mmo_-_mlas_-_2017

MMO - Marine Licences Public Register

Download 17MLAs-240913.csv

csv file=“https://northeastfc.uk/MMO/17MLAs-240913.csv” /csv

Case Details Project TypeProject Title Locations Applicant Name Submission DateDecision Date
MLA/2017/00001/2 - Completed Application - Aggregate dredging, SamplingArea 526Area 526 (English)Tarmac Marine Dredging Limited 03 Jan 201701 Jun 2023
MLA/2017/00002/2 - Completed Application - Disposal of dredged materialRenew of license for maintenance dredging and disposal in WhitbyWHITBY (TY180)Scarborough Borough Council06 Jan 201709 Dec 2020
MLA/2017/00003 - Completed Application - Construction of new works Hesketh Out Marsh East (HOME) Management Realignment Scheme Breach 1, Breach 2, Breach 3, Breach 4Environment Agency (Warrington)06 Jan 201728 Apr 2017
MLA/2017/00004 - Completed Application - Maintenance of existing works RNLI Ramsgate Lifeboat Station - Low Impact Maintenance Works to Boathouse & Pontoon Berth (Fast Track Licence) Ramsgate Lifeboat Station Rnli 08 Jan 201731 Mar 2017
MLA/2017/00005 - Completed Application - Maintenance of existing works Eastern Road Water Bridge Maintenance Works Eastern Road Water Bridge Portsmouth City Council08 Jan 201703 Mar 2017
MLA/2017/00006/3 - Completed Application - Scientific instrumentsHOW01_Anemometry Mast HOW01 Anemometry mast Dong Energy Wind Power As09 Jan 201718 Jul 2018
MLA/2017/00007/2 - Completed Application - Construction of new works Lostwithiel Sewerage Treatment Works- Site Access Road and Outfall ReinforcementOutfall Protection sheet piling, Access road protection sheet pilingMay Gurney Limited 10 Jan 201713 Nov 2018
MLA/2017/00008 - Completed Application - Maintenance of existing works Howdon JettyHowdon JettyEsh Construction 10 Jan 201706 Feb 2017
MLA/2017/00009/1 - Completed Application - Construction of new works Dart Marina Hotel Wall repair Dart Marina hotel quay wall Tms Maritime Ltd 11 Jan 201706 Oct 2017
MLA/2017/00010/1 - Completed Application - Maintenance of existing works, Other worksSizewell A Off-Shore Structures Maintenance Works.SZA Intake Offshore Structure, SZA Outfall Offshore Structure Magnox Limited 12 Jan 201720 Nov 2017
MLA/2017/00011 - Completed Application - Other removalsGravel Removal Northside Workington River Derwent, North Bank Ashcroft Plant (Cumbria) Limited 13 Jan 201731 May 2017
MLA/2017/00014 - Completed Application - Wrecks and other archaeological remains HMS Invincible ProjectInvincible Designated wreck Maritime Archaeology Sea Trust 18 Jan 201718 Apr 2017
MLA/2017/00015 - Completed Application - Wrecks and other archaeological remains Recovery of lead Mr Vince Woolsgrove18 Jan 201720 May 2019
MLA/2017/00016 - Completed Application - Construction of new works The installation of a platform required for the operation of a boat hoist Hoist PositionC. Toms And Son Limited18 Jan 201731 May 2017
MLA/2017/00018 - Completed Application - Construction of new works Hamford Water, Walton-on-the-Naze Surface Water Outfall HeadwallHEADWALLTaylor Wimpey Developments Limited 19 Jan 201709 May 2017
MLA/2017/00020 - Completed Application - Construction of new works Boat Ladder installation Lowestoft HarbourLowestoft Harbour Vbms (Uk) Limited23 Jan 201713 Feb 2017
MLA/2017/00021/1 - Completed Application - Maintenance of existing works Landcross Viaduct RepaintingLandcross Viaduct Devon County Council 25 Jan 201726 Oct 2017
MLA/2017/00023 - Completed Application - Maintenance of existing works Hadrians Way-Site B (Opposite Shot Factory Lane). Hadrians Way Site B Colas Limited25 Jan 201723 Mar 2017
MLA/2017/00024 - Completed Application - Maintenance of existing works FNH419 Hope Wharf Hope Wharf, Deptford CreekFairview New Homes Limited 25 Jan 201723 Aug 2017
MLA/2017/00025 - Completed Application - Construction of new works Cloud 9 Marina Bar and Restaraunt Dartmouth Dart Marina Dart Marina Hotel Limited26 Jan 201708 Nov 2017
MLA/2017/00026 - Completed Application - Maintenance of existing works Ramsholt Dingy Hard RepairRamsholt Hard Ramsholt Fairway Committee 27 Jan 201707 Mar 2017
MLA/2017/00027 - Completed Application - Construction of new works Appledore Quay signs and new mooring anchorsAppledore QuaySouth West Highways Limited27 Jan 201713 Apr 2017
MLA/2017/00028 - Withdrawn Application - Construction of new works, Decommissioning of works, Maintenance of existing worksTown Quay Sewage Pumping Station Emergency Sewer Rehabilitation Town Quay Emergency working AreaSouth West Water Limited 27 Jan 2017
MLA/2017/00029 - Completed Application - Maintenance of existing works Timber fendering system and access ladders maintenanceWhite Mountain JettyEurovia Roadstone Limited31 Jan 201728 Apr 2017
MLA/2017/00030/2 - Completed Application - Other works Esso Fawley Marine Terminal Berths 1-4 Sample Point UpgradesBerth 1, Berth 2, Berth 3, Berth 4Esso Petroleum Company,Limited 01 Feb 201718 Dec 2019
MLA/2017/00031 - Completed Application - Disposal of dredged materialSilloth Dredge Licence RenewalSILLOTH B (IS251) Captain Ian Macpherson 01 Feb 201718 Sep 2017
MLA/2017/00032/2 - Completed Application - Construction of new works, Maintenance of existing worksHull River Defence Grouped under: Hull River Flood Defences Showing 2 of 5 cases301L06, 301L04, 201L46, 201R43/44 Bmm Jv Limited 01 Feb 201702 Nov 2017
MLA/2017/00033 - Completed Application - Maintenance of existing works Sizewell 'B' Power Station - De-silting works and maintenance Licence Drumscreen, surge chamber and forebay areas, Sizewell B power station, Outfall location, Sizewell B Power station, Sizewell B IntakeEdf Energy Nuclear Generation Limited01 Feb 201721 Jul 2017
MLA/2017/00035 - Completed Application - Other works Southampton Boat Show Marina Construction Soton Boat Show Southampton International Boat Show Limited02 Feb 201723 May 2017
MLA/2017/00036 - Completed Application - Maintenance of existing works, Other worksEmbankment Pier Pontoon replacement Embankment, Embankment 2County Building Services Ltd 02 Feb 201723 Mar 2017
MLA/2017/00037/4 - Completed Application - Maintenance of existing works Race Bank Offshore Wind Farm Transmission Assets Grouped under: Race Bank Offshore Wind Farm Showing 3 of 11 casesRace Bank Offshore Wind Farm OFTO Diamond Transmission Partners Galloper Limited 03 Feb 201712 Oct 2020
MLA/2017/00038 - Completed Application - Other works Wind LIDAR Buoy - East Anglia THREE - Wind LIDAR Buoy East Anglia THREE Floating Lidar Buoy East Anglia Offshore Wind03 Feb 201706 Mar 2017
MLA/2017/00039/9 - Completed Application - Incineration of any substance or object at seaHornsea Project One Unexploded Ordnance Clearance Hornsea_Project_One_Order_limits_UXO_Disposal Hornsea 1 Ltd04 Feb 201729 May 2019
MLA/2017/00040/1 - Completed Application - Maintenance of existing works Royal Southern Yacht Club - Replacement of 3 damaged piles and 2 pontoons Repair footprintRoyal Southern Yacht Club Limited06 Feb 201728 Mar 2018
MLA/2017/00041/2 - Completed Application - Maintenance of existing works RNLI East Division - Regional Licence for Low Impact Maintenance WorksWells Next the Sea Lifeboat Station, Wells next the Sea Beach Lifeguard Area, Sheringham Lifeboat Station, Cromer Lifeboat Station, Sea Palling Beach Lifeguard Area, Happisburgh Lifeboat Station, Hemsby Beach, Great Yarmouth Beach Lifeguard Area, Great Yarmouth & Gorleston Lifeboat Station, Gorleston Beach Lifeguard Area, Lowestoft Lifeboat Station, Lowestoft South Beach Lifeguard Area, Aldburgh Lifeboat Station, Aldburgh Lifeboat Station (ILB), Harwich Lifeboat Station, Walton and Frinton Lifeboat Station, West Mersea Lifeboat Station, Burnham on Crouch Lifeboat Station (Boathouses), Southend on Sea Lifeboat Station (north) Lifeboat Station, Southend on Sea Lifeboat Station (South), Tower Lifeboat Station, Chiswick Lifeboat Station, Gravesend Lifeboat Station, Gravesend Refueling Pontoon, Sheerness Lifeboat Station, Ramsgate Lifeboat Station, Ramsgate Beach Lifeguard Area, Westbrook Bay Beach Lifeguard Area, Margate Beach Lifeguard Area, Botany Bay Beach Lifeguard Area, Viking Bay Beach Lifeguard Area, Walmer Lifeboat Station, Littlestone on Sea Lifeboat Station, Dungeness Lifeboat Station, Rye Lifeboat Station, Hastings Lifeboat Station, Eastbourne Lifeboat Station (slipway/access structure), Eastbourne Lifeboat Station (moorings), Newhaven Lifeboat Station, Brighton Lifeboat Station, Shoreham Lifeboat Station, Selsey Lifeboat station (temporary ILB station), Selsey Lifeboat Station, Selsey Lifeboat Station (New Station), Selsey Lifeboat Station (Swinging mooring), Portsmouth Lifeboat Station, Yarmouth Lifeboat Station, Cowes Lifeboat Station, Bembridge Lifeboat StationRnli 07 Feb 201723 May 2019
MLA/2017/00042 - Completed Application - Maintenance of existing works Routine Miantenance of South West Water's marker to a storm overflowMarker beacon in Torridge Estuary, belonging to South West WaterSouth West Water Limited 08 Feb 201722 Mar 2017
MLA/2017/00043 - Completed Application - Maintenance of existing works Chilton Trinity STW Outfall - Flap Valve Replacement and Bank Reinstatement Chilton Trinity Outfall Replacement and Bank ReinstatementMr Lee Porter08 Feb 201701 Sep 2017
MLA/2017/00044 - Completed Application - Other works The Vinery Jetty, SalcombeVinery JettyPca Consulting Engineers Ltd 09 Feb 201721 Nov 2017
MLA/2017/00045 - Completed Application - Construction of new works Derrydown, Downderry Mansion Developments South West Limited09 Feb 201721 May 2019
MLA/2017/00046 - Completed Application - Maintenance of existing works Temporary scaffold at Flat 7, 128 Grosvenor Road, Westminster Flat 7, 128 Grosvenor Road, London, SW1V 3JYEmbankment Holdings Limited09 Feb 201728 Apr 2017
MLA/2017/00047/1 - Completed Application - Construction of new works Blyth Offshore Wind Demonstrator Project Cable Secondary Protection Works (Array 2) Blyth Offshore Demonstrator Blyth Offshore Demonstrator Limited10 Feb 201727 Jun 2017
MLA/2017/00048/1 - Completed Application - Other works Forewind Met Mast Decommissioning Dogger Bank Met Mast 1, Dogger Bank Met Mast 2Forewind Limited 10 Feb 201712 Feb 2018
MLA/2017/00049 - Completed Application - Navigational dredging (maintenance) HMNB Devonport Plough dredgingHMNBD Plough only areaDefence Infrastructure Organisation14 Feb 201708 Feb 2018
MLA/2017/00052/2 - Completed Application - Disposal of dredged material, Navigational dredging (capital) Turnchapel Wharf - Capital Dredging Turnchapel Wharf, Plymouth Deep (PL035) Turnchapel Wharf Limited 15 Feb 201725 Sep 2018
MLA/2017/00053 - Withdrawn Application - Construction of new works New Mills Sluice Eel Pass Environment Agency 15 Feb 2017
MLA/2017/00054 - Completed Application - Maintenance of existing works Hayling Island Sailing Club – Proposed Pontoon ExtensionHISC PontoonHayling Island Sailing Club15 Feb 201712 Jun 2017
MLA/2017/00055/1 - Completed Application - Construction of new works Thames Tideway - JettyJetty Ingrebourne Valley Limited 15 Feb 201720 Dec 2021
MLA/2017/00056 - Completed Application - Other works Barnes rail footbridge remedial strengthening repairs to existing structure Barnes rail footbridgeF M Conway Limited 16 Feb 201705 Apr 2017
MLA/2017/00057 - Completed Application - Construction of new works, Other worksProposed Groyne Construction, Bembridge Coast Hotel, Fishermans Walk, Bembridge, Isle of Wightaccess, groyne 1, groyne 2, groyne 3, plant compound, compoundBourne Leisure Limited 17 Feb 201725 Apr 2017
