Both sides previous revisionPrevious revision | |
r-2019-0427-ffm-officer_report [2024/04/02 20:04] – [RECOMMENDATION] nefcadmin | r-2019-0427-ffm-officer_report [2024/04/03 13:43] (current) – external edit 127.0.0.1 |
---|
| |
The application has been accompanied by plans and cross-sections of the storage sites, and the following documents; | The application has been accompanied by plans and cross-sections of the storage sites, and the following documents; |
* [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-201920%20Ecology%20report%20final.pdf|Ecology Report]] | * [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-201920 Ecology report final.pdf|Ecology Report]] |
* [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-60686_01%20-%20Planning%20Statement%20-%2028.06.19.pdf|Planning Statement]] | * [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-60686_01 - Planning Statement - 28.06.19.pdf|Planning Statement]] |
* [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-TN-WM-0001_S2_P01.3%20Soil%20Stockpiling%20Outline%20and%20Regulatory%20Regime.PDF|Technical Note]] | * [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-TN-WM-0001_S2_P01.3 Soil Stockpiling Outline and Regulatory Regime.PDF|Technical Note]] |
* [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|Remediation Strategy]] | * [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf|Remediation Strategy]] |
* [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf|FRA and Drainage Strategy]] | * [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf|FRA and Drainage Strategy]] |
| |
• British Steel support the application subject to some specific comments relating to dust emissions, contamination and traffic | • British Steel support the application subject to some specific comments relating to dust emissions, contamination and traffic |
==== Natural England - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-R_2019_0427_FFM%20-%20Natural%20England.pdf|response]] ==== | ==== Natural England - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-R_2019_0427_FFM - Natural England.pdf|response]] ==== |
| |
No objection - Based on the plans submitted, Natural England considers that the proposed development will not have significant adverse impacts on designated sites and has no objection. | No objection - Based on the plans submitted, Natural England considers that the proposed development will not have significant adverse impacts on designated sites and has no objection. |
==== Environment Agency - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-R%202019%200427%20FFM%208%208%202019.pdf|response]] ==== | ==== Environment Agency - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-R 2019 0427 FFM 8 8 2019.pdf|response]] ==== |
| |
The proposed application will only meet the National Planning Policy Framework’s requirements if the following planning condition is included. | The proposed application will only meet the National Planning Policy Framework’s requirements if the following planning condition is included. |
Condition | Condition |
| |
The work will be carried out in accordance with the submitted flood risk assessment and drainage strategy ([[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf|June 2019, Wood]]) and consistent with the layout identified in [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SCW-XX-PLA-0002%20Materials%20Storage%20Site%20Location%20Plan%20with%20mounds.PDF|STDC-SCW-XX-PLA-0002 Materials Storage Site Location Plan with mounds]]. | The work will be carried out in accordance with the submitted flood risk assessment and drainage strategy ([[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OW-0001_A_P01.pdf|June 2019, Wood]]) and consistent with the layout identified in [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SCW-XX-PLA-0002 Materials Storage Site Location Plan with mounds.PDF|STDC-SCW-XX-PLA-0002 Materials Storage Site Location Plan with mounds]]. |
| |
The storage mounds must be sited exclusively in Flood Zone 1 | The storage mounds must be sited exclusively in Flood Zone 1 |
| |
No objection | No objection |
