mmo_-_mlas_-_2016

MMO - Marine Licences Public Register

Download 16MLAs-240913.csv

csv file=“https://northeastfc.uk/MMO/16MLAs-240913.csv” /csv

Case DetailsProject TypeProject TitleLocations Applicant NameSubmission DateDecision Date
MLA/2016/00001 - CompletedApplication - Other depositsNorth Killingholme Toe Beam RepairsNorth KillingholmeEnvironment Agency04 Jan 201607 Feb 2017
MLA/2016/00002/4 - CompletedApplication - SamplingOffshore Exploratory Boreholes WCM Offshore boreholes phase 3West Cumbria Mining Limited 04 Jan 201618 Oct 2017
MLA/2016/00004 - CompletedApplication - Maintenance of existing works Petrel Pier (Gosport) - Pontoon ReplacementArea 1 (Petrel Pier)Bae Systems Marine Limited06 Jan 201629 Jan 2016
MLA/2016/00005/1 - CompletedApplication - Other works EDF Energy - Hinkley Point 'B' Power station - Installation of Stop Gates for Cooling Water System Isolation in advance of planned 2016 outage.Hinkley Point 'B' Power Station - Stop Log/Coarse screen location Edf Energy Nuclear Generation Limited 07 Jan 201621 Jan 2016
MLA/2016/00006 - CompletedApplication - Construction of new works, Other removals Byways Slipway, Bouldnor, Isle of WightBouldnorMr Niall Dowling11 Jan 201610 Jun 2016
MLA/2016/00008 - CompletedApplication - Other depositsSovereign Harbour Emergency works to remove shingle bank Sovereign Harbour Shingle Bank Removal 2016 Premier Marinas (Eastbourne) Limited12 Jan 201620 Jan 2016
MLA/2016/00009 - CompletedApplication - Construction of new works St Anne's Wharf River Wall St Anne's Wharf Tcm Ltd 12 Jan 201610 May 2016
MLA/2016/00010 - WithdrawnApplication - Construction of new works Extension to I Jetty at Universal Marina, River Hamble, Southampton John Willment Marine Limited13 Jan 2016
MLA/2016/00011 - CompletedApplication - Construction of new works Varne Boat Club, Replacement Slipway Varne Boat Club Varne Boat Club Limited(The)14 Jan 201623 May 2016
MLA/2016/00013 - CompletedApplication - Clean-up dredging, Disposal of dredged material Minehead Harbour Shinglre Bank removal Minehead Harbour, Disposal site West Somerset District Council15 Jan 201619 Feb 2016
MLA/2016/00014/4 - CompletedApplication - Disposal of dredged materialLincshore Beach Renourishment WorksMablethorpe to Skegness Environment Agency15 Jan 201630 Jun 2020
MLA/2016/00015 - CompletedApplication - Maintenance of existing works Old Swan BridgeOld Swan Spanning Over River Arun Wsp Group Limited 18 Jan 201604 Jul 2017
MLA/2016/00017/2 - CompletedApplication - Construction of new works, Disposal of dredged material, Other deposits, Other dredging Anchorsholme Storm Water Outfall Anchorsholme outfall Working area, BARROW D (IS205) United Utilities Water Plc19 Jan 201623 Mar 2018
MLA/2016/00018/1 - CompletedApplication - Maintenance of existing works Long Rock Sea Wall Interim RepairLong Rock Cormac Solutions Ltd20 Jan 201608 Jul 2016
MLA/2016/00019/1 - CompletedApplication - SamplingNorth West Cost Connections Geotchnical Survey 2016Tunnel_Route_Survey_CorridorNational Grid Commercial Holdings Limited 21 Jan 201607 Apr 2016
MLA/2016/00020 - CompletedApplication - Construction of new works ARPW Old Beford Sluice Eel PassOld Bedford Eel PassEnvironment Agency21 Jan 201623 Feb 2016
MLA/2016/00021/1 - CompletedApplication - Construction of new works Barrier Garden Pier ExtensionBarrier Garden Pier Extension SitePort Of London Authority21 Jan 201627 Sep 2016
MLA/2016/00022/4 - CompletedApplication - Other dredgingBLAKE BRIDGE BLAKE BRIDGESomerset County Council 24 Jan 201630 Aug 2018
MLA/2016/00023/1 - CompletedApplication - Disposal of dredged materialPlacement of Maintenance Dredge Material Wells Harbour Grouped under: Wells Harbour dredge disposal Showing 2 of 6 cases Well Beneficial use site2 (HU156), Wells outer harbour site A (HU152), Wells Outer Harbour B1 (HU157), Wells outer harbour site C (HU154) Wells Harbour Commissioners 25 Jan 201612 Jul 2016
MLA/2016/00024/2 - CompletedApplication - Clean-up dredging Warkworth Harbour North Side Sand Relocation Warkworth Harbour North SideMr Simon Baxter 25 Jan 201627 Jun 2019
MLA/2016/00025/3 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Esso Fawley Marine Terminal Maintenance Dredging and Disposal Licence RenewalNAB TOWER (WI060), FMT Dredge AreaEsso Petroleum Company,Limited26 Jan 201614 Oct 2019
MLA/2016/00027 - CompletedApplication - Maintenance of existing works rebuild quay at 1 noss mayo1 The Point Noss Mayo Mrs Kathryn Barnett 27 Jan 201613 May 2016
MLA/2016/00028/1 - CompletedApplication - Maintenance of existing works Network Rail - Brantsy to Parton Bransty Network Rail Limited28 Jan 201619 Sep 2016
MLA/2016/00029 - CompletedApplication - Other removalsUK-Germany 6 Cable RecoveryUK-Germany 6 cable Recovery 20 meter Corridor Bt Plc29 Jan 201629 Apr 2016
MLA/2016/00030 - CompletedApplication - Other works Pontoon installation Trinity Quay, Alicat Workboats LtdAlicat Workboats Limited29 Jan 201616 May 2016
MLA/2016/00031 - CompletedApplication - Maintenance of existing works Eskmeals Viaduct Re-railingEskmeals Viaduct LA19 5YG Carillion Plc 29 Jan 201605 Feb 2016
MLA/2016/00033/1 - CompletedApplication - Construction of new works, Maintenance of existing worksGreater Gabbard Offshore Wind Farm (OWF) Export Cable Operations & Maintenance Works Balfour Beatty Usl01 Feb 201609 Nov 2016
MLA/2016/00034/1 - CompletedApplication - Other works Gweek Boatyard Test Pile Indicative Test Pile Location Gweek Quay Limited01 Feb 201604 Apr 2017
MLA/2016/00035/1 - CompletedApplication - Construction of new works Addition of extended walkways to RNLI slipway at Sennen cove Sennen Cove Lifeboat StationR.N.L.I. (Trading) Limited02 Feb 201618 Oct 2016
MLA/2016/00036/3 - CompletedApplication - Construction of new works, Disposal of dredged material, Navigational dredging (capital)Portsmouth Heritage Pontoon and HMS Warrior Dredging and Construction WorksHeritage Pontoon, HMS Warrior, NAB TOWER (WI060)Portsmouth Naval Base Property Trust02 Feb 201606 May 2020
MLA/2016/00037 - CompletedApplication - Maintenance of existing works Thorn Sluice Refurbishment Thorn SluiceEnvironment Agency - South West Region03 Feb 201606 Apr 2016
MLA/2016/00038 - CompletedApplication - Maintenance of existing works Maintenance painting part of external face of Canary Wharf Pier pontoon, LondonCanary Wharf Pier pontoon Canary Wharf Management Limited 03 Feb 201615 Feb 2016
MLA/2016/00039 - CompletedApplication - Maintenance of existing works MR3511 River MerseyMR3511 river Mersey J. Murphy & Sons Limited03 Feb 201614 Mar 2016
MLA/2016/00042 - CompletedApplication - Other depositsDudgeon Offshore Wind Farm - waverider buoy installation Buoy location Dudgeon Offshore Wind Limited 05 Feb 201625 Feb 2016
MLA/2016/00043/1 - CompletedApplication - Navigational dredging (maintenance) Essex Marina Removal of Silt Build UpEssex MarinaEssex Marina05 Feb 201622 Feb 2017
MLA/2016/00044 - CompletedApplication - Maintenance of existing works Creek House Narrow Street London, E14 8BPCreek House, Narrow Street, London, E14 8BP Mr Anthony Johncock 08 Feb 201621 Mar 2016
MLA/2016/00045 - CompletedApplication - Construction of new works Pontoon extension to Harbour Master's Jetty, Warsash.Harbour Master's Jetty, warsash River Hamble Harbour Authority08 Feb 201610 May 2016
MLA/2016/00046 - CompletedApplication - Maintenance of existing works Dawlish, Teignmouth and Exe estuary seawall repairsDawlish, Teignmouth and Exe estuary seawall Dyer And Butler 08 Feb 201617 Aug 2016
MLA/2016/00047/2 - CompletedApplication - Maintenance of existing works add additional pile (pontoon C extension)Installation of 1No. Pile to existing pontoon extension Pontoon Berth Holders Two 09 Feb 201609 Jun 2017
MLA/2016/00048 - CompletedApplication - Construction of new works, Other dredging, Other worksThe Garden BridgeGarden Bridge, Crown River Cruises new mooring location, Relocation of HQS Wellington Garden Bridge Trust 09 Feb 201629 Jul 2016
MLA/2016/00049 - CompletedApplication - Other dredging, Other removalsBurbo Bank Extension Debris ClearanceBurbo Bank Extension Offshore Wind Farm, Burbo Bank Extension OWF (IS135) Dong Energy Burbo Extension (Uk) Ltd09 Feb 201606 May 2016
MLA/2016/00050 - CompletedApplication - SamplingTrial pit within the back filled former outdoor pool.Tynemouth Outdoor PoolFriends Of Tynemouth Outdoor Pool 10 Feb 201609 Mar 2016
MLA/2016/00051 - CompletedApplication - Maintenance of existing works, Other dredging RNLI Selsey -Emergency Beach Re-Profiling of Launch RouteSelsey Inshore Lifeboat Launch Route (upper), Selsey Inshore Lifeboat Launch Route (Lower)Rnli10 Feb 201616 Feb 2016
MLA/2016/00052/2 - CompletedApplication - Construction of new works Carbis Bay Hotel - Ocean Sports Centre and ApartmentsCarbis Bay Hotel2gh Water 11 Feb 201616 Aug 2017
MLA/2016/00053 - CompletedApplication - Maintenance of existing works Crescendo Court sea wall repairs and improvementsCrescendo Court TR11 2SZBarleycroft Limited 11 Feb 201616 May 2016
MLA/2016/00055/3 - CompletedApplication - Construction of new works Oikos Deepwater Jetty (ODWJ) Proposals ODWJ ProposalsOikos Storage Limited 11 Feb 201630 Nov 2017
MLA/2016/00056 - CompletedApplication - Maintenance of existing works Flood Defence Wall Repairs John Day HouseMoore Project Management Solutions Llp11 Feb 201625 May 2016
MLA/2016/00058/1 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Hill Head Harbour Channel MaintenanceShingle Bank Removal Area, Shingle DepositHill Head Sailing Club14 Feb 201616 Aug 2017
MLA/2016/00059 - CompletedApplication - Maintenance of existing works ScaffoldingTides Reach Appartments, Egloshayle, Wadebridge, Cornwall PL27 6BWH&H Scaffolding (Sw) Limited15 Feb 201610 May 2016
MLA/2016/00060 - CompletedApplication - Maintenance of existing works RNLI Fleetwood -Low Impact Maintenance Works to Pontoon Berth (Fast Track Licence) RNLI Fleetwood: Lifeboat PenRoyal National Lifeboat Institution 15 Feb 201621 Mar 2016
MLA/2016/00061 - CompletedApplication - Maintenance of existing works Brixham Marina Pile Repair Brixham Pile Repair Marina Developments Limited 16 Feb 201611 Mar 2016
MLA/2016/00062/3 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Continuation of the Disposal of Maintenance Dredgings at ABP King's Lynn WEST STONES (HU143) Associated British Ports Kings Lynn 16 Feb 201602 Jun 2020
MLA/2016/00064/3 - CompletedApplication - Maintenance of existing works Coastal Defence Reconstruction Works, Fort Cumberland, PortsmouthFort_Cumberland_MMO_Site_Extent Southern Water Services Limited 17 Feb 201611 Sep 2017
MLA/2016/00065/2 - CompletedApplication - Construction of new works Blyth West Quay StrengtheningWest Quay Port Of Blyth 17 Feb 201620 Nov 2017
MLA/2016/00066 - CompletedApplication - Construction of new works Fairlight Cove Coast Protection Works Phase 3Construction Area Canterbury City Council 17 Feb 201629 Jul 2016
MLA/2016/00067/5 - CompletedApplication - Maintenance of existing works Maintenance (component replacement) at Westermost Rough Offshore Wind Farm Westermost Rough Offshore Wind Farm siteDong Energy Power (Uk) Limited17 Feb 201609 May 2017
MLA/2016/00068 - CompletedApplication - Navigational dredging (maintenance) Tollesbury Marina Maintenance Dredging Grouped under: Tollesbury Marina Showing 2 of 2 cases Tollesbury Marina Tollesbury Marina Llp 18 Feb 201612 Jul 2016
