Case Details | Project Type | Project Title | Locations | Applicant Name | Submission Date | Decision Date |
---|---|---|---|---|---|---|
MLA/2016/00001 - Completed | Application - Other deposits | North Killingholme Toe Beam Repairs | North Killingholme | Environment Agency | 04 Jan 2016 | 07 Feb 2017 |
MLA/2016/00002/4 - Completed | Application - Sampling | Offshore Exploratory Boreholes | WCM Offshore boreholes phase 3 | West Cumbria Mining Limited | 04 Jan 2016 | 18 Oct 2017 |
MLA/2016/00004 - Completed | Application - Maintenance of existing works | Petrel Pier (Gosport) - Pontoon Replacement | Area 1 (Petrel Pier) | Bae Systems Marine Limited | 06 Jan 2016 | 29 Jan 2016 |
MLA/2016/00005/1 - Completed | Application - Other works | EDF Energy - Hinkley Point 'B' Power station - Installation of Stop Gates for Cooling Water System Isolation in advance of planned 2016 outage. | Hinkley Point 'B' Power Station - Stop Log/Coarse screen location | Edf Energy Nuclear Generation Limited | 07 Jan 2016 | 21 Jan 2016 |
MLA/2016/00006 - Completed | Application - Construction of new works, Other removals | Byways Slipway, Bouldnor, Isle of Wight | Bouldnor | Mr Niall Dowling | 11 Jan 2016 | 10 Jun 2016 |
MLA/2016/00008 - Completed | Application - Other deposits | Sovereign Harbour Emergency works to remove shingle bank | Sovereign Harbour Shingle Bank Removal 2016 | Premier Marinas (Eastbourne) Limited | 12 Jan 2016 | 20 Jan 2016 |
MLA/2016/00009 - Completed | Application - Construction of new works | St Anne's Wharf River Wall | St Anne's Wharf | Tcm Ltd | 12 Jan 2016 | 10 May 2016 |
MLA/2016/00010 - Withdrawn | Application - Construction of new works | Extension to I Jetty at Universal Marina, River Hamble, Southampton | John Willment Marine Limited | 13 Jan 2016 | ||
MLA/2016/00011 - Completed | Application - Construction of new works | Varne Boat Club, Replacement Slipway | Varne Boat Club | Varne Boat Club Limited(The) | 14 Jan 2016 | 23 May 2016 |
MLA/2016/00013 - Completed | Application - Clean-up dredging, Disposal of dredged material | Minehead Harbour Shinglre Bank removal | Minehead Harbour, Disposal site | West Somerset District Council | 15 Jan 2016 | 19 Feb 2016 |
MLA/2016/00014/4 - Completed | Application - Disposal of dredged material | Lincshore Beach Renourishment Works | Mablethorpe to Skegness | Environment Agency | 15 Jan 2016 | 30 Jun 2020 |
MLA/2016/00015 - Completed | Application - Maintenance of existing works | Old Swan Bridge | Old Swan Spanning Over River Arun | Wsp Group Limited | 18 Jan 2016 | 04 Jul 2017 |
MLA/2016/00017/2 - Completed | Application - Construction of new works, Disposal of dredged material, Other deposits, Other dredging | Anchorsholme Storm Water Outfall | Anchorsholme outfall Working area, BARROW D (IS205) | United Utilities Water Plc | 19 Jan 2016 | 23 Mar 2018 |
MLA/2016/00018/1 - Completed | Application - Maintenance of existing works | Long Rock Sea Wall Interim Repair | Long Rock | Cormac Solutions Ltd | 20 Jan 2016 | 08 Jul 2016 |
MLA/2016/00019/1 - Completed | Application - Sampling | North West Cost Connections Geotchnical Survey 2016 | Tunnel_Route_Survey_Corridor | National Grid Commercial Holdings Limited | 21 Jan 2016 | 07 Apr 2016 |
MLA/2016/00020 - Completed | Application - Construction of new works | ARPW Old Beford Sluice Eel Pass | Old Bedford Eel Pass | Environment Agency | 21 Jan 2016 | 23 Feb 2016 |
MLA/2016/00021/1 - Completed | Application - Construction of new works | Barrier Garden Pier Extension | Barrier Garden Pier Extension Site | Port Of London Authority | 21 Jan 2016 | 27 Sep 2016 |
MLA/2016/00022/4 - Completed | Application - Other dredging | BLAKE BRIDGE | BLAKE BRIDGE | Somerset County Council | 24 Jan 2016 | 30 Aug 2018 |
MLA/2016/00023/1 - Completed | Application - Disposal of dredged material | Placement of Maintenance Dredge Material Wells Harbour Grouped under: Wells Harbour dredge disposal Showing 2 of 6 cases | Well Beneficial use site2 (HU156), Wells outer harbour site A (HU152), Wells Outer Harbour B1 (HU157), Wells outer harbour site C (HU154) | Wells Harbour Commissioners | 25 Jan 2016 | 12 Jul 2016 |
MLA/2016/00024/2 - Completed | Application - Clean-up dredging | Warkworth Harbour North Side Sand Relocation | Warkworth Harbour North Side | Mr Simon Baxter | 25 Jan 2016 | 27 Jun 2019 |
MLA/2016/00025/3 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Esso Fawley Marine Terminal Maintenance Dredging and Disposal Licence Renewal | NAB TOWER (WI060), FMT Dredge Area | Esso Petroleum Company,Limited | 26 Jan 2016 | 14 Oct 2019 |
MLA/2016/00027 - Completed | Application - Maintenance of existing works | rebuild quay at 1 noss mayo | 1 The Point Noss Mayo | Mrs Kathryn Barnett | 27 Jan 2016 | 13 May 2016 |
MLA/2016/00028/1 - Completed | Application - Maintenance of existing works | Network Rail - Brantsy to Parton | Bransty | Network Rail Limited | 28 Jan 2016 | 19 Sep 2016 |
MLA/2016/00029 - Completed | Application - Other removals | UK-Germany 6 Cable Recovery | UK-Germany 6 cable Recovery 20 meter Corridor | Bt Plc | 29 Jan 2016 | 29 Apr 2016 |
MLA/2016/00030 - Completed | Application - Other works | Pontoon installation | Trinity Quay, Alicat Workboats Ltd | Alicat Workboats Limited | 29 Jan 2016 | 16 May 2016 |
MLA/2016/00031 - Completed | Application - Maintenance of existing works | Eskmeals Viaduct Re-railing | Eskmeals Viaduct LA19 5YG | Carillion Plc | 29 Jan 2016 | 05 Feb 2016 |
MLA/2016/00033/1 - Completed | Application - Construction of new works, Maintenance of existing works | Greater Gabbard Offshore Wind Farm (OWF) Export Cable Operations & Maintenance Works | Balfour Beatty Usl | 01 Feb 2016 | 09 Nov 2016 | |
MLA/2016/00034/1 - Completed | Application - Other works | Gweek Boatyard Test Pile | Indicative Test Pile Location | Gweek Quay Limited | 01 Feb 2016 | 04 Apr 2017 |
MLA/2016/00035/1 - Completed | Application - Construction of new works | Addition of extended walkways to RNLI slipway at Sennen cove | Sennen Cove Lifeboat Station | R.N.L.I. (Trading) Limited | 02 Feb 2016 | 18 Oct 2016 |
MLA/2016/00036/3 - Completed | Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital) | Portsmouth Heritage Pontoon and HMS Warrior Dredging and Construction Works | Heritage Pontoon, HMS Warrior, NAB TOWER (WI060) | Portsmouth Naval Base Property Trust | 02 Feb 2016 | 06 May 2020 |
MLA/2016/00037 - Completed | Application - Maintenance of existing works | Thorn Sluice Refurbishment | Thorn Sluice | Environment Agency - South West Region | 03 Feb 2016 | 06 Apr 2016 |
MLA/2016/00038 - Completed | Application - Maintenance of existing works | Maintenance painting part of external face of Canary Wharf Pier pontoon, London | Canary Wharf Pier pontoon | Canary Wharf Management Limited | 03 Feb 2016 | 15 Feb 2016 |
MLA/2016/00039 - Completed | Application - Maintenance of existing works | MR3511 River Mersey | MR3511 river Mersey | J. Murphy & Sons Limited | 03 Feb 2016 | 14 Mar 2016 |
MLA/2016/00042 - Completed | Application - Other deposits | Dudgeon Offshore Wind Farm - waverider buoy installation | Buoy location | Dudgeon Offshore Wind Limited | 05 Feb 2016 | 25 Feb 2016 |
MLA/2016/00043/1 - Completed | Application - Navigational dredging (maintenance) | Essex Marina Removal of Silt Build Up | Essex Marina | Essex Marina | 05 Feb 2016 | 22 Feb 2017 |
MLA/2016/00044 - Completed | Application - Maintenance of existing works | Creek House Narrow Street London, E14 8BP | Creek House, Narrow Street, London, E14 8BP | Mr Anthony Johncock | 08 Feb 2016 | 21 Mar 2016 |
MLA/2016/00045 - Completed | Application - Construction of new works | Pontoon extension to Harbour Master's Jetty, Warsash. | Harbour Master's Jetty, warsash | River Hamble Harbour Authority | 08 Feb 2016 | 10 May 2016 |
MLA/2016/00046 - Completed | Application - Maintenance of existing works | Dawlish, Teignmouth and Exe estuary seawall repairs | Dawlish, Teignmouth and Exe estuary seawall | Dyer And Butler | 08 Feb 2016 | 17 Aug 2016 |
MLA/2016/00047/2 - Completed | Application - Maintenance of existing works | add additional pile (pontoon C extension) | Installation of 1No. Pile to existing pontoon extension | Pontoon Berth Holders Two | 09 Feb 2016 | 09 Jun 2017 |
MLA/2016/00048 - Completed | Application - Construction of new works, Other dredging, Other works | The Garden Bridge | Garden Bridge, Crown River Cruises new mooring location, Relocation of HQS Wellington | Garden Bridge Trust | 09 Feb 2016 | 29 Jul 2016 |
MLA/2016/00049 - Completed | Application - Other dredging, Other removals | Burbo Bank Extension Debris Clearance | Burbo Bank Extension Offshore Wind Farm, Burbo Bank Extension OWF (IS135) | Dong Energy Burbo Extension (Uk) Ltd | 09 Feb 2016 | 06 May 2016 |
MLA/2016/00050 - Completed | Application - Sampling | Trial pit within the back filled former outdoor pool. | Tynemouth Outdoor Pool | Friends Of Tynemouth Outdoor Pool | 10 Feb 2016 | 09 Mar 2016 |
MLA/2016/00051 - Completed | Application - Maintenance of existing works, Other dredging | RNLI Selsey -Emergency Beach Re-Profiling of Launch Route | Selsey Inshore Lifeboat Launch Route (upper), Selsey Inshore Lifeboat Launch Route (Lower) | Rnli | 10 Feb 2016 | 16 Feb 2016 |
MLA/2016/00052/2 - Completed | Application - Construction of new works | Carbis Bay Hotel - Ocean Sports Centre and Apartments | Carbis Bay Hotel | 2gh Water | 11 Feb 2016 | 16 Aug 2017 |
MLA/2016/00053 - Completed | Application - Maintenance of existing works | Crescendo Court sea wall repairs and improvements | Crescendo Court TR11 2SZ | Barleycroft Limited | 11 Feb 2016 | 16 May 2016 |
MLA/2016/00055/3 - Completed | Application - Construction of new works | Oikos Deepwater Jetty (ODWJ) Proposals | ODWJ Proposals | Oikos Storage Limited | 11 Feb 2016 | 30 Nov 2017 |
MLA/2016/00056 - Completed | Application - Maintenance of existing works | Flood Defence Wall Repairs | John Day House | Moore Project Management Solutions Llp | 11 Feb 2016 | 25 May 2016 |
MLA/2016/00058/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Hill Head Harbour Channel Maintenance | Shingle Bank Removal Area, Shingle Deposit | Hill Head Sailing Club | 14 Feb 2016 | 16 Aug 2017 |
MLA/2016/00059 - Completed | Application - Maintenance of existing works | Scaffolding | Tides Reach Appartments, Egloshayle, Wadebridge, Cornwall PL27 6BW | H&H Scaffolding (Sw) Limited | 15 Feb 2016 | 10 May 2016 |
MLA/2016/00060 - Completed | Application - Maintenance of existing works | RNLI Fleetwood -Low Impact Maintenance Works to Pontoon Berth (Fast Track Licence) | RNLI Fleetwood: Lifeboat Pen | Royal National Lifeboat Institution | 15 Feb 2016 | 21 Mar 2016 |
MLA/2016/00061 - Completed | Application - Maintenance of existing works | Brixham Marina Pile Repair | Brixham Pile Repair | Marina Developments Limited | 16 Feb 2016 | 11 Mar 2016 |
MLA/2016/00062/3 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Continuation of the Disposal of Maintenance Dredgings at ABP King's Lynn | WEST STONES (HU143) | Associated British Ports Kings Lynn | 16 Feb 2016 | 02 Jun 2020 |
MLA/2016/00064/3 - Completed | Application - Maintenance of existing works | Coastal Defence Reconstruction Works, Fort Cumberland, Portsmouth | Fort_Cumberland_MMO_Site_Extent | Southern Water Services Limited | 17 Feb 2016 | 11 Sep 2017 |
MLA/2016/00065/2 - Completed | Application - Construction of new works | Blyth West Quay Strengthening | West Quay | Port Of Blyth | 17 Feb 2016 | 20 Nov 2017 |
MLA/2016/00066 - Completed | Application - Construction of new works | Fairlight Cove Coast Protection Works Phase 3 | Construction Area | Canterbury City Council | 17 Feb 2016 | 29 Jul 2016 |
MLA/2016/00067/5 - Completed | Application - Maintenance of existing works | Maintenance (component replacement) at Westermost Rough Offshore Wind Farm | Westermost Rough Offshore Wind Farm site | Dong Energy Power (Uk) Limited | 17 Feb 2016 | 09 May 2017 |
MLA/2016/00068 - Completed | Application - Navigational dredging (maintenance) | Tollesbury Marina Maintenance Dredging Grouped under: Tollesbury Marina Showing 2 of 2 cases | Tollesbury Marina | Tollesbury Marina Llp | 18 Feb 2016 | 12 Jul 2016 |
