MMO - Marine Licences Public Register

Download 18MLAs-240913.csv

Case DetailsProject TypeProject TitleLocationsApplicant NameSubmission DateDecision Date
MLA/2018/00001
Completed
Application - Minor removalsRetrieval of lost fishing gear from PlymouthConstance, Ajax, Encourage, FS Poulmic, Glen Strathallan, HMT Abelard, HMT Elk, HMT Kingston Alalite, Hopper no.42, James Egan Layne, Nepaul, Rame barge, Rosehill, Rothesay, Scylla, Vectis, Viking princessFathoms Free01 Jan 201801 Jan 2018
MLA/2018/00002
Completed
Application - Other depositsBlue shark filmingBlue shark filming on dead dolphinMr Charles Hood02 Jan 201801 Oct 2018
MLA/2018/00003/1
Completed
Application - Navigational dredging (maintenance)Tides Reach Marina - Medina EstuaryTides Reach Management Company02 Jan 201806 Nov 2023
MLA/2018/00004
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mr Charles Lister03 Jan 201803 Jan 2018
MLA/2018/00005
Completed
Application - Other worksMorecambe Outfall Site Investigation worksworking area for trial holesUnited Utilities03 Jan 201803 Apr 2018
MLA/2018/00006
Completed
Application - Maintenance of existing works136/090/Mayflower Pub, Rotherhithe, ThamesMayflower pub, RotherhytheHaydn Evans Consulting Limited04 Jan 201826 Mar 2018
MLA/2018/00007
Completed
Application - Maintenance of existing structures or assetsNorthney Marina - Hoist Dock Corrosion ProtectionNorthney Marina Hoist DockMarina Developments Limited05 Jan 201805 Jan 2018
MLA/2018/00008
Completed
Application - Maintenance of existing worksNavigator Terminal Thames - Dolphin 1 Temporary RepairsNavigator Terminal ThamesNavigator Terminals Thames05 Jan 201806 Feb 2018
MLA/2018/00009
Completed
Application - Maintenance of existing structures or assetsOpen Blasting at the OSPOSP Blasting siteE.On Climate & Renewables Uk Rampion Offshore Wind Limited05 Jan 201805 Jan 2018
MLA/2018/00010
Completed
Application - Maintenance of existing structures or assetsFerry Boat SPS Dittisham - manhole cover repairFerry Boat SPSHatchplan Limited08 Jan 201808 Jan 2018
MLA/2018/00011
Completed
Application - Other worksMount Batten Ferry Pontoon ReplacementMount Batten FerryPlymouth County Ccouncil08 Jan 201809 Mar 2018
MLA/2018/00012
Completed
Application - Maintenance of existing structures or assetsBembridge Lane Beach, IOWBembridge Lane BeachBeasley Christopher Limited09 Jan 201809 Jan 2018
MLA/2018/00013
Completed
Application - Maintenance of existing structures or assetsDuver Rd, Opp Boat House, IOWDuver Road , Opp boat house PubBeasley Christopher Limited09 Jan 201809 Jan 2018
MLA/2018/00014/1
Completed
Application - Non-navigational clearance dredgingLong Curtain Moat shingle removalLong Curtain MoatPortsmouth City Council09 Jan 201818 Jan 2018
MLA/2018/00015
Completed
Application - Maintenance of existing structures or assetsGravesend Town Pier - Timber Deck RepairsGravesend Town PierGravesham Borough Council10 Jan 201810 Jan 2018
MLA/2018/00016
Completed
Application - Maintenance of existing structures or assetsPowders Quay repairs; Frenchmans Creek; HelfordPolygonNational Trust10 Jan 201810 Jan 2018
MLA/2018/00017
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mr Charles Lister)10 Jan 201810 Jan 2018
MLA/2018/00018
Completed
Application - Maintenance of existing structures or assetsWorthing, The Esplanadepolygons_magicBeasley Christopher Limited10 Jan 201810 Jan 2018
MLA/2018/00020
Completed
Application - Maintenance of existing worksSouth Wharf Quay RepairsSouth Wharf - West End of QuayNorfolk Marine11 Jan 201816 Feb 2018
MLA/2018/00021
Completed
Application - Maintenance of existing structures or assetsHythe Promenade - Outfall protective grille replacemementHythe_PromenadeSouthern Water Limited12 Jan 201812 Jan 2018
MLA/2018/00022
Completed
Application - Maintenance of existing structures or assetsMousehole Harbour Emergency Manhole worksMousehole MH 9318Glanville Services Limited12 Jan 201812 Jan 2018
MLA/2018/00023
Completed
Application - Beach maintenance activitiesHythe Promenade - Beach re-profiling using shingle removed from front of outfallHythe_PromenadeSouthern Water Limited12 Jan 201812 Jan 2018
MLA/2018/00024
Completed
Application - Non-navigational clearance dredgingHythe Promenade - Shingle clearance from in front of outfall using hand tools to replace protective grilleHythe_PromenadeSouthern Water Limited12 Jan 201812 Jan 2018
MLA/2018/00025/1
Completed
Application - Construction of new worksLincolnshire Lakes Flood Defence SchemeInstallation of scour protectionNorth Lincolnshire Council12 Jan 201826 Mar 2019
MLA/2018/00026
Completed
Application - Construction of new worksCobbs Quay Outfall 2018Outfall PipeTms Maritime Ltd13 Jan 201828 Feb 2018
MLA/2018/00027
Completed
Application - Construction of new worksInstallation of Boat LiftBoat Lift Location Apt 1 Longrow South ShieldsMr Mark Turnbull14 Jan 201805 Apr 2018
MLA/2018/00028
Completed
Application - Construction of new works, Other removalsNearshore Seaweed Cultivation of Native SpeciesSustainable Seaweed Limited16 Jan 201824 Mar 2020
MLA/2018/00029
Completed
Application - Maintenance of existing structures or assetsVirgina QuayVirginia Quay E14Wph Limited17 Jan 201817 Jan 2018
MLA/2018/00031
Completed
Application - Construction of new works, Other worksDeacons MarinaAlteration to existing layout, Removal of access brow and walkway, New access and walkway point, Public PontoonDean & Reddyhoff Limited17 Jan 201823 May 2018
MLA/2018/00032
Completed
Application - Maintenance of existing structures or assetsOutfall mesh - Long Curtain Moatpolygons_magicPortsmouth City Council18 Jan 201818 Jan 2018
MLA/2018/00034
Completed
Application - Deposit of markersAnchorsholme BuoyAnchorsholme BuoyUnited Utilities Water Plc19 Jan 201819 Jan 2018
MLA/2018/00035/2
Completed
Application - Construction of new worksHull River DefenceSite 1, Site 2, Site 3, Site 4Bmmjv Ltd19 Jan 201826 Apr 2019
MLA/2018/00036
Completed
Application - Maintenance of existing structures or assetsSea Place Tideflex Valvepolygons_magicBeasley Christopher Limited19 Jan 201819 Jan 2018
MLA/2018/00038
Completed
Application - Construction of new worksCreation of slipway on shore at Bosalan, Restronguet Point, CornwallBoslan SlipwayMr Tom Green20 Jan 201817 Apr 2018
MLA/2018/00039
Completed
Application - Other removals, SamplingRampion Offshore Wind Farm - Removal of Disused Outfall Grouped under: Rampion Offshore Wind Farm Showing 2 of 13 casesSouthern Water Disused OutfallE.On Climate & Renewables Uk Rampion Offshore Wind Limited22 Jan 201830 Apr 2018
MLA/2018/00040/1
Completed
Application - Other depositsWater Sculpture - GEOTNTyne Water SculptureNewcastlegateshead Initiative22 Jan 201819 Jun 2018
MLA/2018/00041
Completed
Application - Maintenance of existing structures or assetsNewhaven Swing Bridge - Control Tower RefurbishmentNewhaven Swing Bridge - Control TowerEast Sussex County Council23 Jan 201823 Jan 2018
MLA/2018/00042
Completed
Application - Maintenance of existing worksComposite Licence at London Array Offshore Wind FarmHV1, HV2, HV3, HV4, SS1, SS2Blue Transmission London Array Limited23 Jan 201803 Dec 2020
MLA/2018/00043
Completed
Application - Deposit of markersArun YC yacht racing marksRacing areaArun Yacht Club Limited(The)23 Jan 201823 Jan 2018
MLA/2018/00044/1
Completed
Application - Maintenance of existing structures or assetsgabion repairseast side fence, eastney cruising associationEastney Cruising Association23 Jan 201803 May 2018
MLA/2018/00046
Completed
Application - Maintenance of existing structures or assetsRepair of MH8002 in the foreshore at Berril's Yard, Fowey to stop saline infiltration into the sewer system.Access to work area and work areaSouth West Water Limited24 Jan 201824 Jan 2018
MLA/2018/00047
Completed
Application - Maintenance of existing structures or assetsWorthing - West StreetWorthing - West StreetBeasley Christopher Limited24 Jan 201824 Jan 2018
MLA/2018/00048
Completed
Application - Maintenance of existing structures or assetsWorthing 200m west of BrooklandsWorthing - 200m west of brooklandsBeasley Christopher Limited24 Jan 201824 Jan 2018
MLA/2018/00050
Completed
Application - Marine licence for the burial of human remains at seaTYNE BURIAL SITE (TY193)E Bush Ltd25 Jan 201825 Jan 2018
MLA/2018/00051
Completed
Application - Maintenance of existing structures or assetsWorthing Steyne GardensWorthing steyne gardensBeasley Christopher Limited25 Jan 201825 Jan 2018
MLA/2018/00052/1
Completed
Application - Construction of new worksSeahouses Main PierConcrete encasement - Seaward face of Main Pier, Concrete encasement - End of Main Pier, Concrete encasement - Inner face of Main PierNorthumberland County Council26 Jan 201802 Sep 2019
MLA/2018/00053
Completed
Application - Maintenance of existing structures or assetsInstallation of wooden stakes as part of an erosion plan to protect the main slipway at Emsworth Sailing Club and prevent further erosion of mud-land.Emsworth Sailing ClubEmsworth Sailing Club27 Jan 201827 Jan 2018
MLA/2018/00054
Completed
Application - Maintenance of existing structures or assetsWorthing Wallace Avenueworthing wallace aveBeasley Christopher Limited28 Jan 201828 Jan 2018
MLA/2018/00055/1
Completed
Application - Construction of new worksEssex Yacht Club Limited - water pipe replacementEssex Yacht Club Limited pipeEssex Yacht Club,Limited29 Jan 201821 Dec 2018
MLA/2018/00056
Completed
Application - Maintenance of existing structures or assetsQueenborough South MarshesQueenborough South MarshesBeasley Christopher Limited30 Jan 201830 Jan 2018
MLA/2018/00057
Completed
Application - Maintenance of existing structures or assetsNewton Voss Tidal PathNewton Voss Tidal PathDevon County Council30 Jan 201830 Jan 2018
MLA/2018/00058
Completed
Application - Navigational dredging (capital)OSL J1 Berth Approach Capital DredgeOSL Berth 1 ApproachOikos Storage Limited31 Jan 201812 Apr 2018
MLA/2018/00059
Completed
Application - Other removalsRemoval of redundant hand rails, access platforms, crane beam and timber fenders from the Bradwell site outfall structureBradwell site outfall structureMagnox Ltd01 Feb 201824 Apr 2018
MLA/2018/00060
Completed
Application - Maintenance of existing structures or assets5137 Northolt Avenue Culvert Repairs, Northolt Avenue, PlymouthNortholt Culvert - Culvert Pipe, Downstream Tidal Estuary - Anticipated Max. Work AreaPlymouth City Council01 Feb 201801 Feb 2018
MLA/2018/00061
Completed
Application - Maintenance of existing structures or assetsRenovations and extension the Sail Loft, Whitford Yard, Fowey.Whitford boat yardMr Ian Forrest01 Feb 201801 Feb 2018
MLA/2018/00062
Completed
Application - Construction of new worksHMNB Portsmouth QEC 2nd BerthHMNB Portsmouth QEC 2nd Berth Sheer and Victory Jetties Work AreaDefence Infrastructure Organisation (Dio)02 Feb 201829 Jun 2018
MLA/2018/00063/1
Completed
Application - Navigational dredging (maintenance)London Thamesport Maintenance Dredging ProjectThamesports_Project_FootprintThamesport London Ltd05 Feb 201814 Jun 2023
MLA/2018/00064
Completed
Application - Maintenance of existing structures or assetsWorthing 68 Marine CresentWorthing 68 marine cresentBeasley Christopher Limited07 Feb 201807 Feb 2018
MLA/2018/00065
Completed
Application - Maintenance of existing structures or assetsWorthing Heene Terrace westWorthing Heene Terrace WestBeasley Christopher Limited07 Feb 201807 Feb 2018
MLA/2018/00066
Completed
Application - Maintenance of existing structures or assetsReplacement of Flap Valvepolygons_magicBeasley Christopher Limited07 Feb 201807 Feb 2018
MLA/2018/00067
Completed
Application - Minor removalsRAINHAM JETTY BERTH 3RAINHAM JETTY BERTH 3Land & Water Remediation Limited07 Feb 201807 Feb 2018
MLA/2018/00068
Completed
Application - Maintenance of existing structures or assetsSouthwark River Wall RepairsBermonsey Beach WallF M Conway Limited07 Feb 201807 Feb 2018
