MMO - Marine Licences Public Register
Case Details | Project Type | Project Title | Locations | Applicant Name | Submission Date | Decision Date |
---|---|---|---|---|---|---|
MLA/2013/00002/1 - Completed | Application - Construction | Package 604 bridge replacements | Bam Nuttall Limited | 08 Jan 2013 | 14 Feb 2013 | |
MLA/2013/00004/3 - Completed | Application - Dredged Material Disposal, Dredging | Penzance Harbour Dredging | Cornwall Council | 08 Jan 2013 | 22 Oct 2014 | |
MLA/2013/00005/3 - Completed | Application - Removals (inc. Grab Samples) | Maryport South Beach, tidal deposit removals | Mr Joseph Scott-Plummer | 10 Jan 2013 | 28 Jul 2021 | |
MLA/2013/00006/1 - Completed | Application - Construction | Eastoke Point, Hayling Island Coastal Defence Scheme | Havant Borough Council | 10 Jan 2013 | 18 Jul 2013 | |
MLA/2013/00007/3 - Completed | Application - Construction | Woolwich Ferry Terminal | Briggs Marine Contractors Limited | 11 Jan 2013 | 06 Aug 2014 | |
MLA/2013/00008 - Completed | Application - Construction | DENTON WHARF FINGER PONTOON | Port Of London Limited | 14 Jan 2013 | 26 Feb 2013 | |
MLA/2013/00009 - Completed | Application - Construction | CU083 Lamplighters outfall | Wessex Water Authority | 14 Jan 2013 | 01 Feb 2013 | |
MLA/2013/00010 - Completed | Application - Removals (inc. Grab Samples) | Humber Multibeam Sonar Survey | Netsurvey Ltd. | 14 Jan 2013 | 04 Feb 2013 | |
MLA/2013/00011/1 - Completed | Application - Construction | Trevol Jetty Main Construction Licence, HMS Raleigh, Torpoint, Cornwall | Debut Services (South West) Limited | 15 Jan 2013 | 26 Jan 2015 | |
MLA/2013/00012/1 - Completed | Application - Emergency Work | Bridgend South 50530 Retaining Wall | Devon County Council | 15 Jan 2013 | 01 Feb 2013 | |
MLA/2013/00013 - Completed | Application - Emergency Work | Urgent repairs to unsafe cliffs adjacent to tourist beach | Dr Mark Sullivan | 15 Jan 2013 | 16 Jan 2013 | |
MLA/2013/00014/1 - Completed | Application - Construction | South Yard Outer Pontoons | Princess Yachts International Plc | 15 Jan 2013 | 25 Mar 2013 | |
MLA/2013/00015 - Completed | Application - Miscellaneous Disposal | Middleton Sea Outfall - Dye Tracing | United Utilities Water Plc | 21 Jan 2013 | 25 Mar 2013 | |
MLA/2013/00016 - Completed | Application - Construction | Licence for Racing Marker Buoy | Arun Yacht Club Ltd | 21 Jan 2013 | 05 Mar 2013 | |
MLA/2013/00017/1 - Completed | Application - Construction | Cobnor Point Habitat Creation Scheme | Mrs Susan Simmonite | 22 Jan 2013 | 21 Jun 2013 | |
MLA/2013/00018 - Completed | Application - Construction | Replacement Timber Groynes T1 & T2 - Southwick Beach | Shoreham Port Authority | 23 Jan 2013 | 10 Apr 2013 | |
MLA/2013/00019/6 - Completed | Application - Dredged Material Disposal, Dredging | Hythe Marine Park Maintenance Dredge Renewal | Oceanic Estates Ltd | 23 Jan 2013 | 20 Oct 2016 | |
MLA/2013/00020 - Completed | Application - Construction | Town Quay Pontoon Extension | Poole Harbour Commissioners | 24 Jan 2013 | 29 Apr 2013 | |
MLA/2013/00021 - Completed | Application - Removals (inc. Grab Samples) | Enderby Wharf Marine Boreholes | Enderby Wharf Limited | 24 Jan 2013 | 16 May 2013 | |
MLA/2013/00022 - Completed | Application - Construction, Removals (inc. Grab Samples) | Pier at North House, High Street, Yarmouth | Edra Securities Ltd | 24 Jan 2013 | 04 Apr 2013 | |
MLA/2013/00023/5 - Completed | Application - Construction | Manufacture and Placing of 100 tonne concrete wavebreakers | Devonport Royal Dockyard Limited | 28 Jan 2013 | 15 Dec 2017 | |
MLA/2013/00026/4 - Completed | Application - Renewables | Greater Gabbard - Exposed Export Cable - Approval to lay concrete mattressing | Greater Gabbard Offshore Winds Limited | 29 Jan 2013 | 15 Aug 2014 | |
MLA/2013/00028 - Completed | Application - Removals (inc. Grab Samples) | Adur Estuary Macrobenthic Survey | Environment Agency (Southern Region) | 29 Jan 2013 | 21 Mar 2013 | |
MLA/2013/00029/2 - Completed | Application - Construction, Dredged Material Disposal, Dredging | RAFYC & RSrnYC pontoon development | Royal Southern Yacht Club Limited | 29 Jan 2013 | 05 Jun 2014 | |
MLA/2013/00030 - Completed | Application - Removals (inc. Grab Samples) | Benthic Survey for Marine Minerals (MML) off the North Cornwall Coast | Marine Minerals Limited | 29 Jan 2013 | 19 Feb 2013 | |
MLA/2013/00031 - Completed | Application - Construction | Town Wall Set Back Wall and Drainage Outfall | Hartlepool Borough Council | 30 Jan 2013 | 13 Sep 2013 | |
MLA/2013/00033 - Completed | Application - Removals (inc. Grab Samples) | Sellafield - Offshore Sediment Sampling | Sellafield Limited | 30 Jan 2013 | 05 Mar 2013 | |
MLA/2013/00034 - Completed | Application - Removals (inc. Grab Samples) | Lizard Point to Dodman Point Hydrographic Survey | Netsurvey Ltd. | 30 Jan 2013 | 15 Feb 2013 | |
MLA/2013/00035 - Completed | Application - Removals (inc. Grab Samples) | Navitus Bay Wind Park - Geotechnical Investigations vibrocore acquisition 2013 Grouped under: Navitus Bay Wind Park Showing 2 of 4 cases | Eneco Round 3 Development Limited | 31 Jan 2013 | 25 Feb 2013 | |
MLA/2013/00036 - Completed | Application - Removals (inc. Grab Samples) | Scientific Research in the Western English Channel | Plymouth Marine Laboratory | 31 Jan 2013 | 04 Mar 2013 | |
MLA/2013/00037/2 - Completed | Application - Aggregate Dredging | Area 127 | Hanson Aggregates Marine Limited | 31 Jan 2013 | 12 Apr 2017 | |
MLA/2013/00038/2 - Completed | Application - Aggregate Dredging, Removals (inc. Grab Samples) | Area 127 SW Needles | Tarmac Marine Dredging Limited | 31 Jan 2013 | 09 Feb 2017 | |
MLA/2013/00039 - Completed | Application - Construction | Emergency works to beach at Arun Yacht Club | Arun Yacht Club Ltd | 01 Feb 2013 | 15 Apr 2013 | |
MLA/2013/00040/3 - Completed | Application - Aggregate Dredging | Area 137 Full Term Marine Licence Application | Cemex Uk Marine Limited | 04 Feb 2013 | 28 Feb 2017 | |
MLA/2013/00041 - Completed | Application - Construction | Barrow Long Sea Outfall - Site Investigation Grouped under: Barrow Long Sea Outfall Showing 2 of 3 cases | United Utilities Water Plc | 04 Feb 2013 | 19 Apr 2013 | |
MLA/2013/00042 - Completed | Application - Emergency Work | Clearance of sluice outfall - Naze North | Jd &Fw Eagle Farms | 05 Feb 2013 | 27 Feb 2013 | |
MLA/2013/00045/5 - Completed | Application - Alternative Use of Dredged Material, Construction, Dredging | Stabilisation of Pontoons, Zeta Berth, Instow, North Devon | Debut Services | 06 Feb 2013 | 09 Apr 2014 | |
MLA/2013/00046 - Completed | Application - Burial at Sea | Green Endings Funerals | 07 Feb 2013 | 08 Feb 2013 | ||
MLA/2013/00047 - Completed | Application - Construction | Humber Gateway Offshore Wind Farm- Met Mast | E.On Climate & Renewables Uk Limited | 08 Feb 2013 | 15 Feb 2013 | |
MLA/2013/00048 - Withdrawn | Application - Emergency Work | Removal of whale remains | Mortehoe Parish Council | 11 Feb 2013 | ||
MLA/2013/00049 - Completed | Application - Construction | Replacement of Aids to Navigation (Licence Enquiry Ref MLP/2012/00309 | Martin Wright Associates Limited | 11 Feb 2013 | 11 Apr 2013 | |
MLA/2013/00050/6 - Completed | Application - Construction | Erosion Protection Phase 3, Shotley Gate, Ipswich, Suffolk | Shotley Parish Council | 11 Feb 2013 | 15 Aug 2019 | |
MLA/2013/00051/1 - Completed | Application - Construction | REPAIR TO PILES ON SANDQUAY JETTY BRNC DARTMOUTH | Debut Services (South West) Limited | 12 Feb 2013 | 30 Apr 2013 | |
MLA/2013/00052/2 - Completed | Application - Construction | Wheatcroft Outfall Repair No. 2 | Yorkshire Water Services Limited | 12 Feb 2013 | 01 Aug 2013 | |
MLA/2013/00053 - Completed | Application - Removals (inc. Grab Samples) | Environment Agency Intertidal Grab samplking for Benthic Inverts and Contaminant | The Environment Agency | 13 Feb 2013 | 08 Mar 2013 | |
MLA/2013/00055 - Completed | Application - Construction | Trinity College, Cambridge, Loompit Lake - River Wall Maintenance | Bidwells Llp | 14 Feb 2013 | 25 Mar 2013 | |
MLA/2013/00056 - Completed | Application - Construction, Removals (inc. Grab Samples) | Repair of localised damage to a jetty. | Vopak Terminal London B.V. Limited | 14 Feb 2013 | 11 Apr 2013 | |
MLA/2013/00057 - Completed | Application - Miscellaneous Disposal | Mixing and Dispersion of Small Estuarine Plumes | Plymouth University | 14 Feb 2013 | 07 Jun 2013 | |