==== Redcar and Cleveland Borough Council (Local Lead Flood Authority) - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-LLFA%20comments.pdf|response]] ==== | ==== Redcar and Cleveland Borough Council (Local Lead Flood Authority) - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-LLFA comments.pdf|response]] ==== |
| |
//The LLFA would offer no objection to the proposed development, as the proposed Surface Water Drainage Strategy accords with the requirements of Policy SD7. The LLFA would request the following documents be deemed 'approved documents', to ensure compliance accordingly.// | //The LLFA would offer no objection to the proposed development, as the proposed Surface Water Drainage Strategy accords with the requirements of Policy SD7. The LLFA would request the following documents be deemed 'approved documents', to ensure compliance accordingly.// |
| |
//REASON: In the interests of neighbour amenity and maintaining good Air Quality// | //REASON: In the interests of neighbour amenity and maintaining good Air Quality// |
==== Redcar and Cleveland Borough Council (Business and Employment Growth Team) - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-Consultee%20Response%20Employment%20Growth.pdf|response]] ==== | ==== Redcar and Cleveland Borough Council (Business and Employment Growth Team) - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-Consultee Response Employment Growth.pdf|response]] ==== |
| |
//Thanks for sending this planning application through. We are supportive of the proposal in terms of preparing the former steel site for future investment and would request the contractor use local labour and supply content on this contract wherever possible. Support for this can be provided via Grangetown Training and Recruitment Hub on 01642 459035 or email grangetownproject@redcar-cleveland.gov.uk// | //Thanks for sending this planning application through. We are supportive of the proposal in terms of preparing the former steel site for future investment and would request the contractor use local labour and supply content on this contract wherever possible. Support for this can be provided via Grangetown Training and Recruitment Hub on 01642 459035 or email grangetownproject@redcar-cleveland.gov.uk// |
For the reasons outlined above the proposal is considered acceptable. The development would not have a significant adverse impact on neighbour amenity and the proposal raises no issues in terms of highways safety or crime prevention. The scale and design is acceptable and the proposal would respect the character of the site and surroundings. The proposal accords with policies SD3 SD4 SD7 LS4 N1 N2 and N4 of the Redcar and Cleveland Local Plan. | For the reasons outlined above the proposal is considered acceptable. The development would not have a significant adverse impact on neighbour amenity and the proposal raises no issues in terms of highways safety or crime prevention. The scale and design is acceptable and the proposal would respect the character of the site and surroundings. The proposal accords with policies SD3 SD4 SD7 LS4 N1 N2 and N4 of the Redcar and Cleveland Local Plan. |
===== RECOMMENDATION ===== | ===== RECOMMENDATION ===== |
| |
{{this>DieOff/211005a-Thumb.jpg}} | |
| |
Taking into account the content of the report the recommendation is to: | Taking into account the content of the report the recommendation is to: |
2. The development hereby permitted shall be carried out in accordance with the following approved plans: | 2. The development hereby permitted shall be carried out in accordance with the following approved plans: |
| |
Drawing No. STDC-SCW-XX-PLA-0001 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SCW-XX-PLA-0001%20Materials%20Storage%20-%20Site%20Location%20Plan.PDF|Materials storage site location plan]] | Drawing No. STDC-SCW-XX-PLA-0001 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SCW-XX-PLA-0001 Materials Storage - Site Location Plan.PDF|Materials storage site location plan]] |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SCW-XX-PLA-0001 Materials Storage - Site Location Plan.JPG-1.jpg}} | {{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SCW-XX-PLA-0001 Materials Storage - Site Location Plan.JPG-1.jpg}} |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SCW-XX-PLA-0001%20Materials%20Storage%20-%20Site%20Location%20Plan.JPG-1.jpg}} | Drawing No. STDC-SCW-XX-PLA-0002 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SCW-XX-PLA-0002 Materials Storage Site Location Plan with mounds.PDF|STDC-SCW-XX-PLA-0002 Materials Storage Site Location Plan with mounds]] |
