mmo_-_mlas_-_2026
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| mmo_-_mlas_-_2026 [2026/09/15 08:43] – nefcadmin | mmo_-_mlas_-_2026 [2026/09/15 09:04] (current) – nefcadmin | ||
|---|---|---|---|
| Line 6: | Line 6: | ||
| < | < | ||
| + | |||
| ^Case Details^Project Type^Project Title^Locations^Applicant Name^Submission Date^Decision Date^ | ^Case Details^Project Type^Project Title^Locations^Applicant Name^Submission Date^Decision Date^ | ||
| - | |MLA/2026/00149\\ Submitted|Application - Construction | + | |MLA/2026/00002\\ Completed|Application - Maintenance |
| - | |MLA/2026/00176\\ Submitted|Application - Construction | + | |MLA/2026/00004\\ Completed|Application - Maintenance |
| - | |MLA/2026/00228\\ Submitted|Application - Maintenance of existing | + | |MLA/2026/00006\\ Completed|Application - Maintenance of existing |
| - | |MLA/ | + | |MLA/2026/00008\\ Completed|Application - Navigational dredging (capital)|Svitzer Quay Capital |
| - | |MLA/2026/00261\\ Submitted|Application - Disposal of dredged material| | + | |MLA/2026/00009\\ Completed|Application - Wrecks and other archaeological remains|SS Richard Montgomery Mast Reduction and Removal|SS Richard Montgomery|Department For Transport|06 Jan 2026|08 Apr 2026| |
| - | |MLA/ | + | |MLA/2026/00010\\ Completed|Application - Navigational dredging (maintenance)|Maintenance dredging |
| - | |MLA/ | + | |MLA/2026/00011\\ Completed|Application - Disposal of dredged material, Navigational dredging (maintenance)|Hamble Point Marina - Maintenance Dredging and Disposal|Hamble Point Marina - Dredge Area (limits), NAB TOWER (WI060), HURST FORT (WI080)|Marina Developments|07 Jan 2026|09 Jul 2026| |
| - | |MLA/2026/00304\\ Submitted|Application - Maintenance of existing works|Creeksea Jetty| |Baltic Distribution Limited|16 Jun 2026| | + | |MLA/2026/00012\\ Completed|Application - Maintenance of existing structures or assets|Blackwater Sailing Club - Slipway |
| - | |MLA/ | + | |MLA/2026/00014\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00309\\ Submitted|Application - Maintenance | + | |MLA/2026/00016\\ Completed|Application - Maintenance of existing |
| - | |MLA/ | + | |MLA/2026/00017\\ Completed|Application - Maintenance of existing structures or assets|ROCK O NOR|ROCK O NOR|Beasley Christopher |
| - | |MLA/ | + | |MLA/2026/00019\\ Submitted|Application - Disposal of dredged material, Navigational dredging (capital), Navigational dredging |
| - | |MLA/ | + | |MLA/2026/00021\\ Completed|Application - Maintenance of existing structures or assets|Polmorla Pump Station Refurbishment|Polmorla PS|Kier|12 Jan 2026|12 Jan 2026| |
| - | |MLA/ | + | |MLA/2026/00022\\ Completed|Application - Maintenance of existing structures or assets|Falmouth Marina Cill Maintenance|Falmouth Marina Cill|Premier Marinas (Falmouth) |
| - | |MLA/ | + | |MLA/2026/00024\\ Completed|Application - Other deposits|SeaSTORE lander deployment |
| - | |MLA/2026/00082\\ Completed|Application - Disposal of dredged material| Navigational dredging (maintenance)|ABP King's Lynn Maintenance Dredging and Disposal|WEST STONES | + | |MLA/2026/00026\\ Submitted|Application - Maintenance of existing |
| - | |MLA/ | + | |MLA/2026/00027\\ Submitted|Application - Other deposits|Weymouth |
| - | |MLA/2026/00433\\ Completed|Application - Maintenance of existing structures or assets|Greenhithe Jetty - Dolphin | + | |MLA/2026/00028\\ Completed|Application - Maintenance of existing structures or assets|Repair timber retaining wall near Waldringfield Sailing Club clubhouse, on tidal River Deben.|RIVER WALL|Waldringfield Sailing Club|13 Jan 2026|13 Jan 2026| |
| - | |MLA/2026/00029/1\\ Completed|Application - Alternative use of dredged material| Construction of new works| | + | |MLA/2026/00029/1\\ Completed|Application - Alternative use of dredged material, |
| - | |MLA/ | + | |MLA/2026/00030\\ Completed|Application - Maintenance of existing structures or assets|The Queens Walk|The Queens Walk|A2 Site Investigation Limited|22 Jan 2026|22 Jan 2026| |
| - | |MLA/2026/00080\\ Completed|Application - Maintenance of existing | + | |MLA/2026/00032\\ Completed|Application - Maintenance of existing structures or assets|A180 Alexandra Dock Bridge Above Deck Works|Alexandra Dock Bridge|North East Lincolnshire Council|14 Jan 2026|14 Jan 2026| |
| - | |MLA/2026/00420\\ Completed|Application - Maintenance of existing structures or assets|Urgent maintenance and repair works to The Old Mill| West Looe|The Old Mill| Looe PL13 2AF – Riverside Scaffolding|N.G.B. Associates | + | |MLA/2026/00033\\ Completed|Application - Beach maintenance activities|East Cowes Slipway Beach Re-Grading|East Cowes Slipway|Marine Safety Services Ltd|14 Jan 2026|14 Jan 2026| |
| - | |MLA/2026/00194\\ Completed|Application - Construction of new works| | + | |MLA/2026/00036\\ Completed|Application - Other works|Harbour Walkway |
| - | |MLA/ | + | |MLA/ |
| - | |MLA/ | + | |MLA/2026/00038\\ Completed|Application - Construction of new works|Southwold Sailing Club Slip Reinstatment|Southwold Sailing Club Dinghy Slip|Southwold Sailing Club|15 Jan 2026|16 Jul 2026| |
| - | |MLA/ | + | |MLA/2026/00039\\ Completed|Application - Construction of new works|The White House Jetty|CM0 8PL|Mr Jonathan Beckett|16 Jan 2026|24 Jun 2026| |
| - | |MLA/ | + | |MLA/2026/00040\\ Completed|Application - Maintenance of existing structures or assets|Bognor Norfolk St|Norfolk St|Beasley Christopher Limited|16 Jan 2026|16 Jan 2026| |
| - | |MLA/2026/00412\\ Completed|Application - Maintenance of existing structures or assets|HK239732 - Alnmouth Footpath No.10 (Lovers Walk)|HK239732_00_U3026_01_99_Site_Location_MMO|Northumberland County Council|02 Sep 2026|02 Sep 2026 | + | |MLA/2026/00041\\ Completed|Application - Maintenance of existing |
| - | |MLA/ | + | |MLA/2026/00042\\ Completed|Application - Maintenance of existing structures or assets|Vauxhall Bridge Maintenance|Vauxhall Bridge|Ringway Infrastructure Services |
| - | |MLA/2026/00407\\ Completed|Application - Maintenance of existing structures or assets|Concrete Repairs to Laira Bridge|Laira Bridge|Wsp Uk Limited|28 Aug 2026|28 Aug 2026 | + | |MLA/2026/00044/1\\ Variation Requested|Application - Construction of new works, |
| - | |MLA/ | + | |MLA/2026/00045\\ Submitted|Application - Disposal of dredged material|ABP Ipswich |
| - | |MLA/2026/00402\\ Completed|Application - Maintenance of existing structures or assets|Falmouth Marina | + | |MLA/2026/00046\\ Completed|Application - Other deposits, Sampling|Pagham Harbour MCZ Investigation|Marine Licensing Survey Extent|Southern Water|16 Jan 2026|05 May 2026| |
| - | |MLA/2026/00403\\ Completed|Application - Maintenance of existing | + | |MLA/2026/00047\\ Completed|Application - Maintenance of existing structures or assets|urgent scaffold on foreshore due to storm damage from 8/1/26 storm in cormwall|Wall repair|Logistic |
| - | |MLA/2026/00404\\ Completed|Application - Maintenance of existing structures or assets|Emergency Repair | + | |MLA/2026/00048\\ Completed|Application - Deposit of markers|Deployment of Arun Yacht Club's racing buoys|Arun Yacht Club Race Buoy Zone|Arun Yacht Club Limited(The)|19 Jan 2026|19 Jan 2026| |
| - | |MLA/2026/00400\\ Completed|Application - Maintenance of existing structures or assets|Sladesbridge Ditch Maintainence|Sladesbridge Drainage Ditch|Cornwall Council|24 Aug 2026|24 Aug 2026 | + | |MLA/2026/00049\\ Submitted|Application - Construction |
| - | |MLA/2026/00216\\ Completed|Application - Construction of new works| Maintenance of existing works|Barrack Lane - Surface water outfall capacity restoration by dualling outfall.|Barrack Lane|Southern Water Ltd|16 Apr 2026|21 Aug 2026 | + | |MLA/2026/00050\\ Completed|Application - Maintenance of existing structures or assets|EGL2 OHL 4VJ026|4VJ026 Tower|Balfour Beatty Plc|21 Jan 2026|21 Jan 2026| |
| - | |MLA/2026/00394\\ Completed|Application - Maintenance of existing structures or assets|Hesketh Out Marsh - Lagoon| bund and track repairs|RSPB Hesketh Out Marsh|Rspb|18 Aug 2026|18 Aug 2026 | + | |MLA/2026/00051\\ Completed|Application - Maintenance |
| - | |MLA/2026/00383\\ Completed|Application - Maintenance of existing structures or assets|Bossiney Outfall Remedial | + | |MLA/2026/00052\\ Completed|Application - Maintenance of existing structures or assets|EGL2 OHL 4VJ024|4VJ024 Works|Balfour Beatty Plc|21 Jan 2026|21 Jan 2026| |
| - | |MLA/2026/00381\\ Completed|Application - Non-navigational clearance dredging|Dredging of Leigh Marina|Leigh Marina|Thamescraft Limited|10 Aug 2026|10 Aug 2026 | + | |MLA/2026/00053\\ Submitted|Application - Disposal |
| - | |MLA/ | + | |MLA/2026/00054\\ Completed|Application - Maintenance |
| - | |MLA/ | + | |MLA/2026/00055\\ Completed|Application - Maintenance |
| - | |MLA/2026/00114\\ Completed|Application - Decommissioning of works|Jet Jetty Demolition Works|Jet Jetty|Brett Group Holdings Limited|23 Feb 2026|06 Aug 2026 | + | |MLA/2026/00056\\ Completed|Application - Maintenance |
| - | |MLA/ | + | |MLA/2026/00057\\ Completed|Application - Maintenance |
| - | |MLA/ | + | |MLA/ |
| - | |MLA/ | + | |MLA/2026/00059\\ Completed|Application - Maintenance of existing structures or assets|King Edward Memorial Park Foreshore (KEMPF) |
| - | |MLA/ | + | |MLA/2026/00060\\ Completed|Application - Maintenance of existing structures or assets|RUSTINGTON HENDON AVE|HENDON AVE|Beasley Christopher |
| - | |MLA/2026/00368\\ Completed|Application - Non-navigational clearance dredging|Greater Gabbard Marine Component Exchange Campaign pre-emptive dredging licence August 2026|GG_SiteBoundaryJoinedUpArea_SSE_20221102|Greater Gabbard Offshore Winds Limited|04 Aug 2026|04 Aug 2026 | + | |MLA/2026/00061\\ Completed|Application - Maintenance of existing structures or assets|HMNB Portsmouth - 2026 Penstock Replacements|2026 Penstocks|Kbs Maritime Limited|26 Jan 2026|26 Jan 2026| |