MLA/2017/00059/1 - Completed Application - Maintenance of existing works Tamar Tavy Overhead Line Refurbishment ProjectYF023-YF024, YF011-YF012National Grid Electricity Transmission Plc 21 Feb 201720 Oct 2017
MLA/2017/00060 - Completed Application - Construction of new works, Decommissioning of works Middlehaven Dock Bridge ConstructionDock Bridge locationMiddlesbrough Council21 Feb 201728 Jul 2017
MLA/2017/00062 - Completed Application - Wrecks and other archaeological remains Cargo of wreck ss Argonaut Deep Sea Salvage Bv22 Feb 201726 Jun 2018
MLA/2017/00063/1 - Completed Application - Maintenance of existing works, Other removals Heysham A & B, Sea Wall Site investigationHeysham A & B Sea Wall. Edf Energy Nuclear Generation Limited22 Feb 201721 Jun 2017
MLA/2017/00064 - Completed Application - Maintenance of existing works The Boathouse, Ashlake Copse Road, Wotton Creek, IOWBoathouse IOW Stewart Newnham23 Feb 201702 Jun 2017
MLA/2017/00065/1 - Completed Application - Maintenance of existing works River Wall MaintenanceQuay Wall Looe Town Council23 Feb 201717 Nov 2017
MLA/2017/00066 - Completed Application - Other removalsNemo Link Interconnector - Unexploded Ordnance WorksRevised Nemo Link Cable Corridor - 22nd April 2013National Grid Nemo Link Limited23 Feb 201708 Jun 2017
MLA/2017/00067/1 - Completed Application - Maintenance of existing works Replace damaged/ corroded seawater intake grills for Dundeness B' Nuclear power station in Kent Dungeness 'B' Power station seawater intake Burgess Marine Limited 24 Feb 201720 Sep 2017
MLA/2017/00069 - Completed Application - Construction of new works, Decommissioning of works GWave Wave Hub ProjectGWave Berth Coordinates Gwave Uk Wave Hub Limited28 Feb 201721 Apr 2017
MLA/2017/00070 - Completed Application - Construction of new works Proposed remediation work to Towers NM13 and NMA1 at Eling Marsh, Southampton Millbrook Tee, Southampton - Update Scottish And Southern Energy Plc 28 Feb 201721 Mar 2018
MLA/2017/00071/3 - Completed Application - Construction of new works, Disposal of dredged material, Other dredging East Lytham Main Drain and Liggard Brook, Disposal Site Bam Nuttall Limited28 Feb 201727 Apr 2018
MLA/2017/00072 - Completed Application - Marine licence for the burial of human remains at sea Burail at sea - Rupert Donald Cathles NEWHAVEN (WI011)Hinkley Funeral Services 01 Mar 201708 Mar 2017
MLA/2017/00073 - Completed Application - Decommissioning of works, Other works Tamblyn Way StairsTambln Way - Droskyn Stiars Cormac Solutions Limited 01 Mar 201711 May 2017
MLA/2017/00074/3 - Completed Application - Other depositsAnother Time for Margate: Temporary installation of sculpture by Antony Gormley offshore on Fulsam Rock, MargateOld Pier Foundation, MargateTurner Contemporary01 Mar 201719 Oct 2020
MLA/2017/00075 - Completed Application - Maintenance of existing works, Other removals Clearance of sand and rocks from Bude Sea pool and wall repairs Bude Sea Pool Friends Of Bude Sea Pool 01 Mar 201720 Apr 2017
MLA/2017/00076/1 - Completed Application - Other removalsRecovery and recycling of non ferrous metals and other cargo. English TraderGlobal Marine Solutions Ltd04 Mar 201721 Aug 2019
MLA/2017/00077 - Completed Application - Other depositsOil on water exercise 'OilTech' Deposit of the oil, Deposit of the dispersant Oil Spill Response Limited 06 Mar 201731 May 2017
MLA/2017/00078 - Completed Application - Construction of new works Installation of scrubbing piles at Bridge Hard LittlehamptonScrubbing Piles Littlehampton Harbour Board07 Mar 201718 Jul 2017
MLA/2017/00079 - Completed Application - Maintenance of existing works Repairs to Wivenhoe Sailing Club Old Hard.Wivenhoe Sailing Club Old Hard. Wivenhoe Sailing Club07 Mar 201724 Mar 2017
MLA/2017/00080/1 - Completed Application - Other works Hill Head Seawall Reconstruction (150 meters) location_plan Fareham Borough Council C/O Escp 08 Mar 201720 Sep 2017
MLA/2017/00081/2 - Completed Application - Maintenance of existing works, Other worksWalney Offshore Wind Farm, Composite Operational and Maintence (O&M) Marine Licence Application WOWO01 Cable RouteBlue Transmission Walney 1 Limited 08 Mar 201701 Oct 2018
MLA/2017/00082 - Completed Application - Maintenance of existing works Replacement of Tidal Flap No 5 at Fingringhoe Ranges sea wall GR TM0347 1895Fingringhoe Ranges sea wall tidal flap no 5 Landmarc Support Services Limited08 Mar 201707 Jul 2017
MLA/2017/00083 - Completed Application - Construction of new works New timber groyne at the mouth of the river Lyne, NorthumberlandGroyne at Lynemouth, Northumberland Northumberland River Trust 10 Mar 201714 Aug 2017
MLA/2017/00084/1 - Completed Application - Maintenance of existing works Masthouse Terrace Pier RepairsMasthouse Terrace Pier,Isle Of Dods, London Canal & River Trust12 Mar 201707 Jun 2017
MLA/2017/00085 - Completed Application - Construction of new works, Other deposits, Other removals, Other worksHightown Outfallworking_area, access_routeUnited Utilities 13 Mar 201713 Aug 2018
MLA/2017/00086/1 - Completed Application - Other works Installation of Bird Perches at Burbo Bank Offshore Wind Farm DONG Energy Burbo (UK) Ltd. Dong Energy Power (Uk) Limited 14 Mar 201716 Apr 2018
MLA/2017/00087 - Completed Application - Construction of new works, Decommissioning of works, Navigational dredging (capital)Woods Quay- Savoy Pier enhancements and extension Woods QuayWoods River Cruises Ltd15 Mar 201727 Jun 2017
MLA/2017/00088 - Completed Application - Other removalsDemolition and Site clearance of No 1 Jetty at Sabic Petrochemicals UK, North Tees Site Jetty 1 (WGS84) as defined by the following coordinates:Sabic Uk Petrochemicals Limited16 Mar 201722 Jun 2017
MLA/2017/00090 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mr Charles Lister16 Mar 201722 Mar 2017
MLA/2017/00091 - Completed Application - Other removalsGravel Removal River Derwent Workington River Derwent gravel extraction WorkingtonThomas Armstrong (Aggregates) Limited18 Mar 201703 Aug 2017
MLA/2017/00092 - Completed Application - Maintenance of existing works Runcorn Viaduct - Ancillary Works Runcorn Viaduct Buckingham Group Contracting Limited 20 Mar 201722 Sep 2017
MLA/2017/00093/2 - Completed Application - Other works Seawork Exhibition Temporary Pontoons Mercator Media Limited 20 Mar 201710 Feb 2022
MLA/2017/00094/1 - Completed Application - Disposal of dredged materialMarchwood Wharf - Silt Disposal NAB TOWER (WI060) Raymond Brown Aggregates 21 Mar 201712 May 2020
MLA/2017/00095/1 - Completed Application - Disposal of dredged materialBedhampton Silt DisposalNAB TOWER (WI060) Tarmac Trading Limited 21 Mar 201716 Aug 2017
MLA/2017/00096/3 - Completed Application - Maintenance of existing works London Array Offshore Wind Farm O&M Marine LicenceLondon ArrayLondon Array Limited 22 Mar 201718 Nov 2020
MLA/2017/00097 - Completed Application - Construction of new works Holyhead Deep Project , Safety Zone Application Offshore Support Buoy (Primary Location) - primary reference point for a 500m Safety Zone (please see uploaded application) Minesto Uk Limited 23 Mar 201722 Aug 2017
MLA/2017/00100/1 - Completed Application - Maintenance of existing works Routine operational and maintenance activities at five Offshore Substations (Barrow, Ormonde, Lincs, Westermost Rough, and Gunfleet Sands)Barrow Substation, Ormonde Substation, Lincs Substation, Westermost Rough Substation, Gunfleet Sands Substation Transmission Capital Partners Ltd24 Mar 201730 Jan 2020
MLA/2017/00101 - Completed Application - Construction of new works Central Poole Flood DefencesCreekmoor Channel, Sterte Channel Borough Of Poole 2 27 Mar 201722 Nov 2017
MLA/2017/00103/1 - Completed Application - Disposal of dredged material, Navigational dredging (maintenance) Dredging and Disposal of dredged material, A&P Tyne frontageA&P Tyne Frontage, NORTH TYNE (TY070), SOUTER POINT (OUTER) (TY081) A&P Tyne Limited 28 Mar 201719 Nov 2019
MLA/2017/00104 - Completed Application - Alternative use of dredged material, Other deposits South Hayling Island Beach Management Plan (2017-22) implementation Site Area Eastern Solent Coastal Partnership 28 Mar 201721 Aug 2017
MLA/2017/00105 - Completed Application - Disposal of dredged material, Navigational dredging (maintenance) Gosport Ferry Clarence Wharf Maintenance Dredging NAB TOWER (WI060), HURST FORT (WI080), Clarence Wharf, GosportGosport Ferry Limited30 Mar 201709 Jun 2017
MLA/2017/00106/4 - Completed Application - Construction of new works, Incineration of any substance or object at sea, Other removals Viking Link National Grid Viking Link Limited30 Mar 201728 Jul 2022
MLA/2017/00107 - Completed Application - Maintenance of existing works Bideford Long Bridge RefurbishmentBideford Long BridgeJacobs Engineering U.K. Limited30 Mar 201719 Jul 2017
MLA/2017/00108 - Completed Application - Other depositsIsles of Scilly Gravel Bag Deployment Cable ProtectionIoS Cable Repair Gravel Bag DeploymentGlobal Marine Systems Limited04 Apr 201713 Apr 2017
MLA/2017/00109/1 - Completed Application - Disposal of dredged materialMaintenance dredging and disposal in Bristol Harbour Area PORTISHEAD (LU070), AVONMOUTH (INNER) (LU080), ROYAL PORTBURY ENTRANCE (LU083), ROYAL PORTBURY PIER (LU084), ROYAL EDWARD ENTRANCE (LU085)The Bristol Port Company Limited 04 Apr 201722 Aug 2024
MLA/2017/00110/2 - Completed Application - Construction of new works Upgrading of NuStar jetties 1 and 2, Grays, River Thamesgrays jetties 1&2 Nustar Terminals Limited 04 Apr 201707 Mar 2018
MLA/2017/00111/2 - Completed Application - Other works Installation of bird perches and deterrents at Barrow Offshore Wind FarmBarrowDong Energy Power (Uk) Limited 05 Apr 201727 Apr 2018
MLA/2017/00112 - Completed Application - Other works New Bowcombe Creek Bridge Coring Investigations New Bowcombe Creek Bridge Jacobs Engineering U.K. Limited05 Apr 201731 Jul 2017
MLA/2017/00113/2 - Completed Application - Other depositsHinkley Point C Nuclear Power Station Single point mooringNnb Generation Company (Hpc) Limited 06 Apr 201728 Sep 2017
MLA/2017/00115 - Withdrawn Application - Construction of new works Bridge View Drainage Works Nijhuise H2ok Ltd06 Apr 2017
MLA/2017/00118/1 - Completed Application - Wrecks and other archaeological remains Rooswijk Protected Wreck Site, Achaeological Excavation and PreservationROOSWIJKMsds Marine Limited08 Apr 201719 Jun 2017
MLA/2017/00119 - Completed Application - Disposal of dredged material, Other dredgingClearance of Sea Water Intake at BAE Systems (Barrow-in-Furness)SMITE Seawater Abstraction Point -Barrow, Lancashire Coast, BARROW D (IS205)Bae Systems Marine Ltd 10 Apr 201702 Aug 2017
MLA/2017/00122/1 - Completed Application - Maintenance of existing works Repair of Jetty and Sea wall defenses 67 Southwood Rd, Hayling Island PO11 9PTMr Colin Street11 Apr 201719 Oct 2017
MLA/2017/00123/2 - Completed Application - SamplingGround Investigations for Combwich Wharf refurbishmentBorehole 1, Borehole 2, Borehole 5, Borehole 6Nnb Generation Company (Hpc) Limited 13 Apr 201721 Dec 2017
MLA/2017/00124 - Completed Application - Construction of new works Bates Terminal Quay Bates Terminal Quay Works Port Of Blyth13 Apr 201724 Aug 2018
MLA/2017/00125/1 - Completed Application - Decommissioning of worksShell Flat Met Masts Decommissioning ProjectMet Mast 1, Met Mast 2Dong Energy Rb (Uk) Limited13 Apr 201710 Aug 2017
MLA/2017/00126 - Completed Application - SamplingHornsea Project Three (HOW03) Geotechnical Investigations B-BH4, B-BH5, B-BH6, B-BH3, B-BH2, B-BH1Orsted Ltd 13 Apr 201730 Jan 2018
