User Tools

Site Tools


mla-2015-00088

This is an old revision of the document!


Table of Contents

MLA/2015/00088 - updated 17th June 2022

Initial Application - Submitted 06-Nov-2020

Case ref: MLA/2020/00506/2

Licence ref: L/2021/00333/2

Project title

Tees and Hartlepool Maintenance Dredge Disposal

Project background

Renewal of the current maintenance dredge disposal licence (L/2012/00366) which has been on-going over many years. This application is for a 10 year maintenance dredging disposal licence.

The updated Tees Maintenance Dredging Protocol (MDP) Baseline Document. is attached below and is referred to throughout the application.

Programme of works

Works are performed on a daily basis throughout the year and covered under the Tees MDP Baseline Document.

Other information

Applicant details

Mr Andrew Ridley / 01642 877103 / andrew.ridley@pdports.co.uk

PD TEESPORT LIMITED / CRAFT DEPOT VULCAN STREET MIDDLESBROUGH / TS2 1LX

Date application submitted

20-FEB-2015

Date application validated

17-JUN-2022

Date initial decision made

30-DEC-2015

Date decision made for latest variation

17-JUN-2022

Status

Completed

(Discharging conditions)

Application and Documents

MLA/2015/00088

Initial Application - Submitted 20-Feb-2015

Application Form

Response Documents - Licence L/2015/00427/1

Additional Documents

FileSizeDate
PD Teesport - Maintenance Dredging Method Statement.docx15 KB18-Feb-2015
PD Teesport - Maintenance Dredging Method Statement.docx15 KB18-Feb-2015
151030_PDT Advert_Gazette.pdf324 KB02-Nov-2015
RiverTees/Planning/MLA_2015_00088/Additional Documents/PB3308_101_304258_200215_Final.pdfTees Maintenance Dredging Protocol (MDP) Baseline Document3 MB20-Feb-2015
[20150603 MLP201500094 PD Teesport Results MMO Template.xlsxthis>RiverTees/Planning/MLA_2015_00088/Additional Documents/20150603 MLP201500094 PD Teesport Results MMO Template.xlsx598 KB28-Sep-2015
20150603 MLP201500094 PD Teesport Results MMO Template.xlsx598 KB28-Sep-2015

MLA/2015/00088/1

Variation 1 - Submitted 18-Mar-2019

Accepted

Variation Form

Response Documents - Licence L/2015/00427/2

FileSizeDate
Licence Document (Marine).pdf87 KB29-Mar-2019
Returns.pdf6 KB29-Mar-2019
Decision Letter (Marine).pdf641 KB29-Mar-2019
Marine Coordinate Schedules.pdf21 KB29-Mar-2019

Additional Documents

Information box,No published documents

MLA/2015/00088/2

Variation 2 - Submitted 05-Apr-2019

Accepted

Variation Form

Response Documents - Licence L/2015/00427/3

FileSizeDate
Marine Coordinate Schedules.pdf21 KB20-Sep-2019
Decision Letter (Marine).pdf673 KB20-Sep-2019
Licence Document (Marine).pdf120 KB20-Sep-2019
Returns.pdf14 KB20-Sep-2019

Additional Documents

Information box,No published documents

MLA/2015/00088/3

Variation 3 - Submitted 20-Sep-2019

Accepted

Variation Form

Response Documents - Licence L/2015/00427/4

FileSizeDate
Licence Document (Marine).pdf120 KB02-Oct-2019
Returns.pdf14 KB02-Oct-2019
Marine Coordinate Schedules.pdf21 KB02-Oct-2019
Decision Letter (Marine).pdf674 KB02-Oct-2019

Additional Documents

Information box,No published documents

MLA/2015/00088/4

Variation 4 - Submitted 10-Oct-2019

Accepted

Variation Form

Response Documents - Licence L/2015/00427/5

FileSizeDate
Decision Letter (Marine).pdf675 KB22-Nov-2019
Returns.pdf16 KB22-Nov-2019
Licence Document (Marine).pdf120 KB22-Nov-2019
Marine Coordinate Schedules.pdf21 KB22-Nov-2019

Additional Documents

MLA/2015/00088/5

Variation 5 - Submitted 04-Aug-2020

Accepted

Variation Form

Response Documents - Licence L/2015/00427/6

FileSizeDate
Decision Letter (Marine).pdf674 KB12-Apr-2021
Marine Coordinate Schedules.pdf21 KB12-Apr-2021
Returns.pdf16 KB12-Apr-2021
Licence Document (Marine).pdf121 KB12-Apr-2021

Additional Documents

MLA/2015/00088/6

Variation 6 - Submitted 17-Jun-2022

Accepted

Variation Form

Response Documents - Licence L/2015/00427/7

FileSizeDate
Returns.pdf19 KB17-Jun-2022
Decision Letter (Marine).pdf1 MB17-Jun-2022
Marine Coordinate Schedules.pdf21 KB17-Jun-2022
Licence Document (Marine).pdf121 KB17-Jun-2022

Additional Documents

Information box,No published documents

Consultations

Case Consultation Responses

Centre for Environment, Fisheries and Aquaculture Science - SEAL

Consulted on 23 October 2015. Responded on 19 November 2015.

The consultee was asked for their comments on an older version of this case (MLA/2015/00088). Their recommendation was “Accept Proposal Subject to Conditions (your recommended conditions and rationale should be included in your reply below)”. They had the following comments:

Please detail your advice here.

Licensing advice attached

Let me know if you require anything further

Regards

Ruth

The consultee included the following files with their response:

Crown Estate - Marine Estates

Consulted on 23 October 2015. Responded on 6 November 2015.

The consultee was asked for their comments on an older version of this case (MLA/2015/00088). Their recommendation was “Accept Proposal Subject to Conditions (your recommended conditions and rationale should be included in your reply below)”. They had the following comments:

The proposed disposal activity is planned to take place in an area under the ownership of The Crown Estate and as such also requires our consent. The Crown Estate has no objection to the granting of a Marine Licence and is in the process of granting the applicant a consent for the proposed activity.

Environment Agency - North East Area

Consulted on 23 October 2015. Responded on 25 November 2015.

The consultee was asked for their comments on an older version of this case (MLA/2015/00088). Their recommendation was “Accept Proposal”.

The consultee included the following files with their response:

Historic England - Durham/Northumberland/Tees

Consulted on 23 October 2015. Responded on 23 October 2015.

The consultee was asked for their comments on an older version of this case (MLA/2015/00088). Their recommendation was “Accept Proposal”.

