Case DetailsProject TypeProject TitleLocationsApplicant NameSubmission DateDecision Date
MLA/2011/00001
Completed
Application - RenewablesRound 3 Hornsea Zone Anemometry MastSmart Wind Ltd07 Apr 201127 May 2011
MLA/2011/00002
Completed
Application - ConstructionPrivate slipway, minor repairsMr Michael Philpott07 Apr 201120 May 2011
MLA/2011/00003/1
Completed
Application - ConstructionOikos Ltd, Canvey Island, Upgrading Works to No.1 JettyOikos Storage Limited07 Apr 201114 Dec 2011
MLA/2011/00004
Completed
Application - ConstructionRockley BoatyardBourne Leisure08 Apr 201106 May 2011
MLA/2011/00005/1
Completed
Application - ConstructionCdMR Purfleet - Proposed extenion to existing facilityCdmr Purfleet Limited08 Apr 201113 Mar 2012
MLA/2011/00006/10
Completed
Application - ConstructionWeymouth and Portland Wreck to ReefO'Three Ltd12 Apr 201125 Jul 2022
MLA/2011/00007/1
Completed
Application - ConstructionKentish Flats Offshore Wind Farm ExtensionVattenfall Wind Power Ltd12 Apr 201121 Nov 2011
MLA/2011/00008
Completed
Application - ConstructionReplacement Pontoon Jetty @ Svitzer Hebern QuayMr Allen Etherington12 Apr 201112 Jul 2011
MLA/2011/00009
Completed
Application - Construction, Removals (inc. Grab Samples)Demolition of Jetty at Old Ballast Wharf Charlton LondonMelrose Plc13 Apr 201126 Jul 2011
MLA/2011/00010/1
Completed
Application - Removals (inc. Grab Samples)Project ExpressHibernia Atlantic (Uk) Limited14 Apr 201130 Apr 2012
MLA/2011/00011
Completed
Application - ConstructionSpecial Purpose Buoy - BMYC #6Brighton Marina Yacht Club Limited14 Apr 201101 Jul 2011
MLA/2011/00012/2
Completed
Application - Removals (inc. Grab Samples)Newbiggin Bay Beach ManagementNorthumberland County Council15 Apr 201102 Jul 2015
MLA/2011/00013/1
Completed
Application - Construction87236_Golden Hind Dry DockInvista Real Estate Investment Management Limited18 Apr 201130 Jan 2012
MLA/2011/00014/1
Completed
Application - ConstructionMargate Flood and Coast Protection Works - Phase IIThanet District Council18 Apr 201112 Nov 2012
MLA/2011/00016/1
Completed
Application - Miscellaneous Disposal, Removals (inc. Grab Samples)Removal of drill pipe from the Brisitol ChannelChannel Energy Limited19 Apr 201116 Aug 2011
MLA/2011/00017/5
Completed
Application - ConstructionWestermost Rough geotechnical survey and installation of wave buoysWestermost Rough Limited20 Apr 201103 Apr 2012
MLA/2011/00018
Completed
Application - ConstructionMillom Ground Investigation WorksUnited Utilities Plc20 Apr 201101 Sep 2011
MLA/2011/00019/2
Completed
Application - Dredged Material Disposal, DredgingLimited Maintenance Dredge - McNulty QuayPort Of Tyne Authority20 Apr 201123 Aug 2012
MLA/2011/00020
Completed
Application - ConstructionBartolph's Creek mooringMr Thomas Robertson21 Apr 201116 Jun 2011
MLA/2011/00021/2
Completed
Application - Removals (inc. Grab Samples)Forewind - Benthic Ecology Survey at Dogger BankForewind Limited21 Apr 201117 Nov 2011
MLA/2011/00022/1
Completed
Application - ConstructionProposed repair to River Humber Flood Bank at Hawkin's Point, Sunk IslandCarter Jonas Llp21 Apr 201103 Aug 2011
MLA/2011/00023/1
Completed
Application - RenewablesHornsea Benthic Ecology Cable Route SurveySmart Wind Limited26 Apr 201121 Sep 2011
MLA/2011/00024
Completed
Application - RenewablesBurbo Bank Extension Offshore Wind FarmDong Energy Burbo Extension (Uk) Ltd27 Apr 201127 Jul 2011
MLA/2011/00025/1
Completed
Application - ConstructionSparkes Marina Visitor Pontoon RefurbishmentMarina Developments Limited28 Apr 201123 Sep 2011
MLA/2011/00026/1
Completed
Application - ConstructionInstallation of Replacement River Wall, Smurfit Kappa, Snodland, KentSmurfit Kappa Townsend Hook28 Apr 201127 Sep 2012
MLA/2011/00027/1
Completed
Application - ConstructionHightown Dune Restoration ProjectSefton Council, Dept Of Planning & Regeneration28 Apr 201112 Sep 2011
MLA/2011/00028
Completed
Application - Removals (inc. Grab Samples)Area 392/3 Hilbe Swash Benthic SurveyTarmac Marine Dredging Limited03 May 201113 May 2011
MLA/2011/00029/4
Completed
Application - ConstructionCentral Felixstowe Coast Protection SchemeSuffolk Coastal District Council05 May 201123 Mar 2012
MLA/2011/00030
Completed
Application - ConstructionDirectional Waverider buoy at PorthlevenTeignbridge District Council06 May 201113 Jul 2011
MLA/2011/00031/1
Completed
Application - ConstructionExtension of Tower Millennium Pier, LondonTransport For London09 May 201117 Jan 2012
MLA/2011/00032
Completed
Application - Removals (inc. Grab Samples)Area 228 - Benthic Grab SamplingVolker Dredging Ltd11 May 201113 May 2011
MLA/2011/00033/1
Completed
Application - ConstructionFMC Dagenham Jetty RefurbishmentFord Motor Company Limited11 May 201110 Oct 2011
MLA/2011/00034/1
Completed
Application - ConstructionSelsmore Seawall MaintenanceEnvironment Agency (Southern Region)11 May 201127 Sep 2011
MLA/2011/00035/2
Completed
Application - Removals (inc. Grab Samples)Railway Quay NewhavenWest Register (Realisations) Limited12 May 201103 Dec 2012
MLA/2011/00036
Completed
Application - RenewablesWalney 1 & 2 Offshore Windfarm - Offshore cable route vibrocore samplesWalney (Uk) Offshore Windfarms Limited13 May 201115 Aug 2011
MLA/2011/00037
Completed
Application - Construction22 Riverside West KirbyMr Ian Kirkham13 May 201125 May 2012
MLA/2011/00038
Completed
Application - Removals (inc. Grab Samples)Area 228 Vibrocoring SurveyVolker Dredging Ltd16 May 201117 Jun 2011
MLA/2011/00039
Completed
Application - Removals (inc. Grab Samples)The Wash Subtidal Sandbanks SurveyNatural England16 May 201117 May 2011
MLA/2011/00040
Completed
Application - Construction, Removals (inc. Grab Samples)Whitstable Groynes 2011Canterbury City Council16 May 201101 Sep 2011
MLA/2011/00041
Withdrawn
Application - ConstructionPROPOSED NAVIGATION LIGHT REFURBISHMENTAssociated British Ports17 May 2011
MLA/2011/00042
Completed
Application - ConstructionExtension to Pier A, Port of DoverDover Harbour Board18 May 201107 Oct 2011
MLA/2011/00043
Completed