MLA/2016/00070 - Completed | Application - Construction of new works | Americas Cup World Series - Portsmouth | Americas Cup World Series - temporary Pontoon | Teamorigin Llp | 19 Feb 2016 | 15 Jun 2016 |
MLA/2016/00071 - Completed | Application - Construction of new works | Middleton Wastewater Treatment Works Outfall Marker Post | Marker Post working area | United Utilities Water Plc | 19 Feb 2016 | 14 Jun 2016 |
MLA/2016/00072/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Maintenance dredging Dock Point Kings Lynn and Disposal site at HU143 10 year disposal licence | Dock Point Kings Lynn, WEST STONES (HU143) | Kings Lynn Conservancy Board | 22 Feb 2016 | 08 Jan 2020 |
MLA/2016/00074 - Completed | Application - Construction of new works | Waldringfield Saltmarsh Restoration Project | Waldringfield saltmarsh | Water Management Alliance Limited | 23 Feb 2016 | 16 May 2016 |
MLA/2016/00075 - Completed | Application - Incineration of any substance or object at sea | Walney Extension UXO Clearance | WOW03_04_UXOworkingArea_WGS84 | Dong Energy Walney Extension (Uk) Ltd | 24 Feb 2016 | 04 Aug 2016 |
MLA/2016/00077/5 - Completed | Application - Maintenance of existing works | Component exchanges (maintenance) at Burbo Bank offshore wind farm Grouped under: Burbo Bank offshore windfarm Showing 2 of 3 cases | Burbo Bank OWF | Dong Energy Power (Uk) Limited | 25 Feb 2016 | 04 May 2017 |
MLA/2016/00078/3 - Completed | Application - Maintenance of existing works | River Stour Power Station Underbridge | River Stour Power Station Underbridge | Costain Group Plc | 25 Feb 2016 | 31 Mar 2017 |
MLA/2016/00079/4 - Completed | Application - Maintenance of existing works | Component exchanges (maintenance) at Walney wind farms Grouped under: Maintenance (component replacement) Walney Showing 3 of 8 cases | Walney 1 OWF, Walney 2 OWF | Dong Energy Power (Uk) Limited | 26 Feb 2016 | 09 Mar 2017 |
MLA/2016/00080 - Completed | Application - Maintenance of existing works | Gosshall Water Feed Platform | Gosshall Platform | Environment Agency | 26 Feb 2016 | 26 May 2016 |
MLA/2016/00082/1 - Completed | Application - Other removals | Ryde Esplanade Canopy Removal Grouped under: Ryde Esplanade Canopy Support Structure Showing 2 of 2 cases | Ryde Canopy | Geoffrey Osborne Limited | 26 Feb 2016 | 07 Jul 2016 |
MLA/2016/00083 - Completed | Application - Maintenance of existing works | South Wharf Quay Repairs | South Wharf - West End of Quay | Norfolk Marine | 29 Feb 2016 | 23 May 2016 |
MLA/2016/00085/1 - Completed | Application - Construction of new works, Maintenance of existing works, Other removals | Hamble Yacht Services - Proposed New Hoist Dock | Hoist Dock, Sheet Piled Wall | Hys (Holdings) Limited | 02 Mar 2016 | 22 Feb 2017 |
MLA/2016/00087/2 - Completed | Application - Maintenance of existing works | Humber Gateway Offshore Wind Farm (OWF) Export Cable Operations & Maintenance Works | Humber Gateway OWF export cable corridor | Balfour Beatty Group Limited | 03 Mar 2016 | 02 Jun 2023 |
MLA/2016/00091/1 - Completed | Application - Maintenance of existing works | Castle Beach, Falmouth - Sea Defence Wall Repairs | Castle Beach, Falmouth | Cornwall Council | 04 Mar 2016 | 09 May 2016 |
MLA/2016/00093/2 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Maintenance Dredge of the area in and around Shepards Wharf Marina and Town Quay (Cowes) Grouped under: Maintenance Dredge of the area in and around Shepards Wharf Marina and Town Quay (Cowes) Showing 2 of 3 cases | Town Quay Mooring Basin, Shepards Wharf Marina Zone 1 (2.0m BCD), Shepards Wharf Marina Zone 2 (1.5m BCD), Shepards Wharf Marina Zone 3 (3.0m BCD), NAB TOWER (WI060), HURST FORT (WI080) | Cowes Harbour Commission | 07 Mar 2016 | 09 Feb 2017 |
MLA/2016/00094 - Completed | Application - Other removals | Vegetation removel - Thames river wall, Hammersmith | Black Lion Lane (south) | London Borough Of Hammersmith And Fulham | 07 Mar 2016 | 10 Nov 2016 |
MLA/2016/00095 - Withdrawn | Application - Wrecks and other archaeological remains | Salvage of the SS Ballarat, the SS Briardene, and the SS Vinovia | Lodestone Marine Ventures Limited | 07 Mar 2016 | ||
MLA/2016/00098 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | RYS Jubilee Haven Grouped under: Maintenance Dredge of the area in and around Shepards Wharf Marina and Town Quay (Cowes) Showing 2 of 3 cases | NAB TOWER (WI060), HURST FORT (WI080), RYS Cowes | Royal Yacht Squadron | 07 Mar 2016 | 07 Jun 2016 |
MLA/2016/00099 - Completed | Application - Construction of new works | Pontoons Tug Boat Yard Grouped under: Wells Harbour dredge disposal Showing 2 of 6 cases | Pontoon Location Tug Boat Yard | Wells Harbour Commissioners | 08 Mar 2016 | 24 Jun 2016 |
MLA/2016/00100 - Completed | Application - Maintenance of existing works | Blake Bridge, Brigwater, Taunton | Blake Bridge, Bridgwater, Taunton | Parsons Brinckerhoff Ltd | 09 Mar 2016 | 21 Apr 2016 |
MLA/2016/00101 - Completed | Application - Maintenance of existing works | Caisson repair - Laira Rail Bridge | Laira Rail Bridge, The Cattewater, Plymouth | Plymouth City Council | 09 Mar 2016 | 11 Apr 2016 |
MLA/2016/00103/3 - Completed | Application - Explosive substances or articles, Other deposits, Other removals | Rampion Offshore Wind Farm Grouped under: Rampion Offshore Wind Farm Showing 4 of 13 cases | Rampion UXO clearance / boulder relocation | E.On Climate & Renewables Uk Rampion Offshore Wind Limited | 09 Mar 2016 | 28 Mar 2018 |
MLA/2016/00104/3 - Completed | Application - Other deposits, Other removals | potters leisure sea defence project, emergency works | potters sea defence project | Rosebay Services | 10 Mar 2016 | 29 Apr 2016 |
MLA/2016/00107 - Completed | Application - Construction of new works | Reinstatement of existing collapsed river wall | Tarmac Cement And Lime Ltd | 15 Mar 2016 | 12 Apr 2017 | |
MLA/2016/00108 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | SHOTLEY MARINA MAINTENANCE DREDGE 2016 | Shotley Marina Dredge Area, Shotley Marina Beach Replenishment Area | Shotley Marina Limited | 15 Mar 2016 | 26 Aug 2016 |
MLA/2016/00109 - Completed | Application - Other removals | Ground Investigations for potential Stem Wave Mitigation Structure | Trench locations (eastern end of HPC sea wall) | Nnb Generation Company (Hpc) Limited | 15 Mar 2016 | 26 Apr 2016 |
MLA/2016/00110/3 - Completed | Application - Other works | Use of bird deterrents at Burbo Offshore Wind Farm | DONG Energy Burbo (UK) Ltd. | Dong Energy Power (Uk) Limited | 15 Mar 2016 | 10 Mar 2020 |
MLA/2016/00111/4 - Completed | Application - Maintenance of existing works | Maintenance activities at London Array wind farm | LondonArray_WindFarmBoundary_TCE_20150520 | London Array Limited | 17 Mar 2016 | 05 Dec 2017 |
MLA/2016/00112 - Completed | Application - Construction of new works | Newhaven Construction Base - Temporary Pontoon to support construction of Rampion | Rampion Offshore Wind Farm Newhaven Construction Base - Temporary Pontoon | E.On Climate & Renewables Uk Rampion Offshore Wind Limited | 17 Mar 2016 | 24 Mar 2016 |
MLA/2016/00114 - Completed | Application - Maintenance of existing works | Messack House water pipeline, Cornwall | Messack House & Creek | Mr David Halsey | 17 Mar 2016 | 12 Apr 2016 |
MLA/2016/00115 - Completed | Application - Other works | Ryde pier head station urgent track works | Ryde Pier Head Station | Dyer And Butler Limited | 18 Mar 2016 | 21 Apr 2016 |
MLA/2016/00116 - Completed | Application - Construction of new works | Erosion control at the Lodge, Sutton | The Lodge | Mrs Margaret Millar | 18 Mar 2016 | 03 Jun 2016 |
MLA/2016/00117/2 - Completed | Application - Wrecks and other archaeological remains | North Sea wreck | Mr Andrew Watson | 19 Mar 2016 | 12 Sep 2016 | |
MLA/2016/00120/2 - Completed | Application - Construction of new works | TQEZ RIF St Philips Footbridge | St Philips Footbridge | Bristol City Council | 22 Mar 2016 | 18 Dec 2018 |
MLA/2016/00121 - Completed | Application - Construction of new works, Decommissioning of works | Battersea Power Station River Bus Jetty | Battersea Riverbus | Battersea Power Station Development Company Limited | 24 Mar 2016 | 17 Aug 2016 |
MLA/2016/00122/3 - Completed | Application - Construction of new works, Disposal of dredged material, Maintenance of existing works, Other deposits, Other dredging, Other removals | Dawlish Warren Beach Management Scheme | Dawlish beach, Pole Sands Dredge Site | Environment Agency | 24 Mar 2016 | 28 Jun 2017 |
MLA/2016/00123 - Completed | Application - Construction of new works | Robertsons Boatyard, Woodbridge - Creation of Additional Hardstanding | Site 1 | Robertsons Of Woodbridge (Boat Builders) Limited | 29 Mar 2016 | 25 Jan 2017 |
MLA/2016/00124 - Completed | Application - Construction of new works | Third Solent Fibre Optic Telecoms Cable | Gurnard Bay to Stone Point | British Telecommunications Public Limited Company | 29 Mar 2016 | 17 Aug 2017 |
MLA/2016/00125 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Great Yarmouth inner harbour dredge disposal | Great Yarmouth Inner Harbour and the River Yare, GREAT YARMOUTH (HU150) | Great Yarmouth Port Company Ltd | 29 Mar 2016 | 09 Dec 2016 |
MLA/2016/00126/1 - Completed | Application - Maintenance of existing works | Plaidy CSO Outfall concrete repairs Grouped under: Plaidy CSO Outfall concrete repairs Showing 2 of 2 cases | Plaidy CSO Outfall | South West Water Limited | 29 Mar 2016 | 20 Feb 2017 |
MLA/2016/00127 - Completed | Application - Other works | Greater Gabbard Offshore Wind Farm Met Mast IGMMX Removal of lattice | Greater Gabbard Met Mast IGMMX | Greater Gabbard Offshore Winds Limited | 31 Mar 2016 | 16 Jun 2016 |
MLA/2016/00128/1 - Completed | Application - Other works | Chapel Riverside Sea Wall | Sea Wall | Inland Homes Plc | 31 Mar 2016 | 28 Aug 2019 |
MLA/2016/00129 - Completed | Application - Maintenance of existing works | London Array BRITNED CROSSING - REMEDIAL ROCK INSTALLATION | 0 | Blue Transmission London Array Limited | 31 Mar 2016 | 15 Jul 2016 |
MLA/2016/00130 - Completed | Application - Maintenance of existing works | Swan Hunter Quay Wall Repairs | Swan Hunter Quay Wall Repairs | North Tyneside Council | 01 Apr 2016 | 11 Aug 2016 |
MLA/2016/00131 - Completed | Application - Other deposits | Marker Buoys | Harbour Marker Buoys, Leisure zone special mark buoy, Construction site marker buoys | Dover Harbour Board | 01 Apr 2016 | 25 May 2016 |
MLA/2016/00132 - Withdrawn | Application - Other removals | Bransholme Storm Water Pumping Station | Yorkshire Water Services Limited | 04 Apr 2016 | ||
MLA/2016/00133/2 - Completed | Application - Construction of new works | Liverpool 2 | Seaforth 1 | Peel Ports Limited | 04 Apr 2016 | 27 Oct 2016 |
MLA/2016/00134 - Completed | Application - Maintenance of existing works | RNLI Selsey -Emergency Repairs to Roof Cladding | Selsey - Station Roof Repairs | Royal National Lifeboat Institution | 04 Apr 2016 | 07 Apr 2016 |
MLA/2016/00135 - Completed | Application - Other deposits | Hindu Engagement | Weymouth Bay | Royal Fleet Auxillary | 04 Apr 2016 | 11 May 2016 |
MLA/2016/00136/6 - Completed | Application - Other deposits, Other removals | Rampion Offshore Wind- Flotation pits Grouped under: Rampion Offshore Wind Farm Showing 4 of 13 cases | Disposal site, CR1 FP1, CR1 FP2, CR1 FP3, CR2 FP1, CR2 FP2, CR2 FP3 | E.On Climate & Renewables Uk Rampion Offshore Wind Limited | 04 Apr 2016 | 23 Nov 2018 |
MLA/2016/00138/2 - Completed | Application - Construction of new works, Maintenance of existing works | Hastings Coastal Defence Works Stage 2 | Hastings Coastal Defence Works Site | Canterbury City Council | 06 Apr 2016 | 27 Jul 2018 |
MLA/2016/00139 - Completed | Application - Maintenance of existing works | Southbank River Wall | Southbank River Wall | Concrete Repairs Limited | 06 Apr 2016 | 21 Jun 2016 |