| |
Drawing No. STDC-SCW-XX-PLA-0002 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SCW-XX-PLA-0002%20Materials%20Storage%20Site%20Location%20Plan%20with%20mounds.PDF|STDC-SCW-XX-PLA-0002 Materials Storage Site Location Plan with mounds]] | |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SCW-XX-PLA-0002%20Materials%20Storage%20Site%20Location%20Plan%20with%20mounds.JPG-1.jpg}} | {{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SCW-XX-PLA-0002 Materials Storage Site Location Plan with mounds.JPG-1.jpg}} |
| |
Drawing No. STDC-NEZ-WA-PLA-0006 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0006%20Warrenby%20CLE%2031%20Area%20Site%20Plan.PDF|plan]] | Drawing No. STDC-NEZ-WA-PLA-0006 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0006 Warrenby CLE 31 Area Site Plan.PDF|plan]] |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0006%20Warrenby%20CLE%2031%20Area%20Site%20Plan.JPG-1.jpg}} | {{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0006 Warrenby CLE 31 Area Site Plan.JPG-1.jpg}} |
| |
Drawing No. STDC-SIZ-MR-PLA-0004 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-MR-PLA-0004%20Metals%20Recovery%20Site%20Plan.PDF|Metals recovery site plan]] | Drawing No. STDC-SIZ-MR-PLA-0004 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-MR-PLA-0004 Metals Recovery Site Plan.PDF|Metals recovery site plan]] |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-MR-PLA-0004%20Metals%20Recovery%20Site%20Plan.JPG-1.jpg}} | {{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-MR-PLA-0004 Metals Recovery Site Plan.JPG-1.jpg}} |
| |
Drawing No. STDC-SIZ-GP-PLA-0007 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0007%20Grangetown%20Prairie%20Site%20Plan.PDF|Grangetown Prairie site plan]] | Drawing No. STDC-SIZ-GP-PLA-0007 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0007 Grangetown Prairie Site Plan.PDF|Grangetown Prairie site plan]] |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0007%20Grangetown%20Prairie%20Site%20Plan.JPG-1.jpg}} | {{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0007 Grangetown Prairie Site Plan.JPG-1.jpg}} |
| |
Drawing No. STDC-NEZ-WA-PLA-0005 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0005%20Warrenby%20proposed%20use%20levels.PDF|Warrenby Proposed Use Levels]] | Drawing No. STDC-NEZ-WA-PLA-0005 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0005 Warrenby proposed use levels.PDF|Warrenby Proposed Use Levels]] |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0005%20Warrenby%20proposed%20use%20levels.JPG-1.jpg}} | {{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0005 Warrenby proposed use levels.JPG-1.jpg}} |
| |
Drawing No. STDC-SIZ-LA-PLA-0001 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-LA-PLA-0001%20Lackenby%20proposed%20use%20levels.PDF|Lackenby proposed use levels]] | Drawing No. STDC-SIZ-LA-PLA-0001 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-LA-PLA-0001 Lackenby proposed use levels.PDF|Lackenby proposed use levels]] |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-LA-PLA-0001%20Lackenby%20proposed%20use%20levels.JPG-1.jpg}} | {{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-LA-PLA-0001 Lackenby proposed use levels.JPG-1.jpg}} |
| |
Drawing No. STDC-SIZ-SB-PLA-0001 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-SB-PLA-0001%20South%20Bank%20proposed%20use%20levels.PDF|South Bank proposed use level]] | Drawing No. STDC-SIZ-SB-PLA-0001 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-SB-PLA-0001 South Bank proposed use levels.PDF|South Bank proposed use level]] |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-SB-PLA-0001%20South%20Bank%20proposed%20use%20levels.JPG-1.jpg}} | {{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-SB-PLA-0001 South Bank proposed use levels.JPG-1.jpg}} |
| |