MLA/2013/00058 - Completed | Application - Construction | Navitus Bay Development Limited Meteorological Mast Application Grouped under: Navitus Bay Wind Park Showing 2 of 4 cases | Eneco Round 3 Development Limited | 14 Feb 2013 | 19 Jul 2013 | |
MLA/2013/00060 - Completed | Application - Construction | Millendreath outfall works | Espalier Developments | 15 Feb 2013 | 03 May 2013 | |
MLA/2013/00062 - Completed | Application - Burial at Sea | Mr David Williams | 15 Feb 2013 | 05 Mar 2013 | ||
MLA/2013/00063/1 - Completed | Application - Construction | Brixham Marina Sealift | Marina Developments Limited | 18 Feb 2013 | 04 Jul 2013 | |
MLA/2013/00064 - Completed | Application - Construction | BOW B String Cable Remedial Works | Barrow Offshore Wind Limited | 19 Feb 2013 | 26 Mar 2013 | |
MLA/2013/00065/1 - Completed | Application - Construction | Nethertown Rock Armour Sea Defence Works | Network Rail Infrastructure Limited | 19 Feb 2013 | 12 Jun 2013 | |
MLA/2013/00068 - Withdrawn | Application - Removals (inc. Grab Samples) | Seaton Sluice Harbour Dredging, Clearance and maintenance | Northumberland County Council | 20 Feb 2013 | ||
MLA/2013/00069 - Completed | Application - Construction | speed limit markers buoys beach road hopton on sea | Hopton Parish Council | 20 Feb 2013 | 04 Jun 2014 | |
MLA/2013/00071 - Completed | Application - Emergency Work | HMS Cambridge Outfall repair | South West Water Limited | 21 Feb 2013 | 28 Feb 2013 | |
MLA/2013/00072/5 - Completed | Application - Construction | Nemo Link - UK to Belgium Interconnector | Nemo Link Ltd | 21 Feb 2013 | 19 Jan 2024 | |
MLA/2013/00073 - Completed | Application - Construction | River Plym - Railway Viaduct | Bam Nuttall Limited | 22 Feb 2013 | 18 Apr 2013 | |
MLA/2013/00074 - Completed | Application - Construction | Bridlington rBWD Compliance - Connection Stub to Long Sea Outfall | Yorkshire Water Limited | 25 Feb 2013 | 22 Apr 2013 | |
MLA/2013/00075 - Completed | Application - Construction | Dinghy Park Extension | Orford Sailing Club | 25 Feb 2013 | 15 Mar 2013 | |
MLA/2013/00077 - Completed | Application - Construction | Construction of new river wall - works to the rear of 37-41 High St, Chatham | Chartway Group Limited | 26 Feb 2013 | 31 May 2013 | |
MLA/2013/00078 - Completed | Application - Construction | Crosssness River Wall - Urgent (Pease Process within 4 weeks) | Thames Water Utilities Limited | 26 Feb 2013 | 18 Apr 2013 | |
MLA/2013/00079 - Completed | Application - Construction | Portishead RNLI Lifeboat Station | Rnli | 27 Feb 2013 | 22 May 2013 | |
MLA/2013/00080/2 - Completed | Application - Construction | Strood Yacht Club Pontoon Moorings | Mr John Lambert | 27 Feb 2013 | 23 Jan 2015 | |
MLA/2013/00083/1 - Completed | Application - Construction | Proposed Piling Works, Wootton Creek, I.W. | Mr Steve Vick | 28 Feb 2013 | 31 May 2013 | |
MLA/2013/00084/2 - Completed | Application - Construction | Pontoons at South Quay, Berth 5, King's Lynn | Borough Council Of King'S Lynn & West Norfolk | 28 Feb 2013 | 08 Jul 2013 | |
MLA/2013/00085/1 - Completed | Application - Miscellaneous Disposal | Sand Movement back onto the foreshore | Cornwall Council | 01 Mar 2013 | 17 Feb 2014 | |
MLA/2013/00088/1 - Completed | Application - Removals (inc. Grab Samples) | Removal of Docking Shoal meterological mast. | Centrica Renewable Energy Limited | 01 Mar 2013 | 18 Dec 2014 | |
MLA/2013/00089 - Completed | Application - Removals (inc. Grab Samples) | Removal of lattice tower of Race Bank meterological mast. | Centrica Renewable Energy Limited | 01 Mar 2013 | 04 Apr 2013 | |
MLA/2013/00090/1 - Completed | Application - Removals (inc. Grab Samples) | HMS Boynes Cannon | Dr Douglas Mcelvogue | 04 Mar 2013 | 24 May 2013 | |
MLA/2013/00091 - Completed | Application - Construction | Hamble Bridge Outfall Aprons | Enterprisemouchel Limited | 04 Mar 2013 | 21 May 2013 | |
MLA/2013/00092/2 - Completed | Application - Dredged Material Disposal, Dredging | Trafalgar Wharf Approach Channel Maintenance Dredge | Trafalgar Wharf Limited | 05 Mar 2013 | 24 May 2016 | |
MLA/2013/00095/1 - Completed | Application - Construction | Pontoon installation River Hamble L31/L32 Grouped under: Swanwick Marina River Wall Showing 4 of 9 cases | Premier Marinas (Hamble) Limited | 07 Mar 2013 | 09 May 2014 | |
MLA/2013/00096/1 - Completed | Application - Construction | Removal of Redundant ESSO Waterside Jetty at Oulton Broad, Harbour Road, NR323LY | Esso Petroleum Company,Limited | 12 Mar 2013 | 09 Jun 2015 | |
MLA/2013/00097/3 - Completed | Application - Construction | Brighton Marina Grouped under: Brighton Marina Master Case Showing 2 of 10 cases | Midgard Ltd | 12 Mar 2013 | 27 Jul 2016 | |
MLA/2013/00098/2 - Completed | Application - Construction | Rossall and Anchorsholme Ground Investigation Works | Wyre Borough Council | 13 Mar 2013 | 19 Dec 2013 | |
MLA/2013/00099 - Completed | Application - Construction | Jetty Removal, DE Pass Wharf | Gordon Alison Ltd | 13 Mar 2013 | 04 Jun 2013 | |
MLA/2013/00101 - Withdrawn | Application - Dredging | Dredging Docklands Transfer Station | Van Oord Uk Ltd | 14 Mar 2013 | ||
MLA/2013/00102/2 - Completed | Application - Construction | Scarborough rBWD - Corner Cafe | Morgan Sindall Group Plc | 14 Mar 2013 | 08 Aug 2013 | |
MLA/2013/00103/1 - Completed | Application - Construction | Devonport Energy From Waste Plant | South West Water Limited | 15 Mar 2013 | 13 May 2014 | |
MLA/2013/00104 - Completed | Application - Construction | Eastern Breakwater Refurbishment | Falmouth Petroleum Limited | 18 Mar 2013 | 05 Jul 2013 | |
MLA/2013/00105/2 - Completed | Application - Construction | Boston Haven Site 4 sheet piled flood wall replacement | Environment Agency | 18 Mar 2013 | 17 Oct 2013 | |
MLA/2013/00106 - Completed | Application - Construction | Installation of Artwork/Sculpture in Limehouse Reach, Narrow Street, London E14 | Mr Ian Mckellen | 18 Mar 2013 | 10 May 2013 | |
MLA/2013/00108/3 - Completed | Application - Miscellaneous Disposal | Westermost Rough Offshore Wind Farm - Boulder Removal and Disposal Campaign Grouped under: Westermost Rough OWF Showing 4 of 8 cases | Westermost Rough Limited | 20 Mar 2013 | 17 Jan 2014 | |
MLA/2013/00110/2 - Completed | Application - Construction | Kingsbridge Berthing Improvements | Salcombe Harbour | 22 Mar 2013 | 21 Aug 2013 | |
MLA/2013/00111/2 - Completed | Application - Dredged Material Disposal, Dredging | Poole Harbour - In Harbour Disposal | Poole Harbour Commissioners | 22 Mar 2013 | 05 Jul 2013 | |
MLA/2013/00112/1 - Completed | Application - Construction | Repairs to Ocean Village Jetty, Southampton | Pacific Close Estates Limited | 25 Mar 2013 | 16 Aug 2013 | |
MLA/2013/00113/1 - Completed | Application - Construction | Tees Overhead Line Removal | National Grid Electricity Transmission Plc | 26 Mar 2013 | 31 Jul 2013 | |
MLA/2013/00114 - Completed | Application - Construction | South Sands pipeline repairs | South West Water Limited | 27 Mar 2013 | 14 May 2013 | |
MLA/2013/00117/1 - Completed | Application - Construction | Mevagissey Harbour Fish Jetty Extension | Mevagissey Harbour Trustees | 28 Mar 2013 | 25 Apr 2014 | |
MLA/2013/00118/2 - Completed | Application - Aggregate Dredging | Aggregate Dredging from Application Area 506 | Deme Building Materials Limited | 28 Mar 2013 | 25 Sep 2018 | |
MLA/2013/00119/2 - Completed | Application - Aggregate Dredging, Removals (inc. Grab Samples) | Area 212, 240 and 328 | Hanson Aggregates Marine Limited | 28 Mar 2013 | 13 Aug 2019 | |
MLA/2013/00120 - Completed | Application - Construction | Go Ahead Northern Bus Depot - Metrocentre | Joyce Construction & Civils Ltd | 02 Apr 2013 | 20 May 2013 | |
MLA/2013/00121 - Completed | Application - Construction | Ocean Business 2013 | Mr Keith Birch | 02 Apr 2013 | 04 Apr 2013 | |
MLA/2013/00122 - Completed | Application - Removals (inc. Grab Samples) | Tresco Channel Exploratory Excavation | Mr Kevin Camidge | 03 Apr 2013 | 27 Jun 2013 | |
MLA/2013/00123/4 - Completed | Application - Construction | Laying a Mooring bouy for 17 Port la Salle | Mr Peter Grigalis | 03 Apr 2013 | 13 May 2014 | |
MLA/2013/00124 - Completed | Application - Construction | Isle of Man Interconnector Cable - Cable Protection on Bispham beach | Manx Cable Company Limited | 03 Apr 2013 | 09 May 2013 | |
MLA/2013/00125/18 - Completed | Application - Construction | Bridlington rBWD Stormwater Long Sea Outfall | Yorkshire Water Services Ltd | 04 Apr 2013 | 24 Jun 2014 | |
