Case Details Project Type Project Title Locations Applicant NameSubmission DateDecision Date
MLA/2013/00002/1 - Completed Application - Construction Package 604 bridge replacements Bam Nuttall Limited 08 Jan 201314 Feb 2013
MLA/2013/00004/3 - Completed Application - Dredged Material Disposal, DredgingPenzance Harbour Dredging Cornwall Council08 Jan 201322 Oct 2014
MLA/2013/00005/3 - Completed Application - Removals (inc. Grab Samples) Maryport South Beach, tidal deposit removals Mr Joseph Scott-Plummer 10 Jan 201328 Jul 2021
MLA/2013/00006/1 - Completed Application - Construction Eastoke Point, Hayling Island Coastal Defence Scheme Havant Borough Council10 Jan 201318 Jul 2013
MLA/2013/00007/3 - Completed Application - Construction Woolwich Ferry Terminal Briggs Marine Contractors Limited 11 Jan 201306 Aug 2014
MLA/2013/00008 - Completed Application - Construction DENTON WHARF FINGER PONTOON Port Of London Limited14 Jan 201326 Feb 2013
MLA/2013/00009 - Completed Application - Construction CU083 Lamplighters outfall Wessex Water Authority14 Jan 201301 Feb 2013
MLA/2013/00010 - Completed Application - Removals (inc. Grab Samples) Humber Multibeam Sonar Survey Netsurvey Ltd.14 Jan 201304 Feb 2013
MLA/2013/00011/1 - Completed Application - Construction Trevol Jetty Main Construction Licence, HMS Raleigh, Torpoint, Cornwall Debut Services (South West) Limited 15 Jan 201326 Jan 2015
MLA/2013/00012/1 - Completed Application - Emergency Work Bridgend South 50530 Retaining Wall Devon County Council15 Jan 201301 Feb 2013
MLA/2013/00013 - Completed Application - Emergency Work Urgent repairs to unsafe cliffs adjacent to tourist beach Dr Mark Sullivan15 Jan 201316 Jan 2013
MLA/2013/00014/1 - Completed Application - Construction South Yard Outer Pontoons Princess Yachts International Plc 15 Jan 201325 Mar 2013
MLA/2013/00015 - Completed Application - Miscellaneous Disposal Middleton Sea Outfall - Dye Tracing United Utilities Water Plc21 Jan 201325 Mar 2013
MLA/2013/00016 - Completed Application - Construction Licence for Racing Marker Buoy Arun Yacht Club Ltd 21 Jan 201305 Mar 2013
MLA/2013/00017/1 - Completed Application - Construction Cobnor Point Habitat Creation Scheme Mrs Susan Simmonite 22 Jan 201321 Jun 2013
MLA/2013/00018 - Completed Application - Construction Replacement Timber Groynes T1 & T2 - Southwick Beach Shoreham Port Authority 23 Jan 201310 Apr 2013
MLA/2013/00019/6 - Completed Application - Dredged Material Disposal, DredgingHythe Marine Park Maintenance Dredge Renewal Oceanic Estates Ltd 23 Jan 201320 Oct 2016
MLA/2013/00020 - Completed Application - Construction Town Quay Pontoon Extension Poole Harbour Commissioners 24 Jan 201329 Apr 2013
MLA/2013/00021 - Completed Application - Removals (inc. Grab Samples) Enderby Wharf Marine Boreholes Enderby Wharf Limited 24 Jan 201316 May 2013
MLA/2013/00022 - Completed Application - Construction, Removals (inc. Grab Samples) Pier at North House, High Street, Yarmouth Edra Securities Ltd 24 Jan 201304 Apr 2013
MLA/2013/00023/5 - Completed Application - Construction Manufacture and Placing of 100 tonne concrete wavebreakers Devonport Royal Dockyard Limited28 Jan 201315 Dec 2017
MLA/2013/00026/4 - Completed Application - Renewables Greater Gabbard - Exposed Export Cable - Approval to lay concrete mattressing Greater Gabbard Offshore Winds Limited29 Jan 201315 Aug 2014
MLA/2013/00028 - Completed Application - Removals (inc. Grab Samples) Adur Estuary Macrobenthic Survey Environment Agency (Southern Region)29 Jan 201321 Mar 2013
MLA/2013/00029/2 - Completed Application - Construction, Dredged Material Disposal, DredgingRAFYC & RSrnYC pontoon development Royal Southern Yacht Club Limited 29 Jan 201305 Jun 2014
MLA/2013/00030 - Completed Application - Removals (inc. Grab Samples) Benthic Survey for Marine Minerals (MML) off the North Cornwall Coast Marine Minerals Limited 29 Jan 201319 Feb 2013
MLA/2013/00031 - Completed Application - Construction Town Wall Set Back Wall and Drainage Outfall Hartlepool Borough Council30 Jan 201313 Sep 2013
MLA/2013/00033 - Completed Application - Removals (inc. Grab Samples) Sellafield - Offshore Sediment Sampling Sellafield Limited30 Jan 201305 Mar 2013
MLA/2013/00034 - Completed Application - Removals (inc. Grab Samples) Lizard Point to Dodman Point Hydrographic Survey Netsurvey Ltd.30 Jan 201315 Feb 2013
MLA/2013/00035 - Completed Application - Removals (inc. Grab Samples) Navitus Bay Wind Park - Geotechnical Investigations vibrocore acquisition 2013 Grouped under: Navitus Bay Wind Park Showing 2 of 4 cases Eneco Round 3 Development Limited 31 Jan 201325 Feb 2013
MLA/2013/00036 - Completed Application - Removals (inc. Grab Samples) Scientific Research in the Western English Channel Plymouth Marine Laboratory31 Jan 201304 Mar 2013
MLA/2013/00037/2 - Completed Application - Aggregate Dredging Area 127 Hanson Aggregates Marine Limited31 Jan 201312 Apr 2017
MLA/2013/00038/2 - Completed Application - Aggregate Dredging, Removals (inc. Grab Samples) Area 127 SW Needles Tarmac Marine Dredging Limited31 Jan 201309 Feb 2017
MLA/2013/00039 - Completed Application - Construction Emergency works to beach at Arun Yacht Club Arun Yacht Club Ltd 01 Feb 201315 Apr 2013
MLA/2013/00040/3 - Completed Application - Aggregate Dredging Area 137 Full Term Marine Licence Application Cemex Uk Marine Limited 04 Feb 201328 Feb 2017
MLA/2013/00041 - Completed Application - Construction Barrow Long Sea Outfall - Site Investigation Grouped under: Barrow Long Sea Outfall Showing 2 of 3 cases United Utilities Water Plc04 Feb 201319 Apr 2013
MLA/2013/00042 - Completed Application - Emergency Work Clearance of sluice outfall - Naze North Jd &Fw Eagle Farms05 Feb 201327 Feb 2013
MLA/2013/00045/5 - Completed Application - Alternative Use of Dredged Material, Construction, DredgingStabilisation of Pontoons, Zeta Berth, Instow, North Devon Debut Services06 Feb 201309 Apr 2014
MLA/2013/00046 - Completed Application - Burial at Sea Green Endings Funerals07 Feb 201308 Feb 2013
MLA/2013/00047 - Completed Application - Construction Humber Gateway Offshore Wind Farm- Met Mast E.On Climate & Renewables Uk Limited08 Feb 201315 Feb 2013
MLA/2013/00048 - Withdrawn Application - Emergency Work Removal of whale remains Mortehoe Parish Council 11 Feb 2013
MLA/2013/00049 - Completed Application - Construction Replacement of Aids to Navigation (Licence Enquiry Ref MLP/2012/00309 Martin Wright Associates Limited11 Feb 201311 Apr 2013
MLA/2013/00050/6 - Completed Application - Construction Erosion Protection Phase 3, Shotley Gate, Ipswich, Suffolk Shotley Parish Council11 Feb 201315 Aug 2019
MLA/2013/00051/1 - Completed Application - Construction REPAIR TO PILES ON SANDQUAY JETTY BRNC DARTMOUTH Debut Services (South West) Limited 12 Feb 201330 Apr 2013
MLA/2013/00052/2 - Completed Application - Construction Wheatcroft Outfall Repair No. 2 Yorkshire Water Services Limited12 Feb 201301 Aug 2013
MLA/2013/00053 - Completed Application - Removals (inc. Grab Samples) Environment Agency Intertidal Grab samplking for Benthic Inverts and Contaminant The Environment Agency13 Feb 201308 Mar 2013
MLA/2013/00055 - Completed Application - Construction Trinity College, Cambridge, Loompit Lake - River Wall Maintenance Bidwells Llp14 Feb 201325 Mar 2013
MLA/2013/00056 - Completed Application - Construction, Removals (inc. Grab Samples) Repair of localised damage to a jetty. Vopak Terminal London B.V. Limited14 Feb 201311 Apr 2013
MLA/2013/00057 - Completed Application - Miscellaneous Disposal Mixing and Dispersion of Small Estuarine Plumes Plymouth University 14 Feb 201307 Jun 2013
