MMO - Marine Licences Public Register

Download 12MLAs-240913.csv

Case DetailsProject TypeProject TitleLocationsApplicant NameSubmission DateDecision Date
MLA/2012/00001 - CompletedApplication - Removals (inc. Grab Samples)Removal of Redundant Sheet Piles. Tidal Ponds, Stoke Lake,Haslar,Gosport, HantsQinetiq Limited03 Jan 201203 Jul 2012
MLA/2012/00002 - CompletedApplication - Removals (inc. Grab Samples)Whale removal Hunstanton beachPeaceful Pets Limited03 Jan 201203 Jan 2012
MLA/2012/00003/4 - CompletedApplication - Alternative Use of Dredged Material, Dredged Material Disposal, DredgingPort of Ramsgate Maintenance DredgingPort Of Ramsgate04 Jan 201214 Apr 2015
MLA/2012/00004/1 - CompletedApplication - Removals (inc. Grab Samples)Vibrocore and Grab sample surveys for Area 492Hanson Aggregates Marine Limited04 Jan 201212 Mar 2012
MLA/2012/00005/1 - CompletedApplication - Removals (inc. Grab Samples)Vibrocore and Grab sample surveys for Areas 106, 400 and 439Hanson Aggregates Marine Limited04 Jan 201212 Mar 2012
MLA/2012/00006 - CompletedApplication - Removals (inc. Grab Samples)Area 447 Vibrocore SurveyHanson Aggregates Marine Limited04 Jan 201210 Jan 2012
MLA/2012/00007/4 - CompletedApplication - Dredged Material DisposalNewhaven Maintenance DredgingNewhaven Port & Properties Limited04 Jan 201207 May 2015
MLA/2012/00009/4 - CompletedApplication - ConstructionScour Protection BML2-E20-6 River Stour, ChristchurchNetwork Rail Infrastructure Limited05 Jan 201220 Jul 2012
MLA/2012/00010 - CompletedApplication - Removals (inc. Grab Samples)Forewind Dogger Bank Round 3 Cable Corridor Benthic Survey WorkForewind Limited05 Jan 201210 Jan 2012
MLA/2012/00011/2 - CompletedApplication - ConstructionWhitehaven, Parton Long Sea OutfallUnited Utilities Water Plc10 Jan 201204 Jan 2013
MLA/2012/00012/1 - CompletedApplication - Removals (inc. Grab Samples)Pendennis- Boreholes & minor ground investigationsPendennis Superyachts Limited11 Jan 201218 Jun 2012
MLA/2012/00013 - CompletedApplication - ConstructionReplacement of old fingers and pontoons with newEmsworth Yacht Harbour Limited12 Jan 201203 Apr 2012
MLA/2012/00014/3 - CompletedApplication - Aggregate DredgingArea 351 short term marine licence applicationNorthwood(Fareham)Limited12 Jan 201216 Jul 2014
MLA/2012/00015/3 - CompletedApplication - Aggregate DredgingArea 351 - Short Term Marine Licence ApplicationVolker Dredging Ltd12 Jan 201203 Jul 2014
MLA/2012/00016 - CompletedApplication - ConstructionPontoon Replacements, Queen Anne's Battery, PlymouthMarina Developments Limited12 Jan 201214 Mar 2012
MLA/2012/00017 - CompletedApplication - ConstructionSHYC new buoysSovereign Harbour Yacht Club Ltd12 Jan 201229 Feb 2012
MLA/2012/00018 - CompletedApplication - Constructionmooring sinker blocks southseaMr Mark Laskey16 Jan 201228 Feb 2012
MLA/2012/00019/2 - CompletedApplication - Construction, Dredged Material Disposal, DredgingMarina ExtensionThe Royal Motor Yacht Club16 Jan 201224 Oct 2012
MLA/2012/00020/2 - CompletedApplication - ConstructionRCYC Seasonal Pontoon InstallationRoyal Cornwall Yacht Club16 Jan 201204 Mar 2015
MLA/2012/00021 - CompletedApplication - Miscellaneous DisposalExercise Green TideOil Spill Response Limited17 Jan 201227 Mar 2012
MLA/2012/00022 - CompletedApplication - ConstructionEvaluation of Techniques for Oyster RestorationUniversity Of Southampton17 Jan 201221 May 2012
MLA/2012/00023 - CompletedApplication - ConstructionKingsbridge Sewage Treatment Works Countryside Rights Of Way ScopingSouth West Water Limited19 Jan 201221 May 2012
MLA/2012/00024 - CompletedApplication - Dredged Material DisposalBurnley Wharf - disposal of silt from aggregate productionTarmac Ltd19 Jan 201230 Apr 2012
MLA/2012/00025 - CompletedApplication - Construction47 River Road, LittlehamptonBrownfield Estates Limited19 Jan 201229 Feb 2012
MLA/2012/00026 - CompletedApplication - Constructionconstruction of jetty to rear of 19 birmingham Road CowesMr Chris Little19 Jan 201216 Apr 2012
MLA/2012/00027 - CompletedApplication - Dredged Material Disposal, DredgingSilloth docks maintenance dredgeAssociated British Ports Holdings Limited19 Jan 201206 Aug 2012
MLA/2012/00028 - CompletedApplication - ConstructionWest of Duddon Sands Met Mast - Ground InvestigationDong Energy Power (Uk) Limited19 Jan 201201 Jun 2012
MLA/2012/00029 - WithdrawnApplication - ConstructionSluice No7 - Foulness IslandQinetiq20 Jan 2012
MLA/2012/00030/1 - CompletedApplication - ConstructionReconstruction of part of the frontage at Ridham Dock Grouped under: Marine Minerals Limited Showing 2 of 3 casesCommercial Estates Group Limited20 Jan 201228 Aug 2013
MLA/2012/00031/4 - CompletedApplication - ConstructionLymington Harbour Protection - Phase 2Lymington Harbour Commissioners23 Jan 201212 Sep 2014
MLA/2012/00032 - CompletedApplication - Removals (inc. Grab Samples)Medway & Swale Sediment PlanPeel Ports Medway23 Jan 201222 Mar 2012
MLA/2012/00033 - WithdrawnApplication - ConstructionINSTALLATION OF NEW SUBAQUEOUS CABLESBritish Telecommunications Public Limited Company24 Jan 2012
MLA/2012/00034 - CompletedApplication - Removals (inc. Grab Samples)BEEMS WP2 Sizewell Grab Survey 2012Cefas24 Jan 201209 Mar 2012
MLA/2012/00035 - CompletedApplication - ConstructionGreenwich Peninsula - Riverwall Refurbishment and / or ReplacementQuintain Estates And Development Plc24 Jan 201201 Jun 2012
MLA/2012/00036/2 - CompletedApplication - Removals (inc. Grab Samples)North Sea NetworkNational Grid Commercial Holdings Limited24 Jan 201202 Oct 2012
MLA/2012/00037/4 - CompletedApplication - Removals (inc. Grab Samples)Teesside Offshore WindfarmTeesside Windfarm Limited25 Jan 201213 Jul 2012
MLA/2012/00038/2 - CompletedApplication - Removals (inc. Grab Samples)2012 grab samples for Sovereign disposal sitePremier Marinas26 Jan 201229 Feb 2012
MLA/2012/00040/2 - CompletedApplication - Removals (inc. Grab Samples)Statutory monitoringEnvironment Agency26 Jan 201211 Mar 2013
MLA/2012/00041 - CompletedApplication - ConstructionBrownsea Castle, Poole Jetteyand Sea Defence REpairsJohn Lewis Partnership26 Jan 201205 Sep 2012
MLA/2012/00042 - CompletedApplication - Alternative Use of Dredged MaterialBeneficial Use Of Dredged Spoil, Blue Lagoon, Poole HarbourLilliput Sailing Club26 Jan 201221 May 2012
MLA/2012/00043/1 - CompletedApplication - Removals (inc. Grab Samples)Marine Conservation Zones monitoringEnvironment Agency27 Jan 201211 Mar 2013
MLA/2012/00044 - CompletedApplication - Removals (inc. Grab Samples)Sellafield - Offshore Sediment SamplingSellafield Limited27 Jan 201208 Mar 2012
MLA/2012/00045/3 - CompletedApplication - Removals (inc. Grab Samples)Benthic survey of proposed Marine Conservation ZonesCefas27 Jan 201228 Mar 2012
MLA/2012/00046/1 - CompletedApplication - Dredged Material Disposal, DredgingWidening of Berths 204 and 205, Port of SouthamptonAssociated British Ports, Southampton27 Jan 201231 May 2012
MLA/2012/00047 - CompletedApplication - Removals (inc. Grab Samples)London Array Phase 2 Geotechnical surveyLondon Array Limited27 Jan 201226 Mar 2012
MLA/2012/00048 - WithdrawnApplication - Dredged Material Disposal, Dredging, Removals (inc. Grab Samples)North Camber sediment removal and DisposalDebut Services Ltd27 Jan 2012
MLA/2012/00049 - CompletedApplication - ConstructionFulham Reach PontoonSt George Central London Limited27 Jan 201204 May 2012
MLA/2012/00050/2 - CompletedApplication - ConstructionOsborne Bay Marker BuoysEnglish Heritage30 Jan 201202 Oct 2012
MLA/2012/00051/2 - CompletedApplication - ConstructionGreatham Managed Realignment Scheme (Greatham MRS)Environment Agency30 Jan 201225 Mar 2014
MLA/2012/00052/1 - CompletedApplication - Removals (inc. Grab Samples)coring survey in Owers licence area 122/1Tarmac Marine Dredging Limited30 Jan 201225 May 2012
MLA/2012/00053/2 - CompletedApplication - Construction, Dredged Material Disposal, DredgingBembridge Harbour Dredging and Pontoon Works Grouped under: Bembridge Harbour (IoW) dredging Showing 2 of 4 casesBembridge Harbour Improvements Company Limited31 Jan 201212 Nov 2012
MLA/2012/00054/5 - CompletedApplication - ConstructionSea Outfall at Burn Road, Hartlepool, County DurhamNorthumbrian Water Limited31 Jan 201207 Jan 2014
MLA/2012/00055 - CompletedApplication - RenewablesUse of tracer dyesGreater Gabbard Offshore Winds Limited01 Feb 201217 Feb 2012
MLA/2012/00057 - CompletedApplication - Removals (inc. Grab Samples)Thames Tunnel Overwater CPT Testing and Vibro CoringThames Water Utilities Limited01 Feb 201213 Apr 2012