MLA/2013/00126 - Completed | Application - Removals (inc. Grab Samples), Renewables | ETI Offshore Floating Wind Demonstrator Project | Wave Hub Limited | 04 Apr 2013 | 24 May 2013 | |
MLA/2013/00127/1 - Completed | Application - Emergency Work | Emergency repairs to seawall | Rfh Associates | 04 Apr 2013 | 06 Sep 2013 | |
MLA/2013/00129/1 - Completed | Application - Dredged Material Disposal, Dredging | Maintenance dredging and disposal in Bristol Harbour Area | The Bristol Port Company Limited | 05 Apr 2013 | 06 Jan 2017 | |
MLA/2013/00131/6 - Completed | Application - Dredged Material Disposal, Dredging | Tyne Maintenance Dredging | Port Of Tyne Authority | 05 Apr 2013 | 14 Sep 2022 | |
MLA/2013/00132 - Completed | Application - Construction | Pont Quay Repair Works | The National Trust | 05 Apr 2013 | 03 Jun 2013 | |
MLA/2013/00133/1 - Completed | Application - Construction | Countess Wear Bridge Maintenance Works Grouped under: Bridge Road Widening Showing 2 of 3 cases | Devon County Council | 08 Apr 2013 | 06 Jun 2013 | |
MLA/2013/00135 - Completed | Application - Construction | WALB0462 River Severn Pipe outlet repair | Amalgamated Construction Ltd | 09 Apr 2013 | 24 May 2013 | |
MLA/2013/00136/1 - Completed | Application - Construction | Workington Riverbank Protection | Connect Cndr Limited | 10 Apr 2013 | 04 Jun 2013 | |
MLA/2013/00137/1 - Completed | Application - Construction | Scour Protection to Network Rail Structure CHW2 1 | Amalgamted Construction Ltd | 11 Apr 2013 | 19 Aug 2013 | |
MLA/2013/00138 - Completed | Application - Emergency Work | Wightlink - Scour Hole Gunwharf Car Ferry Terminal Portsmouth | Wightlink Limited | 11 Apr 2013 | 11 Jul 2013 | |
MLA/2013/00139 - Completed | Application - Emergency Work | Emergency Placement of Rock Armour | Qinetiq | 12 Apr 2013 | 19 Apr 2013 | |
MLA/2013/00141/1 - Completed | Application - Alternative Use of Dredged Material | Weymouth Beach dredge and regrading | West Dorset District Council | 15 Apr 2013 | 18 Jul 2013 | |
MLA/2013/00142 - Completed | Application - Construction | Brixham Trawler Agents Ltd Ice Plant Renewal | Brixham Trawler Agents Limited | 16 Apr 2013 | 30 Jul 2013 | |
MLA/2013/00143 - Completed | Application - Construction | Eskmeals Sea Wall Reprofiling | Qinetiq Estates Limited | 17 Apr 2013 | 06 Jun 2013 | |
MLA/2013/00144 - Completed | Application - Construction | Diving and Marine Centre | Mansell | 17 Apr 2013 | 25 Jun 2013 | |
MLA/2013/00148/2 - Completed | Application - Dredged Material Disposal | Disposal of Dredged Arisings from the Lymington Lower River Approach Channel Grouped under: Lymington Harbour Dredge and Disposal Showing 2 of 3 cases | Lymington Harbour Commissioners | 18 Apr 2013 | 07 Sep 2015 | |
MLA/2013/00149 - Completed | Application - Removals (inc. Grab Samples) | Jennycliff Wall Project | Promare | 22 Apr 2013 | 17 Jul 2013 | |
MLA/2013/00151/1 - Completed | Application - Removals (inc. Grab Samples) | North Blyth Biomass Project | Res Uk & Ireland Limited | 22 Apr 2013 | 04 Sep 2013 | |
MLA/2013/00152/1 - Completed | Application - Removals (inc. Grab Samples) | Raising of brass propellor | Mr Gifford Pound | 23 Apr 2013 | 22 Aug 2013 | |
MLA/2013/00153/1 - Completed | Application - Construction | Irsha Street, Appledore | Mr Phil Wright | 24 Apr 2013 | 03 Jun 2013 | |
MLA/2013/00154/1 - Completed | Application - Construction | Countess Wear Bridge Advance Foundation Works Grouped under: Bridge Road Widening Showing 2 of 3 cases | Devon County Council | 24 Apr 2013 | 14 Jun 2013 | |
MLA/2013/00155/1 - Completed | Application - Construction | Clubb's Jetty, Gravesend | J Clubb Limited | 25 Apr 2013 | 03 Jul 2013 | |
MLA/2013/00156 - Completed | Application - Emergency Work | Nethertown Slip | J. Murphy & Sons Limited | 25 Apr 2013 | 03 May 2013 | |
MLA/2013/00157/4 - Completed | Application - Construction | South Fambridge all tide pontoon | Fambridge Yacht Haven Limited | 26 Apr 2013 | 24 Aug 2016 | |
MLA/2013/00158/2 - Completed | Application - Construction | Town Quay Radar Mast, Port of Southampton | Associated British Ports, Southampton | 26 Apr 2013 | 02 Oct 2013 | |
MLA/2013/00160 - Completed | Application - Burial at Sea | Charles Lister | 29 Apr 2013 | 02 May 2013 | ||
MLA/2013/00162 - Completed | Application - Construction | Smugglers Way Fender Maintenance | Riverside (Thames) Ltd | 30 Apr 2013 | 11 Jun 2013 | |
MLA/2013/00164 - Completed | Application - Construction, Removals (inc. Grab Samples) | Lake Lothing Swing Bridge Lowestoft | Suffolk County Council | 30 Apr 2013 | 04 Oct 2013 | |
MLA/2013/00165/1 - Completed | Application - Construction | Improvement works to harbour at Holy Island | Holy Island Of Lindisfarne Community Development Trust | 30 Apr 2013 | 04 Jun 2014 | |
MLA/2013/00166 - Completed | Application - Construction | Reinstatement of barge blocks at Standard Quay | Quayside Properties (Faversham) Ltd | 01 May 2013 | 12 Feb 2014 | |
MLA/2013/00167 - Completed | Application - Construction | Isle Of Man Interconnector Cable - Concrete Mattress Cable Protection Remedial W | Manx Cable Company Limited | 01 May 2013 | 28 Jun 2013 | |
MLA/2013/00168/1 - Completed | Application - Construction | Great Yarmouth Flood Defences 2013-2016 Phase 1 | Environment Agency | 01 May 2013 | 20 Dec 2013 | |
MLA/2013/00169/9 - Completed | Application - Construction | Teesside Wind Farm Operations and Maintenance Building | Teesside Windfarm Limited | 03 May 2013 | 30 Mar 2016 | |
MLA/2013/00170/2 - Completed | Application - Dredged Material Disposal | Maintenace Dredging at Kendalls Wharf | Kendall Bros. (Portsmouth) Limited | 03 May 2013 | 19 Nov 2015 | |
MLA/2013/00172 - Completed | Application - Removals (inc. Grab Samples) | Harwich Channel Deepening Site Investigation Grouped under: Harwich dredge and disposal Showing 3 of 9 cases | Harwich Haven Authority | 03 May 2013 | 30 Jul 2013 | |
MLA/2013/00173/1 - Completed | Application - Construction | London Gateway Western Outfall | London Gateway Port Ltd | 03 May 2013 | 15 Jul 2013 | |
MLA/2013/00174/1 - Completed | Application - Construction | Pendennis Seawall | Pendennis Shipyard Limited | 03 May 2013 | 16 Aug 2013 | |
MLA/2013/00175/1 - Completed | Application - Removals (inc. Grab Samples) | Goodwin Sands Dornier 17 Recovery Project | Royal Air Force Museum | 03 May 2013 | 10 Jun 2013 | |
MLA/2013/00176 - Completed | Application - Construction | Goshem Farm Temporary Jetty | Ingrebourne Valley Ltd | 07 May 2013 | 05 Aug 2013 | |
MLA/2013/00178/1 - Completed | Application - Construction | Jubilee Bridge, Barrow - Welfare Provision and Mechanical Upgrades | Cumbria County Council | 07 May 2013 | 31 Jan 2014 | |
MLA/2013/00179 - Completed | Application - Construction | Repairs to Mooring Dolphin | Cory Riverside | 07 May 2013 | 28 Jun 2013 | |
MLA/2013/00180/4 - Completed | Application - Dredged Material Disposal, Dredging | Corporation Wharf, Finnigan Road, Plymouth | Dredge site, LANTIC BAY (PL060) | Victoria Wharf Ltd | 08 May 2013 | 23 Dec 2015 |
MLA/2013/00182/1 - Completed | Application - Construction | Meols LSO | United Utilities Plc | 08 May 2013 | 02 May 2014 | |
MLA/2013/00184/3 - Completed | Application - Construction | Old Quay Head Ilfracombe Harbour | North Devon District Council | 09 May 2013 | 29 Jul 2014 | |
MLA/2013/00185 - Completed | Application - Burial at Sea | Mr Charles Lister | 09 May 2013 | 09 May 2013 | ||
MLA/2013/00186/2 - Completed | Application - Removals (inc. Grab Samples) | Port of Tyne - Site Investigation | Port Of Tyne Authority | 10 May 2013 | 29 Oct 2013 | |
MLA/2013/00187/5 - Completed | Application - Construction | Rossall Coastal Defence Scheme | Wyre Borough Council | 10 May 2013 | 21 Dec 2017 | |
MLA/2013/00188/1 - Completed | Application - Removals (inc. Grab Samples) | Demolition of Henley's Jetty | Homes And Communities Agency | 10 May 2013 | 22 Jul 2013 | |
MLA/2013/00189/5 - Completed | Application - Construction | Anchorsholme Coast Protection Scheme | Blackpool Borough Council | 10 May 2013 | 30 Jul 2015 | |
MLA/2013/00190 - Withdrawn | Application - Construction | Proposed Floating Pontoon at Osea Leisure Park | Osea Road Camp Sites Limited | 10 May 2013 | ||
MLA/2013/00192 - Completed | Application - Construction | Rock armour at tip of Sunderland Point | Sunderland Point Community Association | 10 May 2013 | 23 Jul 2013 | |
MLA/2013/00195 - Completed | Application - Construction | Tynemouth Haven Launch Ramp | North Tyneside Council | 15 May 2013 | 28 Aug 2013 | |