Application - Removals (inc. Grab Samples)Severn Estuary Grab SamplingNatural England19 May 201110 Aug 2011
MLA/2011/00044
Completed
Application - Removals (inc. Grab Samples)Thames River Park SurveyThomson Unicomarine Limited19 May 201116 Jun 2011
MLA/2011/00045
Completed
Application - ConstructionSt Paul's School Drainage Outfall PipeSt. Paul'S School20 May 201110 Aug 2011
MLA/2011/00046/1
Completed
Application - Dredged Material DisposalABP FLEETWOOD MAINTENANCE DREDGINGAssociated British Ports Holdings Limited23 May 201110 Sep 2014
MLA/2011/00047/2
Completed
Application - ConstructionCliff Road, Clacton-on-Sea, Essex - Sea Wall RepairsTendring District Council24 May 201116 Sep 2011
MLA/2011/00048
Completed
Application - ConstructionR.K. Marine Hoist Dock, SwanickR K Marine25 May 201115 Aug 2011
MLA/2011/00049/1
Completed
Application - Removals (inc. Grab Samples)Greenwich Peninsula / London - Site Investigation for future Riverwall worksGreenwich Peninsula Regeneration Limited25 May 201120 Oct 2011
MLA/2011/00050/1
Completed
Application - ConstructionThe Needles Park - Chairlift (Beach structure)Heritage Great Britain Plc25 May 201105 Sep 2011
MLA/2011/00051/6
Completed
Application - Construction, Removals (inc. Grab Samples)Medmerry Managed Realignment (MMR) schemeEnvironment Agency (Southern Region)26 May 201120 Dec 2013
MLA/2011/00052
Completed
Application - Removals (inc. Grab Samples)Walton Mere Ground InvestigationSilverbrook Estates Limited27 May 201115 Jul 2011
MLA/2011/00053/4
Completed
Application - Dredged Material DisposalPort of Southampton Maintenance DredgeAssociated British Ports Holdings Limited27 May 201114 Apr 2015
MLA/2011/00054
Completed
Application - ConstructionDevelopment of a Fast Ferry Terminal in Portland Harbour (Attention A. Chumbley)Fast Ferry Partners Limited31 May 201113 Sep 2011
MLA/2011/00055
Completed
Application - ConstructionThe Boathouse, Port La Salle, Bouldnor: Jetty and decking constructionMr Mark Hall01 Jun 201112 Jul 2011
MLA/2011/00056
Completed
Application - Removals (inc. Grab Samples)Benthic and sediment surveysHarwich Haven Authority01 Jun 201120 Jul 2011
MLA/2011/00057
Completed
Application - Removals (inc. Grab Samples)Area 240 Archaeological InvestigationsHanson Aggregates Marine Limited01 Jun 201104 Aug 2011
MLA/2011/00058
Completed
Application - Removals (inc. Grab Samples)BEEMS WP2 Hinkley Point Grab SurveyCefas01 Jun 201101 Jul 2011
MLA/2011/00059
Withdrawn
Application - Removals (inc. Grab Samples)BEEMS WP2 Sizewell Grab SurveyC E F A S01 Jun 2011
MLA/2011/00060/1
Completed
Application - Removals (inc. Grab Samples)Humber Vibrocore Surveys for 106, 400 & 439Hanson Aggregates Marine Limited03 Jun 201127 Jul 2011
MLA/2011/00061/1
Completed
Application - Removals (inc. Grab Samples)Area 482, 473 & 474 Vibrocore SurveyHanson Aggregates Marine Limited03 Jun 201118 Jul 2011
MLA/2011/00062/2
Completed
Application - Removals (inc. Grab Samples)Vibrocore and Grab sample surveys for Areas 328 and 242/361Hanson Aggregates Marine Limited03 Jun 201127 Sep 2011
MLA/2011/00063/1
Completed
Application - ConstructionDooley Terminal - Improvements to RORO 3 and 4Felixstowe Dock And Railway Company03 Jun 201108 Jul 2013
MLA/2011/00064
Withdrawn
Application - ConstructionSeaworkMercator Media Ltd06 Jun 2011
MLA/2011/00065/2
Completed
Application - ConstructionA380 South Devon Link Road - Kingskerswell Bypass; Acitivity - Culvert No.22Devon County Council06 Jun 201103 Feb 2012
MLA/2011/00066/1
Completed
Application - Removals (inc. Grab Samples)Cefas Annual Survey ProgrammeCefas06 Jun 201101 Jun 2012
MLA/2011/00067
Completed
Application - ConstructionFulham Wharf Site InvestigationJ Sainsbury Plc07 Jun 201129 Jul 2011
MLA/2011/00068/3
Completed
Application - Construction, Dredged Material Disposal, DredgingRNLI CowesRoyal National Lifeboat Institution08 Jun 201120 Jul 2015
MLA/2011/00069/3
Completed
Application - RenewablesHornsea Round 3 Zone Cable Route Geotechnical SurveySmart Wind Limited08 Jun 201116 Apr 2012
MLA/2011/00070/1
Completed
Application - Removals (inc. Grab Samples)Gunfleet Sands Demonstration Project: Export Cable Survey Grouped under: Gunfleet Sands OWF 1, 2, 3 Showing 2 of 15 casesDong Energy Gunfleet Sands Demo (Uk) Ltd08 Jun 201104 Jul 2011
MLA/2011/00071/1
Completed
Application - Alternative Use of Dredged Material, DredgingMinehead HarbourAlbert Stone09 Jun 201108 Jan 2016
MLA/2011/00072
Completed
Application - ConstructionProject ExpressHibernia ExpressHibernia Atlantic (Uk) Limited09 Jun 201124 Mar 2015
MLA/2011/00073/1
Completed
Application - ConstructionBrus Outfall ReplacementNorthumbrian Water Limited10 Jun 201111 Aug 2011
MLA/2011/00074
Completed
Application - ConstructionWhitehaven Ground InvestigationUnited Utilities Water Plc13 Jun 201123 Aug 2011
MLA/2011/00075
Completed
Application - ConstructionNorthside Bridge Permanent ReplacementCumbria County Council13 Jun 201106 Sep 2011
MLA/2011/00076/5
Completed
Application - ConstructionBembridge Cliff and Beach Management PlanBourne Leisure Limited14 Jun 201123 Sep 2013
MLA/2011/00077
Completed
Application - Removals (inc. Grab Samples)Statutory sediment grabbingEnvironment Agency15 Jun 201124 Jun 2011
MLA/2011/00078/3
Completed
Application - ConstructionHornsea Zone MetOcean Measurement CampaignSmart Wind Limited16 Jun 201105 Nov 2012
MLA/2011/00079/3
Completed
Application - ConstructionInstallation of Floating Pontoons & Steel PilesGrimsby Fish Dock Enterprises Limited16 Jun 201108 Aug 2013
MLA/2011/00080
Completed
Application - Removals (inc. Grab Samples)Green Port HullAbp Marine Environmental Research Limited16 Jun 201112 Jul 2011
MLA/2011/00081/1
Completed
Application - ConstructionJarrold footbridge, Norwich.Jarrold (St. James) Limited20 Jun 201111 Nov 2011
MLA/2011/00082/1
Completed
Application - Dredged Material DisposalBedhampton Quay Silt DisposalTarmac Limited20 Jun 201109 Sep 2014
MLA/2011/00083
Completed
Application - ConstructionNewcastle Quayside PontoonsNewcastle Ne1 Limited20 Jun 201109 Aug 2011
MLA/2011/00084
Completed
