MLA/2017/00001/2 - Completed | Application - Aggregate dredging, Sampling | Area 526 | Area 526 (English) | Tarmac Marine Dredging Limited | 03 Jan 2017 | 01 Jun 2023 |
MLA/2017/00002/2 - Completed | Application - Disposal of dredged material | Renew of license for maintenance dredging and disposal in Whitby | WHITBY (TY180) | Scarborough Borough Council | 06 Jan 2017 | 09 Dec 2020 |
MLA/2017/00003 - Completed | Application - Construction of new works | Hesketh Out Marsh East (HOME) Management Realignment Scheme | Breach 1, Breach 2, Breach 3, Breach 4 | Environment Agency (Warrington) | 06 Jan 2017 | 28 Apr 2017 |
MLA/2017/00004 - Completed | Application - Maintenance of existing works | RNLI Ramsgate Lifeboat Station - Low Impact Maintenance Works to Boathouse & Pontoon Berth (Fast Track Licence) | Ramsgate Lifeboat Station | Rnli | 08 Jan 2017 | 31 Mar 2017 |
MLA/2017/00005 - Completed | Application - Maintenance of existing works | Eastern Road Water Bridge Maintenance Works | Eastern Road Water Bridge | Portsmouth City Council | 08 Jan 2017 | 03 Mar 2017 |
MLA/2017/00006/3 - Completed | Application - Scientific instruments | HOW01_Anemometry Mast | HOW01 Anemometry mast | Dong Energy Wind Power As | 09 Jan 2017 | 18 Jul 2018 |
MLA/2017/00007/2 - Completed | Application - Construction of new works | Lostwithiel Sewerage Treatment Works- Site Access Road and Outfall Reinforcement | Outfall Protection sheet piling, Access road protection sheet piling | May Gurney Limited | 10 Jan 2017 | 13 Nov 2018 |
MLA/2017/00008 - Completed | Application - Maintenance of existing works | Howdon Jetty | Howdon Jetty | Esh Construction | 10 Jan 2017 | 06 Feb 2017 |
MLA/2017/00009/1 - Completed | Application - Construction of new works | Dart Marina Hotel Wall repair | Dart Marina hotel quay wall | Tms Maritime Ltd | 11 Jan 2017 | 06 Oct 2017 |
MLA/2017/00010/1 - Completed | Application - Maintenance of existing works, Other works | Sizewell A Off-Shore Structures Maintenance Works. | SZA Intake Offshore Structure, SZA Outfall Offshore Structure | Magnox Limited | 12 Jan 2017 | 20 Nov 2017 |
MLA/2017/00011 - Completed | Application - Other removals | Gravel Removal Northside Workington | River Derwent, North Bank | Ashcroft Plant (Cumbria) Limited | 13 Jan 2017 | 31 May 2017 |
MLA/2017/00014 - Completed | Application - Wrecks and other archaeological remains | HMS Invincible Project | Invincible Designated wreck | Maritime Archaeology Sea Trust | 18 Jan 2017 | 18 Apr 2017 |
MLA/2017/00015 - Completed | Application - Wrecks and other archaeological remains | Recovery of lead | Mr Vince Woolsgrove | 18 Jan 2017 | 20 May 2019 | |
MLA/2017/00016 - Completed | Application - Construction of new works | The installation of a platform required for the operation of a boat hoist | Hoist Position | C. Toms And Son Limited | 18 Jan 2017 | 31 May 2017 |
MLA/2017/00018 - Completed | Application - Construction of new works | Hamford Water, Walton-on-the-Naze | Surface Water Outfall Headwall | HEADWALL | Taylor Wimpey Developments Limited | 19 Jan 2017 | 09 May 2017 |
MLA/2017/00020 - Completed | Application - Construction of new works | Boat Ladder installation Lowestoft Harbour | Lowestoft Harbour | Vbms (Uk) Limited | 23 Jan 2017 | 13 Feb 2017 |
MLA/2017/00021/1 - Completed | Application - Maintenance of existing works | Landcross Viaduct Repainting | Landcross Viaduct | Devon County Council | 25 Jan 2017 | 26 Oct 2017 |
MLA/2017/00023 - Completed | Application - Maintenance of existing works | Hadrians Way-Site B (Opposite Shot Factory Lane). | Hadrians Way Site B | Colas Limited | 25 Jan 2017 | 23 Mar 2017 |
MLA/2017/00024 - Completed | Application - Maintenance of existing works | FNH419 Hope Wharf | Hope Wharf, Deptford Creek | Fairview New Homes Limited | 25 Jan 2017 | 23 Aug 2017 |
MLA/2017/00025 - Completed | Application - Construction of new works | Cloud 9 Marina Bar and Restaraunt Dartmouth | Dart Marina | Dart Marina Hotel Limited | 26 Jan 2017 | 08 Nov 2017 |
MLA/2017/00026 - Completed | Application - Maintenance of existing works | Ramsholt Dingy Hard Repair | Ramsholt Hard | Ramsholt Fairway Committee | 27 Jan 2017 | 07 Mar 2017 |
MLA/2017/00027 - Completed | Application - Construction of new works | Appledore Quay signs and new mooring anchors | Appledore Quay | South West Highways Limited | 27 Jan 2017 | 13 Apr 2017 |
MLA/2017/00028 - Withdrawn | Application - Construction of new works, Decommissioning of works, Maintenance of existing works | Town Quay Sewage Pumping Station Emergency Sewer Rehabilitation | Town Quay Emergency working Area | South West Water Limited | 27 Jan 2017 | |
MLA/2017/00029 - Completed | Application - Maintenance of existing works | Timber fendering system and access ladders maintenance | White Mountain Jetty | Eurovia Roadstone Limited | 31 Jan 2017 | 28 Apr 2017 |
MLA/2017/00030/2 - Completed | Application - Other works | Esso Fawley Marine Terminal Berths 1-4 Sample Point Upgrades | Berth 1, Berth 2, Berth 3, Berth 4 | Esso Petroleum Company,Limited | 01 Feb 2017 | 18 Dec 2019 |
MLA/2017/00031 - Completed | Application - Disposal of dredged material | Silloth Dredge Licence Renewal | SILLOTH B (IS251) | Captain Ian Macpherson | 01 Feb 2017 | 18 Sep 2017 |
MLA/2017/00032/2 - Completed | Application - Construction of new works, Maintenance of existing works | Hull River Defence Grouped under: Hull River Flood Defences Showing 2 of 5 cases | 301L06, 301L04, 201L46, 201R43/44 | Bmm Jv Limited | 01 Feb 2017 | 02 Nov 2017 |
MLA/2017/00033 - Completed | Application - Maintenance of existing works | Sizewell 'B' Power Station - De-silting works and maintenance Licence | Drumscreen, surge chamber and forebay areas, Sizewell B power station, Outfall location, Sizewell B Power station, Sizewell B Intake | Edf Energy Nuclear Generation Limited | 01 Feb 2017 | 21 Jul 2017 |
MLA/2017/00035 - Completed | Application - Other works | Southampton Boat Show Marina Construction | Soton Boat Show | Southampton International Boat Show Limited | 02 Feb 2017 | 23 May 2017 |
MLA/2017/00036 - Completed | Application - Maintenance of existing works, Other works | Embankment Pier Pontoon replacement | Embankment, Embankment 2 | County Building Services Ltd | 02 Feb 2017 | 23 Mar 2017 |
MLA/2017/00037/4 - Completed | Application - Maintenance of existing works | Race Bank Offshore Wind Farm Transmission Assets Grouped under: Race Bank Offshore Wind Farm Showing 3 of 11 cases | Race Bank Offshore Wind Farm OFTO | Diamond Transmission Partners Galloper Limited | 03 Feb 2017 | 12 Oct 2020 |
MLA/2017/00038 - Completed | Application - Other works | Wind LIDAR Buoy - East Anglia THREE - Wind LIDAR Buoy | East Anglia THREE Floating Lidar Buoy | East Anglia Offshore Wind | 03 Feb 2017 | 06 Mar 2017 |
MLA/2017/00039/9 - Completed | Application - Incineration of any substance or object at sea | Hornsea Project One Unexploded Ordnance Clearance | Hornsea_Project_One_Order_limits_UXO_Disposal | Hornsea 1 Ltd | 04 Feb 2017 | 29 May 2019 |
MLA/2017/00040/1 - Completed | Application - Maintenance of existing works | Royal Southern Yacht Club - Replacement of 3 damaged piles and 2 pontoons | Repair footprint | Royal Southern Yacht Club Limited | 06 Feb 2017 | 28 Mar 2018 |
MLA/2017/00041/2 - Completed | Application - Maintenance of existing works | RNLI East Division - Regional Licence for Low Impact Maintenance Works | Wells Next the Sea Lifeboat Station, Wells next the Sea Beach Lifeguard Area, Sheringham Lifeboat Station, Cromer Lifeboat Station, Sea Palling Beach Lifeguard Area, Happisburgh Lifeboat Station, Hemsby Beach, Great Yarmouth Beach Lifeguard Area, Great Yarmouth & Gorleston Lifeboat Station, Gorleston Beach Lifeguard Area, Lowestoft Lifeboat Station, Lowestoft South Beach Lifeguard Area, Aldburgh Lifeboat Station, Aldburgh Lifeboat Station (ILB), Harwich Lifeboat Station, Walton and Frinton Lifeboat Station, West Mersea Lifeboat Station, Burnham on Crouch Lifeboat Station (Boathouses), Southend on Sea Lifeboat Station (north) Lifeboat Station, Southend on Sea Lifeboat Station (South), Tower Lifeboat Station, Chiswick Lifeboat Station, Gravesend Lifeboat Station, Gravesend Refueling Pontoon, Sheerness Lifeboat Station, Ramsgate Lifeboat Station, Ramsgate Beach Lifeguard Area, Westbrook Bay Beach Lifeguard Area, Margate Beach Lifeguard Area, Botany Bay Beach Lifeguard Area, Viking Bay Beach Lifeguard Area, Walmer Lifeboat Station, Littlestone on Sea Lifeboat Station, Dungeness Lifeboat Station, Rye Lifeboat Station, Hastings Lifeboat Station, Eastbourne Lifeboat Station (slipway/access structure), Eastbourne Lifeboat Station (moorings), Newhaven Lifeboat Station, Brighton Lifeboat Station, Shoreham Lifeboat Station, Selsey Lifeboat station (temporary ILB station), Selsey Lifeboat Station, Selsey Lifeboat Station (New Station), Selsey Lifeboat Station (Swinging mooring), Portsmouth Lifeboat Station, Yarmouth Lifeboat Station, Cowes Lifeboat Station, Bembridge Lifeboat Station | Rnli | 07 Feb 2017 | 23 May 2019 |
MLA/2017/00042 - Completed | Application - Maintenance of existing works | Routine Miantenance of South West Water's marker to a storm overflow | Marker beacon in Torridge Estuary, belonging to South West Water | South West Water Limited | 08 Feb 2017 | 22 Mar 2017 |
MLA/2017/00043 - Completed | Application - Maintenance of existing works | Chilton Trinity STW Outfall - Flap Valve Replacement and Bank Reinstatement | Chilton Trinity Outfall Replacement and Bank Reinstatement | Mr Lee Porter | 08 Feb 2017 | 01 Sep 2017 |
MLA/2017/00044 - Completed | Application - Other works | The Vinery Jetty, Salcombe | Vinery Jetty | Pca Consulting Engineers Ltd | 09 Feb 2017 | 21 Nov 2017 |
MLA/2017/00045 - Completed | Application - Construction of new works | Derrydown, Downderry | Mansion Developments South West Limited | 09 Feb 2017 | 21 May 2019 | |
MLA/2017/00046 - Completed | Application - Maintenance of existing works | Temporary scaffold at Flat 7, 128 Grosvenor Road, Westminster | Flat 7, 128 Grosvenor Road, London, SW1V 3JY | Embankment Holdings Limited | 09 Feb 2017 | 28 Apr 2017 |
MLA/2017/00047/1 - Completed | Application - Construction of new works | Blyth Offshore Wind Demonstrator Project Cable Secondary Protection Works (Array 2) | Blyth Offshore Demonstrator | Blyth Offshore Demonstrator Limited | 10 Feb 2017 | 27 Jun 2017 |
MLA/2017/00048/1 - Completed | Application - Other works | Forewind Met Mast Decommissioning | Dogger Bank Met Mast 1, Dogger Bank Met Mast 2 | Forewind Limited | 10 Feb 2017 | 12 Feb 2018 |
MLA/2017/00049 - Completed | Application - Navigational dredging (maintenance) | HMNB Devonport Plough dredging | HMNBD Plough only area | Defence Infrastructure Organisation | 14 Feb 2017 | 08 Feb 2018 |
MLA/2017/00052/2 - Completed | Application - Disposal of dredged material, Navigational dredging (capital) | Turnchapel Wharf - Capital Dredging | Turnchapel Wharf, Plymouth Deep (PL035) | Turnchapel Wharf Limited | 15 Feb 2017 | 25 Sep 2018 |
MLA/2017/00053 - Withdrawn | Application - Construction of new works | New Mills Sluice Eel Pass | Environment Agency | 15 Feb 2017 | ||
MLA/2017/00054 - Completed | Application - Maintenance of existing works | Hayling Island Sailing Club – Proposed Pontoon Extension | HISC Pontoon | Hayling Island Sailing Club | 15 Feb 2017 | 12 Jun 2017 |
MLA/2017/00055/1 - Completed | Application - Construction of new works | Thames Tideway - Jetty | Jetty | Ingrebourne Valley Limited | 15 Feb 2017 | 20 Dec 2021 |
MLA/2017/00056 - Completed | Application - Other works | Barnes rail footbridge remedial strengthening repairs to existing structure | Barnes rail footbridge | F M Conway Limited | 16 Feb 2017 | 05 Apr 2017 |
MLA/2017/00057 - Completed | Application - Construction of new works, Other works | Proposed Groyne Construction, Bembridge Coast Hotel, Fishermans Walk, Bembridge, Isle of Wight | access, groyne 1, groyne 2, groyne 3, plant compound, compound | Bourne Leisure Limited | 17 Feb 2017 | 25 Apr 2017 |
MLA/2017/00059/1 - Completed | Application - Maintenance of existing works | Tamar Tavy Overhead Line Refurbishment Project | YF023-YF024, YF011-YF012 | National Grid Electricity Transmission Plc | 21 Feb 2017 | 20 Oct 2017 |
MLA/2017/00060 - Completed | Application - Construction of new works, Decommissioning of works | Middlehaven Dock Bridge Construction | Dock Bridge location | Middlesbrough Council | 21 Feb 2017 | 28 Jul 2017 |
