User Tools

Site Tools


teesworks_-_keywords_-_impactassessment

{include:Teesworks - keywords - menu}

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:6: Ecological Impact Assessment Methodology …………………………………………………….. 52

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:6:7. Environmental Impact Assessment ………………………………………. 63

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:8: UK Ltd (AECOM) to prepare this Environmental Impact Assessment (EIA) Scoping

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:8: Impact Assessment) Regulations 2017’ for a proposed full chain Carbon Capture

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:11: the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:13:Source: Advice Note Seven: Environmental Impact Assessment: Process, Preliminary Environmental Information and

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:14:Source: Advice Note Seven: Environmental Impact Assessment: Preliminary Environmental Information, Screening and

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:15:  Section 7 – Environmental Impact Assessment: provides an outline structure for

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:43:6.17 An atmospheric impact assessment will be undertaken for the main point source

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:43:6.22 An air quality impact assessment will also be undertaken on the effects of road traffic

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:44:6.27 This section will draw on the IEMA ‘Environmental Impact Assessment Guide to:

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:53: Ecological Impact Assessment Methodology

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:53:6.82 This guidance follows a ‘biodiversity’ approach to impact assessment (rather than

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:54: Phase 1 Habitat survey will be used to undertake an ecological impact assessment.

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:54: Ecology and Environmental Management (IEEM) Ecological Impact Assessment

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:55: Phase 1 Habitat survey will be used to undertake an ecological impact assessment.

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:57:  cumulative impact assessment – including consideration of the traffic likely to be

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:58:6.111 The proposed method of landscape and visual impact assessment has been devised

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:58:  ‘Guidelines for Landscape and Visual Impact Assessment’ (IEMA, 2013,

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:58:  ‘Photography and photomontage in landscape and visual impact assessment’

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:60: as part of the landscape and visual impact assessment as discussed in Section 6.7)

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:61:6.130 Following the impact assessment process, any potential mitigation strategies

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:62: standards). Therefore, no specific human health impact assessment is proposed for

EN010103-001057-NZT DCO 6.4.1 ES Vol III Appendix 1A EIA Scoping Report Part 1.pdf:64:7. Environmental Impact Assessment

EN010103-001063-NZT DCO 6.4.27 ES Vol III Appendix 12J GCN Report.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001063-NZT DCO 6.4.27 ES Vol III Appendix 12J GCN Report.pdf:3: on survey work undertaken in support of the ecological impact assessment

EN010103-001063-NZT DCO 6.4.27 ES Vol III Appendix 12J GCN Report.pdf:13: Guidelines for Ecological Impact Assessment in the UK and Ireland:

EN010103-001137-NZT DCO 6.4.46 ES Vol III Appendix 24A Planned Development and Development Allocations.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-002421-NZT DCO 9.42 - Comments on D9 Submissions & Additional Submissions - Oct 2022 (D11).pdf:2: EIA Environmental Impact Assessment

EN010103-002421-NZT DCO 9.42 - Comments on D9 Submissions & Additional Submissions - Oct 2022 (D11).pdf:39: Development's environmental impact assessment and the need for protective

EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:2: AIA Atmospheric Impact Assessment

EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:2: AQIA Air Quality Impact Assessment

EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:2: EIA Environmental Impact Assessment

EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:12: Impact Assessment (EIA) process.

EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:14:3.2.2 Therefore, these are the European sites covered by the air quality impact assessment

EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:35: an absolute noise threshold, is used as an alternative means of impact assessment.

EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:38:4.2.17 An Air Quality Impact Assessment (AQIA) has been carried out in Appendix 8A [APP-

EN010103-002552-NZT DCO 5.13 - HRA Report (Clean) - Nov 2022 (D12) (1).pdf:48:4.3.6 An Atmospheric Impact Assessment (AIA) has been undertaken using detailed air

EN010103-002080-NZT DCO 2.1 - Draft DCO (Comparison with (D5) August 2022) - August 2022 (D6).pdf:7:(Environmental Impact Assessment) Regulations 2017(b) and having had regard to the documents

EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:3: EIA Environmental Impact Assessment - the assessment of the likely

EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:3: EIA Regulations Infrastructure Planning (Environmental Impact Assessment)

EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:37: provided they are within the scope of the environmental impact assessment.

EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:40: (Document Ref. 6.1 - 6.4) also ensure that the air impact assessment and visual

EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:40: impact assessment of the tallest structures associated with the Proposed

EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:44: update to the hydrogeological impact assessment including hydrogeological conceptual

EN010103-002528-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Nov 2022 (D12).pdf:46: into account the updated hydrogeological impact assessment and any further ground

EN010103-001899-NZT DCO 8.12 - Northumbrian Water Ltd SoCG (Tracked) July 2022 (D4).pdf:3: EIA Environmental Impact Assessment - the

EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:2: AIA Atmospheric Impact Assessment

EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:2: AQIA Air Quality Impact Assessment

EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:2: EIA Environmental Impact Assessment

EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:12: Impact Assessment (EIA) process.

EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:14:3.2.2 Therefore, these are the European sites covered by the air quality impact assessment

EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:35: an absolute noise threshold, is used as an alternative means of impact assessment.

EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:40:4.2.164.2.17 An Air Quality Impact Assessment (AQIA) has been carried out in Appendix 8A

EN010103-002258-NZT DCO - 5.13 - HRA (Tracked) - Sept 2022(D8).pdf:50:4.3.6 An Atmospheric Impact Assessment (AIA) has been undertaken using detailed air

EN010103-000886-NZT DCO 6.2.1 ES Vol I Chapter 1 Introduction.pdf:1:1.5 Environmental Impact Assessment and the Purpose of the Environmental

EN010103-000886-NZT DCO 6.2.1 ES Vol I Chapter 1 Introduction.pdf:2: (Environmental Impact Assessment) Regulations 2017 (‘the EIA

EN010103-000886-NZT DCO 6.2.1 ES Vol I Chapter 1 Introduction.pdf:5:1.5 Environmental Impact Assessment and the

EN010103-000886-NZT DCO 6.2.1 ES Vol I Chapter 1 Introduction.pdf:7:1.5.11 PINS Advice Note Seven: Environmental Impact Assessment: Process,

EN010103-000886-NZT DCO 6.2.1 ES Vol I Chapter 1 Introduction.pdf:7: • baseline data gathered during the impact assessment process;

EN010103-002461-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 20.pdf:3:Planning (Environmental Impact Assessment) Regulations 2009(b) and has had regard to the

EN010103-002551-NZT DCO 5.4 - DAS (Tracked) - Nov 2022 (D12).pdf:3: EIA Environmental Impact Assessment - a term used for the assessment of

EN010103-002551-NZT DCO 5.4 - DAS (Tracked) - Nov 2022 (D12).pdf:3: Environment Impact Assessment are documented.

EN010103-002551-NZT DCO 5.4 - DAS (Tracked) - Nov 2022 (D12).pdf:7: the purposes of the Environmental Impact Assessment (‘EIA’) of the Proposed

EN010103-002551-NZT DCO 5.4 - DAS (Tracked) - Nov 2022 (D12).pdf:18: parameters upon which the Environmental Impact Assessment of it has been

EN010103-001787-NZT DCO 8.7 - Historic England SoCG - June 2022.pdf:3: EIA Environmental Impact Assessment - the

EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:3: EIA Environmental Impact Assessment - the assessment of the likely

EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:3: EIA Regulations Infrastructure Planning (Environmental Impact Assessment)

EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:38: provided they are within the scope of the environmental impact assessment.

EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:41: (Document Ref. 6.1 - 6.4) also ensure that the air impact assessment and visual

EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:41: impact assessment of the tallest structures associated with the Proposed

EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:44: with; an update to the hydrogeological impact assessment; a long term monitoring and

EN010103-002254-NZT DCO 2.2 - Explanatory Memorandum (Clean) - Sept 2022(D8).pdf:47: into account the updated hydrogeological impact assessment and any further ground

EN010103-002631-NZT DCO 3.3 - Funding Statement - Appendix 1 (Clean) - Nov 2022 (D13).pdf:3: EIA Environmental Impact Assessment. The

EN010103-002631-NZT DCO 3.3 - Funding Statement - Appendix 1 (Clean) - Nov 2022 (D13).pdf:3: Impact Assessment) Regulations 2017 (as

EN010103-001858-9.11 - Applicants' Comments on Deadline 2 Submissions - June 2022(D3).pdf:2: EIA Environmental Impact Assessment

EN010103-000910-NZT DCO 6.2.18 ES Vol Chapter 18 Archaeology and Cultural Heritage.pdf:3: the Environmental Impact Assessment (EIA) methodology forms part of a

EN010103-001764-NZT DCO 9.8 - Appendix PPL.1.3c - Teesworks Design Guide - June 2022.pdf:65: Major Application requiring environmental impact assessment

EN010103-001764-NZT DCO 9.8 - Appendix PPL.1.3c - Teesworks Design Guide - June 2022.pdf:65: in accordance with the Environmental Impact Assessment regulations.

EN010103-002178-NZT DCO 8.30 - NTG SoCG - Sept 2022(D7) (Clean).pdf:3: EIA Environmental Impact Assessment – the

EN010103-001119-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 1.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001119-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 1.pdf:3: Appraisal (PEA) undertaken in support of the ecological impact assessment

EN010103-001119-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 1.pdf:3: features are and are not relevant to the impact assessment of the Proposed

EN010103-001119-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 1.pdf:12: 12B: Ecological Impact Assessment Methods (ES Volume III, Document Ref.

EN010103-001119-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 1.pdf:13: due to requirements for good practice air quality impact assessment, for all

EN010103-001119-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 1.pdf:16: affected and therefore require impact assessment.

EN010103-001119-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 1.pdf:17: different. Accordingly, for purposes of clarity and to assist impact assessment

EN010103-001119-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 1.pdf:31: designations to permit robust impact assessment, but some species surveys

EN010103-001119-NZT DCO 6.4.20 ES Vol III Appendix 12C Preliminary Ecological Appraisal Part 1.pdf:33: inform impact assessment Cleveland on-Tees ES chapter

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:4: EIA Environmental Impact Assessment - a term used

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:4: Impact Assessment) Regulations 2017.

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:25:2.6.6 The Proposed Development represents an Environmental Impact Assessment (‘EIA’)

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:39:  The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:55: According to the Impact Assessment for this carbon budget this could lead to a 40-

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:109:  A ‘Lifecycle Greenhouse Gas’ (‘GHG’) impact assessment – an assessment of the

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:109:6.2.966.2.99 The Lifecycle GHG impact assessment factors in construction, operational and

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:124: air quality limits. Where the limits conservative assumptions. The results of the operation impact assessment for

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:135: and Visual Impact Assessment (‘LVIA’) generating station.”

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:250: • A ‘Lifecycle Greenhouse Gas’ (‘GHG’) impact assessment – an

EN010103-001582-NZT DCO 5.3 - Planning Statement - May 2022 (Tracked).pdf:250: The Lifecycle GHG impact assessment factors in construction, operational

EN010103-001127-NZT DCO 6.4.38 ES Vol III Appendix 16C Framework Traffic Management Plan.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-002638-NZT DCO 8.12 - NWL SoCG - Final - Nov 2022 (D13).pdf:3: EIA Environmental Impact Assessment - the

EN010103-001735-Redcar & Cleveland Borough Council - EN010103-001527-NZT-ExQ1-editable-version.pdf:3:EIA Environmental Impact Assessment

EN010103-001735-Redcar & Cleveland Borough Council - EN010103-001527-NZT-ExQ1-editable-version.pdf:3:LVIA Landscape and Visual Impact Assessment

EN010103-001735-Redcar & Cleveland Borough Council - EN010103-001527-NZT-ExQ1-editable-version.pdf:11: ii) Review the baseline since the Landscape and Visual Impact Assessment (LVIA) and

EN010103-001735-Redcar & Cleveland Borough Council - EN010103-001527-NZT-ExQ1-editable-version.pdf:11: extent necessary to provide a robust position to undertake the impact assessment.

EN010103-001853-8.3 - STDC SoCG (Clean) - June 2022(D3).pdf:3:EIA Environmental Impact Assessment - the assessment

EN010103-001234-NZT - Regulation 32 Transboundary Screening (13).pdf:3:Under Regulation 32 of The Infrastructure Planning (Environmental Impact Assessment)

EN010103-000822-NZT DCO 3.3 - Funding Statement incl. Appendix 1.pdf:3: EIA Environmental Impact Assessment. The

EN010103-000822-NZT DCO 3.3 - Funding Statement incl. Appendix 1.pdf:3: Impact Assessment) Regulations 2017 (as

EN010103-002069-NZT DCO 8.5 - Environment Agency SoCG (Tracked) August 2-22 (D6).pdf:3: EIA Environmental Impact Assessment - the

EN010103-002069-NZT DCO 8.5 - Environment Agency SoCG (Tracked) August 2-22 (D6).pdf:21: Hydrological Impact Assessment (HIA). These reports will be

EN010103-002069-NZT DCO 8.5 - Environment Agency SoCG (Tracked) August 2-22 (D6).pdf:21: The EA agrees that the Hydrogeological Impact Assessment

EN010103-002414-NZT DCO 5.10 - Other Consents and Licences - Oct 2022 D11 (Tracked).pdf:22: (Environmental Impact Assessment)

EN010103-002414-NZT DCO 5.10 - Other Consents and Licences - Oct 2022 D11 (Tracked).pdf:24: Storage (Environmental Impact Assessment)

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:3: • Stage 3: WFD Impact Assessment.

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:12: • Stage 3: WFD Impact Assessment - A detailed assessment of the water

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:19:9.3.24 The impact assessment is based on a source-pathway-receptor model. For an

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:24: forward into the impact assessment, and are assessed in

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:54: need to be assessed in the WFD impact assessment. These receptors are

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:57: further consideration in the WFD impact assessment, summarised in Table

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:59:9.6.18 Habitats should be included as part of the WFD impact assessment if the

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:63: in the WFD impact assessment. The risks of introducing or spreading INNS

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:63: been scoped into the WFD impact assessment for the Tees Coastal is shown

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:65: consideration in the WFD impact assessment, summarised in Table 9C-2021.

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:66: impact assessment.

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:67:9.6.39 Habitats should be included as part of the WFD impact assessment if the

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:67: been scoped out ofinto the WFD impact assessment on account of a potential

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:70: been scoped into the WFD impact assessment for the Tees Coastal is shown

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:135: included in the full impact assessment once received. The general pattern

EN010103-002424-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Tracked).pdf:142:D.1.5 Two earlier impact assessments of sediment quality were undertaken to

EN010103-001788-NZT DCO 5.10 - Other Consents and Licences - June 2022 (Tracked).pdf:22: (Environmental Impact Assessment)

EN010103-001788-NZT DCO 5.10 - Other Consents and Licences - June 2022 (Tracked).pdf:22: (Environmental Impact Assessment)

EN010103-001788-NZT DCO 5.10 - Other Consents and Licences - June 2022 (Tracked).pdf:25: Storage (Environmental Impact Assessment)

EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:3: EIA Environmental Impact Assessment - the assessment of the likely

EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:3: EIA Regulations Infrastructure Planning (Environmental Impact Assessment)

EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:37: provided they are within the scope of the environmental impact assessment.

EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:41: (Document Ref. 6.1 - 6.4) also ensure that the air impact assessment and visual

EN010103-002046-NZT DCO 2.2 - Explanatory Memorandum (Tracked) August 2022 (D6).pdf:41: impact assessment of the tallest structures associated with the Proposed

EN010103-002053-NZT DCO 5.4 - Design and Access Statement - Tracked - August 2022(D6).pdf:3: EIA Environmental Impact Assessment - a term used for the assessment of

EN010103-002053-NZT DCO 5.4 - Design and Access Statement - Tracked - August 2022(D6).pdf:3: Environment Impact Assessment are documented.

EN010103-002053-NZT DCO 5.4 - Design and Access Statement - Tracked - August 2022(D6).pdf:7: the purposes of the Environmental Impact Assessment (‘EIA’) of the Proposed

EN010103-002053-NZT DCO 5.4 - Design and Access Statement - Tracked - August 2022(D6).pdf:18: parameters upon which the Environmental Impact Assessment of it has been

EN010103-001211-NZT DCO 1.2 - Application Guide - Oct 2021 Rev.2.0.pdf:2: EIA Environmental Impact Assessment - a term used

EN010103-001211-NZT DCO 1.2 - Application Guide - Oct 2021 Rev.2.0.pdf:3: Impact Assessment) Regulations 2017.

EN010103-001211-NZT DCO 1.2 - Application Guide - Oct 2021 Rev.2.0.pdf:12: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the

EN010103-001211-NZT DCO 1.2 - Application Guide - Oct 2021 Rev.2.0.pdf:16: Category 6.0 Environmental Impact Assessment Information May 2021

EN010103-001211-NZT DCO 1.2 - Application Guide - Oct 2021 Rev.2.0.pdf:25: Impact Assessment Methods

EN010103-001246-EA_NZT_OFFICIAL_171221_Redacted.pdf:3:Hydrogeological Impact Assessment and assess the cumulative impact of the

EN010103-001586-NZT DCO 8.4 - MMO SoCG - May 2022.pdf:3: EIA Environmental Impact Assessment - the

EN010103-001586-NZT DCO 8.4 - MMO SoCG - May 2022.pdf:43: separate Environmental Impact Assessment (EIA) it is dealt with via a separate consenting regime. However, we remain

EN010103-001586-NZT DCO 8.4 - MMO SoCG - May 2022.pdf:93:benthic data are suitable for the completion of an impact assessment for the proposed Outfall II location.

EN010103-001104-NZT DCO 6.4.17 ES Vol III Appendix 11B Operational Noise Information.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001795-NZT DCO 1.2 - Application Guide - June 2022.pdf:2: EIA Environmental Impact Assessment - a term used

EN010103-001795-NZT DCO 1.2 - Application Guide - June 2022.pdf:3: Impact Assessment) Regulations 2017.

EN010103-001795-NZT DCO 1.2 - Application Guide - June 2022.pdf:13: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the

EN010103-001795-NZT DCO 1.2 - Application Guide - June 2022.pdf:17: Category 6.0 Environmental Impact Assessment Information May 2021

EN010103-001795-NZT DCO 1.2 - Application Guide - June 2022.pdf:26: Impact Assessment Methods

EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:30: and completed a strategic impact assessment.

EN010103-002630-NZT DCO 3.3 - Funding Statement - Appendix 6 - NG - Nov 2022 (D13).pdf:33: reputational impact assessments. These

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:197: societal impact assessment (ESHIA) and the biodiversity protection

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:197: On the basis of this impact assessment, and referring to the highest

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:254: waste management and impact assessments, etc.), health (occupational – the imposition of increased local content requirements;

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:275:management describes TotalEnergies’ requirements for a unified assessments and impact assessments on human rights, managing the

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:279:impact assessments to be carried out and, if necessary, actions must be taken, be sources of chronic or accidental pollution. In addition to the

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:284: TotalEnergies conducts assessments and impact assessments of with a total of 517 employees (in Kenya and Poland). These

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:284: – Impact assessments to analyze the challenges and the societal and 2020 in Subsidiaries in Brazil, Cameroon, Egypt, Nigeria,

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:284: impact assessments on human rights; is planned to follow up the action plan for the Pau site (France) in 2022.

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:284: Impact assessments of industrial projects

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:284: assessment. These assessments help identify Subsidiaries’ best societal impact assessment is then conducted to evaluate and analyze

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:284: In addition to these impact assessments, specific human rights impact

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:285: Human Rights Impact Assessment

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:285: TotalEnergies launched a human rights risks and impact assessment in and traditional leaders of Vulnerable Ethnic Groups self-identifying as

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:285: 2016 through societal and environmental impact assessments. These Indigenous Peoples. Three Tanzanian NGOs have been supporting this

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:285: conduct specific human rights impact assessments in parallel with the impacted by the Project.

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:285: assessments. The specific human rights impact assessment for EACOP Since 2013, the Tilenga and EACOP projects have formed an

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:285: have a dedicated Gender Impact Assessment carried out.

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:287: A Human Rights Impact Assessment had been conducted in 2015 for conducted for all JTF officers deployed to site. In 2021, 1,027 officers

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:289:Code of Conduct and respect human rights. The roadmap for 2021-2022 example, in the impact assessments of new projects), preventive and

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:401: safety and security studies, impact assessments, particularly

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:435:impact assessments to be carried out and, if necessary, actions must be Hydrocarbon content of onshore

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:459:human rights violations in each country, the number of alerts received the Standalone human rights impact assessments may also be conducted in

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:459:previous year and the date of the subsidiary’s last assessment. These addition to the environmental and societal impact assessments in high-

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:459:awareness-raising sessions. Employees are encouraged to voice their launched in 2016 a human rights risk and impact assessment through

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:459: environmental impact assessments. This specific human rights impact

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:459:assessments were conducted in 2020 in Madagascar and in Pau The specific human rights impact assessment on the Tilenga project was

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:469: Environmental and Societal Impact Assessment (ESIA), the Human

EN010103-001604-NZT DCO 9.4 - APPENDIX 5 LATEST AUDITED ACCOUNTS – TOTAL GAS & POWER CHARTERING LIMITED.pdf:469: Rights Impact Assessment for the Uganda project, and reports from

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:1: Impact Assessment

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:1:2 ENVIRONMENTAL IMPACT ASSESSMENT: FULL LIFE-CYCLE CLIMATE CHANGE IMPACTS ……………………………………..5

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:1:3 ENVIRONMENTAL IMPACT ASSESSMENT: CUMULATIVE EFFECTS………………………………………………………………………………. 14

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:1:4 ENVIRONMENTAL IMPACT ASSESSMENT: IEMA/EIA GUIDANCE …………………………………………………………………………………. 15

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:2:16 APPENDIX J: EIA GUIDANCE, “ENVIRONMENTAL IMPACT ASSESSMENT OF PROJECTS: GUIDANCE ON THE

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:2:PREPARATION OF THE ENVIRONMENTAL IMPACT ASSESSMENT REPORT”, EUROPEAN COMMISSION, 2017 …………. 19

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:5:2 ENVIRONMENTAL IMPACT ASSESSMENT: FULL LIFE-CYCLE CLIMATE

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:14:3 ENVIRONMENTAL IMPACT ASSESSMENT: CUMULATIVE EFFECTS

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:15:4 ENVIRONMENTAL IMPACT ASSESSMENT: IEMA/EIA GUIDANCE

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:19:16 APPENDIX J: EIA GUIDANCE, “ENVIRONMENTAL IMPACT ASSESSMENT OF

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:19: IMPACT ASSESSMENT REPORT”, EUROPEAN COMMISSION, 2017

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:30: The project’s Climate Change Impact Assessment (CCIA) asserts that, “The proposed CCPP plant will be fueled

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:148: IA – Impact Assessment

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:148: EIA – Environmental Impact Assessment UNFCCC – United Nations Framework Convention on

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:149: and non-statutory Environmental Impact Assessment

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:149: Planning (Environmental Impact Assessment) Regulations

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:149: 2 IEMA (2017) Environmental Impact Assessment Guide to: Assessing Greenhouse Gas Emissions and Evaluating their Significance.

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:149: 4 UK Legislation (2017) The Town and Country Planning (Environmental Impact Assessment) Regulations

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:149: 5 UK Legislation (2017) The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:151: 10 IEMA (2015) Environmental Impact Assessment Guide to Shaping Quality Development.

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:151: 11 IEMA (2016) Environmental Impact Assessment Guide to Delivering Quality Development.

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:184:GUIDANCE ON THE PREPARATION OF THE ENVIRONMENTAL IMPACT ASSESSMENT

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:188:2012 IA Study Impact Assessment Accompanying the document Proposal for a Directive of

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:188:EIA process (or EIA) The process of carrying out an Environmental Impact Assessment as required by

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:188:EIA Report The Environmental Impact Assessment Report is the document prepared by the

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:190:ESPOO Convention Convention on Environmental Impact Assessment in a transboundary context

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:192:good quality Environmental Impact Assessment Reports and to guide competent authorities and other

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:193:The Environmental Impact Assessment (EIA) of Projects is a key instrument of European Union

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:193:1(2)(g) (see box below) which provides a definition of the Environmental Impact Assessment by

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:194:(g) ‘environmental impact assessment’ means a process consisting of:

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:194:(i) the preparation of an environmental impact assessment report by the developer, as referred to in Article 5(1)

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:206:As part of the Environmental Impact Assessment, the Developer must prepare and submit an

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:206:Environmental Impact Assessment Report (hereafter referred to as the EIA Report). This is the first

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:206:1. Where an environmental impact assessment is required, the developer shall prepare and submit an

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:206:environmental impact assessment report. The information to be provided by the developer shall include at least:

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:206: the environmental impact assessment report include the information that may reasonably be required for

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:206:legislation, in preparing the environmental impact assessment report.

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:206:3. In order to ensure the completeness and quality of the environmental impact assessment report:

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:206: (a) the developer shall ensure that the environmental impact assessment report is prepared by competent

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:206: examine the environmental impact assessment report; and

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:207: preparing the Environmental Impact Assessment report (Article 5(4)).

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:215:Annex IV, point 3 outlines the information for the Environmental Impact Assessment Report, and includes:

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:220:1. The environmental impact assessment shall identify, describe, and assess in an appropriate manner, in the light

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:221:biodiversity into Environmental Impact Assessment (see the Annex to this Guidance Document on

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:222:The Directive also requires that Environmental Impact Assessments consider the impacts that climate

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:226:The environmental impact assessment shall identify, describe and assess in an appropriate manner, in the light of

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:227: biodiversity-inclusive Environmental Impact Assessment.

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:227: Chartered Institute of Ecology and Environmental Management, Guidelines for ecological impact assessment

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:228: RPS, Environmental impact assessment practical guidelines toolkit for marine fish farming

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:228: EMEC, Environmental impact assessment (EIA) guidance for developers at the European Marine Energy Centre

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:231:‘The environmental impact assessment shall identify, describe and assess in an appropriate manner, in the light of

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:231:‘where an environmental impact assessment is required, the developer shall prepare and submit an

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:231:environmental impact assessment report. The information to be provided by the developer shall include at least:

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:232:IEMA special report: The State of Environmental Impact assessment practice in the UK

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:232:effective and good-quality impact assessments with transparent and clear reporting in the context of EIA and

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:233:Criteria and Determination in Sustainability-Based Environmental Impact Assessment see the Annex

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:234:Quality of Environmental Impact Assessment, full references in the Annex to this Guidance Document

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:240:measures if appropriate (Article 8a (4) 3rd paragraph). Indeed, the 2012 Impact Assessment for the

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:247:1. Where an environmental impact assessment is required, the developer shall prepare and submit an

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:247:environmental impact assessment report. The information to be provided by the developer shall include at least:

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:248:In order to ensure the completeness and quality of the environmental impact assessment report:

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:248: (a) the developer shall ensure that the environmental impact assessment report is prepared by competent

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:248: examine the environmental impact assessment report; and

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:249:environmental impact assessment reports should be qualified and competent…’. The non-specific

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:249: In Poland, the National Environmental Impact Assessment Commission has been functioning for years. It is an

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:253: Περιβαλλοντικών Sustainable impact assessment18 Environmental

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:257:(7) The time-frames for consulting the public concerned on the environmental impact assessment report referred

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:259:‘Member States should ensure that the various steps of the environmental impact assessment of Projects are

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:260:Environmental Impact Assessment Directive (Directive 2011/92/EU of the European Parliament and of the Council,

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:261:(g) ‘environmental impact assessment’ means a process consisting of:

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:263: impact assessment in the light of the factors set out in that provision.

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:264:2. The environmental impact assessment may be integrated into the existing procedures for development consent

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:285:Impact Assessment Methods

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:285: impact assessment report been taken into

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:304:Relevant EU Guidance on the Application of the Environmental Impact Assessment Procedure for

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:307: Commission guidance on the application of the Environmental Impact Assessment Procedure for

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:308: EMEC, Environmental impact assessment (EIA) guidance for developers at the European Marine

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:308: Jalava, K., et al., (2010) Quality of Environmental Impact Assessment: Finnish EISs and the opinions

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:308: of EIA professionals, Impact Assessment and Project Appraisal, 28:1, 15-27

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:308: on biodiversity-inclusive Environmental Impact Assessment

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:308: RPS, Environmental impact assessment practical guidelines toolkit for marine fish farming

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:308: Scottish Natural Heritage, A handbook on environmental impact assessment: Guidance for

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:308: Competent Authorities, Consultees and others involved in the Environmental Impact Assessment

EN010103-001652-Climate Emergency Policy and Planning - Written Representations.pdf:309: UK Environment Agency: Environmental Impact Assessment (EIA), A handbook for Scoping projects

EN010103-000902-NZT DCO 6.2.10 ES Vol I Chapter 10 Geology and Contaminated Land.pdf:38: In-Combination Climate Change Impact Assessment

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:35: power, considerably reducing its carbon footprint. The field presented the impact assessment for Wisting. Since 1

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:64:The CONAMA Regulation No. 382/06 regulates air emissions largely to environmental and social impact assessments. The

EN010103-002629-NZT DCO 3.3 - Funding Statement - Appendix 5 - Equinor - Nov 2022 (D13).pdf:114:Health and working environment As part of environmental and social impact assessments for new

EN010103-002077-NZT DCO 9.31 - Response to Examining Authority's Written Questions DLV1.7 ii August 2022 (D6).pdf:5: • Review the baseline since the Landscape and Visual Impact Assessment (LVIA) and

EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf:42:EQS in Table 2-1 is highlighted in yellow. A water quality impact assessment is not required for those

EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf:69:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf:117:Proposed Development, the Environmental Impact Assessment (EIA) for NZT is being undertaken

EN010103-002248-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper - Sept 2022(D8).pdf:119:EIA Environmental Impact Assessment

EN010103-002247-NZT DCO 9.35 - Applicants' Comments on Deadline 7 Submissions - Sept 2022(D8).pdf:2: EIA Environmental Impact Assessment

EN010103-002247-NZT DCO 9.35 - Applicants' Comments on Deadline 7 Submissions - Sept 2022(D8).pdf:7: Hydrogeological Impact Assessment. The Applicants also note the Environment

EN010103-002247-NZT DCO 9.35 - Applicants' Comments on Deadline 7 Submissions - Sept 2022(D8).pdf:19: and Storage (Environmental Impact Assessment) Regulations 2020.