Application - Removals (inc. Grab Samples)Lowestoft South Beach - removal of hazards to bathersWaveney District Council20 Jun 201109 Jul 2012
MLA/2011/00085
Completed
Application - ConstructionOldbury Power Station New Reservoir Anchor BlocksMagnox Limited21 Jun 201124 Aug 2011
MLA/2011/00086/2
Completed
Application - Dredged Material DisposalRenewal of Port of Blyth 3 year Disposal licencePort Of Blyth21 Jun 201110 Sep 2014
MLA/2011/00087
Completed
Application - ConstructionRiver Lune Sewer Upgrade WorksUnited Utilities Plc21 Jun 201112 Aug 2011
MLA/2011/00088/3
Completed
Application - Dredged Material Disposal, Dredging11 Dock Rehabilitation - HMNB DevonportWestminster Dredging Company Limited22 Jun 201112 Feb 2013
MLA/2011/00089
Completed
Application - ConstructionLee Tunnel.Mvbjv22 Jun 201114 Sep 2011
MLA/2011/00090/1
Completed
Application - Construction, Removals (inc. Grab Samples)Scarborough Spa Coast Protection Scheme (MLP/2011/000): Site Investigation WorksScarborough Borough Council22 Jun 201109 Aug 2011
MLA/2011/00091/1
Completed
Application - Removals (inc. Grab Samples)Thames Tunnel Hydrographic Study Grab SamplingThames Water Utilities Limited23 Jun 201105 Sep 2011
MLA/2011/00092
Completed
Application - Removals (inc. Grab Samples)Vibrocore and Grab sample surveys for Areas 492Hanson Aggregates Marine Limited23 Jun 201104 Aug 2011
MLA/2011/00093/2
Completed
Application - Removals (inc. Grab Samples)V164 WTM SheernessPort Of Sheerness Limited24 Jun 201117 Aug 2011
MLA/2011/00094/1
Completed
Application - Removals (inc. Grab Samples)Burnham on Sea Pile Refurbishment WorksEnvironment Agency,Bradney Depot24 Jun 201122 Sep 2011
MLA/2011/00095
Completed
Application - ConstructionNEW FLOATING PONTOONS, TYNE CRUISING CLUBTyne Cruising Club24 Jun 201124 Aug 2011
MLA/2011/00096
Completed
Application - ConstructionTilbury B Power Station Biomass Conversion Scheme: Jetty worksRwe Npower Plc24 Jun 201109 Aug 2011
MLA/2011/00097
Withdrawn
Application - Removals (inc. Grab Samples)Thames Tunnel Foreshore Contamination TestingThames Water Utilities Limited27 Jun 2011
MLA/2011/00098/4
Completed
Application - Dredged Material Disposal, DredgingPort Pendennis Marina DredgingCastlematter Ltd29 Jun 201117 Oct 2012
MLA/2011/00099/12
Completed
Application - RenewablesScour Prevention TrialEon30 Jun 201120 Jul 2023
MLA/2011/00100
Completed
Application - Burial at SeaTapper Funeral Service30 Jun 201127 Jun 2014
MLA/2011/00103/2
Completed
Application - ConstructionNewburn Bridge; Cycleway Retaining WallGateshead Council01 Jul 201115 Feb 2012
MLA/2011/00104
Completed
Application - ConstructionAmericas Cup Temporary Race VillagePlymouth City Council01 Jul 201118 Aug 2011
MLA/2011/00105
Completed
Application - ConstructionNarec Surface Water Drainage OutfallNarec Limited05 Jul 201114 Oct 2011
MLA/2011/00107
Withdrawn
Application - Removals (inc. Grab Samples)Thames Tunnel Phase 5 Overwater SIThames Water Utilities Limited05 Jul 2011
MLA/2011/00108/4
Completed
Application - Dredged Material DisposalDisposal of Maintenence Dredged ArisingsLymington Harbour Commissioners05 Jul 201118 Sep 2014
MLA/2011/00109
Completed
Application - Removals (inc. Grab Samples)Testing of scientific equipmentGardline Environmental Limited06 Jul 201122 Jul 2011
MLA/2011/00110/1
Completed
Application - Dredged Material Disposal, DredgingHeysham North BankThe Mersey Docks And Harbour Company Limited06 Jul 201104 Oct 2012
MLA/2011/00111/4
Completed
Application - ConstructionCable Protection - Interarray Cables - Thanet Offshore Windfarm Grouped under: Thanet Offshore Wind Farm Showing 2 of 6 casesVattenfall Wind Power Ltd06 Jul 201127 Jun 2012
MLA/2011/00112
Completed
Application - ConstructionSalcombe Town Landing Refurbisment and ExtensionSouth Hams District Council07 Jul 201111 Oct 2011
MLA/2011/00113/1
Completed
Application - Removals (inc. Grab Samples)Removal of sediments using grabs and cores for scientific purposesEcospan Environmental Limited07 Jul 201104 Sep 2012
MLA/2011/00114
Completed
Application - Removals (inc. Grab Samples)Newhaven North Quay Cemex BerthCemex Uk Materials Limited07 Jul 201110 Aug 2011
MLA/2011/00115/3
Completed
Application - Dredged Material DisposalMaintenance DredgingsShoreham Port Authority07 Jul 201108 Oct 2014
MLA/2011/00116
Completed
Application - ConstructionWoolwich Ferry North TerminalSerco08 Jul 201128 Nov 2011
MLA/2011/00117
Withdrawn
Application - Removals (inc. Grab Samples)hindostan wreck Wedge sandSalacia Marine Salvage Ltd08 Jul 2011
MLA/2011/00118/2
Completed
Application - Construction, Removals (inc. Grab Samples)HMS Bristol pontoon, Portsmouth HarbourPortsmouth City Council08 Jul 201106 Nov 2012
MLA/2011/00119/1
Completed
Application - ConstructionConstruction of Wavebreaker BlocksDevonport Royal Dockyard Limited08 Jul 201111 Oct 2012
MLA/2011/00120
Completed
Application - Removals (inc. Grab Samples)Humber Estuary Marine Ecological Survey Summer 2011Seastar Survey Limited08 Jul 201127 Jul 2011
MLA/2011/00121
Completed
Application - ConstructionRefurbishment of Crysanthemum Pier, Victoria Embankment, LondonCrown River Cruises Limited10 Jul 201110 Jan 2012
MLA/2011/00122
Withdrawn
Application - Miscellaneous Disposal, Removals (inc. Grab Samples)BP Forties Pipeline system (FPS) Unexploded Ordnance (UXO) removalBp Exploration Operating Company Ltd.11 Jul 2011
MLA/2011/00123/1
Completed
Application - ConstructionNuStar Terminal Thurrock - CP WorksNustar Terminals Limited11 Jul 201127 Apr 2012
MLA/2011/00124/1
Completed
Application - Dredged Material DisposalTeignmouth Harbour Commission Disposal LicenseTeignmouth Harbour Commission11 Jul 201118 Oct 2011
MLA/2011/00125/1
Completed
Application - ConstructionFishery Lane outfall replacementSouthern Water Services Limited12 Jul 201122 Aug 2012
MLA/2011/00126
Withdrawn
Application - ConstructionREVETMENT REPAIR - LANGENHOE MARSHDefence Infrastructure Organisation12 Jul 2011
MLA/2011/00127/1
Completed
Application - ConstructionRenewal of Fendering System, Berth 3 Pier A Eastern Docks DoverDover Harbour Board13 Jul 201129 Sep 2011