| - | |MLA/2026/00370\\ Completed|Application - Beach maintenance activities|Shoreham to Southwick Beach Recycling|shoreham to southwick shingle transfer|Shoreham Port Authority|04 Aug 2026|04 Aug 2026 | + | |MLA/2026/00063\\ Completed|Application - Non-navigational clearance dredging|Greater Gabbard Marine Component Exchange Campaign pre-emptive |
| - | |MLA/2026/00371\\ Completed|Application - Maintenance of existing structures or assets|Cape Cornwall Tidal Pool Repairs|Cape Cornwall|National Trust|04 Aug 2026|04 Aug 2026 | + | |MLA/2026/00064\\ Submitted|Application - Construction of new works|Cowes Marina Project |
| - | |MLA/ | + | |MLA/2026/00065\\ Submitted|Application - Disposal of dredged material, Navigational dredging (maintenance), Other deposits|Brighton Marina |
| - | |MLA/2026/00090\\ Completed|Application - Maintenance of existing | + | |MLA/2026/00066\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00364\\ Completed|Application - Maintenance of existing structures or assets|Greater Gabbard Heli Basket Replacement|GG_SiteBoundaryJoinedUpArea_SSE_20221102|Greater Gabbard Offshore Winds Limited|31 Jul 2026|31 Jul 2026 | + | |MLA/2026/00067\\ Submitted|Application - Disposal of dredged material, Navigational |
| - | |MLA/2026/00141\\ Completed|Application - Other deposits|BritNed Geophysical Inspection Survey|BritNed_UK_Route_pll_200mBuffer_WGS84UTM31|Fugro Geoconsulting Limited|09 Mar 2026|30 Jul 2026 | + | |MLA/2026/00068\\ Completed|Application - Maintenance of existing structures or assets|S106 Totterdown Basin Enhancement Works|S106 Totterdown Basin Enhancement Works|Sir Robert Mcalpine |
| - | |MLA/2026/00205\\ Completed|Application - Maintenance of existing works|Selsey West Beach Urgent Coastal Defence works|20260323_Redline_Boundary_Selsey|Coastal Partners-Civic Centre Road|10 Apr 2026|30 Jul 2026 | + | |MLA/2026/00070\\ Completed|Application - Other deposits|Humber Carbon Capture Pipeline |
| - | |MLA/2026/00214\\ Completed|Application - Maintenance of existing works|Jetty Repair at Mayflower|Site|Constructex Limited|15 Apr 2026|30 Jul 2026 | + | |MLA/2026/00072\\ Completed|Application - Maintenance of existing structures or assets|Necessary Repairs of Wharf Frontage at Kendalls Wharf|Kendalls Wharf Repair|Holcim Uk Limited|03 Feb 2026|03 Feb 2026| |
| - | |MLA/2026/00361\\ Completed|Application - Maintenance of existing structures or assets|Tide Watch|input|Dyson Construction | + | |MLA/2026/00073\\ Completed|Application - Deposit |
| - | |MLA/2026/00360\\ Completed|Application - Non-navigational clearance dredging|Thornham Marina clearance dredging|Thornham Marina 2026|Thornham Marina | + | |MLA/2026/00077\\ Completed|Application - Maintenance of existing structures or assets|Repairing the hand rail on Cleethorpes |
| - | |MLA/2026/00352\\ Completed|Application - Maintenance | + | |MLA/2026/00078\\ Completed|Application - Maintenance of existing structures or assets|Poole Town Quay Fender Replacement Works|Site 1|Poole Harbour Commissioners|05 Feb 2026|05 Feb 2026| |
| - | |MLA/2026/00267\\ Completed|Application - Maintenance of existing structures or assets|QEII Cable Stay Corrosion Protection|Dartford|Octavius|20 Jul 2026|20 Jul 2026 | + | |MLA/2026/00079\\ Completed|Application - Non-navigational clearance dredging|Non-navigational clearance dredging |
| - | |MLA/2026/00348\\ Completed|Application - Marine licence for the burial | + | |MLA/2026/00080\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00350\\ Completed|Application - Maintenance of existing structures or assets|Eling Tide Mill - Mill building repair works|Eling Tide Mill - Building repair works|New Forest District Council|20 Jul 2026|20 Jul 2026 | + | |MLA/2026/00081\\ Submitted|Application - Maintenance of existing |
| - | |MLA/2026/00038\\ Completed|Application - Construction | + | |MLA/2026/00082\\ Completed|Application - Disposal |
| - | |MLA/2026/00187\\ Completed|Application - Construction | + | |MLA/2026/00084\\ Completed|Application - Maintenance of existing structures or assets|Replacement of One Aid to Navigation |
| - | |MLA/2026/00344\\ Completed|Application - Deposit | + | |MLA/2026/00086\\ Completed|Application - Construction of new works|FYB Marine |
| - | |MLA/2026/00345\\ Completed|Application - Deposit | + | |MLA/2026/00087\\ Completed|Application - Maintenance of existing structures or assets|Portsmouth Harbour station maintenance|Portsmouth Harbour train station|Octavius Infrastructure |
| - | |MLA/2026/00343\\ Completed|Application - Deposit | + | |MLA/2026/00088\\ Completed|Application - Maintenance of existing |
| - | |MLA/ | + | |MLA/2026/00089\\ Completed|Application - Maintenance of existing structures or assets|WPH2 17A/3 Portcreek Viaduct|Portcreek|Volkerfitzpatrick |
| - | |MLA/ | + | |MLA/2026/00090\\ Completed|Application - Maintenance |
| - | |MLA/ | + | |MLA/2026/00091\\ Completed|Application - Maintenance of existing structures or assets|HERNE BAY CENTRAL AVENUE|HERNE BAY CENTRAL AVENUE|Beasley Christopher |
| - | |MLA/ | + | |MLA/2026/00092\\ Completed|Application - Deposit of markers|Eastern IFCA - Marking |
| - | |MLA/2026/00339\\ Completed|Application - Maintenance of existing structures or assets|Thames refinery Jetty - River wall Assessment & Repairs|Thames | + | |MLA/2026/00093\\ Completed|Application - Maintenance of existing structures or assets|Abbey Road|Abbey Road|Statom Group Limited|13 Feb 2026|13 Feb 2026| |
| - | |MLA/ | + | |MLA/2026/00094\\ Completed|Application - Decommissioning |
| - | |MLA/2026/00335\\ Completed|Application - Maintenance of existing structures or assets|Battersea Bridge - Principal Inspection & Bearing Shelf Cleaning|Battersea Bridge|Ringway Infrastructure Services | + | |MLA/2026/00095\\ Submitted|Application - Other deposits|Sofia Offshore Wind Farm Export Cable Repairs |
| - | |MLA/ | + | |MLA/2026/00098\\ Submitted|Application - Construction of new works, Decommissioning |
| - | |MLA/2026/00329\\ Completed|Application - Maintenance of existing structures or assets|Calshot Urgent Coastal Asset Repairs|NorthernJetty| WesternSlipway| WesternGroyne| WesternSeaWall|Hampshire County Council|29 Jun 2026|29 Jun 2026 | + | |MLA/2026/00101\\ Completed|Application - Marine |
| - | |MLA/2026/00149\\ Submitted|Application - Construction of new works|Sedgeletch Outfall| |Avove Utilites|13 Mar 2026| | + | |MLA/2026/00102\\ Completed|Application - Beach maintenance activities|Landguard Beach Reprofiling|Landguard Beach|Port Of Felixstowe |
| - | |MLA/2026/00176\\ Submitted|Application - Construction of new works|West Street Pier| |Port Of London Authority|01 Apr 2026| | + | |MLA/2026/00105\\ Submitted|Application - Construction |
| - | |MLA/ | + | |MLA/2026/00108\\ Completed|Application - Maintenance |
| - | |MLA/2026/00243\\ Submitted|Application - Aggregate dredging| Sampling|Area 407| |Cemex Uk Marine Ltd|27 Apr 2026| | + | |MLA/2026/00109\\ Completed|Application - Minor removals|Victoria Deep Water Terminal |
| - | |MLA/2026/00261\\ Submitted|Application - Disposal of dredged material| Navigational dredging (maintenance)|Emsworth Yacht Harbour | + | |MLA/2026/00110\\ Submitted|Application - Construction of new works, Maintenance of existing |
| - | |MLA/ | + | |MLA/2026/00111\\ Completed|Application - Minor removals|Thorpness Structure removal|thorpness structure|Breheny Civil Engineering |
| - | |MLA/2026/ | + | |MLA/2026/00113\\ Completed|Application - Maintenance of existing structures or assets|Lifstan Way Flap Valve Replacement|Lifstan Way Outfall Flap Valve Replacement|Anglian Water Services Limited|20 Feb 2026|20 Feb 2026| |
| - | |MLA/2026/00304\\ Submitted|Application - Maintenance of existing | + | |MLA/2026/00114\\ Completed|Application - Decommissioning of works|Jet Jetty Demolition Works|Jet Jetty|Brett Group Holdings |
| - | |MLA/ | + | |MLA/2026/00115\\ Completed|Application - Maintenance of existing structures or assets|Maintenance - Replacement |
| - | |MLA/2026/00309\\ Submitted|Application - Maintenance of existing works|Shaldon Bridge - lifting span pier scour repairs| |Devon County Council|17 Jun 2026| | + | |MLA/2026/00116\\ Completed|Application - Maintenance of existing structures or assets|Alpha Jetty Condition Survey|Alpha Jetty|Brett Aggregates Limited|23 Feb 2026|23 Feb 2026| |
| - | |MLA/ | + | |MLA/2026/00118\\ Submitted|Application - Construction |
| - | |MLA/ | + | |MLA/2026/00119\\ Completed|Application - Maintenance of existing structures or assets|Chiswick Pier - Chiswick Pier Trust|Chiswick Pier|Chiswick Pier Trust|23 Feb 2026|23 Feb 2026| |
| - | |MLA/ | + | |MLA/2026/00120\\ Completed|Application - Maintenance of existing structures or assets|BLUE BOAR LANE|BLUE BOAR LANE|Beasley Christopher |
| - | |MLA/ | + | |MLA/2026/00122\\ Completed|Application - Maintenance of existing structures or assets|Burbo Bank Offshore Windfarm Guano Removal|Burbo_Bank_Windfarm_WGS84|Orsted Burbo Uk Limited|24 Feb 2026|24 Feb 2026| |
| - | |MLA/2026/00385\\ Submitted|Application - Construction of new works|Dart Harbour North Embankment Works|North Embankment|Dart Harbour And Navigation Authority|12 Aug 2026| | + | |MLA/2026/00123\\ Completed|Application - Beach maintenance activities|Teignmouth Track drainage|magic_polygons|Network Rail Limited|25 Feb 2026|25 Feb 2026| |
| - | |MLA/ | + | |MLA/2026/00124\\ Completed|Application - Maintenance of existing structures or assets|Ropehawn Breakwater maintenance|Ropehorn breakwater|Mr Timothy Robinson|26 Feb 2026|26 Feb 2026| |