MLA/2018/00069
Completed
Application - Maintenance of existing worksHH HW JJ Tower RefurbishmentHH7 & HH8 Towers and oversailScottish And Southern Energy07 Feb 201818 Jul 2018
MLA/2018/00071
Completed
Application - Construction of new worksNEW CUTTER AND WORK BOAT BERTH AT RO RO 3New Cutter Boat BerthPort Of Tyne Authority07 Feb 201811 May 2018
MLA/2018/00072
Completed
Application - Maintenance of existing structures or assetsORE Catapult Blyth - Minor WorksORE Catapult Minor Repair WorksOre Catapult Development Services Limited07 Feb 201807 Feb 2018
MLA/2018/00073
Completed
Application - Minor removalsGhost Fishing UK Project: Removal of ALDFG and Marine Litter from Wreck sites west of WeymouthBuccaneer HMS [W49] [+1946], P-555 HMS [+1947], Frogner SS [+1918], UB-74 [+1918], Sidon HMS [+1957], Landrail HMS [+1906], Pomeranian SS [+1918], Salsette SS [+1917]Ghost Fishing Uk08 Feb 201808 Feb 2018
MLA/2018/00074
Completed
Application - Minor removalsGhost Fishing UK Project: Removal of ALDFG and Marine Litter from Wreck sites Falmouth BayLady Of The Isles HMS [+1940], Andola SV [+1895], Bay of Panama SV [+1891], Caroni River MV [+1940], SS Epsilon, SS Mohegan, N. G. Petersen SS [+1918], Rock Island Bridge SS [+1920], VolnayGhost Fishing Uk08 Feb 201808 Feb 2018
MLA/2018/00075/1
Completed
Application - Construction of new works, Decommissioning of worksRoyal Wharf PierRoyal Wharf SiteOxley Wharf Property 3 Limited09 Feb 201825 Sep 2018
MLA/2018/00077/1
Completed
Application - Maintenance of existing worksLondon Array Offshore Wind Farm Blade Maintenance WorksLondon Array Wind Farm BoundaryLondon Array Limited09 Feb 201801 Mar 2019
MLA/2018/00078
Completed
Application - Maintenance of existing structures or assetsVictoria Wharf Flood Defence Wall RepairsVictoria WharfMoore Project Management Solutions Llp12 Feb 201812 Feb 2018
MLA/2018/00080
Completed
Application - Beach maintenance activitiesClearance of Slipway (MLA/2017/00302)Riverbank ReinforcementCornwall Council14 Feb 201814 Feb 2018
MLA/2018/00081
Completed
Application - Deposit of markersBuoys in Colwell Bay for The Hut Restaurant, it's customers and neighbours.Colwell BayAka Restaurants (Colwell) Ltd14 Feb 201814 Feb 2018
MLA/2018/00082/1
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Buckler's Hard Maintenance DredgeBuckler's Hard Yacht Harbour, NAB TOWER (WI060), HURST FORT (WI080), NEEDLES (WI090)Beaulieu Enterprises Limited14 Feb 201802 Dec 2020
MLA/2018/00083
Completed
Application - Maintenance of existing worksROYAL SOLENT YACHT CLUB JETTY STRENGTHENINGMetal PileRoyal Solent Yacht Club14 Feb 201808 May 2019
MLA/2018/00084/1
Completed
Application - Maintenance of existing worksAsset Refurbishment Programme of Works Revetment Repairs Essex1057.01 Malyons Revetment Repairs, 1077.01 CreekseaJacksonhyder15 Feb 201828 Sep 2018
MLA/2018/00085
Completed
Application - Construction of new worksNew Crew Facilities at RNLI Penlee, NewlynRNLI PenleeRnli Estates15 Feb 201801 May 2018
MLA/2018/00086
Completed
Application - Maintenance of existing structures or assetsReplacing 1 Steel pileEssex MarinaEssex Marina15 Feb 201815 Feb 2018
MLA/2018/00087
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mr Charles Lister)16 Feb 201816 Feb 2018
MLA/2018/00088
Completed
Application - Construction of new worksGreatham South Flood Alleviation Scheme (FAS) North West Habitat CreationGreatham Creek Channel Breach ExcavationEnvironment Agency Leeds16 Feb 201805 Oct 2018
MLA/2018/00089
Completed
Application - Construction of new worksWandle WallWandle WallFrasers Property (Uk) Limited16 Feb 201813 Jun 2018
MLA/2018/00090
Completed
Application - Other deposits, Other removalsNemo Link Cable Protection at KP90.4Nemo Link Cable Protection KP90.4National Grid Nemo Link Limited19 Feb 201815 Jun 2018
MLA/2018/00091
Completed
Application - Construction of new works, Maintenance of existing works, Other removals, Other worksCanal Basin Floodgate ReplacementCanal Basin FloodgateTeam210019 Feb 201807 Sep 2018
MLA/2018/00092
Completed
Application - Maintenance of existing structures or assetsRepair of dinghy launching slipway.Buck Shore Beach, Swanage Sailing ClubSwanage Sailing Club20 Feb 201820 Feb 2018
MLA/2018/00093
Completed
Application - Maintenance of existing worksWightlink Moorings PortsmouthWightlinkWightlink Limited21 Feb 201816 May 2018
MLA/2018/00094
Completed
Application - Construction of new works, Decommissioning of worksThe Folly Pontoon replacement, River Medina, IoWThe Folly PontoonGreene King Retailing Ltd21 Feb 201821 Aug 2018
MLA/2018/00095
Completed
Application - Construction of new works, Other worksEast Runton Proposed Ramp WorkEast Runton RampNorth Norfolk District Council21 Feb 201806 Jun 2018
MLA/2018/00096
Completed
Application - Construction of new worksEXTENTION OF MARCHWOOD YACHTCLUB INSHORE UPSTREAM PONTOONMarchwood Yacht ClubMarchwood Yacht Club22 Feb 201810 May 2018
MLA/2018/00097
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mr Britannia Shipping (Fao: Lister)22 Feb 201822 Feb 2018
MLA/2018/00098
Completed
Application - Maintenance of existing structures or assetsTrinity Hospital Flood Defence Wall Remediation Works - ScaffoldingTrinity HospitalCh2m Hill Europe Limited23 Feb 201823 Feb 2018
MLA/2018/00099
Completed
Application - Maintenance of existing worksWarrington Cenothaph WorksWarrington Cenotaph Sheet Piling AreaBalfour Beatty23 Feb 201801 Aug 2018
MLA/2018/00100
Completed
Application - Non-navigational clearance dredgingLot's AitLot's AitHither Green Developments Limited23 Feb 201823 Feb 2018
MLA/2018/00101
Completed
Application - Minor removalsGhost Fishing UK Project: Removal of ALDFG and Marine Litter from Wreck sites and reefs from Plymouth to PortlandEddystone Rocks, Hatt Rock, Glocliffe SS [+1917], Louis Sheid SS [+1939], James Fennell HMT [+1920], Royal Adelaide SV [+1872], Anworth, Minerva SS [+1917], Scaldis (+1974), Saint Dunstan HMS [+1917], Tracy [+2016], Ailsa Craig SS [+1918], Moidart SS [+1918], Baygitano SS [+1918], Heroine SV [+1852], Gibel Hamam SS [+1918], Nil Desperandum MFV [+1993], Radaas | SS [+1917], Galicia SS [+1917], Boma SS (I) [+1918], City of Swansea SS [+1917], Gefion SS [+1917], Lord Stewart SS [+1918], Bretagne SS [+1918], Trawl gear|, Dudley Rose SS [+1941], Sevilla SS [+1918], Northville SS [+1918], Unknown wreck, Girl Barbara [+1990], Les Mercenaires MFV [+2005], Dutch tug, Benton Castle HMT [+1916], Picton Castle HMS [+1917], Dryad SV [+1891], Newholm SS [+1917], Baychattan SS [+1917], Demetrios MV [+1992], Riversdale SS [+1917], Herzogin Cecilie SV [+1936], Soudan SS [+1887], Liberta SS [+1926], Skaala SS [+1917], Maine SS (II) [+1917], Oregon SV [+1890], Persier SS [+1945], Totnes Castle PSS [+1967], Untiring HMS (P-59) [+1957], Medoc SS (Half Way Wreck) [+1940], Eddystone Lighthouse (+1703), Foyle HMS (D 20) [+1917], Unicorn SS (Tile Boat) [+1923], Leen, Beatrice SV [+1988], Rosehill SS [+1917], James Eagan Layne SS [+1945], Scylla HMS (F71) [+2004], Breakwater South, Hands DeepGhost Fishing Uk25 Feb 201825 Feb 2018
MLA/2018/00102
Completed
Application - Construction of new worksTrinity Buoy Wharf Temporary ExtensionTrinity Buoy WharfThames Clippers27 Feb 201813 Feb 2019
MLA/2018/00103
Completed
Application - Construction of new worksSmall Quay LerrynSmall Quay, LerrynMr Hugh Sinclair27 Feb 201818 May 2018
MLA/2018/00104
Completed
Application - Maintenance of existing structures or assetsHythe opp WaitroseHythe opp waitroseBeasley Christopher Limited28 Feb 201828 Feb 2018
MLA/2018/00105
Completed
Application - Maintenance of existing worksPortobello WTW Groyne RepairPortobello Groyne RepairSouthern Water28 Feb 201806 Aug 2019
MLA/2018/00106
Completed
Application - Maintenance of existing structures or assetsBembridge Lane, IOWBembridge LaneBeasley Christopher Limited01 Mar 201801 Mar 2018
MLA/2018/00107
Completed
Application - Construction of new worksRelocation and installation of new access for the R.S. Hispaniola Restaurant VesselRS Hispaniola Temporary Access Steps, Ramp and Goods LiftBazalgette Tunnel Limited01 Mar 201814 May 2018
MLA/2018/00108
Completed
Application - Construction of new works, Other deposits, Other removalsExport cable Installation - Rampion Offshore Wind Farm Grouped under: Rampion Offshore Wind Farm Showing 2 of 13 casesEC 4 corridorRampion Offshore Wind02 Mar 201824 May 2018
MLA/2018/00109
Completed
Application - Maintenance of existing worksProspect Quay - Scour DamageProspect Mooring - T head berthProspect Moorings 2013 Limited02 Mar 201827 Jul 2018
MLA/2018/00110/2
Completed
Application - Maintenance of existing worksHuckers Bow Tidal Sluice Flood Defence ImprovementsHuckers Bow Tidal OutfallBmm Jv Ltd05 Mar 201821 Mar 2019
MLA/2018/00111
Completed
Application - Disposal of dredged materialClearance of SlipwayRiverbank reinforcement with dredged spoil from slipwayCaptain Mark Killingback05 Mar 201813 Jan 2020
MLA/2018/00112
Completed
Application - Maintenance of existing structures or assetsRepairs to seawall revetment and out fall pipeWaldegraves Holiday ParkMr Graham Rampling05 Mar 201805 Mar 2018
MLA/2018/00113
Completed
Application - Maintenance of existing works, Other depositsWest of Duddon Sands OFTO O&M Marine LicenceSite 1 EOR0709 WDS Cable Repair BoundaryWods Transmission Plc06 Mar 201817 Sep 2018
MLA/2018/00115/1
Completed
Application - Construction of new worksProposed Pontoon and Lime Quay, Tregothnan Estate, St Micheal PenkivelLime QuayFalmouth Estates Management Company Limited07 Mar 201822 Nov 2019
MLA/2018/00116
Completed
Application - Maintenance of existing structures or assetsSouth Sands Salcombe - manhole repairsSouth Sands Salcombe ManholesR&M Utility & Civil Engineering Services South West Limited08 Mar 201808 Mar 2018
MLA/2018/00118/1
Completed
Application - Disposal of dredged material, Navigational dredging (capital), Other depositsStone Beds at Green Port Hull Berth 1Green Port Hull Berth 1, Holme Channel Deep (HU056)Abp08 Mar 201824 Sep 2018
MLA/2018/00119
Completed
Application - Other worksFoxfield Water Main ReinstatementArea B (East of Estuary), Area A (West of Estuary)United Utilities Water Plc09 Mar 201831 Jul 2018
MLA/2018/00120
Completed
Application - Maintenance of existing worksReplacement of existing jetty and launch hard facility.Hook FarmMr Matthew Walton09 Mar 201802 Jul 2018
MLA/2018/00122
Withdrawn
Application - Other depositsPann’s East Quay Emergency Stabilisation WorksSunderland County Council09 Mar 2018
MLA/2018/00123
Completed
Application - Maintenance of existing structures or assetsSurface Water Outfall Inspection West Street WorthingWest Street WorthingBeasley Christopher Limited10 Mar 201810 Mar 2018
MLA/2018/00124
Completed
Application - Maintenance of existing structures or assetsBexhill Sutton PlaceBexhill Sutton PlaceBeasley Christopher Limited12 Mar 201812 Mar 2018
MLA/2018/00125
Completed
Application - Beach maintenance activitiesManagement of shingle on the Landguard FrontageLandguard Peninsula, SuffolkPort Of Felixstowe Limited12 Mar 201812 Mar 2018
MLA/2018/00126
Completed
Application - Maintenance of existing worksQueen's Wharf - Remedial WorksQUEENS WHARFMount Anvil Limited12 Mar 201827 Jul 2018
MLA/2018/00127
Completed
Application - Maintenance of existing structures or assetsReplacement of four worn out floats on our floating bridge leading to a pontoon.Lobster QuayWarsash Sailing12 Mar 201812 Mar 2018
MLA/2018/00128
Completed
Application - Maintenance of existing structures or assetsCooden BeachCooden BeachBeasley Christopher Limited13 Mar 201813 Mar 2018
MLA/2018/00129
Completed
Application - Other worksDeployment of bird deterrents at Burbo Extension Offshore Wind FarmBurbo Extension Offshore Wind FarmOrsted13 Mar 201816 May 2018
MLA/2018/00130
Completed
Application - Maintenance of existing structures or assetsSeaford SplashSeaford SplashBeasley Christopher Limited13 Mar 201813 Mar 2018