MLA/2017/00127 - Completed Application - Construction of new works ION Environmental Lots Road Power Station Bridge Abutment Works Lots Road Power Station Eon Environmental13 Apr 201706 Jul 2017
MLA/2017/00128/1 - Completed Application - Navigational dredging (maintenance) Maintenance DredgeLicence-OGN Hadrian Yard, River TyneNorth Tyne, OGN Hadrian Yard - Area 32, River Tyne, SOUTER POINT (OUTER) (TY081)Smulders Projects Uk Limited 13 Apr 201718 Apr 2019
MLA/2017/00129 - Completed Application - Maintenance of existing works Polkerris SPS Outfall RepairPolkerris Outfall access and work areaGlanville Cleansing Limited13 Apr 201708 May 2017
MLA/2017/00130 - Completed Application - Construction of new works Quayside Marina Hoist DockQuayside HoistSouthampton Dry Stack Limited13 Apr 201728 Jul 2017
MLA/2017/00131 - Completed Application - Construction of new works Royal Clarence Yard - Disposal of LandRoyal Clarence Yard Gosport Hampshire PO12 1EQThe Oil & Pipeline Agency18 Apr 201716 Jun 2017
MLA/2017/00132 - Completed Application - Decommissioning of worksWallasea Island Wild Coast Project: Decommissioning and Removal of Offloading Facility in fulfilment of Condition 3.3.1 of MMO Licence L/2011/00043/2 Wallasea Island Offloading facility Rspb Sales Limited 18 Apr 201715 Jan 2018
MLA/2017/00133 - Completed Application - Other depositsRepair of existing Slipway at the Littlehampton Yacht ClubLYC Slipway Littlehampton Yacht Club Ltd 18 Apr 201726 May 2017
MLA/2017/00134 - Completed Application - Maintenance of existing works SHOEBURYNESS SEAWALL REPAIR WORKS Shoeburyness Seawall defence repairsAvant Homes (Central) Limited18 Apr 201731 Aug 2017
MLA/2017/00135 - Completed Application - Construction of new works Port Werburgh Sheet PilingPort Werburgh Sheet Piling, MedwayResidential Marine Ltd.21 Apr 201721 Apr 2017
MLA/2017/00137 - Completed Application - Other works Steps -22 Passage Street, Fowey New steps -22 Passage Street, Fowey, PL23 1DE Mr John Carr 21 Apr 201702 Jun 2017
MLA/2017/00138 - Completed Application - Construction of new works Strood Riverside Flood Defence Scheme: Phase 1 and Phase 2Phase_1_Site_Boundary, Phase_2_Site_BoundaryMedway Council 25 Apr 201718 Dec 2017
MLA/2017/00140/1 - Completed Application - Clean-up dredging, Construction of new worksQueenborough Creek Barrier RefurbishmentQueenborough Creek BarrierTeam2100 25 Apr 201715 Sep 2017
MLA/2017/00141 - Completed Application - Maintenance of existing works Shaldon Bridge re-painting defect remedial work Shaldon BridgeDevon County Council 26 Apr 201702 Jun 2017
MLA/2017/00142/1 - Completed Application - Other works Mount Batten Ferry PontoonMount Batten Ferry PontoonPlymouth City Council26 Apr 201708 Jan 2018
MLA/2017/00143 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mr Charles Lister26 Apr 201728 Apr 2017
MLA/2017/00144/1 - Completed Application - Maintenance of existing works Prospect Quay - Scour DamageProspect Mooring - T head berth Prospect Moorings 2013 Limited 28 Apr 201705 Mar 2018
MLA/2017/00147/1 - Completed Application - Maintenance of existing works Eastern Road Water Bridge Maintenance Works Eastern_Road_WaterbridgeColas Limited02 May 201728 Sep 2018
MLA/2017/00148 - Completed Application - Maintenance of existing works Renewal of Gryones adjacent to Sunderland Hanger at Calshot Activities Centre Calshot Groynes Hampshire County Council.03 May 201729 Aug 2017
MLA/2017/00149 - Completed Application - Clean-up dredging NJ-001-002 and NJ-009-003 Went & Don Aqueducts Dredging Don AqueductCanal & River Trust 204 May 201713 Jul 2017
MLA/2017/00150 - Completed Application - Construction of new works Lobster ModuleNewlyn Harbour wall The National Lobster Hatchery04 May 201711 Jul 2017
MLA/2017/00151/1 - Completed Application - Maintenance of existing works Arundel River Wallarundel Wph Marine Construction04 May 201715 Feb 2018
MLA/2017/00152 - Completed Application - Construction of new works Pontoon Reconfiguration and Piling, Hamble Point Marina, Hamble Pier ExtensionMdl Marina Ltd 04 May 201725 Sep 2017
MLA/2017/00154 - Completed Application - Maintenance of existing works Pier extension to existing structure in Alum Bay, Isle of Wight Pier Extension in Alum Bay, Isle of Wight Needles Pleasure Cruises 04 May 201718 Aug 2017
MLA/2017/00155 - Completed Application - Marine licence for the burial of human remains at sea NEWHAVEN (WI011)Jh Kenyon04 May 201710 May 2017
MLA/2017/00156 - Completed Application - Maintenance of existing works Exmouth sinkhole - Orcombe Point emergency repairsExmouth Sinkhole 2R&M Utility & Civil Engineering Services South West Limited04 May 201715 May 2017
MLA/2017/00157 - Completed Application - Maintenance of existing works Old Coastguard Station External redecoration National Trust -York 05 May 201725 May 2017
MLA/2017/00158/2 - Completed Application - Construction of new works, Maintenance of existing worksStallington's Clyce Embankment WorksStallingtons Clyce WorksEnvironment Agency – South West Reg05 May 201718 Oct 2017
MLA/2017/00159 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090) A W Lymn 05 May 201711 May 2017
MLA/2017/00160 - Completed Application - Other works Installation of Spud-leg Pontoon for use by Crew Transfer Vessels (CTVs) for the Walney Extension Offshore Windfarm construction phaseSpud-leg PontoonDong Energy Walney Extension (Uk) Ltd05 May 201720 Jul 2017
MLA/2017/00161 - Completed Application - Construction of new works, Other worksHamble Point Marina Hoist DockHPM Hoist DockMarina Developments Limited05 May 201715 Aug 2017
MLA/2017/00162/2 - Completed Application - Other removalsHinkley Point C - UXO removalsSite 1Nnb Generation Company (Hpc) Limited 08 May 201708 Oct 2018
MLA/2017/00163 - Completed Application - Construction of new works, Other worksArun Timber Docks Removal of decaying existing wooden piles and installation of new steel piles and pontoonsArun Timber Docks mooringsRiver Arun Investments Ltd 08 May 201705 Oct 2017
MLA/2017/00164 - Completed Application - Maintenance of existing works Burbo Bank Extension - Array cable repair and remediation activitiesBurbo Bank Extension ArrayDong Energy Burbo Extension09 May 201708 Mar 2018
MLA/2017/00165 - Completed Application - Disposal of dredged material, Navigational dredging (maintenance) Offshore Technology Park Dredging and DisposalOffshore Technology Park Dredge Pocket, NORTH TYNE (TY070), SOUTER POINT (OUTER) (TY081)Shepherd Offshore Services Ltd.09 May 201706 Oct 2017
MLA/2017/00166/1 - Completed Application - Maintenance of existing works Burbo Bank Extension - Export cable repair and remediation activities BBW02 Export Cable (English waters) Dong Energy Burbo Extension Holding Ltd09 May 201704 May 2018
MLA/2017/00167 - Completed Application - Maintenance of existing works Repointing repair to River Wall River Wall BN18 9DF Ms Susan Paterson11 May 201715 Jun 2017
MLA/2017/00168 - Completed Application - Construction of new works Stanford le Hope StationStanford le HopeMorgan Sindall Construction & Infrastructure Ltd 11 May 201730 Jan 2018
MLA/2017/00169/1 - Completed Application - Construction of new works Radipole Pumping Station CSO improvement worksWeymouth Marina CSO outfall locationWessex Water Services Limited11 May 201726 Sep 2018
MLA/2017/00170 - Completed Application - Maintenance of existing works Portsmouth Harbour Entrance range reinstatement and maintenance Portsmouth HER area Qinetiq Limited12 May 201727 Jul 2017
MLA/2017/00171/2 - Completed Application - Construction of new works Blacktoft and Laxton Pumping Stations Blacktoft Pumping Station, Laxton pumping station Esh Construction 12 May 201712 Dec 2017
MLA/2017/00172 - Completed Application - Other removals, Sampling, Scientific instrumentsHermitage Steam Wharf - Site Investigation WorksHermitage Steam Wharf Environment Agency 12 May 201720 Jun 2017
MLA/2017/00173 - Completed Application - Other removals, Sampling, Scientific instruments46 Nine Elms Lane - Site Investigation Works46 Nine Elms Lane Environment Agency 12 May 201720 Jun 2017
MLA/2017/00174/1 - Completed Application - Disposal of dredged material, Navigational dredging (capital), Other removals RE: Portsmouth International Ferry Port - Berth 2 Deepening NAB TOWER (WI060), Berth 2 Capital Dredge, Scour Mattresses (EAST), Scour Mattresses (WEST) Portsmouth City Council12 May 201711 Sep 2018
MLA/2017/00175/3 - Variation Requested Application - Clean-up dredging, Maintenance of existing worksDungeness B Power Station Cooling Water System Marine ActivitiesCooling Water Forebay Edf Energy Nuclear Generation Ltd12 May 201719 May 2022
MLA/2017/00176 - Completed Application - Other depositsGun Rocks Dive TrailGun Rocks Miss Nicola Faulks 14 May 201711 Sep 2017
MLA/2017/00177 - Completed Application - Decommissioning of worksHMS Belfast - Sewage pipework upgrade HMS Belfast Unitspark Ltd15 May 201715 Jun 2017
MLA/2017/00178/1 - Completed Application - Other works The Bay, Cawsand Bay. The Bay, Cawsand, Cornwall. PL10 1PGParsonage Developments 16 May 201703 Nov 2017
MLA/2017/00179 - Completed Application - Other deposits33kv Joint Protection Works following cable damage33kv Joint approx 6nm off Cornwall CoastWestern Power Distribution Limited 16 May 201731 Aug 2017
MLA/2017/00181 - Completed Application - Other removalsRepairing the Slipway at Chapman's Pool Chapman's Pool SlipwayMr James Gaggero 18 May 201702 Aug 2017
MLA/2017/00182/2 - Completed Application - Other works Plastic tubing to deter birds at BBW01 and BBW02 Offshore Windfarms Burbo Bank Extension OWF, Burbo Bank OWFDong Energy Power Ltd18 May 201720 Dec 2018
MLA/2017/00183/1 - Completed Application - Disposal of dredged material, Navigational dredging (maintenance) Heysham Harbour and Approaches Maintenance Disposal License Heysham harbour, Heysham Approach, MORECAMBE BAY B (IS200)Heysham Port Limited 18 May 201713 Sep 2024
MLA/2017/00184 - Completed Application - Other works Hornsea Project One Boulder Clearance HOW01_OffshoreOrderLimits_WGS84_DE_20170118 Heron Wind Limited 18 May 201723 Aug 2017
MLA/2017/00186 - Completed Application - Maintenance of existing works Installation of two piles and a pontoon at Normanby Wharf Normanby Wharf, Dockside Road Middlesbrough B. Marshall Marine Limited 19 May 201704 Aug 2017
MLA/2017/00187/1 - Completed Application - Other depositsRiver Wandle Weir Removal - Emergency Works Rock Armour (Site 1 - South), Bulk Bags (Site 2 - North)Wandsworth Council 19 May 201729 Aug 2017
MLA/2017/00188 - Completed Application - Construction of new works Tide and Time Bell, Morecambe Bay by Sculptor Marcus Vergette Tide and Time Bell sculpture, Morecambe Bay Morecambe Artist Colony21 May 201722 Aug 2017
MLA/2017/00189 - Completed Application - Other removalsBransholme Storm Water Pumping StationBransholme SWPS Yorkshire Water Services Limited 23 May 201716 Oct 2017
MLA/2017/00190 - Completed Application - Maintenance of existing works St Katharine dock St Katherines Docks F M Conway Limited 23 May 201718 Aug 2017
MLA/2017/00191/1 - Completed Application - Alternative use of dredged material, Clean-up dredging, Disposal of dredged materialJarrow Wharf - Disposal Application Area 25 Jarrow Wharf, NORTH TYNE (TY070), SOUTER POINT (OUTER) (TY081)Cemex Uk Marine Limited23 May 201729 Mar 2023
MLA/2017/00192 - Completed Application - Construction of new works, Maintenance of existing works, Other removalsBarking Floatel Barking Floatel Global Tunnelling Experts Uk Limited 24 May 201711 Apr 2018
MLA/2017/00193 - Completed Application - Maintenance of existing works MEB6132 - Hull River Swing Bridge Hull Swing Bridge Renew Holdings Plc.24 May 201730 Jun 2017