MLA/2013/00058 - Completed Application - Construction Navitus Bay Development Limited Meteorological Mast Application Grouped under: Navitus Bay Wind Park Showing 2 of 4 cases Eneco Round 3 Development Limited 14 Feb 201319 Jul 2013
MLA/2013/00060 - Completed Application - Construction Millendreath outfall works Espalier Developments 15 Feb 201303 May 2013
MLA/2013/00062 - Completed Application - Burial at Sea Mr David Williams 15 Feb 201305 Mar 2013
MLA/2013/00063/1 - Completed Application - Construction Brixham Marina Sealift Marina Developments Limited 18 Feb 201304 Jul 2013
MLA/2013/00064 - Completed Application - Construction BOW B String Cable Remedial Works Barrow Offshore Wind Limited19 Feb 201326 Mar 2013
MLA/2013/00065/1 - Completed Application - Construction Nethertown Rock Armour Sea Defence Works Network Rail Infrastructure Limited 19 Feb 201312 Jun 2013
MLA/2013/00068 - Withdrawn Application - Removals (inc. Grab Samples) Seaton Sluice Harbour Dredging, Clearance and maintenance Northumberland County Council 20 Feb 2013
MLA/2013/00069 - Completed Application - Construction speed limit markers buoys beach road hopton on sea Hopton Parish Council 20 Feb 201304 Jun 2014
MLA/2013/00071 - Completed Application - Emergency Work HMS Cambridge Outfall repair South West Water Limited21 Feb 201328 Feb 2013
MLA/2013/00072/5 - Completed Application - Construction Nemo Link - UK to Belgium Interconnector Nemo Link Ltd 21 Feb 201319 Jan 2024
MLA/2013/00073 - Completed Application - Construction River Plym - Railway Viaduct Bam Nuttall Limited 22 Feb 201318 Apr 2013
MLA/2013/00074 - Completed Application - Construction Bridlington rBWD Compliance - Connection Stub to Long Sea Outfall Yorkshire Water Limited 25 Feb 201322 Apr 2013
MLA/2013/00075 - Completed Application - Construction Dinghy Park Extension Orford Sailing Club 25 Feb 201315 Mar 2013
MLA/2013/00077 - Completed Application - Construction Construction of new river wall - works to the rear of 37-41 High St, Chatham Chartway Group Limited26 Feb 201331 May 2013
MLA/2013/00078 - Completed Application - Construction Crosssness River Wall - Urgent (Pease Process within 4 weeks) Thames Water Utilities Limited26 Feb 201318 Apr 2013
MLA/2013/00079 - Completed Application - Construction Portishead RNLI Lifeboat Station Rnli27 Feb 201322 May 2013
MLA/2013/00080/2 - Completed Application - Construction Strood Yacht Club Pontoon Moorings Mr John Lambert 27 Feb 201323 Jan 2015
MLA/2013/00083/1 - Completed Application - Construction Proposed Piling Works, Wootton Creek, I.W. Mr Steve Vick 28 Feb 201331 May 2013
MLA/2013/00084/2 - Completed Application - Construction Pontoons at South Quay, Berth 5, King's Lynn Borough Council Of King'S Lynn & West Norfolk 28 Feb 201308 Jul 2013
MLA/2013/00085/1 - Completed Application - Miscellaneous Disposal Sand Movement back onto the foreshore Cornwall Council01 Mar 201317 Feb 2014
MLA/2013/00088/1 - Completed Application - Removals (inc. Grab Samples) Removal of Docking Shoal meterological mast. Centrica Renewable Energy Limited 01 Mar 201318 Dec 2014
MLA/2013/00089 - Completed Application - Removals (inc. Grab Samples) Removal of lattice tower of Race Bank meterological mast. Centrica Renewable Energy Limited 01 Mar 201304 Apr 2013
MLA/2013/00090/1 - Completed Application - Removals (inc. Grab Samples) HMS Boynes Cannon Dr Douglas Mcelvogue04 Mar 201324 May 2013
MLA/2013/00091 - Completed Application - Construction Hamble Bridge Outfall Aprons Enterprisemouchel Limited 04 Mar 201321 May 2013
MLA/2013/00092/2 - Completed Application - Dredged Material Disposal, DredgingTrafalgar Wharf Approach Channel Maintenance Dredge Trafalgar Wharf Limited 05 Mar 201324 May 2016
MLA/2013/00095/1 - Completed Application - Construction Pontoon installation River Hamble L31/L32 Grouped under: Swanwick Marina River Wall Showing 4 of 9 cases Premier Marinas (Hamble) Limited07 Mar 201309 May 2014
MLA/2013/00096/1 - Completed Application - Construction Removal of Redundant ESSO Waterside Jetty at Oulton Broad, Harbour Road, NR323LY Esso Petroleum Company,Limited12 Mar 201309 Jun 2015
MLA/2013/00097/3 - Completed Application - Construction Brighton Marina Grouped under: Brighton Marina Master Case Showing 2 of 10 cases Midgard Ltd 12 Mar 201327 Jul 2016
MLA/2013/00098/2 - Completed Application - Construction Rossall and Anchorsholme Ground Investigation Works Wyre Borough Council13 Mar 201319 Dec 2013
MLA/2013/00099 - Completed Application - Construction Jetty Removal, DE Pass Wharf Gordon Alison Ltd 13 Mar 201304 Jun 2013
MLA/2013/00101 - Withdrawn Application - Dredging Dredging Docklands Transfer Station Van Oord Uk Ltd 14 Mar 2013
MLA/2013/00102/2 - Completed Application - Construction Scarborough rBWD - Corner Cafe Morgan Sindall Group Plc14 Mar 201308 Aug 2013
MLA/2013/00103/1 - Completed Application - Construction Devonport Energy From Waste Plant South West Water Limited15 Mar 201313 May 2014
MLA/2013/00104 - Completed Application - Construction Eastern Breakwater Refurbishment Falmouth Petroleum Limited18 Mar 201305 Jul 2013
MLA/2013/00105/2 - Completed Application - Construction Boston Haven Site 4 sheet piled flood wall replacement Environment Agency18 Mar 201317 Oct 2013
MLA/2013/00106 - Completed Application - Construction Installation of Artwork/Sculpture in Limehouse Reach, Narrow Street, London E14 Mr Ian Mckellen 18 Mar 201310 May 2013
MLA/2013/00108/3 - Completed Application - Miscellaneous Disposal Westermost Rough Offshore Wind Farm - Boulder Removal and Disposal Campaign Grouped under: Westermost Rough OWF Showing 4 of 8 cases Westermost Rough Limited20 Mar 201317 Jan 2014
MLA/2013/00110/2 - Completed Application - Construction Kingsbridge Berthing Improvements Salcombe Harbour22 Mar 201321 Aug 2013
MLA/2013/00111/2 - Completed Application - Dredged Material Disposal, DredgingPoole Harbour - In Harbour Disposal Poole Harbour Commissioners 22 Mar 201305 Jul 2013
MLA/2013/00112/1 - Completed Application - Construction Repairs to Ocean Village Jetty, Southampton Pacific Close Estates Limited 25 Mar 201316 Aug 2013
MLA/2013/00113/1 - Completed Application - Construction Tees Overhead Line Removal National Grid Electricity Transmission Plc26 Mar 201331 Jul 2013
MLA/2013/00114 - Completed Application - Construction South Sands pipeline repairs South West Water Limited27 Mar 201314 May 2013
MLA/2013/00117/1 - Completed Application - Construction Mevagissey Harbour Fish Jetty Extension Mevagissey Harbour Trustees 28 Mar 201325 Apr 2014
MLA/2013/00118/2 - Completed Application - Aggregate Dredging Aggregate Dredging from Application Area 506 Deme Building Materials Limited 28 Mar 201325 Sep 2018
MLA/2013/00119/2 - Completed Application - Aggregate Dredging, Removals (inc. Grab Samples) Area 212, 240 and 328 Hanson Aggregates Marine Limited28 Mar 201313 Aug 2019
MLA/2013/00120 - Completed Application - Construction Go Ahead Northern Bus Depot - Metrocentre Joyce Construction & Civils Ltd 02 Apr 201320 May 2013
MLA/2013/00121 - Completed Application - Construction Ocean Business 2013 Mr Keith Birch02 Apr 201304 Apr 2013
MLA/2013/00122 - Completed Application - Removals (inc. Grab Samples) Tresco Channel Exploratory Excavation Mr Kevin Camidge03 Apr 201327 Jun 2013
MLA/2013/00123/4 - Completed Application - Construction Laying a Mooring bouy for 17 Port la Salle Mr Peter Grigalis 03 Apr 201313 May 2014
MLA/2013/00124 - Completed Application - Construction Isle of Man Interconnector Cable - Cable Protection on Bispham beach Manx Cable Company Limited03 Apr 201309 May 2013
MLA/2013/00125/18 - CompletedApplication - Construction Bridlington rBWD Stormwater Long Sea Outfall Yorkshire Water Services Ltd04 Apr 201324 Jun 2014