MLA/2012/00058/2 - CompletedApplication - ConstructionNavitus Bay Wind Park Meteorological Mast ApplicationEneco Wind Uk Limited01 Feb 201210 Dec 2015
MLA/2012/00060 - CompletedApplication - Removals (inc. Grab Samples)Anglo-Scottish Eastern HVDC LinkMmt06 Feb 201201 May 2012
MLA/2012/00061 - CompletedApplication - Removals (inc. Grab Samples)Launching improvements for inshore lifeboat at RNLI Burnham on SeaRoyal National Lifeboat Institution06 Feb 201216 Apr 2012
MLA/2012/00062 - CompletedApplication - RenewablesGreater Gabbard - Exposed export cable - approval to lay concrete mattressingGreater Gabbard Offshore Winds Limited07 Feb 201231 Aug 2012
MLA/2012/00063/1 - CompletedApplication - ConstructionGreenbank Hotel Mooring Boat and PontoonsGreenbank Hotel07 Feb 201203 Oct 2013
MLA/2012/00064/1 - CompletedApplication - Dredged Material Disposal, DredgingMaintenance Dredging of Bridlington HarbourBridlington Harbour Commissioners07 Feb 201218 Feb 2013
MLA/2012/00065 - CompletedApplication - ConstructionRepair of Jetty HammerheadHoo Ness Yacht Club07 Feb 201222 Mar 2012
MLA/2012/00066 - CompletedApplication - Removals (inc. Grab Samples)Salcombe Fish Quay Site InvestigationSouth Hams District Council07 Feb 201223 Mar 2012
MLA/2012/00067 - CompletedApplication - Constructionpontoon c extensionPontoon Berth Holders Two09 Feb 201221 Jun 2012
MLA/2012/00068/1 - CompletedApplication - Alternative Use of Dredged Material, ConstructionCleveleys Beach Nourishment SchemeWyre Borough Council09 Feb 201231 Jan 2014
MLA/2012/00069/1 - CompletedApplication - Construction, Removals (inc. Grab Samples)Detection and removal of out-of-service cables area 478Deme Building Materials Limited10 Feb 201210 Oct 2012
MLA/2012/00070/1 - CompletedApplication - Aggregate DredgingArea 137Cemex Uk Marine Limited10 Feb 201202 Jul 2014
MLA/2012/00072/1 - CompletedApplication - Dredged Material DisposalABP Port of IpswichAbport Limited13 Feb 201222 Oct 2012
MLA/2012/00073/2 - CompletedApplication - ConstructionLiverpool John Lennon Airport Lighting Gantry MaintenanceLiverpool Airport Limited13 Feb 201211 Jun 2013
MLA/2012/00075/2 - CompletedApplication - Aggregate DredgingArea 106 (Restricted Footprint)Hanson Aggregates Marine Limited13 Feb 201203 Jul 2014
MLA/2012/00076 - CompletedApplication - ConstructionHarrington coastal ProtectionJ. Murphy & Sons Limited13 Feb 201204 May 2012
MLA/2012/00077 - CompletedApplication - ConstructionSlipway repairs, Tregonce Cliff, PadstowMr Hugh Osmond13 Feb 201230 Apr 2012
MLA/2012/00078 - CompletedApplication - ConstructionWhitehaven Harbour Pontoon DevelopmentWhitehaven Harbour Commissioners Vice Chairman14 Feb 201209 Aug 2012
MLA/2012/00080 - CompletedApplication - ConstructionKemsly Burley Outfall - AccessEnvironment Agency (Southern Region)16 Feb 201208 May 2012
MLA/2012/00081/2 - CompletedApplication - Removals (inc. Grab Samples)Benthic and Fish Ecology Field SurveyEneco Wind Uk Limited17 Feb 201217 May 2012
MLA/2012/00082 - CompletedApplication - DredgingOikos Jetty No.1 Phase 2Oikos Storage Limited17 Feb 201201 Aug 2012
MLA/2012/00083/4 - CompletedApplication - Dredged Material Disposal, DredgingC.RO PORTS NORTH KILLINGHOLME (BERTHS 1 to 6 PLUS APPROACHES)Humber Sea Terminal Limited17 Feb 201220 Jun 2016
MLA/2012/00086/1 - CompletedApplication - Dredged Material Disposal, DredgingTrafalgar Wharf Marina Basin Access ChannelTrafalgar Wharf Limited17 Feb 201202 Aug 2012
MLA/2012/00089/1 - CompletedApplication - Removals (inc. Grab Samples)Vibrocore and Grab Sample Surveys for Area 499Hanson Aggregates Marine Limited20 Feb 201230 Mar 2012
MLA/2012/00090 - CompletedApplication - Construction, Removals (inc. Grab Samples)Swash Channel Wreck ProjectBournemouth University20 Feb 201219 Apr 2012
MLA/2012/00091/2 - CompletedApplication - ConstructionSeawork Exhibition Temporary PontoonsMercator Media Limited20 Feb 201229 Apr 2016
MLA/2012/00094 - CompletedApplication - Aggregate DredgingArea 102 STCemex Uk Marine Limited22 Feb 201204 Sep 2012
MLA/2012/00096/1 - CompletedApplication - Aggregate DredgingProtector Overfalls Area 197Tarmac Marine Dredging Limited23 Feb 201207 Jul 2014
MLA/2012/00097/1 - CompletedApplication - ConstructionRenovate Moorings at River Yar BoatyardMr Roger Allen24 Feb 201218 Jun 2013
MLA/2012/00098/2 - CompletedApplication - ConstructionBrus CulvertNorthumbrian Water Limited24 Feb 201202 Aug 2013
MLA/2012/00099/1 - CompletedApplication - ConstructionKing Point Marina Wave GateSutton Harbour Services Limited24 Feb 201224 Sep 2012
MLA/2012/00100/10 - CompletedApplication - Miscellaneous Disposal, Removals (inc. Grab Samples)Port of Falmouth Development Initiative: TrialFalmouth Harbour Commissioners24 Feb 201227 Aug 2013
MLA/2012/00101/5 - CompletedApplication - Dredged Material Disposal, DredgingBrighton Marina Dredging & Disposal Program 2012 - 2015Premier Marinas (Brighton) Limited27 Feb 201217 Sep 2015
MLA/2012/00102 - CompletedApplication - ConstructionFulham Football Club New Riverside StandFulham Football Club Marine WorksFulham Stadium Limited28 Feb 201222 Dec 2015
MLA/2012/00106 - CompletedApplication - Emergency Worktamesis dock cradleTamesis Dock Limited04 Mar 201203 Apr 2012
MLA/2012/00107 - CompletedApplication - ConstructionDischarge Outfall Protection, Crossrail Limmo WorksiteDragados Sisk Joint Venture05 Mar 201229 May 2012
MLA/2012/00108 - CompletedApplication - Removals (inc. Grab Samples)Removal of dead sperm whale from Skegness beachEast Lindsey District Council05 Mar 201205 Mar 2012
MLA/2012/00109 - CompletedApplication - Removals (inc. Grab Samples)Area 483 and 484 Characterisation/ Pre-Dredge Benthic SurveyEmu Limited05 Mar 201227 Jul 2012
MLA/2012/00110/2 - CompletedApplication - ConstructionCrossrail C807 Marine TransportationBam Nuttall Limited05 Mar 201212 Jun 2012
MLA/2012/00111 - CompletedApplication - ConstructionSea of Voices Public Art work for Brighton FestivalInvisible Flock05 Mar 201219 Apr 2012
MLA/2012/00112 - CompletedApplication - Removals (inc. Grab Samples)Stock assessments, marine monitoring and environmental researchEastern Inshore Fisheries And Conservation Authority06 Mar 201201 May 2012
MLA/2012/00113/3 - CompletedApplication - Aggregate DredgingArea 240 (Restricted Footprint)Hanson Aggregates Marine Limited07 Mar 201208 Jul 2014
MLA/2012/00116/1 - CompletedApplication - Removals (inc. Grab Samples)Gunfleet Sands Demonstration Project Export Cable Vibrocore SurveyDong Energy Gunfleet Sands Demo (Uk) Ltd07 Mar 201209 Jul 2012
MLA/2012/00117/1 - CompletedApplication - ConstructionRiver Clyst BridgeDevon County Council07 Mar 201209 May 2013
MLA/2012/00119/2 - CompletedApplication - Removals (inc. Grab Samples)Ground Investigation (GI) Works for Hinkley Point C Preliminary Works (Jetty) Grouped under: Hinkley Point C Showing 2 of 7 casesEdf Energy07 Mar 201213 Mar 2013
MLA/2012/00120 - CompletedApplication - Emergency WorkHill Head Sailing Club: Beach Shingle Project to make SafeHill Head Sailing Club08 Mar 201215 Mar 2012
MLA/2012/00121 - CompletedApplication - Emergency WorkThe Mouth of the River AxeEast Devon District Council08 Mar 201220 Mar 2012
MLA/2012/00122/10 - CompletedApplication - RenewablesBlyth Offshore Demonstration ProjectBlyth Offshore Demonstrator Limited09 Mar 201222 Dec 2021
MLA/2012/00123/1 - CompletedApplication - Aggregate DredgingArea 228 Short Term Marine Licence ApplicationVolker Dredging Limited12 Mar 201207 Jul 2014
MLA/2012/00124/1 - CompletedApplication - ConstructionInstallation of Warsash Maritime Academy Transfer ladderWarsash Maritime Academy13 Mar 201220 Jun 2012
MLA/2012/00126/7 - CompletedApplication - Removals (inc. Grab Samples)Burbo Bank Extension Offshore Wind Farm - Geotechnical investigations #1 & #2Dong Energy Burbo Extension (Uk) Ltd13 Mar 201218 Dec 2013
MLA/2012/00127 - CompletedApplication - ConstructionSouthampton International Boat ShowSouthampton International Boat Show Limited15 Mar 201201 Jun 2012
MLA/2012/00128/1 - CompletedApplication - Emergency WorkSlipper Mill Pond Gate ReplacementSlipper Mill Pond Association15 Mar 201212 Jun 2012
MLA/2012/00129/2 - CompletedApplication - ConstructionMiddleton Wastewater Treatment Works Long Sea Outfall - Diffuser ModificationsUnited Utilities Plc16 Mar 201220 Mar 2013
MLA/2012/00130/1 - CompletedApplication - Construction132kV electric cable replacement Lepe to Thorness BayScottish And Southern Energy Plc19 Mar 201221 Aug 2013
MLA/2012/00131 - CompletedApplication - Construction, Dredged Material Disposal, DredgingRNSA Moorings GosportRnsa (Portsmouth Branch Moorings)20 Mar 201211 Jul 2012