MLA/2013/00196 - Completed | Application - Construction | Dartmouth Public Slipway | South Hams District Council | 16 May 2013 | 17 May 2013 | |
MLA/2013/00197 - Completed | Application - Construction | NKL-526 scour protection | B.& M.Mchugh Limited | 17 May 2013 | 31 Jul 2013 | |
MLA/2013/00198/2 - Completed | Application - Construction | Woolwich Ferry Jetties | Concrete Repairs | 20 May 2013 | 10 Feb 2014 | |
MLA/2013/00201 - Completed | Application - Construction | Dawlish Sea Wall (D.C.D.) | Dyer & Butler Ltd | 22 May 2013 | 13 Jun 2013 | |
MLA/2013/00203 - Completed | Application - Construction | Reconstruction part garden wall for boat mooring | Andrew Reid | 22 May 2013 | 15 Jul 2013 | |
MLA/2013/00204/1 - Completed | Application - Construction | Lee Moor Tramway Bridge repair works, River Plym, Plymouth | Sustrans | 23 May 2013 | 11 Jul 2013 | |
MLA/2013/00205 - Completed | Application - Construction | Scour Protection Littlehempston MLN1-221-42.75 | Network Rail Infrastructure Limited | 24 May 2013 | 22 Aug 2013 | |
MLA/2013/00206 - Completed | Application - Construction | Bishops Tawton NDN209-68 | Network Rail Limited | 24 May 2013 | 10 Sep 2013 | |
MLA/2013/00207 - Completed | Application - Construction | Repair of Sea Wall, Godolphin Arms Marazion Cornwall Grouped under: St Aubyn Estate Showing 2 of 7 cases | St Aubyn Estates | 24 May 2013 | 21 Aug 2013 | |
MLA/2013/00208 - Completed | Application - Construction | St Michael's Mount Causeway Grouped under: St Aubyn Estate Showing 2 of 7 cases | St Aubyn Estates | 24 May 2013 | 21 Aug 2013 | |
MLA/2013/00209 - Completed | Application - Construction | No 1. Covered Slipway Rails | Mr William Stirling | 28 May 2013 | 17 Jul 2013 | |
MLA/2013/00210 - Completed | Application - Construction | Refurbishment of Chainlocker & Shipwrights | Harvey Shopfitters Limited | 28 May 2013 | 03 Jun 2013 | |
MLA/2013/00211/1 - Completed | Application - Construction | Portsmouth Flood Alleviation Scheme - Improvement Works to Gt Salterns Outfall | 4delivery Limited | 28 May 2013 | 02 Sep 2013 | |
MLA/2013/00212/8 - Completed | Application - Construction | Littlehampton Arun East Bank Tidal Walls | Environment Agency (Southern Region) | 29 May 2013 | 14 Nov 2017 | |
MLA/2013/00215/1 - Completed | Application - Construction | Cromer Coast Protection Scheme 982 | North Norfolk District Council | 30 May 2013 | 27 Mar 2015 | |
MLA/2013/00216/6 - Completed | Application - Dredged Material Disposal, Dredging | Cowes Outer Harbour Project Dredge disposal renewal | Cowes Harbour Commission | 31 May 2013 | 28 Sep 2022 | |
MLA/2013/00217/7 - Completed | Application - Dredged Material Disposal, Dredging | Offshore Technology Park Dredge | Shepherd Offshore Services Limited | 31 May 2013 | 04 Jul 2014 | |
MLA/2013/00218/1 - Completed | Application - Construction | Helford River Children' Sailing Trust Pontoon | Helford River Children' Sailing Trust | 03 Jun 2013 | 16 Dec 2020 | |
MLA/2013/00219 - Completed | Application - Construction | Folkestone Warren - Clearance of fallen chalk on walkway | Network Rail Limited | 04 Jun 2013 | 01 Aug 2013 | |
MLA/2013/00221/1 - Completed | Application - Emergency Work | Emergency works Wells Harbour channel | Wells Harbour Commissioners | 07 Jun 2013 | 05 Jul 2013 | |
MLA/2013/00223 - Withdrawn | Application - Removals (inc. Grab Samples) | Fender at Thornham, North Norfolk coast | Gac Shipping (Uk) Ltd. | 07 Jun 2013 | ||
MLA/2013/00224/1 - Completed | Application - Construction | ATH-1788 scour protection, River Rother near Rye | B.& M.Mchugh Limited | 10 Jun 2013 | 18 Nov 2013 | |
MLA/2013/00225/1 - Completed | Application - Construction | Timber Pile Replacement and Anchor Retaining System , Walberswick | Walberswick Common Lands Charity | 10 Jun 2013 | 05 Aug 2013 | |
MLA/2013/00227 - Completed | Application - Construction | North West Quay Outfall Relocation Works (Phase 1) | Port Of Tyne Authority | 12 Jun 2013 | 21 Aug 2013 | |
MLA/2013/00228 - Completed | Application - Construction | Finger Jetty Refurbishment | Bae Systems Surface Ships Limited | 12 Jun 2013 | 29 Jul 2013 | |
MLA/2013/00229 - Completed | Application - Construction | Monitoring nearshore currents around St Bees Head | Sefton Mbc | 13 Jun 2013 | 15 Nov 2013 | |
MLA/2013/00230/3 - Completed | Application - Construction | Northumbrian Quay Pontoons | Port Of Tyne | 13 Jun 2013 | 31 Mar 2016 | |
MLA/2013/00231 - Completed | Application - Construction | Beeding Bridge strengthening works | West Sussex County Council | 13 Jun 2013 | 25 Jul 2013 | |
MLA/2013/00233 - Completed | Application - Construction | Spragger Clough Outfall Refurbishment (Primary and Secondary Defence Structures) | Carter Jonas Llp | 17 Jun 2013 | 09 Aug 2013 | |
MLA/2013/00234 - Completed | Application - Construction | Proposed Repairs to Kiddies Corner | Scarborough Borough Council | 19 Jun 2013 | 07 Oct 2013 | |
MLA/2013/00235 - Completed | Application - Construction | The Saltings Saltmarsh Habitat Creation Project | Rastrum Limited | 21 Jun 2013 | 16 Jan 2014 | |
MLA/2013/00236/1 - Completed | Application - Construction | Swanwick Marina Pile Replacement Grouped under: Swanwick Marina River Wall Showing 4 of 9 cases | Premier Marinas (Hamble) Limited | 21 Jun 2013 | 07 Aug 2013 | |
MLA/2013/00237 - Completed | Application - Construction | Merlin Quay Pontoons | Merlin Real Estate Limited | 21 Jun 2013 | 22 Aug 2013 | |
MLA/2013/00238/5 - Completed | Application - Construction, Dredged Material Disposal, Dredging | RSQ Downriver Extension | Port Of Tyne Authority | 24 Jun 2013 | 21 Dec 2017 | |
MLA/2013/00239/5 - Completed | Application - Construction | Roof repair | Mr Chris Kennedy | 24 Jun 2013 | 05 Feb 2015 | |
MLA/2013/00240 - Completed | Application - Construction | Construction of 4 Houses & 9 apartments @ 18 North Parade | Milbourne Developments Ltd | 25 Jun 2013 | 29 Aug 2013 | |
MLA/2013/00241 - Completed | Application - Miscellaneous Disposal | Catchment to Coast (Natural Environment Research Council, Acronym C2C) | Aberystwyth University | 25 Jun 2013 | 16 Aug 2013 | |
MLA/2013/00242 - Completed | Application - Construction | Millbay Dolphins Refurbishment Works | Bam Nuttall Limited | 26 Jun 2013 | 04 Jun 2014 | |
MLA/2013/00243 - Completed | Application - Construction | Caytor Bridge Leak Repair | Environment Agency (Southern Region) | 27 Jun 2013 | 08 Aug 2013 | |
MLA/2013/00244/1 - Completed | Application - Construction | Gosport Cruising Club Repair Works | Gosport Cruising Club | 28 Jun 2013 | 05 Sep 2016 | |
MLA/2013/00245 - Completed | Application - Burial at Sea | Mr Gavin Palin | 28 Jun 2013 | 04 Jul 2013 | ||
MLA/2013/00247/1 - Completed | Application - Construction | 58 Pearce Avenue | Colmar Construction (Poole) Limited | 02 Jul 2013 | 18 Sep 2013 | |
MLA/2013/00248 - Completed | Application - Emergency Work | Lympstone Sea Wall - Repair | Devon County Council | 02 Jul 2013 | 05 Jul 2013 | |
MLA/2013/00249/4 - Completed | Application - Dredged Material Disposal, Dredging | Annual Maintenance Dredging and Disposal | Port Of Sheerness Limited | 02 Jul 2013 | 27 Jan 2017 | |
MLA/2013/00250/1 - Completed | Application - Construction | River Condenser Pipework and Associated Equipment Replacement Project | British Telecommunications Public Limited Company | 02 Jul 2013 | 01 Nov 2013 | |
MLA/2013/00252/1 - Completed | Application - Construction | 18 Gillender Street | Ardmore Construction Limited | 03 Jul 2013 | 28 Aug 2013 | |
MLA/2013/00254 - Completed | Application - Removals (inc. Grab Samples) | Howdon Jetty Mooring Improvement Works | Port Of Tyne Authority | 03 Jul 2013 | 24 Sep 2013 | |
MLA/2013/00255/4 - Completed | Application - Dredged Material Disposal, Dredging | Maintenance Dredge Licence - A&P Tyne Ltd, Hebburn - Quays & Dry Dock Entrance | A&P Tyne Ltd | 04 Jul 2013 | 14 Feb 2017 | |
MLA/2013/00256/2 - Completed | Application - Construction, Dredged Material Disposal, Dredging | Berth 9 Quay Extension | Hutchison Ports (Uk) Limited | 04 Jul 2013 | 22 May 2014 | |
MLA/2013/00257/2 - Completed | Application - Construction | Replacement of 4 wooden piles with 4 tubular steel piles at the RVYC | Royal Victoria Yacht Club | 05 Jul 2013 | 08 May 2014 | |
MLA/2013/00258/2 - Completed | Application - Construction | Carr Lane Sewage Pumping Station, Goole | Yorkshire Water Services Limited | 05 Jul 2013 | 09 Apr 2014 | |
MLA/2013/00259/1 - Completed | Application - Construction | Cabin Boatyard Quay Wall Repairs | Cabin Boatyard | 05 Jul 2013 | 04 Oct 2013 | |