MLA/2016/00140 - Completed | Application - Construction of new works | Alexandra Yacht Club Jetty H10842 Grouped under: Emergency making safe of Alexandra Yacht Club Jetty Showing 2 of 2 cases | Alexandra Yacht Club Jetty Works | Southend On Sea Borough Council | 07 Apr 2016 | 08 Jul 2016 |
MLA/2016/00141 - Completed | Application - Construction of new works | Workington Rail Transport Hub | Workington Rail Transport Hub. (Outfall Pipe) | Story Contracting Limited | 07 Apr 2016 | 23 Jun 2016 |
MLA/2016/00142/1 - Completed | Application - Maintenance of existing works | PLOVER SCAR LIGHTHOUSE | Plover Scar Lighthouse and Access Track | Lancaster Port Commission | 07 Apr 2016 | 11 Jan 2017 |
MLA/2016/00143/2 - Completed | Application - Disposal of dredged material, Other dredging | Disposal to Nab Tower W1060 of surplus sand and gravel used in the construction of East Cowes Breakwater | East Cowes Breakwater Project - Surplus Material Site, NAB TOWER (WI060) | Boskalis Westminster Ltd | 08 Apr 2016 | 19 Dec 2018 |
MLA/2016/00144 - Completed | Application - Maintenance of existing works | Tower Bridge bascule Re-decking and Approach Structure Waterproofing | Tower Bridge london | Bam Nuttall Limited | 08 Apr 2016 | 18 Jul 2016 |
MLA/2016/00145 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Thames Estuary Channel Management - Medium Term | Knock John, West Oaze, Black Deep, NORTH EDINBURGH CHANNEL (TH080) | Port Of London Authority | 08 Apr 2016 | 06 Feb 2018 |
MLA/2016/00146 - Completed | Application - Construction of new works, Other removals | Dismantling and installation of scaffold access to the outfall structure | Site | Magnox Limited | 12 Apr 2016 | 06 Jul 2016 |
MLA/2016/00147/3 - Completed | Application - Maintenance of existing works, Other removals | Westermost Rough Offshore Wind Farm O&M Marine Licence | Westermost_Rough_Windfarm_WGS84 | Westermost Rough Limited | 12 Apr 2016 | 12 Feb 2020 |
MLA/2016/00148/4 - Completed | Application - Maintenance of existing works, Other removals | Burbo Bank Offshore Wind Farm O&M Marine Licence Grouped under: Burbo Bank offshore windfarm Showing 2 of 3 cases | Burbo_Bank_Windfarm_WGS84 | Dong Energy Burbo (Uk) Limited | 12 Apr 2016 | 03 Feb 2022 |
MLA/2016/00149/3 - Completed | Application - Maintenance of existing works, Other removals | Barrow Offshore Wind Farm O&M Marine Licence | Barrow Offshore Wind Farm | Barrow Offshore Wind Limited | 12 Apr 2016 | 29 Nov 2019 |
MLA/2016/00150/3 - Completed | Application - Maintenance of existing works, Other removals | West of Duddon Sands Offshore Wind Farm O&M Marine Licence | West of Duddon Offshore Windfarm | Orsted Westermost Rough Limited | 12 Apr 2016 | 25 Nov 2019 |
MLA/2016/00151/3 - Completed | Application - Maintenance of existing works, Other removals | Walney 1&2 Offshore Wind Farms O&M Marine Licence Grouped under: Maintenance (component replacement) Walney Showing 3 of 8 cases | Walney 1&2 Offshore Wind Farms | Walney (Uk) Offshore Windfarms Limited | 12 Apr 2016 | 10 Dec 2019 |
MLA/2016/00153 - Completed | Application - Other works | Brixham Boatlift Pile Replacement | Brixham Marina | Marina Developments Limited | 12 Apr 2016 | 05 May 2016 |
MLA/2016/00154/2 - Completed | Application - Other removals | Removal of algal growth and/or guano on wind turbine structures at Gunfleet Sands for health and safety and corrosion protection Grouped under: Gunfleet Sands OWF 1, 2, 3 Showing 4 of 15 cases | Gunfleet Sands 2, Gunfleet Sands 1, Gunfleet Sands 3 | Dong Energy Power (Uk) Limited | 13 Apr 2016 | 31 Mar 2017 |
MLA/2016/00155/1 - Completed | Application - Construction of new works | New Hoist Dock for Berthon Boatyard, Lymington | Berthon Boat Company Limited(The) | 13 Apr 2016 | 21 Mar 2022 | |
MLA/2016/00156 - Completed | Application - Other works | Ryde Esplanade Canopy Support Structure Grouped under: Ryde Esplanade Canopy Support Structure Showing 2 of 2 cases | Ryde Esaplnade Canopy | Geoffrey Osborne Limited | 13 Apr 2016 | 14 Apr 2016 |
MLA/2016/00157 - Completed | Application - Construction of new works | Rock Revetment at Bakers Gap, Folkestone | Rock Revetment at Bakers Gap | Canterbury City Council | 13 Apr 2016 | 20 Apr 2017 |
MLA/2016/00159 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Tapper And Son (Poole) Limited | 14 Apr 2016 | 20 Apr 2016 | |
MLA/2016/00160/3 - Completed | Application - Maintenance of existing works | Westermost Rough - Removal of algal growth and/or guano | Westermost Rough Offshore Wind Farm site | Dong Energy Power (Uk) Limited | 14 Apr 2016 | 30 Mar 2017 |
MLA/2016/00162/2 - Completed | Application - Maintenance of existing works | Component exchanges (maintenance) at Barrow offshore wind farm and reomval of algal growth and/or guano | Barrow Offshore Windfarm | Barrow Offshore Wind Limited | 14 Apr 2016 | 03 Mar 2017 |
MLA/2016/00163/2 - Completed | Application - Other removals | Removal of algal growth and/or guano on wind farm structures at Walney, West of Duddon Sands, and Burbo Bank Wind farm, for health and safety and corrosion protection Grouped under: Maintenance (component replacement) Walney Showing 3 of 8 cases | Walney wind farm part 1, Walney wind farm part 2, West of Duddon Sands wind farm, Burbo Bank wind farm | Dong Energy Power (Uk) Limited | 15 Apr 2016 | 28 Apr 2017 |
MLA/2016/00165 - Completed | Application - Maintenance of existing works | Construction of concrete ring beam to replace rotting timber at foot of slipway | Brading Haven Yacht Club slipway | Brading Haven Yacht Club | 15 Apr 2016 | 08 Jun 2016 |
MLA/2016/00166 - Completed | Application - Construction of new works | 151396 DS Project | Shakespeare Beach | Network Rail Limited | 15 Apr 2016 | 12 Aug 2016 |
MLA/2016/00167/4 - Completed | Application - Maintenance of existing works, Other removals | Gunfleet Sands 1&2 Offshore Wind Farms O&M Marine Licence Grouped under: Gunfleet Sands OWF 1, 2, 3 Showing 4 of 15 cases | Gunfleet Sands 1&2 Offshore Wind Farms | Gunfleet Sands Holding Ltd | 15 Apr 2016 | 13 Dec 2019 |
MLA/2016/00168/4 - Completed | Application - Maintenance of existing works, Other removals | Gunfleet Sands 3 Offshore Wind Farm O&M Marine Licence Grouped under: Gunfleet Sands OWF 1, 2, 3 Showing 4 of 15 cases | Gunfleet Sands 3 Offshore Wind Farm | Dong Energy Gunfleet Sands Demo (Uk) Ltd | 15 Apr 2016 | 16 Jan 2020 |
MLA/2016/00169 - Completed | Application - Maintenance of existing works | Maintenance Works to Mulberry Quays Falmouth | Mulberry Quays Falmouth | Mulberry Quay Management Company Limited | 18 Apr 2016 | 11 Jul 2016 |
MLA/2016/00172 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr John Lister | 19 Apr 2016 | 21 Apr 2016 | |
MLA/2016/00175/7 - Completed | Application - Construction of new works | Anchorsholme Coast Protection Scheme | Anchorsholme Coast Protection Scheme | Blackpool Borough Council | 20 Apr 2016 | 07 Jan 2022 |
MLA/2016/00176 - Completed | Application - Maintenance of existing works | RMYC Panorama Road Tidal Flap Upgrade | 600mm Tidal Flap | Wessex Water Services Limited | 20 Apr 2016 | 16 Jun 2016 |
MLA/2016/00177 - Completed | Application - Construction of new works | Albany House Moorings | Walkway structure over water | Bellway Homes Limited | 20 Apr 2016 | 30 Aug 2016 |
MLA/2016/00179/2 - Completed | Application - Other removals | Blyth Offshore Demonstration - UXO Clearance and Disposal | Blyth Offshore Demonstrator | Blyth Offshore Demonstrator Limited | 21 Apr 2016 | 27 Jun 2017 |
MLA/2016/00180/1 - Completed | Application - Disposal of dredged material | DISPOSAL OF MATERIAL FROM WEYMOUTH HARBOUR DREDGING | SWANAGE BAY (WI110) | Weymouth Harbour | 21 Apr 2016 | 17 Dec 2020 |
MLA/2016/00181/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | ABP Lowestoft - Maintenance dredge material disposal | LOWESTOFT CIRCULAR NORTH (TH005) | Abp Acquisitions Uk Limited | 21 Apr 2016 | 01 Aug 2018 |
MLA/2016/00182 - Completed | Application - Maintenance of existing works | RNLI Barrow - Emergency Works Application for Repair to Slipway | RNLI Barrow: Boathouse, Slipway and Access Jetty | Rnli Barrow | 21 Apr 2016 | 27 Apr 2016 |
MLA/2016/00183 - Completed | Application - Maintenance of existing works | Tideways, Creeksea, Burnham on Crouch, Essex, CM08PL | tideways | Mr Roger Miles | 22 Apr 2016 | 30 Jun 2016 |
MLA/2016/00185 - Completed | Application - Maintenance of existing works | Like for Like Replacement Sea Defence | Moorings, Westlands Estate, Birdham, Chichester, West Sussex PO20 7HJ | Mr Malcolm Oliver | 25 Apr 2016 | 21 Jul 2016 |
MLA/2016/00186/1 - Completed | Application - Maintenance of existing works | Rebuilding first 48 metres of existing Jetty | Harlow (Blackwater) Sailing Club | Harlow (Blackwater) Sailing Club | 25 Apr 2016 | 26 Apr 2017 |
MLA/2016/00187 - Completed | Application - Construction of new works | Installation of a new 15 metre readar tower on Shell Pier, Portsmouth | Shell Pier | Bae Systems Plc | 25 Apr 2016 | 11 May 2016 |
MLA/2016/00188 - Completed | Application - Construction of new works | Queen's Wharf and Riverside Studios | Queen's Wharf and Riverside Studios | Mount Anvil Limited | 26 Apr 2016 | 21 Jul 2016 |
MLA/2016/00189/1 - Completed | Application - Other works | Thames Tideway Tunnel (C450) Dormay Street riverwall replacement and associated works | DOrmay Street River Wall - Temporary Emergency Works | Jackson Civil Engineering Group Limited | 27 Apr 2016 | 29 Jul 2016 |
MLA/2016/00190 - Completed | Application - Decommissioning of works | Race Bank Met Mast Decommissioning | Race Bank Met Mast | Dong Energy Rb (Uk) Limited | 27 Apr 2016 | 21 Jul 2016 |
MLA/2016/00192 - Completed | Application - Maintenance of existing works | Emergency making safe of Alexandra Yacht Club Jetty Grouped under: Emergency making safe of Alexandra Yacht Club Jetty Showing 2 of 2 cases | Alexandra Yacht Club | Southend On Sea Borough Council | 27 Apr 2016 | 20 May 2016 |
MLA/2016/00193/1 - Completed | Application - Construction of new works, Decommissioning of works | RNLI Poole: Replacement of Floating Boathouse | RNLI Poole Lifeboat Station | R.N.L.I. (Trading) Limited | 28 Apr 2016 | 22 Aug 2017 |
MLA/2016/00195/1 - Completed | Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital) | Birdham Pool - Basin Dredge, Revetment and Pontoons | Birdham Pool Dredge, Birdham Pool Construction, Birdham Pool Marina (WI042) | Castle Marinas Limited | 29 Apr 2016 | 28 Jul 2017 |
MLA/2016/00196 - Completed | Application - Construction of new works | Proposed Boat House and Slipway - 50 Trefusis Road - Flushing - Falmouth - Cornwall TR11 5UB | 50 Trefusis Road, Flushing, falmouth TR11 5UB | Mr Geoff. Evans | 29 Apr 2016 | 29 Jul 2016 |
MLA/2016/00197 - Completed | Application - Alternative use of dredged material, Navigational dredging (maintenance) | Maintenance dredging, alternative use of dredged material (salt marsh replenishment) | Area of south east salt marsh recharged by discharge location points one & two (a), Area of north west salt marsh recharged by discharge location point three (a), Area of south east salt marsh recharged by discharge location points one & two (b), Area of south east salt marsh recharged by discharge location points one & two (c), Area of north west salt marsh recharged by discharge location point three (b) | Yacht Havens Limited | 29 Apr 2016 | 17 Jan 2017 |
MLA/2016/00198 - Completed | Application - Maintenance of existing works | TIDEWAYS, FERRY LANE, CREEKSEA, BURNHAM ON CROUCH, ESSEX, CM0 8PL | creeksea | Miles Water Engineering Ltd | 29 Apr 2016 | 29 Sep 2016 |
MLA/2016/00199 - Completed | Application - Scientific instruments | Trinity Hospital and Crowleys Wharf Trial pits | Trinity Hospital and Crowley's Wharf | Environment Agency | 29 Apr 2016 | 26 May 2016 |
MLA/2016/00200/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Dredge and disposal of Dredged Materials | Commercial Dock and Navigable Channel, NOSES POINT (TY130) | Seaham Harbour Dock Company | 30 Apr 2016 | 18 Feb 2021 |
MLA/2016/00202/1 - Completed | Application - Other deposits | Milford on Sea Beach Recharge | Milford on Sea beach recharge | New Forest District Council | 03 May 2016 | 21 Oct 2021 |