MLA/2017/00195 - Completed Application - Other removalsRemoval of redundant hand rails, access platforms and timber fenders from the Bradwell site outfall structure.Bradwell site outfall structure Magnox Limited 24 May 201703 Aug 2017
MLA/2017/00196 - Completed Application - Other removalsNorth Sea Link Interconnector - Debris ClearanceNSL Corridor 12nm 1 National Grid Nsn Link Limited 24 May 201714 Nov 2017
MLA/2017/00198 - Completed Application - Maintenance of existing works Gosport Marina Pile Replacement Programme Gosport Marina Pontoons Premier Marinas (Gosport) Limited25 May 201718 Aug 2017
MLA/2017/00202 - Completed Application - Maintenance of existing works RNLI North Division - Regional Licence for Low Impact Maintenance Works Berwick Upon Tweed Lifeboat Station, Amble Pontoon Berth & Pen, RNLI Blyth Pontoon berth, RNLI Whitley Bay Beach Lifeguard Area, RNLI Cullercoats Bay Beach Lifeguards Area, RNLI Longsands South Beach Lifeguard Area, RNLI Cullercoats Lifeboat Station: slipway and Quay walls, RNLI Tynemouth Boathouse, Jetty, berth and wavescreen, RNLI Hartlepool Pontoon Berth, RNLI Staithes & Runswick Slipway, RNLI Sandsend Beach Lifeguard Area, RNLI Whitby Pontoon berth & Pen, RNLI Scarborough North Beach Lifeguard Area, RNLI Scarborough South Beach Lifeguard Area, RNLI Scarborough Boathouse and Slipway, RNLI Flamborough Lifeboat Station, RNLI Bridlington Lifeboat Station: Slipway, RNLI Belvedere Beach Lifeguard Area, Bridlington Mooring, RNLI Humber: lifeboat mooring, RNLI Cleethorpes: Slipway, RNLI West Kirby Beach Lifeguard Area, RNLI Hoylake: Slipway, RNLI The Plataeux Beach Lifeguard Area, RNLI Formby Beach Lifeguard Area, RNLI Ainsdale Beach Lifeguard Area, RNLI Lytham St. Annes: Slipway, RNLI Fleetwood: Lifeboat Pen, RNLI Fleetwood: Mooring, RNLI Barrow: Boathouse, Slipway and Access Jetty, RNLI Barrow: Mooring, RNLI St. Bees: Slipway, RNLI Workington: Quay walls and mooring, RNLI Silloth: Slipway, beach re-profiling and matting, RNLI Humber - Jetty, New Brighton Recovery AnchorRnli Division South30 May 201729 Sep 2017
MLA/2017/00203 - Completed Application - Construction of new works, Other removals Gosport Marina Link Pontoon to Endeavour Quay Hoist dock removal and Link Pontoon installationPremier Marinas (Gosport) Ltd30 May 201718 Aug 2017
MLA/2017/00205 - Completed Application - Navigational dredging (maintenance) RNLI Lifeboat Berth Fleetwood - Marine Licence for Maintenance Dredging RNLI Fleetwood - Maintenance Dredging Area (Revised 27.6.17)Rnli Division South31 May 201704 Sep 2017
MLA/2017/00206 - Completed Application - Maintenance of existing works RNLI Western-Super-Mare - Emergency Licence for Mooring Works Area of Mooring Rnli 31 May 201708 Jun 2017
MLA/2017/00207 - Completed Application - Maintenance of existing works RNLI Barrow - Emergency Works to Slipway ToeRNLI Barrow: Boathouse, Slipway and Access JettyRnli Barrow02 Jun 201707 Jun 2017
MLA/2017/00208 - Completed Application - Construction of new works Repair works to St. Cuthbert's Chapel St Cuthbert's Chapel, St. Cuthbert's Island Peregrini Lindisfarne Landscape Partnership02 Jun 201718 Sep 2017
MLA/2017/00209 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mr Charles Lister02 Jun 201707 Jun 2017
MLA/2017/00210 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090) Marmarine Llp Burial At Sea02 Jun 201715 Jun 2017
MLA/2017/00212/1 - Completed Application - Construction of new works Project NEMONEMO CONVERTOR STATION RIVER OUTFALLJ. Murphy & Sons Limited 05 Jun 201728 Sep 2017
MLA/2017/00213 - Completed Application - Other works Deployment of fencing and rubber spikes on turbines to deter birds at BBW02 offshore wind farmBurbo Bank Extension OWFDong Energy Burbo Extension Holding Ltd06 Jun 201724 Jul 2017
MLA/2017/00214 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mr Charles Lister08 Jun 201716 Jun 2017
MLA/2017/00215 - Completed Application - Maintenance of existing works RNLI Tynemouth - Emergency Works to Timber Pier RNLI Tynemouth Boathouse, Jetty, berth and wavescreen Rnli North Shields 08 Jun 201729 Jun 2017
MLA/2017/00216/1 - Completed Application - Construction of new works Galloper Wind Farm OFTO G20170406_GWF_MarineLicence_OFTOarea_Polygon_ACT_WGS84Diamond Transmission Partners Galloper Limited 08 Jun 201717 Feb 2020
MLA/2017/00217 - Completed Application - Other depositsRefurbishment of the Torpoint River CrossingTorpoint Gas Pipe remediation works areaNorthern Divers (Engineering) Limited09 Jun 201709 Apr 2018
MLA/2017/00218/2 - Completed Application - Maintenance of existing works Various Hartlepool Sea Outfalls Hartlepool SO 3, Hartlepool SO 4, Hartlepool SO 5, Hartlepool SO 6Northumbrian Water 09 Jun 201707 Dec 2017
MLA/2017/00219 - Completed Application - Construction of new works, Other removals, Other worksRiver Gardens, Banning Street, Greenwich SE10 0NT River Gardens Foreshore Bellway Homes Ltd09 Jun 201720 Apr 2018
MLA/2017/00220/1 - Completed Application - Maintenance of existing works Kimberly Clark - Northfleet Jetty Repair WorksNorthfleet Jetty Repair Works Jacobs Engineering U.K. Limited09 Jun 201729 Nov 2017
MLA/2017/00221 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090) Paul Williams Independent Funeral Directors12 Jun 201723 Jun 2017
MLA/2017/00222 - Completed Application - Construction of new works Canade Road Outfall Extension Canada Road Outfall Extension Beasley Christopher Limited13 Jun 201721 Jul 2017
MLA/2017/00223 - Completed Application - Maintenance of existing works East Anglia Zone - Met Mast ZE - Operations & Maintenance East Anglia_Met Mast ZE East Anglia Offshore Wind Limited14 Jun 201715 Sep 2017
MLA/2017/00225 - Completed Application - Other dredgingGreenwich Pumping Station - Geo-technical Investigation Sampling Works at Deptford CreekGREPS Technical Works Location 1, GREPS Technical Works Location 2Jackie Roe 14 Jun 201723 Jun 2017
MLA/2017/00226 - Completed Application - Maintenance of existing works RNLI Humber - Fast Track Application for Jetty Repair Works Rnli Division South14 Jun 201705 Mar 2018
MLA/2017/00227 - Completed Application - Aggregate dredging, SamplingMarine Aggregate Extraction at Area 372/1 Area 372/1Hanson Aggregates Marine Limited 14 Jun 201701 Dec 2017
MLA/2017/00228 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mr Charles Lister14 Jun 201723 Jun 2017
MLA/2017/00229 - Completed Application - Other depositsMARLIN - Modular floating platform for offshore windMARLINPort Of Sunderland 15 Jun 201724 Aug 2017
MLA/2017/00230 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mr Charles Lister15 Jun 201722 Jun 2017
MLA/2017/00232 - Completed Application - Other works Pontoon installationTrinity Quay, Alicat Workboats LtdAlicat Workboats Limited 15 Jun 201719 Oct 2017
MLA/2017/00233 - Completed Application - Other depositsInstallation of Pontoon system, South Dock, Padstow Padstow South DockPadstow Harbour Commissioners15 Jun 201729 Sep 2017
MLA/2017/00235 - Completed Application - Construction of new works Sea cage unit to be anchored in the Fal estuary Cornish Trout Farm 20 Jun 201717 Dec 2018
MLA/2017/00236 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mr Charles Lister21 Jun 201728 Jun 2017
MLA/2017/00237 - Withdrawn Application - Construction of new works Residential barge mooring at 3 Dugdale`s Quay, Point, Devoran. TR3 6NB Mr Dean Richards 21 Jun 2017
MLA/2017/00238/4 - Completed Application - Construction of new works, Navigational dredging (capital)Devonshire Dock QuaySite 0 Barrow -in-Furness, Lancashire coast Bae Systems Submarines 22 Jun 201728 Jul 2022
MLA/2017/00239/1 - Completed Application - Navigational dredging (maintenance) Maintenance Dredging of Humber Dock outer basin, Hull Humber Dock Outer Basin, Hull Kingston Upon Hull City Council22 Jun 201710 Jul 2020
MLA/2017/00240 - Completed Application - Maintenance of existing works Dolphin walkway remediation Sabic Dolphine Walkways 3 and 7 Sabic Uk Petrochemicals Limited22 Jun 201720 Oct 2017
MLA/2017/00241 - Completed Application - Disposal of dredged materialDisposal (by discharge into the River Mersey) of dredgings from Canning Half Tide Dock, Liverpool Canning Half Tide (IS126) Canal & River Trust 223 Jun 201713 Dec 2017
MLA/2017/00242 - Completed Application - Construction of new works Bank re-alignment and improvement works.Bradwell Marina excavation., Bradwell Marina piling., Bradwell Marina floating pontoons.Portflair Limited23 Jun 201719 Dec 2017
MLA/2017/00243 - Completed Application - Disposal of dredged materialScarborough Harbour disposal of maintenace dredged material SCARBOROUGH ROCK (TY190)Scarborough Borough Council23 Jun 201701 Feb 2018
MLA/2017/00244/1 - Completed Application - Other removalsNorth Sea Link - Unexploded Ordnance WorksNorth Sea Link Cable Corridor National Grid Nsn Link Limited 26 Jun 201705 Apr 2019
MLA/2017/00245/1 - Completed Application - Construction of new works Leamouth South (Goodluck Hope)Union Wharf, Castle and Hercules wharfHemsley Orrell Partnership 26 Jun 201718 Jul 2018
MLA/2017/00249/2 - Completed Application - Decommissioning of works, Maintenance of existing works, Other deposits Emergency repairs to Withernsea Long Sea OutfallWithernsea LSO Emergency WorksYorkshire Water Services Ltd 29 Jun 201704 Dec 2018
MLA/2017/00251 - Completed Application - Construction of new works Pontoon Tidesreach PontoonMr Daniel Simson 04 Jul 201709 Apr 2019
MLA/2017/00252/1 - Completed Application - Other works Install test frame at Teesside Offshore Wind Farm Ltd WTG05, WTG13Teesside Windfarm Limited04 Jul 201714 May 2019
MLA/2017/00254 - Completed Application - Construction of new works Sydenham, Poole Harbour Application Site, Pile for Navigational Safety Boom Atlas Partners (Sydenham) Ltd04 Jul 201728 May 2019
MLA/2017/00255 - Completed Application - Other removalsPossible removing of 10 - 50 m3 soil in support of retrieving legs of jack-up vessel WIND SERVER at Greater Gabbard OWF Greater Gabbard and GalloperZiton A/S05 Jul 201712 Jul 2017
MLA/2017/00256/2 - Completed Application - Construction of new works Cobb's Quay Outfall Outfall PipeTms Maritime Ltd 05 Jul 201722 Feb 2018
MLA/2017/00259/3 - Completed Application - Navigational dredging (capital), Other worksNoss on Dart Marina, DartmouthIndicative Site LocationPremier Marinas (Dart) Limited 05 Jul 201727 Jul 2023
MLA/2017/00260 - Completed Application - Construction of new works, Other deposits Starcross and Cockwood Tidal Defence Scheme Cockwood, Starcross Site 3, Starcross Site 2, Starcross Site 1Environment Agency – South West Reg06 Jul 201731 Oct 2017
MLA/2017/00262/1 - Completed Application - Disposal of dredged materialHarwich/ Felixstowe maintenance dredging beneficial disposalCOPPERAS (TH216), ERWARTON TRACK (TH217), ORWELL WEST TRACK (TH218), ORWELL EAST TRACK (TH219)Harwich Haven Authority07 Jul 201714 Dec 2023
MLA/2017/00266/3 - Completed Application - Construction of new works, Decommissioning of works Monktonmead Brook Outfall ImprovementsExisting Monktonmead Outfall removal, Monktonmead re-routing the outfall and scour protection Environment Agency (Southern Region) 13 Jul 201714 Mar 2018
MLA/2017/00267 - Completed Application - Minor removalsRetrieval of lost fishing gear Falmouth The Lady of the Isles, The Stanwood, The Andromeda, The Epsilon, The Caroni River, The Bay of Panama, The Volnay, The Mohegan Fathoms Free 13 Jul 201713 Jul 2017
MLA/2017/00268 - Completed Application - Construction of new works Hull River Defence (HRD) Grouped under: Hull River Flood Defences Showing 2 of 5 cases201R65Bmm Jv Limited 13 Jul 201709 Nov 2017
