MMO - Marine Licences Public Register
| Case Details | Project Type | Project Title | Locations | Applicant Name | Submission Date | Decision Date |
|---|---|---|---|---|---|---|
| MLA/2021/00001 - Completed | Application - Construction of new works, Maintenance of existing works | Maintenance and addition to moorings | Bury Mooring area, Main Mooring Area | Marchwood Yacht Club | 03 Jan 2021 | 04 Jan 2022 |
| MLA/2021/00003 - Completed | Application - Maintenance of existing structures or assets | Installation of cable under quay at Port of Tyne Bulk Terminal | TBT | Port Of Tyne | 05 Jan 2021 | 05 Jan 2021 |
| MLA/2021/00004 - Completed | Application - Maintenance of existing structures or assets | Foreshore trial pit excavations, The Ness, Shaldon, Devon | Ness, Shaldon, Devon | Tda | 05 Jan 2021 | 05 Jan 2021 |
| MLA/2021/00005 - Completed | Application - Other deposits | Studland Bay Eco-moorings | Studland Bay Moorings | The Seahorse Trust | 05 Jan 2021 | 21 May 2021 |
| MLA/2021/00007 - Completed | Application - Maintenance of existing works | NDYC Slipway Maintenance and Minor Extension | North Devon yacht club slipway | North Devon Yacht Club | 06 Jan 2021 | 21 Jul 2022 |
| MLA/2021/00009 - Completed | Application - Maintenance of existing structures or assets | Gateshead Millennium Bridge; End Supports; Glazed Canopies; Joint Sealant Replacement | South End Support, North End Support | Gateshead Council | 07 Jan 2021 | 07 Jan 2021 |
| MLA/2021/00010/1 - Completed | Application - Construction of new works, Maintenance of existing works, Other works | Barnes Flood Alleviation Scheme | Elm Bank Outfall/ Culvert, White Hart Lane Outfall/ Culvert | Ch2m Hill United Kingdom | 07 Jan 2021 | 02 Nov 2022 |
| MLA/2021/00011 - Completed | Application - Minor removals | Great Yarmouth EPOCH 2 Ground Investigation for New Flood Defence Wall | Ground Investigation Site Extent | Jba Bentley Limited | 07 Jan 2021 | 07 Jan 2021 |
| MLA/2021/00012 - Completed | Application - Maintenance of existing structures or assets | South Ferriby Flood Alleviation Scheme - Parapet strengthening | Sluice parapet | Environment Agency | 07 Jan 2021 | 07 Jan 2021 |
| MLA/2021/00013 - Completed | Application - Maintenance of existing works | Bedlington Viaduct | Bedlington Viaduct | Jba Consultants Limited | 08 Jan 2021 | 04 Oct 2021 |
| MLA/2021/00014/2 - Completed | Application - Other works | Tamar Estuary (South Hooe) Habitat Creation Project | Tamar Embankment Breach | Environment Agency | 08 Jan 2021 | 03 Oct 2022 |
| MLA/2021/00015 - Completed | Application - Maintenance of existing structures or assets | Hastings Denmark Place | Hastings Denmark Place | Beasley Christopher Limited | 11 Jan 2021 | 11 Jan 2021 |
| MLA/2021/00016 - Completed | Application - Maintenance of existing structures or assets | Weymouth Harbour Walls E&9 - Repair Works | walls e&9 | Dorset Council | 12 Jan 2021 | 12 Jan 2021 |
| MLA/2021/00017 - Completed | Application - Maintenance of existing structures or assets | Ernesettle Jetty Repair Works | Ernesettle Jetty | Pdp Green Consulting Ltd | 11 Jan 2021 | 11 Jan 2021 |
| MLA/2021/00019 - Completed | Application - Maintenance of existing structures or assets | Hove Welbeck Avenue | Hove Welbeck Avenue | Beasley Christopher Limited | 12 Jan 2021 | 12 Jan 2021 |
| MLA/2021/00020 - Completed | Application - Construction of new works | Marina Maintenance and Improvement Works | Phase 1, Phase 2, Phase 3 | Sailport Plc-Mayflower Marina | 12 Jan 2021 | 24 Jan 2022 |
| MLA/2021/00021 - Withdrawn | Application - Disposal of dredged material | West Bay harbour dredging | Dorset Council | 12 Jan 2021 | ||
| MLA/2021/00022 - Completed | Application - Maintenance of existing works | Replacement of existing timber quay heading/piling, Oulton Broad | Quay Heading North Landing, Oulton Broad | Dr Paul Roper | 13 Jan 2021 | 13 Aug 2021 |
| MLA/2021/00023 - Completed | Application - Maintenance of existing structures or assets | Padstow Tidal gate | Padstow Tidal gate | Environment Agency | 14 Jan 2021 | 14 Jan 2021 |
| MLA/2021/00024 - Completed | Application - Maintenance of existing structures or assets | A14 Orwell Bearing maint yr5 scheme pin 605626 | Orwell | John Graham Construction Limited | 15 Jan 2021 | 15 Jan 2021 |
| MLA/2021/00025/1 - Completed | Application - Construction of new works, Other deposits | Scylla fibre optic cable system installation | Scylla PLSE Route Corridor, Scylla Main Lay Route Corridor, Interconnector UK Crossing Pre Lay Concrete Mattress, Interconnector UK Crossing Post Lay Rock Berm | Eunetworks Fiber Uk Limited | 17 Jan 2021 | 21 Mar 2022 |
| MLA/2021/00026 - Completed | Application - Construction of new works | Frederick Ward Way Public Realm Scheme Improvements | FWW-BeachArea-Slipway | C R Reynolds Ltd | 18 Jan 2021 | 11 May 2022 |
| MLA/2021/00028 - Completed | Application - Construction of new works | New Wear Footbridge | New Wear Footbridge | Sunderland County Council Hendon | 19 Jan 2021 | 26 Mar 2021 |
| MLA/2021/00030 - Completed | Application - Maintenance of existing structures or assets | Anchor Iron Wharf- Flood Wall Crack Monitoring | Anchor Iron Wharf | Ch2m Hill Europe Limited | 19 Jan 2021 | 19 Jan 2021 |
| MLA/2021/00031 - Completed | Application - Maintenance of existing structures or assets | Bognor Regis sea Lane | Bognor Regis Sea Lane | Beasley Christopher Limited | 20 Jan 2021 | 20 Jan 2021 |
| MLA/2021/00032/2 - Completed | Application - Construction of new works, Disposal of dredged material | Lydd Ranges Sea Defences Scheme | Lydd Ranges Sea Defence Scheme, Lydd Ranges (DV031) | J T Mackley & Co Ltd | 20 Jan 2021 | 14 Aug 2023 |
| MLA/2021/00033 - Completed | Application - Maintenance of existing structures or assets | IOW Gurnard | IOW Gurnard | Beasley Christopher Limited | 21 Jan 2021 | 21 Jan 2021 |
| MLA/2021/00034 - Completed | Application - Maintenance of existing structures or assets | IOW woodvale | IOW woodvale | Beasley Christopher Limited | 21 Jan 2021 | 21 Jan 2021 |
| MLA/2021/00035 - Completed | Application - Non-navigational clearance dredging | Cleaning of Sewer Network Noss Mayo PL8 1EE | Plymouth Sound and Estuaries SAC Noss Mayo | Clear-Flow Limited | 21 Jan 2021 | 21 Jan 2021 |
| MLA/2021/00036 - Completed | Application - Maintenance of existing works | Dubmill Point Repairing of Groynes | Site_Boundary | Cumbria County Council Highways Dep | 21 Jan 2021 | 10 Jan 2022 |
| MLA/2021/00037 - Completed | Application - Construction of new works | Wight Hoist | Wight Hoist Site | Wight Shipyard Company Limited | 22 Jan 2021 | 21 Dec 2021 |
| MLA/2021/00038 - Completed | Application - Maintenance of existing structures or assets | MAC0447 River Stour Viaduct, Manningtree | MAC0447_River Stour Viaduct | Amalgamated Construction Ltd | 25 Jan 2021 | 25 Jan 2021 |
| MLA/2021/00039 - Completed | Application - Maintenance of existing structures or assets | Platform refurbishment at Ryde Pier Head station, Isle of Wight | magic_polygons | First Mtr South Western Trains Limited | 25 Jan 2021 | 25 Jan 2021 |
| MLA/2021/00040 - Completed | Application - Maintenance of existing structures or assets | No 27-36 Clive Street River Wall | Clive Street no 26-37 | Southbay Civil Engineering Limited | 25 Jan 2021 | 25 Jan 2021 |
| MLA/2021/00041/2 - Completed | Application - Maintenance of existing works | Drying Grid Renewal | Drying Grid | Padstow Harbour Commissioners | 26 Jan 2021 | 23 Jan 2023 |
| MLA/2021/00042 - Completed | Application - Construction of new works | Telecoms Cable Crossing of the Yar Estuary, Isle of Wight | Indicative route, Yar crossing | Wightfibre Limited | 26 Jan 2021 | 12 Aug 2021 |
| MLA/2021/00043 - Completed | Application - Other works | Great Yarmouth Operations and Maintenance Campus | Marine Ground Investiation Site | Norfolk County Council | 27 Jan 2021 | 13 Oct 2021 |
| MLA/2021/00044 - Completed | Application - Maintenance of existing structures or assets | Beach maintenance | Waterside Holiday park | Waterside Holiday Group Limited | 28 Jan 2021 | 28 Jan 2021 |
| MLA/2021/00045 - Completed | Application - Construction of new works | Mast Quay Phase II | Mast Quay Phase II | Opecprime Developments Ltd | 28 Jan 2021 | 10 Dec 2021 |
| MLA/2021/00047/1 - Completed | Application - Construction of new works | Penketh and Whittle FRMS - Whittle Brook Tidal Outfall Works | Penketh and Whittle FRMS - Whittle Brook Tidal Outfall | Volker Stevin Ltd-Preston | 28 Jan 2021 | 28 Sep 2022 |
| MLA/2021/00049 - Completed | Application - Maintenance of existing structures or assets | Waterman Steps Chelsea Embankment - Fender Replacement | Chelsea Embankment Waterman Steps | F M Conway Limited | 29 Jan 2021 | 29 Jan 2021 |
| MLA/2021/00050 - Completed | Application - Maintenance of existing works, Other removals | Repair of Station CW intake wall structure | Heysham 1 Power Station excavation area | Edf Energy Nuclear Generation Limited | 29 Jan 2021 | 30 Sep 2021 |
| MLA/2021/00051 - Completed | Application - Construction of new works | Isaac Cordal at Estuary 2021 festival | Chalkwell Beach Foreshore | Metal Culture Limited | 29 Jan 2021 | 20 Apr 2021 |
| MLA/2021/00052 - Completed | Application - Construction of new works | Grace Hopper Telecommunications Cable System | 29 Jan 2021 | 24 Jun 2021 | ||
| MLA/2021/00053 - Completed | Application - Other dredging | WAPPING POLICE STATION DREDGE | WAPPING POLICE STATION DREDGE | Land & Water Services Ltd | 01 Feb 2021 | 23 Mar 2021 |
| MLA/2021/00054/5 - Completed | Application - Other deposits | Galloper Wind Farm Rectification of Failure of Cable Protection System on Cable A1L | A1L Cable Failure Area | Galloper Wind Farm Limited | 01 Feb 2021 | 23 May 2022 |
| MLA/2021/00058 - Completed | Application - Maintenance of existing structures or assets | Bognor Regis Barrack Lane | Bognor Regis Barrack Lane | Beasley Christopher Limited | 04 Feb 2021 | 04 Feb 2021 |
| MLA/2021/00060 - Completed | Application - Maintenance of existing structures or assets | No.s 4 & 5 Riverside Wharf, Littlehapton, west Sussex, BN17 5BZ | Riverside Wharf | Westley Building Contractors Limited | 04 Feb 2021 | 04 Feb 2021 |
| MLA/2021/00061 - Completed | Application - Other dredging | Non-navigational clearance dredging, Ramsholt Reach, Deben Estuary Special Protection Area and Ramsar site | Dock Marsh, Bull Marsh | The Trustees Of The Adeane Bawdsey Settlement | 05 Feb 2021 | 25 Jun 2021 |
| MLA/2021/00062 - Completed | Application - Minor removals | Fishing net removal from the wreck of the Northumberland | Buffer_150m (Northumberland Wreck) | Mr Daniel Pascoe | 05 Feb 2021 | 05 Feb 2021 |
| MLA/2021/00064/1 - Completed | Application - Other works | Victoria Quay pontoon installation | Victoria Quay1 | Uk Docks Royal Clarence Yard Ltd | 05 Feb 2021 | 21 Jan 2022 |
| MLA/2021/00065 - Completed | Application - Other deposits | Cefas Acoustic Recorder Deployment for the Improvement of Regional Conservation Management of Cecateans | Replacement Blackhead, Two Alt, Three, Four, Five, St Austell Bay 2, Replacement Silvermine 2, One, Seven, Six | Cefas Plymouth | 07 Feb 2021 | 25 Oct 2021 |
| MLA/2021/00066 - Completed | Application - Construction of new works | Bristol Community Hydro | HEP site area, Eel and lamprey pass area | Bristol Community Energy Ltd | 08 Feb 2021 | 03 Nov 2021 |
| MLA/2021/00067 - Withdrawn | Application - Navigational dredging (capital) | Gillingham Pier Dredging | Moore Project Management Solutions Llp | 08 Feb 2021 | ||
| MLA/2021/00068 - Completed | Application - Minor removals | East Beach, West Bay: safety removals | Area_of_works | Wessex Water Engineering Services Limited | 09 Feb 2021 | 09 Feb 2021 |
| MLA/2021/00069 - Completed | Application - Maintenance of existing structures or assets | Replacment of 6 No Fender frames at South Shields Ferry Landing | South Shields Ferry Landing | Site And Offshore Specialists Ltd | 09 Feb 2021 | 09 Feb 2021 |
| MLA/2021/00070 - Completed | Application - Maintenance of existing structures or assets | MAC0420 Oulton Swingbridge Maintenance | Oulton Swingbridge | Amalgamated Construction Ltd | 10 Feb 2021 | 10 Feb 2021 |
| MLA/2021/00071 - Completed | Application - Construction of new works | CBC1 W21050 Parton to Harrington Sea Wall No 3 | P-H No3 | Network Rail Ltd | 10 Feb 2021 | 11 Aug 2021 |
| MLA/2021/00072 - Completed | Application - Construction of new works | Cliff House Wall, Torcross | Cliff House Wall | Devon County Council. | 11 Feb 2021 | 07 Sep 2021 |
| MLA/2021/00073 - Completed | Application - Maintenance of existing works | 0289 Canvey Island Bridge - Replacement of ICCP System | 0289 Canvey Island Bridge | Essex County Council -Seax House | 12 Feb 2021 | 20 May 2021 |
