| Next revision | Previous revision |
| mmo_-_mlas_-_2013 [2024/09/15 20:21] – created nefcadmin | mmo_-_mlas_-_2013 [2026/04/06 08:38] (current) – nefcadmin |
|---|
| [[this>MMO/13MLAs-240913.csv|Download 13MLAs-240913.csv]] | [[this>MMO/13MLAs-240913.csv|Download 13MLAs-240913.csv]] |
| |
| <csv file="https://northeastfc.uk/MMO/13MLAs-240913.csv"></csv> | csv file="https://northeastfc.uk/MMO/13MLAs-240913.csv" /csv |
| | |
| | <datatables> |
| | ^Case Details ^Project Type ^Project Title ^Locations ^Applicant Name^Submission Date^Decision Date^ |
| | |MLA/2013/00002/1 - Completed |Application - Construction |Package 604 bridge replacements | |Bam Nuttall Limited |08 Jan 2013|14 Feb 2013| |
| | |MLA/2013/00004/3 - Completed |Application - Dredged Material Disposal, Dredging|Penzance Harbour Dredging | |Cornwall Council|08 Jan 2013|22 Oct 2014| |
| | |MLA/2013/00005/3 - Completed |Application - Removals (inc. Grab Samples) |Maryport South Beach, tidal deposit removals| |Mr Joseph Scott-Plummer |10 Jan 2013|28 Jul 2021| |
| | |MLA/2013/00006/1 - Completed |Application - Construction |Eastoke Point, Hayling Island Coastal Defence Scheme| |Havant Borough Council|10 Jan 2013|18 Jul 2013| |
| | |MLA/2013/00007/3 - Completed |Application - Construction |Woolwich Ferry Terminal | |Briggs Marine Contractors Limited |11 Jan 2013|06 Aug 2014| |
| | |MLA/2013/00008 - Completed |Application - Construction |DENTON WHARF FINGER PONTOON | |Port Of London Limited|14 Jan 2013|26 Feb 2013| |
| | |MLA/2013/00009 - Completed |Application - Construction |CU083 Lamplighters outfall| |Wessex Water Authority|14 Jan 2013|01 Feb 2013| |
| | |MLA/2013/00010 - Completed |Application - Removals (inc. Grab Samples) |Humber Multibeam Sonar Survey | |Netsurvey Ltd.|14 Jan 2013|04 Feb 2013| |
| | |MLA/2013/00011/1 - Completed |Application - Construction |Trevol Jetty Main Construction Licence, HMS Raleigh, Torpoint, Cornwall | |Debut Services (South West) Limited |15 Jan 2013|26 Jan 2015| |
| | |MLA/2013/00012/1 - Completed |Application - Emergency Work |Bridgend South 50530 Retaining Wall | |Devon County Council|15 Jan 2013|01 Feb 2013| |
| | |MLA/2013/00013 - Completed |Application - Emergency Work |Urgent repairs to unsafe cliffs adjacent to tourist beach | |Dr Mark Sullivan|15 Jan 2013|16 Jan 2013| |
| | |MLA/2013/00014/1 - Completed |Application - Construction |South Yard Outer Pontoons | |Princess Yachts International Plc |15 Jan 2013|25 Mar 2013| |
| | |MLA/2013/00015 - Completed |Application - Miscellaneous Disposal |Middleton Sea Outfall - Dye Tracing | |United Utilities Water Plc|21 Jan 2013|25 Mar 2013| |
| | |MLA/2013/00016 - Completed |Application - Construction |Licence for Racing Marker Buoy| |Arun Yacht Club Ltd |21 Jan 2013|05 Mar 2013| |
| | |MLA/2013/00017/1 - Completed |Application - Construction |Cobnor Point Habitat Creation Scheme| |Mrs Susan Simmonite |22 Jan 2013|21 Jun 2013| |
| | |MLA/2013/00018 - Completed |Application - Construction |Replacement Timber Groynes T1 & T2 - Southwick Beach| |Shoreham Port Authority |23 Jan 2013|10 Apr 2013| |
| | |MLA/2013/00019/6 - Completed |Application - Dredged Material Disposal, Dredging|Hythe Marine Park Maintenance Dredge Renewal| |Oceanic Estates Ltd |23 Jan 2013|20 Oct 2016| |
| | |MLA/2013/00020 - Completed |Application - Construction |Town Quay Pontoon Extension | |Poole Harbour Commissioners |24 Jan 2013|29 Apr 2013| |
| | |MLA/2013/00021 - Completed |Application - Removals (inc. Grab Samples) |Enderby Wharf Marine Boreholes| |Enderby Wharf Limited |24 Jan 2013|16 May 2013| |
| | |MLA/2013/00022 - Completed |Application - Construction, Removals (inc. Grab Samples) |Pier at North House, High Street, Yarmouth| |Edra Securities Ltd |24 Jan 2013|04 Apr 2013| |
| | |MLA/2013/00023/5 - Completed |Application - Construction |Manufacture and Placing of 100 tonne concrete wavebreakers| |Devonport Royal Dockyard Limited|28 Jan 2013|15 Dec 2017| |
| | |MLA/2013/00026/4 - Completed |Application - Renewables |Greater Gabbard - Exposed Export Cable - Approval to lay concrete mattressing | |Greater Gabbard Offshore Winds Limited|29 Jan 2013|15 Aug 2014| |
| | |MLA/2013/00028 - Completed |Application - Removals (inc. Grab Samples) |Adur Estuary Macrobenthic Survey| |Environment Agency (Southern Region)|29 Jan 2013|21 Mar 2013| |
| | |MLA/2013/00029/2 - Completed |Application - Construction, Dredged Material Disposal, Dredging|RAFYC & RSrnYC pontoon development| |Royal Southern Yacht Club Limited |29 Jan 2013|05 Jun 2014| |
| | |MLA/2013/00030 - Completed |Application - Removals (inc. Grab Samples) |Benthic Survey for Marine Minerals (MML) off the North Cornwall Coast | |Marine Minerals Limited |29 Jan 2013|19 Feb 2013| |
| | |MLA/2013/00031 - Completed |Application - Construction |Town Wall Set Back Wall and Drainage Outfall| |Hartlepool Borough Council|30 Jan 2013|13 Sep 2013| |
| | |MLA/2013/00033 - Completed |Application - Removals (inc. Grab Samples) |Sellafield - Offshore Sediment Sampling | |Sellafield Limited|30 Jan 2013|05 Mar 2013| |
| | |MLA/2013/00034 - Completed |Application - Removals (inc. Grab Samples) |Lizard Point to Dodman Point Hydrographic Survey| |Netsurvey Ltd.|30 Jan 2013|15 Feb 2013| |
| | |MLA/2013/00035 - Completed |Application - Removals (inc. Grab Samples) |Navitus Bay Wind Park - Geotechnical Investigations vibrocore acquisition 2013 Grouped under: Navitus Bay Wind Park Showing 2 of 4 cases| |Eneco Round 3 Development Limited |31 Jan 2013|25 Feb 2013| |
| | |MLA/2013/00036 - Completed |Application - Removals (inc. Grab Samples) |Scientific Research in the Western English Channel| |Plymouth Marine Laboratory|31 Jan 2013|04 Mar 2013| |
| | |MLA/2013/00037/2 - Completed |Application - Aggregate Dredging |Area 127| |Hanson Aggregates Marine Limited|31 Jan 2013|12 Apr 2017| |
| | |MLA/2013/00038/2 - Completed |Application - Aggregate Dredging, Removals (inc. Grab Samples) |Area 127 SW Needles | |Tarmac Marine Dredging Limited|31 Jan 2013|09 Feb 2017| |
| | |MLA/2013/00039 - Completed |Application - Construction |Emergency works to beach at Arun Yacht Club | |Arun Yacht Club Ltd |01 Feb 2013|15 Apr 2013| |
| | |MLA/2013/00040/3 - Completed |Application - Aggregate Dredging |Area 137 Full Term Marine Licence Application | |Cemex Uk Marine Limited |04 Feb 2013|28 Feb 2017| |
| | |MLA/2013/00041 - Completed |Application - Construction |Barrow Long Sea Outfall - Site Investigation Grouped under: Barrow Long Sea Outfall Showing 2 of 3 cases| |United Utilities Water Plc|04 Feb 2013|19 Apr 2013| |
| | |MLA/2013/00042 - Completed |Application - Emergency Work |Clearance of sluice outfall - Naze North| |Jd &Fw Eagle Farms|05 Feb 2013|27 Feb 2013| |
| | |MLA/2013/00045/5 - Completed |Application - Alternative Use of Dredged Material, Construction, Dredging|Stabilisation of Pontoons, Zeta Berth, Instow, North Devon| |Debut Services|06 Feb 2013|09 Apr 2014| |
| | |MLA/2013/00046 - Completed |Application - Burial at Sea| | |Green Endings Funerals|07 Feb 2013|08 Feb 2013| |
| | |MLA/2013/00047 - Completed |Application - Construction |Humber Gateway Offshore Wind Farm- Met Mast | |E.On Climate & Renewables Uk Limited|08 Feb 2013|15 Feb 2013| |
| | |MLA/2013/00048 - Withdrawn |Application - Emergency Work |Removal of whale remains| |Mortehoe Parish Council |11 Feb 2013| | |
| | |MLA/2013/00049 - Completed |Application - Construction |Replacement of Aids to Navigation (Licence Enquiry Ref MLP/2012/00309 | |Martin Wright Associates Limited|11 Feb 2013|11 Apr 2013| |
| | |MLA/2013/00050/6 - Completed |Application - Construction |Erosion Protection Phase 3, Shotley Gate, Ipswich, Suffolk| |Shotley Parish Council|11 Feb 2013|15 Aug 2019| |
| | |MLA/2013/00051/1 - Completed |Application - Construction |REPAIR TO PILES ON SANDQUAY JETTY BRNC DARTMOUTH| |Debut Services (South West) Limited |12 Feb 2013|30 Apr 2013| |
| | |MLA/2013/00052/2 - Completed |Application - Construction |Wheatcroft Outfall Repair No. 2 | |Yorkshire Water Services Limited|12 Feb 2013|01 Aug 2013| |
| | |MLA/2013/00053 - Completed |Application - Removals (inc. Grab Samples) |Environment Agency Intertidal Grab samplking for Benthic Inverts and Contaminant| |The Environment Agency|13 Feb 2013|08 Mar 2013| |
| | |MLA/2013/00055 - Completed |Application - Construction |Trinity College, Cambridge, Loompit Lake - River Wall Maintenance | |Bidwells Llp|14 Feb 2013|25 Mar 2013| |