MLA/2011/00128
Completed
Application - Removals (inc. Grab Samples)Seaton Channel Marine Ecological Survey Summer 2011Seastar Survey Limited13 Jul 201101 Sep 2011
MLA/2011/00129
Withdrawn
Application - Aggregate DredgingAggregate Extraction Area 466, North West RoughCemex Uk Marine Limited13 Jul 2011
MLA/2011/00131/1
Completed
Application - Removals (inc. Grab Samples)Area 407 seabed sampling surveyCemex Uk Marine Limited13 Jul 201119 Sep 2011
MLA/2011/00132/6
Completed
Application - Construction, Removals (inc. Grab Samples)Natural England Marine Monitoring ProgrammeNatural England14 Jul 201128 Feb 2013
MLA/2011/00133/1
Completed
Application - Removals (inc. Grab Samples)Hornsea Subzone 2 Geophysical Survey - Grab SamplesSmart Wind Limited14 Jul 201130 Sep 2011
MLA/2011/00134
Withdrawn
Application - ConstructionHornsea Round 3 Zone - Underwater Noise SurveySmart Wind Limited15 Jul 2011
MLA/2011/00135/1
Completed
Application - ConstructionPhysical Oceanographic survey of transient shelf sea frontsUniversity Of Plymouth Enterprise Limited18 Jul 201118 Nov 2011
MLA/2011/00136
Completed
Application - ConstructionNorthumbrian Water - Spittal Beach Bathing Water Improvement SchemeNorthumbrian Water Limited18 Jul 201120 Sep 2011
MLA/2011/00137
Withdrawn
Application - Construction, RenewablesEast Anglia Offshore Wind Meteorological Mast Grouped under: East Anglia ONE Offshore Windfarm Showing 3 of 7 casesEast Anglia Offshore Wind Limited19 Jul 2011
MLA/2011/00138/2
Completed
Application - ConstructionLynemouth Power Station combined discharge outfall pipe replacement.Alcan Aluminium Uk Limited19 Jul 201120 Dec 2011
MLA/2011/00139/4
Completed
Application - Dredged Material Disposal, DredgingMaintenance Dredgeing of Garston Approach Channel and Garston DocksAssociated British Ports Holdings Limited20 Jul 201103 Aug 2015
MLA/2011/00140
Completed
Application - Removals (inc. Grab Samples)JER4941 Port of SheernessPort Of Sheerness Limited20 Jul 201129 Jul 2011
MLA/2011/00141
Completed
Application - Removals (inc. Grab Samples)EMERALD (Formerly known as Atlantis ICEUS) Cable Route SurveyGems Survey Ltd20 Jul 201125 Aug 2011
MLA/2011/00143
Completed
Application - ConstructionLymington Yacht Haven Replacement Finger JettyYacht Havens Limited22 Jul 201119 Sep 2011
MLA/2011/00144
Withdrawn
Application - ConstructionRiverside (Iron Ore) Quay Fender ReplacementPort Of Tyne Authority22 Jul 2011
MLA/2011/00145/1
Completed
Application - Removals (inc. Grab Samples)Sellafield - Offshore Sediment SamplingEnvironment Agency25 Jul 201119 Aug 2011
MLA/2011/00146
Completed
Application - Removals (inc. Grab Samples)Dawlish Warren and Exmouth Beach Management Technical Appraisal StudyTeignbridge District Council25 Jul 201106 Sep 2011
MLA/2011/00147
Completed
Application - ConstructionRevetment Stabilisation, Hythe Marina Village, SouthamptonMarina Developments Limited26 Jul 201119 Dec 2011
MLA/2011/00148
Completed
Application - Removals (inc. Grab Samples)East Anglia Offshore Wind - East Anglia ONE Offshore Export Cable Benthic Survey Grouped under: East Anglia ONE Offshore Windfarm Showing 3 of 7 casesEast Anglia Offshore Wind26 Jul 201109 Aug 2011
MLA/2011/00149
Completed
Application - Removals (inc. Grab Samples)Quarterly benthic monitoringDover Harbour Board28 Jul 201109 Aug 2011
MLA/2011/00150
Completed
Application - ConstructionReplacing Dolphin StructureWarsash Sailing Club28 Jul 201127 Sep 2011
MLA/2011/00152/1
Completed
Application - ConstructionYarmouth (Isle of Wight) Pier - Pierhead Strengthening WorksYarmouth Harbour Commissioners (Iow)29 Jul 201112 Oct 2011
MLA/2011/00153/1
Completed
Application - ConstructionStabilisation of Retaining Wall Berths 5 and 6, Eastern DocksDover Harbour Board29 Jul 201125 Oct 2011
MLA/2011/00154
Completed
Application - ConstructionFurther conveyor expansion at the Humber International Terminal, ImminghamAssociated British Ports.29 Jul 201112 Oct 2011
MLA/2011/00155
Completed
Application - Alternative Use of Dredged MaterialSouthsea Shingle TransferPortsmouth City Council01 Aug 201117 Oct 2011
MLA/2011/00156
Completed
Application - ConstructionSennen Cove RNLI SlipwaysRoyal National Lifeboat Institution02 Aug 201131 Oct 2011
MLA/2011/00157
Completed
Application - Removals (inc. Grab Samples)Area 447 Vibrocore surveyHanson Aggregates Marine Limited03 Aug 201115 Aug 2011
MLA/2011/00158/1
Completed
Application - ConstructionReplacement of existing slipway, Create crane plinth / dry dockOcean Yacht Company Limited03 Aug 201101 Feb 2012
MLA/2011/00159/2
Completed
Application - ConstructionIntertidal Joint Replacement - Thanet Offshore Windfarm Grouped under: Thanet Offshore Wind Farm Showing 2 of 6 casesVattenfall Wind Power Ltd04 Aug 201126 Oct 2011
MLA/2011/00160/5
Completed
Application - ConstructionWest Sands Coast Protection SchemeMr John Bunn05 Aug 201131 Mar 2014
MLA/2011/00161
Withdrawn
Application - Removals (inc. Grab Samples)Kenn Outfall Demolition WorksEnvironment Agency08 Aug 2011
MLA/2011/00162
Withdrawn
Application - Removals (inc. Grab Samples)Collection of lab samples by hovercraft from intertidal areasIntertidal Ltd08 Aug 2011
MLA/2011/00163
Completed
Application - ConstructionWEST BAY HARBOUR - DRY DOCK PLATFORMWest Dorset District Council09 Aug 201124 Oct 2011
MLA/2011/00164/1
Completed
Application - Alternative Use of Dredged MaterialMedmerry Beach Reprofilling and Shingle Recycling 2011/12Environment Agency-Southern Region09 Aug 201122 Oct 2012
MLA/2011/00165
Completed
Application - Removals (inc. Grab Samples)Sediment Sampling, UK, Annual licenceAquatech Survey Limited10 Aug 201122 Sep 2011
MLA/2011/00166/1
Completed
Application - Removals (inc. Grab Samples)Mersey Gateway Pre Construction SurveysApem Ltd10 Aug 201117 Jul 2013
MLA/2011/00167/3
Completed
Application - ConstructionNavitus Bay Metocean and Marine Mammal Data Acquisition ProgrammeEneco Wind Uk Limited11 Aug 201113 Jan 2012
MLA/2011/00168
Completed
Application - ConstructionInternational PaintsNorthumbrian Water Limited12 Aug 201101 Feb 2012