| MLA/2021/00075 - Completed | Application - Maintenance of existing works | Repairs/Replacements to Timber Supports; Dispose of and Replacement of 1200mm dia Cast Iron Outfall Pipe near the Worthing pier, across Steyne Gardens | Sea Outfall Cast Iron Pipe Across Steyne Gardens, Worthing | Cappagh Browne Ltd-Brighton | 12 Feb 2021 | 10 May 2021 |
| MLA/2021/00077 - Completed | Application - Maintenance of existing works | Marine Licence Application for Repair, Replacement or Reburial Works on the Nearshore Cable Route | Hornsea One Intertidal Works Offshore From ExitPit. | Diamond Transmission Partners Hornsea One Limited | 15 Feb 2021 | 22 May 2023 |
| MLA/2021/00078 - Completed | Application - Construction of new works, Other deposits | CrossChannel Fibre Project | Crosslake Fibre Uk Ltd | 16 Feb 2021 | 25 Aug 2021 | |
| MLA/2021/00079 - Completed | Application - Maintenance of existing structures or assets | DRA1-5 River Aire Railway Bridge | DRA1-5 River Aire Railway Bridge | Amalgamated Construction Ltd | 16 Feb 2021 | 16 Feb 2021 |
| MLA/2021/00080 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Haslar Marina Maintenance Dredge | Haslar Dredge Area, NAB TOWER, HURST FORT | Boatfolk Marinas Ltd | 17 Feb 2021 | 10 Sep 2021 |
| MLA/2021/00081 - Completed | Application - Deposit of markers | Beach Management Zoning - Sandown Bay | Isle Of Wight Council | 17 Feb 2021 | 17 Feb 2021 | |
| MLA/2021/00082 - Completed | Application - Other deposits | Whitby Yacht Club Racing Marks Deployment | Mark A, Mark H, Mark P, Mark S, Mark W, Mark B, Mark C | Whitby Yacht Club | 17 Feb 2021 | 15 Jun 2021 |
| MLA/2021/00084 - Completed | Application - Non-navigational clearance dredging | Shell Sumps Airlifting | Millennium Pier | Seatec Uk Limited | 18 Feb 2021 | 18 Feb 2021 |
| MLA/2021/00085 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Sandra Homewood Funerals (Oxford) Ltd | 19 Feb 2021 | 19 Feb 2021 | |
| MLA/2021/00086 - Completed | Application - Non-navigational clearance dredging | Wootton Slipway Repairs | 50.724782 -1.2258516 | Isle Of Wight Council | 19 Feb 2021 | 19 Feb 2021 |
| MLA/2021/00087 - Completed | Application - Deposit of markers | Beach Management Zoning, Bembridge | Bembridge Site | Isle Of Wight Council | 20 Feb 2021 | 20 Feb 2021 |
| MLA/2021/00088 - Completed | Application - Deposit of markers | Beach Management Zoning Colwell | Marker Buoys | Isle Of Wight Council | 20 Feb 2021 | 20 Feb 2021 |
| MLA/2021/00089 - Completed | Application - Minor removals | RNLI Exmouth Ramp Extension, Ground Investigation | RNLI Exmouth | Wsp Limited | 22 Feb 2021 | 22 Feb 2021 |
| MLA/2021/00091/1 - Variation Requested | Application - Disposal of dredged material, Navigational dredging (maintenance) | Maintenance Dredging at Hadrian Yard Wallsend | OGN Hadrian Yard - Area 32, Tyne River, NORTH TYNE (TY070), SOUTER POINT (OUTER) (TY081) | Smulders Projects Uk Limited | 22 Feb 2021 | 19 Jan 2022 |
| MLA/2021/00092 - Completed | Application - Maintenance of existing structures or assets | Masthouse Terrace Pier - replacement of fenders | Masthouse Terrace Pier | Canal & River Trust | 22 Feb 2021 | 22 Feb 2021 |
| MLA/2021/00093 - Completed | Application - Non-navigational clearance dredging | Wivenhoe Sailing Club Mainternace Dredging 2021 | WIVENHOE SAILING CLUB | Wivenhoe Sailing Club | 22 Feb 2021 | 22 Feb 2021 |
| MLA/2021/00094/1 - Completed | Application - Construction of new works | West Thurrock Lagoon and Marshes SSSI Saltmarsh Restoration | West Thurrock Lagoon and Marshes SSSI Saltmarsh Restoration Works Boundary | Port Of London Authority | 23 Feb 2021 | 28 Sep 2021 |
| MLA/2021/00096/1 - Completed | Application - Other deposits | Pevensey Bay Nearshore Monitoring | Site 1, Site 2, Site 3, Site 4 | Partrac Ltd -Devon | 24 Feb 2021 | 10 Aug 2023 |
| MLA/2021/00097 - Completed | Application - Construction of new works | Reconstruction of North Wave Screen, Lymington Harbour | North Wave Screen, Lymington Harbour | Lymington Harbour Commissioners | 24 Feb 2021 | 09 Sep 2021 |
| MLA/2021/00098 - Completed | Application - Minor removals | Underwater obstruction - removal | Underwater obstruction for removal | Nnb Generation Company (Hpc) Limited | 25 Feb 2021 | 25 Feb 2021 |
| MLA/2021/00099 - Completed | Application - Beach maintenance activities | Black Rock to Southwick Beach Recycling | Brighton Recycling | Shoreham Port Authority | 25 Feb 2021 | 25 Feb 2021 |
| MLA/2021/00100 - Withdrawn | Application - Other works | Medway Headwall Replacement | Medway Headwall | Bam Nuttall Ltd | 25 Feb 2021 | |
| MLA/2021/00101 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mamarine.Com Llp | 25 Feb 2021 | 25 Feb 2021 | |
| MLA/2021/00102 - Completed | Application - Deposit of markers | Deployment of guard buoy near Ryde Pier, Isle of Wight | P2001_Ryde_Pier_100m_Boundary | Partrac Limited | 26 Feb 2021 | 26 Feb 2021 |
| MLA/2021/00103/2 - Completed | Application - Maintenance of existing works | Scheme of Maintenance for existing coastal defence at Dolphin Boathouse, Wootton Bridge, IW (northern frontage) | Dolphin Boathouse Maintenance Scheme | Mr Dave Callen | 01 Mar 2021 | 07 Sep 2023 |
| MLA/2021/00104 - Completed | Application - Construction of new works | Replacement of domestic quay heading | Quay for renewal | Dr Graham Hunt | 01 Mar 2021 | 11 Jan 2022 |
| MLA/2021/00105 - Completed | Application - Maintenance of existing works | Rock Park Bridge repair works | Rock Park Bridge | Devon County Council. | 01 Mar 2021 | 12 Apr 2022 |
| MLA/2021/00107 - Completed | Application - Construction of new works | Pentalver Container Yard Expansion | London Gateway Port Limited | 01 Mar 2021 | 25 Jun 2021 | |
| MLA/2021/00108 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mamarine.Com Llp | 01 Mar 2021 | 01 Mar 2021 | |
| MLA/2021/00109 - Completed | Application - Construction of new works | Barrow Docks Crane Relocation | Crane | Orsted-Barrow | 02 Mar 2021 | 30 Sep 2021 |
| MLA/2021/00110 - Completed | Application - Maintenance of existing structures or assets | Arun Surface Water Abstraction - Screen replacement / eel screens | Arun_SWA_Eel_Screen_Replacement_River_Works_Area | Southern Water Limited | 02 Mar 2021 | 02 Mar 2021 |
| MLA/2021/00111 - Completed | Application - Maintenance of existing structures or assets | Repairs to existing Royal Solent Yacht Club slipway - Removal and replacement of rotten and unsafe wooden planks on slipway with sustainable and hardwearing recycled plastic planks | Royal Solent Yacht Club Slipway | Royal Solent Yacht Club Limited | 02 Mar 2021 | 02 Mar 2021 |
| MLA/2021/00112 - Completed | Application - Non-navigational clearance dredging | Investigation of archaeological anomaly with ROV and option to use dredge skim | SOF_T15_500x500_survey_polygon | Sofia Offshore Wind Farm Limited | 03 Mar 2021 | 03 Mar 2021 |
| MLA/2021/00113 - Completed | Application - Maintenance of existing structures or assets | Replacement of pontoon bridges | Minor works | Barrow Offshore Wind Limited | 03 Mar 2021 | 03 Mar 2021 |
| MLA/2021/00114 - Completed | Application - Maintenance of existing structures or assets | Hove opp Norman Rd | Hove opp Norman Rd | Beasley Christopher Limited | 03 Mar 2021 | 03 Mar 2021 |
| MLA/2021/00115 - Completed | Application - Maintenance of existing structures or assets | Worthing west street | Worthing West Street | Beasley Christopher Limited | 03 Mar 2021 | 03 Mar 2021 |
| MLA/2021/00116 - Completed | Application - Other deposits, Other removals, Other works | CIRCE North 2 | CIRCE NORTH2, Rock Placement, Mattress Placement, Route Clearance 1, Route Clearance 2, Route Clearance 3, Route Clearance 4, Route Clearance 5, Route Clearance 6 | Zayo Group Uk Limited | 03 Mar 2021 | 26 Oct 2021 |
| MLA/2021/00117 - Completed | Application - Beach maintenance activities | Re-distribution of sand in Harbour Basins. | Portreath Harbour | Cornwall Council | 04 Mar 2021 | 04 Mar 2021 |
| MLA/2021/00118/1 - Completed | Application - Construction of new works | 3rd Chalkwell Bay Sea Scouts Slipway, Davit & Boarding Pontoon | 3rd Chalkwell Bay Slipway, Davit and Boarding Pontoon | 3rd Chalkwell Bay Sea Scouts | 05 Mar 2021 | 10 Sep 2021 |
| MLA/2021/00119 - Completed | Application - Other deposits | GRCF2020 Enabling large scale seagrass restoration supporting fisheries whilst sequestering carbon | St Marys Bay | National Marine Aquarium | 05 Mar 2021 | 22 Feb 2022 |
| MLA/2021/00120 - Completed | Application - Minor removals | Removal of Pill box at Kelling Hard | Kelling Hard WW11 Pill Box | North Norfolk District Council | 05 Mar 2021 | 05 Mar 2021 |
| MLA/2021/00121 - Completed | Application - Construction of new works | Methersgate Slipway | Pac Farms Ltd | 08 Mar 2021 | 08 Dec 2021 | |
| MLA/2021/00122 - Completed | Application - Maintenance of existing structures or assets | Seaford splash point | Seaford splash point | Beasley Christopher Limited | 08 Mar 2021 | 08 Mar 2021 |
| MLA/2021/00123/1 - Completed | Application - Alternative use of dredged material, Construction of new works, Decommissioning of works, Other dredging | Tower RNLI Floating Life Boat Station | Piling location 1, Piling location 2, Removals and construction site, Dredging box, Disposal site (Rainham Marshes) | Royal National Lifeboat Institution | 09 Mar 2021 | 17 May 2022 |
| MLA/2021/00124 - Completed | Application - Construction of new works | Extension to Grove Place Boat Park pontoons | Grove Place extension | Falmouth Harbour Commissioners | 09 Mar 2021 | 21 Jul 2021 |
| MLA/2021/00125 - Completed | Application - Construction of new works | Southbank Sailing Club Slipway Extension | Intermarine Limited | 10 Mar 2021 | 27 Jan 2022 | |
| MLA/2021/00126 - Completed | Application - Construction of new works, Decommissioning of works, Other removals | Itchenor Sailing Club New Jetty and Pontoons | Itchenor Sailing Club Jetty | Itchenor Sailing Club | 10 Mar 2021 | 09 Mar 2022 |
| MLA/2021/00127 - Completed | Application - Maintenance of existing structures or assets | Minor maintenance work at BOW hub. | Licensed area | Orsted Power Uk Ltd | 11 Mar 2021 | 11 Mar 2021 |
| MLA/2021/00128 - Completed | Application - Maintenance of existing structures or assets | Resurfacing Existing Slipway | Salcombe Yacht Club Slipway | Salcombe Yacht Club | 11 Mar 2021 | 11 Mar 2021 |
| MLA/2021/00129 - Completed | Application - Deposit of markers | Arun Yacht Club yacht racing marks | Arun Yacht Club cruiser racing sea marks | Arun Yacht Club Limited(The) | 12 Mar 2021 | 12 Mar 2021 |
| MLA/2021/00131 - Completed | Application - Maintenance of existing structures or assets | Gosport Gillkicker point | Gillkicker point | Beasley Christopher Limited | 15 Mar 2021 | 15 Mar 2021 |
| MLA/2021/00132 - Completed | Application - Maintenance of existing structures or assets | Ashlett Creek | Ashlett creek | Beasley Christopher Limited | 15 Mar 2021 | 15 Mar 2021 |
| MLA/2021/00134 - Completed | Application - Maintenance of existing structures or assets | Sandymere Beach Access Maintenance | Sandymere Sleeper Walkway | Torridge District Council | 15 Mar 2021 | 15 Mar 2021 |
| MLA/2021/00135/2 - Completed | Application - Maintenance of existing works | Stanford Wharf Nature Reserve - Remedial Works | Stanford Wharf Nature Reserve Remedial Works | London Gateway Port Ltd-Stanford | 16 Mar 2021 | 21 Jun 2023 |
| MLA/2021/00136 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mamarine.Com Llp | 16 Mar 2021 | 16 Mar 2021 | |
| MLA/2021/00137 - Completed | Application - Construction of new works | Berth 7 Truck Park | Berth 7 Truck Park | London Gateway Port Ltd-Stanford | 17 Mar 2021 | 25 Jun 2021 |
| MLA/2021/00138 - Completed | Application - Construction of new works | Deploy 'Versadock' pontoon system tethered to land by metal brace. Pontoon system to float up with the tide and rest on existing slipway at low tide | Broad street, Portsmouth | Mr George Pounds | 17 Mar 2021 | 27 Jan 2022 |
| MLA/2021/00139 - Completed | Application - Maintenance of existing structures or assets | Manea Emergency Wheel Timbers | Manea Wheel Timbers | Network Rail Limited | 18 Mar 2021 | 18 Mar 2021 |
| MLA/2021/00141 - Completed | Application - Maintenance of existing works | Aylesford River Wall | Aylesford Flood Wall | Byrnelooby Uk | 19 Mar 2021 | 07 Feb 2022 |
| MLA/2021/00142 - Completed | Application - Non-navigational clearance dredging | Goodchild Marine Services maintenance dredging | Goodchild Marine Services Limited | 21 Mar 2021 | 21 Mar 2021 | |
| MLA/2021/00143 - Completed | Application - Other deposits | Looe Bay ADCP Deployment | Looe_ADCP_buffer_2 | Cornwall Council -Environment Service | 22 Mar 2021 | 16 Sep 2021 |