The consultee included the following files with their response:

Inshore Fisheries and Conservation Authorities - North Eastern

Consulted on 23 October 2015. Responded on 3 November 2015.

The consultee was asked for their comments on an older version of this case (MLA/2015/00088). Their recommendation was “Accept Proposal”.

The consultee included the following files with their response:

Maritime and Coastguard Agency - Navigational Safety Branch

Consulted on 23 October 2015. Responded on 18 November 2015.

The consultee was asked for their comments on an older version of this case (MLA/2015/00088). Their recommendation was “Accept Proposal Subject to Conditions (your recommended conditions and rationale should be included in your reply below)”. They had the following comments:

Your Ref: MLA /2015/00088

Our Ref: MNA 053/008/0028

MMO Contact: Tim Dixon

Date: 18 November 2015

Tees and Hartlepool Maintenance Dredge Disposal

Dear Tim

Thank you for the opportunity to comment on the potential impact of the above proposed works on the interests of navigation.

The proposal has been examined by staff of the Navigation Safety Branch and it can be noted that the works are unlikely to have an adverse impact, with regards to safety of navigation, provided all maritime safety legislation is followed and:

  • The Consent Holder should ensure suitable bunding, storage facilities are employed to prevent the release of fuel oils, lubricating fluids associated with the plant and equipment into the marine environment.
  • The site is within port limits and the applicant should gain the approval/agreement of the responsible local navigation authority or the Harbour Authority/Commissioners/Council. They may wish to issue local warnings to alert those navigating in the vicinity to the presence of the works, as deemed necessary.
  • If in the opinion of the Secretary of State the assistance of a Government Department, including the broadcast of navigational warnings, is required in connection with the works or to deal with any emergency arising from the failure to mark and light the works as required by the consent or to maintain the works in good order or from the drifting or wreck of the works, the owner of the works shall be liable for any expense incurred in securing such assistance

If these conditions are met I am able to advise you that the Maritime and Coastguard Agency (MCA) has no objection to consent being granted provided that measures are also taken to ensure that details of the proposed works are promulgated to maritime users through notice to mariners and/or navigational warnings.

Please note, however, that a charge will be levied on the developers where appropriate, by MCA, for the transmission of maritime safety information, via Navtex or Coastguard VHF radio network, in respect of the proposed works. Agreement by the developers to pay any such charges should, ideally, be a condition of the consent if they are likely to be used.

Yours sincerely,

Helen Croxson

Navigation Safety Branch

MMO Coastal Offices & MCT - North East Marine Area

Consulted on 23 October 2015. Responded on 4 November 2015.

The consultee was asked for their comments on an older version of this case (MLA/2015/00088). Their recommendation was “Accept Proposal Subject to Conditions (your recommended conditions and rationale should be included in your reply below)”. They had the following comments:

-Local potting and trawling vessels operate from surrounding area Hartlepool and Redcar. I would not anticipate any of the activities proposed in this application to negatively impact the local fishing industry as all dredged material is deposited at agreed spoil grounds known to the fishing industry.

-There are many surrounding sensitive areas and Marine protected areas, I would recommend consulting with the Marine Management organisations Marine Conservation and Enforcement team to minimise impact on these areas.

-As the proposed work coincides with freshwater fish migrations I recommend some consultation with the Environment Agency in an effort to minimise impact on these species.

Name of staff member - Patrick Gray

Staff Grade - MEO

Time spent providing advice - 30 minutes

Time attending meetings - n/a

Time spent at site visit - n/a

Total time - 30 minutes

Natural England - Northern North Sea

Consulted on 23 October 2015. Responded on 12 November 2015.

The consultee was asked for their comments on an older version of this case (MLA/2015/00088). Their recommendation was “Accept Proposal Subject to Conditions (your recommended conditions and rationale should be included in your reply below)”. They had the following comments:

Please detail your advice here.

Date: 12/11/ 2015

Our ref: 169545

Your ref: MLA/2015/00088

Tim Dixon

Greg Tomlinson

Marine Management Organisation

Licensing Team

Lancaster House

Hampshire Court

Newcastle Upon Tyne

NE4 7YH

Natural England

North East Region

Lancaster House

Hampshire Court

Newcastle on Tyne

NE4 7YH

BY EMAIL ONLY

Dear Tim, Greg.

Application: Tees and Hartlepool Maintenance Dredge Disposal MLA/2015/00088

Thank you for your consultation dated 23/10/2015 regarding the above proposal. As there are several designated sites potentially affected by the proposal which are subject to different legislation, my response is differentiated accordingly.

Marine and Coastal Access Act 2009

The works as set out in the information supplied by the applicant are not sited within or near to a Marine Conservation Zone. Natural England has not identified a pathway by which impacts from the development would affect the interest features of such a site. We are therefore confident that the works will not hinder the conservation objectives of such a site.

The Conservation of Habitats and Species Regulations 2010(as amended) and The offshore Marine Conservation (Natural Habitats,& c.) Regulations 2007 (as amended)

We can confirm that the proposed works are located near to or within the Teesmouth and Cleveland Coast SPA and Ramsar site.

Natural England advises that providing the works are carried out in strict accordance with the details of the application which have been submitted, it can be excluded that the application will have a significant effect on any SAC, SPA or Ramsar site, either individually or in combination with other plans or projects. Therefore it is our view that an Appropriate Assessment of the implications of this proposal on the site's conservation objectives will not be required.

  • We have made this assessment based on the understanding the details in the application and the Maintenance Dredging Baseline Document will be followed and any significant departure from the application or Baseline Document will be notified to Natural England. We have noted it is now a ten year licence so any major changes would be compounded over a ten year period.
  • Cefas guidelines on the disposal of sediment to sea should be adhered to in order to avoid pollutants entering the Marine environment.
  • It is the assumption of Natural England that we will be consulted on any Significant Capital Dredges which are in addition to the maintenance dredging of this application.

Wildlife and Countryside Act 1981 (as amended)

We can confirm that the proposed works are located close to or within the Tees and Hartlepool Foreshore and Wetland SSSI, Seal Sands SSSI, Coatham Sands SSSI. Natural England advises that the proposal, if undertaken in strict accordance with the details submitted, is not likely to damage the interest features for which the site has been notified. However this advice is given on the assumption that the activity is undertaken as per the application (see bullet points above for specific relevant aspects of the proposal) and therefore compliant with the above legislation.

Should the application change, or if the applicant submits further information relating to the predicted impacts of this proposal on the designated sites we will provide further advice as appropriate.

