{include:Teesworks - keywords - menu}

EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:71: Document Ref. 6.2). Specifically, sound propagation associated with UXO explosions

EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:72: to over 10km from the site of potential explosions (see Table 4Table 4.1).

EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:72: explosive charges (where feasible) and the use of Acoustic Deterrent Devices (ADDs).

EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:72: These standard JNCC Guidelines for explosions will be adopted for the Proposed

EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:72:explosives. 10pp.

EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:90: exposure level from underwater explosions in shallow water. The Journal of

EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:125: 51. No explosives for blasting are to be used within 400 metres of any part of the CATS

EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:133: © the use of explosives within 400 metres of the Exolum operations; and

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:10:Explosive Sites

EN010103-001076-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 3 EC1_C.pdf:67:Explosive Sites

EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:73: Document Ref. 6.2). Specifically, sound propagation associated with UXO explosions

EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:73: to over 10km from the site of potential explosions (see Table 4Table 4.1).

EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:74: explosive charges (where feasible) and the use of Acoustic Deterrent Devices (ADDs).

EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:74: These standard JNCC Guidelines for explosions will be adopted for the Proposed

EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:74:explosives. 10pp.

EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:91: exposure level from underwater explosions in shallow water. The Journal of

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:114: explosive site. The Applicants have consulted the operators of the relevant sites and

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:114: fire/explosions, toxic exposure, noxious substances, storms, climate change,

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:115: environment from events such as explosion are relatively low. However, as the

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:116: Development include fires, explosions and the release of CO2. These incidents

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:96: • BS 5908: Fire and explosion precautions at premises handling flammable

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:96: explosion in chemical plants, chemical storage and similar premises

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:255:fields, which can cause blow outs, explosions, fires or other damage, in injury and material damage, chronic damage to health and environmental

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:255:major industrial accident such as fires, explosions, significant damage to

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:273:impacting a sensitive natural environment(2). could be an explosion, a fire or a leak resulting in fatalities or bodily

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:277:explosion, fire, leakage of hazardous products or mass leakage that facilities operated by the Company, formal rules have been set out to

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:283: and procedures for interventions in the event of leaks, fires or explosions

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:290: Company recorded 4 Tier 1 or Tier 2 events due to acts of sabotage or more or less significant consequences (fires, explosions, injuries, etc.), as

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:404: explosion, fire, leakage of hazardous products or mass leakage that might standards include applicable regulatory requirements and refer to

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:405:Tier 2 losses of containment as defined by the American Petroleum of leaks, fires or explosions and that subsidiaries have to test these at

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:405: more or less significant consequences (fires, explosions, injuries, etc.), as TotalEnergies also continued to roll out its Incident Management System

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:449: electricity, explosion hazards (ATEX standard), transportation of

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:595: To prevent the occurrence of a major industrial accident such as an explosion, fire, leakage of

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:596: interventions in the event of leaks, fires or explosions and that subsidiaries have to test these at

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:599:ATEX: explosive atmosphere LNG: liquefied natural gas

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:278: • risks from spills fire, explosion;

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:99:and/or license agreements, and impact on the environment and other hazardous materials, fires, explosions and water

EN010103-001729-Deadline 2 Response to First Written Questions (CATS North Sea Limited).pdf:2: (b) Restrictions on use of explosives for blasting should be restricted over a

EN010103-001020-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP.pdf:22:Potential risks of explosion if

EN010103-001020-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP.pdf:22:explosive gases were to accumulate  Best practice measures will be adopted during construction to

EN010103-001020-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP.pdf:34:  The standard JNCC mitigation measures for explosives, piling and

EN010103-001979-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Tracked) August 2022 (D5).pdf:22:Potential risks of explosion if

EN010103-001979-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Tracked) August 2022 (D5).pdf:22:explosive gases were to accumulate • Best practice measures will be adopted during construction to

EN010103-001979-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Tracked) August 2022 (D5).pdf:38: • The standard JNCC mitigation measures for explosives, piling and

EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf:10:Explosive Sites

EN010103-001086-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 13 EC2_E.pdf:21:Explosive Sites

EN010103-001052-NZT DCO 6.3.125 ES Vol II Figure 22-1 HSE Consultation Zones.pdf:1: HSE Explosive Safeguarding Zone

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:11:Explosive Sites

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:70: Hazardous Part B, Highly Reactive and Explosive Substance, Ethylene oxide, where

EN010103-001085-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 12 EC2_D.pdf:106:Explosive Sites

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:84: • BS 5908: Fire and explosion precautions at premises handling flammable

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:84: explosion in chemical plants, chemical storage and similar premises

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:169: licensed explosive site (Ports licensed site No. required for the Proposed Development and will

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:201: dispersion/explosion/QRA studies or modelling

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:604:Explosives sites

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:604:The proposed development is in the vicinity of a licensed explosive site (Ports licensed site No43). The main site is at some

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:604:relation to the explosives berth.

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1070: dispersion/explosion/QRA studies or modelling been undertaken to inform blast / toxicity radii circles?

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1102:Explosives sites

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1102:The proposed development is in the vicinity of a licensed explosive site (Ports licensed site No43). The

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1102:the proposed structures will lie in relation to the explosives berth.

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1231: EXPLOSIVE SAFEGUARDING ZONES

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1234: EXPLOSIVE SAFEGUARDING ZONES

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1237: EXPLOSIVE SAFEGUARDING ZONES

EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf:26: • BS 5908: Fire and explosion precautions at

EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf:26: and explosion in chemical plants, chemical storage

EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf:35: explosives would occur with prior warning, at management; and

EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf:44: injury to marine mammals whilst using explosives

EN010103-002312-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Tracked Oct 2022 (D9).pdf:74: explosives, piling and geophysical surveys (JNCC,

EN010103-002651-SABIC Protective Provisions 1.pdf:8: 9. No explosives are to be used within the protected land.

EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:123: 51. No explosives for blasting are to be used within 400 metres of any part of the CATS

EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:131: © the use of explosives within 400 metres of the Exolum operations; and

EN010103-001339-NZTDCO 6.3.125 Rev 2 ES Addendum Vol II Figure 22-1 HSE Consultation Zones.pdf:1: HSE Explosive Safeguarding Zone

EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:66: 10km from the site of potential explosions.

EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:67: mammals, sequencing of explosive charges (where feasible) and the use of Acoustic

EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:67:explosives. 10pp.

EN010103-002652-Huntsman Protective Provisions.pdf:7: 9. No explosives are to be used within the protected land.

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:100: 32.—(1) Only when driven or part-driven pile foundations or detonation of explosives are

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:100: location, start and end date of impact pile driving / detonation of explosives to satisfy the

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:100: (b) within 12 weeks of completion of impact pile driving / detonation of explosives,

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:100: information on the locations and dates of impact pile driving / detonation of explosives to

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:114: 32.—(1) Only when driven or part-driven pile foundations or detonation of explosives are

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:114: location, start and end dates of impact pile driving / detonation of explosives to satisfy the

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:114: (b) within 12 weeks of completion of impact pile driving / detonation of explosives,

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:114: information on the locations and dates of impact pile driving / detonation of explosives to

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:141: 65.51. No explosives for blasting are to be used within 400 metres of any part of the CATS

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:149: © the use of explosives within 400 metres of the Exolum operations; and

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:178: 194. No explosives are to be used within the protected land.

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:220: 311. No explosives are to be used within the protected land.

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:10:Explosive Sites

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:77: Hazardous Part B, Highly Reactive and Explosive Substance, Hydrogen, where amount

EN010103-001088-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 15 EC2_G.pdf:92:Explosive Sites

EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf:41:proposition. damage to equipment from a fire or explosion, a from subsidiaries« and the percentage of emissions

EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf:71:as well as fires, explosions or other personal and process safety incidents,

EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf:103: Explosion or release at our facilities

EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf:228:Deepwater Horizon was deployed at the time of the 20 April 2010 explosion and fire and resulting oil spill (the Incident). Lawsuits and claims arising

EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf:228:The vast majority of post-explosion clean-up, medical monitoring and personal injury claims from individuals that either opted out of the Medical

EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf:228:In 2019, the federal district court in New Orleans determined in a series of proceedings that 923 plaintiffs had post-explosion clean-up, medical

EN010103-000825-NZT DCO 3.3 - Funding Statement - Appendix 2.pdf:349:damage to equipment from a fire or explosion, a community impact or The nearest equivalent measure on an IFRS basis for the group is profit or

EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf:10:Explosive Sites

EN010103-001089-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 16 EC2_H.pdf:27:Explosive Sites

EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:69: Document Ref. 6.2). Specifically, sound propagation associated with UXO explosions

EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:69: to over 10km from the site of potential explosions (see Table 4.1).

EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:70: explosive charges (where feasible) and the use of Acoustic Deterrent Devices (ADDs).

EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:70: These standard JNCC Guidelines for explosions will be adopted for the Proposed

EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:70:explosives. 10pp.

EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:86: exposure level from underwater explosions in shallow water. The Journal of

EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:72: Document Ref. 6.2). Specifically, sound propagation associated with UXO explosions

EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:73: to over 10km from the site of potential explosions (see Table 4Table 4.1).

EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:73: explosive charges (where feasible) and the use of Acoustic Deterrent Devices (ADDs).

EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:73: These standard JNCC Guidelines for explosions will be adopted for the Proposed

EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:73:explosives. 10pp.

EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:91: exposure level from underwater explosions in shallow water. The Journal of

EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf:27: • BS 5908: Fire and explosion precautions at

EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf:27: and explosion in chemical plants, chemical storage

EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf:36: explosives would occur with prior warning, at management; and Requirement 23 : UXO Clearance,

EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf:74: explosives, piling and geophysical surveys (JNCC,

EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:120: 51. No explosives for blasting are to be used within 400 metres of any part of the CATS pipeline(s)

EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:128: © the use of explosives within 400 metres of the Exolum operations; and

EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:129: 51. No explosives for blasting are to be used within 400 metres of any part of the CATS

EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:137: © the use of explosives within 400 metres of the Exolum operations; and

EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf:11: underwater explosions is to use the methodology from Soloway and Dahl (2014),

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:134: 51. No explosives for blasting are to be used within 400 metres of any part of the CATS pipeline(s)

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:142: © the use of explosives within 400 metres of the Exolum operations; and

EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:71: Document Ref. 6.2). Specifically, sound propagation associated with UXO explosions

EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:71: to over 10km from the site of potential explosions (see Table 4Table 4.1).

EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:71: explosive charges (where feasible) and the use of Acoustic Deterrent Devices (ADDs).

EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:71: These standard JNCC Guidelines for explosions will be adopted for the Proposed

EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:71:explosives. 10pp.

EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:89: exposure level from underwater explosions in shallow water. The Journal of

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:29: b) Restrictions on use of explosives for blasting should be restricted over a wider area than is

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:11:Explosive Sites pg 59 2

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:72: Explosive Sites

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:72: Explosive Sites

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:73: Hazardous Part B, Highly Reactive and Explosive Substance, Liquid Oxygen, where

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:74: Hazardous Part B, Highly Reactive and Explosive Substance, Hydrogen, where amount

EN010103-001084-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 11 EC2_C.pdf:101:Explosive Sites

EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf:51:7.16.2 Major accidents are incidents such as fires and explosions that could result in

EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf:51: include fire, explosion, toxic release, high rainfall and storm surges from the

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:10:Explosive Sites

EN010103-001075-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 2 EC1_B.pdf:126:Explosive Sites

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:242:• Explosion/Asphyxiation;

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:246:• Ground gas inhalation/explosion risk.

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:282:The greatest hazards posed by methane are those of fire and explosion. The limits of flammability, i.e. the Lower

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:282:Explosion Limit (LEL) and Upper Explosion Limit (UEL), are 5% v/v and 15% v/v respectively. Where methane

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:282:concentrations are encountered between these two ranges there is the possibility of ignition/explosion. However, it is

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:282:can occur bringing it back to within explosive limits.

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:287:Explosives 1,3-Dinitrobenzene mg/kg 82

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:291:Explosives 1,3-Dinitrobenzene mg/kg 82

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:295:Explosives 1,3-Dinitrobenzene mg/kg 82

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:299:Explosives 1,3-Dinitrobenzene mg/kg 82

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:303:Explosives 1,3-Dinitrobenzene mg/kg 82

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:307:Explosives 1,3-Dinitrobenzene mg/kg 82

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:311:Explosives 1,3-Dinitrobenzene mg/kg 82

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:315:Explosives 1,3-Dinitrobenzene mg/kg 82

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:325:Explosives 1,3-Dinitrobenzene µg/L 2#3 <1 <1 - <1 - <1 - <1 <1 <1 <1

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:329:Explosives 1,3-Dinitrobenzene µg/L 2#3 <1 - <1 <1 - - - - - <1 -

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:333:Explosives 1,3-Dinitrobenzene µg/L 2#3 12 0 <1 <1 0.5 0.5 0 0 0

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:337:Explosives 1,3-Dinitrobenzene µg/L <1 <1 - <1 - <1 - <1 <1 <1 <1

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:341:Explosives 1,3-Dinitrobenzene µg/L <1 - <1 <1 - - - - - <1 -

EN010103-001738-NZT DCO 9.8 Appendix GH.1.1b Preliminary Onshore Ground Investigation for GIR Report - June 2022.pdf:345:Explosives 1,3-Dinitrobenzene µg/L 12 0 <1 <1 0.5 0.5 0 0 0

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:45: managed. Any use of controlled explosives would only be undertaken with prior

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:246: 6.2.1 The MMO note that the standard approach for the considering underwater explosions within shallow water. The findings of this

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:246: estimation of noise levels from underwater explosions is to report show that the influence of the bounded underwater wave guide is for

EN010103-001730-Written Representation (CATS North Sea Limited).pdf:10: (b) Restrictions on use of explosives for blasting should be restricted over a wider

EN010103-001730-Written Representation (CATS North Sea Limited).pdf:21: 36” Gas Pipeline Explosion, North Texas June 7, 2010

EN010103-001730-Written Representation (CATS North Sea Limited).pdf:24:4.3 Use of Explosives ………………………………………………………………………………………. 7

EN010103-001730-Written Representation (CATS North Sea Limited).pdf:29:4.3 Use of Explosives

EN010103-001730-Written Representation (CATS North Sea Limited).pdf:29:Before a decision is made to use explosives for blasting within 400 metres of any part of a CATS

EN010103-001730-Written Representation (CATS North Sea Limited).pdf:34: 36” Gas Pipeline Explosion, North Texas June 7, 2010

EN010103-001730-Written Representation (CATS North Sea Limited).pdf:44: 36” Gas Pipeline Explosion, North Texas June 7, 2010

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:33: EVENTS transportation of hydrocarbons and derivatives by sea and land (i.e. fires, explosions, etc.) with damages on people

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:121: of residential customers to switch smoothly from one sup- explosions, blow-outs, fires, oil and gas spills from wells, pi-

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:121: cost of the energy bill. blowout, fire or explosion.

EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:72: 10km from the site of potential explosions.

EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:72: propagation associated with UXO explosions was calculated using a semi-empirical

EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:73: to over 10km from the site of potential explosions (see Table 4Table 5.1).

EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:73: marine mammals, sequencing of explosive charges (where feasible) and the use of

EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:73: Acoustic Deterrent Devices (ADDs). These standard JNCC Guidelines for explosions

EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:73:explosives. 10pp.

EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:90: exposure level from underwater explosions in shallow water. The Journal of

EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:30: parties, and safety lapses. If a major risk materialises, such as an explosion or hydrocarbon leak if an HSSE risk materialises, we avoid catastrophic

EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:30: could have a material adverse effect on our earnings, cash flows and financial condition. as a spill, toxic substances, fire or explosion).

EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf:3:Explosives 1,3-Dinitrobenzene mg/kg 82

EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf:7:Explosives 1,3-Dinitrobenzene mg/kg 82

EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf:11:Explosives 1,3-Dinitrobenzene mg/kg 82

EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf:15:Explosives 1,3-Dinitrobenzene mg/kg 82

EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf:19:Explosives 1,3-Dinitrobenzene mg/kg 82

EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf:23:Explosives 1,3-Dinitrobenzene mg/kg 82

EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf:27:Explosives 1,3-Dinitrobenzene mg/kg 82

EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf:31:Explosives 1,3-Dinitrobenzene mg/kg 82

EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf:41:Explosives 1,3-Dinitrobenzene µg/L 2#3 <1 <1 - <1 - <1 - <1 <1 <1 <1

EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf:45:Explosives 1,3-Dinitrobenzene µg/L 2#3 <1 - <1 <1 - - - - - <1 -

EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf:49:Explosives 1,3-Dinitrobenzene µg/L 2#3 12 0 <1 <1 0.5 0.5 0 0 0

EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf:53:Explosives 1,3-Dinitrobenzene µg/L <1 <1 - <1 - <1 - <1 <1 <1 <1

EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf:57:Explosives 1,3-Dinitrobenzene µg/L <1 - <1 <1 - - - - - <1 -

EN010103-001740-NZT DCO 9.8 Appendix GH.1.1b Appendix I Screening Tables - June 2022.pdf:61:Explosives 1,3-Dinitrobenzene µg/L 12 0 <1 <1 0.5 0.5 0 0 0

EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:67: 10km from the site of potential explosions.

EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:68: mammals, sequencing of explosive charges (where feasible) and the use of Acoustic

EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:68:explosives. 10pp.

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:10:Explosive Sites

EN010103-001083-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 10 EC2_B.pdf:60:Explosive Sites

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:10:Explosive Sites pg 41 1

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:53: Explosive Sites

EN010103-001074-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 1 EC1_A.pdf:80:Explosive Sites

EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:121: 51. No explosives for blasting are to be used within 400 metres of any part of the CATS

EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:129: © the use of explosives within 400 metres of the Exolum operations; and

EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf:6:Unexploded ordnance UXO dropped during 3 5 15 Explosion, injury or fatality Provision of detailed report

EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf:12:Unexploded ordnance UXO dropped during 3 5 15 Explosion, injury or fatality Provision of detailed report

EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf:18:Unexploded ordnance UXO dropped during 3 5 15 Explosion, injury or fatality Provision of detailed report

EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf:24:Unexploded ordnance UXO dropped during 3 5 15 Explosion, injury or fatality Provision of detailed report

EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf:30:Unexploded ordnance UXO dropped during WWII 3 5 15 Explosion, injury or fatality Provision of detailed report

EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:72: Document Ref. 6.2). Specifically, sound propagation associated with UXO explosions

EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:73: to over 10km from the site of potential explosions (see Table 4Table 4.1).

EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:73: explosive charges (where feasible) and the use of Acoustic Deterrent Devices (ADDs).

EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:73: These standard JNCC Guidelines for explosions will be adopted for the Proposed

EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:73:explosives. 10pp.

EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:91: exposure level from underwater explosions in shallow water. The Journal of

EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:3: fuel storage tanks the risk from explosive vapours could be acute, whereas

EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:66: 10km from the site of potential explosions.

EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:67: mammals, sequencing of explosive charges (where feasible) and the use of Acoustic

EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:67:explosives. 10pp.

EN010103-002498-NZT DCO 6.3.125 - ES Vol II Figure 22-1 HSE Consultation Zones Nov 2022 (D12).pdf:1: HSE Explosive Safeguarding Zone

EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:30: manufacture of explosive ordnance

EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:31:UXB Unexploded Bombs – explosive weapons that are unexploded.

EN010103-001978-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Clean) August 2022 (D5).pdf:22:Potential risks of explosion if

EN010103-001978-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Clean) August 2022 (D5).pdf:22:explosive gases were to accumulate • Best practice measures will be adopted during construction to

EN010103-001978-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP (Clean) August 2022 (D5).pdf:35: • The standard JNCC mitigation measures for explosives, piling and

EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:71: Document Ref. 6.2). Specifically, sound propagation associated with UXO explosions

EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:71: to over 10km from the site of potential explosions (see Table 4.1).

EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:71: explosive charges (where feasible) and the use of Acoustic Deterrent Devices (ADDs).

EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:71:explosives. 10pp.

EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:72: These standard JNCC Guidelines for explosions will be adopted for the Proposed

EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:88: from underwater explosions in shallow water. The Journal of the Acoustical Society

EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:66: 10km from the site of potential explosions.

EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:67: mammals, sequencing of explosive charges (where feasible) and the use of Acoustic

EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:67:explosives. 10pp.

EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:68: 10km from the site of potential explosions.

EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:69: mammals, sequencing of explosive charges (where feasible) and the use of Acoustic

EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:69:explosives. 10pp.

EN010103-002309-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Clean) Oct 2022 (D9).pdf:22:Potential risks of explosion if

EN010103-002309-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Clean) Oct 2022 (D9).pdf:22:explosive gases were to accumulate • Best practice measures will be adopted during construction to

EN010103-002309-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Clean) Oct 2022 (D9).pdf:37: • The standard JNCC mitigation measures for explosives, piling and

EN010103-002521-NZT DCO 9.48 - Applicants' Comments on D11 Submissons - Nov 2022 (D12).pdf:27: pile foundations or detonation of explosives are

EN010103-002521-NZT DCO 9.48 - Applicants' Comments on D11 Submissons - Nov 2022 (D12).pdf:27: impact pile driving / detonation of explosives to

EN010103-002521-NZT DCO 9.48 - Applicants' Comments on D11 Submissons - Nov 2022 (D12).pdf:27: explosives, information on the locations and

EN010103-002521-NZT DCO 9.48 - Applicants' Comments on D11 Submissons - Nov 2022 (D12).pdf:27: explosives to satisfy the Marine Noise

EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf:34: of the Installation from the released hydrocarbon (for example from fire or explosion), dispersants may

EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf:52: Fire and explosion Topside vessels and pipework

EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf:66: or explosion), approved dispersants may be used without prior guidance or approval

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:111: and major accident pipelines and also in the vicinity of a licensed explosive site. The

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:111: worst-case environmental consequences/effects (this includes fire/explosions, toxic

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:112: events such as explosion are relatively low. However, as the concentration of CO2 in

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:113: Development include fires, explosions and the release of CO2. These incidents

EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:71: Document Ref. 6.2). Specifically, sound propagation associated with UXO explosions

EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:71: to over 10km from the site of potential explosions (see Table 4.1).

EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:71: explosive charges (where feasible) and the use of Acoustic Deterrent Devices (ADDs).

EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:71: These standard JNCC Guidelines for explosions will be adopted for the Proposed

EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:71:explosives. 10pp.

EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:89: exposure level from underwater explosions in shallow water. The Journal of

EN010103-002384-Marine Management Organistation - Comments on any other information submitted at Deadline 10.pdf:5: explosives are proposed to be used as part of the foundation

EN010103-002384-Marine Management Organistation - Comments on any other information submitted at Deadline 10.pdf:5: detonation of explosives to satisfy the Marine Noise Registry’s

EN010103-002384-Marine Management Organistation - Comments on any other information submitted at Deadline 10.pdf:5: explosives, information on the locations and dates of impact pile

EN010103-002384-Marine Management Organistation - Comments on any other information submitted at Deadline 10.pdf:5: driving / detonation of explosives to satisfy the Marine Noise

EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf:10:Explosive Sites

EN010103-001090-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 17 EC2_I.pdf:23:Explosive Sites

EN010103-002131-NZT DCO 6.3.125 - ES Vol II Figure 22-1 HSE Consultation Zones August 2022 (D6).pdf:1: HSE Explosive Safeguarding Zone

EN010103-000821-NZT DCO 3.3 - Funding Statement - Appendix 7.pdf:31:The UK electricity transmission network is continuing with innovation Infrastructure risk prevention and manhole explosion prevention.

EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf:27: • BS 5908: Fire and explosion precautions at

EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf:27: and explosion in chemical plants, chemical storage

EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf:36: explosives would occur with prior warning, at management; and

EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf:45: injury to marine mammals whilst using explosives

EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf:75: explosives, piling and geophysical surveys (JNCC,

EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf:22:  BS 5908: Fire and explosion precautions at premises handling flammable gases, liquids and

EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf:22: dusts. Code of practice for precautions against fire and explosion in chemical plants,

EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf:28:and Vibration any use of explosives would occur with prior warning, at appropriate times of day and taking Requirement 16: Construction

EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf:35: marine mammals whilst using explosives (JNCC, 2010a) shall be adopted for the Proposed

EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf:61:  The standard JNCC mitigation measures for explosives, piling and geophysical surveys Environmental Management Plan

EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf:10:Explosive Sites

EN010103-001077-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 4 EC1_D.pdf:23:Explosive Sites

EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:10:Explosive Sites pg 64 1

EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:76: Explosive Sites

EN010103-001087-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 14 EC2_F.pdf:95:Explosive Sites

EN010103-001974-Exolum Seal Sands.pdf:2: © the use of explosives within 400 metres of the Exolum operations; and

EN010103-001974-Exolum Seal Sands.pdf:7: © the use of explosives within 400 metres of the Exolum operations; and

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:101: and major accident pipelines and also in the vicinity of a licensed explosive site. The

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:102: worst-case environmental consequences/effects (this includes fire/explosions, toxic

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:102: events such as explosion are relatively low. However, as the concentration of CO2 in

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:103: Development include fires, explosions and the release of CO2. These incidents

EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:68: 10km from the site of potential explosions.

EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:69: mammals, sequencing of explosive charges (where feasible) and the use of Acoustic

EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:69:explosives. 10pp.

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:11:Explosive Sites

EN010103-001079-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 6 EC1_F.pdf:114:Explosive Sites

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:3: lead to asphyxiation, toxic exposure, fires and/or explosions.

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:4: environment from events such as explosion are relatively low. However, as

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:7:major accidents would be suitably assessed, fires/explosions, toxic exposure, noxious

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:9:Development (Gas Connection Corridor) is in of Explosive Safeguarding Zones provided by HSE

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:9:the vicinity of a licensed explosive site. indicates that this only affects the potential

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:11: pose a risk of fire, explosion or an industrial accident, such as chemical

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:14: • Fire or explosion including through disturbance of UXO;

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:17:C-1 Fire/ explosion and risk of Natural gas - disturbance of Risk of fire/ explosion and Consultation with appropriate Yes Yes

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:17: from third party supply Risk of fire/ explosion causes System (CATS) Pipeline and

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:18: leading to fires/ explosions. public off site from fire/ will be installed at the

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:18: explosions; and/ or irreversible construction site, including site

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:19: utilities leading to explosion. standard construction

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:20: explosions. warning lighting to be fitted to

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:21:C-10 Domino effects from incidents Risk of accidental release of Fire/ explosion impact upon It is expected that existing Yes Yes

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:21: explosion at neighbouring of a CEMP at the Proposed

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:22:O-1 Fire/explosion Natural gas – loss of Fire and/or explosion could Design of the natural gas Yes Yes

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:22: an explosion and/or flash fire radiant heat burns and impact (PSR) (HSE, 1996).

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:22: burning back to a jet fire. injuries from explosions.

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:22: explosion and/or fire. areas of unmade ground could Managing the storage

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:31:O-8 Domino effects from incidents Fire and/or explosion, toxic The location of the PCC is on Further details of the potential Yes Yes

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:32: explosions and toxic releases. there will be no consultation

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:33:O-9 Domino effects to Fire and/or explosion, toxic Neighbouring facilities include The PCC has been Yes Yes

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:33: as a fire, explosion or toxic industrial operations so as to

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:35:O-12 Terrorism/arson Fires, explosions. Fires and explosions at the Security measures will be Yes Yes

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:36: subsequent fires, explosions. of significant magnitude could have occurred in the area of

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:36: subsequent fires, explosions. a major accident, harm to Proposed Development will

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:37: subsequent fires, explosions Proposed Development is located in an area which does

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:41: fires, explosions and the release of CO2 gas. These incidents have an

EN010103-002310-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Tracked) Oct 2022 (D9).pdf:22:Potential risks of explosion if

EN010103-002310-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Tracked) Oct 2022 (D9).pdf:22:explosive gases were to accumulate • Best practice measures will be adopted during construction to

EN010103-002310-NZT DCO 6.4.5 - ES Vol III Appendix 5A - Framework CEMP (Tracked) Oct 2022 (D9).pdf:37: • The standard JNCC mitigation measures for explosives, piling and

EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:123: 51. No explosives for blasting are to be used within 400 metres of any part of the CATS

EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:131: © the use of explosives within 400 metres of the Exolum operations; and

EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf:11:Explosive Sites pg 15 1 1

EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf:28: Explosive Sites

EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf:28: Explosive Sites

EN010103-001081-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 8 EC1_H.pdf:37:Explosive Sites

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:92: • BS 5908: Fire and explosion precautions at premises handling flammable

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:92: explosion in chemical plants, chemical storage and similar premises

EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:70: Document Ref. 6.2). Specifically, sound propagation associated with UXO explosions

EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:70: to over 10km from the site of potential explosions (see Table 4.1).

EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:71: explosive charges (where feasible) and the use of Acoustic Deterrent Devices (ADDs).

EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:71: These standard JNCC Guidelines for explosions will be adopted for the Proposed

EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:71:explosives. 10pp.

EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:87: exposure level from underwater explosions in shallow water. The Journal of

EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:123: 51. No explosives for blasting are to be used within 400 metres of any part of the CATS pipeline(s)

EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:131: © the use of explosives within 400 metres of the Exolum operations; and

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:254:fields, which can cause blow outs, explosions, fires or other damage, in injury and material damage, chronic damage to health and environmental

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:254:major industrial accident such as fires, explosions, significant damage to

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:272:impacting a sensitive natural environment(2). could be an explosion, a fire or a leak resulting in fatalities or bodily

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:276:explosion, fire, leakage of hazardous products or mass leakage that facilities operated by the Company, formal rules have been set out to

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:282: and procedures for interventions in the event of leaks, fires or explosions

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:289: Company recorded 4 Tier 1 or Tier 2 events due to acts of sabotage or more or less significant consequences (fires, explosions, injuries, etc.), as

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:403: explosion, fire, leakage of hazardous products or mass leakage that might standards include applicable regulatory requirements and refer to

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:404:Tier 2 losses of containment as defined by the American Petroleum of leaks, fires or explosions and that subsidiaries have to test these at

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:404: more or less significant consequences (fires, explosions, injuries, etc.), as TotalEnergies also continued to roll out its Incident Management System

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:448: electricity, explosion hazards (ATEX standard), transportation of

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:594: To prevent the occurrence of a major industrial accident such as an explosion, fire, leakage of

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:595: interventions in the event of leaks, fires or explosions and that subsidiaries have to test these at

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:598:ATEX: explosive atmosphere LNG: liquefied natural gas

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:98: 32.—(1) Only when driven or part-driven pile foundations or detonation of explosives are

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:99: location, start and end date of impact pile driving / detonation of explosives to satisfy the

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:99: (b) within 12 weeks of completion of impact pile driving / detonation of explosives,

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:99: information on the locations and dates of impact pile driving / detonation of explosives to

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:111: 32.—(1) Only when driven or part-driven pile foundations or detonation of explosives are

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:111: location, start and end dates of impact pile driving / detonation of explosives to satisfy the

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:111: (b) within 12 weeks of completion of impact pile driving / detonation of explosives,

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:111: information on the locations and dates of impact pile driving / detonation of explosives to

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:136: 65. No explosives for blasting are to be used within 400 metres of any part of the CATS

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:144: © the use of explosives within 400 metres of the Exolum operations; and

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:173: 194. No explosives are to be used within the protected land.

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:213: 311. No explosives are to be used within the protected land.

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:21: • the standard JNCC mitigation measures for explosives, piling and geophysical surveys

EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:11:Explosive Sites

EN010103-001078-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 5 EC1_E.pdf:43:Explosive Sites

EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:72: 10km from the site of potential explosions.

EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:72: propagation associated with UXO explosions was calculated using a semi-empirical

EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:73: to over 10km from the site of potential explosions (see Table 4Table 4.1).

EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:73: marine mammals, sequencing of explosive charges (where feasible) and the use of

EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:73: Acoustic Deterrent Devices (ADDs). These standard JNCC Guidelines for explosions

EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:73:explosives. 10pp.

EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:90: from underwater explosions in shallow water. The Journal of the Acoustical Society

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:236: operations, which can cause blow outs, explosions, fires or other Ethical misconduct or non-compliance of the Group, its

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:236: a major industrial accident such as fires, explosions, significant damage criminal and civil proceedings and be damaging to its

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:251:3.6.2.1 Safety, health and the environment could be an explosion, a fire or a leak resulting in fatalities or bodily

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:255:an explosion, fire, leakage of hazardous products or mass leakage that

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:261:Supplier database. A brochure explaining these principles in detail is for interventions in the event of leaks, fires or explosions and to test them

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:266: or less significant consequences (fires, explosions, injuries, etc.), as defined by the

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:364: Latin America 3.3 3.8 3.5 electricity, explosion hazards (ATEX standard), transportation of

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:371:explosion, fire, leakage of hazardous products or mass leakage that identification of safety critical equipment for special monitoring,

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:371:related to the Group’s industrial operations at each operated site subject or less significant consequences (fires, explosions, injuries, etc.), as defined by the

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:371: explosions and to test these at regular intervals. The intervention teams at

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:490: To prevent the occurrence of a major industrial accident such as an explosion, fire, leakage of hazardous products

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:491: draw up plans and procedures for interventions in the event of leaks, fires or explosions and to test these at regular

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:189: Reactive and Explosive Substance,

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:190: Explosive Substance, Liquid Oxygen, where

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:190: Explosive Substance, Hydrogen, where amount

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:196: Part B, Highly Reactive and Explosive

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:196: Part B, Highly Reactive and Explosive

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:219: synthetic ammonia for production of explosives during World War I,

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:220: produce of petroleum refining. In 1959 a serious explosion occurred in

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:230: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Mild n/a n/a

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:232: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Mild n/a n/a

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:233: 4. Explosion / Asphyxiation

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:234: 4. Explosion / Asphyxiation

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:235: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Minor n/a n/a

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:238:LRO) 4. Explosion / Asphyxiation

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:239: 4. Explosion / Asphyxiation General Public (off-site) (1) None n/a n/a

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:240: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Minor n/a n/a

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:242: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Minor n/a n/a

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:248: of the ground it should be assumed that toxic, asphyxiating or explosive

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:248: development of explosive or oxygen deficient atmospheres in confined

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:261:Unexploded Unexploded bombs (UXB) remaining 3 5 15 Explosion, injury or fatality (site Provision of detailed report for site from

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:265:Unexploded Unexploded bombs (UXB) remaining 3 5 15 Explosion, injury or fatality (site Provision of detailed report for site from

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:268:Unexploded Unexploded bombs (UXB) remaining 3 5 15 Explosion, injury or fatality (site Provision of detailed report for site from

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:271:Unexploded Unexploded bombs (UXB) remaining 3 5 15 Explosion, injury or fatality (site Provision of detailed report for site from

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:275:Unexploded Unexploded bombs (UXB) remaining 3 5 15 Explosion, injury or fatality (site Provision of detailed report for site from

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:77: • BS 5908: Fire and explosion precautions at premises handling flammable

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:77: explosion in chemical plants, chemical storage and similar premises

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:11:Explosive Sites

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:130: Hazardous Part B, Highly Reactive and Explosive Substance, Ammonium nitrate in

EN010103-001080-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 7 EC1_G.pdf:215:Explosive Sites

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:100:and/or license agreements, and impact on the environment and other hazardous materials, fires, explosions and water

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:1:Table 14-8: Fish Sensitivity Thresholds for Fish for Explosions

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:1:Table 14-10: Fish Impact Zones for UXO Explosions …………………………………… 14-66

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:2:Table 14-15: Marine Mammal Impact Zones* For Explosions (UXO Detonation) 14-73

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:44:14.5.14 The standard JNCC mitigation measures for explosives and geophysical

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:63:14.6.73 The sound propagation for UXO explosions has been calculated using the

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:64:UXO explosions – Impulsive 289 (peak) 10 Soloway and Dahl

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:66: explosions (e.g. UXO detonation) and continuous sound sources, which

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:66:14.6.84 With the exception of explosions, the only impulsive sound source generated

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:66:14.6.85 There are however, thresholds for explosions, shown in Table 14-8, which are

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:67:Table 14-8: Fish Sensitivity Thresholds for Fish for Explosions (UXO

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:68: Modelling Results and Assessment for Fish – Explosions (UXO

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:68: may occur as a result of explosions (Table 14-10). Predicted distances can

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:68:Table 14-10: Fish Impact Zones for UXO Explosions

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:68: Standard JNCC mitigation measures for using explosives shall be applied in

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:70: abandonment. In some circumstances, sound from explosions or some

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:71: circumstances, sound from explosions or military sonar, have been

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:75:Table 14-15: Marine Mammal Impact Zones* For Explosions (UXO Detonation)

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:75: Potential impact zones determined on the basis of SPL to reflect only 1 pulse per explosion

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:75:14.6.118 The standard JNCC Guidelines for explosions (JNCC, 2010) shall be

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:76: explosions, JNCC, 2010) elsewhere, the effects to pinnipeds from underwater

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:119: mammals from using explosives. Peterborough: JNCC.

EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:71: Document Ref. 6.2). Specifically, sound propagation associated with UXO explosions

EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:71: to over 10km from the site of potential explosions (see Table 4.1).

EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:72: explosive charges (where feasible) and the use of Acoustic Deterrent Devices (ADDs).

EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:72: These standard JNCC Guidelines for explosions will be adopted for the Proposed

EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:72:explosives. 10pp.

EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:90: exposure level from underwater explosions in shallow water. The Journal of

EN010103-002022-UK Health Security Agency's - Responses to the ExA's ExQ2.pdf:2:project. Common scenarios have been considered by the applicant, such as fire/explosions,

EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf:26: • BS 5908: Fire and explosion precautions at

EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf:26: and explosion in chemical plants, chemical storage

EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf:35: explosives would occur with prior warning, at management; and Condition 23 : UXO Clearance,

EN010103-002311-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Clean Oct 2022 (D9).pdf:73: explosives, piling and geophysical surveys (JNCC,

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:27:C-1 Fire/ explosion Multiple manufactured hydrocarbon Asphyxiation risk and toxic effects Use of Sembcorp Safe Systems of Yes Yes

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:29:O-9 Domino Fire and/or explosion, toxic Inside the tunnel, CO2 being heavier The proposed CO2 Gathering Yes Yes

EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:10:Explosive Sites

EN010103-001082-NZT DCO 6.4.12 ES Vol III Appendix 10A Annex B Part 9 EC2_A.pdf:46:Explosive Sites

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:10: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Mild n/a n/a

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:12: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Mild n/a n/a

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:13: 4. Explosion / Asphyxiation

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:14: 4. Explosion / Asphyxiation

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:15: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Minor n/a n/a

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:18: 4. Explosion / Asphyxiation General Public (off-site) (1) None n/a n/a

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:20: 4. Explosion / Asphyxiation

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:20: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Minor n/a n/a

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:22: 4. Explosion / Asphyxiation General Public (off-site) (1,2) Minor n/a n/a

EN010082-000499-_DOC_40066269(1)_DEADLINE 2_ EM v2 (Formatted - Clean).pdf:22: such as fire or explosion following loss of containment of natural gas, has

EN010082-000377-2.1 - Tees CCPP - Draft DCO with proposed change - tracked Rev 2.pdf:22:populations or major hazard installations, including fire or explosion following loss of

EN010082-000520-8.46 - DOC_140207101(1)_DCO changes summary.pdf:10: local populations or major hazard installations, including fire or explosion following loss of the proposed activities and taking appropriate measures to manage and control the risks,

EN010082-000496-_CONSENTORDER_40063542(1)_DEADLINE 2_ DCOv2.pdf:21:populations or major hazard installations, including fire or explosion following loss of

EN010082-000551-8.54 - Explanatory Memorandum - Tracked (v3).pdf:24: hazards, such as fire or explosion following loss of containment of

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:72: a loss of containment of natural gas and a subsequent explosion. To prevent this,

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:72: before there was a risk of explosion.

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:72: lower explosive limit by airflow from the forced ventilation system. Forced ventilation

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:86: CCPP, with the potential to impact on local populations, gas and a subsequent explosion. To prevent this, the gas

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:86: to vapour gas explosion, jet fire or flash fire. These may would be detected by installed gas detectors that provide

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:86: Applicant should provide such information before the the gas system, before there was a risk of explosion.

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:86: HSC would be required. diluted below the lower explosive limit by airflow from the

EN010082-000480-HSE D3 Submission.pdf:1:Major Hazards Policy – Chemicals & Land Use Planning I Chemicals, Explosives & Microbiological Hazards

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:7:Explosive Sites

EN010082-000195-EN010082-6.3.5-ES Annex D2-Envirocheck-Final-November 2017.pdf:87:Explosive Sites

EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf:7: explosion, jet fire or flash fire. These may in turn escalate to adjacent plant. HSE suggests that the Applicant This will be addressed

EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf:9: explosive incident.

EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf:10: containment may give rise to vapour gas explosion, jet fire or flash fire. These may in turn escalate to natural gas;

EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf:14: a ”major accident” as an occurrence such as a major emission, fire, or explosion

EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf:15: occurrence such as a major emission, fire, or explosion

EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf:16: to cause harm (for example a gas leak to ignite, causing an explosion with

EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf:20: the primary hazards of fire, explosion and fumes leading to a secondary toxic

EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf:20: or explosion.

EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf:22: of natural gas and a subsequent explosion. To prevent this, the gas turbines

EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf:22: lower explosive limit by airflow from the forced ventilation system. Forced

EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf:22:15.63 In the event that there is a larger gas leak that exceeds the lower explosive

EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf:22: was a risk of explosion.

EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf:23: Gas transmission pipelines Pipeline rupture Potential for fire / explosion Maintenance of an easement Line will only contain gas

EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf:25: Large gas leak Explosion or gas fire Injury or fatality to a GT design to include

EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf:25: Small gas leak causing gas Explosion or gas fire Injury or fatality to a GT design to include forced

EN010082-000186-EN010082-6.2.15-ES Chapter 15-Major Accidents-Final-November 2017.pdf:25: team or member of the below lower explosive limit

EN010082-000369-2.1 - Tees CCPP - Draft DCO with proposed change - clean Rev 2.pdf:22:populations or major hazard installations, including fire or explosion following loss of

EN010082-000497-_DOC_40064625(1)_DEADLINE 2_ DCO showing changes.pdf:23:local populations or major hazard installations, including fire or explosion following loss of

EN010082-000144-EN010082-2.1-Draft Development Consent Order-Final-November 2017.pdf:20:hazard installations, including fire or explosion following loss of containment of natural gas, accompanied by

EN010082-000498-_DOC_40066241(1)_DEADLINE 2_ EM v2 (Formatted - Tracked).pdf:22: such as fire or explosion following loss of containment of natural gas, has

EN010082-000427-HSE Response to Deadline 2.pdf:1:Land Use Planning Policy, Chemicals, Explosives & Microbiological Hazards Division, Health and Safety Executive.

EN010082-000475-The Applicant's Cover letter_Redacted.pdf:3:gas containment may give rise to vapour cloud explosion, jet fire or flash fire. These may in turn

EN010082-000519-8.45 - CONSENTORDER_150335454(1)_DEADLINE 4_ DCOv3.pdf:21:populations or major hazard installations, including fire or explosion following loss of

EN010082-000145-EN010082-2.2-Explanatory Memorandum-Final-November 2017.pdf:22: such as fire or explosion following loss of containment of natural gas, has

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:66:Major Hazards Policy – Chemicals & Land Use Planning I Chemicals, Explosives & Microbiological Hazards Division I Health and Safety Executive.

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:29:Ground,  Explosion risks through accumulation of gases in

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:44: Explosive Sites

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:105:Explosive Sites

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:128: Explosive Sites

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:171: Hazardous Part B, Highly Reactive and Explosive Substance, Hydrogen, where amount

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:181:Explosive Sites

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:204: Explosive Sites

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:220:Explosive Sites

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:244: Explosive Sites

TR030002-000469-Section 6 App 6.3 Land Quality Preliminary Risk Assessment.pdf:253:Explosive Sites

TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:106: 14. No explosives should be used within the vicinity of the pipeline corridor.

TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:130: and any breakout of molten metal may result in a large explosion. Further, there is potential for a

TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:130: there is a risk of breakouts of molten metal causing explosions

TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:140: The risk of breakouts from the torpedo wagons which may result in explosions.

TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:141:Explosions are caused if the escaping metal comes into contact with confined moisture. This generates

TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:141:superheated steam which causes explosions throwing up molten metal and debris potentially 300m into

TR030002-000778-151009 TR030002 Tata Steel UK Limited and Others.pdf:141:the air if it cannot escape quickly. In practice explosions would result if molten metal landed on moist clay

TR030002-000872-York Potash Ltd 1.pdf:29:immediately to form a jet fire or pool fire, or if there is delayed ignition, a vapour cloud explosion is

TR030002-000460-Section 3 App 3.1 Waste management.pdf:55: 2.2 H1 Explosive ……………………………………………………………………………………………………………… 13

TR030002-000460-Section 3 App 3.1 Waste management.pdf:61:H1 Explosive Not appropriate for silt

TR030002-000460-Section 3 App 3.1 Waste management.pdf:68: “Explosive”: substances and preparations which may explode under the effect of flame or

TR030002-000460-Section 3 App 3.1 Waste management.pdf:68: H1 Explosive

TR030002-000460-Section 3 App 3.1 Waste management.pdf:69:2.2 H1 Explosive

TR030002-000460-Section 3 App 3.1 Waste management.pdf:69: considered as an explosive for the hazardous property to apply.

TR030002-000460-Section 3 App 3.1 Waste management.pdf:70: (REACH) (known as the ‘Test methods for REACH’). Tests for explosive can be found in

TR030002-000460-Section 3 App 3.1 Waste management.pdf:70: Section A14: Explosive Properties. The approach in WM2 is to take a worst-case desk top

TR030002-000460-Section 3 App 3.1 Waste management.pdf:70: extreme risk of explosion by shock, friction, fire or other sources of ignition, then the waste is

TR030002-000460-Section 3 App 3.1 Waste management.pdf:70: considered explosive, unless test methods (carried out in accordance with Section A14)

TR030002-000460-Section 3 App 3.1 Waste management.pdf:70: demonstrate that the waste as a whole is not explosive.

TR030002-000460-Section 3 App 3.1 Waste management.pdf:70: explosive, given it has existed in a marine environment. There has been no indication of any

TR030002-000460-Section 3 App 3.1 Waste management.pdf:70: site history that would give rise to suspect contamination by explosive substances at

TR030002-000460-Section 3 App 3.1 Waste management.pdf:70: concentrations that would render the silt explosive. On this basis, the assessment against H1

TR030002-000460-Section 3 App 3.1 Waste management.pdf:70: as explosive or having explosive properties. If there is any unexploded ordinance within the silt

TR030002-000460-Section 3 App 3.1 Waste management.pdf:70: fact that there are no specific explosive substances within the silt at concentrations that give

TR030002-000460-Section 3 App 3.1 Waste management.pdf:79:• R1 Explosive when dry

TR030002-000460-Section 3 App 3.1 Waste management.pdf:79:• R4 Forms very sensitive explosive metal compounds

TR030002-000460-Section 3 App 3.1 Waste management.pdf:79:• R5 Heating may cause explosion

TR030002-000460-Section 3 App 3.1 Waste management.pdf:79:• R6 Explosive with or without contact with air

TR030002-000460-Section 3 App 3.1 Waste management.pdf:79:• R16 Explosive when mixed with oxidising material

TR030002-000460-Section 3 App 3.1 Waste management.pdf:79:• R18 In use may form flammable/explosive vapour-air mixture

TR030002-000460-Section 3 App 3.1 Waste management.pdf:79:• R19 May form explosive peroxides

TR030002-000460-Section 3 App 3.1 Waste management.pdf:79:• R44 Risk of explosion if heated under confinement

TR030002-000460-Section 3 App 3.1 Waste management.pdf:83:H1 Explosive Not appropriate for a soil

TR030002-000460-Section 3 App 3.1 Waste management.pdf:87:H1 Explosive

TR030002-000479-Section 10 App 10.2 Terrestrial ecology survey reports.pdf:71:Acer pseudoplatanus. Because of the risk of fire and explosion photography is not

TR030002-000801-Document 6.8B - Governance Tracker.pdf:16:  Avoid explosive blasting, using appropriate manual or mechanical alternatives where

TR030002-000895-160113_TR03002_Draft DCO (Comparite with First Draft DCO (Document 4.1)).pdf:83: 12. No explosives shouldmust be used within the vicinityprotected land.

TR030002-000470-Section 6 App 6.4 CEMP.pdf:25:  Avoid explosive blasting, using appropriate manual or mechanical alternatives where possible.

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:213: and there will be noise from explosions. I support plan to realign Swindale

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:72:degrades. Methane can present a risk of fire and explosion. Carbon dioxide can present a risk of

TR030002-000750-Document 4.1A Draft DCO (Tracked).pdf:76: 11.14. No explosives should be used within the vicinity of the pipes without prior consultation

TR030002-000710-York Potash Limited (Document 6.8A).pdf:17:  Avoid explosive blasting, using appropriate manual or mechanical alternatives where

TR030002-000790-150821 TR030002 CATS Parties Protective Provisions.pdf:9:11. No explosives must be used within the protected land.

TR030002-000725-York Potash Limited (Document 6.10).pdf:23:  Avoid explosive blasting, using appropriate manual or mechanical alternatives where possible.

TR030002-000869-151216 TR030002 Tata Steel UK and Redcar Bulk Terminal - Comments on ExA_s dDCO.pdf:12: 12. No explosives must be used within the protected land.

TR030002-000861-SABIC UK Petrochemicals Limited.PDF:17: 12. No explosives must be used within the protected land.

TR030002-000861-SABIC UK Petrochemicals Limited.PDF:50: 12. No explosives must be used within the protected land.

TR030002-000769-York Potash Ltd (2).pdf:73: 14. No explosives should be used within the vicinity of the pipeline corridor.

TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:17: 12. No explosives must be used within the protected land.

TR030002-000858-Huntsman Polyurethanes (UK) Limited.PDF:50: 12. No explosives must be used within the protected land.

TR030002-000689-York Potash Ltd (4).pdf:22: 11. No explosives must be used within the protected land.

TR030002-000689-York Potash Ltd (4).pdf:34: 11. No explosives must be used within the protected land.

TR030002-001865-The York Potash Harbour Facilities Order 2016 - Tracked Changes showing non-material amendments.pdf:71: 12. No explosives are to be used within the protected land.

TR030002-000564-Doc 6.8 Governance Tracker.pdf:16:  Avoid explosive blasting, using appropriate manual or mechanical alternatives where

TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:17: 12. No explosives must be used within the protected land.

TR030002-000862-INEOS UK SNS Limited (INEOS) - formerly DEA UK SNS Limited (DEA).PDF:50: 12. No explosives must be used within the protected land.

TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:36: Explosives

TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:36: The proposed York Potash Harbour Facilities development does not impinge on the separation distances of explosives

TR030002-001855-Development Consent Order as made by the Secretary of State.pdf:73: 12. No explosives are to be used within the protected land.

TR030002-000732-DEA UK SNS Limited (Written Representation).pdf:26: 6.13.15 Paragraph 11 provides a restriction on the use of explosives “in the vicinity of the

TR030002-000732-DEA UK SNS Limited (Written Representation).pdf:26: envisage no circumstance in which explosives could or should be used anywhere near

TR030002-000732-DEA UK SNS Limited (Written Representation).pdf:26: consider that the use of explosives should be prohibited.

TR030002-000898-160113_TR030002_Draft Development Consent Order (Tracked).pdf:80: 12. No explosives must be used within the protected land.

TR030002-001856-Examining Authority’s Recommendation Report.pdf:291: 12. No explosives must be used within the protected land.

TR030002-000854-York Potash Limited - Document 4.1D - Draft Development Consent Order (Tracked).pdf:82: 11.12. No explosives must be used within the protected land.

TR030002-000693-151120 TR030002 Tata Steel - covering email.pdf:17:11. No explosives must be used within the protected land.

TR030002-000863-York Potash Limited - Document 4.1D - Draft Development Consent Order (Clean).pdf:81: 12. No explosives must be used within the protected land.

TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf:23: 6.13.15 Paragraph 11 provides a restriction on the use of explosives “in the vicinity of the

TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf:23: envisage no circumstance in which explosives could or should be used anywhere near

TR030002-000741-Huntsman Polyurethanes (IK) Limited (2).pdf:23: consider that the use of explosives should be prohibited.

TR030002-000735-Applicant response to First Questions - Appendix 4.pdf:25: structure. The risk of an explosive or asphyxiating atmosphere

TR030002-000840-Document 4.1C - Draft Development Consent Order (Tracked).pdf:81: 24.11. No explosives shouldmust be used within the vicinity of the pipeline corridorprotected

TR030002-000839-Huntsman Polyurethanes (UK) Ltd - Deadline 4 Submission.pdf:13:11. No explosives must be used within the protected land.

TR030002-000448-ES Section 13 Air quality.pdf:27: x Avoid explosive blasting, using appropriate manual or mechanical alternatives.

TR030002-000771-York Potash Ltd (3).pdf:73: 14. No explosives should be used within the vicinity of the pipeline corridor.

TR030002-000868-CATS Parties - young lady report.pdf:50: loss of buoyancy due to gas aerated water, or by fire or explosion, and result in an

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:26:injury or fatality are primarily based on studies of blast injury at close range to explosives with an

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:45:Bebb A H and Wright H C. (1953). Injury to animals from underwater explosions. Medical

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:45:Bebb A H and Wright H C. (1954a). Lethal conditions from underwater explosion blast. RNP

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:45:Bebb A H and Wright H C. (1954b). Protection from underwater explosion blast. III. Animal

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:45:Bebb A H and Wright H C. (1955). Underwater explosion blast data from the Royal Navy

TR030002-000826-York Potash Ltd (2).pdf:43: and any breakout of molten metal may result in a large explosion. Further, there is potential for a

TR030002-000826-York Potash Ltd (2).pdf:43:• there is a risk of breakouts of molten metal causing explosions

TR030002-000826-York Potash Ltd (2).pdf:51:• The risk of breakouts from the torpedo wagons which may result in explosions.

TR030002-000826-York Potash Ltd (2).pdf:51:Explosions are caused if the escaping metal comes into contact with confined moisture. This generates

TR030002-000826-York Potash Ltd (2).pdf:51:superheated steam which causes explosions throwing up molten metal and debris potentially 300m into

TR030002-000826-York Potash Ltd (2).pdf:51:the air if it cannot escape quickly. In practice explosions would result if molten metal landed on moist clay

TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf:23: 6.13.15 Paragraph 11 provides a restriction on the use of explosives “in the vicinity of the

TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf:23: envisage no circumstance in which explosives could or should be used anywhere near

TR030002-000742-SABIC UK Petrochemicals Limited 2.pdf:23: consider that the use of explosives should be prohibited.

TR030002-000836-DEA UK SNS Limited - Deadline 4 Submission.pdf:13:11. No explosives must be used within the protected land.

TR030002-000894-160113_TR030002 Draft DCO (Comparite with Deadline 4 Draft DCO (Document 4.1C)).pdf:81: 10.12. No explosives must be used within the protected land.

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:70:degrades. Methane can present a risk of fire and explosion. Carbon dioxide can present a risk of

TR030002-000670-Doc 6.1 Consultation Statement - Main Text.pdf:70: explosives licensed site at Tees Port.

TR030002-000756-Document 8.3 Appendix 5 - Shipping Notes Part 3.pdf:16: Gas leaks – Explosion risk

TR030002-000754-Document 4.1A Draft DCO (Clean).pdf:73: 14. No explosives should be used within the vicinity of the pipeline corridor.

TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:106: • To dilute and remove toxic and/or, explosive gases that may be present in the strata

TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:113: • Gas inrush resulting in asphyxia and/ or an explosion.

TR030002-000576-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 1.pdf:191: 1991) at Boulby Mine and in certain areas can outburst with explosive force as the

TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:22: 12. No explosives must be used within the protected land.

TR030002-000856-151216 TR030002 York Potash Ltd - Document 8.10 - Schedule of Changes to the Draft DCO.pdf:42: 12. No explosives must be used within the protected land.

TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:37: and any breakout of molten metal may result in a large explosion. Further, there is potential for a

TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:37:• there is a risk of breakouts of molten metal causing explosions

TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:44:• The risk of breakouts from the torpedo wagons which may result in explosions.

TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:45:Explosions are caused if the escaping metal comes into contact with confined moisture. This generates

TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:45:superheated steam which causes explosions throwing up molten metal and debris potentially 300m into

TR030002-000760-Document 8.3 Appendix 3 - Constructability Notes.pdf:45:the air if it cannot escape quickly. In practice explosions would result if molten metal landed on moist clay

TR030002-000857-151216 TR030002 York Potash Ltd - Document 6.10A - Outline Construction Environmental Management Plan.pdf:24:  Avoid explosive blasting, using appropriate manual or mechanical alternatives where possible.

TR030002-000820-Document 4.1C - Draft Development Consent Order (Clean).pdf:77: 11. No explosives must be used within the protected land.

TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:53: explosive force as the seam is mined. Where faulting is present in an

TR030002-000838-SABIC UK Petrochemicals Ltd - Deadline 4 Submission.pdf:13:11. No explosives must be used within the protected land.

TR030002-000512-Doc 6.6 App 6.2 In combination HGV.pdf:2:Sinking Explosives Explosives 0 0 0 0 0 0 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16

TR030002-000512-Doc 6.6 App 6.2 In combination HGV.pdf:7:Sinking Explosives Explosives 0 0 0 0 0 0 0 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 0 0 0 0 0 0 0 0 0 0 0 0 0

TR030002-000512-Doc 6.6 App 6.2 In combination HGV.pdf:9:Shaft Explosives Explosives 0 0 0 0 0 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0

TR030002-000512-Doc 6.6 App 6.2 In combination HGV.pdf:11:Sinking Explosives Explosives 0 0 0 0 0 0 0 8 8 8 8 8 8 8 8 8 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

TR030002-000371-141125_York_Potash_ExAs_Draft_DCO.PDF:81: 11. No explosives must be used within the protected land.

TR030002-000427-Doc 4.1 Draft DCO (including requirements).pdf:54: 11.No explosives should be used within the vicinity of the pipes without prior consultation with

TR030002-000897-160113_TR03002_Draft Development Consent Order (Clean).pdf:80: 12. No explosives must be used within the protected land.

TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:21:Professional experience − Gas leak, gas explosion (industry, onshore)

TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:21: hazardous materials (toxic, flammable, explosive) > 2009 to date (Netherlands).

TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:21:− National Safety Board: fire at Chemie-Pack, explosion at Business case opportunities and employability in the field of

TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:22:2015 Lecturer at Copla NL (Safety, Fire and Explosion).

TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:25:temperature, and fire and explosion safety. defined risk acceptance criteria, and evaluate mitigation

TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:25:the completed installation, but also the risks during evacuation and rescue analysis (EERA), fire and explosion

TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:26:■ Preparing explosion safety documents in compliance

TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:26: toxic and flammable gasses, fires and explosions, using

TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:27:The effects of incidents will range from toxic clouds to fire n toxic and flammable materials, fires and explosions, and

TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:27:radiation and explosions. Fires can include pool fires, tank the size of and concentrations in a toxic cloud released

TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:27:vapour explosions). n liquid, forming a pool and evaporating slowly over time

TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:28:n explosions in confined areas (eg, an offshore platform) planning and transport and water.