MLA/2013/00126 - Completed Application - Removals (inc. Grab Samples), Renewables ETI Offshore Floating Wind Demonstrator Project Wave Hub Limited04 Apr 201324 May 2013
MLA/2013/00127/1 - Completed Application - Emergency Work Emergency repairs to seawall Rfh Associates04 Apr 201306 Sep 2013
MLA/2013/00129/1 - Completed Application - Dredged Material Disposal, DredgingMaintenance dredging and disposal in Bristol Harbour Area The Bristol Port Company Limited05 Apr 201306 Jan 2017
MLA/2013/00131/6 - Completed Application - Dredged Material Disposal, DredgingTyne Maintenance Dredging Port Of Tyne Authority05 Apr 201314 Sep 2022
MLA/2013/00132 - Completed Application - Construction Pont Quay Repair Works The National Trust05 Apr 201303 Jun 2013
MLA/2013/00133/1 - Completed Application - Construction Countess Wear Bridge Maintenance Works Grouped under: Bridge Road Widening Showing 2 of 3 cases Devon County Council08 Apr 201306 Jun 2013
MLA/2013/00135 - Completed Application - Construction WALB0462 River Severn Pipe outlet repair Amalgamated Construction Ltd09 Apr 201324 May 2013
MLA/2013/00136/1 - Completed Application - Construction Workington Riverbank Protection Connect Cndr Limited10 Apr 201304 Jun 2013
MLA/2013/00137/1 - Completed Application - Construction Scour Protection to Network Rail Structure CHW2 1 Amalgamted Construction Ltd 11 Apr 201319 Aug 2013
MLA/2013/00138 - Completed Application - Emergency Work Wightlink - Scour Hole Gunwharf Car Ferry Terminal Portsmouth Wightlink Limited 11 Apr 201311 Jul 2013
MLA/2013/00139 - Completed Application - Emergency Work Emergency Placement of Rock Armour Qinetiq 12 Apr 201319 Apr 2013
MLA/2013/00141/1 - Completed Application - Alternative Use of Dredged MaterialWeymouth Beach dredge and regrading West Dorset District Council15 Apr 201318 Jul 2013
MLA/2013/00142 - Completed Application - Construction Brixham Trawler Agents Ltd Ice Plant Renewal Brixham Trawler Agents Limited16 Apr 201330 Jul 2013
MLA/2013/00143 - Completed Application - Construction Eskmeals Sea Wall Reprofiling Qinetiq Estates Limited 17 Apr 201306 Jun 2013
MLA/2013/00144 - Completed Application - Construction Diving and Marine Centre Mansell 17 Apr 201325 Jun 2013
MLA/2013/00148/2 - Completed Application - Dredged Material DisposalDisposal of Dredged Arisings from the Lymington Lower River Approach Channel Grouped under: Lymington Harbour Dredge and Disposal Showing 2 of 3 cases Lymington Harbour Commissioners 18 Apr 201307 Sep 2015
MLA/2013/00149 - Completed Application - Removals (inc. Grab Samples) Jennycliff Wall Project Promare 22 Apr 201317 Jul 2013
MLA/2013/00151/1 - Completed Application - Removals (inc. Grab Samples) North Blyth Biomass Project Res Uk & Ireland Limited22 Apr 201304 Sep 2013
MLA/2013/00152/1 - Completed Application - Removals (inc. Grab Samples) Raising of brass propellor Mr Gifford Pound23 Apr 201322 Aug 2013
MLA/2013/00153/1 - Completed Application - Construction Irsha Street, Appledore Mr Phil Wright24 Apr 201303 Jun 2013
MLA/2013/00154/1 - Completed Application - Construction Countess Wear Bridge Advance Foundation Works Grouped under: Bridge Road Widening Showing 2 of 3 cases Devon County Council24 Apr 201314 Jun 2013
MLA/2013/00155/1 - Completed Application - Construction Clubb's Jetty, Gravesend J Clubb Limited 25 Apr 201303 Jul 2013
MLA/2013/00156 - Completed Application - Emergency Work Nethertown Slip J. Murphy & Sons Limited25 Apr 201303 May 2013
MLA/2013/00157/4 - Completed Application - Construction South Fambridge all tide pontoon Fambridge Yacht Haven Limited 26 Apr 201324 Aug 2016
MLA/2013/00158/2 - Completed Application - Construction Town Quay Radar Mast, Port of Southampton Associated British Ports, Southampton 26 Apr 201302 Oct 2013
MLA/2013/00160 - Completed Application - Burial at Sea Charles Lister29 Apr 201302 May 2013
MLA/2013/00162 - Completed Application - Construction Smugglers Way Fender Maintenance Riverside (Thames) Ltd30 Apr 201311 Jun 2013
MLA/2013/00164 - Completed Application - Construction, Removals (inc. Grab Samples) Lake Lothing Swing Bridge Lowestoft Suffolk County Council30 Apr 201304 Oct 2013
MLA/2013/00165/1 - Completed Application - Construction Improvement works to harbour at Holy Island Holy Island Of Lindisfarne Community Development Trust30 Apr 201304 Jun 2014
MLA/2013/00166 - Completed Application - Construction Reinstatement of barge blocks at Standard Quay Quayside Properties (Faversham) Ltd 01 May 201312 Feb 2014
MLA/2013/00167 - Completed Application - Construction Isle Of Man Interconnector Cable - Concrete Mattress Cable Protection Remedial W Manx Cable Company Limited01 May 201328 Jun 2013
MLA/2013/00168/1 - Completed Application - Construction Great Yarmouth Flood Defences 2013-2016 Phase 1 Environment Agency01 May 201320 Dec 2013
MLA/2013/00169/9 - Completed Application - Construction Teesside Wind Farm Operations and Maintenance Building Teesside Windfarm Limited 03 May 201330 Mar 2016
MLA/2013/00170/2 - Completed Application - Dredged Material DisposalMaintenace Dredging at Kendalls Wharf Kendall Bros. (Portsmouth) Limited03 May 201319 Nov 2015
MLA/2013/00172 - Completed Application - Removals (inc. Grab Samples) Harwich Channel Deepening Site Investigation Grouped under: Harwich dredge and disposal Showing 3 of 9 cases Harwich Haven Authority 03 May 201330 Jul 2013
MLA/2013/00173/1 - Completed Application - Construction London Gateway Western Outfall London Gateway Port Ltd 03 May 201315 Jul 2013
MLA/2013/00174/1 - Completed Application - Construction Pendennis Seawall Pendennis Shipyard Limited03 May 201316 Aug 2013
MLA/2013/00175/1 - Completed Application - Removals (inc. Grab Samples) Goodwin Sands Dornier 17 Recovery Project Royal Air Force Museum03 May 201310 Jun 2013
MLA/2013/00176 - Completed Application - Construction Goshem Farm Temporary Jetty Ingrebourne Valley Ltd07 May 201305 Aug 2013
MLA/2013/00178/1 - Completed Application - Construction Jubilee Bridge, Barrow - Welfare Provision and Mechanical Upgrades Cumbria County Council07 May 201331 Jan 2014
MLA/2013/00179 - Completed Application - Construction Repairs to Mooring Dolphin Cory Riverside07 May 201328 Jun 2013
MLA/2013/00180/4 - Completed Application - Dredged Material Disposal, DredgingCorporation Wharf, Finnigan Road, PlymouthDredge site, LANTIC BAY (PL060) Victoria Wharf Ltd08 May 201323 Dec 2015
MLA/2013/00182/1 - Completed Application - Construction Meols LSO United Utilities Plc08 May 201302 May 2014
MLA/2013/00184/3 - Completed Application - Construction Old Quay Head Ilfracombe Harbour North Devon District Council09 May 201329 Jul 2014
MLA/2013/00185 - Completed Application - Burial at Sea Mr Charles Lister 09 May 201309 May 2013
MLA/2013/00186/2 - Completed Application - Removals (inc. Grab Samples) Port of Tyne - Site Investigation Port Of Tyne Authority10 May 201329 Oct 2013
MLA/2013/00187/5 - Completed Application - Construction Rossall Coastal Defence Scheme Wyre Borough Council10 May 201321 Dec 2017
MLA/2013/00188/1 - Completed Application - Removals (inc. Grab Samples) Demolition of Henley's Jetty Homes And Communities Agency10 May 201322 Jul 2013
MLA/2013/00189/5 - Completed Application - Construction Anchorsholme Coast Protection Scheme Blackpool Borough Council 10 May 201330 Jul 2015
MLA/2013/00190 - Withdrawn Application - Construction Proposed Floating Pontoon at Osea Leisure Park Osea Road Camp Sites Limited10 May 2013
MLA/2013/00192 - Completed Application - Construction Rock armour at tip of Sunderland Point Sunderland Point Community Association10 May 201323 Jul 2013
MLA/2013/00195 - Completed Application - Construction Tynemouth Haven Launch Ramp North Tyneside Council15 May 201328 Aug 2013