If the MMO is minded to grant permission for this application contrary to the advice relating to the Tees and Hartlepool Maintenance Dredge Disposal contained in this letter, we refer you to Section28l (6) of the Wildlife and Countryside Act 1981 (as amended), specifically the duty placed upon the MMO, requiring that you;

Provide notice to Natural England of the permission, and of its terms. This notice should include a statement of how (if at all) the MMO has taken account of Natural England's advice; and

For any queries relating to the content of this letter please contact me using the details provided below.

Yours Sincerely

Richard Macdonald

Marine Team Northumbria

Email: xxxxx

Tel. xxxx

Royal Yachting Association - Royal Yachting Association

Consulted on 23 October 2015. Responded on 11 November 2015.

The consultee was asked for their comments on an older version of this case (MLA/2015/00088). Their recommendation was “Accept Proposal”.

Trinity House - Trinity House

Consulted on 23 October 2015. Responded on 23 November 2015.

The consultee was asked for their comments on an older version of this case (MLA/2015/00088). Their recommendation was “Accept Proposal Subject to Conditions (your recommended conditions and rationale should be included in your reply below)”. They had the following comments:

Trinity House email dated 23.11.15 refers.

Centre for Environment, Fisheries and Aquaculture Science - SEAL

Consulted on 21 October 2019. Responded on 14 November 2019.

The consultee was asked for their comments on an older version of this case (MLA/2015/00088/4). They responded:

Hi Luiella,

Please see my advice attached.

Joe

The consultee included the following files with their response:

Centre for Environment, Fisheries and Aquaculture Science - SEAL

Consulted on 2 March 2021. Responded on 1 April 2021.

The consultee was asked for their comments on an older version of this case (MLA/2015/00088/5). They responded:

Please see my advice attached.

The consultee included the following files with their response:

Returns Consultation Responses

CEFAS (SEAL) R7.1

Consulted on 22 November 2021. Responded on 20 December 2021.

The consultee was asked for their comments on these documents:

* MMO_Results_Template - MAR01178.xlsm

* SAM202000057 Tees Estuary Sample Plan Response.pdf

They responded:

Please find my advice attached.

The consultee included the following files with their response:

* 20211217 MLA2015000885 L2015004276 Tees and Hartlepool Maintenance Disposal Mid-licence Advice Minute FINAL.docx

CEFAS (SEAL) NGCT Sample analysis 2 (full)

Consulted on 17 October 2019. Responded on 7 November 2019.

The consultee was asked for their comments on these documents:

* MAR00356.pdf

* MAR00356.xls

* MMO Results_Template MAR00356_1.xlsm

* MMO Results_Template MAR00356_2.xlsm

* FW MAR00356 - MMO Sediment Samples.msg Message Text Message Image

* RE SAM201800069 - Northern Gateway Container Terminal .msg Message Text

They responded:

Hi Luella,

Please see my advice attached.

Joe

The consultee included the following files with their response:

* 20191107 MLA2015000884 Tees and Hartlepool L201500427 - Mid-licence advice minute + JLQC.docx

CEFAS (SEAL) NGCT Sample analysis 1

Consulted on 26 September 2019. Responded on 17 October 2019.

The consultee was asked for their comments on these documents:

* Copy of 20125933 - MMO Results.xlsm

* Copy of MMO Results_Template MAR00356_1 Interim_2.xlsm

* Copy of MMO Results_Template MAR00356_2 Interim_2.xlsm

They responded:

Please find my advice attached.

The consultee included the following files with their response:

* 20191017 MLA2015000884 Tees and Hartlepool L201500427 - Mid-licence advice minute KR QC.docx

CEFAS (SEAL) Sample analysis return

Consulted on 10 July 2019. Responded on 14 August 2019.

The consultee was asked for their comments on these documents:

* Carcinus - 20126278 - MMO Results.xlsm

* MMO_Results_Template MAR00179 V3 (1).xlsm

* 20151118 MLA201500088 PD Teesport Tees and Hartelpool maintenance dredge advice final.docx

They responded:

Please find my advice attached.

The consultee included the following files with their response:

* 20190814 MLA2015000882 Tees and Hartlepool - Mid-licence Advice Minute + CC QC.docx

Returns

Notification of commencement

MLA/2015/00088/R1 Discharged

The licence holder must notify the MMO prior to the commencement of the first instance of any licensed activity. This notice must be received by the MMO no less than five working days before the commencement of that licensed activity.