MLA/2017/00062 - Completed | Application - Wrecks and other archaeological remains | Cargo of wreck ss Argonaut | Deep Sea Salvage Bv | 22 Feb 2017 | 26 Jun 2018 | |
MLA/2017/00063/1 - Completed | Application - Maintenance of existing works, Other removals | Heysham A & B, Sea Wall Site investigation | Heysham A & B Sea Wall. | Edf Energy Nuclear Generation Limited | 22 Feb 2017 | 21 Jun 2017 |
MLA/2017/00064 - Completed | Application - Maintenance of existing works | The Boathouse, Ashlake Copse Road, Wotton Creek, IOW | Boathouse IOW | Stewart Newnham | 23 Feb 2017 | 02 Jun 2017 |
MLA/2017/00065/1 - Completed | Application - Maintenance of existing works | River Wall Maintenance | Quay Wall | Looe Town Council | 23 Feb 2017 | 17 Nov 2017 |
MLA/2017/00066 - Completed | Application - Other removals | Nemo Link Interconnector - Unexploded Ordnance Works | Revised Nemo Link Cable Corridor - 22nd April 2013 | National Grid Nemo Link Limited | 23 Feb 2017 | 08 Jun 2017 |
MLA/2017/00067/1 - Completed | Application - Maintenance of existing works | Replace damaged/ corroded seawater intake grills for Dundeness B' Nuclear power station in Kent | Dungeness 'B' Power station seawater intake | Burgess Marine Limited | 24 Feb 2017 | 20 Sep 2017 |
MLA/2017/00069 - Completed | Application - Construction of new works, Decommissioning of works | GWave Wave Hub Project | GWave Berth Coordinates | Gwave Uk Wave Hub Limited | 28 Feb 2017 | 21 Apr 2017 |
MLA/2017/00070 - Completed | Application - Construction of new works | Proposed remediation work to Towers NM13 and NMA1 at Eling Marsh, Southampton | Millbrook Tee, Southampton - Update | Scottish And Southern Energy Plc | 28 Feb 2017 | 21 Mar 2018 |
MLA/2017/00071/3 - Completed | Application - Construction of new works, Disposal of dredged material, Other dredging | East Lytham | Main Drain and Liggard Brook, Disposal Site | Bam Nuttall Limited | 28 Feb 2017 | 27 Apr 2018 |
MLA/2017/00072 - Completed | Application - Marine licence for the burial of human remains at sea | Burail at sea - Rupert Donald Cathles | NEWHAVEN (WI011) | Hinkley Funeral Services | 01 Mar 2017 | 08 Mar 2017 |
MLA/2017/00073 - Completed | Application - Decommissioning of works, Other works | Tamblyn Way Stairs | Tambln Way - Droskyn Stiars | Cormac Solutions Limited | 01 Mar 2017 | 11 May 2017 |
MLA/2017/00074/3 - Completed | Application - Other deposits | Another Time for Margate: Temporary installation of sculpture by Antony Gormley offshore on Fulsam Rock, Margate | Old Pier Foundation, Margate | Turner Contemporary | 01 Mar 2017 | 19 Oct 2020 |
MLA/2017/00075 - Completed | Application - Maintenance of existing works, Other removals | Clearance of sand and rocks from Bude Sea pool and wall repairs | Bude Sea Pool | Friends Of Bude Sea Pool | 01 Mar 2017 | 20 Apr 2017 |
MLA/2017/00076/1 - Completed | Application - Other removals | Recovery and recycling of non ferrous metals and other cargo. | English Trader | Global Marine Solutions Ltd | 04 Mar 2017 | 21 Aug 2019 |
MLA/2017/00077 - Completed | Application - Other deposits | Oil on water exercise 'OilTech' | Deposit of the oil, Deposit of the dispersant | Oil Spill Response Limited | 06 Mar 2017 | 31 May 2017 |
MLA/2017/00078 - Completed | Application - Construction of new works | Installation of scrubbing piles at Bridge Hard Littlehampton | Scrubbing Piles | Littlehampton Harbour Board | 07 Mar 2017 | 18 Jul 2017 |
MLA/2017/00079 - Completed | Application - Maintenance of existing works | Repairs to Wivenhoe Sailing Club Old Hard. | Wivenhoe Sailing Club Old Hard. | Wivenhoe Sailing Club | 07 Mar 2017 | 24 Mar 2017 |
MLA/2017/00080/1 - Completed | Application - Other works | Hill Head Seawall Reconstruction (150 meters) | location_plan | Fareham Borough Council C/O Escp | 08 Mar 2017 | 20 Sep 2017 |
MLA/2017/00081/2 - Completed | Application - Maintenance of existing works, Other works | Walney Offshore Wind Farm, Composite Operational and Maintence (O&M) Marine Licence Application | WOWO01 Cable Route | Blue Transmission Walney 1 Limited | 08 Mar 2017 | 01 Oct 2018 |
MLA/2017/00082 - Completed | Application - Maintenance of existing works | Replacement of Tidal Flap No 5 at Fingringhoe Ranges sea wall GR TM0347 1895 | Fingringhoe Ranges sea wall tidal flap no 5 | Landmarc Support Services Limited | 08 Mar 2017 | 07 Jul 2017 |
MLA/2017/00083 - Completed | Application - Construction of new works | New timber groyne at the mouth of the river Lyne, Northumberland | Groyne at Lynemouth, Northumberland | Northumberland River Trust | 10 Mar 2017 | 14 Aug 2017 |
MLA/2017/00084/1 - Completed | Application - Maintenance of existing works | Masthouse Terrace Pier Repairs | Masthouse Terrace Pier,Isle Of Dods, London | Canal & River Trust | 12 Mar 2017 | 07 Jun 2017 |
MLA/2017/00085 - Completed | Application - Construction of new works, Other deposits, Other removals, Other works | Hightown Outfall | working_area, access_route | United Utilities | 13 Mar 2017 | 13 Aug 2018 |
MLA/2017/00086/1 - Completed | Application - Other works | Installation of Bird Perches at Burbo Bank Offshore Wind Farm | DONG Energy Burbo (UK) Ltd. | Dong Energy Power (Uk) Limited | 14 Mar 2017 | 16 Apr 2018 |
MLA/2017/00087 - Completed | Application - Construction of new works, Decommissioning of works, Navigational dredging (capital) | Woods Quay- Savoy Pier enhancements and extension | Woods Quay | Woods River Cruises Ltd | 15 Mar 2017 | 27 Jun 2017 |
MLA/2017/00088 - Completed | Application - Other removals | Demolition and Site clearance of No 1 Jetty at Sabic Petrochemicals UK, North Tees Site | Jetty 1 (WGS84) as defined by the following coordinates: | Sabic Uk Petrochemicals Limited | 16 Mar 2017 | 22 Jun 2017 |
MLA/2017/00090 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Charles Lister | 16 Mar 2017 | 22 Mar 2017 | |
MLA/2017/00091 - Completed | Application - Other removals | Gravel Removal River Derwent Workington | River Derwent gravel extraction Workington | Thomas Armstrong (Aggregates) Limited | 18 Mar 2017 | 03 Aug 2017 |
MLA/2017/00092 - Completed | Application - Maintenance of existing works | Runcorn Viaduct - Ancillary Works | Runcorn Viaduct | Buckingham Group Contracting Limited | 20 Mar 2017 | 22 Sep 2017 |
MLA/2017/00093/2 - Completed | Application - Other works | Seawork Exhibition Temporary Pontoons | Mercator Media Limited | 20 Mar 2017 | 10 Feb 2022 | |
MLA/2017/00094/1 - Completed | Application - Disposal of dredged material | Marchwood Wharf - Silt Disposal | NAB TOWER (WI060) | Raymond Brown Aggregates | 21 Mar 2017 | 12 May 2020 |
MLA/2017/00095/1 - Completed | Application - Disposal of dredged material | Bedhampton Silt Disposal | NAB TOWER (WI060) | Tarmac Trading Limited | 21 Mar 2017 | 16 Aug 2017 |
MLA/2017/00096/3 - Completed | Application - Maintenance of existing works | London Array Offshore Wind Farm O&M Marine Licence | London Array | London Array Limited | 22 Mar 2017 | 18 Nov 2020 |
MLA/2017/00097 - Completed | Application - Construction of new works | Holyhead Deep Project , Safety Zone Application | Offshore Support Buoy (Primary Location) - primary reference point for a 500m Safety Zone (please see uploaded application) | Minesto Uk Limited | 23 Mar 2017 | 22 Aug 2017 |
MLA/2017/00100/1 - Completed | Application - Maintenance of existing works | Routine operational and maintenance activities at five Offshore Substations (Barrow, Ormonde, Lincs, Westermost Rough, and Gunfleet Sands) | Barrow Substation, Ormonde Substation, Lincs Substation, Westermost Rough Substation, Gunfleet Sands Substation | Transmission Capital Partners Ltd | 24 Mar 2017 | 30 Jan 2020 |
MLA/2017/00101 - Completed | Application - Construction of new works | Central Poole Flood Defences | Creekmoor Channel, Sterte Channel | Borough Of Poole 2 | 27 Mar 2017 | 22 Nov 2017 |
MLA/2017/00103/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Dredging and Disposal of dredged material, A&P Tyne frontage | A&P Tyne Frontage, NORTH TYNE (TY070), SOUTER POINT (OUTER) (TY081) | A&P Tyne Limited | 28 Mar 2017 | 19 Nov 2019 |
MLA/2017/00104 - Completed | Application - Alternative use of dredged material, Other deposits | South Hayling Island Beach Management Plan (2017-22) implementation | Site Area | Eastern Solent Coastal Partnership | 28 Mar 2017 | 21 Aug 2017 |
MLA/2017/00105 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Gosport Ferry Clarence Wharf Maintenance Dredging | NAB TOWER (WI060), HURST FORT (WI080), Clarence Wharf, Gosport | Gosport Ferry Limited | 30 Mar 2017 | 09 Jun 2017 |
MLA/2017/00106/4 - Completed | Application - Construction of new works, Incineration of any substance or object at sea, Other removals | Viking Link | National Grid Viking Link Limited | 30 Mar 2017 | 28 Jul 2022 | |
MLA/2017/00107 - Completed | Application - Maintenance of existing works | Bideford Long Bridge Refurbishment | Bideford Long Bridge | Jacobs Engineering U.K. Limited | 30 Mar 2017 | 19 Jul 2017 |
MLA/2017/00108 - Completed | Application - Other deposits | Isles of Scilly Gravel Bag Deployment Cable Protection | IoS Cable Repair Gravel Bag Deployment | Global Marine Systems Limited | 04 Apr 2017 | 13 Apr 2017 |
MLA/2017/00109/1 - Completed | Application - Disposal of dredged material | Maintenance dredging and disposal in Bristol Harbour Area | PORTISHEAD (LU070), AVONMOUTH (INNER) (LU080), ROYAL PORTBURY ENTRANCE (LU083), ROYAL PORTBURY PIER (LU084), ROYAL EDWARD ENTRANCE (LU085) | The Bristol Port Company Limited | 04 Apr 2017 | 22 Aug 2024 |
MLA/2017/00110/2 - Completed | Application - Construction of new works | Upgrading of NuStar jetties 1 and 2, Grays, River Thames | grays jetties 1&2 | Nustar Terminals Limited | 04 Apr 2017 | 07 Mar 2018 |
MLA/2017/00111/2 - Completed | Application - Other works | Installation of bird perches and deterrents at Barrow Offshore Wind Farm | Barrow | Dong Energy Power (Uk) Limited | 05 Apr 2017 | 27 Apr 2018 |
MLA/2017/00112 - Completed | Application - Other works | New Bowcombe Creek Bridge Coring Investigations | New Bowcombe Creek Bridge | Jacobs Engineering U.K. Limited | 05 Apr 2017 | 31 Jul 2017 |
MLA/2017/00113/2 - Completed | Application - Other deposits | Hinkley Point C Nuclear Power Station | Single point mooring | Nnb Generation Company (Hpc) Limited | 06 Apr 2017 | 28 Sep 2017 |
MLA/2017/00115 - Withdrawn | Application - Construction of new works | Bridge View Drainage Works | Nijhuise H2ok Ltd | 06 Apr 2017 | ||
MLA/2017/00118/1 - Completed | Application - Wrecks and other archaeological remains | Rooswijk Protected Wreck Site, Achaeological Excavation and Preservation | ROOSWIJK | Msds Marine Limited | 08 Apr 2017 | 19 Jun 2017 |
MLA/2017/00119 - Completed | Application - Disposal of dredged material, Other dredging | Clearance of Sea Water Intake at BAE Systems (Barrow-in-Furness) | SMITE Seawater Abstraction Point -Barrow, Lancashire Coast, BARROW D (IS205) | Bae Systems Marine Ltd | 10 Apr 2017 | 02 Aug 2017 |
MLA/2017/00122/1 - Completed | Application - Maintenance of existing works | Repair of Jetty and Sea wall defenses | 67 Southwood Rd, Hayling Island PO11 9PT | Mr Colin Street | 11 Apr 2017 | 19 Oct 2017 |
MLA/2017/00123/2 - Completed | Application - Sampling | Ground Investigations for Combwich Wharf refurbishment | Borehole 1, Borehole 2, Borehole 5, Borehole 6 | Nnb Generation Company (Hpc) Limited | 13 Apr 2017 | 21 Dec 2017 |
MLA/2017/00124 - Completed | Application - Construction of new works | Bates Terminal Quay | Bates Terminal Quay Works | Port Of Blyth | 13 Apr 2017 | 24 Aug 2018 |
MLA/2017/00125/1 - Completed | Application - Decommissioning of works | Shell Flat Met Masts Decommissioning Project | Met Mast 1, Met Mast 2 | Dong Energy Rb (Uk) Limited | 13 Apr 2017 | 10 Aug 2017 |
MLA/2017/00126 - Completed | Application - Sampling | Hornsea Project Three (HOW03) Geotechnical Investigations | B-BH4, B-BH5, B-BH6, B-BH3, B-BH2, B-BH1 | Orsted Ltd | 13 Apr 2017 | 30 Jan 2018 |
MLA/2017/00127 - Completed | Application - Construction of new works | ION Environmental Lots Road Power Station Bridge Abutment Works | Lots Road Power Station | Eon Environmental | 13 Apr 2017 | 06 Jul 2017 |
MLA/2017/00128/1 - Completed | Application - Navigational dredging (maintenance) | Maintenance DredgeLicence-OGN Hadrian Yard, River Tyne | North Tyne, OGN Hadrian Yard - Area 32, River Tyne, SOUTER POINT (OUTER) (TY081) | Smulders Projects Uk Limited | 13 Apr 2017 | 18 Apr 2019 |