MLA/2018/00131
Completed
Application - Maintenance of existing structures or assetsAshlett Creek 2Ashlett Creek 2Beasley Christopher Limited14 Mar 201814 Mar 2018
MLA/2018/00132/1
Completed
Application - Other depositsEstimating catchability of scallop dredges and TV survey efficiencySite 3, Site 1, Site 2Cefas14 Mar 201804 Oct 2018
MLA/2018/00133
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Bosham Quay DredgeNAB TOWER (WI060), Bosham QuayChichester Harbour Conservancy.15 Mar 201831 May 2018
MLA/2018/00134
Completed
Application - Maintenance of existing structures or assetsNewton Ferrers Saline OutfallNewton FerrersGlanville Cleansing Limited15 Mar 201815 Mar 2018
MLA/2018/00135
Completed
Application - Maintenance of existing structures or assetsKentish Flats - Blade ExchangeUKF_EGWTG_WTG_LUKF003_v01_161120lm_4258_ExtUKFE01_Buf500mVattenfall Wind Power Ltd15 Mar 201815 Mar 2018
MLA/2018/00136
Completed
Application - Maintenance of existing works, Other removalsMarine licence - 10 year generic maintenance licence- HappisburghHappisburgh Marine LicenseNorth Norfolk District Council15 Mar 201812 Oct 2018
MLA/2018/00137/1
Completed
Application - Maintenance of existing works, Other removalsMarine licence - 10 year generic maintenance licence- Weybourne Beck outfall to WalcottMarine_License2North Norfolk District Council15 Mar 201822 May 2019
MLA/2018/00138
Completed
Application - Maintenance of existing structures or assetsLangley PointLangley PointBeasley Christopher Limited16 Mar 201816 Mar 2018
MLA/2018/00142
Completed
Application - Maintenance of existing structures or assetsPontoon preventative maintenancePontoon at Burnham on Crouch Sailing ClubBurnham On Crouch Sailing Club19 Mar 201819 Mar 2018
MLA/2018/00143
Completed
Application - Other removalsHolker Estate - flood defence embankment repairsSand extraction siteHolker Estates Co Ltd19 Mar 201830 Jul 2018
MLA/2018/00144
Completed
Application - Non-navigational clearance dredgingclearance of silt under pontoonsDoug Ashley Marine maintenance dredgeMr James Douglas Ashley19 Mar 201819 Mar 2018
MLA/2018/00145
Completed
Application - Maintenance of existing structures or assetsHRSC Pontoon re-establishment of moorings following Storm damageHRSC Pontoon Mooring SpreadHelford River Sailing Club20 Mar 201820 Mar 2018
MLA/2018/00146
Completed
Application - Other removalsDemolition of Little Susie and XoronLittle susie and XoronJpc Demolition Llp21 Mar 201817 Aug 2018
MLA/2018/00147
Completed
Application - Non-navigational clearance dredgingOne off desilt of Broadfleet at PillingBroadfleet channelMr John Barton21 Mar 201821 Mar 2018
MLA/2018/00148
Completed
Application - Navigational dredging (capital)RAINHAM JETTY BERTH 3 DREDGINGRAINHAM JETTY BERTH 3Land & Water Remediation Ltd23 Mar 201822 Aug 2018
MLA/2018/00149
Completed
Application - Maintenance of existing structures or assetsEvent BridgePorthleven Food Festival BridgeArc Live Limited26 Mar 201826 Mar 2018
MLA/2018/00150
Completed
Application - Maintenance of existing worksHelford River Sailing Club Pontoon Pile replacementHelford River Sailing Club Pontoon Pile LocationFalmouth Divers Limited26 Mar 201829 Mar 2018
MLA/2018/00151
Completed
Application - Minor removalsBorehole SampleNavigator Terminal ThamesVopak Terminal London B.V. Limited26 Mar 201826 Mar 2018
MLA/2018/00152
Completed
Application - Maintenance of existing structures or assetsPoole Bridge - remedialsPoole Bridge Approach SpansBorough Of Poole26 Mar 201826 Mar 2018
MLA/2018/00153
Completed
Application - Minor removalsSea Shepherd ALDFG (Ghostnet) removals in Liverpool Bay 1Sea Shepherd UK ALDFG and litter removals in Liverpool Bay area 1Sea Shepherd Uk26 Mar 201826 Mar 2018
MLA/2018/00154/1
Completed
Application - Maintenance of existing works, Other depositsGreatham BeckGreatham Beck- Dry Working AreaAmalgamated Construction27 Mar 201803 Sep 2018
MLA/2018/00155/1
Completed
Application - Maintenance of existing worksRace Bank Offshore Wind farm Operation and Maintenance for non cable activities - Generator assetsRace Bank Wind FarmDong Energy Rb (Uk) Limited27 Mar 201810 Jan 2020
MLA/2018/00157
Completed
Application - Maintenance of existing structures or assetsSir John McDougall - Glengall Gardens River Wall MaintenanceSir John McDougall - Glengall GardensCh2m Hill Europe Limited28 Mar 201828 Mar 2018
MLA/2018/00158
Completed
Application - Maintenance of existing structures or assetsIE00897C Manea Bridge WorksManeaAmalgamated Construction Ltd28 Mar 201828 Mar 2018
MLA/2018/00159
Completed
Application - Maintenance of existing structures or assetsComponent Exchange - Gearbox replacement - location A03Gearbox replacement - Location A03 - Sheringham Shoal Offshore WindfarmScira Offshore Energy Limited28 Mar 201828 Mar 2018
MLA/2018/00161/1
Completed
Application - Construction of new worksPipeline installation at Geo Specialty Chemicals, HytheGeo Outfall PipelineGeo Specialty Chemicals03 Apr 201809 Nov 2018
MLA/2018/00162
Completed
Application - Maintenance of existing structures or assetsPreparations and repainting of 44 WTG's and Offshore SubstationArea of painting worksScira Offshore Energy Limited03 Apr 201803 Apr 2018
MLA/2018/00163
Completed
Application - Construction of new worksOutfall Bay Structure for the Stow Fen Pumping Station ReplacementOutfall Bay for the Replacement of Stow Fen Pumping StationDownham And Stow Bardolph Idb03 Apr 201816 Jul 2018
MLA/2018/00165
Completed
Application - Maintenance of existing structures or assetsSugar Quay - Jetty WorksSugar QuayBarratt London Limited04 Apr 201804 Apr 2018
MLA/2018/00166
Withdrawn
Application - Construction of new worksMooring pilesBridgeMarsh MarinaMr Ben Knill05 Apr 2018
MLA/2018/00167
Completed
Application - Disposal of dredged material, Navigational dredging (capital)Gosport Marina - Endeavour Quay Link Pontoon DredgeNAB TOWER (WI060), Keel Pocket (dredge -1m), Link Pontoon (dredge -3.5m)Premier Marinas (Gosport) Limited05 Apr 201822 Jun 2018
MLA/2018/00169
Completed
Application - Maintenance of existing structures or assetsHelford River Sailing Club Pontoon Pile ReplacementHelford River Sailing Club Pile Replacement location and access areaMr John Lake05 Apr 201805 Apr 2018
MLA/2018/00170
Completed
Application - Minor removalsExmouth Tidal Defence Scheme - Boreholes for geotechnical investigationExmouth TDS - Borehole locationsEnvironment Agency06 Apr 201806 Apr 2018
MLA/2018/00171
Completed
Application - Construction of new works, Other removalsSwanage Slipway ProjectSwanage SlipwaySwanage Town Council06 Apr 201823 Aug 2018
MLA/2018/00172/1
Completed
Application - Disposal of dredged materialPort of Sunderland - disposal of maintenance dredged materialSUNDERLAND (TY090)Port Of Sunderland09 Apr 201814 Nov 2018
MLA/2018/00173
Completed
Application - Maintenance of existing structures or assetsEmergency Quay wall repairsRubber FactorySouthbay Civil Engineering Limited09 Apr 201809 Apr 2018
MLA/2018/00174/1
Completed
Application - Aggregate dredging, SamplingArea 254 - MarconArea 254 - MarconTarmac Marine Dredging Ltd09 Apr 201827 Oct 2020
MLA/2018/00175/1
Completed
Application - Construction of new works, Maintenance of existing works, Other worksRiver wall repair and maintanence 26-37 Clive Street North Shields Grouped under: River wall repair 26-37 Clive Street North Shields Showing 2 of 2 casesClive Street 26-37Southbay Civils Engineering Limited10 Apr 201813 Nov 2019
MLA/2018/00176
Completed
Application - Maintenance of existing worksRNLI Selsey - Emergency Removal of Buried ObstructionRNLI Selsey - Emergency Removal Works (April 18)Rnli Division South11 Apr 201812 Apr 2018
MLA/2018/00177
Completed
Application - Beach maintenance activitiesClearance of sand in harbour to allow better use of Landing Steps on West Pier, St IvesSt Ives HarbourCornwall Council - Harbour Office11 Apr 201811 Apr 2018
MLA/2018/00179
Completed
Application - Construction of new worksBrighton Marina West Quay PontoonBrighton West Quay PontoonPremier Marinas (Brighton) Ltd12 Apr 201806 Jul 2018
MLA/2018/00180
Completed
Application - Maintenance of existing worksRiver wall emergency repair 26-37 Clive Street North Shields Grouped under: River wall repair 26-37 Clive Street North Shields Showing 2 of 2 casesClive Street 26-37Southbay Civils Engineering Limited12 Apr 201816 Apr 2018
MLA/2018/00181
Completed
Application - Maintenance of existing worksSt Helens Mill Dam Footbridge Replacements (B320 and B321)The CausewayRingway Island Roads13 Apr 201821 Aug 2018
MLA/2018/00182
Completed
Application - Maintenance of existing worksB160 Newport Quay Deck ReplacementNewport Quay BridgeRingway Island Roads Limited13 Apr 201806 Nov 2018
MLA/2018/00183
Completed
Application - Maintenance of existing worksAsset Refurbishment Programme of Works Revetment Repairs on the BlackwaterMundon Creek, Rolls Farm site 1Jacksonhyder13 Apr 201815 Oct 2018
MLA/2018/00184
Withdrawn
Application - Other removalsTriton Knoll Wind FarmTriton Knoll Offshore Wind Farm Ltd16 Apr 2018
MLA/2018/00185
Completed
Application - Maintenance of existing worksPontoon change at Thunderbolt PierThunderbolt PierChatham Historic Dockyard Trust16 Apr 201814 Aug 2018
MLA/2018/00187
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mamarine.Com Llp17 Apr 201817 Apr 2018
MLA/2018/00188
Completed
Application - Maintenance of existing structures or assetsURGENT REPAIRS TO ROOF AND TIMBER CLADDING DUE TO STORM DAMAGESt ives Arts Club, ScaffoldingSt Ives ( Cornwall ) Arts Club Society17 Apr 201817 Apr 2018
MLA/2018/00189
Completed
Application - Deposit of markersLaying dinghy racing marks in Christchurch Harbour that remain in place for more than 28 days and are only removed for maintenance.Christchurch Harbour fixed racing marksHighcliffe Sailing Club18 Apr 201818 Apr 2018
MLA/2018/00190
Completed
Application - Construction of new worksproposed shellfish landing jettyOxen Cove proposed jettyTda18 Apr 201804 Feb 2019
MLA/2018/00191/1
Completed
Application - Maintenance of existing structures or assetsCrispins, Newton FerrersBridgendMr Paul Pethick18 Apr 201826 Apr 2018
MLA/2018/00192
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mr Paul Steele19 Apr 201819 Apr 2018
MLA/2018/00193/7
Completed
Application - Construction of new worksDeptford Creek Marine Works - FullDeptford Creek Marine WorksThames Tideway Tunnel Limited20 Apr 201814 Mar 2024
MLA/2018/00194/2
Completed
Application - Construction of new works, Decommissioning of worksReplacement Dolphin Navigator TerminalsCorrect site of worksNavigator Terminals Thames20 Apr 201819 Mar 2019
MLA/2018/00195
Completed
Application - Construction of new worksWest Quarries Recreation Site Landing StageWest Quarries Recreation Site Landing StageRiver Recreation Cic20 Apr 201801 Apr 2019
MLA/2018/00196
Completed
Application - Maintenance of existing structures or assetsEastern Jetty Fender Thrust Pile maintenanceSite 1Falmouth Petroleum Limited23 Apr 201823 Apr 2018
MLA/2018/00197
Completed
Application - Deposit of markersBrightlingsea Sailing Club racing marks licence applicationBatemans (BSC), Pyefleet (CYC), Point Clear (BSC), Hills (BSC), Gazelet (BSC), Cocum (BSC), Beach (BSC), CVP (CYC)Brightlingsea Sailing Club24 Apr 201824 Apr 2018
MLA/2018/00198
Completed
Application - Maintenance of existing structures or assetsJetty 1A Replacement Ethylene Loading ArmNorth Tees Jetty 1ASabic Global Limited24 Apr 201824 Apr 2018
MLA/2018/00199
Completed
Application - Construction of new worksVictoria Breakwater improvementVictoria Breakwater, BrixhamTorbay Council25 Apr 201816 Oct 2018
MLA/2018/00201
Completed
Application - Construction of new works, Other dredgingIntertidal Enhancement WorksEnderby WharfEnderby Wharf Llp25 Apr 201811 Mar 2019
MLA/2018/00202/1
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Newhaven Harbour Maintenance Dredging Sediment DisposalNEWHAVEN (WI010)Newhaven Port & Properties Ltd25 Apr 201818 Oct 2021