Deadline: No less than five working days before the commencement of that licensed activity. Date received: 24 Apr 2019 Date discharged: 25 Apr 2019 Licence holder comments: The licenced activities have commenced and have been on-going since the start date of the licence. ==== Agents / contractors / sub-contractors ==== MLA/2015/00088/R2 Open The licence holder must notify the MMO in writing of any agents, contractors or sub-contractors that will carry on any licensed activity listed in section 4 of this licence on behalf of the licence holder. Such notification must be received by the MMO no less than 24 hours before the commencement of the licensed activity. The licence holder must ensure that a copy of this licence and any subsequent revisions or amendments has been provided to, read and understood by any agents, contractors or sub-contractors that will carry on any licensed activity listed in section 4 of this licence on behalf of the licence holder. Deadline no less than 24 hours before the commencement of the licensed activity. ==== Vessels ==== MLA/2015/00088/R3 Discharged The licence holder must notify the MMO in writing of any vessel being used to carry on any licensed activity listed in section 4 of this licence on behalf of the licence holder. Such notification must be received by the MMO no less than 24 hours before the commencement of the licensed activity. Notification must include the master's name, vessel type, vessel IMO number and vessel owner or operating company. The licence holder must ensure that a copy of this licence and any subsequent revisions or amendments has been read and understood by the masters of any vessel being used to carry on any licensed activity listed in section 4 of this licence, and that a copy of this licence is held on board any such vessel. Deadline: no less than 24 hours before the commencement of the licensed activity.
Date received: 23 Jul 2020
Date discharged: 27 Jul 2020
Licence holder comments
Vessel Name: Cleveland County
Masters Name: Richard Carr
Vessel Type: Trailing Suction Hopper Dredger
IMO Number: 7325306
Operator: PD Teesport Ltd
Start Date: Immediate
Duration: Continuous Vessel Name: Heortnesse
Masters Name: John Wheatley/Andrew Baker
Vessel Type: Trailing Suction Hopper Dredger
IMO Number: 7817189
Operator: PD Teesport Ltd
Start Date: Immediate
Duration: Continuous Vessel Name: UKD BLUEFIN
Masters Name: Howard Everington
Vessel Type: Trailing Suction Hopper Dredger
IMO Number: 9143427
Operator: UK Dredging
Start Date: 26th July 2020
Duration: 5 days
==== Condition ==== MLA/2015/00088/R4 Discharged A regime of future sediment sampling is undertaken by PD Teesport, of at least three yearly intervals, which must be agreed in advance with the MMO. Samples must be collected, analysed and the report of their notification signed off prior to dredging in the fourth and subsequently the seventh and tenth year of this licence. Deadline: prior to dredging in the fourth and subsequently the seventh and tenth year of this licence.
Date received: 24 Apr 2019
Date discharged: 14 Nov 2019
Licence holder comments Consultation was undertaken with the MMO to agree a programme of mid-licence sampling for this licence via SAM/2018/00050 and SAM/2018/00069 - 20190814 MLA2015000882 Tees and Hartlepool - Mid-licence Advice Minute + CC QC.pdf. It was agreed with MMO that the data in ‘Carcinus – 20126278 – MMO Results’ would support both the marine licence application for the Hartlepool channel project and the mid-sampling licence condition on MLA/2015/00088 (as the dredge area for the Hartlepool channel project overlapped with part of the maintenance area on MLA/2015/00088). The same principle has been applied to the Northern Gateway Container Terminal project (as part of the dredge area for the Northern Gateway Container Project overlaps with the maintenance area on MLA/2015/00088 in the Tees estuary) – the results provided in ‘MMO_Results_Template MAR00179 V3’ are the samples that MMO requested from the Tees estuary to inform MLA/2015/00088. * Carcinus - 20126278 - MMO Results.xlsm 551 KB - Created By: Mr Steven Rayner 24-APR-2019 15:19:08 * MMO_Results_Template MAR00179 V3.xlsm 617 KB - Created By: Mr Steven Rayner 24-APR-2019 15:19:21 Further repsonses to mid-licence sampling from CEFAS: * 20191017 MLA2015000884 Tees and Hartlepool L201500427 - Mid-licence advice minute KR QC.pdf * 20191107 MLA2015000884 Tees and Hartlepool L201500427 - Mid-licence advice minute + JLQC.pdf ==== OSPAR returns ==== MLA/2015/00088/R5 Open The licence holder must inform the MMO of the location and quantities of material disposed of each month under this licence. This information must be submitted to the MMO by 15 February each year for the months August to January inclusive, and by 15 August each year for the months February to July inclusive. Subreturns Ref R5.1 Open Deadline by 31 July each year for the months February to July inclusive. Ref R5.2 Open Deadline 15 Feb 2016 Ref R5.3 Open Deadline 15 Aug 2016 Ref R5.4 Open Deadline 15 Feb 2017 Ref R5.5 Open Deadline 15 Aug 2017 Ref R5.6 Open Deadline 15 Feb 2018 Ref R5.7 Open Deadline 15 Aug 2018 Ref R5.8 Open Deadline 15 Feb 2019 Ref R5.9 Open Deadline 15 Aug 2019 Ref R5.10 Open Deadline 15 Feb 2020 Ref R5.11 Open Deadline 15 Aug 2020 Ref R5.12 Open Deadline 15 Feb 2021 Ref R5.13 Open Deadline 15 Aug 2021 Ref R5.14 Open Deadline 15 Feb 2022 Ref R5.15 Open Deadline 15 Aug 2022 Ref R5.16 Open Deadline 15 Feb 2023 Ref R5.17 Open Deadline 15 Aug 2023 Ref R5.18 Open Deadline 15 Feb 2024 Ref R5.19 Open Deadline 15 Aug 2024 Ref R5.20 Open Deadline 15 Feb 2025 Ref R5.21 Open Deadline 15 Aug 2025 Ref R5.22 Open Deadline 15 Feb 2026 ==== Further sample analysis information (R4) ==== MLA/2015/00088/R6 Discharged Further information to be submitted for Return 4- sediment sample analysis. The full suite of analysis under SAM/2018/00069 to cover the lower Tees maintenance dredge area. Deadline Once full analysis obtained Date received 17 Oct 2019 Date discharged 14 Nov 2019 Licence holder comments Data is provided from samples recovered from the downstream part of the maintenance dredge footprint in the Tees, to supplement that provided earlier in R4. The following data is provided: 20125933 – MMO Results – data from the Tees Gasport (Trafigura) dredge footprint, located within the Tees maintenance dredge footprint (referred to within SAM/2018/00069). MMO Results_Template MAR00356_1 - Results from the downstream part of the maintenance dredge footprint in the Tees as agreed with MMO in SAM/2018/00069 MMO Results_Template MAR00356_2 - Results from