Case Details Project Type Project TitleLocationsApplicant NameSubmission DateDecision Date
MLA/2018/00001 - Completed Application - Minor removals Retrieval of lost fishing gear from Plymouth Constance, Ajax, Encourage, FS Poulmic, Glen Strathallan, HMT Abelard, HMT Elk, HMT Kingston Alalite, Hopper no.42, James Egan Layne, Nepaul, Rame barge, Rosehill, Rothesay, Scylla, Vectis, Viking princessFathoms Free01 Jan 201801 Jan 2018
MLA/2018/00002 - Completed Application - Other deposits Blue shark filming Blue shark filming on dead dolphin Mr Charles Hood 02 Jan 201801 Oct 2018
MLA/2018/00003/1 - Completed Application - Navigational dredging (maintenance)Tides Reach Marina - Medina Estuary Tides Reach Management Company02 Jan 201806 Nov 2023
MLA/2018/00004 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090)Mr Charles Lister 03 Jan 201803 Jan 2018
MLA/2018/00005 - Completed Application - Other worksMorecambe Outfall Site Investigation works working area for trial holes United Utilities03 Jan 201803 Apr 2018
MLA/2018/00006 - Completed Application - Maintenance of existing works136/090/Mayflower Pub, Rotherhithe, Thames Mayflower pub, Rotherhythe Haydn Evans Consulting Limited04 Jan 201826 Mar 2018
MLA/2018/00007 - Completed Application - Maintenance of existing structures or assets Northney Marina - Hoist Dock Corrosion ProtectionNorthney Marina Hoist Dock Marina Developments Limited 05 Jan 201805 Jan 2018
MLA/2018/00008 - Completed Application - Maintenance of existing worksNavigator Terminal Thames - Dolphin 1 Temporary RepairsNavigator Terminal ThamesNavigator Terminals Thames05 Jan 201806 Feb 2018
MLA/2018/00009 - Completed Application - Maintenance of existing structures or assets Open Blasting at the OSP OSP Blasting siteE.On Climate & Renewables Uk Rampion Offshore Wind Limited05 Jan 201805 Jan 2018
MLA/2018/00010 - Completed Application - Maintenance of existing structures or assets Ferry Boat SPS Dittisham - manhole cover repairFerry Boat SPS Hatchplan Limited 08 Jan 201808 Jan 2018
MLA/2018/00011 - Completed Application - Other worksMount Batten Ferry Pontoon Replacement Mount Batten Ferry Plymouth County Ccouncil08 Jan 201809 Mar 2018
MLA/2018/00012 - Completed Application - Maintenance of existing structures or assets Bembridge Lane Beach, IOWBembridge Lane Beach Beasley Christopher Limited 09 Jan 201809 Jan 2018
MLA/2018/00013 - Completed Application - Maintenance of existing structures or assets Duver Rd, Opp Boat House, IOWDuver Road , Opp boat house PubBeasley Christopher Limited 09 Jan 201809 Jan 2018
MLA/2018/00014/1 - Completed Application - Non-navigational clearance dredgingLong Curtain Moat shingle removalLong Curtain MoatPortsmouth City Council 09 Jan 201818 Jan 2018
MLA/2018/00015 - Completed Application - Maintenance of existing structures or assets Gravesend Town Pier - Timber Deck RepairsGravesend Town PierGravesham Borough Council 10 Jan 201810 Jan 2018
MLA/2018/00016 - Completed Application - Maintenance of existing structures or assets Powders Quay repairs; Frenchmans Creek; HelfordPolygonNational Trust10 Jan 201810 Jan 2018
MLA/2018/00017 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090)Mr Charles Lister)10 Jan 201810 Jan 2018
MLA/2018/00018 - Completed Application - Maintenance of existing structures or assets Worthing, The Esplanadepolygons_magic Beasley Christopher Limited 10 Jan 201810 Jan 2018
MLA/2018/00020 - Completed Application - Maintenance of existing worksSouth Wharf Quay Repairs South Wharf - West End of Quay Norfolk Marine11 Jan 201816 Feb 2018
MLA/2018/00021 - Completed Application - Maintenance of existing structures or assets Hythe Promenade - Outfall protective grille replacemementHythe_PromenadeSouthern Water Limited12 Jan 201812 Jan 2018
MLA/2018/00022 - Completed Application - Maintenance of existing structures or assets Mousehole Harbour Emergency Manhole worksMousehole MH 9318Glanville Services Limited12 Jan 201812 Jan 2018
MLA/2018/00023 - Completed Application - Beach maintenance activities Hythe Promenade - Beach re-profiling using shingle removed from front of outfall Hythe_PromenadeSouthern Water Limited12 Jan 201812 Jan 2018
MLA/2018/00024 - Completed Application - Non-navigational clearance dredgingHythe Promenade - Shingle clearance from in front of outfall using hand tools to replace protective grille Hythe_PromenadeSouthern Water Limited12 Jan 201812 Jan 2018
MLA/2018/00025/1 - Completed Application - Construction of new worksLincolnshire Lakes Flood Defence SchemeInstallation of scour protection North Lincolnshire Council12 Jan 201826 Mar 2019
MLA/2018/00026 - Completed Application - Construction of new worksCobbs Quay Outfall 2018Outfall Pipe Tms Maritime Ltd13 Jan 201828 Feb 2018
MLA/2018/00027 - Completed Application - Construction of new worksInstallation of Boat LiftBoat Lift Location Apt 1 Longrow South Shields Mr Mark Turnbull14 Jan 201805 Apr 2018
MLA/2018/00028 - Completed Application - Construction of new works, Other removalsNearshore Seaweed Cultivation of Native Species Sustainable Seaweed Limited 16 Jan 201824 Mar 2020
MLA/2018/00029 - Completed Application - Maintenance of existing structures or assets Virgina Quay Virginia Quay E14Wph Limited 17 Jan 201817 Jan 2018
MLA/2018/00031 - Completed Application - Construction of new works, Other works Deacons Marina Alteration to existing layout, Removal of access brow and walkway, New access and walkway point, Public PontoonDean & Reddyhoff Limited17 Jan 201823 May 2018
MLA/2018/00032 - Completed Application - Maintenance of existing structures or assets Outfall mesh - Long Curtain Moat polygons_magic Portsmouth City Council 18 Jan 201818 Jan 2018
MLA/2018/00034 - Completed Application - Deposit of markers Anchorsholme BuoyAnchorsholme BuoyUnited Utilities Water Plc19 Jan 201819 Jan 2018
MLA/2018/00035/2 - Completed Application - Construction of new worksHull River Defence Site 1, Site 2, Site 3, Site 4 Bmmjv Ltd 19 Jan 201826 Apr 2019
MLA/2018/00036 - Completed Application - Maintenance of existing structures or assets Sea Place Tideflex Valve polygons_magic Beasley Christopher Limited 19 Jan 201819 Jan 2018
MLA/2018/00038 - Completed Application - Construction of new worksCreation of slipway on shore at Bosalan, Restronguet Point, Cornwall Boslan Slipway Mr Tom Green20 Jan 201817 Apr 2018
MLA/2018/00039 - Completed Application - Other removals, Sampling Rampion Offshore Wind Farm - Removal of Disused Outfall Grouped under: Rampion Offshore Wind Farm Showing 2 of 13 casesSouthern Water Disused Outfall E.On Climate & Renewables Uk Rampion Offshore Wind Limited22 Jan 201830 Apr 2018
MLA/2018/00040/1 - Completed Application - Other deposits Water Sculpture - GEOTNTyne Water Sculpture Newcastlegateshead Initiative 22 Jan 201819 Jun 2018
MLA/2018/00041 - Completed Application - Maintenance of existing structures or assets Newhaven Swing Bridge - Control Tower RefurbishmentNewhaven Swing Bridge - Control TowerEast Sussex County Council23 Jan 201823 Jan 2018
MLA/2018/00042 - Completed Application - Maintenance of existing worksComposite Licence at London Array Offshore Wind Farm HV1, HV2, HV3, HV4, SS1, SS2 Blue Transmission London Array Limited23 Jan 201803 Dec 2020
MLA/2018/00043 - Completed Application - Deposit of markers Arun YC yacht racing marks Racing areaArun Yacht Club Limited(The)23 Jan 201823 Jan 2018
MLA/2018/00044/1 - Completed Application - Maintenance of existing structures or assets gabion repairs east side fence, eastney cruising associationEastney Cruising Association23 Jan 201803 May 2018
MLA/2018/00046 - Completed Application - Maintenance of existing structures or assets Repair of MH8002 in the foreshore at Berril's Yard, Fowey to stop saline infiltration into the sewer system. Access to work area and work areaSouth West Water Limited24 Jan 201824 Jan 2018
MLA/2018/00047 - Completed Application - Maintenance of existing structures or assets Worthing - West Street Worthing - West Street Beasley Christopher Limited 24 Jan 201824 Jan 2018
MLA/2018/00048 - Completed Application - Maintenance of existing structures or assets Worthing 200m west of Brooklands Worthing - 200m west of brooklands Beasley Christopher Limited 24 Jan 201824 Jan 2018
MLA/2018/00050 - Completed Application - Marine licence for the burial of human remains at sea TYNE BURIAL SITE (TY193) E Bush Ltd25 Jan 201825 Jan 2018
MLA/2018/00051 - Completed Application - Maintenance of existing structures or assets Worthing Steyne GardensWorthing steyne gardensBeasley Christopher Limited 25 Jan 201825 Jan 2018
MLA/2018/00052/1 - Completed Application - Construction of new worksSeahouses Main PierConcrete encasement - Seaward face of Main Pier, Concrete encasement - End of Main Pier, Concrete encasement - Inner face of Main Pier Northumberland County Council 26 Jan 201802 Sep 2019
MLA/2018/00053 - Completed Application - Maintenance of existing structures or assets Installation of wooden stakes as part of an erosion plan to protect the main slipway at Emsworth Sailing Club and prevent further erosion of mud-land. Emsworth Sailing ClubEmsworth Sailing Club 27 Jan 201827 Jan 2018
MLA/2018/00054 - Completed Application - Maintenance of existing structures or assets Worthing Wallace Avenueworthing wallace ave Beasley Christopher Limited 28 Jan 201828 Jan 2018
MLA/2018/00055/1 - Completed Application - Construction of new worksEssex Yacht Club Limited - water pipe replacementEssex Yacht Club Limited pipeEssex Yacht Club,Limited29 Jan 201821 Dec 2018
MLA/2018/00056 - Completed Application - Maintenance of existing structures or assets Queenborough South Marshes Queenborough South Marshes Beasley Christopher Limited 30 Jan 201830 Jan 2018
MLA/2018/00057 - Completed Application - Maintenance of existing structures or assets Newton Voss Tidal Path Newton Voss Tidal Path Devon County Council30 Jan 201830 Jan 2018
MLA/2018/00058 - Completed Application - Navigational dredging (capital)OSL J1 Berth Approach Capital Dredge OSL Berth 1 Approach Oikos Storage Limited 31 Jan 201812 Apr 2018
MLA/2018/00059 - Completed Application - Other removals Removal of redundant hand rails, access platforms, crane beam and timber fenders from the Bradwell site outfall structureBradwell site outfall structureMagnox Ltd01 Feb 201824 Apr 2018
MLA/2018/00060 - Completed Application - Maintenance of existing structures or assets 5137 Northolt Avenue Culvert Repairs, Northolt Avenue, PlymouthNortholt Culvert - Culvert Pipe, Downstream Tidal Estuary - Anticipated Max. Work Area Plymouth City Council 01 Feb 201801 Feb 2018
MLA/2018/00061 - Completed Application - Maintenance of existing structures or assets Renovations and extension the Sail Loft, Whitford Yard, Fowey. Whitford boat yard Mr Ian Forrest01 Feb 201801 Feb 2018
MLA/2018/00062 - Completed Application - Construction of new worksHMNB Portsmouth QEC 2nd BerthHMNB Portsmouth QEC 2nd Berth Sheer and Victory Jetties Work AreaDefence Infrastructure Organisation (Dio) 02 Feb 201829 Jun 2018
MLA/2018/00063/1 - Completed Application - Navigational dredging (maintenance)London Thamesport Maintenance Dredging Project Thamesports_Project_FootprintThamesport London Ltd 05 Feb 201814 Jun 2023
MLA/2018/00064 - Completed Application - Maintenance of existing structures or assets Worthing 68 Marine Cresent Worthing 68 marine cresent Beasley Christopher Limited 07 Feb 201807 Feb 2018
MLA/2018/00065 - Completed Application - Maintenance of existing structures or assets Worthing Heene Terrace westWorthing Heene Terrace WestBeasley Christopher Limited 07 Feb 201807 Feb 2018
MLA/2018/00066 - Completed Application - Maintenance of existing structures or assets Replacement of Flap Valvepolygons_magic Beasley Christopher Limited 07 Feb 201807 Feb 2018
MLA/2018/00067 - Completed Application - Minor removals RAINHAM JETTY BERTH 3RAINHAM JETTY BERTH 3Land & Water Remediation Limited07 Feb 201807 Feb 2018
MLA/2018/00068 - Completed Application - Maintenance of existing structures or assets Southwark River Wall Repairs Bermonsey Beach Wall F M Conway Limited07 Feb 201807 Feb 2018