| - | |MLA/2026/00326\\ Completed|Application - Non-navigational clearance dredging|HMNB- A/B LOCK EAST SILT CLEARANCE|A/B East Silt Clearance works area|Kbs Maritime | + | |MLA/2026/00125\\ Completed|Application - Maintenance of existing structures or assets|Greenland Dock Eastern Public Access|Greenland Dock Eastern Public Access|Southwark Council|26 Feb 2026|26 Feb 2026| |
| - | |MLA/2026/00321\\ Completed|Application - Maintenance of existing structures or assets|3 Basin Minor Maintenance|3 Basin Minor Maintenance Area|Defence Infrastructure Organisation|25 Jun 2026|25 Jun 2026 | + | |MLA/2026/00126\\ Completed|Application - Minor removals|Red Lion Wharf Timber Fender |
| - | |MLA/2026/00039\\ Completed|Application - Construction | + | |MLA/2026/00127\\ Completed|Application - Minor removals|Removal |
| - | |MLA/2026/00316\\ Completed|Application - Maintenance of existing structures or assets|Repairs to Ryde Pier Stonework Dolphin|Dolphin Location|Wightlink | + | |MLA/2026/00128\\ Completed|Application - Non-navigational clearance dredging|Marina Dredging|Goodchild Marine Services|Goodchild |
| - | |MLA/2026/00317\\ Completed|Application - Maintenance of existing structures or assets|Little Coastguard Cottage|LitlleCoastguardsQuay|Mr Neil Harris|24 Jun 2026|24 Jun 2026 | + | |MLA/2026/00129\\ Completed|Application - Maintenance of existing structures or assets|Red lion wharf - Timber Fender Repairs & Structural Investigation|Untitled Polygon|Mibau Stema Uk Ltd|03 Mar 2026|03 Mar 2026| |
| - | |MLA/2026/00315\\ Completed|Application - Non-navigational clearance dredging|3 Basin Inner Non-navigational Clearance Dredging|3 Basin Inner Dredge Area|Defence Infrastructure Organisation|23 Jun 2026|23 Jun 2026 | + | |MLA/2026/00130\\ Completed|Application - Maintenance of existing |
| - | |MLA/ | + | |MLA/2026/00131\\ Completed|Application - Maintenance of existing structures or assets|Whitley Lake Steps and Slipway Two Improvement|Slipway 2, Steps 2, Steps 1|Bcp Council|04 Mar 2026|04 Mar 2026| |
| - | |MLA/ | + | |MLA/2026/00132\\ Completed|Application - Maintenance of existing structures or assets|Shaldon bridge pier remediation works|Site 1|Devon County Council|04 Mar 2026|04 Mar 2026| |
| - | |MLA/2026/00312\\ Completed|Application - Maintenance of existing | + | |MLA/2026/00134\\ Completed|Application - Maintenance of existing structures or assets|Steel Caisson Maintenance|Construction|Devonport Royal Dockyard |
| - | |MLA/ | + | |MLA/2026/00135\\ Completed|Application - Minor removals|PSWC Restoration - Hartlepool Marina Boreholes|PS Wingfield Castle|Hartlepool Borough Council|05 Mar 2026|05 Mar 2026| |
| - | |MLA/ | + | |MLA/2026/00136\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00300\\ Completed|Application - Maintenance of existing | + | |MLA/2026/00140\\ Submitted|Application - Disposal of dredged material, Navigational dredging (maintenance)|BP Oil UK Ltd - Hamble jetty and approaches |
| - | |MLA/ | + | |MLA/2026/00141\\ Completed|Application - Other deposits|BritNed Geophysical Inspection Survey|BritNed_UK_Route_pll_200mBuffer_WGS84UTM31|Fugro Geoconsulting Limited|09 Mar 2026|30 Jul 2026| |
| - | |MLA/2026/00298\\ Completed|Application - Maintenance | + | |MLA/2026/00143\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00291\\ Completed|Application - Maintenance of existing structures or assets|Replacement of Navigation | + | |MLA/2026/00145\\ Submitted|Application - Construction of new works|Ramsgate Pier Pontoon|Ramsgate Port|Dnr Ramsgate Limited|11 Mar 2026| |
| - | |MLA/2026/00293\\ Completed|Application - Minor removals|SEP and DEP 2026 Geotechnical Site Investigation Works SEP|PC4239-RHD-ZZ-OF-M2-Z-0032_SheringhamShoal_280526|Scira | + | |MLA/2026/00147\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00294\\ Completed|Application - Minor removals|SEP and DEP 2026 Geotechnical Site Investigation Works DEP North|PC4239-RHD-ZZ-OF-M2-Z-0033_DudgeonNorth_280526|Scira Extension Limited|04 Jun 2026|04 Jun 2026 | + | |MLA/2026/00148\\ Completed|Application - Non-navigational clearance |
| - | |MLA/2026/00295\\ Completed|Application - Maintenance of existing structures or assets|Slipway Repair - Flushing|Flushing|Landmarc (Uk) Ltd|04 Jun 2026|04 Jun 2026 | + | |MLA/2026/00149\\ Submitted|Application - Construction of new works|Sedgeletch Outfall |
| - | |MLA/2026/00296\\ Completed|Application - Maintenance of existing | + | |MLA/2026/00150\\ Completed|Application - Construction of new works|Hythe Shipyard new wall|Hythe Shipyard new sea wall|Mapp|16 Mar 2026|01 Sep 2026| |
| - | |MLA/2026/00297\\ Completed|Application - Maintenance of existing structures or assets|WORTHING HEENE TERRACE WEST|HEENE TERRACE WEST|Beasley Christopher | + | |MLA/2026/00151\\ Completed|Application - Maintenance of existing structures or assets|GSK Outfall |
| - | |MLA/2026/00070\\ Completed|Application - Other deposits|Humber Carbon Capture Pipeline - Geophysical Surveys for Trial HDD Grouped under: Humber Carbon Capture Pipeline Showing 2 of 2 cases|Humber| Trent|Net Zero North Sea Storage | + | |MLA/2026/00153\\ Completed|Application - Maintenance of existing structures or assets|4 Ravensbury Drive Quayside repairs and loading bay for works|4 Ravensbury|Elliott Construction Ec Ltd|18 Mar 2026|18 Mar 2026| |
| - | |MLA/ | + | |MLA/2026/00155\\ Completed|Application - Maintenance of existing structures or assets|Under water painting of afloat structure|Devonport Royal Dockyard Limited (5 Basin)|Devonport Royal Dockyard Limited|20 Mar 2026|20 |
| - | |MLA/2026/00289\\ Completed|Application - Maintenance of existing structures or assets|Routine Maintenance of Tuff’s Hard| Bosham Hoe| Chichester PO18 8ET|Maintenance Site|Hoe Estate Co.Limited|02 Jun 2026|02 Jun 2026 | + | |MLA/2026/00156\\ Completed|Application - Maintenance of existing structures or assets|Shamrock Quay Pontoon Replacement|Shamrock Quay - B Pontoons|Marina Developments Limited|20 Mar 2026|20 |
| - | |MLA/ | + | |MLA/2026/00157\\ Completed|Application - Other removals|Archaeological Excavation at the Tudor Blockhouse, 300m South of Mersea Stone, East Mersea|Tudor blockhouse 300m south of Mersea Stone|Colchester Archaeological Trust|20 Mar 2026|08 Jun 2026| |
| - | |MLA/2026/00286\\ Completed|Application - Non-navigational clearance dredging|Rebel Marine Clearance dredging|Rebel Marine|Rebel Marine (Isle Of Wight) Llp|29 May 2026|29 May 2026 | + | |MLA/2026/00158\\ Completed|Application - Beach maintenance activities|Lynmouth Harbour Access|Site 1|Lynton & Lynmouth Town Council|20 Mar 2026|20 |
| - | |MLA/ | + | |MLA/2026/00159\\ Completed|Application - Maintenance of existing structures or assets|Topbond Wally' |
| - | |MLA/2026/00285\\ Completed|Application - Maintenance of existing structures or assets|Dawlish Sea Wall and Supporting Infrastructure|Dawlish Sea Wall|Balfour Beatty Rail Limited|28 May 2026|28 May 2026 | + | |MLA/2026/00160\\ Completed|Application - Maintenance of existing structures or assets|WORTHING WEST STREET|WORTHING WEST STREET|Beasley Christopher Limited|24 Mar 2026|24 Mar 2026| |
| - | |MLA/2026/00088\\ Completed|Application - Maintenance | + | |MLA/2026/00161\\ Completed|Application - Maintenance of existing structures or assets|Riverside One River Wall Works|Riverside One Wall|D&G Block Management Limited|26 Mar 2026|26 Mar 2026| |
| - | |MLA/ | + | |MLA/2026/00165\\ Completed|Application - Marine licence for the burial |
| - | |MLA/2026/00149\\ Submitted|Application - Construction of new works|Sedgeletch Outfall| |Avove Utilites|13 Mar 2026| | + | |MLA/2026/00167\\ Completed|Application - Maintenance of existing structures or assets|Severn Bridge Inspection and Maintenance|Severn Bridge|Amey Ow Limited|30 Mar 2026|30 Mar 2026| |
| - | |MLA/2026/00176\\ Submitted|Application - Construction of new works|West Street Pier| |Port Of London Authority|01 Apr 2026| | + | |MLA/2026/00168\\ Completed|Application - Maintenance of existing structures or assets|Morden Wharf River Wall Repairs|Morden Wharf River Wall|Greenwitch |
| - | |MLA/ | + | |MLA/2026/00169\\ Completed|Application - Maintenance of existing structures or assets|South Milton Sands Culvert Pipe Repair|South Milton Sands|National Trust|31 Mar 2026|31 Mar 2026| |
| - | |MLA/2026/00243\\ Submitted|Application - Aggregate dredging| Sampling|Area 407| |Cemex Uk Marine | + | |MLA/2026/00173\\ Completed|Application - Maintenance of existing structures or assets|Galloper Offshre Windfarm O&M Facility|Galloper O&M Facility Rev 1|Galloper Wind Farm Limited|31 Mar 2026|31 Mar 2026| |
| - | |MLA/ | + | |MLA/2026/00176\\ Submitted|Application - Construction |
| - | |MLA/ | + | |MLA/2026/00178\\ Submitted|Application - Disposal |
| - | |MLA/2026/00288\\ Submitted|Application - Other deposits|Tees Estuary Edges - Phase 2| |Tees Rivers Charitable Trust|01 Jun 2026| | + | |MLA/2026/00180\\ Completed|Application - Maintenance of existing structures or assets|Hull Marina Footbridge Repairs|Marina Footbridge|Mason Clark Associates |
| - | |MLA/ | + | |MLA/ |
| - | |MLA/ | + | |MLA/ |
| - | |MLA/2026/00309\\ Submitted|Application - Maintenance | + | |MLA/ |
| - | |MLA/2026/00322\\ Submitted|Application - Disposal | + | |MLA/2026/00187\\ Completed|Application - Construction |
| - | |MLA/ | + | |MLA/2026/00188\\ Completed|Application - Beach maintenance activities|Annual Drainage |
| - | |MLA/2026/00355\\ Submitted|Application - Construction of new works| Other removals| | + | |MLA/2026/00189\\ Completed|Application - Other deposits|Anglian TraC - Blackwater Outer, Crouch and Colne - Sonde deployment|BCCTS1 Sonde, BCCTS2 Sonde, BCCTS3 Sonde, BCCTS4 Sonde, BCCTS5 Sonde, BCCTS6 Sonde, BCCTS7 Sonde|Apem Ltd|07 Apr 2026|03 Aug 2026| |
