Case Details Project Type Project TitleLocationsApplicant Name Submission DateDecision Date
MLA/2012/00001 - Completed Application - Removals (inc. Grab Samples) Removal of Redundant Sheet Piles. Tidal Ponds, Stoke Lake,Haslar,Gosport, Hants Qinetiq Limited03 Jan 201203 Jul 2012
MLA/2012/00002 - Completed Application - Removals (inc. Grab Samples) Whale removal Hunstanton beach Peaceful Pets Limited03 Jan 201203 Jan 2012
MLA/2012/00003/4 - Completed Application - Alternative Use of Dredged Material, Dredged Material Disposal, Dredging Port of Ramsgate Maintenance Dredging Port Of Ramsgate 04 Jan 201214 Apr 2015
MLA/2012/00004/1 - Completed Application - Removals (inc. Grab Samples) Vibrocore and Grab sample surveys for Area 492 Hanson Aggregates Marine Limited 04 Jan 201212 Mar 2012
MLA/2012/00005/1 - Completed Application - Removals (inc. Grab Samples) Vibrocore and Grab sample surveys for Areas 106, 400 and 439 Hanson Aggregates Marine Limited 04 Jan 201212 Mar 2012
MLA/2012/00006 - Completed Application - Removals (inc. Grab Samples) Area 447 Vibrocore Survey Hanson Aggregates Marine Limited 04 Jan 201210 Jan 2012
MLA/2012/00007/4 - Completed Application - Dredged Material DisposalNewhaven Maintenance Dredging Newhaven Port & Properties Limited 04 Jan 201207 May 2015
MLA/2012/00009/4 - Completed Application - Construction Scour Protection BML2-E20-6 River Stour, Christchurch Network Rail Infrastructure Limited05 Jan 201220 Jul 2012
MLA/2012/00010 - Completed Application - Removals (inc. Grab Samples) Forewind Dogger Bank Round 3 Cable Corridor Benthic Survey Work Forewind Limited 05 Jan 201210 Jan 2012
MLA/2012/00011/2 - Completed Application - Construction Whitehaven, Parton Long Sea Outfall United Utilities Water Plc 10 Jan 201204 Jan 2013
MLA/2012/00012/1 - Completed Application - Removals (inc. Grab Samples) Pendennis- Boreholes & minor ground investigations Pendennis Superyachts Limited11 Jan 201218 Jun 2012
MLA/2012/00013 - Completed Application - Construction Replacement of old fingers and pontoons with new Emsworth Yacht Harbour Limited 12 Jan 201203 Apr 2012
MLA/2012/00014/3 - Completed Application - Aggregate Dredging Area 351 short term marine licence application Northwood(Fareham)Limited12 Jan 201216 Jul 2014
MLA/2012/00015/3 - Completed Application - Aggregate Dredging Area 351 - Short Term Marine Licence Application Volker Dredging Ltd12 Jan 201203 Jul 2014
MLA/2012/00016 - Completed Application - Construction Pontoon Replacements, Queen Anne's Battery, Plymouth Marina Developments Limited12 Jan 201214 Mar 2012
MLA/2012/00017 - Completed Application - Construction SHYC new buoys Sovereign Harbour Yacht Club Ltd 12 Jan 201229 Feb 2012
MLA/2012/00018 - Completed Application - Construction mooring sinker blocks southsea Mr Mark Laskey 16 Jan 201228 Feb 2012
MLA/2012/00019/2 - Completed Application - Construction, Dredged Material Disposal, DredgingMarina Extension The Royal Motor Yacht Club 16 Jan 201224 Oct 2012
MLA/2012/00020/2 - Completed Application - Construction RCYC Seasonal Pontoon Installation Royal Cornwall Yacht Club16 Jan 201204 Mar 2015
MLA/2012/00021 - Completed Application - Miscellaneous Disposal Exercise Green Tide Oil Spill Response Limited 17 Jan 201227 Mar 2012
MLA/2012/00022 - Completed Application - Construction Evaluation of Techniques for Oyster Restoration University Of Southampton17 Jan 201221 May 2012
MLA/2012/00023 - Completed Application - Construction Kingsbridge Sewage Treatment Works Countryside Rights Of Way Scoping South West Water Limited 19 Jan 201221 May 2012
MLA/2012/00024 - Completed Application - Dredged Material DisposalBurnley Wharf - disposal of silt from aggregate production Tarmac Ltd 19 Jan 201230 Apr 2012
MLA/2012/00025 - Completed Application - Construction 47 River Road, Littlehampton Brownfield Estates Limited 19 Jan 201229 Feb 2012
MLA/2012/00026 - Completed Application - Construction construction of jetty to rear of 19 birmingham Road Cowes Mr Chris Little19 Jan 201216 Apr 2012
MLA/2012/00027 - Completed Application - Dredged Material Disposal, DredgingSilloth docks maintenance dredge Associated British Ports Holdings Limited19 Jan 201206 Aug 2012
MLA/2012/00028 - Completed Application - Construction West of Duddon Sands Met Mast - Ground Investigation Dong Energy Power (Uk) Limited 19 Jan 201201 Jun 2012
MLA/2012/00029 - Withdrawn Application - Construction Sluice No7 - Foulness Island Qinetiq20 Jan 2012
MLA/2012/00030/1 - Completed Application - Construction Reconstruction of part of the frontage at Ridham Dock Grouped under: Marine Minerals Limited Showing 2 of 3 cases Commercial Estates Group Limited 20 Jan 201228 Aug 2013
MLA/2012/00031/4 - Completed Application - Construction Lymington Harbour Protection - Phase 2 Lymington Harbour Commissioners23 Jan 201212 Sep 2014
MLA/2012/00032 - Completed Application - Removals (inc. Grab Samples) Medway & Swale Sediment Plan Peel Ports Medway23 Jan 201222 Mar 2012
MLA/2012/00033 - Withdrawn Application - Construction INSTALLATION OF NEW SUBAQUEOUS CABLES British Telecommunications Public Limited Company24 Jan 2012
MLA/2012/00034 - Completed Application - Removals (inc. Grab Samples) BEEMS WP2 Sizewell Grab Survey 2012 Cefas24 Jan 201209 Mar 2012
MLA/2012/00035 - Completed Application - Construction Greenwich Peninsula - Riverwall Refurbishment and / or Replacement Quintain Estates And Development Plc 24 Jan 201201 Jun 2012
MLA/2012/00036/2 - Completed Application - Removals (inc. Grab Samples) North Sea Network National Grid Commercial Holdings Limited24 Jan 201202 Oct 2012
MLA/2012/00037/4 - Completed Application - Removals (inc. Grab Samples) Teesside Offshore Windfarm Teesside Windfarm Limited25 Jan 201213 Jul 2012
MLA/2012/00038/2 - Completed Application - Removals (inc. Grab Samples) 2012 grab samples for Sovereign disposal site Premier Marinas26 Jan 201229 Feb 2012
MLA/2012/00040/2 - Completed Application - Removals (inc. Grab Samples) Statutory monitoring Environment Agency 26 Jan 201211 Mar 2013
MLA/2012/00041 - Completed Application - Construction Brownsea Castle, Poole Jetteyand Sea Defence REpairs John Lewis Partnership 26 Jan 201205 Sep 2012
MLA/2012/00042 - Completed Application - Alternative Use of Dredged MaterialBeneficial Use Of Dredged Spoil, Blue Lagoon, Poole Harbour Lilliput Sailing Club26 Jan 201221 May 2012
MLA/2012/00043/1 - Completed Application - Removals (inc. Grab Samples) Marine Conservation Zones monitoring Environment Agency 27 Jan 201211 Mar 2013
MLA/2012/00044 - Completed Application - Removals (inc. Grab Samples) Sellafield - Offshore Sediment Sampling Sellafield Limited 27 Jan 201208 Mar 2012
MLA/2012/00045/3 - Completed Application - Removals (inc. Grab Samples) Benthic survey of proposed Marine Conservation Zones Cefas27 Jan 201228 Mar 2012
MLA/2012/00046/1 - Completed Application - Dredged Material Disposal, DredgingWidening of Berths 204 and 205, Port of Southampton Associated British Ports, Southampton27 Jan 201231 May 2012
MLA/2012/00047 - Completed Application - Removals (inc. Grab Samples) London Array Phase 2 Geotechnical survey London Array Limited 27 Jan 201226 Mar 2012
MLA/2012/00048 - Withdrawn Application - Dredged Material Disposal, Dredging, Removals (inc. Grab Samples)North Camber sediment removal and Disposal Debut Services Ltd 27 Jan 2012
MLA/2012/00049 - Completed Application - Construction Fulham Reach Pontoon St George Central London Limited 27 Jan 201204 May 2012
MLA/2012/00050/2 - Completed Application - Construction Osborne Bay Marker Buoys English Heritage 30 Jan 201202 Oct 2012
MLA/2012/00051/2 - Completed Application - Construction Greatham Managed Realignment Scheme (Greatham MRS) Environment Agency 30 Jan 201225 Mar 2014
MLA/2012/00052/1 - Completed Application - Removals (inc. Grab Samples) coring survey in Owers licence area 122/1 Tarmac Marine Dredging Limited 30 Jan 201225 May 2012
MLA/2012/00053/2 - Completed Application - Construction, Dredged Material Disposal, DredgingBembridge Harbour Dredging and Pontoon Works Grouped under: Bembridge Harbour (IoW) dredging Showing 2 of 4 cases Bembridge Harbour Improvements Company Limited 31 Jan 201212 Nov 2012
MLA/2012/00054/5 - Completed Application - Construction Sea Outfall at Burn Road, Hartlepool, County Durham Northumbrian Water Limited 31 Jan 201207 Jan 2014
MLA/2012/00055 - Completed Application - Renewables Use of tracer dyes Greater Gabbard Offshore Winds Limited 01 Feb 201217 Feb 2012
MLA/2012/00057 - Completed Application - Removals (inc. Grab Samples) Thames Tunnel Overwater CPT Testing and Vibro Coring Thames Water Utilities Limited 01 Feb 201213 Apr 2012