MLA/2017/00129 - Completed | Application - Maintenance of existing works | Polkerris SPS Outfall Repair | Polkerris Outfall access and work area | Glanville Cleansing Limited | 13 Apr 2017 | 08 May 2017 |
MLA/2017/00130 - Completed | Application - Construction of new works | Quayside Marina Hoist Dock | Quayside Hoist | Southampton Dry Stack Limited | 13 Apr 2017 | 28 Jul 2017 |
MLA/2017/00131 - Completed | Application - Construction of new works | Royal Clarence Yard - Disposal of Land | Royal Clarence Yard Gosport Hampshire PO12 1EQ | The Oil & Pipeline Agency | 18 Apr 2017 | 16 Jun 2017 |
MLA/2017/00132 - Completed | Application - Decommissioning of works | Wallasea Island Wild Coast Project: Decommissioning and Removal of Offloading Facility in fulfilment of Condition 3.3.1 of MMO Licence L/2011/00043/2 | Wallasea Island Offloading facility | Rspb Sales Limited | 18 Apr 2017 | 15 Jan 2018 |
MLA/2017/00133 - Completed | Application - Other deposits | Repair of existing Slipway at the Littlehampton Yacht Club | LYC Slipway | Littlehampton Yacht Club Ltd | 18 Apr 2017 | 26 May 2017 |
MLA/2017/00134 - Completed | Application - Maintenance of existing works | SHOEBURYNESS SEAWALL REPAIR WORKS | Shoeburyness Seawall defence repairs | Avant Homes (Central) Limited | 18 Apr 2017 | 31 Aug 2017 |
MLA/2017/00135 - Completed | Application - Construction of new works | Port Werburgh Sheet Piling | Port Werburgh Sheet Piling, Medway | Residential Marine Ltd. | 21 Apr 2017 | 21 Apr 2017 |
MLA/2017/00137 - Completed | Application - Other works | Steps -22 Passage Street, Fowey | New steps -22 Passage Street, Fowey, PL23 1DE | Mr John Carr | 21 Apr 2017 | 02 Jun 2017 |
MLA/2017/00138 - Completed | Application - Construction of new works | Strood Riverside Flood Defence Scheme: Phase 1 and Phase 2 | Phase_1_Site_Boundary, Phase_2_Site_Boundary | Medway Council | 25 Apr 2017 | 18 Dec 2017 |
MLA/2017/00140/1 - Completed | Application - Clean-up dredging, Construction of new works | Queenborough Creek Barrier Refurbishment | Queenborough Creek Barrier | Team2100 | 25 Apr 2017 | 15 Sep 2017 |
MLA/2017/00141 - Completed | Application - Maintenance of existing works | Shaldon Bridge re-painting defect remedial work | Shaldon Bridge | Devon County Council | 26 Apr 2017 | 02 Jun 2017 |
MLA/2017/00142/1 - Completed | Application - Other works | Mount Batten Ferry Pontoon | Mount Batten Ferry Pontoon | Plymouth City Council | 26 Apr 2017 | 08 Jan 2018 |
MLA/2017/00143 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Charles Lister | 26 Apr 2017 | 28 Apr 2017 | |
MLA/2017/00144/1 - Completed | Application - Maintenance of existing works | Prospect Quay - Scour Damage | Prospect Mooring - T head berth | Prospect Moorings 2013 Limited | 28 Apr 2017 | 05 Mar 2018 |
MLA/2017/00147/1 - Completed | Application - Maintenance of existing works | Eastern Road Water Bridge Maintenance Works | Eastern_Road_Waterbridge | Colas Limited | 02 May 2017 | 28 Sep 2018 |
MLA/2017/00148 - Completed | Application - Maintenance of existing works | Renewal of Gryones adjacent to Sunderland Hanger at Calshot Activities Centre | Calshot Groynes | Hampshire County Council. | 03 May 2017 | 29 Aug 2017 |
MLA/2017/00149 - Completed | Application - Clean-up dredging | NJ-001-002 and NJ-009-003 Went & Don Aqueducts Dredging | Don Aqueduct | Canal & River Trust 2 | 04 May 2017 | 13 Jul 2017 |
MLA/2017/00150 - Completed | Application - Construction of new works | Lobster Module | Newlyn Harbour wall | The National Lobster Hatchery | 04 May 2017 | 11 Jul 2017 |
MLA/2017/00151/1 - Completed | Application - Maintenance of existing works | Arundel River Wall | arundel | Wph Marine Construction | 04 May 2017 | 15 Feb 2018 |
MLA/2017/00152 - Completed | Application - Construction of new works | Pontoon Reconfiguration and Piling, Hamble Point Marina, Hamble | Pier Extension | Mdl Marina Ltd | 04 May 2017 | 25 Sep 2017 |
MLA/2017/00154 - Completed | Application - Maintenance of existing works | Pier extension to existing structure in Alum Bay, Isle of Wight | Pier Extension in Alum Bay, Isle of Wight | Needles Pleasure Cruises | 04 May 2017 | 18 Aug 2017 |
MLA/2017/00155 - Completed | Application - Marine licence for the burial of human remains at sea | NEWHAVEN (WI011) | Jh Kenyon | 04 May 2017 | 10 May 2017 | |
MLA/2017/00156 - Completed | Application - Maintenance of existing works | Exmouth sinkhole - Orcombe Point emergency repairs | Exmouth Sinkhole 2 | R&M Utility & Civil Engineering Services South West Limited | 04 May 2017 | 15 May 2017 |
MLA/2017/00157 - Completed | Application - Maintenance of existing works | Old Coastguard Station External redecoration | National Trust -York | 05 May 2017 | 25 May 2017 | |
MLA/2017/00158/2 - Completed | Application - Construction of new works, Maintenance of existing works | Stallington's Clyce Embankment Works | Stallingtons Clyce Works | Environment Agency – South West Reg | 05 May 2017 | 18 Oct 2017 |
MLA/2017/00159 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | A W Lymn | 05 May 2017 | 11 May 2017 | |
MLA/2017/00160 - Completed | Application - Other works | Installation of Spud-leg Pontoon for use by Crew Transfer Vessels (CTVs) for the Walney Extension Offshore Windfarm construction phase | Spud-leg Pontoon | Dong Energy Walney Extension (Uk) Ltd | 05 May 2017 | 20 Jul 2017 |
MLA/2017/00161 - Completed | Application - Construction of new works, Other works | Hamble Point Marina Hoist Dock | HPM Hoist Dock | Marina Developments Limited | 05 May 2017 | 15 Aug 2017 |
MLA/2017/00162/2 - Completed | Application - Other removals | Hinkley Point C - UXO removals | Site 1 | Nnb Generation Company (Hpc) Limited | 08 May 2017 | 08 Oct 2018 |
MLA/2017/00163 - Completed | Application - Construction of new works, Other works | Arun Timber Docks Removal of decaying existing wooden piles and installation of new steel piles and pontoons | Arun Timber Docks moorings | River Arun Investments Ltd | 08 May 2017 | 05 Oct 2017 |
MLA/2017/00164 - Completed | Application - Maintenance of existing works | Burbo Bank Extension - Array cable repair and remediation activities | Burbo Bank Extension Array | Dong Energy Burbo Extension | 09 May 2017 | 08 Mar 2018 |
MLA/2017/00165 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Offshore Technology Park Dredging and Disposal | Offshore Technology Park Dredge Pocket, NORTH TYNE (TY070), SOUTER POINT (OUTER) (TY081) | Shepherd Offshore Services Ltd. | 09 May 2017 | 06 Oct 2017 |
MLA/2017/00166/1 - Completed | Application - Maintenance of existing works | Burbo Bank Extension - Export cable repair and remediation activities | BBW02 Export Cable (English waters) | Dong Energy Burbo Extension Holding Ltd | 09 May 2017 | 04 May 2018 |
MLA/2017/00167 - Completed | Application - Maintenance of existing works | Repointing repair to River Wall | River Wall BN18 9DF | Ms Susan Paterson | 11 May 2017 | 15 Jun 2017 |
MLA/2017/00168 - Completed | Application - Construction of new works | Stanford le Hope Station | Stanford le Hope | Morgan Sindall Construction & Infrastructure Ltd | 11 May 2017 | 30 Jan 2018 |
MLA/2017/00169/1 - Completed | Application - Construction of new works | Radipole Pumping Station CSO improvement works | Weymouth Marina CSO outfall location | Wessex Water Services Limited | 11 May 2017 | 26 Sep 2018 |
MLA/2017/00170 - Completed | Application - Maintenance of existing works | Portsmouth Harbour Entrance range reinstatement and maintenance | Portsmouth HER area | Qinetiq Limited | 12 May 2017 | 27 Jul 2017 |
MLA/2017/00171/2 - Completed | Application - Construction of new works | Blacktoft and Laxton Pumping Stations | Blacktoft Pumping Station, Laxton pumping station | Esh Construction | 12 May 2017 | 12 Dec 2017 |
MLA/2017/00172 - Completed | Application - Other removals, Sampling, Scientific instruments | Hermitage Steam Wharf - Site Investigation Works | Hermitage Steam Wharf | Environment Agency | 12 May 2017 | 20 Jun 2017 |
MLA/2017/00173 - Completed | Application - Other removals, Sampling, Scientific instruments | 46 Nine Elms Lane - Site Investigation Works | 46 Nine Elms Lane | Environment Agency | 12 May 2017 | 20 Jun 2017 |
MLA/2017/00174/1 - Completed | Application - Disposal of dredged material, Navigational dredging (capital), Other removals | RE: Portsmouth International Ferry Port - Berth 2 Deepening | NAB TOWER (WI060), Berth 2 Capital Dredge, Scour Mattresses (EAST), Scour Mattresses (WEST) | Portsmouth City Council | 12 May 2017 | 11 Sep 2018 |
MLA/2017/00175/3 - Variation Requested | Application - Clean-up dredging, Maintenance of existing works | Dungeness B Power Station Cooling Water System Marine Activities | Cooling Water Forebay | Edf Energy Nuclear Generation Ltd | 12 May 2017 | 19 May 2022 |
MLA/2017/00176 - Completed | Application - Other deposits | Gun Rocks Dive Trail | Gun Rocks | Miss Nicola Faulks | 14 May 2017 | 11 Sep 2017 |
MLA/2017/00177 - Completed | Application - Decommissioning of works | HMS Belfast - Sewage pipework upgrade | HMS Belfast | Unitspark Ltd | 15 May 2017 | 15 Jun 2017 |
MLA/2017/00178/1 - Completed | Application - Other works | The Bay, Cawsand Bay. | The Bay, Cawsand, Cornwall. PL10 1PG | Parsonage Developments | 16 May 2017 | 03 Nov 2017 |
MLA/2017/00179 - Completed | Application - Other deposits | 33kv Joint Protection Works following cable damage | 33kv Joint approx 6nm off Cornwall Coast | Western Power Distribution Limited | 16 May 2017 | 31 Aug 2017 |
MLA/2017/00181 - Completed | Application - Other removals | Repairing the Slipway at Chapman's Pool | Chapman's Pool Slipway | Mr James Gaggero | 18 May 2017 | 02 Aug 2017 |
MLA/2017/00182/2 - Completed | Application - Other works | Plastic tubing to deter birds at BBW01 and BBW02 Offshore Windfarms | Burbo Bank Extension OWF, Burbo Bank OWF | Dong Energy Power Ltd | 18 May 2017 | 20 Dec 2018 |
MLA/2017/00183/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Heysham Harbour and Approaches Maintenance Disposal License | Heysham harbour, Heysham Approach, MORECAMBE BAY B (IS200) | Heysham Port Limited | 18 May 2017 | 13 Sep 2024 |
MLA/2017/00184 - Completed | Application - Other works | Hornsea Project One Boulder Clearance | HOW01_OffshoreOrderLimits_WGS84_DE_20170118 | Heron Wind Limited | 18 May 2017 | 23 Aug 2017 |
MLA/2017/00186 - Completed | Application - Maintenance of existing works | Installation of two piles and a pontoon at Normanby Wharf | Normanby Wharf, Dockside Road Middlesbrough | B. Marshall Marine Limited | 19 May 2017 | 04 Aug 2017 |
MLA/2017/00187/1 - Completed | Application - Other deposits | River Wandle Weir Removal - Emergency Works | Rock Armour (Site 1 - South), Bulk Bags (Site 2 - North) | Wandsworth Council | 19 May 2017 | 29 Aug 2017 |
MLA/2017/00188 - Completed | Application - Construction of new works | Tide and Time Bell, Morecambe Bay by Sculptor Marcus Vergette | Tide and Time Bell sculpture, Morecambe Bay | Morecambe Artist Colony | 21 May 2017 | 22 Aug 2017 |
MLA/2017/00189 - Completed | Application - Other removals | Bransholme Storm Water Pumping Station | Bransholme SWPS | Yorkshire Water Services Limited | 23 May 2017 | 16 Oct 2017 |
MLA/2017/00190 - Completed | Application - Maintenance of existing works | St Katharine dock | St Katherines Docks | F M Conway Limited | 23 May 2017 | 18 Aug 2017 |
MLA/2017/00191/1 - Completed | Application - Alternative use of dredged material, Clean-up dredging, Disposal of dredged material | Jarrow Wharf - Disposal Application | Area 25 Jarrow Wharf, NORTH TYNE (TY070), SOUTER POINT (OUTER) (TY081) | Cemex Uk Marine Limited | 23 May 2017 | 29 Mar 2023 |
MLA/2017/00192 - Completed | Application - Construction of new works, Maintenance of existing works, Other removals | Barking Floatel | Barking Floatel | Global Tunnelling Experts Uk Limited | 24 May 2017 | 11 Apr 2018 |
MLA/2017/00193 - Completed | Application - Maintenance of existing works | MEB6132 - Hull River Swing Bridge | Hull Swing Bridge | Renew Holdings Plc. | 24 May 2017 | 30 Jun 2017 |
MLA/2017/00195 - Completed | Application - Other removals | Removal of redundant hand rails, access platforms and timber fenders from the Bradwell site outfall structure. | Bradwell site outfall structure | Magnox Limited | 24 May 2017 | 03 Aug 2017 |