| - | |MLA/ | + | |MLA/2026/00190\\ Completed|Application - Maintenance of existing structures or assets|Silvertown Quays|Silvertown Quays|Keltbray Built Environment |
| - | |MLA/2026/00385\\ Submitted|Application - Construction of new works|Dart Harbour North Embankment Works|North Embankment|Dart Harbour And Navigation Authority|12 Aug 2026| | + | |MLA/2026/00192\\ Submitted|Application - Other deposits|Gunfleet Sands I & II Offshore Wind Farm Rock Protection Installation Licence - Array|Gunfleet Sands I Offshore Wind Farm, Gunfleet Sands II Offshore Wind Farm|Gunfleet Sands Limited|08 Apr 2026| |
| - | |MLA/ | + | |MLA/2026/00194\\ Completed|Application - Construction of new works, Disposal |
| - | |MLA/2026/00279\\ Completed|Application - Maintenance of existing structures or assets|Prince Philip Yacht Haven - Pontoon Repairs and replacement. Identical structures|Pontoon repair|Royal Southern Yacht Club Limited|22 May 2026|22 May 2026 | + | |MLA/2026/00196\\ Submitted|Application - Aggregate dredging, Sampling|Area |
| - | |MLA/ | + | |MLA/2026/00197\\ Completed|Application - Maintenance |
| - | |MLA/2026/00275\\ Completed|Application - Maintenance of existing structures or assets|Manhole repair works|Lime Road slipway|Esh Construction|21 May 2026|21 May 2026 | + | |MLA/2026/00198\\ Submitted|Application - Aggregate dredging, Sampling|Area 460 | |Cemex Uk Marine Ltd|09 Apr 2026| |
| - | |MLA/2026/00277\\ Completed|Application - Minor removals|Putney Slipway Site Investigation|Putney Slipway SI|Collins River Enterprises | + | |MLA/2026/00200\\ Completed|Application - Maintenance of existing structures or assets|Marine Self-Service: Replacement of existing slipway. 26 Branksea Avenue, Poole, BH15 4DP|26 Branksea Avenue|Mr Henry Gill|09 Apr 2026|09 Apr 2026| |
| - | |MLA/ | + | |MLA/2026/00202\\ Submitted|Application - Construction |
| - | |MLA/2026/00272\\ Completed|Application - Maintenance of existing structures or assets|Itchen Bridge | + | |MLA/2026/00203\\ Submitted|Application - Aggregate dredging, |
| - | |MLA/ | + | |MLA/2026/00204\\ Completed|Application - Maintenance of existing |
| - | |MLA/ | + | |MLA/2026/00205\\ Completed|Application - Maintenance |
| - | |MLA/2026/00268\\ Completed|Application - Maintenance of existing structures or assets|The Hard Interchange: | + | |MLA/2026/00206\\ Completed|Application - Maintenance of existing structures or assets|Lambeth Bridge Survey|Lambeth Bridge|County Building Services |
| - | |MLA/2026/00269\\ Completed|Application - Maintenance | + | |MLA/2026/00208\\ Submitted|Application - Construction of new works|New Jetty and Slipway installation|52 Pearce Jetty|Mr Michael Dennis|14 Apr 2026| |
| - | |MLA/2026/00266\\ Completed|Application - Maintenance of existing structures or assets|2809 Stambridge Mills Bridge|Stambridge Mills Bridleway Bridge|Ringway Jacobs Limited|14 May 2026|14 May 2026 | + | |MLA/2026/00211\\ Completed|Application - Maintenance of existing structures or assets|Baqus Pontoon Refurbishment|Smugglers Lane, Bosham, PO18 8QW|Wardle Marine Services Limited|14 Apr 2026|14 Apr 2026| |
| - | |MLA/ | + | |MLA/2026/00213\\ Submitted|Application - Construction of new works, Decommissioning of works, |
| - | |MLA/2026/00264\\ Completed|Application - Maintenance of existing structures or assets|Shore Road sewer cleaning and lining maintenance works|Sewer Maintenance Works|Wessex Water Services | + | |MLA/2026/00214\\ Completed|Application - Maintenance |
| - | |MLA/ | + | |MLA/2026/00215\\ Completed|Application - Maintenance of existing structures or assets|53 Elms Avenue - Jetty Repair & Maintenance|Jetty Area|Vp Elms Limited|16 Apr 2026|16 Apr 2026| |
| - | |MLA/ | + | |MLA/2026/00216\\ Completed|Application - Construction of new works, |
| - | |MLA/2026/00259\\ Completed|Application - Maintenance of existing structures or assets|Grain LNG Jetty 10 Pile Sacrificial Anode wrapping|Grain LNG Jetty 10|Mr Ben Cook|11 May 2026|11 May 2026 | + | |MLA/2026/00217\\ Completed|Application - Deposit |
| - | |MLA/2026/00254\\ Completed|Application - Deposit of markers|Boscombe and Bournemouth Water Quality Buoy Deployment|Boscombe Pier Buoy| Bournemouth Pier Buoy|Wessex Water Limited|07 May 2026|07 May 2026 | + | |MLA/2026/00218\\ Completed|Application - Maintenance of existing structures or assets|Starcross station fence replacement|Starcross Station|Jss Rail Limited|16 Apr 2026|16 Apr 2026| |
| - | |MLA/2026/00256\\ Completed|Application - Maintenance of existing structures or assets|WORTHING NEW PARADE|WORTHING NEW PARADE|Beasley Christopher Limited|07 May 2026|07 May 2026 | + | |MLA/2026/00219\\ Submitted|Application - Maintenance of existing works|Rock Park Bridge - scour protection works|Rock Park Bridge pier 3|Devon County |
| - | |MLA/2026/00257\\ Completed|Application - Maintenance of existing structures or assets|BOGNOR REGIS THE STEYNE|BOGNOR REGIS THE STEYNE|Beasley Christopher Limited|07 May 2026|07 May 2026 | + | |MLA/2026/00220\\ Completed|Application - Other deposits|Rewilding the Dogger Bank Programme|Dogger Bank Mussel Restoration Area|Blue Marine Foundation|17 Apr 2026|11 Sep 2026| |
| - | |MLA/ | + | |MLA/2026/00221\\ Completed|Application - Maintenance of existing structures or assets|Padstow Moorings |
| - | |MLA/2026/00253\\ Completed|Application - Maintenance of existing structures or assets|Gatcomb Sea Wall Repairs|Gatcomb|Mgroup Rail & Aviation|05 May 2026|05 May 2026 | + | |MLA/2026/00222\\ Completed|Application - Maintenance of existing structures or assets|Padstow Town Moorings Maintenance|Padstow Town Moorings|Rnli Poole|17 Apr 2026|17 Apr 2026| |
| - | |MLA/2026/00252\\ Completed|Application - Maintenance of existing structures or assets|BARTON ON SEA INNER|BARTON ON SEA INNER|Beasley Christopher Limited|04 May 2026|04 May 2026 | + | |MLA/2026/00223\\ Completed|Application - Maintenance of existing structures or assets|St Ives Moorings |
| - | |MLA/2026/00250\\ Completed|Application - Maintenance of existing structures or assets|Removal of Marine Deposits from Bearings at Lambeth Bridge|Lambeth Bridge|Ringway Infrastructure | + | |MLA/2026/00224\\ Completed|Application - Maintenance of existing structures or assets|Sennen Moorings |
| - | |MLA/2026/00249\\ Completed|Application - Maintenance of existing structures or assets|Restoration of Boundary Groyne (Dover Seafront) – Granite Block Recovery| Structural Reinstatement| Concrete Void Filling| and Marine | + | |MLA/2026/00225\\ Completed|Application - Maintenance of existing structures or assets|BEACON SQUARE EMSWORTH|BEACON SQUARE EMSWORTH|Beasley Christopher Limited|19 Apr 2026|19 Apr 2026| |
| - | |MLA/2026/00245\\ Completed|Application - Maintenance of existing structures or assets|0641 - Weston Mill Viaduct Maintenance|Site 1|Balfour Beatty Rail Limited|28 Apr 2026|28 Apr 2026 | + | |MLA/2026/00226\\ Completed|Application - Maintenance of existing structures or assets|21 EASTERN PARADE FAREHAM|21 EASTERN PARADE FAREHAM|Beasley Christopher Limited|19 Apr 2026|19 Apr 2026| |
| - | |MLA/2026/00246\\ Completed|Application - Maintenance of existing | + | |MLA/2026/00227\\ Completed|Application - Maintenance of existing structures or assets|Wandsworth Riverside Quarter Deck Maintenance|Wandsworth Riverside Quarter Maintenance Boundary|Rnli Poole|20 Apr 2026|20 Apr 2026| |
| - | |MLA/2026/00236\\ Completed|Application - Maintenance of existing structures or assets|DFRE 4VH016|4VH016 Area|Balfour Beatty Plc|22 Apr 2026|22 Apr 2026 | + | |MLA/2026/00228\\ Submitted|Application - Maintenance of existing |
| - | |MLA/2026/00237\\ Completed|Application - Maintenance of existing structures or assets|DFRE 4VH020|4VH020 Area|Balfour Beatty Plc|22 Apr 2026|22 Apr 2026 | + | |MLA/2026/00229\\ Completed|Application - Maintenance of existing structures or assets|Riverside West Wandsworth, river frontage to - Riverside West, Smugglers Way, London SW18 1EG|Riverside West|Topbond Plc|20 Apr 2026|20 Apr 2026| |
| - | |MLA/2026/00240\\ Completed|Application - Maintenance of existing structures or assets|Heron Wharf River Wall Works - Re-coating of Existing Sheet Piled River Wall|Heron Wharf|Statom Group Limited|22 Apr 2026|22 Apr 2026 | + | |MLA/2026/00230\\ Completed|Application - Maintenance of existing structures or assets|St Marys Moorings Maintenance|St Marys Mooring Maintenance|Rnli Poole|20 Apr 2026|20 Apr 2026| |
| - | |MLA/2026/00149\\ Submitted|Application - Construction of new works|Sedgeletch Outfall| |Avove Utilites|13 Mar 2026| | + | |MLA/2026/00231\\ Completed|Application - Maintenance of existing structures or assets|Lizard Mooring Maintenance|Lizard Moorings Maintenance|Rnli Poole|20 Apr 2026|20 Apr 2026| |
| - | |MLA/ | + | |MLA/2026/00232\\ Completed|Application - Maintenance of existing structures or assets|Swanage Mooring |
| - | |MLA/2026/00228\\ Submitted|Application - Maintenance of existing | + | |MLA/2026/00233\\ Completed|Application - Maintenance of existing structures or assets|Bembridge Moorings Maintenance|Bembridge Mooring Maintenance|Rnli Poole|20 Apr 2026|20 Apr 2026| |
| - | |MLA/ | + | |MLA/2026/00236\\ Completed|Application - Maintenance of existing structures or assets|DFRE 4VH016|4VH016 Area|Balfour Beatty Plc|22 Apr 2026|22 Apr 2026| |
| - | |MLA/2026/00261\\ Submitted|Application - Disposal of dredged material| Navigational dredging (maintenance)|Emsworth Yacht Harbour | + | |MLA/2026/00237\\ Completed|Application - Maintenance of existing structures or assets|DFRE 4VH020|4VH020 Area|Balfour Beatty Plc|22 Apr 2026|22 Apr 2026| |