| MLA/2021/00144/1 - Completed | Application - Maintenance of existing works | Boston Upstream Works - ground investigation | Boston upstream Works GI | Environment Agency-Jacobs | 23 Mar 2021 | 21 Jun 2022 |
| MLA/2021/00146/1 - Completed | Application - Maintenance of existing works | Scour Repair and Protection | Hadrian Yard Wallsend - Port of Tyne Area 32. | Smulders Projects Uk Limited | 24 Mar 2021 | 11 Oct 2022 |
| MLA/2021/00147 - Completed | Application - Maintenance of existing structures or assets | repairs to existing block wall | Priddys Hard | Quadrigy Engineering Ltd | 24 Mar 2021 | 24 Mar 2021 |
| MLA/2021/00148 - Completed | Application - Maintenance of existing structures or assets | IOW Ryde Pier Renewal (Development) | IOW Ryde Pier | Osborne Infrastructure Limited | 24 Mar 2021 | 24 Mar 2021 |
| MLA/2021/00149 - Completed | Application - Minor removals | IOW Ryde Pier Renewal (Development) | IOW Ryde Pier | Osborne Infrastructure Limited | 24 Mar 2021 | 24 Mar 2021 |
| MLA/2021/00150 - Completed | Application - Beach maintenance activities | Shoreham Beach reprofiling | Shoreham Beach | Shoreham Port Authority | 25 Mar 2021 | 25 Mar 2021 |
| MLA/2021/00151/2 - Completed | Application - Maintenance of existing works | Sheet Pile Wall Repairs | Hamble Sheet Pile Wall - Area | Bp Oil Uk Limited. | 26 Mar 2021 | 18 Dec 2023 |
| MLA/2021/00152 - Completed | Application - Maintenance of existing structures or assets | Outfall pipe repairs | Lynemouth Power Limited - Outfall pipe | Lynemouth Power Limited | 26 Mar 2021 | 26 Mar 2021 |
| MLA/2021/00153 - Completed | Application - Maintenance of existing structures or assets | Marine Parade Maintenance Works | Dawlish Beach | Bam Nuttall Limited | 26 Mar 2021 | 26 Mar 2021 |
| MLA/2021/00154 - Withdrawn | Application - Construction of new works | Suffolk Seaweed Farm | Suffolk Sea Farm Ltd | 26 Mar 2021 | ||
| MLA/2021/00155/2 - Completed | Application - Decommissioning of works | Rampion Offshore Wind Farm Met Mast Foundation Removal | Rampion Met Mast | Rampion Offshore Wind Ltd | 29 Mar 2021 | 03 Apr 2024 |
| MLA/2021/00156 - Completed | Application - Maintenance of existing structures or assets | Beacon House Jetty Repairs | Beacon House Jetty | Piers Shepherd | 30 Mar 2021 | 30 Mar 2021 |
| MLA/2021/00157 - Completed | Application - Construction of new works | Conservancy Wharf | Conservancy Wharf | Pd Teesport Limited | 30 Mar 2021 | 24 Sep 2021 |
| MLA/2021/00158 - Completed | Application - Maintenance of existing structures or assets | ULGH5428 W/BW Earthwire Replacement BW19-BW27 | Towers BW25 and BW26 | Wpd Telecoms Limited | 30 Mar 2021 | 30 Mar 2021 |
| MLA/2021/00159 - Completed | Application - Clean-up dredging | Calor LPG Terminal Dredge 2021 | Calor Dredge Site | Calor Gas Ltd-Canvey Terminal | 31 Mar 2021 | 28 Sep 2021 |
| MLA/2021/00160 - Completed | Application - Maintenance of existing works | East Anglia ONE Operations and Maintenance Scour Protection and Cable Armouring for Generation Assets | East Anglia ONE boundary | East Anglia One Limited | 31 Mar 2021 | 26 Aug 2022 |
| MLA/2021/00161 - Completed | Application - Maintenance of existing structures or assets | Public Footpath Fareham 97 Surfacing for England Coast Path establishment | Fareham Public Footpath 97 | Hampshire County Council | 31 Mar 2021 | 31 Mar 2021 |
| MLA/2021/00162 - Completed | Application - Minor removals | Dogger Bank A & B UXO investigation | Offshore_pUXO | Dogger Bank Wind Farm | 31 Mar 2021 | 31 Mar 2021 |
| MLA/2021/00163 - Completed | Application - Minor removals | Dogger Bank A & B Nearshore UXO investigation | Nearshore_self_service_area | Dogger Bank Wind Farm | 31 Mar 2021 | 31 Mar 2021 |
| MLA/2021/00165/1 - Completed | Application - Other works | 4.To raise the existing sea defences to achieve flood protection for the 2070 sea level rise predictions projected by the Environment Agency. | Grey Thatch sea wall | Mr Marcus Evans | 01 Apr 2021 | 27 Oct 2022 |
| MLA/2021/00167 - Completed | Application - Maintenance of existing structures or assets | Replacing weak pile in danger of collapsing | Tenth House hammerhead pontoon, New Road, Wootton Creek | Mrs Adriana Mattei | 06 Apr 2021 | 06 Apr 2021 |
| MLA/2021/00168 - Completed | Application - Other deposits | London Array Offshore Wind Farm Scientific Deployment | London Array OWF | London Array Ltd | 06 Apr 2021 | 22 Jul 2021 |
| MLA/2021/00169 - Completed | Application - Construction of new works, Decommissioning of works | Long View Pontoon | Long View Pontoon | Tony Coe | 07 Apr 2021 | 10 Feb 2022 |
| MLA/2021/00170 - Completed | Application - Construction of new works | 3982 - Ferry Cottage | Ferry Cottage steps site | Mr Piers Banfield | 07 Apr 2021 | 12 Apr 2022 |
| MLA/2021/00171 - Completed | Application - Maintenance of existing structures or assets | Hesketh Out Marsh saline lagoons | Hesketh Out Marsh saline lagoons | Rspb | 08 Apr 2021 | 08 Apr 2021 |
| MLA/2021/00172 - Completed | Application - Maintenance of existing structures or assets | Minor Repairs to the intertidal habitat enhancement on the bank of the River Yare | Repair_Location | Jba Bentley Limited | 08 Apr 2021 | 08 Apr 2021 |
| MLA/2021/00173/1 - Completed | Application - Aggregate dredging, Sampling | Area 473 | 473_1, 473_2 | Cemex Uk Marine Ltd | 09 Apr 2021 | 06 Mar 2023 |
| MLA/2021/00174 - Completed | Application - Maintenance of existing structures or assets | Mill Meadow (PO18 8LY) - Domestic Sea Wall Repair | Sea Wall - Mill Meadow | Mr Daan Knottenbelt | 10 Apr 2021 | 10 Apr 2021 |
| MLA/2021/00175 - Completed | Application - Maintenance of existing structures or assets | The Slip (PO18 8LZ) - Domestic Sea Wall Repair | Sea Wall - The Slip | Mr Nicholas Von Preussen | 11 Apr 2021 | 11 Apr 2021 |
| MLA/2021/00177/1 - Completed | Application - Aggregate dredging, Sampling | Area 473 | 473_1, 473_2 | Hanson Aggregates Ltd | 12 Apr 2021 | 06 Mar 2023 |
| MLA/2021/00178 - Completed | Application - Minor removals | Lidl Distribution Centre Burts Wharf Refurbishment | Burts Wharf | Gps Marine And Civil Services Ltd | 12 Apr 2021 | 12 Apr 2021 |
| MLA/2021/00179 - Completed | Application - Maintenance of existing structures or assets | Hazel Road Southampton | Hazel Road Southampton | Beasley Christopher Limited | 12 Apr 2021 | 12 Apr 2021 |
| MLA/2021/00180/1 - Completed | Application - Construction of new works, Maintenance of existing works | Fawley Refinery Marine Terminal Export Line Routing Modification | Berth 6, Berth 7 | Exxonmobil Chemical Limited | 12 Apr 2021 | 21 Oct 2022 |
| MLA/2021/00181 - Completed | Application - Maintenance of existing structures or assets | Lidl Distribution Centre Burts Wharf Refurbishment | Burts Wharf | Gps Marine And Civil Services Ltd | 12 Apr 2021 | 12 Apr 2021 |
| MLA/2021/00182 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mamarine.Com Llp | 13 Apr 2021 | 13 Apr 2021 | |
| MLA/2021/00183 - Completed | Application - Maintenance of existing structures or assets | Tilbury Fort Sheet Pile Repairs - Scaffold Access Towers | Tilbury Fort Working Area | Ch2m Hill United Kingdom | 13 Apr 2021 | 13 Apr 2021 |
| MLA/2021/00184 - Completed | Application - Other deposits | Hullbridge Flood Defence Repairs | Hullbridge | Enviroment Agency Thorpe St Andrews | 14 Apr 2021 | 09 Mar 2022 |
| MLA/2021/00185 - Completed | Application - Construction of new works | Tilbury Tunnel Head House Drainage | Tilbury Tunnel Head House Drainage, Tilbury Tunnel outfall (TH099) | National Grid Leeds | 14 Apr 2021 | 28 Jul 2022 |
| MLA/2021/00186 - Completed | Application - Maintenance of existing structures or assets | Outfall lock gate - remove loose coach bolts, re-drill holes, insert resin and install new bolts | Spragger Clough | The Crown Estate | 15 Apr 2021 | 15 Apr 2021 |
| MLA/2021/00188 - Completed | Application - Maintenance of existing structures or assets | MNC1753 - Culvert at Grange-Over-Sands | Culvert at Grange-Over-Sands | Amalgamated Construction Ltd | 16 Apr 2021 | 16 Apr 2021 |
| MLA/2021/00189/1 - Completed | Application - Maintenance of existing works, Navigational dredging (maintenance) | Combwich Wharf Operational Marine Licence | Combwich Wharf | Nnb Generation Company (Hpc) Limited | 16 Apr 2021 | 20 Jun 2024 |
| MLA/2021/00190/1 - Completed | Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital), Other deposits, Other dredging | Lowestoft Eastern Energy Facility | Abp Lowestoft-Commercial Road | 16 Apr 2021 | 17 Nov 2023 | |
| MLA/2021/00191/1 - Completed | Application - Other deposits | Tees Seagrass Project | Seagrass Site 1, Seagrass Site 2, Seagrass Site 3, Seagrass Site 4, Seagrass Site 5 | Tees Rivers Charitable Trust | 18 Apr 2021 | 29 Apr 2024 |
| MLA/2021/00193 - Completed | Application - Deposit of markers | Brightlingsea Sailing Club racing marks licence application | Batemans (BSC), Pyefleet (CYC), Point Clear (BSC), Hills (BSC), Gazelet (BSC), Cocum (BSC), Beach (BSC), CVP (CYC) | Brightlingsea Sailing Club | 21 Apr 2021 | 21 Apr 2021 |
| MLA/2021/00195 - Completed | Application - Maintenance of existing structures or assets | Replacement of a single CPS on a inter-array cable at WOW04 | WOW04 B16 | Dong Energy Walney Extension (Uk) Ltd | 23 Apr 2021 | 23 Apr 2021 |
| MLA/2021/00196 - Completed | Application - Maintenance of existing structures or assets | Surrey Wharf River-wall maintenance | Surrey Wharf Arundel | Wph Limited | 27 Apr 2021 | 27 Apr 2021 |
| MLA/2021/00197 - Completed | Application - Decommissioning of works, Other deposits, Other removals | TAT14 Segment G & H Decommissioning | TAT14 Segment G, TAT14 Segment H | British Telecommunications Plc | 27 Apr 2021 | 09 Feb 2022 |
| MLA/2021/00198 - Completed | Application - Maintenance of existing works | Boothferry Bridge Refurbishment | Jetty Beneath Bridge, Boothferry Bridge | East Riding Of Yorkshire Council | 28 Apr 2021 | 14 Sep 2021 |
| MLA/2021/00199 - Completed | Application - Maintenance of existing structures or assets | Foulness Island - X5-Headway Refurbishment | Foulness island - X5 Headway - Works Location | Qinetiq Limited | 28 Apr 2021 | 28 Apr 2021 |
| MLA/2021/00200 - Completed | Application - Maintenance of existing works | Cable Stabilisation Works | Race Bank Offshore Wind Farm | Race Bank Wind Farm Limited | 28 Apr 2021 | 16 Sep 2021 |
| MLA/2021/00201 - Completed | Application - Maintenance of existing structures or assets | Canary Wharf Pier - Side Shell Repainting | Canary Wharf Pier | Canary Wharf Management Limited | 28 Apr 2021 | 28 Apr 2021 |
| MLA/2021/00202/1 - Completed | Application - Disposal of dredged material | Mersey Channel and River Maintenance Dredge Disposal Renewal | MERSEY OF BROMBOROUGH2, SITE Z, MERSEY (MID-RIVER SITE), SITE Y (IS150) | Mersey Docks & Harbour Company | 28 Apr 2021 | 09 May 2023 |
| MLA/2021/00204 - Completed | Application - Minor removals | HHLG Marine Boreholes | Groyne_200m_Buffer | Bcp Council | 30 Apr 2021 | 30 Apr 2021 |
| MLA/2021/00205/1 - Completed | Application - Other works | Hurst Castle Urgent Repairs | Hurst Castle | English Heritage | 30 Apr 2021 | 04 Feb 2022 |
| MLA/2021/00206/2 - Completed | Application - Construction of new works | London Gateway Port Berth 4 Development | Site 1 | London Gateway Port Limited | 30 Apr 2021 | 04 Jun 2024 |
| MLA/2021/00207/1 - Completed | Application - Construction of new works | Kinkerdale Beck, Teesport - Oil Containment Structure | Site Location | Pd Teesport Limited | 04 May 2021 | 28 Jun 2024 |
| MLA/2021/00209 - Completed | Application - Minor removals | Artificial sandbank experiment on Littlestone Beach | LittleStoneExperimentNew | Mr Olivier Bourdin | 04 May 2021 | 04 May 2021 |
| MLA/2021/00210 - Completed | Application - Maintenance of existing structures or assets | Ribble Viaduct | Ribble Viaduct | Network Rail | 04 May 2021 | 04 May 2021 |
| MLA/2021/00213 - Withdrawn | Application - Construction of new works | Exceat Bridge Replacement | magic_polygons | East Sussex County Council-County Hall | 05 May 2021 | |
| MLA/2021/00215/1 - Completed | Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital) | Teesport Ro-Ro No.2 Linkspan Replacement Works | Tees Dock Number 2 Ro Ro, TEES BAY C (TY150) | Pd Teesport Limited | 06 May 2021 | 14 Apr 2022 |
| MLA/2021/00216 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Charles Lister | 06 May 2021 | 06 May 2021 | |
| MLA/2021/00217 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Charles Lister | 06 May 2021 | 06 May 2021 | |
| MLA/2021/00218 - Completed | Application - Deposit of markers | Installation of safety buoys at Colwell Bay, Isle of Wight PO40 9SB (Easting 432815, Northing 88187) | Safety buoys at Colwell Bay, Freshwater | Freshwater Parish Council | 06 May 2021 | 06 May 2021 |