MLA/2013/00196 - Completed Application - Construction Dartmouth Public Slipway South Hams District Council 16 May 201317 May 2013
MLA/2013/00197 - Completed Application - Construction NKL-526 scour protection B.& M.Mchugh Limited17 May 201331 Jul 2013
MLA/2013/00198/2 - Completed Application - Construction Woolwich Ferry Jetties Concrete Repairs20 May 201310 Feb 2014
MLA/2013/00201 - Completed Application - Construction Dawlish Sea Wall (D.C.D.) Dyer & Butler Ltd 22 May 201313 Jun 2013
MLA/2013/00203 - Completed Application - Construction Reconstruction part garden wall for boat mooring Andrew Reid 22 May 201315 Jul 2013
MLA/2013/00204/1 - Completed Application - Construction Lee Moor Tramway Bridge repair works, River Plym, Plymouth Sustrans23 May 201311 Jul 2013
MLA/2013/00205 - Completed Application - Construction Scour Protection Littlehempston MLN1-221-42.75 Network Rail Infrastructure Limited 24 May 201322 Aug 2013
MLA/2013/00206 - Completed Application - Construction Bishops Tawton NDN209-68 Network Rail Limited24 May 201310 Sep 2013
MLA/2013/00207 - Completed Application - Construction Repair of Sea Wall, Godolphin Arms Marazion Cornwall Grouped under: St Aubyn Estate Showing 2 of 7 cases St Aubyn Estates24 May 201321 Aug 2013
MLA/2013/00208 - Completed Application - Construction St Michael's Mount Causeway Grouped under: St Aubyn Estate Showing 2 of 7 cases St Aubyn Estates24 May 201321 Aug 2013
MLA/2013/00209 - Completed Application - Construction No 1. Covered Slipway Rails Mr William Stirling 28 May 201317 Jul 2013
MLA/2013/00210 - Completed Application - Construction Refurbishment of Chainlocker & Shipwrights Harvey Shopfitters Limited28 May 201303 Jun 2013
MLA/2013/00211/1 - Completed Application - Construction Portsmouth Flood Alleviation Scheme - Improvement Works to Gt Salterns Outfall 4delivery Limited 28 May 201302 Sep 2013
MLA/2013/00212/8 - Completed Application - Construction Littlehampton Arun East Bank Tidal Walls Environment Agency (Southern Region)29 May 201314 Nov 2017
MLA/2013/00215/1 - Completed Application - Construction Cromer Coast Protection Scheme 982 North Norfolk District Council30 May 201327 Mar 2015
MLA/2013/00216/6 - Completed Application - Dredged Material Disposal, DredgingCowes Outer Harbour Project Dredge disposal renewal Cowes Harbour Commission31 May 201328 Sep 2022
MLA/2013/00217/7 - Completed Application - Dredged Material Disposal, DredgingOffshore Technology Park Dredge Shepherd Offshore Services Limited31 May 201304 Jul 2014
MLA/2013/00218/1 - Completed Application - Construction Helford River Children' Sailing Trust Pontoon Helford River Children' Sailing Trust 03 Jun 201316 Dec 2020
MLA/2013/00219 - Completed Application - Construction Folkestone Warren - Clearance of fallen chalk on walkway Network Rail Limited04 Jun 201301 Aug 2013
MLA/2013/00221/1 - Completed Application - Emergency Work Emergency works Wells Harbour channel Wells Harbour Commissioners 07 Jun 201305 Jul 2013
MLA/2013/00223 - Withdrawn Application - Removals (inc. Grab Samples) Fender at Thornham, North Norfolk coast Gac Shipping (Uk) Ltd.07 Jun 2013
MLA/2013/00224/1 - Completed Application - Construction ATH-1788 scour protection, River Rother near Rye B.& M.Mchugh Limited10 Jun 201318 Nov 2013
MLA/2013/00225/1 - Completed Application - Construction Timber Pile Replacement and Anchor Retaining System , Walberswick Walberswick Common Lands Charity10 Jun 201305 Aug 2013
MLA/2013/00227 - Completed Application - Construction North West Quay Outfall Relocation Works (Phase 1) Port Of Tyne Authority12 Jun 201321 Aug 2013
MLA/2013/00228 - Completed Application - Construction Finger Jetty Refurbishment Bae Systems Surface Ships Limited 12 Jun 201329 Jul 2013
MLA/2013/00229 - Completed Application - Construction Monitoring nearshore currents around St Bees Head Sefton Mbc13 Jun 201315 Nov 2013
MLA/2013/00230/3 - Completed Application - Construction Northumbrian Quay Pontoons Port Of Tyne13 Jun 201331 Mar 2016
MLA/2013/00231 - Completed Application - Construction Beeding Bridge strengthening works West Sussex County Council13 Jun 201325 Jul 2013
MLA/2013/00233 - Completed Application - Construction Spragger Clough Outfall Refurbishment (Primary and Secondary Defence Structures) Carter Jonas Llp17 Jun 201309 Aug 2013
MLA/2013/00234 - Completed Application - Construction Proposed Repairs to Kiddies Corner Scarborough Borough Council 19 Jun 201307 Oct 2013
MLA/2013/00235 - Completed Application - Construction The Saltings Saltmarsh Habitat Creation Project Rastrum Limited 21 Jun 201316 Jan 2014
MLA/2013/00236/1 - Completed Application - Construction Swanwick Marina Pile Replacement Grouped under: Swanwick Marina River Wall Showing 4 of 9 cases Premier Marinas (Hamble) Limited21 Jun 201307 Aug 2013
MLA/2013/00237 - Completed Application - Construction Merlin Quay Pontoons Merlin Real Estate Limited21 Jun 201322 Aug 2013
MLA/2013/00238/5 - Completed Application - Construction, Dredged Material Disposal, DredgingRSQ Downriver Extension Port Of Tyne Authority24 Jun 201321 Dec 2017
MLA/2013/00239/5 - Completed Application - Construction Roof repair Mr Chris Kennedy24 Jun 201305 Feb 2015
MLA/2013/00240 - Completed Application - Construction Construction of 4 Houses & 9 apartments @ 18 North Parade Milbourne Developments Ltd25 Jun 201329 Aug 2013
MLA/2013/00241 - Completed Application - Miscellaneous Disposal Catchment to Coast (Natural Environment Research Council, Acronym C2C) Aberystwyth University25 Jun 201316 Aug 2013
MLA/2013/00242 - Completed Application - Construction Millbay Dolphins Refurbishment Works Bam Nuttall Limited 26 Jun 201304 Jun 2014
MLA/2013/00243 - Completed Application - Construction Caytor Bridge Leak Repair Environment Agency (Southern Region)27 Jun 201308 Aug 2013
MLA/2013/00244/1 - Completed Application - Construction Gosport Cruising Club Repair Works Gosport Cruising Club 28 Jun 201305 Sep 2016
MLA/2013/00245 - Completed Application - Burial at Sea Mr Gavin Palin28 Jun 201304 Jul 2013
MLA/2013/00247/1 - Completed Application - Construction 58 Pearce Avenue Colmar Construction (Poole) Limited 02 Jul 201318 Sep 2013
MLA/2013/00248 - Completed Application - Emergency Work Lympstone Sea Wall - Repair Devon County Council02 Jul 201305 Jul 2013
MLA/2013/00249/4 - Completed Application - Dredged Material Disposal, DredgingAnnual Maintenance Dredging and Disposal Port Of Sheerness Limited 02 Jul 201327 Jan 2017
MLA/2013/00250/1 - Completed Application - Construction River Condenser Pipework and Associated Equipment Replacement Project British Telecommunications Public Limited Company 02 Jul 201301 Nov 2013
MLA/2013/00252/1 - Completed Application - Construction 18 Gillender Street Ardmore Construction Limited03 Jul 201328 Aug 2013
MLA/2013/00254 - Completed Application - Removals (inc. Grab Samples) Howdon Jetty Mooring Improvement Works Port Of Tyne Authority03 Jul 201324 Sep 2013
MLA/2013/00255/4 - Completed Application - Dredged Material Disposal, DredgingMaintenance Dredge Licence - A&P Tyne Ltd, Hebburn - Quays & Dry Dock Entrance A&P Tyne Ltd04 Jul 201314 Feb 2017
MLA/2013/00256/2 - Completed Application - Construction, Dredged Material Disposal, DredgingBerth 9 Quay Extension Hutchison Ports (Uk) Limited04 Jul 201322 May 2014
MLA/2013/00257/2 - Completed Application - Construction Replacement of 4 wooden piles with 4 tubular steel piles at the RVYC Royal Victoria Yacht Club 05 Jul 201308 May 2014
MLA/2013/00258/2 - Completed Application - Construction Carr Lane Sewage Pumping Station, Goole Yorkshire Water Services Limited05 Jul 201309 Apr 2014
MLA/2013/00259/1 - Completed Application - Construction Cabin Boatyard Quay Wall Repairs Cabin Boatyard05 Jul 201304 Oct 2013