| | |MLA/2013/00056 - Completed |Application - Construction, Removals (inc. Grab Samples) |Repair of localised damage to a jetty.| |Vopak Terminal London B.V. Limited|14 Feb 2013|11 Apr 2013| |
| | |MLA/2013/00057 - Completed |Application - Miscellaneous Disposal |Mixing and Dispersion of Small Estuarine Plumes | |Plymouth University |14 Feb 2013|07 Jun 2013| |
| | |MLA/2013/00058 - Completed |Application - Construction |Navitus Bay Development Limited Meteorological Mast Application Grouped under: Navitus Bay Wind Park Showing 2 of 4 cases | |Eneco Round 3 Development Limited |14 Feb 2013|19 Jul 2013| |
| | |MLA/2013/00060 - Completed |Application - Construction |Millendreath outfall works| |Espalier Developments |15 Feb 2013|03 May 2013| |
| | |MLA/2013/00062 - Completed |Application - Burial at Sea| | |Mr David Williams |15 Feb 2013|05 Mar 2013| |
| | |MLA/2013/00063/1 - Completed |Application - Construction |Brixham Marina Sealift| |Marina Developments Limited |18 Feb 2013|04 Jul 2013| |
| | |MLA/2013/00064 - Completed |Application - Construction |BOW B String Cable Remedial Works | |Barrow Offshore Wind Limited|19 Feb 2013|26 Mar 2013| |
| | |MLA/2013/00065/1 - Completed |Application - Construction |Nethertown Rock Armour Sea Defence Works| |Network Rail Infrastructure Limited |19 Feb 2013|12 Jun 2013| |
| | |MLA/2013/00068 - Withdrawn |Application - Removals (inc. Grab Samples) |Seaton Sluice Harbour Dredging, Clearance and maintenance | |Northumberland County Council |20 Feb 2013| | |
| | |MLA/2013/00069 - Completed |Application - Construction |speed limit markers buoys beach road hopton on sea| |Hopton Parish Council |20 Feb 2013|04 Jun 2014| |
| | |MLA/2013/00071 - Completed |Application - Emergency Work |HMS Cambridge Outfall repair| |South West Water Limited|21 Feb 2013|28 Feb 2013| |
| | |MLA/2013/00072/5 - Completed |Application - Construction |Nemo Link - UK to Belgium Interconnector| |Nemo Link Ltd |21 Feb 2013|19 Jan 2024| |
| | |MLA/2013/00073 - Completed |Application - Construction |River Plym - Railway Viaduct| |Bam Nuttall Limited |22 Feb 2013|18 Apr 2013| |
| | |MLA/2013/00074 - Completed |Application - Construction |Bridlington rBWD Compliance - Connection Stub to Long Sea Outfall | |Yorkshire Water Limited |25 Feb 2013|22 Apr 2013| |
| | |MLA/2013/00075 - Completed |Application - Construction |Dinghy Park Extension | |Orford Sailing Club |25 Feb 2013|15 Mar 2013| |
| | |MLA/2013/00077 - Completed |Application - Construction |Construction of new river wall - works to the rear of 37-41 High St, Chatham| |Chartway Group Limited|26 Feb 2013|31 May 2013| |
| | |MLA/2013/00078 - Completed |Application - Construction |Crosssness River Wall - Urgent (Pease Process within 4 weeks) | |Thames Water Utilities Limited|26 Feb 2013|18 Apr 2013| |
| | |MLA/2013/00079 - Completed |Application - Construction |Portishead RNLI Lifeboat Station| |Rnli|27 Feb 2013|22 May 2013| |
| | |MLA/2013/00080/2 - Completed |Application - Construction |Strood Yacht Club Pontoon Moorings| |Mr John Lambert |27 Feb 2013|23 Jan 2015| |
| | |MLA/2013/00083/1 - Completed |Application - Construction |Proposed Piling Works, Wootton Creek, I.W.| |Mr Steve Vick |28 Feb 2013|31 May 2013| |
| | |MLA/2013/00084/2 - Completed |Application - Construction |Pontoons at South Quay, Berth 5, King's Lynn| |Borough Council Of King'S Lynn & West Norfolk |28 Feb 2013|08 Jul 2013| |
| | |MLA/2013/00085/1 - Completed |Application - Miscellaneous Disposal |Sand Movement back onto the foreshore | |Cornwall Council|01 Mar 2013|17 Feb 2014| |
| | |MLA/2013/00088/1 - Completed |Application - Removals (inc. Grab Samples) |Removal of Docking Shoal meterological mast.| |Centrica Renewable Energy Limited |01 Mar 2013|18 Dec 2014| |
| | |MLA/2013/00089 - Completed |Application - Removals (inc. Grab Samples) |Removal of lattice tower of Race Bank meterological mast. | |Centrica Renewable Energy Limited |01 Mar 2013|04 Apr 2013| |
| | |MLA/2013/00090/1 - Completed |Application - Removals (inc. Grab Samples) |HMS Boynes Cannon | |Dr Douglas Mcelvogue|04 Mar 2013|24 May 2013| |
| | |MLA/2013/00091 - Completed |Application - Construction |Hamble Bridge Outfall Aprons| |Enterprisemouchel Limited |04 Mar 2013|21 May 2013| |
| | |MLA/2013/00092/2 - Completed |Application - Dredged Material Disposal, Dredging|Trafalgar Wharf Approach Channel Maintenance Dredge | |Trafalgar Wharf Limited |05 Mar 2013|24 May 2016| |
| | |MLA/2013/00095/1 - Completed |Application - Construction |Pontoon installation River Hamble L31/L32 Grouped under: Swanwick Marina River Wall Showing 4 of 9 cases| |Premier Marinas (Hamble) Limited|07 Mar 2013|09 May 2014| |
| | |MLA/2013/00096/1 - Completed |Application - Construction |Removal of Redundant ESSO Waterside Jetty at Oulton Broad, Harbour Road, NR323LY| |Esso Petroleum Company,Limited|12 Mar 2013|09 Jun 2015| |
| | |MLA/2013/00097/3 - Completed |Application - Construction |Brighton Marina Grouped under: Brighton Marina Master Case Showing 2 of 10 cases| |Midgard Ltd |12 Mar 2013|27 Jul 2016| |
| | |MLA/2013/00098/2 - Completed |Application - Construction |Rossall and Anchorsholme Ground Investigation Works | |Wyre Borough Council|13 Mar 2013|19 Dec 2013| |
| | |MLA/2013/00099 - Completed |Application - Construction |Jetty Removal, DE Pass Wharf| |Gordon Alison Ltd |13 Mar 2013|04 Jun 2013| |
| | |MLA/2013/00101 - Withdrawn |Application - Dredging |Dredging Docklands Transfer Station | |Van Oord Uk Ltd |14 Mar 2013| | |
| | |MLA/2013/00102/2 - Completed |Application - Construction |Scarborough rBWD - Corner Cafe| |Morgan Sindall Group Plc|14 Mar 2013|08 Aug 2013| |
| | |MLA/2013/00103/1 - Completed |Application - Construction |Devonport Energy From Waste Plant | |South West Water Limited|15 Mar 2013|13 May 2014| |
| | |MLA/2013/00104 - Completed |Application - Construction |Eastern Breakwater Refurbishment| |Falmouth Petroleum Limited|18 Mar 2013|05 Jul 2013| |
| | |MLA/2013/00105/2 - Completed |Application - Construction |Boston Haven Site 4 sheet piled flood wall replacement| |Environment Agency|18 Mar 2013|17 Oct 2013| |
| | |MLA/2013/00106 - Completed |Application - Construction |Installation of Artwork/Sculpture in Limehouse Reach, Narrow Street, London E14 | |Mr Ian Mckellen |18 Mar 2013|10 May 2013| |
| | |MLA/2013/00108/3 - Completed |Application - Miscellaneous Disposal |Westermost Rough Offshore Wind Farm - Boulder Removal and Disposal Campaign Grouped under: Westermost Rough OWF Showing 4 of 8 cases| |Westermost Rough Limited|20 Mar 2013|17 Jan 2014| |
| | |MLA/2013/00110/2 - Completed |Application - Construction |Kingsbridge Berthing Improvements | |Salcombe Harbour|22 Mar 2013|21 Aug 2013| |
| | |MLA/2013/00111/2 - Completed |Application - Dredged Material Disposal, Dredging|Poole Harbour - In Harbour Disposal | |Poole Harbour Commissioners |22 Mar 2013|05 Jul 2013| |
| | |MLA/2013/00112/1 - Completed |Application - Construction |Repairs to Ocean Village Jetty, Southampton | |Pacific Close Estates Limited |25 Mar 2013|16 Aug 2013| |
| | |MLA/2013/00113/1 - Completed |Application - Construction |Tees Overhead Line Removal| |National Grid Electricity Transmission Plc|26 Mar 2013|31 Jul 2013| |
| | |MLA/2013/00114 - Completed |Application - Construction |South Sands pipeline repairs| |South West Water Limited|27 Mar 2013|14 May 2013| |
| | |MLA/2013/00117/1 - Completed |Application - Construction |Mevagissey Harbour Fish Jetty Extension | |Mevagissey Harbour Trustees |28 Mar 2013|25 Apr 2014| |
| | |MLA/2013/00118/2 - Completed |Application - Aggregate Dredging |Aggregate Dredging from Application Area 506| |Deme Building Materials Limited |28 Mar 2013|25 Sep 2018| |
| | |MLA/2013/00119/2 - Completed |Application - Aggregate Dredging, Removals (inc. Grab Samples) |Area 212, 240 and 328 | |Hanson Aggregates Marine Limited|28 Mar 2013|13 Aug 2019| |
| | |MLA/2013/00120 - Completed |Application - Construction |Go Ahead Northern Bus Depot - Metrocentre | |Joyce Construction & Civils Ltd |02 Apr 2013|20 May 2013| |
| | |MLA/2013/00121 - Completed |Application - Construction |Ocean Business 2013 | |Mr Keith Birch|02 Apr 2013|04 Apr 2013| |
| | |MLA/2013/00122 - Completed |Application - Removals (inc. Grab Samples) |Tresco Channel Exploratory Excavation | |Mr Kevin Camidge|03 Apr 2013|27 Jun 2013| |
| | |MLA/2013/00123/4 - Completed |Application - Construction |Laying a Mooring bouy for 17 Port la Salle| |Mr Peter Grigalis |03 Apr 2013|13 May 2014| |
| | |MLA/2013/00124 - Completed |Application - Construction |Isle of Man Interconnector Cable - Cable Protection on Bispham beach| |Manx Cable Company Limited|03 Apr 2013|09 May 2013| |