MLA/2012/00134 - CompletedApplication - Removals (inc. Grab Samples)Port of Poole Master Plan Surveys for EIAPoole Harbour Commissioners22 Mar 201202 May 2012
MLA/2012/00135/5 - CompletedApplication - Aggregate DredgingArea 328 (Restricted Footprint)Hanson Aggregates Marine Limited23 Mar 201203 Jul 2014
MLA/2012/00136/7 - CompletedApplication - Construction, Removals (inc. Grab Samples)Construction of CTV PontoonCammell Laird Shiprepairers & Shipbuilders Limited23 Mar 201217 Jul 2015
MLA/2012/00137 - CompletedApplication - Emergency WorkLiara Bridge North West Abutment Masonry RepairsPlymouth City Council23 Mar 201228 Mar 2012
MLA/2012/00138/1 - CompletedApplication - ConstructionDesignated Bathing Area (swimming area buoys)Blue Flag RequirementsSwanage Town Council26 Mar 201216 Aug 2012
MLA/2012/00139/1 - CompletedApplication - Aggregate DredgingArea 360 short-term applicationCemex Uk Marine Limited26 Mar 201222 May 2014
MLA/2012/00140/1 - CompletedApplication - Aggregate DredgingArea 251 South Lowestoft short term applicationCemex Uk Marine Limited27 Mar 201203 Jul 2014
MLA/2012/00141/2 - CompletedApplication - Dredged Material DisposalTees and Hartlepool Maintenance Dredge DisposalPd Teesport Limited28 Mar 201230 Sep 2015
MLA/2012/00142 - CompletedApplication - Removals (inc. Grab Samples)Removal of mud from Dingy PoolAdur Cruising Association28 Mar 201230 Jul 2012
MLA/2012/00143 - CompletedApplication - ConstructionStallingborough Phase 2 Revetment Maintenance and ImprovementsEnvironment Agency28 Mar 201231 May 2012
MLA/2012/00144/1 - CompletedApplication - Removals (inc. Grab Samples)Seaforth Marine Geo-Environmental InvestigationPeel Ports Limited29 Mar 201230 Jan 2013
MLA/2012/00145 - CompletedApplication - ConstructionSouth Bank Bird Roosting PlatformAssociated British Ports.29 Mar 201203 Jul 2012
MLA/2012/00147/2 - CompletedApplication - ConstructionSalcombe Fish QuaySouth Hams District Council29 Mar 201217 Sep 2012
MLA/2012/00148/3 - CompletedApplication - ConstructionSCOTSWOOD REGENARATIONNewcastle City Council02 Apr 201202 Sep 2015
MLA/2012/00150/1 - CompletedApplication - RenewablesDogger Bank Windfarm CPT CampaignForewind Limited03 Apr 201218 May 2012
MLA/2012/00151/1 - CompletedApplication - Aggregate DredgingCross Sands Area 296 aggregate dredging licence applicationTarmac Marine Dredging Limited03 Apr 201202 Jul 2014
MLA/2012/00152/8 - CompletedApplication - DredgingDredging Adjacent Falmouth Petroleum Ltd's Eastern JettyFalmouth Petroleum Limited04 Apr 201218 Jul 2014
MLA/2012/00153/3 - CompletedApplication - Removals (inc. Grab Samples)Hornsea offshore wind farm benthic survey 2012Smart Wind Limited04 Apr 201208 Aug 2012
MLA/2012/00154 - CompletedApplication - ConstructionBeach Well installation on pakefield beach LowestoftCefas Technology Limited04 Apr 201226 Jul 2012
MLA/2012/00156/1 - CompletedApplication - Emergency WorkTorcross sewage outfall repairSouth West Water Limited04 Apr 201203 Sep 2012
MLA/2012/00158 - CompletedApplication - ConstructionSt. Mary's Slipway RepairsRoyal National Lifeboat Institution10 Apr 201212 Sep 2012
MLA/2012/00160 - CompletedApplication - Removals (inc. Grab Samples)Pile Removing Poole HarbourPerenco Uk Limited11 Apr 201212 Jul 2012
MLA/2012/00161/1 - CompletedApplication - ConstructionMersey Warrington Flood Risk Management Scheme (FRMS)Environment Agency (Warrington)12 Apr 201225 Mar 2013
MLA/2012/00162/1 - CompletedApplication - ConstructionAVON WHARF PONTOON MOORINGSAvon Wharf Management Company Limited13 Apr 201202 Aug 2012
MLA/2012/00163/1 - CompletedApplication - Removals (inc. Grab Samples)Geotechnical investigation: Race Bank and Docking Shoal export cable routeCentrica Renewable Energy Limited16 Apr 201219 Aug 2013
MLA/2012/00164/2 - CompletedApplication - Dredged Material DisposalYarmouth Harbour Phase 2Yarmouth Harbour Commissioners (Iow)17 Apr 201205 Oct 2012
MLA/2012/00165 - CompletedApplication - ConstructionRockley Viaduct and Creekmoor WallAmalgamated Construction Ltd17 Apr 201209 Aug 2012
MLA/2012/00166 - CompletedApplication - ConstructionPrivate Timber JettyMr Duncan Willard17 Apr 201211 Jul 2012
MLA/2012/00167/1 - CompletedApplication - Construction, Removals (inc. Grab Samples)Shingle Transfer and Beach Re-ProfileShoreham Port Authority18 Apr 201204 Dec 2013
MLA/2012/00168 - CompletedApplication - ConstructionSalcombe Harbour HotelGalliford Try18 Apr 201226 Jun 2012
MLA/2012/00169/6 - CompletedApplication - ConstructionDeal Sea DefencesEnvironment Agency18 Apr 201227 Aug 2013
MLA/2012/00170/3 - CompletedApplication - Removals (inc. Grab Samples)Thames Vibrocoring and Grab SurveyMarinespace Ltd19 Apr 201203 Jul 2012
MLA/2012/00172 - CompletedApplication - ConstructionSalcombe Saline InterventionsSouth West Water Limited20 Apr 201214 May 2012
MLA/2012/00173 - CompletedApplication - ConstructionGas Works Bridge 13Bam Nuttall Limited23 Apr 201225 Jun 2012
MLA/2012/00174 - CompletedApplication - ConstructionGreenwich Yacht ClubGreenwich Yacht Club Limited23 Apr 201212 Sep 2012
MLA/2012/00175/3 - CompletedApplication - Construction, Removals (inc. Grab Samples)River wall reconstruction 26 - 37 Clive Street North ShieldsSouthbay Civil Engineering Limited24 Apr 201209 Dec 2014
MLA/2012/00176 - CompletedApplication - DredgingCrossrailDragados Sisk Joint Venture24 Apr 201217 Aug 2012
MLA/2012/00178/4 - CompletedApplication - Removals (inc. Grab Samples)Marine Sampling off North Cornwall Coast Grouped under: Marine Minerals Limited Showing 2 of 3 casesMarine Minerals Limited24 Apr 201215 Jan 2013
MLA/2012/00179 - CompletedApplication - Removals (inc. Grab Samples)Dogger Bank Tranche Geotechnical Campaign - BoreholesForewind Limited25 Apr 201212 Jul 2012
MLA/2012/00180/1 - CompletedApplication - Removals (inc. Grab Samples)Tranche B and Teesside Cable Corridor Benthic SurveyForewind Limited25 Apr 201229 Oct 2012
MLA/2012/00181 - CompletedApplication - ConstructionFoulness Island-Sea wall protectionQinetiq25 Apr 201216 Jul 2012
MLA/2012/00182 - CompletedApplication - ConstructionAlbion Terrace Flooding AlleviationNorthumbrian Water Limited25 Apr 201222 Oct 2012
MLA/2012/00183 - CompletedApplication - ConstructionReinstatment of Dilapitated Ham WharfMr Dan Tester25 Apr 201219 Jul 2012
MLA/2012/00184/1 - CompletedApplication - Removals (inc. Grab Samples)Roosecote Biomass Power Station / Ramsden Dock New BerthRps Planning & Development Limited25 Apr 201210 Jul 2012
MLA/2012/00185/3 - CompletedApplication - ConstructionTees Transporter Bridge EnhancementsMiddlesbrough Council25 Apr 201221 Jul 2014
MLA/2012/00186/1 - CompletedApplication - ConstructionNethertown-St Bees to Braystones Coastal ProtectionJ. Murphy & Sons Limited25 Apr 201223 Apr 2013
MLA/2012/00187/6 - CompletedApplication - Removals (inc. Grab Samples)TETNEY SEALINE REPLACEMENT PROJECT - GEOTECHNICAL/GEOPHYSICAL SURVEY WORKSPhillips 66 Limited26 Apr 201225 Mar 2014
MLA/2012/00188 - WithdrawnApplication - Removals (inc. Grab Samples)Removal of unsafe timber fende adjacent to Shoreham Harbour FootbridgeWest Sussex County Council26 Apr 2012
MLA/2012/00189 - CompletedApplication - ConstructionYWS Scarborough & Bridlington Sea Outfalls - Ground Investigation Grouped under: Wheatcroft Long Sea Outfall Showing 2 of 7 casesYorkshire Water Services Limited27 Apr 201218 Jul 2012
MLA/2012/00190 - CompletedApplication - Emergency WorkCowbar Rock Fall Remediation WorksRedcar & Cleveland Borough Council27 Apr 201204 May 2012
MLA/2012/00191 - CompletedApplication - ConstructionRelocate Floating pontoonMr William Baker27 Apr 201219 Jun 2012
MLA/2012/00192 - CompletedApplication - ConstructionWest Quay wall replacementSomerset County Council27 Apr 201220 Jul 2012
MLA/2012/00193/8 - CompletedApplication - ConstructionQuay wall repair, South Quay HayleIng Red Uk27 Apr 201208 Aug 2014
MLA/2012/00194/2 - CompletedApplication - RenewablesGeophysical and geotechnical surveyGalloper Wind Farm Limited27 Apr 201230 Nov 2012
MLA/2012/00195/6 - CompletedApplication - Aggregate Dredging, Removals (inc. Grab Samples)Aggregate dredging Area 395 licence renewalTarmac Marine Dredging Limited27 Apr 201221 May 2024
MLA/2012/00196 - CompletedApplication - Construction, Removals (inc. Grab Samples)Repair of Existing Wharf Damaged by Ship Collision (42 Wharf, Northfleet)Lafarge Cement Uk Limited30 Apr 201220 Aug 2012
MLA/2012/00197/6 - CompletedApplication - Aggregate Dredging, Removals (inc. Grab Samples)Aggregate dredging Area 395 licence renewalAggregate Industries Uk Limited30 Apr 201214 Feb 2019