MLA/2016/00203/2 - Completed | Application - Maintenance of existing works | Network Rail - Sellafield Pitching | Sellafield Pitching | Network Rail Limited | 03 May 2016 | 15 Jun 2018 |
MLA/2016/00204/2 - Completed | Application - Sampling | Site Investigation at Nissan Terminal | Tyne Car Terminal Redevelopment | Port Of Tyne Authority | 04 May 2016 | 19 May 2017 |
MLA/2016/00205 - Completed | Application - Maintenance of existing works | Millbank River Wall Repairs | Millbank River Wall Repairs | F.M. Conway Building And Maintenance Limited | 05 May 2016 | 14 Jun 2016 |
MLA/2016/00206 - Completed | Application - Maintenance of existing works | Greater Gabbard Offshore Windfarm - Interarray Cable Maintenance | Greater Gabbard Offshore Wind Farm | Greater Gabbard Offshore Winds Limited | 05 May 2016 | 30 Sep 2016 |
MLA/2016/00207/1 - Completed | Application - Maintenance of existing works | Outfall repairs at Gunness and Althorpe | Keadby Outfall, Gunness Outfall | Severn Trent Water Limited | 06 May 2016 | 05 Aug 2016 |
MLA/2016/00208/2 - Completed | Application - Other removals | The Salvage & recovery of remaining cargo from shipwrecks Alpha 1 to 6 | Flagship Marine Management Limited | 08 May 2016 | 28 Oct 2016 | |
MLA/2016/00209/4 - Completed | Application - Construction of new works | IFA2 Electricity Interconnector | National Grid Ifa2 Ltd | 09 May 2016 | 13 Sep 2021 | |
MLA/2016/00210/1 - Completed | Application - Maintenance of existing works | CBC1 Br141 Eskmeals Viaduct | Eskmeals viaduct | Story Contracting Limited | 10 May 2016 | 27 Sep 2017 |
MLA/2016/00211 - Completed | Application - Other deposits | Isle of Man to UK Interconnector Cable - Maintenance and Repair | IOM Cable Route 1000m Buffer | Manx Cable Company Limited | 11 May 2016 | 09 Aug 2018 |
MLA/2016/00212 - Completed | Application - Maintenance of existing works | Heybridge Sea Lock Gate Replacement (Phase 2) | Heybridge Sea Lock Gate Replacement | Essex & Suffolk Water | 11 May 2016 | 08 Aug 2016 |
MLA/2016/00214 - Completed | Application - Construction of new works | Terminal Groyne Reconstruction, Cleethorpes. | Terminal_Groyne_Site_Area | North East Lincolnshire Council | 13 May 2016 | 12 May 2017 |
MLA/2016/00215 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Mercury Yacht Harbour Grouped under: MDL Marinas Showing 2 of 3 cases | Mercury Yacht Harbour - Dredge Area (limits), NAB TOWER (WI060), HURST FORT (WI080), NEEDLES (WI090) | Marina Developments Limited | 13 May 2016 | 14 Oct 2016 |
MLA/2016/00216/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Hamble Point Marina - Maintenance Dredging Grouped under: MDL Marinas Showing 2 of 3 cases | Hamble Point Marina - Dredge Area (limits), NAB TOWER (WI060), HURST FORT (WI080), NEEDLES (WI090) | Marina Developments Limited | 13 May 2016 | 16 Aug 2017 |
MLA/2016/00219 - Completed | Application - Construction of new works | Installation of 2 steel piles and a timber mooring grid for a new mooring for a residential boat in the River Thames, including extracting an existing steel pile and levelling the existing campshed. | Vertrouwen, The Hollows, Brentford TW8 0DZ | Morlandia Limited | 17 May 2016 | 20 Jan 2017 |
MLA/2016/00221 - Completed | Application - Construction of new works | Humber Wind Farm Turbine Export Cable Clamps | Humber Gateway Turbines J02, A10, B06 and D05 | E.On Climate & Renewables Uk Humber Wind Limited | 18 May 2016 | 11 Jul 2016 |
MLA/2016/00222/1 - Completed | Application - Decommissioning of works | Removal of some of the redundant structures at Phoenix Wharf, Rainham, Essex | Phoenix Wharf | Shanks Waste Management Limited | 18 May 2016 | 28 Feb 2019 |
MLA/2016/00224/3 - Completed | Application - Maintenance of existing works, Navigational dredging (maintenance), Other removals | Ormonde Offshore Wind Farm O&M Marine Licence | Ormonde Offshore Wind Farm, Ormonde Pontoon Working Area | Ormonde Energy Limited | 19 May 2016 | 25 Jan 2024 |
MLA/2016/00225/1 - Completed | Application - Construction of new works, Maintenance of existing works, Other dredging | Garston North Dock - Infilled entrance wall repairs | Inner Dock Wall, Outer Dock Wall | Associated British Ports Holdings Limited | 19 May 2016 | 18 Aug 2016 |
MLA/2016/00226 - Completed | Application - Maintenance of existing works | Thamesmead - Gallions Reach River Wall Repairs | Gallions Reach Line | Tilfen Land | 19 May 2016 | 05 Jul 2016 |
MLA/2016/00227 - Completed | Application - Aggregate dredging | Goodwin Sands Aggregate Dredging Scheme | Proposed Dredge Area | Dover Harbour Board | 19 May 2016 | 26 Jul 2018 |
MLA/2016/00228 - Completed | Application - Construction of new works | Greenodd Wastewater Pumping Station Temporary Dewatering | Greenodd Wastewater Pumping Station Dewatering Area | United Utilities Water Plc | 20 May 2016 | 03 Aug 2016 |
MLA/2016/00231 - Completed | Application - Construction of new works | Sheerness Pipeline | Sheerness Port Pipeline | Ecocem Ltd | 23 May 2016 | 07 Dec 2016 |
MLA/2016/00232 - Completed | Application - Other removals, Other works | Repairs to landslip, Creek House, Restronguet Passage | creek house land slip | South Western Mining & Tunnelling Ltd | 23 May 2016 | 27 Jun 2016 |
MLA/2016/00233 - Completed | Application - Maintenance of existing works | Penketh Brook outfall refurbishment | Penketh Brook outfall | Environment Agency | 23 May 2016 | 09 Aug 2016 |
MLA/2016/00234/4 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance), Other removals | Maintenance Dredge, Disposal at Sea and Removal of TBT, Neptune Quay | Neptune Quay Current Dredge Pocket, SOUTER POINT (OUTER) (TY081), NORTH TYNE (TY070) | Shepherd Offshore Ltd | 23 May 2016 | 21 May 2020 |
MLA/2016/00235 - Completed | Application - Other dredging | RNLI Skegness - Emergency Works Application for Beach Re-Profiling | RNLI Skegness - Lifeboat Launch Route | Rnli | 24 May 2016 | 25 May 2016 |
MLA/2016/00237/1 - Completed | Application - Other works | Wandle River Wall SI Works | Wandle Weir River Wall | Kumar Associates | 25 May 2016 | 15 Aug 2016 |
MLA/2016/00238 - Completed | Application - Maintenance of existing works | Bellot Memorial River Wall Repair Works | Bellot Memorial River Wall | Greenwich Hospital | 25 May 2016 | 21 Dec 2016 |
MLA/2016/00239/1 - Completed | Application - Construction of new works | Replacement downstream berth + accompanying demolition & removal works at the C.RO Ports Purfleet Terminal | C.RO Ports Purfleet berths | Purfleet Real Estate Limited | 25 May 2016 | 11 Feb 2020 |
MLA/2016/00240 - Completed | Application - Other deposits | River Wall Protection of Exposed Footings | River Wall, Old Royal Naval College | The Greenwich Foundation For The Old Royal Naval College | 26 May 2016 | 13 Oct 2016 |
MLA/2016/00241 - Completed | Application - Maintenance of existing works | Imperial Wharf, Gravesend, Cathodic Protection installation | Imperial Wharf, Gravesend | F M Conway Limited | 26 May 2016 | 21 Jun 2016 |
MLA/2016/00242/1 - Completed | Application - Maintenance of existing works | Millennium Quay River Wall Repair Works | Glaisher Street, London. SE8 3EP. | Knights Brown Construction Ltd | 26 May 2016 | 31 Oct 2017 |
MLA/2016/00243 - Completed | Application - Maintenance of existing works | B110 Bridge 600m South of Yarmouth Mill - Deck Replacement | B110 Bridge | Ringway Island Roads Limited | 26 May 2016 | 23 May 2017 |
MLA/2016/00244 - Completed | Application - Maintenance of existing works | Installation of sea plug, into cooling water outfall, at Heysham B Power Station, and subsequent removal | Middleton Sands, around Red Nab | Edf Energy Nuclear Generation Limited | 26 May 2016 | 18 Jul 2016 |
MLA/2016/00245/1 - Completed | Application - Maintenance of existing works | Gunfleet Sands Offshore Wind Farm (OWF) Export Cable Repair and Remediation Grouped under: Gunfleet Sands OWF 1, 2, 3 Showing 4 of 15 cases | Gunfleet Sands OWF export cable corridor | Tc Gunfleet Sands Ofto Limited | 27 May 2016 | 14 Jul 2017 |
MLA/2016/00246/2 - Completed | Application - Other dredging, Other works, Wrecks and other archaeological remains | DLR5461: Removal of the River Wandle Half Tide Weir | River Wandle Half-Tide Weir Removal, Dredged Area | Wandsworth Borough Council | 31 May 2016 | 13 Apr 2017 |
MLA/2016/00247 - Completed | Application - Construction of new works | New timber slipway (16mx2.4m approx.) on the foreshore adjacent Dolphin Cottage | Slipway | Pamber Place Ltd | 01 Jun 2016 | 07 Jul 2016 |
MLA/2016/00248 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Paul Williams Independent Funeral Directors | 01 Jun 2016 | 09 Jun 2016 | |
MLA/2016/00249 - Completed | Application - Sampling | Lost Frontiers - DNA of North Sea | Core1, Core2 | University Of St Andrews | 02 Jun 2016 | 11 Aug 2016 |
MLA/2016/00250/6 - Completed | Application - Maintenance of existing works, Other deposits, Other dredging, Other works | Hartlepool Nuclear Power Station - Routine Maintenance Activities Licence | Hartlepool Power Station Intake location, Hartlepool Power Station Drumscreen and Forebay areas | Edf Energy Nuclear Generation Limited | 03 Jun 2016 | 08 May 2024 |
MLA/2016/00251 - Completed | Application - Construction of new works, Other deposits | Toe End Beach Stabilisation Scheme and future beach maintenance | Rock armour, groyne replacement and timber wall, Beach maintenance area | Mr John Bunn | 03 Jun 2016 | 23 Jan 2017 |
MLA/2016/00252 - Completed | Application - Construction of new works | Newhaven Construction Base - new pontoon at RoRo2 Berth | Ro Ro 2 | E.On Climate & Renewables Uk Rampion Offshore Wind Limited | 06 Jun 2016 | 27 Jul 2016 |
MLA/2016/00254 - Completed | Application - Maintenance of existing works | Creswell SO1 | Creswell SO1 | Northumbrian Water Limited | 07 Jun 2016 | 11 Aug 2016 |
MLA/2016/00255/2 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Haslar Marina Maintenance Dredge | NAB TOWER (WI060), HURST FORT (WI080) | Dean & Reddyhoff Limited | 08 Jun 2016 | 30 Jun 2017 |
MLA/2016/00256/1 - Completed | Application - Construction of new works | Greatham South - NE SABIC Embankment Grouped under: Greatham Flood Alleviation Scheme Showing 2 of 4 cases | MMO_Outline_1, MMO_Outline_2 | Environment Agency Leeds | 08 Jun 2016 | 26 Jul 2018 |
MLA/2016/00257 - Completed | Application - Other works | TEIGNMOUTH SANDBANK | Teignmouth Beach, Lifeboat Lane | Mr Greg Allen | 09 Jun 2016 | 10 Jun 2016 |
MLA/2016/00258 - Completed | Application - Construction of new works, Maintenance of existing works | Runcorn Viaduct | Runcorn Viaduct Scaffold location | Buckingham Group Contracting Limited | 10 Jun 2016 | 14 Jul 2016 |
MLA/2016/00259/2 - Completed | Application - Maintenance of existing works | Network Rail - Parton to Harrington Sea Walls No.2 & No.3 | Parton to Harrington Sea Wall No.2, Parton to Harrington Sea Wall No.3 | Network Rail Limited | 10 Jun 2016 | 07 Feb 2018 |
MLA/2016/00260/1 - Completed | Application - Other deposits | Artificial reef created with Reefball structures within Torbay's Harbour Authority | ARC-Marine Torbay Reef Site | Arc-Marine Ltd | 13 Jun 2016 | 08 Jan 2018 |
MLA/2016/00261 - Completed | Application - Maintenance of existing works | Renewal of Pontoon K | Pontoon K | Kemps Shipyard Limited | 13 Jun 2016 | 14 Feb 2017 |
MLA/2016/00262 - Completed | Application - Construction of new works | The Point, Teignmouth - Coastal Defence Wall Replacement | The Point, Teignmouth - Coastal Defence Wall Replacement | Teignbridge District Council | 13 Jun 2016 | 13 Oct 2016 |
MLA/2016/00263/2 - Completed | Application - Other dredging | Small Scale Subsea Plough Trials | Filey Site | Engineering Technology Applications Limited | 14 Jun 2016 | 07 Feb 2017 |
MLA/2016/00265 - Completed | Application - Maintenance of existing works | refubishment to falmouth Tourist information centre | Falmouth Tourist Information Centre | Cormac Solutions Ltd | 17 Jun 2016 | 01 Dec 2016 |
MLA/2016/00269/1 - Completed | Application - Construction of new works | Hollicombe Cliffs Rock Armour Revetment Scheme | Hollicombe_rock_armour_area_MMO | Torbay Council | 22 Jun 2016 | 08 Mar 2017 |