| | |MLA/2013/00125/18 - Completed|Application - Construction |Bridlington rBWD Stormwater Long Sea Outfall| |Yorkshire Water Services Ltd|04 Apr 2013|24 Jun 2014| |
| | |MLA/2013/00126 - Completed |Application - Removals (inc. Grab Samples), Renewables |ETI Offshore Floating Wind Demonstrator Project | |Wave Hub Limited|04 Apr 2013|24 May 2013| |
| | |MLA/2013/00127/1 - Completed |Application - Emergency Work |Emergency repairs to seawall| |Rfh Associates|04 Apr 2013|06 Sep 2013| |
| | |MLA/2013/00129/1 - Completed |Application - Dredged Material Disposal, Dredging|Maintenance dredging and disposal in Bristol Harbour Area | |The Bristol Port Company Limited|05 Apr 2013|06 Jan 2017| |
| | |MLA/2013/00131/6 - Completed |Application - Dredged Material Disposal, Dredging|Tyne Maintenance Dredging | |Port Of Tyne Authority|05 Apr 2013|14 Sep 2022| |
| | |MLA/2013/00132 - Completed |Application - Construction |Pont Quay Repair Works| |The National Trust|05 Apr 2013|03 Jun 2013| |
| | |MLA/2013/00133/1 - Completed |Application - Construction |Countess Wear Bridge Maintenance Works Grouped under: Bridge Road Widening Showing 2 of 3 cases | |Devon County Council|08 Apr 2013|06 Jun 2013| |
| | |MLA/2013/00135 - Completed |Application - Construction |WALB0462 River Severn Pipe outlet repair| |Amalgamated Construction Ltd|09 Apr 2013|24 May 2013| |
| | |MLA/2013/00136/1 - Completed |Application - Construction |Workington Riverbank Protection | |Connect Cndr Limited|10 Apr 2013|04 Jun 2013| |
| | |MLA/2013/00137/1 - Completed |Application - Construction |Scour Protection to Network Rail Structure CHW2 1 | |Amalgamted Construction Ltd |11 Apr 2013|19 Aug 2013| |
| | |MLA/2013/00138 - Completed |Application - Emergency Work |Wightlink - Scour Hole Gunwharf Car Ferry Terminal Portsmouth | |Wightlink Limited |11 Apr 2013|11 Jul 2013| |
| | |MLA/2013/00139 - Completed |Application - Emergency Work |Emergency Placement of Rock Armour| |Qinetiq |12 Apr 2013|19 Apr 2013| |
| | |MLA/2013/00141/1 - Completed |Application - Alternative Use of Dredged Material|Weymouth Beach dredge and regrading | |West Dorset District Council|15 Apr 2013|18 Jul 2013| |
| | |MLA/2013/00142 - Completed |Application - Construction |Brixham Trawler Agents Ltd Ice Plant Renewal| |Brixham Trawler Agents Limited|16 Apr 2013|30 Jul 2013| |
| | |MLA/2013/00143 - Completed |Application - Construction |Eskmeals Sea Wall Reprofiling | |Qinetiq Estates Limited |17 Apr 2013|06 Jun 2013| |
| | |MLA/2013/00144 - Completed |Application - Construction |Diving and Marine Centre| |Mansell |17 Apr 2013|25 Jun 2013| |
| | |MLA/2013/00148/2 - Completed |Application - Dredged Material Disposal|Disposal of Dredged Arisings from the Lymington Lower River Approach Channel Grouped under: Lymington Harbour Dredge and Disposal Showing 2 of 3 cases| |Lymington Harbour Commissioners |18 Apr 2013|07 Sep 2015| |
| | |MLA/2013/00149 - Completed |Application - Removals (inc. Grab Samples) |Jennycliff Wall Project | |Promare |22 Apr 2013|17 Jul 2013| |
| | |MLA/2013/00151/1 - Completed |Application - Removals (inc. Grab Samples) |North Blyth Biomass Project | |Res Uk & Ireland Limited|22 Apr 2013|04 Sep 2013| |
| | |MLA/2013/00152/1 - Completed |Application - Removals (inc. Grab Samples) |Raising of brass propellor| |Mr Gifford Pound|23 Apr 2013|22 Aug 2013| |
| | |MLA/2013/00153/1 - Completed |Application - Construction |Irsha Street, Appledore | |Mr Phil Wright|24 Apr 2013|03 Jun 2013| |
| | |MLA/2013/00154/1 - Completed |Application - Construction |Countess Wear Bridge Advance Foundation Works Grouped under: Bridge Road Widening Showing 2 of 3 cases| |Devon County Council|24 Apr 2013|14 Jun 2013| |
| | |MLA/2013/00155/1 - Completed |Application - Construction |Clubb's Jetty, Gravesend| |J Clubb Limited |25 Apr 2013|03 Jul 2013| |
| | |MLA/2013/00156 - Completed |Application - Emergency Work |Nethertown Slip | |J. Murphy & Sons Limited|25 Apr 2013|03 May 2013| |
| | |MLA/2013/00157/4 - Completed |Application - Construction |South Fambridge all tide pontoon| |Fambridge Yacht Haven Limited |26 Apr 2013|24 Aug 2016| |
| | |MLA/2013/00158/2 - Completed |Application - Construction |Town Quay Radar Mast, Port of Southampton | |Associated British Ports, Southampton |26 Apr 2013|02 Oct 2013| |
| | |MLA/2013/00160 - Completed |Application - Burial at Sea| | |Charles Lister|29 Apr 2013|02 May 2013| |
| | |MLA/2013/00162 - Completed |Application - Construction |Smugglers Way Fender Maintenance| |Riverside (Thames) Ltd|30 Apr 2013|11 Jun 2013| |
| | |MLA/2013/00164 - Completed |Application - Construction, Removals (inc. Grab Samples) |Lake Lothing Swing Bridge Lowestoft | |Suffolk County Council|30 Apr 2013|04 Oct 2013| |
| | |MLA/2013/00165/1 - Completed |Application - Construction |Improvement works to harbour at Holy Island | |Holy Island Of Lindisfarne Community Development Trust|30 Apr 2013|04 Jun 2014| |
| | |MLA/2013/00166 - Completed |Application - Construction |Reinstatement of barge blocks at Standard Quay| |Quayside Properties (Faversham) Ltd |01 May 2013|12 Feb 2014| |
| | |MLA/2013/00167 - Completed |Application - Construction |Isle Of Man Interconnector Cable - Concrete Mattress Cable Protection Remedial W| |Manx Cable Company Limited|01 May 2013|28 Jun 2013| |
| | |MLA/2013/00168/1 - Completed |Application - Construction |Great Yarmouth Flood Defences 2013-2016 Phase 1 | |Environment Agency|01 May 2013|20 Dec 2013| |
| | |MLA/2013/00169/9 - Completed |Application - Construction |Teesside Wind Farm Operations and Maintenance Building| |Teesside Windfarm Limited |03 May 2013|30 Mar 2016| |
| | |MLA/2013/00170/2 - Completed |Application - Dredged Material Disposal|Maintenace Dredging at Kendalls Wharf | |Kendall Bros. (Portsmouth) Limited|03 May 2013|19 Nov 2015| |
| | |MLA/2013/00172 - Completed |Application - Removals (inc. Grab Samples) |Harwich Channel Deepening Site Investigation Grouped under: Harwich dredge and disposal Showing 3 of 9 cases| |Harwich Haven Authority |03 May 2013|30 Jul 2013| |
| | |MLA/2013/00173/1 - Completed |Application - Construction |London Gateway Western Outfall| |London Gateway Port Ltd |03 May 2013|15 Jul 2013| |
| | |MLA/2013/00174/1 - Completed |Application - Construction |Pendennis Seawall | |Pendennis Shipyard Limited|03 May 2013|16 Aug 2013| |
| | |MLA/2013/00175/1 - Completed |Application - Removals (inc. Grab Samples) |Goodwin Sands Dornier 17 Recovery Project | |Royal Air Force Museum|03 May 2013|10 Jun 2013| |
| | |MLA/2013/00176 - Completed |Application - Construction |Goshem Farm Temporary Jetty | |Ingrebourne Valley Ltd|07 May 2013|05 Aug 2013| |
| | |MLA/2013/00178/1 - Completed |Application - Construction |Jubilee Bridge, Barrow - Welfare Provision and Mechanical Upgrades| |Cumbria County Council|07 May 2013|31 Jan 2014| |
| | |MLA/2013/00179 - Completed |Application - Construction |Repairs to Mooring Dolphin| |Cory Riverside|07 May 2013|28 Jun 2013| |
| | |MLA/2013/00180/4 - Completed |Application - Dredged Material Disposal, Dredging|Corporation Wharf, Finnigan Road, Plymouth|Dredge site, LANTIC BAY (PL060) |Victoria Wharf Ltd|08 May 2013|23 Dec 2015| |
| | |MLA/2013/00182/1 - Completed |Application - Construction |Meols LSO | |United Utilities Plc|08 May 2013|02 May 2014| |
| | |MLA/2013/00184/3 - Completed |Application - Construction |Old Quay Head Ilfracombe Harbour| |North Devon District Council|09 May 2013|29 Jul 2014| |
| | |MLA/2013/00185 - Completed |Application - Burial at Sea| | |Mr Charles Lister |09 May 2013|09 May 2013| |
| | |MLA/2013/00186/2 - Completed |Application - Removals (inc. Grab Samples) |Port of Tyne - Site Investigation | |Port Of Tyne Authority|10 May 2013|29 Oct 2013| |
| | |MLA/2013/00187/5 - Completed |Application - Construction |Rossall Coastal Defence Scheme| |Wyre Borough Council|10 May 2013|21 Dec 2017| |
| | |MLA/2013/00188/1 - Completed |Application - Removals (inc. Grab Samples) |Demolition of Henley's Jetty| |Homes And Communities Agency|10 May 2013|22 Jul 2013| |
| | |MLA/2013/00189/5 - Completed |Application - Construction |Anchorsholme Coast Protection Scheme| |Blackpool Borough Council |10 May 2013|30 Jul 2015| |
| | |MLA/2013/00190 - Withdrawn |Application - Construction |Proposed Floating Pontoon at Osea Leisure Park| |Osea Road Camp Sites Limited|10 May 2013| | |
| | |MLA/2013/00192 - Completed |Application - Construction |Rock armour at tip of Sunderland Point| |Sunderland Point Community Association|10 May 2013|23 Jul 2013| |