MLA/2016/00070 - CompletedApplication - Construction of new works Americas Cup World Series - Portsmouth Americas Cup World Series - temporary Pontoon Teamorigin Llp19 Feb 201615 Jun 2016
MLA/2016/00071 - CompletedApplication - Construction of new works Middleton Wastewater Treatment Works Outfall Marker Post Marker Post working areaUnited Utilities Water Plc19 Feb 201614 Jun 2016
MLA/2016/00072/1 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Maintenance dredging Dock Point Kings Lynn and Disposal site at HU143 10 year disposal licence Dock Point Kings Lynn, WEST STONES (HU143)Kings Lynn Conservancy Board22 Feb 201608 Jan 2020
MLA/2016/00074 - CompletedApplication - Construction of new works Waldringfield Saltmarsh Restoration ProjectWaldringfield saltmarsh Water Management Alliance Limited 23 Feb 201616 May 2016
MLA/2016/00075 - CompletedApplication - Incineration of any substance or object at seaWalney Extension UXO Clearance WOW03_04_UXOworkingArea_WGS84 Dong Energy Walney Extension (Uk) Ltd 24 Feb 201604 Aug 2016
MLA/2016/00077/5 - CompletedApplication - Maintenance of existing works Component exchanges (maintenance) at Burbo Bank offshore wind farm Grouped under: Burbo Bank offshore windfarm Showing 2 of 3 casesBurbo Bank OWFDong Energy Power (Uk) Limited25 Feb 201604 May 2017
MLA/2016/00078/3 - CompletedApplication - Maintenance of existing works River Stour Power Station UnderbridgeRiver Stour Power Station Underbridge Costain Group Plc 25 Feb 201631 Mar 2017
MLA/2016/00079/4 - CompletedApplication - Maintenance of existing works Component exchanges (maintenance) at Walney wind farms Grouped under: Maintenance (component replacement) Walney Showing 3 of 8 casesWalney 1 OWF, Walney 2 OWFDong Energy Power (Uk) Limited26 Feb 201609 Mar 2017
MLA/2016/00080 - CompletedApplication - Maintenance of existing works Gosshall Water Feed Platform Gosshall Platform Environment Agency26 Feb 201626 May 2016
MLA/2016/00082/1 - CompletedApplication - Other removalsRyde Esplanade Canopy Removal Grouped under: Ryde Esplanade Canopy Support Structure Showing 2 of 2 casesRyde Canopy Geoffrey Osborne Limited26 Feb 201607 Jul 2016
MLA/2016/00083 - CompletedApplication - Maintenance of existing works South Wharf Quay Repairs South Wharf - West End of QuayNorfolk Marine29 Feb 201623 May 2016
MLA/2016/00085/1 - CompletedApplication - Construction of new works, Maintenance of existing works, Other removalsHamble Yacht Services - Proposed New Hoist DockHoist Dock, Sheet Piled WallHys (Holdings) Limited02 Mar 201622 Feb 2017
MLA/2016/00087/2 - CompletedApplication - Maintenance of existing works Humber Gateway Offshore Wind Farm (OWF) Export Cable Operations & Maintenance WorksHumber Gateway OWF export cable corridorBalfour Beatty Group Limited03 Mar 201602 Jun 2023
MLA/2016/00091/1 - CompletedApplication - Maintenance of existing works Castle Beach, Falmouth - Sea Defence Wall RepairsCastle Beach, FalmouthCornwall Council04 Mar 201609 May 2016
MLA/2016/00093/2 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Maintenance Dredge of the area in and around Shepards Wharf Marina and Town Quay (Cowes) Grouped under: Maintenance Dredge of the area in and around Shepards Wharf Marina and Town Quay (Cowes) Showing 2 of 3 casesTown Quay Mooring Basin, Shepards Wharf Marina Zone 1 (2.0m BCD), Shepards Wharf Marina Zone 2 (1.5m BCD), Shepards Wharf Marina Zone 3 (3.0m BCD), NAB TOWER (WI060), HURST FORT (WI080) Cowes Harbour Commission07 Mar 201609 Feb 2017
MLA/2016/00094 - CompletedApplication - Other removalsVegetation removel - Thames river wall, HammersmithBlack Lion Lane (south) London Borough Of Hammersmith And Fulham07 Mar 201610 Nov 2016
MLA/2016/00095 - WithdrawnApplication - Wrecks and other archaeological remains Salvage of the SS Ballarat, the SS Briardene, and the SS Vinovia Lodestone Marine Ventures Limited 07 Mar 2016
MLA/2016/00098 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) RYS Jubilee Haven Grouped under: Maintenance Dredge of the area in and around Shepards Wharf Marina and Town Quay (Cowes) Showing 2 of 3 cases NAB TOWER (WI060), HURST FORT (WI080), RYS CowesRoyal Yacht Squadron07 Mar 201607 Jun 2016
MLA/2016/00099 - CompletedApplication - Construction of new works Pontoons Tug Boat Yard Grouped under: Wells Harbour dredge disposal Showing 2 of 6 cases Pontoon Location Tug Boat YardWells Harbour Commissioners 08 Mar 201624 Jun 2016
MLA/2016/00100 - CompletedApplication - Maintenance of existing works Blake Bridge, Brigwater, Taunton Blake Bridge, Bridgwater, Taunton Parsons Brinckerhoff Ltd09 Mar 201621 Apr 2016
MLA/2016/00101 - CompletedApplication - Maintenance of existing works Caisson repair - Laira Rail Bridge Laira Rail Bridge, The Cattewater, Plymouth Plymouth City Council 09 Mar 201611 Apr 2016
MLA/2016/00103/3 - CompletedApplication - Explosive substances or articles, Other deposits, Other removalsRampion Offshore Wind Farm Grouped under: Rampion Offshore Wind Farm Showing 4 of 13 cases Rampion UXO clearance / boulder relocationE.On Climate & Renewables Uk Rampion Offshore Wind Limited09 Mar 201628 Mar 2018
MLA/2016/00104/3 - CompletedApplication - Other deposits, Other removalspotters leisure sea defence project, emergency works potters sea defence project Rosebay Services10 Mar 201629 Apr 2016
MLA/2016/00107 - CompletedApplication - Construction of new works Reinstatement of existing collapsed river wall Tarmac Cement And Lime Ltd15 Mar 201612 Apr 2017
MLA/2016/00108 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) SHOTLEY MARINA MAINTENANCE DREDGE 2016 Shotley Marina Dredge Area, Shotley Marina Beach Replenishment Area Shotley Marina Limited15 Mar 201626 Aug 2016
MLA/2016/00109 - CompletedApplication - Other removalsGround Investigations for potential Stem Wave Mitigation Structure Trench locations (eastern end of HPC sea wall)Nnb Generation Company (Hpc) Limited15 Mar 201626 Apr 2016
MLA/2016/00110/3 - CompletedApplication - Other works Use of bird deterrents at Burbo Offshore Wind Farm DONG Energy Burbo (UK) Ltd. Dong Energy Power (Uk) Limited15 Mar 201610 Mar 2020
MLA/2016/00111/4 - CompletedApplication - Maintenance of existing works Maintenance activities at London Array wind farm LondonArray_WindFarmBoundary_TCE_20150520 London Array Limited17 Mar 201605 Dec 2017
MLA/2016/00112 - CompletedApplication - Construction of new works Newhaven Construction Base - Temporary Pontoon to support construction of RampionRampion Offshore Wind Farm Newhaven Construction Base - Temporary Pontoon E.On Climate & Renewables Uk Rampion Offshore Wind Limited17 Mar 201624 Mar 2016
MLA/2016/00114 - CompletedApplication - Maintenance of existing works Messack House water pipeline, Cornwall Messack House & Creek Mr David Halsey 17 Mar 201612 Apr 2016
MLA/2016/00115 - CompletedApplication - Other works Ryde pier head station urgent track worksRyde Pier Head StationDyer And Butler Limited 18 Mar 201621 Apr 2016
MLA/2016/00116 - CompletedApplication - Construction of new works Erosion control at the Lodge, Sutton The Lodge Mrs Margaret Millar 18 Mar 201603 Jun 2016
MLA/2016/00117/2 - CompletedApplication - Wrecks and other archaeological remains North Sea wreck Mr Andrew Watson19 Mar 201612 Sep 2016
MLA/2016/00120/2 - CompletedApplication - Construction of new works TQEZ RIF St Philips Footbridge St Philips Footbridge Bristol City Council22 Mar 201618 Dec 2018
MLA/2016/00121 - CompletedApplication - Construction of new works, Decommissioning of works Battersea Power Station River Bus JettyBattersea RiverbusBattersea Power Station Development Company Limited 24 Mar 201617 Aug 2016
MLA/2016/00122/3 - CompletedApplication - Construction of new works, Disposal of dredged material, Maintenance of existing works, Other deposits, Other dredging, Other removalsDawlish Warren Beach Management Scheme Dawlish beach, Pole Sands Dredge Site Environment Agency24 Mar 201628 Jun 2017
MLA/2016/00123 - CompletedApplication - Construction of new works Robertsons Boatyard, Woodbridge - Creation of Additional HardstandingSite 1Robertsons Of Woodbridge (Boat Builders) Limited29 Mar 201625 Jan 2017
MLA/2016/00124 - CompletedApplication - Construction of new works Third Solent Fibre Optic Telecoms CableGurnard Bay to Stone PointBritish Telecommunications Public Limited Company 29 Mar 201617 Aug 2017
MLA/2016/00125 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Great Yarmouth inner harbour dredge disposal Great Yarmouth Inner Harbour and the River Yare, GREAT YARMOUTH (HU150) Great Yarmouth Port Company Ltd 29 Mar 201609 Dec 2016
MLA/2016/00126/1 - CompletedApplication - Maintenance of existing works Plaidy CSO Outfall concrete repairs Grouped under: Plaidy CSO Outfall concrete repairs Showing 2 of 2 casesPlaidy CSO OutfallSouth West Water Limited29 Mar 201620 Feb 2017
MLA/2016/00127 - CompletedApplication - Other works Greater Gabbard Offshore Wind Farm Met Mast IGMMX Removal of lattice Greater Gabbard Met Mast IGMMXGreater Gabbard Offshore Winds Limited31 Mar 201616 Jun 2016
MLA/2016/00128/1 - CompletedApplication - Other works Chapel Riverside Sea WallSea WallInland Homes Plc31 Mar 201628 Aug 2019
MLA/2016/00129 - CompletedApplication - Maintenance of existing works London Array BRITNED CROSSING - REMEDIAL ROCK INSTALLATION 0 Blue Transmission London Array Limited31 Mar 201615 Jul 2016
MLA/2016/00130 - CompletedApplication - Maintenance of existing works Swan Hunter Quay Wall RepairsSwan Hunter Quay Wall Repairs North Tyneside Council01 Apr 201611 Aug 2016
MLA/2016/00131 - CompletedApplication - Other depositsMarker Buoys Harbour Marker Buoys, Leisure zone special mark buoy, Construction site marker buoysDover Harbour Board 01 Apr 201625 May 2016
MLA/2016/00132 - WithdrawnApplication - Other removalsBransholme Storm Water Pumping Station Yorkshire Water Services Limited04 Apr 2016
MLA/2016/00133/2 - CompletedApplication - Construction of new works Liverpool 2Seaforth 1Peel Ports Limited04 Apr 201627 Oct 2016
MLA/2016/00134 - CompletedApplication - Maintenance of existing works RNLI Selsey -Emergency Repairs to Roof CladdingSelsey - Station Roof Repairs Royal National Lifeboat Institution 04 Apr 201607 Apr 2016
MLA/2016/00135 - CompletedApplication - Other depositsHindu Engagement Weymouth BayRoyal Fleet Auxillary 04 Apr 201611 May 2016
MLA/2016/00136/6 - CompletedApplication - Other deposits, Other removalsRampion Offshore Wind- Flotation pits Grouped under: Rampion Offshore Wind Farm Showing 4 of 13 casesDisposal site, CR1 FP1, CR1 FP2, CR1 FP3, CR2 FP1, CR2 FP2, CR2 FP3 E.On Climate & Renewables Uk Rampion Offshore Wind Limited04 Apr 201623 Nov 2018
MLA/2016/00138/2 - CompletedApplication - Construction of new works, Maintenance of existing worksHastings Coastal Defence Works Stage 2 Hastings Coastal Defence Works Site Canterbury City Council 06 Apr 201627 Jul 2018
MLA/2016/00139 - CompletedApplication - Maintenance of existing works Southbank River Wall Southbank River WallConcrete Repairs Limited06 Apr 201621 Jun 2016
MLA/2016/00140 - CompletedApplication - Construction of new works Alexandra Yacht Club Jetty H10842 Grouped under: Emergency making safe of Alexandra Yacht Club Jetty Showing 2 of 2 casesAlexandra Yacht Club Jetty WorksSouthend On Sea Borough Council 07 Apr 201608 Jul 2016