| MLA/2021/00219 - Completed | Application - Maintenance of existing structures or assets | Kirtling Street Cemex Jetty Fender Repairs | Cemex Jetty | Laing O'Rourke Construction Limited | 19 May 2021 | 19 May 2021 |
| MLA/2021/00220 - Completed | Application - Disposal of dredged material, Navigational dredging (capital) | Dredge Deepening of NSSB Quay 2 and NSSB Quay 1 | NSSB Quay 1 and Quay 2, TEES BAY C (TY150) | A.V.Dawson Limited | 07 May 2021 | 08 Dec 2021 |
| MLA/2021/00221/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Portsmouth International Port Maintenanec Dredging and Berth 2 Works | Area A, Area B, Area C, Area D, Area E, Area F, Camber, NAB TOWER (WI060), HURST FORT (WI080) | Portsmouth International Port | 08 May 2021 | 11 Nov 2022 |
| MLA/2021/00224 - Withdrawn | Application - Construction of new works | Hammersmith Temporary Ferry | Hammersmith Ferry | Uber Boats By Thames Clippers | 10 May 2021 | |
| MLA/2021/00225 - Completed | Application - Maintenance of existing works | Broadmarsh Revetment Repair Scheme (Scheme HE Pin - 569741) | Broadmarsh Revetment Repair | Kier Highways Ltd | 11 May 2021 | 11 Aug 2021 |
| MLA/2021/00226 - Completed | Application - Maintenance of existing structures or assets | Bembridge Southern Water outfall | Bembridge outfall | Beasley Christopher Limited | 11 May 2021 | 11 May 2021 |
| MLA/2021/00229/3 - Completed | Application - Construction of new works | Great Yarmouth Port Operation and Maintenance Facility | Great Yarmouth Port Operation and Maintenance Facility | Norfolk County Council | 14 May 2021 | 09 Aug 2024 |
| MLA/2021/00230 - Completed | Application - Minor removals | Boreholes for SI at Oxen Cove, Brixham | Oxen Cove, Brixham | Torbay Council | 17 May 2021 | 17 May 2021 |
| MLA/2021/00231 - Completed | Application - Other deposits | Hull Wrapping Programme | 3 Basin | Babcock International Group | 17 May 2021 | 19 Oct 2021 |
| MLA/2021/00232 - Completed | Application - Construction of new works | Saving The REYC Chatham Branch | REYC Chatham Branch Jetty 1 | Royal Engineer Yacht Club Chatham | 18 May 2021 | 14 Jun 2022 |
| MLA/2021/00234 - Completed | Application - Non-navigational clearance dredging | Barge Harbour Dredging | Robertsons Boatyard | 19 May 2021 | 19 May 2021 | |
| MLA/2021/00235 - Completed | Application - Deposit of markers | Beach Management Zoning Totland Bay | Totland Bay Beach Management | Isle Of Wight Council | 19 May 2021 | 19 May 2021 |
| MLA/2021/00236/1 - Completed | Application - Construction of new works | Avonmouth and Severnside Enterprise Area (ASEA) Ecology Mitigation and Flood Defence Scheme | GIS_401273_MMD_ASEA_Area2_HolesMouthOutfall_100m_Ply, GIS_401273_MMD_ASEA_Area2_KingsWestonOutfall_100m_Ply | Mott Macdonald Ltd-Bristol | 21 May 2021 | 24 Jan 2023 |
| MLA/2021/00239/1 - Completed | Application - Construction of new works | Ryde Tramway Pier Redevelopment | Ryde Tramway Pier | Wightlink Limited | 24 May 2021 | 15 Jul 2022 |
| MLA/2021/00240 - Completed | Application - Wrecks and other archaeological remains | SS Richard Montgomery Mast Reduction and Removal | SSRM | Department For Transport | 25 May 2021 | 24 Jun 2022 |
| MLA/2021/00241 - Completed | Application - Deposit of markers | Hinkley Point Waverider Buoy | HP_Waverider_Buoy_BNG_Buffer_100m_Envelope_20210429_pg | Cefas Ltd | 27 May 2021 | 27 May 2021 |
| MLA/2021/00242 - Completed | Application - Maintenance of existing structures or assets | Polruan and Milltown Woods Line Renewal and Maintenance Activities | Whole Project - Locations 1-3 | Network Rail Limited | 27 May 2021 | 27 May 2021 |
| MLA/2021/00243 - Completed | Application - Maintenance of existing structures or assets | Repair of Barge Harbour Jetty | Robertsons Boatyard | 27 May 2021 | 27 May 2021 | |
| MLA/2021/00244 - Completed | Application - Construction of new works | WAPPING POLICE PONTOON ICCP INSTALLATION | WAPPING POLICE PONTOON ICCP | Land And Water Services | 28 May 2021 | 08 Dec 2021 |
| MLA/2021/00245 - Completed | Application - Maintenance of existing works | Hurlingham River Wall | Hurlingham River Wall | Sweco Uk Limited | 28 May 2021 | 11 Jan 2022 |
| MLA/2021/00246 - Completed | Application - Maintenance of existing structures or assets | Sea Wall Repairs | Sea Wall | Balfour Beatty Rail Limited | 03 Jun 2021 | 03 Jun 2021 |
| MLA/2021/00247 - Completed | Application - Construction of new works | Haslar Marina G Block improvements | G Block 1, G Block 2 | Boatfolk Marinas Ltd | 03 Jun 2021 | 02 Sep 2021 |
| MLA/2021/00248 - Completed | Application - Maintenance of existing structures or assets | Cromer West Seawall | Cromer Seawall | North Norfolk District Council | 03 Jun 2021 | 03 Jun 2021 |
| MLA/2021/00249 - Completed | Application - Maintenance of existing works | Dunston Promenade River Wall; Remedial Works | Dunstion Promenade | Gateshead Council | 04 Jun 2021 | 03 Dec 2021 |
| MLA/2021/00250 - Completed | Application - Maintenance of existing structures or assets | Locksway (Water) Footbridge (FB612) Re-painting | Locksway Road Footbridge | Colas Limited | 04 Jun 2021 | 04 Jun 2021 |
| MLA/2021/00251 - Completed | Application - Maintenance of existing works | Walney Extension Array Cable Stabilisation | Walney Extension Offshore Wind Farm | Dong Energy Rb (Uk) Limited | 04 Jun 2021 | 04 Oct 2021 |
| MLA/2021/00252 - Completed | Application - Maintenance of existing structures or assets | Little Hayes Farm ditch crossing | Ditch_Crossing | Taziker Industrial Limited | 04 Jun 2021 | 04 Jun 2021 |
| MLA/2021/00253 - Completed | Application - Disposal of dredged material, Navigational dredging (capital) | Southampton Container Terminal Berth Access Dredge | Proposed Works, NAB TOWER (WI060), HURST FORT (WI080) | Associated British Ports, Southampton | 04 Jun 2021 | 29 Nov 2021 |
| MLA/2021/00254 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mamarine.Com Llp | 07 Jun 2021 | 07 Jun 2021 | |
| MLA/2021/00255 - Completed | Application - Disposal of dredged material, Navigational dredging (capital) | Floating Dock Jetty (FDJ) dredging | Dredge area, NAB TOWER (WI060), HURST FORT (WI080) | Portsmouth International Port | 07 Jun 2021 | 07 Dec 2021 |
| MLA/2021/00256 - Completed | Application - Maintenance of existing structures or assets | Cinnabar & Capital Wharf Repairs | Cinnabar and Capital Wharf | Moore Project Management Solutions Llp | 07 Jun 2021 | 07 Jun 2021 |
| MLA/2021/00257 - Completed | Application - Other deposits | Galloper Wind Farm Array Cable Protection System Remediation | GWF cable protection | Galloper Wind Farm Limited | 07 Jun 2021 | 09 Feb 2022 |
| MLA/2021/00258 - Completed | Application - Non-navigational clearance dredging | Pontoon dredging | magic_lines | The Woodbridge Boat Yard Limited | 08 Jun 2021 | 08 Jun 2021 |
| MLA/2021/00259/1 - Completed | Application - Other deposits, Other removals | RNLI Tower - open water source heat pump | RNLI Tower Lifeboat Station | Royal National Lifeboat Institution | 09 Jun 2021 | 02 Dec 2022 |
| MLA/2021/00263 - Completed | Application - Construction of new works | Construction of new Hoist Dock Facility at Victoria Quay in Portsmouth Harbour | victoria quay | Uk Docks Ltd | 10 Jun 2021 | 27 Jan 2022 |
| MLA/2021/00264 - Completed | Application - Construction of new works, Other removals | Manaccan 16 Helford Point | Manaccan 16 Helford Point | Cormac Solutions Ltd | 11 Jun 2021 | 28 Nov 2022 |
| MLA/2021/00265 - Completed | Application - Maintenance of existing structures or assets | Minor maintenance to existing pontoons at the end of my garden but within my property boundary | Jetty/Pontoon repairs 31 Eastoke Avenue, Hayling Island | Mr Roland Hopkins | 11 Jun 2021 | 11 Jun 2021 |
| MLA/2021/00266/3 - Completed | Application - Maintenance of existing works | Burbo Bank Extension Array Cable Stabilisation | Burbo Bank Extension Offshore Wind Farm | Burbo Extension Ltd | 11 Jun 2021 | 12 Aug 2024 |
| MLA/2021/00267/2 - Completed | Application - Construction of new works, Other removals | Watermans Park | watermans park | Watermans Riverside Limited | 11 Jun 2021 | 13 Jun 2023 |
| MLA/2021/00268/2 - Completed | Application - Alternative use of dredged material, Other dredging | Maintenance Dredging of the Marine Lake at Weston-super-Mare and Sustainable Relocation (by Discharge) of Dredged Material to Weston Bay | Weston-super-Mare Marine Lake | North Somerset District Council | 11 Jun 2021 | 21 Nov 2023 |
| MLA/2021/00270 - Completed | Application - Other deposits | Glysophate application to seawall structure | Fylde Council | 14 Jun 2021 | 10 Nov 2021 | |
| MLA/2021/00271 - Completed | Application - Construction of new works | Bridle Footbridge Replacement | Site and work area | Lancashire County Council | 14 Jun 2021 | 14 Jan 2022 |
| MLA/2021/00272 - Completed | Application - Other works | Pagham Harbour Church Norton Spit | Pagham Harbour | Planning Flood Defence Trust | 14 Jun 2021 | 19 Oct 2021 |
| MLA/2021/00273 - Completed | Application - Maintenance of existing structures or assets | Race Bank CPS Bandage Solution | Race Bank Offshore Wind Farm | Dong Energy Rb (Uk) Limited | 15 Jun 2021 | 15 Jun 2021 |
| MLA/2021/00274/2 - Completed | Application - Maintenance of existing works | Euro Wharf Sheet Pile Flap Valve Installation & Repair | Euro Wharf Sheet Pile Wall | Hanson Aggregates-Rochester | 15 Jun 2021 | 21 Feb 2023 |
| MLA/2021/00275/1 - Completed | Application - Other deposits | Duddon Estuary pipeline remediation works | Duddon Estuary Pipeline Remediation Works | Northern Divers (Engineering) Limited | 16 Jun 2021 | 24 Jan 2023 |
| MLA/2021/00276 - Completed | Application - Maintenance of existing structures or assets | Allington Lock Fenders | Allington Lock Fenders | Volker Stevin | 16 Jun 2021 | 16 Jun 2021 |
| MLA/2021/00277 - Completed | Application - Maintenance of existing structures or assets | Replacement of Two Outhaul Posts | Outhaul posts | Royal Solent Yacht Club | 16 Jun 2021 | 16 Jun 2021 |
| MLA/2021/00278 - Completed | Application - Non-navigational clearance dredging | Castle Park WSHP Dredging | Bristol City Holdings Limited | 16 Jun 2021 | 16 Jun 2021 | |
| MLA/2021/00279 - Completed | Application - Maintenance of existing structures or assets | Hartlepool Power Station - Forebay concrete repairs | Hartlepool Cooling Water Intake Forebay beam | Edf Energy Nuclear Generation Limited | 17 Jun 2021 | 17 Jun 2021 |
| MLA/2021/00280 - Completed | Application - Maintenance of existing structures or assets | Pageant Steps | Pageant Steps | Moore Project Management Solutions Llp | 18 Jun 2021 | 18 Jun 2021 |
| MLA/2021/00281/1 - Completed | Application - Construction of new works, Decommissioning of works | Replacement Jetty - Upper Upnor | Upper Upnor New Jetty Location, Existing Jetty - Proposed demolition | Constructex Limited | 18 Jun 2021 | 04 Jul 2024 |
| MLA/2021/00282 - Completed | Application - Non-navigational clearance dredging | Wind Enterprise -Component Exchange Project. Greater Gabbard Offshore Wind LTD | MISC_GreaterGabbardWorksArea_SSE_20210524 | Greater Gabbard Offshore Winds Limited | 18 Jun 2021 | 18 Jun 2021 |
| MLA/2021/00283/1 - Completed | Application - Other deposits | Deployment and operation of Floating LiDAR buoys and metocean buoys | Survey Area_1 | Morgan Offshore Wind Limited | 18 Jun 2021 | 27 Sep 2021 |
| MLA/2021/00284/1 - Completed | Application - Maintenance of existing works | Revetment Remediation, Shipyard Estate, Hythe | Proposed_Revetment_Area_160621_WGS84 | Taylor Wimpey (Southern Counties) | 21 Jun 2021 | 29 Sep 2023 |
| MLA/2021/00285 - Completed | Application - Maintenance of existing structures or assets | London Fire Brigade Pontoon | Site Location - LFB | London Fire Brigade Enterprises Limited | 21 Jun 2021 | 21 Jun 2021 |
| MLA/2021/00287 - Completed | Application - Maintenance of existing structures or assets | A14 Orwell Bearing maint yr5 scheme pin 605626 (summer works) | Orwell | John Graham Construction Limited | 21 Jun 2021 | 21 Jun 2021 |
| MLA/2021/00288 - Completed | Application - Maintenance of existing structures or assets | QinetiQ Portland Grove Point maintenance and repair (June 2021 - June 2022) | Grove Point | Qinetiq Limited | 22 Jun 2021 | 22 Jun 2021 |
| MLA/2021/00290 - Completed | Application - Maintenance of existing structures or assets | Islington Wharf | Islington Wharf | Bolitho Estate | 22 Jun 2021 | 22 Jun 2021 |
| MLA/2021/00292/1 - Completed | Application - Maintenance of existing works | Triton Knoll Offshore Wind Farm: Transmission Assets Operations and Maintenance | Triton Knoll Order Limits | Triton Knoll Ofto Limited | 23 Jun 2021 | 26 Jan 2024 |