Drawing No. STDC-SIZ-GP-PLA-0006 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0006%20Grangetown%20Prairie%20Proposed%20use%20-%20existing%20spot%20levels.PDF|Grangetown Prairie proposed use - existing site levels]] | Drawing No. STDC-SIZ-GP-PLA-0006 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0006 Grangetown Prairie Proposed use - existing spot levels.PDF|Grangetown Prairie proposed use - existing site levels]] |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0006%20Grangetown%20Prairie%20Proposed%20use%20-%20existing%20spot%20levels.JPG-1.jpg}} | {{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0006 Grangetown Prairie Proposed use - existing spot levels.JPG-1.jpg}} |
| |
Drawing No. STDC-NEZ-WA-PLA-0004 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0004%20Stock%20pile%203b%20details%20&%20sections.PDF|Stock pile 3b details & sections]] | Drawing No. STDC-NEZ-WA-PLA-0004 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0004 Stock pile 3b details & sections.PDF|Stock pile 3b details & sections]] |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0004%20Stock%20pile%203b%20details%20&%20sections.JPG-1.jpg}} | {{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0004 Stock pile 3b details & sections.JPG-1.jpg}} |
| |
Drawing No. STDC-NEZ-WA-PLA-0003 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0003%20Stock%20pile%203a%20details%20&%20sections.PDF|Stock pile 3a details & sections]] | Drawing No. STDC-NEZ-WA-PLA-0003 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0003 Stock pile 3a details & sections.PDF|Stock pile 3a details & sections]] |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0003%20Stock%20pile%203a%20details%20&%20sections.JPG-1.jpg}} | {{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0003 Stock pile 3a details & sections.JPG-1.jpg}} |
| |
Drawing No. STDC-SIZ-GP-PLA-0005 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0005%20Stockpile%201c.PDF|Stockpile 1c]] | Drawing No. STDC-SIZ-GP-PLA-0005 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0005 Stockpile 1c.PDF|Stockpile 1c]] |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0005%20Stockpile%201c.JPG-1.jpg}} | {{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0005 Stockpile 1c.JPG-1.jpg}} |
| |
Drawing No. STDC-SIZ-GP-PLA-0004 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0004%20Stockpile%201b.PDF|Stockpile 1b]] | Drawing No. STDC-SIZ-GP-PLA-0004 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0004 Stockpile 1b.PDF|Stockpile 1b]] |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0004%20Stockpile%201b.JPG-1.jpg}} | {{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0004 Stockpile 1b.JPG-1.jpg}} |
| |
Drawing No. STDC-SIZ-GP-PLA-0003 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0003%20Stockpile%201a.PDF|Stockpile 1a]] | Drawing No. STDC-SIZ-GP-PLA-0003 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0003 Stockpile 1a.PDF|Stockpile 1a]] |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0003%20Stockpile%201a.JPG-1.jpg}} | {{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0003 Stockpile 1a.JPG-1.jpg}} |
| |
Drawing No. STDC-SIZ-MR-PLA-0003 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-MR-PLA-0003%20Metals%20Recovery%20Stock%20pile%202%20Contours%20&%20Sections.PDF|Metals Recovery Stock pile 2 countours & sections]] | Drawing No. STDC-SIZ-MR-PLA-0003 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-MR-PLA-0003 Metals Recovery Stock pile 2 Contours & Sections.PDF|Metals Recovery Stock pile 2 countours & sections]] |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-MR-PLA-0003%20Metals%20Recovery%20Stock%20pile%202%20Contours%20&%20Sections.JPG-1.jpg}} | {{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-MR-PLA-0003 Metals Recovery Stock pile 2 Contours & Sections.JPG-1.jpg}} |
| |
Drawing No. STDC-SIZ-WA-PLA-0001 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0001%20Warrenby%20CLE31%20Existing%20contours%20and%20long%20sections.PDF|Warrenby CLE31 existing contours & long sections]] | Drawing No. STDC-SIZ-WA-PLA-0001 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0001 Warrenby CLE31 Existing contours and long sections.PDF|Warrenby CLE31 existing contours & long sections]] |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0001%20Warrenby%20CLE31%20Existing%20contours%20and%20long%20sections.JPG-1.jpg}} | {{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0001 Warrenby CLE31 Existing contours and long sections.JPG-1.jpg}} |