MLA/2016/00141 - CompletedApplication - Construction of new works Workington Rail Transport HubWorkington Rail Transport Hub. (Outfall Pipe) Story Contracting Limited 07 Apr 201623 Jun 2016
MLA/2016/00142/1 - CompletedApplication - Maintenance of existing works PLOVER SCAR LIGHTHOUSE Plover Scar Lighthouse and Access Track Lancaster Port Commission 07 Apr 201611 Jan 2017
MLA/2016/00143/2 - CompletedApplication - Disposal of dredged material, Other dredgingDisposal to Nab Tower W1060 of surplus sand and gravel used in the construction of East Cowes Breakwater East Cowes Breakwater Project - Surplus Material Site, NAB TOWER (WI060)Boskalis Westminster Ltd08 Apr 201619 Dec 2018
MLA/2016/00144 - CompletedApplication - Maintenance of existing works Tower Bridge bascule Re-decking and Approach Structure Waterproofing Tower Bridge london Bam Nuttall Limited 08 Apr 201618 Jul 2016
MLA/2016/00145 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Thames Estuary Channel Management - Medium TermKnock John, West Oaze, Black Deep, NORTH EDINBURGH CHANNEL (TH080)Port Of London Authority08 Apr 201606 Feb 2018
MLA/2016/00146 - CompletedApplication - Construction of new works, Other removals Dismantling and installation of scaffold access to the outfall structure SiteMagnox Limited12 Apr 201606 Jul 2016
MLA/2016/00147/3 - CompletedApplication - Maintenance of existing works, Other removals Westermost Rough Offshore Wind Farm O&M Marine Licence Westermost_Rough_Windfarm_WGS84 Westermost Rough Limited12 Apr 201612 Feb 2020
MLA/2016/00148/4 - CompletedApplication - Maintenance of existing works, Other removals Burbo Bank Offshore Wind Farm O&M Marine Licence Grouped under: Burbo Bank offshore windfarm Showing 2 of 3 casesBurbo_Bank_Windfarm_WGS84 Dong Energy Burbo (Uk) Limited12 Apr 201603 Feb 2022
MLA/2016/00149/3 - CompletedApplication - Maintenance of existing works, Other removals Barrow Offshore Wind Farm O&M Marine Licence Barrow Offshore Wind Farm Barrow Offshore Wind Limited12 Apr 201629 Nov 2019
MLA/2016/00150/3 - CompletedApplication - Maintenance of existing works, Other removals West of Duddon Sands Offshore Wind Farm O&M Marine Licence West of Duddon Offshore WindfarmOrsted Westermost Rough Limited 12 Apr 201625 Nov 2019
MLA/2016/00151/3 - CompletedApplication - Maintenance of existing works, Other removals Walney 1&2 Offshore Wind Farms O&M Marine Licence Grouped under: Maintenance (component replacement) Walney Showing 3 of 8 cases Walney 1&2 Offshore Wind FarmsWalney (Uk) Offshore Windfarms Limited12 Apr 201610 Dec 2019
MLA/2016/00153 - CompletedApplication - Other works Brixham Boatlift Pile ReplacementBrixham MarinaMarina Developments Limited 12 Apr 201605 May 2016
MLA/2016/00154/2 - CompletedApplication - Other removalsRemoval of algal growth and/or guano on wind turbine structures at Gunfleet Sands for health and safety and corrosion protection Grouped under: Gunfleet Sands OWF 1, 2, 3 Showing 4 of 15 cases Gunfleet Sands 2, Gunfleet Sands 1, Gunfleet Sands 3Dong Energy Power (Uk) Limited13 Apr 201631 Mar 2017
MLA/2016/00155/1 - CompletedApplication - Construction of new works New Hoist Dock for Berthon Boatyard, Lymington Berthon Boat Company Limited(The) 13 Apr 201621 Mar 2022
MLA/2016/00156 - CompletedApplication - Other works Ryde Esplanade Canopy Support Structure Grouped under: Ryde Esplanade Canopy Support Structure Showing 2 of 2 casesRyde Esaplnade Canopy Geoffrey Osborne Limited13 Apr 201614 Apr 2016
MLA/2016/00157 - CompletedApplication - Construction of new works Rock Revetment at Bakers Gap, Folkestone Rock Revetment at Bakers GapCanterbury City Council 13 Apr 201620 Apr 2017
MLA/2016/00159 - CompletedApplication - Marine licence for the burial of human remains at sea NEEDLES (WI090) Tapper And Son (Poole) Limited14 Apr 201620 Apr 2016
MLA/2016/00160/3 - CompletedApplication - Maintenance of existing works Westermost Rough - Removal of algal growth and/or guanoWestermost Rough Offshore Wind Farm siteDong Energy Power (Uk) Limited14 Apr 201630 Mar 2017
MLA/2016/00162/2 - CompletedApplication - Maintenance of existing works Component exchanges (maintenance) at Barrow offshore wind farm and reomval of algal growth and/or guanoBarrow Offshore WindfarmBarrow Offshore Wind Limited14 Apr 201603 Mar 2017
MLA/2016/00163/2 - CompletedApplication - Other removalsRemoval of algal growth and/or guano on wind farm structures at Walney, West of Duddon Sands, and Burbo Bank Wind farm, for health and safety and corrosion protection Grouped under: Maintenance (component replacement) Walney Showing 3 of 8 casesWalney wind farm part 1, Walney wind farm part 2, West of Duddon Sands wind farm, Burbo Bank wind farmDong Energy Power (Uk) Limited15 Apr 201628 Apr 2017
MLA/2016/00165 - CompletedApplication - Maintenance of existing works Construction of concrete ring beam to replace rotting timber at foot of slipwayBrading Haven Yacht Club slipwayBrading Haven Yacht Club15 Apr 201608 Jun 2016
MLA/2016/00166 - CompletedApplication - Construction of new works 151396 DS ProjectShakespeare Beach Network Rail Limited15 Apr 201612 Aug 2016
MLA/2016/00167/4 - CompletedApplication - Maintenance of existing works, Other removals Gunfleet Sands 1&2 Offshore Wind Farms O&M Marine Licence Grouped under: Gunfleet Sands OWF 1, 2, 3 Showing 4 of 15 casesGunfleet Sands 1&2 Offshore Wind FarmsGunfleet Sands Holding Ltd15 Apr 201613 Dec 2019
MLA/2016/00168/4 - CompletedApplication - Maintenance of existing works, Other removals Gunfleet Sands 3 Offshore Wind Farm O&M Marine Licence Grouped under: Gunfleet Sands OWF 1, 2, 3 Showing 4 of 15 cases Gunfleet Sands 3 Offshore Wind Farm Dong Energy Gunfleet Sands Demo (Uk) Ltd15 Apr 201616 Jan 2020
MLA/2016/00169 - CompletedApplication - Maintenance of existing works Maintenance Works to Mulberry Quays Falmouth Mulberry Quays Falmouth Mulberry Quay Management Company Limited18 Apr 201611 Jul 2016
MLA/2016/00172 - CompletedApplication - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mr John Lister19 Apr 201621 Apr 2016
MLA/2016/00175/7 - CompletedApplication - Construction of new works Anchorsholme Coast Protection Scheme Anchorsholme Coast Protection SchemeBlackpool Borough Council 20 Apr 201607 Jan 2022
MLA/2016/00176 - CompletedApplication - Maintenance of existing works RMYC Panorama Road Tidal Flap Upgrade600mm Tidal FlapWessex Water Services Limited 20 Apr 201616 Jun 2016
MLA/2016/00177 - CompletedApplication - Construction of new works Albany House MooringsWalkway structure over waterBellway Homes Limited 20 Apr 201630 Aug 2016
MLA/2016/00179/2 - CompletedApplication - Other removalsBlyth Offshore Demonstration - UXO Clearance and DisposalBlyth Offshore Demonstrator Blyth Offshore Demonstrator Limited 21 Apr 201627 Jun 2017
MLA/2016/00180/1 - CompletedApplication - Disposal of dredged materialDISPOSAL OF MATERIAL FROM WEYMOUTH HARBOUR DREDGINGSWANAGE BAY (WI110) Weymouth Harbour21 Apr 201617 Dec 2020
MLA/2016/00181/1 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) ABP Lowestoft - Maintenance dredge material disposal LOWESTOFT CIRCULAR NORTH (TH005)Abp Acquisitions Uk Limited 21 Apr 201601 Aug 2018
MLA/2016/00182 - CompletedApplication - Maintenance of existing works RNLI Barrow - Emergency Works Application for Repair to SlipwayRNLI Barrow: Boathouse, Slipway and Access JettyRnli Barrow 21 Apr 201627 Apr 2016
MLA/2016/00183 - CompletedApplication - Maintenance of existing works Tideways, Creeksea, Burnham on Crouch, Essex, CM08PL tidewaysMr Roger Miles22 Apr 201630 Jun 2016
MLA/2016/00185 - CompletedApplication - Maintenance of existing works Like for Like Replacement Sea DefenceMoorings, Westlands Estate, Birdham, Chichester, West Sussex PO20 7HJ Mr Malcolm Oliver 25 Apr 201621 Jul 2016
MLA/2016/00186/1 - CompletedApplication - Maintenance of existing works Rebuilding first 48 metres of existing Jetty Harlow (Blackwater) Sailing ClubHarlow (Blackwater) Sailing Club25 Apr 201626 Apr 2017
MLA/2016/00187 - CompletedApplication - Construction of new works Installation of a new 15 metre readar tower on Shell Pier, PortsmouthShell PierBae Systems Plc 25 Apr 201611 May 2016
MLA/2016/00188 - CompletedApplication - Construction of new works Queen's Wharf and Riverside StudiosQueen's Wharf and Riverside Studios Mount Anvil Limited 26 Apr 201621 Jul 2016
MLA/2016/00189/1 - CompletedApplication - Other works Thames Tideway Tunnel (C450) Dormay Street riverwall replacement and associated worksDOrmay Street River Wall - Temporary Emergency WorksJackson Civil Engineering Group Limited 27 Apr 201629 Jul 2016
MLA/2016/00190 - CompletedApplication - Decommissioning of worksRace Bank Met Mast Decommissioning Race Bank Met MastDong Energy Rb (Uk) Limited 27 Apr 201621 Jul 2016
MLA/2016/00192 - CompletedApplication - Maintenance of existing works Emergency making safe of Alexandra Yacht Club Jetty Grouped under: Emergency making safe of Alexandra Yacht Club Jetty Showing 2 of 2 casesAlexandra Yacht ClubSouthend On Sea Borough Council 27 Apr 201620 May 2016
MLA/2016/00193/1 - CompletedApplication - Construction of new works, Decommissioning of works RNLI Poole: Replacement of Floating BoathouseRNLI Poole Lifeboat Station R.N.L.I. (Trading) Limited28 Apr 201622 Aug 2017
MLA/2016/00195/1 - CompletedApplication - Construction of new works, Disposal of dredged material, Navigational dredging (capital)Birdham Pool - Basin Dredge, Revetment and PontoonsBirdham Pool Dredge, Birdham Pool Construction, Birdham Pool Marina (WI042) Castle Marinas Limited29 Apr 201628 Jul 2017
MLA/2016/00196 - CompletedApplication - Construction of new works Proposed Boat House and Slipway - 50 Trefusis Road - Flushing - Falmouth - Cornwall TR11 5UB 50 Trefusis Road, Flushing, falmouth TR11 5UB Mr Geoff. Evans 29 Apr 201629 Jul 2016
MLA/2016/00197 - CompletedApplication - Alternative use of dredged material, Navigational dredging (maintenance)Maintenance dredging, alternative use of dredged material (salt marsh replenishment) Area of south east salt marsh recharged by discharge location points one & two (a), Area of north west salt marsh recharged by discharge location point three (a), Area of south east salt marsh recharged by discharge location points one & two (b), Area of south east salt marsh recharged by discharge location points one & two ©, Area of north west salt marsh recharged by discharge location point three (b)Yacht Havens Limited29 Apr 201617 Jan 2017
MLA/2016/00198 - CompletedApplication - Maintenance of existing works TIDEWAYS, FERRY LANE, CREEKSEA, BURNHAM ON CROUCH, ESSEX, CM0 8PLcreekseaMiles Water Engineering Ltd 29 Apr 201629 Sep 2016
MLA/2016/00199 - CompletedApplication - Scientific instrumentsTrinity Hospital and Crowleys Wharf Trial pits Trinity Hospital and Crowley's WharfEnvironment Agency29 Apr 201626 May 2016
MLA/2016/00200/1 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Dredge and disposal of Dredged Materials Commercial Dock and Navigable Channel, NOSES POINT (TY130)Seaham Harbour Dock Company 30 Apr 201618 Feb 2021
MLA/2016/00202/1 - CompletedApplication - Other depositsMilford on Sea Beach RechargeMilford on Sea beach recharge New Forest District Council 03 May 201621 Oct 2021
