ospar_sampling_guidelines
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| ospar_sampling_guidelines [2025/12/18 23:57] – [Spatial Representation Required to Comply Correctly with OSPAR Guidelines] nefcadmin | ospar_sampling_guidelines [2026/01/07 21:05] (current) – [Interactive Calculator] nefcadmin | ||
|---|---|---|---|
| Line 79: | Line 79: | ||
| There are 2 distinct areas which PD Ports as the statutory harbour authority are responsible for the River Tees and the Port of Hartlepool. | There are 2 distinct areas which PD Ports as the statutory harbour authority are responsible for the River Tees and the Port of Hartlepool. | ||
| + | |||
| + | {{ : | ||
| + | |||
| === MLA/ | === MLA/ | ||
| Line 91: | Line 94: | ||
| |**16685800**|**839**| | |**16685800**|**839**| | ||
| - | These figures are based on the map supplied by PD Ports to define the area they want to dredge in, which defines the whole river and port areas, as such 839 stations would have been required. | + | These figures are based on the map supplied by PD Ports to define the area they want to dredge in, which defines the whole river and port areas, as such 839 stations would have been required. |
| + | |||
| + | {{ : | ||
| === MLA/ | === MLA/ | ||
| Line 104: | Line 109: | ||
| |**12171400**|**614**| | |**12171400**|**614**| | ||
| - | These figures are based on the map supplied by PD Ports to define the area they want to dredge in, which defines the whole river and port areas, as such 614 stations would be required. | + | These figures are based on the map supplied by PD Ports to define the area they want to dredge in, which defines the whole river and port areas, as such 614 stations would be required. Less than 150 samples were taken in during the 10 years of the previous licence L/ |
| It is obvious that in order for the L/ | It is obvious that in order for the L/ | ||
| + | ===== Interactive Calculator ===== | ||
| + | |||
| + | OSPAR 2014-06 paragraph 5.3: "Where projected depth of dredging is significant, | ||
| + | |||
| + | This is well reflected in the number of samples calculated based on these tables, where dredging more than 5m depths shows that the volume table recommends a greater number of samples than the area station numbers. | ||
| + | {{url> | ||
ospar_sampling_guidelines.1766102261.txt.gz · Last modified: by nefcadmin