MLA/2017/00269 - Completed Application - Beach maintenance activitiesRNLI Teignmouth - Beach re-profiling at toe of slipwayRNLI Teignmouth - Beach re-profiling Area R.N.L.I. (Trading) Limited 13 Jul 201713 Jul 2017
MLA/2017/00270 - Completed Application - Minor removalsRetrieval of lost fishing gear Penzance The Hellopes, The Conqueror, The Alice MarieFathoms Free 13 Jul 201713 Jul 2017
MLA/2017/00271 - Completed Application - Minor removalsRetrieval of lost fishing gear PadstowThe Sphene, The SaphirFathoms Free 13 Jul 201713 Jul 2017
MLA/2017/00276 - MLC/2017/00400 - CompletedApplication - Maintenance of existing structures or assetsHeybridge Sea LocK Gate Replacement (Phase 2) ContinuationHeybridge Sea Lock Gate Replacement Essex And Suffolk Water Limited18 Jul 201718 Jul 2017
MLA/2017/00277/4 - Completed Application - Maintenance of existing works Race Bank Offshore Wind Farm - Cable Protection Works Race Bank Offshore Wind FarmDong Energy Rb (Uk) Limited18 Jul 201713 Sep 2021
MLA/2017/00278 - Completed Application - Maintenance of existing structures or assetsGearbox Exchange on wind Turbine 14B at EDF-ER offshore wind farm. Using Jack up vessel Wind Server.Teesside Wind FarmEdf Energy Plc 18 Jul 201718 Jul 2017
MLA/2017/00279 - Completed Application - Minor removalsAnchor Chain Removal from Area 460460_licence_AreaHanson Aggregates Marine Limited 19 Jul 201719 Jul 2017
MLA/2017/00280 - Completed Application - Maintenance of existing works Heybridge Sea Locl Gate Replacement (Phase 2) ContinuationHeybridge Sea Lock Gate Replacement Essex & Suffolk Water19 Jul 201706 Oct 2017
MLA/2017/00282 - Completed Application - Maintenance of existing structures or assetsEast Anglia Zone - Met Mast 1B - Operations & Maintenance EA1_MetMast_1BEast Anglia Offshore Wind Limited19 Jul 201719 Jul 2017
MLA/2017/00283 - Completed Application - Construction of new works Cliffe Jetty UpgradeCliffe UpgradeBrett Aggregates Limited 19 Jul 201730 Jul 2020
MLA/2017/00284 - Completed Application - Construction of new works Floating Pontoon, Coast Road, West Mersea floating PontoonColchester Bc21 Jul 201701 Nov 2017
MLA/2017/00285 - Completed Application - Maintenance of existing structures or assetsFolkestone Warren Concrete Apron RepairsArea A, Area BBam Nuttall Limited28 Jul 201728 Jul 2017
MLA/2017/00286 - Completed Application - Maintenance of existing works, Other deposits, Other removals, Other worksRamsgate Flood and Coast Protection SchemeRaising height of groyne, Sea wall refacing site A, Sea wall refacing site B, Sand deposition site, Sand removal site Thanet Dc24 Jul 201701 Nov 2018
MLA/2017/00287/1 - Completed Application - Maintenance of existing works Portobello WTW Groyne RepairPortobello_Groyne_RepairSouthern Water 24 Jul 201705 Mar 2018
MLA/2017/00288 - Completed Application - Minor removalsAnchor chain removal under Burbo Bank Extension Cable ProtectionBBW02_Anchor_Chain_Location_20170725Dong Energy Burbo Extension Holding Ltd25 Jul 201725 Jul 2017
MLA/2017/00289/1 - Completed Application - Construction of new works Newquay North PeirNewquay North PeirTms Maritime Ltd 26 Jul 201714 Nov 2018
MLA/2017/00290 - Completed Application - Maintenance of existing structures or assetsLangness sea defence repairsLangness Sea Defences Mr Michael Atkin 26 Jul 201726 Jul 2017
MLA/2017/00291 - Completed Application - Construction of new works, Maintenance of existing worksRunswick Bay Coastal Improvement Scheme Runswick BayJba Consulting Limited 26 Jul 201711 Dec 2017
MLA/2017/00294 - Completed Application - Non-navigational clearance dredging 2017/18 Tidal Outfall Channel DesiltHorsebridge Dyke, Main Dyke / Skippool Creek, Hackensall, Burrows, Broadfleet Environment Agency 27 Jul 201727 Jul 2017
MLA/2017/00296 - Completed Application - Construction of new works St. Mary's Island - Causeway and Drainage Repair and UpgradeSt Mary's Lighthouse and Causeway North Tyneside Council 28 Jul 201730 Aug 2018
MLA/2017/00297/6 - Completed Application - Construction of new works, Decommissioning of works, Navigational dredging (capital)Boston Barrier Tidal ProjectTidal Flood Barrier, Wet Dock, Temporary Witham Sailing Club slipway, Right Bank, Dredging, Wooden Quay Structure on Right Bank Environment Agency 28 Jul 201721 Nov 2022
MLA/2017/00298 - Completed Application - Maintenance of existing structures or assetsNorth Kent Revetment worksEA_NorthKentRevetmentWorksEnvironment Agency 31 Jul 201731 Jul 2017
MLA/2017/00300 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090) Mr Charles Lister01 Aug 201701 Aug 2017
MLA/2017/00301 - Completed Application - Construction of new works, Maintenance of existing worksCONSTRUCTION OF NEW INLET AND IMPROVEMENTS TO EXISTING OUTLET – ALPHA LAKE, CLIFFE, NEAR ROCHESTER, KENTAlpha Lake - Approximate Location of Refurbished Outlet, Alpha Lake - Approximate Location of New Inlet Brett Aggregates Limited 01 Aug 201720 Feb 2018
MLA/2017/00303 - Completed Application - SamplingLiverpool Cruise Liner Terminal Ground InvestigationProposed Liverpool Cruise Liner TerminalLiverpool City Council 02 Aug 201716 Mar 2018
MLA/2017/00304 - Completed Application - Maintenance of existing structures or assetsChancellors Wharf Repairs Chancellors Wharf Moore Project Management Solutions Llp 02 Aug 201702 Aug 2017
MLA/2017/00305 - Completed Application - Maintenance of existing structures or assetsWorthing Wallace Avenue Outfall repairWorthing Wallace Avenue Beasley Christopher Limited03 Aug 201703 Aug 2017
MLA/2017/00306 - Completed Application - Maintenance of existing structures or assetsMumford Mills Mumford Mills, Greenwich High Road, SE10 8NDPride Scaffolding Limited04 Aug 201704 Aug 2017
MLA/2017/00308 - Completed Application - Disposal of dredged material, Navigational dredging (maintenance) Trafalgar Wharf Approach ChannelTrafalgar Wharf Approach, NAB TOWER (WI060), HURST FORT (WI080) Trafalgar Wharf Limited04 Aug 201705 Dec 2017
MLA/2017/00309 - Completed Application - Other works Steps-24 Passage Street, FoweyNew steps at 24 ,Passage Street, Fowey.PL23 1DE Mr Graham Arturi 06 Aug 201718 Oct 2017
MLA/2017/00310 - Completed Application - Maintenance of existing structures or assetsMelville Road GrilleMelville Road Southsea PortsmouuthBeasley Christopher Limited07 Aug 201707 Aug 2017
MLA/2017/00311 - Completed Application - Maintenance of existing structures or assetsHawkshead, Falmouth Hawkshead, Falmouth Mr Luke Kelland07 Aug 201707 Aug 2017
MLA/2017/00312/1 - Completed Application - Clean-up dredging Keadby Power Station Intake & Outfall DredgingKeadby outflow dredging, River TrentKeadby Generation Limited08 Aug 201702 Jun 2021
MLA/2017/00313 - Completed Application - Marine licence for the burial of human remains at sea NEWHAVEN (WI011)Arthur C. Towner Limited 08 Aug 201708 Aug 2017
MLA/2017/00314 - Completed Application - Construction of new works Hampton to Bishopstone Coast Protection Works 2017East Cliff Site Canterbury City Council08 Aug 201728 Mar 2018
MLA/2017/00315 - Completed Application - Maintenance of existing structures or assetsTrinity Buoy Wharf - Wall Repairs Trinity Buoy WharfUrban Space Management (Tbw) Limited 08 Aug 201708 Aug 2017
MLA/2017/00316/1 - Completed Application - Construction of new works Kemsley Generating Station OutfallSurface Water Outfall Construction & OperationK3 Chp Ltd 08 Aug 201710 May 2019
MLA/2017/00317/6 - Completed Application - Other removalsEast Anglia ONE Unexploded Ordnance Clearance East Anglia ONE Unexploded Ordnance Clearance areaEast Anglia One Limited09 Aug 201713 Nov 2018
MLA/2017/00318 - Completed Application - Maintenance of existing structures or assetsDM Plymouth Jetty DM Plymouth Kelda Limited10 Aug 201710 Aug 2017
MLA/2017/00319 - Completed Application - Maintenance of existing structures or assetsLondon Eye Pier Brow Bearing ReplacementLondon Eye BrowsLondon Eye Management Services Limited 14 Aug 201714 Aug 2017
MLA/2017/00320/1 - Completed Application - SamplingTown Quay SPS, Fowey Harbour Ground Investigation Borehole 1, Borehole 2South West Water Limited 15 Aug 201713 Oct 2017
MLA/2017/00321 - Completed Application - Maintenance of existing structures or assetsLandcross Viaduct Revetment RepairLandcross Viaduct North Revetment Devon County Council 15 Aug 201715 Aug 2017
MLA/2017/00322 - Completed Application - Maintenance of existing structures or assetsMaintenance of Rock armour at Polkirt Beach Portmellon Mevagissey PL26 6PHpolygons_magicMr Peter Bowker15 Aug 201715 Aug 2017
MLA/2017/00323 - Completed Application - Maintenance of existing structures or assetsReplacement of Willway Street/Malago Outfall Tidal Flap Willway Street/Malago Culvert OutletKaymac Marine & Civil Engineering Limited15 Aug 201715 Aug 2017
MLA/2017/00324 - Withdrawn Application - Construction of new works Dover Harbour - Port Vessel Unit Relocation PVU RelocationDover Harbour Board15 Aug 2017
MLA/2017/00325 - Completed Application - Construction of new works Budleigh Outfall East Extension Outfall Extension revBEast Devon District Council15 Aug 201701 Nov 2017
MLA/2017/00326 - Completed Application - Maintenance of existing structures or assetsSt Hildas Wharf St Hilda's Wharf scaffolding site Beckford Contractors Limited 16 Aug 201716 Aug 2017
MLA/2017/00327 - Completed Application - Maintenance of existing works Newtown Harbour Wall Repair Newtown Harbour Stone Wall, Newtown Harbour Pine Wall National Trust Plc 16 Aug 201728 Mar 2018
MLA/2017/00328/3 - Completed Application - Construction of new works Red Earth Developments, Yealm surface water discharge.The River Yealm Hotel Jetty Red Earth Developments Ltd 17 Aug 201708 Nov 2018
MLA/2017/00329 - Completed Application - Maintenance of existing structures or assetsQinetiQ Weymouth and Portland ranges maintenance and repair SSBincleaves MOSR range, Grove Point Acoustic Noise Range Qinetiq Limited17 Aug 201717 Aug 2017
MLA/2017/00330 - Completed Application - Alternative use of dredged material, Other worksManaged Breach of Shingle Spit at PaghamPagham Breach, Tern Island Compensation Habitat Pagham Flood Defence Community Interest Company18 Aug 201701 Sep 2017
MLA/2017/00331 - Completed Application - Maintenance of existing structures or assetsB123 Clamerkin Bridge Strengthening Clamerkin Ringway Island Roads Limited 18 Aug 201718 Aug 2017
MLA/2017/00332 - Completed Application - Other depositsHeysham North Quay Wall emergency stabilisation Heysham Emergency Rock PlacementPeel Ports Limited 18 Aug 201704 Oct 2017
MLA/2017/00333/2 - Completed Application - Maintenance of existing works Race Bank Transmission Assets - Operational and Maintenance activities over the lifetime of the windfarm Grouped under: Race Bank Offshore Wind Farm Showing 3 of 11 casesRace Bank Offshore Wind Farm Offshore transmission assets Dong Energy Rb (Uk) Limited18 Aug 201731 Mar 2023
MLA/2017/00334/2 - Completed Application - Maintenance of existing works Race Bank Operational and Maintenance activities over the lifetime of the windfarm Grouped under: Race Bank Offshore Wind Farm Showing 3 of 11 casesRace Bank Offshore Wind Farm ArrayDong Energy Rb (Uk) Limited18 Aug 201707 Feb 2022
MLA/2017/00335 - Completed Application - Construction of new works Wicormarine connecting pontoonWicormarine Wicormarine Limited22 Aug 201721 Dec 2017
MLA/2017/00336 - Completed Application - Maintenance of existing structures or assetsFixing Leaks To Arun View Pub Riverside Windows Polygon Environment Agency 23 Aug 201723 Aug 2017