MLA/2018/00069 - Completed Application - Maintenance of existing worksHH HW JJ Tower Refurbishment HH7 & HH8 Towers and oversailScottish And Southern Energy07 Feb 201818 Jul 2018
MLA/2018/00071 - Completed Application - Construction of new worksNEW CUTTER AND WORK BOAT BERTH AT RO RO 3New Cutter Boat BerthPort Of Tyne Authority07 Feb 201811 May 2018
MLA/2018/00072 - Completed Application - Maintenance of existing structures or assets ORE Catapult Blyth - Minor Works ORE Catapult Minor Repair WorksOre Catapult Development Services Limited 07 Feb 201807 Feb 2018
MLA/2018/00073 - Completed Application - Minor removals Ghost Fishing UK Project: Removal of ALDFG and Marine Litter from Wreck sites west of Weymouth Buccaneer HMS [W49] [+1946], P-555 HMS [+1947], Frogner SS [+1918], UB-74 [+1918], Sidon HMS [+1957], Landrail HMS [+1906], Pomeranian SS [+1918], Salsette SS [+1917] Ghost Fishing Uk08 Feb 201808 Feb 2018
MLA/2018/00074 - Completed Application - Minor removals Ghost Fishing UK Project: Removal of ALDFG and Marine Litter from Wreck sites Falmouth Bay Lady Of The Isles HMS [+1940], Andola SV [+1895], Bay of Panama SV [+1891], Caroni River MV [+1940], SS Epsilon, SS Mohegan, N. G. Petersen SS [+1918], Rock Island Bridge SS [+1920], VolnayGhost Fishing Uk08 Feb 201808 Feb 2018
MLA/2018/00075/1 - Completed Application - Construction of new works, Decommissioning of worksRoyal Wharf Pier Royal Wharf Site Oxley Wharf Property 3 Limited09 Feb 201825 Sep 2018
MLA/2018/00077/1 - Completed Application - Maintenance of existing worksLondon Array Offshore Wind Farm Blade Maintenance WorksLondon Array Wind Farm BoundaryLondon Array Limited09 Feb 201801 Mar 2019
MLA/2018/00078 - Completed Application - Maintenance of existing structures or assets Victoria Wharf Flood Defence Wall RepairsVictoria Wharf Moore Project Management Solutions Llp12 Feb 201812 Feb 2018
MLA/2018/00080 - Completed Application - Beach maintenance activities Clearance of Slipway (MLA/2017/00302)Riverbank ReinforcementCornwall Council14 Feb 201814 Feb 2018
MLA/2018/00081 - Completed Application - Deposit of markers Buoys in Colwell Bay for The Hut Restaurant, it's customers and neighbours.Colwell BayAka Restaurants (Colwell) Ltd 14 Feb 201814 Feb 2018
MLA/2018/00082/1 - Completed Application - Disposal of dredged material, Navigational dredging (maintenance)Buckler's Hard Maintenance DredgeBuckler's Hard Yacht Harbour, NAB TOWER (WI060), HURST FORT (WI080), NEEDLES (WI090) Beaulieu Enterprises Limited14 Feb 201802 Dec 2020
MLA/2018/00083 - Completed Application - Maintenance of existing worksROYAL SOLENT YACHT CLUB JETTY STRENGTHENINGMetal Pile Royal Solent Yacht Club 14 Feb 201808 May 2019
MLA/2018/00084/1 - Completed Application - Maintenance of existing worksAsset Refurbishment Programme of Works Revetment Repairs Essex 1057.01 Malyons Revetment Repairs, 1077.01 CreekseaJacksonhyder15 Feb 201828 Sep 2018
MLA/2018/00085 - Completed Application - Construction of new worksNew Crew Facilities at RNLI Penlee, Newlyn RNLI PenleeRnli Estates15 Feb 201801 May 2018
MLA/2018/00086 - Completed Application - Maintenance of existing structures or assets Replacing 1 Steel pile Essex Marina Essex Marina15 Feb 201815 Feb 2018
MLA/2018/00087 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090)Mr Charles Lister)16 Feb 201816 Feb 2018
MLA/2018/00088 - Completed Application - Construction of new worksGreatham South Flood Alleviation Scheme (FAS) North West Habitat CreationGreatham Creek Channel Breach Excavation Environment Agency Leeds16 Feb 201805 Oct 2018
MLA/2018/00089 - Completed Application - Construction of new worksWandle WallWandle WallFrasers Property (Uk) Limited 16 Feb 201813 Jun 2018
MLA/2018/00090 - Completed Application - Other deposits, Other removals Nemo Link Cable Protection at KP90.4 Nemo Link Cable Protection KP90.4National Grid Nemo Link Limited 19 Feb 201815 Jun 2018
MLA/2018/00091 - Completed Application - Construction of new works, Maintenance of existing works, Other removals, Other worksCanal Basin Floodgate ReplacementCanal Basin FloodgateTeam210019 Feb 201807 Sep 2018
MLA/2018/00092 - Completed Application - Maintenance of existing structures or assets Repair of dinghy launching slipway.Buck Shore Beach, Swanage Sailing Club Swanage Sailing Club20 Feb 201820 Feb 2018
MLA/2018/00093 - Completed Application - Maintenance of existing worksWightlink Moorings PortsmouthWightlinkWightlink Limited 21 Feb 201816 May 2018
MLA/2018/00094 - Completed Application - Construction of new works, Decommissioning of worksThe Folly Pontoon replacement, River Medina, IoW The Folly PontoonGreene King Retailing Ltd 21 Feb 201821 Aug 2018
MLA/2018/00095 - Completed Application - Construction of new works, Other works East Runton Proposed Ramp Work East Runton Ramp North Norfolk District Council21 Feb 201806 Jun 2018
MLA/2018/00096 - Completed Application - Construction of new worksEXTENTION OF MARCHWOOD YACHTCLUB INSHORE UPSTREAM PONTOONMarchwood Yacht Club Marchwood Yacht Club22 Feb 201810 May 2018
MLA/2018/00097 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090)Mr Britannia Shipping (Fao: Lister) 22 Feb 201822 Feb 2018
MLA/2018/00098 - Completed Application - Maintenance of existing structures or assets Trinity Hospital Flood Defence Wall Remediation Works - ScaffoldingTrinity Hospital Ch2m Hill Europe Limited23 Feb 201823 Feb 2018
MLA/2018/00099 - Completed Application - Maintenance of existing worksWarrington Cenothaph Works Warrington Cenotaph Sheet Piling AreaBalfour Beatty23 Feb 201801 Aug 2018
MLA/2018/00100 - Completed Application - Non-navigational clearance dredgingLot's AitLot's AitHither Green Developments Limited 23 Feb 201823 Feb 2018
MLA/2018/00101 - Completed Application - Minor removals Ghost Fishing UK Project: Removal of ALDFG and Marine Litter from Wreck sites and reefs from Plymouth to PortlandEddystone Rocks, Hatt Rock, Glocliffe SS [+1917], Louis Sheid SS [+1939], James Fennell HMT [+1920], Royal Adelaide SV [+1872], Anworth, Minerva SS [+1917], Scaldis (+1974), Saint Dunstan HMS [+1917], Tracy [+2016], Ailsa Craig SS [+1918], Moidart SS [+1918], Baygitano SS [+1918], Heroine SV [+1852], Gibel Hamam SS [+1918], Nil Desperandum MFV [+1993], Radaas SS [+1917], Galicia SS [+1917], Boma SS (I) [+1918], City of Swansea SS [+1917], Gefion SS [+1917], Lord Stewart SS [+1918], Bretagne SS [+1918], Trawl gear, Dudley Rose SS [+1941], Sevilla SS [+1918], Northville SS [+1918], Unknown wreck, Girl Barbara [+1990], Les Mercenaires MFV [+2005], Dutch tug, Benton Castle HMT [+1916], Picton Castle HMS [+1917], Dryad SV [+1891], Newholm SS [+1917], Baychattan SS [+1917], Demetrios MV [+1992], Riversdale SS [+1917], Herzogin Cecilie SV [+1936], Soudan SS [+1887], Liberta SS [+1926], Skaala SS [+1917], Maine SS (II) [+1917], Oregon SV [+1890], Persier SS [+1945], Totnes Castle PSS [+1967], Untiring HMS (P-59) [+1957], Medoc SS (Half Way Wreck) [+1940], Eddystone Lighthouse (+1703), Foyle HMS (D 20) [+1917], Unicorn SS (Tile Boat) [+1923], Leen, Beatrice SV [+1988], Rosehill SS [+1917], James Eagan Layne SS [+1945], Scylla HMS (F71) [+2004], Breakwater South, Hands DeepGhost Fishing Uk25 Feb 201825 Feb 2018
MLA/2018/00102 - Completed Application - Construction of new worksTrinity Buoy Wharf Temporary Extension Trinity Buoy Wharf Thames Clippers 27 Feb 201813 Feb 2019
MLA/2018/00103 - Completed Application - Construction of new worksSmall Quay LerrynSmall Quay, Lerryn Mr Hugh Sinclair27 Feb 201818 May 2018
MLA/2018/00104 - Completed Application - Maintenance of existing structures or assets Hythe opp Waitrose Hythe opp waitrose Beasley Christopher Limited 28 Feb 201828 Feb 2018
MLA/2018/00105 - Completed Application - Maintenance of existing worksPortobello WTW Groyne Repair Portobello Groyne Repair Southern Water28 Feb 201806 Aug 2019
MLA/2018/00106 - Completed Application - Maintenance of existing structures or assets Bembridge Lane, IOWBembridge Lane Beasley Christopher Limited 01 Mar 201801 Mar 2018
MLA/2018/00107 - Completed Application - Construction of new worksRelocation and installation of new access for the R.S. Hispaniola Restaurant VesselRS Hispaniola Temporary Access Steps, Ramp and Goods LiftBazalgette Tunnel Limited 01 Mar 201814 May 2018
MLA/2018/00108 - Completed Application - Construction of new works, Other deposits, Other removalsExport cable Installation - Rampion Offshore Wind Farm Grouped under: Rampion Offshore Wind Farm Showing 2 of 13 cases EC 4 corridorRampion Offshore Wind 02 Mar 201824 May 2018
MLA/2018/00109 - Completed Application - Maintenance of existing worksProspect Quay - Scour Damage Prospect Mooring - T head berthProspect Moorings 2013 Limited02 Mar 201827 Jul 2018
MLA/2018/00110/2 - Completed Application - Maintenance of existing worksHuckers Bow Tidal Sluice Flood Defence ImprovementsHuckers Bow Tidal OutfallBmm Jv Ltd05 Mar 201821 Mar 2019
MLA/2018/00111 - Completed Application - Disposal of dredged material Clearance of Slipway Riverbank reinforcement with dredged spoil from slipwayCaptain Mark Killingback05 Mar 201813 Jan 2020
MLA/2018/00112 - Completed Application - Maintenance of existing structures or assets Repairs to seawall revetment and out fall pipe Waldegraves Holiday Park Mr Graham Rampling05 Mar 201805 Mar 2018
MLA/2018/00113 - Completed Application - Maintenance of existing works, Other depositsWest of Duddon Sands OFTO O&M Marine Licence Site 1 EOR0709 WDS Cable Repair Boundary Wods Transmission Plc 06 Mar 201817 Sep 2018
MLA/2018/00115/1 - Completed Application - Construction of new worksProposed Pontoon and Lime Quay, Tregothnan Estate, St Micheal Penkivel Lime QuayFalmouth Estates Management Company Limited 07 Mar 201822 Nov 2019
MLA/2018/00116 - Completed Application - Maintenance of existing structures or assets South Sands Salcombe - manhole repairs South Sands Salcombe ManholesR&M Utility & Civil Engineering Services South West Limited 08 Mar 201808 Mar 2018
MLA/2018/00118/1 - Completed Application - Disposal of dredged material, Navigational dredging (capital), Other depositsStone Beds at Green Port Hull Berth 1Green Port Hull Berth 1, Holme Channel Deep (HU056)Abp 08 Mar 201824 Sep 2018
MLA/2018/00119 - Completed Application - Other worksFoxfield Water Main ReinstatementArea B (East of Estuary), Area A (West of Estuary) United Utilities Water Plc09 Mar 201831 Jul 2018
MLA/2018/00120 - Completed Application - Maintenance of existing worksReplacement of existing jetty and launch hard facility.Hook FarmMr Matthew Walton 09 Mar 201802 Jul 2018
MLA/2018/00122 - Withdrawn Application - Other deposits Pann’s East Quay Emergency Stabilisation Works Sunderland County Council 09 Mar 2018
MLA/2018/00123 - Completed Application - Maintenance of existing structures or assets Surface Water Outfall Inspection West Street WorthingWest Street Worthing Beasley Christopher Limited 10 Mar 201810 Mar 2018
MLA/2018/00124 - Completed Application - Maintenance of existing structures or assets Bexhill Sutton Place Bexhill Sutton Place Beasley Christopher Limited 12 Mar 201812 Mar 2018
MLA/2018/00125 - Completed Application - Beach maintenance activities Management of shingle on the Landguard FrontageLandguard Peninsula, Suffolk Port Of Felixstowe Limited12 Mar 201812 Mar 2018
MLA/2018/00126 - Completed Application - Maintenance of existing worksQueen's Wharf - Remedial Works QUEENS WHARF Mount Anvil Limited 12 Mar 201827 Jul 2018
MLA/2018/00127 - Completed Application - Maintenance of existing structures or assets Replacement of four worn out floats on our floating bridge leading to a pontoon. Lobster Quay Warsash Sailing 12 Mar 201812 Mar 2018
MLA/2018/00128 - Completed Application - Maintenance of existing structures or assets Cooden Beach Cooden Beach Beasley Christopher Limited 13 Mar 201813 Mar 2018
MLA/2018/00129 - Completed Application - Other worksDeployment of bird deterrents at Burbo Extension Offshore Wind FarmBurbo Extension Offshore Wind Farm Orsted13 Mar 201816 May 2018
MLA/2018/00130 - Completed Application - Maintenance of existing structures or assets Seaford Splash Seaford Splash Beasley Christopher Limited 13 Mar 201813 Mar 2018