| MLA/2021/00293 - Completed | Application - Maintenance of existing structures or assets | General Maintenance Jetty Infrastructure And Associated Equipment 2021-2022 | Isle of Grain Jetty No 1 | Bp Oil Uk Limited | 23 Jun 2021 | 23 Jun 2021 |
| MLA/2021/00294 - Completed | Application - Construction of new works, Maintenance of existing works | Brunswick Wharf River Wall and Pontoon | Brunswick River Wall and Pontoon | Red Earth Bideford Limited | 23 Jun 2021 | 20 Jul 2022 |
| MLA/2021/00295 - Completed | Application - Other deposits | Bantham harbour and estuary | magic_polygons | Bantham Estate | 24 Jun 2021 | 30 May 2022 |
| MLA/2021/00296 - Completed | Application - Other works | Tyne Estuary Environmental Enhancements Phase 2 | Kingfisher Court, Dunston Staiths Inlet, Newcastle Quayside | Groundwork Ne & Cumbria | 24 Jun 2021 | 17 Jan 2022 |
| MLA/2021/00298 - Completed | Application - Construction of new works | Coverack Coastal Defence Project | Proposed development | Cornwall Council-Bodmin | 24 Jun 2021 | 09 Mar 2022 |
| MLA/2021/00299 - Completed | Application - Maintenance of existing structures or assets | Sharpness South Pier | Sharpness South Pier | Canal & River Trust | 24 Jun 2021 | 24 Jun 2021 |
| MLA/2021/00300 - Completed | Application - Maintenance of existing works | Westermost Rough Offshore Windfarm Array Cable Stabilisation | Westermost Rough Offshore Wind Farm | Westermost Rough Ltd | 25 Jun 2021 | 14 Oct 2021 |
| MLA/2021/00301 - Completed | Application - Non-navigational clearance dredging | Lytham Main Drain tidal desilt | Dock Bridge Tidal desilt | Environment Agency | 28 Jun 2021 | 28 Jun 2021 |
| MLA/2021/00302 - Withdrawn | Application - Other deposits | Redcar Time And Tide Bell | Redcar & Cleveland Bc Cleveland House | 29 Jun 2021 | ||
| MLA/2021/00303 - Completed | Application - Construction of new works | Ocean Business 2021 Pontoon | National Oceanography Centre | Diversified Communications Uk | 29 Jun 2021 | 29 Sep 2021 |
| MLA/2021/00304 - Completed | Application - Decommissioning of works | Scroby Sands Met Mast Foundation Removal | Scroby Sands Met Mast | Rwe Renewables Uk Scroby Sands Limited | 29 Jun 2021 | 23 Dec 2021 |
| MLA/2021/00305 - Completed | Application - Maintenance of existing structures or assets | Chalet No.1 Solent Breezes SO31 9HG Gabion Sea Defences | Chalet No. 1 Solent Breezes SO31 9HG - Gabion Sea Defence | Mr Terry Ralph | 30 Jun 2021 | 30 Jun 2021 |
| MLA/2021/00306 - Completed | Application - Deposit of markers | BEEMS Work Package 7 Oceanographic Measurements. Wavebuoy | HP_Waverider_Buoy_BNG_2018_2020_buffer_100m_envelope_pg | Cefas Ltd | 01 Jul 2021 | 01 Jul 2021 |
| MLA/2021/00308 - Completed | Application - Maintenance of existing structures or assets | Ryde Pier | Ryde Pier | Network Rail Limited | 02 Jul 2021 | 02 Jul 2021 |
| MLA/2021/00309 - Completed | Application - Construction of new works | Outfall pipe and scour protection - Greenwich | Greenwich Dewatering Outfall | Riverlinx Cjv | 02 Jul 2021 | 09 Mar 2022 |
| MLA/2021/00310 - Completed | Application - Construction of new works | RNLI Exmouth Launching Ramp | RNLI Exmouth | Rnli Poole | 02 Jul 2021 | 16 Dec 2021 |
| MLA/2021/00312 - Completed | Application - Maintenance of existing works | Triton Knoll Offshore Wind Farm: Generation Assets Operation and Maintenance | Triton Knoll Order Limits | Triton Knoll Offshore Wind Farm Ltd | 02 Jul 2021 | 18 Apr 2023 |
| MLA/2021/00313 - Completed | Application - Maintenance of existing structures or assets | Hazel Road Southampton | Hazel Road Southampton | Beasley Christopher Limited | 03 Jul 2021 | 03 Jul 2021 |
| MLA/2021/00314/1 - Completed | Application - Construction of new works, Maintenance of existing works | Plaistow and Royal Primrose Wharves - Marine Piling | Plaistow and Royal Primrose Wharves | Gps Marine And Civil Sevices Ltd | 05 Jul 2021 | 22 Jun 2022 |
| MLA/2021/00315 - Completed | Application - Minor removals | ADM Erith Jetties Refurbishment and Modifications - Ground investigation | ADM Erith | Archer Daniels Midland Erith Limited | 21 Jul 2021 | 21 Jul 2021 |
| MLA/2021/00316 - Completed | Application - Maintenance of existing structures or assets | Replacement of single timber pile | lymington Yacht haven | Lymington Yacht Haven Limited | 07 Jul 2021 | 07 Jul 2021 |
| MLA/2021/00317/1 - Completed | Application - Construction of new works, Maintenance of existing works | Naze north cliff stabilisation emergency works project | Naze north cliff and seawall | Naze Protection Society | 08 Jul 2021 | 17 Mar 2023 |
| MLA/2021/00318 - Withdrawn | Application - Construction of new works | New England Farm, Snape, Jetty | Mr Andrew Heald | 08 Jul 2021 | ||
| MLA/2021/00319 - Completed | Application - Maintenance of existing structures or assets | Deans lodge slipway refurbishment | deans lodge slipway | Mr Nick Haworth | 09 Jul 2021 | 09 Jul 2021 |
| MLA/2021/00320 - Completed | Application - Construction of new works, Maintenance of existing works | Viking Energy Network Jarrow | DischargeConstructionActivity, AbstractionConstructionActivity | South Tyneside Council | 11 Jul 2021 | 16 May 2022 |
| MLA/2021/00321 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Charles Lister | 12 Jul 2021 | 12 Jul 2021 | |
| MLA/2021/00323 - Completed | Application - Other deposits | Celtic Interconnector (the UK elements of which are herein ‘the Proposed Development’). | Crossing 1, Crossing 2, Crossing 3, Crossing 4, Crossing 5, Crossing 6, Crossing 7, Crossing 8, Crossing 9, Crossing 10, Chalk substrate, Crossing 11 | Eirgrid Plc | 13 Jul 2021 | 14 Sep 2022 |
| MLA/2021/00324/1 - Variation Requested | Application - Construction of new works | The TwinHub Floating Offshore Wind Demonstration Project | Wave Hub | Wave Hub Limited | 16 Jul 2021 | 12 Jan 2022 |
| MLA/2021/00325 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Fox's Marina Maintenance Dredge | Fox's Marina, RIVER ORWELL (ABP) (TH034) | Foxs Marina Ipswich Ltd-The Strand | 16 Jul 2021 | 24 Oct 2022 |
| MLA/2021/00327 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Island Harbour, IOW. Maintenance Dredging | Island Harbour, Island Harbour Dispose | Uavend Investments-Newport | 19 Jul 2021 | 14 Jun 2022 |
| MLA/2021/00328 - Completed | Application - Other deposits, Other removals | Seaweed Farm, North Devon | Algapelago Marine - Farm Site, Bideford Bay | Algapelago Marine Limited | 19 Jul 2021 | 18 May 2022 |
| MLA/2021/00330 - Completed | Application - Maintenance of existing structures or assets | J Clubb Jetty maintenance | J CLUBB LIMITED JETTY PIER | J Clubb Limited | 19 Jul 2021 | 19 Jul 2021 |
| MLA/2021/00331 - Completed | Application - Construction of new works, Maintenance of existing works | Southampton Sea Cadets - repairs to slipway and additional pontoons. | Sea Cadets Pontoons, Sea Cadets Slipway | Southampton Sea Cadets | 20 Jul 2021 | 23 Jun 2022 |
| MLA/2021/00333/2 - Completed | Application - Construction of new works, Maintenance of existing works | The Boathouse, Mill Hill, Stoke Gabriel | The Boathouse, Mill Hill, Stoke Gabriel | Mr Nigel Rogers | 20 Jul 2021 | 29 Jun 2022 |
| MLA/2021/00334 - Completed | Application - Maintenance of existing structures or assets | Red Funnel Terminal Refurbishment | Red Funnel | Red Funnel Limited | 21 Jul 2021 | 21 Jul 2021 |
| MLA/2021/00335/1 - Completed | Application - Construction of new works | Kingston Wharf - River wall replacement | River wall Replacement Works | P.M.C. Construction And Development Services Limited | 21 Jul 2021 | 06 Dec 2022 |
| MLA/2021/00336 - Completed | Application - Maintenance of existing structures or assets | South Tyneside Council VENJ - Concrete Testing | Jarrow Staithes | Haskoning Uk Limited | 21 Jul 2021 | 21 Jul 2021 |
| MLA/2021/00337 - Completed | Application - Non-navigational clearance dredging | Removal of silt from Local Authority slip way | Bank End Slipway | Torridge District Council | 23 Jul 2021 | 23 Jul 2021 |
| MLA/2021/00338 - Withdrawn | Application - Construction of new works | Halls Jetty Pontoon | Thames Side Services | 23 Jul 2021 | ||
| MLA/2021/00339/1 - Completed | Application - Other deposits | 8" Condensate Pipeline Humber Crossing Rock Dump | 8" Condensate Pipeline | Centrica Storage Limited | 26 Jul 2021 | 05 May 2023 |
| MLA/2021/00340/1 - Completed | Application - Maintenance of existing works | Ridham Sea Terminal - Eastern Quay Maintenance Works | Eastern Quay, Ridham Sea Terminal | Brett Aggregates Ltd -Faversham | 26 Jul 2021 | 16 Feb 2023 |
| MLA/2021/00341 - Completed | Application - Construction of new works | Great Yarmouth - New section of quay wall (WP14A Wall 122) | New Quay Wall | Jba Bentley Ltd-Peterborough | 28 Jul 2021 | 07 Jan 2022 |
| MLA/2021/00342/1 - Completed | Application - Other deposits | Dogger Bank South Offshore Wind Project - metocean buoy installation | DBS West, DBS East | Rwe Npower | 28 Jul 2021 | 19 May 2023 |
| MLA/2021/00343 - Completed | Application - Non-navigational clearance dredging | Ocean Berth Exolum Tyneside Grab Dredge | Exolum Tyneside Ltd - Ocean Berth | Inter Terminals Tyneside Limited | 02 Aug 2021 | 02 Aug 2021 |
| MLA/2021/00344 - Completed | Application - Construction of new works | Elkins Boatyard - Berthing Arrangement Update | Elkins Boatyard Berthing | Elkins Boat Yard Limited | 02 Aug 2021 | 14 Feb 2022 |
| MLA/2021/00345 - Completed | Application - Non-navigational clearance dredging | Hen Pens Sand Sand Winning | Hen Pens Sand Winning | Environment Agency | 02 Aug 2021 | 02 Aug 2021 |
| MLA/2021/00347 - Completed | Application - Other works | Replacement of existing pontoon structures and addition of 12 square metres within the area of the whole structure | Weymouth Rowing Club Pontoon | Weymouth Rowing Club | 03 Aug 2021 | 03 Dec 2021 |
| MLA/2021/00348 - Completed | Application - Maintenance of existing structures or assets | Foul Anchor Sluice - Replacement of outer doors | Foul Anchor Sluice | North Level District Internal Drainage Board | 05 Aug 2021 | 05 Aug 2021 |
| MLA/2021/00349 - Completed | Application - Marine licence for the burial of human remains at sea | NEWHAVEN (WI011) | H.D.Tribe Limited | 08 Aug 2021 | 08 Aug 2021 | |
| MLA/2021/00350 - Completed | Application - Minor removals | Langstone Coastal Defence GI Works | Langstone Broadscale GI Survey Area | Aecom Limited | 11 Aug 2021 | 11 Aug 2021 |
| MLA/2021/00351 - Completed | Application - Maintenance of existing structures or assets | fender repair to wharf wall | Northumberland Wharf | Wph Limited | 12 Aug 2021 | 12 Aug 2021 |
| MLA/2021/00352/1 - Completed | Application - Construction of new works | Mepal Gauging Station | Mepal Gauging Station transducer rack area | Jba Bentley Ltd-Peterborough | 12 Aug 2021 | 11 Nov 2022 |
| MLA/2021/00353/2 - Completed | Application - Construction of new works | Preston & South Ribble Flood Risk Management Scheme - Phases 1 and 2 | Phase 1 - revetment 2, Phase 1 - revetment 1, Phase 1 - revetment 3, Phase 2 - revetment 1 | Environment Agency (Warrington) | 13 Aug 2021 | 23 Feb 2024 |
| MLA/2021/00355 - Completed | Application - Maintenance of existing structures or assets | Repairs to existing lagoon banks and maintenance of small pools and creeks | Hesketh Out Marsh West repairs | Rspb | 14 Aug 2021 | 14 Aug 2021 |
| MLA/2021/00356/1 - Completed | Application - Construction of new works | Small Scale Nearshore Kelp Farm Pilot Test Site | Test Site | Bsc (Southern) Limited | 15 Aug 2021 | 11 Nov 2022 |
| MLA/2021/00357 - Completed | Application - Maintenance of existing structures or assets | Repairs to Northfleet Jetty | Northfleet Jetty | Apa Concrete Repairs Limited | 17 Aug 2021 | 17 Aug 2021 |
| MLA/2021/00358 - Completed | Application - Maintenance of existing structures or assets | Recommendations to remove wooden buffers following Engineering Infrastructural Assessment | Spillers Mill | The Environment Partnership (Tep) Limited | 05 Nov 2021 | 05 Nov 2021 |
| MLA/2021/00359 - Completed | Application - Maintenance of existing structures or assets | LITTLE RAVENSWELL RIVER WALL | River Dart Wall | Ciaran Mcclennon Building Contractors Limited | 18 Aug 2021 | 18 Aug 2021 |
| MLA/2021/00360 - Completed | Application - Maintenance of existing structures or assets | Longrock Stream security screen | Longrock Stream security screen | Cormac Solutions Limited | 18 Aug 2021 | 18 Aug 2021 |
| MLA/2021/00361 - Completed | Application - Maintenance of existing structures or assets | Captain Cook Museum External Repairs & Decoration | CAPTAIN COOK MEMORIAL MUSEUM | Captain Cook Memorial Museum | 18 Aug 2021 | 18 Aug 2021 |
| MLA/2021/00362 - Completed | Application - Construction of new works | Application for the construction of a private jetty- Mast House, 95 Mudeford, Christchurch, BH23 3NJ | Mudeford jetty | Mr Andrew Headley | 18 Aug 2021 | 19 Aug 2022 |