MLA/2017/00196 - Completed | Application - Other removals | North Sea Link Interconnector - Debris Clearance | NSL Corridor 12nm 1 | National Grid Nsn Link Limited | 24 May 2017 | 14 Nov 2017 |
MLA/2017/00198 - Completed | Application - Maintenance of existing works | Gosport Marina Pile Replacement Programme | Gosport Marina Pontoons | Premier Marinas (Gosport) Limited | 25 May 2017 | 18 Aug 2017 |
MLA/2017/00202 - Completed | Application - Maintenance of existing works | RNLI North Division - Regional Licence for Low Impact Maintenance Works | Berwick Upon Tweed Lifeboat Station, Amble Pontoon Berth & Pen, RNLI Blyth Pontoon berth, RNLI Whitley Bay Beach Lifeguard Area, RNLI Cullercoats Bay Beach Lifeguards Area, RNLI Longsands South Beach Lifeguard Area, RNLI Cullercoats Lifeboat Station: slipway and Quay walls, RNLI Tynemouth Boathouse, Jetty, berth and wavescreen, RNLI Hartlepool Pontoon Berth, RNLI Staithes & Runswick Slipway, RNLI Sandsend Beach Lifeguard Area, RNLI Whitby Pontoon berth & Pen, RNLI Scarborough North Beach Lifeguard Area, RNLI Scarborough South Beach Lifeguard Area, RNLI Scarborough Boathouse and Slipway, RNLI Flamborough Lifeboat Station, RNLI Bridlington Lifeboat Station: Slipway, RNLI Belvedere Beach Lifeguard Area, Bridlington Mooring, RNLI Humber: lifeboat mooring, RNLI Cleethorpes: Slipway, RNLI West Kirby Beach Lifeguard Area, RNLI Hoylake: Slipway, RNLI The Plataeux Beach Lifeguard Area, RNLI Formby Beach Lifeguard Area, RNLI Ainsdale Beach Lifeguard Area, RNLI Lytham St. Annes: Slipway, RNLI Fleetwood: Lifeboat Pen, RNLI Fleetwood: Mooring, RNLI Barrow: Boathouse, Slipway and Access Jetty, RNLI Barrow: Mooring, RNLI St. Bees: Slipway, RNLI Workington: Quay walls and mooring, RNLI Silloth: Slipway, beach re-profiling and matting, RNLI Humber - Jetty, New Brighton Recovery Anchor | Rnli Division South | 30 May 2017 | 29 Sep 2017 |
MLA/2017/00203 - Completed | Application - Construction of new works, Other removals | Gosport Marina Link Pontoon to Endeavour Quay | Hoist dock removal and Link Pontoon installation | Premier Marinas (Gosport) Ltd | 30 May 2017 | 18 Aug 2017 |
MLA/2017/00205 - Completed | Application - Navigational dredging (maintenance) | RNLI Lifeboat Berth Fleetwood - Marine Licence for Maintenance Dredging | RNLI Fleetwood - Maintenance Dredging Area (Revised 27.6.17) | Rnli Division South | 31 May 2017 | 04 Sep 2017 |
MLA/2017/00206 - Completed | Application - Maintenance of existing works | RNLI Western-Super-Mare - Emergency Licence for Mooring Works | Area of Mooring | Rnli | 31 May 2017 | 08 Jun 2017 |
MLA/2017/00207 - Completed | Application - Maintenance of existing works | RNLI Barrow - Emergency Works to Slipway Toe | RNLI Barrow: Boathouse, Slipway and Access Jetty | Rnli Barrow | 02 Jun 2017 | 07 Jun 2017 |
MLA/2017/00208 - Completed | Application - Construction of new works | Repair works to St. Cuthbert's Chapel | St Cuthbert's Chapel, St. Cuthbert's Island | Peregrini Lindisfarne Landscape Partnership | 02 Jun 2017 | 18 Sep 2017 |
MLA/2017/00209 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Charles Lister | 02 Jun 2017 | 07 Jun 2017 | |
MLA/2017/00210 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Marmarine Llp Burial At Sea | 02 Jun 2017 | 15 Jun 2017 | |
MLA/2017/00212/1 - Completed | Application - Construction of new works | Project NEMO | NEMO CONVERTOR STATION RIVER OUTFALL | J. Murphy & Sons Limited | 05 Jun 2017 | 28 Sep 2017 |
MLA/2017/00213 - Completed | Application - Other works | Deployment of fencing and rubber spikes on turbines to deter birds at BBW02 offshore wind farm | Burbo Bank Extension OWF | Dong Energy Burbo Extension Holding Ltd | 06 Jun 2017 | 24 Jul 2017 |
MLA/2017/00214 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Charles Lister | 08 Jun 2017 | 16 Jun 2017 | |
MLA/2017/00215 - Completed | Application - Maintenance of existing works | RNLI Tynemouth - Emergency Works to Timber Pier | RNLI Tynemouth Boathouse, Jetty, berth and wavescreen | Rnli North Shields | 08 Jun 2017 | 29 Jun 2017 |
MLA/2017/00216/1 - Completed | Application - Construction of new works | Galloper Wind Farm OFTO | G20170406_GWF_MarineLicence_OFTOarea_Polygon_ACT_WGS84 | Diamond Transmission Partners Galloper Limited | 08 Jun 2017 | 17 Feb 2020 |
MLA/2017/00217 - Completed | Application - Other deposits | Refurbishment of the Torpoint River Crossing | Torpoint Gas Pipe remediation works area | Northern Divers (Engineering) Limited | 09 Jun 2017 | 09 Apr 2018 |
MLA/2017/00218/2 - Completed | Application - Maintenance of existing works | Various Hartlepool Sea Outfalls | Hartlepool SO 3, Hartlepool SO 4, Hartlepool SO 5, Hartlepool SO 6 | Northumbrian Water | 09 Jun 2017 | 07 Dec 2017 |
MLA/2017/00219 - Completed | Application - Construction of new works, Other removals, Other works | River Gardens, Banning Street, Greenwich SE10 0NT | River Gardens Foreshore | Bellway Homes Ltd | 09 Jun 2017 | 20 Apr 2018 |
MLA/2017/00220/1 - Completed | Application - Maintenance of existing works | Kimberly Clark - Northfleet Jetty Repair Works | Northfleet Jetty Repair Works | Jacobs Engineering U.K. Limited | 09 Jun 2017 | 29 Nov 2017 |
MLA/2017/00221 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Paul Williams Independent Funeral Directors | 12 Jun 2017 | 23 Jun 2017 | |
MLA/2017/00222 - Completed | Application - Construction of new works | Canade Road Outfall Extension | Canada Road Outfall Extension | Beasley Christopher Limited | 13 Jun 2017 | 21 Jul 2017 |
MLA/2017/00223 - Completed | Application - Maintenance of existing works | East Anglia Zone - Met Mast ZE - Operations & Maintenance | East Anglia_Met Mast ZE | East Anglia Offshore Wind Limited | 14 Jun 2017 | 15 Sep 2017 |
MLA/2017/00225 - Completed | Application - Other dredging | Greenwich Pumping Station - Geo-technical Investigation Sampling Works at Deptford Creek | GREPS Technical Works Location 1, GREPS Technical Works Location 2 | Jackie Roe | 14 Jun 2017 | 23 Jun 2017 |
MLA/2017/00226 - Completed | Application - Maintenance of existing works | RNLI Humber - Fast Track Application for Jetty Repair Works | Rnli Division South | 14 Jun 2017 | 05 Mar 2018 | |
MLA/2017/00227 - Completed | Application - Aggregate dredging, Sampling | Marine Aggregate Extraction at Area 372/1 | Area 372/1 | Hanson Aggregates Marine Limited | 14 Jun 2017 | 01 Dec 2017 |
MLA/2017/00228 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Charles Lister | 14 Jun 2017 | 23 Jun 2017 | |
MLA/2017/00229 - Completed | Application - Other deposits | MARLIN - Modular floating platform for offshore wind | MARLIN | Port Of Sunderland | 15 Jun 2017 | 24 Aug 2017 |
MLA/2017/00230 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Charles Lister | 15 Jun 2017 | 22 Jun 2017 | |
MLA/2017/00232 - Completed | Application - Other works | Pontoon installation | Trinity Quay, Alicat Workboats Ltd | Alicat Workboats Limited | 15 Jun 2017 | 19 Oct 2017 |
MLA/2017/00233 - Completed | Application - Other deposits | Installation of Pontoon system, South Dock, Padstow | Padstow South Dock | Padstow Harbour Commissioners | 15 Jun 2017 | 29 Sep 2017 |
MLA/2017/00235 - Completed | Application - Construction of new works | Sea cage unit to be anchored in the Fal estuary | Cornish Trout Farm | 20 Jun 2017 | 17 Dec 2018 | |
MLA/2017/00236 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Charles Lister | 21 Jun 2017 | 28 Jun 2017 | |
MLA/2017/00237 - Withdrawn | Application - Construction of new works | Residential barge mooring at 3 Dugdale`s Quay, Point, Devoran. TR3 6NB | Mr Dean Richards | 21 Jun 2017 | ||
MLA/2017/00238/4 - Completed | Application - Construction of new works, Navigational dredging (capital) | Devonshire Dock Quay | Site 0 Barrow -in-Furness, Lancashire coast | Bae Systems Submarines | 22 Jun 2017 | 28 Jul 2022 |
MLA/2017/00239/1 - Completed | Application - Navigational dredging (maintenance) | Maintenance Dredging of Humber Dock outer basin, Hull | Humber Dock Outer Basin, Hull | Kingston Upon Hull City Council | 22 Jun 2017 | 10 Jul 2020 |
MLA/2017/00240 - Completed | Application - Maintenance of existing works | Dolphin walkway remediation | Sabic Dolphine Walkways 3 and 7 | Sabic Uk Petrochemicals Limited | 22 Jun 2017 | 20 Oct 2017 |
MLA/2017/00241 - Completed | Application - Disposal of dredged material | Disposal (by discharge into the River Mersey) of dredgings from Canning Half Tide Dock, Liverpool | Canning Half Tide (IS126) | Canal & River Trust 2 | 23 Jun 2017 | 13 Dec 2017 |
MLA/2017/00242 - Completed | Application - Construction of new works | Bank re-alignment and improvement works. | Bradwell Marina excavation., Bradwell Marina piling., Bradwell Marina floating pontoons. | Portflair Limited | 23 Jun 2017 | 19 Dec 2017 |
MLA/2017/00243 - Completed | Application - Disposal of dredged material | Scarborough Harbour disposal of maintenace dredged material | SCARBOROUGH ROCK (TY190) | Scarborough Borough Council | 23 Jun 2017 | 01 Feb 2018 |
MLA/2017/00244/1 - Completed | Application - Other removals | North Sea Link - Unexploded Ordnance Works | North Sea Link Cable Corridor | National Grid Nsn Link Limited | 26 Jun 2017 | 05 Apr 2019 |
MLA/2017/00245/1 - Completed | Application - Construction of new works | Leamouth South (Goodluck Hope) | Union Wharf, Castle and Hercules wharf | Hemsley Orrell Partnership | 26 Jun 2017 | 18 Jul 2018 |
MLA/2017/00249/2 - Completed | Application - Decommissioning of works, Maintenance of existing works, Other deposits | Emergency repairs to Withernsea Long Sea Outfall | Withernsea LSO Emergency Works | Yorkshire Water Services Ltd | 29 Jun 2017 | 04 Dec 2018 |
MLA/2017/00251 - Completed | Application - Construction of new works | Pontoon | Tidesreach Pontoon | Mr Daniel Simson | 04 Jul 2017 | 09 Apr 2019 |
MLA/2017/00252/1 - Completed | Application - Other works | Install test frame at Teesside Offshore Wind Farm Ltd | WTG05, WTG13 | Teesside Windfarm Limited | 04 Jul 2017 | 14 May 2019 |
MLA/2017/00254 - Completed | Application - Construction of new works | Sydenham, Poole Harbour | Application Site, Pile for Navigational Safety Boom | Atlas Partners (Sydenham) Ltd | 04 Jul 2017 | 28 May 2019 |
MLA/2017/00255 - Completed | Application - Other removals | Possible removing of 10 - 50 m3 soil in support of retrieving legs of jack-up vessel WIND SERVER at Greater Gabbard OWF | Greater Gabbard and Galloper | Ziton A/S | 05 Jul 2017 | 12 Jul 2017 |
MLA/2017/00256/2 - Completed | Application - Construction of new works | Cobb's Quay Outfall | Outfall Pipe | Tms Maritime Ltd | 05 Jul 2017 | 22 Feb 2018 |
MLA/2017/00259/3 - Completed | Application - Navigational dredging (capital), Other works | Noss on Dart Marina, Dartmouth | Indicative Site Location | Premier Marinas (Dart) Limited | 05 Jul 2017 | 27 Jul 2023 |
MLA/2017/00260 - Completed | Application - Construction of new works, Other deposits | Starcross and Cockwood Tidal Defence Scheme | Cockwood, Starcross Site 3, Starcross Site 2, Starcross Site 1 | Environment Agency – South West Reg | 06 Jul 2017 | 31 Oct 2017 |
MLA/2017/00262/1 - Completed | Application - Disposal of dredged material | Harwich/ Felixstowe maintenance dredging beneficial disposal | COPPERAS (TH216), ERWARTON TRACK (TH217), ORWELL WEST TRACK (TH218), ORWELL EAST TRACK (TH219) | Harwich Haven Authority | 07 Jul 2017 | 14 Dec 2023 |
MLA/2017/00266/3 - Completed | Application - Construction of new works, Decommissioning of works | Monktonmead Brook Outfall Improvements | Existing Monktonmead Outfall removal, Monktonmead re-routing the outfall and scour protection | Environment Agency (Southern Region) | 13 Jul 2017 | 14 Mar 2018 |
MLA/2017/00267 - Completed | Application - Minor removals | Retrieval of lost fishing gear Falmouth | The Lady of the Isles, The Stanwood, The Andromeda, The Epsilon, The Caroni River, The Bay of Panama, The Volnay, The Mohegan | Fathoms Free | 13 Jul 2017 | 13 Jul 2017 |
MLA/2017/00268 - Completed | Application - Construction of new works | Hull River Defence (HRD) Grouped under: Hull River Flood Defences Showing 2 of 5 cases | 201R65 | Bmm Jv Limited | 13 Jul 2017 | 09 Nov 2017 |
MLA/2017/00269 - Completed | Application - Beach maintenance activities | RNLI Teignmouth - Beach re-profiling at toe of slipway | RNLI Teignmouth - Beach re-profiling Area | R.N.L.I. (Trading) Limited | 13 Jul 2017 | 13 Jul 2017 |