MLA/2018/00131 - Completed Application - Maintenance of existing structures or assets Ashlett Creek 2Ashlett Creek 2Beasley Christopher Limited 14 Mar 201814 Mar 2018
MLA/2018/00132/1 - Completed Application - Other deposits Estimating catchability of scallop dredges and TV survey efficiencySite 3, Site 1, Site 2 Cefas 14 Mar 201804 Oct 2018
MLA/2018/00133 - Completed Application - Disposal of dredged material, Navigational dredging (maintenance)Bosham Quay Dredge NAB TOWER (WI060), Bosham Quay Chichester Harbour Conservancy. 15 Mar 201831 May 2018
MLA/2018/00134 - Completed Application - Maintenance of existing structures or assets Newton Ferrers Saline OutfallNewton Ferrers Glanville Cleansing Limited 15 Mar 201815 Mar 2018
MLA/2018/00135 - Completed Application - Maintenance of existing structures or assets Kentish Flats - Blade Exchange UKF_EGWTG_WTG_LUKF003_v01_161120lm_4258_ExtUKFE01_Buf500mVattenfall Wind Power Ltd 15 Mar 201815 Mar 2018
MLA/2018/00136 - Completed Application - Maintenance of existing works, Other removalsMarine licence - 10 year generic maintenance licence- HappisburghHappisburgh Marine License North Norfolk District Council15 Mar 201812 Oct 2018
MLA/2018/00137/1 - Completed Application - Maintenance of existing works, Other removalsMarine licence - 10 year generic maintenance licence- Weybourne Beck outfall to WalcottMarine_License2North Norfolk District Council15 Mar 201822 May 2019
MLA/2018/00138 - Completed Application - Maintenance of existing structures or assets Langley PointLangley PointBeasley Christopher Limited 16 Mar 201816 Mar 2018
MLA/2018/00142 - Completed Application - Maintenance of existing structures or assets Pontoon preventative maintenance Pontoon at Burnham on Crouch Sailing ClubBurnham On Crouch Sailing Club19 Mar 201819 Mar 2018
MLA/2018/00143 - Completed Application - Other removals Holker Estate - flood defence embankment repairs Sand extraction site Holker Estates Co Ltd 19 Mar 201830 Jul 2018
MLA/2018/00144 - Completed Application - Non-navigational clearance dredgingclearance of silt under pontoons Doug Ashley Marine maintenance dredgeMr James Douglas Ashley 19 Mar 201819 Mar 2018
MLA/2018/00145 - Completed Application - Maintenance of existing structures or assets HRSC Pontoon re-establishment of moorings following Storm damage HRSC Pontoon Mooring SpreadHelford River Sailing Club20 Mar 201820 Mar 2018
MLA/2018/00146 - Completed Application - Other removals Demolition of Little Susie and Xoron Little susie and Xoron Jpc Demolition Llp21 Mar 201817 Aug 2018
MLA/2018/00147 - Completed Application - Non-navigational clearance dredgingOne off desilt of Broadfleet at PillingBroadfleet channel Mr John Barton21 Mar 201821 Mar 2018
MLA/2018/00148 - Completed Application - Navigational dredging (capital)RAINHAM JETTY BERTH 3 DREDGING RAINHAM JETTY BERTH 3Land & Water Remediation Ltd23 Mar 201822 Aug 2018
MLA/2018/00149 - Completed Application - Maintenance of existing structures or assets Event Bridge Porthleven Food Festival BridgeArc Live Limited26 Mar 201826 Mar 2018
MLA/2018/00150 - Completed Application - Maintenance of existing worksHelford River Sailing Club Pontoon Pile replacementHelford River Sailing Club Pontoon Pile Location Falmouth Divers Limited 26 Mar 201829 Mar 2018
MLA/2018/00151 - Completed Application - Minor removals Borehole SampleNavigator Terminal ThamesVopak Terminal London B.V. Limited26 Mar 201826 Mar 2018
MLA/2018/00152 - Completed Application - Maintenance of existing structures or assets Poole Bridge - remedials Poole Bridge Approach SpansBorough Of Poole26 Mar 201826 Mar 2018
MLA/2018/00153 - Completed Application - Minor removals Sea Shepherd ALDFG (Ghostnet) removals in Liverpool Bay 1Sea Shepherd UK ALDFG and litter removals in Liverpool Bay area 1Sea Shepherd Uk 26 Mar 201826 Mar 2018
MLA/2018/00154/1 - Completed Application - Maintenance of existing works, Other depositsGreatham BeckGreatham Beck- Dry Working AreaAmalgamated Construction27 Mar 201803 Sep 2018
MLA/2018/00155/1 - Completed Application - Maintenance of existing worksRace Bank Offshore Wind farm Operation and Maintenance for non cable activities - Generator assets Race Bank Wind FarmDong Energy Rb (Uk) Limited 27 Mar 201810 Jan 2020
MLA/2018/00157 - Completed Application - Maintenance of existing structures or assets Sir John McDougall - Glengall Gardens River Wall Maintenance Sir John McDougall - Glengall GardensCh2m Hill Europe Limited28 Mar 201828 Mar 2018
MLA/2018/00158 - Completed Application - Maintenance of existing structures or assets IE00897C Manea Bridge WorksManeaAmalgamated Construction Ltd28 Mar 201828 Mar 2018
MLA/2018/00159 - Completed Application - Maintenance of existing structures or assets Component Exchange - Gearbox replacement - location A03Gearbox replacement - Location A03 - Sheringham Shoal Offshore WindfarmScira Offshore Energy Limited 28 Mar 201828 Mar 2018
MLA/2018/00161/1 - Completed Application - Construction of new worksPipeline installation at Geo Specialty Chemicals, HytheGeo Outfall Pipeline Geo Specialty Chemicals 03 Apr 201809 Nov 2018
MLA/2018/00162 - Completed Application - Maintenance of existing structures or assets Preparations and repainting of 44 WTG's and Offshore SubstationArea of painting works Scira Offshore Energy Limited 03 Apr 201803 Apr 2018
MLA/2018/00163 - Completed Application - Construction of new worksOutfall Bay Structure for the Stow Fen Pumping Station Replacement Outfall Bay for the Replacement of Stow Fen Pumping StationDownham And Stow Bardolph Idb 03 Apr 201816 Jul 2018
MLA/2018/00165 - Completed Application - Maintenance of existing structures or assets Sugar Quay - Jetty Works Sugar Quay Barratt London Limited04 Apr 201804 Apr 2018
MLA/2018/00166 - Withdrawn Application - Construction of new worksMooring pilesBridgeMarsh Marina Mr Ben Knill05 Apr 2018
MLA/2018/00167 - Completed Application - Disposal of dredged material, Navigational dredging (capital)Gosport Marina - Endeavour Quay Link Pontoon DredgeNAB TOWER (WI060), Keel Pocket (dredge -1m), Link Pontoon (dredge -3.5m) Premier Marinas (Gosport) Limited 05 Apr 201822 Jun 2018
MLA/2018/00169 - Completed Application - Maintenance of existing structures or assets Helford River Sailing Club Pontoon Pile ReplacementHelford River Sailing Club Pile Replacement location and access area Mr John Lake05 Apr 201805 Apr 2018
MLA/2018/00170 - Completed Application - Minor removals Exmouth Tidal Defence Scheme - Boreholes for geotechnical investigationExmouth TDS - Borehole locations Environment Agency06 Apr 201806 Apr 2018
MLA/2018/00171 - Completed Application - Construction of new works, Other removalsSwanage Slipway ProjectSwanage SlipwaySwanage Town Council06 Apr 201823 Aug 2018
MLA/2018/00172/1 - Completed Application - Disposal of dredged material Port of Sunderland - disposal of maintenance dredged materialSUNDERLAND (TY090) Port Of Sunderland09 Apr 201814 Nov 2018
MLA/2018/00173 - Completed Application - Maintenance of existing structures or assets Emergency Quay wall repairsRubber Factory Southbay Civil Engineering Limited09 Apr 201809 Apr 2018
MLA/2018/00174/1 - Completed Application - Aggregate dredging, Sampling Area 254 - MarconArea 254 - MarconTarmac Marine Dredging Ltd09 Apr 201827 Oct 2020
MLA/2018/00175/1 - Completed Application - Construction of new works, Maintenance of existing works, Other worksRiver wall repair and maintanence 26-37 Clive Street North Shields Grouped under: River wall repair 26-37 Clive Street North Shields Showing 2 of 2 casesClive Street 26-37 Southbay Civils Engineering Limited 10 Apr 201813 Nov 2019
MLA/2018/00176 - Completed Application - Maintenance of existing worksRNLI Selsey - Emergency Removal of Buried ObstructionRNLI Selsey - Emergency Removal Works (April 18) Rnli Division South 11 Apr 201812 Apr 2018
MLA/2018/00177 - Completed Application - Beach maintenance activities Clearance of sand in harbour to allow better use of Landing Steps on West Pier, St IvesSt Ives HarbourCornwall Council - Harbour Office 11 Apr 201811 Apr 2018
MLA/2018/00179 - Completed Application - Construction of new worksBrighton Marina West Quay PontoonBrighton West Quay Pontoon Premier Marinas (Brighton) Ltd12 Apr 201806 Jul 2018
MLA/2018/00180 - Completed Application - Maintenance of existing worksRiver wall emergency repair 26-37 Clive Street North Shields Grouped under: River wall repair 26-37 Clive Street North Shields Showing 2 of 2 casesClive Street 26-37 Southbay Civils Engineering Limited 12 Apr 201816 Apr 2018
MLA/2018/00181 - Completed Application - Maintenance of existing worksSt Helens Mill Dam Footbridge Replacements (B320 and B321) The Causeway Ringway Island Roads13 Apr 201821 Aug 2018
MLA/2018/00182 - Completed Application - Maintenance of existing worksB160 Newport Quay Deck Replacement Newport Quay BridgeRingway Island Roads Limited13 Apr 201806 Nov 2018
MLA/2018/00183 - Completed Application - Maintenance of existing worksAsset Refurbishment Programme of Works Revetment Repairs on the Blackwater Mundon Creek, Rolls Farm site 1Jacksonhyder13 Apr 201815 Oct 2018
MLA/2018/00184 - Withdrawn Application - Other removals Triton Knoll Wind Farm Triton Knoll Offshore Wind Farm Ltd 16 Apr 2018
MLA/2018/00185 - Completed Application - Maintenance of existing worksPontoon change at Thunderbolt Pier Thunderbolt Pier Chatham Historic Dockyard Trust 16 Apr 201814 Aug 2018
MLA/2018/00187 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090)Mamarine.Com Llp17 Apr 201817 Apr 2018
MLA/2018/00188 - Completed Application - Maintenance of existing structures or assets URGENT REPAIRS TO ROOF AND TIMBER CLADDING DUE TO STORM DAMAGE St ives Arts Club, Scaffolding St Ives ( Cornwall ) Arts Club Society17 Apr 201817 Apr 2018
MLA/2018/00189 - Completed Application - Deposit of markers Laying dinghy racing marks in Christchurch Harbour that remain in place for more than 28 days and are only removed for maintenance.Christchurch Harbour fixed racing marksHighcliffe Sailing Club 18 Apr 201818 Apr 2018
MLA/2018/00190 - Completed Application - Construction of new worksproposed shellfish landing jetty Oxen Cove proposed jetty Tda 18 Apr 201804 Feb 2019
MLA/2018/00191/1 - Completed Application - Maintenance of existing structures or assets Crispins, Newton Ferrers Bridgend Mr Paul Pethick 18 Apr 201826 Apr 2018
MLA/2018/00192 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090)Mr Paul Steele19 Apr 201819 Apr 2018
MLA/2018/00193/7 - Completed Application - Construction of new worksDeptford Creek Marine Works - Full Deptford Creek Marine WorksThames Tideway Tunnel Limited 20 Apr 201814 Mar 2024
MLA/2018/00194/2 - Completed Application - Construction of new works, Decommissioning of worksReplacement Dolphin Navigator TerminalsCorrect site of worksNavigator Terminals Thames20 Apr 201819 Mar 2019
MLA/2018/00195 - Completed Application - Construction of new worksWest Quarries Recreation Site Landing StageWest Quarries Recreation Site Landing StageRiver Recreation Cic20 Apr 201801 Apr 2019
MLA/2018/00196 - Completed Application - Maintenance of existing structures or assets Eastern Jetty Fender Thrust Pile maintenance Site 1 Falmouth Petroleum Limited23 Apr 201823 Apr 2018
MLA/2018/00197 - Completed Application - Deposit of markers Brightlingsea Sailing Club racing marks licence applicationBatemans (BSC), Pyefleet (CYC), Point Clear (BSC), Hills (BSC), Gazelet (BSC), Cocum (BSC), Beach (BSC), CVP (CYC) Brightlingsea Sailing Club24 Apr 201824 Apr 2018
MLA/2018/00198 - Completed Application - Maintenance of existing structures or assets Jetty 1A Replacement Ethylene Loading ArmNorth Tees Jetty 1ASabic Global Limited24 Apr 201824 Apr 2018
MLA/2018/00199 - Completed Application - Construction of new worksVictoria Breakwater improvementVictoria Breakwater, Brixham Torbay Council25 Apr 201816 Oct 2018
MLA/2018/00201 - Completed Application - Construction of new works, Other dredgingIntertidal Enhancement Works Enderby WharfEnderby Wharf Llp 25 Apr 201811 Mar 2019
MLA/2018/00202/1 - Completed Application - Disposal of dredged material, Navigational dredging (maintenance)Newhaven Harbour Maintenance Dredging Sediment DisposalNEWHAVEN (WI010) Newhaven Port & Properties Ltd25 Apr 201818 Oct 2021