EN010103-002247-NZT DCO 9.35 - Applicants' Comments on Deadline 7 Submissions - Sept 2022(D8).pdf:25: and Storage (Environmental Impact Assessment) Regulations 2020, being dependent

EN010103-002247-NZT DCO 9.35 - Applicants' Comments on Deadline 7 Submissions - Sept 2022(D8).pdf:28: Update of Hydrogeological Impact Assessment ……………

EN010103-001587-NZT DCO 8.5 - Environment Agency SoCG - May 2022.pdf:3: EIA Environmental Impact Assessment - the

EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:66: CIA Cumulative Impact Assessment

EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:66: EIA Environmental Impact Assessment

EN010103-002460-DLA Piper UK LLP - Other- Protective provisions position statement requested by ExA 19.pdf:68: SLVIA Seascape, Landscape and Visual Impact Assessment

EN010103-001182-NZT EL (12).pdf:7:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (12).pdf:8:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (12).pdf:14:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (12).pdf:16: 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment

EN010103-001234-NZT - Regulation 32 Transboundary Screening (2).pdf:3:Under Regulation 32 of The Infrastructure Planning (Environmental Impact Assessment)

EN010103-001020-NZT DCO 6.4.5 ES Vol III Appendix 5A - Framework CEMP.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (as

EN010103-002190-NZT-R17-changes-accepted-Sept-2022.pdf:2:(Environmental Impact Assessment) Regulations 2017.

EN010103-001234-NZT - Regulation 32 Transboundary Screening (7).pdf:3:Under Regulation 32 of The Infrastructure Planning (Environmental Impact Assessment)

EN010103-001060-NZT DCO 6.4.25 ES Vol III Appendix 12H Supplementary Habitat Information Report Coatham Sands Part 1.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001060-NZT DCO 6.4.25 ES Vol III Appendix 12H Supplementary Habitat Information Report Coatham Sands Part 1.pdf:3: Scientific Interest (SSSI), in support of the ecological impact assessment

EN010103-001060-NZT DCO 6.4.25 ES Vol III Appendix 12H Supplementary Habitat Information Report Coatham Sands Part 1.pdf:4: design and subsequent impact assessment.

EN010103-001060-NZT DCO 6.4.25 ES Vol III Appendix 12H Supplementary Habitat Information Report Coatham Sands Part 1.pdf:12: purpose of the report to make the formal ecologically impact assessment of

EN010103-001060-NZT DCO 6.4.25 ES Vol III Appendix 12H Supplementary Habitat Information Report Coatham Sands Part 1.pdf:12: Guidelines for Ecological Impact Assessment in the UK and Ireland –

EN010103-001060-NZT DCO 6.4.25 ES Vol III Appendix 12H Supplementary Habitat Information Report Coatham Sands Part 1.pdf:28: Ecological Impact Assessment in the UK and Ireland. Available from:

EN010103-001329-NZT DCO 7.7 - Environmental Statement Addendum - Non-Technical Summary - Apr 2022.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (as

EN010103-002061-NZT DCO 7.11.2 Second ES Addendum Vol II Cover and Contents August 2022 (D6).pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (as

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:2: with the Environmental Impact Assessment (EIA) to capture the impacts of

EN010103-000904-NZT DCO 6.2.20 ES Vol I Chapter 20 Socio-economics.pdf:6: Impact Assessment and Significance Criteria

EN010103-001917-NZT DCO 1.2 - Application Guide - July 2022 (D4).pdf:2: EIA Environmental Impact Assessment - a term used

EN010103-001917-NZT DCO 1.2 - Application Guide - July 2022 (D4).pdf:3: Impact Assessment) Regulations 2017.

EN010103-001917-NZT DCO 1.2 - Application Guide - July 2022 (D4).pdf:13: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the

EN010103-001917-NZT DCO 1.2 - Application Guide - July 2022 (D4).pdf:17: Category 6.0 Environmental Impact Assessment Information May 2021

EN010103-001917-NZT DCO 1.2 - Application Guide - July 2022 (D4).pdf:30: Impact Assessment Methods

EN010103-001109-NZT DCO 6.4.21 ES Vol III Appendix 12D Bat Survey Report Part 1.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001109-NZT DCO 6.4.21 ES Vol III Appendix 12D Bat Survey Report Part 1.pdf:3: in support of the ecological impact assessment (EcIA) of the Proposed

EN010103-001109-NZT DCO 6.4.21 ES Vol III Appendix 12D Bat Survey Report Part 1.pdf:24: CIEEM (2019) Guidelines for Ecological Impact Assessment in the UK and

EN010103-001109-NZT DCO 6.4.21 ES Vol III Appendix 12D Bat Survey Report Part 1.pdf:24: ecological impact assessment. In Practice 70.

EN010103-001239-South Tees Development Corporation - Relevant Representation to NZT DCO - 17.12.21.pdf:17: Environmental Impact Assessment (EIA) Environmental Statement

EN010103-000911-NZT DCO 6.3 ES Vol II Cover and Contents.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (as amended)

EN010103-001226-211025- NZT - s56 Notice - Final_Redacted.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 - Regulation 16

EN010103-001226-211025- NZT - s56 Notice - Final_Redacted.pdf:3:Environmental Impact Assessment

EN010103-001226-211025- NZT - s56 Notice - Final_Redacted.pdf:3:11. The Proposed Development is an Environmental impact Assessment (‘EIA’) development under

EN010103-001226-211025- NZT - s56 Notice - Final_Redacted.pdf:3:‘The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017’. The Application

EN010103-001182-NZT EL (5).pdf:7:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (5).pdf:8:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (5).pdf:14:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (5).pdf:16: 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:4: • Stage 3: WFD Impact Assessment.

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:13: • Stage 3: WFD Impact Assessment - A detailed assessment of the water

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:19:9.3.24 The impact assessment is based on a source-pathway-receptor model. For an

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:48: need to be assessed in the WFD impact assessment. These receptors are

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:51: further consideration in the WFD impact assessment, summarised in Table

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:51: impact assessment

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:52:9.6.18 Habitats should be included as part of the WFD impact assessment if the

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:53: outlined in Table 9C-13 have been scoped into the WFD impact assessment

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:55: in the WFD impact assessment. The risks of introducing or spreading INNS

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:55: been scoped into the WFD impact assessment for the Tees Coastal is shown

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:57: consideration in the WFD impact assessment, summarised in Table 9C-20.

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:57: impact assessment.

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:58:9.6.55 Habitats should be included as part of the WFD impact assessment if the

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:58: been scoped into the WFD impact assessment on account of a potential

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:61: been scoped into the WFD impact assessment for the Tees Coastal is shown

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:112: included in the full impact assessment once received. The general pattern

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:119:D.1.5 Two earlier impact assessments of sediment quality were undertaken to

EN010103-001064-NZT DCO 6.4.11 ES Vol III Appendix 9C WFD Assessment.pdf:122:9.1.6 This data also informs the water environment impact assessment of the

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:3: EIA Environmental Impact Assessment - a term used

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:3: Impact Assessment) Regulations 2017.

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:12: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017’ (the

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:23:1.13 Environmental Impact Assessment (EIA) Consultation

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:46:  The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:69:  The findings of the Environmental Impact Assessment (‘EIA’) work undertaken

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:74: and the landscape and visual impact assessment upon a Zone of Theoretical

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:96: by the initial EIA environmental impact assessment (EIA) scoping work. The

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:109:  The Environmental Impact Assessment work being undertaken.

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:116: ­ Environmental Impact Assessment.

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:119:  The findings of the Environmental Impact Assessment (‘EIA’) work undertaken

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:162: 7. All we would like to say is that Teesside The Environmental Impact Assessment (EIA) undertaken for the Proposed Development has No changes Chapter 8: Air Quality; Chapter 11:

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:223: 8(1)(b) of The Infrastructure Planning (Environmental Impact Assessment)

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:245: The Net Zero Teesside Project is an environmental impact assessment (‘EIA’) development for the

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:245: purposes of ‘The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017’

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:251: visual impact assessment upon a Zone of Theoretical Visibility (‘ZTV’) of 20 km.

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:304: EIA Environmental Impact Assessment.

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:315:4.1 NZT is an environmental impact assessment (‘EIA’) development for the purposes of

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:315: ‘The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017’ (the

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:320: Theoretical Influence of up to 15 km and the landscape and visual impact assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:329:The Project is an Environmental Impact Assessment (EIA)

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:356: EIA Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:368: NZT is an environmental impact assessment (‘EIA’) development for the purposes of

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:368: ‘The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017’ (the

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:373: impact assessment upon a Zone of Theoretical Visibility of 10 km.

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:394:procedures; and the findings of the Environmental Impact Assessment (EIA). It is further noted that

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:395:Impact Assessment (EIA) process.

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:395:Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:401:EIA Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:410:4.1 NZT is an environmental impact assessment 4.4 As part of the Stage 2 Consultation a

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:410: Impact Assessment) Regulations 2017’ (the PEI Report will effectively take the form of a

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:413: visual impact assessment upon a Zone of

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:429:EIA Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:431:1.6 NZT is an environmental impact assessment 1.8 This Statement of Community Consultation

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:431: Impact Assessment) Regulations 2017’. This local community’ of the PA 2008. Section

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:433: the landscape and visual impact assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:441:R/2020/0164/CA: Change of use of first and second floor offices NZT is an Environmental Impact Assessment (‘EIA’)

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:441:windows at 23A Milton Street Saltburn by the sea (Environmental Impact Assessment) Regulations 2017’.

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:510:PUBLICISE)’ OF THE INFRASTRUCTURE PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT)

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:511:Regulation 13 of ‘The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017’

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:514:Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:514:NZT is an Environmental Impact Assessment (‘EIA’) development for the purposes of EIA Regulations.

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:520:Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:520:NZT is an Environmental Impact Assessment (‘EIA’) development for the purposes of EIA Regulations.

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:526:Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:526:NZT is an Environmental Impact Assessment (‘EIA’) development for the purposes of EIA Regulations.

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:532:Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:532:NZT is an Environmental Impact Assessment (‘EIA’) development for the purposes of EIA Regulations.

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:538:Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:538:NZT is an Environmental Impact Assessment (‘EIA’) development for the purposes of EIA Regulations.

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:542:Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:542:Planning (Environmental Impact Assessment) Regulations 2017 (the ‘EIA Regulations’) that they intend

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:546:Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:546:Planning (Environmental Impact Assessment) Regulations 2017 (the ‘EIA Regulations’) that they intend

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:587:PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2017

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:609:Publicise)’ of the Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:612:development design, environmental and health impact assessment, and development consent.

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:614:PUBLICISE)’ OF THE INFRASTRUCTURE PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT)

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:638:The Ecology of the site should be assessed in a chapter of an Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:647: Storage project. It is supportive of the current plans, design and impact assessments, including

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:666: Applicant and assessed in the Environmental Impact Assessment, and that appropriate

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:677:Environmental Impact Assessment, in order to assess the maximum parameters for those elements of the

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:688: impact assessment that will form part of the ES for the Proposed Development; and

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:695: ‘The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017’ (the ‘EIA

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:703:Planning (Environmental Impact Assessment) Regulations 2017 – Regulation

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:703:Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 that

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:734:EIA Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:736:1.6 NZT is an environmental impact assessment 1.8 This Statement of Community Consultation

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:736: Impact Assessment) Regulations 2017’. This local community’ of the PA 2008. Section

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:738: the landscape and visual impact assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:781:Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:781: An Environmental Impact Assessment (EIA) is being

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:782:Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:783:Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:795: • the findings of the Environmental Impact Assessment (EIA) work undertaken to date –

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:801:accordance with current offshore Environmental Impact Assessment regulations.

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:802:Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:802: Impact Assessment (‘EIA’) to consider

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:803:Environmental Impact Assessment continued

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:836:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 -

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:837:Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:837:Planning (Environmental Impact Assessment) Regulations 2017 (the ‘EIA Regulations’) that they intend

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:846:ENVIRONMENT & ENVIRONMENTAL IMPACT ASSESSMENT:

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:847:Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:848: The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 - Regulation 13 persons having a claim against or an

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:848: Road Traffic Regulation Act 1984 as amended by the Road Traffic Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:848: length of road specified below. (Environmental Impact Assessment) Regulations 2017 (the ‘EIA Regulations’) that they intend to provide an

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:849: The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 - Regulation 13

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:849:A diversion route will be signed on site. A letter drop will be done by Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:849: (Environmental Impact Assessment) Regulations 2017 (the ‘EIA Regulations’) that they intend to provide

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:851: The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 - Regulation 13

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:851: Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:851: 5. The Applicants have notified the SoS in writing under Regulation 8(1)(b) of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the ‘EIA Regulations’) that they intend to

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:889:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 -

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:890:Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:890:Planning (Environmental Impact Assessment) Regulations 2017 (the ‘EIA Regulations’) that they intend

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:893:PUBLICISE)’ OF THE INFRASTRUCTURE PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT)

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:894:Regulation 13 of ‘The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017’

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:897:Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:897:NZT is an Environmental Impact Assessment (‘EIA’) development for the purposes of EIA Regulations.

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1026:Planning (Environmental Impact Assessment) Regulations 2017 – Regulation

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1026:Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 that

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1047:Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1047:Planning (Environmental Impact Assessment) Regulations 2017 (the ‘EIA Regulations’) that they intend

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1050:Environmental Impact Assessment

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1050:Planning (Environmental Impact Assessment) Regulations 2017 (the ‘EIA Regulations’) that they intend

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1087:PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2017

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1124:Publicise)’ of the Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1145:development design, environmental and health impact assessment, and development consent.

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1210:(Environmental Impact Assessment) Regulations 2017 – Regulation 8

EN010103-001152-NZT DCO 5.1 - Consultation Report.pdf:1210:Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 that

EN010103-002238-NZT DCO 8.5 - SoCG - Environment Agency September (Tracked) 2022 (D8).pdf:3: EIA Environmental Impact Assessment - the

EN010103-002238-NZT DCO 8.5 - SoCG - Environment Agency September (Tracked) 2022 (D8).pdf:20: assessment) and the Hydrological Impact Assessment (HIA). These

EN010103-002238-NZT DCO 8.5 - SoCG - Environment Agency September (Tracked) 2022 (D8).pdf:20: The EA agrees that the Hydrogeological Impact Assessment

EN010103-001027-NZT DCO 6.4.10 ES Vol III Appendix 9B Background Water Quality.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-000891-NZT DCO 6.2.5 ES Vol I Chapter 5 Construction Programme and Management.pdf:16: CO2 Export Pipeline will require a separate environmental impact assessment.

EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:3: EIA Environmental Impact Assessment - the assessment of the likely

EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:3: EIA Regulations Infrastructure Planning (Environmental Impact Assessment)

EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:38: provided they are within the scope of the environmental impact assessment.

EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:41: (Document Ref. 6.1 - 6.4) also ensure that the air impact assessment and visual

EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:41: impact assessment of the tallest structures associated with the Proposed

EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:44: impact assessment; a long term monitoring and maintenance plan in respect of

EN010103-002255-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Sept 2022(D8).pdf:47: into account the updated hydrogeological impact assessment and any further ground

EN010103-002326-NZT DCO 9.40 - Applicants' Response to SWQ CA.2.19 Oct 2022 (D9).pdf:2: EIA Environmental Impact Assessment

EN010103-002286-NZT DCO 8.3 - STDC SoCG (Tracked) - Sept 2022(D8).pdf:3:EIA Environmental Impact Assessment - the assessment

EN010103-002550-NZT DCO 5.4 - DAS (Clean) - Nov 2022 (D12).pdf:3: EIA Environmental Impact Assessment - a term used for the assessment of

EN010103-002550-NZT DCO 5.4 - DAS (Clean) - Nov 2022 (D12).pdf:3: Environment Impact Assessment are documented.

EN010103-002550-NZT DCO 5.4 - DAS (Clean) - Nov 2022 (D12).pdf:7: the purposes of the Environmental Impact Assessment (‘EIA’) of the Proposed

EN010103-002550-NZT DCO 5.4 - DAS (Clean) - Nov 2022 (D12).pdf:18: parameters upon which the Environmental Impact Assessment of it has been

EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf:3:EIA Environmental Impact Assessment

EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf:3:LVIA Landscape and Visual Impact Assessment

EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf:25: Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater and Coastal and

EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf:32:CC.1.5 Applicants Is it intended to undertake a cumulative impact assessment of life-cycle carbon emissions for

EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf:45: ii) Review the baseline since the Landscape and Visual Impact Assessment (LVIA) and

EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf:45: extent necessary to provide a robust position to undertake the impact assessment.

EN010103-001683-Marine Management Organisation - Responses to the ExA’s ExQ1.pdf:51:GH1.5 Applicants i) Please confirm that a Hydrogeological Impact Assessment will be provided, as

EN010103-002249-NZT DCO 9.37 - Justification of Corridor Widths - Sept 2022(D8).pdf:2: EIA Environmental Impact Assessment

EN010103-002285-NZT DCO 8.3 - STDC SoCG (Clean) - Sept 2022(D8).pdf:3:EIA Environmental Impact Assessment - the assessment

EN010103-002058-NZT DCO 7.9 - Letter Requesting Further Proposed Changes - August 2022.pdf:3:Infrastructure Planning (Environmental Impact Assessment) Regulations 2017’ (the ‘EIA Regulations’).

EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:53:EQS in Table 2-1 is highlighted in yellow. A water quality impact assessment is not required for those

EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:80:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:128:Proposed Development, the Environmental Impact Assessment (EIA) for NZT is being undertaken

EN010103-002321-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper (Tracked) Oct 2022 (D9).pdf:130:EIA Environmental Impact Assessment

EN010103-001133-NZT DCO 6.4.44 ES Vol III Appendix 20A Economics Benefits Report.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001715-South Tees Development Corporation - Responses to comments on Relevant Representations.pdf:44: Environmental Impact Assessment (EIA) Environmental See response to paragraph 4.1 to 4.12. Since the relevant No further comments

EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001105-NZT DCO 6.4.18 ES Vol III Appendix 12A Legislation and Planning Policy Relevant to Ecology.pdf:11: – paragraph 2.7.2 length and take this into consideration in the preparation of the Environmental Impact Assessment (EIA) and

EN010103-002042-DLA Piper UK LLP - Responses to the ExA’s ExQ2.pdf:2:EcIA Ecological Impact Assessment

EN010103-002042-DLA Piper UK LLP - Responses to the ExA’s ExQ2.pdf:2:EIA Environmental Impact Assessment

EN010103-001062-NZT DCO 6.4.26 ES Vol III Appendix 12I Terrestrial Invertebrate Survey Coatham Dunes.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001062-NZT DCO 6.4.26 ES Vol III Appendix 12I Terrestrial Invertebrate Survey Coatham Dunes.pdf:8:This work has been undertaken to inform the Ecological Impact Assessment (EcIA) for the proposed Net Zero

EN010103-002043-NZT DCO 2.1 - Draft DCO August 2022 (D6).pdf:7:(Environmental Impact Assessment) Regulations 2017(b) and having had regard to the documents

EN010103-002237-NZT DCO 8.5 - SoCG - Environment Agency September (Clean) 2022 (D8).pdf:3: EIA Environmental Impact Assessment - the

EN010103-002237-NZT DCO 8.5 - SoCG - Environment Agency September (Clean) 2022 (D8).pdf:19: The EA agrees that the Hydrogeological Impact Assessment

EN010103-000812-NZT DCO 1.1 - Application Cover Letter.pdf:5:Environmental Impact Assessment

EN010103-000812-NZT DCO 1.1 - Application Cover Letter.pdf:5:The Proposed Development represents an Environmental Impact Assessment (‘EIA’) development and

EN010103-000812-NZT DCO 1.1 - Application Cover Letter.pdf:5:Infrastructure Planning (Environmental Impact Assessment) Regulations 2017’.

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:2: Impact Assessment (EIA) of the Proposed Development. The assessment

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:3: • Appendix 12B: Ecological Impact Assessment (EcIA) Methods;

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:7: as relevant, within the following ecological impact assessment (EcIA).

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:7: Impact Assessment and Significance Criteria

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:8: within the impact assessment process;

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:12: a contemporary baseline to underpin the finalised impact assessments, as

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:12:https://magic.defra.gov.uk/ quality impact assessment) or otherwise within

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:19:relevant to the ecological impact assessment, with

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:19:Ecological Impact Assessment in the UK and Ireland’ Document Ref. 6.4).

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:19: • Natural England GIS data is currently being impact assessments and associated content

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:20:Based on the information provided Natural England robust ornithological impact assessment.

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:22: and out of impact assessment.

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:53:6.4), are brought forward for impact assessment. Locational information regarding species vulnerable to persecution is treated as confidential and is included only in a separate

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:63: therefore frequently refers to the impact assessments within other topic-

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:64: impact assessments provided by these source chapters and the LSE

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:65: reliant on terrestrial habitats. To enable a focussed impact assessment,

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:66: and that require further impact assessment. Impacts are scoped out of further

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:85: air quality impact assessment (Appendix 8B, ES Volume III, Document Ref.

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:91:15.7.12 Give the findings of the above impact assessment, mitigation measures are

EN010103-000901-NZT DCO 6.2.15 ES Vol I Chapter 15 Ornithology.pdf:99: Guidelines for Ecological Impact Assessment in the UK and Ireland:

EN010103-001182-NZT EL (6).pdf:7:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (6).pdf:8:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (6).pdf:14:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (6).pdf:16: 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment

EN010103-001154-NZT DCO 5.10 - Other Consents and Licences.pdf:19: (Environmental Impact Assessment)

EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:2: EIA Environmental Impact Assessment

EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:10: impact assessment that is informed by any further ground investigation

EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:10: impact assessment;

EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:11:take into account the updated hydrogeological impact assessment and any further ground

EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:12:updated hydrogeological impact assessment and any further ground investigation reports and

EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:12:DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4) REP4-027

EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:30:6 Environmental Impact Assessment (EIA) and Environmental Statement (ES) …………………. 24

EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:51:6 Environmental Impact Assessment (EIA) and Environmental Statement (ES)

EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:51: single receptor using the Source- Source-Pathway-Receptor (SPR) model approach to Environmental Impact Assessment (EIA), in general terms.

EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:53: undertaken as part of the Environmental Impact Assessment. Section 5.4 of the Scoping Report refers to other sea

EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:87: characterisation and impact assessments. The Applicant also welcomes the RSPB’s recognition that, as evidenced by

EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:88: characterisation and impact assessments. The Applicant also welcomes the RSPB’s recognition that, as evidenced by

EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:129: within the Landscape and Visual Impact Assessment, noting that receptors will have

EN010103-002074-NZT DCO 9.28 - Applicants' Responses to Deadline 5 Submissions August 2022 (D6).pdf:138: emerging Jocks Lodge scheme; however, the fundamental principles impact assessment and other representations received from the local highway

EN010103-001344-NZT DCO 7.8.2 ES Addendum Vol II Cover and Contents.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (as

EN010103-001128-NZT DCO 6.4.39 ES Vol III Appendix 17A Landscape Character.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:2: EIA Environmental Impact Assessment

EN010103-002642-NZT DCO 9.50 - Applicants' Comments on D12 Submissons - Nov 2022 (D13).pdf:16: environmental impact assessment, how the same considers the impact on

EN010103-002510-NZT DCO 8.3 - STDC SoCG (Clean) - Nov 2022 (D12).pdf:3:EIA Environmental Impact Assessment - the assessment

EN010103-001774-NZT DCO 9.8 - Appendix GEN.1.41a - TVCA (Functions) Order 2017 - June 2022.pdf:12:A full impact assessment has not been produced for this instrument as no, or no significant, impact

EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf:3: EIA Environmental Impact Assessment. The

EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf:4: (Environmental Impact Assessment) Regulations

EN010103-002533-NZT DCO 3.2 - Statement of Reasons Tracked Nov 2022 (D12).pdf:32:3.1.14 The Environmental Impact Assessment (’EIA’) has therefore been undertaken

EN010103-002604-Climate Emergency Policy and Planning (CEPP) - Other- Final submission.pdf:1: Impact Assessment

EN010103-002604-Climate Emergency Policy and Planning (CEPP) - Other- Final submission.pdf:1:2 ENVIRONMENTAL IMPACT ASSESSMENT: FULL LIFE-CYCLE CLIMATE CHANGE IMPACTS ……………………………………..2

EN010103-002604-Climate Emergency Policy and Planning (CEPP) - Other- Final submission.pdf:2:2 ENVIRONMENTAL IMPACT ASSESSMENT: FULL LIFE-CYCLE CLIMATE

EN010103-002604-Climate Emergency Policy and Planning (CEPP) - Other- Final submission.pdf:2: Planning (Environmental Impact Assessment) Regulations 2017, Schedule 4, para 5:

EN010103-001197-NZT DCO 6.2.4 - ES Vol I Chapter 4 - Oct 2021.pdf:3: require separate environmental impact assessments including assessments

EN010103-001197-NZT DCO 6.2.4 - ES Vol I Chapter 4 - Oct 2021.pdf:3: and will be supported by a separate Environmental Impact Assessment (EIA).

EN010103-001197-NZT DCO 6.2.4 - ES Vol I Chapter 4 - Oct 2021.pdf:14: impact assessment in this ES for the Proposed Development as presented in

EN010103-001197-NZT DCO 6.2.4 - ES Vol I Chapter 4 - Oct 2021.pdf:16: Impact Assessment – see Chapter 5 (Construction Programme and

EN010103-001197-NZT DCO 6.2.4 - ES Vol I Chapter 4 - Oct 2021.pdf:18: been identified as sufficient to allow a robust worst-case impact assessment

EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:2: AIA Atmospheric Impact Assessment

EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:2: AQIA Air Quality Impact Assessment

EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:2: EIA Environmental Impact Assessment

EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:11: Impact Assessment (EIA) process.

EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:13:3.2.2 Therefore, these are the European sites covered by the air quality impact assessment

EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:34: an absolute noise threshold, is used as an alternative means of impact assessment.

EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:37:4.2.17 An Air Quality Impact Assessment (AQIA) has been carried out (Appendix 8A of the

EN010103-001196-NZT DCO 5.13 - HRA Report - Oct 2021 Rev.2.0.pdf:47:4.3.6 An Atmospheric Impact Assessment (AIA) has been undertaken using detailed air

EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf:4: EIA Environmental Impact Assessment. The

EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf:4: Impact Assessment) Regulations 2017 (as

EN010103-001466-NZT DCO 3.2 - Statement of Reasons - Apr 2022.pdf:31:3.1.14 The Environmental Impact Assessment (’EIA’) has therefore been undertaken

EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:2: (Environmental Impact Assessment) Regulations 2017

EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:6: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017

EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:14: ‘Environmental Impact Assessment: Process, Preliminary Environmental

EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:14: Advice Note Seven: Environmental Impact Assessment: Process, Preliminary Environmental

EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:33: ecological impact assessment in the ES.

EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:34: noise impact assessment should be undertaken based on a worst case

EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:39: accordance with the ‘Guidelines for Ecological Impact Assessment in

EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:39: Chartered Institute of Ecology and Environmental Management (CIEEM) Guidelines for Ecological Impact Assessment in the UK and Ireland: Terrestrial,

EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:55:4.11.1 Para 6.142 Human health impact assessment The Scoping Report states that no specific human health impact

EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:59: - Advice Note Seven: Environmental Impact Assessment: Process,

EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:71:will be required and an Environmental Impact Assessment (including returning

EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:81:Impact Assessment) Regulations 2017 (the EIA Regulations) – Regulations 10 and

EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:97:(ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2017 (THE EIA

EN010103-001015-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 1.pdf:99:For the purposes of the Environmental Impact Assessment (“EIA”) Scoping Report prepared

EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:3: EIA Environmental Impact Assessment - the assessment of the likely

EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:3: EIA Regulations Infrastructure Planning (Environmental Impact Assessment)

EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:37: provided they are within the scope of the environmental impact assessment.

EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:41: (Document Ref . 6.1 - 6.4) also ensure that the air impact assessment and visual

EN010103-002000-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Tracked.pdf:41: impact assessment of the tallest structures associated with the Proposed

EN010103-000813-NZT DCO 1.2 - Application Guide.pdf:2: EIA Environmental Impact Assessment - a term used

EN010103-000813-NZT DCO 1.2 - Application Guide.pdf:3: Impact Assessment) Regulations 2017.