| | |MLA/2013/00195 - Completed |Application - Construction |Tynemouth Haven Launch Ramp | |North Tyneside Council|15 May 2013|28 Aug 2013| |
| | |MLA/2013/00196 - Completed |Application - Construction |Dartmouth Public Slipway| |South Hams District Council |16 May 2013|17 May 2013| |
| | |MLA/2013/00197 - Completed |Application - Construction |NKL-526 scour protection| |B.& M.Mchugh Limited|17 May 2013|31 Jul 2013| |
| | |MLA/2013/00198/2 - Completed |Application - Construction |Woolwich Ferry Jetties| |Concrete Repairs|20 May 2013|10 Feb 2014| |
| | |MLA/2013/00201 - Completed |Application - Construction |Dawlish Sea Wall (D.C.D.) | |Dyer & Butler Ltd |22 May 2013|13 Jun 2013| |
| | |MLA/2013/00203 - Completed |Application - Construction |Reconstruction part garden wall for boat mooring| |Andrew Reid |22 May 2013|15 Jul 2013| |
| | |MLA/2013/00204/1 - Completed |Application - Construction |Lee Moor Tramway Bridge repair works, River Plym, Plymouth| |Sustrans|23 May 2013|11 Jul 2013| |
| | |MLA/2013/00205 - Completed |Application - Construction |Scour Protection Littlehempston MLN1-221-42.75| |Network Rail Infrastructure Limited |24 May 2013|22 Aug 2013| |
| | |MLA/2013/00206 - Completed |Application - Construction |Bishops Tawton NDN209-68| |Network Rail Limited|24 May 2013|10 Sep 2013| |
| | |MLA/2013/00207 - Completed |Application - Construction |Repair of Sea Wall, Godolphin Arms Marazion Cornwall Grouped under: St Aubyn Estate Showing 2 of 7 cases| |St Aubyn Estates|24 May 2013|21 Aug 2013| |
| | |MLA/2013/00208 - Completed |Application - Construction |St Michael's Mount Causeway Grouped under: St Aubyn Estate Showing 2 of 7 cases | |St Aubyn Estates|24 May 2013|21 Aug 2013| |
| | |MLA/2013/00209 - Completed |Application - Construction |No 1. Covered Slipway Rails | |Mr William Stirling |28 May 2013|17 Jul 2013| |
| | |MLA/2013/00210 - Completed |Application - Construction |Refurbishment of Chainlocker & Shipwrights| |Harvey Shopfitters Limited|28 May 2013|03 Jun 2013| |
| | |MLA/2013/00211/1 - Completed |Application - Construction |Portsmouth Flood Alleviation Scheme - Improvement Works to Gt Salterns Outfall| |4delivery Limited |28 May 2013|02 Sep 2013| |
| | |MLA/2013/00212/8 - Completed |Application - Construction |Littlehampton Arun East Bank Tidal Walls| |Environment Agency (Southern Region)|29 May 2013|14 Nov 2017| |
| | |MLA/2013/00215/1 - Completed |Application - Construction |Cromer Coast Protection Scheme 982| |North Norfolk District Council|30 May 2013|27 Mar 2015| |
| | |MLA/2013/00216/6 - Completed |Application - Dredged Material Disposal, Dredging|Cowes Outer Harbour Project Dredge disposal renewal | |Cowes Harbour Commission|31 May 2013|28 Sep 2022| |
| | |MLA/2013/00217/7 - Completed |Application - Dredged Material Disposal, Dredging|Offshore Technology Park Dredge | |Shepherd Offshore Services Limited|31 May 2013|04 Jul 2014| |
| | |MLA/2013/00218/1 - Completed |Application - Construction |Helford River Children' Sailing Trust Pontoon | |Helford River Children' Sailing Trust |03 Jun 2013|16 Dec 2020| |
| | |MLA/2013/00219 - Completed |Application - Construction |Folkestone Warren - Clearance of fallen chalk on walkway| |Network Rail Limited|04 Jun 2013|01 Aug 2013| |
| | |MLA/2013/00221/1 - Completed |Application - Emergency Work |Emergency works Wells Harbour channel | |Wells Harbour Commissioners |07 Jun 2013|05 Jul 2013| |
| | |MLA/2013/00223 - Withdrawn |Application - Removals (inc. Grab Samples) |Fender at Thornham, North Norfolk coast | |Gac Shipping (Uk) Ltd.|07 Jun 2013| | |
| | |MLA/2013/00224/1 - Completed |Application - Construction |ATH-1788 scour protection, River Rother near Rye| |B.& M.Mchugh Limited|10 Jun 2013|18 Nov 2013| |
| | |MLA/2013/00225/1 - Completed |Application - Construction |Timber Pile Replacement and Anchor Retaining System , Walberswick | |Walberswick Common Lands Charity|10 Jun 2013|05 Aug 2013| |
| | |MLA/2013/00227 - Completed |Application - Construction |North West Quay Outfall Relocation Works (Phase 1)| |Port Of Tyne Authority|12 Jun 2013|21 Aug 2013| |
| | |MLA/2013/00228 - Completed |Application - Construction |Finger Jetty Refurbishment| |Bae Systems Surface Ships Limited |12 Jun 2013|29 Jul 2013| |
| | |MLA/2013/00229 - Completed |Application - Construction |Monitoring nearshore currents around St Bees Head | |Sefton Mbc|13 Jun 2013|15 Nov 2013| |
| | |MLA/2013/00230/3 - Completed |Application - Construction |Northumbrian Quay Pontoons| |Port Of Tyne|13 Jun 2013|31 Mar 2016| |
| | |MLA/2013/00231 - Completed |Application - Construction |Beeding Bridge strengthening works| |West Sussex County Council|13 Jun 2013|25 Jul 2013| |
| | |MLA/2013/00233 - Completed |Application - Construction |Spragger Clough Outfall Refurbishment (Primary and Secondary Defence Structures)| |Carter Jonas Llp|17 Jun 2013|09 Aug 2013| |
| | |MLA/2013/00234 - Completed |Application - Construction |Proposed Repairs to Kiddies Corner| |Scarborough Borough Council |19 Jun 2013|07 Oct 2013| |
| | |MLA/2013/00235 - Completed |Application - Construction |The Saltings Saltmarsh Habitat Creation Project | |Rastrum Limited |21 Jun 2013|16 Jan 2014| |
| | |MLA/2013/00236/1 - Completed |Application - Construction |Swanwick Marina Pile Replacement Grouped under: Swanwick Marina River Wall Showing 4 of 9 cases | |Premier Marinas (Hamble) Limited|21 Jun 2013|07 Aug 2013| |
| | |MLA/2013/00237 - Completed |Application - Construction |Merlin Quay Pontoons| |Merlin Real Estate Limited|21 Jun 2013|22 Aug 2013| |
| | |MLA/2013/00238/5 - Completed |Application - Construction, Dredged Material Disposal, Dredging|RSQ Downriver Extension | |Port Of Tyne Authority|24 Jun 2013|21 Dec 2017| |
| | |MLA/2013/00239/5 - Completed |Application - Construction |Roof repair | |Mr Chris Kennedy|24 Jun 2013|05 Feb 2015| |
| | |MLA/2013/00240 - Completed |Application - Construction |Construction of 4 Houses & 9 apartments @ 18 North Parade | |Milbourne Developments Ltd|25 Jun 2013|29 Aug 2013| |
| | |MLA/2013/00241 - Completed |Application - Miscellaneous Disposal |Catchment to Coast (Natural Environment Research Council, Acronym C2C)| |Aberystwyth University|25 Jun 2013|16 Aug 2013| |
| | |MLA/2013/00242 - Completed |Application - Construction |Millbay Dolphins Refurbishment Works| |Bam Nuttall Limited |26 Jun 2013|04 Jun 2014| |
| | |MLA/2013/00243 - Completed |Application - Construction |Caytor Bridge Leak Repair | |Environment Agency (Southern Region)|27 Jun 2013|08 Aug 2013| |
| | |MLA/2013/00244/1 - Completed |Application - Construction |Gosport Cruising Club Repair Works| |Gosport Cruising Club |28 Jun 2013|05 Sep 2016| |
| | |MLA/2013/00245 - Completed |Application - Burial at Sea| | |Mr Gavin Palin|28 Jun 2013|04 Jul 2013| |
| | |MLA/2013/00247/1 - Completed |Application - Construction |58 Pearce Avenue| |Colmar Construction (Poole) Limited |02 Jul 2013|18 Sep 2013| |
| | |MLA/2013/00248 - Completed |Application - Emergency Work |Lympstone Sea Wall - Repair | |Devon County Council|02 Jul 2013|05 Jul 2013| |
| | |MLA/2013/00249/4 - Completed |Application - Dredged Material Disposal, Dredging|Annual Maintenance Dredging and Disposal| |Port Of Sheerness Limited |02 Jul 2013|27 Jan 2017| |
| | |MLA/2013/00250/1 - Completed |Application - Construction |River Condenser Pipework and Associated Equipment Replacement Project | |British Telecommunications Public Limited Company |02 Jul 2013|01 Nov 2013| |
| | |MLA/2013/00252/1 - Completed |Application - Construction |18 Gillender Street | |Ardmore Construction Limited|03 Jul 2013|28 Aug 2013| |
| | |MLA/2013/00254 - Completed |Application - Removals (inc. Grab Samples) |Howdon Jetty Mooring Improvement Works| |Port Of Tyne Authority|03 Jul 2013|24 Sep 2013| |
| | |MLA/2013/00255/4 - Completed |Application - Dredged Material Disposal, Dredging|Maintenance Dredge Licence - A&P Tyne Ltd, Hebburn - Quays & Dry Dock Entrance| |A&P Tyne Ltd|04 Jul 2013|14 Feb 2017| |
| | |MLA/2013/00256/2 - Completed |Application - Construction, Dredged Material Disposal, Dredging|Berth 9 Quay Extension| |Hutchison Ports (Uk) Limited|04 Jul 2013|22 May 2014| |
| | |MLA/2013/00257/2 - Completed |Application - Construction |Replacement of 4 wooden piles with 4 tubular steel piles at the RVYC| |Royal Victoria Yacht Club |05 Jul 2013|08 May 2014| |
| | |MLA/2013/00258/2 - Completed |Application - Construction |Carr Lane Sewage Pumping Station, Goole | |Yorkshire Water Services Limited|05 Jul 2013|09 Apr 2014| |