NGCT_Final_ES at KK with figs.pdf:6: 8.1.4 Explosive site 231

NGCT_Final_ES at KK with figs.pdf:260:8.1.4 Explosive site

NGCT_Final_ES at KK with figs.pdf:260: 1. The site of the existing TCT 1 is noted to store explosive materials.

IBPB8270R001F01_EIA REPORT(2).pdf:527:injury or fatality are primarily based on studies of blast injury at close range to explosives with an

IBPB8270R001F01_EIA REPORT(2).pdf:546:Bebb A H and Wright H C. (1953). Injury to animals from underwater explosions. Medical

IBPB8270R001F01_EIA REPORT(2).pdf:546:Bebb A H and Wright H C. (1954a). Lethal conditions from underwater explosion blast. RNP

IBPB8270R001F01_EIA REPORT(2).pdf:546:Bebb A H and Wright H C. (1954b). Protection from underwater explosion blast. III. Animal

IBPB8270R001F01_EIA REPORT(2).pdf:546:Bebb A H and Wright H C. (1955). Underwater explosion blast data from the Royal Navy

IBPB8270R001F01_EIA REPORT.pdf:527:injury or fatality are primarily based on studies of blast injury at close range to explosives with an

IBPB8270R001F01_EIA REPORT.pdf:546:Bebb A H and Wright H C. (1953). Injury to animals from underwater explosions. Medical

IBPB8270R001F01_EIA REPORT.pdf:546:Bebb A H and Wright H C. (1954a). Lethal conditions from underwater explosion blast. RNP

IBPB8270R001F01_EIA REPORT.pdf:546:Bebb A H and Wright H C. (1954b). Protection from underwater explosion blast. III. Animal

IBPB8270R001F01_EIA REPORT.pdf:546:Bebb A H and Wright H C. (1955). Underwater explosion blast data from the Royal Navy

Licence Document (Marine).pdf:16:5.2.8 Information on the expected location, start and end dates of impact pile driving/detonation of explosives must be

Licence Document (Marine).pdf:18:5.2.17 The exact locations and dates of impact pile driving/detonation of explosives must be submitted to the Marine Noise

Licence Document (Marine).pdf:18: pile driving/detonation of explosives carried out in the previous year within 12 weeks of completion of impact pile driving/

Licence Document (Marine).pdf:18: detonation of explosives.

Returns.pdf:3: of explosives must be submitted to the Marine Noise Registry, in order to satisfy the

Returns.pdf:4:Open The exact locations and dates of impact pile driving/detonation of explosives must be

Returns.pdf:4: explosives carried out in the previous year within 12 weeks of completion of impact pile

Returns.pdf:4: driving/detonation of explosives.The MMO must be notified of the successful submission

3 EIS Appendices (3).pdf:44: a) From explosions, spillages e.g. oil and ballast discharge, fires or from the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:35: • Use of explosives.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:393: • Avoid explosive blasting, using appropriate manual or mechanical alternatives.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:35: • Use of explosives.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:393: • Avoid explosive blasting, using appropriate manual or mechanical alternatives.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:283: accumulation in Explosion Low Risk however, no other buildings will be constructed on

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:171: fire and explosion, except where they can be a consequence of a navigation hazard.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: and explosion. term suspension of operations,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: and explosion. of revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: and explosion. services with ensuing loss prolonged restrictions, and/or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: and explosion. of revenue. restrictions, and/or termination

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:210: explosion. of revenue. revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:210: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:210: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:211: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:211: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:211: operation) explosion. services with ensuing loss

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: and explosion. of revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: and explosion. of revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: and explosion. of revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: and explosion. of revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: and explosion. to services with ensuing disruption to commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: and explosion. activities and/or prolonged

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: and explosion. services with ensuing loss revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: and explosion. minor disruption to commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: and explosion. services with ensuing loss revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: and explosion. disruption to commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: and explosion. disruption to commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: and explosion. revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: and explosion. of revenue. disruption to commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: and explosion. revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:217: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: and explosion. termination of commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: and explosion. services with ensuing loss revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: and explosion. termination of commercial

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:219: and explosion. services with ensuing loss revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:219: Fire and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:219: Fire and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: Fire and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: Fire and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: Fire and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:221: explosion. ensuing loss of revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:221: explosion. ensuing loss of revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: Fire and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: and explosion. of revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: and explosion. services with ensuing loss

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: Fire and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: and explosion. of revenue. termination of commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: Fire and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:227: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:227: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:227: explosion. services with ensuing loss commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: and explosion. of revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: and explosion. of revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: and explosion. of revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: and explosion. of revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: and explosion. to services with ensuing disruption to commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: and explosion. and/or prolonged restrictions.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: explosion. services with ensuing loss

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: and explosion. to commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: explosion. services with ensuing loss

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: and explosion. commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:233: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: and explosion. commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: explosion. services with ensuing loss

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: and explosion. commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: explosion. services with ensuing loss

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: Fire and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: Fire and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: Fire and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: Fire and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: Fire and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:237: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:237: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:239: Fire and explosion. operations, prolonged restrictions, and/or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:239: Fire and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: Fire and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: Fire and explosion. of revenue. termination of commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: Fire and explosion. services with ensuing loss of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: Fire and explosion. of revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: Fire and explosion. of revenue. commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: Dredgers) visibility. Fire and explosion. with ensuing loss of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: Fire and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: operation) Fire and explosion. term disruption to services disruption to commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: and explosion. of revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: and explosion. with ensuing loss of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: and explosion. to services with ensuing loss activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: and explosion. services with ensuing loss of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: and explosion. activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: and explosion. to services with ensuing loss

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: and explosion. to services with ensuing loss

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: and explosion. to services with ensuing loss

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: and explosion. with ensuing loss of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:249: and explosion. termination of commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:252: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:252: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:252: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:253: Fire and explosion. revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:253: Fire and explosion. revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: explosion. term disruption to services

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: explosion. Very short-term disruption to Long-term suspension of operations,

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: explosion. revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: explosion. revenue. of commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: and explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: operation) explosion. services with ensuing loss of activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: explosion. revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: explosion. revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: explosion. revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: explosion. revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: explosion. commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: explosion. with ensuing loss of revenue. restrictions.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: explosion. with ensuing loss of revenue. commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: explosion. commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: explosion. with ensuing loss of revenue. termination of commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: explosion. with ensuing loss of revenue. commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: explosion. services with ensuing loss of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: explosion. with ensuing loss of revenue. commercial activities.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: explosion. services with ensuing loss of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: explosion.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: Fire and explosion. services with ensuing loss of loss of revenue.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: Fire and explosion. services with ensuing loss of loss of revenue.

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:9:● Gas Holder Controlled Explosive Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:13:Case Study – Controlled Explosive Demolition – Various Projects

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:13:Controlled Explosive Demolition is a highly efficient and safety proven method for demolition of large structures. The Keltbray Decommissioning

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:14:demolition, with the exception of controlled explosive demolition on the Gasholder.

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:19: Methodology - Heavy Demolition Machine Methodology – Controlled Explosive Demolition

R-2021-0610-PND-SBCO Site - Planning Stage MS - Rev 01 - 15.07.21.pdf:22:Demolition Stage 8 Area of highest potential risk of explosive atmosphere to be carried out as final phase of the works.

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:28:addition, TB17 goes on to reference a concept of an “explosion risk threshold” (as defined by Boltze and de

R-2022-0342-CD-10035117-AUK-XX-XX-RP-ZZ-0395-03-GE Plot.pdf:29: Pressure ranges period during difference during Explosion Risk

R-2023-0246-RMM-20230420_MOD_Response_Letter.pdf:1:explosives storage sites, air weapon ranges, and technical sites or training resources such as the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:1: • Use of explosives.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:41: fire and explosion, except where they can be a consequence of a navigation hazard.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: and explosion. term suspension of operations,

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: and explosion. of revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: and explosion. services with ensuing loss prolonged restrictions, and/or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: and explosion. of revenue. restrictions, and/or termination

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:80: explosion. of revenue. revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:80: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:80: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:81: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:81: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:81: operation) explosion. services with ensuing loss

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: and explosion. of revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: and explosion. of revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: and explosion. of revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: and explosion. of revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: and explosion. to services with ensuing disruption to commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: and explosion. activities and/or prolonged

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: and explosion. services with ensuing loss revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: and explosion. minor disruption to commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: and explosion. services with ensuing loss revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: and explosion. disruption to commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: and explosion. disruption to commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: and explosion. revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: and explosion. of revenue. disruption to commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: and explosion. revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:87: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: and explosion. termination of commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: and explosion. services with ensuing loss revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: and explosion. termination of commercial

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:89: and explosion. services with ensuing loss revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:89: Fire and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:89: Fire and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: Fire and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: Fire and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: Fire and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:91: explosion. ensuing loss of revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:91: explosion. ensuing loss of revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: Fire and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: and explosion. of revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: and explosion. services with ensuing loss

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: Fire and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: and explosion. of revenue. termination of commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: Fire and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:97: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:97: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:97: explosion. services with ensuing loss commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: and explosion. of revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: and explosion. of revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: and explosion. of revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: and explosion. of revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: and explosion. to services with ensuing disruption to commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: and explosion. and/or prolonged restrictions.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: explosion. services with ensuing loss

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: and explosion. to commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: explosion. services with ensuing loss

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: and explosion. commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:103: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: and explosion. commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: explosion. services with ensuing loss

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: and explosion. commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: explosion. services with ensuing loss

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: Fire and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: Fire and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: Fire and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: Fire and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: Fire and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:107: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:107: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:109: Fire and explosion. operations, prolonged restrictions, and/or

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:109: Fire and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: Fire and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: Fire and explosion. of revenue. termination of commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: Fire and explosion. services with ensuing loss of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: Fire and explosion. of revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: Fire and explosion. of revenue. commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: Dredgers) visibility. Fire and explosion. with ensuing loss of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: Fire and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: operation) Fire and explosion. term disruption to services disruption to commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: and explosion. of revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: and explosion. with ensuing loss of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: and explosion. to services with ensuing loss activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: and explosion. services with ensuing loss of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: and explosion. activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: and explosion. to services with ensuing loss

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: and explosion. to services with ensuing loss

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: and explosion. to services with ensuing loss

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: and explosion. with ensuing loss of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:119: and explosion. termination of commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:122: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:122: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:122: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:123: Fire and explosion. revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:123: Fire and explosion. revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: explosion. term disruption to services

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: explosion. Very short-term disruption to Long-term suspension of operations,

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: explosion. revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: explosion. revenue. of commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: and explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: operation) explosion. services with ensuing loss of activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: explosion. revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: explosion. revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: explosion. revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: explosion. revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: explosion. commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: explosion. with ensuing loss of revenue. restrictions.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: explosion. with ensuing loss of revenue. commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: explosion. commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: explosion. with ensuing loss of revenue. termination of commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: explosion. with ensuing loss of revenue. commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: explosion. services with ensuing loss of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: explosion. with ensuing loss of revenue. commercial activities.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: explosion. services with ensuing loss of

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: explosion.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: Fire and explosion. services with ensuing loss of loss of revenue.

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: Fire and explosion. services with ensuing loss of loss of revenue.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:16: • Avoid explosive blasting, using appropriate manual or mechanical alternatives.

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:37: accumulation in Explosion Low Risk however, no other buildings will be constructed on

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:46: explosive Closest NIHHS is a historical site located 85m southeast of the area.

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:60: explosive substances Company: British Steel Corporation Ltd

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:86: Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:86: Landfills Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:89: asphyxiation) and ‘Moderate to Very High’ to onsite and offsite properties (e.g. explosion). Given

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P02.pdf:212: Part 2A, if value or major damage to Explosion, causing building

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:44: explosive Closest NIHHS is a historical site located 85m southeast of the area.

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:58: explosive substances Company: British Steel Corporation Ltd

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:84: Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:84: Landfills Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:87: asphyxiation) and ‘Moderate to Very High’ to onsite and offsite properties (e.g. explosion). Given

R-2019-0427-FFM-41825-WOOD-XX-XX-RP-OC-0002_A_P01.pdf:210: Part 2A, if value or major damage to Explosion, causing building

R-2023-0300-DCO-NSIP(1).pdf:1:advice for Explosives, as HSE Explosive Unit requested further information and we have not received that for them

R-2023-0300-DCO-NSIP(1).pdf:3:Explosives sites

R-2023-0300-DCO-NSIP(1).pdf:3:being developed at the location. This was requested by CEMHD7 Inspector of Explosives – Mr David Myrtle.

R-2021-0166-FFM-Environmental Risk Assessment.pdf:31:explosion due to build-up of hazardous ground gases in confined spaces such as service runs and plant rooms,

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:24:was used at all exploratory locations which involved drilling into natural superficial deposits. An explosive

R-2021-1048-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI1_SSI2A_GI_SCR.pdf:33: confined spaces leading to asphyxiation and/or explosion is considered potentially active.

R-2021-1048-FFM-Earthworks Specification.pdf:26:The Contractor shall not use explosives without the written permission of the Overseeing Organisation.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:47:49 4.7 Regulated explosive sites 0 0 0 0 -

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:93:4.7 Regulated explosive sites

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:93:Explosives Regulations 2005 (MSER). The last update to this data was in April 2011.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:327: Figure Four - WWII High Explosive Bomb Density

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:328: AA Anti-Aircraft NEQ Net Explosive Quantity

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:328: AXO Abandoned Explosive Ordnance PM Parachute Mine

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:328: EO Explosive Ordnance UXB Unexploded Bomb

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:328: EOC Explosive Ordnance Clearance UXO Unexploded Ordnance

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:328: EOD Explosive Ordnance Disposal V Weapons Vergeltungswaffen – Vengeance

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:328: HE High Explosive

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:328: LE Low Explosive

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:334: 6. Historic UXO information provided by 33 Engineer Regiment (Explosive Ordnance Disposal) at Carver Barracks,

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:334: resulting from war fighting activities (also known as the Explosive Remnants of War (ERW)).

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:334: artillery and tank projectiles, explosives, LSA and SAA). Thousands of tonnes of these munitions were used for the

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:334: The most common type of UXO discovered today in the UK is the aerially delivered high explosive (HE) bomb, which

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:337: • The removal of a “legacy artillery projectile” (potentially containing explosives), found in a scrap sorting area

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:337: (subsequently documented as non-explosive. It is considered likely to be an inert training munition);

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:337: Freeport Entrance, on the 13th July 2021 (subsequently documented as non-explosive);

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:344: possibility of explosive ordnance encounter and are a vital part of the general safety

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-03-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:352: Figure Four - WWII High Explosive Bomb Density

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:27:minimise the risk of explosion. The pipeline is an extremely sensitive asset.