MLA/2011/00170/2
Completed
Application - Miscellaneous DisposalSterte Culverts De SiltingBorough Of Poole16 Aug 201102 Aug 2012
MLA/2011/00171/2
Completed
Application - Dredged Material Disposal, DredgingSaxon Wharf - Maintenance DredgingMarina Developments Limited17 Aug 201122 Sep 2015
MLA/2011/00172
Completed
Application - Dredged Material Disposal, DredgingShamrock Quay - Maintenance DredgingMarina Developments Limited18 Aug 201115 Nov 2011
MLA/2011/00173/1
Completed
Application - Dredged Material Disposal, DredgingOcean Village Marina - Maintenance DredgingMarina Developments Limited18 Aug 201120 Dec 2011
MLA/2011/00174
Completed
Application - Dredged Material Disposal, DredgingNorthney Marina - Maintenance DredgingMarina Developments Limited18 Aug 201120 Dec 2011
MLA/2011/00175
Completed
Application - Miscellaneous DisposalSea Trials of BAE Systems Surface Ships Operated Vessels.Bae Systems Surface Ships Limited19 Aug 201121 Dec 2011
MLA/2011/00176
Completed
Application - ConstructionRochester Riverside River Wall OutfallMedway Council23 Aug 201120 Dec 2011
MLA/2011/00177
Completed
Application - Removals (inc. Grab Samples)Vibrocoring Area 457 Liverpool BayWestminster Gravels Limited24 Aug 201124 Aug 2011
MLA/2011/00178
Completed
Application - Alternative Use of Dredged Material, ConstructionBowers Marsh Habitat Creation SchemeRoyal Society For The Protection Of Birds24 Aug 201105 Sep 2011
MLA/2011/00179/2
Completed
Application - Alternative Use of Dredged MaterialClimping Coastal Maintenance Works 2011/12Environment Agency25 Aug 201108 Oct 2013
MLA/2011/00180/2
Completed
Application - ConstructionInstallation of a Meteorological Mast with a ADCP device.E.On Climate & Renewables Uk Rampion Offshore Wind Limited25 Aug 201104 May 2012
MLA/2011/00181
Completed
Application - Miscellaneous DisposalHunstanton outfalls tracer surveyEmu Limited26 Aug 201107 Oct 2011
MLA/2011/00182/1
Completed
Application - RenewablesForewind - Dogger Bank Waverider Buoy Deployment and RelocationForewind Limited26 Aug 201124 Feb 2012
MLA/2011/00183
Completed
Application - ConstructionTown Quay WavebreakAssociated British Ports, Southampton26 Aug 201112 Oct 2011
MLA/2011/00184
Completed
Application - Burial at SeaBritannia Shipping26 Aug 201101 Sep 2011
MLA/2011/00185/1
Completed
Application - Removals (inc. Grab Samples)Site Investigation for Capital Dredging Works - PortsmouthWestminster Dredging Company Limited30 Aug 201127 Jan 2012
MLA/2011/00186/1
Completed
Application - ConstructionExtension of Berth 2 Continental Ferry Port, PortsmouthPortsmouth City Council31 Aug 201119 Jan 2012
MLA/2011/00187/1
Completed
Application - ConstructionNewhaven Fishing Stage 9Newhaven Port & Properties Limited31 Aug 201118 Sep 2012
MLA/2011/00188
Completed
Application - ConstructionPorthloo Boat Slipway ImprovementsDuchy Of Cornwall01 Sep 201127 Apr 2012
MLA/2011/00189/1
Completed
Application - Constructiongravesend sailing club new pontoonGravesend Sailing Club02 Sep 201120 Dec 2013
MLA/2011/00190/2
Completed
Application - Alternative Use of Dredged MaterialLymington Intertidal Habitat Restoration 2012Lymington Harbour Commissioners05 Sep 201122 Aug 2012
MLA/2011/00191/11
Completed
Application - Dredged Material Disposal, DredgingRenewal of license L/2011/00178/2The Mersey Docks And Harbour Company Limited05 Sep 201120 Apr 2015
MLA/2011/00192
Completed
Application - ConstructionEllington Minewater Treatment SchemeThe Coal Authority05 Sep 201112 Oct 2011
MLA/2011/00193
Completed
Application - ConstructionAlterations to mooring facilities at No.2 BerthHarwich International Port05 Sep 201111 Nov 2011
MLA/2011/00194
Completed
Application - Dredged Material DisposalMaintenance dredged material disposal - Port of GooleAssociated British Ports.07 Sep 201119 Dec 2011
MLA/2011/00195
Withdrawn
Application - Dredged Material DisposalMaintenance dredged material disposal - Port of HullAssociated British Ports - Humber Estuary Services07 Sep 2011
MLA/2011/00196/6
Completed
Application - Dredged Material DisposalMaintenance dredged material disposal - Grimsby, Immingham, Sunk Dredged ChannelAssociated British Ports.07 Sep 201105 Sep 2013
MLA/2011/00197
Withdrawn
Application - ConstructionLyme Bay Plough trialsAldamarine S.A.S07 Sep 2011
MLA/2011/00198/1
Completed
Application - ConstructionCousins Lane stairs refurbishment, River ThamesEnvironment Agency London Office08 Sep 201125 Apr 2012
MLA/2011/00199/1
Completed
Application - ConstructionTruro Tidal Defences Phase 3Environment Agency - South West Region10 Sep 201113 Dec 2011
MLA/2011/00200/4
Completed
Application - Dredged Material DisposalMaintenance dredged material disposal, Port of Hull & riverside berthsAssociated British Ports.12 Sep 201130 Jul 2015
MLA/2011/00201
Completed
Application - ConstructionMaypool Boathouse QuayMr Peter Dyball12 Sep 201122 Nov 2011
MLA/2011/00202
Completed
Application - Burial at SeaMr Paul Steele12 Sep 201113 Sep 2011
MLA/2011/00203
Withdrawn
Application - ConstructionLondon River ParkLondon River Park Limited12 Sep 2011
MLA/2011/00204
Withdrawn
Application - Removals (inc. Grab Samples)Kentish KnockSalacia Marine Salvage Ltd13 Sep 2011
MLA/2011/00205/2
Completed
Application - Removals (inc. Grab Samples)Dange BeachSalacia Marine Salvage Limited13 Sep 201108 Jun 2016
MLA/2011/00206
Completed
Application - ConstructionLiverpool WwTW ExtensionUnited Utilities Plc13 Sep 201117 Jan 2012
MLA/2011/00207
Completed
Application - Removals (inc. Grab Samples)North Cornwall Environmental SurveyEmu Limited14 Sep 201127 Oct 2011
MLA/2011/00208
Completed
Application - Removals (inc. Grab Samples)Boston Barrier Phase 2 Ground InvestigationEnvironment Agency15 Sep 201104 Nov 2011
MLA/2011/00209
Completed
Application - Removals (inc. Grab Samples)Great Yarmouth Framework for ActionEnvironment Agency - Anglian Region15 Sep 201114 Nov 2011
MLA/2011/00210
Completed
Application - ConstructionSmack PontoonBrightlingsea Harbour Commissioners16 Sep 201112 Jan 2012
MLA/2011/00211/1
Completed