| | |MLA/2013/00259/1 - Completed |Application - Construction |Cabin Boatyard Quay Wall Repairs| |Cabin Boatyard|05 Jul 2013|04 Oct 2013| |
| | |MLA/2013/00260/1 - Completed |Application - Construction |Brunel landing at Starcross on the Exe Estuary| |Star Cross Fishing & Cruising Club|08 Jul 2013|28 Jul 2014| |
| | |MLA/2013/00262 - Completed |Application - Burial at Sea| | |Charles Lister|09 Jul 2013|12 Jul 2013| |
| | |MLA/2013/00263 - Completed |Application - Construction |West India Pier | |Sunset Moorings Ltd |10 Jul 2013|20 Sep 2013| |
| | |MLA/2013/00266/1 - Completed |Application - Construction, Removals (inc. Grab Samples) |Torquay Inner Harbour - Pontoon Berthing| |Tor Bay Harbour Authority |11 Jul 2013|24 Mar 2014| |
| | |MLA/2013/00267/4 - Completed |Application - Construction |Wash Tide Gauge | |Environment Agency|11 Jul 2013|16 Jul 2019| |
| | |MLA/2013/00268/3 - Completed |Application - Removals (inc. Grab Samples) |EDF Energy NNB Sizewell C Offshore Ground Investigation Works 2013| |Nnb Generation Company Limited|11 Jul 2013|23 Oct 2013| |
| | |MLA/2013/00269/10 - Completed|Application - Construction, Dredging, Miscellaneous Disposal |Bradwell Nuclear Decommissioning Site Silt Removal from Culvert | |Magnox Limited|12 Jul 2013|19 May 2014| |
| | |MLA/2013/00270 - Completed |Application - Miscellaneous Disposal |Westermost Rough Offshore Wind Farm - Disposal Strategy for Foundation Drilling Grouped under: Westermost Rough OWF Showing 4 of 8 cases| |Westermost Rough Limited|12 Jul 2013|15 Apr 2014| |
| | |MLA/2013/00271 - Completed |Application - Construction |Riverside Jetty | |John Hutton |16 Jul 2013|18 Sep 2013| |
| | |MLA/2013/00272 - Completed |Application - Construction |Royal Dock Harbour offshore wind support facility | |Associated British Ports. |17 Jul 2013|15 Oct 2013| |
| | |MLA/2013/00273 - Completed |Application - Dredged Material Disposal, Dredging|Maintenance Dredge Licence - OGN Hadrian Yard, River Tyne | |Offshore Group Newcastle Limited|17 Jul 2013|17 Dec 2013| |
| | |MLA/2013/00274 - Completed |Application - Construction |NKL-645/646 scour protection works| |B.& M.Mchugh Limited|17 Jul 2013|18 Oct 2013| |
| | |MLA/2013/00275/2 - Completed |Application - Construction |Restoration of Hastings Pier| |Hastings Pier Charity |18 Jul 2013|29 Aug 2014| |
| | |MLA/2013/00276/1 - Completed |Application - Construction |North Kent Outfalls | |Environment Agency - Anglian Region |19 Jul 2013|13 Dec 2013| |
| | |MLA/2013/00277 - Completed |Application - Miscellaneous Disposal |Green tide 2 oil spill response exercise| |Oil Spill Response Limited|19 Jul 2013|10 Sep 2013| |
| | |MLA/2013/00278 - Completed |Application - Construction |Longbridge Road Flood Alleviation Scheme| |Mr Adrian Trim|19 Jul 2013|05 Dec 2013| |
| | |MLA/2013/00279/1 - Completed |Application - Construction |Cargo Package Refurbishment | |Environment Agency (Southern Region)|22 Jul 2013|20 Dec 2013| |
| | |MLA/2013/00280/1 - Completed |Application - Construction |Renewal of the main slipway and moving the Eastern jetty 9m East| |Itchenor Sailing Club |23 Jul 2013|01 Apr 2016| |
| | |MLA/2013/00281/1 - Completed |Application - Construction |SABIC North Tees Jetty 2 embankment repair| |Sabic Uk Petrochemicals Limited |23 Jul 2013|07 Nov 2013| |
| | |MLA/2013/00282 - Completed |Application - Construction |Installation and testing of the King Harry Ferry 2 shallow water fibre optic| |Bt Group Plc|23 Jul 2013|15 Apr 2014| |
| | |MLA/2013/00283 - Completed |Application - Emergency Work |Sunny Cliff Pipeline - Salcombe | |South West Water Limited|23 Jul 2013|24 Jul 2013| |
| | |MLA/2013/00285/1 - Completed |Application - Dredged Material Disposal, Dredging|offshore group newcastle/enquest| |Offshore Group Newcastle Limited|24 Jul 2013|04 Oct 2013| |
| | |MLA/2013/00287/1 - Completed |Application - Construction |Laira Rail Bridge Pedestrian and Cycle Scheme | |Plymouth City Council |24 Jul 2013|08 Jan 2014| |
| | |MLA/2013/00288/1 - Completed |Application - Construction |St John Septic Tank outfall repair| |South West Water Limited|24 Jul 2013|05 Sep 2013| |
| | |MLA/2013/00289/3 - Completed |Application - Construction |Millendreath sea defence, slipway and culvert upgrade.| |Espalier Developments (Millendreath) Limited|25 Jul 2013|30 Apr 2018| |
| | |MLA/2013/00290 - Completed |Application - Construction |Repair to sheet pile wall | |Magnox Limited|25 Jul 2013|28 Aug 2013| |
| | |MLA/2013/00291/1 - Completed |Application - Dredged Material Disposal, Dredging|Maintenance Dredge Licence - Simon Storage Ocean Berth, River Tyne| |Inter Terminals Tyneside Limited|26 Jul 2013|12 Aug 2016| |
| | |MLA/2013/00292/3 - Completed |Application - Dredged Material Disposal|Harwich / Felixstowe maintenance dredging disposal Grouped under: Harwich dredge and disposal Showing 3 of 9 cases| |Harwich Haven Authority |26 Jul 2013|28 Feb 2018| |
| | |MLA/2013/00293/2 - Completed |Application - Dredged Material Disposal, Dredging|Maintenance Dredge Licence - Cemex - Jarrow Quay, River Tyne| |Cemex Uk Marine Limited |26 Jul 2013|24 May 2017| |
| | |MLA/2013/00294/1 - Completed |Application - Construction |Pontoon installation River Hamble L30/L31 Grouped under: Swanwick Marina River Wall Showing 4 of 9 cases| |Premier Marinas (Hamble) Limited|26 Jul 2013|02 Oct 2014| |
| | |MLA/2013/00295/1 - Completed |Application - Construction |Dagenham Jetty Refurbishment - Pontoon & Linkspan Resurfacing | |Ford Motor Company Limited|26 Jul 2013|06 Aug 2014| |
| | |MLA/2013/00296/3 - Completed |Application - Aggregate Dredging, Removals (inc. Grab Samples) |Long Sand Head - Area 509 | |Tarmac Marine Dredging Limited|29 Jul 2013|26 May 2017| |
| | |MLA/2013/00297/5 - Completed |Application - Aggregate Dredging, Removals (inc. Grab Samples) |Long Sand Head - Area 510 | |Cemex Uk Marine Limited |29 Jul 2013|17 Aug 2020| |
| | |MLA/2013/00298/2 - Completed |Application - Aggregate Dredging, Removals (inc. Grab Samples) |Long Sand Head - Area 508 | |Britannia Aggregates Limited|29 Jul 2013|25 May 2017| |
| | |MLA/2013/00300 - Withdrawn |Application - Miscellaneous Disposal |West Bay inner harbour dredging | |West Dorset District Council|29 Jul 2013| | |
| | |MLA/2013/00301/1 - Completed |Application - Construction |Greenwich Reach Pedestrian Swing Bridge | |Roamquest Limited |30 Jul 2013|04 Dec 2013| |
| | |MLA/2013/00302/1 - Completed |Application - Construction, Dredged Material Disposal, Dredging|Port Meridian Deep Water Port Project | |Port Meridian Energy Limited|30 Jul 2013|16 Apr 2019| |
| | |MLA/2013/00303 - Completed |Application - Construction |Walcott Beach Steps | |North Norfolk District Council|31 Jul 2013|10 Sep 2013| |
| | |MLA/2013/00304/1 - Completed |Application - Construction |Creekmoor Sheet Piles Maintenance | |Borough Of Poole Council|31 Jul 2013|15 May 2014| |
| | |MLA/2013/00306/1 - Completed |Application - Aggregate Dredging, Removals (inc. Grab Samples) |Area 401/2| |Hanson Aggregates Limited |01 Aug 2013|26 May 2017| |
| | |MLA/2013/00308/1 - Completed |Application - Construction |Boston Boat Yard - River wall improvement | |The Cavanna Group |05 Aug 2013|31 Jul 2014| |
| | |MLA/2013/00310 - Completed |Application - Construction |Small Craft Landing Poontoon| |Bam Nuttall Limited |05 Aug 2013|08 Oct 2013| |
| | |MLA/2013/00311 - Completed |Application - Construction |King Post Wall Reinstatement Works - River Breeze, The Esplanade, Hullbridge| |Mr Stewart Ward |08 Aug 2013|14 Nov 2013| |
| | |MLA/2013/00314/1 - Completed |Application - Construction, Removals (inc. Grab Samples) |Jetty 3 and 5 Thames Oilport| |Vopak Services Uk Limited |08 Aug 2013|08 Oct 2014| |
| | |MLA/2013/00315/2 - Completed |Application - Construction |Severn Critical Eel Tidal Flaps | |Environment Agency – South West Reg |09 Aug 2013|07 Oct 2013| |
| | |MLA/2013/00316 - Completed |Application - Miscellaneous Disposal |Tracer investigation Harrowside Outfall | |Centre For Research Into Environment And Health (Creh) Ltd|09 Aug 2013|24 Sep 2013| |
| | |MLA/2013/00317/1 - Completed |Application - Construction, Removals (inc. Grab Samples) |Pagham Beach Coastal Defence Project| |Arun District Council |09 Aug 2013|29 Nov 2013| |
| | |MLA/2013/00318 - Completed |Application - Renewables |Westermost Rough Offshore Wind Farm - array cable trial trenching Grouped under: Westermost Rough OWF Showing 4 of 8 cases| |Westermost Rough Limited|09 Aug 2013|15 Apr 2014| |
