| "1.2 PD Teesport Limited undertakes maintenance dredging of the Tees Estuary and Hartlepool Channel to maintain navigable depths as part of their statutory harbour authority responsibilities. Under marine licence L/ | "1.2 PD Teesport Limited undertakes maintenance dredging of the Tees Estuary and Hartlepool Channel to maintain navigable depths as part of their statutory harbour authority responsibilities. Under marine licence L/ | ||
| - | The MMO and Cefas considered that 31 samples were sufficient for the annual disposal of the stated 2, | + | The MMO and Cefas considered that 31 samples were sufficient for the annual disposal of the stated 2, |
| "1.1 This advice relates to sampling to support mid-licence condition compliance for the disposal of material from the Tees Estuary and Hartlepool Channel. It is understood that this advice will also be used to support the submission of a marine licence application in 2025 to continue disposal activities." | "1.1 This advice relates to sampling to support mid-licence condition compliance for the disposal of material from the Tees Estuary and Hartlepool Channel. It is understood that this advice will also be used to support the submission of a marine licence application in 2025 to continue disposal activities." | ||
| Line 72: | Line 72: | ||
| |**Total Licence Volume**|22, | |**Total Licence Volume**|22, | ||
| - | Paragraph 2.2 licence L/2025/0 almost quotes OSPAR Agreement 2014-06 paragraph 5.3, but it inverts it so that rather than the samples needing to represent the area sampled it is stated they should represent the volume sampled instead and just reflect the area. | + | Paragraph 2.2 licence |
| "2.2 In accordance with the recommendations of the OSPAR Guidelines for the Management of Dredged Material, samples should be taken to provide a good representation of the volume of material to be dredged. The distribution and depth of sampling should reflect the size and depth of the area to be dredged, the amount to be dredged and the expected variability in the horizontal and vertical distribution of contaminants. The MMO also uses the OSPAR guidelines to inform our advice on sampling requirements for other activities which are likely to lead to the mobilisation of sediments. Based on the information submitted (as described above), the following sampling and analysis is required." | "2.2 In accordance with the recommendations of the OSPAR Guidelines for the Management of Dredged Material, samples should be taken to provide a good representation of the volume of material to be dredged. The distribution and depth of sampling should reflect the size and depth of the area to be dredged, the amount to be dredged and the expected variability in the horizontal and vertical distribution of contaminants. The MMO also uses the OSPAR guidelines to inform our advice on sampling requirements for other activities which are likely to lead to the mobilisation of sediments. Based on the information submitted (as described above), the following sampling and analysis is required." | ||
| Line 78: | Line 78: | ||
| ==== Spatial Representation Required to Comply Correctly with OSPAR Guidelines ==== | ==== Spatial Representation Required to Comply Correctly with OSPAR Guidelines ==== | ||
| - | There are 2 distinct areas which PD Ports as the statutory harbour authority are responsible for. The River Tees where the defined area is 1612.66 hectares | + | There are 2 distinct areas which PD Ports as the statutory harbour authority are responsible for the River Tees and the Port of Hartlepool. |
| - | Using the area of 16685800m< | + | {{ : |
| + | |||
| + | |||
| + | === MLA/ | ||
| + | |||
| + | In this marine licence application, | ||
| + | |||
| + | From the [[this> | ||
| |**Area m< | |**Area m< | ||
| Line 87: | Line 94: | ||
| |**16685800**|**839**| | |**16685800**|**839**| | ||
| - | These figures are based on the map supplied by PD Ports to define the area they want to dredge in, which defines the whole river and port areas, as such 839 samples are required | + | These figures are based on the map supplied by PD Ports to define the area they want to dredge in, which defines the whole river and port areas, as such 839 stations would have been required. |
| + | |||
| + | {{ : | ||
| + | |||
| + | === MLA/ | ||
| + | |||
| + | In this marine | ||
| + | |||
| + | From the [[this> | ||
| |**Area m< | |**Area m< | ||
| |**< | |**< | ||
| |**Subsequent 100, | |**Subsequent 100, | ||
| - | |**3337160**|**172**| | + | |**12171400**|**614**| |
| + | |||
| + | These figures are based on the map supplied by PD Ports to define the area they want to dredge in, which defines the whole river and port areas, as such 614 stations would be required. | ||
| + | |||
| + | It is obvious that in order for the L/ | ||
| + | |||
| + | ===== Interactive Calculator ===== | ||
| + | |||
| + | OSPAR 2014-06 paragraph 5.3: "Where projected depth of dredging is significant, | ||
| - | The correct area which reflects both the dredging | + | This is well reflected in the number of samples calculated based on these tables, where dredging |
| - | However, it is obvious that in order for the L/2025/00366 to be in compliance with the OSPAR Convention that considerably more samples need to be obtained to " | + | {{url> |