ospar_sampling_guidelines
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| ospar_sampling_guidelines [2025/12/03 22:17] – [Spatial Representation Required to Comply Correctly with OSPAR Guidelines] nefcadmin | ospar_sampling_guidelines [2026/01/07 21:05] (current) – [Interactive Calculator] nefcadmin | ||
|---|---|---|---|
| Line 62: | Line 62: | ||
| "1.2 PD Teesport Limited undertakes maintenance dredging of the Tees Estuary and Hartlepool Channel to maintain navigable depths as part of their statutory harbour authority responsibilities. Under marine licence L/ | "1.2 PD Teesport Limited undertakes maintenance dredging of the Tees Estuary and Hartlepool Channel to maintain navigable depths as part of their statutory harbour authority responsibilities. Under marine licence L/ | ||
| - | The MMO and Cefas considered that 31 samples were sufficient for the annual disposal of the stated 2, | + | The MMO and Cefas considered that 31 samples were sufficient for the annual disposal of the stated 2, |
| "1.1 This advice relates to sampling to support mid-licence condition compliance for the disposal of material from the Tees Estuary and Hartlepool Channel. It is understood that this advice will also be used to support the submission of a marine licence application in 2025 to continue disposal activities." | "1.1 This advice relates to sampling to support mid-licence condition compliance for the disposal of material from the Tees Estuary and Hartlepool Channel. It is understood that this advice will also be used to support the submission of a marine licence application in 2025 to continue disposal activities." | ||
| Line 78: | Line 78: | ||
| ==== Spatial Representation Required to Comply Correctly with OSPAR Guidelines ==== | ==== Spatial Representation Required to Comply Correctly with OSPAR Guidelines ==== | ||
| - | There are 2 distinct areas which PD Ports as the statutory harbour authority are responsible for. The River Tees where the defined area is 1612.66 hectares | + | There are 2 distinct areas which PD Ports as the statutory harbour authority are responsible for the River Tees and the Port of Hartlepool. |
| - | Using the area of 16685800m< | + | {{ : |
| + | |||
| + | |||
| + | === MLA/ | ||
| + | |||
| + | In this marine licence application, | ||
| + | |||
| + | From the [[this> | ||
| |**Area m< | |**Area m< | ||
| Line 87: | Line 94: | ||
| |**16685800**|**839**| | |**16685800**|**839**| | ||
| - | These figures are based on the map supplied by PD Ports to define the area they want to dredge in, which defines the whole river and port areas, as such 839 stations would be required. | + | These figures are based on the map supplied by PD Ports to define the area they want to dredge in, which defines the whole river and port areas, as such 839 stations would have been required. |
| + | |||
| + | {{ : | ||
| + | |||
| + | === MLA/ | ||
| + | |||
| + | In this marine licence application, | ||
| + | |||
| + | From the [[this> | ||
| + | |||
| + | |**Area m< | ||
| + | |**< | ||
| + | |**Subsequent 100, | ||
| + | |**12171400**|**614**| | ||
| + | |||
| + | These figures are based on the map supplied by PD Ports to define the area they want to dredge in, which defines the whole river and port areas, as such 614 stations would be required. Less than 150 samples were taken in during the 10 years of the previous licence L/ | ||
| It is obvious that in order for the L/ | It is obvious that in order for the L/ | ||
| + | |||
| + | ===== Interactive Calculator ===== | ||
| + | |||
| + | OSPAR 2014-06 paragraph 5.3: "Where projected depth of dredging is significant, | ||
| + | |||
| + | This is well reflected in the number of samples calculated based on these tables, where dredging more than 5m depths shows that the volume table recommends a greater number of samples than the area station numbers. | ||
| + | |||
| + | {{url> | ||