| | |MLA/2013/00319 - Completed |Application - Construction |Pontoon at Salcombe, Salcombe Estuary, Devon| |Nicolas James Group Limited |12 Aug 2013|21 Feb 2014| |
| | |MLA/2013/00320/1 - Completed |Application - Construction |Phase 3 & 4 installation of Floating Pontoons | |Grimsby Fish Dock Enterprises Limited |13 Aug 2013|17 Dec 2013| |
| | |MLA/2013/00321/3 - Completed |Application - Construction, Dredged Material Disposal, Dredging|Swanwick Marina Maintenance Dredge & Lifting Dock Grouped under: Swanwick Marina River Wall Showing 4 of 9 cases| |Premier Marinas (Hamble) Limited|13 Aug 2013|07 Aug 2018| |
| | |MLA/2013/00322 - Completed |Application - Construction |Keyhaven Quay - Resurfacing Part of Quay and Slipway| |New Forest District Council |13 Aug 2013|14 Nov 2013| |
| | |MLA/2013/00323/1 - Completed |Application - Construction |Repair works to Poulton water treatment outfall | |United Utilities|14 Aug 2013|30 Oct 2013| |
| | |MLA/2013/00324/1 - Completed |Application - Construction |Woolverstone Redevelopment| |Marina Developments Limited |14 Aug 2013|05 Dec 2013| |
| | |MLA/2013/00325 - Completed |Application - Construction, Removals (inc. Grab Samples) |Minoco Wharf River Wall | |Kier Construction |15 Aug 2013|22 Jan 2014| |
| | |MLA/2013/00326/1 - Completed |Application - Construction, Dredging |Harrowside Long Sea Outfall - Maintenance Works | |United Utilities Water Plc|15 Aug 2013|28 Oct 2013| |
| | |MLA/2013/00327/1 - Completed |Application - Alternative Use of Dredged Material, Construction, Dredging, Removals (inc. Grab Samples)|Levington Saltmarsh restoration and beneficial Use of Dredgings Project 2013| |Suffolk Yacht Harbour |16 Aug 2013|07 Nov 2018| |
| | |MLA/2013/00328 - Completed |Application - Construction |Great Breach Pumping Station Gravity Outfall : Repairs to Steel Flap Valve| |The Environment Agency|16 Aug 2013|29 Aug 2013| |
| | |MLA/2013/00329/3 - Completed |Application - Aggregate Dredging, Removals (inc. Grab Samples) |Area 498 - North Inner Gabbard| |Britannia Aggregates Limited|16 Aug 2013|12 May 2017| |
| | |MLA/2013/00330/4 - Completed |Application - Aggregate Dredging, Removals (inc. Grab Samples) |Area 498 - North Inner Gabbard| |Volker Dredging Limited |19 Aug 2013|05 May 2017| |
| | |MLA/2013/00331 - Completed |Application - Construction |Climping Coastal recycling maintenance 2013/14| |Environment Agency (Southern Region)|19 Aug 2013|28 Oct 2013| |
| | |MLA/2013/00332/1 - Completed |Application - Construction |Pontoon replacement City Cruises PLC| |Kent Structural & Architectural Ltd |19 Aug 2013|17 Jan 2014| |
| | |MLA/2013/00333/1 - Completed |Application - Construction |Dagenham Jetty - Ancillary & Marine Safety Works| |Ford Motor Company Ltd|20 Aug 2013|06 Aug 2014| |
| | |MLA/2013/00334/1 - Completed |Application - Dredged Material Disposal, Dredging|Goodchild Marine Services Marina and lift dock| |Goodchild Marine Services Limited |21 Aug 2013|07 Apr 2021| |
| | |MLA/2013/00335 - Withdrawn |Application - Renewables |Floating Offshore Wind Platform Demonstrator at Wave Hub in Cornwall| |Wave Hub Limited|21 Aug 2013| | |
| | |MLA/2013/00336/3 - Completed |Application - Aggregate Dredging, Removals (inc. Grab Samples) |Areas 400 and 106 (Consolidated)| |Hanson Aggregates Ltd |21 Aug 2013|03 Aug 2017| |
| | |MLA/2013/00337/6 - Completed |Application - Construction |Outer Harbour Development, Brighton Marina - Phase 1 Grouped under: Brighton Marina Master Case Showing 2 of 10 cases | |The Brighton Marina Company Ltd |23 Aug 2013|22 May 2014| |
| | |MLA/2013/00338/1 - Completed |Application - Aggregate Dredging, Removals (inc. Grab Samples) |Aggregate Extraction Areas Areas 242-361 & 328A | |Hanson Aggregates Limited |23 Aug 2013|13 Aug 2019| |
| | |MLA/2013/00339 - Completed |Application - Construction, Removals (inc. Grab Samples) |Beach Management Plan Witterings Recycling Scheme | |Chichester District Council |23 Aug 2013|28 Oct 2013| |
| | |MLA/2013/00340 - Completed |Application - Alternative Use of Dredged Material, Construction|Beach Management Plan: Selsey Shingle Recharge Scheme | |Chichester District Council |23 Aug 2013|14 Oct 2013| |
| | |MLA/2013/00341 - Completed |Application - Construction, Removals (inc. Grab Samples) |60 Pearce Avenue| |Mr Duncan Stone |24 Aug 2013|10 Oct 2013| |
| | |MLA/2013/00342/4 - Completed |Application - Dredged Material Disposal, Dredging|Maintenance Dredging at HMNB Portsmouth | |Defence Infrastructure Organisation |27 Aug 2013|20 Dec 2017| |
| | |MLA/2013/00343 - Completed |Application - Removals (inc. Grab Samples) |No. 4 Slip Concrete Upstand Removal | |Devonport Royal Dockyard Limited|28 Aug 2013|08 Oct 2013| |
| | |MLA/2013/00344 - Completed |Application - Construction |Hayle Beach Access| |Hayle Town Council|30 Aug 2013|11 Oct 2013| |
| | |MLA/2013/00345 - Completed |Application - Construction |Millbrook | |Teignmouth Maritime Services Limited|02 Sep 2013|13 Nov 2013| |
| | |MLA/2013/00347 - Completed |Application - Burial at Sea| | |Mr Charles Lister |02 Sep 2013|04 Sep 2013| |
| | |MLA/2013/00349 - Completed |Application - Removals (inc. Grab Samples) |Removal of an old gun barrel from a know wreck site | |Mr Ben Dunstan|02 Sep 2013|14 Aug 2014| |
| | |MLA/2013/00350 - Completed |Application - Construction |Deployment of Directional Waverider buoy off Isles of Scilly| |Mr Simon Humphry|03 Sep 2013|14 Nov 2013| |
| | |MLA/2013/00351/2 - Completed |Application - Dredged Material Disposal, Dredging|Maintenance Dredging at SMC Marchwood | |Westminster Dredging Company Limited|04 Sep 2013|23 Feb 2017| |
| | |MLA/2013/00353/2 - Completed |Application - Alternative Use of Dredged Material|Poole Bay Nearshore Beach Renourishment Trial | |Borough Of Poole|06 Sep 2013|26 Jan 2015| |
| | |MLA/2013/00354 - Completed |Application - Construction |Lower Quay Pontoon| |Looe Harbour Commissioners|06 Sep 2013|20 Nov 2013| |
| | |MLA/2013/00355/1 - Completed |Application - Miscellaneous Disposal |Wheatcroft Long Sea Outfall Dye Test| |Yorkshire Water Limited |06 Sep 2013|25 Oct 2013| |
| | |MLA/2013/00356 - Completed |Application - Construction |Chichester Marina Surface Water Outfall | |Premier Marinas Limited |09 Sep 2013|21 Oct 2013| |
| | |MLA/2013/00357 - Withdrawn |Application - Miscellaneous Disposal, Removals (inc. Grab Samples) |Seaford Beach Recycling 2013/14 - 2017/18 | |Environment Agency|10 Sep 2013| | |
| | |MLA/2013/00358/2 - Completed |Application - Construction, Dredging, Removals (inc. Grab Samples) |RM Poole The Hard: Reconfiguration and construction of new Mooring Pontoons | |Defence Infrastructure Organisation |11 Sep 2013|26 Mar 2014| |
| | |MLA/2013/00359 - Completed |Application - Construction |Pipe adjacent to East Cliff, Teignmouth | |South West Water Limited|11 Sep 2013|30 Oct 2013| |
| | |MLA/2013/00360/1 - Completed |Application - Dredging |Middleton Wastewater Treatment Works Long Sea Outfall - Maintenance | |United Utilities Water Plc|11 Sep 2013|17 Mar 2014| |
| | |MLA/2013/00361/3 - Completed |Application - Dredged Material Disposal|Harwich/ Felixstowe maintenance dredging disposal Grouped under: Harwich dredge and disposal Showing 3 of 9 cases | |Harwich Haven Authority |12 Sep 2013|17 Oct 2016| |
| | |MLA/2013/00362 - Completed |Application - Dredged Material Disposal, Dredging|Maintenance dredging|Foxs Marina, Ipswich, Foxs Marina Disposal Site (Mudflats)|Fox'S Marina Ipswich Limited|12 Sep 2013|14 Jan 2015| |
| | |MLA/2013/00363/2 - Completed |Application - Construction |Gate Lay-By Berth, Able UK Seaton Port| |Able Uk Ltd |12 Sep 2013|22 Mar 2017| |
| | |MLA/2013/00364 - Withdrawn |Application - Construction |Battersea Power Station Temporary Water Taxi Jetty| |Battersea Power Station Development Company |12 Sep 2013| | |
| | |MLA/2013/00365/2 - Completed |Application - Construction |Oldbury Active Effluent Discharge Line| |Magnox Limited|13 Sep 2013|29 Oct 2014| |
| | |MLA/2013/00366/3 - Completed |Application - Construction |River Medway Railway Bridge brick pier and abutment maintenance repairs | |Balfour Beatty Rail Limited |16 Sep 2013|19 Jun 2014| |
| | |MLA/2013/00367 - Completed |Application - Removals (inc. Grab Samples) |NSN Link - Ground Investigation | |Worleyparsons Europe Limited|17 Sep 2013|18 Dec 2013| |
| | |MLA/2013/00368 - Completed |Application - Construction |Proposed Pontoon, Bridge Road, Lymington|Pontoon |Redrow Homes Limited|18 Sep 2013|24 Jun 2015| |