MLA/2013/00260/1 - Completed Application - Construction Brunel landing at Starcross on the Exe Estuary Star Cross Fishing & Cruising Club08 Jul 201328 Jul 2014
MLA/2013/00262 - Completed Application - Burial at Sea Charles Lister09 Jul 201312 Jul 2013
MLA/2013/00263 - Completed Application - Construction West India Pier Sunset Moorings Ltd 10 Jul 201320 Sep 2013
MLA/2013/00266/1 - Completed Application - Construction, Removals (inc. Grab Samples) Torquay Inner Harbour - Pontoon Berthing Tor Bay Harbour Authority 11 Jul 201324 Mar 2014
MLA/2013/00267/4 - Completed Application - Construction Wash Tide Gauge Environment Agency11 Jul 201316 Jul 2019
MLA/2013/00268/3 - Completed Application - Removals (inc. Grab Samples) EDF Energy NNB Sizewell C Offshore Ground Investigation Works 2013 Nnb Generation Company Limited11 Jul 201323 Oct 2013
MLA/2013/00269/10 - CompletedApplication - Construction, Dredging, Miscellaneous Disposal Bradwell Nuclear Decommissioning Site Silt Removal from Culvert Magnox Limited12 Jul 201319 May 2014
MLA/2013/00270 - Completed Application - Miscellaneous Disposal Westermost Rough Offshore Wind Farm - Disposal Strategy for Foundation Drilling Grouped under: Westermost Rough OWF Showing 4 of 8 cases Westermost Rough Limited12 Jul 201315 Apr 2014
MLA/2013/00271 - Completed Application - Construction Riverside Jetty John Hutton 16 Jul 201318 Sep 2013
MLA/2013/00272 - Completed Application - Construction Royal Dock Harbour offshore wind support facility Associated British Ports. 17 Jul 201315 Oct 2013
MLA/2013/00273 - Completed Application - Dredged Material Disposal, DredgingMaintenance Dredge Licence - OGN Hadrian Yard, River Tyne Offshore Group Newcastle Limited17 Jul 201317 Dec 2013
MLA/2013/00274 - Completed Application - Construction NKL-645/646 scour protection works B.& M.Mchugh Limited17 Jul 201318 Oct 2013
MLA/2013/00275/2 - Completed Application - Construction Restoration of Hastings Pier Hastings Pier Charity 18 Jul 201329 Aug 2014
MLA/2013/00276/1 - Completed Application - Construction North Kent Outfalls Environment Agency - Anglian Region 19 Jul 201313 Dec 2013
MLA/2013/00277 - Completed Application - Miscellaneous Disposal Green tide 2 oil spill response exercise Oil Spill Response Limited19 Jul 201310 Sep 2013
MLA/2013/00278 - Completed Application - Construction Longbridge Road Flood Alleviation Scheme Mr Adrian Trim19 Jul 201305 Dec 2013
MLA/2013/00279/1 - Completed Application - Construction Cargo Package Refurbishment Environment Agency (Southern Region)22 Jul 201320 Dec 2013
MLA/2013/00280/1 - Completed Application - Construction Renewal of the main slipway and moving the Eastern jetty 9m East Itchenor Sailing Club 23 Jul 201301 Apr 2016
MLA/2013/00281/1 - Completed Application - Construction SABIC North Tees Jetty 2 embankment repair Sabic Uk Petrochemicals Limited 23 Jul 201307 Nov 2013
MLA/2013/00282 - Completed Application - Construction Installation and testing of the King Harry Ferry 2 shallow water fibre optic Bt Group Plc23 Jul 201315 Apr 2014
MLA/2013/00283 - Completed Application - Emergency Work Sunny Cliff Pipeline - Salcombe South West Water Limited23 Jul 201324 Jul 2013
MLA/2013/00285/1 - Completed Application - Dredged Material Disposal, Dredgingoffshore group newcastle/enquest Offshore Group Newcastle Limited24 Jul 201304 Oct 2013
MLA/2013/00287/1 - Completed Application - Construction Laira Rail Bridge Pedestrian and Cycle Scheme Plymouth City Council 24 Jul 201308 Jan 2014
MLA/2013/00288/1 - Completed Application - Construction St John Septic Tank outfall repair South West Water Limited24 Jul 201305 Sep 2013
MLA/2013/00289/3 - Completed Application - Construction Millendreath sea defence, slipway and culvert upgrade. Espalier Developments (Millendreath) Limited25 Jul 201330 Apr 2018
MLA/2013/00290 - Completed Application - Construction Repair to sheet pile wall Magnox Limited25 Jul 201328 Aug 2013
MLA/2013/00291/1 - Completed Application - Dredged Material Disposal, DredgingMaintenance Dredge Licence - Simon Storage Ocean Berth, River Tyne Inter Terminals Tyneside Limited26 Jul 201312 Aug 2016
MLA/2013/00292/3 - Completed Application - Dredged Material DisposalHarwich / Felixstowe maintenance dredging disposal Grouped under: Harwich dredge and disposal Showing 3 of 9 cases Harwich Haven Authority 26 Jul 201328 Feb 2018
MLA/2013/00293/2 - Completed Application - Dredged Material Disposal, DredgingMaintenance Dredge Licence - Cemex - Jarrow Quay, River Tyne Cemex Uk Marine Limited 26 Jul 201324 May 2017
MLA/2013/00294/1 - Completed Application - Construction Pontoon installation River Hamble L30/L31 Grouped under: Swanwick Marina River Wall Showing 4 of 9 cases Premier Marinas (Hamble) Limited26 Jul 201302 Oct 2014
MLA/2013/00295/1 - Completed Application - Construction Dagenham Jetty Refurbishment - Pontoon & Linkspan Resurfacing Ford Motor Company Limited26 Jul 201306 Aug 2014
MLA/2013/00296/3 - Completed Application - Aggregate Dredging, Removals (inc. Grab Samples) Long Sand Head - Area 509 Tarmac Marine Dredging Limited29 Jul 201326 May 2017
MLA/2013/00297/5 - Completed Application - Aggregate Dredging, Removals (inc. Grab Samples) Long Sand Head - Area 510 Cemex Uk Marine Limited 29 Jul 201317 Aug 2020
MLA/2013/00298/2 - Completed Application - Aggregate Dredging, Removals (inc. Grab Samples) Long Sand Head - Area 508 Britannia Aggregates Limited29 Jul 201325 May 2017
MLA/2013/00300 - Withdrawn Application - Miscellaneous Disposal West Bay inner harbour dredging West Dorset District Council29 Jul 2013
MLA/2013/00301/1 - Completed Application - Construction Greenwich Reach Pedestrian Swing Bridge Roamquest Limited 30 Jul 201304 Dec 2013
MLA/2013/00302/1 - Completed Application - Construction, Dredged Material Disposal, DredgingPort Meridian Deep Water Port Project Port Meridian Energy Limited30 Jul 201316 Apr 2019
MLA/2013/00303 - Completed Application - Construction Walcott Beach Steps North Norfolk District Council31 Jul 201310 Sep 2013
MLA/2013/00304/1 - Completed Application - Construction Creekmoor Sheet Piles Maintenance Borough Of Poole Council31 Jul 201315 May 2014
MLA/2013/00306/1 - Completed Application - Aggregate Dredging, Removals (inc. Grab Samples) Area 401/2 Hanson Aggregates Limited 01 Aug 201326 May 2017
MLA/2013/00308/1 - Completed Application - Construction Boston Boat Yard - River wall improvement The Cavanna Group 05 Aug 201331 Jul 2014
MLA/2013/00310 - Completed Application - Construction Small Craft Landing Poontoon Bam Nuttall Limited 05 Aug 201308 Oct 2013
MLA/2013/00311 - Completed Application - Construction King Post Wall Reinstatement Works - River Breeze, The Esplanade, Hullbridge Mr Stewart Ward 08 Aug 201314 Nov 2013
MLA/2013/00314/1 - Completed Application - Construction, Removals (inc. Grab Samples) Jetty 3 and 5 Thames Oilport Vopak Services Uk Limited 08 Aug 201308 Oct 2014
MLA/2013/00315/2 - Completed Application - Construction Severn Critical Eel Tidal Flaps Environment Agency – South West Reg 09 Aug 201307 Oct 2013
MLA/2013/00316 - Completed Application - Miscellaneous Disposal Tracer investigation Harrowside Outfall Centre For Research Into Environment And Health (Creh) Ltd09 Aug 201324 Sep 2013
MLA/2013/00317/1 - Completed Application - Construction, Removals (inc. Grab Samples) Pagham Beach Coastal Defence Project Arun District Council 09 Aug 201329 Nov 2013
MLA/2013/00318 - Completed Application - Renewables Westermost Rough Offshore Wind Farm - array cable trial trenching Grouped under: Westermost Rough OWF Showing 4 of 8 cases Westermost Rough Limited09 Aug 201315 Apr 2014
MLA/2013/00319 - Completed Application - Construction Pontoon at Salcombe, Salcombe Estuary, Devon Nicolas James Group Limited 12 Aug 201321 Feb 2014