R-2021-1048-FFM-SSI 1 Desk Study_final(2).pdf:77: Act contains no scope for considering Explosion, causing building collapse (can

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:39:49 4.7 Regulated explosive sites 0 0 0 0 -

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:85:4.7 Regulated explosive sites

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:85:Explosives Regulations 2005 (MSER). The last update to this data was in April 2011.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:319: Figure Four - WWII High Explosive Bomb Density

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:320: AA Anti-Aircraft NEQ Net Explosive Quantity

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:320: AXO Abandoned Explosive Ordnance PM Parachute Mine

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:320: EO Explosive Ordnance UXB Unexploded Bomb

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:320: EOC Explosive Ordnance Clearance UXO Unexploded Ordnance

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:320: EOD Explosive Ordnance Disposal V Weapons Vergeltungswaffen – Vengeance

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:320: HE High Explosive

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:320: LE Low Explosive

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:326: 6. Historic UXO information provided by 33 Engineer Regiment (Explosive Ordnance Disposal) at Carver Barracks,

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:326: resulting from war fighting activities (also known as the Explosive Remnants of War (ERW)).

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:326: artillery and tank projectiles, explosives, LSA and SAA). Thousands of tonnes of these munitions were used for the

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:326: The most common type of UXO discovered today in the UK is the aerially delivered high explosive (HE) bomb, which

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:329: • The removal of a “legacy artillery projectile” (potentially containing explosives), found in a scrap sorting area

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:329: (subsequently documented as non-explosive. It is considered likely to be an inert training munition);

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:329: Freeport Entrance, on the 13th July 2021 (subsequently documented as non-explosive);

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:336: possibility of explosive ordnance encounter and are a vital part of the general safety

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment(2).pdf:344: Figure Four - WWII High Explosive Bomb Density

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:8: Explosive Quantity (NEQ) UXO – such as High Explosive bombs and/or Land Service Ammunition; such

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:15: 5.2 WWII High Explosive Bombing Density …………………………………………………………………………… 14

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:15: 5.4 WWII High Explosive Bomb Strikes ………………………………………………………………………………… 15

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:17:Appendix 5 WWII High Explosive Bomb Density

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:18:Annex C Explosives and Detonation Effects

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:19:AXO Abandoned Explosive Ordnance LP-HC Low Probability-High

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:19:Bgl Below Ground Level NEQ Net Explosive Quantity

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:19:EOD Explosive Ordnance Disposal TNT Trinitrotoluene

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:19:ERW Explosive Remnants of War UXB Unexploded Bomb

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:19:HE High Explosive WWII World War Two

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:20: • Unexploded Ordnance (UXO) – any munition with an explosive or chemical fill that failed to initiate

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:24: (Abandoned Explosive Ordnance (AXO)) and ordnance resulting from war fighting activities (also

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:24: known as the Explosive Remnants of War (ERW)).

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:24: common type of UXO discovered in the UK today is the aerially delivered High Explosive (HE) bomb,

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:24: bomb storage (including HE bombs, naval shells, artillery and tank projectiles, explosives, LSA and SAA).

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:25: The explosive or chemical fill within UXO rarely becomes inert or loses its effectiveness with age, but

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:25: the explosive fill may change or crystallise over time - increasing the high explosive’s sensitivity to a

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:28: high explosive effects, but also in defining what degree of UXO risk might be tolerated (if any). For

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:29: • BP, Document Reference GP 04-81, Explosive Remnants of War Risk Mitigation Strategy for

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:33: The consequences of an unplanned UXO initiation are a function of the mass of high explosives in the

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:33: UXO (effectively, their Net Explosive Quantity (NEQ)), and their proximity to and robustness of,

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:33: The mass of high explosives and their surface effects can generally be either estimated or accurately

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:33: explosive events in particular. Generally, personnel are very vulnerable to high explosive

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:33: Further detailed information, detailing both the effects of high explosive detonation events and the

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:35:5.2 WWII High Explosive Bombing Density

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:36:5.4 WWII High Explosive Bomb Strikes

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:53: – such as High Explosive bombs and/or Land Service Ammunition; such risks are considered

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:61: The briefings (aka Tool Box Briefs), are essential when there is a possibility of explosive ordnance

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:72: o Consequence; of UXO initiation, which is driven by the Net (High) Explosive

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:74:Appendix 5 – WWII High Explosive Bomb Density

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:102: 1. Reid, W.D., 1996, The response of surface ships to underwater explosions;

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:102: 2. Szturomski, B., 2015, The effect of an underwater explosion on a ship. Scientific Journal of

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:103:Annex C - Explosives and Detonation Effects

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:103: Explosives can be categorised into two broad categories designed to be either detonating or high

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:103: explosives or deflagrating or low explosives.

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:103: This annex describes the classification of explosives, the generic design of the explosives train and the

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:103:Classification of Explosives

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:103:Detonating or High Explosives

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:103: of a high-pressure shock wave. These explosives detonate at velocities ranging from 1,000m/s to

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:103: 9,000m/s and may be subdivided into two explosives classes, differentiated by their respective

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:103: sensitivity or ease with which an explosive may be ignited or initiated:

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:103: • Primary Explosives – are extremely sensitive to impact, friction, sparks, flames or other

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:103: them unsuitable to use as a base explosive i.e. main-fill explosive in military ordnance.

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:103: • Secondary Explosives – are relatively insensitive to impact, friction, sparks, flame or other

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:103: and/or burnt in bulk. Dynamite, TNT, RDX and HMX are classed as secondary high explosives,

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:103: which are commonly used as base explosives in military ordnance. Pentaerythritol tetranitrate

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:103: (PETN) is the benchmark compound for comparative purposes, with those explosives that are

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:103: more sensitive to initiation than PETN classified as primary explosives.

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:103:Deflagrating or Low Explosives

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:103: A low explosive is usually a mixture of a combustible substance and an oxidant that decomposes

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:104: normal conditions, low explosives undergo deflagration at rates that vary from a few centimetres per

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:104: Deflagration processes of low explosives are easier to control than the detonations of high explosive,

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:104: In general, explosive ordnance items, such as bombs or sea mines tend to have the following basic

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:104: manufactured from aluminium. The case shatters during detonation of the high explosive fill,

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:104: • Main Charge – the main charge makes up most of the explosive mass of the ordnance item

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:104: comprising a high explosive fill with a relatively low sensitivity to initiation;

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:104: • Booster – a secondary high explosive booster charge is used to ignite the main charge

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:104: component and comprises a more sensitive, albeit smaller quantity of high explosive;

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:104: • Fuze – a small quantity, high explosive charge is usually incorporated into the device which is

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:104: sensitive to initiation. The fuze acts as the primary explosive which is used to ignite the

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:104: An explosive chain reaction is therefore started when the sufficient energy (kinetic, electrical, or

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:104: chemical) is generated to initiate the explosive content of the fuze, which in turn detonates the booster

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:104: and finally the main charge. These components form the explosive train of the ordnance device.

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:105: UXO is any munition, weapon delivery system or ordnance item that contains explosives, propellants,

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:105: minimal risk compared to other high explosive content UXO, although SAA may explode if subjected

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:106: comprise either an explosive, chemical, smoke, illumination, or inert/training fill. Projectiles may also

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:107: Landmines are an explosive device typically shallow buried or concealed on the ground and used to

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:107: stabilising fins. The metal casing contains the explosive or chemical fill and may be compartmentalised.

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:107: Bomb types include high explosive, incendiary, chemical, training, and concrete. As UXO, they present

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:109: The other property that an item of UXO has which classifies it from benign debris, is the explosive

R-2021-1048-FFM-UXO NS051-CV-REP-000-00001_Rev A01(18435).PDF:109:Visual Detection – Explosive Ordnance Disposal (EOD) Engineer

R-2021-1048-FFM-EMAIL.pdf:2:explosion, it could result in the loss of the gas supply to local communities.

R-2021-1048-FFM-EMAIL.pdf:2:  The use of explosives within 30m of low/medium pressure mains and 250m of intermediate

R-2021-1048-FFM-EMAIL.pdf:5:Carrying out explosions, pilings, boring or

R-2021-1048-FFM-SSI2 Desk Study_Final(1).pdf:77: Act contains no scope for considering Explosion, causing building collapse (can

R-2021-1048-FFM-Appendix1.pdf:19:services explosion/fire identified. If present in the vicinity of the borehole all

R-2021-1048-FFM-Appendix1.pdf:20:underground explosion/fire Inspection of all available service plans.

R-2021-1048-FFM-Appendix1.pdf:23: explosion/fire remain vigilant and excavation should be avoided where there is

R-2021-1048-FFM-Appendix1.pdf:23:services explosion/fire 2. Visual inspection including where possible lifting of

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:39:49 4.7 Regulated explosive sites 0 0 0 0 -

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:85:4.7 Regulated explosive sites

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:85:Explosives Regulations 2005 (MSER). The last update to this data was in April 2011.

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:319: Figure Four - WWII High Explosive Bomb Density

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:320: AA Anti-Aircraft NEQ Net Explosive Quantity

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:320: AXO Abandoned Explosive Ordnance PM Parachute Mine

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:320: EO Explosive Ordnance UXB Unexploded Bomb

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:320: EOC Explosive Ordnance Clearance UXO Unexploded Ordnance

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:320: EOD Explosive Ordnance Disposal V Weapons Vergeltungswaffen – Vengeance

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:320: HE High Explosive

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:320: LE Low Explosive

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:326: 6. Historic UXO information provided by 33 Engineer Regiment (Explosive Ordnance Disposal) at Carver Barracks,

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:326: resulting from war fighting activities (also known as the Explosive Remnants of War (ERW)).

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:326: artillery and tank projectiles, explosives, LSA and SAA). Thousands of tonnes of these munitions were used for the

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:326: The most common type of UXO discovered today in the UK is the aerially delivered high explosive (HE) bomb, which

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:329: • The removal of a “legacy artillery projectile” (potentially containing explosives), found in a scrap sorting area

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:329: (subsequently documented as non-explosive. It is considered likely to be an inert training munition);

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:329: Freeport Entrance, on the 13th July 2021 (subsequently documented as non-explosive);

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:336: possibility of explosive ordnance encounter and are a vital part of the general safety

R-2021-1048-FFM-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:344: Figure Four - WWII High Explosive Bomb Density

R-2021-0100-CD-Phase II ESA.pdf:33: confined spaces leading to asphyxiation and/or explosion is considered potentially active.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:48: explosive Closest NIHHS is a historical site located 85m southeast of the area.

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:62: explosive substances Company: British Steel Corporation Ltd

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:88: Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:88: Landfills Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:91: asphyxiation) and ‘Moderate to Very High’ to onsite and offsite properties (e.g. explosion). Given

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:114: Part 2A, if value or major damage to Explosion, causing building

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:389:gases poses a potential explosive and asphyxiant risk, whilst an acidic pH poses a potential risk to buried

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:422: levels; potentially an explosive and/or Include ground gas protection measures within

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:459: explosive Human health ‐ √ Severe Moderate High Futu

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:467: explosive Human health ‐ √ Severe Low Moderate Very

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:469: Act contains no scope for considering Explosion, causing building collapse (can also

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix H - July 2020.pdf:531: Explosion / Electric Arcing etc. resulting from contact with

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:8: potential for explosive ground gas accumulation are also highlighted with the built environment

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:27: health (e.g. asphyxiation) as well as onsite and offsite properties (e.g. explosion). Given the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:36: 3 Avoid explosive blasting, using appropriate manual or mechanical alternatives; and

R-2020-0357-OOM-Planning Statement - July 2020.pdf:44: geomorphological significance, geotechnical constraints and the potential for explosive ground

R-2020-0357-OOM-TGN 287_Third party guidance for working near NGET equipment.pdf:9:high-voltage conductors within 30m of the seat of explosive detonated at a particular time). that isn’t – touch, the charge can equalise such as deer fences, metal palisade fencing,

R-2021-0057-VC-email.pdf:13: 36” Gas Pipeline Explosion, North Texas June 7, 2010

R-2021-0057-VC-NGN.pdf:5:Carrying out explosions, pilings, boring or

R-2021-0057-VC-NGN.pdf:6:explosion, it could result in the loss of the gas supply to local communities.

R-2021-0057-VC-NGN.pdf:6:  The use of explosives within 30m of low/medium pressure mains and 250m of intermediate

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils_Part1.pdf:15: confined spaces leading to asphyxiation and/or explosion is considered potentially active.

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0125-02-MPA_Shallow_Soils.pdf:15: confined spaces leading to asphyxiation and/or explosion is considered potentially active.

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:10:all exploratory locations which involved drilling into natural superficial deposits. An explosive ordnance

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0223-01-MPA_Deep_Soils.pdf:21: in confined spaces leading to asphyxiation and/or explosion is considered potentially active.

R-2023-0224-CD-50134151_1_CPP.pdf:4:5.25 Explosives ……………………………………………………………………………………………………………… 52

R-2023-0224-CD-50134151_1_CPP.pdf:4:5.43 Working in Explosive Atmospheres ……………………………………………………………………………. 63

R-2023-0224-CD-50134151_1_CPP.pdf:12:CoSHH Fire & Explosion All chemicals to be recorded on the CoSHH Register

R-2023-0224-CD-50134151_1_CPP.pdf:12:Hot Works Fire & Explosion Task specific RAMS

R-2023-0224-CD-50134151_1_CPP.pdf:38:operation, heavy and critical lifting, hot work activities when risk of explosion or not in green field.

R-2023-0224-CD-50134151_1_CPP.pdf:41:explosion proof where applicable. Powered hand tools used in confined spaces should, where possible, be

R-2023-0224-CD-50134151_1_CPP.pdf:52:5.25 Explosives

R-2023-0224-CD-50134151_1_CPP.pdf:52:Use of explosives or bursting equipment shall be avoided where possible. However, for structures greater

R-2023-0224-CD-50134151_1_CPP.pdf:52:than 1.5m in sectional dimension, the Contractor may use explosives or any safe methods to complete the

R-2023-0224-CD-50134151_1_CPP.pdf:61:assessment of fire or explosion and if necessary, work controlled using a hot work permit.

R-2023-0224-CD-50134151_1_CPP.pdf:63:5.43 Working in Explosive Atmospheres

R-2023-0224-CD-50134151_1_CPP.pdf:63:During the commissioning or operation phase there might be areas considered with explosive atmosphere. For

R-2023-0224-CD-ECL. 007.04.01CEMP-ANNEX.1 Issue 2.pdf:8:  explosive;

R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:19: asphyxiating/explosi Enclosed spaces on the site are anticipated to be divided into above-ground space within the BA building and above-ground office spaces.

R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:19: risk of accumulation of asphyxiating/explosive ground gases and vapours may be present, though the structure of any below ground

R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:25: asphyxiating/explosive gases/vapours in enclosed spaces; and

R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:37: asphyxiating/explosive

R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:38: present a risk of accumulation of asphyxiating/explosive ground gases and vapours.