| | |MLA/2013/00369/1 - Completed |Application - Construction |Trinity Road Seawall| |North Tyneside Council|18 Sep 2013|12 Aug 2014| |
| | |MLA/2013/00370 - Completed |Application - Construction |Gilkicer Lagoon Outfall Replacement | |Southern Water Services Limited |19 Sep 2013|28 Nov 2013| |
| | |MLA/2013/00371/2 - Completed |Application - Dredged Material Disposal, Dredging|Maintenance Dredging 2014 | |Cowes Yacht Haven |19 Sep 2013|21 Jan 2019| |
| | |MLA/2013/00372/1 - Completed |Application - Construction |Hurst Spit Beach Management Plan North Point Recycling| |New Forest District Council |19 Sep 2013|12 Feb 2014| |
| | |MLA/2013/00373 - Completed |Application - Renewables |Westermost Rough Offshore Wind Farm - Export cable plough trial Grouped under: Westermost Rough OWF Showing 4 of 8 cases| |Mr Lars Bie Jensen|20 Sep 2013|15 Apr 2014| |
| | |MLA/2013/00374 - Completed |Application - Construction |Sea Cadet Mooring Pontoons| |T S Southampton |20 Sep 2013|25 Oct 2013| |
| | |MLA/2013/00375/2 - Completed |Application - Construction |Fingringhoe, River Colne Managed Realignment| |Environment Agency|23 Sep 2013|26 Aug 2015| |
| | |MLA/2013/00377/2 - Completed |Application - Construction |Port Hamble Marina Pile Replacement | |Marina Developments Limited |24 Sep 2013|24 Nov 2017| |
| | |MLA/2013/00378 - Completed |Application - Construction |Northney Marina Pile Replacement| |Marina Developments Limited |24 Sep 2013|20 Dec 2013| |
| | |MLA/2013/00379/1 - Completed |Application - Construction |Shamrock Quay Pile Replacement| |Marina Developments Limited |24 Sep 2013|28 Jan 2014| |
| | |MLA/2013/00380/2 - Completed |Application - Construction |Heysham No.1 Power Station Outfall Repairs| |Edf Energy|25 Sep 2013|24 Jul 2014| |
| | |MLA/2013/00381 - Completed |Application - Construction |Plymstock Quarry Storm Water Outfall| |Dyer And Butler Limited |25 Sep 2013|02 Dec 2013| |
| | |MLA/2013/00382 - Completed |Application - Construction |Harrington Coastal Defence No. 5| |J. Murphy & Sons Limited|26 Sep 2013|20 Dec 2013| |
| | |MLA/2013/00384/2 - Completed |Application - Construction |Modification of Fishing Boat Moorings In Lymington River| |Lymington Harbour Commissioners |26 Sep 2013|16 Jan 2014| |
| | |MLA/2013/00385 - Completed |Application - Removals (inc. Grab Samples) |Removal of former Sevalco plant redundant effluent outfall pipe | |Sevalco Limited |26 Sep 2013|15 Nov 2013| |
| | |MLA/2013/00386 - Completed |Application - Construction |ESK-426 scour protection| |B.& M.Mchugh Limited|27 Sep 2013|02 Jan 2014| |
| | |MLA/2013/00387 - Completed |Application - Construction |C1 cable rock protection| |Mr Ole Bigum Nielsen|27 Sep 2013|09 May 2014| |
| | |MLA/2013/00388 - Completed |Application - Construction |Hayle Harbour Swing Bridge Enabling Works | |Hammond (Ecs) Limited |01 Oct 2013|08 Oct 2013| |
| | |MLA/2013/00389 - Completed |Application - Construction |Tower of London temporary river wall repairs| |Historic Royal Palaces|01 Oct 2013|03 Dec 2013| |
| | |MLA/2013/00391 - Completed |Application - Construction |Phase 4 - Secombe Ferry Terminal Platform Repairs and walkway installation| |Merseytravel Limited|02 Oct 2013|06 Mar 2014| |
| | |MLA/2013/00393 - Completed |Application - Construction |Stabilization / Strengthening works to Shotley Pier | |East Anglian Marine Leisure Llp |03 Oct 2013|28 Nov 2013| |
| | |MLA/2013/00395 - Completed |Application - Construction |Fulham Wharf| |Bdw Trading Limited |04 Oct 2013|29 Jan 2014| |
| | |MLA/2013/00396 - Completed |Application - Removals (inc. Grab Samples) |Extension to Project Harbour Gaze Survey areas. | |Mr Robin Burrows|06 Oct 2013|20 Dec 2013| |
| | |MLA/2013/00398 - Completed |Application - Construction |Wind and direction measurement buoy and wave buoy deployment| |Neart Na Gaoithe Offshore Wind Limited|08 Oct 2013|27 Nov 2013| |
| | |MLA/2013/00399/1 - Completed |Application - Alternative Use of Dredged Material|Eastbourne Beach Management Works 2013-2014 and 2014-2015 | |Eastbourne Borough Council|08 Oct 2013|04 Jul 2014| |
| | |MLA/2013/00400/4 - Completed |Application - Miscellaneous Disposal |Tracer Studies| |Centre For Research Into Environment And Health (Creh) Ltd|08 Oct 2013|09 Feb 2015| |
| | |MLA/2013/00401 - Completed |Application - Emergency Work |Sands Lane, Bridlington - Outfall Collapse| |Yorkshire Water Limited |09 Oct 2013|15 Oct 2013| |
| | |MLA/2013/00402 - Completed |Application - Construction |Chiswick Bridge Refurbishment | |Bam Nuttall Limited |09 Oct 2013|08 Jan 2014| |
| | |MLA/2013/00403/1 - Completed |Application - Construction, Removals (inc. Grab Samples) |Sea View Yacht Club Landing Stage and Slipway Replacement | |Sea View Yacht Club Limited |10 Oct 2013|12 Dec 2013| |
| | |MLA/2013/00404/1 - Completed |Application - Construction |Longbridge Drive Bank Restoration Project | |National Trust|10 Oct 2013|12 Feb 2014| |
| | |MLA/2013/00405/8 - Completed |Application - Construction, Removals (inc. Grab Samples) |Isles of Scilly Link - St Mary's Harbour Quay Extension | |Cornwall Council|11 Oct 2013|25 Aug 2015| |
| | |MLA/2013/00406/4 - Completed |Application - Construction, Dredging |Pendennis Wet Dock| |Pendennis Shipyard Limited|11 Oct 2013|26 Feb 2015| |
| | |MLA/2013/00407 - Completed |Application - Construction |Asset Reconditioning Site 207 Hampton Barnes No. 1 Sluice Repair| |Environment Agency|14 Oct 2013|17 Dec 2013| |
| | |MLA/2013/00408 - Completed |Application - Removals (inc. Grab Samples) |Bransholme Storm Water Pumping Station| |Yorkshire Water Services Ltd|14 Oct 2013|06 Dec 2013| |
| | |MLA/2013/00409/2 - Completed |Application - Construction |Watch House and Orestone End pipeline, Salcombe | |South West Water Limited|16 Oct 2013|15 Apr 2014| |
| | |MLA/2013/00410/6 - Completed |Application - Alternative Use of Dredged Material|Lymington Harbour: Saltmarsh Recharge by Bottom Dumping Grouped under: Lymington Harbour Dredge and Disposal Showing 2 of 3 cases | |Lymington Harbour Commissioners |16 Oct 2013|07 Mar 2017| |
| | |MLA/2013/00411 - Completed |Application - Construction |Motney Hill Refurbishment | |Environment Agency – South West Reg |16 Oct 2013|30 Jan 2014| |
| | |MLA/2013/00412/7 - Completed |Application - Construction |Mersey Gateway| |Merseylink|16 Oct 2013|26 Feb 2019| |
| | |MLA/2013/00413/1 - Completed |Application - Alternative Use of Dredged Material, Dredging|Marina Dredging & Salt Marsh Feeding| |Yacht Havens Limited|17 Oct 2013|04 Sep 2015| |
| | |MLA/2013/00414/4 - Completed |Application - Construction |Lots Road Development | |Hutchison Whampoa Properties (Europe) Limited |21 Oct 2013|24 Jan 2018| |
| | |MLA/2013/00415 - Completed |Application - Construction |Leamouth Foot Bridge| |John Sisk & Son Limited |21 Oct 2013|11 Feb 2014| |
| | |MLA/2013/00416/1 - Completed |Application - Construction |Withernsea Commercial Boat Slipway| |East Riding Of Yorkshire Council|24 Oct 2013|08 Sep 2014| |
| | |MLA/2013/00417/2 - Completed |Application - Aggregate Dredging, Removals (inc. Grab Samples) |Area 228 - Cross Sands| |Volker Dredging Ltd |24 Oct 2013|10 May 2017| |
| | |MLA/2013/00418/2 - Completed |Application - Dredged Material Disposal, Dredging|Birdham Pool Approach Channel Maintenance | |Birdham Pool Ltd|28 Oct 2013|15 Oct 2014| |
| | |MLA/2013/00419/1 - Completed |Application - Aggregate Dredging, Removals (inc. Grab Samples) |Area 507, Shipwash| |Cemex Uk Marine Limited |28 Oct 2013|21 Mar 2017| |
| | |MLA/2013/00420/2 - Completed |Application - Renewables |Installation of Anode Bank Arrays | |Scira Offshore Energy Limited |30 Oct 2013|18 Dec 2014| |
| | |MLA/2013/00421/3 - Completed |Application - Construction |Greatstone Terminal Groyne| |Environment Agency|31 Oct 2013|24 Sep 2014| |
| | |MLA/2013/00422 - Completed |Application - Emergency Work |Jury's Gap Outfall Emergency Works| |Environment Agency (Southern Region)|31 Oct 2013|01 Nov 2013| |
| | |MLA/2013/00423/4 - Completed |Application - Dredged Material Disposal|Heysham Harbour Maintenance Disposal Renewal| |Heysham Port Limited|01 Nov 2013|24 May 2017| |
| | |MLA/2013/00425 - Completed |Application - Construction |Broomhill Sands Coastal Defence Scheme| |Environment Agency (Southern Region)|01 Nov 2013|09 Apr 2014| |
| | |MLA/2013/00426/2 - Completed |Application - Construction |Walney Offshore Wind Farm Operational Marine Licence - Inter Array Cable Repair | |Walney (Uk) Offshore Windfarms Limited|01 Nov 2013|31 Jan 2018| |
| | |MLA/2013/00428 - Completed |Application - Construction |Renewal of Fendering System berth 2 Pier A Port of Dover| |Dover Harbour Board |04 Nov 2013|14 Feb 2014| |