MLA/2013/00260/1 - Completed | Application - Construction | Brunel landing at Starcross on the Exe Estuary | Star Cross Fishing & Cruising Club | 08 Jul 2013 | 28 Jul 2014 | |
MLA/2013/00262 - Completed | Application - Burial at Sea | Charles Lister | 09 Jul 2013 | 12 Jul 2013 | ||
MLA/2013/00263 - Completed | Application - Construction | West India Pier | Sunset Moorings Ltd | 10 Jul 2013 | 20 Sep 2013 | |
MLA/2013/00266/1 - Completed | Application - Construction, Removals (inc. Grab Samples) | Torquay Inner Harbour - Pontoon Berthing | Tor Bay Harbour Authority | 11 Jul 2013 | 24 Mar 2014 | |
MLA/2013/00267/4 - Completed | Application - Construction | Wash Tide Gauge | Environment Agency | 11 Jul 2013 | 16 Jul 2019 | |
MLA/2013/00268/3 - Completed | Application - Removals (inc. Grab Samples) | EDF Energy NNB Sizewell C Offshore Ground Investigation Works 2013 | Nnb Generation Company Limited | 11 Jul 2013 | 23 Oct 2013 | |
MLA/2013/00269/10 - Completed | Application - Construction, Dredging, Miscellaneous Disposal | Bradwell Nuclear Decommissioning Site Silt Removal from Culvert | Magnox Limited | 12 Jul 2013 | 19 May 2014 | |
MLA/2013/00270 - Completed | Application - Miscellaneous Disposal | Westermost Rough Offshore Wind Farm - Disposal Strategy for Foundation Drilling Grouped under: Westermost Rough OWF Showing 4 of 8 cases | Westermost Rough Limited | 12 Jul 2013 | 15 Apr 2014 | |
MLA/2013/00271 - Completed | Application - Construction | Riverside Jetty | John Hutton | 16 Jul 2013 | 18 Sep 2013 | |
MLA/2013/00272 - Completed | Application - Construction | Royal Dock Harbour offshore wind support facility | Associated British Ports. | 17 Jul 2013 | 15 Oct 2013 | |
MLA/2013/00273 - Completed | Application - Dredged Material Disposal, Dredging | Maintenance Dredge Licence - OGN Hadrian Yard, River Tyne | Offshore Group Newcastle Limited | 17 Jul 2013 | 17 Dec 2013 | |
MLA/2013/00274 - Completed | Application - Construction | NKL-645/646 scour protection works | B.& M.Mchugh Limited | 17 Jul 2013 | 18 Oct 2013 | |
MLA/2013/00275/2 - Completed | Application - Construction | Restoration of Hastings Pier | Hastings Pier Charity | 18 Jul 2013 | 29 Aug 2014 | |
MLA/2013/00276/1 - Completed | Application - Construction | North Kent Outfalls | Environment Agency - Anglian Region | 19 Jul 2013 | 13 Dec 2013 | |
MLA/2013/00277 - Completed | Application - Miscellaneous Disposal | Green tide 2 oil spill response exercise | Oil Spill Response Limited | 19 Jul 2013 | 10 Sep 2013 | |
MLA/2013/00278 - Completed | Application - Construction | Longbridge Road Flood Alleviation Scheme | Mr Adrian Trim | 19 Jul 2013 | 05 Dec 2013 | |
MLA/2013/00279/1 - Completed | Application - Construction | Cargo Package Refurbishment | Environment Agency (Southern Region) | 22 Jul 2013 | 20 Dec 2013 | |
MLA/2013/00280/1 - Completed | Application - Construction | Renewal of the main slipway and moving the Eastern jetty 9m East | Itchenor Sailing Club | 23 Jul 2013 | 01 Apr 2016 | |
MLA/2013/00281/1 - Completed | Application - Construction | SABIC North Tees Jetty 2 embankment repair | Sabic Uk Petrochemicals Limited | 23 Jul 2013 | 07 Nov 2013 | |
MLA/2013/00282 - Completed | Application - Construction | Installation and testing of the King Harry Ferry 2 shallow water fibre optic | Bt Group Plc | 23 Jul 2013 | 15 Apr 2014 | |
MLA/2013/00283 - Completed | Application - Emergency Work | Sunny Cliff Pipeline - Salcombe | South West Water Limited | 23 Jul 2013 | 24 Jul 2013 | |
MLA/2013/00285/1 - Completed | Application - Dredged Material Disposal, Dredging | offshore group newcastle/enquest | Offshore Group Newcastle Limited | 24 Jul 2013 | 04 Oct 2013 | |
MLA/2013/00287/1 - Completed | Application - Construction | Laira Rail Bridge Pedestrian and Cycle Scheme | Plymouth City Council | 24 Jul 2013 | 08 Jan 2014 | |
MLA/2013/00288/1 - Completed | Application - Construction | St John Septic Tank outfall repair | South West Water Limited | 24 Jul 2013 | 05 Sep 2013 | |
MLA/2013/00289/3 - Completed | Application - Construction | Millendreath sea defence, slipway and culvert upgrade. | Espalier Developments (Millendreath) Limited | 25 Jul 2013 | 30 Apr 2018 | |
MLA/2013/00290 - Completed | Application - Construction | Repair to sheet pile wall | Magnox Limited | 25 Jul 2013 | 28 Aug 2013 | |
MLA/2013/00291/1 - Completed | Application - Dredged Material Disposal, Dredging | Maintenance Dredge Licence - Simon Storage Ocean Berth, River Tyne | Inter Terminals Tyneside Limited | 26 Jul 2013 | 12 Aug 2016 | |
MLA/2013/00292/3 - Completed | Application - Dredged Material Disposal | Harwich / Felixstowe maintenance dredging disposal Grouped under: Harwich dredge and disposal Showing 3 of 9 cases | Harwich Haven Authority | 26 Jul 2013 | 28 Feb 2018 | |
MLA/2013/00293/2 - Completed | Application - Dredged Material Disposal, Dredging | Maintenance Dredge Licence - Cemex - Jarrow Quay, River Tyne | Cemex Uk Marine Limited | 26 Jul 2013 | 24 May 2017 | |
MLA/2013/00294/1 - Completed | Application - Construction | Pontoon installation River Hamble L30/L31 Grouped under: Swanwick Marina River Wall Showing 4 of 9 cases | Premier Marinas (Hamble) Limited | 26 Jul 2013 | 02 Oct 2014 | |
MLA/2013/00295/1 - Completed | Application - Construction | Dagenham Jetty Refurbishment - Pontoon & Linkspan Resurfacing | Ford Motor Company Limited | 26 Jul 2013 | 06 Aug 2014 | |
MLA/2013/00296/3 - Completed | Application - Aggregate Dredging, Removals (inc. Grab Samples) | Long Sand Head - Area 509 | Tarmac Marine Dredging Limited | 29 Jul 2013 | 26 May 2017 | |
MLA/2013/00297/5 - Completed | Application - Aggregate Dredging, Removals (inc. Grab Samples) | Long Sand Head - Area 510 | Cemex Uk Marine Limited | 29 Jul 2013 | 17 Aug 2020 | |
MLA/2013/00298/2 - Completed | Application - Aggregate Dredging, Removals (inc. Grab Samples) | Long Sand Head - Area 508 | Britannia Aggregates Limited | 29 Jul 2013 | 25 May 2017 | |
MLA/2013/00300 - Withdrawn | Application - Miscellaneous Disposal | West Bay inner harbour dredging | West Dorset District Council | 29 Jul 2013 | ||
MLA/2013/00301/1 - Completed | Application - Construction | Greenwich Reach Pedestrian Swing Bridge | Roamquest Limited | 30 Jul 2013 | 04 Dec 2013 | |
MLA/2013/00302/1 - Completed | Application - Construction, Dredged Material Disposal, Dredging | Port Meridian Deep Water Port Project | Port Meridian Energy Limited | 30 Jul 2013 | 16 Apr 2019 | |
MLA/2013/00303 - Completed | Application - Construction | Walcott Beach Steps | North Norfolk District Council | 31 Jul 2013 | 10 Sep 2013 | |
MLA/2013/00304/1 - Completed | Application - Construction | Creekmoor Sheet Piles Maintenance | Borough Of Poole Council | 31 Jul 2013 | 15 May 2014 | |
MLA/2013/00306/1 - Completed | Application - Aggregate Dredging, Removals (inc. Grab Samples) | Area 401/2 | Hanson Aggregates Limited | 01 Aug 2013 | 26 May 2017 | |
MLA/2013/00308/1 - Completed | Application - Construction | Boston Boat Yard - River wall improvement | The Cavanna Group | 05 Aug 2013 | 31 Jul 2014 | |
MLA/2013/00310 - Completed | Application - Construction | Small Craft Landing Poontoon | Bam Nuttall Limited | 05 Aug 2013 | 08 Oct 2013 | |
MLA/2013/00311 - Completed | Application - Construction | King Post Wall Reinstatement Works - River Breeze, The Esplanade, Hullbridge | Mr Stewart Ward | 08 Aug 2013 | 14 Nov 2013 | |
MLA/2013/00314/1 - Completed | Application - Construction, Removals (inc. Grab Samples) | Jetty 3 and 5 Thames Oilport | Vopak Services Uk Limited | 08 Aug 2013 | 08 Oct 2014 | |
MLA/2013/00315/2 - Completed | Application - Construction | Severn Critical Eel Tidal Flaps | Environment Agency – South West Reg | 09 Aug 2013 | 07 Oct 2013 | |
MLA/2013/00316 - Completed | Application - Miscellaneous Disposal | Tracer investigation Harrowside Outfall | Centre For Research Into Environment And Health (Creh) Ltd | 09 Aug 2013 | 24 Sep 2013 | |
MLA/2013/00317/1 - Completed | Application - Construction, Removals (inc. Grab Samples) | Pagham Beach Coastal Defence Project | Arun District Council | 09 Aug 2013 | 29 Nov 2013 | |
MLA/2013/00318 - Completed | Application - Renewables | Westermost Rough Offshore Wind Farm - array cable trial trenching Grouped under: Westermost Rough OWF Showing 4 of 8 cases | Westermost Rough Limited | 09 Aug 2013 | 15 Apr 2014 | |