the downstream part of the maintenance dredge footprint in the Tees as agreed with MMO in SAM/2018/00069 Also attached are two emails which outline why one of the samples requested in SAM/2018/00069 could not be analysed at the laboratory. This information, along with that provided in R4 provides all data requested by the MMO for the Tees and Hartlepool maintenance dredge footprint. * MMO Results_Template MAR00356_1.xlsm 650 KB Created By: Mr Steven Rayner 17-OCT-2019 11:39:57 * MMO Results_Template MAR00356_2.xlsm 637 KB Created By: Mr Steven Rayner 17-OCT-2019 11:40:05 * 20125933 - MMO Results.xlsm 548 KB Created By: Mr Steven Rayner 17-OCT-2019 11:40:17 * RE SAM201800069 - Northern Gateway Container Terminal .msg Message Text 218 KB Created By: Mr Steven Rayner 17-OCT-2019 11:40:39 ==== Mid licence Sediment sampling ==== MLA/2015/00088/R7 Open A regime of future sediment sampling is undertaken by PD Teesport, of at least three yearly intervals, which must be agreed in advance with the MMO. Samples must be collected, analysed and the report of their notification signed off prior to dredging in the fourth and subsequently the seventh and tenth year of this licence. The sampling for prior to the fourth year has been completed within R4 and R7. This return is for the sediment sampling prior to the seventh and tenth year of this licence. Subreturns Ref === R7.1 Discharged === Deadline Prior to dredging in the seventh year of this licence. Date received 15 Nov 2021 Date discharged 14 Jan 2022 Licence holder comments Sediment sampling data has been attached to this return. Please can MMO review and discharge this return. * MMO_Results_Template - MAR01178.xlsm 615 KB Created By: Mr Steven Rayner 15-NOV-2021 10:59:30 * 20211217 MLA2015000885 L2015004276 Tees and Hartlepool Maintenance Disposal Mid-licence Advice Minute FINAL.pdf 250 KB Created By: Emma Shore 14-JAN-2022 10:10:50 * 20220114_MMO_Response_Tees Mid Licence Sampling.pdf 141 KB Created By: Emma Shore 14-JAN-2022 10:10:52 * Re L201500427PC02 Tees Maintenance Samples.msg Message Text 266 KB Created By: Emma Shore 14-JAN-2022 10:10:54 Ref === R7.2 Open === Ref R7.2 Discharged Deadline Prior to dredging in the tenth year of this licence. Date received 12 Nov 2024 Date discharged 31 Jan 2025 Licence holder comments Sediment sampling data has been attached to this return which was undertaken in line with sample plan advice reference SAM/2024/00054 also attached. Please can the MMO review and discharge this return. Thank you * MMO Results Template MAR02499_2.xlsm 563 KB Created By: Mrs Christa Page 12-NOV-2024 14:08:20 * MMO_Results_Template - MAR02481_1.xlsm 605 KB Created By: Mrs Christa Page 12-NOV-2024 14:08:24 * SAM202400054.pdf 1 MB Created By: Mrs Christa Page 12-NOV-2024 14:08:28 * MMO_Results_Template - MAR02481 V2.xlsm605 KB Created By: Karen Schnetler 06-JAN-2025 13:34:04 * MMO Results Template MAR02499 V2.xlsm 563 KB Created By: Karen Schnetler 06-JAN-2025 13:34:06 * Post_Consent_Discharge MLA201500088 CP_.pdf 360 KB Created By: Brendan Malone 31-JAN-2025 10:12:01 === Vessels === MLA/2015/00088/R8 Open The licence holder must notify the MMO in writing of any vessel being used to carry on any licensed activity listed in section 4 of this licence on behalf of the licence holder. Such notification must be received by the MMO no less than 24 hours before the commencement of the licensed activity. Notification must include the master's name, vessel type, vessel IMO number and vessel owner or operating company. The licence holder must ensure that a copy of this licence and any subsequent revisions or amendments has been read and understood by the masters of any vessel being used to carry on any licensed activity listed in section 4 of this licence, and that a copy of this licence is held on board any such vessel. Subreturns Ref R8.1 Discharged Deadline no less than 24 hours before the commencement of the licensed activity. Date received 23 Sep 2021 Date discharged 07 Oct 2021 Licence holder comments New vessel to add to this license Vessel Name: UKD ORCA Masters Name: Maciej Miszczuk Vessel Type: Trailing Suction Hopper Dredger IMO Number: 9491355 Operator: UK Dredging Start Date: 25/09/2021 Duration: 9 days Licence: L.2015.00427.5 Masters Name: Maciej Miszczuk Email: UKDOrca@abports.co.uk Tel: xxxxx Ref R8.2 Open Deadline no less than 24 hours before the commencement of the licensed activity. Ref R8.3 Open Deadline no less than 24 hours before the commencement of the licensed activity. ==== Sampling requirements if disposal of more than 1 million tonnes in wet weight is required in 2022, 2023 or 2024. ==== MLA/2015/00088/R9 Open If disposal of more than 1 million tonnnes wet weight is required at Tees Bay A (TY160) in 2022, 2023 or 2024, then additional sediment sampling requirements must be agreed with the MMO. Agreed sample results must be submitted to and approval given in writing by the MMO prior to disposal of material above 1 million tonnes wet weight per annum. Deadline Agreed sample results must be submitted to and approval given in writing by the MMO prior to disposal of material above 1 million tonnes wet weight per annum. * MMO_Results_Template - MAR02085.xlsm 581 KB Created By: Mrs Christa Page 28-NOV-2023 09:41:55 * MMO_Results_ - MAR02085 UPDATED.xlsm 579 KB Created By: Lauren Thraves 22-OCT-2024 09:15:38 * 20240625_L201500427_Return 9.1_MMO response_v3.pdf 211 KB Created By: Lauren Thraves 22-OCT-2024 09:47:24 Subreturns Ref R9.1 Discharged Deadline Agreed sample results must be submitted to and approval given in writing by the MMO prior to disposal of material above 1 million tonnes wet weight per annum. Date received 28 Nov 2023 Date discharged 27 Jun 2024 Licence holder comments Please find attached results of the sampling as agreed in sample plan SAM/2023/00028 * MMO_Results_Template - MAR02085.xlsm 581 KB Created By: Mrs Christa Page 28-NOV-2023 09:41:55 * MMO_Results_ - MAR02085 UPDATED.xlsm 579 KB Created By: Lauren Thraves 22-OCT-2024 09:15:38 * 20240625_L201500427_Return 9.1_MMO response_v3.pdf 211 KB Created By: Lauren Thraves 22-OCT-2024 09:47:24 Ref R9.2 Open Deadline Agreed sample results must be submitted to and approval given in writing by the MMO prior to disposal of material above 1 million tonnes wet weight per annum. ===== OSPAR Returns ===== Initial 29/120 ==== TEES BAY A ==== 2016 Show/HideRefreshes the page MLA/2015/00088/OSP001 Discharged ReceivedDischarged 22-JUL-2019 9:5613-OCT-2022 10:30 Start dateEnd date 01-JAN-201631-JAN-2016 Wet tonnageDry tonnage 7629753407 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP002 