MLA/2016/00203/2 - CompletedApplication - Maintenance of existing works Network Rail - Sellafield Pitching Sellafield Pitching Network Rail Limited03 May 201615 Jun 2018
MLA/2016/00204/2 - CompletedApplication - SamplingSite Investigation at Nissan TerminalTyne Car Terminal Redevelopment Port Of Tyne Authority04 May 201619 May 2017
MLA/2016/00205 - CompletedApplication - Maintenance of existing works Millbank River Wall RepairsMillbank River Wall Repairs F.M. Conway Building And Maintenance Limited05 May 201614 Jun 2016
MLA/2016/00206 - CompletedApplication - Maintenance of existing works Greater Gabbard Offshore Windfarm - Interarray Cable Maintenance Greater Gabbard Offshore Wind FarmGreater Gabbard Offshore Winds Limited05 May 201630 Sep 2016
MLA/2016/00207/1 - CompletedApplication - Maintenance of existing works Outfall repairs at Gunness and AlthorpeKeadby Outfall, Gunness Outfall Severn Trent Water Limited06 May 201605 Aug 2016
MLA/2016/00208/2 - CompletedApplication - Other removalsThe Salvage & recovery of remaining cargo from shipwrecks Alpha 1 to 6 Flagship Marine Management Limited08 May 201628 Oct 2016
MLA/2016/00209/4 - CompletedApplication - Construction of new works IFA2 Electricity Interconnector National Grid Ifa2 Ltd09 May 201613 Sep 2021
MLA/2016/00210/1 - CompletedApplication - Maintenance of existing works CBC1 Br141 Eskmeals ViaductEskmeals viaductStory Contracting Limited 10 May 201627 Sep 2017
MLA/2016/00211 - CompletedApplication - Other depositsIsle of Man to UK Interconnector Cable - Maintenance and RepairIOM Cable Route 1000m BufferManx Cable Company Limited11 May 201609 Aug 2018
MLA/2016/00212 - CompletedApplication - Maintenance of existing works Heybridge Sea Lock Gate Replacement (Phase 2)Heybridge Sea Lock Gate Replacement Essex & Suffolk Water 11 May 201608 Aug 2016
MLA/2016/00214 - CompletedApplication - Construction of new works Terminal Groyne Reconstruction, Cleethorpes. Terminal_Groyne_Site_Area North East Lincolnshire Council 13 May 201612 May 2017
MLA/2016/00215 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Mercury Yacht Harbour Grouped under: MDL Marinas Showing 2 of 3 casesMercury Yacht Harbour - Dredge Area (limits), NAB TOWER (WI060), HURST FORT (WI080), NEEDLES (WI090)Marina Developments Limited 13 May 201614 Oct 2016
MLA/2016/00216/1 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Hamble Point Marina - Maintenance Dredging Grouped under: MDL Marinas Showing 2 of 3 cases Hamble Point Marina - Dredge Area (limits), NAB TOWER (WI060), HURST FORT (WI080), NEEDLES (WI090)Marina Developments Limited 13 May 201616 Aug 2017
MLA/2016/00219 - CompletedApplication - Construction of new works Installation of 2 steel piles and a timber mooring grid for a new mooring for a residential boat in the River Thames, including extracting an existing steel pile and levelling the existing campshed. Vertrouwen, The Hollows, Brentford TW8 0DZMorlandia Limited 17 May 201620 Jan 2017
MLA/2016/00221 - CompletedApplication - Construction of new works Humber Wind Farm Turbine Export Cable Clamps Humber Gateway Turbines J02, A10, B06 and D05 E.On Climate & Renewables Uk Humber Wind Limited18 May 201611 Jul 2016
MLA/2016/00222/1 - CompletedApplication - Decommissioning of worksRemoval of some of the redundant structures at Phoenix Wharf, Rainham, Essex Phoenix Wharf Shanks Waste Management Limited 18 May 201628 Feb 2019
MLA/2016/00224/3 - CompletedApplication - Maintenance of existing works, Navigational dredging (maintenance), Other removalsOrmonde Offshore Wind Farm O&M Marine LicenceOrmonde Offshore Wind Farm, Ormonde Pontoon Working AreaOrmonde Energy Limited19 May 201625 Jan 2024
MLA/2016/00225/1 - CompletedApplication - Construction of new works, Maintenance of existing works, Other dredgingGarston North Dock - Infilled entrance wall repairsInner Dock Wall, Outer Dock WallAssociated British Ports Holdings Limited 19 May 201618 Aug 2016
MLA/2016/00226 - CompletedApplication - Maintenance of existing works Thamesmead - Gallions Reach River Wall Repairs Gallions Reach Line Tilfen Land 19 May 201605 Jul 2016
MLA/2016/00227 - CompletedApplication - Aggregate dredgingGoodwin Sands Aggregate Dredging SchemeProposed Dredge AreaDover Harbour Board 19 May 201626 Jul 2018
MLA/2016/00228 - CompletedApplication - Construction of new works Greenodd Wastewater Pumping Station Temporary Dewatering Greenodd Wastewater Pumping Station Dewatering Area United Utilities Water Plc20 May 201603 Aug 2016
MLA/2016/00231 - CompletedApplication - Construction of new works Sheerness Pipeline Sheerness Port Pipeline Ecocem Ltd23 May 201607 Dec 2016
MLA/2016/00232 - CompletedApplication - Other removals, Other works Repairs to landslip, Creek House, Restronguet Passagecreek house land slip South Western Mining & Tunnelling Ltd 23 May 201627 Jun 2016
MLA/2016/00233 - CompletedApplication - Maintenance of existing works Penketh Brook outfall refurbishmentPenketh Brook outfall Environment Agency23 May 201609 Aug 2016
MLA/2016/00234/4 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance), Other removals Maintenance Dredge, Disposal at Sea and Removal of TBT, Neptune Quay Neptune Quay Current Dredge Pocket, SOUTER POINT (OUTER) (TY081), NORTH TYNE (TY070)Shepherd Offshore Ltd 23 May 201621 May 2020
MLA/2016/00235 - CompletedApplication - Other dredgingRNLI Skegness - Emergency Works Application for Beach Re-Profiling RNLI Skegness - Lifeboat Launch Route Rnli24 May 201625 May 2016
MLA/2016/00237/1 - CompletedApplication - Other works Wandle River Wall SI Works Wandle Weir River WallKumar Associates25 May 201615 Aug 2016
MLA/2016/00238 - CompletedApplication - Maintenance of existing works Bellot Memorial River Wall Repair WorksBellot Memorial River WallGreenwich Hospital25 May 201621 Dec 2016
MLA/2016/00239/1 - CompletedApplication - Construction of new works Replacement downstream berth + accompanying demolition & removal works at the C.RO Ports Purfleet Terminal C.RO Ports Purfleet berthsPurfleet Real Estate Limited25 May 201611 Feb 2020
MLA/2016/00240 - CompletedApplication - Other depositsRiver Wall Protection of Exposed FootingsRiver Wall, Old Royal Naval College The Greenwich Foundation For The Old Royal Naval College26 May 201613 Oct 2016
MLA/2016/00241 - CompletedApplication - Maintenance of existing works Imperial Wharf, Gravesend, Cathodic Protection installationImperial Wharf, Gravesend F M Conway Limited26 May 201621 Jun 2016
MLA/2016/00242/1 - CompletedApplication - Maintenance of existing works Millennium Quay River Wall Repair WorksGlaisher Street, London. SE8 3EP. Knights Brown Construction Ltd26 May 201631 Oct 2017
MLA/2016/00243 - CompletedApplication - Maintenance of existing works B110 Bridge 600m South of Yarmouth Mill - Deck Replacement B110 Bridge Ringway Island Roads Limited26 May 201623 May 2017
MLA/2016/00244 - CompletedApplication - Maintenance of existing works Installation of sea plug, into cooling water outfall, at Heysham B Power Station, and subsequent removal Middleton Sands, around Red Nab Edf Energy Nuclear Generation Limited 26 May 201618 Jul 2016
MLA/2016/00245/1 - CompletedApplication - Maintenance of existing works Gunfleet Sands Offshore Wind Farm (OWF) Export Cable Repair and Remediation Grouped under: Gunfleet Sands OWF 1, 2, 3 Showing 4 of 15 casesGunfleet Sands OWF export cable corridorTc Gunfleet Sands Ofto Limited27 May 201614 Jul 2017
MLA/2016/00246/2 - CompletedApplication - Other dredging, Other works, Wrecks and other archaeological remainsDLR5461: Removal of the River Wandle Half Tide WeirRiver Wandle Half-Tide Weir Removal, Dredged Area Wandsworth Borough Council31 May 201613 Apr 2017
MLA/2016/00247 - CompletedApplication - Construction of new works New timber slipway (16mx2.4m approx.) on the foreshore adjacent Dolphin CottageSlipway Pamber Place Ltd01 Jun 201607 Jul 2016
MLA/2016/00248 - CompletedApplication - Marine licence for the burial of human remains at sea NEEDLES (WI090) Paul Williams Independent Funeral Directors 01 Jun 201609 Jun 2016
MLA/2016/00249 - CompletedApplication - SamplingLost Frontiers - DNA of North SeaCore1, Core2University Of St Andrews02 Jun 201611 Aug 2016
MLA/2016/00250/6 - CompletedApplication - Maintenance of existing works, Other deposits, Other dredging, Other worksHartlepool Nuclear Power Station - Routine Maintenance Activities LicenceHartlepool Power Station Intake location, Hartlepool Power Station Drumscreen and Forebay areas Edf Energy Nuclear Generation Limited 03 Jun 201608 May 2024
MLA/2016/00251 - CompletedApplication - Construction of new works, Other deposits Toe End Beach Stabilisation Scheme and future beach maintenanceRock armour, groyne replacement and timber wall, Beach maintenance area Mr John Bunn03 Jun 201623 Jan 2017
MLA/2016/00252 - CompletedApplication - Construction of new works Newhaven Construction Base - new pontoon at RoRo2 BerthRo Ro 2 E.On Climate & Renewables Uk Rampion Offshore Wind Limited06 Jun 201627 Jul 2016
MLA/2016/00254 - CompletedApplication - Maintenance of existing works Creswell SO1 Creswell SO1Northumbrian Water Limited07 Jun 201611 Aug 2016
MLA/2016/00255/2 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Haslar Marina Maintenance Dredge NAB TOWER (WI060), HURST FORT (WI080) Dean & Reddyhoff Limited08 Jun 201630 Jun 2017
MLA/2016/00256/1 - CompletedApplication - Construction of new works Greatham South - NE SABIC Embankment Grouped under: Greatham Flood Alleviation Scheme Showing 2 of 4 cases MMO_Outline_1, MMO_Outline_2Environment Agency Leeds08 Jun 201626 Jul 2018
MLA/2016/00257 - CompletedApplication - Other works TEIGNMOUTH SANDBANKTeignmouth Beach, Lifeboat Lane Mr Greg Allen 09 Jun 201610 Jun 2016
MLA/2016/00258 - CompletedApplication - Construction of new works, Maintenance of existing worksRuncorn ViaductRuncorn Viaduct Scaffold location Buckingham Group Contracting Limited10 Jun 201614 Jul 2016
MLA/2016/00259/2 - CompletedApplication - Maintenance of existing works Network Rail - Parton to Harrington Sea Walls No.2 & No.3Parton to Harrington Sea Wall No.2, Parton to Harrington Sea Wall No.3Network Rail Limited10 Jun 201607 Feb 2018
MLA/2016/00260/1 - CompletedApplication - Other depositsArtificial reef created with Reefball structures within Torbay's Harbour Authority ARC-Marine Torbay Reef Site Arc-Marine Ltd13 Jun 201608 Jan 2018
MLA/2016/00261 - CompletedApplication - Maintenance of existing works Renewal of Pontoon K Pontoon K Kemps Shipyard Limited13 Jun 201614 Feb 2017
MLA/2016/00262 - CompletedApplication - Construction of new works The Point, Teignmouth - Coastal Defence Wall Replacement The Point, Teignmouth - Coastal Defence Wall ReplacementTeignbridge District Council13 Jun 201613 Oct 2016
MLA/2016/00263/2 - CompletedApplication - Other dredgingSmall Scale Subsea Plough Trials Filey SiteEngineering Technology Applications Limited 14 Jun 201607 Feb 2017
MLA/2016/00265 - CompletedApplication - Maintenance of existing works refubishment to falmouth Tourist information centreFalmouth Tourist Information Centre Cormac Solutions Ltd17 Jun 201601 Dec 2016