| | |MLA/2013/00431/4 - Completed |Application - Construction |Barrow Long Sea Outfall Grouped under: Barrow Long Sea Outfall Showing 2 of 3 cases | |United Utilities Plc|08 Nov 2013|14 Jul 2015| |
| | |MLA/2013/00432/3 - MLC/2014/00072 - Completed|Application - Dredged Material Disposal, Dredging|Maintenance Dredging at HMNB Devonport| |Boskalis Westminster Ltd|08 Nov 2013|08 Oct 2014| |
| | |MLA/2013/00436/4 - Completed |Application - Construction |Norway - UK Interconnector|Rock Armour/Concete Mattressing Deposit |National Grid Nsn Link Limited|15 Nov 2013|07 Dec 2018| |
| | |MLA/2013/00437 - Completed |Application - Construction, Dredged Material Disposal, Dredging|Catchment Tidal Flap Overhaul | |Esso Petroleum Company,Limited|18 Nov 2013|12 Mar 2014| |
| | |MLA/2013/00438/2 - Completed |Application - Construction |Simon Storage fender refurbishment system | |Simon Storage Limited |18 Nov 2013|25 Mar 2014| |
| | |MLA/2013/00439 - Completed |Application - Construction |West Shore Park, Walney Island - Coast Protection Work| |Barrow Borough Council|19 Nov 2013|11 Feb 2014| |
| | |MLA/2013/00440/2 - Completed |Application - Dredged Material Disposal, Dredging|Yarmouth Harbour (IOW) Maintenance Dredge | |Yarmouth Harbour Comissioners (Iow) |19 Nov 2013|07 May 2021| |
| | |MLA/2013/00441 - Withdrawn |Application - Construction, Dredged Material Disposal|Immingham Western Deepwater Jetty | |Associated British Ports|20 Nov 2013| | |
| | |MLA/2013/00442 - Completed |Application - Construction |Crown Sluice Refurbishment| |Environment Agency|20 Nov 2013|20 Mar 2014| |
| | |MLA/2013/00443 - Completed |Application - Construction |Codds Outfall Refurbishment | |Environment Agency|20 Nov 2013|13 Mar 2014| |
| | |MLA/2013/00444/1 - Completed |Application - Construction |Porth Promenade - Beach Ramp Improvements | |Cornwall Council|20 Nov 2013|22 Apr 2014| |
| | |MLA/2013/00445/7 - Completed |Application - Alternative Use of Dredged Material, Construction|Clacton and Holland-on-Sea Sea Defences | |Tendring District Council |21 Nov 2013|09 Sep 2015| |
| | |MLA/2013/00447 - Completed |Application - Construction |Abbey Wharf | |Environment Agency (Southern Region)|22 Nov 2013|21 Mar 2014| |
| | |MLA/2013/00448 - Completed |Application - Construction |Wall stabilisation Kingfisher Quay| |Mr Jonathan Taylor|27 Nov 2013|18 Mar 2014| |
| | |MLA/2013/00449/4 - Completed |Application - Dredged Material Disposal, Dredging|COBB'S QUAY MARINA MAINTENANCE DREDGING | |Marina Developments Limited |27 Nov 2013|01 May 2019| |
| | |MLA/2013/00450 - Completed |Application - Construction |Replacement ramp at Bognor Regis Yacht Club | |Bognor Yacht Club |28 Nov 2013|26 Feb 2014| |
| | |MLA/2013/00451 - Completed |Application - Construction, Dredged Material Disposal, Dredging|Kendall's Wharf extension and capital dredge| |Kendall Bros. (Portsmouth) Limited|29 Nov 2013|08 Feb 2016| |
| | |MLA/2013/00452 - Completed |Application - Construction |Derwenthaugh Cycle Link | |Gateshead Council |02 Dec 2013|31 Jan 2014| |
| | |MLA/2013/00453/6 - Completed |Application - Aggregate Dredging, Removals (inc. Grab Samples) |Area 197|Area 197|Tarmac Marine Dredging Limited|03 Dec 2013|06 Aug 2019| |
| | |MLA/2013/00455/1 - Completed |Application - Dredging |water jetting system|Purfleet Deep Wharf |C.Ro Ports London Limited |04 Dec 2013|13 Mar 2019| |
| | |MLA/2013/00456 - Completed |Application - Removals (inc. Grab Samples) |Demolition of redundant Linkspan Bridge Western Docks | |Dover Harbour Board |05 Dec 2013|16 May 2014| |
| | |MLA/2013/00457/2 - Completed |Application - Dredged Material Disposal, Dredging|Maintenance Dredging| |The Royal Motor Yacht Club|05 Dec 2013|01 Oct 2014| |
| | |MLA/2013/00458 - Completed |Application - Construction |Westcliff Paddling Pool Access Ramp | |Southend-On-Sea Borough Council |05 Dec 2013|07 May 2014| |
| | |MLA/2013/00459 - Completed |Application - Emergency Work |Iford (old) Bridge - Wing Wall Scour Protection | |Bournemouth Borough Council |06 Dec 2013|13 Dec 2013| |
| | |MLA/2013/00460 - Completed |Application - Aggregate Dredging |Area 492, Trial Dredging| |Hanson Aggregates Marine Limited|06 Dec 2013|12 Feb 2014| |
| | |MLA/2013/00462/2 - Completed |Application - Construction |Sutton Harbour Boardwalk Development|Sutton Harbour|Sutton Harbour Holdings Plc |09 Dec 2013|21 Dec 2022| |
| | |MLA/2013/00463/1 - Completed |Application - Alternative Use of Dredged Material, Construction, Dredging, Removals (inc. Grab Samples)|Exeter Flood Defence Scheme | |Environment Agency - South West Region|09 Dec 2013|30 Apr 2015| |
| | |MLA/2013/00464/1 - Completed |Application - Removals (inc. Grab Samples) |Feeder 9 - River Humber Pipeline Replacement Project| |National Grid Gas Plc |09 Dec 2013|07 Apr 2014| |
| | |MLA/2013/00467 - Completed |Application - Construction |River Bank Repair at BAE Systems Newcastle upon Tyne| |Bae Systems |11 Dec 2013|10 Feb 2014| |
| | |MLA/2013/00468 - Completed |Application - Miscellaneous Disposal |Enhancing knowledge of norovirus in the marine environment| |Cefas Weymouth|11 Dec 2013|20 Feb 2014| |
| | |MLA/2013/00469 - Withdrawn |Application - Miscellaneous Disposal |Enhancing knowledge of norovirus behaviour in the marine environment| |Cefas Weymouth Laboratory |11 Dec 2013| | |
| | |MLA/2013/00470 - Completed |Application - Dredged Material Disposal, Dredging|Maintenance dredging, Ryde Harbour, Isle of Wight | |Isle Of Wight Council |11 Dec 2013|20 Aug 2014| |
| | |MLA/2013/00471/1 - Completed |Application - Construction |57 River Road, Littlehampton, BN17 5BZ| |Brownfield Estates Limited|11 Dec 2013|09 May 2014| |
| | |MLA/2013/00472/1 - Completed |Application - Construction |Outfall 15, St. Mary's Island | |Countryside Maritime Limited|13 Dec 2013|27 Jan 2015| |
| | |MLA/2013/00473 - Completed |Application - Construction |Maintenance replacement of sheet piled river wall at Hythe Quay Colchester| |Colchester Borough Council|13 Dec 2013|03 Apr 2014| |
| | |MLA/2013/00474/1 - Completed |Application - Construction |Ribble Link Sea Gate Embankment | |Canal & River Trust |13 Dec 2013|02 Sep 2014| |
| | |MLA/2013/00475/1 - Completed |Application - Construction, Removals (inc. Grab Samples) |Dinghy Pen Wall Repairs, Replacment metal walkway | |Arun Yacht Club Limited(The)|13 Dec 2013|05 Mar 2014| |
| | |MLA/2013/00477/1 - Completed |Application - Construction |Kew Bridge Walkway| |St George West London Ltd |13 Dec 2013|08 Jul 2014| |
| | |MLA/2013/00478 - Completed |Application - Construction |TEMPORARY SLIPWAY TO SUPPORT ST MARY’S AIRPORT PROJECT| |Council Of The Isles Of Scilly|13 Dec 2013|17 Feb 2014| |
| | |MLA/2013/00479/1 - Completed |Application - Construction, Renewables |Totnes Hydro| |Dart Renewables Ltd |16 Dec 2013|08 Oct 2015| |
| | |MLA/2013/00483 - Completed |Application - Dredging |Thunderer Jetty Dredging|Thunderer (No. 5) Jetty |Stolthaven Dagenham Limited |17 Dec 2013|22 May 2015| |
| | |MLA/2013/00484 - Completed |Application - Construction |Coastal Protection to Siddick Sea Wall| |J. Murphy & Sons Limited|17 Dec 2013|28 Feb 2014| |
| | |MLA/2013/00485/3 - Completed |Application - Dredged Material Disposal, Dredging|Chichester Marina Approach Channel| |Premier Marinas Limited |19 Dec 2013|12 Jan 2018| |
| | |MLA/2013/00487/1 - Completed |Application - Alternative Use of Dredged Material, Construction, Dredging|Plantation Wharf| |Mso Marine|19 Dec 2013|17 Nov 2015| |
| | |MLA/2013/00488/2 - Completed |Application - Aggregate Dredging, Removals (inc. Grab Samples) |Area 511/512/513| |Cemex Uk Marine Limited |19 Dec 2013|17 Jul 2017| |
| | |MLA/2013/00490 - Completed |Application - Construction |Repairs to Coastal Protection at Hurst Castle | |Historic Buildings Commission For England |20 Dec 2013|23 Jan 2014| |
| | |MLA/2013/00491 - Completed |Application - Removals (inc. Grab Samples) |Southsea and North Portsea Island CFERM Schemes - Structural Investigation| |Eastern Solent Coastal Partnership|20 Dec 2013|10 Feb 2014| |
| | |MLA/2013/00492 - Completed |Application - Construction |Porthloo Boat Slipway Improvements| |Duchy Of Cornwall |23 Dec 2013|13 Feb 2014| |
| | |MLA/2013/00494 - Completed |Application - Construction |King Point Marina Wave Gate modifications | |Sutton Harbour Holdings Plc |24 Dec 2013|11 Mar 2014| |
| | </datatables> |
| |
| [[MMO - Marine Licences Public Register]] | [[MMO - Marine Licences Public Register]] |
| |