| - | |MLA/2026/00270\\ Submitted|Application - Decommissioning of works| | + | |MLA/2026/00239\\ Submitted|Application - Construction of new works|Abbey Road|Abbey Road|Statom Group Limited|22 Apr 2026| |
| - | |MLA/ | + | |MLA/2026/00240\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00304\\ Submitted|Application - Maintenance of existing | + | |MLA/2026/00241\\ Submitted|Application - Construction |
| - | |MLA/2026/00307\\ Submitted|Application - Sampling|Nautilus Nearshore Geotechnical Investigations| |National Grid Ventures Ltd -Warwick|17 Jun 2026| | + | |MLA/2026/00242\\ Submitted|Application - Other deposits|Surrey Docks Water Source Heat Pump Project|Greenland Dock Heat Pump|London Borough Council Of Southwick |
| - | |MLA/2026/00309\\ Submitted|Application - Maintenance of existing | + | |MLA/2026/00243\\ Submitted|Application - Aggregate dredging, Sampling|Area 407 | |Cemex Uk Marine Ltd|27 Apr 2026| |
| - | |MLA/2026/00322\\ Submitted|Application - Disposal of dredged material| Other dredging|Central Docks Development – Marine Works to Screening Chamber| |Peel Waters Group Uk Limited|25 Jun 2026| | + | |MLA/2026/00245\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00332\\ Submitted|Application - Construction of new works|Transforming the Thames - Saltmarsh restoration Kent| |Zoological Society Of London|30 Jun 2026| | + | |MLA/2026/00246\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00355\\ Submitted|Application - Construction of new works| | + | |MLA/2026/00248\\ Submitted|Application - Construction of new works, Other deposits, |
| - | |MLA/ | + | |MLA/2026/00249\\ Completed|Application - Maintenance of existing structures or assets|Restoration of Boundary Groyne (Dover Seafront) – Granite Block Recovery, Structural Reinstatement, |
| - | |MLA/2026/00385\\ Submitted|Application - Construction of new works|Dart Harbour North Embankment Works|North Embankment|Dart Harbour And Navigation Authority|12 Aug 2026| | + | |MLA/2026/00250\\ Completed|Application - Maintenance of existing structures or assets|Removal of Marine Deposits from Bearings at Lambeth Bridge|Lambeth Bridge|Ringway Infrastructure |
| - | |MLA/ | + | |MLA/2026/00252\\ Completed|Application - Maintenance of existing structures or assets|BARTON ON SEA INNER|BARTON ON SEA INNER|Beasley Christopher |
| - | |MLA/2026/00229\\ Completed|Application - Maintenance of existing structures or assets|Riverside West Wandsworth| river frontage to - Riverside West| Smugglers Way| London SW18 1EG|Riverside West|Topbond Plc|20 Apr 2026|20 Apr 2026 | + | |MLA/2026/00253\\ Completed|Application - Maintenance of existing structures or assets|Gatcomb Sea Wall Repairs|Gatcomb|Mgroup Rail & Aviation|05 May 2026|05 May 2026| |
| - | |MLA/2026/00230\\ Completed|Application - Maintenance of existing structures or assets|St Marys Moorings Maintenance|St Marys Mooring Maintenance|Rnli Poole|20 Apr 2026|20 | + | |MLA/2026/00254\\ Completed|Application - Deposit of markers|Boscombe and Bournemouth Water Quality Buoy Deployment|Boscombe Pier Buoy, Bournemouth Pier Buoy|Wessex Water Limited|07 May 2026|07 May 2026| |
| - | |MLA/2026/00231\\ Completed|Application - Maintenance of existing structures or assets|Lizard Mooring Maintenance|Lizard Moorings Maintenance|Rnli Poole|20 Apr 2026|20 | + | |MLA/2026/00255\\ Submitted|Application - Construction |
| - | |MLA/2026/00232\\ Completed|Application - Maintenance | + | |MLA/2026/00256\\ Completed|Application - Maintenance of existing structures or assets|WORTHING NEW PARADE|WORTHING NEW PARADE|Beasley Christopher |
| - | |MLA/2026/00233\\ Completed|Application - Maintenance of existing structures or assets|Bembridge Moorings Maintenance|Bembridge Mooring Maintenance|Rnli Poole|20 Apr 2026|20 | + | |MLA/2026/00257\\ Completed|Application - Maintenance of existing structures or assets|BOGNOR REGIS THE STEYNE|BOGNOR REGIS THE STEYNE|Beasley Christopher Limited|07 May 2026|07 May 2026| |
| - | |MLA/2026/00225\\ Completed|Application - Maintenance of existing structures or assets|BEACON SQUARE EMSWORTH|BEACON SQUARE EMSWORTH|Beasley Christopher Limited|19 Apr 2026|19 Apr 2026 | + | |MLA/2026/00258\\ Submitted|Application - Maintenance |
| - | |MLA/2026/00226\\ Completed|Application - Maintenance of existing structures or assets|21 EASTERN PARADE FAREHAM|21 EASTERN PARADE FAREHAM|Beasley Christopher Limited|19 Apr 2026|19 Apr 2026 | + | |MLA/2026/00259\\ Completed|Application - Maintenance of existing structures or assets|Grain LNG Jetty 10 Pile Sacrificial Anode wrapping|Grain LNG Jetty 10|Mr Ben Cook|11 May 2026|11 |
| - | |MLA/2026/00221\\ Completed|Application - Maintenance of existing structures or assets|Padstow Moorings Maintenance|Padstow Moorings|Rnli Poole|17 Apr 2026|17 Apr 2026 | + | |MLA/2026/00261\\ Submitted|Application - Disposal |
| - | |MLA/ | + | |MLA/2026/00263\\ Submitted|Application - Other deposits|South Tees Inshore Reef (STIR)|STIR_Licence_Area|Tees Rivers Charitable |
| - | |MLA/2026/00223\\ Completed|Application - Maintenance | + | |MLA/2026/00264\\ Completed|Application - Maintenance of existing structures or assets|Shore Road sewer cleaning |
| - | |MLA/ | + | |MLA/2026/00266\\ Completed|Application - Maintenance of existing structures or assets|2809 Stambridge Mills Bridge|Stambridge Mills Bridleway Bridge|Ringway Jacobs |
| - | |MLA/2026/00215\\ Completed|Application - Maintenance of existing structures or assets|53 Elms Avenue - Jetty Repair & Maintenance|Jetty Area|Vp Elms Limited|16 Apr 2026|16 Apr 2026 | + | |MLA/2026/00267\\ Completed|Application - Maintenance of existing structures or assets|QEII Cable Stay Corrosion Protection|Dartford|Octavius|20 Jul 2026|20 Jul 2026| |
| - | |MLA/ | + | |MLA/2026/00268\\ Completed|Application - Maintenance of existing structures or assets|The Hard Interchange: |
| - | |MLA/2026/00218\\ Completed|Application - Maintenance of existing structures or assets|Starcross station fence replacement|Starcross Station|Jss Rail Limited|16 Apr 2026|16 Apr 2026 | + | |MLA/2026/00269\\ Completed|Application - Maintenance of existing structures or assets|Repointing of quay wall|Yacht Haven Quay, Quay Wall|Yacht Haven Quay Limited|18 May 2026|18 May 2026| |
| - | |MLA/2026/00211\\ Completed|Application - Maintenance of existing structures or assets|Baqus Pontoon Refurbishment|Smugglers Lane| Bosham| PO18 8QW|Wardle Marine Services Limited|14 Apr 2026|14 Apr 2026 | + | |MLA/2026/00270\\ Submitted|Application - Decommissioning |
| - | |MLA/2026/00206\\ Completed|Application - Maintenance of existing structures or assets|Lambeth Bridge Survey|Lambeth Bridge|County Building Services | + | |MLA/2026/00271\\ Completed|Application - Non-navigational clearance dredging|Bawdsey jetty|Bawdsey ferry landing|Felixstowe Ferry Boat Yard Limited|20 May 2026|20 May 2026| |
| - | |MLA/ | + | |MLA/2026/00272\\ Completed|Application - Maintenance of existing structures or assets|Itchen Bridge Maintenance Project|magic_polygons|Balfour Beatty Plc|20 May 2026|20 May 2026| |
| - | |MLA/2026/00197\\ Completed|Application - Maintenance | + | |MLA/2026/00273\\ Completed|Application - Maintenance of existing structures or assets|Replacement pontoons including piles|Glasson - Pontoons|Aquavista Watersides Ltd|20 May 2026|20 May 2026| |
| - | |MLA/2026/00200\\ Completed|Application - Maintenance | + | |MLA/2026/00274\\ Completed|Application - Non-navigational clearance dredging|Bridgwater Tidal Barrier - emergency removal |
| - | |MLA/ | + | |MLA/2026/00275\\ Completed|Application - Maintenance of existing structures or assets|Manhole repair works|Lime Road slipway|Esh Construction|21 May 2026|21 May 2026| |
| - | |MLA/ | + | |MLA/2026/00277\\ Completed|Application - Minor removals|Putney Slipway Site Investigation|Putney Slipway SI|Collins |
| - | |MLA/2026/00190\\ Completed|Application - Maintenance of existing structures or assets|Silvertown Quays|Silvertown Quays|Keltbray Built Environment | + | |MLA/2026/00278\\ Submitted|Application - Navigational dredging (capital), Navigational dredging (maintenance)|Gillingham Pier Capital and Maintenance |
| - | |MLA/ | + | |MLA/2026/00279\\ Completed|Application - Maintenance of existing structures or assets|Prince Philip Yacht Haven - Pontoon Repairs and replacement. Identical structures|Pontoon repair|Royal Southern Yacht Club Limited|22 May 2026|22 May 2026| |
| - | |MLA/ | + | |MLA/2026/00282\\ Completed|Application - Maintenance of existing structures or assets|Portishead Lifeboat Station Launch Ramp Maintenance|Portishead LBS slipway Maintenance Boundary|Royal National Lifeboat Institution|27 May 2026|27 May 2026| |
| - | |MLA/ | + | |MLA/2026/00284\\ Completed|Application - Maintenance |
| - | |MLA/2026/00180\\ Completed|Application - Maintenance | + | |MLA/2026/00285\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00168\\ Completed|Application - Maintenance | + | |MLA/2026/00286\\ Completed|Application - Non-navigational clearance |
| - | |MLA/2026/00169\\ Completed|Application - Maintenance of existing structures or assets|South Milton Sands Culvert Pipe Repair|South Milton Sands|National Trust|31 Mar 2026|31 Mar 2026 | + | |MLA/2026/00287\\ Completed|Application - Minor removals|Port |
| - | |MLA/2026/00173\\ Completed|Application - Maintenance of existing structures or assets|Galloper Offshre Windfarm O&M Facility|Galloper O&M Facility Rev 1|Galloper Wind Farm Limited|31 Mar 2026|31 Mar 2026 | + | |MLA/ |