Application - Dredged Material Disposal, DredgingScarborough Harbour Maintenance DredgingScarborough Borough Council19 Sep 201118 Dec 2013
MLA/2011/00212
Completed
Application - Removals (inc. Grab Samples)Tees Transporter Bridge Ground InvestigationMiddlesborough Council20 Sep 201117 Nov 2011
MLA/2011/00213/3
Completed
Application - Dredged Material DisposalDisposal of Dredged Material from Berths 201 and 202Associated British Ports, Southampton20 Sep 201128 Aug 2013
MLA/2011/00214
Completed
Application - ConstructionSlipway Repairs, Northney Marina, Hayling IslandMarina Developments Limited20 Sep 201123 Nov 2011
MLA/2011/00216/1
Completed
Application - ConstructionKing Point MarinaSutton Harbour Company21 Sep 201107 Sep 2012
MLA/2011/00217/1
Completed
Application - Removals (inc. Grab Samples)Robin Rigg Offshore Wind Farm Marine Environment Monitoring ProgramE.On Climate & Renewables Uk Operations Limited21 Sep 201129 Sep 2011
MLA/2011/00218
Completed
Application - ConstructionOld Boatyard SlipwayNorth Quay Management Ltd23 Sep 201108 Feb 2012
MLA/2011/00219/4
Completed
Application - ConstructionReconstruction of Berth 201/202Associated British Ports, Southampton23 Sep 201103 May 2013
MLA/2011/00220
Completed
Application - Construction132kV Submarine cable replacement Lepe to Thorness Bay - Trial pit excavationsScottish And Southern Energy Plc26 Sep 201111 Nov 2011
MLA/2011/00221
Completed
Application - ConstructionHornsea Zone Underwater Noise Assessment CampaignSmart Wind Limited26 Sep 201123 Nov 2011
MLA/2011/00223
Completed
Application - ConstructionSoil Investigation SurveyLondon River Park Limited28 Sep 201111 Nov 2011
MLA/2011/00224
Completed
Application - ConstructionRock SlipwayPadstow Harbour Commissioners29 Sep 201113 Dec 2011
MLA/2011/00225/2
Completed
Application - ConstructionGateshead Millennium Bridge; Removal of Vessel Collision Protection SystemGateshead Council29 Sep 201115 Feb 2012
MLA/2011/00226
Completed
Application - Burial at SeaBritannia Shipping29 Sep 201130 Sep 2011
MLA/2011/00227
Withdrawn
Application - RenewablesWave HubSouth West Rda30 Sep 2011
MLA/2011/00228/5
Completed
Application - Dredged Material DisposalDredging Material Disposal at Maldon Saltings,TH062Northumbrian Water Limited30 Sep 201114 Jul 2015
MLA/2011/00230
Completed
Application - ConstructionBede Quay RepairsA&P Gh 2006 Limited30 Sep 201109 Jan 2012
MLA/2011/00231
Completed
Application - Removals (inc. Grab Samples)Neptune Yard SamplingShepherd Offshore Services Limited30 Sep 201101 Nov 2011
MLA/2011/00232/8
Completed
Application - ConstructionWestern High Voltage Direct Current Link Marine Cable RouteNget/Spt Upgrades Limited30 Sep 201101 Aug 2014
MLA/2011/00233
Completed
Application - Burial at SeaArthur C. Towner Limited01 Oct 201104 Oct 2011
MLA/2011/00234
Completed
Application - Removals (inc. Grab Samples)Lincs Offshore Wind FarmLincs Wind Farm Limited03 Oct 201121 Dec 2011
MLA/2011/00235/3
Completed
Application - ConstructionShoreham FootbridgeGeoffrey Osborne Limited04 Oct 201107 Feb 2013
MLA/2011/00236/2
Completed
Application - Aggregate DredgingSW Needles Area 127 (restricted footprint)Tarmac Marine Dredging Limited05 Oct 201108 Jul 2014
MLA/2011/00237/2
Completed
Application - Aggregate DredgingSW Needles Area 127 (restricted footprint)Hanson Aggregates Marine Limited05 Oct 201108 Jul 2014
MLA/2011/00239/1
Completed
Application - ConstructionPlacement of rock mattress, Irvine's Quay, Victoria Harbour, HartlepoolPd Teesport Limited06 Oct 201113 Dec 2012
MLA/2011/00240/2
Completed
Application - ConstructionWest of Duddon Sands (WoDS) Offshore Windfarm O&M Facility PontoonDong Energy07 Oct 201113 Jun 2013
MLA/2011/00241/1
Completed
Application - Removals (inc. Grab Samples)Boscombe Surf Reef Fisheries surveyBournemouth University Limited07 Oct 201126 Oct 2011
MLA/2011/00243/6
Completed
Application - DredgingA&P Group- Dock Entrance Dredging TyneA&P Group Limited11 Oct 201107 Jul 2016
MLA/2011/00244/1
Completed
Application - ConstructionPlacement of visitor moorings in Porthcressa BayMrs Charlie Carss11 Oct 201125 Apr 2012
MLA/2011/00245
Completed
Application - ConstructionPile replacement winter 2011/2012Darthaven Marina Ltd11 Oct 201117 Nov 2011
MLA/2011/00246/1
Completed
Application - ConstructionIpswich Flood Defence Management Scheme: Upstream Civil WorksEnvironment Agency11 Oct 201126 Jan 2012
MLA/2011/00247/1
Completed
Application - DredgingMaintenance Water Injection Dredging Fawley Power StationRwe Npower Plc12 Oct 201119 Jan 2012
MLA/2011/00248
Completed
Application - ConstructionReinstatement of collapsed quay wallFowey River Development Corporation Limited(The)12 Oct 201121 Dec 2011
MLA/2011/00249/2
Completed
Application - ConstructionBridge Street Outfall RepairNorthumbrian Water Limited13 Oct 201129 Aug 2012
MLA/2011/00250/2
Completed
Application - Dredged Material DisposalGlasson Dock Maintenance DredgingLancaster Port Commission13 Oct 201120 Dec 2013
MLA/2011/00251
Completed
Application - ConstructionProposed TEYC jetty extension and boat shedThames Estuary Yacht Club14 Oct 201119 Dec 2011
MLA/2011/00252
Completed
Application - ConstructionWestcliff Paddling PoolSouthend Council14 Oct 201110 Jan 2012
MLA/2011/00253
Completed
Application - Construction, Removals (inc. Grab Samples)replacement of small craft moorings at Downs Road BoatyardCaterelle Limited15 Oct 201123 Jan 2012
MLA/2011/00254/4
Completed
Application - Dredged Material Disposal, Dredging, Miscellaneous DisposalImmingham Oil Terminal Approach Channel Dredge Grouped under: Green Port Hull Showing 2 of 3 casesAssociated British Ports.17 Oct 201106 Jul 2015
MLA/2011/00255
Completed
Application - Removals (inc. Grab Samples)Vibrocore sampling at the Teesside Offshore WindfarmVan Oord Uk Limited18 Oct 201123 Nov 2011
MLA/2011/00256
Completed
Application - ConstructionReplacement of existing piles on pontoonDavis'S Boatyard19 Oct 201118 Nov 2011
MLA/2011/00257
Completed