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 10:05 Start dateEnd date 01-FEB-201629-FEB-2016 Wet tonnageDry tonnage 13909297364 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP003 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 10:05 Start dateEnd date 01-MAR-201631-MAR-2016 Wet tonnageDry tonnage 169623118736 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP004 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 10:05 Start dateEnd date 01-APR-201630-APR-2016 Wet tonnageDry tonnage 153618107532 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP005 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 10:05 Start dateEnd date 01-MAY-201631-MAY-2016 Wet tonnageDry tonnage 5817040719 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP006 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 10:05 Start dateEnd date 01-JUN-201630-JUN-2016 Wet tonnageDry tonnage 203033142123 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP007 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 10:05 Start dateEnd date 01-JUL-201631-JUL-2016 Wet tonnageDry tonnage 7597953185 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP008 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 10:05 Start dateEnd date 01-AUG-201631-AUG-2016 Wet tonnageDry tonnage 9193264352 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP009 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 10:05 Start dateEnd date 01-SEP-201630-SEP-2016 Wet tonnageDry tonnage 7186850307 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP010 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 10:05 Start dateEnd date 01-OCT-201631-OCT-2016 Wet tonnageDry tonnage 5216135512 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP011 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 10:05 Start dateEnd date 01-NOV-201630-NOV-2016 Wet tonnageDry tonnage 8512459586 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP012 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 10:05 Start dateEnd date 01-DEC-201631-DEC-2016 Wet tonnageDry tonnage 6334444340 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool ==== 2017 ==== Show/HideRefreshes the page MLA/2015/00088/OSP013 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:17 Start dateEnd date 01-JAN-201731-JAN-2017 Wet tonnageDry tonnage 103338.1471303.32 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP014 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:17 Start dateEnd date 01-FEB-201728-FEB-2017 Wet tonnageDry tonnage 84758.2258483.17 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP015 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:17 Start dateEnd date 01-MAR-201731-MAR-2017 Wet tonnageDry tonnage 99305.1868520.57 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP016 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:18 Start dateEnd date 01-APR-201730-APR-2017 Wet tonnageDry tonnage 83780.1157808.28 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP017 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:18 Start dateEnd date 01-MAY-201731-MAY-2017 Wet tonnageDry tonnage 91247.2762960.62 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP018 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:18 Start dateEnd date 01-JUN-201730-JUN-2017 Wet tonnageDry tonnage 103892.8271686.05 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP019 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:18 Start dateEnd date 01-JUL-201731-JUL-2017 Wet tonnageDry tonnage 78369.9454075.26 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP020 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:18 Start dateEnd date 01-AUG-201731-AUG-2017 Wet tonnageDry tonnage 25761.9617775.75 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP021 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:18 Start dateEnd date 01-SEP-201730-SEP-2017 Wet tonnageDry tonnage 124000.1485560.10 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP022 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:18 Start dateEnd date 01-OCT-201731-OCT-2017 Wet tonnageDry tonnage 110420.9176190.43 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP023 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:19 Start dateEnd date 01-NOV-201730-NOV-2017 Wet tonnageDry tonnage 105464.2072770.30 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP024 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:19 Start dateEnd date 01-DEC-201731-DEC-2017 Wet tonnageDry tonnage 67745.0046744.05 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool ==== 2018 ==== Show/HideRefreshes the page MLA/2015/00088/OSP025 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:20 Start dateEnd date 01-JAN-201831-JAN-2018 Wet tonnageDry tonnage 122386.9384446.98 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP026 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:21 Start dateEnd date 01-FEB-201828-FEB-2018 Wet tonnageDry tonnage 50126.7334587.44 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP027 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:20 Start dateEnd date 01-MAR-201831-MAR-2018 Wet tonnageDry tonnage 96521.9466600.14 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP028 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:20 Start dateEnd date 01-APR-201830-APR-2018 Wet tonnageDry tonnage 106778.5973677.23 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP029 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:20 Start dateEnd date 01-MAY-201831-MAY-2018 Wet tonnageDry tonnage 25434.9217550.09 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP030 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:20 Start dateEnd date 01-JUN-201830-JUN-2018 Wet tonnageDry tonnage 106984.9373819.60 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP031 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:20 Start dateEnd date 01-JUL-201831-JUL-2018 Wet tonnageDry tonnage 106528.4173504.60 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP032 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:20 Start dateEnd date 01-AUG-201831-AUG-2018 Wet tonnageDry tonnage 42577.6129378.55 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP033 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:20 Start dateEnd date 01-SEP-201830-SEP-2018 Wet tonnageDry tonnage 75073.3151800.58 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP034 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:20 Start dateEnd date 01-OCT-201831-OCT-2018 Wet tonnageDry tonnage 102078.7070434.30 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP035 