MLA/2016/00270 - Completed | Application - Construction of new works | Land at Caldecott Road Oulton Broad | Land at Caldecott Road Oulton Broad | Badger Building (E.Anglia) Limited | 22 Jun 2016 | 05 Dec 2016 |
MLA/2016/00271 - Completed | Application - Other works | Installation of Submersible flowmeter on exisitng River Water intake pipes | Jurgens Jetty | Pura Foods Limited | 22 Jun 2016 | 28 Sep 2017 |
MLA/2016/00273 - Completed | Application - Construction of new works | Beacon of Light Outfall into the River Wear, Sunderland | BoL Surface Water Outfall | The Beacon Of Light Limited | 23 Jun 2016 | 28 Oct 2016 |
MLA/2016/00274 - Completed | Application - Other deposits | Hill Head Coastal Protection Project: Phase 1b Beach Recharge | Hill Head Beach Recharge 1 | Eastern Solent Coastal Partnership | 23 Jun 2016 | 18 Aug 2016 |
MLA/2016/00275/3 - Completed | Application - Maintenance of existing works | Greater Gabbard Offshore Wind Farm - Operations and Maintenance | Greater Gabbard Offshore Wind Farm Array | Greater Gabbard Offshore Wind Limited | 23 Jun 2016 | 25 Jan 2021 |
MLA/2016/00276 - Completed | Application - Maintenance of existing works | South West Water - Salcombe Harbour Hotel | Sewer Replacement | South West Water Limited | 24 Jun 2016 | 23 Sep 2016 |
MLA/2016/00278 - Completed | Application - Construction of new works | Rampion O&M Facility - Newhaven Grouped under: Rampion Offshore Wind Farm Showing 4 of 13 cases | Rampion O&M | E.On Climate & Renewables Uk Rampion Offshore Wind Limited | 26 Jun 2016 | 01 Dec 2016 |
MLA/2016/00279/2 - Completed | Application - Construction of new works | Boat Lift | Site 1 | Amble Marina Limited | 27 Jun 2016 | 15 Aug 2017 |
MLA/2016/00280 - Withdrawn | Application - Construction of new works, Maintenance of existing works | Radipole Pumping Station CSO improvement works | Wessex Water Services Limited | 28 Jun 2016 | ||
MLA/2016/00281/1 - Completed | Application - Maintenance of existing works, Other removals | Routine maintenance, inspection and testing at Heysham 2 power station | Location 1: Cooling water intake, Location 2: Cooling water discharge structure (surge chamber and shaft), Location 3: Marine Outfall, Location 4: Main surface water drain outfall | Edf Energy Nuclear Generation Limited | 28 Jun 2016 | 28 Aug 2019 |
MLA/2016/00282/1 - Completed | Application - Maintenance of existing works | Newton Ferrers Saline | Working Area 1, Working Area 2, Working Area 3 | South West Water Limited | 29 Jun 2016 | 06 Dec 2016 |
MLA/2016/00283 - Completed | Application - Maintenance of existing works | Works to Slipway at Tide End TR11 5LJ | Tide End Trenarth Bridge Mawnan Smith Falmouth Cornwall TR11 5LJ | Mr Stuart Powell | 29 Jun 2016 | 30 Aug 2016 |
MLA/2016/00284/1 - Completed | Application - Decommissioning of works | Demolition of Pier and Brow known as Blackwall Pier, 1 Paul Julias Close, Blackwall way, London, E142EH. Marine Location, Bugsby Reach, River Thames, London. | Blackwall Pier | Medtow Marine Limited | 30 Jun 2016 | 01 Mar 2017 |
MLA/2016/00285 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Charles Lister | 30 Jun 2016 | 14 Jul 2016 | |
MLA/2016/00286 - Completed | Application - Construction of new works | Grimsby Slipways New Slipway | New Grimsby Slipway | Grimsby Fish Dock Enterprises Limited | 30 Jun 2016 | 29 Jul 2016 |
MLA/2016/00287 - Completed | Application - Maintenance of existing works | SWW - Lanhydrock Road outfall maintenance | Surface Water Outfall Maintenance | South West Water Limited | 01 Jul 2016 | 29 Jul 2016 |
MLA/2016/00289 - Completed | Application - Maintenance of existing works | River wall reconstruction 26-37 Clive Street North Shields | Site | Southbay Civil Engineering Limited | 04 Jul 2016 | 11 Oct 2016 |
MLA/2016/00290/1 - Completed | Application - Navigational dredging (maintenance) | Hanson Purfleet Jetty Maintenance Dredging | Hanson Aggregates Purfleet Jetty | Hanson Quarry Products Europe Limited | 04 Jul 2016 | 15 Dec 2016 |
MLA/2016/00292 - Completed | Application - Construction of new works, Other works | Woolwich Royal Arsenal Pier River Transport | Piles area | The Royal Borough Of Greenwich | 06 Jul 2016 | 04 Jan 2017 |
MLA/2016/00293 - Completed | Application - Other deposits | Beach Recharge, Eastoke Point, Hayling Island Coastal Defence Works | Beach_Recharge_HI | Havant Borough Council | 06 Jul 2016 | 23 Dec 2016 |
MLA/2016/00294 - Completed | Application - Maintenance of existing works | Maintenance and repainting of Fremington Viaduct steel deck | Fremington Viaduct | Devon County Council | 07 Jul 2016 | 29 Jul 2016 |
MLA/2016/00295 - Completed | Application - Maintenance of existing works | Shaldon Bridge lifting span re-painting works | Shaldon Bridge lifting span | Devon County Council | 07 Jul 2016 | 12 Aug 2016 |
MLA/2016/00297/1 - Completed | Application - Decommissioning of works | Pomphlett Marine Loading Jetty, Plymouth, PL9-7HJ. Due to structural degradation of the facility it is proposed that it is dismantled. | Pomphlett Marine Aggregate Loading Conveyor | Aggregate Industries Uk Ltd | 08 Jul 2016 | 20 Oct 2016 |
MLA/2016/00298/3 - Completed | Application - Construction of new works | Placement of piles to support pontoon | Area encompassing piles, pontoons and access bridge | Gweek Quay Limited | 12 Jul 2016 | 19 Sep 2018 |
MLA/2016/00300/1 - Completed | Application - Construction of new works | ED3, 8 and 9 Berth Deck to Deck Access Safety Improvements | ED3 Berth, ED8 Berth, ED9 Berth | Dover Harbour Board | 13 Jul 2016 | 08 Mar 2017 |
MLA/2016/00301 - Completed | Application - Sampling | Kingston Marine Park Site Investigations | River Medina - Kingston Marine Park Site Investigation Boundary | Homes And Communities Agency | 13 Jul 2016 | 04 Aug 2016 |
MLA/2016/00302 - Completed | Application - Other removals | QinetiQ Site at St Thomas’ Head Kewstoke near Weston Super Mare | St Thomas’ Head Kewstoke - Removal of trials frames and cable trays, St Thomas’ Head Kewstoke - Removal of pier | Qinetiq Group Plc | 13 Jul 2016 | 22 Dec 2016 |
MLA/2016/00303 - Completed | Application - Construction of new works | Malojo Boat House | Slipway at Malojo, Restronguet Point | Frewfix Ltd | 14 Jul 2016 | 02 Dec 2016 |
MLA/2016/00304 - Completed | Application - Construction of new works | Bells and Mocketts Pumping Station | Bells and Mocketts Pumping Station | Medway Internal Drainage Board | 19 Jul 2016 | 30 Jan 2017 |
MLA/2016/00305/1 - Completed | Application - Construction of new works, Decommissioning of works | Runswick Bay Sewer Diversion facilitating sea defences | Sewer Replacement | Yorkshire Water Services Limited | 19 Jul 2016 | 15 Mar 2017 |
MLA/2016/00307 - Completed | Application - Construction of new works, Maintenance of existing works, Other works | Renovations and extension the Sail Loft, Whitford Yard, Fowey. | Whitford boat yard | Phil Chapman Construction | 21 Jul 2016 | 01 Sep 2016 |
MLA/2016/00308 - Completed | Application - Construction of new works | Concrete step blocks over 7 No. reconstructed timber groynes at Withernsea - 2016 | Groyne 13, Groyne 12, Groyne 11, Groyne 10, Groyne 9, Groyne 4, Groyne 3 | East Riding Of Yorkshire Council | 21 Jul 2016 | 26 Apr 2017 |
MLA/2016/00309 - Completed | Application - Construction of new works | Long Rock Sea Wall Rock Armour Protection Works | Rock Armour | Cormac Solutions Ltd | 21 Jul 2016 | 23 May 2017 |
MLA/2016/00310 - Completed | Application - Maintenance of existing works | QS06-07 R1052 Sandsend Beck Crossing and Associated Works | Sandsend Beck | Yorkshire Water Services Ltd | 21 Jul 2016 | 14 Oct 2016 |
MLA/2016/00311 - Completed | Application - Other deposits | Brightlingsea Harbour Commissioners, Retaining Structure Site Trial | Morgan's Marina, Town Hard | Brightlingsea Harbour Commissioners | 22 Jul 2016 | 18 Oct 2016 |
MLA/2016/00312/6 - Completed | Application - Other removals | Ground investigation (GI) works at Hinkley Point C to inform seawall design and build | Historic Dry Dock, HPA Sea Wall | Nnb Generation Company (Hpc) Limited | 22 Jul 2016 | 29 Mar 2018 |
MLA/2016/00313 - Completed | Application - Maintenance of existing works | Repair of storm damaged piers to existing boathouse. Work to include the temporary removal of the super-structure, storage on site & subsequent rebuilding. | Boathouse | Mr Nigel Chaplin | 25 Jul 2016 | 15 Aug 2016 |
MLA/2016/00315 - Completed | Application - Incineration of any substance or object at sea, Maintenance of existing works, Other deposits, Other removals | FAB Link | UK Cable Corridor | Fab Link | 27 Jul 2016 | 15 Dec 2017 |
MLA/2016/00316 - Completed | Application - Maintenance of existing works | Arrowhead Quay | Arrowhead Quay | Eco World-Ballymore Arrowhead Quay Company Limited | 27 Jul 2016 | 23 Aug 2016 |
MLA/2016/00317/2 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Liverpool Channel and River disposal license | Mersey Approach Channel, Eastham Channel, River Mersey, Jetties and Cammell Lairds, MERSEY OF BROMBOROUGH2 (IS128), MERSEY (MID-RIVER SITE) (IS120), SITE Z (IS140) | The Mersey Docks And Harbour Company Limited | 27 Jul 2016 | 13 May 2019 |
MLA/2016/00318 - Completed | Application - Construction of new works | Ladder for Kings Wharf O&M site (Burbo Bank Wind Farms) | Ladder Installation Area | Dong Energy Burbo Extension Holding Ltd | 28 Jul 2016 | 23 Sep 2016 |
MLA/2016/00319 - Completed | Application - Maintenance of existing works | South West Water - Ship Inn, Noss Mayo | Ship Inn, Noss Mayo (updated) | South West Water Limited | 01 Aug 2016 | 19 Oct 2016 |
MLA/2016/00321 - Completed | Application - Other works | Sculptural Installation | Rossall Beach | Invisible Flock | 02 Aug 2016 | 14 Sep 2016 |
MLA/2016/00322 - Completed | Application - Maintenance of existing works | Peruvian Wharf - Jetty and River Wall Works | Peruvian Wharf | Brett Aggregates Limited | 02 Aug 2016 | 17 Sep 2018 |
MLA/2016/00323 - Completed | Application - Other removals | Turners Cove Sluice | Turners Cove Sluice | Environment Agency - South West Region | 03 Aug 2016 | 23 Aug 2016 |
MLA/2016/00324 - Withdrawn | Application - Other deposits | Burbo Bank Extension Mattress Remediation | Dong Energy Burbo Extension (Uk) Ltd | 03 Aug 2016 | ||
MLA/2016/00326 - Completed | Application - Other dredging | Great Ouse Tidal River Water Injection Dredging Pilot Project | Stowbridge Silt Bank | Environment Agency | 04 Aug 2016 | 26 Jan 2018 |
MLA/2016/00327/2 - Completed | Application - Other works | Tideway Trenching Trial Works | Zone Alpha, Zone Bravo | Heron Wind Limited | 04 Aug 2016 | 07 Apr 2017 |
MLA/2016/00329 - Completed | Application - Maintenance of existing works | Hopton Groyne 6 Modification | Hopton Groyne 6 | Mr Alastair Tindle | 04 Aug 2016 | 17 Aug 2017 |
MLA/2016/00330/1 - Completed | Application - Maintenance of existing works | Trig Lane Flood defecne wall brick and concrete reapirs to match existing | Site 1 | City Of London | 05 Aug 2016 | 02 Nov 2017 |
MLA/2016/00331/1 - Completed | Application - Construction of new works, Other works | Enderby Wharf - Stormwater Outfall | Enderby Wharf - Stormwater Outfall | Enderby Wharf Llp | 08 Aug 2016 | 23 May 2018 |
MLA/2016/00332 - Completed | Application - Maintenance of existing works | Trinity Pier, Millbay | Trinity Pier | Homes And Communities Agency | 08 Aug 2016 | 02 Nov 2016 |
MLA/2016/00334/2 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Plymouth Yacht Haven - Maintenance Dredging | Plymouth Yacht Haven, Plymouth Deep (PL035) | Plymouth Yacht Haven Limited | 09 Aug 2016 | 22 Aug 2018 |
MLA/2016/00335/2 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Yacht Haven Quay - Maintenance Dredging | Yacht Haven Quay, Plymouth Deep (PL035) | Yacht Haven Quay Limited | 09 Aug 2016 | 14 Sep 2018 |
MLA/2016/00336/1 - Completed | Application - Construction of new works, Other removals | Yarmouth Pier - Phase 2 Repair Works | Yarmouth Pier | The Yarmouth (Isle Of Wight) Harbour Commissioners | 10 Aug 2016 | 05 Dec 2017 |