MLA/2018/00203 - Completed Application - Deposit of markers REPAIR TO MARKERS - ISOLATED DANGER BEACON - POLLARD GROUNDPOLLARD GROUND SEASALTER Seasalter Shellfish (Whitstable) Ltd25 Apr 201825 Apr 2018
MLA/2018/00204 - Completed Application - Maintenance of existing structures or assets Maintenance to existing outfall diffuser valvesOutfall pipe outlet location (activities centred on this point)Falmouth Divers Limited 26 Apr 201826 Apr 2018
MLA/2018/00205 - Completed Application - Other worksPenzance Promenade Trial PitsPenzance Promenade Cormac Solutions Limited26 Apr 201829 Jun 2018
MLA/2018/00206/1 - Completed Application - Navigational dredging (maintenance)Maintenance Dredging around W Trout & Son Ltd Pontoons - Lat. 50*40'5500N, Lon 3*27'58.02W W Trout & Son LtdW Trout & Son Limited 27 Apr 201812 Nov 2020
MLA/2018/00207/1 - Completed Application - Maintenance of existing structures or assets Manea Bridge ManeaJ. Murphy & Sons Limited27 Apr 201803 May 2018
MLA/2018/00208 - Completed Application - Other deposits Barrow Offshore Wind Farm Rock Placement Barrow_Windfarm_WGS84Orsted Power Uk Ltd 30 Apr 201814 Aug 2018
MLA/2018/00209/1 - Completed Application - Construction of new worksAlterations to Twelve Quays Terminal Twelve Quays SitePeel Ports (Medway) Limited 30 Apr 201805 Aug 2019
MLA/2018/00210 - Completed Application - Maintenance of existing structures or assets Slipway repairs for Harbour House, 22 Greenacres, Birdham, Po20 7HLSlipway repairs , Harbour house ,22 Greenacres, BirdhamMr Andy Fitzgerald30 Apr 201830 Apr 2018
MLA/2018/00212/1 - Completed Application - Maintenance of existing worksSheerness Asset MaintenanceNeptune JettyTeam Van Oord 30 Apr 201822 Mar 2019
MLA/2018/00213 - Completed Application - Other dredging Excavation of sediment to investigate and repair failed soakaway under Porthminster beachPorthminster Cornwall Council -Environment Service 30 Apr 201802 Jul 2018
MLA/2018/00214 - Completed Application - Construction of new works, Navigational dredging (capital) Development of Standard Wharf Standard Wharf Ltd01 May 201827 Oct 2022
MLA/2018/00215 - Completed Application - Maintenance of existing worksInstallation of two 323mm dia piles to prevent storm damage to existing leisure pontoonBurnham on Crouch Sailing Club Pontoon Burnham On Crouch Sailing Club01 May 201801 Aug 2018
MLA/2018/00216 - Withdrawn Application - Construction of new worksNatural Flood Management using Saltmarsh in Suffolk EstuariesSudbourne, Alde and Ore Estuary between Orford and Aldeburgh Environmentagency 02 May 2018
MLA/2018/00217 - Withdrawn Application - Other deposits Lincolnshire Time and Tide BellTime and Tide Bell, Beach, North End, MablethorpeLincolnshire Time And Tide Bell Community Interest Company02 May 2018
MLA/2018/00218 - Completed Application - Maintenance of existing structures or assets Refurbishment of Two Rustic Timber Pole Groynes, below Eastcliff, Undertyne, Bembridge, IOWBembridge GroynesGraham Attrill Civil Engineering Limited02 May 201802 May 2018
MLA/2018/00220 - Completed Application - Construction of new worksWorks to sea wall at 69-73 Whitworth Crescent, Southampton.69-73 Whitworth Crescent, SouthamptonMr Jeremy Swadling03 May 201810 Jul 2018
MLA/2018/00221/1 - Completed Application - Construction of new worksFresh Wharf River Wall and Temporary MooringsFresh Wharf River WorksErith Contractors Ltd 04 May 201831 Mar 2022
MLA/2018/00222/2 - Completed Application - Maintenance of existing worksA14 River Orwell Pier 10 CPA14 River Orwell Bridge - Pier 10Kier Highways Limited 04 May 201827 Aug 2019
MLA/2018/00223 - Completed Application - Disposal of dredged material, Maintenance of existing works, Other dredgingGrain Power Station Cooling Water Intake Maintenance. Site - Grain Power Station, Isle of Grain, Rochester, ME3 0ARCooling water intake structure dredging and maintenance works, SOUTH FALLS (TH070) Uniper Uk Limited 04 May 201806 Feb 2019
MLA/2018/00224 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090)Mr John Mckenzie04 May 201804 May 2018
MLA/2018/00225 - Completed Application - Maintenance of existing structures or assets Restoration of the Wreck Trail on the SS Bretagne - Centenary CelebrationWreck site of the SS BretagneBritish Sub-Aqua Club 05 May 201805 May 2018
MLA/2018/00226 - Completed Application - Maintenance of existing structures or assets Resurfacing of slipway Tregonce Barn SlipwayMrs June Totman 08 May 201808 May 2018
MLA/2018/00227 - Completed Application - Construction of new works, Other depositsFort Bovisand Cliff Stabilisation180406_07645_00001_SiteBoundary_digitisedFort Bovisand Developments Ltd08 May 201815 May 2019
MLA/2018/00228 - Completed Application - Maintenance of existing structures or assets Flat Cliffs - Temporary Access Platform for Installation of Cliff Drainage Works Flat cliffs v4 Scarborough Borough Council 09 May 201809 May 2018
MLA/2018/00229 - Completed Application - Construction of new worksColdharbour Outfall ExtensionOutfall_Extension_Extent Canterbury City Council 11 May 201815 Aug 2018
MLA/2018/00230 - Completed Application - Construction of new worksRD30 Waren Mill STWWaren Mill - Outfall, Waren Mill - Pipe Crossing Mott Macdonald Bentley Limited11 May 201808 Aug 2018
MLA/2018/00231 - Completed Application - Maintenance of existing worksRNLI Selsey - Emergency Removal of Buried Obstruction (Phase 2)RNLI Selsey - Emergency Removal WorksRnli Estates14 May 201822 May 2018
MLA/2018/00232 - Completed Application - Minor removals Subsea Drill Test ProgramBlyth West QuayRoyal Ihc Limited 14 May 201814 May 2018
MLA/2018/00233 - Completed Application - Construction of new worksWeymouth Marina Pontoons Weymouth PontoonsDean & Reddyhoff Limited14 May 201828 Aug 2018
MLA/2018/00234/3 - Variation Requested Application - Disposal of dredged material, Navigational dredging (maintenance)Maintenance Dredging at HMNB Devonport Plymouth Deep (PL035), Dredge_Area_IndicativeDefence Infrastructure Organisation (Dio) 15 May 201826 Oct 2022
MLA/2018/00235/3 - Completed Application - Decommissioning of works Decommissioning of Meteorological Mast 1BMeteorological Mast Working Area East Anglia Offshore Wind Limited 16 May 201824 Apr 2020
MLA/2018/00236 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090)Mr Charles Lister)16 May 201816 May 2018
MLA/2018/00237 - Completed Application - Maintenance of existing structures or assets Redecoration of Applewharf, The Plains, Totnes, TQ9 5QLApplewharf, The Plains, Totnes, TQ9 5QLApplewharf Management Limited 16 May 201816 May 2018
MLA/2018/00238 - Completed Application - Maintenance of existing worksRIVER WALL DEFENCE REMEDIATION – CLIFFESouthern Eroded Section, Northern Eroded Section Brett Aggregates Ltd16 May 201816 Jul 2018
MLA/2018/00239 - Completed Application - Maintenance of existing worksLow Level Concrete Pile Repair Navigator Terminal Thames JettyVopak Terminal London B.V. Ltd17 May 201823 Nov 2018
MLA/2018/00240 - Completed Application - Construction of new worksRD30 Waren Mill Sea Wall Sea Wall Mott Macdonald Bentley Limited18 May 201809 Aug 2018
MLA/2018/00242 - Completed Application - Construction of new worksScotline New Quay Wall Scotline New Quay Wall Gdc Partnership Ltd 19 May 201831 Oct 2018
MLA/2018/00243 - Completed Application - Decommissioning of works Blyth Offshore Wind Farm Decommissioning Project Blyth Decommissioning Site, North Turbine, South Turbine E.On Climate & Renewables Uk Blyth Limited21 May 201818 Mar 2019
MLA/2018/00244 - Completed Application - Minor removals Hambleton Flood Risk Management Scheme (Our ref. ENV0000064C)Hambleton FRMS - Ground Investigations AreaEnvironment Agency21 May 201821 May 2018
MLA/2018/00245 - Completed Application - Maintenance of existing workspile repairs, rail & bracing repairs and replacement and removal of debris under brighton palace pierBRIGHTON PALACE PIER Brighton Marine Palace & Pier Company (The) 21 May 201820 Jun 2019
MLA/2018/00248 - Completed Application - Other deposits Exercise Imber - 727 Spray EvaluationSpray area Oil Spill Response Limited23 May 201820 Jun 2018
MLA/2018/00251/1 - Completed Application - Other deposits Spraying of Fresh Water from a B727 to simulate oil spill dispersant application exercise by Oil Spill Response LtdSD1 2018 Exercise Area Oil Spill Response Limited23 May 201805 Oct 2018
MLA/2018/00253 - Completed Application - Maintenance of existing structures or assets Downings Roads MooringsDOWNINGSROAD Tower Bridge Yacht And Boat Company Limited 01 Jun 201801 Jun 2018
MLA/2018/00254 - Completed Application - Maintenance of existing structures or assets Shell Bacton Outfall NDT Shell Outfall NDT Area Shell U.K. Limited01 Jun 201801 Jun 2018
MLA/2018/00255 - Completed Application - Marine licence for the burial of human remains at sea TYNE BURIAL SITE (TY193) Gordon Fletcher & Sons Limited04 Jun 201804 Jun 2018
MLA/2018/00256 - Completed Application - Maintenance of existing structures or assets Houghton Bridge repairsHoughton BridgeWest Sussex County Council04 Jun 201804 Jun 2018
MLA/2018/00257 - Withdrawn Application - Disposal of dredged material, Other dredging, Other worksMylor Yacht Harbour - Extension to the Existing Marina Mylor Yacht Harbour Ltd 04 Jun 2018
MLA/2018/00258 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090)Mr John Lister04 Jun 201804 Jun 2018
MLA/2018/00259 - Completed Application - Maintenance of existing structures or assets Replacement of existing sea defences on foreshore land Warrens ForeshoreMr Paul Cox 04 Jun 201804 Jun 2018
MLA/2018/00260 - Withdrawn Application - Construction of new worksBathurst Basin Bridge - Pontoon Bristol City Council04 Jun 2018
MLA/2018/00261 - Completed Application - Maintenance of existing structures or assets River Lune Viaduct Scour ProtectionRiver Lune Viaduct J. Murphy & Sons Limited05 Jun 201805 Jun 2018
MLA/2018/00262 - Completed Application - Maintenance of existing structures or assets Paighton Pier Maintainence Paighton PierUk Industrial Services Ltd05 Jun 201805 Jun 2018
MLA/2018/00263 - Completed Application - Minor removals Ghost Fishing UK Project: Removal of ALDFG and Marine Litter from Haybrook Bay to MothercombeBlackstone Point AreaGhost Fishing Uk05 Jun 201805 Jun 2018
MLA/2018/00264 - Completed Application - Maintenance of existing structures or assets Sea Wall and Structure Repairs Sea Wall Balfour Beatty Plc06 Jun 201806 Jun 2018
MLA/2018/00265 - Completed Application - Deposit of markers Silloth Outfall Pipe Marker Buoy Replacement Silloth Outfall Buoy United Utilities Water Plc07 Jun 201807 Jun 2018
MLA/2018/00266 - Completed Application - Maintenance of existing structures or assets Trippet Wall Repairs TrippetWest Sussex County Council07 Jun 201807 Jun 2018
MLA/2018/00267 - Completed Application - Sampling Lyme Regis - The Cobb - Ground InvestigationsGround investigation area - The Cobb Jba Consulting Limited07 Jun 201815 Oct 2018
MLA/2018/00268 - Completed Application - Construction of new works, Maintenance of existing works Northey Island South Embankment WorksNorthey Island South EmbankmentNational Turst08 Jun 201816 Jan 2019
MLA/2018/00269 - Completed Application - Non-navigational clearance dredgingSilt removal spittys pointMr Peter Herbert10 Jun 201810 Jun 2018
MLA/2018/00270 - Completed Application - Maintenance of existing structures or assets Race Bank Offshore Wind Farm : Removal of marine growth/guano from WTG access points Race Bank Wind FarmDong Energy Rb (Uk) Limited 11 Jun 201811 Jun 2018
MLA/2018/00271 - Completed Application - Maintenance of existing worksDarthaven Marina Darthaven Marina Darthaven Marina Limited11 Jun 201804 Dec 2018
MLA/2018/00272 - Completed Application - Construction of new works, Maintenance of existing works Yacht Haven, Hayling Island, Hants Yacht Haven Sea Defence 1, Yacht Haven Sea Defence 2, Yacht Haven Slipway, New pontoonsAlpine Homes Ltd12 Jun 201827 Jan 2023
MLA/2018/00273/1 - Completed Application - Construction of new worksEast End Landing pontoon with two pilesEast End slipway Wells Harbour Commissioners 12 Jun 201803 Oct 2018