MLA/2017/00270 - Completed | Application - Minor removals | Retrieval of lost fishing gear Penzance | The Hellopes, The Conqueror, The Alice Marie | Fathoms Free | 13 Jul 2017 | 13 Jul 2017 |
MLA/2017/00271 - Completed | Application - Minor removals | Retrieval of lost fishing gear Padstow | The Sphene, The Saphir | Fathoms Free | 13 Jul 2017 | 13 Jul 2017 |
MLA/2017/00276 - MLC/2017/00400 - Completed | Application - Maintenance of existing structures or assets | Heybridge Sea LocK Gate Replacement (Phase 2) Continuation | Heybridge Sea Lock Gate Replacement | Essex And Suffolk Water Limited | 18 Jul 2017 | 18 Jul 2017 |
MLA/2017/00277/4 - Completed | Application - Maintenance of existing works | Race Bank Offshore Wind Farm - Cable Protection Works | Race Bank Offshore Wind Farm | Dong Energy Rb (Uk) Limited | 18 Jul 2017 | 13 Sep 2021 |
MLA/2017/00278 - Completed | Application - Maintenance of existing structures or assets | Gearbox Exchange on wind Turbine 14B at EDF-ER offshore wind farm. Using Jack up vessel Wind Server. | Teesside Wind Farm | Edf Energy Plc | 18 Jul 2017 | 18 Jul 2017 |
MLA/2017/00279 - Completed | Application - Minor removals | Anchor Chain Removal from Area 460 | 460_licence_Area | Hanson Aggregates Marine Limited | 19 Jul 2017 | 19 Jul 2017 |
MLA/2017/00280 - Completed | Application - Maintenance of existing works | Heybridge Sea Locl Gate Replacement (Phase 2) Continuation | Heybridge Sea Lock Gate Replacement | Essex & Suffolk Water | 19 Jul 2017 | 06 Oct 2017 |
MLA/2017/00282 - Completed | Application - Maintenance of existing structures or assets | East Anglia Zone - Met Mast 1B - Operations & Maintenance | EA1_MetMast_1B | East Anglia Offshore Wind Limited | 19 Jul 2017 | 19 Jul 2017 |
MLA/2017/00283 - Completed | Application - Construction of new works | Cliffe Jetty Upgrade | Cliffe Upgrade | Brett Aggregates Limited | 19 Jul 2017 | 30 Jul 2020 |
MLA/2017/00284 - Completed | Application - Construction of new works | Floating Pontoon, Coast Road, West Mersea | floating Pontoon | Colchester Bc | 21 Jul 2017 | 01 Nov 2017 |
MLA/2017/00285 - Completed | Application - Maintenance of existing structures or assets | Folkestone Warren Concrete Apron Repairs | Area A, Area B | Bam Nuttall Limited | 28 Jul 2017 | 28 Jul 2017 |
MLA/2017/00286 - Completed | Application - Maintenance of existing works, Other deposits, Other removals, Other works | Ramsgate Flood and Coast Protection Scheme | Raising height of groyne, Sea wall refacing site A, Sea wall refacing site B, Sand deposition site, Sand removal site | Thanet Dc | 24 Jul 2017 | 01 Nov 2018 |
MLA/2017/00287/1 - Completed | Application - Maintenance of existing works | Portobello WTW Groyne Repair | Portobello_Groyne_Repair | Southern Water | 24 Jul 2017 | 05 Mar 2018 |
MLA/2017/00288 - Completed | Application - Minor removals | Anchor chain removal under Burbo Bank Extension Cable Protection | BBW02_Anchor_Chain_Location_20170725 | Dong Energy Burbo Extension Holding Ltd | 25 Jul 2017 | 25 Jul 2017 |
MLA/2017/00289/1 - Completed | Application - Construction of new works | Newquay North Peir | Newquay North Peir | Tms Maritime Ltd | 26 Jul 2017 | 14 Nov 2018 |
MLA/2017/00290 - Completed | Application - Maintenance of existing structures or assets | Langness sea defence repairs | Langness Sea Defences | Mr Michael Atkin | 26 Jul 2017 | 26 Jul 2017 |
MLA/2017/00291 - Completed | Application - Construction of new works, Maintenance of existing works | Runswick Bay Coastal Improvement Scheme | Runswick Bay | Jba Consulting Limited | 26 Jul 2017 | 11 Dec 2017 |
MLA/2017/00294 - Completed | Application - Non-navigational clearance dredging | 2017/18 Tidal Outfall Channel Desilt | Horsebridge Dyke, Main Dyke / Skippool Creek, Hackensall, Burrows, Broadfleet | Environment Agency | 27 Jul 2017 | 27 Jul 2017 |
MLA/2017/00296 - Completed | Application - Construction of new works | St. Mary's Island - Causeway and Drainage Repair and Upgrade | St Mary's Lighthouse and Causeway | North Tyneside Council | 28 Jul 2017 | 30 Aug 2018 |
MLA/2017/00297/6 - Completed | Application - Construction of new works, Decommissioning of works, Navigational dredging (capital) | Boston Barrier Tidal Project | Tidal Flood Barrier, Wet Dock, Temporary Witham Sailing Club slipway, Right Bank, Dredging, Wooden Quay Structure on Right Bank | Environment Agency | 28 Jul 2017 | 21 Nov 2022 |
MLA/2017/00298 - Completed | Application - Maintenance of existing structures or assets | North Kent Revetment works | EA_NorthKentRevetmentWorks | Environment Agency | 31 Jul 2017 | 31 Jul 2017 |
MLA/2017/00300 - Completed | Application - Marine licence for the burial of human remains at sea | NEEDLES (WI090) | Mr Charles Lister | 01 Aug 2017 | 01 Aug 2017 | |
MLA/2017/00301 - Completed | Application - Construction of new works, Maintenance of existing works | CONSTRUCTION OF NEW INLET AND IMPROVEMENTS TO EXISTING OUTLET – ALPHA LAKE, CLIFFE, NEAR ROCHESTER, KENT | Alpha Lake - Approximate Location of Refurbished Outlet, Alpha Lake - Approximate Location of New Inlet | Brett Aggregates Limited | 01 Aug 2017 | 20 Feb 2018 |
MLA/2017/00303 - Completed | Application - Sampling | Liverpool Cruise Liner Terminal Ground Investigation | Proposed Liverpool Cruise Liner Terminal | Liverpool City Council | 02 Aug 2017 | 16 Mar 2018 |
MLA/2017/00304 - Completed | Application - Maintenance of existing structures or assets | Chancellors Wharf Repairs | Chancellors Wharf | Moore Project Management Solutions Llp | 02 Aug 2017 | 02 Aug 2017 |
MLA/2017/00305 - Completed | Application - Maintenance of existing structures or assets | Worthing Wallace Avenue Outfall repair | Worthing Wallace Avenue | Beasley Christopher Limited | 03 Aug 2017 | 03 Aug 2017 |
MLA/2017/00306 - Completed | Application - Maintenance of existing structures or assets | Mumford Mills | Mumford Mills, Greenwich High Road, SE10 8ND | Pride Scaffolding Limited | 04 Aug 2017 | 04 Aug 2017 |
MLA/2017/00308 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Trafalgar Wharf Approach Channel | Trafalgar Wharf Approach, NAB TOWER (WI060), HURST FORT (WI080) | Trafalgar Wharf Limited | 04 Aug 2017 | 05 Dec 2017 |
MLA/2017/00309 - Completed | Application - Other works | Steps-24 Passage Street, Fowey | New steps at 24 ,Passage Street, Fowey.PL23 1DE | Mr Graham Arturi | 06 Aug 2017 | 18 Oct 2017 |
MLA/2017/00310 - Completed | Application - Maintenance of existing structures or assets | Melville Road Grille | Melville Road Southsea Portsmouuth | Beasley Christopher Limited | 07 Aug 2017 | 07 Aug 2017 |
MLA/2017/00311 - Completed | Application - Maintenance of existing structures or assets | Hawkshead, Falmouth | Hawkshead, Falmouth | Mr Luke Kelland | 07 Aug 2017 | 07 Aug 2017 |
MLA/2017/00312/1 - Completed | Application - Clean-up dredging | Keadby Power Station Intake & Outfall Dredging | Keadby outflow dredging, River Trent | Keadby Generation Limited | 08 Aug 2017 | 02 Jun 2021 |
MLA/2017/00313 - Completed | Application - Marine licence for the burial of human remains at sea | NEWHAVEN (WI011) | Arthur C. Towner Limited | 08 Aug 2017 | 08 Aug 2017 | |
MLA/2017/00314 - Completed | Application - Construction of new works | Hampton to Bishopstone Coast Protection Works 2017 | East Cliff Site | Canterbury City Council | 08 Aug 2017 | 28 Mar 2018 |
MLA/2017/00315 - Completed | Application - Maintenance of existing structures or assets | Trinity Buoy Wharf - Wall Repairs | Trinity Buoy Wharf | Urban Space Management (Tbw) Limited | 08 Aug 2017 | 08 Aug 2017 |
MLA/2017/00316/1 - Completed | Application - Construction of new works | Kemsley Generating Station Outfall | Surface Water Outfall Construction & Operation | K3 Chp Ltd | 08 Aug 2017 | 10 May 2019 |
MLA/2017/00317/6 - Completed | Application - Other removals | East Anglia ONE Unexploded Ordnance Clearance | East Anglia ONE Unexploded Ordnance Clearance area | East Anglia One Limited | 09 Aug 2017 | 13 Nov 2018 |
MLA/2017/00318 - Completed | Application - Maintenance of existing structures or assets | DM Plymouth Jetty | DM Plymouth | Kelda Limited | 10 Aug 2017 | 10 Aug 2017 |
MLA/2017/00319 - Completed | Application - Maintenance of existing structures or assets | London Eye Pier Brow Bearing Replacement | London Eye Brows | London Eye Management Services Limited | 14 Aug 2017 | 14 Aug 2017 |
MLA/2017/00320/1 - Completed | Application - Sampling | Town Quay SPS, Fowey Harbour Ground Investigation | Borehole 1, Borehole 2 | South West Water Limited | 15 Aug 2017 | 13 Oct 2017 |
MLA/2017/00321 - Completed | Application - Maintenance of existing structures or assets | Landcross Viaduct Revetment Repair | Landcross Viaduct North Revetment | Devon County Council | 15 Aug 2017 | 15 Aug 2017 |
MLA/2017/00322 - Completed | Application - Maintenance of existing structures or assets | Maintenance of Rock armour at Polkirt Beach Portmellon Mevagissey PL26 6PH | polygons_magic | Mr Peter Bowker | 15 Aug 2017 | 15 Aug 2017 |
MLA/2017/00323 - Completed | Application - Maintenance of existing structures or assets | Replacement of Willway Street/Malago Outfall Tidal Flap | Willway Street/Malago Culvert Outlet | Kaymac Marine & Civil Engineering Limited | 15 Aug 2017 | 15 Aug 2017 |
MLA/2017/00324 - Withdrawn | Application - Construction of new works | Dover Harbour - Port Vessel Unit Relocation | PVU Relocation | Dover Harbour Board | 15 Aug 2017 | |
MLA/2017/00325 - Completed | Application - Construction of new works | Budleigh Outfall East Extension | Outfall Extension revB | East Devon District Council | 15 Aug 2017 | 01 Nov 2017 |
MLA/2017/00326 - Completed | Application - Maintenance of existing structures or assets | St Hildas Wharf | St Hilda's Wharf scaffolding site | Beckford Contractors Limited | 16 Aug 2017 | 16 Aug 2017 |
MLA/2017/00327 - Completed | Application - Maintenance of existing works | Newtown Harbour Wall Repair | Newtown Harbour Stone Wall, Newtown Harbour Pine Wall | National Trust Plc | 16 Aug 2017 | 28 Mar 2018 |
MLA/2017/00328/3 - Completed | Application - Construction of new works | Red Earth Developments, Yealm surface water discharge. | The River Yealm Hotel Jetty | Red Earth Developments Ltd | 17 Aug 2017 | 08 Nov 2018 |
MLA/2017/00329 - Completed | Application - Maintenance of existing structures or assets | QinetiQ Weymouth and Portland ranges maintenance and repair SS | Bincleaves MOSR range, Grove Point Acoustic Noise Range | Qinetiq Limited | 17 Aug 2017 | 17 Aug 2017 |
MLA/2017/00330 - Completed | Application - Alternative use of dredged material, Other works | Managed Breach of Shingle Spit at Pagham | Pagham Breach, Tern Island Compensation Habitat | Pagham Flood Defence Community Interest Company | 18 Aug 2017 | 01 Sep 2017 |
MLA/2017/00331 - Completed | Application - Maintenance of existing structures or assets | B123 Clamerkin Bridge Strengthening | Clamerkin | Ringway Island Roads Limited | 18 Aug 2017 | 18 Aug 2017 |
MLA/2017/00332 - Completed | Application - Other deposits | Heysham North Quay Wall emergency stabilisation | Heysham Emergency Rock Placement | Peel Ports Limited | 18 Aug 2017 | 04 Oct 2017 |
MLA/2017/00333/2 - Completed | Application - Maintenance of existing works | Race Bank Transmission Assets - Operational and Maintenance activities over the lifetime of the windfarm Grouped under: Race Bank Offshore Wind Farm Showing 3 of 11 cases | Race Bank Offshore Wind Farm Offshore transmission assets | Dong Energy Rb (Uk) Limited | 18 Aug 2017 | 31 Mar 2023 |
MLA/2017/00334/2 - Completed | Application - Maintenance of existing works | Race Bank Operational and Maintenance activities over the lifetime of the windfarm Grouped under: Race Bank Offshore Wind Farm Showing 3 of 11 cases | Race Bank Offshore Wind Farm Array | Dong Energy Rb (Uk) Limited | 18 Aug 2017 | 07 Feb 2022 |
MLA/2017/00335 - Completed | Application - Construction of new works | Wicormarine connecting pontoon | Wicormarine | Wicormarine Limited | 22 Aug 2017 | 21 Dec 2017 |
MLA/2017/00336 - Completed | Application - Maintenance of existing structures or assets | Fixing Leaks To Arun View Pub Riverside Windows | Polygon | Environment Agency | 23 Aug 2017 | 23 Aug 2017 |
MLA/2017/00338 - Completed | Application - Maintenance of existing works | Interconnexion France-Angleterre (IFA) 2000 Urgent Remedial Works | IFA2000 Cables 11 & 12, IFA2000 Cables 33 & 34 | Reseau De Transport Delectricite | 24 Aug 2017 | 11 Sep 2017 |