MLA/2017/00338 - Completed Application - Maintenance of existing works Interconnexion France-Angleterre (IFA) 2000 Urgent Remedial Works IFA2000 Cables 11 & 12, IFA2000 Cables 33 & 34Reseau De Transport Delectricite 24 Aug 201711 Sep 2017
MLA/2017/00340 - Completed Application - Maintenance of existing structures or assetsTideway - Cemex Jetty Eastern Dolphin Walkway Replacement Cemex Jetty - Eastern Dolphin Walkway Replacement Laing O'Rourke Construction Limited25 Aug 201725 Aug 2017
MLA/2017/00341 - Completed Application - Maintenance of existing structures or assetsRopehawn rock armour repair Trenarren Sea Defence Mr Chris Casey 25 Aug 201725 Aug 2017
MLA/2017/00342 - Completed Application - Other works Marine Based Ground Investigation L36 - Inner Harbour, Lowestoft: BHD01, L36 - Inner Harbour, Lowestoft: BHD02, L36 - Inner Harbour, Lowestoft: BHD03, L36 - Inner Harbour, Lowestoft: BHD04, L36 - Inner Harbour, Lowestoft: BHD05, L36 - Inner Harbour, Lowestoft: BHD06, L36 - Inner Harbour, Lowestoft: BHD07 Geosphere Environmental Limited29 Aug 201716 Sep 2019
MLA/2017/00343 - Completed Application - Other works Greenwich Pier Refurbishmentpolygons_magicCfu29 Aug 201717 Nov 2017
MLA/2017/00344 - Completed Application - Maintenance of existing structures or assetsFort Bovisand Repairs to Pier WallFort Bovisand Piers Powder Creek Limited 19 Sep 201719 Sep 2017
MLA/2017/00345/1 - Completed Application - SamplingIsle of Man Marine Ground Investigation Isle of Man Ferry Terminal Marine GI mersey side, Isle of Man Ferry Terminal Marine GI Dock SideIsle Of Man Government 29 Aug 201723 May 2018
MLA/2017/00346 - Completed Application - Maintenance of existing works Arundel River Wall MaintenanceB. River Rd Car Park, C. Town Quay, D. Maison Dieu, E. Jubilee Gardens South, A. Public Gardens Arun District Council30 Aug 201705 Dec 2017
MLA/2017/00347 - Completed Application - Maintenance of existing works Foulton Hall Pile Repair Works near Little Oakley, EssexFoulton HallJacksonhyder 30 Aug 201715 Dec 2017
MLA/2017/00348 - Completed Application - Minor removalsBeerwick Harbour - Ground Investigation Berwick Harbour - GI behind alignment structure Berwick Harbour Commission 30 Aug 201730 Aug 2017
MLA/2017/00349/5 - Completed Application - Disposal of dredged material, Other deposits, Other removals, Other works Port of Sunderland - Tall Ships Event SUNDERLAND (TY090), Pontoon a, Pontoon b, Pontoon c, Pontoon d, Mooring removal Port Of Sunderland 31 Aug 201721 Nov 2018
MLA/2017/00351 - Completed Application - Construction of new works, Decommissioning of works, Navigational dredging (capital)Woolwich Ferry Life Extension DLM7500 Project AreaBam Nuttall Limited31 Aug 201701 Mar 2018
MLA/2017/00352/2 - Completed Application - Construction of new works, Other deposits, Other removals, Other worksWhitby Piers RefurbishmentEast Pier, West PierScarborough Borough Counicl31 Aug 201708 Mar 2019
MLA/2017/00353 - Completed Application - Deposit of markersReplacement of Range Danger signage and Beacons at Donna Nook Air Weapons Range DonnaNook Landmarc Support Services Limited31 Aug 201731 Aug 2017
MLA/2017/00354 - Completed Application - Maintenance of existing works Plaistow Wharf: River Wall WorksWorks Area Plaistow Wharf Port Of London Authority & Brett Aggregates Ltd31 Aug 201720 Feb 2018
MLA/2017/00355 - Completed Application - Maintenance of existing structures or assetsPoole Quay Boat Haven pontoon refurbishment ('A' Pier only) A PierPoole Harbour Commissioners01 Sep 201701 Sep 2017
MLA/2017/00356 - Completed Application - Maintenance of existing structures or assetsWTG D01 MB Exchange Sheringham Shoal Wind Farm WTG D01Mr Gavin Graham05 Sep 201705 Sep 2017
MLA/2017/00357/3 - Completed Application - Other works Millbay Quay Wall Repairs Quay wall works Associated British Ports.06 Sep 201719 Dec 2019
MLA/2017/00358 - Completed Application - Marine licence for the burial of human remains at sea NEWHAVEN (WI011)Sullivan & Son 06 Sep 201706 Sep 2017
MLA/2017/00359 - Completed Application - Maintenance of existing structures or assetsWater Sonde Guard TubeWater_Sonde_Guard_Tube_Site_LocationBournemouth Borough Council07 Sep 201707 Sep 2017
MLA/2017/00360 - Completed Application - Maintenance of existing works Plymouth Magnetics Ranges maintenance Pier Cellars range, Eastern Kings range Quintiq Ltd07 Sep 201707 Dec 2017
MLA/2017/00361 - Completed Application - Minor removalsNoss Marina, Bridge Rd, Kingswear, Dartmouth TQ6 0EANoss BoreholesSoils Limited08 Sep 201708 Sep 2017
MLA/2017/00362 - Completed Application - Maintenance of existing structures or assetsTruro Tide Gate Sheet Pile Painting Truro Tide Gate Sheet Piles The Environment Agency 08 Sep 201708 Sep 2017
MLA/2017/00363/1 - Completed Application - Construction of new works Offshore Accommodation Jack Up PlatformsHOW01 Substation Jack Up Zones_Z01, HOW01 Substation Jack Up Zones_Z13, HOW01 Substation Jack Up Zones_Z12, HOW01 Substation Jack Up Zones_Z11Heron Wind Limited 11 Sep 201711 Jul 2018
MLA/2017/00364 - Completed Application - Maintenance of existing works A590 Jubilee Bridge Waterproofing Works A590 Jubilee Bridge Cumbria County Council 11 Sep 201712 Dec 2017
MLA/2017/00365 - Completed Application - Minor removalsArchaeological Services in Relation to Marine Protection (Historic England) - Tankerton Beach Wreck Tankerton Wreck SiteWessex Archaeology Limited 12 Sep 201712 Sep 2017
MLA/2017/00366 - Completed Application - Maintenance of existing structures or assetsGrille Installation Marine Parade WorthingMarine Parade WorthingBeasley Christopher Limited13 Sep 201713 Sep 2017
MLA/2017/00367 - Completed Application - Maintenance of existing structures or assetsCoverack North Sea Wall Coverack North Sea Wall Cormac Solutions Limited 13 Sep 201713 Sep 2017
MLA/2017/00369 - Completed Application - Maintenance of existing works Watermark Place Campshed RemediationWatermark Place Campshed RemediationClarkebond Uk Ltd13 Sep 201722 Dec 2017
MLA/2017/00370/2 - Completed Application - Other removalsEast Anglia ONE Boulder Clearance & Redundant Cable Removal Marine Licence ApplicationEast Anglia ONE Boulder Clearance and Redundant Cable Removal AreaEast Anglia One Ltd14 Sep 201704 Dec 2019
MLA/2017/00371 - Completed Application - Disposal of dredged materialEast Anglia ONE Export Cable Disposal Licence EC-1 (TH220), EC-5 (TH224), EC-4 (TH223), EC-3 (TH222), EC-2 (TH221)East Anglia One Limited14 Sep 201702 Aug 2018
MLA/2017/00372 - Completed Application - Maintenance of existing structures or assetsSlipway maintenance Falmouth BoatCo slipway Falmouth Boat Construction Limited 14 Sep 201714 Sep 2017
MLA/2017/00373 - Completed Application - Maintenance of existing works Surface Water Outfall Remedial worksBattersea Reach St. George Developments14 Sep 201714 Dec 2018
MLA/2017/00374 - Completed Application - Other works Port Solent Pontoon Piers A-E Reconfiguration Port Solent: Pontoons A-E Rearrangement Premier Marinas (Solent) 15 Sep 201728 Nov 2017
MLA/2017/00375 - Completed Application - Construction of new works Lymington Yacht Haven - Replacement Pontoon Mooring Piles Lymington Yacht Haven Lymington Yacht Haven Limited15 Sep 201722 Nov 2017
MLA/2017/00376 - Completed Application - Construction of new works Construction of three 12 m long groynes, removal of redudant steel groyne 27 Paddock DriveMr M Woodford18 Sep 201722 Jan 2018
MLA/2017/00377/3 - Completed Application - Disposal of dredged material, Navigational dredging (maintenance) Maintenance dredging, Ryde Harbour, Isle of Wight Harbour entrance, Disposal site north of car park Isle Of Wight Council18 Sep 201719 Feb 2024
MLA/2017/00378 - Completed Application - Maintenance of existing structures or assetsCN1601442 - Furniss Island Bridge RepairEnys Quay FootbridgeCormac Solutions Limited 19 Sep 201719 Sep 2017
MLA/2017/00379/1 - Completed Application - Maintenance of existing works, Other deposits Blyth Offshore Demonstrator Project O&M Marine LicenceArray 2, Export Cable Blyth Offshore Demonstrator Ltd18 Sep 201706 Dec 2022
MLA/2017/00380 - Completed Application - Maintenance of existing structures or assetsThanet Offshore Wind Blade Exchange G11 Thanet Offshore Wind Limited 18 Sep 201718 Sep 2017
MLA/2017/00381 - Completed Application - Non-navigational clearance dredging Archaeological inspections and diving on the wreck site of the Mary Rose (1545) Mary Rose Wreck SiteMary Rose Trust(The) 19 Sep 201719 Sep 2017
MLA/2017/00382 - Completed Application - Maintenance of existing structures or assetsLyndale Bridge - Minor Maintenance worksLyndale BridgeJacobs Engineering Uk Limited20 Sep 201720 Sep 2017
MLA/2017/00383 - Completed Application - Other works Extension to Burnham on Crouch Town Pontoon Burnham Town Pontoon extension area Maldon District Council20 Sep 201706 Aug 2018
MLA/2017/00384/1 - Completed Application - Alternative use of dredged material Pevensey Bay Sea Defences PPP Pevensey Beach Replenishment, Pevensey Sand Reuse Pevensey Coastal Defence Limited 20 Sep 201719 Mar 2018
MLA/2017/00385 - Withdrawn Application - Maintenance of existing works Slipway enhancement & works to sea wall at FORMER BAYLYS YARD, BAYLYS ROAD ORESTON PLYMOUTH PL9 7NQ J Boston & Sons Holdings 22 Sep 2017
MLA/2017/00386/2 - Completed Application - Other depositsSeaweed and Mussel aquaculture off the Yorkshire CoastSeaweed aquaculture siteSeagrown 23 Sep 201703 Mar 2023
MLA/2017/00387 - Completed Application - Maintenance of existing structures or assetsFremington Viaduct - Revetment RepairsFremington Viaduct Revetments Devon County Council 25 Sep 201725 Sep 2017
MLA/2017/00389 - Completed Application - Maintenance of existing structures or assetsDeptford creek wall Faircharm Industrial Estate Faircharm EstateWph Limited25 Sep 201725 Sep 2017
MLA/2017/00390 - Completed Application - Maintenance of existing structures or assetsKentish Flats Wind Farm Gearbox ExchangeWTG B04 Amec Wind Energy Limited 25 Sep 201725 Sep 2017
MLA/2017/00391/1 - Completed Application - Maintenance of existing works Millbrook Tidal Barrier LocationBoundaryEnvironment Agency – South West Reg25 Sep 201710 Oct 2018
MLA/2017/00393/1 - Completed Application - Maintenance of existing works Network Rail - Brantsy to PartonBransty Network Rail Limited 27 Sep 201707 May 2020
MLA/2017/00395/3 - Completed Application - Construction of new works Quay 1 ExtensionQuay 1 ExtensionAble Uk Limited28 Sep 201711 Jan 2021
MLA/2017/00396 - Completed Application - Minor removalsTrial pits at Southern Water OutfallTrial Pits, Trial pits 2E.On Climate & Renewables Uk Rampion Offshore Wind Limited 04 Oct 201704 Oct 2017
MLA/2017/00397 - Completed Application - Maintenance of existing structures or assetsKenwith Pump Station - ScaffoldingKenwith Pumping Station Environment Agency 29 Sep 201729 Sep 2017
MLA/2017/00398/1 - Completed Application - Disposal of dredged materialMarchwood Yacht Club - Dredge Inner Pontoon AreaHURST FORT (WI080)Marchwood Yacht Club 29 Sep 201725 Jul 2018
MLA/2017/00399 - Completed Application - Construction of new works Replacement of removed jetty with walkway and pontoonsFive Oaks pontoon Mrs Fay Class02 Oct 201726 Jan 2018
MLA/2017/00400 - Withdrawn Application - Maintenance of existing works Greenwich River Wall Rsk Environment Ltd04 Oct 2017
MLA/2017/00401 - Completed Application - Maintenance of existing structures or assetsEastcliff Sea Defence WallEastcliff Sea Defence WallTeignbridge District Council 05 Oct 201705 Oct 2017
MLA/2017/00402 - Completed Application - Maintenance of existing structures or assetsTowan Beach steps Towan Beach steps Cormac Solutions Limited 05 Oct 201705 Oct 2017