MLA/2018/00274 - Completed Application - Maintenance of existing structures or assets Old Mill, DartmouthOld Mill, DartmouthGlanville Cleansing Limited 12 Jun 201812 Jun 2018
MLA/2018/00275 - Completed Application - Non-navigational clearance dredgingHen Pens Sand WinningHen Pens, Foulshaw Environment Agency12 Jun 201812 Jun 2018
MLA/2018/00276/1 - Completed Application - Decommissioning of works Convoys Wharf Demolition and Removal of Pontoon BerthConvoys WharfHerbosch-Kiere Marine Contractors Ltd.13 Jun 201821 Jun 2019
MLA/2018/00277/1 - Completed Application - Maintenance of existing works2017s6104 - Eels regulation compliance measures at Hempholme LockHempholme Lock Yorkshire Water Services Ltd13 Jun 201828 Mar 2019
MLA/2018/00279 - Completed Application - Maintenance of existing structures or assets Old Bridge Street Retaining Wall RepairOld Bridge Street Retaining Wall Cormac Solutions Limited14 Jun 201814 Jun 2018
MLA/2018/00280 - Completed Application - Maintenance of existing structures or assets King Henry's Wharf Flood Defence Wall RepairsKing Henry's Wharf Moore Project Management Solutions Llp14 Jun 201814 Jun 2018
MLA/2018/00282 - Completed Application - Maintenance of existing worksRNLI Selsey - Emergency Relocation of MooringNew swinging mooring Rnli Division South 15 Jun 201829 Jun 2018
MLA/2018/00283 - Completed Application - Non-navigational clearance dredgingHundred End Gutter DesiltigHundred End Gutter Outfall DredgeEnvironment Agency15 Jun 201815 Jun 2018
MLA/2018/00284 - Completed Application - Non-navigational clearance dredgingCrossens Tidal Outfall Channel Crossens Tidal Outfall DredgeEnvironment Agency15 Jun 201815 Jun 2018
MLA/2018/00285/2 - Completed Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital), Navigational dredging (maintenance)East Cowes Lay-By BerthNAB TOWER (WI060), Lay-by Berth Construction Area, HURST FORT (WI080)Southampton Isle Of Wight And South Of England Royal Mail Steam Packet Company Limited15 Jun 201823 Jul 2019
MLA/2018/00287 - Completed Application - Maintenance of existing structures or assets The Old Mill, Lee BayThe Old Mill, Lee BayTaw & Torridge Scaffolding Ltd19 Jun 201819 Jun 2018
MLA/2018/00288 - Completed Application - Maintenance of existing structures or assets Ocean Wharf 2 Flood Defence RepairsOcean Wharf 2 Flood Defence RepairsMoore Project Management Solutions Llp19 Jun 201819 Jun 2018
MLA/2018/00289 - Completed Application - Construction of new works, Other deposits, Other removalsSussex Yacht Club Slipway Infill Sussex Yacht ClubSussex Yacht Club,Limited 20 Jun 201809 May 2019
MLA/2018/00290 - Completed Application - Maintenance of existing structures or assets East Anglia Zone- Meteorological Mast 1B- Operations & Maintenance EAOW Met Mast 1B East Anglia Offshore Wind Limited 20 Jun 201820 Jun 2018
MLA/2018/00291 - Completed Application - Maintenance of existing worksSpice Quay Fender Pile Replacement and RepairFender Pile Replacement or RepairLangbourn Properties (Spice Quay) Ltd 21 Jun 201823 Nov 2018
MLA/2018/00292 - Completed Application - Non-navigational clearance dredgingSea Sanctuary - Waterside Barge Mooring ProjectWaterside Quay, Penryn Falmouth Divers Limited 21 Jun 201821 Jun 2018
MLA/2018/00293 - Withdrawn Application - Construction of new worksNewlyn Harbour Work space Regeneration Newlyn Pier And Harbour 21 Jun 2018
MLA/2018/00294 - Withdrawn Application - Other worksPersonal Water Craft Potoon Brightlingsea Harbour Commissioners 22 Jun 2018
MLA/2018/00295 - Completed Application - Construction of new worksEbbsfleet OutfallOutfallIndependent Water Networks Limited22 Jun 201802 Jul 2019
MLA/2018/00296 - Withdrawn Application - Construction of new worksRoyal Dock tidal basin: pilot launch mooringsGrimsby pilot launch berths area Associated British Port-Grimsby 22 Jun 2018
MLA/2018/00297 - Completed Application - Maintenance of existing structures or assets Repair to the sea wall at Bosham Quay Meadow Bosham Quay Meadow National Trust (Enterprises) Limited (The)26 Jun 201826 Jun 2018
MLA/2018/00298 - Completed Application - Construction of new worksHollows Mooring (previous licence granted: MLA/2015/00190) HollowsMorlandia Limited 26 Jun 201813 Sep 2018
MLA/2018/00299 - Completed Application - Maintenance of existing worksRebuilding final 24 metres of existing jetty Harlow (Blackwater) Sailing Club Harlow (Blackwater) Sailing Club26 Jun 201803 Oct 2018
MLA/2018/00300 - Withdrawn Application - Disposal of dredged material, Navigational dredging (capital)Willington Quay Gut dredging existing mud banks Mr Len Clarke 26 Jun 2018
MLA/2018/00301/3 - Completed Application - Other worksMarine Licence Application for the Reconfiguration of Moorings at Town Quay, Lymington Town Quay Works Area Lymington Harbour Commissioners 26 Jun 201823 Jun 2020
MLA/2018/00302/1 - Completed Application - Construction of new worksRNLI Portsmouth Slipway Works and ExtensionRNLI_Portsmouth_Working_Area_Extent_20180622 Rnli Estates26 Jun 201815 Apr 2019
MLA/2018/00303/1 - Completed Application - Other removals Humber Gateway Offshore Wind Farm Marine Licence Humber Gateway Offshore Wind FarmRwe Renewables Uk Wind Ltd27 Jun 201826 Apr 2021
MLA/2018/00304 - Completed Application - Other removals Scroby Sands Offshore Wind Farm Operational Marine Licence Scroby Sands E.On Climate & Renewables Uk Offshore Wind Limited27 Jun 201826 Oct 2021
MLA/2018/00306 - Completed Application - Minor removals Anchor Chain Removal from Area 460 460_licence_Area Hanson Aggregates Marine Limited27 Jun 201827 Jun 2018
MLA/2018/00307/1 - Completed Application - Construction of new worksThe construction of a slipway from the proposed watersports centre in Ilfracombe Harbour and the construction of a harbour wall. Slipway, WallNorth Devon Council 28 Jun 201817 Apr 2023
MLA/2018/00308 - Completed Application - Construction of new worksQueenborough Harbour pontoon extension Pontoon extensionQueenborough Harbour Trust29 Jun 201819 Nov 2018
MLA/2018/00309 - Completed Application - Maintenance of existing worksDrake's Island Emergency jetty repairs Drake's Island Jetty Rotolok (Holdings) Limited02 Jul 201808 Aug 2018
MLA/2018/00310 - Completed Application - Construction of new works, Other removalsRoyal Wharf phase 3 river wall Royal Wharf Phase 3 River Wall, Tidal Terrace/Outfall Construction Oxley Wharf Property 3 Limited02 Jul 201823 Nov 2018
MLA/2018/00311 - Completed Application - Construction of new worksMudlark Pontoon and Piles, IOW Mudlark Pontoons Mr Andrew Finnamore 02 Jul 201812 Oct 2018
MLA/2018/00312 - Completed Application - Marine licence for the burial of human remains at sea NEWHAVEN (WI011) H.D.Tribe Limited 03 Jul 201803 Jul 2018
MLA/2018/00313 - Completed Application - Construction of new worksMaribor Park, Woolwich, London Maribor Park, Woolwich, London Berkeley Homes (East Thames) Limited03 Jul 201814 Oct 2019
MLA/2018/00314 - Completed Application - Construction of new worksWoolwich Reach, Pier Road, LondonWoolwich Reach, Pier Road, LondonHiggins Construction Plc04 Jul 201825 Oct 2019
MLA/2018/00315 - Completed Application - Construction of new worksWest Plain Marsh Habitat Restoration Project Site_of_Interest Holker Estates Co Ltd 04 Jul 201816 Jan 2019
MLA/2018/00316 - Completed Application - Maintenance of existing structures or assets Tom's Boatyard Toms BoatyardC. Toms And Son Limited 04 Jul 201804 Jul 2018
MLA/2018/00317 - Completed Application - Maintenance of existing structures or assets Royal Lymington Yacht Club Starting Platform Starting PlatformRoyal Lymington Yacht Club Limited05 Jul 201805 Jul 2018
MLA/2018/00318 - Completed Application - Maintenance of existing structures or assets Hartlepool SO11Hartlepool SO11Northumbrian Water Limited05 Jul 201805 Jul 2018
MLA/2018/00320 - Completed Application - Maintenance of existing worksWeymouth Magnetic Open Sea Range Weymouth Magnetic Open Sea range Qinetiq Limited 05 Jul 201809 Nov 2018
MLA/2018/00321 - Completed Application - Navigational dredging (capital), Other depositsBerth 4 Rock Dredge, Battleship Wharf, Port of Blyth Berth 4 Dredge Area 1, Berth 4 Dredge Area 2 Port Of Blyth 09 Jul 201813 Dec 2018
MLA/2018/00322 - Completed Application - Maintenance of existing worksSt Saviours Dock Bridge strengthening worksSt Saviours dock footbridgeF M Conway Limited09 Jul 201825 Oct 2018
MLA/2018/00323/1 - Completed Application - Aggregate dredging, Sampling Bassurelle Extension BX 458, BX 464 Cemex Uk Marine Ltd 09 Jul 201819 Oct 2023
MLA/2018/00324/1 - Completed Application - Maintenance of existing structures or assets Parton to Bransty sea wall MMOStory Contracting Limited 10 Jul 201812 Jul 2018
MLA/2018/00325 - Completed Application - Maintenance of existing structures or assets Fleetwood Training Platform MaintenanceFleetwood Training PlatformBlackpool And The Fylde College 10 Jul 201810 Jul 2018
MLA/2018/00326 - Completed Application - Maintenance of existing structures or assets Arpley Longitudinal TimbersArpley Network Rail11 Jul 201811 Jul 2018
MLA/2018/00327 - Completed Application - Maintenance of existing structures or assets B159 Little London Bridge MaintenanceLittle London Bridge Ringway Island Roads Limited11 Jul 201811 Jul 2018
MLA/2018/00328/1 - Completed Application - Construction of new works, Other removalsDenver mooring replacement Denver LockJ.N. Bentley Limited11 Jul 201819 Mar 2019
MLA/2018/00329 - Completed Application - Other removals Sheet Pile Removal/ Cropping at Blyth Power Station OutfallMetal Sheet PilesRwe Npower Plc12 Jul 201818 Oct 2018
MLA/2018/00330 - Completed Application - Maintenance of existing structures or assets River Winster Tidal Flap Replacement River Winster Tidal Flap Amalgamated Construction Ltd13 Jul 201813 Jul 2018
MLA/2018/00331 - Completed Application - Maintenance of existing structures or assets Newton Voss Tidal Path 2 Newton Voss Tidal Path Devon County Council13 Jul 201813 Jul 2018
MLA/2018/00332/3 - Completed Application - Maintenance of existing structures or assets Coombe Quay Mr Nick Haworth 13 Jul 201816 Jul 2018
MLA/2018/00335 - Completed Application - Maintenance of existing structures or assets Porth Nanven Beach, Cot Valley, St Just, Penzance, TR19 7QHPorth Nanven Beach Glanville Cleansing Limited 16 Jul 201816 Jul 2018
MLA/2018/00336 - Completed Application - Navigational dredging (maintenance)Medway Approach Channel Water Injection Dredging MAC Extent Port Of Sheerness Limited.16 Jul 201819 Mar 2019
MLA/2018/00337 - Completed Application - Maintenance of existing structures or assets London Eye Sub-structure RepaintingCoca Cola London Eye - PaintingI&C Limited 16 Jul 201816 Jul 2018
MLA/2018/00338 - Completed Application - Maintenance of existing worksNemo Link Cat 2 (& additional Cat 1) Remedial WorksLocation 2R.1, Location 2R.2, Location 2R.3, Location 2R.4, Location 2R.5, Location 2R.6, Location 2R.7, Location 13B.1, Location 14.1, 15.1, 16.1 National Grid Nemo Link Limited 16 Jul 201819 Oct 2018
MLA/2018/00339/1 - Completed Application - Use of tracers Proposal to release Rhodamine WT and biological tracers in the upper Fal Estuary Dye release activity siteCefas Weymouth18 Jul 201813 Nov 2018
MLA/2018/00340/1 - Completed Application - Other worksSHELLNESS EMERGENCY WORKSWork LocationTeam Van Oord 18 Jul 201830 Oct 2018
MLA/2018/00341 - Completed Application - Maintenance of existing structures or assets Waterhead Creek Stepping Stone maintenance Waterhead_Creek_Stepping_Stones_July2018_regionDevon County Council18 Jul 201818 Jul 2018
MLA/2018/00342 - Completed Application - Other worksRace Bank Saltmarsh Restoration WorksRace Bank Landfall Orsted Power Uk Ltd 18 Jul 201820 Jul 2018
MLA/2018/00343 - Completed Application - Minor removals Trial holes in rock armour revetment, Shipyards Estate, Shore Road, Hythe, Southampton Revetment to Sea Wall, Shipyards Estate, Shore Road, Hythe, SouthamptonTaylor Wimpey Uk Limited19 Jul 201819 Jul 2018
MLA/2018/00344 - Completed Application - Maintenance of existing structures or assets Town Quay SPS, Fowey - Rising Main Repair. Undertaken from an existing South West Water chamber on the slipway adjacent to Town Quay, utilising an access tower to gain entry to the chamber.South West Water Manhole SX12516631 on Slipway Adjacent Town Qay, FoweySouth West Water Limited19 Jul 201819 Jul 2018