MLA/2016/00269/1 - CompletedApplication - Construction of new works Hollicombe Cliffs Rock Armour Revetment Scheme Hollicombe_rock_armour_area_MMO Torbay Council22 Jun 201608 Mar 2017
MLA/2016/00270 - CompletedApplication - Construction of new works Land at Caldecott Road Oulton BroadLand at Caldecott Road Oulton Broad Badger Building (E.Anglia) Limited22 Jun 201605 Dec 2016
MLA/2016/00271 - CompletedApplication - Other works Installation of Submersible flowmeter on exisitng River Water intake pipes Jurgens Jetty Pura Foods Limited22 Jun 201628 Sep 2017
MLA/2016/00273 - CompletedApplication - Construction of new works Beacon of Light Outfall into the River Wear, SunderlandBoL Surface Water Outfall The Beacon Of Light Limited 23 Jun 201628 Oct 2016
MLA/2016/00274 - CompletedApplication - Other depositsHill Head Coastal Protection Project: Phase 1b Beach RechargeHill Head Beach Recharge 1Eastern Solent Coastal Partnership23 Jun 201618 Aug 2016
MLA/2016/00275/3 - CompletedApplication - Maintenance of existing works Greater Gabbard Offshore Wind Farm - Operations and MaintenanceGreater Gabbard Offshore Wind Farm ArrayGreater Gabbard Offshore Wind Limited 23 Jun 201625 Jan 2021
MLA/2016/00276 - CompletedApplication - Maintenance of existing works South West Water - Salcombe Harbour HotelSewer Replacement South West Water Limited24 Jun 201623 Sep 2016
MLA/2016/00278 - CompletedApplication - Construction of new works Rampion O&M Facility - Newhaven Grouped under: Rampion Offshore Wind Farm Showing 4 of 13 casesRampion O&M E.On Climate & Renewables Uk Rampion Offshore Wind Limited26 Jun 201601 Dec 2016
MLA/2016/00279/2 - CompletedApplication - Construction of new works Boat LiftSite 1Amble Marina Limited27 Jun 201615 Aug 2017
MLA/2016/00280 - WithdrawnApplication - Construction of new works, Maintenance of existing worksRadipole Pumping Station CSO improvement works Wessex Water Services Limited 28 Jun 2016
MLA/2016/00281/1 - CompletedApplication - Maintenance of existing works, Other removals Routine maintenance, inspection and testing at Heysham 2 power station Location 1: Cooling water intake, Location 2: Cooling water discharge structure (surge chamber and shaft), Location 3: Marine Outfall, Location 4: Main surface water drain outfall Edf Energy Nuclear Generation Limited 28 Jun 201628 Aug 2019
MLA/2016/00282/1 - CompletedApplication - Maintenance of existing works Newton Ferrers SalineWorking Area 1, Working Area 2, Working Area 3South West Water Limited29 Jun 201606 Dec 2016
MLA/2016/00283 - CompletedApplication - Maintenance of existing works Works to Slipway at Tide End TR11 5LJTide End Trenarth Bridge Mawnan Smith Falmouth Cornwall TR11 5LJMr Stuart Powell29 Jun 201630 Aug 2016
MLA/2016/00284/1 - CompletedApplication - Decommissioning of worksDemolition of Pier and Brow known as Blackwall Pier, 1 Paul Julias Close, Blackwall way, London, E142EH. Marine Location, Bugsby Reach, River Thames, London.Blackwall PierMedtow Marine Limited 30 Jun 201601 Mar 2017
MLA/2016/00285 - CompletedApplication - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mr Charles Lister 30 Jun 201614 Jul 2016
MLA/2016/00286 - CompletedApplication - Construction of new works Grimsby Slipways New Slipway New Grimsby Slipway Grimsby Fish Dock Enterprises Limited 30 Jun 201629 Jul 2016
MLA/2016/00287 - CompletedApplication - Maintenance of existing works SWW - Lanhydrock Road outfall maintenanceSurface Water Outfall Maintenance South West Water Limited01 Jul 201629 Jul 2016
MLA/2016/00289 - CompletedApplication - Maintenance of existing works River wall reconstruction 26-37 Clive Street North Shields SiteSouthbay Civil Engineering Limited04 Jul 201611 Oct 2016
MLA/2016/00290/1 - CompletedApplication - Navigational dredging (maintenance) Hanson Purfleet Jetty Maintenance Dredging Hanson Aggregates Purfleet JettyHanson Quarry Products Europe Limited 04 Jul 201615 Dec 2016
MLA/2016/00292 - CompletedApplication - Construction of new works, Other worksWoolwich Royal Arsenal Pier River TransportPiles areaThe Royal Borough Of Greenwich06 Jul 201604 Jan 2017
MLA/2016/00293 - CompletedApplication - Other depositsBeach Recharge, Eastoke Point, Hayling Island Coastal Defence WorksBeach_Recharge_HI Havant Borough Council06 Jul 201623 Dec 2016
MLA/2016/00294 - CompletedApplication - Maintenance of existing works Maintenance and repainting of Fremington Viaduct steel deckFremington ViaductDevon County Council07 Jul 201629 Jul 2016
MLA/2016/00295 - CompletedApplication - Maintenance of existing works Shaldon Bridge lifting span re-painting worksShaldon Bridge lifting span Devon County Council07 Jul 201612 Aug 2016
MLA/2016/00297/1 - CompletedApplication - Decommissioning of worksPomphlett Marine Loading Jetty, Plymouth, PL9-7HJ. Due to structural degradation of the facility it is proposed that it is dismantled. Pomphlett Marine Aggregate Loading Conveyor Aggregate Industries Uk Ltd 08 Jul 201620 Oct 2016
MLA/2016/00298/3 - CompletedApplication - Construction of new works Placement of piles to support pontoonArea encompassing piles, pontoons and access bridge Gweek Quay Limited12 Jul 201619 Sep 2018
MLA/2016/00300/1 - CompletedApplication - Construction of new works ED3, 8 and 9 Berth Deck to Deck Access Safety Improvements ED3 Berth, ED8 Berth, ED9 Berth Dover Harbour Board 13 Jul 201608 Mar 2017
MLA/2016/00301 - CompletedApplication - SamplingKingston Marine Park Site Investigations River Medina - Kingston Marine Park Site Investigation Boundary Homes And Communities Agency13 Jul 201604 Aug 2016
MLA/2016/00302 - CompletedApplication - Other removalsQinetiQ Site at St Thomas’ Head Kewstoke near Weston Super MareSt Thomas’ Head Kewstoke - Removal of trials frames and cable trays, St Thomas’ Head Kewstoke - Removal of pier Qinetiq Group Plc 13 Jul 201622 Dec 2016
MLA/2016/00303 - CompletedApplication - Construction of new works Malojo Boat HouseSlipway at Malojo, Restronguet PointFrewfix Ltd 14 Jul 201602 Dec 2016
MLA/2016/00304 - CompletedApplication - Construction of new works Bells and Mocketts Pumping Station Bells and Mocketts Pumping StationMedway Internal Drainage Board19 Jul 201630 Jan 2017
MLA/2016/00305/1 - CompletedApplication - Construction of new works, Decommissioning of works Runswick Bay Sewer Diversion facilitating sea defences Sewer Replacement Yorkshire Water Services Limited19 Jul 201615 Mar 2017
MLA/2016/00307 - CompletedApplication - Construction of new works, Maintenance of existing works, Other works Renovations and extension the Sail Loft, Whitford Yard, Fowey. Whitford boat yardPhil Chapman Construction 21 Jul 201601 Sep 2016
MLA/2016/00308 - CompletedApplication - Construction of new works Concrete step blocks over 7 No. reconstructed timber groynes at Withernsea - 2016Groyne 13, Groyne 12, Groyne 11, Groyne 10, Groyne 9, Groyne 4, Groyne 3East Riding Of Yorkshire Council21 Jul 201626 Apr 2017
MLA/2016/00309 - CompletedApplication - Construction of new works Long Rock Sea Wall Rock Armour Protection WorksRock Armour Cormac Solutions Ltd21 Jul 201623 May 2017
MLA/2016/00310 - CompletedApplication - Maintenance of existing works QS06-07 R1052 Sandsend Beck Crossing and Associated WorksSandsend Beck Yorkshire Water Services Ltd21 Jul 201614 Oct 2016
MLA/2016/00311 - CompletedApplication - Other depositsBrightlingsea Harbour Commissioners, Retaining Structure Site TrialMorgan's Marina, Town HardBrightlingsea Harbour Commissioners 22 Jul 201618 Oct 2016
MLA/2016/00312/6 - CompletedApplication - Other removalsGround investigation (GI) works at Hinkley Point C to inform seawall design and buildHistoric Dry Dock, HPA Sea Wall Nnb Generation Company (Hpc) Limited22 Jul 201629 Mar 2018
MLA/2016/00313 - CompletedApplication - Maintenance of existing works Repair of storm damaged piers to existing boathouse. Work to include the temporary removal of the super-structure, storage on site & subsequent rebuilding.Boathouse Mr Nigel Chaplin25 Jul 201615 Aug 2016
MLA/2016/00315 - CompletedApplication - Incineration of any substance or object at sea, Maintenance of existing works, Other deposits, Other removals FAB Link UK Cable Corridor Fab Link27 Jul 201615 Dec 2017
MLA/2016/00316 - CompletedApplication - Maintenance of existing works Arrowhead Quay Arrowhead QuayEco World-Ballymore Arrowhead Quay Company Limited27 Jul 201623 Aug 2016
MLA/2016/00317/2 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Liverpool Channel and River disposal license Mersey Approach Channel, Eastham Channel, River Mersey, Jetties and Cammell Lairds, MERSEY OF BROMBOROUGH2 (IS128), MERSEY (MID-RIVER SITE) (IS120), SITE Z (IS140) The Mersey Docks And Harbour Company Limited27 Jul 201613 May 2019
MLA/2016/00318 - CompletedApplication - Construction of new works Ladder for Kings Wharf O&M site (Burbo Bank Wind Farms)Ladder Installation AreaDong Energy Burbo Extension Holding Ltd 28 Jul 201623 Sep 2016
MLA/2016/00319 - CompletedApplication - Maintenance of existing works South West Water - Ship Inn, Noss Mayo Ship Inn, Noss Mayo (updated) South West Water Limited01 Aug 201619 Oct 2016
MLA/2016/00321 - CompletedApplication - Other works Sculptural InstallationRossall Beach Invisible Flock 02 Aug 201614 Sep 2016
MLA/2016/00322 - CompletedApplication - Maintenance of existing works Peruvian Wharf - Jetty and River Wall WorksPeruvian WharfBrett Aggregates Limited02 Aug 201617 Sep 2018
MLA/2016/00323 - CompletedApplication - Other removalsTurners Cove SluiceTurners Cove Sluice Environment Agency - South West Region03 Aug 201623 Aug 2016
MLA/2016/00324 - WithdrawnApplication - Other depositsBurbo Bank Extension Mattress Remediation Dong Energy Burbo Extension (Uk) Ltd03 Aug 2016
MLA/2016/00326 - CompletedApplication - Other dredgingGreat Ouse Tidal River Water Injection Dredging Pilot ProjectStowbridge Silt BankEnvironment Agency04 Aug 201626 Jan 2018
MLA/2016/00327/2 - CompletedApplication - Other works Tideway Trenching Trial WorksZone Alpha, Zone BravoHeron Wind Limited04 Aug 201607 Apr 2017
MLA/2016/00329 - CompletedApplication - Maintenance of existing works Hopton Groyne 6 Modification Hopton Groyne 6 Mr Alastair Tindle04 Aug 201617 Aug 2017
MLA/2016/00330/1 - CompletedApplication - Maintenance of existing works Trig Lane Flood defecne wall brick and concrete reapirs to match existingSite 1City Of London05 Aug 201602 Nov 2017
MLA/2016/00331/1 - CompletedApplication - Construction of new works, Other worksEnderby Wharf - Stormwater Outfall Enderby Wharf - Stormwater OutfallEnderby Wharf Llp 08 Aug 201623 May 2018
MLA/2016/00332 - CompletedApplication - Maintenance of existing works Trinity Pier, MillbayTrinity PierHomes And Communities Agency08 Aug 201602 Nov 2016
MLA/2016/00334/2 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Plymouth Yacht Haven - Maintenance DredgingPlymouth Yacht Haven, Plymouth Deep (PL035) Plymouth Yacht Haven Limited09 Aug 201622 Aug 2018
MLA/2016/00335/2 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Yacht Haven Quay - Maintenance DredgingYacht Haven Quay, Plymouth Deep (PL035) Yacht Haven Quay Limited09 Aug 201614 Sep 2018
MLA/2016/00336/1 - CompletedApplication - Construction of new works, Other removals Yarmouth Pier - Phase 2 Repair Works Yarmouth Pier The Yarmouth (Isle Of Wight) Harbour Commissioners10 Aug 201605 Dec 2017