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:20 Start dateEnd date 01-NOV-201830-NOV-2018 Wet tonnageDry tonnage 92293.8163682.73 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP036 Discharged ReceivedDischarged 22-JUL-2019 9:5724-JAN-2023 9:19 Start dateEnd date 01-DEC-201831-DEC-2018 Wet tonnageDry tonnage 32869.6522680.06 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool ==== 2019 ==== Show/HideRefreshes the page MLA/2015/00088/OSP037 Discharged ReceivedDischarged 22-JUL-2019 11:4206-FEB-2020 10:59 Start dateEnd date 01-JAN-201931-JAN-2019 Wet tonnageDry tonnage 46964.0832405.22 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP038 Discharged ReceivedDischarged 22-JUL-2019 11:4206-FEB-2020 10:59 Start dateEnd date 01-FEB-201928-FEB-2019 Wet tonnageDry tonnage 86340.7259575.10 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP039 Discharged ReceivedDischarged 22-JUL-2019 11:4206-FEB-2020 10:59 Start dateEnd date 01-MAR-201931-MAR-2019 Wet tonnageDry tonnage 81977.8756564.73 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP040 Discharged ReceivedDischarged 22-JUL-2019 11:4206-FEB-2020 10:59 Start dateEnd date 01-APR-201930-APR-2019 Wet tonnageDry tonnage 58687.9640494.69 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP041 Discharged ReceivedDischarged 22-JUL-2019 11:4206-FEB-2020 10:59 Start dateEnd date 01-MAY-201931-MAY-2019 Wet tonnageDry tonnage 155233.76107111.29 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP042 Discharged ReceivedDischarged 22-JUL-2019 11:4206-FEB-2020 10:59 Start dateEnd date 01-JUN-201930-JUN-2019 Wet tonnageDry tonnage 58267.9140204.86 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP043 Discharged ReceivedDischarged 19-AUG-2019 15:1006-FEB-2020 10:59 Start dateEnd date 01-JUL-201931-JUL-2019 Wet tonnageDry tonnage 12450885910.53 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP044 Discharged ReceivedDischarged 28-JAN-2020 15:4706-FEB-2020 10:59 Start dateEnd date 01-AUG-201931-AUG-2019 Wet tonnageDry tonnage 6112342182.88 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP045 Discharged ReceivedDischarged 28-JAN-2020 15:4706-FEB-2020 10:59 Start dateEnd date 01-SEP-201930-SEP-2019 Wet tonnageDry tonnage 3566124610.76 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP046 Discharged ReceivedDischarged 28-JAN-2020 15:4706-FEB-2020 10:59 Start dateEnd date 01-OCT-201931-OCT-2019 Wet tonnageDry tonnage 2247915513.46 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP047 Discharged ReceivedDischarged 28-JAN-2020 15:4706-FEB-2020 10:59 Start dateEnd date 01-NOV-201930-NOV-2019 Wet tonnageDry tonnage 1827712613.53 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP048 Discharged ReceivedDischarged 28-JAN-2020 15:4706-FEB-2020 10:59 Start dateEnd date 01-DEC-201931-DEC-2019 Wet tonnageDry tonnage 39822748.10 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool ==== 2020 ==== Show/HideRefreshes the page MLA/2015/00088/OSP049 Discharged ReceivedDischarged 17-AUG-2020 13:2716-FEB-2021 11:23 Start dateEnd date 01-JAN-202031-JAN-2020 Wet tonnageDry tonnage 81822.0956429.03 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP050 Discharged ReceivedDischarged 17-AUG-2020 13:2716-FEB-2021 11:23 Start dateEnd date 01-FEB-202029-FEB-2020 Wet tonnageDry tonnage 54778.9437778.58 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP051 Discharged ReceivedDischarged 17-AUG-2020 13:2716-FEB-2021 11:23 Start dateEnd date 01-MAR-202031-MAR-2020 Wet tonnageDry tonnage 32911.8222697.81 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP052 Discharged ReceivedDischarged 17-AUG-2020 13:2716-FEB-2021 11:23 Start dateEnd date 01-APR-202030-APR-2020 Wet tonnageDry tonnage 37531.8225884.01 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP053 Discharged ReceivedDischarged 17-AUG-2020 13:2716-FEB-2021 11:23 Start dateEnd date 01-MAY-202031-MAY-2020 Wet tonnageDry tonnage 44182.1230470.43 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP054 Discharged ReceivedDischarged 17-AUG-2020 13:2716-FEB-2021 11:23 Start dateEnd date 01-JUN-202030-JUN-2020 Wet tonnageDry tonnage 36044.624858.34 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP055 Discharged ReceivedDischarged 17-AUG-2020 13:2716-FEB-2021 11:23 Start dateEnd date 01-JUL-202031-JUL-2020 Wet tonnageDry tonnage 212735.4146714.1 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP056 Discharged ReceivedDischarged 18-SEP-2020 14:2816-FEB-2021 11:23 Start dateEnd date 01-AUG-202031-AUG-2020 Wet tonnageDry tonnage 21334.615239 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP057 Discharged ReceivedDischarged 19-NOV-2020 11:1516-FEB-2021 11:23 Start dateEnd date 01-SEP-202030-SEP-2020 Wet tonnageDry tonnage 1149.4821 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP058 Discharged ReceivedDischarged 19-NOV-2020 11:1516-FEB-2021 11:23 Start dateEnd date 01-OCT-202031-OCT-2020 Wet tonnageDry tonnage 40532.828952 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP059 Discharged ReceivedDischarged 02-FEB-2021 8:0216-FEB-2021 11:23 Start dateEnd date 01-NOV-202030-NOV-2020 Wet tonnageDry tonnage 4182829877 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP060 Discharged ReceivedDischarged 02-FEB-2021 8:0216-FEB-2021 11:23 Start dateEnd date 01-DEC-202031-DEC-2020 Wet tonnageDry tonnage 4613132951 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool ==== 2021 ==== Show/HideRefreshes the page MLA/2015/00088/OSP061 Discharged ReceivedDischarged 02-FEB-2021 8:0224-JAN-2023 9:21 Start dateEnd date 01-JAN-202131-JAN-2021 Wet tonnageDry tonnage 5938742419 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP062 Discharged ReceivedDischarged 10-JUN-2021 11:5924-JAN-2023 9:21 Start dateEnd date 01-FEB-202128-FEB-2021 Wet tonnageDry tonnage 7175051250 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP063 Discharged ReceivedDischarged 10-JUN-2021 11:5924-JAN-2023 9:22 Start dateEnd date 01-MAR-202131-MAR-2021 Wet tonnageDry tonnage 8167358338 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP064 Discharged ReceivedDischarged 10-JUN-2021 11:5924-JAN-2023 9:22 Start dateEnd date 01-APR-202130-APR-2021 Wet tonnageDry tonnage 3409524354 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP065 Discharged ReceivedDischarged 10-JUN-2021 11:5924-JAN-2023 9:22 Start dateEnd date 01-MAY-202131-MAY-2021 Wet tonnageDry tonnage 8148758205 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP066 Discharged ReceivedDischarged 22-SEP-2021 16:3824-JAN-2023 9:22 Start dateEnd date 01-JUN-202130-JUN-2021 Wet tonnageDry tonnage 7595054250 