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:30: Substances and Explosive Atmospheres Regulations 2002 (DSEAR) and

R-2023-0247-OOM-EA_R20230247OOM_OFFICIAL_180423.pdf:2:and explosion. Carbon dioxide can present a risk of asphyxiation or suffocation. The

R-2021-0316-VC-1400007002.pdf:5:Carrying out explosions, pilings, boring or

R-2021-0316-VC-1400007002.pdf:6:explosion, it could result in the loss of the gas supply to local communities.

R-2021-0316-VC-1400007002.pdf:6: • The use of explosives within 30m of low/medium pressure mains and 250m of intermediate

R-2021-0316-VC-CAT-PPI-PRC-019.pdf:10: 36” Gas Pipeline Explosion, North Texas June 7, 2010

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:11: potential for explosive ground gas accumulation are also highlighted with the built environment

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:29: well as onsite and offsite properties (e.g. explosion). Based on available data, no volatile

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:31: therefore considered to be explosion from UXO, land instability and risk from contamination.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:32: main risk from explosions is to Construction Workers and off-site human health receptors.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1442:explosion due to build-up of hazardous ground gases in confined spaces such as service runs and plant rooms,

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1517: confined spaces leading to asphyxiation and/or explosion is considered potentially active.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1528: confined spaces leading to asphyxiation and/or explosion is considered potentially active.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1705: explosive Closest NIHHS is a historical site located 85m southeast of the area.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1719: explosive substances Company: British Steel Corporation Ltd

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1745: Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1745: Landfills Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1748: asphyxiation) and ‘Moderate to Very High’ to onsite and offsite properties (e.g. explosion). Given

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1871: Part 2A, if value or major damage to Explosion, causing building

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1890:64 4.7 Regulated explosive sites 0 0 0 0 -

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1951:4.7 Regulated explosive sites

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter G - Ground Conditions - Dec 2020.pdf:1951:Explosives Regulations 2005 (MSER). The last update to this data was in April 2011.

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:49: from explosions is to construction workers and off site human health receptors.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:13: accidents associated with the hazardous installations, including explosions, could have

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:40: explosions of ignition to flammable

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:41: Landslide explosions Infrastructure and harm to

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:41: Fire and/or Natural gas – Fire and/or explosion could Not N/A N/A

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:41: explosion loss of gas result in significant harm, up relevant.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:41: explosions.

R-2020-0270-FFM-a) Stay safe near our pipes.pdf:3:Carrying out explosions, pilings, boring or

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:6: asphyxiation) and ‘Moderate to Very High’ to onsite and offsite properties (e.g. explosion). Given

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:51: explosive Closest NIHHS is a historical site located 85m southeast of the area.

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:68: explosive substances Company: British Steel Corporation Ltd

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:94: Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:94: Landfills Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood

R-2020-0270-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:220: Part 2A, if value or major damage to Explosion, causing building

R-2020-0270-FFM-b) Important Safety Guidance (002).pdf:1:explosion, it could result in the loss of the gas supply to local communities.

R-2020-0270-FFM-b) Important Safety Guidance (002).pdf:1: • The use of explosives within 30m of low/medium pressure mains and 250m of intermediate

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:32: confined spaces leading to asphyxiation and/or explosion is considered potentially active.

R-2021-0432-FFM-Redcar Steelworks-AUK-XX-XX-RP-GE-0001-02-SSI3_GI_SCR.PDF:43: confined spaces leading to asphyxiation and/or explosion is considered potentially active.

R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:19: Explosive risks ✓ Current and Future site users

R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:47:38 4.7 Regulated explosive sites 0 0 0 0 -

R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:82:4.7 Regulated explosive sites

R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:82:Explosives Regulations 2005 (MSER). The last update to this data was in April 2011.

R-2021-0846-FFM-Lighting Solutions.pdf:15:A place in which an explosive atmosphere consisting of a

R-2021-0846-FFM-Lighting Solutions.pdf:15:A place in which an explosive atmosphere consisting of

R-2020-0730-CD-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:33: confined spaces leading to asphyxiation and/or explosion is considered potentially active.

R-2023-0253-RMM-ECL. 007.04.01CEMP-ANNEX.1 Issue 2.pdf:8:  explosive;

R-2023-0253-RMM-50134151_1_CPP.pdf:4:5.25 Explosives ……………………………………………………………………………………………………………… 52

R-2023-0253-RMM-50134151_1_CPP.pdf:4:5.43 Working in Explosive Atmospheres ……………………………………………………………………………. 63

R-2023-0253-RMM-50134151_1_CPP.pdf:12:CoSHH Fire & Explosion All chemicals to be recorded on the CoSHH Register

R-2023-0253-RMM-50134151_1_CPP.pdf:12:Hot Works Fire & Explosion Task specific RAMS

R-2023-0253-RMM-50134151_1_CPP.pdf:38:operation, heavy and critical lifting, hot work activities when risk of explosion or not in green field.

R-2023-0253-RMM-50134151_1_CPP.pdf:41:explosion proof where applicable. Powered hand tools used in confined spaces should, where possible, be

R-2023-0253-RMM-50134151_1_CPP.pdf:52:5.25 Explosives

R-2023-0253-RMM-50134151_1_CPP.pdf:52:Use of explosives or bursting equipment shall be avoided where possible. However, for structures greater

R-2023-0253-RMM-50134151_1_CPP.pdf:52:than 1.5m in sectional dimension, the Contractor may use explosives or any safe methods to complete the

R-2023-0253-RMM-50134151_1_CPP.pdf:61:assessment of fire or explosion and if necessary, work controlled using a hot work permit.

R-2023-0253-RMM-50134151_1_CPP.pdf:63:5.43 Working in Explosive Atmospheres

R-2023-0253-RMM-50134151_1_CPP.pdf:63:During the commissioning or operation phase there might be areas considered with explosive atmosphere. For

R-2023-0253-RMM-20230420_MOD_Response_Letter.pdf:1:explosives storage sites, air weapon ranges, and technical sites or training resources such as the

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:48: • The site must be cleared to ensure there is nothing that could cause fire or explosion.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:68: • Avoid explosive blasting, using appropriate manual or mechanical alternatives.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:101:materials H1 – Explosive

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:197: • Avoid explosive blasting, using appropriate

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:48: • The site must be cleared to ensure there is nothing that could cause fire or explosion.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:68: • Avoid explosive blasting, using appropriate manual or mechanical alternatives.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:101:materials H1 – Explosive

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:169: • Avoid explosive blasting, using appropriate

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:22:Remote Demolition or Explosive Demolition of the Battery Bunker, Battery Chimney & Associated

R-2021-0397-PND-Outline Method Statement - South Bank Coke Oven Battery Plant - Rev0 (002).PDF:22: machine or explosive demolition activities.

R-2020-0598-FF-email.pdf:11: 36” Gas Pipeline Explosion, North Texas June 7, 2010

R-2020-0598-FF-Northern Gas.pdf:4:Carrying out explosions, pilings, boring or

R-2020-0598-FF-Northern Gas.pdf:6:explosion, it could result in the loss of the gas supply to local communities.

R-2020-0598-FF-Northern Gas.pdf:6:  The use of explosives within 30m of low/medium pressure mains and 250m of intermediate

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:6: asphyxiation) and ‘Moderate to Very High’ to onsite and offsite properties (e.g. explosion). Given

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:51: explosive Closest NIHHS is a historical site located 85m southeast of the area.

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:68: explosive substances Company: British Steel Corporation Ltd

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:94: Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:94: Landfills Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood

R-2020-0318-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:220: Part 2A, if value or major damage to Explosion, causing building

R-2020-0318-FFM-Phase II ESA.PDF:33: confined spaces leading to asphyxiation and/or explosion is considered potentially active.

R-2023-0291-ESM-ES Vol 1 Chapter 14 Contaminated Lands.pdf:26: occupants and Site users through asphyxiation or explosion. The risk to future occupants and Site users

R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:5:48 4.7 Regulated explosive sites 0 0 0 0 -

R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:50:4.7 Regulated explosive sites

R-2023-0291-ESM-ES Vol 2 Appendix 14.1 A. Groundsure.pdf:50:Explosives Regulations 2005 (MSER). The last update to this data was in April 2011.

R-2023-0291-ESM-ES Vol 2 Appendix 14.1 E. PRA Methodology.pdf:3: Catastrophic damage to buildings or property (e.g. explosion causing building collapse). Ecological system

R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:16: (f)for the production of explosives.

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:15: confined spaces leading to asphyxiation and/or explosion is considered potentially active.

R-2022-0237-CD-10035117-AUK-XX-XX-RP-ZZ-0452-01-P4_GI_AD Part 1.pdf:28:dioxide, which present an explosion and asphyxiation risk.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:35: • Use of explosives.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:393: • Avoid explosive blasting, using appropriate manual or mechanical alternatives.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:283: accumulation in Explosion Low Risk however, no other buildings will be constructed on

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:35: • Use of explosives.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:393: • Avoid explosive blasting, using appropriate manual or mechanical alternatives.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:171: fire and explosion, except where they can be a consequence of a navigation hazard.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: and explosion. term suspension of operations,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:207: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: and explosion. of revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:208: and explosion. services with ensuing loss prolonged restrictions, and/or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: and explosion. of revenue. restrictions, and/or termination

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:209: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:210: explosion. of revenue. revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:210: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:210: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:211: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:211: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:211: operation) explosion. services with ensuing loss

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: and explosion. of revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: and explosion. of revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:212: and explosion. of revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: and explosion. of revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:213: and explosion. to services with ensuing disruption to commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: and explosion. activities and/or prolonged

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: and explosion. services with ensuing loss revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:214: and explosion. minor disruption to commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: and explosion. services with ensuing loss revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: and explosion. disruption to commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:215: and explosion. disruption to commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: and explosion. revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: and explosion. of revenue. disruption to commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:216: and explosion. revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:217: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: and explosion. termination of commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: and explosion. services with ensuing loss revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:218: and explosion. termination of commercial

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:219: and explosion. services with ensuing loss revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:219: Fire and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:219: Fire and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: Fire and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: Fire and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:220: Fire and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:221: explosion. ensuing loss of revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:221: explosion. ensuing loss of revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:223: Fire and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: and explosion. of revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:224: and explosion. services with ensuing loss

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: Fire and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: and explosion. of revenue. termination of commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:225: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: Fire and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:226: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:227: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:227: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:227: explosion. services with ensuing loss commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: and explosion. of revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: and explosion. of revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:228: and explosion. of revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: and explosion. of revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:229: and explosion. to services with ensuing disruption to commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: and explosion. and/or prolonged restrictions.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: explosion. services with ensuing loss

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:230: and explosion. to commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: explosion. services with ensuing loss

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:231: and explosion. commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:232: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:233: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: and explosion. commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: explosion. services with ensuing loss

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:234: and explosion. commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: explosion. services with ensuing loss

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: Fire and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:235: Fire and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: Fire and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: Fire and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:236: Fire and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:237: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:237: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:239: Fire and explosion. operations, prolonged restrictions, and/or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:239: Fire and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: Fire and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: Fire and explosion. of revenue. termination of commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:240: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: Fire and explosion. services with ensuing loss of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: Fire and explosion. of revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:241: Fire and explosion. of revenue. commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: Dredgers) visibility. Fire and explosion. with ensuing loss of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:242: Fire and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:243: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: operation) Fire and explosion. term disruption to services disruption to commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:244: and explosion. of revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: and explosion. with ensuing loss of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:245: and explosion. to services with ensuing loss activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: and explosion. services with ensuing loss of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:246: and explosion. activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: and explosion. to services with ensuing loss

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: and explosion. to services with ensuing loss

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:247: and explosion. to services with ensuing loss

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:248: and explosion. with ensuing loss of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:249: and explosion. termination of commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:250: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:251: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:252: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:252: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:252: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:253: Fire and explosion. revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:253: Fire and explosion. revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: explosion. term disruption to services

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: explosion. Very short-term disruption to Long-term suspension of operations,

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:255: explosion. revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:256: explosion. revenue. of commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:257: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: and explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: operation) explosion. services with ensuing loss of activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:258: explosion. revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: explosion. revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: explosion. revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: explosion. revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:259: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: explosion. commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: explosion. with ensuing loss of revenue. restrictions.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:260: explosion. with ensuing loss of revenue. commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: explosion. commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:261: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:262: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: explosion. with ensuing loss of revenue. termination of commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: explosion. with ensuing loss of revenue. commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: explosion. services with ensuing loss of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:263: explosion. with ensuing loss of revenue. commercial activities.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: explosion. services with ensuing loss of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:264: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: explosion.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: Fire and explosion. services with ensuing loss of loss of revenue.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:265: Fire and explosion. services with ensuing loss of loss of revenue.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:35: • Use of explosives.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:393: • Avoid explosive blasting, using appropriate manual or mechanical alternatives.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:1: • Use of explosives.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:41: fire and explosion, except where they can be a consequence of a navigation hazard.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: and explosion. term suspension of operations,

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:77: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: and explosion. of revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:78: and explosion. services with ensuing loss prolonged restrictions, and/or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: and explosion. of revenue. restrictions, and/or termination

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:79: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:80: explosion. of revenue. revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:80: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:80: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:81: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:81: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:81: operation) explosion. services with ensuing loss

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: and explosion. of revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: and explosion. of revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:82: and explosion. of revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: and explosion. of revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:83: and explosion. to services with ensuing disruption to commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: and explosion. activities and/or prolonged

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: and explosion. services with ensuing loss revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:84: and explosion. minor disruption to commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: and explosion. services with ensuing loss revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: and explosion. disruption to commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:85: and explosion. disruption to commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: and explosion. revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: and explosion. of revenue. disruption to commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:86: and explosion. revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:87: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: and explosion. termination of commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: and explosion. services with ensuing loss revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:88: and explosion. termination of commercial

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:89: and explosion. services with ensuing loss revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:89: Fire and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:89: Fire and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: Fire and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: Fire and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:90: Fire and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:91: explosion. ensuing loss of revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:91: explosion. ensuing loss of revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:93: Fire and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: and explosion. of revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:94: and explosion. services with ensuing loss

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: Fire and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: and explosion. of revenue. termination of commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:95: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: Fire and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:96: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:97: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:97: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:97: explosion. services with ensuing loss commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: and explosion. of revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: and explosion. of revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:98: and explosion. of revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: and explosion. of revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:99: and explosion. to services with ensuing disruption to commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: and explosion. and/or prolonged restrictions.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: explosion. services with ensuing loss

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:100: and explosion. to commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: explosion. services with ensuing loss

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:101: and explosion. commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:102: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:103: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: and explosion. commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: explosion. services with ensuing loss

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:104: and explosion. commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: explosion. services with ensuing loss

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: Fire and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:105: Fire and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: Fire and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: Fire and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:106: Fire and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:107: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:107: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:109: Fire and explosion. operations, prolonged restrictions, and/or

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:109: Fire and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: Fire and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: Fire and explosion. of revenue. termination of commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:110: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: Fire and explosion. services with ensuing loss of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: Fire and explosion. of revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:111: Fire and explosion. of revenue. commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: Dredgers) visibility. Fire and explosion. with ensuing loss of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:112: Fire and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:113: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: operation) Fire and explosion. term disruption to services disruption to commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:114: and explosion. of revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: and explosion. with ensuing loss of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:115: and explosion. to services with ensuing loss activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: and explosion. services with ensuing loss of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:116: and explosion. activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: and explosion. to services with ensuing loss

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: and explosion. to services with ensuing loss

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:117: and explosion. to services with ensuing loss

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:118: and explosion. with ensuing loss of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:119: and explosion. termination of commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:120: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:121: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:122: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:122: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:122: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:123: Fire and explosion. revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:123: Fire and explosion. revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: explosion. term disruption to services

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: explosion. Very short-term disruption to Long-term suspension of operations,

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:125: explosion. revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:126: explosion. revenue. of commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:127: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: and explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: operation) explosion. services with ensuing loss of activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:128: explosion. revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: explosion. revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: explosion. revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: explosion. revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:129: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: explosion. commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: explosion. with ensuing loss of revenue. restrictions.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:130: explosion. with ensuing loss of revenue. commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: explosion. commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:131: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:132: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: explosion. with ensuing loss of revenue. termination of commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: explosion. with ensuing loss of revenue. commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: explosion. services with ensuing loss of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:133: explosion. with ensuing loss of revenue. commercial activities.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: explosion. services with ensuing loss of

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:134: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: explosion.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: Fire and explosion. services with ensuing loss of loss of revenue.