MLA/2016/00337/1 - CompletedApplication - Construction of new works Torcross Sea Wall Emergency Works, Devon Torcross Sea DefenceEnvironment Agency – South West Reg 11 Aug 201628 Nov 2016
MLA/2016/00338 - CompletedApplication - Construction of new works New Slipway at New Grimsby, Tresco, Isles of ScillyNew Slipway, New Grimsby, TrescoSymons Construction 11 Aug 201620 Jan 2017
MLA/2016/00339 - CompletedApplication - Maintenance of existing works Greenwich River Wall Works Greenwich River WallRsk Environment Limited 12 Aug 201629 Sep 2016
MLA/2016/00341/3 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) BP Oil UK Ltd - Hamble jetty and approaches Maintenance Dredging Magenta boundary, Blue boundary, Green area (emergency tugs), NAB TOWER (WI060) Bp Oil (Uk) Ltd 15 Aug 201629 Sep 2017
MLA/2016/00342/2 - CompletedApplication - Construction of new works Walney Extension Offshore Wind Farm Operations and Maintenance (O&M) FacilitiesLead-in Jetty, No 1 Berth Dong Energy Walney Extension (Uk) Ltd 15 Aug 201624 Aug 2017
MLA/2016/00344 - CompletedApplication - Incineration of any substance or object at sea, Other works London 1666River Thames, 1666 LoadingArtichoke Trust 16 Aug 201631 Aug 2016
MLA/2016/00345 - CompletedApplication - Maintenance of existing works River Quay Repairs, Electra Business ParkElectra Quay Business ParkF M Conway Limited17 Aug 201618 Oct 2016
MLA/2016/00346 - CompletedApplication - Maintenance of existing works Proposed sea defence repairs at East Chidham Site 1Ms Diana Beale18 Aug 201628 Sep 2016
MLA/2016/00347/2 - CompletedApplication - Maintenance of existing works Component Exchange (Main Bearing)Sheringham Shoal Wind FarmScira Offshore Energy Limited 18 Aug 201616 Mar 2017
MLA/2016/00350 - CompletedApplication - Maintenance of existing works, Other removals Grays BeachGrays Beach Anglian Water Services Ltd19 Aug 201628 Sep 2016
MLA/2016/00351 - CompletedApplication - Other depositsBurial at sea of ashes Miss Denise Richards19 Aug 201602 Sep 2016
MLA/2016/00352 - CompletedApplication - Maintenance of existing works Teesside Offshore Wind Farm LtdTeesside Offshore Wind Farm Teesside Windfarm Limited 19 Aug 201621 Sep 2016
MLA/2016/00353 - CompletedApplication - Maintenance of existing works Masthouse Terrace Pier repairs Masthouse Terrace Pier, end of Napier Avenue, E14 3QE Canal & River Trust 19 Aug 201607 Dec 2016
MLA/2016/00354/1 - CompletedApplication - Maintenance of existing works Plaidy CSO Outfall concrete repairs Grouped under: Plaidy CSO Outfall concrete repairs Showing 2 of 2 casesPlaidy CSO OutfallSouth West Water Limited22 Aug 201629 Dec 2016
MLA/2016/00355/5 - CompletedApplication - Disposal of dredged materialKendalls wharf aggregate washings silt disposalNAB TOWER (WI060) Aggregate Industries Uk Limited 23 Aug 201627 Mar 2024
MLA/2016/00356 - CompletedApplication - Maintenance of existing works Seathorne Promenade seawall foundation strengthening works Seathorne foundation worksEast Riding Of Yorkshire Council23 Aug 201630 May 2017
MLA/2016/00357/3 - CompletedApplication - Navigational dredging (capital) Peruvian Wharf - Capital Dredge Works for Berthing PocketThames Seabed Brett Aggregates Limited24 Aug 201610 Aug 2018
MLA/2016/00358 - CompletedApplication - Construction of new works Development of Standard Wharf Standard Warf Ltd 25 Aug 201612 Oct 2016
MLA/2016/00359/1 - CompletedApplication - Maintenance of existing works Steamer Quay flood defence repairs SteamerQuay_WallRepairs Environment Agency25 Aug 201624 Mar 2017
MLA/2016/00360 - CompletedApplication - Maintenance of existing works Westermost Rough Offshore Wind Farm Export Cable Repair and RemediationWMR_exportcable Tc Westermost Rough Ofto Limited26 Aug 201617 Mar 2017
MLA/2016/00361 - CompletedApplication - Alternative use of dredged material Beach Management Plan : Selsey Shingle RechargeRecharge Area Chichester District Council 26 Aug 201604 Nov 2016
MLA/2016/00362/7 - CompletedApplication - Alternative use of dredged material, Navigational dredging (maintenance)Dredging and Restoration of Brightlingsea HarbourBrightlingsea Dredging and Restoration, Restoration site 1 Borrow pits, Restoration site 2 Borrow pits, Restoration site 3 Borrow pits, Restoration site 4 Borrow pits, Restoration site 5 Borrow pits, Restoration site 6 Borrow pits, Restoration site 7 Borrow pits, restoration site 8 Borrow pits, restoration site 9 Borrow pits, Restoration site 10 Borrow pits, Restoration site 11 Borrow pits, Restoration site 12 Borrow pits, Restoration site 13 Borrow pits, Restoration site 14 Borrow pits, Restoration site 15 Borrow pits, Restoration site 16 Borrow pits, Restoration site 17 Borrow pits, Restoration site 18 Borrow pits, Restoration site 19 Borrow pits, Restoration site 20 Borrow pits, Restoration site 21 Borrow pits, Restoration site 22 Borrow pits, Restoration site Howlands, Restoration Site Howlands East, Restoration Site Howlands West, Restoration Site Cinderyeast West Point, Restoration Site CW Eastpoint, Restoration Site CW Northsite, Site Restoration CW WestpointBrightlingsea Harbour Commissioners 30 Aug 201601 Feb 2022
MLA/2016/00363 - CompletedApplication - Construction of new works Land Adjacent to Whitestrand car park, Fore Street, Salcombe, Devon South Hams District Council 31 Aug 201617 Jan 2017
MLA/2016/00365 - CompletedApplication - Construction of new works Stone facing of a sea wall Tregenver wall cladding John Coombs 04 Sep 201605 Oct 2016
MLA/2016/00366/1 - CompletedApplication - Construction of new works Blyth Offshore Wind Demonstrator Project Seabed Preparation and Scour Protection Works (Array 2) Blyth Offshore Demonstrator Array 2 Blyth Offshore Demonstrator Limited 06 Sep 201627 Jun 2017
MLA/2016/00367 - CompletedApplication - Maintenance of existing works Chilton Trinity STW Outfall - Flap Valve Replacement Chilton Trinity STW Outfall Mr Craig Ryder07 Sep 201603 Oct 2016
MLA/2016/00368 - CompletedApplication - Construction of new works Pontoon attached to seawall at Salcombe Harbour Hotel, Salcombe Estuary, Devon Pontoon location Salcombe Harbour Hotel Salcombe Harbour Hotel Limited07 Sep 201620 Mar 2017
MLA/2016/00369 - CompletedApplication - Construction of new works The Deckhouse Brow PileThe Deckhouse Brow support pile Ray Stewart 08 Sep 201607 Oct 2016
MLA/2016/00370 - CompletedApplication - Maintenance of existing works add additional pile (pontoon C extension)Installation of 1 No. pile to existing pontoon C extensionPontoon Berth Holders Two 08 Sep 201613 Sep 2016
MLA/2016/00371 - CompletedApplication - Navigational dredging (maintenance) West of Duddon Sands Pontoon Dredging Marine Licence West of Duddon Sands Offshore Wind Farm Pontoon areaDong Energy West Of Duddon Sands09 Sep 201615 Mar 2018
MLA/2016/00372/2 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Dredging Exmouth MarinaExmouth MarinaExmouth Marina Ltd10 Sep 201610 Sep 2020
MLA/2016/00373 - CompletedApplication - Maintenance of existing works BRAEMAR QUAY REPAIRS NOSS MAYO BRAEMAR QUAY REPAIRS NOSS MAYOPolawn Bay Limited11 Sep 201626 Oct 2016
MLA/2016/00374 - CompletedApplication - Construction of new works Alteration to hamble mooring L01-02between piles LO1 to LO2 in the hamble riverMr James Youngman 11 Sep 201623 Jan 2017
MLA/2016/00375 - CompletedApplication - Construction of new works RNLI Station Fowey, Cornwall R.N.L.I. (Trading) Limited13 Sep 201601 Nov 2016
MLA/2016/00376 - CompletedApplication - Other removalsChilling - Removal of Derelict Outfall PipeLocation of Chilling OutfallNjp Environmental 13 Sep 201617 Jan 2017
MLA/2016/00377 - CompletedApplication - Construction of new works CRL Penzance CRL Wharf Road, PenzanceChurchill Retirement Living Limited 15 Sep 201624 Nov 2016
MLA/2016/00378 - WithdrawnApplication - Construction of new works Marine Terminal for importing cement at Frog Island, River Thames. S.Walsh & Sons Ltd16 Sep 2016
MLA/2016/00379 - CompletedApplication - Maintenance of existing works River Wall repairCharltonCory Riverside Ltd19 Sep 201601 Feb 2017
MLA/2016/00380 - CompletedApplication - Maintenance of existing works Folkestone Harbour temporary works to enable maintenance works to viaduct and swing bridge Folkestone Harbour Viaduct and Swing Bridge Folkestone Harbour (Gp) Limited 19 Sep 201607 Oct 2016
MLA/2016/00381/1 - CompletedApplication - Construction of new works Gosport Oil Fuel Depot Groundwater Migration Barrier, Pipe BridgeDefence Infrastructure Organisation 20 Sep 201603 Oct 2018
MLA/2016/00382 - CompletedApplication - Other works Calshot pontoon replacementCalshot Pontoon Hampshire County Council20 Sep 201609 Dec 2016
MLA/2016/00383/2 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Medway Approach Channel Maintenance LicenseSOUTH FALLS (TH070), INNER GABBARD (TH052), MAC ExtentPort Of Sheerness Limited 20 Sep 201629 Mar 2023
MLA/2016/00384 - CompletedApplication - Construction of new works Outfall and Scour Protection Sugar QuayBarratt London20 Sep 201607 Feb 2017
MLA/2016/00385 - CompletedApplication - Construction of new works Fulham Wharf Fulham Wharf River Wall Bdw Trading Limited 21 Sep 201615 Mar 2017
MLA/2016/00386/2 - CompletedApplication - Construction of new works, Disposal of dredged material Mersea Harbour and Tollesbury Wick Climate Change Adaptation Recharge ProjectPacking Marsh north, Packing_Marsh_Island, Cobmarsh_Island, Old_Hall, Tollesbury_Wick, Cobmarsh north-westThe Mersea Harbour Protection Trust 21 Sep 201621 Jun 2021
MLA/2016/00387 - CompletedApplication - Maintenance of existing works RNLI Barrow - Emergency Works Application for Slipway Grating RepairsRNLI Barrow: Boathouse, Slipway and Access JettyRoyal National Lifeboat Institution 22 Sep 201630 Sep 2016
MLA/2016/00388/1 - CompletedApplication - Construction of new works Arun Sailing Club Dinghy Pen River WallArun Sailing Club Arun Sailing Club 22 Sep 201613 Oct 2017
MLA/2016/00389 - CompletedApplication - Maintenance of existing works Cremyll View Mount Edgcumbe Sea Wall RepairMount Edgcumbe, Toll House Quay, Lower Lodge, Garden BatteryCormac Solutions Ltd22 Sep 201624 Feb 2017
MLA/2016/00390 - CompletedApplication - Wrecks and other archaeological remains Recovery of engine from P-47 Thunderbolt 42-75116Seabed off Tanners Lane, Boldre, Hampshire. Mr Richard Reeves 22 Sep 201617 Mar 2017
MLA/2016/00391 - CompletedApplication - Maintenance of existing works RNLI Western Super Mare - Emergency Licence for Mooring Inspection Mooring location and area of mooring activity Royal National Lifeboat Institution 26 Sep 201628 Sep 2016
MLA/2016/00392 - CompletedApplication - Construction of new works, Maintenance of existing worksTrafalgar Wharf Dry Stack Pontoons Pontoon A, Pontoon BTrafalgar Wharf Limited 27 Sep 201606 Nov 2018
MLA/2016/00393 - CompletedApplication - Maintenance of existing works RECONSTRUCTION OF ATLANTIC HOTEL CSO & MINOR REPAIRS TO OTHER OUTFALLS ATLANTIC HOTEL CSO, MERMAID INN OUTFALL, OLD TOWN BAY OUTFALL Council Of The Isles Of Scilly27 Sep 201619 Dec 2016
MLA/2016/00395 - CompletedApplication - Maintenance of existing works RNLI Amble - Low Impact Maintenance Works to Pontoon Berth & Wave Screen (Fast Track Licence)Amble Pontoon Berth & Pen Royal National Lifeboat Institution 04 Oct 201603 Nov 2016