MLA/2018/00203
Completed
Application - Deposit of markersREPAIR TO MARKERS - ISOLATED DANGER BEACON - POLLARD GROUNDPOLLARD GROUND SEASALTERSeasalter Shellfish (Whitstable) Ltd25 Apr 201825 Apr 2018
MLA/2018/00204
Completed
Application - Maintenance of existing structures or assetsMaintenance to existing outfall diffuser valvesOutfall pipe outlet location (activities centred on this point)Falmouth Divers Limited26 Apr 201826 Apr 2018
MLA/2018/00205
Completed
Application - Other worksPenzance Promenade Trial PitsPenzance PromenadeCormac Solutions Limited26 Apr 201829 Jun 2018
MLA/2018/00206/1
Completed
Application - Navigational dredging (maintenance)Maintenance Dredging around W Trout & Son Ltd Pontoons - Lat. 50*40'5500N, Lon 3*27'58.02WW Trout & Son LtdW Trout & Son Limited27 Apr 201812 Nov 2020
MLA/2018/00207/1
Completed
Application - Maintenance of existing structures or assetsManea BridgeManeaJ. Murphy & Sons Limited27 Apr 201803 May 2018
MLA/2018/00208
Completed
Application - Other depositsBarrow Offshore Wind Farm Rock PlacementBarrow_Windfarm_WGS84Orsted Power Uk Ltd30 Apr 201814 Aug 2018
MLA/2018/00209/1
Completed
Application - Construction of new worksAlterations to Twelve Quays TerminalTwelve Quays SitePeel Ports (Medway) Limited30 Apr 201805 Aug 2019
MLA/2018/00210
Completed
Application - Maintenance of existing structures or assetsSlipway repairs for Harbour House, 22 Greenacres, Birdham, Po20 7HLSlipway repairs , Harbour house ,22 Greenacres, BirdhamMr Andy Fitzgerald30 Apr 201830 Apr 2018
MLA/2018/00212/1
Completed
Application - Maintenance of existing worksSheerness Asset MaintenanceNeptune JettyTeam Van Oord30 Apr 201822 Mar 2019
MLA/2018/00213
Completed
Application - Other dredgingExcavation of sediment to investigate and repair failed soakaway under Porthminster beachPorthminsterCornwall Council -Environment Service30 Apr 201802 Jul 2018
MLA/2018/00214
Completed
Application - Construction of new works, Navigational dredging (capital)Development of Standard WharfStandard Wharf Ltd01 May 201827 Oct 2022
MLA/2018/00215
Completed
Application - Maintenance of existing worksInstallation of two 323mm dia piles to prevent storm damage to existing leisure pontoonBurnham on Crouch Sailing Club PontoonBurnham On Crouch Sailing Club01 May 201801 Aug 2018
MLA/2018/00216
Withdrawn
Application - Construction of new worksNatural Flood Management using Saltmarsh in Suffolk EstuariesSudbourne, Alde and Ore Estuary between Orford and AldeburghEnvironmentagency02 May 2018
MLA/2018/00217
Withdrawn
Application - Other depositsLincolnshire Time and Tide BellTime and Tide Bell, Beach, North End, MablethorpeLincolnshire Time And Tide Bell Community Interest Company02 May 2018
MLA/2018/00218
Completed
Application - Maintenance of existing structures or assetsRefurbishment of Two Rustic Timber Pole Groynes, below Eastcliff, Undertyne, Bembridge, IOWBembridge GroynesGraham Attrill Civil Engineering Limited02 May 201802 May 2018
MLA/2018/00220
Completed
Application - Construction of new worksWorks to sea wall at 69-73 Whitworth Crescent, Southampton.69-73 Whitworth Crescent, SouthamptonMr Jeremy Swadling03 May 201810 Jul 2018
MLA/2018/00221/1
Completed
Application - Construction of new worksFresh Wharf River Wall and Temporary MooringsFresh Wharf River WorksErith Contractors Ltd04 May 201831 Mar 2022
MLA/2018/00222/2
Completed
Application - Maintenance of existing worksA14 River Orwell Pier 10 CPA14 River Orwell Bridge - Pier 10Kier Highways Limited04 May 201827 Aug 2019
MLA/2018/00223
Completed
Application - Disposal of dredged material, Maintenance of existing works, Other dredgingGrain Power Station Cooling Water Intake Maintenance. Site - Grain Power Station, Isle of Grain, Rochester, ME3 0ARCooling water intake structure dredging and maintenance works, SOUTH FALLS (TH070)Uniper Uk Limited04 May 201806 Feb 2019
MLA/2018/00224
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mr John Mckenzie04 May 201804 May 2018
MLA/2018/00225
Completed
Application - Maintenance of existing structures or assetsRestoration of the Wreck Trail on the SS Bretagne - Centenary CelebrationWreck site of the SS BretagneBritish Sub-Aqua Club05 May 201805 May 2018
MLA/2018/00226
Completed
Application - Maintenance of existing structures or assetsResurfacing of slipwayTregonce Barn SlipwayMrs June Totman08 May 201808 May 2018
MLA/2018/00227
Completed
Application - Construction of new works, Other depositsFort Bovisand Cliff Stabilisation180406_07645_00001_SiteBoundary_digitisedFort Bovisand Developments Ltd08 May 201815 May 2019
MLA/2018/00228
Completed
Application - Maintenance of existing structures or assetsFlat Cliffs - Temporary Access Platform for Installation of Cliff Drainage WorksFlat cliffs v4Scarborough Borough Council09 May 201809 May 2018
MLA/2018/00229
Completed
Application - Construction of new worksColdharbour Outfall ExtensionOutfall_Extension_ExtentCanterbury City Council11 May 201815 Aug 2018
MLA/2018/00230
Completed
Application - Construction of new worksRD30 Waren Mill STWWaren Mill - Outfall, Waren Mill - Pipe CrossingMott Macdonald Bentley Limited11 May 201808 Aug 2018
MLA/2018/00231
Completed
Application - Maintenance of existing worksRNLI Selsey - Emergency Removal of Buried Obstruction (Phase 2)RNLI Selsey - Emergency Removal WorksRnli Estates14 May 201822 May 2018
MLA/2018/00232
Completed
Application - Minor removalsSubsea Drill Test ProgramBlyth West QuayRoyal Ihc Limited14 May 201814 May 2018
MLA/2018/00233
Completed
Application - Construction of new worksWeymouth Marina PontoonsWeymouth PontoonsDean & Reddyhoff Limited14 May 201828 Aug 2018
MLA/2018/00234/3
Variation Requested
Application - Disposal of dredged material, Navigational dredging (maintenance)Maintenance Dredging at HMNB DevonportPlymouth Deep (PL035), Dredge_Area_IndicativeDefence Infrastructure Organisation (Dio)15 May 201826 Oct 2022
MLA/2018/00235/3
Completed
Application - Decommissioning of worksDecommissioning of Meteorological Mast 1BMeteorological Mast Working AreaEast Anglia Offshore Wind Limited16 May 201824 Apr 2020
MLA/2018/00236
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mr Charles Lister)16 May 201816 May 2018
MLA/2018/00237
Completed
Application - Maintenance of existing structures or assetsRedecoration of Applewharf, The Plains, Totnes, TQ9 5QLApplewharf, The Plains, Totnes, TQ9 5QLApplewharf Management Limited16 May 201816 May 2018
MLA/2018/00238
Completed
Application - Maintenance of existing worksRIVER WALL DEFENCE REMEDIATION – CLIFFESouthern Eroded Section, Northern Eroded SectionBrett Aggregates Ltd16 May 201816 Jul 2018
MLA/2018/00239
Completed
Application - Maintenance of existing worksLow Level Concrete Pile RepairNavigator Terminal Thames JettyVopak Terminal London B.V. Ltd17 May 201823 Nov 2018
MLA/2018/00240
Completed
Application - Construction of new worksRD30 Waren Mill Sea WallSea WallMott Macdonald Bentley Limited18 May 201809 Aug 2018
MLA/2018/00242
Completed
Application - Construction of new worksScotline New Quay WallScotline New Quay WallGdc Partnership Ltd19 May 201831 Oct 2018
MLA/2018/00243
Completed
Application - Decommissioning of worksBlyth Offshore Wind Farm Decommissioning ProjectBlyth Decommissioning Site, North Turbine, South TurbineE.On Climate & Renewables Uk Blyth Limited21 May 201818 Mar 2019
MLA/2018/00244
Completed
Application - Minor removalsHambleton Flood Risk Management Scheme (Our ref. ENV0000064C)Hambleton FRMS - Ground Investigations AreaEnvironment Agency21 May 201821 May 2018
MLA/2018/00245
Completed
Application - Maintenance of existing workspile repairs, rail & bracing repairs and replacement and removal of debris under brighton palace pierBRIGHTON PALACE PIERBrighton Marine Palace & Pier Company (The)21 May 201820 Jun 2019
MLA/2018/00248
Completed
Application - Other depositsExercise Imber - 727 Spray EvaluationSpray areaOil Spill Response Limited23 May 201820 Jun 2018
MLA/2018/00251/1
Completed
Application - Other depositsSpraying of Fresh Water from a B727 to simulate oil spill dispersant application exercise by Oil Spill Response LtdSD1 2018 Exercise AreaOil Spill Response Limited23 May 201805 Oct 2018
MLA/2018/00253
Completed
Application - Maintenance of existing structures or assetsDownings Roads MooringsDOWNINGSROADTower Bridge Yacht And Boat Company Limited01 Jun 201801 Jun 2018
MLA/2018/00254
Completed
Application - Maintenance of existing structures or assetsShell Bacton Outfall NDTShell Outfall NDT AreaShell U.K. Limited01 Jun 201801 Jun 2018
MLA/2018/00255
Completed
Application - Marine licence for the burial of human remains at seaTYNE BURIAL SITE (TY193)Gordon Fletcher & Sons Limited04 Jun 201804 Jun 2018
MLA/2018/00256
Completed
Application - Maintenance of existing structures or assetsHoughton Bridge repairsHoughton BridgeWest Sussex County Council04 Jun 201804 Jun 2018
MLA/2018/00257
Withdrawn
Application - Disposal of dredged material, Other dredging, Other worksMylor Yacht Harbour - Extension to the Existing MarinaMylor Yacht Harbour Ltd04 Jun 2018
MLA/2018/00258
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mr John Lister04 Jun 201804 Jun 2018
MLA/2018/00259
Completed
Application - Maintenance of existing structures or assetsReplacement of existing sea defences on foreshore landWarrens ForeshoreMr Paul Cox04 Jun 201804 Jun 2018
MLA/2018/00260
Withdrawn
Application - Construction of new worksBathurst Basin Bridge - PontoonBristol City Council04 Jun 2018
MLA/2018/00261
Completed
Application - Maintenance of existing structures or assetsRiver Lune Viaduct Scour ProtectionRiver Lune ViaductJ. Murphy & Sons Limited05 Jun 201805 Jun 2018
MLA/2018/00262
Completed
Application - Maintenance of existing structures or assetsPaighton Pier MaintainencePaighton PierUk Industrial Services Ltd05 Jun 201805 Jun 2018
MLA/2018/00263
Completed
Application - Minor removalsGhost Fishing UK Project: Removal of ALDFG and Marine Litter from Haybrook Bay to MothercombeBlackstone Point AreaGhost Fishing Uk05 Jun 201805 Jun 2018
MLA/2018/00264
Completed
Application - Maintenance of existing structures or assetsSea Wall and Structure RepairsSea WallBalfour Beatty Plc06 Jun 201806 Jun 2018
MLA/2018/00265
Completed
Application - Deposit of markersSilloth Outfall Pipe Marker Buoy ReplacementSilloth Outfall BuoyUnited Utilities Water Plc07 Jun 201807 Jun 2018
MLA/2018/00266
Completed
Application - Maintenance of existing structures or assetsTrippet Wall RepairsTrippetWest Sussex County Council07 Jun 201807 Jun 2018
MLA/2018/00267
Completed
Application - SamplingLyme Regis - The Cobb - Ground InvestigationsGround investigation area - The CobbJba Consulting Limited07 Jun 201815 Oct 2018
MLA/2018/00268
Completed
Application - Construction of new works, Maintenance of existing worksNorthey Island South Embankment WorksNorthey Island South EmbankmentNational Turst08 Jun 201816 Jan 2019
MLA/2018/00269
Completed
Application - Non-navigational clearance dredgingSilt removalspittys pointMr Peter Herbert10 Jun 201810 Jun 2018
MLA/2018/00270
Completed
Application - Maintenance of existing structures or assetsRace Bank Offshore Wind Farm : Removal of marine growth/guano from WTG access pointsRace Bank Wind FarmDong Energy Rb (Uk) Limited11 Jun 201811 Jun 2018
MLA/2018/00271
Completed
Application - Maintenance of existing worksDarthaven MarinaDarthaven MarinaDarthaven Marina Limited11 Jun 201804 Dec 2018
MLA/2018/00272
Completed
Application - Construction of new works, Maintenance of existing worksYacht Haven, Hayling Island, HantsYacht Haven Sea Defence 1, Yacht Haven Sea Defence 2, Yacht Haven Slipway, New pontoonsAlpine Homes Ltd12 Jun 201827 Jan 2023
MLA/2018/00273/1
Completed
Application - Construction of new worksEast End Landing pontoon with two pilesEast End slipwayWells Harbour Commissioners12 Jun 201803 Oct 2018