MLA/2012/00198/3 - CompletedApplication - ConstructionLots Road DevelopmentCircadian Limited01 May 201227 Nov 2013
MLA/2012/00199/1 - CompletedApplication - ConstructionHadston Outfall RepairNorthumbrian Water Limited01 May 201207 Nov 2012
MLA/2012/00200/1 - CompletedApplication - Construction, Removals (inc. Grab Samples)Removal of revetment and deposit of revetment material on beach at AldbroughSse Hornsea Limited02 May 201202 Nov 2012
MLA/2012/00203/9 - CompletedApplication - ConstructionScour Protection BML2-41 River Avon, ChristchurchNetwork Rail03 May 201230 Jul 2014
MLA/2012/00204/1 - CompletedApplication - Removals (inc. Grab Samples)Lower Ferry Project, DartmouthSouth Hams District Council04 May 201222 Jun 2012
MLA/2012/00205/8 - CompletedApplication - Dredged Material DisposalRiver Yare Maintenance Dredging DisposalGreat Yarmouth Port Company Ltd04 May 201223 Sep 2015
MLA/2012/00206/8 - CompletedApplication - Dredged Material DisposalPort of Barrow Maintenance DredgingAssociated British Ports.04 May 201211 Mar 2016
MLA/2012/00207/2 - CompletedApplication - Construction, Removals (inc. Grab Samples)Felixstowe Pier redevelopmentPier Amusements (Felixstowe) Ltd04 May 201208 Jan 2013
MLA/2012/00208/2 - CompletedApplication - DredgingMillbay Enabling Works, Outer Basin DredgingEnglish Cities Fund04 May 201208 Feb 2013
MLA/2012/00209 - CompletedApplication - Removals (inc. Grab Samples)Area 137 vibrocoring surveyCemex Uk Marine Limited08 May 201208 Aug 2012
MLA/2012/00210/1 - CompletedApplication - ConstructionRyde Pier RepairsDyer And Butler Limited08 May 201220 Dec 2012
MLA/2012/00211 - CompletedApplication - Removals (inc. Grab Samples)Area 123 Vibrocore surveyCemex Uk Marine Limited09 May 201221 Aug 2012
MLA/2012/00213 - CompletedApplication - ConstructionProposed Strengthening Sutton Ford Bridge, Rochford (River Roach)Essex Highways09 May 201223 Jul 2012
MLA/2012/00214/2 - CompletedApplication - ConstructionMedway Valley DevelopmentTrenport (Peters Village) Limited09 May 201217 Jan 2013
MLA/2012/00215 - CompletedApplication - ConstructionTrack Renewal on the Royal Albert Bridge, PlymouthNetwork Rail Limited10 May 201205 Jul 2012
MLA/2012/00216 - CompletedApplication - Emergency WorkSouthwick Beach Emergency ReinforcementShoreham Port Authority10 May 201216 May 2012
MLA/2012/00217 - CompletedApplication - Constructionconvert part of decking to steps for access to small L shaped floating platformMrs Dianah Humber11 May 201227 Jun 2012
MLA/2012/00218/5 - CompletedApplication - Removals (inc. Grab Samples)Geotechnical investigations at the proposed Walney Extension Offshore Wind farmDong Energy Power (Uk) Limited14 May 201212 Jun 2014
MLA/2012/00219 - CompletedApplication - ConstructionClevedon Pier Painting 2012Clevedon Pier And Heritage Trust Ltd14 May 201205 Jul 2012
MLA/2012/00220/4 - CompletedApplication - ConstructionReplacement Footbridges Morston BorfolkThe National Trust15 May 201224 Feb 2014
MLA/2012/00221 - CompletedApplication - Removals (inc. Grab Samples)Portsmouth UHAF - Demolition Works of Existing FacilityVolker Stevin Limited15 May 201223 Jul 2012
MLA/2012/00222 - CompletedApplication - RenewablesDogger Bank Tranche A calibration CPTs Spring 2012Forewind Limited15 May 201231 May 2012
MLA/2012/00223 - CompletedApplication - Miscellaneous DisposalTracer DepositEnvironment Agency (Southern Region)16 May 201227 Jun 2012
MLA/2012/00224 - CompletedApplication - ConstructionSouth Basin BreakwaterArun Yacht Club Ltd16 May 201221 Aug 2012
MLA/2012/00225/2 - CompletedApplication - Removals (inc. Grab Samples)Swath bathymetry survey of St Catherine's DeepDr Travis Mason16 May 201217 Jul 2012
MLA/2012/00226/1 - CompletedApplication - Construction, Removals (inc. Grab Samples)Shandon, Yarmouth - Proposed Replacement JettyMr + Mrs Jonathan + Jill Whitehead17 May 201214 Feb 2013
MLA/2012/00227 - CompletedApplication - Dredged Material Disposal, DredgingHusbands ShipyardOceanic Estates Ltd18 May 201202 Nov 2012
MLA/2012/00228/3 - CompletedApplication - Construction, Dredged Material Disposal, DredgingKingston Marine ParkIsle Of Wight Council21 May 201210 Jun 2019
MLA/2012/00229 - WithdrawnApplication - Construction, Removals (inc. Grab Samples)Roa Jetty ReconstructionBarrow Borough Council21 May 2012
MLA/2012/00230 - CompletedApplication - Emergency WorkAtwick coastal site concrete plinth removalSse Hornsea Limited22 May 201225 May 2012
MLA/2012/00231 - CompletedApplication - Removals (inc. Grab Samples)BEEMS WP2 Hinkley Point Ecological Survey 2012Cefas23 May 201215 Jun 2012
MLA/2012/00232/1 - CompletedApplication - Removals (inc. Grab Samples)Removal of wreck Vivian Sue in FleetIlchester Estates23 May 201214 Aug 2012
MLA/2012/00233 - CompletedApplication - ConstructionBSC Main Pontoon - StabilisationBembridge Sailing Club24 May 201218 Jul 2012
MLA/2012/00234 - CompletedApplication - Construction, Removals (inc. Grab Samples)Venture Quay Proposed Hoist DockSouth Boats Special Projects Limited24 May 201220 Aug 2012
MLA/2012/00235 - CompletedApplication - Removals (inc. Grab Samples)Western HVDC Link submarine power cable surveyNget/Spt Upgrades Limited24 May 201223 Aug 2012
MLA/2012/00236 - CompletedApplication - ConstructionWeymouth & Portland Olympic Sailing Venue Installation Of Olympic RingsThe London Organising Committee Of The Olympic Games And Paralympic Games Limited25 May 201203 Jul 2012
MLA/2012/00237 - CompletedApplication - ConstructionSea Lawn Outfall DawlishSouth West Water Limited28 May 201229 Oct 2012
MLA/2012/00238/1 - CompletedApplication - Miscellaneous Disposal, Removals (inc. Grab Samples)Liverpool 2 and Middle Deep & Mid-River Sediment Management StudiesMersey Docks And Harbour Company29 May 201210 Aug 2012
MLA/2012/00239 - CompletedApplication - ConstructionLarkstone Slipway extensionIlfracombe Harbour Authority30 May 201223 Jul 2012
MLA/2012/00240/1 - CompletedApplication - ConstructionSteart Coastal Management ProjectEnvironment Agency – South West Reg30 May 201201 Nov 2012
MLA/2012/00241 - WithdrawnApplication - Removals (inc. Grab Samples)Hornsea Offshore Wind Farm Project One - Landfall Geotechnical SurveySmart Wind Limited30 May 2012
MLA/2012/00242/13 - CompletedApplication - Alternative Use of Dredged Material, Construction, Dredging, Removals (inc. Grab Samples)Lee Tunnel ProjectMvbjv30 May 201230 Jun 2015
MLA/2012/00243/5 - CompletedApplication - Dredged Material DisposalMaintenance Dredging Disposal - Dover Harbour BoardDover Harbour Board31 May 201204 Jan 2016
MLA/2012/00244/1 - CompletedApplication - ConstructionRepairs at Baltic WharfBaltic Distribution Limited31 May 201230 Aug 2012
MLA/2012/00245 - CompletedApplication - Removals (inc. Grab Samples)Removal of piles in connection with the construction of new Launching RampMpi Services (Uk) Limited31 May 201208 Aug 2012
MLA/2012/00246 - CompletedApplication - ConstructionOBS SkyCam across the ThamesThe London Organising Committee Of The Olympic Games And Paralympic Games Limited01 Jun 201204 Jul 2012
MLA/2012/00247/2 - CompletedApplication - Dredged Material Disposal, DredgingDredging material from around the Cleveland Potash Ltd outfall for disposalCleveland Potash Limited02 Jun 201213 Nov 2015
MLA/2012/00248 - CompletedApplication - ConstructionFloating Pontoon at Redcliff BeachCoastline Cruises Ltd05 Jun 201216 Jul 2012
MLA/2012/00249/4 - CompletedApplication - Dredged Material DisposalPort of Workington Maintenance DredgingPort Of Workington06 Jun 201208 Jan 2016
MLA/2012/00250 - CompletedApplication - Miscellaneous Disposal, Removals (inc. Grab Samples)Rye Harbour sand bar removalEnvironment Agency06 Jun 201204 Sep 2012
MLA/2012/00251/1 - CompletedApplication - Construction, Removals (inc. Grab Samples)Proposed Timber Piling to Part Spragger Drain, Sunk IslandCarter Jonas Llp06 Jun 201208 Oct 2012
MLA/2012/00253 - CompletedApplication - ConstructionSeasalter Shellfish slipway refurbishment project.Seasalter Shellfish (Whitstable) Ltd08 Jun 201224 Sep 2012
MLA/2012/00254/1 - CompletedApplication - ConstructionConstruction of a new outfall into the Duddon EstuaryUnited Utilities Water Plc08 Jun 201222 Aug 2013
MLA/2012/00256/1 - CompletedApplication - ConstructionFalmouth Marina - Cill DefectPremier Marinas Limited11 Jun 201211 Jul 2013
MLA/2012/00257/6 - CompletedApplication - Dredged Material DisposalMaintenance dredging - Wells HarbourWells Harbour Commissioners12 Jun 201222 Aug 2014
MLA/2012/00258/2 - CompletedApplication - Removals (inc. Grab Samples)HarwichThomson Unicomarine Limited13 Jun 201223 Jul 2012