MLA/2013/00320/1 - Completed Application - Construction Phase 3 & 4 installation of Floating Pontoons Grimsby Fish Dock Enterprises Limited 13 Aug 201317 Dec 2013
MLA/2013/00321/3 - Completed Application - Construction, Dredged Material Disposal, DredgingSwanwick Marina Maintenance Dredge & Lifting Dock Grouped under: Swanwick Marina River Wall Showing 4 of 9 cases Premier Marinas (Hamble) Limited13 Aug 201307 Aug 2018
MLA/2013/00322 - Completed Application - Construction Keyhaven Quay - Resurfacing Part of Quay and Slipway New Forest District Council 13 Aug 201314 Nov 2013
MLA/2013/00323/1 - Completed Application - Construction Repair works to Poulton water treatment outfall United Utilities14 Aug 201330 Oct 2013
MLA/2013/00324/1 - Completed Application - Construction Woolverstone Redevelopment Marina Developments Limited 14 Aug 201305 Dec 2013
MLA/2013/00325 - Completed Application - Construction, Removals (inc. Grab Samples) Minoco Wharf River Wall Kier Construction 15 Aug 201322 Jan 2014
MLA/2013/00326/1 - Completed Application - Construction, Dredging Harrowside Long Sea Outfall - Maintenance Works United Utilities Water Plc15 Aug 201328 Oct 2013
MLA/2013/00327/1 - Completed Application - Alternative Use of Dredged Material, Construction, Dredging, Removals (inc. Grab Samples)Levington Saltmarsh restoration and beneficial Use of Dredgings Project 2013 Suffolk Yacht Harbour 16 Aug 201307 Nov 2018
MLA/2013/00328 - Completed Application - Construction Great Breach Pumping Station Gravity Outfall : Repairs to Steel Flap Valve The Environment Agency16 Aug 201329 Aug 2013
MLA/2013/00329/3 - Completed Application - Aggregate Dredging, Removals (inc. Grab Samples) Area 498 - North Inner Gabbard Britannia Aggregates Limited16 Aug 201312 May 2017
MLA/2013/00330/4 - Completed Application - Aggregate Dredging, Removals (inc. Grab Samples) Area 498 - North Inner Gabbard Volker Dredging Limited 19 Aug 201305 May 2017
MLA/2013/00331 - Completed Application - Construction Climping Coastal recycling maintenance 2013/14 Environment Agency (Southern Region)19 Aug 201328 Oct 2013
MLA/2013/00332/1 - Completed Application - Construction Pontoon replacement City Cruises PLC Kent Structural & Architectural Ltd 19 Aug 201317 Jan 2014
MLA/2013/00333/1 - Completed Application - Construction Dagenham Jetty - Ancillary & Marine Safety Works Ford Motor Company Ltd20 Aug 201306 Aug 2014
MLA/2013/00334/1 - Completed Application - Dredged Material Disposal, DredgingGoodchild Marine Services Marina and lift dock Goodchild Marine Services Limited 21 Aug 201307 Apr 2021
MLA/2013/00335 - Withdrawn Application - Renewables Floating Offshore Wind Platform Demonstrator at Wave Hub in Cornwall Wave Hub Limited21 Aug 2013
MLA/2013/00336/3 - Completed Application - Aggregate Dredging, Removals (inc. Grab Samples) Areas 400 and 106 (Consolidated) Hanson Aggregates Ltd 21 Aug 201303 Aug 2017
MLA/2013/00337/6 - Completed Application - Construction Outer Harbour Development, Brighton Marina - Phase 1 Grouped under: Brighton Marina Master Case Showing 2 of 10 cases The Brighton Marina Company Ltd 23 Aug 201322 May 2014
MLA/2013/00338/1 - Completed Application - Aggregate Dredging, Removals (inc. Grab Samples) Aggregate Extraction Areas Areas 242-361 & 328A Hanson Aggregates Limited 23 Aug 201313 Aug 2019
MLA/2013/00339 - Completed Application - Construction, Removals (inc. Grab Samples) Beach Management Plan Witterings Recycling Scheme Chichester District Council 23 Aug 201328 Oct 2013
MLA/2013/00340 - Completed Application - Alternative Use of Dredged Material, ConstructionBeach Management Plan: Selsey Shingle Recharge Scheme Chichester District Council 23 Aug 201314 Oct 2013
MLA/2013/00341 - Completed Application - Construction, Removals (inc. Grab Samples) 60 Pearce Avenue Mr Duncan Stone 24 Aug 201310 Oct 2013
MLA/2013/00342/4 - Completed Application - Dredged Material Disposal, DredgingMaintenance Dredging at HMNB Portsmouth Defence Infrastructure Organisation 27 Aug 201320 Dec 2017
MLA/2013/00343 - Completed Application - Removals (inc. Grab Samples) No. 4 Slip Concrete Upstand Removal Devonport Royal Dockyard Limited28 Aug 201308 Oct 2013
MLA/2013/00344 - Completed Application - Construction Hayle Beach Access Hayle Town Council30 Aug 201311 Oct 2013
MLA/2013/00345 - Completed Application - Construction Millbrook Teignmouth Maritime Services Limited02 Sep 201313 Nov 2013
MLA/2013/00347 - Completed Application - Burial at Sea Mr Charles Lister 02 Sep 201304 Sep 2013
MLA/2013/00349 - Completed Application - Removals (inc. Grab Samples) Removal of an old gun barrel from a know wreck site Mr Ben Dunstan02 Sep 201314 Aug 2014
MLA/2013/00350 - Completed Application - Construction Deployment of Directional Waverider buoy off Isles of Scilly Mr Simon Humphry03 Sep 201314 Nov 2013
MLA/2013/00351/2 - Completed Application - Dredged Material Disposal, DredgingMaintenance Dredging at SMC Marchwood Westminster Dredging Company Limited04 Sep 201323 Feb 2017
MLA/2013/00353/2 - Completed Application - Alternative Use of Dredged MaterialPoole Bay Nearshore Beach Renourishment Trial Borough Of Poole06 Sep 201326 Jan 2015
MLA/2013/00354 - Completed Application - Construction Lower Quay Pontoon Looe Harbour Commissioners06 Sep 201320 Nov 2013
MLA/2013/00355/1 - Completed Application - Miscellaneous Disposal Wheatcroft Long Sea Outfall Dye Test Yorkshire Water Limited 06 Sep 201325 Oct 2013
MLA/2013/00356 - Completed Application - Construction Chichester Marina Surface Water Outfall Premier Marinas Limited 09 Sep 201321 Oct 2013
MLA/2013/00357 - Withdrawn Application - Miscellaneous Disposal, Removals (inc. Grab Samples) Seaford Beach Recycling 2013/14 - 2017/18 Environment Agency10 Sep 2013
MLA/2013/00358/2 - Completed Application - Construction, Dredging, Removals (inc. Grab Samples) RM Poole The Hard: Reconfiguration and construction of new Mooring Pontoons Defence Infrastructure Organisation 11 Sep 201326 Mar 2014
MLA/2013/00359 - Completed Application - Construction Pipe adjacent to East Cliff, Teignmouth South West Water Limited11 Sep 201330 Oct 2013
MLA/2013/00360/1 - Completed Application - Dredging Middleton Wastewater Treatment Works Long Sea Outfall - Maintenance United Utilities Water Plc11 Sep 201317 Mar 2014
MLA/2013/00361/3 - Completed Application - Dredged Material DisposalHarwich/ Felixstowe maintenance dredging disposal Grouped under: Harwich dredge and disposal Showing 3 of 9 cases Harwich Haven Authority 12 Sep 201317 Oct 2016
MLA/2013/00362 - Completed Application - Dredged Material Disposal, DredgingMaintenance dredgingFoxs Marina, Ipswich, Foxs Marina Disposal Site (Mudflats)Fox'S Marina Ipswich Limited12 Sep 201314 Jan 2015
MLA/2013/00363/2 - Completed Application - Construction Gate Lay-By Berth, Able UK Seaton Port Able Uk Ltd 12 Sep 201322 Mar 2017
MLA/2013/00364 - Withdrawn Application - Construction Battersea Power Station Temporary Water Taxi Jetty Battersea Power Station Development Company 12 Sep 2013
MLA/2013/00365/2 - Completed Application - Construction Oldbury Active Effluent Discharge Line Magnox Limited13 Sep 201329 Oct 2014
MLA/2013/00366/3 - Completed Application - Construction River Medway Railway Bridge brick pier and abutment maintenance repairs Balfour Beatty Rail Limited 16 Sep 201319 Jun 2014
MLA/2013/00367 - Completed Application - Removals (inc. Grab Samples) NSN Link - Ground Investigation Worleyparsons Europe Limited17 Sep 201318 Dec 2013
MLA/2013/00368 - Completed Application - Construction Proposed Pontoon, Bridge Road, LymingtonPontoon Redrow Homes Limited18 Sep 201324 Jun 2015
MLA/2013/00369/1 - Completed Application - Construction Trinity Road Seawall North Tyneside Council18 Sep 201312 Aug 2014