MLA/2016/00399 - CompletedApplication - Maintenance of existing works Fowey Sewer Rehabilitation - Caffa MillSewer RehabilitationSouth West Water Limited06 Oct 201612 Jan 2017
MLA/2016/00400/1 - CompletedApplication - Construction of new works Plymouth Bathing Waters – Cattedown Surface Water Separation SchemeCattedown Surface Water Separation Outfall 1, Cattedown Surface Water Separation Outfall 2South West Water Limited06 Oct 201631 Mar 2017
MLA/2016/00401 - CompletedApplication - Construction of new works, Other removals, Other worksSlipway Repairs at Saqqara, Restronguet Point, Truro, TR3 6RBSaqqara Slipway, Restronguet Point, TR3 6RB Mr William Brown07 Oct 201607 Dec 2016
MLA/2016/00403/1 - CompletedApplication - Disposal of dredged material, Navigational dredging (capital) Portsmouth International Port – Floating Dock Jetty Capital Dredge Portsmouth -Floating Dock Jetty, Disposal Site - Nab Tower Disposal SitePortsmouth City Council 07 Oct 201602 Dec 2016
MLA/2016/00404/1 - CompletedApplication - Disposal of dredged materialSpoil ground use Mounts BayMOUNTS BAY (PL100)Newlyn Pier & Harbour Commissioners 10 Oct 201619 Oct 2017
MLA/2016/00405 - CompletedApplication - Maintenance of existing works German Tunnel, Workington Slag BankGerman Tunnel, Workington Slag Bank Thomas Armstrong (Construction) Limited 10 Oct 201613 Apr 2017
MLA/2016/00406 - CompletedApplication - Maintenance of existing works Burbo Bank Offshore Wind Farm - O&M Marine Licence for Export Cable Repair/Remediation ActivitiesBBW01 Array and Export Cable Boundary Dong Energy Burbo (Uk) Limited10 Oct 201608 Mar 2018
MLA/2016/00407/2 - Variation RequestedApplication - Other depositsManagement of excess sand build up across the shoreline of West Wittering BeachWork area West Wittering Estate Plc 11 Oct 201630 Jul 2024
MLA/2016/00408 - CompletedApplication - Maintenance of existing works Hinkley Point B Nuclear Power Station - routine marine activities licenceForebay, Drumscreen areas, HPB, Cooling Water Intake Caisson, Outfall, Seal Pit (Syphon recovery chamber) Edf Energy Nuclear Generation Limited 11 Oct 201628 Nov 2016
MLA/2016/00409 - CompletedApplication - Navigational dredging (capital) Berth 1 WID Clearance Channel & Transit Approach Berth 1, Oikos Terminal, Jetty 1 Transit Approach Oikos Storage Limited 11 Oct 201608 Dec 2016
MLA/2016/00411 - CompletedApplication - Construction of new works Hamford Water, Walton-on-the-Naze Surface Water Outfall Headwall Taylor Wimpey Developments Limited12 Oct 201611 Jan 2017
MLA/2016/00412/2 - CompletedApplication - Maintenance of existing works Weybourne - Refurbishment of unlighted Beacon/Support Structure (Local Aid to Navigation)Weybourne BeaconNorth Norfolk District Council14 Oct 201610 Oct 2018
MLA/2016/00413 - CompletedApplication - Construction of new works Trial hole investigation for drainage outfall replacements at Rustington and Ferring, West SussexRustington, Ferring Opus International Consultants (Uk) Limited 14 Oct 201631 Oct 2016
MLA/2016/00414 - CompletedApplication - Navigational dredging (maintenance) Tollesbury Marina Spring 2017 Grouped under: Tollesbury Marina Showing 2 of 2 casesTollesbury Marina Tollesbury Marina Llp 14 Oct 201628 Feb 2017
MLA/2016/00415/1 - CompletedApplication - Decommissioning of works, Maintenance of existing works #1 Coldharbour, Isle House wall remediation and foreshore protection works 1 Coldharbour Environment Agency14 Oct 201605 May 2017
MLA/2016/00417/1 - CompletedApplication - Maintenance of existing works Yorkshire Water Services - Long term maintenance and repair marine licence Staithes LSO CWO, Runswick Bay LSO CWO, Sandsend LSO CWO, Whitby LSO CWO, Robin Hoods Bay LSO CWO, Jacksons Bay CWO, Scalby Mills SPS SSO CWO, Scarborough STW LSO CWO, Corner Cafe CWO, Toll House CWO, Wheatcroft SSO CWO, Wheatcroft LSO CWO, Filey Brigg LSO CWO, Coble Landing CWO, Flamborough Village LSO CWO, Limekiln Lane CWO, Sands Lane Brid CWO, Bridlington SSO CWO, Hornsea SSO CWO, Belgrave CWO, Mappleton CWO, Withernsea LSO CWO, Bridlington LSO CWO, Hornsea Storm CWO, Hornsea LSO CWOYorkshire Water Services Limited17 Oct 201613 Nov 2017
MLA/2016/00418/1 - CompletedApplication - Construction of new works Pontoon Berth S88 Port SolentPort Solent MarinaMr Shane Dance18 Oct 201624 Oct 2017
MLA/2016/00419 - CompletedApplication - Other works Mussel mitigation - Drumscreen scaffold slides Sizewell B Power StationEdf Energy Nuclear Generation Limited 20 Oct 201610 Nov 2016
MLA/2016/00420 - WithdrawnApplication - Maintenance of existing works Replacing Existing Piles for our Jetty with like for like as the existing Piles are very wasted at the bottom Barry Field 20 Oct 2016
MLA/2016/00421 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Southampton Boat Show Maintenance Dredge NAB TOWER (WI060), HURST FORT (WI080), NEEDLES (WI090), Soton Harbour Southampton International Boat Show Limited 21 Oct 201627 Feb 2017
MLA/2016/00424 - CompletedApplication - Maintenance of existing works Battery Rock Coastal AccessBattery Rocks Sea AccessCornwall Council21 Oct 201603 Jan 2017
MLA/2016/00425 - CompletedApplication - Construction of new works Paull Sea DefenceNew Revetment, Earth bund heightening area 1East Riding Of Yorkshire Council21 Oct 201601 Jun 2017
MLA/2016/00426 - CompletedApplication - Maintenance of existing works Drumscreen Maintenance Drumscreens Edf Energy Nuclear Generation Limited 24 Oct 201628 Oct 2016
MLA/2016/00427/1 - CompletedApplication - Construction of new works Scaffolding for Site Investigation works for proposed Shadwell Basin Outdoor Activity Centre Slipway Scaffold Location Volker Stevin Limited 24 Oct 201616 Dec 2016
MLA/2016/00428 - CompletedApplication - Maintenance of existing works Court Bridge Concrete RepairsCourt BridgeWest Sussex County Council25 Oct 201623 Nov 2016
MLA/2016/00429 - CompletedApplication - Maintenance of existing works Poole Harbour (Holes Bay) Sea Defence Repairs Easter 2017Poole Harbour (Hole's Bay) Sea Defence Repairs Easter 2017Geoffrey Osborne Limited25 Oct 201601 Mar 2017
MLA/2016/00430/1 - CompletedApplication - Other depositsNational Grid Proposed Blyth Converter Station, Surface Water Outfallland south of the proposed converter station, to the east of East Sleekburn, Northumberland National Grid Nsn Link Limited26 Oct 201620 Oct 2017
MLA/2016/00431 - CompletedApplication - Other works Fal River Floating Cafe King Harry Steam27 Oct 201604 Nov 2016
MLA/2016/00432 - CompletedApplication - Construction of new works Pontoon Installation at Lowestoft DocksLowestoft - Trawl DockGreater Gabbard Offshore Winds Limited27 Oct 201619 Jan 2017
MLA/2016/00433/5 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Maintenance Dredging at Kendalls Wharf NAB TOWER (WI060), Kendalls Wharf Kendall Bros. (Portsmouth) Limited28 Oct 201617 Aug 2021
MLA/2016/00434/1 - CompletedApplication - Maintenance of existing works Maldon 2 Tier Wall The Granaries Maldon two tier wall the granariesEnvironment Agency28 Oct 201621 Apr 2017
MLA/2016/00435 - CompletedApplication - Maintenance of existing works RK Marine Pile Replacement RK Marine PileR K Marine28 Oct 201618 Nov 2016
MLA/2016/00436/2 - CompletedApplication - Construction of new works, Other removals, Other worksNorth Portsea Island Flood and Coastal Erosion Scheme Phase 3 - Tipner LakePlanning_site_boundary2 Portsmouth City Council 28 Oct 201611 Sep 2018
MLA/2016/00437 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Beneficial Use Of Dredged Spoil, Blue Lagoon, Poole HarbourBlue Lagoon 1 (Wl12), Blue Lagoon 2 (Wl13), Channel Lilliput Sailing Club 30 Oct 201621 Feb 2017
MLA/2016/00438/1 - CompletedApplication - SamplingSwan Hunter Steel Quay Ground InvestigationBorehole 1, Borehole 2, Borehole 3, Borehole 4, Borehole 5, Borehole 6North Tyneside Council01 Nov 201621 Aug 2017
MLA/2016/00439/1 - CompletedApplication - Maintenance of existing works Lindisfarne causeway ditchingHoly Island CausewayNorthumberland County Council 03 Nov 201612 Dec 2016
MLA/2016/00440 - CompletedApplication - Navigational dredging (maintenance) Maintenance Water Injection Dredging of the Former Fawley Power StationSouthampton Water Seabed Site 1 Fawley Waterside Limited03 Nov 201627 Jan 2017
MLA/2016/00441/2 - CompletedApplication - Construction of new works Fairhaven to Church Scar Coast Protection Scheme Fairhaven to Church ScarFlyde Borough Council 03 Nov 201620 Sep 2019
MLA/2016/00442/1 - CompletedApplication - Other removalsRemoving damaged sections from disused Southern Water outfall pipeline Grouped under: Rampion Offshore Wind Farm Showing 4 of 13 cases Disused Southern Water Pipe - damaged end of pipe 5 6, Disused Southern Water Pipe - damaged area 3 4, Disused Southern Water Pipe - damaged area 1 2 E.On Climate & Renewables Uk Rampion Offshore Wind Limited04 Nov 201611 Apr 2017
MLA/2016/00443 - CompletedApplication - Maintenance of existing works Jetty repair and replacement Jetty Multi Service Marine04 Nov 201602 Aug 2017
MLA/2016/00445/2 - CompletedApplication - Maintenance of existing works Blue Transmission London Array Ltd. - Marine Licence for scour protection works at the London Array/BritNed Crossing Blue Transmission London Array Limited04 Nov 201615 Nov 2016
MLA/2016/00446/3 - Variation RequestedApplication - Clean-up dredging, Disposal of dredged material CCYC Marina maintenance dredge NAB TOWER (WI060), CCYC marinaCowes Corinthian Yacht Club Limited 04 Nov 201620 Dec 2023
MLA/2016/00449 - CompletedApplication - Other removals, Sampling, Scientific instrumentsHermitage Steam WharfHermitage Steam Wharf Environment Agency07 Nov 201622 Dec 2016
MLA/2016/00451/1 - CompletedApplication - Maintenance of existing works Marsh Mills ResillienceMarsh Mills Kier Limited08 Nov 201628 Apr 2017
MLA/2016/00453 - CompletedApplication - Construction of new works New Providence Wharf Pier Transport For London11 Nov 201608 Mar 2019
MLA/2016/00454 - CompletedApplication - Other removals, Sampling, Scientific instruments46 Nine Elms Lane46 Nine Elms Lane Environment Agency11 Nov 201622 Dec 2016
MLA/2016/00455 - CompletedApplication - Construction of new works Gwelva Landing upgrade Gwelva LandingNational Trust Plc11 Nov 201620 Feb 2017
MLA/2016/00456 - WithdrawnApplication - Maintenance of existing works Network Rail - Parton to Harrington Sea Wall No.5 Network Rail Limited14 Nov 2016
MLA/2016/00457 - CompletedApplication - Other depositsBlyth Offshore Demonstrator – Temporary Deployment of Waverider Buoy Waverider Buoy Location Blyth Offshore Demonstrator Limited 15 Nov 201620 Dec 2016
MLA/2016/00458/1 - CompletedApplication - Construction of new works, Other removals East Face step extension Ilfracombe HarbourIlfracombe Harbour Authority15 Nov 201612 Apr 2017
MLA/2016/00460 - CompletedApplication - Construction of new works Kingsweir revetment repairsKingsweir revetment repairs Tms Maritime Ltd16 Nov 201627 Mar 2017
MLA/2016/00461 - WithdrawnApplication - Other works Fal River Floating Cafe King Harry Steam16 Nov 2016
MLA/2016/00462 - CompletedApplication - Construction of new works Foxfield Water Main DiversionFoxfield Main Diversion Rev 3 United Utilities17 Nov 201605 Jun 2017