MLA/2017/00404/1 - Completed Application - Maintenance of existing works Rochester Bridge Trust Combined Bridge RefurbishmentRochester Bridge Trust CBR Site Rocherster Bridge Trust06 Oct 201720 Jul 2020
MLA/2017/00405 - Completed Application - Maintenance of existing structures or assetsCanary Wharf Pier Access Brow Repainting and Repair Canary Wharf Pier Canary Wharf Management Limited06 Oct 201706 Oct 2017
MLA/2017/00406 - Completed Application - Maintenance of existing structures or assetsA27 Farlington Marshes Broadmarsh Revetment Repairs Revetment Repairs Enterprisemouchel Limited06 Oct 201706 Oct 2017
MLA/2017/00407/1 - Completed Application - Maintenance of existing structures or assetsRye Cricket Salts - Re-paintRye Cricket Salts Beasley Christopher Limited07 Oct 201710 Oct 2017
MLA/2017/00408/1 - Completed Application - Maintenance of existing structures or assetsRottingdean, Brighton - Re-paintRottingdean, Brighton Beasley Christopher Limited08 Oct 201710 Oct 2017
MLA/2017/00409/3 - Variation Requested Application - Maintenance of existing works, Other deposits Teesside Offshore Wind Farm Ltd O&M Marine LicenceTeesside Offshore Wind Farm, Export Cable Area, Pontoon Teesside Windfarm Limited09 Oct 201712 Dec 2023
MLA/2017/00410 - Completed Application - Maintenance of existing structures or assetsReplace 600mm outfall flap on the beach Seaview Southern Water Limited 09 Oct 201709 Oct 2017
MLA/2017/00411 - Withdrawn Application - Maintenance of existing works Newbridge Point Development, Holes Bay, Poole - quay wall work that is part of a residential development of a former power station site Gallagher Estates10 Oct 2017
MLA/2017/00412 - Completed Application - Maintenance of existing structures or assetsScrapesgate polygons_magicBeasley Christopher Limited10 Oct 201710 Oct 2017
MLA/2017/00413/1 - Completed Application - Construction of new works Portland Marina PontoonsFender Pile, Main AreaDean & Reddyhoff Limited 12 Oct 201719 Feb 2024
MLA/2017/00414 - Completed Application - Minor removalssantagata santagata Mr Nigel Ingram12 Oct 201712 Oct 2017
MLA/2017/00415 - Completed Application - Construction of new works The Green House, Bridgend, Newton Ferrers, Devon, PL8 1AW - Proposed jetty and boat house The Green House, Bridgend, Newton Ferrers, Devon, PL8 1AW Mr Andrew Beveridge12 Oct 201718 Jan 2018
MLA/2017/00416 - Completed Application - Maintenance of existing structures or assetsFremington Viaduct and Rock Park Bridge Defect Painting Fremington Viaduct, Rock Park BridgeDevon County Council 12 Oct 201712 Oct 2017
MLA/2017/00417 - Completed Application - Maintenance of existing structures or assetsGateshead Millennium Bridge; Glass Canopies; Re-sealing of Gaps South End Support Gateshead Council12 Oct 201712 Oct 2017
MLA/2017/00418 - Completed Application - Maintenance of existing structures or assetsHillgate Quay Refurbishment Timber Suspended StructureGateshead Council12 Oct 201712 Oct 2017
MLA/2017/00419 - Completed Application - Maintenance of existing works Sheet Pile Wall and Slipway Maintenance Works Slipway, Sheet Pile WallConstructex Ltd13 Oct 201703 Oct 2018
MLA/2017/00420 - Completed Application - Maintenance of existing structures or assetsBognor Regis - Opposite Steyne Gardenspolygons_magicBeasley Christopher Limited13 Oct 201713 Oct 2017
MLA/2017/00421 - Completed Application - Maintenance of existing structures or assetsBognor Regis - Marine Drive WestMarine Drive West - Bognor RegisBeasley Christopher Limited13 Oct 201713 Oct 2017
MLA/2017/00422 - Completed Application - Maintenance of existing structures or assetsBridge View Egloshayle Wadebridge Headwall Bridge view Egloshayle Nijhuis H2ok Limited 13 Oct 201713 Oct 2017
MLA/2017/00423 - Completed Application - Maintenance of existing structures or assetsTopsham Lock sand bag dam silt removal and investigationTopsham LockDevon County Council 13 Oct 201713 Oct 2017
MLA/2017/00424 - Completed Application - Maintenance of existing structures or assetsHayling SeagroceHayling SeagroveBeasley Christopher Limited14 Oct 201714 Oct 2017
MLA/2017/00425 - Completed Application - Maintenance of existing structures or assetsShoreham Albion St InnerShoreham Albion St - InnerBeasley Christopher Limited14 Oct 201714 Oct 2017
MLA/2017/00426 - Completed Application - Construction of new works Admiralty Pier - Shotley Marina, Ipswich IP9 1QJAdmiralty PierShotley Marina Limited 16 Oct 201721 Dec 2017
MLA/2017/00427 - Completed Application - Construction of new works Kew Bridge Remedial Works St. George Developments Limited17 Oct 201718 Dec 2018
MLA/2017/00428 - Completed Application - Marine licence for the burial of human remains at sea NEWHAVEN (WI011)H.D.Tribe Limited17 Oct 201717 Oct 2017
MLA/2017/00429/1 - Completed Application - Maintenance of existing works Walney 2 Offshore Wind Farm, Composite Operational and Maintence (O&M) Marine Licence Application WOWO02 Cable RouteBlue Transmission Walney 2 Limited 17 Oct 201723 Jul 2018
MLA/2017/00430 - Completed Application - Maintenance of existing structures or assetsSheringham Beach Road Beach Access Ramp Remedial Workssheringham beach road rampNorth Norfolk District Council 18 Oct 201718 Oct 2017
MLA/2017/00431/1 - Completed Application - Non-navigational clearance dredging Clearing accumulated mud and silt from the slipway at Rolle Quay, Barnstaple, Devon Role Quay Slipway Barnstaple Pilot Gig Club Cio18 Oct 201705 Mar 2018
MLA/2017/00433 - Completed Application - Maintenance of existing works Marine Drive SPS Torpoint, Maintenance works to outfall Marine Drive OutfallR&M Utility & Civil Engineering Services South West Limited19 Oct 201730 Jan 2018
MLA/2017/00434 - Completed Application - Maintenance of existing structures or assetsJanes Creek Flap Valve Repairspolygons_magicBeasley Christopher Limited20 Oct 201720 Oct 2017
MLA/2017/00435 - Completed Application - Maintenance of existing structures or assetsRestoration of saltmarsh preservation systemORFORD QUAY WESTAlde And Ore Enterprise Partnership22 Oct 201722 Oct 2017
MLA/2017/00436 - Completed Application - Navigational dredging (maintenance) Marina maintenance dredging Arun Yacht Club marina moorings Arun Yacht Club Limited(The) 22 Oct 201708 Feb 2018
MLA/2017/00437/1 - Completed Application - Construction of new works, Decommissioning of works Wolferton Pumping Station Wolferton Pumping Station siteWater Level Management Alliance Limited23 Oct 201720 Sep 2018
MLA/2017/00438 - Completed Application - Maintenance of existing structures or assetsChelsea marina river bank repairs Chelsea marinaF M Conway Limited 23 Oct 201723 Oct 2017
MLA/2017/00440 - Completed Application - Other works Modification of an existing sluice on Roach Estuary, Essex (to deliver Cells 2 and 4 of the RSPB's ongoing Wallasea Island Wild Coast Project)Wallasea Old Pool SluiceRspb Sales Limited 23 Oct 201713 Feb 2018
MLA/2017/00441 - Completed Application - Non-navigational clearance dredging Topsham Lock sand bag dam silt removal and investigation dredging in non navigation channel Topsham LockDevon County Council 24 Oct 201724 Oct 2017
MLA/2017/00442 - Completed Application - Other removalsOdessa WharfOdessa WharfHollybrook Limited 24 Oct 201720 Dec 2017
MLA/2017/00443 - Completed Application - Maintenance of existing structures or assetsDawlish, Teignmouth and Exe estuary seawall repairs Dawlish, Teignmouth and Exe estuary seawall Dyer And Butler Limited25 Oct 201725 Oct 2017
MLA/2017/00444 - Completed Application - Maintenance of existing structures or assetsHighshore House New Bridge Street Truro TR1 2AA Highshore House Park Green Investments Limited 26 Oct 201726 Oct 2017
MLA/2017/00446 - Completed Application - Maintenance of existing works River Esk Pitching Up LineRiver Esk PitchingNetwork Rail Ltd 27 Oct 201721 Aug 2019
MLA/2017/00447 - Completed Application - Maintenance of existing structures or assetsBexhill - Beaulieu Rd Bexhill - Beaulieu Rd Beasley Christopher Limited30 Oct 201730 Oct 2017
MLA/2017/00448/1 - Completed Application - Construction of new works, Other dredging Wandsworth Riverside Quarter Pier Extension WRQ Pier ExtensionFrasers Riverside Quarter Ltd30 Oct 201706 Dec 2018
MLA/2017/00449 - Completed Application - Maintenance of existing structures or assetsC405/CARRR/ENV/MMO/006 CARRR RW 922 Strengthening RW 922 Strengthening worksPeter Brett Associates Llp 31 Oct 201731 Oct 2017
MLA/2017/00450/1 - Completed Application - Disposal of dredged material, Navigational dredging (maintenance) Cattewater Harbour disposal of maintenance dredged material: 10 year licencePlymouth Deep (PL035) Cattewater Harbour Commissioners 01 Nov 201722 Aug 2023
MLA/2017/00451 - Completed Application - Construction of new works Emergency action to provide a protective barrier around a designated monument at Hamble Point.Hamble Gun EmplacementEastleigh Borough Cl 06 Nov 201708 Nov 2017
MLA/2017/00452 - Completed Application - Maintenance of existing structures or assetsWhitstable Yacht Club Slipway RepairArea of the WYC RampWhitstable Yacht Club06 Nov 201706 Nov 2017
MLA/2017/00453 - Completed Application - Maintenance of existing works Rumbling Bridge Remediation Rumbling Bridge Eric Wright Civil Engineering Limited06 Nov 201725 Jan 2018
MLA/2017/00454 - Completed Application - Construction of new works Eastchurch Saltmarsh RemediationEastchurch SaltmarshFive Rivers Envrionmental Contacting 07 Nov 201730 Jan 2018
MLA/2017/00455 - Completed Application - Maintenance of existing works Horsey Island Flood defence repairHorsey Island Culvert Mr Mark Wyatt07 Nov 201710 Nov 2017
MLA/2017/00457/7 - Completed Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital), Other deposits, Other removalsEast Sleekburn Enterprise Zone: Ash Barge DockAsh Barge Dock - Extent of All WorksArch (Development Projects) Limited08 Nov 201728 Jun 2022
MLA/2017/00458/1 - Completed Application - Disposal of dredged material, Navigational dredging (maintenance) Penzance Harbour - Disposal of Dredged SpoilMOUNTS BAY (PL100)Cornwall Council -Harbour Office 08 Nov 201728 Jul 2022
MLA/2017/00460 - Completed Application - Maintenance of existing structures or assetsGreyhound BridgeGreyhound BridgeLancashire County Council08 Nov 201708 Nov 2017
MLA/2017/00461/1 - Completed Application - Construction of new works Free Wharf, Shoreham-by-Sea Free WharfSouthern Housing Group 09 Nov 201721 Feb 2020
MLA/2017/00462 - Completed Application - Maintenance of existing structures or assetsscaffold to 3 new propertiesScaffolding at Spital Bridge, WhitbyR.S.D. Buildings Limited 09 Nov 201709 Nov 2017
MLA/2017/00463 - Completed Application - Maintenance of existing works repairing of the Quay LAMORNA QUAY WALL Mr Roy Stevenson 10 Nov 201716 Jan 2018
MLA/2017/00464 - Withdrawn Application - Maintenance of existing works The Stanners, Warkworth Pumping Station ProtectionThe Stanners Pumping StationNorthumbrian Water Group Ltd 12 Nov 2017
MLA/2017/00465 - Completed Application - Maintenance of existing structures or assetsBexhill - Clock Tower Bexhill - Clock Tower Beasley Christopher Limited13 Nov 201713 Nov 2017
MLA/2017/00467 - MLC/2017/00755 - CompletedApplication - Maintenance of existing structures or assetsAberthaw Power Station - River Thaw Pipe Bridge RepaintingAberthaw Power Station River Thaw Pipe Bridge Rwe Npower Plc 17 Nov 201717 Nov 2017
MLA/2017/00468 - Completed Application - Construction of new works, Other removals Pontoon improvement works in Salcombe Harbour Dentridge Salcombe Harbour 17 Nov 201726 Sep 2018
