Planning Application Details for - R-2023-0224-CD



Official consultation has expired





















Condition number
Condition Details

1
Upon the approval of the Reserved Matters, and prior to the implementation of the approved scheme, the development shall be the subject of an updated Habitats Regulations Assessment and additional supplementary air quality assessment. The HRA and additional air quality assessment shall confirm, based on the approved detail of the development and its processes, the conclusions of the Environmental Impact Assessment and Air Quality Assessment that the development will not give rise to significant adverse impacts on designated sites. Where significant impacts not previously identified are assessed to arise from the approved detailed scheme, the additional information shall set out those mitigation measures to be employed to minimise or eliminate such impacts. REASON: Whilst the Local Planning Authority and Natural England are satisfied based on the information submitted with the outline application, that the development is unlikely to have significant impacts on local designated sites, this conclusion partly based on modelling of data and an outline planning application with limited information as to the final technical design of the development, the Local Planning Authority considers it appropriate to adopt the precautionary principle to confirm those conclusions once the detail of the scheme and its operational process are confirmed.
2
No development shall take place until a Construction Environmental Management Plan (CEMP) for the development has been submitted and approved in writing by the Local Planning Authority. The approved CEMP shall be adhered to throughout the construction phase and shall include of all those mitigation measures set out in Chapter 15 of Volume 1 of the submitted Environmental Impact Assessment December 2019 and Chapter 7 (Mitigation) of the Air Quality Assessment Rev 02 6 March 2020, unless alternative approaches to biodiversity and archaeology mitigation are submitted to and approved by the Local Planning Authority, in accordance with condition nos. 7 and 13, and thereafter carried out in the required timescales. In addition, the CEMP shall set out; i. The method to be used to control the emission of dust, noise and vibration from construction works, including any details of any mitigation measures required; ii. Measures to control the deposit of mud and debris on adjoining public highways iii. Site fencing and security iv. Temporary contractors’ buildings, plant, storage of materials, lighting and parking for site operatives v. The use of temporary generators vi. The arrangement or turning of vehicles within the site so that they may enter and leave in forward gear vii. A risk assessment of construction activities with potentially damaging effects on local ecological receptors including any measures to protect those receptors during construction viii. Roles and responsibilities for the implementation of the CEMP requirements and measures. REASON: To mitigate the impact of the development in accordance with the strategy set out in the Environmental Assessment. REASON FOR PRE-COMMENCEMENT: A pre-commencement condition is required as the environmental impact of the development will occur on the commencement of development.
3
Development shall not commence until a detailed scheme for the disposal of foul water from the development hereby approved has been submitted to and approved in writing by the Local Planning Authority in consultation with Northumbrian Water and the Lead Local Flood Authority. Thereafter the development shall take place in accordance with the approved details. REASON: To prevent the increased risk of flooding from any sources in accordance with the NPPF. REASON FOR PRE-COMMENCEMENT: A pre-commencement condition is required to ensure that excavations and groundworks do not compromise the installation of the approved foul water drainage infrastructure.
4
Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30-year storm. (ii) The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100-year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100-year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: A pre-commencement condition is required to ensure that excavations and groundworks do not compromise the installation of the approved surface water drainage infrastructure.
5
Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process. The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. REASON FOR PRE-COMMENCEMENT: A pre-commencement condition is required to ensure that excavations and groundworks do not compromise the installation of the approved surface water drainage infrastructure.
6
The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local Planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short- and long-term maintenance of the SuDS elements of the surface water system REASON: To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality.
7
Prior to the commencement of the development final details shall be agreed of the finished floor levels of the development and the development completed in accordance with the approved details. REASON: To confirm the finished floor level of the development in the light of any necessary groundworks to meet the requirement of other planning conditions and confirm the overall height of the final scheme in the context of the information provided in the Environmental Statement. REASON FOR PRE-COMMENCEMENT: A pre-commencement condition is required so that the final agreed levels for the site are not compromised by the start of groundworks.
8
No development, other that site preparation works, shall take place unless details have been submitted and approved of a biodiversity improvement plan for the site has been submitted to an approved by the Local Planning Authority. The Plan shall set out those measures identified in the Environmental Statement or alternative measures to be submitted to and agreed with the Local Planning Authority for on or off-site mitigation and net gain provision that will be implemented to offset predicted impacts on the biodiversity value of the site and those measures to be implemented to improve the biodiversity value of the area. REASON: To mitigate the impact of the development on the biodiversity interest on the site and to secure net improvement to that value in accordance with national and local planning policy.
9
No development, other that site preparation works, and construction of the works compound shall take place unless details have been submitted and approved of a landscaping scheme for the site. The scheme shall include size, type and species of plant and the proposed layout and surfacing of all landscaped areas. A programme of implementation and subsequent maintenance shall also be submitted, and the development completed in accordance with the approved details. REASON: To ensure the satisfactory implementation of the approved scheme in the interests of the visual amenity of the locality and the appearance of the development.
10
A detailed scheme for vehicular access and egress to the site during construction and once operational shall be submitted and approved by the Local Planning Authority. This scheme shall demonstrate how the majority of vehicles to / from the development shall access/egress via Eston Road. Thereafter the scheme shall be implemented prior to construction of the development in accordance with the approved details. REASON: On order to confirm the access arrangements to the site for construction and operational traffic as set out in the Environmental Statement



Name
Date Letter Sent
Expiry Date

Councillor S Jeffrey (SOUTH BANK)
28/03/2023
18/04/2023
Councillor Sandra Smith (SOUTH BANK)
28/03/2023
18/04/2023
Engineering Team (Highways)
28/03/2023
18/04/2023
Engineers (Local Lead Flood Authority)
28/03/2023
18/04/2023
Environmental Protection Team
28/03/2023
18/04/2023
Natural England
28/03/2023
18/04/2023
Northumbrian Water Ltd
28/03/2023
18/04/2023


No Neighbours Found For This Application


If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

Size
Date
Application Form
294kb 24/03/2023
Plans and Supporting Documentation
7167kb 24/03/2023
8366kb 24/03/2023
9460kb 24/03/2023
2836kb 24/03/2023
3482kb 24/03/2023
599kb 24/03/2023
726kb 24/03/2023
459kb 24/03/2023
3395kb 24/03/2023
349kb 24/03/2023
3395kb 24/03/2023
504kb 24/03/2023
9387kb 24/03/2023
497kb 24/03/2023
8728kb 24/03/2023
2866kb 24/03/2023
3650kb 24/03/2023
3135kb 24/03/2023
877kb 24/03/2023
927kb 24/03/2023
849kb 24/03/2023
8364kb 24/03/2023
3513kb 24/03/2023
484kb 24/03/2023
502kb 24/03/2023
517kb 24/03/2023
3967kb 24/03/2023
513kb 24/03/2023
161kb 24/03/2023
Consultee Responses
49kb 03/04/2023
191kb 17/04/2023
202kb 17/04/2023
Neighbour representations
734kb 19/04/2023
631kb 19/04/2023
280kb 24/04/2023
446kb 28/04/2023
629kb 28/04/2023
758kb 28/04/2023
449kb 28/04/2023
242kb 02/05/2023
330kb 02/05/2023
246kb 02/05/2023
244kb 02/05/2023
252kb 02/05/2023
235kb 02/05/2023
341kb 02/05/2023
249kb 02/05/2023