| |
Drawing No. STDC-SIZ-MR-PLA-0001 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-MR-PLA-0001%20Metals%20Recovery%20Existing%20Long%20Section.PDF|Metals Recovery existing long section]] | Drawing No. STDC-SIZ-MR-PLA-0001 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-MR-PLA-0001 Metals Recovery Existing Long Section.PDF|Metals Recovery existing long section]] |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-MR-PLA-0001%20Metals%20Recovery%20Existing%20Long%20Section.JPG-1.jpg}} | {{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-MR-PLA-0001 Metals Recovery Existing Long Section.JPG-1.jpg}} |
| |
Drawing No. STDC-SIZ-GP-PLA-0001 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0001-%20Grangetown%20Prairie%20Existing%20Contours.PDF|Grangetown Prairie existing contours]] | Drawing No. STDC-SIZ-GP-PLA-0001 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0001- Grangetown Prairie Existing Contours.PDF|Grangetown Prairie existing contours]] |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0001-%20Grangetown%20Prairie%20Existing%20Contours.JPG-1.jpg}} | {{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0001- Grangetown Prairie Existing Contours.JPG-1.jpg}} |
| |
Drawing No. STDC-SIZ-WA-PLA-0002 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0002%20Warrenby%20CLE31%20Existing%20cross%20sections.PDF|Warrenby CLE31 existing cross sections]] | Drawing No. STDC-SIZ-WA-PLA-0002 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0002 Warrenby CLE31 Existing cross sections.PDF|Warrenby CLE31 existing cross sections]] |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0002%20Warrenby%20CLE31%20Existing%20cross%20sections.JPG-1.jpg}} | {{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-NEZ-WA-PLA-0002 Warrenby CLE31 Existing cross sections.JPG-1.jpg}} |
| |
Drawing No. STDC-SIZ-MR-PLA-0002 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-MR-PLA-0002%20Metals%20Recovery%20Existing%20Cross%20Sections.PDF|Metals Recovery existing cross sections]] | Drawing No. STDC-SIZ-MR-PLA-0002 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-MR-PLA-0002 Metals Recovery Existing Cross Sections.PDF|Metals Recovery existing cross sections]] |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-MR-PLA-0002%20Metals%20Recovery%20Existing%20Cross%20Sections.JPG-1.jpg}} | {{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-MR-PLA-0002 Metals Recovery Existing Cross Sections.JPG-1.jpg}} |
| |
Drawing No. STDC-SIZ-GP-PLA-0002 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0002%20-%20Grangetown%20Prairie%20Cross%20Sections.PDF|Grangetown Prairie cross sections]] | Drawing No. STDC-SIZ-GP-PLA-0002 received by the Local Planning Authority on 01/07/19 - [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0002 - Grangetown Prairie Cross Sections.PDF|Grangetown Prairie cross sections]] |
| |
{{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0002%20-%20Grangetown%20Prairie%20Cross%20Sections.JPG-1.jpg}} | {{this>Teesworks/Planning/R-2019-0427-FFM/images/R-2019-0427-FFM-STDC-SIZ-GP-PLA-0002 - Grangetown Prairie Cross Sections.JPG-1.jpg}} |
| |
REASON: To accord with the terms of the planning application. | REASON: To accord with the terms of the planning application. |
REASON: In the interests of amenity | REASON: In the interests of amenity |
| |
4. The work will be carried out in accordance with the submitted flood risk assessment and drainage strategy (June 2019, wood) and consistent with the layout identified in [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SCW-XX-PLA-0002%20Materials%20Storage%20Site%20Location%20Plan%20with%20mounds.PDF|STDC-SCW-XX-PLA-0002 Materials Storage Site Location Plan with mounds]]. | 4. The work will be carried out in accordance with the submitted flood risk assessment and drainage strategy (June 2019, wood) and consistent with the layout identified in [[this>Teesworks/Planning/R-2019-0427-FFM/R-2019-0427-FFM-STDC-SCW-XX-PLA-0002 Materials Storage Site Location Plan with mounds.PDF|STDC-SCW-XX-PLA-0002 Materials Storage Site Location Plan with mounds]]. |
* The storage mounds must be sited exclusively in Flood Zone 1 | * The storage mounds must be sited exclusively in Flood Zone 1 |
| |