MLA/2012/00259/10 - Variation RequestedApplication - Construction, Dredging, Miscellaneous DisposalHinkley Point C Project: New Nuclear Development Grouped under: Hinkley Point C Showing 2 of 7 casesNnb Generation Company (Hpc) Limited15 Jun 201222 Feb 2023
MLA/2012/00260/1 - CompletedApplication - ConstructionImprovement of Lower Ferry SlipwaysSouth Hams District Council15 Jun 201214 Dec 2012
MLA/2012/00261 - CompletedApplication - Emergency WorkTeesside Offshore Windfarm - Ordnance DisposalTeesside Windfarm Limited19 Jun 201222 Jun 2012
MLA/2012/00263 - CompletedApplication - ConstructionStrengthening of Raw Sugar JettyTate & Lyle20 Jun 201213 Sep 2012
MLA/2012/00264/1 - CompletedApplication - Dredged Material Disposal, DredgingParkstone Yacht Club Haven Maintenance DredgeParkstone Yacht Club (Haven) Limited21 Jun 201211 Nov 2013
MLA/2012/00265/1 - CompletedApplication - Removals (inc. Grab Samples)Removal of items from ship wrecksMr William Pocklington21 Jun 201204 Sep 2015
MLA/2012/00266 - CompletedApplication - ConstructionWaveSentry DeploymentEmu Limited22 Jun 201203 Sep 2012
MLA/2012/00267 - CompletedApplication - Removals (inc. Grab Samples)Particle size distribution survey in Liverpool BayUniversity Of Liverpool22 Jun 201226 Jul 2012
MLA/2012/00268/1 - CompletedApplication - ConstructionMarina Extension, Chatham Maritime MarinaMarina Developments Limited22 Jun 201215 Feb 2013
MLA/2012/00270/2 - CompletedApplication - ConstructionOsea Island, Causeway Annual MaintenanceDha Planning Ltd26 Jun 201222 Dec 2015
MLA/2012/00271/7 - CompletedApplication - Dredged Material DisposalRiver Mersey Maintenance Dredge License RenewalThe Mersey Docks And Harbour Company Limited26 Jun 201230 Jan 2017
MLA/2012/00272 - CompletedApplication - Aggregate DredgingArea 340 Short Term Marine Licence ApplicationVolker Dredging Ltd28 Jun 201220 Sep 2012
MLA/2012/00273 - CompletedApplication - Removals (inc. Grab Samples)Teesside Offshore Windfarm - Magnetic anomaly investigationsTeesside Windfarm Limited28 Jun 201213 Jul 2012
MLA/2012/00274 - CompletedApplication - Aggregate DredgingArea 340 Short Term Marine Licence ApplicationCemex Uk Marine Limited28 Jun 201220 Sep 2012
MLA/2012/00275 - CompletedApplication - Construction, Removals (inc. Grab Samples)Blyth SO1 and SO2 Outfalls RepairNorthumbrian Water Limited28 Jun 201203 Oct 2012
MLA/2012/00276 - CompletedApplication - Emergency WorkProtection of Town Quay, LowestoftAbport Limited28 Jun 201228 Jun 2012
MLA/2012/00277 - CompletedApplication - ConstructionPre-application I.D MLP/2012/00063Scarborough Borough Council28 Jun 201221 Sep 2012
MLA/2012/00278/1 - CompletedApplication - Dredged Material DisposalKings Lynn Dock Point Maintenance Dredging and DisposalKings Lynn Conservancy Board29 Jun 201210 Dec 2013
MLA/2012/00279 - CompletedApplication - Dredged Material Disposal, DredgingMercury Yacht Harbour - Maintenance DredgingMarina Developments Limited29 Jun 201205 Feb 2013
MLA/2012/00280/2 - CompletedApplication - Dredged Material Disposal, DredgingPort Hamble Marina - Maintenance DredgingMarina Developments Limited29 Jun 201207 Oct 2015
MLA/2012/00281 - CompletedApplication - Dredged Material Disposal, DredgingHamble Point Marina - Maintenance DredgingMarina Developments Limited29 Jun 201205 Feb 2013
MLA/2012/00282/2 - CompletedApplication - Aggregate DredgingArea 242/361 (Restricted Footprint)Hanson Aggregates Marine Limited29 Jun 201222 Jul 2014
MLA/2012/00283/2 - CompletedApplication - Dredged Material Disposal, DredgingSeaham Harbour DredgingSeaham Harbour Dock Company02 Jul 201218 May 2015
MLA/2012/00284 - CompletedApplication - ConstructionImperial Recreation Ground, Revetment reconstruction and improvement worksEast Devon District Council02 Jul 201221 Dec 2012
MLA/2012/00285/2 - CompletedApplication - Dredged Material Disposal, DredgingHythe Marina Village (Approach Channel) - Maintenance DredgingMarina Developments Limited02 Jul 201210 Aug 2015
MLA/2012/00286/2 - CompletedApplication - ConstructionRoyal Princes Parade Coastal Protection WorksEast Riding Of Yorkshire Council02 Jul 201213 Nov 2012
MLA/2012/00287/1 - CompletedApplication - Aggregate DredgingArea 123/122-1 Short Term Marine Licence ApplicationCemex Uk Marine Limited03 Jul 201222 Jul 2014
MLA/2012/00288/1 - CompletedApplication - Aggregate DredgingOwers Area 123/122-1 short term marine licence applicationTarmac Marine Dredging Limited03 Jul 201222 Jul 2014
MLA/2012/00289/2 - CompletedApplication - Aggregate DredgingArea 212 (Restricted Footprint)Hanson Aggregates Marine Limited03 Jul 201207 Jul 2014
MLA/2012/00290 - CompletedApplication - Removals (inc. Grab Samples)Wash intertidal opportunistic macroalgae surveyEnvironment Agency03 Jul 201231 Aug 2012
MLA/2012/00291/1 - CompletedApplication - Construction101 Berth Scour ProtectionAssociated British Ports, Southampton04 Jul 201202 May 2013
MLA/2012/00293 - CompletedApplication - ConstructionInstallation of CO2 tank on jetty at Tilbury Power StationRwe Npower Plc06 Jul 201223 Aug 2012
MLA/2012/00294/3 - CompletedApplication - Construction, Dredged Material Disposal, Dredging, Removals (inc. Grab Samples)Replacement Quay AV DawsonA.V.Dawson Limited06 Jul 201202 Jun 2014
MLA/2012/00297/1 - CompletedApplication - Aggregate Dredging319 short-term applicationCemex Uk Marine Limited09 Jul 201223 May 2014
MLA/2012/00298/1 - CompletedApplication - Removals (inc. Grab Samples)Round 3 Geophysical Survey with seabed samplesCentrica Energy Renewable Investments Limited09 Jul 201220 Aug 2012
MLA/2012/00299 - CompletedApplication - ConstructionRevetment Works, Hythe Marina Village, SouthamptonMarina Developments Limited10 Jul 201207 Nov 2012
MLA/2012/00300/2 - CompletedApplication - Miscellaneous DisposalAinsdale and Blackpool monitoringSefton Mbc11 Jul 201225 Jul 2013
MLA/2012/00301 - CompletedApplication - ConstructionReplace Sea Wall at Kimmeridge BaySmedmore Estate12 Jul 201212 Oct 2012
MLA/2012/00302/6 - Variation RequestedApplication - Aggregate DredgingMarine aggregate dredging licence Area 451 renewalWestminster Gravels Limited16 Jul 201206 Apr 2017
MLA/2012/00303 - CompletedApplication - Removals (inc. Grab Samples)Environment Agency WFD Macroalgae surveys- Solent and Isle of WightJacobs Engineering U.K. Limited17 Jul 201203 Aug 2012
MLA/2012/00304/4 - CompletedApplication - Construction, Removals (inc. Grab Samples)Littlehaven Sea WallSouth Tyneside Council17 Jul 201216 Sep 2013
MLA/2012/00306 - CompletedApplication - Construction, Dredged Material Disposal, DredgingGosport Marina Piers A-D ReconfigurationPremier Marinas (Gosport) Limited23 Jul 201212 Oct 2012
MLA/2012/00307/1 - CompletedApplication - RenewablesMooring Component Tests at Wave Hub SiteOcean Energy Limited23 Jul 201228 Sep 2012
MLA/2012/00309/1 - CompletedApplication - ConstructionFitting of tideslide moorings at Port of WorkingtonE.On Climate & Renewables Uk Operations Limited24 Jul 201202 Aug 2013
MLA/2012/00310/2 - CompletedApplication - Removals (inc. Grab Samples)Quarterly Benthic MonitoringDover Harbour Board24 Jul 201220 Mar 2013
MLA/2012/00311 - CompletedApplication - Removals (inc. Grab Samples)Investigation of Geophysical survey of area 1 Isles of ScilllyMr Robin Burrows25 Jul 201201 Oct 2012
MLA/2012/00312 - WithdrawnApplication - ConstructionAlbion Terrace Flood AlleviationNorthumbrian Water Ltd27 Jul 2012
MLA/2012/00314 - CompletedApplication - ConstructionLeighton Beck Tidal Door ReplacementSouth Cumbria Rivers Trust01 Aug 201204 Sep 2012
MLA/2012/00315 - CompletedApplication - Removals (inc. Grab Samples)Lyme Regis Environmental Improvements Phase IV - Coring WorksDean & Dyball Civil Engineering Limited01 Aug 201201 Oct 2012
MLA/2012/00316 - CompletedApplication - ConstructionHighshore Beck Tidal Flap Valve ReplacementSouth Cumbria Rivers Trust01 Aug 201204 Sep 2012
MLA/2012/00317 - CompletedApplication - Emergency WorkGreater Gabbard - removal of UXOGreater Gabbard Offshore Winds Limited01 Aug 201207 Nov 2012
MLA/2012/00318 - CompletedApplication - ConstructionMythic Coast Golden ShellWyre Borough Council02 Aug 201217 Sep 2012
MLA/2012/00319/7 - CompletedApplication - Aggregate DredgingArea 340 15 Year Marine LicenceVolker Dredging Ltd02 Aug 201226 Mar 2024
MLA/2012/00320/7 - CompletedApplication - Aggregate DredgingArea 340 full term licence applicationCemex Uk Marine Limited02 Aug 201226 Mar 2024
MLA/2012/00321 - CompletedApplication - DredgingUnblocking Tidal SluiceHampshire County Council03 Aug 201220 Nov 2012