MLA/2017/00469 - Completed Application - Construction of new works Extension of existing quay with new slipway at Waterings Boatyard Waterings Boatyard 3Mr Sam Heard 17 Nov 201716 Apr 2018
MLA/2017/00470 - Completed Application - Maintenance of existing structures or assetsRepairs to Sea Wall Warsash Harbour WallWarsash Sailing Club 20 Nov 201720 Nov 2017
MLA/2017/00471 - Completed Application - Maintenance of existing structures or assetsGreenwich River Wall Remedial Works 2017Greenwich River WallRsk Environment Limited20 Nov 201720 Nov 2017
MLA/2017/00472 - Completed Application - Construction of new works Bringing HM Bark Endeavour To WhitbyEndeavour Wharf, Whitby, North Yorkshire, YO21 1YNHm Bark Endeavour Ltd20 Nov 201713 Mar 2018
MLA/2017/00473/1 - Completed Application - Minor removalsOPERATION SEASWEEPISLE OF WIGHT Blue Seas Protection Charity 20 Nov 201705 Apr 2018
MLA/2017/00474 - Completed Application - Maintenance of existing works Over water replacement of timber decking, support bearers & cladding of jetty / landing stage The Moorings Jetty and Landing StageRichard Balding21 Nov 201708 Jun 2018
MLA/2017/00475 - Completed Application - Minor removalsBorehole site investigation, Oxen Cove, Brixham Oxen Cove, BrixhamTorbay Council 21 Nov 201721 Nov 2017
MLA/2017/00476 - Completed Application - Maintenance of existing works, Other deposits Management of beach access points to help maintain provision of beach safety services Summerleaze beach access, Widemouth stream access, Black Rock slipway, Trevone slipway access, Constantine slipway, Mawgan Porth slipway, Great Western slipway, Towan slipway, Fistral slipway, Crantock dune access, Crantock SLSB slipway, Trevaunance Cove slipway, Porthtowan slipway, Sennen slipway, Perranuthnoe slipway, Praa Sands slipway, Porthleven slipway, Seaton sandy slopeCornwall Council 22 Nov 201726 Apr 2018
MLA/2017/00477 - Completed Application - Other works Newton Ferrers Saline - Ship Inn outfall repairsNewton Ferrers Saline workGlanville Cleansing Limited22 Nov 201731 Jul 2019
MLA/2017/00478/5 - Variation Requested Application - Disposal of dredged material, Navigational dredging (maintenance) HMNB Portsmouth Maintenance Dredging and Disposal HMNB Portsmouth maintenance dredging, NAB TOWER (WI060) Defence Infrastructure Ogranisation23 Nov 201719 Apr 2022
MLA/2017/00480 - Completed Application - Maintenance of existing structures or assetsCHINA HOUSE BALCONY SUPPORT WORKpolygons_magicG. Oakley & Sons Ltd 24 Nov 201724 Nov 2017
MLA/2017/00481 - Completed Application - Maintenance of existing structures or assetsKimberly Clark - Northfleet Jetty Repair WorksNorthfleet JettyKimberly - Clark Limited 26 Nov 201726 Nov 2017
MLA/2017/00482 - Completed Application - Minor removalsRecovery of historic anchors from Woodside Beach, Isle of Wight Woodside beachDr Michael Beckett 27 Nov 201727 Nov 2017
MLA/2017/00483 - Completed Application - Maintenance of existing structures or assetsLamorna covelamorna QuayMr Roy Stevenson 27 Nov 201727 Nov 2017
MLA/2017/00484 - Completed Application - Maintenance of existing structures or assetsInstallation of 225mm flap valve on end of outfallSea_LaneSouthern Water Limited 27 Nov 201727 Nov 2017
MLA/2017/00485 - Completed Application - Non-navigational clearance dredging Excavate shingle to expose 2 outfalls Sea_LaneSouthern Water Limited 27 Nov 201727 Nov 2017
MLA/2017/00486 - Completed Application - Beach maintenance activitiesBeach re-profiling after shingle excavation Sea_LaneSouthern Water Limited 27 Nov 201727 Nov 2017
MLA/2017/00487 - Completed Application - Maintenance of existing structures or assetsMarine Drive Torpoint - outfall grille removalMarine Drive OutfallR&M Utility & Civil Engineering Services South West Limited27 Nov 201727 Nov 2017
MLA/2017/00488 - Completed Application - Construction of new works, Other deposits, Other removals Morecambe Outfall AMP6Outfall diffuser working area United Utilities 28 Nov 201723 Apr 2018
MLA/2017/00489 - Completed Application - Maintenance of existing structures or assetsRustington Hendon Ave Rustington Henden Ave Beasley Christopher Limited28 Nov 201728 Nov 2017
MLA/2017/00490 - Withdrawn Application - Construction of new works, Other deposits Isles of Scilly Dune & Flood Defence Scheme Council Of The Isles Of Scilly 29 Nov 2017
MLA/2017/00491/1 - Completed Application - Construction of new works Stolford Flood Defence Scheme Stolford Flood Defence Scheme Environment Agency - South West Region 30 Nov 201717 Dec 2018
MLA/2017/00493 - Completed Application - Minor removalsFairhaven to Church Scar Coast Protection SchemeChurch Scar Foreshore Volker Stevin Limited01 Dec 201701 Dec 2017
MLA/2017/00494 - Withdrawn Application - Maintenance of existing works Glaven Outfall - Flap & Penstock ReplacementGlaven OutfallJacksonhyder 01 Dec 2017
MLA/2017/00495/2 - Completed Application - Maintenance of existing works West of Duddon Sands Blade Repair CampaignWest of Duddon Sands Offshore WindfarmDong Energy West Of Duddon Sands 04 Dec 201729 Nov 2019
MLA/2017/00498/5 - Completed Application - Decommissioning of worksHornsea Anemometry Mast (met mast) Decommissioning Plan HOW01_MetMast_WGS84_DE_20170914_Point, HOW01_MetMast_WGS84_DE_20170914_Working Zone Orsted 07 Dec 201703 Nov 2020
MLA/2017/00499/2 - Completed Application - Construction of new works New RNLI Lifeboat Station at Wells-next-the-Sea Indicative redline boundary RNLI WellsRnli Poole 07 Dec 201729 Sep 2020
MLA/2017/00500 - Completed Application - Construction of new works AT2322 Topsham - Retreat Drive Surface Water Sewer Outfall Requisitionpolygons_magicAqua-Tech Consultancy08 Dec 201730 Jul 2018
MLA/2017/00501 - Completed Application - Maintenance of existing works, Other worksRepairs to vessel fender - River Blyth harbour entrance Southwold, SuffolkSouthwold Harbour and The Denes Waveney District Council 08 Dec 201707 Mar 2018
MLA/2017/00503 - Completed Application - Maintenance of existing structures or assetsBognor Regis - Barrack Lane Bognor Regis - Barrack Lane Beasley Christopher Limited11 Dec 201711 Dec 2017
MLA/2017/00504 - Completed Application - Maintenance of existing structures or assetsWorthing - Seaview Road Worthing - Seaview Road Beasley Christopher Limited11 Dec 201711 Dec 2017
MLA/2017/00505/1 - Completed Application - Other works Swanwick Marina Pontoon Reconfiguration Swanwick Marina Reconfiguration Premier Marinas Limited11 Dec 201708 Aug 2018
MLA/2017/00506 - Completed Application - Construction of new works HMS Calliope Pontoons HMS CalliopeBillinghurst George And Partners 13 Dec 201706 Feb 2018
MLA/2017/00507/1 - Completed Application - Other deposits, Other works, Sampling Restoration of Native Oyster Beds in the Blackwater Estuary, EssexBlackwater Conservation Box Zoological Society Of London 13 Dec 201717 Feb 2020
MLA/2017/00508 - Completed Application - Maintenance of existing works Nemo Link Urgent Remedial Works Mattress Location 1 (2.1), Mattress Location 2 (6C.1), Mattress Location 3 (9C.1), Mattress Location 4 (9C.2), Mattress Location 5 (9C.3), Mattress Location 6 (9C.4), Mattress Location 7 (10.1), Mattress Location 8 (11B.1), Mattress Location 9 (11E.1) National Grid Nemo Link Limited15 Dec 201713 Apr 2018
MLA/2017/00510 - Completed Application - Construction of new works Blyth Outfall PlugBlyth Outfall PlugSouthbay Civil Engineering Ltd 15 Dec 201706 Mar 2018
MLA/2017/00511/1 - Completed Application - Construction of new works, Other deposits Maunufacture and Placing of 100 tonne concrete wavebreakers River Plym, Oreston, Plymouth, Plymouth BreakwaterDevonport Royal Dockyard Ltd 15 Dec 201703 Oct 2022
MLA/2017/00512 - Completed Application - Maintenance of existing structures or assetsMessack House water pipeline, CornwallMessack House & Creek Mr David Halsay15 Dec 201715 Dec 2017
MLA/2017/00513 - Completed Application - Non-navigational clearance dredging The Esplanade, Bognor Regis - Minor outfall maintenance The_Esplanade Southern Water Limited 18 Dec 201718 Dec 2017
MLA/2017/00514 - Completed Application - Beach maintenance activitiesThe Esplanade, Bognor Regis - Minor outfall maintenance The_Esplanade Southern Water Limited 18 Dec 201718 Dec 2017
MLA/2017/00515 - Completed Application - Construction of new works Fremington Army CampFremington OutfallBarratt David Wilson Homes 18 Dec 201727 Sep 2018
MLA/2017/00516/1 - Completed Application - Other works Weymouth Harbour - Weymouth Sailing Club Cove Project Weymouth Sailing Club Cove Pontoon ProjectWeymouth Harbour 18 Dec 201720 Dec 2018
MLA/2017/00517 - Completed Application - Maintenance of existing structures or assetsDenmark Place Outfall Works polygons_magicBeasley Christopher Limited18 Dec 201718 Dec 2017
MLA/2017/00518/1 - Completed Application - Maintenance of existing structures or assetsDownderry SPS, Torpoint.Downderry SPS South West Water Limited 19 Dec 201711 Jan 2018
MLA/2017/00519 - Completed Application - Construction of new works, Other removals Flat Cliffs Urgent WorksFlat Cliffs Scarborough Borough Counicl19 Dec 201712 Apr 2018
MLA/2017/00520/1 - Completed Application - Maintenance of existing structures or assetsRehab - 6559 - Newton Ferrers Newton FerrersGlanville Cleansing Limited20 Dec 201722 Dec 2017
MLA/2017/00521 - Completed Application - Maintenance of existing structures or assetsThames Young Mariners Lock Gate Replacement Thames Young Mariners Lock Gate Replacement Surrey County Ltd20 Dec 201720 Dec 2017
MLA/2017/00523 - Completed Application - Maintenance of existing works Shoeburyness Seawall Repair Works Shoeburyness Seawall defence repairsAvant Homes (Central) Limited21 Dec 201716 Apr 2018
MLA/2017/00524 - Completed Application - Construction of new works, Other dredging Greenwich Development Outfall Zone DGreenwich Zone D Surface Water Outfall - Site AreaKnights Dragon Developments21 Dec 201706 Jan 2020
MLA/2017/00525 - Completed Application - Other works Great Yarmouth Third River Crossing Great Yarmouth Third River Yare CrossingNorfolk County Council 21 Dec 201703 May 2018
MLA/2017/00526/1 - Completed Application - Construction of new works, Decommissioning of works Galloper Wind Farm - Construction, Operation and Decommissioning of a Temporary Crew Transfer Vessel Pontoon at the Navyard, Harwich, for 5 years Galloper OWF Operations and Maintenance Facility Temporary CTV PontoonHarwich Dock Company Limited 22 Dec 201708 Dec 2020
MLA/2017/00527 - Completed Application - Construction of new works Warrington Centre Park Link Warrington Centre Park Link Bafour Beatty Construction Services Ltd22 Dec 201712 Dec 2018
MLA/2017/00528 - Completed Application - Minor removalsRetrieval of lost fishing gear Weymouth Sea Otter, Unidentified barge, Enecuri, Landing craft a, Bombardon unit a, Binnendyk, Landing craft b, Elena R, Ethel, Saratogo, Bombardon unit b, Dumb lighter c19, Unidentified wreck, Fishing vessel, Countess of Erne, Unidentified dredger, Hartlepool, Sudon, Landing craft, Himalaya, Gertude, SS Thames, Myrtledene, James Fennell, SS Barmstrom, Minerve, Bournemouth, Frogner, UB-74, Vera, Submarine P555, Anworth, Inisinver, Landing craft d, Nor, Royal AdelaideFathoms Free 22 Dec 201722 Dec 2017
MLA/2017/00530 - Completed Application - Maintenance of existing works Lindisfarne causeway ditching Lindisfarne CausewayNorthumberland Cc29 Dec 201713 Apr 2018
MLA/2017/00531 - Completed Application - Non-navigational clearance dredging Tides Reach Pontoon Area Dredging Tides Reach Pontoon Basin Tides Reach Management Company Limited 29 Dec 201729 Dec 2017

MMO - Marine Licences Public Register