EN010103-000813-NZT DCO 1.2 - Application Guide.pdf:12: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the

EN010103-000813-NZT DCO 1.2 - Application Guide.pdf:14: Category 6.0 Environmental Impact Assessment Information

EN010103-001913-NZT DCO 9.18 - Further information to Historic Environment Questions July 2022 (D4).pdf:2: EIA Environmental Impact Assessment

EN010103-001913-NZT DCO 9.18 - Further information to Historic Environment Questions July 2022 (D4).pdf:17: Impact assessment

EN010103-001913-NZT DCO 9.18 - Further information to Historic Environment Questions July 2022 (D4).pdf:18: Impact assessment

EN010103-001913-NZT DCO 9.18 - Further information to Historic Environment Questions July 2022 (D4).pdf:19: Impact assessment

EN010103-001913-NZT DCO 9.18 - Further information to Historic Environment Questions July 2022 (D4).pdf:20: Impact assessment

EN010103-001913-NZT DCO 9.18 - Further information to Historic Environment Questions July 2022 (D4).pdf:21: Impact assessment

EN010103-001132-NZT DCO 6.4.43 ES Vol III Appendix 18B Cultural Heritage Gazetter.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (as

EN010103-001245-Certificates of Compliance.pdf:1: The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017

EN010103-001245-Certificates of Compliance.pdf:1:Planning (Environmental Impact Assessment) Regulations 2017 –

EN010103-001024-NZT DCO 6.4.9 ES Vol III Appendix 9A Flood Risk Assessment Part 1.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:13: why they are not included (Environmental Impact Assessment) Regulations 2020 (“the 2020 Regulations”).

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:14: offshore elements of NZT. PE confirms that an offshore environmental impact assessment is

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:27: (Environmental Impact Assessment) Regulations 2017 .

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:52: & CR 350 ) and, to some extent, by Regulation 21(3)© of the Infrastructure Planning (Environmental Impact Assessment)

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:56: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (SI 2017 No. 572) (“the 2017 Regulations”)

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:88: Impact Assessment Directive 2011/92/EU (as amended) (“the EIA Directive”) and the Infrastructure Planning (Environmental

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:88: Impact Assessment) Regulations 2017 (“the EIA Regulations”), greenhouse gas emissions would have to be assessed and

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:88: consent ( regulation 21 ). Under the regime for environmental impact assessment, a significant environmental effect such as

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:90: 95. One cannot say that she misunderstood the purpose of environmental impact assessment under the EIA Directive and

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:163: and Storage (Environmental Impact Assessment) Regulations 2020 (the

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:164: must not agree to the grant of consent unless an environmental impact assessment has

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:164: been carried out, or an environmental impact assessment is not required.

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:166: environmental and social impact assessment (‘ESIA’).

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:166: part of the Proposed Development’s Environmental Impact Assessment (“EIA”).

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:166: in the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the “EIA

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:182: (Environmental Impact Assessment) Regulations 2017 (“the 2017 EIA

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:183: (Environmental Impact Assessment) Regulations 2017 require the

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:185: the Environmental Impact Assessment (“EIA”) Regulations had been met. It

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:194: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017.

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:206: 29. The project constituted EIA development to which the Infrastructure Planning (Environmental Impact Assessment)

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:217: through physical impact or by affecting their setting. A separate Heritage Impact Assessment (“HIA”) was provided to deal

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:224: Visual Impact Assessment (3rd Edition) published by the Landscape Institute and the Institute of Environmental Management

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:240: to heritage benefits or benefits for the WHS in question. I also note that in its Guidance on Heritage Impact Assessments

EN010103-001575-NZT DCO 9.2 - Written Summary ISH1 - May 2022.pdf:255: the Applicant's Heritage Impact Assessment ER 5.7.66. Furthermore, it is also noted from Historic England's concluding

EN010103-000892-NZT DCO 6.2.6 ES Vol I Chapter 6 Alternatives and Design Evolution.pdf:2:6.1.2 The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-000892-NZT DCO 6.2.6 ES Vol I Chapter 6 Alternatives and Design Evolution.pdf:3: in the environmental impact assessment.

EN010103-000892-NZT DCO 6.2.6 ES Vol I Chapter 6 Alternatives and Design Evolution.pdf:19: The Infrastructure Planning (Environmental Impact Assessment)

EN010103-001962-c 16 May 2022.pdf:5: of the Infrastructure Planning (Environmental Impact Assessment)

EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:3: EIA Environmental Impact Assessment - the

EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:16: environmental impact assessment (‘EIA’).

EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:49: (Document Ref 6.1 – 6.4) also ensure that the air impact assessment and visual

EN010103-001469-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Apr 2022.pdf:49: impact assessment of the tallest structures associated with the Proposed

EN010103-001059-NZT DCO 6.4.24 ES Vol III Appendix 12G Water Vole and Otter Survey Report.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:52: (f) an update to the hydrogeological impact assessment including hydrogeological

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:52: statement and the hydrogeological impact assessment;

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:54: must take into account the updated hydrogeological impact assessment and any further

EN010103-002526-NZT DCO 2.1 - Final draft DCO (Tracked) - Nov 2022 (D12).pdf:58:hydrogeological impact assessment and any further ground investigation reports and groundwater

EN010103-000063-Acknowledgement of S46 Notification.pdf:1:Planning (Environmental Impact Assessment) Regulations 2017 – Regulation

EN010103-000063-Acknowledgement of S46 Notification.pdf:1:Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 that

EN010103-002235-NZT DCO 8.4 - MMO SoCG (Clean) - Sept 2022(D8).pdf:3: EIA Environmental Impact Assessment - the

EN010103-002235-NZT DCO 8.4 - MMO SoCG (Clean) - Sept 2022(D8).pdf:42: separate Environmental Impact Assessment (EIA) it is dealt with via a separate consenting regime. However, we remain

EN010103-002235-NZT DCO 8.4 - MMO SoCG (Clean) - Sept 2022(D8).pdf:92:benthic data are suitable for the completion of an impact assessment for the proposed Outfall II location.

EN010103-002633-NZT DCO 3.3 - Funding Statement - Appendix 1 (Tracked) - Nov 2022 (D13).pdf:3: EIA Environmental Impact Assessment. The

EN010103-002633-NZT DCO 3.3 - Funding Statement - Appendix 1 (Tracked) - Nov 2022 (D13).pdf:3: Impact Assessment) Regulations 2017 (as

EN010103-001896-NZT DCO 8.11 - Northern Powergrid SoCG (Clean) - July 22 (D4).pdf:3:EIA Environmental Impact Assessment - the assessment

EN010103-001990-NZT DCO 9.22 - Written Summary of ISH3 - August 2022(D5).pdf:20: as a worst case scenario for the purposes of the Environmental Impact Assessment. It is not necessary to secure

EN010103-001142-NZT DCO 6.4.31 ES Vol III Appendix 14C Marine Mammal Baseline.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-000061-S46 Notification.pdf:2: ‘The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017’ (the ‘EIA

EN010103-002644-NZT DCO 9.52 - End of Examination Negotiation Status - Nov 2022 (D13).pdf:2: EIA Environmental Impact Assessment

EN010103-002240-NZT DCO 8.6 - Natural England SoCG (Tracked) - Sept 2022(D8).pdf:3: EIA Environmental Impact Assessment - the

EN010103-000889-NZT DCO 6.4.28 ES Vol III Appendix 13A Aquatic Ecology Supplementary Desk Study and Field Survey Report.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-000889-NZT DCO 6.4.28 ES Vol III Appendix 13A Aquatic Ecology Supplementary Desk Study and Field Survey Report.pdf:3: make an ecological impact assessment of the Proposed Development.

EN010103-000889-NZT DCO 6.4.28 ES Vol III Appendix 13A Aquatic Ecology Supplementary Desk Study and Field Survey Report.pdf:3:13.1.16. The ecological impact assessment is provided in the formal EcIA provided as

EN010103-000889-NZT DCO 6.4.28 ES Vol III Appendix 13A Aquatic Ecology Supplementary Desk Study and Field Survey Report.pdf:13: and aquatic plant species and assemblages, while the impact assessment is

EN010103-000889-NZT DCO 6.4.28 ES Vol III Appendix 13A Aquatic Ecology Supplementary Desk Study and Field Survey Report.pdf:14: Management (CIEEM) Guidelines for Ecological Impact Assessment in the UK

EN010103-001234-NZT - Regulation 32 Transboundary Screening (4).pdf:3:Under Regulation 32 of The Infrastructure Planning (Environmental Impact Assessment)

EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:2: AIA Atmospheric Impact Assessment

EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:2: AQIA Air Quality Impact Assessment

EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:2: EIA Environmental Impact Assessment

EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:12: Impact Assessment (EIA) process.

EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:14:3.2.2 Therefore, these are the European sites covered by the air quality impact assessment

EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:35: an absolute noise threshold, is used as an alternative means of impact assessment.

EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:38:4.2.17 An Air Quality Impact Assessment (AQIA) has been carried out in Appendix 8A [APP-

EN010103-002062-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Clean) August 2022 (D6).pdf:48:4.3.6 An Atmospheric Impact Assessment (AIA) has been undertaken using detailed air

EN010103-001182-NZT EL.pdf:7:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL.pdf:8:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL.pdf:14:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL.pdf:16: 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment

EN010103-001994-NZT DCO 9.26 - Riparian Mammal Report - August 2022(D5).pdf:2: EIA Environmental Impact Assessment

EN010103-000013-EN010103_Scoping Opinion.pdf:1: (Environmental Impact Assessment) Regulations 2017

EN010103-000013-EN010103_Scoping Opinion.pdf:5: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017

EN010103-000013-EN010103_Scoping Opinion.pdf:13: ‘Environmental Impact Assessment: Process, Preliminary Environmental

EN010103-000013-EN010103_Scoping Opinion.pdf:13: Advice Note Seven: Environmental Impact Assessment: Process, Preliminary Environmental

EN010103-000013-EN010103_Scoping Opinion.pdf:32: ecological impact assessment in the ES.

EN010103-000013-EN010103_Scoping Opinion.pdf:33: noise impact assessment should be undertaken based on a worst case

EN010103-000013-EN010103_Scoping Opinion.pdf:38: accordance with the ‘Guidelines for Ecological Impact Assessment in

EN010103-000013-EN010103_Scoping Opinion.pdf:38: Chartered Institute of Ecology and Environmental Management (CIEEM) Guidelines for Ecological Impact Assessment in the UK and Ireland: Terrestrial,

EN010103-000013-EN010103_Scoping Opinion.pdf:54:4.11.1 Para 6.142 Human health impact assessment The Scoping Report states that no specific human health impact

EN010103-000013-EN010103_Scoping Opinion.pdf:58: - Advice Note Seven: Environmental Impact Assessment: Process,

EN010103-000013-EN010103_Scoping Opinion.pdf:70:will be required and an Environmental Impact Assessment (including returning

EN010103-000013-EN010103_Scoping Opinion.pdf:80:Impact Assessment) Regulations 2017 (the EIA Regulations) – Regulations 10 and

EN010103-000013-EN010103_Scoping Opinion.pdf:96:(ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2017 (THE EIA

EN010103-000013-EN010103_Scoping Opinion.pdf:98:For the purposes of the Environmental Impact Assessment (“EIA”) Scoping Report prepared

EN010103-000013-EN010103_Scoping Opinion.pdf:118:Environmental Impact Assessment Scoping consultation (Regulation 15 (4) of the EIA

EN010103-000013-EN010103_Scoping Opinion.pdf:118:Environmental Impact Assessment (EIA) for this development.

EN010103-000013-EN010103_Scoping Opinion.pdf:118: 2 Note on Environmental Impact Assessment Directive for Local Planning Authorities Office of the Deputy Prime

EN010103-000013-EN010103_Scoping Opinion.pdf:119:Schedule 4 of the Town & Country Planning (Environmental Impact Assessment) Regulations 2017,

EN010103-000013-EN010103_Scoping Opinion.pdf:119:Ecological Impact Assessment (EcIA) have been developed by the Chartered Institute of Ecology

EN010103-000013-EN010103_Scoping Opinion.pdf:121:results, impact assessments and appropriate accompanying mitigation strategies included as part of

EN010103-000013-EN010103_Scoping Opinion.pdf:121:therefore advises that survey, impact assessment and mitigation proposals for Habitats and Species

EN010103-000013-EN010103_Scoping Opinion.pdf:122:Natural England supports the publication Guidelines for Landscape and Visual Impact Assessment,

EN010103-000013-EN010103_Scoping Opinion.pdf:122:landscape and visual impact assessment.

EN010103-000013-EN010103_Scoping Opinion.pdf:122:Environmental Impact Assessment process should detail the measures to be taken to ensure the

EN010103-000013-EN010103_Scoping Opinion.pdf:122:cumulative impact assessment should include other proposals currently at Scoping stage. Due to

EN010103-000013-EN010103_Scoping Opinion.pdf:123:The ES should include an impact assessment to identify, describe and evaluate the effects that are

EN010103-000013-EN010103_Scoping Opinion.pdf:125:With reference to the protection of the railway, the Environmental Impact Assessment should consider issues that

EN010103-000013-EN010103_Scoping Opinion.pdf:127:We have read the Environmental Impact Assessment (EIA) Scoping Report and note the intentions of

EN010103-000013-EN010103_Scoping Opinion.pdf:130:health impact assessment, and development consent.

EN010103-000013-EN010103_Scoping Opinion.pdf:131:(Environmental Impact Assessment: Process, Preliminary Environmental Information and

EN010103-000013-EN010103_Scoping Opinion.pdf:131:not make links to the list of protected characteristics within an Equality Impact Assessment

EN010103-000013-EN010103_Scoping Opinion.pdf:133: Environmental Impact Assessment: A guide to good practice and procedures - A consultation paper; 2006; Department for Communities

EN010103-000013-EN010103_Scoping Opinion.pdf:139:PHE expects promoters to carry out the necessary radiological impact assessments to

EN010103-000013-EN010103_Scoping Opinion.pdf:139:Any radiological impact assessment should also consider the possibility of short-term

EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf:3: EIA Environmental Impact Assessment. The

EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf:3: (Environmental Impact Assessment) Regulations

EN010103-000824-NZT DCO 3.2 - Statement of Reasons.pdf:29:3.1.14 The Environmental Impact Assessment (’EIA’) has therefore been undertaken adopting

EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:2: AIA Atmospheric Impact Assessment

EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:2: AQIA Air Quality Impact Assessment

EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:2: EIA Environmental Impact Assessment

EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:12: Impact Assessment (EIA) process.

EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:14:3.2.2 Therefore, these are the European sites covered by the air quality impact assessment

EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:35: an absolute noise threshold, is used as an alternative means of impact assessment.

EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:38:4.2.17 An Air Quality Impact Assessment (AQIA) has been carried out in Appendix 8A [APP-

EN010103-002553-NZT DCO 5.13 - HRA Report (Tracked) - Nov 2022 (D12).pdf:48:4.3.6 An Atmospheric Impact Assessment (AIA) has been undertaken using detailed air

EN010103-001727-DLA Piper UK LLP - Written Representations (WRs), including summaries of all WRs exceeding 1500 words 1.pdf:20:Planning (Environmental Impact Assessment) Regulations 2009(b) and has had regard to the

EN010103-001995-NZT DCO 1.2 - Application Guide - August 2022(D5).pdf:2: EIA Environmental Impact Assessment - a term used

EN010103-001995-NZT DCO 1.2 - Application Guide - August 2022(D5).pdf:3: Impact Assessment) Regulations 2017.