MLA/2012/00322 - CompletedApplication - Removals (inc. Grab Samples)APEM RNLI Poole Harbour SurveyApem Ltd03 Aug 201212 Sep 2012
MLA/2012/00323 - CompletedApplication - Aggregate DredgingArea 105 Short Term Marine LicenceCemex Uk Marine Limited03 Aug 201207 Dec 2012
MLA/2012/00324 - CompletedApplication - Alternative Use of Dredged Material, DredgingFolkestone Harbour DredgingFolkestone Harbour Company Limited03 Aug 201207 Feb 2013
MLA/2012/00325 - CompletedApplication - Aggregate DredgingArea 107 Short Term Marine LicenceCemex Uk Marine Limited06 Aug 201207 Dec 2012
MLA/2012/00326/2 - CompletedApplication - Dredged Material DisposalEsso Fawley Marine Terminal Maintenance Dredging and Disposal Licence RenewalEsso Petroleum Company,Limited06 Aug 201230 Jan 2013
MLA/2012/00328 - CompletedApplication - Removals (inc. Grab Samples)3 Mills River wall replacement (Ref MLP/2012/00087) - Site InvestigationLondon Legacy Development Corporation08 Aug 201218 Oct 2012
MLA/2012/00330 - CompletedApplication - ConstructionWarren Point Ferry LandingDevon County Council09 Aug 201208 Feb 2013
MLA/2012/00332/1 - CompletedApplication - ConstructionYWS Wheatcroft Marine Outfall - LSO Temporary Repair Grouped under: Wheatcroft Long Sea Outfall Showing 2 of 7 casesYorkshire Water Services Limited10 Aug 201213 Dec 2012
MLA/2012/00333/1 - CompletedApplication - Removals (inc. Grab Samples)Triton Knoll Cable Route Geotechnical SurveyRwe Npower Renewables Limited13 Aug 201229 Oct 2012
MLA/2012/00334/6 - CompletedApplication - ConstructionSandwich TTDEnvironment Agency (Southern Region)14 Aug 201201 Jul 2015
MLA/2012/00335/3 - CompletedApplication - Dredged Material Disposal, DredgingEast Cowes MarinaDean & Reddyhoff Limited15 Aug 201223 Dec 2015
MLA/2012/00336/2 - CompletedApplication - Removals (inc. Grab Samples)York PotashYork Potash Ltd15 Aug 201201 Sep 2022
MLA/2012/00337/1 - CompletedApplication - Removals (inc. Grab Samples)Thames Tideway Tunnel Archaeological surveyThames Water Utilities Limited20 Aug 201225 Sep 2013
MLA/2012/00338/1 - CompletedApplication - Dredged Material Disposal, DredgingPort of Southampton: Main Channel (Marchwood) Widening WorksAssociated British Ports, Southampton21 Aug 201223 Jan 2013
MLA/2012/00339 - CompletedApplication - ConstructionHooe Lake - enabling road worksBdw Ltd21 Aug 201226 Apr 2013
MLA/2012/00340 - CompletedApplication - Aggregate Dredging, Removals (inc. Grab Samples)Short term marine licence application for Area 331 in the Irish SeaTarmac Marine Dredging Limited22 Aug 201229 Nov 2012
MLA/2012/00341/1 - CompletedApplication - ConstructionGolant Outfall Pipe ReplacementSouth West Water Limited22 Aug 201206 Dec 2012
MLA/2012/00342/1 - CompletedApplication - Emergency WorkProtection of quay wall, Lowestoft HarbourAssociated British Ports Holdings Limited23 Aug 201228 Aug 2012
MLA/2012/00344 - CompletedApplication - RenewablesGreater Gabbard - Exposed export cable - Approval to lay concrete mattressingMs Kate Harvey23 Aug 201218 Jan 2013
MLA/2012/00346 - CompletedApplication - ConstructionScarborough North Bay asset refurbishment schemeMr Robin Siddle24 Aug 201223 Nov 2012
MLA/2012/00347 - CompletedApplication - ConstructionReplacement of Tidal Flapvalve on Red Bank Dyke WatercourseThe Lune Rivers Trust25 Aug 201225 Sep 2012
MLA/2012/00348 - CompletedApplication - ConstructionReplacement of Tidal Flap Valve on Bank End WatercourseThe Lune Rivers Trust25 Aug 201225 Sep 2012
MLA/2012/00349 - CompletedApplication - ConstructionReplacement of Tidal Flapvalve on Black DykeThe Lune Rivers Trust25 Aug 201225 Sep 2012
MLA/2012/00351 - CompletedApplication - ConstructionReplacement of Flap Valve at Brickwork Outfall, Glasson DockThe Lune Rivers Trust25 Aug 201225 Sep 2012
MLA/2012/00352 - CompletedApplication - ConstructionReplacement of Flap Valve on Hasty BeckThe Lune Rivers Trust25 Aug 201225 Sep 2012
MLA/2012/00353 - CompletedApplication - ConstructionPONTOONS AT KING EDWARD QUAY COLCHESTERColchester Borough Council26 Aug 201214 Nov 2012
MLA/2012/00354 - CompletedApplication - Burial at SeaJohn Lister28 Aug 201204 Sep 2012
MLA/2012/00355 - CompletedApplication - ConstructionReplacement of Tidal Flap Valve at Mill House East OutfallThe Lune Rivers Trust28 Aug 201225 Sep 2012
MLA/2012/00357 - CompletedApplication - ConstructionInstallation of New TIdal Valve on Oxcliffe Dyke WatercourseThe Lune Rivers Trust28 Aug 201225 Sep 2012
MLA/2012/00358 - CompletedApplication - ConstructionReplacement of Tidal Flap Valve on Trunk Dyke EastThe Lune Rivers Trust28 Aug 201225 Sep 2012
MLA/2012/00359 - CompletedApplication - ConstructionReplacement of Flap Valve on Trunk Dyke East Tidal OutfallThe Lune Rivers Trust28 Aug 201225 Sep 2012
MLA/2012/00360 - CompletedApplication - ConstructionInstallation of Tidal Flap Valve at Work Pool Tidal OutfallThe Lune Rivers Trust28 Aug 201225 Sep 2012
MLA/2012/00361 - CompletedApplication - Burial at SeaJohn Lister28 Aug 201230 Aug 2012
MLA/2012/00362 - CompletedApplication - ConstructionBristish Heart Foundation ShopCeltic Scaffolding Limited29 Aug 201209 Oct 2012
MLA/2012/00363 - CompletedApplication - ConstructionDerwentwater Mews Care FacilityOlnato Limited29 Aug 201207 Jan 2013
MLA/2012/00364 - CompletedApplication - Removals (inc. Grab Samples)NERC Coastal Biodiversity and Ecosystem Services (CBESS)St Andrews University30 Aug 201202 Jan 2013
MLA/2012/00365 - CompletedApplication - ConstructionShoreham Cooling Water Outfall WorksScottish Power Generation Holdings Limited30 Aug 201221 Jan 2013
MLA/2012/00366 - CompletedApplication - Emergency WorkNethertown - St Bees LandslipJ. Murphy & Sons Limited30 Aug 201230 Aug 2012
MLA/2012/00367 - CompletedApplication - ConstructionCanoe PontoonMr Gary C Akers31 Aug 201214 Jan 2013
MLA/2012/00368 - CompletedApplication - Removals (inc. Grab Samples)Cowes Outer Harbour - Site InvestigationCowes Harbour Commission03 Sep 201213 Nov 2012
MLA/2012/00369 - CompletedApplication - ConstructionNewcaflex (Duco)Balfour Beatty Civil Engineering Limited04 Sep 201217 Jan 2013
MLA/2012/00370 - CompletedApplication - Removals (inc. Grab Samples)Western Docks - VibrocoresAssociated British Ports, Southampton04 Sep 201218 Oct 2012
MLA/2012/00372 - CompletedApplication - ConstructionSt Marys Quay Ground Investigation WorksCouncil Of The Isles Of Scilly05 Sep 201207 Nov 2012
MLA/2012/00373 - CompletedApplication - DredgingCleaning of Stone Creek and Hedon HavenKeyingham Level Drainage Board05 Sep 201211 Mar 2013
MLA/2012/00374/5 - CompletedApplication - Aggregate DredgingArea 351 Full Term Licence ApplicationTarmac Marine Dredging Limited05 Sep 201223 Jan 2017
MLA/2012/00375/5 - CompletedApplication - Aggregate DredgingArea 351 Full Term Licence ApplicationVolker Dredging Ltd05 Sep 201205 Feb 2024
MLA/2012/00376/3 - CompletedApplication - Removals (inc. Grab Samples)R3 Irish Sea Zone Rhiannon Wind Farm marine ecology (grab sampling) surveysCentrica Energy Renewable Investments Limited05 Sep 201225 Oct 2012
MLA/2012/00377/1 - CompletedApplication - Removals (inc. Grab Samples)Beacon Cove InvestigationLiving Coasts05 Sep 201217 Oct 2012
MLA/2012/00378/1 - CompletedApplication - RenewablesInter Array Cable ProtectionVattenfall Wind Power Ltd05 Sep 201220 Nov 2012
MLA/2012/00379/2 - CompletedApplication - Construction, Dredged Material Disposal, DredgingSandbanks Yacht Company Access DredgingSandbanks Yacht Company Limited05 Sep 201218 Jun 2013
MLA/2012/00380 - CompletedApplication - ConstructionSecond Tyne Tunnel Highway Drainage OutfallBouygues Tp (Uk Branch)06 Sep 201224 Oct 2012
MLA/2012/00381 - CompletedApplication - ConstructionWeston Sailing Club Slipway ExtensionWeston Sailing Club07 Sep 201223 Nov 2012
MLA/2012/00382/1 - CompletedApplication - Dredged Material DisposalContinuation of the Disposal of Maintenance Dredgings at ABP King's LynnAssociated British Ports Holdings Limited08 Sep 201210 Dec 2013
MLA/2012/00383/4 - CompletedApplication - Construction, Removals (inc. Grab Samples)Arun Timber Docks mooring refurbishmentOsborne Of Arun Group (Management) Limited10 Sep 201219 Jan 2015
MLA/2012/00386 - CompletedApplication - Miscellaneous DisposalCammel Laird Wet Basin harbour sub-soil reinforcement workRwe Npower Renewables Limited10 Sep 201217 Dec 2012
MLA/2012/00387/1 - CompletedApplication - ConstructionLadye Bay Outfall Tidal FlapWessex Water Services Limited11 Sep 201223 Apr 2013
MLA/2012/00388 - CompletedApplication - DredgingNeptune Yard Capital DredgeShepherd Offshore Ltd11 Sep 201221 Dec 2012