| MLA/2021/00363 - Completed | Application - Non-navigational clearance dredging | Barge Harbour dredging | Robertsons Barge Harbour | Robertsons Boatyard | 19 Aug 2021 | 19 Aug 2021 |
| MLA/2021/00364 - Withdrawn | Application - Construction of new works | West Coast Main Life Extension: Gantry Replacements (PN84-PN85-PN86-PN87-PN89) | Volkerrail Specialist Businesses | 19 Aug 2021 | ||
| MLA/2021/00365 - Completed | Application - Maintenance of existing structures or assets | Safety works Install Handrails and replace non slip strips to Gangplank | Mooring 11, River Arun, The Causeway, Arundel BN18 9LE, West Sussex | Mr Peter Bonsall | 23 Aug 2021 | 23 Aug 2021 |
| MLA/2021/00366 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Merlin Quay Maintenance Dredge | Merlin Quay | Merlin Real Estate Limited | 25 Aug 2021 | 15 Jun 2022 |
| MLA/2021/00367 - Completed | Application - Maintenance of existing structures or assets | NEW BRIDGE BOWCOMBE CREEK REPOINTING | NEW BRIDGE BOWCOMBE CREEK REPOINTING | Devon County Council | 25 Aug 2021 | 25 Aug 2021 |
| MLA/2021/00368/1 - Completed | Application - Other works | Wear Estuary Ecological Enhancement - Liebherr Slipway | Liebherr Slipway | Groundwork Ne & Cumbria | 26 Aug 2021 | 20 May 2022 |
| MLA/2021/00369/1 - Completed | Application - Construction of new works | Urgent: Arun to Pagham Beach Management Plan Phase 4 | Sheet Pile Wall works area | Arun District Council | 26 Aug 2021 | 26 Jun 2023 |
| MLA/2021/00370 - Completed | Application - Maintenance of existing structures or assets | Drigg Viaduct Rerail/resleeper | Drigg Viaduct | Network Rail | 09 Dec 2021 | 09 Dec 2021 |
| MLA/2021/00371 - Completed | Application - Maintenance of existing structures or assets | Riverside West Wall Repairs | Riverside West Wall Repair | Topbond Plc | 27 Aug 2021 | 27 Aug 2021 |
| MLA/2021/00372/3 - Completed | Application - Maintenance of existing works, Other deposits, Other removals | Lancing beach soft sediment remediation works in the vicinity of Rampion Export Cable 4 | Lancing beach soft sediment A, Lancing beach soft sediment B | Rampion Offshore Wind Ltd | 31 Aug 2021 | 03 Sep 2024 |
| MLA/2021/00373 - Completed | Application - Maintenance of existing structures or assets | Perranwharf Bridge Ground Investigation | Perran Wharf Bridge | Cormac Solutions Limited | 01 Sep 2021 | 01 Sep 2021 |
| MLA/2021/00374 - Completed | Application - Minor removals | EA ONE North and EA TWO Sediment Sampling Survey (2021) | Site 1 | East Anglia Two Limited | 01 Sep 2021 | 01 Sep 2021 |
| MLA/2021/00375 - Completed | Application - Construction of new works | Old Swan Bridge - Arch 1 Strengthening, Removal of Existing Temporary Works Under Arch 1 and Masonry Repairs | Old Swan Bridge | West Sussex County Council | 01 Sep 2021 | 08 Mar 2022 |
| MLA/2021/00376 - Withdrawn | Application - Construction of new works | Race Bank PowerBuoy | Orsted Wind Power A/S | 02 Sep 2021 | ||
| MLA/2021/00377 - Completed | Application - Minor removals | Plaistow and Royal Primrose Wharves - 4 no. Trial Pits | Plaistow and Royal Primrose Wharves | Marine And Civil Services Ltd | 02 Sep 2021 | 02 Sep 2021 |
| MLA/2021/00378 - Completed | Application - Maintenance of existing structures or assets | Dover Town Outfall | Dover Town Outfall | Beasley Christopher Limited | 06 Sep 2021 | 06 Sep 2021 |
| MLA/2021/00379 - Completed | Application - Maintenance of existing structures or assets | Dover Town Outfall | Dover Town Hall | Beasley Christopher Limited | 06 Sep 2021 | 06 Sep 2021 |
| MLA/2021/00380 - Completed | Application - Construction of new works | Cleavel Point Seasonal Pontoon | Cleavel Point | Activate Outdoors Limited | 06 Sep 2021 | 19 Apr 2022 |
| MLA/2021/00381 - Completed | Application - Maintenance of existing structures or assets | Deal Dolphin | Deal Dolphin | Beasley Christopher Limited | 06 Sep 2021 | 06 Sep 2021 |
| MLA/2021/00382 - Completed | Application - Minor removals | Trial pits at Meadfoot Beach, Torquay | Meadfoot Beach | Torbay Council | 06 Sep 2021 | 06 Sep 2021 |
| MLA/2021/00384 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Renewal of Dredging Licence for 5 years | BRIDLINGTON A (HU015), Bridlington Harbour Dredge Area | Bridlington Harbour Commissioners | 08 Sep 2021 | 19 May 2022 |
| MLA/2021/00385 - Completed | Application - Maintenance of existing structures or assets | SALCOMBE - The provision and replacement of sewer hatch-boxes on the foreshore sewer and the subsequent CCTV surveying and cleansing of the sewer. | Hatchbox 1, Hatchbox 2, Hatchbox 3, Hatchbox 4 | South West Water Limited | 08 Sep 2021 | 08 Sep 2021 |
| MLA/2021/00386 - Completed | Application - Maintenance of existing structures or assets | Longrock Marazion Marsh Outfall Pipe Repairs | Longrock Marazion Marsh Outfall Pipe Repairs | Cormac Solutions Limited | 09 Sep 2021 | 09 Sep 2021 |
| MLA/2021/00387 - Completed | Application - Construction of new works | Construction of a replacement Jetty at 43 Elms Avenue, Poole, BH148EE | 43 Elms Avenue Jetty, Existing Slipway | Mr Stephen Govier | 09 Sep 2021 | 29 Mar 2022 |
| MLA/2021/00388 - Completed | Application - Maintenance of existing structures or assets | lANGSTONE OPP SHIP INN | Langstone opp ship Inn | Beasley Christopher Limited | 09 Sep 2021 | 09 Sep 2021 |
| MLA/2021/00389 - Completed | Application - Maintenance of existing structures or assets | Bognor Regis Blakes Road | Bognor Regis Blakes RD | Beasley Christopher Limited | 09 Sep 2021 | 09 Sep 2021 |
| MLA/2021/00390/2 - Completed | Application - Construction of new works | Blue Anchor Coastal Protection Works | Blue Anchor Marine Licence Area | Somerset West And Taunton Council | 10 Sep 2021 | 13 Apr 2023 |
| MLA/2021/00391 - Completed | Application - Construction of new works, Maintenance of existing works | West India Pier Recommissioning | West India Pier | Thames Marine Services Limited | 10 Sep 2021 | 21 Dec 2021 |
| MLA/2021/00392/1 - Variation Requested | Application - Alternative use of dredged material | Saltfleet to Gibraltar Point Beach Management 2022 - 2031 | Mablethorpe to Skegness | Environment Agency | 10 Sep 2021 | 27 May 2022 |
| MLA/2021/00393/1 - Completed | Application - Other removals | Ormesby Beck Intertidal Zone Restoration | Ormesby Beck | Bam Nutall Newcastle | 13 Sep 2021 | 06 Feb 2023 |
| MLA/2021/00394 - Completed | Application - Minor removals | Brett Wharf Quay Wall SI | Brett Wharf SI | Solmek Limited | 13 Sep 2021 | 13 Sep 2021 |
| MLA/2021/00395 - Completed | Application - Maintenance of existing structures or assets | Old Sun Wharf | Old Sun Wharf | Osw Freehold & Management Limited | 16 Sep 2021 | 16 Sep 2021 |
| MLA/2021/00396 - Completed | Application - Maintenance of existing structures or assets | calshot outer | Calshot outer | Beasley Christopher Limited | 14 Sep 2021 | 14 Sep 2021 |
| MLA/2021/00397 - Completed | Application - Maintenance of existing structures or assets | Gurnard outer | Gurnard outer | Beasley Christopher Limited | 14 Sep 2021 | 14 Sep 2021 |
| MLA/2021/00398/1 - Completed | Application - Construction of new works | Isles of Scilly Dune & Coastal Flood Defence Scheme | Porthloo working area, Porth Mellon working area | Council Of The Isles Of Scilly | 14 Sep 2021 | 28 Oct 2022 |
| MLA/2021/00399 - Completed | Application - Maintenance of existing structures or assets | Woodvale outer | Woodvale outer | Beasley Christopher Limited | 14 Sep 2021 | 14 Sep 2021 |
| MLA/2021/00400 - Completed | Application - Maintenance of existing structures or assets | Great Eastern Quays - Wall type 2 Refurbishment and Ancillary works | Wall type 2 works and ancillary items | Galliford Try Partnerships Limited | 14 Sep 2021 | 14 Sep 2021 |
| MLA/2021/00401 - Completed | Application - Maintenance of existing structures or assets | RIVER HOUSE | Jetty maintenance | Cutts Marine | 14 Sep 2021 | 14 Sep 2021 |
| MLA/2021/00402 - Completed | Application - Maintenance of existing structures or assets | Ryde outer | Ryde outer | Beasley Christopher Limited | 15 Sep 2021 | 15 Sep 2021 |
| MLA/2021/00403 - Completed | Application - Other deposits | Sofia UXO site investigations (no disposal) | Unexploded Ordnance (UXO) investigation area | Sofia Offshore Wind Farm Limited | 15 Sep 2021 | 16 Sep 2021 |
| MLA/2021/00404 - Completed | Application - Maintenance of existing structures or assets | Binstead outer | Binstead outer | Beasley Christopher Limited | 15 Sep 2021 | 15 Sep 2021 |
| MLA/2021/00405 - Completed | Application - Construction of new works, Decommissioning of works, Disposal of dredged material, Other works | Riverside Ro-Ro | TEES BAY A (TY160), Dolphin D1, Dolphin D2, Dolphin_D4 and D5, Approach bridge, platform, abutment | Pd Teesport Ltd | 16 Sep 2021 | 22 Apr 2024 |
| MLA/2021/00406 - Completed | Application - Construction of new works | Boat Lifting Hoiste | Boat Lifting Hoiste | Mr Nigel Constantine | 16 Sep 2021 | 20 Jul 2022 |
| MLA/2021/00407 - Completed | Application - Maintenance of existing structures or assets | Hythe (Southampton) Sailing Club Jetty Refurbishment | Hythe (Southampton) SC Jetty | Kenneth Endean | 16 Sep 2021 | 16 Sep 2021 |
| MLA/2021/00408 - Completed | Application - Non-navigational clearance dredging | Slipway maintenance | Shamblers Yard | Wooden & Steel Ship Repairs Ltd | 16 Sep 2021 | 16 Sep 2021 |
| MLA/2021/00409/1 - Variation Requested | Application - Construction of new works, Maintenance of existing works | The Port of Ramsgate Vessel Access Platform | Boat Landing Area | Vattenfall Wind Power Limited | 17 Sep 2021 | 04 Mar 2022 |
| MLA/2021/00410/1 - Completed | Application - Construction of new works | 20/20a Kingsmans Farm Road Pontoon Relocation | Foreshore adjacent 20/20a Kingsmans Farm Rd Land registry No. EX743024 | Mr Rhett Butler | 17 Sep 2021 | 29 Mar 2023 |
| MLA/2021/00412 - Completed | Application - Maintenance of existing structures or assets | Lee on the Solent Range House | LEE ON THE SOLENT RANGE HOUSE | Beasley Christopher Limited | 21 Sep 2021 | 21 Sep 2021 |
| MLA/2021/00413/2 - Completed | Application - Other deposits, Other removals | Seaweed Farm St Austell Bay, Cornwall. | Updated seaweed farm site | West Country Mussels Of Fowey Limited | 21 Sep 2021 | 03 May 2023 |
| MLA/2021/00414 - Completed | Application - Maintenance of existing structures or assets | Rottingdean Outfall Marker | Rottingdean | Beasley Christopher Limited | 21 Sep 2021 | 21 Sep 2021 |
| MLA/2021/00415 - Completed | Application - Maintenance of existing works | Alpha Jetty, Cliffe - Northern Embankment Maintenance Works | Northern Embankment, Alpha Jetty, Cliffe | Robert Brett & Son-Faversham | 22 Sep 2021 | 18 Jul 2022 |
| MLA/2021/00416 - Withdrawn | Application - Other removals | Demolition of three timber jetties on the River Ouse and removal of several timber mooring posts. | Jetty 1, Jetty 2, Jetty 3, Mooring post removal site | Sam Gilpin Demolition-Newton Abbot | 23 Sep 2021 | |
| MLA/2021/00417 - Completed | Application - Maintenance of existing structures or assets | Shell Haven Terminal. Replacement of Marine Loading Arms 2021 | Shell Haven S Jetty | Shell U.K. Limited | 24 Sep 2021 | 24 Sep 2021 |
| MLA/2021/00418 - Completed | Application - Maintenance of existing structures or assets | West India Dock Pier Reinstatement | West India Dock Pier | Thames Marine Services Limited | 27 Sep 2021 | 27 Sep 2021 |
| MLA/2021/00419 - Completed | Application - Maintenance of existing structures or assets | Erection of Scaffolding for emergency roof repairs | Guy's Quay, Sutton Harbour | Sutton Harbour Holdings Plc | 27 Sep 2021 | 27 Sep 2021 |
| MLA/2021/00420/1 - Completed | Application - Maintenance of existing works | Martello Marine Ltd - Slipway Extension | Martello Marine Ltd Rye Boatyard | Martello Developments Ltd | 28 Sep 2021 | 15 May 2023 |
| MLA/2021/00421 - Completed | Application - Maintenance of existing structures or assets | Inspection and minor maintenance of Dungeness A Intake and Outfall Pipelines | Dungeness A outfall and intake area | Magnox Limited | 28 Sep 2021 | 28 Sep 2021 |
| MLA/2021/00422/1 - Completed | Application - Construction of new works | Royal Quays Marina Improvement Works | Royal Quays A1, Royal Quays A2, Royal Quays B1, Royal Quays B2 | Boatfolk Marinas Ltd | 29 Sep 2021 | 07 Nov 2023 |
| MLA/2021/00423 - Completed | Application - Construction of new works | Portsmouth Harbour Station Berthing Upgrades | Wightlink Fendering, Wightlink mooring dolphin and access bridge | Wightlink Limited | 29 Sep 2021 | 25 Apr 2022 |
| MLA/2021/00424/1 - Completed | Application - Disposal of dredged material | Deepening of Berths 8 and 9, Port of Felixstowe | INNER GABBARD EAST (TH056) | Felixstowe Dock And Railway Company | 29 Sep 2021 | 21 Apr 2023 |