Application - Removals (inc. Grab Samples)Humber Gateway Offshore Wind Farm - Suspect UXO Target Removal / Disposal Grouped under: Humber Gateway Offshore Wind Farm Showing 2 of 10 casesE.On Climate & Renewables Uk Humber Wind Limited19 Oct 201128 Oct 2011
MLA/2011/00258/1
Completed
Application - ConstructionBeach Management Works For Kingsdown, DealDover District Council20 Oct 201102 Mar 2012
MLA/2011/00259
Completed
Application - Burial at SeaMr John Lister21 Oct 201125 Oct 2011
MLA/2011/00260
Completed
Application - ConstructionWicormarine Mooring ReplacementWicormarine Limited21 Oct 201127 Jan 2012
MLA/2011/00261/1
Completed
Application - ConstructionConstruction/Repairs to Dry Stone WallMr Peter Williams21 Oct 201112 Mar 2014
MLA/2011/00262/1
Completed
Application - Dredged Material Disposal, DredgingWoolverstone MarinaMarina Developments Limited24 Oct 201120 Jan 2015
MLA/2011/00263/1
Completed
Application - Dredged Material Disposal, DredgingGosport Marina Maintenance DredgePremier Marinas Limited25 Oct 201111 Apr 2012
MLA/2011/00264/2
Completed
Application - Constructionrefurbishment of existing roro jetty and redevelopmentof former lubes jetty to rPurfleet Real Estate25 Oct 201111 Jan 2013
MLA/2011/00267
Completed
Application - Miscellaneous DisposalHumber Gateway Offshore Wind Farm - Suspect UXO Target Disposal Grouped under: Humber Gateway Offshore Wind Farm Showing 2 of 10 casesE.On Climate & Renewables Uk Humber Wind Limited26 Oct 201131 Oct 2011
MLA/2011/00268
Completed
Application - Miscellaneous DisposalTrials for use of peat and clay mixes as infill material at Wallasea Wild CoastRspb Sales Limited27 Oct 201105 Jan 2012
MLA/2011/00269
Completed
Application - Removals (inc. Grab Samples)Ground Investigation WorksEneco Wind Uk Limited27 Oct 201119 Dec 2011
MLA/2011/00271/1
Completed
Application - ConstructionTriton Knoll Offshore Wind Farm - Meterological Monitoring MastTriton Knoll Offshore Wind Farm Limited31 Oct 201119 Dec 2012
MLA/2011/00272
Completed
Application - ConstructionFerry Way Car Park Retaining Wall Site InvestigationBorough Of Poole Council31 Oct 201114 Dec 2011
MLA/2011/00273
Completed
Application - ConstructionRother Tidal Wall WestEnvironment Agency (Southern Region)01 Nov 201116 Jan 2012
MLA/2011/00274/1
Completed
Application - ConstructionRNLI BlythRoyal National Lifeboat Institution02 Nov 201102 Apr 2012
MLA/2011/00275
Completed
Application - ConstructionParton Sea Wall Coastall ProtectionJ. Murphy & Sons Limited02 Nov 201131 May 2012
MLA/2011/00276
Withdrawn
Application - ConstructionDARTMOUTH PUBLIC SLIPWAY, NORTH EMBANKMENT, DARTMOUTHSouth Hams District Council04 Nov 2011
MLA/2011/00278
Completed
Application - Construction, Removals (inc. Grab Samples)South Coast REA - Oceanographic MeasurementsEmu Limited07 Nov 201120 Dec 2011
MLA/2011/00279
Completed
Application - ConstructionTrenewth Boathouse re-furbish, construct slipway on line of earlier slipwayMr Christopher Taylor08 Nov 201127 Jul 2012
MLA/2011/00282
Completed
Application - ConstructionInstallation of Floating Pontoon Restraint PilesAarsleff Bilfinger Berger Jv London Array08 Nov 201110 Jan 2012
MLA/2011/00283
Completed
Application - Miscellaneous DisposalHMS Colossus monitoring and investigationKevin Camidge08 Nov 201116 Jan 2012
MLA/2011/00286
Completed
Application - ConstructionIntake and Outfall for new Water Treatment WorksAnglian Water Services Ltd09 Nov 201125 Apr 2012
MLA/2011/00287/1
Completed
Application - Dredged Material Disposal, DredgingBedhampton ApproachTarmac Ltd10 Nov 201114 Aug 2014
MLA/2011/00288/13
Completed
Application - Construction, RenewablesEast Anglia Offshore Wind Meteorological Mast Grouped under: East Anglia ONE Offshore Windfarm Showing 3 of 7 casesEast Anglia Offshore Wind10 Nov 201101 May 2018
MLA/2011/00289
Completed
Application - ConstructionYork Field Development ProjectCentrica Resources Limited11 Nov 201102 Mar 2012
MLA/2011/00290
Withdrawn
Application - ConstructionEmergency WorksJ. Murphy & Sons Limited11 Nov 2011
MLA/2011/00291
Completed
Application - Alternative Use of Dredged MaterialEastbourne Beach Management Works 2011-12Eastbourne Borough Council14 Nov 201105 Mar 2012
MLA/2011/00292/2
Completed
Application - Construction, Dredged Material Disposal, DredgingHamble Yacht Services - Port Hamble BerthsHamble Yacht Services Ltd15 Nov 201111 Mar 2013
MLA/2011/00293
Completed
Application - Removals (inc. Grab Samples)Plymouth Yacht Haven and Yacht Haven Quay Sediment SamplingYacht Havens Limited15 Nov 201106 Dec 2011
MLA/2011/00294
Completed
Application - ConstructionGosport Marina Pile Replacement WorksPremier Marinas (Gosport) Limited15 Nov 201103 Feb 2012
MLA/2011/00295/2
Completed
Application - Removals (inc. Grab Samples)Gunfleet Sands 3 - Geotechnical Investigations at export cable route Grouped under: Gunfleet Sands OWF 1, 2, 3 Showing 2 of 15 casesDong Energy Gunfleet Sands Demo (Uk) Ltd15 Nov 201119 Apr 2012
MLA/2011/00296/1
Completed
Application - Alternative Use of Dredged MaterialFolkestone to Hythe Beach ManagementShepway District Council16 Nov 201121 Jun 2013
MLA/2011/00297
Completed
Application - Removals (inc. Grab Samples)Chatham Basin Caisson MaintenancePort Of Sheerness Limited17 Nov 201122 Dec 2011
MLA/2011/00298/1
Completed
Application - ConstructionCanary Wharf Pier MaintenanceCanary Wharf Management Limited18 Nov 201112 Apr 2013
MLA/2011/00299
Completed
Application - Constructionsea defence Britannia houseMrs Susan Rogerson21 Nov 201131 Jan 2012
MLA/2011/00301/7
Completed
Application - Dredged Material Disposal, DredgingPoole Harbour Maintenance Dredging and DisposalPoole Harbour Commissioners21 Nov 201121 Jun 2016
MLA/2011/00302/1
Completed
Application - Aggregate DredgingArea 407Cemex Uk Marine Limited23 Nov 201128 Feb 2017
MLA/2011/00303
Completed
Application - ConstructionWaterside House - Penryn - Replacement of Sea WallMr William Hudd24 Nov 201118 Dec 2012
MLA/2011/00304/4
Completed
Application - ConstructionExport Cable ReplacementVattenfall Wind Power Ltd24 Nov 201116 Mar 2012
MLA/2011/00305/2
Completed