MLA/2012/00058/2 - Completed Application - Construction Navitus Bay Wind Park Meteorological Mast Application Eneco Wind Uk Limited01 Feb 201210 Dec 2015
MLA/2012/00060 - Completed Application - Removals (inc. Grab Samples) Anglo-Scottish Eastern HVDC Link Mmt06 Feb 201201 May 2012
MLA/2012/00061 - Completed Application - Removals (inc. Grab Samples) Launching improvements for inshore lifeboat at RNLI Burnham on Sea Royal National Lifeboat Institution06 Feb 201216 Apr 2012
MLA/2012/00062 - Completed Application - Renewables Greater Gabbard - Exposed export cable - approval to lay concrete mattressing Greater Gabbard Offshore Winds Limited 07 Feb 201231 Aug 2012
MLA/2012/00063/1 - Completed Application - Construction Greenbank Hotel Mooring Boat and Pontoons Greenbank Hotel07 Feb 201203 Oct 2013
MLA/2012/00064/1 - Completed Application - Dredged Material Disposal, DredgingMaintenance Dredging of Bridlington Harbour Bridlington Harbour Commissioners07 Feb 201218 Feb 2013
MLA/2012/00065 - Completed Application - Construction Repair of Jetty Hammerhead Hoo Ness Yacht Club07 Feb 201222 Mar 2012
MLA/2012/00066 - Completed Application - Removals (inc. Grab Samples) Salcombe Fish Quay Site Investigation South Hams District Council07 Feb 201223 Mar 2012
MLA/2012/00067 - Completed Application - Construction pontoon c extension Pontoon Berth Holders Two09 Feb 201221 Jun 2012
MLA/2012/00068/1 - Completed Application - Alternative Use of Dredged Material, ConstructionCleveleys Beach Nourishment Scheme Wyre Borough Council 09 Feb 201231 Jan 2014
MLA/2012/00069/1 - Completed Application - Construction, Removals (inc. Grab Samples) Detection and removal of out-of-service cables area 478 Deme Building Materials Limited10 Feb 201210 Oct 2012
MLA/2012/00070/1 - Completed Application - Aggregate Dredging Area 137 Cemex Uk Marine Limited10 Feb 201202 Jul 2014
MLA/2012/00072/1 - Completed Application - Dredged Material DisposalABP Port of Ipswich Abport Limited 13 Feb 201222 Oct 2012
MLA/2012/00073/2 - Completed Application - Construction Liverpool John Lennon Airport Lighting Gantry Maintenance Liverpool Airport Limited13 Feb 201211 Jun 2013
MLA/2012/00075/2 - Completed Application - Aggregate Dredging Area 106 (Restricted Footprint) Hanson Aggregates Marine Limited 13 Feb 201203 Jul 2014
MLA/2012/00076 - Completed Application - Construction Harrington coastal Protection J. Murphy & Sons Limited 13 Feb 201204 May 2012
MLA/2012/00077 - Completed Application - Construction Slipway repairs, Tregonce Cliff, Padstow Mr Hugh Osmond 13 Feb 201230 Apr 2012
MLA/2012/00078 - Completed Application - Construction Whitehaven Harbour Pontoon Development Whitehaven Harbour Commissioners Vice Chairman 14 Feb 201209 Aug 2012
MLA/2012/00080 - Completed Application - Construction Kemsly Burley Outfall - Access Environment Agency (Southern Region) 16 Feb 201208 May 2012
MLA/2012/00081/2 - Completed Application - Removals (inc. Grab Samples) Benthic and Fish Ecology Field Survey Eneco Wind Uk Limited17 Feb 201217 May 2012
MLA/2012/00082 - Completed Application - Dredging Oikos Jetty No.1 Phase 2 Oikos Storage Limited17 Feb 201201 Aug 2012
MLA/2012/00083/4 - Completed Application - Dredged Material Disposal, DredgingC.RO PORTS NORTH KILLINGHOLME (BERTHS 1 to 6 PLUS APPROACHES) Humber Sea Terminal Limited17 Feb 201220 Jun 2016
MLA/2012/00086/1 - Completed Application - Dredged Material Disposal, DredgingTrafalgar Wharf Marina Basin Access Channel Trafalgar Wharf Limited17 Feb 201202 Aug 2012
MLA/2012/00089/1 - Completed Application - Removals (inc. Grab Samples) Vibrocore and Grab Sample Surveys for Area 499 Hanson Aggregates Marine Limited 20 Feb 201230 Mar 2012
MLA/2012/00090 - Completed Application - Construction, Removals (inc. Grab Samples) Swash Channel Wreck Project Bournemouth University 20 Feb 201219 Apr 2012
MLA/2012/00091/2 - Completed Application - Construction Seawork Exhibition Temporary Pontoons Mercator Media Limited 20 Feb 201229 Apr 2016
MLA/2012/00094 - Completed Application - Aggregate Dredging Area 102 ST Cemex Uk Marine Limited22 Feb 201204 Sep 2012
MLA/2012/00096/1 - Completed Application - Aggregate Dredging Protector Overfalls Area 197 Tarmac Marine Dredging Limited 23 Feb 201207 Jul 2014
MLA/2012/00097/1 - Completed Application - Construction Renovate Moorings at River Yar Boatyard Mr Roger Allen 24 Feb 201218 Jun 2013
MLA/2012/00098/2 - Completed Application - Construction Brus Culvert Northumbrian Water Limited 24 Feb 201202 Aug 2013
MLA/2012/00099/1 - Completed Application - Construction King Point Marina Wave Gate Sutton Harbour Services Limited24 Feb 201224 Sep 2012
MLA/2012/00100/10 - CompletedApplication - Miscellaneous Disposal, Removals (inc. Grab Samples) Port of Falmouth Development Initiative: Trial Falmouth Harbour Commissioners 24 Feb 201227 Aug 2013
MLA/2012/00101/5 - Completed Application - Dredged Material Disposal, DredgingBrighton Marina Dredging & Disposal Program 2012 - 2015 Premier Marinas (Brighton) Limited 27 Feb 201217 Sep 2015
MLA/2012/00102 - Completed Application - Construction Fulham Football Club New Riverside Stand Fulham Football Club Marine WorksFulham Stadium Limited 28 Feb 201222 Dec 2015
MLA/2012/00106 - Completed Application - Emergency Work tamesis dock cradle Tamesis Dock Limited 04 Mar 201203 Apr 2012
MLA/2012/00107 - Completed Application - Construction Discharge Outfall Protection, Crossrail Limmo Worksite Dragados Sisk Joint Venture05 Mar 201229 May 2012
MLA/2012/00108 - Completed Application - Removals (inc. Grab Samples) Removal of dead sperm whale from Skegness beach East Lindsey District Council05 Mar 201205 Mar 2012
MLA/2012/00109 - Completed Application - Removals (inc. Grab Samples) Area 483 and 484 Characterisation/ Pre-Dredge Benthic Survey Emu Limited05 Mar 201227 Jul 2012
MLA/2012/00110/2 - Completed Application - Construction Crossrail C807 Marine Transportation Bam Nuttall Limited05 Mar 201212 Jun 2012
MLA/2012/00111 - Completed Application - Construction Sea of Voices Public Art work for Brighton Festival Invisible Flock05 Mar 201219 Apr 2012
MLA/2012/00112 - Completed Application - Removals (inc. Grab Samples) Stock assessments, marine monitoring and environmental research Eastern Inshore Fisheries And Conservation Authority 06 Mar 201201 May 2012
MLA/2012/00113/3 - Completed Application - Aggregate Dredging Area 240 (Restricted Footprint) Hanson Aggregates Marine Limited 07 Mar 201208 Jul 2014
MLA/2012/00116/1 - Completed Application - Removals (inc. Grab Samples) Gunfleet Sands Demonstration Project Export Cable Vibrocore Survey Dong Energy Gunfleet Sands Demo (Uk) Ltd 07 Mar 201209 Jul 2012
MLA/2012/00117/1 - Completed Application - Construction River Clyst Bridge Devon County Council 07 Mar 201209 May 2013
MLA/2012/00119/2 - Completed Application - Removals (inc. Grab Samples) Ground Investigation (GI) Works for Hinkley Point C Preliminary Works (Jetty) Grouped under: Hinkley Point C Showing 2 of 7 cases Edf Energy 07 Mar 201213 Mar 2013
MLA/2012/00120 - Completed Application - Emergency Work Hill Head Sailing Club: Beach Shingle Project to make Safe Hill Head Sailing Club 08 Mar 201215 Mar 2012
MLA/2012/00121 - Completed Application - Emergency Work The Mouth of the River Axe East Devon District Council08 Mar 201220 Mar 2012
MLA/2012/00122/10 - CompletedApplication - Renewables Blyth Offshore Demonstration Project Blyth Offshore Demonstrator Limited09 Mar 201222 Dec 2021
MLA/2012/00123/1 - Completed Application - Aggregate Dredging Area 228 Short Term Marine Licence Application Volker Dredging Limited12 Mar 201207 Jul 2014
MLA/2012/00124/1 - Completed Application - Construction Installation of Warsash Maritime Academy Transfer ladder Warsash Maritime Academy 13 Mar 201220 Jun 2012
MLA/2012/00126/7 - Completed Application - Removals (inc. Grab Samples) Burbo Bank Extension Offshore Wind Farm - Geotechnical investigations #1 & #2 Dong Energy Burbo Extension (Uk) Ltd 13 Mar 201218 Dec 2013
MLA/2012/00127 - Completed Application - Construction Southampton International Boat Show Southampton International Boat Show Limited15 Mar 201201 Jun 2012
MLA/2012/00128/1 - Completed Application - Emergency Work Slipper Mill Pond Gate Replacement Slipper Mill Pond Association15 Mar 201212 Jun 2012
MLA/2012/00129/2 - Completed Application - Construction Middleton Wastewater Treatment Works Long Sea Outfall - Diffuser Modifications United Utilities Plc 16 Mar 201220 Mar 2013
MLA/2012/00130/1 - Completed Application - Construction 132kV electric cable replacement Lepe to Thorness Bay Scottish And Southern Energy Plc 19 Mar 201221 Aug 2013
MLA/2012/00131 - Completed Application - Construction, Dredged Material Disposal, DredgingRNSA Moorings Gosport Rnsa (Portsmouth Branch Moorings)20 Mar 201211 Jul 2012