MLA/2016/00463/1 - CompletedApplication - Construction of new works, Disposal of dredged material, Navigational dredging (capital), Other removalsGalloper O&M Facility, Harwich INNER GABBARD EAST (TH056), Galloper O&M Facility Rev 1 Galloper Wind Farm18 Nov 201611 Mar 2019
MLA/2016/00464 - CompletedApplication - Construction of new works Proposed pontoon Royal London Yacht Club The Parade CowesRoyal London Yacht Club 18 Nov 201627 Apr 2017
MLA/2016/00465 - CompletedApplication - Construction of new works Shadwell Basin Outdoor Activity Centre Slipway Shadwell Slipway Boundary Shadwell Basin Outdoor Activity Centre18 Nov 201617 Feb 2017
MLA/2016/00466 - CompletedApplication - Construction of new works RNLI Station Fowey, Cornwall Fowey RNLI stationR.N.L.I. (Trading) Limited21 Nov 201607 Dec 2016
MLA/2016/00467/1 - CompletedApplication - Maintenance of existing works The Causeway - maintenance ofOsea Island CausewayMr Nigel Frieda 21 Nov 201613 Oct 2020
MLA/2016/00468 - CompletedApplication - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mr Charles Lister 21 Nov 201623 Nov 2016
MLA/2016/00469 - CompletedApplication - Maintenance of existing works RNLI New Brighton - Repair to Damaged Recovery AnchorNew Brighton Recovery AnchorRnli21 Nov 201624 Nov 2016
MLA/2016/00471 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Emsworth Yacht Harbour Maintenance DredgeEmsworth Yacht Harbour, TRELOAR HOLE (WI046), NAB TOWER (WI060) Emsworth Yacht Harbour Limited24 Nov 201621 Feb 2017
MLA/2016/00472 - CompletedApplication - Maintenance of existing works Emergency Repair Works to the North Shields Ferry LandingNorth Shields Ferry Landing Nexus 24 Nov 201625 Nov 2016
MLA/2016/00473 - CompletedApplication - Maintenance of existing works Emergency stabilisation of existing coastal defence groyne Cleveleys Groyne Zero Wyre Council24 Nov 201616 Jun 2017
MLA/2016/00474/2 - CompletedApplication - Construction of new works, Decommissioning of works Wirral Docks Bridges Replacement Tower Road Birkenhead Mott Macdonald Limited24 Nov 201624 Jul 2017
MLA/2016/00475/2 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Maintenance Dredge Licence - Interterminals Tyneside Ocean Berth, River Tyne NORTH TYNE (TY070), SOUTER POINT (OUTER) (TY081), Interterminals Tyneside Ltd - Ocean berth Inter Terminals Tyneside Limited25 Nov 201631 Mar 2022
MLA/2016/00476/1 - CompletedApplication - Maintenance of existing works Brownsea Castle Jetty RepairsBrownsea Castle Jetty Hurst Peirce & Malcolm Llp25 Nov 201608 Feb 2017
MLA/2016/00477 - CompletedApplication - Construction of new works Replacement of removed jetty with walkway and pontoons Mrs Fay Class 25 Nov 201626 Jan 2017
MLA/2016/00478/3 - CompletedApplication - Disposal of dredged material, Navigational dredging (capital) Dredging the Approach Channel to Lowestoft Harbour LOWESTOFT CIRCULAR NORTH (TH005), Lowestoft Approach ChannelAssociated British Ports. 26 Nov 201611 Jun 2024
MLA/2016/00479/1 - CompletedApplication - Construction of new works HMS Calliope PontoonsHMS CalliopeBgp Consulting Limited28 Nov 201628 Jun 2017
MLA/2016/00481 - CompletedApplication - Other depositsCarbon Capture and Storage experiments in carbon doixide leakage detection in a marine environment Leakage siteFugro Geoconsulting Limited 28 Nov 201603 Mar 2017
MLA/2016/00482/2 - CompletedApplication - Construction of new works Hamilton Dock, Lowestoft Hamilton Dock Associated British Ports. 28 Nov 201619 Sep 2017
MLA/2016/00484 - CompletedApplication - Construction of new works, Disposal of dredged material, Navigational dredging (capital), Navigational dredging (maintenance) RNSA - Alliance, Haslar Pontoon & Hornet Alliance, Haslar Pontoon, Hornet, NAB TOWER (WI060), HURST FORT (WI080) Royal Naval Sailing Association 29 Nov 201628 Apr 2017
MLA/2016/00485/1 - CompletedApplication - Maintenance of existing works Blake Bridge, Bridgwater, Somerset.Blake Bridge, Bridgwater, SomersetWsp Limited 30 Nov 201609 Jan 2019
MLA/2016/00486 - CompletedApplication - Maintenance of existing works MEPR44 Goole Swing BridgeGoole Swing Bridge, River HumberAmalgamated Construction Ltd30 Nov 201622 May 2017
MLA/2016/00487 - CompletedApplication - Maintenance of existing works Piling Works, Pontoon A, Emsworth Yacht HarbourEmsworth Yacht HarbourEmsworth Yacht Harbour Limited01 Dec 201628 Feb 2017
MLA/2016/00490 - CompletedApplication - Construction of new works, Other removals Portsmouth Sailing Club Camber Dock WorksPSC Crane, PSC Brow Portsmouth Sailing Club 03 Dec 201606 Mar 2017
MLA/2016/00491 - CompletedApplication - Construction of new works, Decommissioning of works, Other worksWoolverstone Marina Hoist Dock Hoist DockMarina Developments Limited 05 Dec 201621 Mar 2017
MLA/2016/00492/3 - CompletedApplication - Construction of new works, Maintenance of existing workspile replacement within Marina footprint and adjacent to Yard wall together with replacement pontoon units to yard wallBerthon Marina, Lymington Berthon Boat Company Limited(The) 05 Dec 201629 Jan 2021
MLA/2016/00494 - CompletedApplication - Construction of new works, Other worksWhitley Bay Central Promenade Coastal Defence Scheme Whitley Bay Central Promenade North Tyneside Council06 Dec 201604 Apr 2017
MLA/2016/00495/1 - CompletedApplication - Construction of new works, Maintenance of existing worksPontoon Replacement, Refurbishment & Reconfiguration, and Piling, Ocean Village, Southampton.Untitled PolygonMarina Developments Limited 06 Dec 201629 Jun 2017
MLA/2016/00496 - CompletedApplication - Maintenance of existing works Quay Pontoon Pile Replacement (Hamble Point Marina)Quay Pontoon Pile Replacement Marina Developments Limited 08 Dec 201620 Dec 2016
MLA/2016/00497/1 - CompletedApplication - Other dredgingNorth Shields Ferry Landing Clearance Dredging Nexus North Shields Clearance DredgingSouthbay Civil Engineering Limited08 Dec 201606 Mar 2017
MLA/2016/00498 - CompletedApplication - Construction of new works Middleton Wastewater Treatment Works Marker Post Marker Post working areaUnited Utilities Water Plc08 Dec 201626 Jan 2017
MLA/2016/00499/3 - CompletedApplication - Construction of new works, Disposal of dredged material, Navigational dredging (capital)Berth 9 Container Yard, Port of Felixstowe INNER GABBARD (TH052), Berth 9 Reclamation WorksHutchison Ports (Uk) Limited09 Dec 201616 May 2018
MLA/2016/00500 - CompletedApplication - Other depositsCustom House Quay small boat facilityCustom House Quay small boat facility Falmouth Harbour Commissioners12 Dec 201615 Mar 2017
MLA/2016/00501/2 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Hythe Marine Park Maintenance Dredge Area D, Area E, Area E2, Area F, Area F1, Area J, Area K, Area L, Area M, NAB TOWER (WI060), HURST FORT (WI080), NEEDLES (WI090)Aew Uk Core Plus Property Fund12 Dec 201612 May 2023
MLA/2016/00502 - CompletedApplication - Maintenance of existing works Southwark river wall repairs 135 Rotherhithe St, London SE16 - to - 43 William Square, London SE16 5XJ F M Conway Limited12 Dec 201625 Oct 2017
MLA/2016/00503 - CompletedApplication - Other deposits, SamplingNorth West Cost Connection Geotchnical Survey 2017 National Grid Commercial Holdings Limited 12 Dec 201631 May 2018
MLA/2016/00504 - CompletedApplication - Maintenance of existing works Nethertown Wastewater Pumping Station OutfallNethertown Wastewater Pumping Station Outfall United Utilities Water Plc13 Dec 201623 Mar 2017
MLA/2016/00505 - CompletedApplication - Construction of new works Port Clarence Erosion Protection Works Port Clarence EmbankmentEnvironment Agency Leeds13 Dec 201603 Mar 2017
MLA/2016/00506/1 - CompletedApplication - Construction of new works Arrowhead Quay OutfallsArrowhead QuayEco World-Ballymore Arrowhead Quay Company Limited13 Dec 201624 Aug 2017
MLA/2016/00507/1 - CompletedApplication - Disposal of dredged material, Navigational dredging (maintenance) Bedhampton Approach Channel and Berth Maintenance Dredge Bedhampton Outer Area, Bedhampton Inner Area, NAB TOWER (WI060) Tarmac Limited14 Dec 201604 Aug 2017
MLA/2016/00508 - CompletedApplication - Construction of new works, Maintenance of existing worksNetwork Rail CP5 42 & 43 Cumbrian Coastal Protection Works Head of Workington Harbour, Derwent Viaduct Network Rail Limited14 Dec 201612 Jan 2018
MLA/2016/00509 - CompletedApplication - Disposal of dredged materialLeamouth Wharf Silt Disposal NAB TOWER (WI060) Cemex Uk14 Dec 201620 Mar 2017
MLA/2016/00511 - WithdrawnApplication - Other works Walney Offshore Wind Farm Anchor handling Trials Deepocean 14 Dec 2016
MLA/2016/00515 - CompletedApplication - Other works ACP2 TrialsACP2 trials siteDeepocean 1 Uk Limited15 Dec 201624 Jan 2017
MLA/2016/00516 - CompletedApplication - Construction of new works New 14“ Jetty Gasoline Import Line Navigator Terminals Thames16 Dec 201625 May 2017
MLA/2016/00517/1 - CompletedApplication - Construction of new works, Decommissioning of works Offshore wind operations and maintenance expansion project, Royal Dock, GrimsbyNo 1 quay pontoon, Royal Dock, Coaling Jetty, Royal DockAssociated British Ports. 16 Dec 201609 Jun 2017
MLA/2016/00518 - CompletedApplication - Construction of new works Ocean Business pontoon Ocean Business -Empress DockDiversified Communications Limited19 Dec 201602 Mar 2017
MLA/2016/00519 - CompletedApplication - Construction of new works, Other deposits Greatham South - INOVYN Grouped under: Greatham Flood Alleviation Scheme Showing 2 of 4 casesBreach Site, Creek Dredge Disposal 1, Creek Dredge Disposal 2 Environment Agency Leeds19 Dec 201607 Sep 2018
MLA/2016/00520 - CompletedApplication - Navigational dredging (capital) NuStar Jetty 1 Capital Dredge, Grays, Thames NuStar Jetty 1 Dredge UPDATED (2017)Nustar Corporation L.P. 20 Dec 201625 Aug 2017
MLA/2016/00521 - CompletedApplication - Construction of new works, Decommissioning of works King Point Marina Wave ProtectionKing Point Marina Wave Protection Land & Water Services Ltd 21 Dec 201624 Apr 2017
MLA/2016/00522 - CompletedApplication - Construction of new works Torridge Estuary Torridge Estuary - Chircombe Field Wall Environment Agency - South West Region21 Dec 201608 Mar 2017
MLA/2016/00523 - CompletedApplication - Maintenance of existing works RNLI Harwich Lifeboat Station - Low Impact Maintenance Works to Boathouse & Pontoon Berth (Fast Track Licence) Harwich Lifeboat StationR.N.L.I. (Trading) Limited21 Dec 201627 Mar 2017
MLA/2016/00524/1 - CompletedApplication - Maintenance of existing works Regency Quay River Wall RepairsRegency QuayRegency Quay Residents Company Limited22 Dec 201607 Jun 2017
MLA/2016/00525 - CompletedApplication - Construction of new works C405/CARRR/ENV/MMO/006 CARRR RW 922 StrengtheningRW 922 Strengthening worksPeter Brett Associates22 Dec 201623 Feb 2017
MLA/2016/00526/1 - CompletedApplication - Aggregate dredging, SamplingArea 526 Grouped under: Area 526 Showing 2 of 4 casesArea 526 (English)Hanson Aggregates Marine Limited23 Dec 201601 Jun 2023
MLA/2016/00527/2 - CompletedApplication - Aggregate dredging, SamplingArea 526 Grouped under: Area 526 Showing 2 of 4 casesArea 526 (English)Cemex Uk Marine 23 Dec 201601 Jun 2023
MLA/2016/00528 - CompletedApplication - Maintenance of existing works Duke Shore Wharf Duke Shore WharfEnvironment Agency23 Dec 201616 Jan 2017

MMO - Marine Licences Public Register

mmo_-_mlas_-_2016.txt · Last modified: by nefcadmin