Application - ConstructionConstruction of a new long sea outfall on the seafront at Friars Bay PeacehavenSouthern Water Limited24 Nov 201112 Apr 2012
MLA/2011/00307
Completed
Application - ConstructionOil Fuel Jetty Gosport - Fuel Transfer Pontoon InstallationBae Systems Surface Ships Support Limited25 Nov 201110 Feb 2012
MLA/2011/00308/3
Completed
Application - ConstructionWest Wittering Flood BanksEnvironment Agency (Southern Region)28 Nov 201112 Apr 2013
MLA/2011/00309/2
Completed
Application - ConstructionIrish Sea South Met Mast and Geotechnical surveyDong Energy Power (Uk) Limited28 Nov 201131 May 2013
MLA/2011/00310/1
Completed
Application - ConstructionIrish Sea North Met mast and Geotechnical surveyDong Energy Power (Uk) Limited28 Nov 201114 Sep 2012
MLA/2011/00311/1
Completed
Application - ConstructionPontoon Replacements, Ocean Village Marina, SouthamptonMarina Developments Limited29 Nov 201122 Feb 2013
MLA/2011/00312
Completed
Application - ConstructionWarkworth Harbour Commissioners - New Broomhill quayWarkworth Harbour Commissioners30 Nov 201112 Mar 2012
MLA/2011/00313
Completed
Application - Removals (inc. Grab Samples)Vibrocore and Grab sample surveys for Areas 328 and 242/361Hanson Aggregates Marine Limited30 Nov 201102 Dec 2011
MLA/2011/00314
Completed
Application - ConstructionStone WharfEnvironment Agency London Office30 Nov 201130 Mar 2012
MLA/2011/00315
Completed
Application - ConstructionMalago River OutfallBristol City Council30 Nov 201130 Mar 2012
MLA/2011/00316/1
Completed
Application - ConstructionMaintenance Works - Brixham WavescreenMarina Developments Limited30 Nov 201113 Jun 2016
MLA/2011/00317
Completed
Application - Removals (inc. Grab Samples)Newhaven Harbour Site InvestigationNewhaven Port & Properties Limited01 Dec 201108 Feb 2012
MLA/2011/00318
Completed
Application - ConstructionCoronation Park Outfall - DartmouthFalmouth Divers Limited01 Dec 201131 Jan 2012
MLA/2011/00320/2
Completed
Application - Dredged Material DisposalDisposal of maintenance dredgings from the Harwich Channel at the Walker BuoyHarwich Haven Authority02 Dec 201112 Dec 2013
MLA/2011/00321/1
Completed
Application - ConstructionNene Marine - Sutton Bridge Moorings ProjectLincolnshire County Council05 Dec 201126 Mar 2013
MLA/2011/00322/2
Completed
Application - ConstructionWhitley Lake Sea Defence Feasibility StudyBorough Of Poole Council05 Dec 201108 Feb 2013
MLA/2011/00323
Completed
Application - ConstructionStarcross Culvert ReplacementNetwork Rail Limited07 Dec 201119 Apr 2012
MLA/2011/00325/2
Completed
Application - ConstructionOcean Court Seawall RepairsOcean Court Residents Association08 Dec 201118 Jan 2013
MLA/2011/00326
Completed
Application - ConstructionBoat launching Ramp and stepsPutney Rowing Club12 Dec 201113 Mar 2012
MLA/2011/00327
Completed
Application - ConstructionGrannys Bay SchemeFylde Borough Council12 Dec 201124 Apr 2012
MLA/2011/00328
Withdrawn
Application - Dredged Material DisposalMaintenance DredgingF C Mitchell & Son Ltd12 Dec 2011
MLA/2011/00329/9
Completed
Application - Dredged Material Disposal, DredgingAble Seaton Port and Seaton ChannelAble Uk Limited13 Dec 201115 Dec 2015
MLA/2011/00330/1
Completed
Application - ConstructionArnside Outfall replacementUnited Utilities Plc13 Dec 201126 Jul 2012
MLA/2011/00331
Completed
Application - ConstructionTees Crossing Overhead Power Line SchemeNational Grid Electricity Transmission Plc13 Dec 201116 Apr 2012
MLA/2011/00332/8
Completed
Application - Construction, Dredged Material Disposal, DredgingGreen Port Hull Grouped under: Green Port Hull Showing 2 of 3 casesAssociated British Ports.14 Dec 201128 Jul 2017
MLA/2011/00333
Completed
Application - ConstructionTown Quay Outer WavebreakAssociated British Ports, Southampton15 Dec 201109 Mar 2012
MLA/2011/00334
Completed
Application - ConstructionWadebridge Boating Club Slipway Improvements & new PontoonWadebridge Boating Club15 Dec 201112 Mar 2012
MLA/2011/00336
Completed
Application - Removals (inc. Grab Samples)Area 351 vibrocore surveyNorthwood(Fareham)Limited16 Dec 201119 Jan 2012
MLA/2011/00337/4
Completed
Application - Construction, Dredged Material Disposal, DredgingLiverpool Wastewater Treatment Works OutfallUnited Utilities Water Plc16 Dec 201109 Dec 2013
MLA/2011/00338/2
Completed
Application - ConstructionSelsmore Replacement OutfallEnvironment Agency19 Dec 201112 Dec 2012
MLA/2011/00339/1
Completed
Application - ConstructionWalney 1+2 Offshore Wind Farm Export Cable Routes Rock DumpingWalney (Uk) Offshore Windfarms Limited19 Dec 201111 Jul 2012
MLA/2011/00340
Completed
Application - ConstructionGreat Yarmouth Framework for ActionEnvironment Agency - Anglian Region20 Dec 201123 Feb 2012
MLA/2011/00341
Completed
Application - Removals (inc. Grab Samples)Mersey Gateway Project - Phase 10 Marine Ground Investigation.Halton Borough Council20 Dec 201120 Mar 2012
MLA/2011/00342/1
Completed
Application - ConstructionFerry Way Car Park Retaining Wall ReplacementBorough Of Poole Council20 Dec 201127 Nov 2012
MLA/2011/00343/1
Completed
Application - Construction, Removals (inc. Grab Samples)SABIC Quay Marine Licence ApplicationSabic Uk Petrochemicals Limited20 Dec 201130 Mar 2012
MLA/2011/00345
Completed
Application - Removals (inc. Grab Samples)Savoy Hotel Pier DevelopmentEmu Limited21 Dec 201103 Feb 2012
MLA/2011/00346/2
Completed
Application - ConstructionWimbourne Quay StrengtheningPort Of Blyth22 Dec 201107 Jun 2012
MLA/2011/00348/1
Completed
Application - Dredged Material Disposal, DredgingPort of Boston Maintenance Dredging and DisposalPort Of Boston Limited22 Dec 201123 Apr 2012
MLA/2011/00349/1
Completed
Application - RenewablesOrmonde Offshore Wind Farm Export Cable Remedial Works (Rock Dump)Ormonde Energy Limited22 Dec 201123 Mar 2012
MLA/2011/00350/1
Completed
Application - ConstructionGrand Pier painting worksGrand Pier Limited22 Dec 201116 Nov 2012
MLA/2011/00351
Completed
Application - ConstructionSheerness Lower Camber PontoonPeel Ports Medway23 Dec 201119 Apr 2012
MLA/2011/00352
Completed
Application - ConstructionLondon Eye Pier ExtensionEdf Energy30 Dec 201115 Mar 2012