User Tools

Site Tools


ospar_sampling_guidelines

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
ospar_sampling_guidelines [2025/12/18 23:57] – [Spatial Representation Required to Comply Correctly with OSPAR Guidelines] nefcadminospar_sampling_guidelines [2026/01/07 21:05] (current) – [Interactive Calculator] nefcadmin
Line 79: Line 79:
  
 There are 2 distinct areas which PD Ports as the statutory harbour authority are responsible for the River Tees and the Port of Hartlepool. There are 2 distinct areas which PD Ports as the statutory harbour authority are responsible for the River Tees and the Port of Hartlepool.
 +
 +{{ :251217mla_2015_00088-all10yearsamples.png?400 |All sampling locations during 10 year duration of MLA/2015/00088}}
 +
  
 === MLA/2015/00088 === === MLA/2015/00088 ===
Line 91: Line 94:
 |**16685800**|**839**| |**16685800**|**839**|
  
-These figures are based on the map supplied by PD Ports to define the area they want to dredge in, which defines the whole river and port areas, as such 839 stations would have been required.+These figures are based on the map supplied by PD Ports to define the area they want to dredge in, which defines the whole river and port areas, as such 839 stations would have been required.  In the whole 10 years of the L/2015/00427 less than 150 samples were taken at the locations shown in the figure above. 
 + 
 +{{ :251217mla_2025_00263-applicationsamples.png?400 |31 Samples from MLA/2015/00088 mid-licence sampling accepted as application samples}}
  
 === MLA/2025/00263 === === MLA/2025/00263 ===
Line 104: Line 109:
 |**12171400**|**614**| |**12171400**|**614**|
  
-These figures are based on the map supplied by PD Ports to define the area they want to dredge in, which defines the whole river and port areas, as such 614 stations would be required.+These figures are based on the map supplied by PD Ports to define the area they want to dredge in, which defines the whole river and port areas, as such 614 stations would be required.  Less than 150 samples were taken in during the 10 years of the previous licence L/2015/00427 for the licensed area of 1,669hectares and the last mid-licence samples were consider appropriate to represent the state of the whole 1,217hectares for which a new licence was requested.
  
 It is obvious that in order for the L/2025/00366 to be in compliance with the OSPAR Convention that considerably more samples need to be obtained to "represent the horizontal and vertical extent of the area" with a subsequent check that "the quantity of material to be dredged" is also properly represented." (OSPAR Agreement 2014-06 paragraph 5.2). It is obvious that in order for the L/2025/00366 to be in compliance with the OSPAR Convention that considerably more samples need to be obtained to "represent the horizontal and vertical extent of the area" with a subsequent check that "the quantity of material to be dredged" is also properly represented." (OSPAR Agreement 2014-06 paragraph 5.2).
  
 +===== Interactive Calculator =====
 +
 +OSPAR 2014-06 paragraph 5.3: "Where projected depth of dredging is significant, samples will be required at depth, usually by vibracore. The volume of the dredge material should be taken into consideration to determine the number of samples, as below."
 +
 +This is well reflected in the number of samples calculated based on these tables, where dredging more than 5m depths shows that the volume table recommends a greater number of samples than the area station numbers.
  
 +{{url>https://northeastfc.uk/Tools/OSPAR-NumberStationSampleCalculator.html 100%,5000}}
ospar_sampling_guidelines.1766102261.txt.gz · Last modified: by nefcadmin