MLA/2012/00134 - Completed Application - Removals (inc. Grab Samples) Port of Poole Master Plan Surveys for EIA Poole Harbour Commissioners22 Mar 201202 May 2012
MLA/2012/00135/5 - Completed Application - Aggregate Dredging Area 328 (Restricted Footprint) Hanson Aggregates Marine Limited 23 Mar 201203 Jul 2014
MLA/2012/00136/7 - Completed Application - Construction, Removals (inc. Grab Samples) Construction of CTV Pontoon Cammell Laird Shiprepairers & Shipbuilders Limited 23 Mar 201217 Jul 2015
MLA/2012/00137 - Completed Application - Emergency Work Liara Bridge North West Abutment Masonry Repairs Plymouth City Council23 Mar 201228 Mar 2012
MLA/2012/00138/1 - Completed Application - Construction Designated Bathing Area (swimming area buoys)Blue Flag Requirements Swanage Town Council 26 Mar 201216 Aug 2012
MLA/2012/00139/1 - Completed Application - Aggregate Dredging Area 360 short-term application Cemex Uk Marine Limited26 Mar 201222 May 2014
MLA/2012/00140/1 - Completed Application - Aggregate Dredging Area 251 South Lowestoft short term application Cemex Uk Marine Limited27 Mar 201203 Jul 2014
MLA/2012/00141/2 - Completed Application - Dredged Material DisposalTees and Hartlepool Maintenance Dredge Disposal Pd Teesport Limited28 Mar 201230 Sep 2015
MLA/2012/00142 - Completed Application - Removals (inc. Grab Samples) Removal of mud from Dingy Pool Adur Cruising Association28 Mar 201230 Jul 2012
MLA/2012/00143 - Completed Application - Construction Stallingborough Phase 2 Revetment Maintenance and Improvements Environment Agency 28 Mar 201231 May 2012
MLA/2012/00144/1 - Completed Application - Removals (inc. Grab Samples) Seaforth Marine Geo-Environmental Investigation Peel Ports Limited 29 Mar 201230 Jan 2013
MLA/2012/00145 - Completed Application - Construction South Bank Bird Roosting Platform Associated British Ports.29 Mar 201203 Jul 2012
MLA/2012/00147/2 - Completed Application - Construction Salcombe Fish Quay South Hams District Council29 Mar 201217 Sep 2012
MLA/2012/00148/3 - Completed Application - Construction SCOTSWOOD REGENARATION Newcastle City Council 02 Apr 201202 Sep 2015
MLA/2012/00150/1 - Completed Application - Renewables Dogger Bank Windfarm CPT Campaign Forewind Limited 03 Apr 201218 May 2012
MLA/2012/00151/1 - Completed Application - Aggregate Dredging Cross Sands Area 296 aggregate dredging licence application Tarmac Marine Dredging Limited 03 Apr 201202 Jul 2014
MLA/2012/00152/8 - Completed Application - Dredging Dredging Adjacent Falmouth Petroleum Ltd's Eastern Jetty Falmouth Petroleum Limited 04 Apr 201218 Jul 2014
MLA/2012/00153/3 - Completed Application - Removals (inc. Grab Samples) Hornsea offshore wind farm benthic survey 2012 Smart Wind Limited 04 Apr 201208 Aug 2012
MLA/2012/00154 - Completed Application - Construction Beach Well installation on pakefield beach Lowestoft Cefas Technology Limited 04 Apr 201226 Jul 2012
MLA/2012/00156/1 - Completed Application - Emergency Work Torcross sewage outfall repair South West Water Limited 04 Apr 201203 Sep 2012
MLA/2012/00158 - Completed Application - Construction St. Mary's Slipway Repairs Royal National Lifeboat Institution10 Apr 201212 Sep 2012
MLA/2012/00160 - Completed Application - Removals (inc. Grab Samples) Pile Removing Poole Harbour Perenco Uk Limited 11 Apr 201212 Jul 2012
MLA/2012/00161/1 - Completed Application - Construction Mersey Warrington Flood Risk Management Scheme (FRMS) Environment Agency (Warrington)12 Apr 201225 Mar 2013
MLA/2012/00162/1 - Completed Application - Construction AVON WHARF PONTOON MOORINGS Avon Wharf Management Company Limited13 Apr 201202 Aug 2012
MLA/2012/00163/1 - Completed Application - Removals (inc. Grab Samples) Geotechnical investigation: Race Bank and Docking Shoal export cable route Centrica Renewable Energy Limited16 Apr 201219 Aug 2013
MLA/2012/00164/2 - Completed Application - Dredged Material DisposalYarmouth Harbour Phase 2 Yarmouth Harbour Commissioners (Iow) 17 Apr 201205 Oct 2012
MLA/2012/00165 - Completed Application - Construction Rockley Viaduct and Creekmoor Wall Amalgamated Construction Ltd 17 Apr 201209 Aug 2012
MLA/2012/00166 - Completed Application - Construction Private Timber Jetty Mr Duncan Willard17 Apr 201211 Jul 2012
MLA/2012/00167/1 - Completed Application - Construction, Removals (inc. Grab Samples) Shingle Transfer and Beach Re-Profile Shoreham Port Authority18 Apr 201204 Dec 2013
MLA/2012/00168 - Completed Application - Construction Salcombe Harbour Hotel Galliford Try18 Apr 201226 Jun 2012
MLA/2012/00169/6 - Completed Application - Construction Deal Sea Defences Environment Agency 18 Apr 201227 Aug 2013
MLA/2012/00170/3 - Completed Application - Removals (inc. Grab Samples) Thames Vibrocoring and Grab Survey Marinespace Ltd19 Apr 201203 Jul 2012
MLA/2012/00172 - Completed Application - Construction Salcombe Saline Interventions South West Water Limited 20 Apr 201214 May 2012
MLA/2012/00173 - Completed Application - Construction Gas Works Bridge 13 Bam Nuttall Limited23 Apr 201225 Jun 2012
MLA/2012/00174 - Completed Application - Construction Greenwich Yacht Club Greenwich Yacht Club Limited 23 Apr 201212 Sep 2012
MLA/2012/00175/3 - Completed Application - Construction, Removals (inc. Grab Samples) River wall reconstruction 26 - 37 Clive Street North Shields Southbay Civil Engineering Limited 24 Apr 201209 Dec 2014
MLA/2012/00176 - Completed Application - Dredging Crossrail Dragados Sisk Joint Venture24 Apr 201217 Aug 2012
MLA/2012/00178/4 - Completed Application - Removals (inc. Grab Samples) Marine Sampling off North Cornwall Coast Grouped under: Marine Minerals Limited Showing 2 of 3 cases Marine Minerals Limited24 Apr 201215 Jan 2013
MLA/2012/00179 - Completed Application - Removals (inc. Grab Samples) Dogger Bank Tranche Geotechnical Campaign - Boreholes Forewind Limited 25 Apr 201212 Jul 2012
MLA/2012/00180/1 - Completed Application - Removals (inc. Grab Samples) Tranche B and Teesside Cable Corridor Benthic Survey Forewind Limited 25 Apr 201229 Oct 2012
MLA/2012/00181 - Completed Application - Construction Foulness Island-Sea wall protection Qinetiq25 Apr 201216 Jul 2012
MLA/2012/00182 - Completed Application - Construction Albion Terrace Flooding Alleviation Northumbrian Water Limited 25 Apr 201222 Oct 2012
MLA/2012/00183 - Completed Application - Construction Reinstatment of Dilapitated Ham Wharf Mr Dan Tester25 Apr 201219 Jul 2012
MLA/2012/00184/1 - Completed Application - Removals (inc. Grab Samples) Roosecote Biomass Power Station / Ramsden Dock New Berth Rps Planning & Development Limited 25 Apr 201210 Jul 2012
MLA/2012/00185/3 - Completed Application - Construction Tees Transporter Bridge Enhancements Middlesbrough Council25 Apr 201221 Jul 2014
MLA/2012/00186/1 - Completed Application - Construction Nethertown-St Bees to Braystones Coastal Protection J. Murphy & Sons Limited 25 Apr 201223 Apr 2013
MLA/2012/00187/6 - Completed Application - Removals (inc. Grab Samples) TETNEY SEALINE REPLACEMENT PROJECT - GEOTECHNICAL/GEOPHYSICAL SURVEY WORKS Phillips 66 Limited26 Apr 201225 Mar 2014
MLA/2012/00188 - Withdrawn Application - Removals (inc. Grab Samples) Removal of unsafe timber fende adjacent to Shoreham Harbour Footbridge West Sussex County Council 26 Apr 2012
MLA/2012/00189 - Completed Application - Construction YWS Scarborough & Bridlington Sea Outfalls - Ground Investigation Grouped under: Wheatcroft Long Sea Outfall Showing 2 of 7 cases Yorkshire Water Services Limited 27 Apr 201218 Jul 2012
MLA/2012/00190 - Completed Application - Emergency Work Cowbar Rock Fall Remediation Works Redcar & Cleveland Borough Council 27 Apr 201204 May 2012
MLA/2012/00191 - Completed Application - Construction Relocate Floating pontoon Mr William Baker 27 Apr 201219 Jun 2012
MLA/2012/00192 - Completed Application - Construction West Quay wall replacement Somerset County Council27 Apr 201220 Jul 2012
MLA/2012/00193/8 - Completed Application - Construction Quay wall repair, South Quay Hayle Ing Red Uk 27 Apr 201208 Aug 2014
MLA/2012/00194/2 - Completed Application - Renewables Geophysical and geotechnical survey Galloper Wind Farm Limited 27 Apr 201230 Nov 2012
MLA/2012/00195/6 - Completed Application - Aggregate Dredging, Removals (inc. Grab Samples) Aggregate dredging Area 395 licence renewal Tarmac Marine Dredging Limited 27 Apr 201221 May 2024
MLA/2012/00196 - Completed Application - Construction, Removals (inc. Grab Samples) Repair of Existing Wharf Damaged by Ship Collision (42 Wharf, Northfleet) Lafarge Cement Uk Limited30 Apr 201220 Aug 2012
MLA/2012/00197/6 - Completed Application - Aggregate Dredging, Removals (inc. Grab Samples) Aggregate dredging Area 395 licence renewal Aggregate Industries Uk Limited30 Apr 201214 Feb 2019