| MLA/2021/00426 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mamarine.Com Llp | 01 Oct 2021 | 01 Oct 2021 | |
| MLA/2021/00427 - Completed | Application - Construction of new works | Installation of Floating Pontoons at Brigham and Cowan Docks | South Shields Marina | M-Technic Limited | 01 Oct 2021 | 05 Apr 2022 |
| MLA/2021/00428 - Completed | Application - Maintenance of existing works | Dawsmere Pumping Station Outfall refurbishment | Outfall | South Holland Internal Drainage Board | 01 Oct 2021 | 16 Mar 2022 |
| MLA/2021/00430 - Completed | Application - Non-navigational clearance dredging | Dock Marsh sluice clearance, Ramsholt, Deben Estuary SSSI/SPA/Ramsar site | Dock Marsh outfall | The Trustees Of The Adeane Bawdsey Settlement | 01 Oct 2021 | 01 Oct 2021 |
| MLA/2021/00431/1 - Completed | Application - Maintenance of existing works | London Bridge City River Wall | London Bridge City River Wall | Sweco Uk Ipswich | 04 Oct 2021 | 20 Mar 2024 |
| MLA/2021/00432/1 - Completed | Application - Maintenance of existing works | Maintenance and Structural Alteration Works to Fawley Refinery Sea Water Pump House | Fawley cofferdam | Constructex Limited | 04 Oct 2021 | 04 Oct 2022 |
| MLA/2021/00433 - Completed | Application - Construction of new works | Hardway Sailing Club pontoons | Hardway Pontoons | Hardway-Sailing Club | 04 Oct 2021 | 09 Dec 2022 |
| MLA/2021/00434 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Newhaven Harbour Maintenance Dredging Sediment Disposal | NEWHAVEN | Newhaven Port & Properties Ltd | 04 Oct 2021 | 31 Jan 2022 |
| MLA/2021/00435 - Completed | Application - Maintenance of existing structures or assets | Triton Knoll Demarcation Buoy and Boat Landing Cleaning | DemarcationBuoysPoly_5mBuff | Triton Knoll Offshore Wind Farm Limited | 05 Oct 2021 | 05 Oct 2021 |
| MLA/2021/00436 - Completed | Application - Non-navigational clearance dredging | Deben Yacht Club dinghy slipway clearance | DYC dredging area | Mr Michael Sheppard | 05 Oct 2021 | 05 Oct 2021 |
| MLA/2021/00437 - Completed | Application - Disposal of dredged material, Navigational dredging (capital), Navigational dredging (maintenance) | Leamouth Wharf Dredge | Dredge site - Leamouth Wharf, NAB TOWER (WI060) | Cemex Uk Ltd -Belvedier | 06 Oct 2021 | 17 Feb 2022 |
| MLA/2021/00439 - Completed | Application - Marine licence for the burial of human remains at sea | NEWHAVEN (WI011) | Barnes & Hicks Limited | 07 Oct 2021 | 07 Oct 2021 | |
| MLA/2021/00440 - Completed | Application - Minor removals | Wouldham Embankment Repairs - Ground Investigations | Wouldham_Site_Area | Environment Agency | 07 Oct 2021 | 07 Oct 2021 |
| MLA/2021/00441 - Completed | Application - Maintenance of existing structures or assets | Vipers Quay - jetty repair | Vipers Quay jetty | Mr Andrew Scott | 08 Oct 2021 | 08 Oct 2021 |
| MLA/2021/00442 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Great Yarmouth Third Crossing Waiting Facility Maintenance Dredging | GREAT YARMOUTH (HU150), Dredge Area | Norfolk County Council | 08 Oct 2021 | 08 Apr 2022 |
| MLA/2021/00443 - Completed | Application - Minor removals | St Annes Seawall Ground Investigation | Site 1 | Jacobs Engineering U.K. Limited | 11 Oct 2021 | 11 Oct 2021 |
| MLA/2021/00444/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Royal Southern YC - Maintenance Dredging in Winter 2022 | RSrnYC_Maintenance_Dredge_Area_Border, NAB TOWER (WI060) | Royal Southern Yacht Club Limited | 12 Oct 2021 | 08 Feb 2023 |
| MLA/2021/00445/1 - Completed | Application - Other removals | Victoria Stone Wharf | Victoria Stone Wharf | Marine And Civil Services Ltd | 13 Oct 2021 | 27 Jul 2022 |
| MLA/2021/00447 - Completed | Application - Maintenance of existing works | Inter-array Cable Replacement | Race Bank Offshore Wind Farm | Race Bank Wind Farm Limited | 18 Oct 2021 | 12 Feb 2024 |
| MLA/2021/00448 - Completed | Application - Construction of new works | Dover Harbour Board - Outer Wave Screen | Outer Wave Wall | Dover Harbour Board | 19 Oct 2021 | 20 Jul 2022 |
| MLA/2021/00449 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mamarine.Com Llp | 19 Oct 2021 | 19 Oct 2021 | |
| MLA/2021/00450 - Completed | Application - Decommissioning of works | Wave Hub Site – Seatricity Anchor block removal | Wave Hub - Seatricity Central Anchor Block | Celtic Sea Power | 20 Oct 2021 | 27 Jan 2022 |
| MLA/2021/00451 - Completed | Application - Maintenance of existing structures or assets | 9 Dock Entrance Repairs | 9 Dock_1 | Babcock International Limited | 20 Oct 2021 | 20 Oct 2021 |
| MLA/2021/00452 - Completed | Application - Maintenance of existing structures or assets | 31 Market Street, Falmouth | 31 Market Street | Yelverton Properties Limited | 20 Oct 2021 | 20 Oct 2021 |
| MLA/2021/00453 - Completed | Application - Maintenance of existing works | 3716 - Dinah's Side - Pipework | Dinah's Side water pipeline | Mr James Campbell | 21 Oct 2021 | 31 Jan 2022 |
| MLA/2021/00454 - Completed | Application - Maintenance of existing works | Repair work to pier in Dittisham | Dittisham Pier | Landmarc | 21 Oct 2021 | 19 Dec 2022 |
| MLA/2021/00455 - Completed | Application - Construction of new works | Sustainable and Resilient Coastal Cities (SARCC) - Vertipools and piling habitats | Westcliff Beach Viewing Platform, Leigh Port | Southend-On-Sea Borough Council | 22 Oct 2021 | 13 Apr 2022 |
| MLA/2021/00456/1 - Variation Requested | Application - Navigational dredging (maintenance) | Maintenance Dredge of Shiplift at Solent Gateway Port in Marchwood | Marchwood Shiplift Dredge Area, Marchwood Shiplift Disposal Area (WI076) | Solent Gateway-Sea Mounting Centre | 25 Oct 2021 | 19 May 2022 |
| MLA/2021/00457 - Completed | Application - Construction of new works | West Mersea Floating Pontoon works, West Mersea, Essex | West Mersea Floating Hammerhead Pontoon | Colchester Borough Council-Rowan House | 25 Oct 2021 | 27 Jul 2022 |
| MLA/2021/00458/1 - Completed | Application - Construction of new works | Willoughby Road Mooring | Mooring_site | Nomad Property Ltd | 26 Oct 2021 | 17 Jan 2023 |
| MLA/2021/00459 - Completed | Application - Construction of new works, Maintenance of existing works | TEAM2100 - Deptford Walls - Wall Repair Works | Deptford Walls Permanent Repairs | Jacobs Team2100 | 27 Oct 2021 | 24 Mar 2022 |
| MLA/2021/00460 - Completed | Application - Construction of new works | Aldingham beck culvert outfall | Aldingham Beck Culvert Outfall | Metcalfe Plant Hire Ltd. | 27 Oct 2021 | 25 May 2022 |
| MLA/2021/00461 - Completed | Application - Maintenance of existing works | Hornsea Project Two Helideck Guano Removal | HOW02_MMO_MarineLicenseArray_WGS84_20211026 | Optimus Wind Limited | 28 Oct 2021 | 03 Feb 2022 |
| MLA/2021/00462 - Completed | Application - Deposit of markers | P00006882 AECOM - Mersey & Sankey Salinity Monitoring | Buoy monitoring upstream | Apem Ltd | 28 Oct 2021 | 28 Oct 2021 |
| MLA/2021/00463 - Completed | Application - Maintenance of existing structures or assets | Hove opposite King Alfred Leisure | Hove opp King Alfred leisue | Beasley Christopher Limited | 01 Nov 2021 | 01 Nov 2021 |
| MLA/2021/00464 - Completed | Application - Maintenance of existing structures or assets | BAE Barrow South Quay Concrete Removal | South and West Quay works | Bae Systems Submarines | 01 Nov 2021 | 01 Nov 2021 |
| MLA/2021/00465 - Completed | Application - Construction of new works, Other deposits, Other dredging | Hemsby rock berm scheme | Hemsby rock berm activity area (nearshore delivery corridors to be determined) | Great Yarmouth Borough Council | 01 Nov 2021 | 14 Mar 2023 |
| MLA/2021/00466 - Completed | Application - Deposit of markers | Marker buoy placement: Ormonde Dropped Object | Area 1 | Ormonde Energy Limited | 01 Nov 2021 | 01 Nov 2021 |
| MLA/2021/00467 - Completed | Application - Beach maintenance activities | Shoreham to Southwick beach recycling | shoreham to southwick shingle transfer | Shoreham Port Authority | 02 Nov 2021 | 02 Nov 2021 |
| MLA/2021/00468 - Completed | Application - Maintenance of existing works | Saltfleet Haven Rationalisation Project | Pumping Station & Transformer House, Silt Flushing System | Lindsey Marsh Drainage Board | 02 Nov 2021 | 30 Mar 2022 |
| MLA/2021/00469 - Completed | Application - Construction of new works | Retention of Jetty, Highfield | Highfield, Lower Swanwick | Clive & Victoria Nightingale | 02 Nov 2021 | 01 Feb 2022 |
| MLA/2021/00470 - Completed | Application - Maintenance of existing structures or assets | Barge Harbour marker and mooring posts | Robertsons Barge Harbour | Robertsons Boatyard | 03 Nov 2021 | 03 Nov 2021 |
| MLA/2021/00471 - Completed | Application - Maintenance of existing structures or assets | Island House, 25 Lower Street, Dartmouth. TQ6 9AN | Island House, 25 Lower Street, Dartmouth. TQ6 9AN | Saint Petrox Trust Lands | 10 Jan 2022 | 10 Jan 2022 |
| MLA/2021/00472 - Completed | Application - Aggregate dredging, Sampling | 458/464 West Bassurelle | Area 458, Area 464 | Tarmac Marine Dredging Ltd | 04 Nov 2021 | 21 Nov 2022 |
| MLA/2021/00473 - Completed | Application - Aggregate dredging, Sampling | Area 458/464 | Area 458, Area 464 | Cemex Uk Marine Ltd | 04 Nov 2021 | 21 Nov 2022 |
| MLA/2021/00474 - Withdrawn | Application - Other removals | Nemo Link Saltmarsh Remediation Works | National Grid Nemo Link Limited | 04 Nov 2021 | ||
| MLA/2021/00475/1 - Completed | Application - Maintenance of existing works | Redbridge Causeway Remediation Works, Southampton (Work Package 3) | Redbridge Causeway WP3 Site Boundary | Hampshire County Council | 05 Nov 2021 | 05 Jan 2024 |
| MLA/2021/00477/1 - Completed | Application - Construction of new works | BEACH Esk - Whitehall Landing | Whitehall Landing | Groundwork Ne & Cumbria | 08 Nov 2021 | 04 Jul 2022 |
| MLA/2021/00478 - Completed | Application - Maintenance of existing structures or assets | Weymouth Walls E&9 Repair Works | walls e&9 | Dorset Council | 09 Nov 2021 | 09 Nov 2021 |
| MLA/2021/00479/1 - Completed | Application - Maintenance of existing works | Walney Island Causeway Remedials | Walney Causeway | Cumbria County Council Carlisle | 11 Nov 2021 | 14 Apr 2023 |
| MLA/2021/00480 - Completed | Application - Sampling | Hornsea Three Geotechnical Survey (2022) | Hornsea Three Geotechnical Survey Area | Orsted Hornsea Three | 11 Nov 2021 | 27 Jan 2022 |
| MLA/2021/00481 - Completed | Application - Maintenance of existing structures or assets | Anchor Iron Wharf Repairs, North Greenwich | Anchor Iron Wharf | Morden College | 12 Nov 2021 | 12 Nov 2021 |
| MLA/2021/00483 - Completed | Application - Construction of new works | Great Yarmouth - New Flood Defence Quay Wall (WP10 Wall 112) | New quay wall | Jba Bentley Limited | 15 Nov 2021 | 12 May 2022 |
| MLA/2021/00484 - Completed | Application - Maintenance of existing structures or assets | External Steel Walkway Repair | Walkway | Babcock Marine (Devonport) Limited | 16 Nov 2021 | 16 Nov 2021 |
| MLA/2021/00485 - Completed | Application - Maintenance of existing structures or assets | Replacement of mooring riser chains with Eco Friendly Sealite Synthetic Mooring strops | Studland Bay Bankes Arms Moorings | Mrs Pippa Lightbown | 16 Nov 2021 | 16 Nov 2021 |
| MLA/2021/00486 - Completed | Application - Minor removals | Rock Sewage Pumping station- sea wall trial pits | Rock SPS - Trial pitting area | Teignmouth Maritime Services Limited | 16 Nov 2021 | 16 Nov 2021 |
| MLA/2021/00487 - Completed | Application - Maintenance of existing structures or assets | Blackfriars bridge refurbishment works | Main Works Area | F M Conway Limited | 17 Nov 2021 | 17 Nov 2021 |
| MLA/2021/00488 - Completed | Application - Maintenance of existing structures or assets | LONGROCK BEACH ACCESS RAMP REPAIRS | Longrock Beach Access | Cormac Solutions Limited | 17 Nov 2021 | 17 Nov 2021 |
| MLA/2021/00489/1 - Completed | Application - Other deposits | LIFE Recreation ReMEDIES Solent Seagrass Restoration | Solent | National Marine Aquarium | 18 Nov 2021 | 22 Nov 2022 |
| MLA/2021/00490 - Completed | Application - Maintenance of existing structures or assets | MAC0464 - Reedham Swingbridge Survey | magic_polygons | Amalgamated Construction Ltd | 02 Dec 2021 | 02 Dec 2021 |
| MLA/2021/00491 - Completed | Application - Maintenance of existing structures or assets | Canvey Island LPG Import Terminal (Calor Gas) - Jetty & Approach Road Remedial Works | Canvey Island LPG Terminal - Jetty & Approach | Frankham Consultancy Group Limited | 19 Nov 2021 | 19 Nov 2021 |
| MLA/2021/00492 - Completed | Application - Maintenance of existing structures or assets | New Grimsby Sewage Pump Station, Tresco, CSO Pipe Minor Repairs | polygon | May Gurney Limited | 22 Nov 2021 | 22 Nov 2021 |