MLA/2018/00345 - Completed Application - Maintenance of existing structures or assets Renovation of Slipway StepsRepair to stepsMr John Willcox-Jones 20 Jul 201820 Jul 2018
MLA/2018/00346 - Completed Application - Maintenance of existing structures or assets QinetiQ Portland Grove Point maintenance and repairGrove Point rangeQinetiq Limited 20 Jul 201820 Jul 2018
MLA/2018/00347 - Completed Application - Maintenance of existing structures or assets Oldbury Power Station Revetment Repairs 2018 Oldbury Revetments Magnox Limited23 Jul 201823 Jul 2018
MLA/2018/00348 - Completed Application - Maintenance of existing structures or assets MNC0236 - Railway Uderbridge 38A MNC0236 - Underbridge 38A - River Mersey Amalgamated Construction Ltd24 Jul 201824 Jul 2018
MLA/2018/00349 - Completed Application - Maintenance of existing structures or assets Netley Sailing Club Slipway Minor MaintenanceSlipway_Boundary Netley Sailing Club Ltd 24 Jul 201824 Jul 2018
MLA/2018/00350 - Completed Application - Other deposits 727 - Simulated oil spill spraying operationsArea 2 - Spray West, Area 1 - Spray East, Area 3 - Spray West, Area 7 - Spray South East, Area 8 - Spray South Oil Spill Response Limited25 Jul 201818 Dec 2018
MLA/2018/00351 - Completed Application - Maintenance of existing structures or assets Reinstatement of steel stepped access to Babbacombe BeachBabbacombe Beach access stepsTorbay Development Agency 26 Jul 201826 Jul 2018
MLA/2018/00352 - Completed Application - Non-navigational clearance dredgingAldeburgh Yacht Club - Dredging around existing pontoonAldeburgh Yacht Club Aldeburgh Yacht Club29 Jul 201829 Jul 2018
MLA/2018/00353 - Completed Application - Minor removals Fairhaven to Church Scar Coast Protection Scheme Fairhaven - Location 1 Volker Stevin Limited 29 Jul 201829 Jul 2018
MLA/2018/00354 - Completed Application - Minor removals Fairhaven to Church Scar Coast Protection Scheme Fairhaven - Location 2 Volker Stevin Limited 29 Jul 201829 Jul 2018
MLA/2018/00356 - Completed Application - Minor removals soils investigation Thunderer Jetty Dagenham thunderer jettyMr Andrew Taylor30 Jul 201830 Jul 2018
MLA/2018/00357 - Completed Application - Construction of new worksSalcombe, Fish Quay access bridge and fenderingBatson Creek - Pontoons and bridge Salcombe Harbour30 Jul 201808 Nov 2018
MLA/2018/00358/1 - Completed Application - Construction of new worksA63 Castle Street Improvements, Princes Quay FootbridgePrinces Quay FootbridgeHighways England01 Aug 201807 May 2019
MLA/2018/00359 - Completed Application - Maintenance of existing structures or assets Livermead Beach - guardrail repair Livermead beach, Torquay Torbay Council02 Aug 201802 Aug 2018
MLA/2018/00360 - Completed Application - Construction of new worksProtection of private property at Archbrook by gabions Archbrook Embankment Mr Edward Aldous03 Aug 201825 Oct 2018
MLA/2018/00361/3 - Completed Application - Other removals cargo recovery from wrecks around the UK. Phase 1. Marine Salvage Solutions07 Aug 201812 Jul 2022
MLA/2018/00362/1 - Completed Application - Construction of new worksRNLI Exmouth Launching Ramp ExtensionRNLI Exmouth R.N.L.I. (Trading) Limited07 Aug 201831 Jul 2019
MLA/2018/00363 - Completed Application - Navigational dredging (capital)Woolwich Ferry Life Extension - North inner berth capital dredging North inner berth dredge areaBam Nuttall Limited 08 Aug 201818 Oct 2018
MLA/2018/00364/1 - Completed Application - Construction of new worksNew External Stairway to Foreshore, Underdeck, Cliff Road, SalcombeForeshore, Cliff Road, Salcombe, TQ8 8JQ Tms Maritime Ltd08 Aug 201812 Mar 2019
MLA/2018/00366 - Completed Application - Construction of new worksInstallation of 100 headlines for cultivation of rope grown musselsrope grown mussels Fowey Sea Farms Ltd 08 Aug 201811 Dec 2018
MLA/2018/00368 - Completed Application - Wrecks and other archaeological remainsProject Mercury Mr Nigel Hodge08 Aug 201802 Mar 2020
MLA/2018/00369 - Completed Application - Minor removals Removal of Seatricity's Moorings at Wave Hub Wave Hub, Cornwall Seatricity Limited09 Aug 201809 Aug 2018
MLA/2018/00370 - Completed Application - Maintenance of existing structures or assets North Kent Revetment works PolygonEnvironment Agency09 Aug 201809 Aug 2018
MLA/2018/00371 - Completed Application - Maintenance of existing structures or assets North Shields Pedestrian Ferry Terminal Jetty RepairsNorth Shields Ferry Terminal G & B Civil Engineering Limited 10 Aug 201810 Aug 2018
MLA/2018/00372 - Completed Application - Minor removals Margate Harbour ground investigation Margate HarbourR.N.L.I. (Sales) Limited10 Aug 201810 Aug 2018
MLA/2018/00373/2 - Completed Application - Construction of new works, Decommissioning of works, Other depositsBacton to Walcott Coastal Management SchemeBacton to Walcott Beach FrontNorth Norfolk District Council13 Aug 201812 Jul 2019
MLA/2018/00374 - Completed Application - Other worksSt Andrews Art Centre - Repair Works St Andrews Art CentreColin Toms And Partners Llp 13 Aug 201823 May 2019
MLA/2018/00375 - Completed Application - Non-navigational clearance dredgingB18-239 - Grange Outfall Operational Clearance Grange_Outfall Environment Agency13 Aug 201813 Aug 2018
MLA/2018/00377/1 - Completed Application - Maintenance of existing worksAdditional piles to ensure safety of existing structures Port WerburghResidential Marine Ltd. 14 Aug 201806 Oct 2021
MLA/2018/00378 - Completed Application - Disposal of dredged material, Navigational dredging (maintenance)Hamble Yacht Services Maintenance Dredge HYS Dredge Area, NAB TOWER (WI060), HURST FORT (WI080) Hamble Yacht Services Limited 15 Aug 201821 Dec 2018
MLA/2018/00380 - Completed Application - Maintenance of existing structures or assets Blind Yeo Outfall Refurbishment - concrete revetment repairs BY_resurface Bmm Jv Limited15 Aug 201815 Aug 2018
MLA/2018/00381 - Completed Application - Maintenance of existing structures or assets Blind Yeo Outfall Refurbishment - minor maintenanceBY_maint Bmm Jv Limited15 Aug 201815 Aug 2018
MLA/2018/00382 - Completed Application - Construction of new worksAddition of pontoon sections to existing pontoon 1 Vespasian and 71 Chafen Road Southampton SO18 1BDMr Gavin Webster15 Aug 201826 Jul 2019
MLA/2018/00383 - Completed Application - Maintenance of existing structures or assets River Stour - Cattawade Creek - Wheel Timber Replacement Cattawade Bridge J. Murphy & Sons Limited17 Aug 201817 Aug 2018
MLA/2018/00385 - Completed Application - Disposal of dredged material, Other dredging Race Bank Export Cable Protection Works Orsted17 Aug 201806 Oct 2021
MLA/2018/00386 - Completed Application - Construction of new worksLANTIVET MUSSELFARM Westcountry Mussels Of Fowey Ltd18 Aug 201811 Dec 2018
MLA/2018/00388 - Completed Application - Non-navigational clearance dredgingWhites Brook- De Silting Whites Brook Amalgamated Construction Ltd21 Aug 201821 Aug 2018
MLA/2018/00389 - Completed Application - Maintenance of existing structures or assets Poole Harbour Tidal Flap Poole Harbour Tidal Flap Kingcombe Stonbury Limited21 Aug 201821 Aug 2018
MLA/2018/00390 - Completed Application - Maintenance of existing structures or assets replacement ladders at strand quay STRAND QUAYEnvironment Agency21 Aug 201821 Aug 2018
MLA/2018/00391 - Completed Application - Construction of new worksrye harbour marine piling worksHarbour rd MooringsEnvironment Agency21 Aug 201808 Feb 2019
MLA/2018/00392 - Completed Application - Minor removals Holborn Enabling Works - Ground Investigation Stage Grouped under: Holborn Enabling Works - Ground Investigation Stage Showing 2 of 2 casesHolborn Site ground investigationSouth Tyneside Council21 Aug 201821 Aug 2018
MLA/2018/00393 - Completed Application - Construction of new works, Other deposits, Other works Alma Bridge, SidmouthNew Bridge site, Demolish existing bridge, Sandstone depositionDevon County Council. 22 Aug 201819 Mar 2019
MLA/2018/00394 - Completed Application - Construction of new worksTimber deck on existing stone quay One Old CoastguardsMr Charles Stewart22 Aug 201810 Sep 2019
MLA/2018/00395 - Completed Application - Construction of new works, Decommissioning of worksDolphin Quay - Quay (Flood) Wall Replacement and Removal of Existing Dolphin Quay Minsted Properties Llp. 23 Aug 201806 Mar 2019
MLA/2018/00396 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090)Mr Britannia Shipping (Fao: Lister24 Aug 201824 Aug 2018
MLA/2018/00397/1 - Completed Application - Construction of new worksArchway House Water Cooling Intake and Outfall Digital London Limited24 Aug 201825 Nov 2019
MLA/2018/00398 - Completed Application - Maintenance of existing worksMarine Parade, Shaldon. Highway Sea wall - Concrete Toe Protection Beam. Marine Parade, Shaldon. Concrete Toe Protection Beam Devon County Council, Engineering Design Group29 Aug 201818 Dec 2018
MLA/2018/00399 - Completed Application - Maintenance of existing structures or assets Temporary timber works to reduce Salmon predation at Amble Half Tide WeirAmble Half Tide Weir Northumberland Rivers Trust 30 Aug 201830 Aug 2018
MLA/2018/00401/1 - Completed Application - Navigational dredging (maintenance)Tideway - Application for removal of Accretion at ALBEFALBEF Area of accretionFlo 31 Aug 201810 Dec 2018
MLA/2018/00403/1 - Completed Application - Disposal of dredged material, Navigational dredging (maintenance)Walney Extension pontoon/jetty dredging and disposal Berth No.1 Pontoons, BARROW D (IS205), Lead in Jetty Dong Energy Walney Extension (Uk) Ltd 03 Sep 201815 Jul 2024
MLA/2018/00404 - Completed Application - Maintenance of existing structures or assets Sea Wall Repairs Lovers Walk, AlnmouthNorthumberland Estates05 Sep 201805 Sep 2018
MLA/2018/00405/5 - Variation Requested Application - Decommissioning of works, Maintenance of existing works, Other depositsHOW02 Intertidal Access Ramp Marine Licence Grouped under: Hornsea Offshore Wind Farm Project Two Showing 2 of 10 casesHOW02 Intertidal Working AreaDiamond Transmission Corporation Limited05 Sep 201806 Nov 2023
MLA/2018/00406 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090)Mr Britannia Shipping Lister06 Sep 201806 Sep 2018
MLA/2018/00407 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090)Mamarine.Com Llp06 Sep 201806 Sep 2018
MLA/2018/00408/1 - Completed Application - Navigational dredging (capital)Dagenham Jetty upgrade for Cemex UK (dredging) dagenham Cemex Uk. 07 Sep 201801 May 2020
MLA/2018/00409 - Completed Application - Sampling Holborn Enabling Works - Ground Investigation Grouped under: Holborn Enabling Works - Ground Investigation Stage Showing 2 of 2 casesHolborn Site ground investigationSouth Tyneside Council10 Sep 201819 Nov 2018
MLA/2018/00410 - Completed Application - Construction of new worksSection 36 Application for Floating Wind at Wave Hub Wave Hub, Cornwall Wave Hub Limited10 Sep 201819 Nov 2020
MLA/2018/00411 - Completed Application - Beach maintenance activities Brighton to Southwick Beach RecyclingMarina to Adur Recycling SiteShoreham Port Authority 11 Sep 201811 Sep 2018
MLA/2018/00413 - Completed Application - Maintenance of existing structures or assets CN1601442 - Furniss Island Bridge Repair Enys Quay Footbridge Cormac Solutions Limited12 Sep 201812 Sep 2018
MLA/2018/00414 - Completed Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital) Orwell Yacht Club - Capital navigational dredge, to accommodate floating pontoon, and disposal of dredgingsOrwell Yacht Club dredge site, Orwell Yacht Club disposal site - TH032 Orwell Yacht Club 12 Sep 201812 Dec 2018
MLA/2018/00415 - Completed Application - Maintenance of existing structures or assets Repairs to stonework of retaining harbour wall to cottage wing of museum Repairs to stonework of retaining harbour wall to cottage wing of museum Captain Cook Memorial Museum12 Sep 201812 Sep 2018
MLA/2018/00416 - Completed Application - Maintenance of existing structures or assets Repairs to river wallRiver wall to the rear of Dunbar Wharf, 108-134 Narrow Street, Limehouse, London Dunbar Wharf Management Company Limited 14 Sep 201814 Sep 2018