MLA/2016/00337/1 - Completed | Application - Construction of new works | Torcross Sea Wall Emergency Works, Devon | Torcross Sea Defence | Environment Agency – South West Reg | 11 Aug 2016 | 28 Nov 2016 |
MLA/2016/00338 - Completed | Application - Construction of new works | New Slipway at New Grimsby, Tresco, Isles of Scilly | New Slipway, New Grimsby, Tresco | Symons Construction | 11 Aug 2016 | 20 Jan 2017 |
MLA/2016/00339 - Completed | Application - Maintenance of existing works | Greenwich River Wall Works | Greenwich River Wall | Rsk Environment Limited | 12 Aug 2016 | 29 Sep 2016 |
MLA/2016/00341/3 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | BP Oil UK Ltd - Hamble jetty and approaches Maintenance Dredging | Magenta boundary, Blue boundary, Green area (emergency tugs), NAB TOWER (WI060) | Bp Oil (Uk) Ltd | 15 Aug 2016 | 29 Sep 2017 |
MLA/2016/00342/2 - Completed | Application - Construction of new works | Walney Extension Offshore Wind Farm Operations and Maintenance (O&M) Facilities | Lead-in Jetty, No 1 Berth | Dong Energy Walney Extension (Uk) Ltd | 15 Aug 2016 | 24 Aug 2017 |
MLA/2016/00344 - Completed | Application - Incineration of any substance or object at sea, Other works | London 1666 | River Thames, 1666 Loading | Artichoke Trust | 16 Aug 2016 | 31 Aug 2016 |
MLA/2016/00345 - Completed | Application - Maintenance of existing works | River Quay Repairs, Electra Business Park | Electra Quay Business Park | F M Conway Limited | 17 Aug 2016 | 18 Oct 2016 |
MLA/2016/00346 - Completed | Application - Maintenance of existing works | Proposed sea defence repairs at East Chidham | Site 1 | Ms Diana Beale | 18 Aug 2016 | 28 Sep 2016 |
MLA/2016/00347/2 - Completed | Application - Maintenance of existing works | Component Exchange (Main Bearing) | Sheringham Shoal Wind Farm | Scira Offshore Energy Limited | 18 Aug 2016 | 16 Mar 2017 |
MLA/2016/00350 - Completed | Application - Maintenance of existing works, Other removals | Grays Beach | Grays Beach | Anglian Water Services Ltd | 19 Aug 2016 | 28 Sep 2016 |
MLA/2016/00351 - Completed | Application - Other deposits | Burial at sea of ashes | Miss Denise Richards | 19 Aug 2016 | 02 Sep 2016 | |
MLA/2016/00352 - Completed | Application - Maintenance of existing works | Teesside Offshore Wind Farm Ltd | Teesside Offshore Wind Farm | Teesside Windfarm Limited | 19 Aug 2016 | 21 Sep 2016 |
MLA/2016/00353 - Completed | Application - Maintenance of existing works | Masthouse Terrace Pier repairs | Masthouse Terrace Pier, end of Napier Avenue, E14 3QE | Canal & River Trust | 19 Aug 2016 | 07 Dec 2016 |
MLA/2016/00354/1 - Completed | Application - Maintenance of existing works | Plaidy CSO Outfall concrete repairs Grouped under: Plaidy CSO Outfall concrete repairs Showing 2 of 2 cases | Plaidy CSO Outfall | South West Water Limited | 22 Aug 2016 | 29 Dec 2016 |
MLA/2016/00355/5 - Completed | Application - Disposal of dredged material | Kendalls wharf aggregate washings silt disposal | NAB TOWER (WI060) | Aggregate Industries Uk Limited | 23 Aug 2016 | 27 Mar 2024 |
MLA/2016/00356 - Completed | Application - Maintenance of existing works | Seathorne Promenade seawall foundation strengthening works | Seathorne foundation works | East Riding Of Yorkshire Council | 23 Aug 2016 | 30 May 2017 |
MLA/2016/00357/3 - Completed | Application - Navigational dredging (capital) | Peruvian Wharf - Capital Dredge Works for Berthing Pocket | Thames Seabed | Brett Aggregates Limited | 24 Aug 2016 | 10 Aug 2018 |
MLA/2016/00358 - Completed | Application - Construction of new works | Development of Standard Wharf | Standard Warf Ltd | 25 Aug 2016 | 12 Oct 2016 | |
MLA/2016/00359/1 - Completed | Application - Maintenance of existing works | Steamer Quay flood defence repairs | SteamerQuay_WallRepairs | Environment Agency | 25 Aug 2016 | 24 Mar 2017 |
MLA/2016/00360 - Completed | Application - Maintenance of existing works | Westermost Rough Offshore Wind Farm Export Cable Repair and Remediation | WMR_exportcable | Tc Westermost Rough Ofto Limited | 26 Aug 2016 | 17 Mar 2017 |
MLA/2016/00361 - Completed | Application - Alternative use of dredged material | Beach Management Plan : Selsey Shingle Recharge | Recharge Area | Chichester District Council | 26 Aug 2016 | 04 Nov 2016 |
MLA/2016/00362/7 - Completed | Application - Alternative use of dredged material, Navigational dredging (maintenance) | Dredging and Restoration of Brightlingsea Harbour | Brightlingsea Dredging and Restoration, Restoration site 1 Borrow pits, Restoration site 2 Borrow pits, Restoration site 3 Borrow pits, Restoration site 4 Borrow pits, Restoration site 5 Borrow pits, Restoration site 6 Borrow pits, Restoration site 7 Borrow pits, restoration site 8 Borrow pits, restoration site 9 Borrow pits, Restoration site 10 Borrow pits, Restoration site 11 Borrow pits, Restoration site 12 Borrow pits, Restoration site 13 Borrow pits, Restoration site 14 Borrow pits, Restoration site 15 Borrow pits, Restoration site 16 Borrow pits, Restoration site 17 Borrow pits, Restoration site 18 Borrow pits, Restoration site 19 Borrow pits, Restoration site 20 Borrow pits, Restoration site 21 Borrow pits, Restoration site 22 Borrow pits, Restoration site Howlands, Restoration Site Howlands East, Restoration Site Howlands West, Restoration Site Cinderyeast West Point, Restoration Site CW Eastpoint, Restoration Site CW Northsite, Site Restoration CW Westpoint | Brightlingsea Harbour Commissioners | 30 Aug 2016 | 01 Feb 2022 |
MLA/2016/00363 - Completed | Application - Construction of new works | Land Adjacent to Whitestrand car park, Fore Street, Salcombe, Devon | South Hams District Council | 31 Aug 2016 | 17 Jan 2017 | |
MLA/2016/00365 - Completed | Application - Construction of new works | Stone facing of a sea wall | Tregenver wall cladding | John Coombs | 04 Sep 2016 | 05 Oct 2016 |
MLA/2016/00366/1 - Completed | Application - Construction of new works | Blyth Offshore Wind Demonstrator Project Seabed Preparation and Scour Protection Works (Array 2) | Blyth Offshore Demonstrator Array 2 | Blyth Offshore Demonstrator Limited | 06 Sep 2016 | 27 Jun 2017 |
MLA/2016/00367 - Completed | Application - Maintenance of existing works | Chilton Trinity STW Outfall - Flap Valve Replacement | Chilton Trinity STW Outfall | Mr Craig Ryder | 07 Sep 2016 | 03 Oct 2016 |
MLA/2016/00368 - Completed | Application - Construction of new works | Pontoon attached to seawall at Salcombe Harbour Hotel, Salcombe Estuary, Devon | Pontoon location Salcombe Harbour Hotel | Salcombe Harbour Hotel Limited | 07 Sep 2016 | 20 Mar 2017 |
MLA/2016/00369 - Completed | Application - Construction of new works | The Deckhouse Brow Pile | The Deckhouse Brow support pile | Ray Stewart | 08 Sep 2016 | 07 Oct 2016 |
MLA/2016/00370 - Completed | Application - Maintenance of existing works | add additional pile (pontoon C extension) | Installation of 1 No. pile to existing pontoon C extension | Pontoon Berth Holders Two | 08 Sep 2016 | 13 Sep 2016 |
MLA/2016/00371 - Completed | Application - Navigational dredging (maintenance) | West of Duddon Sands Pontoon Dredging Marine Licence | West of Duddon Sands Offshore Wind Farm Pontoon area | Dong Energy West Of Duddon Sands | 09 Sep 2016 | 15 Mar 2018 |
MLA/2016/00372/2 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Dredging Exmouth Marina | Exmouth Marina | Exmouth Marina Ltd | 10 Sep 2016 | 10 Sep 2020 |
MLA/2016/00373 - Completed | Application - Maintenance of existing works | BRAEMAR QUAY REPAIRS NOSS MAYO | BRAEMAR QUAY REPAIRS NOSS MAYO | Polawn Bay Limited | 11 Sep 2016 | 26 Oct 2016 |
MLA/2016/00374 - Completed | Application - Construction of new works | Alteration to hamble mooring L01-02 | between piles LO1 to LO2 in the hamble river | Mr James Youngman | 11 Sep 2016 | 23 Jan 2017 |
MLA/2016/00375 - Completed | Application - Construction of new works | RNLI Station Fowey, Cornwall | R.N.L.I. (Trading) Limited | 13 Sep 2016 | 01 Nov 2016 | |
MLA/2016/00376 - Completed | Application - Other removals | Chilling - Removal of Derelict Outfall Pipe | Location of Chilling Outfall | Njp Environmental | 13 Sep 2016 | 17 Jan 2017 |
MLA/2016/00377 - Completed | Application - Construction of new works | CRL Penzance | CRL Wharf Road, Penzance | Churchill Retirement Living Limited | 15 Sep 2016 | 24 Nov 2016 |
MLA/2016/00378 - Withdrawn | Application - Construction of new works | Marine Terminal for importing cement at Frog Island, River Thames. | S.Walsh & Sons Ltd | 16 Sep 2016 | ||
MLA/2016/00379 - Completed | Application - Maintenance of existing works | River Wall repair | Charlton | Cory Riverside Ltd | 19 Sep 2016 | 01 Feb 2017 |
MLA/2016/00380 - Completed | Application - Maintenance of existing works | Folkestone Harbour temporary works to enable maintenance works to viaduct and swing bridge | Folkestone Harbour Viaduct and Swing Bridge | Folkestone Harbour (Gp) Limited | 19 Sep 2016 | 07 Oct 2016 |
MLA/2016/00381/1 - Completed | Application - Construction of new works | Gosport Oil Fuel Depot | Groundwater Migration Barrier, Pipe Bridge | Defence Infrastructure Organisation | 20 Sep 2016 | 03 Oct 2018 |
MLA/2016/00382 - Completed | Application - Other works | Calshot pontoon replacement | Calshot Pontoon | Hampshire County Council | 20 Sep 2016 | 09 Dec 2016 |
MLA/2016/00383/2 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Medway Approach Channel Maintenance License | SOUTH FALLS (TH070), INNER GABBARD (TH052), MAC Extent | Port Of Sheerness Limited | 20 Sep 2016 | 29 Mar 2023 |
MLA/2016/00384 - Completed | Application - Construction of new works | Outfall and Scour Protection | Sugar Quay | Barratt London | 20 Sep 2016 | 07 Feb 2017 |
MLA/2016/00385 - Completed | Application - Construction of new works | Fulham Wharf | Fulham Wharf River Wall | Bdw Trading Limited | 21 Sep 2016 | 15 Mar 2017 |
MLA/2016/00386/2 - Completed | Application - Construction of new works, Disposal of dredged material | Mersea Harbour and Tollesbury Wick Climate Change Adaptation Recharge Project | Packing Marsh north, Packing_Marsh_Island, Cobmarsh_Island, Old_Hall, Tollesbury_Wick, Cobmarsh north-west | The Mersea Harbour Protection Trust | 21 Sep 2016 | 21 Jun 2021 |
MLA/2016/00387 - Completed | Application - Maintenance of existing works | RNLI Barrow - Emergency Works Application for Slipway Grating Repairs | RNLI Barrow: Boathouse, Slipway and Access Jetty | Royal National Lifeboat Institution | 22 Sep 2016 | 30 Sep 2016 |
MLA/2016/00388/1 - Completed | Application - Construction of new works | Arun Sailing Club Dinghy Pen River Wall | Arun Sailing Club | Arun Sailing Club | 22 Sep 2016 | 13 Oct 2017 |
MLA/2016/00389 - Completed | Application - Maintenance of existing works | Cremyll View Mount Edgcumbe Sea Wall Repair | Mount Edgcumbe, Toll House Quay, Lower Lodge, Garden Battery | Cormac Solutions Ltd | 22 Sep 2016 | 24 Feb 2017 |
MLA/2016/00390 - Completed | Application - Wrecks and other archaeological remains | Recovery of engine from P-47 Thunderbolt 42-75116 | Seabed off Tanners Lane, Boldre, Hampshire. | Mr Richard Reeves | 22 Sep 2016 | 17 Mar 2017 |
MLA/2016/00391 - Completed | Application - Maintenance of existing works | RNLI Western Super Mare - Emergency Licence for Mooring Inspection | Mooring location and area of mooring activity | Royal National Lifeboat Institution | 26 Sep 2016 | 28 Sep 2016 |
MLA/2016/00392 - Completed | Application - Construction of new works, Maintenance of existing works | Trafalgar Wharf Dry Stack Pontoons | Pontoon A, Pontoon B | Trafalgar Wharf Limited | 27 Sep 2016 | 06 Nov 2018 |
MLA/2016/00393 - Completed | Application - Maintenance of existing works | RECONSTRUCTION OF ATLANTIC HOTEL CSO & MINOR REPAIRS TO OTHER OUTFALLS | ATLANTIC HOTEL CSO, MERMAID INN OUTFALL, OLD TOWN BAY OUTFALL | Council Of The Isles Of Scilly | 27 Sep 2016 | 19 Dec 2016 |
MLA/2016/00395 - Completed | Application - Maintenance of existing works | RNLI Amble - Low Impact Maintenance Works to Pontoon Berth & Wave Screen (Fast Track Licence) | Amble Pontoon Berth & Pen | Royal National Lifeboat Institution | 04 Oct 2016 | 03 Nov 2016 |