MLA/2012/00389 - CompletedApplication - Emergency WorkProtection of quay wall, Lowestoft HarbourAssociated British Ports Holdings Limited12 Sep 201213 Sep 2012
MLA/2012/00390/1 - CompletedApplication - ConstructionRemedial Works to Seafront GroynesDover Harbour Board13 Sep 201230 Dec 2013
MLA/2012/00391 - CompletedApplication - ConstructionLowestoft South Beach Wall Toe Protection ShemeWaveney District Council13 Sep 201227 Nov 2012
MLA/2012/00394 - CompletedApplication - Removals (inc. Grab Samples)Yorkshire and Humber CCS ProjectNational Grid Grain Lng Ltd14 Sep 201201 Nov 2012
MLA/2012/00395 - CompletedApplication - ConstructionPortsmouth Offshore Group - Wicor Pontoon ExtensionPortsmouth Offshore Group,17 Sep 201202 Nov 2012
MLA/2012/00396 - CompletedApplication - RenewablesDeployment of a Prototype Device at the Wave Hub Test SiteOcean Energy Limited17 Sep 201221 Dec 2012
MLA/2012/00397 - CompletedApplication - ConstructionNew pipeline at Cemex, NorthfleetCemex Uk Materials Limited17 Sep 201228 Nov 2012
MLA/2012/00398 - CompletedApplication - Alternative Use of Dredged MaterialSwalecliffe Brook Mouth Improvement WorksEnvironment Agency, Ncpms17 Sep 201219 Nov 2012
MLA/2012/00399 - CompletedApplication - ConstructionLondon Gateway PortLondon Gateway Port Ltd18 Sep 201214 Dec 2012
MLA/2012/00401/4 - CompletedApplication - ConstructionLot 1 Hydrodynamic services along Cell 1 CoastlineScarborough Borough Council19 Sep 201216 Jul 2015
MLA/2012/00402/11 - CompletedApplication - Alternative Use of Dredged Material, Construction, Dredged Material Disposal, DredgingLiverpool 2 and River Mersey Approach Channel DredgingMersey Docks & Harbour Company20 Sep 201203 Dec 2015
MLA/2012/00403/1 - CompletedApplication - ConstructionFrequent Ferry Pontoons - Torquay & Brixham HarbourTorbay Council20 Sep 201227 Mar 2013
MLA/2012/00404 - CompletedApplication - ConstructionQuayside Marina New PontoonQuayside Marina20 Sep 201215 Jan 2013
MLA/2012/00405/1 - CompletedApplication - ConstructionBarrow OWF export cable remedial works - jettingBarrow Offshore Wind Limited20 Sep 201226 Mar 2013
MLA/2012/00406/4 - CompletedApplication - ConstructionBarrow OWF export cable remedial works - rock berm installationBarrow Offshore Wind Limited21 Sep 201229 May 2013
MLA/2012/00407 - CompletedApplication - ConstructionLORDS SLUICE REFURBISHMENTSouth Holland Internal Drainage Board24 Sep 201203 Dec 2012
MLA/2012/00408/1 - CompletedApplication - Removals (inc. Grab Samples)Grimsby Flood Defence Improvements - Ground InvestigationEnvironment Agency - Anglian Region25 Sep 201206 Dec 2012
MLA/2012/00409/1 - CompletedApplication - ConstructionRNLI Harwich - Replacement AWB PontoonR.N.L.I. (Trading) Limited26 Sep 201204 Mar 2014
MLA/2012/00412/2 - CompletedApplication - ConstructionReconstruction of Town Quay, LowestoftAssociated British Ports.27 Sep 201214 Jan 2014
MLA/2012/00413/1 - CompletedApplication - Emergency WorkNewton Ferrers Foreshore Pollution RepairsSouth West Water Limited27 Sep 201227 Nov 2012
MLA/2012/00415 - CompletedApplication - Dredging, Removals (inc. Grab Samples)Rye Harbour turning circle dredge and Admiral Jetty removalEnvironment Agency (Southern Region)28 Sep 201224 Jan 2013
MLA/2012/00416 - CompletedApplication - ConstructionTilbury Biomass Phase 2 ProjectRwe Npower Plc28 Sep 201230 Jan 2013
MLA/2012/00417 - CompletedApplication - Emergency WorkEmergency Maintenance Dredging Disposal - Dover Harbour BoardDover Harbour Board01 Oct 201208 Oct 2012
MLA/2012/00418 - CompletedApplication - ConstructionPontoons on the Hamble RiverThe Crown Estate01 Oct 201212 Feb 2013
MLA/2012/00419 - CompletedApplication - Removals (inc. Grab Samples)Earl Percy, Kalo & Ben MacduiPan Salvage01 Oct 201205 Aug 2013
MLA/2012/00421 - CompletedApplication - Emergency WorkWhale on Fraishthorpe beachEast Riding Of Yorkshire Council02 Oct 201202 Oct 2012
MLA/2012/00422/1 - CompletedApplication - Aggregate DredgingMarine Aggregate Licence Area 108/3 - Application for a Marine Works LicenceBritannia Aggregates Limited02 Oct 201207 Jul 2014
MLA/2012/00423/1 - CompletedApplication - Dredged Material Disposal, DredgingUniversal Marina Maintenance DredgeJohn Willment Marine Limited03 Oct 201203 Apr 2014
MLA/2012/00424/5 - CompletedApplication - RenewablesLynn Offshore Wind Farm Grouped under: Lincs, Lynn and Inner Dowsing Offshore Wind Farm Showing 2 of 7 casesGlid Wind Farms Topco Limited03 Oct 201226 Sep 2016
MLA/2012/00425/7 - CompletedApplication - RenewablesLincs/LID6 Offshore Wind Farm Grouped under: Lincs, Lynn and Inner Dowsing Offshore Wind Farm Showing 2 of 7 casesLincs Wind Farm Limited03 Oct 201222 Dec 2021
MLA/2012/00426 - CompletedApplication - ConstructionDerwenthaugh Cycle LinkGateshead Council03 Oct 201219 Aug 2013
MLA/2012/00427 - CompletedApplication - ConstructionPilingSailport Plc03 Oct 201228 Nov 2012
MLA/2012/00428/4 - CompletedApplication - Dredged Material DisposalABP Lowestoft - Maintenance Dredged Material DisposalAbp Acquisitions Uk Limited04 Oct 201218 Apr 2016
MLA/2012/00429/2 - CompletedApplication - ConstructionReplacement access bridge over Weston Mill Creek.Kier Construction04 Oct 201211 Apr 2013
MLA/2012/00430 - CompletedApplication - Construction, Removals (inc. Grab Samples)Shallow Dock Tidal Flap, Princess Yachts, South Yard, Plymouth (MLP/2012/00229)Princess Yachts International Plc04 Oct 201227 Dec 2012
MLA/2012/00432/1 - CompletedApplication - ConstructionHerne Bay Sea Defence ImprovementsCanterbury City Council05 Oct 201208 Mar 2013
MLA/2012/00433/1 - CompletedApplication - ConstructionBristol Rapid Transit Ashton Vale to Temple Meads Ground InvestigationBristol City Council05 Oct 201204 Jan 2013
MLA/2012/00434 - CompletedApplication - Construction, Removals (inc. Grab Samples)Re-construction of Pipewellgate River WallGateshead Council05 Oct 201214 Jan 2013
MLA/2012/00435/1 - CompletedApplication - ConstructionHadrian Yard Central River Side WorksG. O'Brien & Sons (Nationwide Demolition Contractors) Limited08 Oct 201225 Nov 2013
MLA/2012/00436 - CompletedApplication - Construction, Removals (inc. Grab Samples)Jetty at 212 Sandbanks Road, PooleMr Andrew Watts08 Oct 201207 Dec 2012
MLA/2012/00437/1 - CompletedApplication - ConstructionNewton Ferrers Sewer ReplacementSouth West Water Limited08 Oct 201226 Feb 2013
MLA/2012/00438/1 - CompletedApplication - ConstructionRNLI CoventinaR.N.L.I. (Trading) Limited08 Oct 201212 Feb 2013
MLA/2012/00439/1 - CompletedApplication - ConstructionMooring Buoys alongside Spitbank Fort, Solent.Clarenco Llp09 Oct 201229 Nov 2012
MLA/2012/00440 - CompletedApplication - Removals (inc. Grab Samples)Severn Estuary intertidal surveys for National Grid jettyApem Ltd10 Oct 201209 Nov 2012
MLA/2012/00442/1 - CompletedApplication - Burial at SeaMiss Yvonne Dupre11 Oct 201209 Jan 2013
MLA/2012/00443/1 - CompletedApplication - ConstructionDemolition of Jetty at Old Ballast Wharf, Charlton, LondonMelrose Plc15 Oct 201219 Nov 2012
MLA/2012/00444 - CompletedApplication - Construction, Removals (inc. Grab Samples)Emergency Sea Defence WorksCemex Uk Materials Limited15 Oct 201205 Feb 2013
MLA/2012/00445/5 - CompletedApplication - ConstructionDonna Nook Managed Realignment SchemeEnvironment Agency Leeds15 Oct 201228 Sep 2021
MLA/2012/00446/1 - CompletedApplication - Removals (inc. Grab Samples)BEEMS New Nuclear Build Marine Science ProgrammeCefas16 Oct 201213 Feb 2013
MLA/2012/00447 - WithdrawnApplication - ConstructionThe repair of bund walls approx 880 mtrs.Silverbrook Estates Limited17 Oct 2012
MLA/2012/00449 - CompletedApplication - ConstructionMartlesham CreekEnvironment Agency - Anglian Region19 Oct 201222 Jan 2013
MLA/2012/00450 - CompletedApplication - ConstructionCleaning and repainting steel piles to Paignton PierUk Piers Ltd22 Oct 201215 Jan 2013
MLA/2012/00451 - CompletedApplication - Removals (inc. Grab Samples)Newhaven Benthic SamplingNewhaven Port & Properties Limited22 Oct 201223 Oct 2012
MLA/2012/00452 - CompletedApplication - Construction, Removals (inc. Grab Samples)Watchhouse Quay RepairPort Of Blyth23 Oct 201209 Jan 2013
MLA/2012/00453 - CompletedApplication - ConstructionNorth Sands Beach, Salcombe, DevonDevon County Council24 Oct 201218 Dec 2012
MLA/2012/00454/2 - CompletedApplication - Dredged Material Disposal, DredgingHeysham 1 & 2Edf Energy Nuclear Generation Limited25 Oct 201205 May 2016
MLA/2012/00455 - CompletedApplication - Removals (inc. Grab Samples)Removal of Dead Marine Mammals from the Northumberland Foreshore.Northumberland County Council29 Oct 201219 Feb 2013