MLA/2018/00274
Completed
Application - Maintenance of existing structures or assetsOld Mill, DartmouthOld Mill, DartmouthGlanville Cleansing Limited12 Jun 201812 Jun 2018
MLA/2018/00275
Completed
Application - Non-navigational clearance dredgingHen Pens Sand WinningHen Pens, FoulshawEnvironment Agency12 Jun 201812 Jun 2018
MLA/2018/00276/1
Completed
Application - Decommissioning of worksConvoys Wharf Demolition and Removal of Pontoon BerthConvoys WharfHerbosch-Kiere Marine Contractors Ltd.13 Jun 201821 Jun 2019
MLA/2018/00277/1
Completed
Application - Maintenance of existing works2017s6104 - Eels regulation compliance measures at Hempholme LockHempholme LockYorkshire Water Services Ltd13 Jun 201828 Mar 2019
MLA/2018/00279
Completed
Application - Maintenance of existing structures or assetsOld Bridge Street Retaining Wall RepairOld Bridge Street Retaining WallCormac Solutions Limited14 Jun 201814 Jun 2018
MLA/2018/00280
Completed
Application - Maintenance of existing structures or assetsKing Henry's Wharf Flood Defence Wall RepairsKing Henry's WharfMoore Project Management Solutions Llp14 Jun 201814 Jun 2018
MLA/2018/00282
Completed
Application - Maintenance of existing worksRNLI Selsey - Emergency Relocation of MooringNew swinging mooringRnli Division South15 Jun 201829 Jun 2018
MLA/2018/00283
Completed
Application - Non-navigational clearance dredgingHundred End Gutter DesiltigHundred End Gutter Outfall DredgeEnvironment Agency15 Jun 201815 Jun 2018
MLA/2018/00284
Completed
Application - Non-navigational clearance dredgingCrossens Tidal Outfall ChannelCrossens Tidal Outfall DredgeEnvironment Agency15 Jun 201815 Jun 2018
MLA/2018/00285/2
Completed
Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital), Navigational dredging (maintenance)East Cowes Lay-By BerthNAB TOWER (WI060), Lay-by Berth Construction Area, HURST FORT (WI080)Southampton Isle Of Wight And South Of England Royal Mail Steam Packet Company Limited15 Jun 201823 Jul 2019
MLA/2018/00287
Completed
Application - Maintenance of existing structures or assetsThe Old Mill, Lee BayThe Old Mill, Lee BayTaw & Torridge Scaffolding Ltd19 Jun 201819 Jun 2018
MLA/2018/00288
Completed
Application - Maintenance of existing structures or assetsOcean Wharf 2 Flood Defence RepairsOcean Wharf 2 Flood Defence RepairsMoore Project Management Solutions Llp19 Jun 201819 Jun 2018
MLA/2018/00289
Completed
Application - Construction of new works, Other deposits, Other removalsSussex Yacht Club Slipway InfillSussex Yacht ClubSussex Yacht Club,Limited20 Jun 201809 May 2019
MLA/2018/00290
Completed
Application - Maintenance of existing structures or assetsEast Anglia Zone- Meteorological Mast 1B- Operations & MaintenanceEAOW Met Mast 1BEast Anglia Offshore Wind Limited20 Jun 201820 Jun 2018
MLA/2018/00291
Completed
Application - Maintenance of existing worksSpice Quay Fender Pile Replacement and RepairFender Pile Replacement or RepairLangbourn Properties (Spice Quay) Ltd21 Jun 201823 Nov 2018
MLA/2018/00292
Completed
Application - Non-navigational clearance dredgingSea Sanctuary - Waterside Barge Mooring ProjectWaterside Quay, PenrynFalmouth Divers Limited21 Jun 201821 Jun 2018
MLA/2018/00293
Withdrawn
Application - Construction of new worksNewlyn Harbour Work space RegenerationNewlyn Pier And Harbour21 Jun 2018
MLA/2018/00294
Withdrawn
Application - Other worksPersonal Water Craft PotoonBrightlingsea Harbour Commissioners22 Jun 2018
MLA/2018/00295
Completed
Application - Construction of new worksEbbsfleet OutfallOutfallIndependent Water Networks Limited22 Jun 201802 Jul 2019
MLA/2018/00296
Withdrawn
Application - Construction of new worksRoyal Dock tidal basin: pilot launch mooringsGrimsby pilot launch berths areaAssociated British Port-Grimsby22 Jun 2018
MLA/2018/00297
Completed
Application - Maintenance of existing structures or assetsRepair to the sea wall at Bosham Quay MeadowBosham Quay MeadowNational Trust (Enterprises) Limited (The)26 Jun 201826 Jun 2018
MLA/2018/00298
Completed
Application - Construction of new worksHollows Mooring (previous licence granted: MLA/2015/00190)HollowsMorlandia Limited26 Jun 201813 Sep 2018
MLA/2018/00299
Completed
Application - Maintenance of existing worksRebuilding final 24 metres of existing jettyHarlow (Blackwater) Sailing ClubHarlow (Blackwater) Sailing Club26 Jun 201803 Oct 2018
MLA/2018/00300
Withdrawn
Application - Disposal of dredged material, Navigational dredging (capital)Willington Quay Gut dredging existing mud banksMr Len Clarke26 Jun 2018
MLA/2018/00301/3
Completed
Application - Other worksMarine Licence Application for the Reconfiguration of Moorings at Town Quay, LymingtonTown Quay Works AreaLymington Harbour Commissioners26 Jun 201823 Jun 2020
MLA/2018/00302/1
Completed
Application - Construction of new worksRNLI Portsmouth Slipway Works and ExtensionRNLI_Portsmouth_Working_Area_Extent_20180622Rnli Estates26 Jun 201815 Apr 2019
MLA/2018/00303/1
Completed
Application - Other removalsHumber Gateway Offshore Wind Farm Marine LicenceHumber Gateway Offshore Wind FarmRwe Renewables Uk Wind Ltd27 Jun 201826 Apr 2021
MLA/2018/00304
Completed
Application - Other removalsScroby Sands Offshore Wind Farm Operational Marine LicenceScroby SandsE.On Climate & Renewables Uk Offshore Wind Limited27 Jun 201826 Oct 2021
MLA/2018/00306
Completed
Application - Minor removalsAnchor Chain Removal from Area 460460_licence_AreaHanson Aggregates Marine Limited27 Jun 201827 Jun 2018
MLA/2018/00307/1
Completed
Application - Construction of new worksThe construction of a slipway from the proposed watersports centre in Ilfracombe Harbour and the construction of a harbour wall.Slipway, WallNorth Devon Council28 Jun 201817 Apr 2023
MLA/2018/00308
Completed
Application - Construction of new worksQueenborough Harbour pontoon extensionPontoon extensionQueenborough Harbour Trust29 Jun 201819 Nov 2018
MLA/2018/00309
Completed
Application - Maintenance of existing worksDrake's Island Emergency jetty repairsDrake's Island JettyRotolok (Holdings) Limited02 Jul 201808 Aug 2018
MLA/2018/00310
Completed
Application - Construction of new works, Other removalsRoyal Wharf phase 3 river wallRoyal Wharf Phase 3 River Wall, Tidal Terrace/Outfall ConstructionOxley Wharf Property 3 Limited02 Jul 201823 Nov 2018
MLA/2018/00311
Completed
Application - Construction of new worksMudlark Pontoon and Piles, IOWMudlark PontoonsMr Andrew Finnamore02 Jul 201812 Oct 2018
MLA/2018/00312
Completed
Application - Marine licence for the burial of human remains at seaNEWHAVEN (WI011)H.D.Tribe Limited03 Jul 201803 Jul 2018
MLA/2018/00313
Completed
Application - Construction of new worksMaribor Park, Woolwich, LondonMaribor Park, Woolwich, LondonBerkeley Homes (East Thames) Limited03 Jul 201814 Oct 2019
MLA/2018/00314
Completed
Application - Construction of new worksWoolwich Reach, Pier Road, LondonWoolwich Reach, Pier Road, LondonHiggins Construction Plc04 Jul 201825 Oct 2019
MLA/2018/00315
Completed
Application - Construction of new worksWest Plain Marsh Habitat Restoration ProjectSite_of_InterestHolker Estates Co Ltd04 Jul 201816 Jan 2019
MLA/2018/00316
Completed
Application - Maintenance of existing structures or assetsTom's BoatyardToms BoatyardC. Toms And Son Limited04 Jul 201804 Jul 2018
MLA/2018/00317
Completed
Application - Maintenance of existing structures or assetsRoyal Lymington Yacht Club Starting PlatformStarting PlatformRoyal Lymington Yacht Club Limited05 Jul 201805 Jul 2018
MLA/2018/00318
Completed
Application - Maintenance of existing structures or assetsHartlepool SO11Hartlepool SO11Northumbrian Water Limited05 Jul 201805 Jul 2018
MLA/2018/00320
Completed
Application - Maintenance of existing worksWeymouth Magnetic Open Sea RangeWeymouth Magnetic Open Sea rangeQinetiq Limited05 Jul 201809 Nov 2018
MLA/2018/00321
Completed
Application - Navigational dredging (capital), Other depositsBerth 4 Rock Dredge, Battleship Wharf, Port of BlythBerth 4 Dredge Area 1, Berth 4 Dredge Area 2Port Of Blyth09 Jul 201813 Dec 2018
MLA/2018/00322
Completed
Application - Maintenance of existing worksSt Saviours Dock Bridge strengthening worksSt Saviours dock footbridgeF M Conway Limited09 Jul 201825 Oct 2018
MLA/2018/00323/1
Completed
Application - Aggregate dredging, SamplingBassurelle ExtensionBX 458, BX 464Cemex Uk Marine Ltd09 Jul 201819 Oct 2023
MLA/2018/00324/1
Completed
Application - Maintenance of existing structures or assetsParton to Bransty sea wallMMOStory Contracting Limited10 Jul 201812 Jul 2018
MLA/2018/00325
Completed
Application - Maintenance of existing structures or assetsFleetwood Training Platform MaintenanceFleetwood Training PlatformBlackpool And The Fylde College10 Jul 201810 Jul 2018
MLA/2018/00326
Completed
Application - Maintenance of existing structures or assetsArpley Longitudinal TimbersArpleyNetwork Rail11 Jul 201811 Jul 2018
MLA/2018/00327
Completed
Application - Maintenance of existing structures or assetsB159 Little London Bridge MaintenanceLittle London BridgeRingway Island Roads Limited11 Jul 201811 Jul 2018
MLA/2018/00328/1
Completed
Application - Construction of new works, Other removalsDenver mooring replacementDenver LockJ.N. Bentley Limited11 Jul 201819 Mar 2019
MLA/2018/00329
Completed
Application - Other removalsSheet Pile Removal/ Cropping at Blyth Power Station OutfallMetal Sheet PilesRwe Npower Plc12 Jul 201818 Oct 2018
MLA/2018/00330
Completed
Application - Maintenance of existing structures or assetsRiver Winster Tidal Flap ReplacementRiver Winster Tidal FlapAmalgamated Construction Ltd13 Jul 201813 Jul 2018
MLA/2018/00331
Completed
Application - Maintenance of existing structures or assetsNewton Voss Tidal Path 2Newton Voss Tidal PathDevon County Council13 Jul 201813 Jul 2018
MLA/2018/00332/3
Completed
Application - Maintenance of existing structures or assetsCoombe QuayMr Nick Haworth13 Jul 201816 Jul 2018
MLA/2018/00335
Completed
Application - Maintenance of existing structures or assetsPorth Nanven Beach, Cot Valley, St Just, Penzance, TR19 7QHPorth Nanven BeachGlanville Cleansing Limited16 Jul 201816 Jul 2018
MLA/2018/00336
Completed
Application - Navigational dredging (maintenance)Medway Approach Channel Water Injection DredgingMAC ExtentPort Of Sheerness Limited.16 Jul 201819 Mar 2019
MLA/2018/00337
Completed
Application - Maintenance of existing structures or assetsLondon Eye Sub-structure RepaintingCoca Cola London Eye - PaintingI&C Limited16 Jul 201816 Jul 2018
MLA/2018/00338
Completed
Application - Maintenance of existing worksNemo Link Cat 2 (& additional Cat 1) Remedial WorksLocation 2R.1, Location 2R.2, Location 2R.3, Location 2R.4, Location 2R.5, Location 2R.6, Location 2R.7, Location 13B.1, Location 14.1, 15.1, 16.1National Grid Nemo Link Limited16 Jul 201819 Oct 2018
MLA/2018/00339/1
Completed
Application - Use of tracersProposal to release Rhodamine WT and biological tracers in the upper Fal EstuaryDye release activity siteCefas Weymouth18 Jul 201813 Nov 2018
MLA/2018/00340/1
Completed
Application - Other worksSHELLNESS EMERGENCY WORKSWork LocationTeam Van Oord18 Jul 201830 Oct 2018
MLA/2018/00341
Completed
Application - Maintenance of existing structures or assetsWaterhead Creek Stepping Stone maintenanceWaterhead_Creek_Stepping_Stones_July2018_regionDevon County Council18 Jul 201818 Jul 2018
MLA/2018/00342
Completed
Application - Other worksRace Bank Saltmarsh Restoration WorksRace Bank LandfallOrsted Power Uk Ltd18 Jul 201820 Jul 2018
MLA/2018/00343
Completed
Application - Minor removalsTrial holes in rock armour revetment, Shipyards Estate, Shore Road, Hythe, SouthamptonRevetment to Sea Wall, Shipyards Estate, Shore Road, Hythe, SouthamptonTaylor Wimpey Uk Limited19 Jul 201819 Jul 2018
MLA/2018/00344
Completed
Application - Maintenance of existing structures or assetsTown Quay SPS, Fowey - Rising Main Repair. Undertaken from an existing South West Water chamber on the slipway adjacent to Town Quay, utilising an access tower to gain entry to the chamber.South West Water Manhole SX12516631 on Slipway Adjacent Town Qay, FoweySouth West Water Limited19 Jul 201819 Jul 2018