MLA/2017/00340 - Completed | Application - Maintenance of existing structures or assets | Tideway - Cemex Jetty Eastern Dolphin Walkway Replacement | Cemex Jetty - Eastern Dolphin Walkway Replacement | Laing O'Rourke Construction Limited | 25 Aug 2017 | 25 Aug 2017 |
MLA/2017/00341 - Completed | Application - Maintenance of existing structures or assets | Ropehawn rock armour repair | Trenarren Sea Defence | Mr Chris Casey | 25 Aug 2017 | 25 Aug 2017 |
MLA/2017/00342 - Completed | Application - Other works | Marine Based Ground Investigation | L36 - Inner Harbour, Lowestoft: BHD01, L36 - Inner Harbour, Lowestoft: BHD02, L36 - Inner Harbour, Lowestoft: BHD03, L36 - Inner Harbour, Lowestoft: BHD04, L36 - Inner Harbour, Lowestoft: BHD05, L36 - Inner Harbour, Lowestoft: BHD06, L36 - Inner Harbour, Lowestoft: BHD07 | Geosphere Environmental Limited | 29 Aug 2017 | 16 Sep 2019 |
MLA/2017/00343 - Completed | Application - Other works | Greenwich Pier Refurbishment | polygons_magic | Cfu | 29 Aug 2017 | 17 Nov 2017 |
MLA/2017/00344 - Completed | Application - Maintenance of existing structures or assets | Fort Bovisand Repairs to Pier Wall | Fort Bovisand Piers | Powder Creek Limited | 19 Sep 2017 | 19 Sep 2017 |
MLA/2017/00345/1 - Completed | Application - Sampling | Isle of Man Marine Ground Investigation | Isle of Man Ferry Terminal Marine GI mersey side, Isle of Man Ferry Terminal Marine GI Dock Side | Isle Of Man Government | 29 Aug 2017 | 23 May 2018 |
MLA/2017/00346 - Completed | Application - Maintenance of existing works | Arundel River Wall Maintenance | B. River Rd Car Park, C. Town Quay, D. Maison Dieu, E. Jubilee Gardens South, A. Public Gardens | Arun District Council | 30 Aug 2017 | 05 Dec 2017 |
MLA/2017/00347 - Completed | Application - Maintenance of existing works | Foulton Hall Pile Repair Works near Little Oakley, Essex | Foulton Hall | Jacksonhyder | 30 Aug 2017 | 15 Dec 2017 |
MLA/2017/00348 - Completed | Application - Minor removals | Beerwick Harbour - Ground Investigation | Berwick Harbour - GI behind alignment structure | Berwick Harbour Commission | 30 Aug 2017 | 30 Aug 2017 |
MLA/2017/00349/5 - Completed | Application - Disposal of dredged material, Other deposits, Other removals, Other works | Port of Sunderland - Tall Ships Event | SUNDERLAND (TY090), Pontoon a, Pontoon b, Pontoon c, Pontoon d, Mooring removal | Port Of Sunderland | 31 Aug 2017 | 21 Nov 2018 |
MLA/2017/00351 - Completed | Application - Construction of new works, Decommissioning of works, Navigational dredging (capital) | Woolwich Ferry Life Extension | DLM7500 Project Area | Bam Nuttall Limited | 31 Aug 2017 | 01 Mar 2018 |
MLA/2017/00352/2 - Completed | Application - Construction of new works, Other deposits, Other removals, Other works | Whitby Piers Refurbishment | East Pier, West Pier | Scarborough Borough Counicl | 31 Aug 2017 | 08 Mar 2019 |
MLA/2017/00353 - Completed | Application - Deposit of markers | Replacement of Range Danger signage and Beacons at Donna Nook Air Weapons Range | DonnaNook | Landmarc Support Services Limited | 31 Aug 2017 | 31 Aug 2017 |
MLA/2017/00354 - Completed | Application - Maintenance of existing works | Plaistow Wharf: River Wall Works | Works Area Plaistow Wharf | Port Of London Authority & Brett Aggregates Ltd | 31 Aug 2017 | 20 Feb 2018 |
MLA/2017/00355 - Completed | Application - Maintenance of existing structures or assets | Poole Quay Boat Haven pontoon refurbishment ('A' Pier only) | A Pier | Poole Harbour Commissioners | 01 Sep 2017 | 01 Sep 2017 |
MLA/2017/00356 - Completed | Application - Maintenance of existing structures or assets | WTG D01 MB Exchange | Sheringham Shoal Wind Farm WTG D01 | Mr Gavin Graham | 05 Sep 2017 | 05 Sep 2017 |
MLA/2017/00357/3 - Completed | Application - Other works | Millbay Quay Wall Repairs | Quay wall works | Associated British Ports. | 06 Sep 2017 | 19 Dec 2019 |
MLA/2017/00358 - Completed | Application - Marine licence for the burial of human remains at sea | NEWHAVEN (WI011) | Sullivan & Son | 06 Sep 2017 | 06 Sep 2017 | |
MLA/2017/00359 - Completed | Application - Maintenance of existing structures or assets | Water Sonde Guard Tube | Water_Sonde_Guard_Tube_Site_Location | Bournemouth Borough Council | 07 Sep 2017 | 07 Sep 2017 |
MLA/2017/00360 - Completed | Application - Maintenance of existing works | Plymouth Magnetics Ranges maintenance | Pier Cellars range, Eastern Kings range | Quintiq Ltd | 07 Sep 2017 | 07 Dec 2017 |
MLA/2017/00361 - Completed | Application - Minor removals | Noss Marina, Bridge Rd, Kingswear, Dartmouth TQ6 0EA | Noss Boreholes | Soils Limited | 08 Sep 2017 | 08 Sep 2017 |
MLA/2017/00362 - Completed | Application - Maintenance of existing structures or assets | Truro Tide Gate Sheet Pile Painting | Truro Tide Gate Sheet Piles | The Environment Agency | 08 Sep 2017 | 08 Sep 2017 |
MLA/2017/00363/1 - Completed | Application - Construction of new works | Offshore Accommodation Jack Up Platforms | HOW01 Substation Jack Up Zones_Z01, HOW01 Substation Jack Up Zones_Z13, HOW01 Substation Jack Up Zones_Z12, HOW01 Substation Jack Up Zones_Z11 | Heron Wind Limited | 11 Sep 2017 | 11 Jul 2018 |
MLA/2017/00364 - Completed | Application - Maintenance of existing works | A590 Jubilee Bridge Waterproofing Works | A590 Jubilee Bridge | Cumbria County Council | 11 Sep 2017 | 12 Dec 2017 |
MLA/2017/00365 - Completed | Application - Minor removals | Archaeological Services in Relation to Marine Protection (Historic England) - Tankerton Beach Wreck | Tankerton Wreck Site | Wessex Archaeology Limited | 12 Sep 2017 | 12 Sep 2017 |
MLA/2017/00366 - Completed | Application - Maintenance of existing structures or assets | Grille Installation Marine Parade Worthing | Marine Parade Worthing | Beasley Christopher Limited | 13 Sep 2017 | 13 Sep 2017 |
MLA/2017/00367 - Completed | Application - Maintenance of existing structures or assets | Coverack North Sea Wall | Coverack North Sea Wall | Cormac Solutions Limited | 13 Sep 2017 | 13 Sep 2017 |
MLA/2017/00369 - Completed | Application - Maintenance of existing works | Watermark Place Campshed Remediation | Watermark Place Campshed Remediation | Clarkebond Uk Ltd | 13 Sep 2017 | 22 Dec 2017 |
MLA/2017/00370/2 - Completed | Application - Other removals | East Anglia ONE Boulder Clearance & Redundant Cable Removal Marine Licence Application | East Anglia ONE Boulder Clearance and Redundant Cable Removal Area | East Anglia One Ltd | 14 Sep 2017 | 04 Dec 2019 |
MLA/2017/00371 - Completed | Application - Disposal of dredged material | East Anglia ONE Export Cable Disposal Licence | EC-1 (TH220), EC-5 (TH224), EC-4 (TH223), EC-3 (TH222), EC-2 (TH221) | East Anglia One Limited | 14 Sep 2017 | 02 Aug 2018 |
MLA/2017/00372 - Completed | Application - Maintenance of existing structures or assets | Slipway maintenance | Falmouth BoatCo slipway | Falmouth Boat Construction Limited | 14 Sep 2017 | 14 Sep 2017 |
MLA/2017/00373 - Completed | Application - Maintenance of existing works | Surface Water Outfall Remedial works | Battersea Reach | St. George Developments | 14 Sep 2017 | 14 Dec 2018 |
MLA/2017/00374 - Completed | Application - Other works | Port Solent Pontoon Piers A-E Reconfiguration | Port Solent: Pontoons A-E Rearrangement | Premier Marinas (Solent) | 15 Sep 2017 | 28 Nov 2017 |
MLA/2017/00375 - Completed | Application - Construction of new works | Lymington Yacht Haven - Replacement Pontoon Mooring Piles | Lymington Yacht Haven | Lymington Yacht Haven Limited | 15 Sep 2017 | 22 Nov 2017 |
MLA/2017/00376 - Completed | Application - Construction of new works | Construction of three 12 m long groynes, removal of redudant steel groyne | 27 Paddock Drive | Mr M Woodford | 18 Sep 2017 | 22 Jan 2018 |
MLA/2017/00377/3 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Maintenance dredging, Ryde Harbour, Isle of Wight | Harbour entrance, Disposal site north of car park | Isle Of Wight Council | 18 Sep 2017 | 19 Feb 2024 |
MLA/2017/00378 - Completed | Application - Maintenance of existing structures or assets | CN1601442 - Furniss Island Bridge Repair | Enys Quay Footbridge | Cormac Solutions Limited | 19 Sep 2017 | 19 Sep 2017 |
MLA/2017/00379/1 - Completed | Application - Maintenance of existing works, Other deposits | Blyth Offshore Demonstrator Project O&M Marine Licence | Array 2, Export Cable | Blyth Offshore Demonstrator Ltd | 18 Sep 2017 | 06 Dec 2022 |
MLA/2017/00380 - Completed | Application - Maintenance of existing structures or assets | Thanet Offshore Wind Blade Exchange | G11 | Thanet Offshore Wind Limited | 18 Sep 2017 | 18 Sep 2017 |
MLA/2017/00381 - Completed | Application - Non-navigational clearance dredging | Archaeological inspections and diving on the wreck site of the Mary Rose (1545) | Mary Rose Wreck Site | Mary Rose Trust(The) | 19 Sep 2017 | 19 Sep 2017 |
MLA/2017/00382 - Completed | Application - Maintenance of existing structures or assets | Lyndale Bridge - Minor Maintenance works | Lyndale Bridge | Jacobs Engineering Uk Limited | 20 Sep 2017 | 20 Sep 2017 |
MLA/2017/00383 - Completed | Application - Other works | Extension to Burnham on Crouch Town Pontoon | Burnham Town Pontoon extension area | Maldon District Council | 20 Sep 2017 | 06 Aug 2018 |
MLA/2017/00384/1 - Completed | Application - Alternative use of dredged material | Pevensey Bay Sea Defences PPP | Pevensey Beach Replenishment, Pevensey Sand Reuse | Pevensey Coastal Defence Limited | 20 Sep 2017 | 19 Mar 2018 |
MLA/2017/00385 - Withdrawn | Application - Maintenance of existing works | Slipway enhancement & works to sea wall at FORMER BAYLYS YARD, BAYLYS ROAD ORESTON PLYMOUTH PL9 7NQ | J Boston & Sons Holdings | 22 Sep 2017 | ||
MLA/2017/00386/2 - Completed | Application - Other deposits | Seaweed and Mussel aquaculture off the Yorkshire Coast | Seaweed aquaculture site | Seagrown | 23 Sep 2017 | 03 Mar 2023 |
MLA/2017/00387 - Completed | Application - Maintenance of existing structures or assets | Fremington Viaduct - Revetment Repairs | Fremington Viaduct Revetments | Devon County Council | 25 Sep 2017 | 25 Sep 2017 |
MLA/2017/00389 - Completed | Application - Maintenance of existing structures or assets | Deptford creek wall Faircharm Industrial Estate | Faircharm Estate | Wph Limited | 25 Sep 2017 | 25 Sep 2017 |
MLA/2017/00390 - Completed | Application - Maintenance of existing structures or assets | Kentish Flats Wind Farm Gearbox Exchange | WTG B04 | Amec Wind Energy Limited | 25 Sep 2017 | 25 Sep 2017 |
MLA/2017/00391/1 - Completed | Application - Maintenance of existing works | Millbrook Tidal Barrier | LocationBoundary | Environment Agency – South West Reg | 25 Sep 2017 | 10 Oct 2018 |
MLA/2017/00393/1 - Completed | Application - Maintenance of existing works | Network Rail - Brantsy to Parton | Bransty | Network Rail Limited | 27 Sep 2017 | 07 May 2020 |
MLA/2017/00395/3 - Completed | Application - Construction of new works | Quay 1 Extension | Quay 1 Extension | Able Uk Limited | 28 Sep 2017 | 11 Jan 2021 |
MLA/2017/00396 - Completed | Application - Minor removals | Trial pits at Southern Water Outfall | Trial Pits, Trial pits 2 | E.On Climate & Renewables Uk Rampion Offshore Wind Limited | 04 Oct 2017 | 04 Oct 2017 |
MLA/2017/00397 - Completed | Application - Maintenance of existing structures or assets | Kenwith Pump Station - Scaffolding | Kenwith Pumping Station | Environment Agency | 29 Sep 2017 | 29 Sep 2017 |
MLA/2017/00398/1 - Completed | Application - Disposal of dredged material | Marchwood Yacht Club - Dredge Inner Pontoon Area | HURST FORT (WI080) | Marchwood Yacht Club | 29 Sep 2017 | 25 Jul 2018 |
MLA/2017/00399 - Completed | Application - Construction of new works | Replacement of removed jetty with walkway and pontoons | Five Oaks pontoon | Mrs Fay Class | 02 Oct 2017 | 26 Jan 2018 |
MLA/2017/00400 - Withdrawn | Application - Maintenance of existing works | Greenwich River Wall | Rsk Environment Ltd | 04 Oct 2017 | ||
MLA/2017/00401 - Completed | Application - Maintenance of existing structures or assets | Eastcliff Sea Defence Wall | Eastcliff Sea Defence Wall | Teignbridge District Council | 05 Oct 2017 | 05 Oct 2017 |
MLA/2017/00402 - Completed | Application - Maintenance of existing structures or assets | Towan Beach steps | Towan Beach steps | Cormac Solutions Limited | 05 Oct 2017 | 05 Oct 2017 |