MLA/2012/00198/3 - Completed Application - Construction Lots Road Development Circadian Limited01 May 201227 Nov 2013
MLA/2012/00199/1 - Completed Application - Construction Hadston Outfall Repair Northumbrian Water Limited 01 May 201207 Nov 2012
MLA/2012/00200/1 - Completed Application - Construction, Removals (inc. Grab Samples) Removal of revetment and deposit of revetment material on beach at Aldbrough Sse Hornsea Limited02 May 201202 Nov 2012
MLA/2012/00203/9 - Completed Application - Construction Scour Protection BML2-41 River Avon, Christchurch Network Rail 03 May 201230 Jul 2014
MLA/2012/00204/1 - Completed Application - Removals (inc. Grab Samples) Lower Ferry Project, Dartmouth South Hams District Council04 May 201222 Jun 2012
MLA/2012/00205/8 - Completed Application - Dredged Material DisposalRiver Yare Maintenance Dredging Disposal Great Yarmouth Port Company Ltd04 May 201223 Sep 2015
MLA/2012/00206/8 - Completed Application - Dredged Material DisposalPort of Barrow Maintenance Dredging Associated British Ports.04 May 201211 Mar 2016
MLA/2012/00207/2 - Completed Application - Construction, Removals (inc. Grab Samples) Felixstowe Pier redevelopment Pier Amusements (Felixstowe) Ltd 04 May 201208 Jan 2013
MLA/2012/00208/2 - Completed Application - Dredging Millbay Enabling Works, Outer Basin Dredging English Cities Fund04 May 201208 Feb 2013
MLA/2012/00209 - Completed Application - Removals (inc. Grab Samples) Area 137 vibrocoring survey Cemex Uk Marine Limited08 May 201208 Aug 2012
MLA/2012/00210/1 - Completed Application - Construction Ryde Pier Repairs Dyer And Butler Limited08 May 201220 Dec 2012
MLA/2012/00211 - Completed Application - Removals (inc. Grab Samples) Area 123 Vibrocore survey Cemex Uk Marine Limited09 May 201221 Aug 2012
MLA/2012/00213 - Completed Application - Construction Proposed Strengthening Sutton Ford Bridge, Rochford (River Roach) Essex Highways 09 May 201223 Jul 2012
MLA/2012/00214/2 - Completed Application - Construction Medway Valley Development Trenport (Peters Village) Limited09 May 201217 Jan 2013
MLA/2012/00215 - Completed Application - Construction Track Renewal on the Royal Albert Bridge, Plymouth Network Rail Limited 10 May 201205 Jul 2012
MLA/2012/00216 - Completed Application - Emergency Work Southwick Beach Emergency Reinforcement Shoreham Port Authority10 May 201216 May 2012
MLA/2012/00217 - Completed Application - Construction convert part of decking to steps for access to small L shaped floating platform Mrs Dianah Humber11 May 201227 Jun 2012
MLA/2012/00218/5 - Completed Application - Removals (inc. Grab Samples) Geotechnical investigations at the proposed Walney Extension Offshore Wind farm Dong Energy Power (Uk) Limited 14 May 201212 Jun 2014
MLA/2012/00219 - Completed Application - Construction Clevedon Pier Painting 2012 Clevedon Pier And Heritage Trust Ltd 14 May 201205 Jul 2012
MLA/2012/00220/4 - Completed Application - Construction Replacement Footbridges Morston Borfolk The National Trust 15 May 201224 Feb 2014
MLA/2012/00221 - Completed Application - Removals (inc. Grab Samples) Portsmouth UHAF - Demolition Works of Existing Facility Volker Stevin Limited15 May 201223 Jul 2012
MLA/2012/00222 - Completed Application - Renewables Dogger Bank Tranche A calibration CPTs Spring 2012 Forewind Limited 15 May 201231 May 2012
MLA/2012/00223 - Completed Application - Miscellaneous Disposal Tracer Deposit Environment Agency (Southern Region) 16 May 201227 Jun 2012
MLA/2012/00224 - Completed Application - Construction South Basin Breakwater Arun Yacht Club Ltd16 May 201221 Aug 2012
MLA/2012/00225/2 - Completed Application - Removals (inc. Grab Samples) Swath bathymetry survey of St Catherine's Deep Dr Travis Mason16 May 201217 Jul 2012
MLA/2012/00226/1 - Completed Application - Construction, Removals (inc. Grab Samples) Shandon, Yarmouth - Proposed Replacement Jetty Mr + Mrs Jonathan + Jill Whitehead 17 May 201214 Feb 2013
MLA/2012/00227 - Completed Application - Dredged Material Disposal, DredgingHusbands Shipyard Oceanic Estates Ltd18 May 201202 Nov 2012
MLA/2012/00228/3 - Completed Application - Construction, Dredged Material Disposal, DredgingKingston Marine Park Isle Of Wight Council21 May 201210 Jun 2019
MLA/2012/00229 - Withdrawn Application - Construction, Removals (inc. Grab Samples) Roa Jetty Reconstruction Barrow Borough Council 21 May 2012
MLA/2012/00230 - Completed Application - Emergency Work Atwick coastal site concrete plinth removal Sse Hornsea Limited22 May 201225 May 2012
MLA/2012/00231 - Completed Application - Removals (inc. Grab Samples) BEEMS WP2 Hinkley Point Ecological Survey 2012 Cefas23 May 201215 Jun 2012
MLA/2012/00232/1 - Completed Application - Removals (inc. Grab Samples) Removal of wreck Vivian Sue in Fleet Ilchester Estates23 May 201214 Aug 2012
MLA/2012/00233 - Completed Application - Construction BSC Main Pontoon - Stabilisation Bembridge Sailing Club 24 May 201218 Jul 2012
MLA/2012/00234 - Completed Application - Construction, Removals (inc. Grab Samples) Venture Quay Proposed Hoist Dock South Boats Special Projects Limited 24 May 201220 Aug 2012
MLA/2012/00235 - Completed Application - Removals (inc. Grab Samples) Western HVDC Link submarine power cable survey Nget/Spt Upgrades Limited24 May 201223 Aug 2012
MLA/2012/00236 - Completed Application - Construction Weymouth & Portland Olympic Sailing Venue Installation Of Olympic Rings The London Organising Committee Of The Olympic Games And Paralympic Games Limited25 May 201203 Jul 2012
MLA/2012/00237 - Completed Application - Construction Sea Lawn Outfall Dawlish South West Water Limited 28 May 201229 Oct 2012
MLA/2012/00238/1 - Completed Application - Miscellaneous Disposal, Removals (inc. Grab Samples) Liverpool 2 and Middle Deep & Mid-River Sediment Management Studies Mersey Docks And Harbour Company 29 May 201210 Aug 2012
MLA/2012/00239 - Completed Application - Construction Larkstone Slipway extension Ilfracombe Harbour Authority 30 May 201223 Jul 2012
MLA/2012/00240/1 - Completed Application - Construction Steart Coastal Management Project Environment Agency – South West Reg30 May 201201 Nov 2012
MLA/2012/00241 - Withdrawn Application - Removals (inc. Grab Samples) Hornsea Offshore Wind Farm Project One - Landfall Geotechnical Survey Smart Wind Limited 30 May 2012
MLA/2012/00242/13 - CompletedApplication - Alternative Use of Dredged Material, Construction, Dredging, Removals (inc. Grab Samples)Lee Tunnel Project Mvbjv30 May 201230 Jun 2015
MLA/2012/00243/5 - Completed Application - Dredged Material DisposalMaintenance Dredging Disposal - Dover Harbour Board Dover Harbour Board31 May 201204 Jan 2016
MLA/2012/00244/1 - Completed Application - Construction Repairs at Baltic Wharf Baltic Distribution Limited31 May 201230 Aug 2012
MLA/2012/00245 - Completed Application - Removals (inc. Grab Samples) Removal of piles in connection with the construction of new Launching Ramp Mpi Services (Uk) Limited31 May 201208 Aug 2012
MLA/2012/00246 - Completed Application - Construction OBS SkyCam across the Thames The London Organising Committee Of The Olympic Games And Paralympic Games Limited01 Jun 201204 Jul 2012
MLA/2012/00247/2 - Completed Application - Dredged Material Disposal, DredgingDredging material from around the Cleveland Potash Ltd outfall for disposal Cleveland Potash Limited 02 Jun 201213 Nov 2015
MLA/2012/00248 - Completed Application - Construction Floating Pontoon at Redcliff Beach Coastline Cruises Ltd05 Jun 201216 Jul 2012
MLA/2012/00249/4 - Completed Application - Dredged Material DisposalPort of Workington Maintenance Dredging Port Of Workington 06 Jun 201208 Jan 2016
MLA/2012/00250 - Completed Application - Miscellaneous Disposal, Removals (inc. Grab Samples) Rye Harbour sand bar removal Environment Agency 06 Jun 201204 Sep 2012
MLA/2012/00251/1 - Completed Application - Construction, Removals (inc. Grab Samples) Proposed Timber Piling to Part Spragger Drain, Sunk Island Carter Jonas Llp 06 Jun 201208 Oct 2012
MLA/2012/00253 - Completed Application - Construction Seasalter Shellfish slipway refurbishment project. Seasalter Shellfish (Whitstable) Ltd 08 Jun 201224 Sep 2012
MLA/2012/00254/1 - Completed Application - Construction Construction of a new outfall into the Duddon Estuary United Utilities Water Plc 08 Jun 201222 Aug 2013
MLA/2012/00256/1 - Completed Application - Construction Falmouth Marina - Cill Defect Premier Marinas Limited11 Jun 201211 Jul 2013
MLA/2012/00257/6 - Completed Application - Dredged Material DisposalMaintenance dredging - Wells Harbour Wells Harbour Commissioners12 Jun 201222 Aug 2014