MLA/2013/00319 - Completed | Application - Construction | Pontoon at Salcombe, Salcombe Estuary, Devon | Nicolas James Group Limited | 12 Aug 2013 | 21 Feb 2014 | |
MLA/2013/00320/1 - Completed | Application - Construction | Phase 3 & 4 installation of Floating Pontoons | Grimsby Fish Dock Enterprises Limited | 13 Aug 2013 | 17 Dec 2013 | |
MLA/2013/00321/3 - Completed | Application - Construction, Dredged Material Disposal, Dredging | Swanwick Marina Maintenance Dredge & Lifting Dock Grouped under: Swanwick Marina River Wall Showing 4 of 9 cases | Premier Marinas (Hamble) Limited | 13 Aug 2013 | 07 Aug 2018 | |
MLA/2013/00322 - Completed | Application - Construction | Keyhaven Quay - Resurfacing Part of Quay and Slipway | New Forest District Council | 13 Aug 2013 | 14 Nov 2013 | |
MLA/2013/00323/1 - Completed | Application - Construction | Repair works to Poulton water treatment outfall | United Utilities | 14 Aug 2013 | 30 Oct 2013 | |
MLA/2013/00324/1 - Completed | Application - Construction | Woolverstone Redevelopment | Marina Developments Limited | 14 Aug 2013 | 05 Dec 2013 | |
MLA/2013/00325 - Completed | Application - Construction, Removals (inc. Grab Samples) | Minoco Wharf River Wall | Kier Construction | 15 Aug 2013 | 22 Jan 2014 | |
MLA/2013/00326/1 - Completed | Application - Construction, Dredging | Harrowside Long Sea Outfall - Maintenance Works | United Utilities Water Plc | 15 Aug 2013 | 28 Oct 2013 | |
MLA/2013/00327/1 - Completed | Application - Alternative Use of Dredged Material, Construction, Dredging, Removals (inc. Grab Samples) | Levington Saltmarsh restoration and beneficial Use of Dredgings Project 2013 | Suffolk Yacht Harbour | 16 Aug 2013 | 07 Nov 2018 | |
MLA/2013/00328 - Completed | Application - Construction | Great Breach Pumping Station Gravity Outfall : Repairs to Steel Flap Valve | The Environment Agency | 16 Aug 2013 | 29 Aug 2013 | |
MLA/2013/00329/3 - Completed | Application - Aggregate Dredging, Removals (inc. Grab Samples) | Area 498 - North Inner Gabbard | Britannia Aggregates Limited | 16 Aug 2013 | 12 May 2017 | |
MLA/2013/00330/4 - Completed | Application - Aggregate Dredging, Removals (inc. Grab Samples) | Area 498 - North Inner Gabbard | Volker Dredging Limited | 19 Aug 2013 | 05 May 2017 | |
MLA/2013/00331 - Completed | Application - Construction | Climping Coastal recycling maintenance 2013/14 | Environment Agency (Southern Region) | 19 Aug 2013 | 28 Oct 2013 | |
MLA/2013/00332/1 - Completed | Application - Construction | Pontoon replacement City Cruises PLC | Kent Structural & Architectural Ltd | 19 Aug 2013 | 17 Jan 2014 | |
MLA/2013/00333/1 - Completed | Application - Construction | Dagenham Jetty - Ancillary & Marine Safety Works | Ford Motor Company Ltd | 20 Aug 2013 | 06 Aug 2014 | |
MLA/2013/00334/1 - Completed | Application - Dredged Material Disposal, Dredging | Goodchild Marine Services Marina and lift dock | Goodchild Marine Services Limited | 21 Aug 2013 | 07 Apr 2021 | |
MLA/2013/00335 - Withdrawn | Application - Renewables | Floating Offshore Wind Platform Demonstrator at Wave Hub in Cornwall | Wave Hub Limited | 21 Aug 2013 | ||
MLA/2013/00336/3 - Completed | Application - Aggregate Dredging, Removals (inc. Grab Samples) | Areas 400 and 106 (Consolidated) | Hanson Aggregates Ltd | 21 Aug 2013 | 03 Aug 2017 | |
MLA/2013/00337/6 - Completed | Application - Construction | Outer Harbour Development, Brighton Marina - Phase 1 Grouped under: Brighton Marina Master Case Showing 2 of 10 cases | The Brighton Marina Company Ltd | 23 Aug 2013 | 22 May 2014 | |
MLA/2013/00338/1 - Completed | Application - Aggregate Dredging, Removals (inc. Grab Samples) | Aggregate Extraction Areas Areas 242-361 & 328A | Hanson Aggregates Limited | 23 Aug 2013 | 13 Aug 2019 | |
MLA/2013/00339 - Completed | Application - Construction, Removals (inc. Grab Samples) | Beach Management Plan Witterings Recycling Scheme | Chichester District Council | 23 Aug 2013 | 28 Oct 2013 | |
MLA/2013/00340 - Completed | Application - Alternative Use of Dredged Material, Construction | Beach Management Plan: Selsey Shingle Recharge Scheme | Chichester District Council | 23 Aug 2013 | 14 Oct 2013 | |
MLA/2013/00341 - Completed | Application - Construction, Removals (inc. Grab Samples) | 60 Pearce Avenue | Mr Duncan Stone | 24 Aug 2013 | 10 Oct 2013 | |
MLA/2013/00342/4 - Completed | Application - Dredged Material Disposal, Dredging | Maintenance Dredging at HMNB Portsmouth | Defence Infrastructure Organisation | 27 Aug 2013 | 20 Dec 2017 | |
MLA/2013/00343 - Completed | Application - Removals (inc. Grab Samples) | No. 4 Slip Concrete Upstand Removal | Devonport Royal Dockyard Limited | 28 Aug 2013 | 08 Oct 2013 | |
MLA/2013/00344 - Completed | Application - Construction | Hayle Beach Access | Hayle Town Council | 30 Aug 2013 | 11 Oct 2013 | |
MLA/2013/00345 - Completed | Application - Construction | Millbrook | Teignmouth Maritime Services Limited | 02 Sep 2013 | 13 Nov 2013 | |
MLA/2013/00347 - Completed | Application - Burial at Sea | Mr Charles Lister | 02 Sep 2013 | 04 Sep 2013 | ||
MLA/2013/00349 - Completed | Application - Removals (inc. Grab Samples) | Removal of an old gun barrel from a know wreck site | Mr Ben Dunstan | 02 Sep 2013 | 14 Aug 2014 | |
MLA/2013/00350 - Completed | Application - Construction | Deployment of Directional Waverider buoy off Isles of Scilly | Mr Simon Humphry | 03 Sep 2013 | 14 Nov 2013 | |
MLA/2013/00351/2 - Completed | Application - Dredged Material Disposal, Dredging | Maintenance Dredging at SMC Marchwood | Westminster Dredging Company Limited | 04 Sep 2013 | 23 Feb 2017 | |
MLA/2013/00353/2 - Completed | Application - Alternative Use of Dredged Material | Poole Bay Nearshore Beach Renourishment Trial | Borough Of Poole | 06 Sep 2013 | 26 Jan 2015 | |
MLA/2013/00354 - Completed | Application - Construction | Lower Quay Pontoon | Looe Harbour Commissioners | 06 Sep 2013 | 20 Nov 2013 | |
MLA/2013/00355/1 - Completed | Application - Miscellaneous Disposal | Wheatcroft Long Sea Outfall Dye Test | Yorkshire Water Limited | 06 Sep 2013 | 25 Oct 2013 | |
MLA/2013/00356 - Completed | Application - Construction | Chichester Marina Surface Water Outfall | Premier Marinas Limited | 09 Sep 2013 | 21 Oct 2013 | |
MLA/2013/00357 - Withdrawn | Application - Miscellaneous Disposal, Removals (inc. Grab Samples) | Seaford Beach Recycling 2013/14 - 2017/18 | Environment Agency | 10 Sep 2013 | ||
MLA/2013/00358/2 - Completed | Application - Construction, Dredging, Removals (inc. Grab Samples) | RM Poole The Hard: Reconfiguration and construction of new Mooring Pontoons | Defence Infrastructure Organisation | 11 Sep 2013 | 26 Mar 2014 | |
MLA/2013/00359 - Completed | Application - Construction | Pipe adjacent to East Cliff, Teignmouth | South West Water Limited | 11 Sep 2013 | 30 Oct 2013 | |
MLA/2013/00360/1 - Completed | Application - Dredging | Middleton Wastewater Treatment Works Long Sea Outfall - Maintenance | United Utilities Water Plc | 11 Sep 2013 | 17 Mar 2014 | |
MLA/2013/00361/3 - Completed | Application - Dredged Material Disposal | Harwich/ Felixstowe maintenance dredging disposal Grouped under: Harwich dredge and disposal Showing 3 of 9 cases | Harwich Haven Authority | 12 Sep 2013 | 17 Oct 2016 | |
MLA/2013/00362 - Completed | Application - Dredged Material Disposal, Dredging | Maintenance dredging | Foxs Marina, Ipswich, Foxs Marina Disposal Site (Mudflats) | Fox'S Marina Ipswich Limited | 12 Sep 2013 | 14 Jan 2015 |
MLA/2013/00363/2 - Completed | Application - Construction | Gate Lay-By Berth, Able UK Seaton Port | Able Uk Ltd | 12 Sep 2013 | 22 Mar 2017 | |
MLA/2013/00364 - Withdrawn | Application - Construction | Battersea Power Station Temporary Water Taxi Jetty | Battersea Power Station Development Company | 12 Sep 2013 | ||
MLA/2013/00365/2 - Completed | Application - Construction | Oldbury Active Effluent Discharge Line | Magnox Limited | 13 Sep 2013 | 29 Oct 2014 | |
MLA/2013/00366/3 - Completed | Application - Construction | River Medway Railway Bridge brick pier and abutment maintenance repairs | Balfour Beatty Rail Limited | 16 Sep 2013 | 19 Jun 2014 | |
MLA/2013/00367 - Completed | Application - Removals (inc. Grab Samples) | NSN Link - Ground Investigation | Worleyparsons Europe Limited | 17 Sep 2013 | 18 Dec 2013 | |
MLA/2013/00368 - Completed | Application - Construction | Proposed Pontoon, Bridge Road, Lymington | Pontoon | Redrow Homes Limited | 18 Sep 2013 | 24 Jun 2015 |
MLA/2013/00369/1 - Completed | Application - Construction | Trinity Road Seawall | North Tyneside Council | 18 Sep 2013 | 12 Aug 2014 | |