| - | |MLA/2026/00149\\ Submitted|Application - Construction of new works|Sedgeletch Outfall| |Avove Utilites|13 Mar 2026| | + | |MLA/2026/00289\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00176\\ Submitted|Application - Construction of new works|West Street Pier| |Port Of London Authority|01 Apr 2026| | + | |MLA/2026/00290\\ Submitted|Application - Construction |
| - | |MLA/ | + | |MLA/2026/00291\\ Completed|Application - Maintenance |
| - | |MLA/2026/00243\\ Submitted|Application - Aggregate dredging| Sampling|Area | + | |MLA/2026/00293\\ Completed|Application - Minor removals|SEP and DEP 2026 Geotechnical Site Investigation Works SEP|PC4239-RHD-ZZ-OF-M2-Z-0032_SheringhamShoal_280526|Scira Extension Limited|04 Jun 2026|04 Jun 2026| |
| - | |MLA/2026/00261\\ Submitted|Application - Disposal | + | |MLA/2026/00294\\ Completed|Application - Minor removals|SEP and DEP 2026 Geotechnical Site Investigation |
| - | |MLA/2026/00270\\ Submitted|Application - Decommissioning of works| Other deposits|CANTAT 3 Segment F4 & UK GERMANY 6 Cable Decommissioning| |British Telecom-Braham St|20 May 2026| | + | |MLA/2026/00295\\ Completed|Application - Maintenance of existing structures or assets|Slipway Repair |
| - | |MLA/2026/00288\\ Submitted|Application - Other deposits|Tees Estuary Edges - Phase 2| |Tees Rivers Charitable Trust|01 Jun 2026| | + | |MLA/2026/00296\\ Completed|Application - Maintenance of existing structures or assets|BEXHILL BEAULIEU RD|BEXHILL BEAULIEU RD|Beasley Christopher Limited|04 Jun 2026|04 Jun 2026| |
| - | |MLA/2026/00304\\ Submitted|Application - Maintenance | + | |MLA/2026/00297\\ Completed|Application - Maintenance of existing structures or assets|WORTHING HEENE TERRACE WEST|HEENE TERRACE WEST|Beasley Christopher Limited|04 Jun 2026|04 Jun 2026| |
| - | |MLA/2026/00307\\ Submitted|Application - Sampling|Nautilus Nearshore Geotechnical Investigations| |National Grid Ventures | + | |MLA/2026/00298\\ Completed|Application - Maintenance of existing structures or assets|Bristol Heat Network Crossings - Marsh Bridge|RLB_14_07_25|Bristol Heat Networks |
| - | |MLA/2026/00309\\ Submitted|Application - Maintenance of existing | + | |MLA/2026/00299\\ Completed|Application - Maintenance of existing structures or assets|BP Oil Self Service Licence 2026|Jetty No1|Bp Oil Uk Limited|12 Jun 2026|12 Jun 2026| |
| - | |MLA/ | + | |MLA/2026/00300\\ Completed|Application - Maintenance of existing structures or assets|Olympus |
| - | |MLA/ | + | |MLA/2026/00304\\ Submitted|Application - Maintenance of existing |
| - | |MLA/2026/00355\\ Submitted|Application - Construction | + | |MLA/2026/00306\\ Completed|Application - Maintenance of existing structures or assets|Battersea Bridge Inspection|Battersea Bridge|County Building Services |
| - | |MLA/2026/00365\\ Submitted|Application - Other deposits|Southwest Water Torbay ADCP|Inner North| Outer North| Outer South| Inner South|Partrac | + | |MLA/2026/00307\\ Submitted|Application - Sampling|Nautilus Nearshore Geotechnical Investigations |
| - | |MLA/2026/00385\\ Submitted|Application - Construction of new works|Dart Harbour North Embankment Works|North Embankment|Dart Harbour And Navigation Authority|12 Aug 2026| | + | |MLA/2026/00307\\ Submitted|Application - Sampling|Nautilus Nearshore Geotechnical Investigations |
| - | |MLA/2026/00159\\ Completed|Application - Maintenance of existing structures or assets|Topbond Wally' | + | |MLA/2026/00309\\ Submitted|Application - Maintenance of existing |
| - | |MLA/2026/00167\\ Completed|Application - Maintenance of existing | + | |MLA/2026/00310\\ Completed|Application - Non-navigational clearance dredging|Bawdsey jetty|633138 , 237903|Felixstowe Ferry Boat Yard Limited|18 Jun 2026|18 Jun 2026| |
| - | |MLA/2026/00165\\ Completed|Application - Marine licence for the burial | + | |MLA/2026/00311\\ Completed|Application - Marine licence for the burial |
| - | |MLA/2026/00161\\ Completed|Application - Maintenance of existing structures or assets|Riverside One River Wall Works|Riverside One Wall|D&G Block Management | + | |MLA/2026/00312\\ Completed|Application - Maintenance of existing structures or assets|Free Trade Wharf - Timber Restraining|Free Trade Wharf Newcastle |
| - | |MLA/2026/00160\\ Completed|Application - Maintenance of existing | + | |MLA/2026/00313\\ Submitted|Application - Construction of new works|Aylesford River Wall|Aylesford River Wall Project |
| - | |MLA/2026/00155\\ Completed|Application - Maintenance | + | |MLA/2026/00314\\ Submitted|Application - Disposal of dredged material, Navigational dredging (maintenance)|Gosport Ferry maintenance dredge of berth and approach channel |
| - | |MLA/2026/00156\\ Completed|Application - Maintenance of existing structures or assets|Shamrock Quay Pontoon Replacement|Shamrock Quay - B Pontoons|Marina Developments | + | |MLA/2026/00315\\ Completed|Application - Non-navigational clearance |
| - | |MLA/2026/00158\\ Completed|Application - Beach maintenance activities|Lynmouth Harbour Access|Site 1|Lynton & Lynmouth Town Council|20 Mar 2026|20 Mar 2026 | + | |MLA/2026/00316\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00153\\ Completed|Application - Maintenance of existing structures or assets|4 Ravensbury Drive Quayside repairs and loading bay for works|4 Ravensbury|Elliott Construction Ec Ltd|18 Mar 2026|18 Mar 2026 | + | |MLA/2026/00317\\ Completed|Application - Maintenance |
| - | |MLA/2026/00151\\ Completed|Application - Maintenance of existing structures or assets|GSK Outfall | + | |MLA/2026/00321\\ Completed|Application - Maintenance of existing |
| - | |MLA/ | + | |MLA/2026/00322\\ Submitted|Application - Disposal of dredged material, Other dredging|Central Docks Development – Marine Works to Screening Chamber |
| - | |MLA/2026/00147\\ Completed|Application - Maintenance of existing structures or assets|Black Bridge outfall - Dawlish|Black Bridge outfall Dawlish|Teignmouth Maritime Services Limited|12 Mar 2026|12 Mar 2026 | + | |MLA/2026/00326\\ Completed|Application - Non-navigational clearance dredging|HMNB- A/B LOCK EAST SILT CLEARANCE|A/B East Silt Clearance works area|Kbs Maritime Limited|26 Jun 2026|26 Jun 2026| |
| - | |MLA/2026/00143\\ Completed|Application - Maintenance of existing structures or assets|Birdham Pool Essential Lock Maintenance|Birdham Pool Lock|Aquavista Watersides Ltd|10 Mar 2026|10 Mar 2026 | + | |MLA/2026/00328\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00134\\ Completed|Application - Maintenance of existing structures or assets|Steel Caisson | + | |MLA/2026/00329\\ Completed|Application - Maintenance of existing |
| - | |MLA/ | + | |MLA/2026/00331\\ Submitted|Application - Other works|Stanah Saltmarsh Resilience Project|Stanah Saltmarsh|Wyre Borough Council|29 Jun 2026| |
| - | |MLA/2026/00136\\ Completed|Application - Maintenance of existing structures or assets|Ørsted West Coast Hub - Pontoon Cleaning for Guano and Marine Growth Removal|BOW WOW Pontoon| BOW Pontoon| Inner Berth Pontoon| Lead in jetty steps 1| Lead in Jetty steps 3| Lead in Jetty steps 2| Deep Water Berth|Orsted Power Uk Ltd|05 Mar 2026|05 Mar 2026 | + | |MLA/ |
| - | |MLA/2026/00131\\ Completed|Application - Maintenance of existing structures or assets|Whitley Lake Steps and Slipway Two Improvement|Slipway 2| Steps 2| Steps 1|Bcp Council|04 Mar 2026|04 Mar 2026 | + | |MLA/2026/00333\\ Completed|Application - Minor removals|3 Basin Marine Ground Investigations|3 Basin MGI area|Defence Infrastructure Organisation|01 Jul 2026|01 Jul 2026| |
| - | |MLA/2026/00132\\ Completed|Application - Maintenance of existing structures or assets|Shaldon bridge pier remediation works|Site 1|Devon County Council|04 Mar 2026|04 Mar 2026 | + | |MLA/2026/00335\\ Completed|Application - Maintenance of existing structures or assets|Battersea Bridge - Principal Inspection & Bearing Shelf Cleaning|Battersea Bridge|Ringway Infrastructure Services |
| - | |MLA/2026/00129\\ Completed|Application - Maintenance of existing | + | |MLA/2026/00337\\ Completed|Application - Minor removals|Moor Sand|MOOR SAND|Mrs Alison James|07 Jul 2026|07 Jul 2026| |
| - | |MLA/ | + | |MLA/2026/00339\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00124\\ Completed|Application - Maintenance of existing structures or assets|Ropehawn Breakwater maintenance|Ropehorn breakwater|Mr Timothy Robinson|26 Feb 2026|26 Feb 2026 | + | |MLA/2026/00342\\ Completed|Application - Minor removals|Understanding the protected wreck Northumberland: |
| - | |MLA/2026/00125\\ Completed|Application - Maintenance of existing structures or assets|Greenland Dock Eastern Public Access|Greenland Dock Eastern Public Access|Southwark Council|26 Feb 2026|26 Feb 2026 | + | |MLA/2026/00343\\ Completed|Application - Deposit |
| - | |MLA/ | + | |MLA/2026/00344\\ Completed|Application - Deposit of markers|St Austell Bay Marine Soundscape Research|St Austell Bay|Cornwall Trust For Nature Conservation |
| - | |MLA/2026/00127\\ Completed|Application - Minor removals|Removal Of container debris|Selsey| West Beach in the vicinity of Clayton Road / West Street|Quest Underwater Services Limited|26 Feb 2026|26 Feb 2026 | + | |MLA/2026/00345\\ Completed|Application - Deposit |
| - | |MLA/ | + | |MLA/2026/00346\\ Submitted|Application - Construction of new works|Torcross Urgent Works | |Kier (Nr) Limited|17 Jul 2026| |
| - | |MLA/ | + | |MLA/2026/00348\\ Completed|Application - Marine licence for the burial |