| MLA/2021/00493 - Completed | Application - Maintenance of existing structures or assets | Combined Sewer Overflows (CSO) Clearance | Acton SR - CS01X, Stamford Brook SR - CS02X, nLL1 Brook Green - CS37X, North West SR - CS03X, Hammersmith PS - CS04X, West Putney - CS05X, Frogmore SR (Bell Ln) - CS07A, Frogmore SR (Buckhold Rd) - CS07B, Jews Row (Wandle Valley SR) - CS08A, Jews Row (Falconbrook SR) - CS08B, Falconbrook PS - CS09X, Lots Road PS - CS10X, Church St - CS11X, Queen St - CS12X, Smith St (ML) - CS13A, Smith St (SR) - CS13B, Western PS - CS15X, Kings Scholars Pond - CS18X, Grosvenor Ditch - CS21X, Horseferry - CS39X, Wood St - CS40X, Northumberland St - CS23X, Savoy St - CS24X, Norfolk St - CS25X, Essex St - CS26X, Goswell St - CS41X, Pauls Pier - CS42X, Battle Bridge - CS43X, Beer Ln - CS44X, Iron Gate - CS45X, London Bridge - CS55X, Shad Thames PS - CS28X, Nightingale Ln - CS46X, Union Wharf - CS47X, Wapping Dock - CS48X, Cole Stairs - CS49X, Bell Wharf - CS50X, Ratcliffe - CS51X, Holloway SR - CS30X, Blackwall Sewer - CS52X, Earl PS - CS31X, Deptford SR - CS32A, Deptford Creek - CS32B, Greenwich PS - CS33X, Abbey Mills PS - CS35X, Isle of Dogs PS - CS56X, Canning Town PS - CS57X, Charlton SR - CS34X, Henley Rd - CS53X, Tideway CSO - CS81X | Thames Water Limited | 22 Nov 2021 | 22 Nov 2021 |
| MLA/2021/00495 - Completed | Application - Construction of new works | 1203610 FCF-09 Donna Nook - MMO Licence for 3D Target for Military Training Purposes | 3D Target | Ladmarc Support Services | 22 Nov 2021 | 17 Mar 2022 |
| MLA/2021/00496 - Completed | Application - Other removals | Seaweed and sea vegetables farming and harvest | Efal Ltd | 23 Nov 2021 | 13 May 2022 | |
| MLA/2021/00497/1 - Completed | Application - Maintenance of existing works, Sampling | A47 Great Ouse bridge refurbishment | A47 River Great Ouse bridge area | Highways England Company Limited | 23 Nov 2021 | 23 Dec 2022 |
| MLA/2021/00498 - Completed | Application - Maintenance of existing works | Upgrading of mooring for Trinity | LV Trinity | Fellowship Afloat Charitable Trust | 24 Nov 2021 | 27 May 2022 |
| MLA/2021/00499 - Completed | Application - Maintenance of existing structures or assets | Bexhill Beaulieu Road | Bexhill Beaulieu Road | Beasley Christopher Limited | 24 Nov 2021 | 24 Nov 2021 |
| MLA/2021/00500 - Completed | Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital) | River Tyne Restoration Facility | Construction of the Confined Disposal Facility, Navigational dredge area | Newcastle Upon Tyne City Council | 24 Nov 2021 | 05 May 2023 |
| MLA/2021/00501 - Completed | Application - Maintenance of existing structures or assets | Bexhill Clock Tower | Bexhill Clock Tower | Beasley Christopher Limited | 25 Nov 2021 | 25 Nov 2021 |
| MLA/2021/00502 - Completed | Application - Maintenance of existing structures or assets | Fareham Quay Street | Fareham Quay Street | Beasley Christopher Limited | 25 Nov 2021 | 25 Nov 2021 |
| MLA/2021/00503 - Completed | Application - Maintenance of existing structures or assets | Waldringfield Sailing Club, Slipway A repairs | Waldringfield Slipway A | Waldringfield Sailing Club | 25 Nov 2021 | 25 Nov 2021 |
| MLA/2021/00504 - Completed | Application - Construction of new works | Pasco’s Boatyard - Sea Defences | Pasco's Sea Defence | Pasco'S Boatyard | 26 Nov 2021 | 30 Oct 2023 |
| MLA/2021/00505 - Completed | Application - Deposit of markers | Downs Sailing Club - Deployment of Racing Marks | Downs sailing club racing marks | Downs Sailing Club | 26 Nov 2021 | 26 Nov 2021 |
| MLA/2021/00507 - Completed | Application - Maintenance of existing structures or assets | Newhaven Fort Road | Newhaven Fort Road | Beasley Christopher Limited | 29 Nov 2021 | 29 Nov 2021 |
| MLA/2021/00508 - Completed | Application - Maintenance of existing structures or assets | Lime Kilns CSO Ground Investigation | polygon | May Gurney Limited | 29 Nov 2021 | 29 Nov 2021 |
| MLA/2021/00509/2 - Completed | Application - Other removals | Dogger Bank A and B Array Site Unexploded Ordnance Investigation | DBB UXO investigation area, DBA UXO investigation area | Dogger Bank Wind Farm | 30 Nov 2021 | 29 Mar 2023 |
| MLA/2021/00510 - Completed | Application - Maintenance of existing structures or assets | Hayling Is opp Sea grove Avenue | Hayling Is opp Sea Grove Avenue | Beasley Christopher Limited | 30 Nov 2021 | 30 Nov 2021 |
| MLA/2021/00511 - Completed | Application - Construction of new works | O&M Shed | O&M Shed | Cordwell Leisure Development Ltd | 30 Nov 2021 | 08 Mar 2022 |
| MLA/2021/00512 - Completed | Application - Maintenance of existing structures or assets | Baltic Wharf Jetty - Concrete Investigation | Baltic Wharf | Baltic Distribution Limited | 02 Dec 2021 | 02 Dec 2021 |
| MLA/2021/00513 - Completed | Application - Maintenance of existing structures or assets | Repair and maintenance to slip at Foundry Dock | Foundry quay | Mrs Marcia Fuller | 02 Dec 2021 | 02 Dec 2021 |
| MLA/2021/00514 - Completed | Application - Maintenance of existing structures or assets | MAC00453 Trowse Swing Bridge | MAC0453 Trowse Swingbridge | Amalgamated Construction Ltd | 02 Dec 2021 | 02 Dec 2021 |
| MLA/2021/00515 - Completed | Application - Maintenance of existing works | Shell Barking - River Rodding wall repairs | Shell Barking IG11 8BU | Toureen Contactors Ltd | 02 Dec 2021 | 08 Aug 2023 |
| MLA/2021/00516 - Completed | Application - Construction of new works, Maintenance of existing works | North Haven Yacht Club repair works | NHYC T section, NHYC Access jetty | North Haven Yacht Club | 03 Dec 2021 | 14 Sep 2022 |
| MLA/2021/00518 - Completed | Application - Navigational dredging (capital), Navigational dredging (maintenance) | Purfleet Berth Dredge | Purfleet Berth Dredge Area, Purfleet Berth Adjacent Site Dredge Area | Hanson Cement | 03 Dec 2021 | 24 Mar 2022 |
| MLA/2021/00523 - Completed | Application - Maintenance of existing structures or assets | Culvert headwall repair | Newtown Salt Works feeding ponds | National Trust (Enterprises) Limited (The) | 07 Dec 2021 | 07 Dec 2021 |
| MLA/2021/00524 - Withdrawn | Application - Other removals | CIRCE North 2 UXO Clearance | Zayo Group Uk Ltd-St Katherines Way | 07 Dec 2021 | ||
| MLA/2021/00526 - Completed | Application - Maintenance of existing structures or assets | Brunel Green Gabions | Brunel Green Gabions | Cormac Solutions Limited | 08 Dec 2021 | 08 Dec 2021 |
| MLA/2021/00527 - Completed | Application - Construction of new works | Island House, Chiswick - New Pontoon | Island House, Chiswick | Jason Gissing | 08 Dec 2021 | 11 Mar 2022 |
| MLA/2021/00528 - Completed | Application - Construction of new works | Brett Wharf Quay Works | Brett Wharf | Edrri Brett Wharf Gateshead Sarl | 08 Dec 2021 | 22 Sep 2022 |
| MLA/2021/00529 - Completed | Application - Deposit of markers | Laying dinghy racing marks in Christchurch Harbour that remain in place for more than 28 days and are only removed for maintenance. | Christchurch Harbour fixed racing marks | Highcliffe Sailing Club Limited | 16 Jan 2022 | 16 Jan 2022 |
| MLA/2021/00530 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | RNSA Moorings maintenance dredging | Alliance, Dolphin, Haslar Pontoon, Coldharbour, NAB TOWER (WI060) | Rnsa Moorings Limited | 09 Dec 2021 | 07 Apr 2022 |
| MLA/2021/00531 - Completed | Application - Maintenance of existing structures or assets | Kitley Dam | magic_polygons | Mr James Bastard | 09 Dec 2021 | 09 Dec 2021 |
| MLA/2021/00532 - Completed | Application - Construction of new works | Brooksend Outfall Extension | Brooksend Outfall | Canterbury City Council | 09 Dec 2021 | 21 Jul 2022 |
| MLA/2021/00533 - Completed | Application - Maintenance of existing structures or assets | Pile Replacement | Site 1 | Amble Marina Limited | 10 Dec 2021 | 10 Dec 2021 |
| MLA/2021/00534 - Completed | Application - Other removals | Hornsea Three Marine Debris Removal Campaign | NNSSR SAC AoS, NNSSR SAC AoSearch, WNNC SAC AoS, WNNC SAC AoSearch | Orsted Hornsea Three | 10 Dec 2021 | 17 May 2022 |
| MLA/2021/00535 - Completed | Application - Maintenance of existing structures or assets | Littlehampton Hendon Avenue | Littlehampton Hendon Ave | Beasley Christopher Limited | 13 Dec 2021 | 13 Dec 2021 |
| MLA/2021/00536/1 - Completed | Application - Maintenance of existing works | Dynamic Bend Stiffener (DBS) Installation Works | London Array Dynamic Bend Stiffener Installation Works | London Array Ltd | 13 Dec 2021 | 12 Sep 2023 |
| MLA/2021/00538 - Withdrawn | Application - Construction of new works | Bawdsey Manor Coast Protection Works | Bawdsey Manor coastal protection | Pgl Travel Ltd Bawdsey Manor | 14 Dec 2021 | |
| MLA/2021/00539 - Completed | Application - Maintenance of existing works | Fieldgate Quay, Colchester | Fieldgate Quay, Colchester | Breheny Civil Engineering | 14 Dec 2021 | 09 May 2022 |
| MLA/2021/00540 - Completed | Application - Construction of new works | Southend Inner Pier Head Café | Southend Pier Café | Southend On Sea Borough Council | 14 Dec 2021 | 13 May 2022 |
| MLA/2021/00541/1 - Completed | Application - Maintenance of existing works | Holehaven Creek Gas Pipeline Protection | Holehaven Creek | Marine And Civil Services Ltd | 15 Dec 2021 | 10 May 2024 |
| MLA/2021/00542 - Completed | Application - Maintenance of existing structures or assets | Sunseeker Shipyard quay wall repairs | Site 1 | Sunseeker International Limited | 15 Dec 2021 | 15 Dec 2021 |
| MLA/2021/00543 - Completed | Application - Maintenance of existing structures or assets | Scaffolding works at Fort Cumberland coastal defence | Fort Cumberland Scaffolding | Southern Water Limited | 15 Dec 2021 | 15 Dec 2021 |
| MLA/2021/00544 - Completed | Application - Maintenance of existing structures or assets | KSLES Culvert Inspection Programme - EM0312 Asset 106537 | Asset 106537 | Amalgamated Construction Ltd | 16 Dec 2021 | 16 Dec 2021 |
| MLA/2021/00545 - Completed | Application - Non-navigational clearance dredging | Wellington Dock Culvert Closure | Wellington Dock Culvert | Dover Harbour Board | 18 Jan 2022 | 18 Jan 2022 |
| MLA/2021/00546 - Completed | Application - Other removals | Dogger Bank C Wind Farm UXO Investigation | Dogger Bank C UXO Investigation Area | Equinor Uk Limited | 17 Dec 2021 | 27 Apr 2022 |
| MLA/2021/00547 - Completed | Application - Maintenance of existing structures or assets | West Coast Main Life Extension: Gantry Replacements (PN84-PN85-PN86-PN87-PN89) | West Coast Main Life Extension: Gantry Replacements (PN84-PN85-PN86-PN87-PN89) | Volkerrail Specialist Businesses Limited | 17 Dec 2021 | 17 Dec 2021 |
| MLA/2021/00548 - Completed | Application - Disposal of dredged material | DEEP WATER RELOCATION SITE - EXTENSION (PORTLAND INNER HARBOUR) (PLACEMENT OF UP TO 100'000m3) | Portland Harbour Deep Water Relocation (PO112) | Portland Harbour Authority Limited | 20 Dec 2021 | 24 May 2022 |
| MLA/2021/00549 - Completed | Application - Non-navigational clearance dredging | Plaistow and Royal Primrose Wharves | Plaistow and Royal Primrose Wharves | Gps Marine And Civil Services Ltd | 21 Dec 2021 | 21 Dec 2021 |
| MLA/2021/00550 - Completed | Application - Maintenance of existing structures or assets | KSLES Culvert Inspection Programme - EM0312 Asset 96922 | Asset 96922 | Amalgamated Construction Ltd | 22 Dec 2021 | 22 Dec 2021 |
| MLA/2021/00551 - Withdrawn | Application - Construction of new works, Other works | Marine works associated with the redevelopment of Albert Island, London. | London & Regional Properties Ltd | 22 Dec 2021 | ||
| MLA/2021/00552 - Completed | Application - Incineration of any substance or object at sea | Dogger Bank A and B Array Sites Unexploded Ordnance Clearance | Dogger Bank B | Doggerbank Offshore Wind Farm Project 2 Projco Limited | 23 Dec 2021 | 31 Jan 2023 |
| MLA/2021/00553/1 - Completed | Application - Construction of new works, Sampling | West Staithes | Site Investigations, New bollard and associated works, Temporary works | Blyth Harbour Commission | 23 Dec 2021 | 31 Oct 2023 |
| MLA/2021/00554 - Completed | Application - Other deposits | Shingle recharge at Stakes Island, Chichester Harbour | Proposed recharge site, Stakes Island, Chichester Harbour | Chichester Harbour Conservancy | 23 Dec 2021 | 30 May 2022 |
| MLA/2021/00555 - Withdrawn | Application - Maintenance of existing works | East Anglia ONE Operations and Maintenance Scour Protection and Cable Armouring for Transmission Assets | East Anglia One Limited | 24 Dec 2021 | ||
| MLA/2021/00556 - Withdrawn | Application - Disposal of dredged material | Scarborough Harbour disposal of maintenace dredged material | Scarborough Borough Council | 31 Dec 2021 |