MLA/2017/00404/1 - Completed | Application - Maintenance of existing works | Rochester Bridge Trust Combined Bridge Refurbishment | Rochester Bridge Trust CBR Site | Rocherster Bridge Trust | 06 Oct 2017 | 20 Jul 2020 |
MLA/2017/00405 - Completed | Application - Maintenance of existing structures or assets | Canary Wharf Pier Access Brow Repainting and Repair | Canary Wharf Pier | Canary Wharf Management Limited | 06 Oct 2017 | 06 Oct 2017 |
MLA/2017/00406 - Completed | Application - Maintenance of existing structures or assets | A27 Farlington Marshes Broadmarsh Revetment Repairs | Revetment Repairs | Enterprisemouchel Limited | 06 Oct 2017 | 06 Oct 2017 |
MLA/2017/00407/1 - Completed | Application - Maintenance of existing structures or assets | Rye Cricket Salts - Re-paint | Rye Cricket Salts | Beasley Christopher Limited | 07 Oct 2017 | 10 Oct 2017 |
MLA/2017/00408/1 - Completed | Application - Maintenance of existing structures or assets | Rottingdean, Brighton - Re-paint | Rottingdean, Brighton | Beasley Christopher Limited | 08 Oct 2017 | 10 Oct 2017 |
MLA/2017/00409/3 - Variation Requested | Application - Maintenance of existing works, Other deposits | Teesside Offshore Wind Farm Ltd O&M Marine Licence | Teesside Offshore Wind Farm, Export Cable Area, Pontoon | Teesside Windfarm Limited | 09 Oct 2017 | 12 Dec 2023 |
MLA/2017/00410 - Completed | Application - Maintenance of existing structures or assets | Replace 600mm outfall flap on the beach | Seaview | Southern Water Limited | 09 Oct 2017 | 09 Oct 2017 |
MLA/2017/00411 - Withdrawn | Application - Maintenance of existing works | Newbridge Point Development, Holes Bay, Poole - quay wall work that is part of a residential development of a former power station site | Gallagher Estates | 10 Oct 2017 | ||
MLA/2017/00412 - Completed | Application - Maintenance of existing structures or assets | Scrapesgate | polygons_magic | Beasley Christopher Limited | 10 Oct 2017 | 10 Oct 2017 |
MLA/2017/00413/1 - Completed | Application - Construction of new works | Portland Marina Pontoons | Fender Pile, Main Area | Dean & Reddyhoff Limited | 12 Oct 2017 | 19 Feb 2024 |
MLA/2017/00414 - Completed | Application - Minor removals | santagata | santagata | Mr Nigel Ingram | 12 Oct 2017 | 12 Oct 2017 |
MLA/2017/00415 - Completed | Application - Construction of new works | The Green House, Bridgend, Newton Ferrers, Devon, PL8 1AW - Proposed jetty and boat house | The Green House, Bridgend, Newton Ferrers, Devon, PL8 1AW | Mr Andrew Beveridge | 12 Oct 2017 | 18 Jan 2018 |
MLA/2017/00416 - Completed | Application - Maintenance of existing structures or assets | Fremington Viaduct and Rock Park Bridge Defect Painting | Fremington Viaduct, Rock Park Bridge | Devon County Council | 12 Oct 2017 | 12 Oct 2017 |
MLA/2017/00417 - Completed | Application - Maintenance of existing structures or assets | Gateshead Millennium Bridge; Glass Canopies; Re-sealing of Gaps | South End Support | Gateshead Council | 12 Oct 2017 | 12 Oct 2017 |
MLA/2017/00418 - Completed | Application - Maintenance of existing structures or assets | Hillgate Quay Refurbishment | Timber Suspended Structure | Gateshead Council | 12 Oct 2017 | 12 Oct 2017 |
MLA/2017/00419 - Completed | Application - Maintenance of existing works | Sheet Pile Wall and Slipway Maintenance Works | Slipway, Sheet Pile Wall | Constructex Ltd | 13 Oct 2017 | 03 Oct 2018 |
MLA/2017/00420 - Completed | Application - Maintenance of existing structures or assets | Bognor Regis - Opposite Steyne Gardens | polygons_magic | Beasley Christopher Limited | 13 Oct 2017 | 13 Oct 2017 |
MLA/2017/00421 - Completed | Application - Maintenance of existing structures or assets | Bognor Regis - Marine Drive West | Marine Drive West - Bognor Regis | Beasley Christopher Limited | 13 Oct 2017 | 13 Oct 2017 |
MLA/2017/00422 - Completed | Application - Maintenance of existing structures or assets | Bridge View Egloshayle Wadebridge | Headwall Bridge view Egloshayle | Nijhuis H2ok Limited | 13 Oct 2017 | 13 Oct 2017 |
MLA/2017/00423 - Completed | Application - Maintenance of existing structures or assets | Topsham Lock sand bag dam silt removal and investigation | Topsham Lock | Devon County Council | 13 Oct 2017 | 13 Oct 2017 |
MLA/2017/00424 - Completed | Application - Maintenance of existing structures or assets | Hayling Seagroce | Hayling Seagrove | Beasley Christopher Limited | 14 Oct 2017 | 14 Oct 2017 |
MLA/2017/00425 - Completed | Application - Maintenance of existing structures or assets | Shoreham Albion St Inner | Shoreham Albion St - Inner | Beasley Christopher Limited | 14 Oct 2017 | 14 Oct 2017 |
MLA/2017/00426 - Completed | Application - Construction of new works | Admiralty Pier - Shotley Marina, Ipswich IP9 1QJ | Admiralty Pier | Shotley Marina Limited | 16 Oct 2017 | 21 Dec 2017 |
MLA/2017/00427 - Completed | Application - Construction of new works | Kew Bridge Remedial Works | St. George Developments Limited | 17 Oct 2017 | 18 Dec 2018 | |
MLA/2017/00428 - Completed | Application - Marine licence for the burial of human remains at sea | NEWHAVEN (WI011) | H.D.Tribe Limited | 17 Oct 2017 | 17 Oct 2017 | |
MLA/2017/00429/1 - Completed | Application - Maintenance of existing works | Walney 2 Offshore Wind Farm, Composite Operational and Maintence (O&M) Marine Licence Application | WOWO02 Cable Route | Blue Transmission Walney 2 Limited | 17 Oct 2017 | 23 Jul 2018 |
MLA/2017/00430 - Completed | Application - Maintenance of existing structures or assets | Sheringham Beach Road Beach Access Ramp Remedial Works | sheringham beach road ramp | North Norfolk District Council | 18 Oct 2017 | 18 Oct 2017 |
MLA/2017/00431/1 - Completed | Application - Non-navigational clearance dredging | Clearing accumulated mud and silt from the slipway at Rolle Quay, Barnstaple, Devon | Role Quay Slipway | Barnstaple Pilot Gig Club Cio | 18 Oct 2017 | 05 Mar 2018 |
MLA/2017/00433 - Completed | Application - Maintenance of existing works | Marine Drive SPS Torpoint, Maintenance works to outfall | Marine Drive Outfall | R&M Utility & Civil Engineering Services South West Limited | 19 Oct 2017 | 30 Jan 2018 |
MLA/2017/00434 - Completed | Application - Maintenance of existing structures or assets | Janes Creek Flap Valve Repairs | polygons_magic | Beasley Christopher Limited | 20 Oct 2017 | 20 Oct 2017 |
MLA/2017/00435 - Completed | Application - Maintenance of existing structures or assets | Restoration of saltmarsh preservation system | ORFORD QUAY WEST | Alde And Ore Enterprise Partnership | 22 Oct 2017 | 22 Oct 2017 |
MLA/2017/00436 - Completed | Application - Navigational dredging (maintenance) | Marina maintenance dredging | Arun Yacht Club marina moorings | Arun Yacht Club Limited(The) | 22 Oct 2017 | 08 Feb 2018 |
MLA/2017/00437/1 - Completed | Application - Construction of new works, Decommissioning of works | Wolferton Pumping Station | Wolferton Pumping Station site | Water Level Management Alliance Limited | 23 Oct 2017 | 20 Sep 2018 |
MLA/2017/00438 - Completed | Application - Maintenance of existing structures or assets | Chelsea marina river bank repairs | Chelsea marina | F M Conway Limited | 23 Oct 2017 | 23 Oct 2017 |
MLA/2017/00440 - Completed | Application - Other works | Modification of an existing sluice on Roach Estuary, Essex (to deliver Cells 2 and 4 of the RSPB's ongoing Wallasea Island Wild Coast Project) | Wallasea Old Pool Sluice | Rspb Sales Limited | 23 Oct 2017 | 13 Feb 2018 |
MLA/2017/00441 - Completed | Application - Non-navigational clearance dredging | Topsham Lock sand bag dam silt removal and investigation dredging in non navigation channel | Topsham Lock | Devon County Council | 24 Oct 2017 | 24 Oct 2017 |
MLA/2017/00442 - Completed | Application - Other removals | Odessa Wharf | Odessa Wharf | Hollybrook Limited | 24 Oct 2017 | 20 Dec 2017 |
MLA/2017/00443 - Completed | Application - Maintenance of existing structures or assets | Dawlish, Teignmouth and Exe estuary seawall repairs | Dawlish, Teignmouth and Exe estuary seawall | Dyer And Butler Limited | 25 Oct 2017 | 25 Oct 2017 |
MLA/2017/00444 - Completed | Application - Maintenance of existing structures or assets | Highshore House New Bridge Street Truro TR1 2AA | Highshore House | Park Green Investments Limited | 26 Oct 2017 | 26 Oct 2017 |
MLA/2017/00446 - Completed | Application - Maintenance of existing works | River Esk Pitching Up Line | River Esk Pitching | Network Rail Ltd | 27 Oct 2017 | 21 Aug 2019 |
MLA/2017/00447 - Completed | Application - Maintenance of existing structures or assets | Bexhill - Beaulieu Rd | Bexhill - Beaulieu Rd | Beasley Christopher Limited | 30 Oct 2017 | 30 Oct 2017 |
MLA/2017/00448/1 - Completed | Application - Construction of new works, Other dredging | Wandsworth Riverside Quarter Pier Extension | WRQ Pier Extension | Frasers Riverside Quarter Ltd | 30 Oct 2017 | 06 Dec 2018 |
MLA/2017/00449 - Completed | Application - Maintenance of existing structures or assets | C405/CARRR/ENV/MMO/006 CARRR RW 922 Strengthening | RW 922 Strengthening works | Peter Brett Associates Llp | 31 Oct 2017 | 31 Oct 2017 |
MLA/2017/00450/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Cattewater Harbour disposal of maintenance dredged material: 10 year licence | Plymouth Deep (PL035) | Cattewater Harbour Commissioners | 01 Nov 2017 | 22 Aug 2023 |
MLA/2017/00451 - Completed | Application - Construction of new works | Emergency action to provide a protective barrier around a designated monument at Hamble Point. | Hamble Gun Emplacement | Eastleigh Borough Cl | 06 Nov 2017 | 08 Nov 2017 |
MLA/2017/00452 - Completed | Application - Maintenance of existing structures or assets | Whitstable Yacht Club Slipway Repair | Area of the WYC Ramp | Whitstable Yacht Club | 06 Nov 2017 | 06 Nov 2017 |
MLA/2017/00453 - Completed | Application - Maintenance of existing works | Rumbling Bridge Remediation | Rumbling Bridge | Eric Wright Civil Engineering Limited | 06 Nov 2017 | 25 Jan 2018 |
MLA/2017/00454 - Completed | Application - Construction of new works | Eastchurch Saltmarsh Remediation | Eastchurch Saltmarsh | Five Rivers Envrionmental Contacting | 07 Nov 2017 | 30 Jan 2018 |
MLA/2017/00455 - Completed | Application - Maintenance of existing works | Horsey Island Flood defence repair | Horsey Island Culvert | Mr Mark Wyatt | 07 Nov 2017 | 10 Nov 2017 |
MLA/2017/00457/7 - Completed | Application - Construction of new works, Disposal of dredged material, Navigational dredging (capital), Other deposits, Other removals | East Sleekburn Enterprise Zone: Ash Barge Dock | Ash Barge Dock - Extent of All Works | Arch (Development Projects) Limited | 08 Nov 2017 | 28 Jun 2022 |
MLA/2017/00458/1 - Completed | Application - Disposal of dredged material, Navigational dredging (maintenance) | Penzance Harbour - Disposal of Dredged Spoil | MOUNTS BAY (PL100) | Cornwall Council -Harbour Office | 08 Nov 2017 | 28 Jul 2022 |
MLA/2017/00460 - Completed | Application - Maintenance of existing structures or assets | Greyhound Bridge | Greyhound Bridge | Lancashire County Council | 08 Nov 2017 | 08 Nov 2017 |
MLA/2017/00461/1 - Completed | Application - Construction of new works | Free Wharf, Shoreham-by-Sea | Free Wharf | Southern Housing Group | 09 Nov 2017 | 21 Feb 2020 |
MLA/2017/00462 - Completed | Application - Maintenance of existing structures or assets | scaffold to 3 new properties | Scaffolding at Spital Bridge, Whitby | R.S.D. Buildings Limited | 09 Nov 2017 | 09 Nov 2017 |
MLA/2017/00463 - Completed | Application - Maintenance of existing works | repairing of the Quay | LAMORNA QUAY WALL | Mr Roy Stevenson | 10 Nov 2017 | 16 Jan 2018 |
MLA/2017/00464 - Withdrawn | Application - Maintenance of existing works | The Stanners, Warkworth Pumping Station Protection | The Stanners Pumping Station | Northumbrian Water Group Ltd | 12 Nov 2017 | |
MLA/2017/00465 - Completed | Application - Maintenance of existing structures or assets | Bexhill - Clock Tower | Bexhill - Clock Tower | Beasley Christopher Limited | 13 Nov 2017 | 13 Nov 2017 |
MLA/2017/00467 - MLC/2017/00755 - Completed | Application - Maintenance of existing structures or assets | Aberthaw Power Station - River Thaw Pipe Bridge Repainting | Aberthaw Power Station River Thaw Pipe Bridge | Rwe Npower Plc | 17 Nov 2017 | 17 Nov 2017 |
MLA/2017/00468 - Completed | Application - Construction of new works, Other removals | Pontoon improvement works in Salcombe Harbour | Dentridge | Salcombe Harbour | 17 Nov 2017 | 26 Sep 2018 |