MLA/2013/00370 - Completed | Application - Construction | Gilkicer Lagoon Outfall Replacement | Southern Water Services Limited | 19 Sep 2013 | 28 Nov 2013 | |
MLA/2013/00371/2 - Completed | Application - Dredged Material Disposal, Dredging | Maintenance Dredging 2014 | Cowes Yacht Haven | 19 Sep 2013 | 21 Jan 2019 | |
MLA/2013/00372/1 - Completed | Application - Construction | Hurst Spit Beach Management Plan North Point Recycling | New Forest District Council | 19 Sep 2013 | 12 Feb 2014 | |
MLA/2013/00373 - Completed | Application - Renewables | Westermost Rough Offshore Wind Farm - Export cable plough trial Grouped under: Westermost Rough OWF Showing 4 of 8 cases | Mr Lars Bie Jensen | 20 Sep 2013 | 15 Apr 2014 | |
MLA/2013/00374 - Completed | Application - Construction | Sea Cadet Mooring Pontoons | T S Southampton | 20 Sep 2013 | 25 Oct 2013 | |
MLA/2013/00375/2 - Completed | Application - Construction | Fingringhoe, River Colne Managed Realignment | Environment Agency | 23 Sep 2013 | 26 Aug 2015 | |
MLA/2013/00377/2 - Completed | Application - Construction | Port Hamble Marina Pile Replacement | Marina Developments Limited | 24 Sep 2013 | 24 Nov 2017 | |
MLA/2013/00378 - Completed | Application - Construction | Northney Marina Pile Replacement | Marina Developments Limited | 24 Sep 2013 | 20 Dec 2013 | |
MLA/2013/00379/1 - Completed | Application - Construction | Shamrock Quay Pile Replacement | Marina Developments Limited | 24 Sep 2013 | 28 Jan 2014 | |
MLA/2013/00380/2 - Completed | Application - Construction | Heysham No.1 Power Station Outfall Repairs | Edf Energy | 25 Sep 2013 | 24 Jul 2014 | |
MLA/2013/00381 - Completed | Application - Construction | Plymstock Quarry Storm Water Outfall | Dyer And Butler Limited | 25 Sep 2013 | 02 Dec 2013 | |
MLA/2013/00382 - Completed | Application - Construction | Harrington Coastal Defence No. 5 | J. Murphy & Sons Limited | 26 Sep 2013 | 20 Dec 2013 | |
MLA/2013/00384/2 - Completed | Application - Construction | Modification of Fishing Boat Moorings In Lymington River | Lymington Harbour Commissioners | 26 Sep 2013 | 16 Jan 2014 | |
MLA/2013/00385 - Completed | Application - Removals (inc. Grab Samples) | Removal of former Sevalco plant redundant effluent outfall pipe | Sevalco Limited | 26 Sep 2013 | 15 Nov 2013 | |
MLA/2013/00386 - Completed | Application - Construction | ESK-426 scour protection | B.& M.Mchugh Limited | 27 Sep 2013 | 02 Jan 2014 | |
MLA/2013/00387 - Completed | Application - Construction | C1 cable rock protection | Mr Ole Bigum Nielsen | 27 Sep 2013 | 09 May 2014 | |
MLA/2013/00388 - Completed | Application - Construction | Hayle Harbour Swing Bridge Enabling Works | Hammond (Ecs) Limited | 01 Oct 2013 | 08 Oct 2013 | |
MLA/2013/00389 - Completed | Application - Construction | Tower of London temporary river wall repairs | Historic Royal Palaces | 01 Oct 2013 | 03 Dec 2013 | |
MLA/2013/00391 - Completed | Application - Construction | Phase 4 - Secombe Ferry Terminal Platform Repairs and walkway installation | Merseytravel Limited | 02 Oct 2013 | 06 Mar 2014 | |
MLA/2013/00393 - Completed | Application - Construction | Stabilization / Strengthening works to Shotley Pier | East Anglian Marine Leisure Llp | 03 Oct 2013 | 28 Nov 2013 | |
MLA/2013/00395 - Completed | Application - Construction | Fulham Wharf | Bdw Trading Limited | 04 Oct 2013 | 29 Jan 2014 | |
MLA/2013/00396 - Completed | Application - Removals (inc. Grab Samples) | Extension to Project Harbour Gaze Survey areas. | Mr Robin Burrows | 06 Oct 2013 | 20 Dec 2013 | |
MLA/2013/00398 - Completed | Application - Construction | Wind and direction measurement buoy and wave buoy deployment | Neart Na Gaoithe Offshore Wind Limited | 08 Oct 2013 | 27 Nov 2013 | |
MLA/2013/00399/1 - Completed | Application - Alternative Use of Dredged Material | Eastbourne Beach Management Works 2013-2014 and 2014-2015 | Eastbourne Borough Council | 08 Oct 2013 | 04 Jul 2014 | |
MLA/2013/00400/4 - Completed | Application - Miscellaneous Disposal | Tracer Studies | Centre For Research Into Environment And Health (Creh) Ltd | 08 Oct 2013 | 09 Feb 2015 | |
MLA/2013/00401 - Completed | Application - Emergency Work | Sands Lane, Bridlington - Outfall Collapse | Yorkshire Water Limited | 09 Oct 2013 | 15 Oct 2013 | |
MLA/2013/00402 - Completed | Application - Construction | Chiswick Bridge Refurbishment | Bam Nuttall Limited | 09 Oct 2013 | 08 Jan 2014 | |
MLA/2013/00403/1 - Completed | Application - Construction, Removals (inc. Grab Samples) | Sea View Yacht Club Landing Stage and Slipway Replacement | Sea View Yacht Club Limited | 10 Oct 2013 | 12 Dec 2013 | |
MLA/2013/00404/1 - Completed | Application - Construction | Longbridge Drive Bank Restoration Project | National Trust | 10 Oct 2013 | 12 Feb 2014 | |
MLA/2013/00405/8 - Completed | Application - Construction, Removals (inc. Grab Samples) | Isles of Scilly Link - St Mary's Harbour Quay Extension | Cornwall Council | 11 Oct 2013 | 25 Aug 2015 | |
MLA/2013/00406/4 - Completed | Application - Construction, Dredging | Pendennis Wet Dock | Pendennis Shipyard Limited | 11 Oct 2013 | 26 Feb 2015 | |
MLA/2013/00407 - Completed | Application - Construction | Asset Reconditioning Site 207 Hampton Barnes No. 1 Sluice Repair | Environment Agency | 14 Oct 2013 | 17 Dec 2013 | |
MLA/2013/00408 - Completed | Application - Removals (inc. Grab Samples) | Bransholme Storm Water Pumping Station | Yorkshire Water Services Ltd | 14 Oct 2013 | 06 Dec 2013 | |
MLA/2013/00409/2 - Completed | Application - Construction | Watch House and Orestone End pipeline, Salcombe | South West Water Limited | 16 Oct 2013 | 15 Apr 2014 | |
MLA/2013/00410/6 - Completed | Application - Alternative Use of Dredged Material | Lymington Harbour: Saltmarsh Recharge by Bottom Dumping Grouped under: Lymington Harbour Dredge and Disposal Showing 2 of 3 cases | Lymington Harbour Commissioners | 16 Oct 2013 | 07 Mar 2017 | |
MLA/2013/00411 - Completed | Application - Construction | Motney Hill Refurbishment | Environment Agency – South West Reg | 16 Oct 2013 | 30 Jan 2014 | |
MLA/2013/00412/7 - Completed | Application - Construction | Mersey Gateway | Merseylink | 16 Oct 2013 | 26 Feb 2019 | |
MLA/2013/00413/1 - Completed | Application - Alternative Use of Dredged Material, Dredging | Marina Dredging & Salt Marsh Feeding | Yacht Havens Limited | 17 Oct 2013 | 04 Sep 2015 | |
MLA/2013/00414/4 - Completed | Application - Construction | Lots Road Development | Hutchison Whampoa Properties (Europe) Limited | 21 Oct 2013 | 24 Jan 2018 | |
MLA/2013/00415 - Completed | Application - Construction | Leamouth Foot Bridge | John Sisk & Son Limited | 21 Oct 2013 | 11 Feb 2014 | |
MLA/2013/00416/1 - Completed | Application - Construction | Withernsea Commercial Boat Slipway | East Riding Of Yorkshire Council | 24 Oct 2013 | 08 Sep 2014 | |
MLA/2013/00417/2 - Completed | Application - Aggregate Dredging, Removals (inc. Grab Samples) | Area 228 - Cross Sands | Volker Dredging Ltd | 24 Oct 2013 | 10 May 2017 | |
MLA/2013/00418/2 - Completed | Application - Dredged Material Disposal, Dredging | Birdham Pool Approach Channel Maintenance | Birdham Pool Ltd | 28 Oct 2013 | 15 Oct 2014 | |
MLA/2013/00419/1 - Completed | Application - Aggregate Dredging, Removals (inc. Grab Samples) | Area 507, Shipwash | Cemex Uk Marine Limited | 28 Oct 2013 | 21 Mar 2017 | |
MLA/2013/00420/2 - Completed | Application - Renewables | Installation of Anode Bank Arrays | Scira Offshore Energy Limited | 30 Oct 2013 | 18 Dec 2014 | |
MLA/2013/00421/3 - Completed | Application - Construction | Greatstone Terminal Groyne | Environment Agency | 31 Oct 2013 | 24 Sep 2014 | |
MLA/2013/00422 - Completed | Application - Emergency Work | Jury's Gap Outfall Emergency Works | Environment Agency (Southern Region) | 31 Oct 2013 | 01 Nov 2013 | |
MLA/2013/00423/4 - Completed | Application - Dredged Material Disposal | Heysham Harbour Maintenance Disposal Renewal | Heysham Port Limited | 01 Nov 2013 | 24 May 2017 | |
MLA/2013/00425 - Completed | Application - Construction | Broomhill Sands Coastal Defence Scheme | Environment Agency (Southern Region) | 01 Nov 2013 | 09 Apr 2014 | |
MLA/2013/00426/2 - Completed | Application - Construction | Walney Offshore Wind Farm Operational Marine Licence - Inter Array Cable Repair | Walney (Uk) Offshore Windfarms Limited | 01 Nov 2013 | 31 Jan 2018 | |