MLA/2018/00417 - Completed Application - Maintenance of existing worksLondon Array Offshore Wind Farm Array Cable ReplacementLondon Array Offshore Wind Farm - Cable WorksLondon Array Ltd14 Sep 201801 Feb 2019
MLA/2018/00418 - Completed Application - Alternative use of dredged materialSelsey Beach Management Plan: Selsey Shingle RechargeBeach Replenishment Area Chichester District Council.17 Sep 201821 Dec 2018
MLA/2018/00419 - Completed Application - Beach maintenance activities Outfall jetting at Gilkicker lagoonFort_Gilkicker_working_areaSouthern Water Limited17 Sep 201817 Sep 2018
MLA/2018/00420 - Completed Application - Maintenance of existing structures or assets replacement of a small piece of pipe, Steephill Cove Steephill_Cove_working_areaSouthern Water Limited17 Sep 201817 Sep 2018
MLA/2018/00422 - Completed Application - Navigational dredging (capital)River Hull+ Scheme Arctic Corsair Bmm Jv Limited. 20 Sep 201828 Feb 2019
MLA/2018/00423 - Completed Application - Minor removals TEC Geo-Environmental Sampling Site AreaRwe Npower Plc20 Sep 201820 Sep 2018
MLA/2018/00424 - Completed Application - Maintenance of existing structures or assets Fairport House Fence repairs Fairport Mr Mark Keeling 21 Sep 201821 Sep 2018
MLA/2018/00425 - Completed Application - Marine licence for the burial of human remains at sea NEEDLES (WI090)Britannia Shipping21 Sep 201821 Sep 2018
MLA/2018/00426 - Completed Application - Maintenance of existing structures or assets Maryport Seawall Groyne repairsMaryport Seawall Groyne RepairsThomas Armstrong (Construction) Limited 21 Sep 201821 Sep 2018
MLA/2018/00427 - Completed Application - Maintenance of existing worksCBC1 W630675 Calder Viaduct and Approaches (145932)Calder Viaduct Network Rail Limited21 Sep 201817 Dec 2018
MLA/2018/00428 - Completed Application - Maintenance of existing worksDunston StaithsDunston staithsTyne And Wear Building Preservation Trust 24 Sep 201801 Apr 2019
MLA/2018/00431 - Completed Application - Maintenance of existing structures or assets Bayards Cove Fort- Dartmouth Bayards Cove FortSouth West Scaffolding Limited27 Sep 201827 Sep 2018
MLA/2018/00432/1 - Completed Application - Maintenance of existing worksCBC1 W16107 Leven ViaductLeven East, Leven West Network Rail Ltd28 Sep 201801 Aug 2019
MLA/2018/00434 - Completed Application - Non-navigational clearance dredgingRampside surface water & CSO outfall Rampside_Outfall Cumbria County Council28 Sep 201828 Sep 2018
MLA/2018/00435 - Completed Application - Disposal of dredged material Axmouth Harbour Dredge Disposal Site Seaton Disposal site East Devon District Council 28 Sep 201822 Mar 2019
MLA/2018/00436 - Completed Application - Wrecks and other archaeological remainsBattle of Britain hurricane excavation Excavation site of hurricane aircraftMr Stephen Vizard 30 Sep 201825 Feb 2019
MLA/2018/00437 - Withdrawn Application - Construction of new works, Other removalsNearshore Seaweed Cultivation of Native Species Sustainable Seaweed Limited 01 Oct 2018
MLA/2018/00438 - Completed Application - Maintenance of existing structures or assets Cromer Pier Substructure Maintenance Cromer PierNorth Norfolk District Council01 Oct 201801 Oct 2018
MLA/2018/00439 - Completed Application - Maintenance of existing worksPeruvian Wharf - Jetty and River Wall WorksPeruvian Wharf Brett Aggregates Limited01 Oct 201804 Dec 2018
MLA/2018/00440/2 - Completed Application - Maintenance of existing works, Other works Exmouth TDSMarine_License_LocationPlan_C_20180927, Marine_Licence_Location_Plan_A_20181001Environment Agency - South West Region03 Oct 201814 Jan 2021
MLA/2018/00441 - Completed Application - Minor removals Millennium Quay Soil Investigation Millennium QuayColin Toms And Partners Llp 04 Oct 201804 Oct 2018
MLA/2018/00442 - Completed Application - Construction of new worksWeymouth Harbour Quay Wall D Strengthening weymouth Harbour Quay Wall D Strengthening Dorset Council05 Oct 201802 Apr 2019
MLA/2018/00443 - Completed Application - Other worksThe provision of a temporary 300 mm diameter overland sewer rising main along the foreshore from Town Quay sewage pumping station to Caffa Mill car park, Fowey. Temporary Over Forshore Pipeline Route and Working AreaSouth West Water Limited05 Oct 201809 Jan 2019
MLA/2018/00444/2 - Completed Application - Maintenance of existing worksTuckett's ClyceTuckett's ClyceMr Nol Vincent05 Oct 201807 Jun 2019
MLA/2018/00445 - Completed Application - Maintenance of existing structures or assets Brooklands 200m West Brooklands 200m West Beasley Christopher Limited 06 Oct 201806 Oct 2018
MLA/2018/00446 - Completed Application - Maintenance of existing structures or assets Removal of marine growth on WTG locations. Sheringham Shoal Offshore windfarm Scira Offshore Energy Limited 08 Oct 201808 Oct 2018
MLA/2018/00447 - Completed Application - Construction of new worksMooreing a Houseboat in Bembridge HarbourBembridge Harbour Plot17 Mr Stephen Beill08 Oct 201820 Jan 2020
MLA/2018/00448 - Completed Application - Decommissioning of works Bay Wharf Slipway RemovalBay Wharf SlipwayThamescraft Dry Docking 08 Oct 201812 Feb 2019
MLA/2018/00449 - Completed Application - Construction of new worksRiver Hull+ Scheme North Bridge, Crown Dock Bmm Jv Limited. 09 Oct 201823 May 2019
MLA/2018/00450/1 - Completed Application - Construction of new worksThree Shells Tidal Lagoon DeckingDecking , Actuator and Cable Route Southend-On-Sea Borough Council 10 Oct 201815 Jul 2019
MLA/2018/00451/1 - Completed Application - Construction of new worksLower Steenbergs YardLower Steenbergs YardIgloo 12 Oct 201829 Nov 2019
MLA/2018/00452/3 - Completed Application - Maintenance of existing worksJupiter Point Plymouth Jupiter Point PontoonCarillion Amey12 Oct 201824 Jul 2020
MLA/2018/00453 - Completed Application - Maintenance of existing structures or assets Landcross Viaduct Paint Defect Rectification Landcross ViaductDevon County Council15 Oct 201815 Oct 2018
MLA/2018/00454 - Completed Application - Sampling Subsea Drill - Test ProgramBlyth West QuayTi Geosciences Ltd15 Oct 201815 Feb 2019
MLA/2018/00457 - Completed Application - Maintenance of existing structures or assets Kingswear Slip RepairRepair to slip wall and Tirfor mounting area The Dartmouth-Kingswear Floating Bridge Company Limited 18 Oct 201818 Oct 2018
MLA/2018/00458 - Withdrawn Application - Construction of new worksStatic barge restaurant off pontoon off Church Street Car Park, Falmouth Elliott-Cannon Associates Ltd 18 Oct 2018
MLA/2018/00459 - Completed Application - Maintenance of existing structures or assets Maintainance to existing Public Sewer Pipeline Forde Road R&M Utility & Civil Engineering Services South West Limited 18 Oct 201818 Oct 2018
MLA/2018/00461 - Completed Application - Minor removals Watchet Harbour East quay wall condition surveyWatchet Harbour East QuayPick Everard22 Oct 201822 Oct 2018
MLA/2018/00464/1 - Completed Application - Maintenance of existing worksPier Point Jetty Repairs Pier Point Jetty Dylan Morgan23 Oct 201829 May 2019
MLA/2018/00466 - Completed Application - Maintenance of existing structures or assets Coldharbour Moorings ColdharbourRoyal Naval Sailing Association 24 Oct 201824 Oct 2018
MLA/2018/00467/1 - Variation Requested Application - Disposal of dredged material DISPOSAL AT SEA after maintenance dredging at the turning area. Lighterage Quay, Newham, Truro. Also dredging at Town Quay Truro.FALMOUTH BAY (B) (PL075) Cornwall Council -Harbour Office25 Oct 201814 Aug 2020
MLA/2018/00468 - Completed Application - Maintenance of existing structures or assets South Milton Outfall Pipe MaintenanceSouth Milton Sands Outfall PipeNational Trust25 Oct 201825 Oct 2018
MLA/2018/00469/1 - Completed Application - Disposal of dredged material, Navigational dredging (maintenance)Levington Saltmarsh restoration and beneficial use of dredgings project 2018 Suffolk Yacht Harbour Dredge Area, Suffolk Yacht Harbour 1, Suffolk Yacht Harbour 2, Suffolk Yacht Harbour 3, Suffolk Yacht Harbour 4Suffolk Yacht Harbour.25 Oct 201808 Aug 2023
MLA/2018/00470 - Completed Application - Other removals IFA2 Interconnector - Unexploded Ordnance Activities DC Cables Redline, AC Cables Redline, X5037_Solent_Detonation_Zone National Grid Ifa 2 Limited 26 Oct 201809 May 2019
MLA/2018/00471 - Completed Application - Maintenance of existing structures or assets Friars Goose WSC; Slipway RepairsFriars Goose Slipway Gateshead Council 26 Oct 201826 Oct 2018
MLA/2018/00472 - Completed Application - Other worksEmergency Works Port of GarstonRepairs to the quay wall at Port of GarstonAssociated British Ports. 26 Oct 201831 Oct 2018
MLA/2018/00473 - Completed Application - Construction of new worksFuelling Scheme at Tower BridgeFuelling Facility at Tower BridgeThames Marine Services Limited30 Oct 201814 Jan 2020
MLA/2018/00475 - Completed Application - Incineration of any substance or object at sea Triton Knoll OWF Unexploded Ordnance Clearance OrderLimitsExportTriton Knoll Offshore Wind Farm Limited 30 Oct 201813 Jun 2019
MLA/2018/00477 - Completed Application - Maintenance of existing structures or assets Maintenance to existing public sewer (Combe Martin Sewage Outfall) Combe Martin Bay R&M Utility & Civil Engineering Services South West Limited 31 Oct 201831 Oct 2018
MLA/2018/00478 - Completed Application - Construction of new worksThe Crabpot, The Esplanade, Fowey John Grimes Partnership Limited 31 Oct 201806 May 2020
MLA/2018/00479 - Completed Application - Maintenance of existing structures or assets Nethertown sea defence.Line 2 Story Contracting Limited 31 Oct 201831 Oct 2018
MLA/2018/00480 - Completed Application - Construction of new worksEnlargement of rowing pontoon and replacement piles and access rampLatymer Upper Boat House Rowing PontoonLatymer Upper School31 Oct 201826 Oct 2020
MLA/2018/00481 - Completed Application - Construction of new worksImprovements to Queen's Pier Improvements to Queen's Pier - Marine Licence Application Area Portland Harbour Authority Ltd01 Nov 201807 Feb 2019
MLA/2018/00482 - Completed Application - Maintenance of existing structures or assets Prince of Wales Pier - Screening Chamber RefurbSELECT Kier Limited01 Nov 201801 Nov 2018
MLA/2018/00483 - Completed Application - Construction of new works, Decommissioning of works, Maintenance of existing works Blyford Bridge Sluice RemovalBlyford Bridge Jacksonhyder02 Nov 201809 Jan 2019
MLA/2018/00484/1 - Completed Application - Construction of new worksProposed stone slipway at Prime CellarsPrime Cellars, Fowey Dr William Collinson02 Nov 201819 Aug 2020
MLA/2018/00485 - Completed Application - Disposal of dredged material, Other dredging Clevedon Marine Lake: Return Silt to the Bristol Channel De-silting Area, Disposal Area Marine Lake Enthusiasts (Marlens) 03 Nov 201818 Oct 2019
MLA/2018/00486 - Completed Application - Other worksNorthfleet Jetty Ship Unloading System Northfleet Jetty Port Of London Authority05 Nov 201805 Apr 2019
MLA/2018/00487/3 - Completed Application - Construction of new worksTRIDENT-AQUASAIL™ TIDAL ENERGY TURBINE SYSTEM (PROOF OF CONCEPT TRIALS)Yarmouth (Isle of Wight) PierTrident Renewable Energy Systems Limited06 Nov 201821 Sep 2023
MLA/2018/00488 - Completed Application - Construction of new worksRebuilding the Pier at Withernsea (Seaside resort) Viewing Platform Withernsea Pier And Promenade Association Ltd 07 Nov 201815 Apr 2019
MLA/2018/00489 - Completed Application - Maintenance of existing structures or assets Woodside Ferry Pontoon Emergency Restraint ChainsWoodside Linkspan Work areaMerseytravel Limited08 Nov 201808 Nov 2018
MLA/2018/00490 - Completed Application - Construction of new worksNewhaven Port Access RoadNewhaven Mill CreekBam Nuttall Ltd 08 Nov 201806 Jun 2019
MLA/2018/00491 - Completed Application - Non-navigational clearance dredgingFlushing of Pipelines to Prove Flow Path in Preparation for First UseBradwell Outfall Structure Magnox Limited08 Nov 201808 Nov 2018
MLA/2018/00492 - Completed Application - Maintenance of existing structures or assets RW 922 Installation of fenders RW 922 Strengthening works Thames Water Limited08 Nov 201808 Nov 2018