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP067 Discharged ReceivedDischarged 22-SEP-2021 16:3824-JAN-2023 9:22 Start dateEnd date 01-JUL-202131-JUL-2021 Wet tonnageDry tonnage 91152.365109 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP068 Discharged ReceivedDischarged 22-SEP-2021 16:3824-JAN-2023 9:22 Start dateEnd date 01-AUG-202131-AUG-2021 Wet tonnageDry tonnage 7051850370 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP069 Discharged ReceivedDischarged 19-JAN-2022 9:1024-JAN-2023 9:23 Start dateEnd date 01-SEP-202130-SEP-2021 Wet tonnageDry tonnage 7235351680 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP070 Discharged ReceivedDischarged 19-JAN-2022 9:1024-JAN-2023 9:23 Start dateEnd date 01-OCT-202131-OCT-2021 Wet tonnageDry tonnage 2998121350 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP071 Discharged ReceivedDischarged 19-JAN-2022 9:1024-JAN-2023 9:23 Start dateEnd date 01-NOV-202130-NOV-2021 Wet tonnageDry tonnage 51143652 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP072 Discharged ReceivedDischarged 19-JAN-2022 9:1024-JAN-2023 9:23 Start dateEnd date 01-DEC-202131-DEC-2021 Wet tonnageDry tonnage 3688726347 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool ==== 2022 ==== Show/HideRefreshes the page MLA/2015/00088/OSP073 Discharged ReceivedDischarged 14-APR-2022 10:3724-JAN-2023 9:23 Start dateEnd date 01-JAN-202231-JAN-2022 Wet tonnageDry tonnage 13487496339 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP074 Discharged ReceivedDischarged 14-APR-2022 10:3724-JAN-2023 9:24 Start dateEnd date 01-FEB-202228-FEB-2022 Wet tonnageDry tonnage 6822048729 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP075 Discharged ReceivedDischarged 14-APR-2022 10:3724-JAN-2023 9:24 Start dateEnd date 01-MAR-202231-MAR-2022 Wet tonnageDry tonnage 9457167551 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP076 Discharged ReceivedDischarged 06-JUL-2022 15:5624-JAN-2023 9:24 Start dateEnd date 01-APR-202230-APR-2022 Wet tonnageDry tonnage 67242.548250 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP077 Discharged ReceivedDischarged 06-JUL-2022 15:5624-JAN-2023 9:24 Start dateEnd date 01-MAY-202231-MAY-2022 Wet tonnageDry tonnage 8347048030 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP078 Discharged ReceivedDischarged 25-OCT-2022 15:3824-JAN-2023 9:24 Start dateEnd date 01-JUN-202230-JUN-2022 Wet tonnageDry tonnage 115071.682194 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP079 Discharged ReceivedDischarged 25-OCT-2022 15:3824-JAN-2023 9:24 Start dateEnd date 01-JUL-202231-JUL-2022 Wet tonnageDry tonnage 46974.233553 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP080 Discharged ReceivedDischarged 25-OCT-2022 15:3824-JAN-2023 9:24 Start dateEnd date 01-AUG-202231-AUG-2022 Wet tonnageDry tonnage 37759.426971 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP081 Discharged ReceivedDischarged 25-OCT-2022 15:3824-JAN-2023 9:25 Start dateEnd date 01-SEP-202230-SEP-2022 Wet tonnageDry tonnage 86931.662094 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP082 Discharged ReceivedDischarged 20-DEC-2022 11:0124-JAN-2023 9:25 Start dateEnd date 01-OCT-202231-OCT-2022 Wet tonnageDry tonnage 8391359937.85 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP083 Discharged ReceivedDischarged 20-DEC-2022 11:0124-JAN-2023 9:25 Start dateEnd date 01-NOV-202230-NOV-2022 Wet tonnageDry tonnage 6884249712.85 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool MLA/2015/00088/OSP084 Discharged ReceivedDischarged 06-JAN-2023 11:0624-JAN-2023 9:25 Start dateEnd date 01-DEC-202231-DEC-2022 Wet tonnageDry tonnage 56837.240598 Dredged area typesDumping methodsWater body Harbour BedBottom dumpingTees/Hartlepool ==== 2023 ==== Show/HideRefreshes the page MLA/2015/00088/OSP085 Responded Received 21-MAR-2023 15:02 Start dateEnd date 01-JAN-202331-JAN-2023 MLA/2015/00088/OSP086 Responded Received 21-MAR-2023 15:02 Start dateEnd date 01-FEB-202328-FEB-2023 MLA/2015/00088/OSP087 Responded Received 09-AUG-2023 11:28 Start dateEnd date 01-MAR-202331-MAR-2023 MLA/2015/00088/OSP088 Responded Received 09-AUG-2023 11:28 Start dateEnd date 01-APR-202330-APR-2023 MLA/2015/00088/OSP089 Responded Received 09-AUG-2023 11:28 Start dateEnd date 01-MAY-202331-MAY-2023 MLA/2015/00088/OSP090 Responded Received 09-AUG-2023 11:28 Start dateEnd date 01-JUN-202330-JUN-2023 MLA/2015/00088/OSP091 Responded Received 09-AUG-2023 11:28 Start dateEnd date 01-JUL-202331-JUL-2023 MLA/2015/00088/OSP092 Open Start dateEnd date 01-AUG-202331-AUG-2023 MLA/2015/00088/OSP093 Open Start dateEnd date 01-SEP-202330-SEP-2023 MLA/2015/00088/OSP094 Open Start dateEnd date 01-OCT-202331-OCT-2023 MLA/2015/00088/OSP095 Open Start dateEnd date 01-NOV-202330-NOV-2023 MLA/2015/00088/OSP096 Open Start dateEnd date 01-DEC-202331-DEC-2023 ==== 2024 ==== Show/HideRefreshes the page MLA/2015/00088/OSP097 Open Start dateEnd date 01-JAN-202431-JAN-2024 MLA/2015/00088/OSP098 Open Start dateEnd date 01-FEB-202429-FEB-2024 MLA/2015/00088/OSP099 Open Start dateEnd date 01-MAR-202431-MAR-2024 MLA/2015/00088/OSP100 Open Start dateEnd date 01-APR-202430-APR-2024 MLA/2015/00088/OSP101 Open Start dateEnd date 01-MAY-202431-MAY-2024 MLA/2015/00088/OSP102 Open Start dateEnd date 01-JUN-202430-JUN-2024 MLA/2015/00088/OSP103 Open Start dateEnd date 01-JUL-202431-JUL-2024 MLA/2015/00088/OSP104 Open Start dateEnd date 01-AUG-202431-AUG-2024 MLA/2015/00088/OSP105 Open Start dateEnd date 01-SEP-202430-SEP-2024 MLA/2015/00088/OSP106 Open Start dateEnd date 01-OCT-202431-OCT-2024 MLA/2015/00088/OSP107 Open Start dateEnd date 01-NOV-202430-NOV-2024 MLA/2015/00088/OSP108 Open Start dateEnd date 01-DEC-202431-DEC-2024 ==== 2025 ==== Show/HideRefreshes the page MLA/2015/00088/OSP109 Open Start dateEnd date 01-JAN-202531-JAN-2025 MLA/2015/00088/OSP110 Open Start dateEnd date 01-FEB-202528-FEB-2025 MLA/2015/00088/OSP111 Open Start dateEnd date 01-MAR-202531-MAR-2025 MLA/2015/00088/OSP112 Open Start dateEnd date 01-APR-202530-APR-2025 MLA/2015/00088/OSP113 Open Start dateEnd date 01-MAY-202531-MAY-2025 MLA/2015/00088/OSP114 Open Start dateEnd date 01-JUN-202530-JUN-2025 MLA/2015/00088/OSP115 Open Start dateEnd date 01-JUL-202531-JUL-2025 MLA/2015/00088/OSP116 Open Start dateEnd date 01-AUG-202531-AUG-2025 MLA/2015/00088/OSP117 Open Start dateEnd date 01-SEP-202530-SEP-2025 MLA/2015/00088/OSP118 Open Start dateEnd date 01-OCT-202531-OCT-2025 MLA/2015/00088/OSP119 Open Start dateEnd date 01-NOV-202530-NOV-2025 MLA/2015/00088/OSP120 Open Start dateEnd date 01-DEC-202531-DEC-2025

mla-2015-00088.1753261305.txt.gz · Last modified: by nefcadmin