MLA/2013/00428 - Completed | Application - Construction | Renewal of Fendering System berth 2 Pier A Port of Dover | Dover Harbour Board | 04 Nov 2013 | 14 Feb 2014 | |
MLA/2013/00431/4 - Completed | Application - Construction | Barrow Long Sea Outfall Grouped under: Barrow Long Sea Outfall Showing 2 of 3 cases | United Utilities Plc | 08 Nov 2013 | 14 Jul 2015 | |
MLA/2013/00432/3 - MLC/2014/00072 - Completed | Application - Dredged Material Disposal, Dredging | Maintenance Dredging at HMNB Devonport | Boskalis Westminster Ltd | 08 Nov 2013 | 08 Oct 2014 | |
MLA/2013/00436/4 - Completed | Application - Construction | Norway - UK Interconnector | Rock Armour/Concete Mattressing Deposit | National Grid Nsn Link Limited | 15 Nov 2013 | 07 Dec 2018 |
MLA/2013/00437 - Completed | Application - Construction, Dredged Material Disposal, Dredging | Catchment Tidal Flap Overhaul | Esso Petroleum Company,Limited | 18 Nov 2013 | 12 Mar 2014 | |
MLA/2013/00438/2 - Completed | Application - Construction | Simon Storage fender refurbishment system | Simon Storage Limited | 18 Nov 2013 | 25 Mar 2014 | |
MLA/2013/00439 - Completed | Application - Construction | West Shore Park, Walney Island - Coast Protection Work | Barrow Borough Council | 19 Nov 2013 | 11 Feb 2014 | |
MLA/2013/00440/2 - Completed | Application - Dredged Material Disposal, Dredging | Yarmouth Harbour (IOW) Maintenance Dredge | Yarmouth Harbour Comissioners (Iow) | 19 Nov 2013 | 07 May 2021 | |
MLA/2013/00441 - Withdrawn | Application - Construction, Dredged Material Disposal | Immingham Western Deepwater Jetty | Associated British Ports | 20 Nov 2013 | ||
MLA/2013/00442 - Completed | Application - Construction | Crown Sluice Refurbishment | Environment Agency | 20 Nov 2013 | 20 Mar 2014 | |
MLA/2013/00443 - Completed | Application - Construction | Codds Outfall Refurbishment | Environment Agency | 20 Nov 2013 | 13 Mar 2014 | |
MLA/2013/00444/1 - Completed | Application - Construction | Porth Promenade - Beach Ramp Improvements | Cornwall Council | 20 Nov 2013 | 22 Apr 2014 | |
MLA/2013/00445/7 - Completed | Application - Alternative Use of Dredged Material, Construction | Clacton and Holland-on-Sea Sea Defences | Tendring District Council | 21 Nov 2013 | 09 Sep 2015 | |
MLA/2013/00447 - Completed | Application - Construction | Abbey Wharf | Environment Agency (Southern Region) | 22 Nov 2013 | 21 Mar 2014 | |
MLA/2013/00448 - Completed | Application - Construction | Wall stabilisation Kingfisher Quay | Mr Jonathan Taylor | 27 Nov 2013 | 18 Mar 2014 | |
MLA/2013/00449/4 - Completed | Application - Dredged Material Disposal, Dredging | COBB'S QUAY MARINA MAINTENANCE DREDGING | Marina Developments Limited | 27 Nov 2013 | 01 May 2019 | |
MLA/2013/00450 - Completed | Application - Construction | Replacement ramp at Bognor Regis Yacht Club | Bognor Yacht Club | 28 Nov 2013 | 26 Feb 2014 | |
MLA/2013/00451 - Completed | Application - Construction, Dredged Material Disposal, Dredging | Kendall's Wharf extension and capital dredge | Kendall Bros. (Portsmouth) Limited | 29 Nov 2013 | 08 Feb 2016 | |
MLA/2013/00452 - Completed | Application - Construction | Derwenthaugh Cycle Link | Gateshead Council | 02 Dec 2013 | 31 Jan 2014 | |
MLA/2013/00453/6 - Completed | Application - Aggregate Dredging, Removals (inc. Grab Samples) | Area 197 | Area 197 | Tarmac Marine Dredging Limited | 03 Dec 2013 | 06 Aug 2019 |
MLA/2013/00455/1 - Completed | Application - Dredging | water jetting system | Purfleet Deep Wharf | C.Ro Ports London Limited | 04 Dec 2013 | 13 Mar 2019 |
MLA/2013/00456 - Completed | Application - Removals (inc. Grab Samples) | Demolition of redundant Linkspan Bridge Western Docks | Dover Harbour Board | 05 Dec 2013 | 16 May 2014 | |
MLA/2013/00457/2 - Completed | Application - Dredged Material Disposal, Dredging | Maintenance Dredging | The Royal Motor Yacht Club | 05 Dec 2013 | 01 Oct 2014 | |
MLA/2013/00458 - Completed | Application - Construction | Westcliff Paddling Pool Access Ramp | Southend-On-Sea Borough Council | 05 Dec 2013 | 07 May 2014 | |
MLA/2013/00459 - Completed | Application - Emergency Work | Iford (old) Bridge - Wing Wall Scour Protection | Bournemouth Borough Council | 06 Dec 2013 | 13 Dec 2013 | |
MLA/2013/00460 - Completed | Application - Aggregate Dredging | Area 492, Trial Dredging | Hanson Aggregates Marine Limited | 06 Dec 2013 | 12 Feb 2014 | |
MLA/2013/00462/2 - Completed | Application - Construction | Sutton Harbour Boardwalk Development | Sutton Harbour | Sutton Harbour Holdings Plc | 09 Dec 2013 | 21 Dec 2022 |
MLA/2013/00463/1 - Completed | Application - Alternative Use of Dredged Material, Construction, Dredging, Removals (inc. Grab Samples) | Exeter Flood Defence Scheme | Environment Agency - South West Region | 09 Dec 2013 | 30 Apr 2015 | |
MLA/2013/00464/1 - Completed | Application - Removals (inc. Grab Samples) | Feeder 9 - River Humber Pipeline Replacement Project | National Grid Gas Plc | 09 Dec 2013 | 07 Apr 2014 | |
MLA/2013/00467 - Completed | Application - Construction | River Bank Repair at BAE Systems Newcastle upon Tyne | Bae Systems | 11 Dec 2013 | 10 Feb 2014 | |
MLA/2013/00468 - Completed | Application - Miscellaneous Disposal | Enhancing knowledge of norovirus in the marine environment | Cefas Weymouth | 11 Dec 2013 | 20 Feb 2014 | |
MLA/2013/00469 - Withdrawn | Application - Miscellaneous Disposal | Enhancing knowledge of norovirus behaviour in the marine environment | Cefas Weymouth Laboratory | 11 Dec 2013 | ||
MLA/2013/00470 - Completed | Application - Dredged Material Disposal, Dredging | Maintenance dredging, Ryde Harbour, Isle of Wight | Isle Of Wight Council | 11 Dec 2013 | 20 Aug 2014 | |
MLA/2013/00471/1 - Completed | Application - Construction | 57 River Road, Littlehampton, BN17 5BZ | Brownfield Estates Limited | 11 Dec 2013 | 09 May 2014 | |
MLA/2013/00472/1 - Completed | Application - Construction | Outfall 15, St. Mary's Island | Countryside Maritime Limited | 13 Dec 2013 | 27 Jan 2015 | |
MLA/2013/00473 - Completed | Application - Construction | Maintenance replacement of sheet piled river wall at Hythe Quay Colchester | Colchester Borough Council | 13 Dec 2013 | 03 Apr 2014 | |
MLA/2013/00474/1 - Completed | Application - Construction | Ribble Link Sea Gate Embankment | Canal & River Trust | 13 Dec 2013 | 02 Sep 2014 | |
MLA/2013/00475/1 - Completed | Application - Construction, Removals (inc. Grab Samples) | Dinghy Pen Wall Repairs, Replacment metal walkway | Arun Yacht Club Limited(The) | 13 Dec 2013 | 05 Mar 2014 | |
MLA/2013/00477/1 - Completed | Application - Construction | Kew Bridge Walkway | St George West London Ltd | 13 Dec 2013 | 08 Jul 2014 | |
MLA/2013/00478 - Completed | Application - Construction | TEMPORARY SLIPWAY TO SUPPORT ST MARY’S AIRPORT PROJECT | Council Of The Isles Of Scilly | 13 Dec 2013 | 17 Feb 2014 | |
MLA/2013/00479/1 - Completed | Application - Construction, Renewables | Totnes Hydro | Dart Renewables Ltd | 16 Dec 2013 | 08 Oct 2015 | |
MLA/2013/00483 - Completed | Application - Dredging | Thunderer Jetty Dredging | Thunderer (No. 5) Jetty | Stolthaven Dagenham Limited | 17 Dec 2013 | 22 May 2015 |
MLA/2013/00484 - Completed | Application - Construction | Coastal Protection to Siddick Sea Wall | J. Murphy & Sons Limited | 17 Dec 2013 | 28 Feb 2014 | |
MLA/2013/00485/3 - Completed | Application - Dredged Material Disposal, Dredging | Chichester Marina Approach Channel | Premier Marinas Limited | 19 Dec 2013 | 12 Jan 2018 | |
MLA/2013/00487/1 - Completed | Application - Alternative Use of Dredged Material, Construction, Dredging | Plantation Wharf | Mso Marine | 19 Dec 2013 | 17 Nov 2015 | |
MLA/2013/00488/2 - Completed | Application - Aggregate Dredging, Removals (inc. Grab Samples) | Area 511/512/513 | Cemex Uk Marine Limited | 19 Dec 2013 | 17 Jul 2017 | |
MLA/2013/00490 - Completed | Application - Construction | Repairs to Coastal Protection at Hurst Castle | Historic Buildings Commission For England | 20 Dec 2013 | 23 Jan 2014 | |
MLA/2013/00491 - Completed | Application - Removals (inc. Grab Samples) | Southsea and North Portsea Island CFERM Schemes - Structural Investigation | Eastern Solent Coastal Partnership | 20 Dec 2013 | 10 Feb 2014 | |
MLA/2013/00492 - Completed | Application - Construction | Porthloo Boat Slipway Improvements | Duchy Of Cornwall | 23 Dec 2013 | 13 Feb 2014 | |
MLA/2013/00494 - Completed | Application - Construction | King Point Marina Wave Gate modifications | Sutton Harbour Holdings Plc | 24 Dec 2013 | 11 Mar 2014 |