MLA/2013/00370 - Completed Application - Construction Gilkicer Lagoon Outfall Replacement Southern Water Services Limited 19 Sep 201328 Nov 2013
MLA/2013/00371/2 - Completed Application - Dredged Material Disposal, DredgingMaintenance Dredging 2014 Cowes Yacht Haven 19 Sep 201321 Jan 2019
MLA/2013/00372/1 - Completed Application - Construction Hurst Spit Beach Management Plan North Point Recycling New Forest District Council 19 Sep 201312 Feb 2014
MLA/2013/00373 - Completed Application - Renewables Westermost Rough Offshore Wind Farm - Export cable plough trial Grouped under: Westermost Rough OWF Showing 4 of 8 cases Mr Lars Bie Jensen20 Sep 201315 Apr 2014
MLA/2013/00374 - Completed Application - Construction Sea Cadet Mooring Pontoons T S Southampton 20 Sep 201325 Oct 2013
MLA/2013/00375/2 - Completed Application - Construction Fingringhoe, River Colne Managed Realignment Environment Agency23 Sep 201326 Aug 2015
MLA/2013/00377/2 - Completed Application - Construction Port Hamble Marina Pile Replacement Marina Developments Limited 24 Sep 201324 Nov 2017
MLA/2013/00378 - Completed Application - Construction Northney Marina Pile Replacement Marina Developments Limited 24 Sep 201320 Dec 2013
MLA/2013/00379/1 - Completed Application - Construction Shamrock Quay Pile Replacement Marina Developments Limited 24 Sep 201328 Jan 2014
MLA/2013/00380/2 - Completed Application - Construction Heysham No.1 Power Station Outfall Repairs Edf Energy25 Sep 201324 Jul 2014
MLA/2013/00381 - Completed Application - Construction Plymstock Quarry Storm Water Outfall Dyer And Butler Limited 25 Sep 201302 Dec 2013
MLA/2013/00382 - Completed Application - Construction Harrington Coastal Defence No. 5 J. Murphy & Sons Limited26 Sep 201320 Dec 2013
MLA/2013/00384/2 - Completed Application - Construction Modification of Fishing Boat Moorings In Lymington River Lymington Harbour Commissioners 26 Sep 201316 Jan 2014
MLA/2013/00385 - Completed Application - Removals (inc. Grab Samples) Removal of former Sevalco plant redundant effluent outfall pipe Sevalco Limited 26 Sep 201315 Nov 2013
MLA/2013/00386 - Completed Application - Construction ESK-426 scour protection B.& M.Mchugh Limited27 Sep 201302 Jan 2014
MLA/2013/00387 - Completed Application - Construction C1 cable rock protection Mr Ole Bigum Nielsen27 Sep 201309 May 2014
MLA/2013/00388 - Completed Application - Construction Hayle Harbour Swing Bridge Enabling Works Hammond (Ecs) Limited 01 Oct 201308 Oct 2013
MLA/2013/00389 - Completed Application - Construction Tower of London temporary river wall repairs Historic Royal Palaces01 Oct 201303 Dec 2013
MLA/2013/00391 - Completed Application - Construction Phase 4 - Secombe Ferry Terminal Platform Repairs and walkway installation Merseytravel Limited02 Oct 201306 Mar 2014
MLA/2013/00393 - Completed Application - Construction Stabilization / Strengthening works to Shotley Pier East Anglian Marine Leisure Llp 03 Oct 201328 Nov 2013
MLA/2013/00395 - Completed Application - Construction Fulham Wharf Bdw Trading Limited 04 Oct 201329 Jan 2014
MLA/2013/00396 - Completed Application - Removals (inc. Grab Samples) Extension to Project Harbour Gaze Survey areas. Mr Robin Burrows06 Oct 201320 Dec 2013
MLA/2013/00398 - Completed Application - Construction Wind and direction measurement buoy and wave buoy deployment Neart Na Gaoithe Offshore Wind Limited08 Oct 201327 Nov 2013
MLA/2013/00399/1 - Completed Application - Alternative Use of Dredged MaterialEastbourne Beach Management Works 2013-2014 and 2014-2015 Eastbourne Borough Council08 Oct 201304 Jul 2014
MLA/2013/00400/4 - Completed Application - Miscellaneous Disposal Tracer Studies Centre For Research Into Environment And Health (Creh) Ltd08 Oct 201309 Feb 2015
MLA/2013/00401 - Completed Application - Emergency Work Sands Lane, Bridlington - Outfall Collapse Yorkshire Water Limited 09 Oct 201315 Oct 2013
MLA/2013/00402 - Completed Application - Construction Chiswick Bridge Refurbishment Bam Nuttall Limited 09 Oct 201308 Jan 2014
MLA/2013/00403/1 - Completed Application - Construction, Removals (inc. Grab Samples) Sea View Yacht Club Landing Stage and Slipway Replacement Sea View Yacht Club Limited 10 Oct 201312 Dec 2013
MLA/2013/00404/1 - Completed Application - Construction Longbridge Drive Bank Restoration Project National Trust10 Oct 201312 Feb 2014
MLA/2013/00405/8 - Completed Application - Construction, Removals (inc. Grab Samples) Isles of Scilly Link - St Mary's Harbour Quay Extension Cornwall Council11 Oct 201325 Aug 2015
MLA/2013/00406/4 - Completed Application - Construction, Dredging Pendennis Wet Dock Pendennis Shipyard Limited11 Oct 201326 Feb 2015
MLA/2013/00407 - Completed Application - Construction Asset Reconditioning Site 207 Hampton Barnes No. 1 Sluice Repair Environment Agency14 Oct 201317 Dec 2013
MLA/2013/00408 - Completed Application - Removals (inc. Grab Samples) Bransholme Storm Water Pumping Station Yorkshire Water Services Ltd14 Oct 201306 Dec 2013
MLA/2013/00409/2 - Completed Application - Construction Watch House and Orestone End pipeline, Salcombe South West Water Limited16 Oct 201315 Apr 2014
MLA/2013/00410/6 - Completed Application - Alternative Use of Dredged MaterialLymington Harbour: Saltmarsh Recharge by Bottom Dumping Grouped under: Lymington Harbour Dredge and Disposal Showing 2 of 3 cases Lymington Harbour Commissioners 16 Oct 201307 Mar 2017
MLA/2013/00411 - Completed Application - Construction Motney Hill Refurbishment Environment Agency – South West Reg 16 Oct 201330 Jan 2014
MLA/2013/00412/7 - Completed Application - Construction Mersey Gateway Merseylink16 Oct 201326 Feb 2019
MLA/2013/00413/1 - Completed Application - Alternative Use of Dredged Material, DredgingMarina Dredging & Salt Marsh Feeding Yacht Havens Limited17 Oct 201304 Sep 2015
MLA/2013/00414/4 - Completed Application - Construction Lots Road Development Hutchison Whampoa Properties (Europe) Limited 21 Oct 201324 Jan 2018
MLA/2013/00415 - Completed Application - Construction Leamouth Foot Bridge John Sisk & Son Limited 21 Oct 201311 Feb 2014
MLA/2013/00416/1 - Completed Application - Construction Withernsea Commercial Boat Slipway East Riding Of Yorkshire Council24 Oct 201308 Sep 2014
MLA/2013/00417/2 - Completed Application - Aggregate Dredging, Removals (inc. Grab Samples) Area 228 - Cross Sands Volker Dredging Ltd 24 Oct 201310 May 2017
MLA/2013/00418/2 - Completed Application - Dredged Material Disposal, DredgingBirdham Pool Approach Channel Maintenance Birdham Pool Ltd28 Oct 201315 Oct 2014
MLA/2013/00419/1 - Completed Application - Aggregate Dredging, Removals (inc. Grab Samples) Area 507, Shipwash Cemex Uk Marine Limited 28 Oct 201321 Mar 2017
MLA/2013/00420/2 - Completed Application - Renewables Installation of Anode Bank Arrays Scira Offshore Energy Limited 30 Oct 201318 Dec 2014
MLA/2013/00421/3 - Completed Application - Construction Greatstone Terminal Groyne Environment Agency31 Oct 201324 Sep 2014
MLA/2013/00422 - Completed Application - Emergency Work Jury's Gap Outfall Emergency Works Environment Agency (Southern Region)31 Oct 201301 Nov 2013
MLA/2013/00423/4 - Completed Application - Dredged Material DisposalHeysham Harbour Maintenance Disposal Renewal Heysham Port Limited01 Nov 201324 May 2017
MLA/2013/00425 - Completed Application - Construction Broomhill Sands Coastal Defence Scheme Environment Agency (Southern Region)01 Nov 201309 Apr 2014
MLA/2013/00426/2 - Completed Application - Construction Walney Offshore Wind Farm Operational Marine Licence - Inter Array Cable Repair Walney (Uk) Offshore Windfarms Limited01 Nov 201331 Jan 2018