MLA/2017/00469 - Completed | Application - Construction of new works | Extension of existing quay with new slipway at Waterings Boatyard | Waterings Boatyard 3 | Mr Sam Heard | 17 Nov 2017 | 16 Apr 2018 |
MLA/2017/00470 - Completed | Application - Maintenance of existing structures or assets | Repairs to Sea Wall | Warsash Harbour Wall | Warsash Sailing Club | 20 Nov 2017 | 20 Nov 2017 |
MLA/2017/00471 - Completed | Application - Maintenance of existing structures or assets | Greenwich River Wall Remedial Works 2017 | Greenwich River Wall | Rsk Environment Limited | 20 Nov 2017 | 20 Nov 2017 |
MLA/2017/00472 - Completed | Application - Construction of new works | Bringing HM Bark Endeavour To Whitby | Endeavour Wharf, Whitby, North Yorkshire, YO21 1YN | Hm Bark Endeavour Ltd | 20 Nov 2017 | 13 Mar 2018 |
MLA/2017/00473/1 - Completed | Application - Minor removals | OPERATION SEASWEEP | ISLE OF WIGHT | Blue Seas Protection Charity | 20 Nov 2017 | 05 Apr 2018 |
MLA/2017/00474 - Completed | Application - Maintenance of existing works | Over water replacement of timber decking, support bearers & cladding of jetty / landing stage | The Moorings Jetty and Landing Stage | Richard Balding | 21 Nov 2017 | 08 Jun 2018 |
MLA/2017/00475 - Completed | Application - Minor removals | Borehole site investigation, Oxen Cove, Brixham | Oxen Cove, Brixham | Torbay Council | 21 Nov 2017 | 21 Nov 2017 |
MLA/2017/00476 - Completed | Application - Maintenance of existing works, Other deposits | Management of beach access points to help maintain provision of beach safety services | Summerleaze beach access, Widemouth stream access, Black Rock slipway, Trevone slipway access, Constantine slipway, Mawgan Porth slipway, Great Western slipway, Towan slipway, Fistral slipway, Crantock dune access, Crantock SLSB slipway, Trevaunance Cove slipway, Porthtowan slipway, Sennen slipway, Perranuthnoe slipway, Praa Sands slipway, Porthleven slipway, Seaton sandy slope | Cornwall Council | 22 Nov 2017 | 26 Apr 2018 |
MLA/2017/00477 - Completed | Application - Other works | Newton Ferrers Saline - Ship Inn outfall repairs | Newton Ferrers Saline work | Glanville Cleansing Limited | 22 Nov 2017 | 31 Jul 2019 |
MLA/2017/00478/5 - Variation Requested | Application - Disposal of dredged material, Navigational dredging (maintenance) | HMNB Portsmouth Maintenance Dredging and Disposal | HMNB Portsmouth maintenance dredging, NAB TOWER (WI060) | Defence Infrastructure Ogranisation | 23 Nov 2017 | 19 Apr 2022 |
MLA/2017/00480 - Completed | Application - Maintenance of existing structures or assets | CHINA HOUSE BALCONY SUPPORT WORK | polygons_magic | G. Oakley & Sons Ltd | 24 Nov 2017 | 24 Nov 2017 |
MLA/2017/00481 - Completed | Application - Maintenance of existing structures or assets | Kimberly Clark - Northfleet Jetty Repair Works | Northfleet Jetty | Kimberly - Clark Limited | 26 Nov 2017 | 26 Nov 2017 |
MLA/2017/00482 - Completed | Application - Minor removals | Recovery of historic anchors from Woodside Beach, Isle of Wight | Woodside beach | Dr Michael Beckett | 27 Nov 2017 | 27 Nov 2017 |
MLA/2017/00483 - Completed | Application - Maintenance of existing structures or assets | Lamorna cove | lamorna Quay | Mr Roy Stevenson | 27 Nov 2017 | 27 Nov 2017 |
MLA/2017/00484 - Completed | Application - Maintenance of existing structures or assets | Installation of 225mm flap valve on end of outfall | Sea_Lane | Southern Water Limited | 27 Nov 2017 | 27 Nov 2017 |
MLA/2017/00485 - Completed | Application - Non-navigational clearance dredging | Excavate shingle to expose 2 outfalls | Sea_Lane | Southern Water Limited | 27 Nov 2017 | 27 Nov 2017 |
MLA/2017/00486 - Completed | Application - Beach maintenance activities | Beach re-profiling after shingle excavation | Sea_Lane | Southern Water Limited | 27 Nov 2017 | 27 Nov 2017 |
MLA/2017/00487 - Completed | Application - Maintenance of existing structures or assets | Marine Drive Torpoint - outfall grille removal | Marine Drive Outfall | R&M Utility & Civil Engineering Services South West Limited | 27 Nov 2017 | 27 Nov 2017 |
MLA/2017/00488 - Completed | Application - Construction of new works, Other deposits, Other removals | Morecambe Outfall AMP6 | Outfall diffuser working area | United Utilities | 28 Nov 2017 | 23 Apr 2018 |
MLA/2017/00489 - Completed | Application - Maintenance of existing structures or assets | Rustington Hendon Ave | Rustington Henden Ave | Beasley Christopher Limited | 28 Nov 2017 | 28 Nov 2017 |
MLA/2017/00490 - Withdrawn | Application - Construction of new works, Other deposits | Isles of Scilly Dune & Flood Defence Scheme | Council Of The Isles Of Scilly | 29 Nov 2017 | ||
MLA/2017/00491/1 - Completed | Application - Construction of new works | Stolford Flood Defence Scheme | Stolford Flood Defence Scheme | Environment Agency - South West Region | 30 Nov 2017 | 17 Dec 2018 |
MLA/2017/00493 - Completed | Application - Minor removals | Fairhaven to Church Scar Coast Protection Scheme | Church Scar Foreshore | Volker Stevin Limited | 01 Dec 2017 | 01 Dec 2017 |
MLA/2017/00494 - Withdrawn | Application - Maintenance of existing works | Glaven Outfall - Flap & Penstock Replacement | Glaven Outfall | Jacksonhyder | 01 Dec 2017 | |
MLA/2017/00495/2 - Completed | Application - Maintenance of existing works | West of Duddon Sands Blade Repair Campaign | West of Duddon Sands Offshore Windfarm | Dong Energy West Of Duddon Sands | 04 Dec 2017 | 29 Nov 2019 |
MLA/2017/00498/5 - Completed | Application - Decommissioning of works | Hornsea Anemometry Mast (met mast) Decommissioning Plan | HOW01_MetMast_WGS84_DE_20170914_Point, HOW01_MetMast_WGS84_DE_20170914_Working Zone | Orsted | 07 Dec 2017 | 03 Nov 2020 |
MLA/2017/00499/2 - Completed | Application - Construction of new works | New RNLI Lifeboat Station at Wells-next-the-Sea | Indicative redline boundary RNLI Wells | Rnli Poole | 07 Dec 2017 | 29 Sep 2020 |
MLA/2017/00500 - Completed | Application - Construction of new works | AT2322 Topsham - Retreat Drive Surface Water Sewer Outfall Requisition | polygons_magic | Aqua-Tech Consultancy | 08 Dec 2017 | 30 Jul 2018 |
MLA/2017/00501 - Completed | Application - Maintenance of existing works, Other works | Repairs to vessel fender - River Blyth harbour entrance Southwold, Suffolk | Southwold Harbour and The Denes | Waveney District Council | 08 Dec 2017 | 07 Mar 2018 |
MLA/2017/00503 - Completed | Application - Maintenance of existing structures or assets | Bognor Regis - Barrack Lane | Bognor Regis - Barrack Lane | Beasley Christopher Limited | 11 Dec 2017 | 11 Dec 2017 |
MLA/2017/00504 - Completed | Application - Maintenance of existing structures or assets | Worthing - Seaview Road | Worthing - Seaview Road | Beasley Christopher Limited | 11 Dec 2017 | 11 Dec 2017 |
MLA/2017/00505/1 - Completed | Application - Other works | Swanwick Marina Pontoon Reconfiguration | Swanwick Marina Reconfiguration | Premier Marinas Limited | 11 Dec 2017 | 08 Aug 2018 |
MLA/2017/00506 - Completed | Application - Construction of new works | HMS Calliope Pontoons | HMS Calliope | Billinghurst George And Partners | 13 Dec 2017 | 06 Feb 2018 |
MLA/2017/00507/1 - Completed | Application - Other deposits, Other works, Sampling | Restoration of Native Oyster Beds in the Blackwater Estuary, Essex | Blackwater Conservation Box | Zoological Society Of London | 13 Dec 2017 | 17 Feb 2020 |
MLA/2017/00508 - Completed | Application - Maintenance of existing works | Nemo Link Urgent Remedial Works | Mattress Location 1 (2.1), Mattress Location 2 (6C.1), Mattress Location 3 (9C.1), Mattress Location 4 (9C.2), Mattress Location 5 (9C.3), Mattress Location 6 (9C.4), Mattress Location 7 (10.1), Mattress Location 8 (11B.1), Mattress Location 9 (11E.1) | National Grid Nemo Link Limited | 15 Dec 2017 | 13 Apr 2018 |
MLA/2017/00510 - Completed | Application - Construction of new works | Blyth Outfall Plug | Blyth Outfall Plug | Southbay Civil Engineering Ltd | 15 Dec 2017 | 06 Mar 2018 |
MLA/2017/00511/1 - Completed | Application - Construction of new works, Other deposits | Maunufacture and Placing of 100 tonne concrete wavebreakers | River Plym, Oreston, Plymouth, Plymouth Breakwater | Devonport Royal Dockyard Ltd | 15 Dec 2017 | 03 Oct 2022 |
MLA/2017/00512 - Completed | Application - Maintenance of existing structures or assets | Messack House water pipeline, Cornwall | Messack House & Creek | Mr David Halsay | 15 Dec 2017 | 15 Dec 2017 |
MLA/2017/00513 - Completed | Application - Non-navigational clearance dredging | The Esplanade, Bognor Regis - Minor outfall maintenance | The_Esplanade | Southern Water Limited | 18 Dec 2017 | 18 Dec 2017 |
MLA/2017/00514 - Completed | Application - Beach maintenance activities | The Esplanade, Bognor Regis - Minor outfall maintenance | The_Esplanade | Southern Water Limited | 18 Dec 2017 | 18 Dec 2017 |
MLA/2017/00515 - Completed | Application - Construction of new works | Fremington Army Camp | Fremington Outfall | Barratt David Wilson Homes | 18 Dec 2017 | 27 Sep 2018 |
MLA/2017/00516/1 - Completed | Application - Other works | Weymouth Harbour - Weymouth Sailing Club Cove Project | Weymouth Sailing Club Cove Pontoon Project | Weymouth Harbour | 18 Dec 2017 | 20 Dec 2018 |
MLA/2017/00517 - Completed | Application - Maintenance of existing structures or assets | Denmark Place Outfall Works | polygons_magic | Beasley Christopher Limited | 18 Dec 2017 | 18 Dec 2017 |
MLA/2017/00518/1 - Completed | Application - Maintenance of existing structures or assets | Downderry SPS, Torpoint. | Downderry SPS | South West Water Limited | 19 Dec 2017 | 11 Jan 2018 |
MLA/2017/00519 - Completed | Application - Construction of new works, Other removals | Flat Cliffs Urgent Works | Flat Cliffs | Scarborough Borough Counicl | 19 Dec 2017 | 12 Apr 2018 |
MLA/2017/00520/1 - Completed | Application - Maintenance of existing structures or assets | Rehab - 6559 - Newton Ferrers | Newton Ferrers | Glanville Cleansing Limited | 20 Dec 2017 | 22 Dec 2017 |
MLA/2017/00521 - Completed | Application - Maintenance of existing structures or assets | Thames Young Mariners Lock Gate Replacement | Thames Young Mariners Lock Gate Replacement | Surrey County Ltd | 20 Dec 2017 | 20 Dec 2017 |
MLA/2017/00523 - Completed | Application - Maintenance of existing works | Shoeburyness Seawall Repair Works | Shoeburyness Seawall defence repairs | Avant Homes (Central) Limited | 21 Dec 2017 | 16 Apr 2018 |
MLA/2017/00524 - Completed | Application - Construction of new works, Other dredging | Greenwich Development Outfall Zone D | Greenwich Zone D Surface Water Outfall - Site Area | Knights Dragon Developments | 21 Dec 2017 | 06 Jan 2020 |
MLA/2017/00525 - Completed | Application - Other works | Great Yarmouth Third River Crossing | Great Yarmouth Third River Yare Crossing | Norfolk County Council | 21 Dec 2017 | 03 May 2018 |
MLA/2017/00526/1 - Completed | Application - Construction of new works, Decommissioning of works | Galloper Wind Farm - Construction, Operation and Decommissioning of a Temporary Crew Transfer Vessel Pontoon at the Navyard, Harwich, for 5 years | Galloper OWF Operations and Maintenance Facility Temporary CTV Pontoon | Harwich Dock Company Limited | 22 Dec 2017 | 08 Dec 2020 |
MLA/2017/00527 - Completed | Application - Construction of new works | Warrington Centre Park Link | Warrington Centre Park Link | Bafour Beatty Construction Services Ltd | 22 Dec 2017 | 12 Dec 2018 |
MLA/2017/00528 - Completed | Application - Minor removals | Retrieval of lost fishing gear Weymouth | Sea Otter, Unidentified barge, Enecuri, Landing craft a, Bombardon unit a, Binnendyk, Landing craft b, Elena R, Ethel, Saratogo, Bombardon unit b, Dumb lighter c19, Unidentified wreck, Fishing vessel, Countess of Erne, Unidentified dredger, Hartlepool, Sudon, Landing craft, Himalaya, Gertude, SS Thames, Myrtledene, James Fennell, SS Barmstrom, Minerve, Bournemouth, Frogner, UB-74, Vera, Submarine P555, Anworth, Inisinver, Landing craft d, Nor, Royal Adelaide | Fathoms Free | 22 Dec 2017 | 22 Dec 2017 |
MLA/2017/00530 - Completed | Application - Maintenance of existing works | Lindisfarne causeway ditching | Lindisfarne Causeway | Northumberland Cc | 29 Dec 2017 | 13 Apr 2018 |
MLA/2017/00531 - Completed | Application - Non-navigational clearance dredging | Tides Reach Pontoon Area Dredging | Tides Reach Pontoon Basin | Tides Reach Management Company Limited | 29 Dec 2017 | 29 Dec 2017 |