MLA/2016/00399 - Completed | Application - Maintenance of existing works | Fowey Sewer Rehabilitation - Caffa Mill | Sewer Rehabilitation | South West Water Limited | 06 Oct 2016 | 12 Jan 2017 |
MLA/2016/00400/1 - Completed | Application - Construction of new works | Plymouth Bathing Waters – Cattedown Surface Water Separation Scheme | Cattedown Surface Water Separation Outfall 1, Cattedown Surface Water Separation Outfall 2 | South West Water Limited | 06 Oct 2016 | 31 Mar 2017 |
MLA/2016/00401 - Completed | Application - Construction of new works, Other removals, Other works | Slipway Repairs at Saqqara, Restronguet Point, Truro, TR3 6RB | Saqqara Slipway, Restronguet Point, TR3 6RB | Mr William Brown | 07 Oct 2016 | 07 Dec 2016 |
MLA/2016/00403/1 - Completed | Application - Disposal of dredged material, Navigational dredging (capital) | Portsmouth International Port – Floating Dock Jetty Capital Dredge | Portsmouth -Floating Dock Jetty, Disposal Site - Nab Tower Disposal Site | Portsmouth City Council | 07 Oct 2016 | 02 Dec 2016 |
MLA/2016/00404/1 - Completed | Application - Disposal of dredged material | Spoil ground use Mounts Bay | MOUNTS BAY (PL100) | Newlyn Pier & Harbour Commissioners | 10 Oct 2016 | 19 Oct 2017 |
MLA/2016/00405 - Completed | Application - Maintenance of existing works | German Tunnel, Workington Slag Bank | German Tunnel, Workington Slag Bank | Thomas Armstrong (Construction) Limited | 10 Oct 2016 | 13 Apr 2017 |
MLA/2016/00406 - Completed | Application - Maintenance of existing works | Burbo Bank Offshore Wind Farm - O&M Marine Licence for Export Cable Repair/Remediation Activities | BBW01 Array and Export Cable Boundary | Dong Energy Burbo (Uk) Limited | 10 Oct 2016 | 08 Mar 2018 |
MLA/2016/00407/2 - Variation Requested | Application - Other deposits | Management of excess sand build up across the shoreline of West Wittering Beach | Work area | West Wittering Estate Plc | 11 Oct 2016 | 30 Jul 2024 |
MLA/2016/00408 - Completed | Application - Maintenance of existing works | Hinkley Point B Nuclear Power Station - routine marine activities licence | Forebay, Drumscreen areas, HPB, Cooling Water Intake Caisson, Outfall, Seal Pit (Syphon recovery chamber) | Edf Energy Nuclear Generation Limited | 11 Oct 2016 | 28 Nov 2016 |
MLA/2016/00409 - Completed | Application - Navigational dredging (capital) | Berth 1 WID Clearance Channel & Transit Approach | Berth 1, Oikos Terminal, Jetty 1 Transit Approach | Oikos Storage Limited | 11 Oct 2016 | 08 Dec 2016 |
MLA/2016/00411 - Completed | Application - Construction of new works | Hamford Water, Walton-on-the-Naze | Surface Water Outfall Headwall | Taylor Wimpey Developments Limited | 12 Oct 2016 | 11 Jan 2017 | |
MLA/2016/00412/2 - Completed | Application - Maintenance of existing works | Weybourne - Refurbishment of unlighted Beacon/Support Structure (Local Aid to Navigation) | Weybourne Beacon | North Norfolk District Council | 14 Oct 2016 | 10 Oct 2018 |
MLA/2016/00413 - Completed | Application - Construction of new works | Trial hole investigation for drainage outfall replacements at Rustington and Ferring, West Sussex | Rustington, Ferring | Opus International Consultants (Uk) Limited | 14 Oct 2016 | 31 Oct 2016 |
MLA/2016/00414 - Completed | Application - Navigational dredging (maintenance) | Tollesbury Marina Spring 2017 Grouped under: Tollesbury Marina Showing 2 of 2 cases | Tollesbury Marina | Tollesbury Marina Llp | 14 Oct 2016 | 28 Feb 2017 |
MLA/2016/00415/1 - Completed | Application - Decommissioning of works, Maintenance of existing works | #1 Coldharbour, Isle House wall remediation and foreshore protection works | 1 Coldharbour | Environment Agency | 14 Oct 2016 | 05 May 2017 |
MLA/2016/00417/1 - Completed | Application - Maintenance of existing works | Yorkshire Water Services - Long term maintenance and repair marine licence | Staithes LSO CWO, Runswick Bay LSO CWO, Sandsend LSO CWO, Whitby LSO CWO, Robin Hoods Bay LSO CWO, Jacksons Bay CWO, Scalby Mills SPS SSO CWO, Scarborough STW LSO CWO, Corner Cafe CWO, Toll House CWO, Wheatcroft SSO CWO, Wheatcroft LSO CWO, Filey Brigg LSO CWO, Coble Landing CWO, Flamborough Village LSO CWO, Limekiln Lane CWO, Sands Lane Brid CWO, Bridlington SSO CWO, Hornsea SSO CWO, Belgrave CWO, Mappleton CWO, Withernsea LSO CWO, Bridlington LSO CWO, Hornsea Storm CWO, Hornsea LSO CWO | Yorkshire Water Services Limited | 17 Oct 2016 | 13 Nov 2017 |
MLA/2016/00418/1 - Completed | Application - Construction of new works | Pontoon Berth S88 Port Solent | Port Solent Marina | Mr Shane Dance | 18 Oct 2016 | 24 Oct 2017 |
MLA/2016/00419 - Completed | Application - Other works | Mussel mitigation - Drumscreen scaffold slides | Sizewell B Power Station | Edf Energy Nuclear Generation Limited | 20 Oct 2016 | 10 Nov 2016 |
MLA/2016/00420 - Withdrawn | Application - Maintenance of existing works | Replacing Existing Piles for our Jetty with like for like as the existing Piles are very wasted at the bottom | Barry Field | 20 Oct 2016 | ||
MLA/2016/00421 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Southampton Boat Show Maintenance Dredge | NAB TOWER (WI060), HURST FORT (WI080), NEEDLES (WI090), Soton Harbour | Southampton International Boat Show Limited | 21 Oct 2016 | 27 Feb 2017 |
MLA/2016/00424 - Completed | Application - Maintenance of existing works | Battery Rock Coastal Access | Battery Rocks Sea Access | Cornwall Council | 21 Oct 2016 | 03 Jan 2017 |
MLA/2016/00425 - Completed | Application - Construction of new works | Paull Sea Defence | New Revetment, Earth bund heightening area 1 | East Riding Of Yorkshire Council | 21 Oct 2016 | 01 Jun 2017 |
MLA/2016/00426 - Completed | Application - Maintenance of existing works | Drumscreen Maintenance | Drumscreens | Edf Energy Nuclear Generation Limited | 24 Oct 2016 | 28 Oct 2016 |
MLA/2016/00427/1 - Completed | Application - Construction of new works | Scaffolding for Site Investigation works for proposed Shadwell Basin Outdoor Activity Centre Slipway | Scaffold Location | Volker Stevin Limited | 24 Oct 2016 | 16 Dec 2016 |
MLA/2016/00428 - Completed | Application - Maintenance of existing works | Court Bridge Concrete Repairs | Court Bridge | West Sussex County Council | 25 Oct 2016 | 23 Nov 2016 |
MLA/2016/00429 - Completed | Application - Maintenance of existing works | Poole Harbour (Holes Bay) Sea Defence Repairs Easter 2017 | Poole Harbour (Hole's Bay) Sea Defence Repairs Easter 2017 | Geoffrey Osborne Limited | 25 Oct 2016 | 01 Mar 2017 |
MLA/2016/00430/1 - Completed | Application - Other deposits | National Grid Proposed Blyth Converter Station, Surface Water Outfall | land south of the proposed converter station, to the east of East Sleekburn, Northumberland | National Grid Nsn Link Limited | 26 Oct 2016 | 20 Oct 2017 |
MLA/2016/00431 - Completed | Application - Other works | Fal River Floating Cafe | King Harry Steam | 27 Oct 2016 | 04 Nov 2016 | |
MLA/2016/00432 - Completed | Application - Construction of new works | Pontoon Installation at Lowestoft Docks | Lowestoft - Trawl Dock | Greater Gabbard Offshore Winds Limited | 27 Oct 2016 | 19 Jan 2017 |
MLA/2016/00433/5 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Maintenance Dredging at Kendalls Wharf | NAB TOWER (WI060), Kendalls Wharf | Kendall Bros. (Portsmouth) Limited | 28 Oct 2016 | 17 Aug 2021 |
MLA/2016/00434/1 - Completed | Application - Maintenance of existing works | Maldon 2 Tier Wall The Granaries | Maldon two tier wall the granaries | Environment Agency | 28 Oct 2016 | 21 Apr 2017 |
MLA/2016/00435 - Completed | Application - Maintenance of existing works | RK Marine Pile Replacement | RK Marine Pile | R K Marine | 28 Oct 2016 | 18 Nov 2016 |
MLA/2016/00436/2 - Completed | Application - Construction of new works, Other removals, Other works | North Portsea Island Flood and Coastal Erosion Scheme Phase 3 - Tipner Lake | Planning_site_boundary2 | Portsmouth City Council | 28 Oct 2016 | 11 Sep 2018 |
MLA/2016/00437 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Beneficial Use Of Dredged Spoil, Blue Lagoon, Poole Harbour | Blue Lagoon 1 (Wl12), Blue Lagoon 2 (Wl13), Channel | Lilliput Sailing Club | 30 Oct 2016 | 21 Feb 2017 |
MLA/2016/00438/1 - Completed | Application - Sampling | Swan Hunter Steel Quay Ground Investigation | Borehole 1, Borehole 2, Borehole 3, Borehole 4, Borehole 5, Borehole 6 | North Tyneside Council | 01 Nov 2016 | 21 Aug 2017 |
MLA/2016/00439/1 - Completed | Application - Maintenance of existing works | Lindisfarne causeway ditching | Holy Island Causeway | Northumberland County Council | 03 Nov 2016 | 12 Dec 2016 |
MLA/2016/00440 - Completed | Application - Navigational dredging (maintenance) | Maintenance Water Injection Dredging of the Former Fawley Power Station | Southampton Water Seabed Site 1 | Fawley Waterside Limited | 03 Nov 2016 | 27 Jan 2017 |
MLA/2016/00441/2 - Completed | Application - Construction of new works | Fairhaven to Church Scar Coast Protection Scheme | Fairhaven to Church Scar | Flyde Borough Council | 03 Nov 2016 | 20 Sep 2019 |
MLA/2016/00442/1 - Completed | Application - Other removals | Removing damaged sections from disused Southern Water outfall pipeline Grouped under: Rampion Offshore Wind Farm Showing 4 of 13 cases | Disused Southern Water Pipe - damaged end of pipe 5 6, Disused Southern Water Pipe - damaged area 3 4, Disused Southern Water Pipe - damaged area 1 2 | E.On Climate & Renewables Uk Rampion Offshore Wind Limited | 04 Nov 2016 | 11 Apr 2017 |
MLA/2016/00443 - Completed | Application - Maintenance of existing works | Jetty repair and replacement | Jetty | Multi Service Marine | 04 Nov 2016 | 02 Aug 2017 |
MLA/2016/00445/2 - Completed | Application - Maintenance of existing works | Blue Transmission London Array Ltd. - Marine Licence for scour protection works at the London Array/BritNed Crossing | Blue Transmission London Array Limited | 04 Nov 2016 | 15 Nov 2016 | |
MLA/2016/00446/3 - Variation Requested | Application - Clean-up dredging, Disposal of dredged material | CCYC Marina maintenance dredge | NAB TOWER (WI060), CCYC marina | Cowes Corinthian Yacht Club Limited | 04 Nov 2016 | 20 Dec 2023 |
MLA/2016/00449 - Completed | Application - Other removals, Sampling, Scientific instruments | Hermitage Steam Wharf | Hermitage Steam Wharf | Environment Agency | 07 Nov 2016 | 22 Dec 2016 |
MLA/2016/00451/1 - Completed | Application - Maintenance of existing works | Marsh Mills Resillience | Marsh Mills | Kier Limited | 08 Nov 2016 | 28 Apr 2017 |
MLA/2016/00453 - Completed | Application - Construction of new works | New Providence Wharf Pier | Transport For London | 11 Nov 2016 | 08 Mar 2019 | |
MLA/2016/00454 - Completed | Application - Other removals, Sampling, Scientific instruments | 46 Nine Elms Lane | 46 Nine Elms Lane | Environment Agency | 11 Nov 2016 | 22 Dec 2016 |
MLA/2016/00455 - Completed | Application - Construction of new works | Gwelva Landing upgrade | Gwelva Landing | National Trust Plc | 11 Nov 2016 | 20 Feb 2017 |
MLA/2016/00456 - Withdrawn | Application - Maintenance of existing works | Network Rail - Parton to Harrington Sea Wall No.5 | Network Rail Limited | 14 Nov 2016 | ||
MLA/2016/00457 - Completed | Application - Other deposits | Blyth Offshore Demonstrator – Temporary Deployment of Waverider Buoy | Waverider Buoy Location | Blyth Offshore Demonstrator Limited | 15 Nov 2016 | 20 Dec 2016 |
MLA/2016/00458/1 - Completed | Application - Construction of new works, Other removals | East Face step extension | Ilfracombe Harbour | Ilfracombe Harbour Authority | 15 Nov 2016 | 12 Apr 2017 |
MLA/2016/00460 - Completed | Application - Construction of new works | Kingsweir revetment repairs | Kingsweir revetment repairs | Tms Maritime Ltd | 16 Nov 2016 | 27 Mar 2017 |
MLA/2016/00461 - Withdrawn | Application - Other works | Fal River Floating Cafe | King Harry Steam | 16 Nov 2016 | ||
MLA/2016/00462 - Completed | Application - Construction of new works | Foxfield Water Main Diversion | Foxfield Main Diversion Rev 3 | United Utilities | 17 Nov 2016 | 05 Jun 2017 |
