the redevelopment of Albert Island, London.| |London & Regional Properties Ltd|22 Dec 2021| | 
 +|MLA/2021/00552 - Completed|Application - Incineration of any substance or object at sea|Dogger Bank A and B Array Sites Unexploded Ordnance Clearance |Dogger Bank B |Doggerbank Offshore Wind Farm Project 2 Projco Limited|23 Dec 2021|31 Jan 2023| 
 +|MLA/2021/00553/1 - Completed|Application - Construction of new works, Sampling |West Staithes |Site Investigations, New bollard and associated works, Temporary works|Blyth Harbour Commission|23 Dec 2021|31 Oct 2023| 
 +|MLA/2021/00554 - Completed|Application - Other deposits|Shingle recharge at Stakes Island, Chichester Harbour |Proposed recharge site, Stakes Island, Chichester Harbour |Chichester Harbour Conservancy|23 Dec 2021|30 May 2022| 
 +|MLA/2021/00555 - Withdrawn|Application - Maintenance of existing works |East Anglia ONE Operations and Maintenance Scour Protection and Cable Armouring for Transmission Assets | |East Anglia One Limited |24 Dec 2021| | 
 +|MLA/2021/00556 - Withdrawn|Application - Disposal of dredged material|Scarborough Harbour disposal of maintenace dredged material | |Scarborough Borough Council |31 Dec 2021| | 
 +</datatables>
  
 [[MMO - Marine Licences Public Register]] [[MMO - Marine Licences Public Register]]
  
mmo_-_mlas_-_2021.1726431296.txt.gz · Last modified: by nefcadmin