MLA/2018/00345
Completed
Application - Maintenance of existing structures or assetsRenovation of Slipway StepsRepair to stepsMr John Willcox-Jones20 Jul 201820 Jul 2018
MLA/2018/00346
Completed
Application - Maintenance of existing structures or assetsQinetiQ Portland Grove Point maintenance and repairGrove Point rangeQinetiq Limited20 Jul 201820 Jul 2018
MLA/2018/00347
Completed
Application - Maintenance of existing structures or assetsOldbury Power Station Revetment Repairs 2018Oldbury RevetmentsMagnox Limited23 Jul 201823 Jul 2018
MLA/2018/00348
Completed
Application - Maintenance of existing structures or assetsMNC0236 - Railway Uderbridge 38AMNC0236 - Underbridge 38A - River MerseyAmalgamated Construction Ltd24 Jul 201824 Jul 2018
MLA/2018/00349
Completed
Application - Maintenance of existing structures or assetsNetley Sailing Club Slipway Minor MaintenanceSlipway_BoundaryNetley Sailing Club Ltd24 Jul 201824 Jul 2018
MLA/2018/00350
Completed
Application - Other deposits727 - Simulated oil spill spraying operationsArea 2 - Spray West, Area 1 - Spray East, Area 3 - Spray West, Area 7 - Spray South East, Area 8 - Spray SouthOil Spill Response Limited25 Jul 201818 Dec 2018
MLA/2018/00351
Completed
Application - Maintenance of existing structures or assetsReinstatement of steel stepped access to Babbacombe BeachBabbacombe Beach access stepsTorbay Development Agency26 Jul 201826 Jul 2018
MLA/2018/00352
Completed
Application - Non-navigational clearance dredgingAldeburgh Yacht Club - Dredging around existing pontoonAldeburgh Yacht ClubAldeburgh Yacht Club29 Jul 201829 Jul 2018
MLA/2018/00353
Completed
Application - Minor removalsFairhaven to Church Scar Coast Protection SchemeFairhaven - Location 1Volker Stevin Limited29 Jul 201829 Jul 2018
MLA/2018/00354
Completed
Application - Minor removalsFairhaven to Church Scar Coast Protection SchemeFairhaven - Location 2Volker Stevin Limited29 Jul 201829 Jul 2018
MLA/2018/00356
Completed
Application - Minor removalssoils investigation Thunderer Jetty Dagenhamthunderer jettyMr Andrew Taylor30 Jul 201830 Jul 2018
MLA/2018/00357
Completed
Application - Construction of new worksSalcombe, Fish Quay access bridge and fenderingBatson Creek - Pontoons and bridgeSalcombe Harbour30 Jul 201808 Nov 2018
MLA/2018/00358/1
Completed
Application - Construction of new worksA63 Castle Street Improvements, Princes Quay FootbridgePrinces Quay FootbridgeHighways England01 Aug 201807 May 2019
MLA/2018/00359
Completed
Application - Maintenance of existing structures or assetsLivermead Beach - guardrail repairLivermead beach, TorquayTorbay Council02 Aug 201802 Aug 2018
MLA/2018/00360
Completed
Application - Construction of new worksProtection of private property at Archbrook by gabionsArchbrook EmbankmentMr Edward Aldous03 Aug 201825 Oct 2018
MLA/2018/00361/3
Completed
Application - Other removalscargo recovery from wrecks around the UK. Phase 1.Marine Salvage Solutions07 Aug 201812 Jul 2022
MLA/2018/00362/1
Completed
Application - Construction of new worksRNLI Exmouth Launching Ramp ExtensionRNLI ExmouthR.N.L.I. (Trading) Limited07 Aug 201831 Jul 2019
MLA/2018/00363
Completed
Application - Navigational dredging (capital)Woolwich Ferry Life Extension - North inner berth capital dredgingNorth inner berth dredge areaBam Nuttall Limited08 Aug 201818 Oct 2018
MLA/2018/00364/1
Completed
Application - Construction of new worksNew External Stairway to Foreshore, Underdeck, Cliff Road, SalcombeForeshore, Cliff Road, Salcombe, TQ8 8JQTms Maritime Ltd08 Aug 201812 Mar 2019
MLA/2018/00366
Completed
Application - Construction of new worksInstallation of 100 headlines for cultivation of rope grown musselsrope grown musselsFowey Sea Farms Ltd08 Aug 201811 Dec 2018
MLA/2018/00368
Completed
Application - Wrecks and other archaeological remainsProject MercuryMr Nigel Hodge08 Aug 201802 Mar 2020
MLA/2018/00369
Completed
Application - Minor removalsRemoval of Seatricity's Moorings at Wave HubWave Hub, CornwallSeatricity Limited09 Aug 201809 Aug 2018
MLA/2018/00370
Completed
Application - Maintenance of existing structures or assetsNorth Kent Revetment worksPolygonEnvironment Agency09 Aug 201809 Aug 2018
MLA/2018/00371
Completed
Application - Maintenance of existing structures or assetsNorth Shields Pedestrian Ferry Terminal Jetty RepairsNorth Shields Ferry TerminalG & B Civil Engineering Limited10 Aug 201810 Aug 2018
MLA/2018/00372
Completed
Application - Minor removalsMargate Harbour ground investigationMargate HarbourR.N.L.I. (Sales) Limited10 Aug 201810 Aug 2018
MLA/2018/00373/2
Completed
Application - Construction of new works, Decommissioning of works, Other depositsBacton to Walcott Coastal Management SchemeBacton to Walcott Beach FrontNorth Norfolk District Council13 Aug 201812 Jul 2019
MLA/2018/00374
Completed
Application - Other worksSt Andrews Art Centre - Repair WorksSt Andrews Art CentreColin Toms And Partners Llp13 Aug 201823 May 2019
MLA/2018/00375
Completed
Application - Non-navigational clearance dredgingB18-239 - Grange Outfall Operational ClearanceGrange_OutfallEnvironment Agency13 Aug 201813 Aug 2018
MLA/2018/00377/1
Completed
Application - Maintenance of existing worksAdditional piles to ensure safety of existing structuresPort WerburghResidential Marine Ltd.14 Aug 201806 Oct 2021
MLA/2018/00378
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Hamble Yacht Services Maintenance DredgeHYS Dredge Area, NAB TOWER (WI060), HURST FORT (WI080)Hamble Yacht Services Limited15 Aug 201821 Dec 2018
MLA/2018/00380
Completed
Application - Maintenance of existing structures or assetsBlind Yeo Outfall Refurbishment - concrete revetment repairsBY_resurfaceBmm Jv Limited15 Aug 201815 Aug 2018
MLA/2018/00381
Completed
Application - Maintenance of existing structures or assetsBlind Yeo Outfall Refurbishment - minor maintenanceBY_maintBmm Jv Limited15 Aug 201815 Aug 2018
MLA/2018/00382
Completed
Application - Construction of new worksAddition of pontoon sections to existing pontoon1 Vespasian and 71 Chafen Road Southampton SO18 1BDMr Gavin Webster15 Aug 201826 Jul 2019
MLA/2018/00383
Completed
Application - Maintenance of existing structures or assetsRiver Stour - Cattawade Creek - Wheel Timber ReplacementCattawade BridgeJ. Murphy & Sons Limited17 Aug 201817 Aug 2018
MLA/2018/00385
Completed
Application - Disposal of dredged material, Other dredgingRace Bank Export Cable Protection WorksOrsted17 Aug 201806 Oct 2021
MLA/2018/00386
Completed
Application - Construction of new worksLANTIVET MUSSELFARMWestcountry Mussels Of Fowey Ltd18 Aug 201811 Dec 2018
MLA/2018/00388
Completed
Application - Non-navigational clearance dredgingWhites Brook- De SiltingWhites BrookAmalgamated Construction Ltd21 Aug 201821 Aug 2018
MLA/2018/00389
Completed
Application - Maintenance of existing structures or assetsPoole Harbour Tidal FlapPoole Harbour Tidal FlapKingcombe Stonbury Limited21 Aug 201821 Aug 2018
MLA/2018/00390
Completed
Application - Maintenance of existing structures or assetsreplacement ladders at strand quaySTRAND QUAYEnvironment Agency21 Aug 201821 Aug 2018
MLA/2018/00391
Completed
Application - Construction of new worksrye harbour marine piling worksHarbour rd MooringsEnvironment Agency21 Aug 201808 Feb 2019
MLA/2018/00392
Completed
Application - Minor removalsHolborn Enabling Works - Ground Investigation Stage Grouped under: Holborn Enabling Works - Ground Investigation Stage Showing 2 of 2 casesHolborn Site ground investigationSouth Tyneside Council21 Aug 201821 Aug 2018
MLA/2018/00393
Completed
Application - Construction of new works, Other deposits, Other worksAlma Bridge, SidmouthNew Bridge site, Demolish existing bridge, Sandstone depositionDevon County Council.22 Aug 201819 Mar 2019
MLA/2018/00394
Completed
Application - Construction of new worksTimber deck on existing stone quayOne Old CoastguardsMr Charles Stewart22 Aug 201810 Sep 2019
MLA/2018/00395
Completed
Application - Construction of new works, Decommissioning of worksDolphin Quay - Quay (Flood) Wall Replacement and Removal of ExistingDolphin QuayMinsted Properties Llp.23 Aug 201806 Mar 2019
MLA/2018/00396
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mr Britannia Shipping (Fao: Lister24 Aug 201824 Aug 2018
MLA/2018/00397/1
Completed
Application - Construction of new worksArchway House Water Cooling Intake and OutfallDigital London Limited24 Aug 201825 Nov 2019
MLA/2018/00398
Completed
Application - Maintenance of existing worksMarine Parade, Shaldon. Highway Sea wall - Concrete Toe Protection Beam.Marine Parade, Shaldon. Concrete Toe Protection BeamDevon County Council, Engineering Design Group29 Aug 201818 Dec 2018
MLA/2018/00399
Completed
Application - Maintenance of existing structures or assetsTemporary timber works to reduce Salmon predation at Amble Half Tide WeirAmble Half Tide WeirNorthumberland Rivers Trust30 Aug 201830 Aug 2018
MLA/2018/00401/1
Completed
Application - Navigational dredging (maintenance)Tideway - Application for removal of Accretion at ALBEFALBEF Area of accretionFlo31 Aug 201810 Dec 2018
MLA/2018/00403/1
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Walney Extension pontoon/jetty dredging and disposalBerth No.1 Pontoons, BARROW D (IS205), Lead in JettyDong Energy Walney Extension (Uk) Ltd03 Sep 201815 Jul 2024
MLA/2018/00404
Completed
Application - Maintenance of existing structures or assetsSea Wall RepairsLovers Walk, AlnmouthNorthumberland Estates05 Sep 201805 Sep 2018
MLA/2018/00405/5
Variation Requested
Application - Decommissioning of works, Maintenance of existing works, Other depositsHOW02 Intertidal Access Ramp Marine Licence Grouped under: Hornsea Offshore Wind Farm Project Two Showing 2 of 10 casesHOW02 Intertidal Working AreaDiamond Transmission Corporation Limited05 Sep 201806 Nov 2023
MLA/2018/00406
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mr Britannia Shipping Lister06 Sep 201806 Sep 2018
MLA/2018/00407
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Mamarine.Com Llp06 Sep 201806 Sep 2018
MLA/2018/00408/1
Completed
Application - Navigational dredging (capital)Dagenham Jetty upgrade for Cemex UK (dredging)dagenhamCemex Uk.07 Sep 201801 May 2020
MLA/2018/00409
Completed
Application - SamplingHolborn Enabling Works - Ground Investigation Grouped under: Holborn Enabling Works - Ground Investigation Stage Showing 2 of 2 casesHolborn Site ground investigationSouth Tyneside Council10 Sep 201819 Nov 2018
MLA/2018/00410
Completed
Application - Construction of new worksSection 36 Application for Floating Wind at Wave HubWave Hub, CornwallWave Hub Limited10 Sep 201819 Nov 2020
MLA/2018/00411
Completed
Application - Beach maintenance activitiesBrighton to Southwick Beach RecyclingMarina to Adur Recycling SiteShoreham Port Authority11 Sep 201811 Sep 2018
MLA/2018/00413
Completed
Application - Maintenance of existing structures or assetsCN1601442 - Furniss Island Bridge RepairEnys Quay FootbridgeCormac Solutions Limited12 Sep 201812 Sep 2018
MLA/2018/00414
Completed
Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital)Orwell Yacht Club - Capital navigational dredge, to accommodate floating pontoon, and disposal of dredgingsOrwell Yacht Club dredge site, Orwell Yacht Club disposal site - TH032Orwell Yacht Club12 Sep 201812 Dec 2018
MLA/2018/00415
Completed
Application - Maintenance of existing structures or assetsRepairs to stonework of retaining harbour wall to cottage wing of museumRepairs to stonework of retaining harbour wall to cottage wing of museumCaptain Cook Memorial Museum12 Sep 201812 Sep 2018
MLA/2018/00416
Completed
Application - Maintenance of existing structures or assetsRepairs to river wallRiver wall to the rear of Dunbar Wharf, 108-134 Narrow Street, Limehouse, LondonDunbar Wharf Management Company Limited14 Sep 201814 Sep 2018