MLA/2012/00258/2 - Completed Application - Removals (inc. Grab Samples) Harwich Thomson Unicomarine Limited13 Jun 201223 Jul 2012
MLA/2012/00259/10 - Variation RequestedApplication - Construction, Dredging, Miscellaneous Disposal Hinkley Point C Project: New Nuclear Development Grouped under: Hinkley Point C Showing 2 of 7 cases Nnb Generation Company (Hpc) Limited 15 Jun 201222 Feb 2023
MLA/2012/00260/1 - Completed Application - Construction Improvement of Lower Ferry Slipways South Hams District Council15 Jun 201214 Dec 2012
MLA/2012/00261 - Completed Application - Emergency Work Teesside Offshore Windfarm - Ordnance Disposal Teesside Windfarm Limited19 Jun 201222 Jun 2012
MLA/2012/00263 - Completed Application - Construction Strengthening of Raw Sugar Jetty Tate & Lyle20 Jun 201213 Sep 2012
MLA/2012/00264/1 - Completed Application - Dredged Material Disposal, DredgingParkstone Yacht Club Haven Maintenance Dredge Parkstone Yacht Club (Haven) Limited 21 Jun 201211 Nov 2013
MLA/2012/00265/1 - Completed Application - Removals (inc. Grab Samples) Removal of items from ship wrecks Mr William Pocklington 21 Jun 201204 Sep 2015
MLA/2012/00266 - Completed Application - Construction WaveSentry Deployment Emu Limited22 Jun 201203 Sep 2012
MLA/2012/00267 - Completed Application - Removals (inc. Grab Samples) Particle size distribution survey in Liverpool Bay University Of Liverpool22 Jun 201226 Jul 2012
MLA/2012/00268/1 - Completed Application - Construction Marina Extension, Chatham Maritime Marina Marina Developments Limited22 Jun 201215 Feb 2013
MLA/2012/00270/2 - Completed Application - Construction Osea Island, Causeway Annual Maintenance Dha Planning Ltd 26 Jun 201222 Dec 2015
MLA/2012/00271/7 - Completed Application - Dredged Material DisposalRiver Mersey Maintenance Dredge License Renewal The Mersey Docks And Harbour Company Limited 26 Jun 201230 Jan 2017
MLA/2012/00272 - Completed Application - Aggregate Dredging Area 340 Short Term Marine Licence Application Volker Dredging Ltd28 Jun 201220 Sep 2012
MLA/2012/00273 - Completed Application - Removals (inc. Grab Samples) Teesside Offshore Windfarm - Magnetic anomaly investigations Teesside Windfarm Limited28 Jun 201213 Jul 2012
MLA/2012/00274 - Completed Application - Aggregate Dredging Area 340 Short Term Marine Licence Application Cemex Uk Marine Limited28 Jun 201220 Sep 2012
MLA/2012/00275 - Completed Application - Construction, Removals (inc. Grab Samples) Blyth SO1 and SO2 Outfalls Repair Northumbrian Water Limited 28 Jun 201203 Oct 2012
MLA/2012/00276 - Completed Application - Emergency Work Protection of Town Quay, Lowestoft Abport Limited 28 Jun 201228 Jun 2012
MLA/2012/00277 - Completed Application - Construction Pre-application I.D MLP/2012/00063 Scarborough Borough Council28 Jun 201221 Sep 2012
MLA/2012/00278/1 - Completed Application - Dredged Material DisposalKings Lynn Dock Point Maintenance Dredging and Disposal Kings Lynn Conservancy Board 29 Jun 201210 Dec 2013
MLA/2012/00279 - Completed Application - Dredged Material Disposal, DredgingMercury Yacht Harbour - Maintenance Dredging Marina Developments Limited29 Jun 201205 Feb 2013
MLA/2012/00280/2 - Completed Application - Dredged Material Disposal, DredgingPort Hamble Marina - Maintenance Dredging Marina Developments Limited29 Jun 201207 Oct 2015
MLA/2012/00281 - Completed Application - Dredged Material Disposal, DredgingHamble Point Marina - Maintenance Dredging Marina Developments Limited29 Jun 201205 Feb 2013
MLA/2012/00282/2 - Completed Application - Aggregate Dredging Area 242/361 (Restricted Footprint) Hanson Aggregates Marine Limited 29 Jun 201222 Jul 2014
MLA/2012/00283/2 - Completed Application - Dredged Material Disposal, DredgingSeaham Harbour Dredging Seaham Harbour Dock Company02 Jul 201218 May 2015
MLA/2012/00284 - Completed Application - Construction Imperial Recreation Ground, Revetment reconstruction and improvement works East Devon District Council02 Jul 201221 Dec 2012
MLA/2012/00285/2 - Completed Application - Dredged Material Disposal, DredgingHythe Marina Village (Approach Channel) - Maintenance Dredging Marina Developments Limited02 Jul 201210 Aug 2015
MLA/2012/00286/2 - Completed Application - Construction Royal Princes Parade Coastal Protection Works East Riding Of Yorkshire Council 02 Jul 201213 Nov 2012
MLA/2012/00287/1 - Completed Application - Aggregate Dredging Area 123/122-1 Short Term Marine Licence Application Cemex Uk Marine Limited03 Jul 201222 Jul 2014
MLA/2012/00288/1 - Completed Application - Aggregate Dredging Owers Area 123/122-1 short term marine licence application Tarmac Marine Dredging Limited 03 Jul 201222 Jul 2014
MLA/2012/00289/2 - Completed Application - Aggregate Dredging Area 212 (Restricted Footprint) Hanson Aggregates Marine Limited 03 Jul 201207 Jul 2014
MLA/2012/00290 - Completed Application - Removals (inc. Grab Samples) Wash intertidal opportunistic macroalgae survey Environment Agency 03 Jul 201231 Aug 2012
MLA/2012/00291/1 - Completed Application - Construction 101 Berth Scour Protection Associated British Ports, Southampton04 Jul 201202 May 2013
MLA/2012/00293 - Completed Application - Construction Installation of CO2 tank on jetty at Tilbury Power Station Rwe Npower Plc 06 Jul 201223 Aug 2012
MLA/2012/00294/3 - Completed Application - Construction, Dredged Material Disposal, Dredging, Removals (inc. Grab Samples)Replacement Quay AV Dawson A.V.Dawson Limited 06 Jul 201202 Jun 2014
MLA/2012/00297/1 - Completed Application - Aggregate Dredging 319 short-term application Cemex Uk Marine Limited09 Jul 201223 May 2014
MLA/2012/00298/1 - Completed Application - Removals (inc. Grab Samples) Round 3 Geophysical Survey with seabed samples Centrica Energy Renewable Investments Limited09 Jul 201220 Aug 2012
MLA/2012/00299 - Completed Application - Construction Revetment Works, Hythe Marina Village, Southampton Marina Developments Limited10 Jul 201207 Nov 2012
MLA/2012/00300/2 - Completed Application - Miscellaneous Disposal Ainsdale and Blackpool monitoring Sefton Mbc 11 Jul 201225 Jul 2013
MLA/2012/00301 - Completed Application - Construction Replace Sea Wall at Kimmeridge Bay Smedmore Estate12 Jul 201212 Oct 2012
MLA/2012/00302/6 - Variation Requested Application - Aggregate Dredging Marine aggregate dredging licence Area 451 renewal Westminster Gravels Limited16 Jul 201206 Apr 2017
MLA/2012/00303 - Completed Application - Removals (inc. Grab Samples) Environment Agency WFD Macroalgae surveys- Solent and Isle of Wight Jacobs Engineering U.K. Limited17 Jul 201203 Aug 2012
MLA/2012/00304/4 - Completed Application - Construction, Removals (inc. Grab Samples) Littlehaven Sea Wall South Tyneside Council 17 Jul 201216 Sep 2013
MLA/2012/00306 - Completed Application - Construction, Dredged Material Disposal, DredgingGosport Marina Piers A-D Reconfiguration Premier Marinas (Gosport) Limited23 Jul 201212 Oct 2012
MLA/2012/00307/1 - Completed Application - Renewables Mooring Component Tests at Wave Hub Site Ocean Energy Limited 23 Jul 201228 Sep 2012
MLA/2012/00309/1 - Completed Application - Construction Fitting of tideslide moorings at Port of Workington E.On Climate & Renewables Uk Operations Limited24 Jul 201202 Aug 2013
MLA/2012/00310/2 - Completed Application - Removals (inc. Grab Samples) Quarterly Benthic Monitoring Dover Harbour Board24 Jul 201220 Mar 2013
MLA/2012/00311 - Completed Application - Removals (inc. Grab Samples) Investigation of Geophysical survey of area 1 Isles of Scillly Mr Robin Burrows 25 Jul 201201 Oct 2012
MLA/2012/00312 - Withdrawn Application - Construction Albion Terrace Flood Alleviation Northumbrian Water Ltd 27 Jul 2012
MLA/2012/00314 - Completed Application - Construction Leighton Beck Tidal Door Replacement South Cumbria Rivers Trust 01 Aug 201204 Sep 2012
MLA/2012/00315 - Completed Application - Removals (inc. Grab Samples) Lyme Regis Environmental Improvements Phase IV - Coring Works Dean & Dyball Civil Engineering Limited01 Aug 201201 Oct 2012
MLA/2012/00316 - Completed Application - Construction Highshore Beck Tidal Flap Valve Replacement South Cumbria Rivers Trust 01 Aug 201204 Sep 2012
MLA/2012/00317 - Completed Application - Emergency Work Greater Gabbard - removal of UXO Greater Gabbard Offshore Winds Limited 01 Aug 201207 Nov 2012
MLA/2012/00318 - Completed Application - Construction Mythic Coast Golden Shell Wyre Borough Council 02 Aug 201217 Sep 2012
MLA/2012/00319/7 - Completed Application - Aggregate Dredging Area 340 15 Year Marine Licence Volker Dredging Ltd02 Aug 201226 Mar 2024
MLA/2012/00320/7 - Completed Application - Aggregate Dredging Area 340 full term licence application Cemex Uk Marine Limited02 Aug 201226 Mar 2024
MLA/2012/00321 - Completed Application - Dredging Unblocking Tidal Sluice Hampshire County Council 03 Aug 201220 Nov 2012