MLA/2018/00493 - Completed Application - Maintenance of existing structures or assets Cutting and removal of end section of discharge pipe Bradwell Site Outfall StructureMagnox Limited08 Nov 201808 Nov 2018
MLA/2018/00495 - Completed Application - Beach maintenance activities Moving sand on the beach Exmouth seafront Stuart Line Cruises 10 Nov 201810 Nov 2018
MLA/2018/00496 - Completed Application - Non-navigational clearance dredgingGrange Outfall Operational Clearance Grange_Outfall J D Mee 12 Nov 201812 Nov 2018
MLA/2018/00497 - Completed Application - Construction of new worksFishersgate South - Emergency Protection Works Fishersgate South Terminal Shoreham Port Authority 12 Nov 201823 Jan 2019
MLA/2018/00498 - Completed Application - Other worksBeach House Quay - Emergency Wall Repair BHQ3 Pca Consulting Engineers Ltd13 Nov 201816 Nov 2018
MLA/2018/00499/1 - Completed Application - Construction of new worksFulham Football Club Riverside Stand Redevelopment 2017Fulham FC Riverside Permanent & Temporary WorksFulham Stadium Limited13 Nov 201818 Jun 2020
MLA/2018/00500 - Completed Application - Maintenance of existing structures or assets SWRR Dawlish Beach Works Dawlish BeachBam Nuttall Limited 14 Nov 201814 Nov 2018
MLA/2018/00501 - Completed Application - Construction of new worksTriton Knoll Offshore Wind Farm; Boulder Clearance and Seabed PreparationOrderLimitsExportTriton Knoll Offshore Wind Farm Ltd 14 Nov 201810 May 2019
MLA/2018/00502/2 - Completed Application - Disposal of dredged material, Navigational dredging (maintenance)Port of Boston Maintenance and Disposal 2018 BOSTON 7 (HU170), Port of Boston Dredging Area, Berths and Swinging Area. River Witham, Hob Hole Dredging Site. River Witham, The Dock. River Witham Port Of Boston Limited14 Nov 201801 Mar 2023
MLA/2018/00503/3 - Completed Application - Incineration of any substance or object at sea, Other deposits, Other removals, Wrecks and other archaeological remainsHornsea Project Two Offshore Wind Farm - Offshore UXO Inspection and Clearance Grouped under: Hornsea Offshore Wind Farm Project Two Showing 2 of 10 cases HOW02_AFLandCableCorridorBoundary_20181115_WGS84 Optimus Wind Limited16 Nov 201815 Sep 2022
MLA/2018/00505 - Completed Application - Maintenance of existing worksReplacement of a bridge, pontoon and access jettyArun Shipyard Moorings Osborne Of Arun Group (Management) Limited16 Nov 201829 Jan 2019
MLA/2018/00506 - Completed Application - Other deposits, Other removals, Sampling Sustainable Seaweed Farming, Southwest England.Proposed site: seaweed farmBiome Algae Ltd 18 Nov 201827 Feb 2020
MLA/2018/00507 - Completed Application - Maintenance of existing structures or assets Billingham Beck Water Line for CFBillingham BridgeRainham Industrial Services Limited 19 Nov 201819 Nov 2018
MLA/2018/00508 - Withdrawn Application - Other worksHessle Foreshore Construction Marine Limited 22 Nov 2018
MLA/2018/00509 - Completed Application - Maintenance of existing structures or assets Refurbishment of steps along Newton & Noss Footpath No 20Newton & Noss FP20 Steps Devon County Council22 Nov 201822 Nov 2018
MLA/2018/00510 - Completed Application - Construction of new worksNew Union Wharf, Phase 4 New Union Wharf, Phase 4 Hill Partnerships Limited 22 Nov 201812 Mar 2019
MLA/2018/00512 - Completed Application - Maintenance of existing structures or assets Janes Creek Flap Valve Repairs jane Beasley Christopher Limited 23 Nov 201823 Nov 2018
MLA/2018/00514 - Completed Application - Maintenance of existing structures or assets Royal Dart Hotel Masonry Buttress Repair Royal Dart Apartments KingswearTeignmouth Maritime Services Limited25 Nov 201825 Nov 2018
MLA/2018/00516 - Completed Application - Maintenance of existing structures or assets Hullbridge Sea Defence Repairs Hullbridge Environment Agency27 Nov 201827 Nov 2018
MLA/2018/00518 - Completed Application - Construction of new worksre-Build of Mooring No 11, River Arun, Arundel, BN18 9JG Arun Mooring 11Mr Peter Bonsall27 Nov 201821 Oct 2019
MLA/2018/00519 - Completed Application - Maintenance of existing structures or assets A379 Shaldon Bridge - Foundation Stabilisation Repairs A379 Shaldon Bridge - Foundation Stabilisation Repairs Devon County Council28 Nov 201828 Nov 2018
MLA/2018/00520 - Withdrawn Application - Construction of new worksInstallation of Access Pontoons from the Foreshore to the main pontoon areaParkstone Bay Marina Frederick C.Mitchell & Sons Limited 28 Nov 2018
MLA/2018/00521 - Completed Application - Maintenance of existing structures or assets Race Bank Internal Cable Inspection - Ancillary Scaffolding - K05RoW Array - K05 (53 14.619 N, 0 52.633 E)Dong Energy Rb (Uk) Limited 28 Nov 201828 Nov 2018
MLA/2018/00522/1 - Completed Application - Navigational dredging (maintenance)White Mountain, Dagenham - Maintenance DredgeWhite Mountain Jetty, Dagenham Armac Shipping Services Ltd 29 Nov 201806 Jul 2020
MLA/2018/00524 - Withdrawn Application - Maintenance of existing works3177.03 Grand Sluice Jacksonhyder30 Nov 2018
MLA/2018/00525 - Completed Application - Maintenance of existing worksFalmouth Marina Pile Replacement Programme Falmouth Marina - Pile locations on separate attachmentPremier Marinas (Falmouth) Ltd03 Dec 201807 Mar 2019
MLA/2018/00526 - Completed Application - Maintenance of existing structures or assets Handford and Horseshoe Sluice RepairsHandford SluiceJacksonhyder03 Dec 201803 Dec 2018
MLA/2018/00527 - Completed Application - Construction of new worksThe View, PorthThe View, PorthLiving Quarter Properties (Porth) Ltd 03 Dec 201828 Jul 2022
MLA/2018/00528/3 - Variation Requested Application - Construction of new works, Other works Pontoon Replacement & Reconfiguration, Torquay, Torbay TorquayMarina Developments Ltd 04 Dec 201820 Jul 2020
MLA/2018/00529 - Completed Application - Maintenance of existing structures or assets Lock Gate refurbishment at South Dock Marina South Dock LockLondon Borough Of Southwark 04 Dec 201804 Dec 2018
MLA/2018/00530 - Completed Application - Non-navigational clearance dredgingproject 8 windserver project 8 windserver Greater Gabbard Offshore Winds Limited04 Dec 201804 Dec 2018
MLA/2018/00531/1 - Completed Application - Disposal of dredged material, Navigational dredging (capital), Navigational dredging (maintenance) Neptune Energy Park Dredge Pocket Extensions Northern Extension-Tyne, Southern Extension-Tyne Shepherd Offshore Services Limitied 05 Dec 201823 Feb 2021
MLA/2018/00532 - Completed Application - Maintenance of existing structures or assets Southwark Riverwalls Brickwork Corner Repairs2NO Brickwork CornersF M Conway Limited05 Dec 201805 Dec 2018
MLA/2018/00533 - Completed Application - Beach maintenance activities Portwrinkle - re-distribution of sand within harbour Portwrinkle HarbourCornwall Council05 Dec 201805 Dec 2018
MLA/2018/00534 - Completed Application - Maintenance of existing structures or assets Trafalgar Wharf Revetment RepairsTW Revetment Trafalgar Wharf Limited 06 Dec 201806 Dec 2018
MLA/2018/00535 - Withdrawn Application - Construction of new worksChurch Drawdock Slipway ExtensionChurch Drawdock Slipway ExtensionGolden Tours07 Dec 2018
MLA/2018/00536/12 - Variation RequestedApplication - Construction of new works, Disposal of dredged material, Navigational dredging (capital), Other removals Isle of Man Ferry Terminal SITE Z (IS140), SITE Y (IS150), Work Area, Dredge Area -Mersey, Bird Pontoon Area, MERSEY (MID-RIVER SITE) (IS120) Isle Of Man Government08 Dec 201806 Nov 2023
MLA/2018/00537 - Completed Application - Construction of new worksMedina Park Footbridge Replacement (B322)Medina Park Footbridge Ringway Island Roads Ltd10 Dec 201817 Apr 2019
MLA/2018/00538 - Completed Application - Construction of new worksSouthsea Marina - Crane Base Piles Boom Crane Piling Area Premier Marinas (Southsea) Ltd10 Dec 201807 Mar 2019
MLA/2018/00539 - Completed Application - Non-navigational clearance dredgingTaunton Road Sewage Pumping StationTaunton Road SPS Wessex Water Services Limited 11 Dec 201811 Dec 2018
MLA/2018/00540 - Completed Application - Construction of new worksOcean Business 2019 PontoonEmpress Dock Southampton Diversified Communications Uk 12 Dec 201805 Mar 2019
MLA/2018/00542/2 - Completed Application - Maintenance of existing worksJubilee Bridge Painting WorksJubilee Bridge Story Contracting Limited 13 Dec 201830 Sep 2021
MLA/2018/00543 - Completed Application - Marine licence for the burial of human remains at sea NEWHAVEN (WI011) Arthur C. Towner Limited13 Dec 201813 Dec 2018
MLA/2018/00544/1 - Completed Application - Maintenance of existing structures or assets Rochester Bridge - Balustrade investigation & foreshore litter clearance Rochester Bridge F M Conway Limited13 Dec 201814 Dec 2018
MLA/2018/00545/1 - Completed Application - Other deposits, Other removals Dungeness B Power Station, beach nourishment- extension to existing activities at borrow pit.Dungeness Beach Feed, Dungerness Shingle Ridge disposal site Edf Energy Nuclear Generation Ltd 13 Dec 201806 Dec 2021
MLA/2018/00546 - Completed Application - Other worksBeach House Quay - Emergency Wall Repair - Escalated Works BHQ3 Pca Consulting Engineers Ltd14 Dec 201819 Dec 2018
MLA/2018/00547 - Completed Application - Maintenance of existing worksKeadby TAO Trent Side Outfall RefurbishmentRiver Trent OutfallEnvironment Agency Leeds17 Dec 201820 May 2019
MLA/2018/00548 - Completed Application - Maintenance of existing structures or assets Dudgdale Quay maintenance3 Dugdale`s Quay Mr Dean Richards17 Dec 201817 Dec 2018
MLA/2018/00549 - Completed Application - Construction of new works, Other removalsRNLI Plymouth Upgrade WorksRNLI Plymouth Upgrade WorksRoyal National Lifeboat Institution 17 Dec 201806 Mar 2020
MLA/2018/00550/1 - Completed Application - Maintenance of existing worksEast Anglia ONE Operations and Maintenance for Transmission Assets EAONE_WTG_ArrayCable_OffshoreECC_boundaryEast Anglia One Limited 18 Dec 201816 Dec 2022
MLA/2018/00551 - Completed Application - Maintenance of existing worksEast Anglia ONE Operations and Maintenance for Generation Assets East Anglia One wind farmEast Anglia One Limited 18 Dec 201824 Apr 2020
MLA/2018/00553 - Completed Application - Other removals Removal of Marine Growth Sheringham Shoal Offshore Windfarm Scira Offshore Energy Limited 20 Dec 201818 Apr 2019
MLA/2018/00554 - Completed Application - Maintenance of existing structures or assets Denmark Place Outfall ExtensionDenmark Place Hastings Beasley Christopher Limited 20 Dec 201820 Dec 2018
MLA/2018/00555 - Completed Application - Construction of new works, Disposal of dredged materialHartlepool approach channelTEES BAY C (TY150), Underwater retaining wallPd Teesport Limited 21 Dec 201803 Oct 2019
MLA/2018/00556 - Completed Application - Construction of new worksProvision of permanent piles for seasonal pontoon adjacent to The Cobb, Lyme Regis The Cobb, Lyme Regis West Dorset District Council21 Dec 201807 Aug 2019
MLA/2018/00557 - Completed Application - Construction of new worksWest Bay Coastal ImprovementsWest Beach, East Beach, Parkdean Caravan ParkEnvironment Agency – South West Reg 21 Dec 201824 Apr 2019
MLA/2018/00558 - Completed Application - Construction of new worksInstallation of marina pontoons at Walton Yacht Basinmagic_polygons Walton & Frinton Yacht Trust21 Dec 201821 Mar 2019
MLA/2018/00559 - Completed Application - Construction of new worksHQS Wellington Dolphin Replacement HQS Wellington Dolphin Replacement The Wellington Trust21 Dec 201818 Apr 2019
MLA/2018/00560/3 - Completed Application - Other worksEmergency quay wall repair Port of Ipswich Emergency works location Associated British Ports-Ipswich21 Dec 201813 Aug 2020
MLA/2018/00561 - Completed Application - Construction of new worksLooe Island Jetty ExtensionLooe Island JettyCornwall Trust For Nature Conservation Ltd(The) 22 Dec 201830 Apr 2019
MLA/2018/00562 - Completed Application - Minor removals VicDeep A, B & C VicDeep A, B and C Hanson Quarry Products Europe Limited 28 Dec 201828 Dec 2018
MLA/2018/00563 - Completed Application - Minor removals VicDeep D & EVicDeep D and EHanson Quarry Products Europe Limited 28 Dec 201828 Dec 2018