MLA/2018/00417
Completed
Application - Maintenance of existing worksLondon Array Offshore Wind Farm Array Cable ReplacementLondon Array Offshore Wind Farm - Cable WorksLondon Array Ltd14 Sep 201801 Feb 2019
MLA/2018/00418
Completed
Application - Alternative use of dredged materialSelsey Beach Management Plan: Selsey Shingle RechargeBeach Replenishment AreaChichester District Council.17 Sep 201821 Dec 2018
MLA/2018/00419
Completed
Application - Beach maintenance activitiesOutfall jetting at Gilkicker lagoonFort_Gilkicker_working_areaSouthern Water Limited17 Sep 201817 Sep 2018
MLA/2018/00420
Completed
Application - Maintenance of existing structures or assetsreplacement of a small piece of pipe, Steephill CoveSteephill_Cove_working_areaSouthern Water Limited17 Sep 201817 Sep 2018
MLA/2018/00422
Completed
Application - Navigational dredging (capital)River Hull+ SchemeArctic CorsairBmm Jv Limited.20 Sep 201828 Feb 2019
MLA/2018/00423
Completed
Application - Minor removalsTEC Geo-Environmental SamplingSite AreaRwe Npower Plc20 Sep 201820 Sep 2018
MLA/2018/00424
Completed
Application - Maintenance of existing structures or assetsFairport House Fence repairsFairportMr Mark Keeling21 Sep 201821 Sep 2018
MLA/2018/00425
Completed
Application - Marine licence for the burial of human remains at seaNEEDLES (WI090)Britannia Shipping21 Sep 201821 Sep 2018
MLA/2018/00426
Completed
Application - Maintenance of existing structures or assetsMaryport Seawall Groyne repairsMaryport Seawall Groyne RepairsThomas Armstrong (Construction) Limited21 Sep 201821 Sep 2018
MLA/2018/00427
Completed
Application - Maintenance of existing worksCBC1 W630675 Calder Viaduct and Approaches (145932)Calder ViaductNetwork Rail Limited21 Sep 201817 Dec 2018
MLA/2018/00428
Completed
Application - Maintenance of existing worksDunston StaithsDunston staithsTyne And Wear Building Preservation Trust24 Sep 201801 Apr 2019
MLA/2018/00431
Completed
Application - Maintenance of existing structures or assetsBayards Cove Fort- DartmouthBayards Cove FortSouth West Scaffolding Limited27 Sep 201827 Sep 2018
MLA/2018/00432/1
Completed
Application - Maintenance of existing worksCBC1 W16107 Leven ViaductLeven East, Leven WestNetwork Rail Ltd28 Sep 201801 Aug 2019
MLA/2018/00434
Completed
Application - Non-navigational clearance dredgingRampside surface water & CSO outfallRampside_OutfallCumbria County Council28 Sep 201828 Sep 2018
MLA/2018/00435
Completed
Application - Disposal of dredged materialAxmouth Harbour Dredge Disposal SiteSeaton Disposal siteEast Devon District Council28 Sep 201822 Mar 2019
MLA/2018/00436
Completed
Application - Wrecks and other archaeological remainsBattle of Britain hurricane excavationExcavation site of hurricane aircraftMr Stephen Vizard30 Sep 201825 Feb 2019
MLA/2018/00437
Withdrawn
Application - Construction of new works, Other removalsNearshore Seaweed Cultivation of Native SpeciesSustainable Seaweed Limited01 Oct 2018
MLA/2018/00438
Completed
Application - Maintenance of existing structures or assetsCromer Pier Substructure MaintenanceCromer PierNorth Norfolk District Council01 Oct 201801 Oct 2018
MLA/2018/00439
Completed
Application - Maintenance of existing worksPeruvian Wharf - Jetty and River Wall WorksPeruvian WharfBrett Aggregates Limited01 Oct 201804 Dec 2018
MLA/2018/00440/2
Completed
Application - Maintenance of existing works, Other worksExmouth TDSMarine_License_LocationPlan_C_20180927, Marine_Licence_Location_Plan_A_20181001Environment Agency - South West Region03 Oct 201814 Jan 2021
MLA/2018/00441
Completed
Application - Minor removalsMillennium Quay Soil InvestigationMillennium QuayColin Toms And Partners Llp04 Oct 201804 Oct 2018
MLA/2018/00442
Completed
Application - Construction of new worksWeymouth Harbour Quay Wall D Strengtheningweymouth Harbour Quay Wall D StrengtheningDorset Council05 Oct 201802 Apr 2019
MLA/2018/00443
Completed
Application - Other worksThe provision of a temporary 300 mm diameter overland sewer rising main along the foreshore from Town Quay sewage pumping station to Caffa Mill car park, Fowey.Temporary Over Forshore Pipeline Route and Working AreaSouth West Water Limited05 Oct 201809 Jan 2019
MLA/2018/00444/2
Completed
Application - Maintenance of existing worksTuckett's ClyceTuckett's ClyceMr Nol Vincent05 Oct 201807 Jun 2019
MLA/2018/00445
Completed
Application - Maintenance of existing structures or assetsBrooklands 200m WestBrooklands 200m WestBeasley Christopher Limited06 Oct 201806 Oct 2018
MLA/2018/00446
Completed
Application - Maintenance of existing structures or assetsRemoval of marine growth on WTG locations.Sheringham Shoal Offshore windfarmScira Offshore Energy Limited08 Oct 201808 Oct 2018
MLA/2018/00447
Completed
Application - Construction of new worksMooreing a Houseboat in Bembridge HarbourBembridge Harbour Plot17Mr Stephen Beill08 Oct 201820 Jan 2020
MLA/2018/00448
Completed
Application - Decommissioning of worksBay Wharf Slipway RemovalBay Wharf SlipwayThamescraft Dry Docking08 Oct 201812 Feb 2019
MLA/2018/00449
Completed
Application - Construction of new worksRiver Hull+ SchemeNorth Bridge, Crown DockBmm Jv Limited.09 Oct 201823 May 2019
MLA/2018/00450/1
Completed
Application - Construction of new worksThree Shells Tidal Lagoon DeckingDecking , Actuator and Cable RouteSouthend-On-Sea Borough Council10 Oct 201815 Jul 2019
MLA/2018/00451/1
Completed
Application - Construction of new worksLower Steenbergs YardLower Steenbergs YardIgloo12 Oct 201829 Nov 2019
MLA/2018/00452/3
Completed
Application - Maintenance of existing worksJupiter Point PlymouthJupiter Point PontoonCarillion Amey12 Oct 201824 Jul 2020
MLA/2018/00453
Completed
Application - Maintenance of existing structures or assetsLandcross Viaduct Paint Defect RectificationLandcross ViaductDevon County Council15 Oct 201815 Oct 2018
MLA/2018/00454
Completed
Application - SamplingSubsea Drill - Test ProgramBlyth West QuayTi Geosciences Ltd15 Oct 201815 Feb 2019
MLA/2018/00457
Completed
Application - Maintenance of existing structures or assetsKingswear Slip RepairRepair to slip wall and Tirfor mounting areaThe Dartmouth-Kingswear Floating Bridge Company Limited18 Oct 201818 Oct 2018
MLA/2018/00458
Withdrawn
Application - Construction of new worksStatic barge restaurant off pontoon off Church Street Car Park, FalmouthElliott-Cannon Associates Ltd18 Oct 2018
MLA/2018/00459
Completed
Application - Maintenance of existing structures or assetsMaintainance to existing Public Sewer PipelineForde RoadR&M Utility & Civil Engineering Services South West Limited18 Oct 201818 Oct 2018
MLA/2018/00461
Completed
Application - Minor removalsWatchet Harbour East quay wall condition surveyWatchet Harbour East QuayPick Everard22 Oct 201822 Oct 2018
MLA/2018/00464/1
Completed
Application - Maintenance of existing worksPier Point Jetty RepairsPier Point JettyDylan Morgan23 Oct 201829 May 2019
MLA/2018/00466
Completed
Application - Maintenance of existing structures or assetsColdharbour MooringsColdharbourRoyal Naval Sailing Association24 Oct 201824 Oct 2018
MLA/2018/00467/1
Variation Requested
Application - Disposal of dredged materialDISPOSAL AT SEA after maintenance dredging at the turning area. Lighterage Quay, Newham, Truro. Also dredging at Town Quay Truro.FALMOUTH BAY (B) (PL075)Cornwall Council -Harbour Office25 Oct 201814 Aug 2020
MLA/2018/00468
Completed
Application - Maintenance of existing structures or assetsSouth Milton Outfall Pipe MaintenanceSouth Milton Sands Outfall PipeNational Trust25 Oct 201825 Oct 2018
MLA/2018/00469/1
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Levington Saltmarsh restoration and beneficial use of dredgings project 2018Suffolk Yacht Harbour Dredge Area, Suffolk Yacht Harbour 1, Suffolk Yacht Harbour 2, Suffolk Yacht Harbour 3, Suffolk Yacht Harbour 4Suffolk Yacht Harbour.25 Oct 201808 Aug 2023
MLA/2018/00470
Completed
Application - Other removalsIFA2 Interconnector - Unexploded Ordnance ActivitiesDC Cables Redline, AC Cables Redline, X5037_Solent_Detonation_ZoneNational Grid Ifa 2 Limited26 Oct 201809 May 2019
MLA/2018/00471
Completed
Application - Maintenance of existing structures or assetsFriars Goose WSC; Slipway RepairsFriars Goose SlipwayGateshead Council26 Oct 201826 Oct 2018
MLA/2018/00472
Completed
Application - Other worksEmergency Works Port of GarstonRepairs to the quay wall at Port of GarstonAssociated British Ports.26 Oct 201831 Oct 2018
MLA/2018/00473
Completed
Application - Construction of new worksFuelling Scheme at Tower BridgeFuelling Facility at Tower BridgeThames Marine Services Limited30 Oct 201814 Jan 2020
MLA/2018/00475
Completed
Application - Incineration of any substance or object at seaTriton Knoll OWF Unexploded Ordnance ClearanceOrderLimitsExportTriton Knoll Offshore Wind Farm Limited30 Oct 201813 Jun 2019
MLA/2018/00477
Completed
Application - Maintenance of existing structures or assetsMaintenance to existing public sewer (Combe Martin Sewage Outfall)Combe Martin BayR&M Utility & Civil Engineering Services South West Limited31 Oct 201831 Oct 2018
MLA/2018/00478
Completed
Application - Construction of new worksThe Crabpot, The Esplanade, FoweyJohn Grimes Partnership Limited31 Oct 201806 May 2020
MLA/2018/00479
Completed
Application - Maintenance of existing structures or assetsNethertown sea defence.Line 2Story Contracting Limited31 Oct 201831 Oct 2018
MLA/2018/00480
Completed
Application - Construction of new worksEnlargement of rowing pontoon and replacement piles and access rampLatymer Upper Boat House Rowing PontoonLatymer Upper School31 Oct 201826 Oct 2020
MLA/2018/00481
Completed
Application - Construction of new worksImprovements to Queen's PierImprovements to Queen's Pier - Marine Licence Application AreaPortland Harbour Authority Ltd01 Nov 201807 Feb 2019
MLA/2018/00482
Completed
Application - Maintenance of existing structures or assetsPrince of Wales Pier - Screening Chamber RefurbSELECTKier Limited01 Nov 201801 Nov 2018
MLA/2018/00483
Completed
Application - Construction of new works, Decommissioning of works, Maintenance of existing worksBlyford Bridge Sluice RemovalBlyford BridgeJacksonhyder02 Nov 201809 Jan 2019
MLA/2018/00484/1
Completed
Application - Construction of new worksProposed stone slipway at Prime CellarsPrime Cellars, FoweyDr William Collinson02 Nov 201819 Aug 2020
MLA/2018/00485
Completed
Application - Disposal of dredged material, Other dredgingClevedon Marine Lake: Return Silt to the Bristol ChannelDe-silting Area, Disposal AreaMarine Lake Enthusiasts (Marlens)03 Nov 201818 Oct 2019
MLA/2018/00486
Completed
Application - Other worksNorthfleet Jetty Ship Unloading SystemNorthfleet JettyPort Of London Authority05 Nov 201805 Apr 2019
MLA/2018/00487/3
Completed
Application - Construction of new worksTRIDENT-AQUASAIL™ TIDAL ENERGY TURBINE SYSTEM (PROOF OF CONCEPT TRIALS)Yarmouth (Isle of Wight) PierTrident Renewable Energy Systems Limited06 Nov 201821 Sep 2023
MLA/2018/00488
Completed
Application - Construction of new worksRebuilding the Pier at Withernsea (Seaside resort)Viewing PlatformWithernsea Pier And Promenade Association Ltd07 Nov 201815 Apr 2019
MLA/2018/00489
Completed
Application - Maintenance of existing structures or assetsWoodside Ferry Pontoon Emergency Restraint ChainsWoodside Linkspan Work areaMerseytravel Limited08 Nov 201808 Nov 2018
MLA/2018/00490
Completed
Application - Construction of new worksNewhaven Port Access RoadNewhaven Mill CreekBam Nuttall Ltd08 Nov 201806 Jun 2019
MLA/2018/00491
Completed
Application - Non-navigational clearance dredgingFlushing of Pipelines to Prove Flow Path in Preparation for First UseBradwell Outfall StructureMagnox Limited08 Nov 201808 Nov 2018
MLA/2018/00492
Completed
Application - Maintenance of existing structures or assetsRW 922 Installation of fendersRW 922 Strengthening worksThames Water Limited08 Nov 201808 Nov 2018