MLA/2012/00322 - Completed Application - Removals (inc. Grab Samples) APEM RNLI Poole Harbour Survey Apem Ltd 03 Aug 201212 Sep 2012
MLA/2012/00323 - Completed Application - Aggregate Dredging Area 105 Short Term Marine Licence Cemex Uk Marine Limited03 Aug 201207 Dec 2012
MLA/2012/00324 - Completed Application - Alternative Use of Dredged Material, DredgingFolkestone Harbour Dredging Folkestone Harbour Company Limited 03 Aug 201207 Feb 2013
MLA/2012/00325 - Completed Application - Aggregate Dredging Area 107 Short Term Marine Licence Cemex Uk Marine Limited06 Aug 201207 Dec 2012
MLA/2012/00326/2 - Completed Application - Dredged Material DisposalEsso Fawley Marine Terminal Maintenance Dredging and Disposal Licence Renewal Esso Petroleum Company,Limited 06 Aug 201230 Jan 2013
MLA/2012/00328 - Completed Application - Removals (inc. Grab Samples) 3 Mills River wall replacement (Ref MLP/2012/00087) - Site Investigation London Legacy Development Corporation08 Aug 201218 Oct 2012
MLA/2012/00330 - Completed Application - Construction Warren Point Ferry Landing Devon County Council 09 Aug 201208 Feb 2013
MLA/2012/00332/1 - Completed Application - Construction YWS Wheatcroft Marine Outfall - LSO Temporary Repair Grouped under: Wheatcroft Long Sea Outfall Showing 2 of 7 cases Yorkshire Water Services Limited 10 Aug 201213 Dec 2012
MLA/2012/00333/1 - Completed Application - Removals (inc. Grab Samples) Triton Knoll Cable Route Geotechnical Survey Rwe Npower Renewables Limited13 Aug 201229 Oct 2012
MLA/2012/00334/6 - Completed Application - Construction Sandwich TTD Environment Agency (Southern Region) 14 Aug 201201 Jul 2015
MLA/2012/00335/3 - Completed Application - Dredged Material Disposal, DredgingEast Cowes Marina Dean & Reddyhoff Limited 15 Aug 201223 Dec 2015
MLA/2012/00336/2 - Completed Application - Removals (inc. Grab Samples) York Potash York Potash Ltd15 Aug 201201 Sep 2022
MLA/2012/00337/1 - Completed Application - Removals (inc. Grab Samples) Thames Tideway Tunnel Archaeological survey Thames Water Utilities Limited 20 Aug 201225 Sep 2013
MLA/2012/00338/1 - Completed Application - Dredged Material Disposal, DredgingPort of Southampton: Main Channel (Marchwood) Widening Works Associated British Ports, Southampton21 Aug 201223 Jan 2013
MLA/2012/00339 - Completed Application - Construction Hooe Lake - enabling road works Bdw Ltd21 Aug 201226 Apr 2013
MLA/2012/00340 - Completed Application - Aggregate Dredging, Removals (inc. Grab Samples) Short term marine licence application for Area 331 in the Irish Sea Tarmac Marine Dredging Limited 22 Aug 201229 Nov 2012
MLA/2012/00341/1 - Completed Application - Construction Golant Outfall Pipe Replacement South West Water Limited 22 Aug 201206 Dec 2012
MLA/2012/00342/1 - Completed Application - Emergency Work Protection of quay wall, Lowestoft Harbour Associated British Ports Holdings Limited23 Aug 201228 Aug 2012
MLA/2012/00344 - Completed Application - Renewables Greater Gabbard - Exposed export cable - Approval to lay concrete mattressing Ms Kate Harvey 23 Aug 201218 Jan 2013
MLA/2012/00346 - Completed Application - Construction Scarborough North Bay asset refurbishment scheme Mr Robin Siddle24 Aug 201223 Nov 2012
MLA/2012/00347 - Completed Application - Construction Replacement of Tidal Flapvalve on Red Bank Dyke Watercourse The Lune Rivers Trust25 Aug 201225 Sep 2012
MLA/2012/00348 - Completed Application - Construction Replacement of Tidal Flap Valve on Bank End Watercourse The Lune Rivers Trust25 Aug 201225 Sep 2012
MLA/2012/00349 - Completed Application - Construction Replacement of Tidal Flapvalve on Black Dyke The Lune Rivers Trust25 Aug 201225 Sep 2012
MLA/2012/00351 - Completed Application - Construction Replacement of Flap Valve at Brickwork Outfall, Glasson Dock The Lune Rivers Trust25 Aug 201225 Sep 2012
MLA/2012/00352 - Completed Application - Construction Replacement of Flap Valve on Hasty Beck The Lune Rivers Trust25 Aug 201225 Sep 2012
MLA/2012/00353 - Completed Application - Construction PONTOONS AT KING EDWARD QUAY COLCHESTER Colchester Borough Council 26 Aug 201214 Nov 2012
MLA/2012/00354 - Completed Application - Burial at Sea John Lister28 Aug 201204 Sep 2012
MLA/2012/00355 - Completed Application - Construction Replacement of Tidal Flap Valve at Mill House East Outfall The Lune Rivers Trust28 Aug 201225 Sep 2012
MLA/2012/00357 - Completed Application - Construction Installation of New TIdal Valve on Oxcliffe Dyke Watercourse The Lune Rivers Trust28 Aug 201225 Sep 2012
MLA/2012/00358 - Completed Application - Construction Replacement of Tidal Flap Valve on Trunk Dyke East The Lune Rivers Trust28 Aug 201225 Sep 2012
MLA/2012/00359 - Completed Application - Construction Replacement of Flap Valve on Trunk Dyke East Tidal Outfall The Lune Rivers Trust28 Aug 201225 Sep 2012
MLA/2012/00360 - Completed Application - Construction Installation of Tidal Flap Valve at Work Pool Tidal Outfall The Lune Rivers Trust28 Aug 201225 Sep 2012
MLA/2012/00361 - Completed Application - Burial at Sea John Lister28 Aug 201230 Aug 2012
MLA/2012/00362 - Completed Application - Construction Bristish Heart Foundation Shop Celtic Scaffolding Limited 29 Aug 201209 Oct 2012
MLA/2012/00363 - Completed Application - Construction Derwentwater Mews Care Facility Olnato Limited 29 Aug 201207 Jan 2013
MLA/2012/00364 - Completed Application - Removals (inc. Grab Samples) NERC Coastal Biodiversity and Ecosystem Services (CBESS) St Andrews University30 Aug 201202 Jan 2013
MLA/2012/00365 - Completed Application - Construction Shoreham Cooling Water Outfall Works Scottish Power Generation Holdings Limited 30 Aug 201221 Jan 2013
MLA/2012/00366 - Completed Application - Emergency Work Nethertown - St Bees Landslip J. Murphy & Sons Limited 30 Aug 201230 Aug 2012
MLA/2012/00367 - Completed Application - Construction Canoe Pontoon Mr Gary C Akers31 Aug 201214 Jan 2013
MLA/2012/00368 - Completed Application - Removals (inc. Grab Samples) Cowes Outer Harbour - Site Investigation Cowes Harbour Commission 03 Sep 201213 Nov 2012
MLA/2012/00369 - Completed Application - Construction Newcaflex (Duco) Balfour Beatty Civil Engineering Limited 04 Sep 201217 Jan 2013
MLA/2012/00370 - Completed Application - Removals (inc. Grab Samples) Western Docks - Vibrocores Associated British Ports, Southampton04 Sep 201218 Oct 2012
MLA/2012/00372 - Completed Application - Construction St Marys Quay Ground Investigation Works Council Of The Isles Of Scilly 05 Sep 201207 Nov 2012
MLA/2012/00373 - Completed Application - Dredging Cleaning of Stone Creek and Hedon Haven Keyingham Level Drainage Board 05 Sep 201211 Mar 2013
MLA/2012/00374/5 - Completed Application - Aggregate Dredging Area 351 Full Term Licence Application Tarmac Marine Dredging Limited 05 Sep 201223 Jan 2017
MLA/2012/00375/5 - Completed Application - Aggregate Dredging Area 351 Full Term Licence Application Volker Dredging Ltd05 Sep 201205 Feb 2024
MLA/2012/00376/3 - Completed Application - Removals (inc. Grab Samples) R3 Irish Sea Zone Rhiannon Wind Farm marine ecology (grab sampling) surveys Centrica Energy Renewable Investments Limited05 Sep 201225 Oct 2012
MLA/2012/00377/1 - Completed Application - Removals (inc. Grab Samples) Beacon Cove Investigation Living Coasts05 Sep 201217 Oct 2012
MLA/2012/00378/1 - Completed Application - Renewables Inter Array Cable Protection Vattenfall Wind Power Ltd05 Sep 201220 Nov 2012
MLA/2012/00379/2 - Completed Application - Construction, Dredged Material Disposal, DredgingSandbanks Yacht Company Access Dredging Sandbanks Yacht Company Limited05 Sep 201218 Jun 2013
MLA/2012/00380 - Completed Application - Construction Second Tyne Tunnel Highway Drainage Outfall Bouygues Tp (Uk Branch)06 Sep 201224 Oct 2012
MLA/2012/00381 - Completed Application - Construction Weston Sailing Club Slipway Extension Weston Sailing Club07 Sep 201223 Nov 2012
MLA/2012/00382/1 - Completed Application - Dredged Material DisposalContinuation of the Disposal of Maintenance Dredgings at ABP King's Lynn Associated British Ports Holdings Limited08 Sep 201210 Dec 2013
MLA/2012/00383/4 - Completed Application - Construction, Removals (inc. Grab Samples) Arun Timber Docks mooring refurbishment Osborne Of Arun Group (Management) Limited 10 Sep 201219 Jan 2015
MLA/2012/00386 - Completed Application - Miscellaneous Disposal Cammel Laird Wet Basin harbour sub-soil reinforcement work Rwe Npower Renewables Limited10 Sep 201217 Dec 2012
MLA/2012/00387/1 - Completed Application - Construction Ladye Bay Outfall Tidal Flap Wessex Water Services Limited11 Sep 201223 Apr 2013
MLA/2012/00388 - Completed Application - Dredging Neptune Yard Capital Dredge Shepherd Offshore Ltd11 Sep 201221 Dec 2012