| - | |MLA/2026/00115\\ Completed|Application - Maintenance of existing structures or assets|Maintenance | + | |MLA/2026/00350\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00116\\ Completed|Application - Maintenance of existing structures or assets|Alpha Jetty Condition Survey|Alpha Jetty|Brett Aggregates Limited|23 Feb 2026|23 Feb 2026 | + | |MLA/2026/00352\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00119\\ Completed|Application - Maintenance of existing structures or assets|Chiswick Pier - Chiswick Pier Trust|Chiswick Pier|Chiswick Pier Trust|23 Feb 2026|23 Feb 2026 | + | |MLA/2026/00355\\ Submitted|Application - Construction of new works, Other removals, Other works|Rochester Bridge |
| - | |MLA/2026/00120\\ Completed|Application - Maintenance of existing structures or assets|BLUE BOAR LANE|BLUE BOAR LANE|Beasley Christopher Limited|23 Feb 2026|23 Feb 2026 | + | |MLA/2026/00360\\ Completed|Application - Non-navigational clearance |
| - | |MLA/ | + | |MLA/2026/00361\\ Completed|Application - Maintenance |
| - | |MLA/2026/00176\\ Submitted|Application - Construction of new works|West Street Pier| |Port Of London Authority|01 Apr 2026| | + | |MLA/2026/00364\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00228\\ Submitted|Application - Maintenance of existing | + | |MLA/2026/00365\\ Submitted|Application - Other deposits|Southwest Water Torbay ADCP|Inner North, Outer North, Outer South, Inner South|Partrac Limited|31 Jul 2026| |
| - | |MLA/ | + | |MLA/2026/00366\\ Submitted|Application - Maintenance |
| - | |MLA/2026/00261\\ Submitted|Application - Disposal | + | |MLA/2026/00368\\ Completed|Application - Non-navigational clearance |
| - | |MLA/2026/00270\\ Submitted|Application - Decommissioning of works| | + | |MLA/2026/00370\\ Completed|Application - Beach maintenance activities|Shoreham to Southwick Beach Recycling|shoreham to southwick shingle transfer|Shoreham Port Authority|04 Aug 2026|04 Aug 2026| |
| - | |MLA/2026/00288\\ Submitted|Application - Other deposits|Tees Estuary Edges - Phase 2| |Tees Rivers Charitable Trust|01 Jun 2026| | + | |MLA/2026/00371\\ Completed|Application - Maintenance |
| - | |MLA/2026/00304\\ Submitted|Application - Maintenance of existing | + | |MLA/2026/00372\\ Completed|Application - Maintenance |
| - | |MLA/ | + | |MLA/2026/00373\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00309\\ Submitted|Application - Maintenance of existing | + | |MLA/2026/00374\\ Completed|Application - Maintenance of existing structures or assets|Maintenance activities on Ryde Pier, Isle of Wight|Ryde Pier|South Western Railway Limited|06 Aug 2026|06 Aug 2026| |
| - | |MLA/ | + | |MLA/2026/00376\\ Submitted|Application - Disposal of dredged material|Beneficial disposal of dredged material in Stour and Orwell |
| - | |MLA/ | + | |MLA/2026/00377\\ Completed|Application - Non-navigational clearance dredging|Mo Houseboat|Mo House Boat|Mr Simon Beaufoy|07 Aug 2026|07 Aug 2026| |
| - | |MLA/2026/00355\\ Submitted|Application - Construction of new works| Other removals| | + | |MLA/2026/00381\\ Completed|Application - Non-navigational clearance dredging|Dredging |
| - | |MLA/2026/00365\\ Submitted|Application - Other deposits|Southwest Water Torbay ADCP|Inner North| Outer North| Outer South| Inner South|Partrac Limited|31 Jul 2026| | + | |MLA/2026/00383\\ Completed|Application - Maintenance of existing |
| - | |MLA/ | + | |MLA/ |
| - | |MLA/2026/00113\\ Completed|Application - Maintenance of existing structures or assets|Lifstan Way Flap Valve Replacement|Lifstan Way Outfall Flap Valve Replacement|Anglian Water Services Limited|20 Feb 2026|20 Feb 2026 | + | |MLA/2026/00394\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00109\\ Completed|Application - Minor removals|Victoria Deep Water Terminal - Debris Removal|Debris Removal Area|Hanson Quarry Products Europe | + | |MLA/2026/00400\\ Completed|Application - Maintenance of existing |
| - | |MLA/ | + | |MLA/2026/00402\\ Completed|Application - Maintenance |
| - | |MLA/2026/00108\\ Completed|Application - Maintenance of existing structures or assets|Installation of services for pontoons|Provision of Services|Bristol City Council|18 Feb 2026|18 Feb 2026 | + | |MLA/2026/00403\\ Completed|Application - Maintenance |
| - | |MLA/2026/00102\\ Completed|Application - Beach maintenance activities|Landguard Beach Reprofiling|Landguard Beach|Port Of Felixstowe | + | |MLA/2026/00404\\ Completed|Application - Maintenance |
| - | |MLA/2026/00101\\ Completed|Application - Marine licence for the burial | + | |MLA/2026/00406\\ Completed|Application - Maintenance |
| - | |MLA/2026/00093\\ Completed|Application - Maintenance of existing structures or assets|Abbey Road|Abbey Road|Statom Group Limited|13 Feb 2026|13 Feb 2026 | + | |MLA/2026/00407\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00091\\ Completed|Application - Maintenance of existing structures or assets|HERNE BAY CENTRAL AVENUE|HERNE BAY CENTRAL AVENUE|Beasley Christopher Limited|12 Feb 2026|12 Feb 2026 | + | |MLA/2026/00410\\ Completed|Application - Maintenance |
| - | |MLA/2026/00092\\ Completed|Application - Deposit | + | |MLA/2026/00412\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00089\\ Completed|Application - Maintenance of existing structures or assets|WPH2 17A/3 Portcreek Viaduct|Portcreek|Volkerfitzpatrick Limited|11 Feb 2026|11 | + | |MLA/2026/00413\\ Completed|Application - Maintenance |
| - | |MLA/ | + | |MLA/2026/00414\\ Completed|Application - Maintenance of existing |
| - | |MLA/2026/00087\\ Completed|Application - Maintenance | + | |MLA/2026/00415\\ Completed|Application - Marine licence for the burial |
| - | |MLA/2026/00079\\ Completed|Application - Non-navigational clearance dredging|Non-navigational clearance dredging | + | |MLA/2026/00420\\ Completed|Application - Maintenance |
| - | |MLA/2026/00077\\ Completed|Application - Maintenance of existing structures or assets|Repairing the hand rail on Cleethorpes Pier|Cleethorpes Pier Papas Fish and Chips| Central Promenade| Cleethorpes DN35 8SF| United Kingdom|Papas Fish And Chips (Cleethorpes) | + | |MLA/2026/00428\\ Completed|Application - Marine licence for the burial |
| - | |MLA/ | + | |MLA/2026/00433\\ Completed|Application - Maintenance of existing structures or assets|Greenhithe Jetty - Dolphin Repairs|Untitled Polygon|Heidelberg Materials |
| - | |MLA/2026/00072\\ Completed|Application - Maintenance of existing structures or assets|Necessary Repairs of Wharf Frontage at Kendalls Wharf|Kendalls Wharf Repair|Holcim Uk Limited|03 Feb 2026|03 Feb 2026 | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00068\\ Completed|Application - Maintenance of existing structures or assets|S106 Totterdown Basin Enhancement Works|S106 Totterdown Basin Enhancement Works|Sir Robert Mcalpine Limited|30 Jan 2026|30 Jan 2026 | + | |
| - | |MLA/2026/00066\\ Completed|Application - Maintenance of existing structures or assets|PORTSMOUTH HENDERSON RD|HENDERSON ROAD|Beasley Christopher Limited|28 Jan 2026|28 Jan 2026 | + | |
| - | |MLA/2026/00060\\ Completed|Application - Maintenance of existing structures or assets|RUSTINGTON HENDON AVE|HENDON AVE|Beasley Christopher | + | |
| - | |MLA/2026/00061\\ Completed|Application - Maintenance | + | |
| - | |MLA/2026/00063\\ Completed|Application - Non-navigational clearance dredging|Greater Gabbard Marine Component Exchange Campaign pre-emptive dredging licence February - April 2026|GG_SiteBoundaryJoinedUpArea_SSE_20221102|Greater Gabbard Offshore Winds Limited|26 Jan 2026|26 Jan 2026 | + | |
| - | |MLA/2026/00059\\ Completed|Application - Maintenance of existing structures or assets|King Edward Memorial Park Foreshore (KEMPF) - Replacement of 1no. Fender attached to the Permanent Flood Defence|Works area|Thames Tideway Tunnel Limited|23 Jan 2026|23 Jan 2026 | + | |
| - | |MLA/2026/00030\\ Completed|Application - Maintenance of existing structures or assets|The Queens Walk|The Queens Walk|A2 Site Investigation Limited|22 Jan 2026|22 Jan 2026 | + | |
| - | |MLA/2026/00054\\ Completed|Application - Maintenance | + | |
| - | |MLA/2026/00055\\ Completed|Application - Maintenance of existing structures or assets|Paradise Point|Paradise Point| Ravensbury Drive||Unicorn | + | |
| - | |MLA/2026/00056\\ Completed|Application - Maintenance of existing structures or assets|Purton Tilting Weir P13090|Purton Tilting Weir|Canal & River Trust|22 Jan 2026|22 Jan 2026 | + | |
| - | |MLA/2026/00057\\ Completed|Application - Maintenance | + | |
| - | |MLA/2026/00050\\ Completed|Application - Maintenance of existing structures or assets|EGL2 OHL 4VJ026|4VJ026 Tower|Balfour Beatty Plc|21 Jan 2026|21 Jan 2026 | + | |
| - | |MLA/2026/00051\\ Completed|Application - Maintenance of existing structures or assets|EGL2 OHL 4VJ025|4VJ025 Tower|Balfour Beatty Plc|21 Jan 2026|21 Jan 2026 | + | |
| - | |MLA/2026/00149\\ Submitted|Application - Construction | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00228\\ Submitted|Application - Maintenance of existing | + | |
| - | |MLA/2026/00243\\ Submitted|Application - Aggregate | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00270\\ Submitted|Application - Decommissioning | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00304\\ Submitted|Application - Maintenance of existing | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00309\\ Submitted|Application - Maintenance | + | |
| - | |MLA/2026/00322\\ Submitted|Application - Disposal | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00355\\ Submitted|Application - Construction of new works| Other removals| | + | |
| - | |MLA/2026/00365\\ Submitted|Application - Other deposits|Southwest Water Torbay ADCP|Inner North| Outer North| Outer South| Inner South|Partrac Limited|31 Jul 2026| | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00052\\ Completed|Application - Maintenance of existing structures or assets|EGL2 OHL 4VJ024|4VJ024 Works|Balfour Beatty Plc|21 Jan 2026|21 Jan 2026 | + | |