MLA/2018/00493
Completed
Application - Maintenance of existing structures or assetsCutting and removal of end section of discharge pipeBradwell Site Outfall StructureMagnox Limited08 Nov 201808 Nov 2018
MLA/2018/00495
Completed
Application - Beach maintenance activitiesMoving sand on the beachExmouth seafrontStuart Line Cruises10 Nov 201810 Nov 2018
MLA/2018/00496
Completed
Application - Non-navigational clearance dredgingGrange Outfall Operational ClearanceGrange_OutfallJ D Mee12 Nov 201812 Nov 2018
MLA/2018/00497
Completed
Application - Construction of new worksFishersgate South - Emergency Protection WorksFishersgate South TerminalShoreham Port Authority12 Nov 201823 Jan 2019
MLA/2018/00498
Completed
Application - Other worksBeach House Quay - Emergency Wall RepairBHQ3Pca Consulting Engineers Ltd13 Nov 201816 Nov 2018
MLA/2018/00499/1
Completed
Application - Construction of new worksFulham Football Club Riverside Stand Redevelopment 2017Fulham FC Riverside Permanent & Temporary WorksFulham Stadium Limited13 Nov 201818 Jun 2020
MLA/2018/00500
Completed
Application - Maintenance of existing structures or assetsSWRR Dawlish Beach WorksDawlish BeachBam Nuttall Limited14 Nov 201814 Nov 2018
MLA/2018/00501
Completed
Application - Construction of new worksTriton Knoll Offshore Wind Farm; Boulder Clearance and Seabed PreparationOrderLimitsExportTriton Knoll Offshore Wind Farm Ltd14 Nov 201810 May 2019
MLA/2018/00502/2
Completed
Application - Disposal of dredged material, Navigational dredging (maintenance)Port of Boston Maintenance and Disposal 2018BOSTON 7 (HU170), Port of Boston Dredging Area, Berths and Swinging Area. River Witham, Hob Hole Dredging Site. River Witham, The Dock. River WithamPort Of Boston Limited14 Nov 201801 Mar 2023
MLA/2018/00503/3
Completed
Application - Incineration of any substance or object at sea, Other deposits, Other removals, Wrecks and other archaeological remainsHornsea Project Two Offshore Wind Farm - Offshore UXO Inspection and Clearance Grouped under: Hornsea Offshore Wind Farm Project Two Showing 2 of 10 casesHOW02_AFLandCableCorridorBoundary_20181115_WGS84Optimus Wind Limited16 Nov 201815 Sep 2022
MLA/2018/00505
Completed
Application - Maintenance of existing worksReplacement of a bridge, pontoon and access jettyArun Shipyard MooringsOsborne Of Arun Group (Management) Limited16 Nov 201829 Jan 2019
MLA/2018/00506
Completed
Application - Other deposits, Other removals, SamplingSustainable Seaweed Farming, Southwest England.Proposed site: seaweed farmBiome Algae Ltd18 Nov 201827 Feb 2020
MLA/2018/00507
Completed
Application - Maintenance of existing structures or assetsBillingham Beck Water Line for CFBillingham BridgeRainham Industrial Services Limited19 Nov 201819 Nov 2018
MLA/2018/00508
Withdrawn
Application - Other worksHessle ForeshoreConstruction Marine Limited22 Nov 2018
MLA/2018/00509
Completed
Application - Maintenance of existing structures or assetsRefurbishment of steps along Newton & Noss Footpath No 20Newton & Noss FP20 StepsDevon County Council22 Nov 201822 Nov 2018
MLA/2018/00510
Completed
Application - Construction of new worksNew Union Wharf, Phase 4New Union Wharf, Phase 4Hill Partnerships Limited22 Nov 201812 Mar 2019
MLA/2018/00512
Completed
Application - Maintenance of existing structures or assetsJanes Creek Flap Valve RepairsjaneBeasley Christopher Limited23 Nov 201823 Nov 2018
MLA/2018/00514
Completed
Application - Maintenance of existing structures or assetsRoyal Dart Hotel Masonry Buttress RepairRoyal Dart Apartments KingswearTeignmouth Maritime Services Limited25 Nov 201825 Nov 2018
MLA/2018/00516
Completed
Application - Maintenance of existing structures or assetsHullbridge Sea Defence RepairsHullbridgeEnvironment Agency27 Nov 201827 Nov 2018
MLA/2018/00518
Completed
Application - Construction of new worksre-Build of Mooring No 11, River Arun, Arundel, BN18 9JGArun Mooring 11Mr Peter Bonsall27 Nov 201821 Oct 2019
MLA/2018/00519
Completed
Application - Maintenance of existing structures or assetsA379 Shaldon Bridge - Foundation Stabilisation RepairsA379 Shaldon Bridge - Foundation Stabilisation RepairsDevon County Council28 Nov 201828 Nov 2018
MLA/2018/00520
Withdrawn
Application - Construction of new worksInstallation of Access Pontoons from the Foreshore to the main pontoon areaParkstone Bay MarinaFrederick C.Mitchell & Sons Limited28 Nov 2018
MLA/2018/00521
Completed
Application - Maintenance of existing structures or assetsRace Bank Internal Cable Inspection - Ancillary Scaffolding - K05RoW Array - K05 (53 14.619 N, 0 52.633 E)Dong Energy Rb (Uk) Limited28 Nov 201828 Nov 2018
MLA/2018/00522/1
Completed
Application - Navigational dredging (maintenance)White Mountain, Dagenham - Maintenance DredgeWhite Mountain Jetty, DagenhamArmac Shipping Services Ltd29 Nov 201806 Jul 2020
MLA/2018/00524
Withdrawn
Application - Maintenance of existing works3177.03 Grand SluiceJacksonhyder30 Nov 2018
MLA/2018/00525
Completed
Application - Maintenance of existing worksFalmouth Marina Pile Replacement ProgrammeFalmouth Marina - Pile locations on separate attachmentPremier Marinas (Falmouth) Ltd03 Dec 201807 Mar 2019
MLA/2018/00526
Completed
Application - Maintenance of existing structures or assetsHandford and Horseshoe Sluice RepairsHandford SluiceJacksonhyder03 Dec 201803 Dec 2018
MLA/2018/00527
Completed
Application - Construction of new worksThe View, PorthThe View, PorthLiving Quarter Properties (Porth) Ltd03 Dec 201828 Jul 2022
MLA/2018/00528/3
Variation Requested
Application - Construction of new works, Other worksPontoon Replacement & Reconfiguration, Torquay, TorbayTorquayMarina Developments Ltd04 Dec 201820 Jul 2020
MLA/2018/00529
Completed
Application - Maintenance of existing structures or assetsLock Gate refurbishment at South Dock MarinaSouth Dock LockLondon Borough Of Southwark04 Dec 201804 Dec 2018
MLA/2018/00530
Completed
Application - Non-navigational clearance dredgingproject 8 windserverproject 8 windserverGreater Gabbard Offshore Winds Limited04 Dec 201804 Dec 2018
MLA/2018/00531/1
Completed
Application - Disposal of dredged material, Navigational dredging (capital), Navigational dredging (maintenance)Neptune Energy Park Dredge Pocket ExtensionsNorthern Extension-Tyne, Southern Extension-TyneShepherd Offshore Services Limitied05 Dec 201823 Feb 2021
MLA/2018/00532
Completed
Application - Maintenance of existing structures or assetsSouthwark Riverwalls Brickwork Corner Repairs2NO Brickwork CornersF M Conway Limited05 Dec 201805 Dec 2018
MLA/2018/00533
Completed
Application - Beach maintenance activitiesPortwrinkle - re-distribution of sand within harbourPortwrinkle HarbourCornwall Council05 Dec 201805 Dec 2018
MLA/2018/00534
Completed
Application - Maintenance of existing structures or assetsTrafalgar Wharf Revetment RepairsTW RevetmentTrafalgar Wharf Limited06 Dec 201806 Dec 2018
MLA/2018/00535
Withdrawn
Application - Construction of new worksChurch Drawdock Slipway ExtensionChurch Drawdock Slipway ExtensionGolden Tours07 Dec 2018
MLA/2018/00536/12
Variation Requested
Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital), Other removalsIsle of Man Ferry TerminalSITE Z (IS140), SITE Y (IS150), Work Area, Dredge Area -Mersey, Bird Pontoon Area, MERSEY (MID-RIVER SITE) (IS120)Isle Of Man Government08 Dec 201806 Nov 2023
MLA/2018/00537
Completed
Application - Construction of new worksMedina Park Footbridge Replacement (B322)Medina Park FootbridgeRingway Island Roads Ltd10 Dec 201817 Apr 2019
MLA/2018/00538
Completed
Application - Construction of new worksSouthsea Marina - Crane Base PilesBoom Crane Piling AreaPremier Marinas (Southsea) Ltd10 Dec 201807 Mar 2019
MLA/2018/00539
Completed
Application - Non-navigational clearance dredgingTaunton Road Sewage Pumping StationTaunton Road SPSWessex Water Services Limited11 Dec 201811 Dec 2018
MLA/2018/00540
Completed
Application - Construction of new worksOcean Business 2019 PontoonEmpress Dock SouthamptonDiversified Communications Uk12 Dec 201805 Mar 2019
MLA/2018/00542/2
Completed
Application - Maintenance of existing worksJubilee Bridge Painting WorksJubilee BridgeStory Contracting Limited13 Dec 201830 Sep 2021
MLA/2018/00543
Completed
Application - Marine licence for the burial of human remains at seaNEWHAVEN (WI011)Arthur C. Towner Limited13 Dec 201813 Dec 2018
MLA/2018/00544/1
Completed
Application - Maintenance of existing structures or assetsRochester Bridge - Balustrade investigation & foreshore litter clearanceRochester BridgeF M Conway Limited13 Dec 201814 Dec 2018
MLA/2018/00545/1
Completed
Application - Other deposits, Other removalsDungeness B Power Station, beach nourishment- extension to existing activities at borrow pit.Dungeness Beach Feed, Dungerness Shingle Ridge disposal siteEdf Energy Nuclear Generation Ltd13 Dec 201806 Dec 2021
MLA/2018/00546
Completed
Application - Other worksBeach House Quay - Emergency Wall Repair - Escalated WorksBHQ3Pca Consulting Engineers Ltd14 Dec 201819 Dec 2018
MLA/2018/00547
Completed
Application - Maintenance of existing worksKeadby TAO Trent Side Outfall RefurbishmentRiver Trent OutfallEnvironment Agency Leeds17 Dec 201820 May 2019
MLA/2018/00548
Completed
Application - Maintenance of existing structures or assetsDudgdale Quay maintenance3 Dugdale`s QuayMr Dean Richards17 Dec 201817 Dec 2018
MLA/2018/00549
Completed
Application - Construction of new works, Other removalsRNLI Plymouth Upgrade WorksRNLI Plymouth Upgrade WorksRoyal National Lifeboat Institution17 Dec 201806 Mar 2020
MLA/2018/00550/1
Completed
Application - Maintenance of existing worksEast Anglia ONE Operations and Maintenance for Transmission AssetsEAONE_WTG_ArrayCable_OffshoreECC_boundaryEast Anglia One Limited18 Dec 201816 Dec 2022
MLA/2018/00551
Completed
Application - Maintenance of existing worksEast Anglia ONE Operations and Maintenance for Generation AssetsEast Anglia One wind farmEast Anglia One Limited18 Dec 201824 Apr 2020
MLA/2018/00553
Completed
Application - Other removalsRemoval of Marine GrowthSheringham Shoal Offshore WindfarmScira Offshore Energy Limited20 Dec 201818 Apr 2019
MLA/2018/00554
Completed
Application - Maintenance of existing structures or assetsDenmark Place Outfall ExtensionDenmark Place HastingsBeasley Christopher Limited20 Dec 201820 Dec 2018
MLA/2018/00555
Completed
Application - Construction of new works, Disposal of dredged materialHartlepool approach channelTEES BAY C (TY150), Underwater retaining wallPd Teesport Limited21 Dec 201803 Oct 2019
MLA/2018/00556
Completed
Application - Construction of new worksProvision of permanent piles for seasonal pontoon adjacent to The Cobb, Lyme RegisThe Cobb, Lyme RegisWest Dorset District Council21 Dec 201807 Aug 2019
MLA/2018/00557
Completed
Application - Construction of new worksWest Bay Coastal ImprovementsWest Beach, East Beach, Parkdean Caravan ParkEnvironment Agency – South West Reg21 Dec 201824 Apr 2019
MLA/2018/00558
Completed
Application - Construction of new worksInstallation of marina pontoons at Walton Yacht Basinmagic_polygonsWalton & Frinton Yacht Trust21 Dec 201821 Mar 2019
MLA/2018/00559
Completed
Application - Construction of new worksHQS Wellington Dolphin ReplacementHQS Wellington Dolphin ReplacementThe Wellington Trust21 Dec 201818 Apr 2019
MLA/2018/00560/3
Completed
Application - Other worksEmergency quay wall repair Port of IpswichEmergency works locationAssociated British Ports-Ipswich21 Dec 201813 Aug 2020
MLA/2018/00561
Completed
Application - Construction of new worksLooe Island Jetty ExtensionLooe Island JettyCornwall Trust For Nature Conservation Ltd(The)22 Dec 201830 Apr 2019
MLA/2018/00562
Completed
Application - Minor removalsVicDeep A, B & CVicDeep A, B and CHanson Quarry Products Europe Limited28 Dec 201828 Dec 2018
MLA/2018/00563
Completed
Application - Minor removalsVicDeep D & EVicDeep D and EHanson Quarry Products Europe Limited28 Dec 201828 Dec 2018