MLA/2012/00389 - Completed Application - Emergency Work Protection of quay wall, Lowestoft Harbour Associated British Ports Holdings Limited12 Sep 201213 Sep 2012
MLA/2012/00390/1 - Completed Application - Construction Remedial Works to Seafront Groynes Dover Harbour Board13 Sep 201230 Dec 2013
MLA/2012/00391 - Completed Application - Construction Lowestoft South Beach Wall Toe Protection Sheme Waveney District Council 13 Sep 201227 Nov 2012
MLA/2012/00394 - Completed Application - Removals (inc. Grab Samples) Yorkshire and Humber CCS Project National Grid Grain Lng Ltd14 Sep 201201 Nov 2012
MLA/2012/00395 - Completed Application - Construction Portsmouth Offshore Group - Wicor Pontoon Extension Portsmouth Offshore Group, 17 Sep 201202 Nov 2012
MLA/2012/00396 - Completed Application - Renewables Deployment of a Prototype Device at the Wave Hub Test Site Ocean Energy Limited 17 Sep 201221 Dec 2012
MLA/2012/00397 - Completed Application - Construction New pipeline at Cemex, Northfleet Cemex Uk Materials Limited 17 Sep 201228 Nov 2012
MLA/2012/00398 - Completed Application - Alternative Use of Dredged MaterialSwalecliffe Brook Mouth Improvement Works Environment Agency, Ncpms17 Sep 201219 Nov 2012
MLA/2012/00399 - Completed Application - Construction London Gateway Port London Gateway Port Ltd18 Sep 201214 Dec 2012
MLA/2012/00401/4 - Completed Application - Construction Lot 1 Hydrodynamic services along Cell 1 Coastline Scarborough Borough Council19 Sep 201216 Jul 2015
MLA/2012/00402/11 - CompletedApplication - Alternative Use of Dredged Material, Construction, Dredged Material Disposal, Dredging Liverpool 2 and River Mersey Approach Channel Dredging Mersey Docks & Harbour Company 20 Sep 201203 Dec 2015
MLA/2012/00403/1 - Completed Application - Construction Frequent Ferry Pontoons - Torquay & Brixham Harbour Torbay Council 20 Sep 201227 Mar 2013
MLA/2012/00404 - Completed Application - Construction Quayside Marina New Pontoon Quayside Marina20 Sep 201215 Jan 2013
MLA/2012/00405/1 - Completed Application - Construction Barrow OWF export cable remedial works - jetting Barrow Offshore Wind Limited 20 Sep 201226 Mar 2013
MLA/2012/00406/4 - Completed Application - Construction Barrow OWF export cable remedial works - rock berm installation Barrow Offshore Wind Limited 21 Sep 201229 May 2013
MLA/2012/00407 - Completed Application - Construction LORDS SLUICE REFURBISHMENT South Holland Internal Drainage Board24 Sep 201203 Dec 2012
MLA/2012/00408/1 - Completed Application - Removals (inc. Grab Samples) Grimsby Flood Defence Improvements - Ground Investigation Environment Agency - Anglian Region25 Sep 201206 Dec 2012
MLA/2012/00409/1 - Completed Application - Construction RNLI Harwich - Replacement AWB Pontoon R.N.L.I. (Trading) Limited 26 Sep 201204 Mar 2014
MLA/2012/00412/2 - Completed Application - Construction Reconstruction of Town Quay, Lowestoft Associated British Ports.27 Sep 201214 Jan 2014
MLA/2012/00413/1 - Completed Application - Emergency Work Newton Ferrers Foreshore Pollution Repairs South West Water Limited 27 Sep 201227 Nov 2012
MLA/2012/00415 - Completed Application - Dredging, Removals (inc. Grab Samples) Rye Harbour turning circle dredge and Admiral Jetty removal Environment Agency (Southern Region) 28 Sep 201224 Jan 2013
MLA/2012/00416 - Completed Application - Construction Tilbury Biomass Phase 2 Project Rwe Npower Plc 28 Sep 201230 Jan 2013
MLA/2012/00417 - Completed Application - Emergency Work Emergency Maintenance Dredging Disposal - Dover Harbour Board Dover Harbour Board01 Oct 201208 Oct 2012
MLA/2012/00418 - Completed Application - Construction Pontoons on the Hamble River The Crown Estate 01 Oct 201212 Feb 2013
MLA/2012/00419 - Completed Application - Removals (inc. Grab Samples) Earl Percy, Kalo & Ben Macdui Pan Salvage01 Oct 201205 Aug 2013
MLA/2012/00421 - Completed Application - Emergency Work Whale on Fraishthorpe beach East Riding Of Yorkshire Council 02 Oct 201202 Oct 2012
MLA/2012/00422/1 - Completed Application - Aggregate Dredging Marine Aggregate Licence Area 108/3 - Application for a Marine Works Licence Britannia Aggregates Limited 02 Oct 201207 Jul 2014
MLA/2012/00423/1 - Completed Application - Dredged Material Disposal, DredgingUniversal Marina Maintenance Dredge John Willment Marine Limited 03 Oct 201203 Apr 2014
MLA/2012/00424/5 - Completed Application - Renewables Lynn Offshore Wind Farm Grouped under: Lincs, Lynn and Inner Dowsing Offshore Wind Farm Showing 2 of 7 cases Glid Wind Farms Topco Limited03 Oct 201226 Sep 2016
MLA/2012/00425/7 - Completed Application - Renewables Lincs/LID6 Offshore Wind Farm Grouped under: Lincs, Lynn and Inner Dowsing Offshore Wind Farm Showing 2 of 7 cases Lincs Wind Farm Limited03 Oct 201222 Dec 2021
MLA/2012/00426 - Completed Application - Construction Derwenthaugh Cycle Link Gateshead Council03 Oct 201219 Aug 2013
MLA/2012/00427 - Completed Application - Construction Piling Sailport Plc 03 Oct 201228 Nov 2012
MLA/2012/00428/4 - Completed Application - Dredged Material DisposalABP Lowestoft - Maintenance Dredged Material Disposal Abp Acquisitions Uk Limited04 Oct 201218 Apr 2016
MLA/2012/00429/2 - Completed Application - Construction Replacement access bridge over Weston Mill Creek. Kier Construction04 Oct 201211 Apr 2013
MLA/2012/00430 - Completed Application - Construction, Removals (inc. Grab Samples) Shallow Dock Tidal Flap, Princess Yachts, South Yard, Plymouth (MLP/2012/00229) Princess Yachts International Plc04 Oct 201227 Dec 2012
MLA/2012/00432/1 - Completed Application - Construction Herne Bay Sea Defence Improvements Canterbury City Council05 Oct 201208 Mar 2013
MLA/2012/00433/1 - Completed Application - Construction Bristol Rapid Transit Ashton Vale to Temple Meads Ground Investigation Bristol City Council 05 Oct 201204 Jan 2013
MLA/2012/00434 - Completed Application - Construction, Removals (inc. Grab Samples) Re-construction of Pipewellgate River Wall Gateshead Council05 Oct 201214 Jan 2013
MLA/2012/00435/1 - Completed Application - Construction Hadrian Yard Central River Side Works G. O'Brien & Sons (Nationwide Demolition Contractors) Limited08 Oct 201225 Nov 2013
MLA/2012/00436 - Completed Application - Construction, Removals (inc. Grab Samples) Jetty at 212 Sandbanks Road, Poole Mr Andrew Watts08 Oct 201207 Dec 2012
MLA/2012/00437/1 - Completed Application - Construction Newton Ferrers Sewer Replacement South West Water Limited 08 Oct 201226 Feb 2013
MLA/2012/00438/1 - Completed Application - Construction RNLI Coventina R.N.L.I. (Trading) Limited 08 Oct 201212 Feb 2013
MLA/2012/00439/1 - Completed Application - Construction Mooring Buoys alongside Spitbank Fort, Solent. Clarenco Llp 09 Oct 201229 Nov 2012
MLA/2012/00440 - Completed Application - Removals (inc. Grab Samples) Severn Estuary intertidal surveys for National Grid jetty Apem Ltd 10 Oct 201209 Nov 2012
MLA/2012/00442/1 - Completed Application - Burial at Sea Miss Yvonne Dupre11 Oct 201209 Jan 2013
MLA/2012/00443/1 - Completed Application - Construction Demolition of Jetty at Old Ballast Wharf, Charlton, London Melrose Plc15 Oct 201219 Nov 2012
MLA/2012/00444 - Completed Application - Construction, Removals (inc. Grab Samples) Emergency Sea Defence Works Cemex Uk Materials Limited 15 Oct 201205 Feb 2013
MLA/2012/00445/5 - Completed Application - Construction Donna Nook Managed Realignment Scheme Environment Agency Leeds 15 Oct 201228 Sep 2021
MLA/2012/00446/1 - Completed Application - Removals (inc. Grab Samples) BEEMS New Nuclear Build Marine Science Programme Cefas16 Oct 201213 Feb 2013
MLA/2012/00447 - Withdrawn Application - Construction The repair of bund walls approx 880 mtrs. Silverbrook Estates Limited17 Oct 2012
MLA/2012/00449 - Completed Application - Construction Martlesham Creek Environment Agency - Anglian Region19 Oct 201222 Jan 2013
MLA/2012/00450 - Completed Application - Construction Cleaning and repainting steel piles to Paignton Pier Uk Piers Ltd 22 Oct 201215 Jan 2013
MLA/2012/00451 - Completed Application - Removals (inc. Grab Samples) Newhaven Benthic Sampling Newhaven Port & Properties Limited 22 Oct 201223 Oct 2012
MLA/2012/00452 - Completed Application - Construction, Removals (inc. Grab Samples) Watchhouse Quay Repair Port Of Blyth23 Oct 201209 Jan 2013
MLA/2012/00453 - Completed Application - Construction North Sands Beach, Salcombe, Devon Devon County Council 24 Oct 201218 Dec 2012
MLA/2012/00454/2 - Completed Application - Dredged Material Disposal, DredgingHeysham 1 & 2 Edf Energy Nuclear Generation Limited25 Oct 201205 May 2016
MLA/2012/00455 - Completed Application - Removals (inc. Grab Samples) Removal of Dead Marine Mammals from the Northumberland Foreshore. Northumberland County Council29 Oct 201219 Feb 2013