MLA/2016/00463/1 - Completed | Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital), Other removals | Galloper O&M Facility, Harwich | INNER GABBARD EAST (TH056), Galloper O&M Facility Rev 1 | Galloper Wind Farm | 18 Nov 2016 | 11 Mar 2019 |
MLA/2016/00464 - Completed | Application - Construction of new works | Proposed pontoon Royal London Yacht Club | The Parade Cowes | Royal London Yacht Club | 18 Nov 2016 | 27 Apr 2017 |
MLA/2016/00465 - Completed | Application - Construction of new works | Shadwell Basin Outdoor Activity Centre Slipway | Shadwell Slipway Boundary | Shadwell Basin Outdoor Activity Centre | 18 Nov 2016 | 17 Feb 2017 |
MLA/2016/00466 - Completed | Application - Construction of new works | RNLI Station Fowey, Cornwall | Fowey RNLI station | R.N.L.I. (Trading) Limited | 21 Nov 2016 | 07 Dec 2016 |
MLA/2016/00467/1 - Completed | Application - Maintenance of existing works | The Causeway - maintenance of | Osea Island Causeway | Mr Nigel Frieda | 21 Nov 2016 | 13 Oct 2020 |
MLA/2016/00468 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Charles Lister | 21 Nov 2016 | 23 Nov 2016 | |
MLA/2016/00469 - Completed | Application - Maintenance of existing works | RNLI New Brighton - Repair to Damaged Recovery Anchor | New Brighton Recovery Anchor | Rnli | 21 Nov 2016 | 24 Nov 2016 |
MLA/2016/00471 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Emsworth Yacht Harbour Maintenance Dredge | Emsworth Yacht Harbour, TRELOAR HOLE (WI046), NAB TOWER (WI060) | Emsworth Yacht Harbour Limited | 24 Nov 2016 | 21 Feb 2017 |
MLA/2016/00472 - Completed | Application - Maintenance of existing works | Emergency Repair Works to the North Shields Ferry Landing | North Shields Ferry Landing | Nexus | 24 Nov 2016 | 25 Nov 2016 |
MLA/2016/00473 - Completed | Application - Maintenance of existing works | Emergency stabilisation of existing coastal defence groyne | Cleveleys Groyne Zero | Wyre Council | 24 Nov 2016 | 16 Jun 2017 |
MLA/2016/00474/2 - Completed | Application - Construction of new works, Decommissioning of works | Wirral Docks Bridges Replacement | Tower Road Birkenhead | Mott Macdonald Limited | 24 Nov 2016 | 24 Jul 2017 |
MLA/2016/00475/2 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Maintenance Dredge Licence - Interterminals Tyneside Ocean Berth, River Tyne | NORTH TYNE (TY070), SOUTER POINT (OUTER) (TY081), Interterminals Tyneside Ltd - Ocean berth | Inter Terminals Tyneside Limited | 25 Nov 2016 | 31 Mar 2022 |
MLA/2016/00476/1 - Completed | Application - Maintenance of existing works | Brownsea Castle Jetty Repairs | Brownsea Castle Jetty | Hurst Peirce & Malcolm Llp | 25 Nov 2016 | 08 Feb 2017 |
MLA/2016/00477 - Completed | Application - Construction of new works | Replacement of removed jetty with walkway and pontoons | Mrs Fay Class | 25 Nov 2016 | 26 Jan 2017 | |
MLA/2016/00478/3 - Completed | Application - Disposal of dredged material, Navigational dredging (capital) | Dredging the Approach Channel to Lowestoft Harbour | LOWESTOFT CIRCULAR NORTH (TH005), Lowestoft Approach Channel | Associated British Ports. | 26 Nov 2016 | 11 Jun 2024 |
MLA/2016/00479/1 - Completed | Application - Construction of new works | HMS Calliope Pontoons | HMS Calliope | Bgp Consulting Limited | 28 Nov 2016 | 28 Jun 2017 |
MLA/2016/00481 - Completed | Application - Other deposits | Carbon Capture and Storage experiments in carbon doixide leakage detection in a marine environment | Leakage site | Fugro Geoconsulting Limited | 28 Nov 2016 | 03 Mar 2017 |
MLA/2016/00482/2 - Completed | Application - Construction of new works | Hamilton Dock, Lowestoft | Hamilton Dock | Associated British Ports. | 28 Nov 2016 | 19 Sep 2017 |
MLA/2016/00484 - Completed | Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital), Navigational dredging (maintenance) | RNSA - Alliance, Haslar Pontoon & Hornet | Alliance, Haslar Pontoon, Hornet, NAB TOWER (WI060), HURST FORT (WI080) | Royal Naval Sailing Association | 29 Nov 2016 | 28 Apr 2017 |
MLA/2016/00485/1 - Completed | Application - Maintenance of existing works | Blake Bridge, Bridgwater, Somerset. | Blake Bridge, Bridgwater, Somerset | Wsp Limited | 30 Nov 2016 | 09 Jan 2019 |
MLA/2016/00486 - Completed | Application - Maintenance of existing works | MEPR44 Goole Swing Bridge | Goole Swing Bridge, River Humber | Amalgamated Construction Ltd | 30 Nov 2016 | 22 May 2017 |
MLA/2016/00487 - Completed | Application - Maintenance of existing works | Piling Works, Pontoon A, Emsworth Yacht Harbour | Emsworth Yacht Harbour | Emsworth Yacht Harbour Limited | 01 Dec 2016 | 28 Feb 2017 |
MLA/2016/00490 - Completed | Application - Construction of new works, Other removals | Portsmouth Sailing Club Camber Dock Works | PSC Crane, PSC Brow | Portsmouth Sailing Club | 03 Dec 2016 | 06 Mar 2017 |
MLA/2016/00491 - Completed | Application - Construction of new works, Decommissioning of works, Other works | Woolverstone Marina Hoist Dock | Hoist Dock | Marina Developments Limited | 05 Dec 2016 | 21 Mar 2017 |
MLA/2016/00492/3 - Completed | Application - Construction of new works, Maintenance of existing works | pile replacement within Marina footprint and adjacent to Yard wall together with replacement pontoon units to yard wall | Berthon Marina, Lymington | Berthon Boat Company Limited(The) | 05 Dec 2016 | 29 Jan 2021 |
MLA/2016/00494 - Completed | Application - Construction of new works, Other works | Whitley Bay Central Promenade Coastal Defence Scheme | Whitley Bay Central Promenade | North Tyneside Council | 06 Dec 2016 | 04 Apr 2017 |
MLA/2016/00495/1 - Completed | Application - Construction of new works, Maintenance of existing works | Pontoon Replacement, Refurbishment & Reconfiguration, and Piling, Ocean Village, Southampton. | Untitled Polygon | Marina Developments Limited | 06 Dec 2016 | 29 Jun 2017 |
MLA/2016/00496 - Completed | Application - Maintenance of existing works | Quay Pontoon Pile Replacement (Hamble Point Marina) | Quay Pontoon Pile Replacement | Marina Developments Limited | 08 Dec 2016 | 20 Dec 2016 |
MLA/2016/00497/1 - Completed | Application - Other dredging | North Shields Ferry Landing Clearance Dredging | Nexus North Shields Clearance Dredging | Southbay Civil Engineering Limited | 08 Dec 2016 | 06 Mar 2017 |
MLA/2016/00498 - Completed | Application - Construction of new works | Middleton Wastewater Treatment Works Marker Post | Marker Post working area | United Utilities Water Plc | 08 Dec 2016 | 26 Jan 2017 |
MLA/2016/00499/3 - Completed | Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital) | Berth 9 Container Yard, Port of Felixstowe | INNER GABBARD (TH052), Berth 9 Reclamation Works | Hutchison Ports (Uk) Limited | 09 Dec 2016 | 16 May 2018 |
MLA/2016/00500 - Completed | Application - Other deposits | Custom House Quay small boat facility | Custom House Quay small boat facility | Falmouth Harbour Commissioners | 12 Dec 2016 | 15 Mar 2017 |
MLA/2016/00501/2 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Hythe Marine Park Maintenance Dredge | Area D, Area E, Area E2, Area F, Area F1, Area J, Area K, Area L, Area M, NAB TOWER (WI060), HURST FORT (WI080), NEEDLES (WI090) | Aew Uk Core Plus Property Fund | 12 Dec 2016 | 12 May 2023 |
MLA/2016/00502 - Completed | Application - Maintenance of existing works | Southwark river wall repairs | 135 Rotherhithe St, London SE16 - to - 43 William Square, London SE16 5XJ | F M Conway Limited | 12 Dec 2016 | 25 Oct 2017 |
MLA/2016/00503 - Completed | Application - Other deposits, Sampling | North West Cost Connection Geotchnical Survey 2017 | National Grid Commercial Holdings Limited | 12 Dec 2016 | 31 May 2018 | |
MLA/2016/00504 - Completed | Application - Maintenance of existing works | Nethertown Wastewater Pumping Station Outfall | Nethertown Wastewater Pumping Station Outfall | United Utilities Water Plc | 13 Dec 2016 | 23 Mar 2017 |
MLA/2016/00505 - Completed | Application - Construction of new works | Port Clarence Erosion Protection Works | Port Clarence Embankment | Environment Agency Leeds | 13 Dec 2016 | 03 Mar 2017 |
MLA/2016/00506/1 - Completed | Application - Construction of new works | Arrowhead Quay Outfalls | Arrowhead Quay | Eco World-Ballymore Arrowhead Quay Company Limited | 13 Dec 2016 | 24 Aug 2017 |
MLA/2016/00507/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Bedhampton Approach Channel and Berth Maintenance Dredge | Bedhampton Outer Area, Bedhampton Inner Area, NAB TOWER (WI060) | Tarmac Limited | 14 Dec 2016 | 04 Aug 2017 |
MLA/2016/00508 - Completed | Application - Construction of new works, Maintenance of existing works | Network Rail CP5 42 & 43 Cumbrian Coastal Protection Works | Head of Workington Harbour, Derwent Viaduct | Network Rail Limited | 14 Dec 2016 | 12 Jan 2018 |
MLA/2016/00509 - Completed | Application - Disposal of dredged material | Leamouth Wharf Silt Disposal | NAB TOWER (WI060) | Cemex Uk | 14 Dec 2016 | 20 Mar 2017 |
MLA/2016/00511 - Withdrawn | Application - Other works | Walney Offshore Wind Farm Anchor handling Trials | Deepocean | 14 Dec 2016 | ||
MLA/2016/00515 - Completed | Application - Other works | ACP2 Trials | ACP2 trials site | Deepocean 1 Uk Limited | 15 Dec 2016 | 24 Jan 2017 |
MLA/2016/00516 - Completed | Application - Construction of new works | New 14" Jetty Gasoline Import Line | Navigator Terminals Thames | 16 Dec 2016 | 25 May 2017 | |
MLA/2016/00517/1 - Completed | Application - Construction of new works, Decommissioning of works | Offshore wind operations and maintenance expansion project, Royal Dock, Grimsby | No 1 quay pontoon, Royal Dock, Coaling Jetty, Royal Dock | Associated British Ports. | 16 Dec 2016 | 09 Jun 2017 |
MLA/2016/00518 - Completed | Application - Construction of new works | Ocean Business pontoon | Ocean Business -Empress Dock | Diversified Communications Limited | 19 Dec 2016 | 02 Mar 2017 |
MLA/2016/00519 - Completed | Application - Construction of new works, Other deposits | Greatham South - INOVYN Grouped under: Greatham Flood Alleviation Scheme Showing 2 of 4 cases | Breach Site, Creek Dredge Disposal 1, Creek Dredge Disposal 2 | Environment Agency Leeds | 19 Dec 2016 | 07 Sep 2018 |
MLA/2016/00520 - Completed | Application - Navigational dredging (capital) | NuStar Jetty 1 Capital Dredge, Grays, Thames | NuStar Jetty 1 Dredge UPDATED (2017) | Nustar Corporation L.P. | 20 Dec 2016 | 25 Aug 2017 |
MLA/2016/00521 - Completed | Application - Construction of new works, Decommissioning of works | King Point Marina Wave Protection | King Point Marina Wave Protection | Land & Water Services Ltd | 21 Dec 2016 | 24 Apr 2017 |
MLA/2016/00522 - Completed | Application - Construction of new works | Torridge Estuary | Torridge Estuary - Chircombe Field Wall | Environment Agency - South West Region | 21 Dec 2016 | 08 Mar 2017 |
MLA/2016/00523 - Completed | Application - Maintenance of existing works | RNLI Harwich Lifeboat Station - Low Impact Maintenance Works to Boathouse & Pontoon Berth (Fast Track Licence) | Harwich Lifeboat Station | R.N.L.I. (Trading) Limited | 21 Dec 2016 | 27 Mar 2017 |
MLA/2016/00524/1 - Completed | Application - Maintenance of existing works | Regency Quay River Wall Repairs | Regency Quay | Regency Quay Residents Company Limited | 22 Dec 2016 | 07 Jun 2017 |
MLA/2016/00525 - Completed | Application - Construction of new works | C405/CARRR/ENV/MMO/006 CARRR RW 922 Strengthening | RW 922 Strengthening works | Peter Brett Associates | 22 Dec 2016 | 23 Feb 2017 |
MLA/2016/00526/1 - Completed | Application - Aggregate dredging, Sampling | Area 526 Grouped under: Area 526 Showing 2 of 4 cases | Area 526 (English) | Hanson Aggregates Marine Limited | 23 Dec 2016 | 01 Jun 2023 |
MLA/2016/00527/2 - Completed | Application - Aggregate dredging, Sampling | Area 526 Grouped under: Area 526 Showing 2 of 4 cases | Area 526 (English) | Cemex Uk Marine | 23 Dec 2016 | 01 Jun 2023 |
MLA/2016/00528 - Completed | Application - Maintenance of existing works | Duke Shore Wharf | Duke Shore Wharf | Environment Agency | 23 Dec 2016 | 16 Jan 2017 |