User Tools

Site Tools


ospar_sampling_guidelines

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
ospar_sampling_guidelines [2026/01/07 21:02] – [Spatial Representation Required to Comply Correctly with OSPAR Guidelines] nefcadminospar_sampling_guidelines [2026/01/07 21:05] (current) – [Interactive Calculator] nefcadmin
Line 114: Line 114:
  
 ===== Interactive Calculator ===== ===== Interactive Calculator =====
 +
 +OSPAR 2014-06 paragraph 5.3: "Where projected depth of dredging is significant, samples will be required at depth, usually by vibracore. The volume of the dredge material should be taken into consideration to determine the number of samples, as below."
 +
 +This is well reflected in the number of samples calculated based on these tables, where dredging more than 5m depths shows that the volume table recommends a greater number of samples than the area station numbers.
  
 {{url>https://northeastfc.uk/Tools/OSPAR-NumberStationSampleCalculator.html 100%,5000}} {{url>https://northeastfc.uk/Tools/OSPAR-NumberStationSampleCalculator.html 100%,5000}}
ospar_sampling_guidelines.1767819733.txt.gz · Last modified: by nefcadmin