MLA/2013/00428 - Completed Application - Construction Renewal of Fendering System berth 2 Pier A Port of Dover Dover Harbour Board 04 Nov 201314 Feb 2014
MLA/2013/00431/4 - Completed Application - Construction Barrow Long Sea Outfall Grouped under: Barrow Long Sea Outfall Showing 2 of 3 cases United Utilities Plc08 Nov 201314 Jul 2015
MLA/2013/00432/3 - MLC/2014/00072 - CompletedApplication - Dredged Material Disposal, DredgingMaintenance Dredging at HMNB Devonport Boskalis Westminster Ltd08 Nov 201308 Oct 2014
MLA/2013/00436/4 - Completed Application - Construction Norway - UK InterconnectorRock Armour/Concete Mattressing Deposit National Grid Nsn Link Limited15 Nov 201307 Dec 2018
MLA/2013/00437 - Completed Application - Construction, Dredged Material Disposal, DredgingCatchment Tidal Flap Overhaul Esso Petroleum Company,Limited18 Nov 201312 Mar 2014
MLA/2013/00438/2 - Completed Application - Construction Simon Storage fender refurbishment system Simon Storage Limited 18 Nov 201325 Mar 2014
MLA/2013/00439 - Completed Application - Construction West Shore Park, Walney Island - Coast Protection Work Barrow Borough Council19 Nov 201311 Feb 2014
MLA/2013/00440/2 - Completed Application - Dredged Material Disposal, DredgingYarmouth Harbour (IOW) Maintenance Dredge Yarmouth Harbour Comissioners (Iow) 19 Nov 201307 May 2021
MLA/2013/00441 - Withdrawn Application - Construction, Dredged Material DisposalImmingham Western Deepwater Jetty Associated British Ports20 Nov 2013
MLA/2013/00442 - Completed Application - Construction Crown Sluice Refurbishment Environment Agency20 Nov 201320 Mar 2014
MLA/2013/00443 - Completed Application - Construction Codds Outfall Refurbishment Environment Agency20 Nov 201313 Mar 2014
MLA/2013/00444/1 - Completed Application - Construction Porth Promenade - Beach Ramp Improvements Cornwall Council20 Nov 201322 Apr 2014
MLA/2013/00445/7 - Completed Application - Alternative Use of Dredged Material, ConstructionClacton and Holland-on-Sea Sea Defences Tendring District Council 21 Nov 201309 Sep 2015
MLA/2013/00447 - Completed Application - Construction Abbey Wharf Environment Agency (Southern Region)22 Nov 201321 Mar 2014
MLA/2013/00448 - Completed Application - Construction Wall stabilisation Kingfisher Quay Mr Jonathan Taylor27 Nov 201318 Mar 2014
MLA/2013/00449/4 - Completed Application - Dredged Material Disposal, DredgingCOBB'S QUAY MARINA MAINTENANCE DREDGING Marina Developments Limited 27 Nov 201301 May 2019
MLA/2013/00450 - Completed Application - Construction Replacement ramp at Bognor Regis Yacht Club Bognor Yacht Club 28 Nov 201326 Feb 2014
MLA/2013/00451 - Completed Application - Construction, Dredged Material Disposal, DredgingKendall's Wharf extension and capital dredge Kendall Bros. (Portsmouth) Limited29 Nov 201308 Feb 2016
MLA/2013/00452 - Completed Application - Construction Derwenthaugh Cycle Link Gateshead Council 02 Dec 201331 Jan 2014
MLA/2013/00453/6 - Completed Application - Aggregate Dredging, Removals (inc. Grab Samples) Area 197Area 197Tarmac Marine Dredging Limited03 Dec 201306 Aug 2019
MLA/2013/00455/1 - Completed Application - Dredging water jetting systemPurfleet Deep Wharf C.Ro Ports London Limited 04 Dec 201313 Mar 2019
MLA/2013/00456 - Completed Application - Removals (inc. Grab Samples) Demolition of redundant Linkspan Bridge Western Docks Dover Harbour Board 05 Dec 201316 May 2014
MLA/2013/00457/2 - Completed Application - Dredged Material Disposal, DredgingMaintenance Dredging The Royal Motor Yacht Club05 Dec 201301 Oct 2014
MLA/2013/00458 - Completed Application - Construction Westcliff Paddling Pool Access Ramp Southend-On-Sea Borough Council 05 Dec 201307 May 2014
MLA/2013/00459 - Completed Application - Emergency Work Iford (old) Bridge - Wing Wall Scour Protection Bournemouth Borough Council 06 Dec 201313 Dec 2013
MLA/2013/00460 - Completed Application - Aggregate Dredging Area 492, Trial Dredging Hanson Aggregates Marine Limited06 Dec 201312 Feb 2014
MLA/2013/00462/2 - Completed Application - Construction Sutton Harbour Boardwalk DevelopmentSutton HarbourSutton Harbour Holdings Plc 09 Dec 201321 Dec 2022
MLA/2013/00463/1 - Completed Application - Alternative Use of Dredged Material, Construction, Dredging, Removals (inc. Grab Samples)Exeter Flood Defence Scheme Environment Agency - South West Region09 Dec 201330 Apr 2015
MLA/2013/00464/1 - Completed Application - Removals (inc. Grab Samples) Feeder 9 - River Humber Pipeline Replacement Project National Grid Gas Plc 09 Dec 201307 Apr 2014
MLA/2013/00467 - Completed Application - Construction River Bank Repair at BAE Systems Newcastle upon Tyne Bae Systems 11 Dec 201310 Feb 2014
MLA/2013/00468 - Completed Application - Miscellaneous Disposal Enhancing knowledge of norovirus in the marine environment Cefas Weymouth11 Dec 201320 Feb 2014
MLA/2013/00469 - Withdrawn Application - Miscellaneous Disposal Enhancing knowledge of norovirus behaviour in the marine environment Cefas Weymouth Laboratory 11 Dec 2013
MLA/2013/00470 - Completed Application - Dredged Material Disposal, DredgingMaintenance dredging, Ryde Harbour, Isle of Wight Isle Of Wight Council 11 Dec 201320 Aug 2014
MLA/2013/00471/1 - Completed Application - Construction 57 River Road, Littlehampton, BN17 5BZ Brownfield Estates Limited11 Dec 201309 May 2014
MLA/2013/00472/1 - Completed Application - Construction Outfall 15, St. Mary's Island Countryside Maritime Limited13 Dec 201327 Jan 2015
MLA/2013/00473 - Completed Application - Construction Maintenance replacement of sheet piled river wall at Hythe Quay Colchester Colchester Borough Council13 Dec 201303 Apr 2014
MLA/2013/00474/1 - Completed Application - Construction Ribble Link Sea Gate Embankment Canal & River Trust 13 Dec 201302 Sep 2014
MLA/2013/00475/1 - Completed Application - Construction, Removals (inc. Grab Samples) Dinghy Pen Wall Repairs, Replacment metal walkway Arun Yacht Club Limited(The)13 Dec 201305 Mar 2014
MLA/2013/00477/1 - Completed Application - Construction Kew Bridge Walkway St George West London Ltd 13 Dec 201308 Jul 2014
MLA/2013/00478 - Completed Application - Construction TEMPORARY SLIPWAY TO SUPPORT ST MARY’S AIRPORT PROJECT Council Of The Isles Of Scilly13 Dec 201317 Feb 2014
MLA/2013/00479/1 - Completed Application - Construction, Renewables Totnes Hydro Dart Renewables Ltd 16 Dec 201308 Oct 2015
MLA/2013/00483 - Completed Application - Dredging Thunderer Jetty DredgingThunderer (No. 5) Jetty Stolthaven Dagenham Limited 17 Dec 201322 May 2015
MLA/2013/00484 - Completed Application - Construction Coastal Protection to Siddick Sea Wall J. Murphy & Sons Limited17 Dec 201328 Feb 2014
MLA/2013/00485/3 - Completed Application - Dredged Material Disposal, DredgingChichester Marina Approach Channel Premier Marinas Limited 19 Dec 201312 Jan 2018
MLA/2013/00487/1 - Completed Application - Alternative Use of Dredged Material, Construction, DredgingPlantation Wharf Mso Marine19 Dec 201317 Nov 2015
MLA/2013/00488/2 - Completed Application - Aggregate Dredging, Removals (inc. Grab Samples) Area 511/512/513 Cemex Uk Marine Limited 19 Dec 201317 Jul 2017
MLA/2013/00490 - Completed Application - Construction Repairs to Coastal Protection at Hurst Castle Historic Buildings Commission For England 20 Dec 201323 Jan 2014
MLA/2013/00491 - Completed Application - Removals (inc. Grab Samples) Southsea and North Portsea Island CFERM Schemes - Structural Investigation Eastern Solent Coastal Partnership20 Dec 201310 Feb 2014
MLA/2013/00492 - Completed Application - Construction Porthloo Boat Slipway Improvements Duchy Of Cornwall 23 Dec 201313 Feb 2014
MLA/2013/00494 - Completed Application - Construction King Point Marina Wave Gate modifications Sutton Harbour Holdings Plc 24 Dec 201311 Mar 2014