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:135: Fire and explosion. services with ensuing loss of loss of revenue.

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:37: accumulation in Explosion Low Risk however, no other buildings will be constructed on

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:16: • Avoid explosive blasting, using appropriate manual or mechanical alternatives.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:57:49 4.7 Regulated explosive sites 0 0 0 0 -

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:103:4.7 Regulated explosive sites

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:103:Explosives Regulations 2005 (MSER). The last update to this data was in April 2011.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:337: Figure Four - WWII High Explosive Bomb Density

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:338: AA Anti-Aircraft NEQ Net Explosive Quantity

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:338: AXO Abandoned Explosive Ordnance PM Parachute Mine

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:338: EO Explosive Ordnance UXB Unexploded Bomb

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:338: EOC Explosive Ordnance Clearance UXO Unexploded Ordnance

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:338: EOD Explosive Ordnance Disposal V Weapons Vergeltungswaffen – Vengeance

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:338: HE High Explosive

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:338: LE Low Explosive

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:344: 6. Historic UXO information provided by 33 Engineer Regiment (Explosive Ordnance Disposal) at Carver Barracks,

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:344: resulting from war fighting activities (also known as the Explosive Remnants of War (ERW)).

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:344: artillery and tank projectiles, explosives, LSA and SAA). Thousands of tonnes of these munitions were used for the

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:344: The most common type of UXO discovered today in the UK is the aerially delivered high explosive (HE) bomb, which

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:347: • The removal of a “legacy artillery projectile” (potentially containing explosives), found in a scrap sorting area

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:347: (subsequently documented as non-explosive. It is considered likely to be an inert training munition);

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:347: Freeport Entrance, on the 13th July 2021 (subsequently documented as non-explosive);

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:354: possibility of explosive ordnance encounter and are a vital part of the general safety

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-04-Land West of Warrenby Redcar.pdf:362: Figure Four - WWII High Explosive Bomb Density

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:39:49 4.7 Regulated explosive sites 0 0 0 0 -

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:85:4.7 Regulated explosive sites

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:85:Explosives Regulations 2005 (MSER). The last update to this data was in April 2011.

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:319: Figure Four - WWII High Explosive Bomb Density

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:320: AA Anti-Aircraft NEQ Net Explosive Quantity

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:320: AXO Abandoned Explosive Ordnance PM Parachute Mine

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:320: EO Explosive Ordnance UXB Unexploded Bomb

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:320: EOC Explosive Ordnance Clearance UXO Unexploded Ordnance

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:320: EOD Explosive Ordnance Disposal V Weapons Vergeltungswaffen – Vengeance

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:320: HE High Explosive

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:320: LE Low Explosive

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:326: 6. Historic UXO information provided by 33 Engineer Regiment (Explosive Ordnance Disposal) at Carver Barracks,

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:326: resulting from war fighting activities (also known as the Explosive Remnants of War (ERW)).

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:326: artillery and tank projectiles, explosives, LSA and SAA). Thousands of tonnes of these munitions were used for the

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:326: The most common type of UXO discovered today in the UK is the aerially delivered high explosive (HE) bomb, which

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:329: • The removal of a “legacy artillery projectile” (potentially containing explosives), found in a scrap sorting area

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:329: (subsequently documented as non-explosive. It is considered likely to be an inert training munition);

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:329: Freeport Entrance, on the 13th July 2021 (subsequently documented as non-explosive);

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:336: possibility of explosive ordnance encounter and are a vital part of the general safety

R-2022-0755-CD-10035117-AUK-XX-XX-RP-ZZ-0520-01-Land West of Warrenby Redcar Preliminary Risk Assessment.pdf:344: Figure Four - WWII High Explosive Bomb Density

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:6: asphyxiation) and ‘Moderate to Very High’ to onsite and offsite properties (e.g. explosion). Given

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:51: explosive Closest NIHHS is a historical site located 85m southeast of the area.

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:68: explosive substances Company: British Steel Corporation Ltd

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:94: Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood Moderate

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 1).pdf:94: Landfills Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood Moderate

R-2021-0879-FF-10035117-AUK-XX-XX-RP-ZZ-0062-02-Prairie_ESA_Part1.PDF:33: confined spaces leading to asphyxiation and/or explosion is considered potentially active.

R-2021-0879-FF-41825-WOOD-XX-XX-RP-OC-0001_S0-P01 (Part 2).pdf:3: halogenated hydrocarbon d biphenyls s and metal metal Explosives

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22:Remote & Explosive Demolition of the BOS Plant

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: explosive demolition activities.

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: ground floor level to assist with the explosive demolition of the main building.

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: • Prior to the explosive demolition, a series of structured pre-weakening cut will be made using

R-2021-0589-PND-Outline Method Statement - BOS Plant - Rev0.PDF:22: hot works to the support column to aid the explosive demolition.

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:15:12.4.17 It is considered that any construction accidents and/or disasters (explosion or similar) would not

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:18:12.5.30 It is considered that any operational accidents and/or disasters (explosion or similar) would not

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:21: • Avoid explosive blasting, using appropriate manual or mechanical alternatives.

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:29: is that it is assumed that the demolition of the REC by explosives or particularly noisy measures

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:34: Noise Demolition by explosives to be avoided during the

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:19: Explosive risks ✓ Current and Future site users

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:47:38 4.7 Regulated explosive sites 0 0 0 0 -

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:82:4.7 Regulated explosive sites

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:82:Explosives Regulations 2005 (MSER). The last update to this data was in April 2011.

R-2022-0731-CD-STDC_HWY-ATK-ELS-PR-DR-LL-000001_C01.PDF:1: - Corrosive, explosive or flammable.

R-2021-0728-PND-COMMENTS Kirsty email.pdf:2:the building is intended to be taken down by using explosives that will send harmful dust into the air. During

R-2021-0728-PND-COMMENTS Kirsty email.pdf:3:been undertaken. As the building is intended to be taken down by using explosives

R-2021-0728-PND-COMMENTS Gregory R.pdf:2:elements has been undertaken. As the building is intended to be taken down by using explosives

R-2021-0728-PND-COMMENTS Gregory R.pdf:2:4. Is it intended to halt all train services during the explosion/s? Using steel containers to shield

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:1: Method Statement for the Controlled Explosive

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:1:Explosives Engineers: Precision Demolition Company Ltd

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:4: for the use of the controlled explosive demolition of the Dorman Long Tower

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:7: • The explosion displacing material in pre-determined directions.

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:7: fly due to the controlled explosion. Ricochet debris is less of a concern.

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:7:2.4 The exclusion zone for material displaced by the explosion is a factor of the

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:12: directed by the explosive engineer.

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:12: bunker by explosives (already considered under section A). This is to include

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:13:3.18 Place the required explosives, stem and connect them together using

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:13:3.19 All explosive materials will be placed on the day that they are delivered to the

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:13: site. No unplaced explosives will be stored on the site overnight.

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:13:3.20 The quantity of explosives required for each shot hole is based on the ratio of

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:13: the volume of concrete to be displaced with respect to explosive charge

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:13: concrete section is achieved. The explosives engineer will also consider a

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:19:4.2 In accordance with the recommendations of BS5607, Safe Use of Explosives

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:19:4.3 Prior to the explosive engineer approaching the structure the non-electric

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:19: explosives engineer will carry out a check on main line connectors from the

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:19: firing point to the charge positions. This will enable the explosives engineer

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:19: to identify the failed element(s) of the explosives system. Failed connectors

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:19: checked to establish if any explosive charges have failed to have detonated.

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:19: explosives.

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:19: • Any attempt to detonate the remaining explosive charges may necessitate

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:19: an increased exclusion zone due to loss of protection / explosive charge

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:19: effectively displaced by the explosive charges. The location of such supports

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:19: explosively or mechanically in consideration of the safest means available.

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:20: misfire has occurred then the explosives engineer is to carefully inspect the

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:20: the explosives engineer to carefully spread out the debris from the area of the

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:20: miss fire so that this can be further inspected by the explosives engineer.

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:20:4.14 Only once the explosives engineer is satisfied that all explosives have been

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:22: 6. Placement of explosives Injury and damage from High All property and personnel Med High Correct and careful handling of Med

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:22: premature detonation due to (3) around work area (2) (6) explosives in accordance with BS (3)

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:22: explosives Machine movements to be supervised

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:22: Adsorption of NG by explosives engineers when in close

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:22: compounds proximity to explosive charges. Use

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:23: 11. Detonation of Explosives Noise, Dust, Flying debris / High All personnel within exclusion Med High Personnel out side of the exclusion Med

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:24: appropriate explosive charge weight.

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:24: 13. Plugging explosively charged Cut, trapped and grazed Med Explosives engineers Med High When stemming shot holes with clay Med

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:26:6.4 The work on site will be carried out by an assistant explosive engineer

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:26: the job and handling explosives in a suitable manner.

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:26: n) Assist the Explosives Engineer with the transport of explosives,

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:27:6.5 The Assistant Explosives Engineer will be a person who has been trained

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:27: in the handling of explosives. They will also be trained to operate Mobile

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:27: of 2 years’ experience of working within the explosives demolition

R-2021-0728-PND-Demolition of Dorman Long Tower.pdf:28:Method Statement for the Controlled Explosive Demolition of Dorman Long

R-2021-0728-PND-Officer Report(1).pdf:2: Impact on health of dust from explosion

R-2021-0728-PND-Officer Report(1).pdf:2:Company Ltd who are the explosives engineers on behalf of the demolition

R-2021-0728-PND-Officer Report(1).pdf:3:of the tower. The tower is to be demolished by way of controlled explosion.

R-2021-0728-PND-Officer Report(1).pdf:4:directed by the explosive engineer.

R-2021-0728-PND-Officer Report(1).pdf:4:bunker by explosives (already considered under section A). This is to include

R-2021-0728-PND-Officer Report(1).pdf:5:Place the required explosives, stem and connect them together using

R-2021-0728-PND-Officer Report(1).pdf:5:All explosive materials will be placed on the day that they are delivered to the

R-2021-0728-PND-Officer Report(1).pdf:5:site. No unplaced explosives will be stored on the site overnight.

R-2021-0728-PND-Officer Report(1).pdf:5:The quantity of explosives required for each shot hole is based on the ratio of

R-2021-0728-PND-Officer Report(1).pdf:5:the volume of concrete to be displaced with respect to explosive charge

R-2021-0728-PND-Officer Report(1).pdf:5:concrete section is achieved. The explosives engineer will also consider a

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:2: the building is intended to be taken down by using explosives

R-2021-0728-PND-Neighbour Comments - Cllr V Smith.pdf:2: 4. Is it intended to halt all train services during the explosion/s?

R-2023-0179-SCP-HSE.pdf:2:5. The development is not located within a safeguarding zone of an explosives site licensed under the Explosives

R-2023-0179-SCP-HSE.pdf:2:Chemicals Explosives Microbiological Hazards Division 5B

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:101: the sites to each other. These risks include, but are not limited to: fire, explosion,

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:103: could result in a fire and/ or explosion.

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:105: fire and explosion. These are credible accident scenarios which have a low

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:147: Ordnance (UXO) Potential for a major construction incident such as fire or explosion to have an impact at neighbouring

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:147: Explosion Y The accidental release of flammable substances could result in an explosion if the gas accumulates prior to

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:147: internal explosion or deflagration. These scenarios could result in significant harm to people onsite and

R-2023-0179-SCP-SCOPING OPINION DECISION.pdf:21:5. The development is not located within a safeguarding zone of an explosives site licensed

R-2023-0179-SCP-SCOPING OPINION DECISION.pdf:21:under the Explosives Regulations 2014 or the Dangerous Goods in Harbour Area Regulations

R-2023-0179-SCP-Consultee Response - CATS Pipeline(1).pdf:11: 36” Gas Pipeline Explosion, North Texas June 7, 2010

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:10: explosive ground gas accumulation are also highlighted with the built environment identified as

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:34: properties (e.g. explosion). Vapour inhalation of volatile contaminants has been assessed

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:37: therefore considered to be explosion from UXO, land instability and risk from contamination.

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:52: geomorphological significance, geotechnical constraints and the potential for explosive ground

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:39: explosions Infrastructure. Lightning could

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:40: e/Seismic explosions accident and damage to site

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:40: Fire and/or Natural gas – loss Fire and/or explosion could Not N/A N/A

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:40: explosion of gas from result in significant harm, up to relevant.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:40: impact injuries from explosions.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:11: accidents associated with the hazardous installations, including explosions, could have

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:43: explosions and cause

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:44: ic event. explosions of significant

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:9: potential for explosive ground gas accumulation are also highlighted with the built environment

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:29: well as onsite and offsite properties (e.g. explosion). Based on available data, no volatile

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:31: therefore considered to be explosion from UXO, land instability and risk from contamination.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:32: main risk from explosions is to Construction Workers and off-site human health receptors.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:11: accidents associated with the hazardous installations, including explosions, could have

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:6: asphyxiation) and ‘Moderate to Very High’ to onsite and offsite properties (e.g. explosion). Given

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:51: explosive Closest NIHHS is a historical site located 85m southeast of the area.

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:68: explosive substances Company: British Steel Corporation Ltd

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:94: Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:94: Landfills Carbon dioxide Future site Migration via permeable strata Explosion and Low likelihood

R-2020-0465-FFM-41825-WOOD-XX-XX-RP-OC-0001_S0_P01.PDF:220: Part 2A, if value or major damage to Explosion, causing building

R-2020-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0125-01-MPA_Shallow_Soils.PDF:15: confined spaces leading to asphyxiation and/or explosion is considered potentially active.