| - | |MLA/2026/00047\\ Completed|Application - Maintenance of existing structures or assets|urgent scaffold on foreshore due to storm damage from 8/1/26 storm in cormwall|Wall repair|Logistic Construction Limited|19 Jan 2026|19 Jan 2026 | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00040\\ Completed|Application - Maintenance of existing structures or assets|Bognor Norfolk St|Norfolk St|Beasley Christopher Limited|16 Jan 2026|16 Jan 2026 | + | |
| - | |MLA/2026/00041\\ Completed|Application - Maintenance of existing structures or assets|Bognor Nywood lane|Nywood Lane|Beasley Christopher Limited|16 Jan 2026|16 Jan 2026 | + | |
| - | |MLA/2026/00042\\ Completed|Application - Maintenance of existing structures or assets|Vauxhall | + | |
| - | |MLA/2026/00032\\ Completed|Application - Maintenance of existing structures or assets|A180 Alexandra Dock Bridge Above Deck Works|Alexandra Dock Bridge|North East Lincolnshire Council|14 Jan 2026|14 Jan 2026 | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00028\\ Completed|Application - Maintenance of existing structures or assets|Repair timber retaining wall near Waldringfield Sailing Club clubhouse| on tidal River Deben.|RIVER WALL|Waldringfield Sailing Club|13 Jan 2026|13 Jan 2026 | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00022\\ Completed|Application - Maintenance of existing | + | |
| - | |MLA/2026/00016\\ Completed|Application - Maintenance of existing structures or assets|Greater Gabbard Heli Basket Replacement|GG_SiteBoundaryJoinedUpArea_SSE_20221102|Greater Gabbard Offshore Winds Limited|09 Jan 2026|09 Jan 2026 | + | |
| - | |MLA/2026/00017\\ Completed|Application - Maintenance of existing structures or assets|ROCK O NOR|ROCK O NOR|Beasley Christopher Limited|09 Jan 2026|09 Jan 2026 | + | |
| - | |MLA/2026/00012\\ Completed|Application - Maintenance of existing structures or assets|Blackwater Sailing Club - Slipway Repairs|Blackwater Sailing Club Slipway|Blackwater Sailing Club Limited|08 Jan 2026|08 Jan 2026 | + | |
| - | |MLA/2026/00014\\ Completed|Application - Maintenance of existing | + | |
| - | |MLA/2026/00006\\ Completed|Application - Maintenance of existing structures or assets|Brixham Wavescreen Maintenance|Brixham Marina Wavescreen|Marina Developments | + | |
| - | |MLA/2026/00002\\ Completed|Application - Maintenance | + | |
| - | |MLA/2026/00004\\ Completed|Application - Maintenance of existing structures or assets|Barrier Garden Pier Tide Gauge and Ladder Replacement|Barrier Garden Pier|Port Of London Authority|05 Jan 2026|05 Jan 2026 | + | |
| - | |MLA/ | + | |
| - | |MLA/ | + | |
| - | |MLA/ | + | |
| - | |MLA/ | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00053\\ Submitted|Application - Disposal of dredged material|Burnley Wharf Silt Disposal|NAB TOWER|Tarmac|22 Jan 2026| | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00065\\ Submitted|Application - Disposal of dredged material| Navigational dredging (maintenance)| | + | |
| - | |MLA/2026/00067\\ Submitted|Application - Disposal of dredged material| Navigational | + | |
| - | |MLA/2026/00081\\ Submitted|Application - Maintenance of existing | + | |
| - | |MLA/ | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00149\\ Submitted|Application - Construction | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00228\\ Submitted|Application - Maintenance of existing | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00261\\ Submitted|Application - Disposal of dredged material| Navigational | + | |
| - | |MLA/2026/00270\\ Submitted|Application - Decommissioning of works| Other deposits|CANTAT 3 Segment F4 & UK GERMANY 6 Cable Decommissioning| |British Telecom-Braham St|20 May 2026| | + | |
| - | |MLA/2026/00288\\ Submitted|Application - Other deposits|Tees Estuary Edges - Phase 2| |Tees Rivers Charitable Trust|01 | + | |
| - | |MLA/2026/00304\\ Submitted|Application - Maintenance of existing | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00309\\ Submitted|Application - Maintenance of existing | + | |
| - | |MLA/2026/00322\\ Submitted|Application - Disposal of dredged material| | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00355\\ Submitted|Application - Construction of new works| Other removals| | + | |
| - | |MLA/2026/00365\\ Submitted|Application - Other deposits|Southwest Water Torbay ADCP|Inner North| Outer North| Outer South| Inner South|Partrac | + | |
| - | |MLA/2026/00385\\ Submitted|Application - Construction of new works|Dart Harbour North Embankment Works|North Embankment|Dart Harbour And Navigation Authority|12 Aug 2026| | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00110\\ Submitted|Application - Construction of new works| | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00140\\ Submitted|Application - Disposal of dredged material| Navigational dredging (maintenance)|BP Oil UK Ltd - Hamble jetty and approaches Maintenance Dredging and disposal|Nab Tower Dredged Material Disposal Site – WI060| Jetty box| Jetty approach| Tug box|Bp Oil (Uk) Ltd|09 Mar 2026| | + | |
| - | |MLA/ | + | |
| - | |MLA/ | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00178\\ Submitted|Application - Disposal | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00196\\ Submitted|Application - Aggregate dredging| Sampling|Area 460 - South Hastings| |Tarmac Marine Dredging | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00202\\ Submitted|Application - Construction | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00208\\ Submitted|Application - Construction of new works|New Jetty and Slipway installation|52 Pearce Jetty|Mr Michael Dennis|14 Apr 2026| | + | |
| - | |MLA/2026/00213\\ Submitted|Application - Construction | + | |
| - | |MLA/2026/00219\\ Submitted|Application - Maintenance of existing works|Rock Park Bridge | + | |
| - | |MLA/2026/00228\\ Submitted|Application - Maintenance of existing | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00241\\ Submitted|Application - Construction of new works|Horseshoe Outfall Replacement|Horseshoe Outfall|Amelio Utilities (Gloucester) Limited|22 Apr 2026| | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00243\\ Submitted|Application - Aggregate | + | |
| - | |MLA/2026/00248\\ Submitted|Application - Construction | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00258\\ Submitted|Application - Maintenance of existing | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00263\\ Submitted|Application - Other deposits|South | + | |
| - | |MLA/2026/00270\\ Submitted|Application - Decommissioning | + | |
| - | |MLA/2026/00278\\ Submitted|Application - Navigational | + | |
| - | |MLA/2026/00288\\ Submitted|Application - Other deposits|Tees Estuary Edges - Phase 2| |Tees Rivers Charitable Trust|01 Jun 2026| | + | |
| - | |MLA/2026/00290\\ Submitted|Application - Construction | + | |
| - | |MLA/2026/00149\\ Submitted|Application - Construction of new works|Sedgeletch Outfall| |Avove Utilites|13 Mar 2026| | + | |
| - | |MLA/2026/00176\\ Submitted|Application - Construction | + | |
| - | |MLA/2026/00228\\ Submitted|Application - Maintenance of existing | + | |
| - | |MLA/2026/00243\\ Submitted|Application - Aggregate dredging| Sampling|Area 407| |Cemex Uk Marine Ltd|27 Apr 2026| | + | |
| - | |MLA/2026/00261\\ Submitted|Application - Disposal of dredged material| | + | |
| - | |MLA/2026/00270\\ Submitted|Application - Decommissioning of works| Other deposits|CANTAT 3 Segment F4 & UK GERMANY 6 Cable Decommissioning| |British Telecom-Braham St|20 May 2026| | + | |
| - | |MLA/2026/00288\\ Submitted|Application - Other deposits|Tees Estuary Edges - Phase 2| |Tees Rivers Charitable Trust|01 Jun 2026| | + | |
| - | |MLA/ | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00309\\ Submitted|Application - Maintenance of existing | + | |
| - | |MLA/ | + | |
| - | |MLA/ | + | |
| - | |MLA/ | + | |
| - | |MLA/ | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00304\\ Submitted|Application - Maintenance of existing | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00309\\ Submitted|Application - Maintenance of existing | + | |
| - | |MLA/2026/00313\\ Submitted|Application - Construction | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00322\\ Submitted|Application - Disposal | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00332\\ Submitted|Application - Construction | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00355\\ Submitted|Application - Construction | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00366\\ Submitted|Application - Maintenance of existing | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00385\\ Submitted|Application - Construction | + | |
| - | |MLA/ | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00228\\ Submitted|Application - Maintenance of existing | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00261\\ Submitted|Application - Disposal | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00288\\ Submitted|Application - Other deposits|Tees Estuary Edges - Phase 2| |Tees Rivers Charitable Trust|01 Jun 2026| | + | |
| - | |MLA/ | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00309\\ Submitted|Application - Maintenance | + | |
| - | |MLA/2026/00322\\ Submitted|Application - Disposal | + | |
| - | |MLA/ | + | |
| - | |MLA/2026/00355\\ Submitted|Application - Construction | + | |
| - | |MLA/2026/00365\\ Submitted|Application - Other deposits|Southwest Water Torbay ADCP|Inner North| Outer North| Outer South| Inner South|Partrac | + | |
| - | |MLA/ | + | |
| </ | </ | ||
| [[mmo_-_marine_licences_public_register]] | [[mmo_-_marine_licences_public_register]] | ||
mmo_-_mlas_-_2026.txt · Last modified: by nefcadmin