User Tools

Site Tools


cefas_-_action_levels

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
cefas_-_action_levels [2024/07/05 14:47] nefcadmincefas_-_action_levels [2024/07/05 14:49] (current) nefcadmin
Line 10: Line 10:
 In general, contaminant levels in dredged material below Action Level 1 are of no concern and are unlikely to influence the licensing decision. However, dredged material with contaminant levels above Action Level 2 is generally considered unsuitable for sea disposal. The latter situation most often applies only to a part of a proposed dredging area and so that area can be excluded from disposal at sea and disposed of by other routes e.g. landfill. Dredged material with contaminant levels between Action Levels 1 and 2 requires further consideration and testing before a decision can be made. In general, contaminant levels in dredged material below Action Level 1 are of no concern and are unlikely to influence the licensing decision. However, dredged material with contaminant levels above Action Level 2 is generally considered unsuitable for sea disposal. The latter situation most often applies only to a part of a proposed dredging area and so that area can be excluded from disposal at sea and disposed of by other routes e.g. landfill. Dredged material with contaminant levels between Action Levels 1 and 2 requires further consideration and testing before a decision can be made.
 ===== ACTION LEVELS ===== ===== ACTION LEVELS =====
-|Contaminant / Compound|Action Level 1|Action Level 2| +|Contaminant / Compound|Action Level 1|Action Level 2| 
-|r 3 mg/kg Dry Weight (ppm)|+|mg/kg Dry Weight (ppm)|
 |As|20|100| |As|20|100|
 |Hg|0.3|3| |Hg|0.3|3|
cefas_-_action_levels.1720190856.txt.gz · Last modified: by nefcadmin