MLA/2012/00456/1 - Completed Application - Construction Western Jetty Pipe Gantry Vessel Collision Protection Associated British Ports.30 Oct 201222 Feb 2013
MLA/2012/00457 - Withdrawn Application - Construction Stabilization / Strengthening works to Shotley Pier East Anglian Renovations Ltd 31 Oct 2012
MLA/2012/00458 - Completed Application - Construction New Hythe Ferry/Red Jet Standby Berth, Red Funnel Terminal 2, Southampton Red Funnel Group Limited 01 Nov 201217 Jan 2013
MLA/2012/00459 - Completed Application - Dredged Material Disposal, DredgingHamble Jetty and Approaches Maintenance Dredging Bp Oil Uk Limited06 Nov 201211 Feb 2013
MLA/2012/00460 - Completed Application - Dredging Berthing Facility Bed Levelling, Trinity Buoy Wharf Dragados-Sisk Joint Venture06 Nov 201225 Jan 2013
MLA/2012/00461 - Withdrawn Application - Construction, Renewables Construction of Trot Moorings at Gwynt y Môr Base Harbour Port Facility Gwynt Y Mor Offshore Wind Farm Limited 06 Nov 2012
MLA/2012/00462 - Completed Application - Construction Fulham wharf Bdw Trading Limited07 Nov 201205 Feb 2013
MLA/2012/00463 - Completed Application - Removals (inc. Grab Samples) Port of Felixstowe Benthic Surveys The Felixstowe Dock And Railway Company08 Nov 201203 Dec 2012
MLA/2012/00464 - Completed Application - Construction Royal Solent Yacht Club, Dinghy Slipway, Yarmouth Royal Solent Yacht Club08 Nov 201214 Jan 2013
MLA/2012/00465 - Completed Application - Emergency Work Nethertown Culvert Collapse J. Murphy & Sons Limited 08 Nov 201209 Nov 2012
MLA/2012/00466 - Completed Application - Miscellaneous Disposal Wave / Current Monitoring off New Brighton Peel Ports Limited 09 Nov 201227 Nov 2012
MLA/2012/00468 - Completed Application - Removals (inc. Grab Samples) UK Civil Hydrography programme Emu Limited13 Nov 201219 Dec 2012
MLA/2012/00469 - Completed Application - Dredged Material DisposalDredged Material Disposal at South Falls Dredging International (Uk) Ltd13 Nov 201207 May 2013
MLA/2012/00470 - Completed Application - Construction Replacement of Timber Piles and Revetment, Bosham, West Sussex Burhill Estates Company Limited15 Nov 201201 May 2013
MLA/2012/00471 - Completed Application - Construction Stabilisation of redundant gas transit pipelines Scotia Gas Networks Limited16 Nov 201211 Feb 2013
MLA/2012/00472/1 - Completed Application - Dredged Material Disposal, DredgingWoolston Riverside Maintenance Dredge Homes And Communities Agency 16 Nov 201226 Jul 2013
MLA/2012/00473/5 - Completed Application - Construction Rye Harbour Moorings Environment Agency (Southern Region) 16 Nov 201205 Mar 2015
MLA/2012/00474/8 - Completed Application - Construction, Dredged Material Disposal, Dredging, Removals (inc. Grab Samples)HMNB Portsmouth Approach Channel Dredging and Associated Works Hmnb Portsmouth16 Nov 201219 Oct 2016
MLA/2012/00475 - Completed Application - Removals (inc. Grab Samples) Tynemouth Haven Launch Ramp Ground Investigation North Tyneside Council 19 Nov 201211 Jan 2013
MLA/2012/00476 - Completed Application - Construction New Cut Bridge GI Investigations Bristol City Council 19 Nov 201216 Jan 2013
MLA/2012/00477 - Withdrawn Application - Construction Owston Ferry Riverbank stabilisation works Environment Agency 19 Nov 2012
MLA/2012/00478 - Completed Application - Removals (inc. Grab Samples) Ecological survey at Gallions Reach and Woolwich Ferry Terminal Thomson Unicomarine Limited20 Nov 201218 Dec 2012
MLA/2012/00479 - Completed Application - Construction Piling work at Lymington Yacht Haven. Yacht Havens Limited 21 Nov 201218 Jan 2013
MLA/2012/00480 - Completed Application - Construction Repairs to existing structure (berths 1 & 2) Vopak Terminals London Ltd 22 Nov 201213 Dec 2012
MLA/2012/00483/1 - Completed Application - Alternative Use of Dredged MaterialEastbourne Beach Management Works 2012-2013 Eastbourne Borough Council 23 Nov 201215 Apr 2013
MLA/2012/00484 - Completed Application - Construction 47 River Road, Littlehampton Pontoon Brownfield Estates Limited 26 Nov 201222 Feb 2013
MLA/2012/00485 - Completed Application - Construction Salcombe Saline Interventions South West Water Limited 27 Nov 201216 Jan 2013
MLA/2012/00486/1 - Completed Application - Removals (inc. Grab Samples) recovery and recycling of non ferrous metals North Sea Recovery Ltd 28 Nov 201220 Aug 2013
MLA/2012/00488 - Completed Application - Burial at Sea John Lister30 Nov 201204 Dec 2012
MLA/2012/00489/1 - Completed Application - Construction, Dredged Material Disposal, DredgingBembridge Dry Stack Grouped under: Bembridge Harbour (IoW) dredging Showing 2 of 4 cases Bembridge Harbour Improvements Company Limited 02 Dec 201222 Apr 2013
MLA/2012/00490/2 - Completed Application - Construction Walney Offshore Windfarm Brown String Array Cable Remedial Works Walney (Uk) Offshore Windfarms Limited 03 Dec 201208 Jul 2013
MLA/2012/00491 - Withdrawn Application - Construction Sperovento Mr David Hunter03 Dec 2012
MLA/2012/00492 - Completed Application - Construction Sutton Harbour Marina Maintenance Sutton Harbour Company 04 Dec 201207 Feb 2013
MLA/2012/00493/8 - Completed Application - Construction, Dredged Material DisposalTees Dock No.1 Quay Pd Teesport Limited04 Dec 201223 Mar 2018
MLA/2012/00494 - Completed Application - Construction Colliters and Longmoor Brook Outfalls Environment Agency,Bradney Depot 05 Dec 201225 Feb 2013
MLA/2012/00495 - Completed Application - Removals (inc. Grab Samples) Teeside Offshore Windfarm Teesside Windfarm Limited05 Dec 201220 Dec 2012
MLA/2012/00496 - Completed Application - Construction Egerton Park Outfall Extension Environment Agency (Southern Region) 06 Dec 201219 Feb 2013
MLA/2012/00497 - Withdrawn Application - Construction, Dredged Material Disposal, DredgingSouthsea Marina Holding Pontoon Area Premier Marinas (Southsea) Limited 07 Dec 2012
MLA/2012/00498 - Completed Application - Construction 1581473 - Arnolds Point Seawall Reconstruction Plymouth City Council07 Dec 201217 Jun 2013
MLA/2012/00499 - Completed Application - Removals (inc. Grab Samples) Trevol Jetty, HMS Raleigh, Torpoint, Cornwall Debut Services (South West) Limited07 Dec 201229 Jan 2013
MLA/2012/00500 - Completed Application - Dredging Dartside Quay - Dredging to Hoist Dock Marina Developments Limited10 Dec 201226 Mar 2013
MLA/2012/00502/1 - Completed Application - Construction, Dredged Material Disposal, DredgingTrafalgar Wharf Wet Dock Improvements Trafalgar Wharf Limited11 Dec 201216 Apr 2013
MLA/2012/00503 - Withdrawn Application - Construction pontoon landing stage Army Sailing Assocation11 Dec 2012
MLA/2012/00504 - Completed Application - Construction Lockfield Sea Wall Remedial Works Mr Nicholas Garrett11 Dec 201225 Mar 2013
MLA/2012/00505 - Completed Application - Construction Tyne Car Terminal New Storm Bollards Port Of Tyne 12 Dec 201220 Mar 2013
MLA/2012/00506/1 - Completed Application - Dredged Material Disposal, DredgingAble Middelsbrogh Port Berth 1&2 Able Uk Limited12 Dec 201219 Feb 2015
MLA/2012/00508 - Completed Application - Construction Lyme Regis Environmental Improvements Phase IV Dean & Dyball Civil Engineering Limited14 Dec 201210 Apr 2013
MLA/2012/00509 - Completed Application - Construction New Capital Quay Roamquest Limited14 Dec 201231 May 2013
MLA/2012/00510 - Withdrawn Application - Construction, Removals (inc. Grab Samples) Tropicana, Weston super Mare North Somerset Council 14 Dec 2012
MLA/2012/00513 - Completed Application - Construction Walney Channel Deep-Water Berth - Southern and Northern Pontoons Associated British Ports Holdings Limited17 Dec 201221 Mar 2013
MLA/2012/00514 - Completed Application - Emergency Work Emergency Shoring to Basin Road South Coast Protection Shoreham Port Authority19 Dec 201219 Dec 2012
MLA/2012/00515/1 - Completed Application - Construction beach maintanence Swanage Sailing Club 19 Dec 201201 Feb 2018
MLA/2012/00516 - Withdrawn Application - Removals (inc. Grab Samples) Rampion Geotechnical Survey E.On Climate & Renewables Uk Rampion Offshore Wind Limited 21 Dec 2012
MLA/2012/00517/2 - Completed Application - Removals (inc. Grab Samples) Site investigation (SI) for the Wash Tide Gauge Project Environment Agency 21 Dec 201213 Aug 2013
MLA/2012/00518 - Withdrawn Application - Removals (inc. Grab Samples) IFA2 Interconnector National Grid Plc21 Dec 2012
MLA/2012/00519 - Completed Application - Construction Severn Vale Water Management Plan Environment Agency – South West Reg21 Dec 201226 Mar 2013
MLA/2012/00520 - Completed Application - Removals (inc. Grab Samples) Approaches to Torbay hydrographic Survey Netsurvey Ltd. 24 Dec 201231 Jan 2013