MLA/2012/00456/1 - CompletedApplication - ConstructionWestern Jetty Pipe Gantry Vessel Collision ProtectionAssociated British Ports.30 Oct 201222 Feb 2013
MLA/2012/00457 - WithdrawnApplication - ConstructionStabilization / Strengthening works to Shotley PierEast Anglian Renovations Ltd31 Oct 2012
MLA/2012/00458 - CompletedApplication - ConstructionNew Hythe Ferry/Red Jet Standby Berth, Red Funnel Terminal 2, SouthamptonRed Funnel Group Limited01 Nov 201217 Jan 2013
MLA/2012/00459 - CompletedApplication - Dredged Material Disposal, DredgingHamble Jetty and Approaches Maintenance DredgingBp Oil Uk Limited06 Nov 201211 Feb 2013
MLA/2012/00460 - CompletedApplication - DredgingBerthing Facility Bed Levelling, Trinity Buoy WharfDragados-Sisk Joint Venture06 Nov 201225 Jan 2013
MLA/2012/00461 - WithdrawnApplication - Construction, RenewablesConstruction of Trot Moorings at Gwynt y Môr Base Harbour Port FacilityGwynt Y Mor Offshore Wind Farm Limited06 Nov 2012
MLA/2012/00462 - CompletedApplication - ConstructionFulham wharfBdw Trading Limited07 Nov 201205 Feb 2013
MLA/2012/00463 - CompletedApplication - Removals (inc. Grab Samples)Port of Felixstowe Benthic SurveysThe Felixstowe Dock And Railway Company08 Nov 201203 Dec 2012
MLA/2012/00464 - CompletedApplication - ConstructionRoyal Solent Yacht Club, Dinghy Slipway, YarmouthRoyal Solent Yacht Club08 Nov 201214 Jan 2013
MLA/2012/00465 - CompletedApplication - Emergency WorkNethertown Culvert CollapseJ. Murphy & Sons Limited08 Nov 201209 Nov 2012
MLA/2012/00466 - CompletedApplication - Miscellaneous DisposalWave / Current Monitoring off New BrightonPeel Ports Limited09 Nov 201227 Nov 2012
MLA/2012/00468 - CompletedApplication - Removals (inc. Grab Samples)UK Civil Hydrography programmeEmu Limited13 Nov 201219 Dec 2012
MLA/2012/00469 - CompletedApplication - Dredged Material DisposalDredged Material Disposal at South FallsDredging International (Uk) Ltd13 Nov 201207 May 2013
MLA/2012/00470 - CompletedApplication - ConstructionReplacement of Timber Piles and Revetment, Bosham, West SussexBurhill Estates Company Limited15 Nov 201201 May 2013
MLA/2012/00471 - CompletedApplication - ConstructionStabilisation of redundant gas transit pipelinesScotia Gas Networks Limited16 Nov 201211 Feb 2013
MLA/2012/00472/1 - CompletedApplication - Dredged Material Disposal, DredgingWoolston Riverside Maintenance DredgeHomes And Communities Agency16 Nov 201226 Jul 2013
MLA/2012/00473/5 - CompletedApplication - ConstructionRye Harbour MooringsEnvironment Agency (Southern Region)16 Nov 201205 Mar 2015
MLA/2012/00474/8 - CompletedApplication - Construction, Dredged Material Disposal, Dredging, Removals (inc. Grab Samples)HMNB Portsmouth Approach Channel Dredging and Associated WorksHmnb Portsmouth16 Nov 201219 Oct 2016
MLA/2012/00475 - CompletedApplication - Removals (inc. Grab Samples)Tynemouth Haven Launch Ramp Ground InvestigationNorth Tyneside Council19 Nov 201211 Jan 2013
MLA/2012/00476 - CompletedApplication - ConstructionNew Cut Bridge GI InvestigationsBristol City Council19 Nov 201216 Jan 2013
MLA/2012/00477 - WithdrawnApplication - ConstructionOwston Ferry Riverbank stabilisation worksEnvironment Agency19 Nov 2012
MLA/2012/00478 - CompletedApplication - Removals (inc. Grab Samples)Ecological survey at Gallions Reach and Woolwich Ferry TerminalThomson Unicomarine Limited20 Nov 201218 Dec 2012
MLA/2012/00479 - CompletedApplication - ConstructionPiling work at Lymington Yacht Haven.Yacht Havens Limited21 Nov 201218 Jan 2013
MLA/2012/00480 - CompletedApplication - ConstructionRepairs to existing structure (berths 1 & 2)Vopak Terminals London Ltd22 Nov 201213 Dec 2012
MLA/2012/00483/1 - CompletedApplication - Alternative Use of Dredged MaterialEastbourne Beach Management Works 2012-2013Eastbourne Borough Council23 Nov 201215 Apr 2013
MLA/2012/00484 - CompletedApplication - Construction47 River Road, Littlehampton PontoonBrownfield Estates Limited26 Nov 201222 Feb 2013
MLA/2012/00485 - CompletedApplication - ConstructionSalcombe Saline InterventionsSouth West Water Limited27 Nov 201216 Jan 2013
MLA/2012/00486/1 - CompletedApplication - Removals (inc. Grab Samples)recovery and recycling of non ferrous metalsNorth Sea Recovery Ltd28 Nov 201220 Aug 2013
MLA/2012/00488 - CompletedApplication - Burial at SeaJohn Lister30 Nov 201204 Dec 2012
MLA/2012/00489/1 - CompletedApplication - Construction, Dredged Material Disposal, DredgingBembridge Dry Stack Grouped under: Bembridge Harbour (IoW) dredging Showing 2 of 4 casesBembridge Harbour Improvements Company Limited02 Dec 201222 Apr 2013
MLA/2012/00490/2 - CompletedApplication - ConstructionWalney Offshore Windfarm Brown String Array Cable Remedial WorksWalney (Uk) Offshore Windfarms Limited03 Dec 201208 Jul 2013
MLA/2012/00491 - WithdrawnApplication - ConstructionSperoventoMr David Hunter03 Dec 2012
MLA/2012/00492 - CompletedApplication - ConstructionSutton Harbour Marina MaintenanceSutton Harbour Company04 Dec 201207 Feb 2013
MLA/2012/00493/8 - CompletedApplication - Construction, Dredged Material DisposalTees Dock No.1 QuayPd Teesport Limited04 Dec 201223 Mar 2018
MLA/2012/00494 - CompletedApplication - ConstructionColliters and Longmoor Brook OutfallsEnvironment Agency,Bradney Depot05 Dec 201225 Feb 2013
MLA/2012/00495 - CompletedApplication - Removals (inc. Grab Samples)Teeside Offshore WindfarmTeesside Windfarm Limited05 Dec 201220 Dec 2012
MLA/2012/00496 - CompletedApplication - ConstructionEgerton Park Outfall ExtensionEnvironment Agency (Southern Region)06 Dec 201219 Feb 2013
MLA/2012/00497 - WithdrawnApplication - Construction, Dredged Material Disposal, DredgingSouthsea Marina Holding Pontoon AreaPremier Marinas (Southsea) Limited07 Dec 2012
MLA/2012/00498 - CompletedApplication - Construction1581473 - Arnolds Point Seawall ReconstructionPlymouth City Council07 Dec 201217 Jun 2013
MLA/2012/00499 - CompletedApplication - Removals (inc. Grab Samples)Trevol Jetty, HMS Raleigh, Torpoint, CornwallDebut Services (South West) Limited07 Dec 201229 Jan 2013
MLA/2012/00500 - CompletedApplication - DredgingDartside Quay - Dredging to Hoist DockMarina Developments Limited10 Dec 201226 Mar 2013
MLA/2012/00502/1 - CompletedApplication - Construction, Dredged Material Disposal, DredgingTrafalgar Wharf Wet Dock ImprovementsTrafalgar Wharf Limited11 Dec 201216 Apr 2013
MLA/2012/00503 - WithdrawnApplication - Constructionpontoon landing stageArmy Sailing Assocation11 Dec 2012
MLA/2012/00504 - CompletedApplication - ConstructionLockfield Sea Wall Remedial WorksMr Nicholas Garrett11 Dec 201225 Mar 2013
MLA/2012/00505 - CompletedApplication - ConstructionTyne Car Terminal New Storm BollardsPort Of Tyne12 Dec 201220 Mar 2013
MLA/2012/00506/1 - CompletedApplication - Dredged Material Disposal, DredgingAble Middelsbrogh Port Berth 1&2Able Uk Limited12 Dec 201219 Feb 2015
MLA/2012/00508 - CompletedApplication - ConstructionLyme Regis Environmental Improvements Phase IVDean & Dyball Civil Engineering Limited14 Dec 201210 Apr 2013
MLA/2012/00509 - CompletedApplication - ConstructionNew Capital QuayRoamquest Limited14 Dec 201231 May 2013
MLA/2012/00510 - WithdrawnApplication - Construction, Removals (inc. Grab Samples)Tropicana, Weston super MareNorth Somerset Council14 Dec 2012
MLA/2012/00513 - CompletedApplication - ConstructionWalney Channel Deep-Water Berth - Southern and Northern PontoonsAssociated British Ports Holdings Limited17 Dec 201221 Mar 2013
MLA/2012/00514 - CompletedApplication - Emergency WorkEmergency Shoring to Basin Road South Coast ProtectionShoreham Port Authority19 Dec 201219 Dec 2012
MLA/2012/00515/1 - CompletedApplication - Constructionbeach maintanenceSwanage Sailing Club19 Dec 201201 Feb 2018
MLA/2012/00516 - WithdrawnApplication - Removals (inc. Grab Samples)Rampion Geotechnical SurveyE.On Climate & Renewables Uk Rampion Offshore Wind Limited21 Dec 2012
MLA/2012/00517/2 - CompletedApplication - Removals (inc. Grab Samples)Site investigation (SI) for the Wash Tide Gauge ProjectEnvironment Agency21 Dec 201213 Aug 2013
MLA/2012/00518 - WithdrawnApplication - Removals (inc. Grab Samples)IFA2 InterconnectorNational Grid Plc21 Dec 2012
MLA/2012/00519 - CompletedApplication - ConstructionSevern Vale Water Management PlanEnvironment Agency – South West Reg21 Dec 201226 Mar 2013
MLA/2012/00520 - CompletedApplication - Removals (inc. Grab Samples)Approaches to Torbay hydrographic SurveyNetsurvey Ltd.24 Dec 201231 Jan 2013

MMO - Marine Licences Public Register

mmo_-_mlas_-_2012.txt · Last modified: 2024/09/15 20:22 by nefcadmin