EN010103-001995-NZT DCO 1.2 - Application Guide - August 2022(D5).pdf:13: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the

EN010103-001995-NZT DCO 1.2 - Application Guide - August 2022(D5).pdf:18: Category 6.0 Environmental Impact Assessment Information May 2021

EN010103-001995-NZT DCO 1.2 - Application Guide - August 2022(D5).pdf:31: Impact Assessment Methods

EN010103-001992-NZT DCO 9.24 - Written Summary of ISH4 August 2022 (D5).pdf:6: • Comments and observations on the Landscape and Visual Impact Assessment In response to comments made by the Redcar and Cleveland Borough Council (“RCBC”) representative in respect of

EN010103-001992-NZT DCO 9.24 - Written Summary of ISH4 August 2022 (D5).pdf:18: Post-hearing note: The request for Tees South Bank Quarry to be included in the cumulative impact assessment was

EN010103-001992-NZT DCO 9.24 - Written Summary of ISH4 August 2022 (D5).pdf:19: impact assessment. Alternatively, the Applicant should provide suitable justification for scoping it out.”

EN010103-001992-NZT DCO 9.24 - Written Summary of ISH4 August 2022 (D5).pdf:22: The Air Quality Impact assessment was carried out based on a number of conservative assumptions, with the

EN010103-002176-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Clean).pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017

EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf:3: EIA Environmental Impact Assessment. The

EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf:3: (Environmental Impact Assessment) Regulations

EN010103-002532-NZT DCO 3.2 - Statement of Reasons Clean Nov 2022 (D12).pdf:32:3.1.14 The Environmental Impact Assessment (’EIA’) has therefore been undertaken

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:2: be considered as part of the Environmental Impact Assessment (EIA) of the

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:2:  Appendix 12B: Ecological Impact Assessment Methods;

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:6: Impact Assessment and Significance Criteria

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:6:12.3.4 Ecological Impact Assessment (EcIA) is the process of identifying,

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:6: in Appendix 12B: Ecological Impact Assessment Methods (ES Volume III,

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:7: further within the impact assessment process;

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:10: needs for robust ecological impact assessment in accordance with Rochdale

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:10: requirements for robust ecological impact assessment. For example,

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:12:https://magic.defra.gov.u quality impact assessment) or otherwise

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:16:relevant to the ecological impact assessment, with

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:16:explained and justified in the ES. informed the ecological impact assessment

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:16:assessment in accordance with the ‘Guidelines for Appendix 12B: Ecological Impact Assessment

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:16:Ecological Impact Assessment in the UK and Ireland’ Methods (ES Volume III, Document Ref. 6.4).

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:17:  NE GIS data is currently being impact assessment.

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:20: ecological features in and out of the impact assessment.

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:20: Ecological Impact Assessment Methods (ES Volume III, Document Ref. 6.4),

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:35: 12B: Ecological Impact Assessment Methods in ES Volume III, Document

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:36: explained within the impact assessment section.

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:38: of worst-case impact assessment that the impact on OMH could be

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:40: purposes of this impact assessment. This is because disturbance of

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:46: the impact assessment, as it is primarily a matter for legal compliance. It is

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:46:12.6.52 Based on the results of the operational air quality impact assessment

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:46:12.6.54 The air quality impact assessment (Appendix 8B: Air Quality – Operational

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:48: review of the air quality impact assessment submitted with the planning

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:48: The air quality impact assessment cannot rule out a potential adverse effect

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:48: load data to inform air quality modelling and impact assessment.

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:52:12.7.9 Given the findings of the above impact assessment, mitigation measures are

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:55:12.9.3 The air quality impact assessment informing this EcIA has considered a

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:55:12.9.4 The air quality impact assessment identifies potential for a cumulative effect

EN010103-000898-NZT DCO 6.2.12 ES Vol I Chapter 12 Terrestrial Ecology.pdf:56: CIEEM (2019). Guidelines for Ecological Impact Assessment in the UK and

EN010103-001918-NZT DCO 2.1 - Draft DCO (Comparison with June 2022) - July 2022 (D4).pdf:6:(Environmental Impact Assessment) Regulations 2017(a) and having had regard to the documents

EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:51: (f) an update to the hydrogeological impact assessment that is informed by any further

EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:51: Chapter 10 of the environmental statement and the hydrogeological impact assessment;

EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:53: must take into account the updated hydrogeological impact assessment and any further

EN010103-002251-NZT DCO 2.1 - Draft DCO (Clean) - Sept 2022(D8).pdf:57:hydrogeological impact assessment and any further ground investigation reports and groundwater

EN010103-001914-NZT DCO 9.19 - Further Response to Written Question GEN.1.37 - July 2022 (D4).pdf:2: EIA Environmental Impact Assessment

EN010103-001468-NZT DCO 5.4 - Design and Access Statement - Tracked - Apr 2022.pdf:3: EIA Environmental Impact Assessment - a term used for the assessment of

EN010103-001468-NZT DCO 5.4 - Design and Access Statement - Tracked - Apr 2022.pdf:3: an Environment Impact Assessment are documented.

EN010103-001468-NZT DCO 5.4 - Design and Access Statement - Tracked - Apr 2022.pdf:7: the purposes of the Environmental Impact Assessment (‘EIA’) of the Proposed

EN010103-001468-NZT DCO 5.4 - Design and Access Statement - Tracked - Apr 2022.pdf:18: parameters upon which the Environmental Impact Assessment of it has been

EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf:15: this development should be included in the cumulative impact assessment.

EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf:15: commence) are not scoped in as part of the cumulative impact assessment. To

EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf:15: cumulative impact assessment, unless suitable justification for scoping it out can

EN010103-001240-EN010103_Marine_Management_Organisation_Relevant_Representation_17122021_Redacted.pdf:16: impact assessments.

EN010103-001474-NZT DCO 1.2 - Application Guide - Apr 2022.pdf:2: EIA Environmental Impact Assessment - a term used

EN010103-001474-NZT DCO 1.2 - Application Guide - Apr 2022.pdf:3: Impact Assessment) Regulations 2017.

EN010103-001474-NZT DCO 1.2 - Application Guide - Apr 2022.pdf:12: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the

EN010103-001474-NZT DCO 1.2 - Application Guide - Apr 2022.pdf:15: Category 6.0 Environmental Impact Assessment Information May 2021

EN010103-001474-NZT DCO 1.2 - Application Guide - Apr 2022.pdf:25: Impact Assessment Methods

EN010103-002527-NZT DCO 2.1f - Schedule of Changes to DCO - Nov 2022 (D12).pdf:4: - R13(2)(f) – change made to make it clear that the hydrogeological impact assessment

EN010103-002052-NZT DCO 5.4 - Design and Access Statement - Clean - August 2022(D6).pdf:3: EIA Environmental Impact Assessment - a term used for the assessment of

EN010103-002052-NZT DCO 5.4 - Design and Access Statement - Clean - August 2022(D6).pdf:3: Environment Impact Assessment are documented.

EN010103-002052-NZT DCO 5.4 - Design and Access Statement - Clean - August 2022(D6).pdf:7: the purposes of the Environmental Impact Assessment (‘EIA’) of the Proposed

EN010103-002052-NZT DCO 5.4 - Design and Access Statement - Clean - August 2022(D6).pdf:18: parameters upon which the Environmental Impact Assessment of it has been

EN010103-001848-1.2 - Application Guide - June 2022(D3).pdf:2: EIA Environmental Impact Assessment - a term used

EN010103-001848-1.2 - Application Guide - June 2022(D3).pdf:3: Impact Assessment) Regulations 2017.

EN010103-001848-1.2 - Application Guide - June 2022(D3).pdf:13: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the

EN010103-001848-1.2 - Application Guide - June 2022(D3).pdf:17: Category 6.0 Environmental Impact Assessment Information May 2021

EN010103-001848-1.2 - Application Guide - June 2022(D3).pdf:30: Impact Assessment Methods

EN010103-000903-NZT DCO 6.2.19 ES Vol I Chapter 19 Marine Heritage.pdf:3: • Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-000903-NZT DCO 6.2.19 ES Vol I Chapter 19 Marine Heritage.pdf:6: Impact Assessment Methodology

EN010103-000903-NZT DCO 6.2.19 ES Vol I Chapter 19 Marine Heritage.pdf:6: (Environmental Impact Assessment) Regulations 2017 (Secretary of

EN010103-000903-NZT DCO 6.2.19 ES Vol I Chapter 19 Marine Heritage.pdf:14: communicate the information. However, the impact assessment has merged

EN010103-000903-NZT DCO 6.2.19 ES Vol I Chapter 19 Marine Heritage.pdf:25: Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-000903-NZT DCO 6.2.19 ES Vol I Chapter 19 Marine Heritage.pdf:27: The Town and Country Planning (Environmental Impact Assessment)

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:7:(Environmental Impact Assessment) Regulations 2017© and having had regard to the documents

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:51: (f) an update to the hydrogeological impact assessment that is informed by any further ground

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:51: 10 of the environmental statement and the hydrogeological impact assessment;

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:53: must take into account the updated hydrogeological impact assessment and any further

EN010103-002252-NZT DCO 2.1 - Draft DCO (Tracked) - Sept 2022(D8).pdf:56:hydrogeological impact assessment and any further ground investigation reports and groundwater

EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:2: AIA Atmospheric Impact Assessment

EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:2: AQIA Air Quality Impact Assessment

EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:2: EIA Environmental Impact Assessment

EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:12: Impact Assessment (EIA) process.

EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:14:3.2.2 Therefore, these are the European sites covered by the air quality impact assessment

EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:35: an absolute noise threshold, is used as an alternative means of impact assessment.

EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:38:4.2.17 An Air Quality Impact Assessment (AQIA) has been carried out in Appendix 8A [APP-

EN010103-002331-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) Oct 2022 (D9).pdf:48:4.3.6 An Atmospheric Impact Assessment (AIA) has been undertaken using detailed air

EN010103-000085-Acknowledgement of s46 Notification April 2021.pdf:1:(Environmental Impact Assessment) Regulations 2017 – Regulation 8

EN010103-000085-Acknowledgement of s46 Notification April 2021.pdf:1:Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 that

EN010103-001187-NZT DCO 5.11 Indicative Lighting Strategy - Reprovided(2).pdf:12: DCO. In addition, the environmental impact assessment (in particular the landscape

EN010103-001187-NZT DCO 5.11 Indicative Lighting Strategy - Reprovided(2).pdf:15: or rules were set for impact assessment purposes. ILP guidance GN01/20 (Ref. 1)

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:2: EIA Environmental Impact Assessment

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:38: 2 ENVIRONMENTAL IMPACT ASSESSMENT: FULL LIFE-CYCLE CLIMATE CHANGE IMPACTS See the Applicants’ response above.

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:43: 27 The Environmental Statement has failed to comply with the Environmental Impact Assessment

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:46: 3 ENVIRONMENTAL IMPACT ASSESSMENT: CUMULATIVE EFFECTS See the Applicants’ response above.

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:47: 4 ENVIRONMENTAL IMPACT ASSESSMENT: IEMA/EIA GUIDANCE See the Applicants’ response above.

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:105: 6.5 The Applicants’ transport impact assessment should reassess impacts during the construction phase with Modelling (Document Ref. 9.13) submitted at Deadline 3.

EN010103-001859-9.12 - Applicants comments on written Representations - June 2022 (D3).pdf:105: 6.7 The Applicants also are required to update their Transport Impact Assessments to account for the

EN010103-002410-NZT DCO - 9.46 Applicants’ Response to the ExA's Third Written Questions - Oct 2022 (D11).pdf:2: EIA Environmental Impact Assessment

EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (as

EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf:7: (Environmental Impact Assessment) Regulations 2017 (as amended) (‘the EIA

EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf:8: Regulations’). Environmental Impact Assessment (EIA) is a systematic

EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf:8:  baseline data gathered during the impact assessment process;

EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf:30: example, the landscape and visual impact assessment has assessed the

EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf:38:7.6.7 Based on the results of the operational air quality impact assessment

EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf:49:  Greenhouse Gas impact assessment (the potential effect the Proposed

EN010103-001161-NZT DCO 6.1 ES Non-Technical Summary.pdf:50: In-Combination Climate Impact Assessment Summary

EN010103-001467-NZT DCO 5.4 - Design and Access Statement - Clean - Apr 2022.pdf:3: EIA Environmental Impact Assessment - a term used for the assessment of

EN010103-001467-NZT DCO 5.4 - Design and Access Statement - Clean - Apr 2022.pdf:3: an Environment Impact Assessment are documented.

EN010103-001467-NZT DCO 5.4 - Design and Access Statement - Clean - Apr 2022.pdf:7: the purposes of the Environmental Impact Assessment (‘EIA’) of the Proposed

EN010103-001467-NZT DCO 5.4 - Design and Access Statement - Clean - Apr 2022.pdf:18: parameters upon which the Environmental Impact Assessment of it has been

EN010103-001471-NZT DCO 2.1 - Draft DCO (Comparison with Oct 2021 version) - Apr 2022.pdf:6:(Environmental Impact Assessment) Regulations 2017(e) and having had regard to the documents

EN010103-001234-NZT - Regulation 32 Transboundary Screening (9).pdf:3:Under Regulation 32 of The Infrastructure Planning (Environmental Impact Assessment)

EN010103-001473-NZT DCO 1.2 - Application Guide (Tracked) - Apr 2022.pdf:2: EIA Environmental Impact Assessment - a term used

EN010103-001473-NZT DCO 1.2 - Application Guide (Tracked) - Apr 2022.pdf:3: Impact Assessment) Regulations 2017.

EN010103-001473-NZT DCO 1.2 - Application Guide (Tracked) - Apr 2022.pdf:12: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the

EN010103-001473-NZT DCO 1.2 - Application Guide (Tracked) - Apr 2022.pdf:16: Category 6.0 Environmental Impact Assessment Information May 2021

EN010103-001473-NZT DCO 1.2 - Application Guide (Tracked) - Apr 2022.pdf:25: Impact Assessment Methods

EN010103-001789-NZT DCO 5.10 - Other Consents and Licences - June 2022 (Clean).pdf:20: (Environmental Impact Assessment)

EN010103-001789-NZT DCO 5.10 - Other Consents and Licences - June 2022 (Clean).pdf:22: Storage (Environmental Impact Assessment)

EN010103-000897-NZT DCO 6.2.11 ES Vol I Chapter 11 Noise and Vibration.pdf:19: Impact Assessment and Significance Criteria

EN010103-000918-NZT DCO 6.2.25 ES Vol I Chapter 25 Summary of Significant Effects.pdf:2: Ref 6.3), for the purposes of this Environmental Impact Assessment (EIA),

EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:3: EIA Environmental Impact Assessment - the

EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:16: environmental impact assessment (‘EIA’).

EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:47: (Document Ref 6.1 – 6.4) also ensure that the air impact assessment and visual

EN010103-001470-NZT DCO 2.2 - Explanatory Memorandum - Apr 2022.pdf:47: impact assessment of the tallest structures associated with the Proposed

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:2: EIA Environmental Impact Assessment

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:47: 9. We have concerns as to whether the relevant environmental 9. The environmental impact assessment for the entire scheme has

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:220: Environmental Impact Assessment (EIA) Environmental Statement See response to paragraph 4.1 to 4.12. Since the relevant

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:255: should be included in the cumulative impact assessment.

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:256: in as part of the cumulative impact assessment. To the best elements of the Anglo American project have multiple different names, but

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:256: cumulative impact assessment, unless suitable justification

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:258: approach to impact assessment is required. For example,

EN010103-001579-NZT DCO 9.6 - Applicants' Comments on RRs - May 2022.pdf:258: consideration in cumulative impact assessments.

EN010103-001234-NZT - Regulation 32 Transboundary Screening (12).pdf:3:Under Regulation 32 of The Infrastructure Planning (Environmental Impact Assessment)

EN010103-002067-NZT DCO 8.4 - Marine Management Organisation SoCG (Tracked) August 2022 (D6).pdf:3: EIA Environmental Impact Assessment - the

EN010103-002067-NZT DCO 8.4 - Marine Management Organisation SoCG (Tracked) August 2022 (D6).pdf:43: separate Environmental Impact Assessment (EIA) it is dealt with via a separate consenting regime. However, we remain

EN010103-002067-NZT DCO 8.4 - Marine Management Organisation SoCG (Tracked) August 2022 (D6).pdf:93:benthic data are suitable for the completion of an impact assessment for the proposed Outfall II location.

EN010103-000005-EN010103_Scoping Report.pdf:5: Ecological Impact Assessment Methodology …………………………………………………….. 52

EN010103-000005-EN010103_Scoping Report.pdf:5:7. Environmental Impact Assessment ………………………………………. 63

EN010103-000005-EN010103_Scoping Report.pdf:7: UK Ltd (AECOM) to prepare this Environmental Impact Assessment (EIA) Scoping

EN010103-000005-EN010103_Scoping Report.pdf:7: Impact Assessment) Regulations 2017’ for a proposed full chain Carbon Capture

EN010103-000005-EN010103_Scoping Report.pdf:10: the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017

EN010103-000005-EN010103_Scoping Report.pdf:12:Source: Advice Note Seven: Environmental Impact Assessment: Process, Preliminary Environmental Information and

EN010103-000005-EN010103_Scoping Report.pdf:13:Source: Advice Note Seven: Environmental Impact Assessment: Preliminary Environmental Information, Screening and

EN010103-000005-EN010103_Scoping Report.pdf:14:  Section 7 – Environmental Impact Assessment: provides an outline structure for

EN010103-000005-EN010103_Scoping Report.pdf:42:6.17 An atmospheric impact assessment will be undertaken for the main point source

EN010103-000005-EN010103_Scoping Report.pdf:42:6.22 An air quality impact assessment will also be undertaken on the effects of road traffic

EN010103-000005-EN010103_Scoping Report.pdf:43:6.27 This section will draw on the IEMA ‘Environmental Impact Assessment Guide to:

EN010103-000005-EN010103_Scoping Report.pdf:52: Ecological Impact Assessment Methodology

EN010103-000005-EN010103_Scoping Report.pdf:52:6.82 This guidance follows a ‘biodiversity’ approach to impact assessment (rather than

EN010103-000005-EN010103_Scoping Report.pdf:53: Phase 1 Habitat survey will be used to undertake an ecological impact assessment.

EN010103-000005-EN010103_Scoping Report.pdf:53: Ecology and Environmental Management (IEEM) Ecological Impact Assessment

EN010103-000005-EN010103_Scoping Report.pdf:54: Phase 1 Habitat survey will be used to undertake an ecological impact assessment.

EN010103-000005-EN010103_Scoping Report.pdf:56:  cumulative impact assessment – including consideration of the traffic likely to be

EN010103-000005-EN010103_Scoping Report.pdf:57:6.111 The proposed method of landscape and visual impact assessment has been devised

EN010103-000005-EN010103_Scoping Report.pdf:57:  ‘Guidelines for Landscape and Visual Impact Assessment’ (IEMA, 2013,

EN010103-000005-EN010103_Scoping Report.pdf:57:  ‘Photography and photomontage in landscape and visual impact assessment’

EN010103-000005-EN010103_Scoping Report.pdf:59: as part of the landscape and visual impact assessment as discussed in Section 6.7)

EN010103-000005-EN010103_Scoping Report.pdf:60:6.130 Following the impact assessment process, any potential mitigation strategies

EN010103-000005-EN010103_Scoping Report.pdf:61: standards). Therefore, no specific human health impact assessment is proposed for

EN010103-000005-EN010103_Scoping Report.pdf:63:7. Environmental Impact Assessment

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:21: Collaborations for the development of Impact Assessment Models (Polytechnic of Milan

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:142: stakeholders, also through training and  prohibit offering, promising, giving, paying, impact assessments and development

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:143:ENVIRONMENT  Application of the Environmental, Social & Health Impact Assessment (ESHIA) process to all projects

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:143:  Human Rights Impact Assessment, with a risk-based prioritization model for industrial projects

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:143:  Application of the ESHIA (Environmental Social & Health Impact Assessment) process to all business projects

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:165:investigated through a Human Rights Impact Assessment Statement”45 and in the “Position on conflict minerals”46.

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:166:Mandatory training for senior managers and middle manag- Although no new Human Rights Impact Assessments (HRIAs)

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:170:ies to Civil Society Organizations present in the territories in tivities through Human Rights Impact Assessments, defini-

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:171: Impact Assessment – (HRIA); Iraq and Mexico. As part of the interventions implemented

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:171: impact assessment tools, useful for evaluating the direct, in- tors and respirators; intensive care equipment and other med-

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:171:velopment activities, of which €20.8 million in Asia, €16.3 mil- pleted 4 HIAs (Health Impact Assessment), of which 3 were

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:171:projects implemented in 2020 include initiatives to encour- Impact Assessment).

EN010103-000820-NZT DCO 3.3 - Funding Statement - Appendix 6.pdf:180: engagement, impact assessments,

EN010103-001512-TEXT_ISH1_Session2_NetZeroTeesside_10052022.pdf:7:environmental impact assessment regulations requirements to consider these particular impacts. The

EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:2: AIA Atmospheric Impact Assessment

EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:2: AQIA Air Quality Impact Assessment

EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:2: EIA Environmental Impact Assessment

EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:12: Impact Assessment (EIA) process.

EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:14:3.2.2 Therefore, these are the European sites covered by the air quality impact assessment

EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:35: an absolute noise threshold, is used as an alternative means of impact assessment.

EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:39:4.2.17 An Air Quality Impact Assessment (AQIA) has been carried out in Appendix 8A [APP-

EN010103-002063-NZT DCO 7.12 - Habitats Regulations Assessment Report (Change Request) (Tracked) August 2022 (D6).pdf:50:4.3.6 An Atmospheric Impact Assessment (AIA) has been undertaken using detailed air

EN010103-001234-NZT - Regulation 32 Transboundary Screening (1).pdf:3:Under Regulation 32 of The Infrastructure Planning (Environmental Impact Assessment)

EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:35: immediate disclosure of information, including sensitive personal data. We must be able to update our ensure we have a robust impact assessment process aligned

EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:109:to prevent serious injuries and fatalities. detailed environmental, social and health impact assessments. We help

EN010103-001603-NZT DCO 9.4 - APPENDIX 4 LATEST AUDITED ACCOUNTS – SHELL U.K. LIMITED.pdf:110:biodiversity as part of our Impact Assessment process. In 2003, In 2021, we set a measurable target for fresh-water use: we will reduce

EN010103-002503-NZT DCO 6.5 - ES Guide - Nov 2022 (D12).pdf:13: Ecological Impact Assessment Methods

EN010103-000817-NZT DCO - Section_55_Checklist (19.07.21).pdf:3: Regulation 8 of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (2017 EIA Regulations), or where Regulation 37 of

EN010103-000817-NZT DCO - Section_55_Checklist (19.07.21).pdf:3: the 2017 EIA Regulations applies, Regulation 6 of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 (2009 EIA

EN010103-000817-NZT DCO - Section_55_Checklist (19.07.21).pdf:21: Environmental Impact Assessment:

EN010103-001898-NZT DCO 8.12 - Northumbrian Water Ltd SoCG (Clean) July 2022 (D4).pdf:3: EIA Environmental Impact Assessment - the

EN010103-001713-South Tees Development Corporation - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:10:6.5 The Applicants’ transport impact assessment should reassess impacts during the construction

EN010103-001713-South Tees Development Corporation - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:11:6.7 The Applicants also are required to update their Transport Impact Assessments to account for

EN010103-002079-NZT DCO 1.2 - Application Guide - August 2022(D6).pdf:2: EIA Environmental Impact Assessment - a term used

EN010103-002079-NZT DCO 1.2 - Application Guide - August 2022(D6).pdf:3: Impact Assessment) Regulations 2017.

EN010103-002079-NZT DCO 1.2 - Application Guide - August 2022(D6).pdf:13: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the

EN010103-002079-NZT DCO 1.2 - Application Guide - August 2022(D6).pdf:18: Category 6.0 Environmental Impact Assessment Information May 2021

EN010103-002079-NZT DCO 1.2 - Application Guide - August 2022(D6).pdf:31: Impact Assessment Methods

EN010103-002325-NZT DCO 9.39 - Applicants' Response to ExA's RFI Oct 2022 (D9).pdf:2: EIA Environmental Impact Assessment

EN010103-002325-NZT DCO 9.39 - Applicants' Response to ExA's RFI Oct 2022 (D9).pdf:7:2.3.1 The offshore ES will also contain a cumulative and in-combination impact assessment

EN010103-000829-NZT DCO 5.4 - Design and Access Statement.pdf:3:EIA Environmental Impact Assessment - a term used for the assessment of

EN010103-000829-NZT DCO 5.4 - Design and Access Statement.pdf:3: Environment Impact Assessment are documented.

EN010103-000829-NZT DCO 5.4 - Design and Access Statement.pdf:7: for the purposes of the Environmental Impact Assessment (‘EIA’) of the Proposed

EN010103-000829-NZT DCO 5.4 - Design and Access Statement.pdf:18: and parameters upon which the Environmental Impact Assessment of it has

EN010103-001609-Redcar and Clevland Council Local Impact Report.pdf:6:5. Environmental Impact Assessment

EN010103-001609-Redcar and Clevland Council Local Impact Report.pdf:6: 5.1 The submission has been supported by an Environmental Impact Assessment. The

EN010103-001609-Redcar and Clevland Council Local Impact Report.pdf:7: involvement and the scope of the Environmental Impact Assessment.

EN010103-001609-Redcar and Clevland Council Local Impact Report.pdf:16: 9.6 A Landscape and Visual Impact assessment has been submitted as part of the

EN010103-001609-Redcar and Clevland Council Local Impact Report.pdf:16: Guidelines for Landscape and Visual Impact Assessment (GVLIA 3) and Technical

EN010103-002021-Natural England - Responses to the ExA’s ExQ2.pdf:4: wider EcIA Ecological Impact Assessment has been the majority of which are not older than 5 years, and field

EN010103-002059-NZT DCO 7.10 Second Environmental Statement Addendum - Non-Technical Statement August 2022 (D6).pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (as

EN010103-002253-NZT DCO 2.1e - Schedule of Changes to DCO - Sept 2022 (D8).pdf:4: impact assessment and any further ground investigation reports and groundwater monitoring

EN010103-002253-NZT DCO 2.1e - Schedule of Changes to DCO - Sept 2022 (D8).pdf:5:(Restoration of land used temporarily for hydrogeological impact assessment and any further ground investigation reports and groundwater

EN010103-001019-NZT DCO 6.4.4 ES Vol III Appendix 2A Transboundary Screening.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001019-NZT DCO 6.4.4 ES Vol III Appendix 2A Transboundary Screening.pdf:2:Regulation 32 of The Infrastructure Planning (Environmental Impact Assessment)

EN010103-001019-NZT DCO 6.4.4 ES Vol III Appendix 2A Transboundary Screening.pdf:4:Under Regulation 32 of The Infrastructure Planning (Environmental Impact Assessment)

EN010103-001794-NZT DCO 2.1 - Draft DCO - June 2022.pdf:7:(Environmental Impact Assessment) Regulations 2017(a) and having had regard to the documents

EN010103-001182-NZT EL (7).pdf:7:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (7).pdf:8:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (7).pdf:14:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (7).pdf:16: 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment

EN010103-002068-NZT DCO 8.5 - Environment Agency SoCG (Clean) August 2-22 (D6).pdf:3: EIA Environmental Impact Assessment - the

EN010103-002068-NZT DCO 8.5 - Environment Agency SoCG (Clean) August 2-22 (D6).pdf:19: assessment) and the Hydrological Impact Assessment (HIA). These

EN010103-002068-NZT DCO 8.5 - Environment Agency SoCG (Clean) August 2-22 (D6).pdf:20: The EA agrees that the Hydrogeological Impact Assessment

EN010103-001725-DLA Piper UK LLP - Responses to the ExA’s ExQ1 1.pdf:3:EIA Environmental Impact Assessment

EN010103-001725-DLA Piper UK LLP - Responses to the ExA’s ExQ1 1.pdf:3:LVIA Landscape and Visual Impact Assessment

EN010103-002055-NZT DCO 5.5 Electricity Grid Connection Statement (Tracked) August 2022 (D6).pdf:11: are assessed as part of the Environmental Impact Assessment, which is reported in

EN010103-002055-NZT DCO 5.5 Electricity Grid Connection Statement (Tracked) August 2022 (D6).pdf:17: as part of the associated Environmental Impact Assessment reported in the ES

EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:2: EIA Environmental Impact Assessment

EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:4: assessed as part of the environmental impact assessment (EIA) for the Project.

EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:44:INFRASTRUCTURE PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT)

EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:44:The Net Zero Teesside Project is an Environmental Impact Assessment (EIA) development,

EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:44:as defined by The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:49: EIA Environmental Impact Assessment

EN010103-001330-NZT DCO 7.6 - Consultation Statement Proposed Changes - Apr 2022_Redacted.pdf:51: part of the environmental impact assessment (EIA) for the Proposed

EN010103-002076-NZT DCO 9.30 - ISH 4 Action 9 Contaminated Land Timeline August 2022 (D6).pdf:2: EIA Environmental Impact Assessment

EN010103-002076-NZT DCO 9.30 - ISH 4 Action 9 Contaminated Land Timeline August 2022 (D6).pdf:7: be produced and the Hydrogeological Impact Assessment updated. A validation

EN010103-001023-NZT DCO 6.4.8 ES Vol III Appendix 8C Air Quality - Amine Degradation Assessment.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-002413-NZT DCO 5.10 - Other Consents and Licences - Oct 2022 D11 (Clean).pdf:26: Impact Assessment) Regulations 2020.

EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:2: AIA Atmospheric Impact Assessment

EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:2: AQIA Air Quality Impact Assessment

EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:2: EIA Environmental Impact Assessment

EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:11: Impact Assessment (EIA) process.

EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:13:3.2.2 Therefore, these are the European sites covered by the air quality impact assessment

EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:34: an absolute noise threshold, is used as an alternative means of impact assessment.

EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:37:4.2.17 An Air Quality Impact Assessment (AQIA) has been carried out (Appendix 8A of the

EN010103-001478-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Tracked.pdf:47:4.3.6 An Atmospheric Impact Assessment (AIA) has been undertaken using detailed air

EN010103-001138-NZT DCO 6.4.47 ES Vol III Appendix 24B Assessment of Cumulative Effects Stages 1-3.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:7: set of protective provisions for inclusion in the NZT DCO (Environment al Impact Assessment) Regulations 2017 (”the EIA

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:10: accordance with the Environmental Impact Assessment regime and secondly with the

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:11: the Energy Act 2008 following Environment Impact Assessment under the Offshore

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:12: made any assessment of this as part of its Environmental Impact Assessment on the

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:12:10. The Applicant recognises a need for the Environmental Impact Assessment to include

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:13:12. Under the Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:13:13. By article 1(2) of the Environmental Impact Assessment Direct 85/337/EEC (as

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:13: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017, reg 14(2)(b).

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:18: Environmental Impact Assessment of Projects Guidance on the preparation of the Environmental Impact

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:173:Infrastructure Planning (Environmental Impact Assessment) Regulations 2017(f) and, as a national

EN010103-002037-Orsted Hornsea Project Four Limited - Responses to the ExA’s ExQ2.pdf:384: Impact Assessment (EIA)

EN010103-001172-EN010103 - The ‘Net Zero Teesside Project’ - Final Section 55 Checklist.pdf:3: Regulation 8 of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (2017 EIA Regulations), or where Regulation 37 of

EN010103-001172-EN010103 - The ‘Net Zero Teesside Project’ - Final Section 55 Checklist.pdf:3: the 2017 EIA Regulations applies, Regulation 6 of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 (2009 EIA

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:2: EIA Environmental Impact Assessment

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:9: Storage (Environmental Impact Assessment) Regulations 2020.

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:38: Traffic Impact Assessment for Coatham Marsh. Coatham Marsh due to construction traffic is 0.5µg/m3 or 1.7% of the annual

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:43: scoped into the assessment no detailed surveys could be undertaken as access impact assessment - survey data is not needed for the identified waterbodies.

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:47: (CIEEM): Guidelines for Ecological Impact Assessment in the UK and Ireland: accordance with the precautionary principle if a significant effect cannot be ruled

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:47: Terrestrial, Freshwater and Coastal and Marine (2019). A detailed methodology out.” The ecological impact assessment was prepared in accordance with the

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:47: is presented in ES Appendix 12B: Ecological Impact Assessment Methods. It is precautionary principle i.e. it was worst case. The minor amendment to the

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:47: Energy (EN-1) and summarises requirements from the NPS of relevance to the water quality and marine ecology. Therefore, the impact assessment is

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:65: CC.1.5 Applicants Is it intended to undertake a cumulative impact assessment of life-cycle carbon The Institute of Environmental Management and Assessment (IEMA) guidance

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:86: the Environmental Impact Assessment. As explained at i) above the

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:88: Technical Appendix 17B: Landscape and Visual Impact Assessment

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:90: purposes of the landscape and visual impact assessment. A level of 7.3

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:97: GH1.5 Applicants i) Please confirm that a Hydrogeological Impact Assessment will be i) Further to the assessment of impacts of controlled waters included in

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:97: provided, as requested by the EA in its RR RR-024? ES Chapter 10 APP-092, a Hydrogeological Impact Assessment/

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:112: Please justify this choice of methodology. used by AECOM for other recent environmental impact assessments to support

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:130: TT.1.2 Applicants STDC do not support HGV and construction traffic access via the A1053 Tees i) A confirmatory traffic impact assessment has been undertaken on the

EN010103-001780-NZT DCO 9.7 - Applicants' Response to ExA's FWQs - June 2022.pdf:144: decision regarding waterbody importance for the impact assessment.

EN010103-001130-NZT DCO 6.4.41 ES Vol III Appendix 17C Potential Viewpoints.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001130-NZT DCO 6.4.41 ES Vol III Appendix 17C Potential Viewpoints.pdf:3: landscape and visual impact assessment for the Proposed Development, these are identified by their Potential Viewpoint ID. Those

EN010103-002179-NZT DCO 8.30 - NTG SoCG - Sept 2022(D7) (Tracked).pdf:3: EIA Environmental Impact Assessment -– the

EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:3: EIA Environmental Impact Assessment - the assessment of the likely

EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:3: EIA Regulations Infrastructure Planning (Environmental Impact Assessment)

EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:38: provided they are within the scope of the environmental impact assessment.

EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:41: (Document Ref. 6.1 - 6.4) also ensure that the air impact assessment and visual

EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:41: impact assessment of the tallest structures associated with the Proposed

EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:44: with; an update to the hydrogeological impact assessment including hydrogeological

EN010103-002529-NZT DCO 2.2 - Explanatory Memorandum (Tracked) - Nov 2022 (D12).pdf:47: submitted must take into account the updated hydrogeological impact assessment and any

EN010103-001144-NZT DCO 6.4.33 ES Vol III Appendix 14E Coastal Modelling Report.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001144-NZT DCO 6.4.33 ES Vol III Appendix 14E Coastal Modelling Report.pdf:49:Proposed Development, the Environmental Impact Assessment (EIA) for NZT is being undertaken

EN010103-001144-NZT DCO 6.4.33 ES Vol III Appendix 14E Coastal Modelling Report.pdf:51:EIA Environmental Impact Assessment

EN010103-001521-NZT-Rule_8-FINAL.pdf:16: • methodology for Environmental Impact Assessment including assessment of

EN010103-001919-NZT DCO 2.1 - Draft DCO July 2022 (D4).pdf:7:(Environmental Impact Assessment) Regulations 2017(b) and having had regard to the documents

EN010103-002506-NZT DCO 7.15.1 - Third ES Addendum Volume I (Main Report) - Nov 2022 (D12).pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (as amended)

EN010103-002506-NZT DCO 7.15.1 - Third ES Addendum Volume I (Main Report) - Nov 2022 (D12).pdf:28: impact assessment.

EN010103-001209-NZT DCO 6.4.48 - ES Vol III Appendix 24C -Oct 2021.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-002522-NZT DCO 9.49 - Response to ISH6 actions Nov22(D12).pdf:2: EIA Environmental Impact Assessment

EN010103-001182-NZT EL (11).pdf:7:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (11).pdf:8:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (11).pdf:14:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (11).pdf:16: 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment

EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:3: EIA Environmental Impact Assessment - the

EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:16: environmental impact assessment (‘EIA’).

EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:46: (Document Ref 6.1 – 6.4) also ensure that the air impact assessment and visual

EN010103-000828-NZT DCO 2.2 - Explanatory Memorandum.pdf:46: impact assessment of the tallest structures associated with the Proposed

EN010103-002411-NZT DCO 1.2 - Application Guide - Oct 2022 (D11).pdf:2: EIA Environmental Impact Assessment - a term used for the

EN010103-002411-NZT DCO 1.2 - Application Guide - Oct 2022 (D11).pdf:2: EIA Regulations The Infrastructure Planning (Environmental Impact Assessment)

EN010103-002411-NZT DCO 1.2 - Application Guide - Oct 2022 (D11).pdf:3: results of an Environment Impact Assessment are documented.

EN010103-002411-NZT DCO 1.2 - Application Guide - Oct 2022 (D11).pdf:12: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the

EN010103-002411-NZT DCO 1.2 - Application Guide - Oct 2022 (D11).pdf:18: Category 6.0 Environmental Impact Assessment Information May 2021 Unless

EN010103-002411-NZT DCO 1.2 - Application Guide - Oct 2022 (D11).pdf:31: Impact Assessment Methods

EN010103-001182-NZT EL (10).pdf:7:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (10).pdf:8:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (10).pdf:14:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (10).pdf:16: 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment

EN010103-002029-Environment Agency - Comments on any other information submitted at Deadline 5.pdf:2: • Submission of an updated hydrogeological impact assessment / and

EN010103-002029-Environment Agency - Comments on any other information submitted at Deadline 5.pdf:3:controlled waters risk assessment and the hydrogeological impact assessment

EN010103-002029-Environment Agency - Comments on any other information submitted at Deadline 5.pdf:5:(f) a hydrogeological impact assessment including hydrogeological

EN010103-002029-Environment Agency - Comments on any other information submitted at Deadline 5.pdf:7:impact assessment (HIA) would be updated, post examination.

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (as

EN010103-002060-NZT DCO 7.11.1 Second Environmental Statement Addendum - Volume I August 2022 (D6).pdf:28: impact assessment.

EN010103-001111-NZT DCO 6.4.22 ES Vol III Appendix 12E Reptile Survey Report.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001111-NZT DCO 6.4.22 ES Vol III Appendix 12E Reptile Survey Report.pdf:3: undertaken in support of the ecological impact assessment (EcIA) of the

EN010103-001111-NZT DCO 6.4.22 ES Vol III Appendix 12E Reptile Survey Report.pdf:7: reference for ecological impact assessment. This first step is set out in this

EN010103-001111-NZT DCO 6.4.22 ES Vol III Appendix 12E Reptile Survey Report.pdf:7: report. The formal impact assessment of the Proposed Development in

EN010103-001111-NZT DCO 6.4.22 ES Vol III Appendix 12E Reptile Survey Report.pdf:8: Guidelines for Ecological Impact Assessment in the UK and Ireland –

EN010103-001910-NZT DCO 9.15 - Applicants' Responses to Deadline 3 Submissions July 2022 (D4).pdf:2: EIA Environmental Impact Assessment

EN010103-001910-NZT DCO 9.15 - Applicants' Responses to Deadline 3 Submissions July 2022 (D4).pdf:34:17.2.1 The Hydrogeological Impact Assessment Report has been submitted at Deadline 4

EN010103-001108-NZT DCO 6.4.15 ES Vol III Appendix 10D Geotechnical Risk Register.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-002066-NZT DCO 8.4 - Marine Management Organisation SoCG (Clean) August 2022 (D6).pdf:3: EIA Environmental Impact Assessment - the

EN010103-002066-NZT DCO 8.4 - Marine Management Organisation SoCG (Clean) August 2022 (D6).pdf:43: separate Environmental Impact Assessment (EIA) it is dealt with via a separate consenting regime. However, we remain

EN010103-002066-NZT DCO 8.4 - Marine Management Organisation SoCG (Clean) August 2022 (D6).pdf:93:benthic data are suitable for the completion of an impact assessment for the proposed Outfall II location.

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:2: EIA Environmental Impact Assessment

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:17: environmental impact assessments it was considered to be

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:21: EIA Environmental Impact Assessment to date.’ out in paragraphs 15.3.30 – 15.3.35 and Table 15-4 of ES Chapter 15

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:26: preliminary findings of the GHG impact assessment for the construction and Where the design has evolved it has reduced the environmental effect of

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:47: relationship to the Landscape and Visual Impact Assessment does not by Teesworks to be 7.3 mAOD, the landscape and visual effects of the

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:173: ground 4 is made out. He agrees that no Equality Impact Assessment was carried out

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:183: Parliament. That order was accompanied by an impact assessment which considered

EN010103-002078-NZT DCO - 9.27 Applicants’ Response to the ExA's Second Written Questions - August 2022 (D6).pdf:183: in the impact assessment (WS paras. 15 to 17).

EN010103-001112-NZT DCO 6.4.23 ES Vol III Appendix 12F Terrestrial Invertebrate Survey Report.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf:3: EIA Environmental Impact Assessment. The

EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf:3: (Environmental Impact Assessment) Regulations

EN010103-002049-NZT DCO 3.2 - Statement of Reasons (Clean) August 2022 (D6).pdf:32:3.1.14 The Environmental Impact Assessment (’EIA’) has therefore been undertaken

EN010103-001526-NZT-ExQ1.pdf:3:EIA Environmental Impact Assessment

EN010103-001526-NZT-ExQ1.pdf:3:LVIA Landscape and Visual Impact Assessment

EN010103-001526-NZT-ExQ1.pdf:25: Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater and Coastal and

EN010103-001526-NZT-ExQ1.pdf:32:CC.1.5 Applicants Is it intended to undertake a cumulative impact assessment of life-cycle carbon emissions for

EN010103-001526-NZT-ExQ1.pdf:45: ii) Review the baseline since the Landscape and Visual Impact Assessment (LVIA) and

EN010103-001526-NZT-ExQ1.pdf:45: extent necessary to provide a robust position to undertake the impact assessment.

EN010103-001526-NZT-ExQ1.pdf:51:GH1.5 Applicants i) Please confirm that a Hydrogeological Impact Assessment will be provided, as

EN010103-001182-NZT EL (13).pdf:7:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (13).pdf:8:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (13).pdf:14:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (13).pdf:16: 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment

EN010103-000064-S42 Letter.pdf:5:Environmental Impact Assessment

EN010103-000064-S42 Letter.pdf:5:NZT is an Environmental Impact Assessment (‘EIA’) development for the purposes of EIA Regulations.

EN010103-000064-S42 Letter.pdf:11:Environmental Impact Assessment

EN010103-000064-S42 Letter.pdf:11:NZT is an Environmental Impact Assessment (‘EIA’) development for the purposes of EIA Regulations.

EN010103-000064-S42 Letter.pdf:13:PUBLICISE)’ OF THE INFRASTRUCTURE PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT)

EN010103-000064-S42 Letter.pdf:14:Regulation 13 of ‘The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017’

EN010103-000064-S42 Letter.pdf:17:Environmental Impact Assessment

EN010103-000064-S42 Letter.pdf:17:NZT is an Environmental Impact Assessment (‘EIA’) development for the purposes of EIA Regulations.

EN010103-Advice-00006-1-EN010103_Section 51 Advice-00005 - Project update meeting (1).pdf:2:Status of Environmental Impact Assessment (EIA)

EN010103-Advice-00006-1-EN010103_Section 51 Advice-00005 - Project update meeting (1).pdf:2:the Environmental Impact Assessment (EIA) and will be able to provide more

EN010103-001022-NZT DCO 6.4.7 ES Vol III Appendix 8B Air Quality - Operation Phase.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001234-NZT - Regulation 32 Transboundary Screening (11).pdf:3:Under Regulation 32 of The Infrastructure Planning (Environmental Impact Assessment)

EN010103-001984-NZT DCO 8.12 - Northumbrian Water Ltd SoCG - August 2022(D5) - Clean.pdf:3: EIA Environmental Impact Assessment - the

EN010103-001946-NZT ISH4 S2.pdf:9:Income off the applicants in the hydrogeological impact assessment that we submitted it deadline for

EN010103-001946-NZT ISH4 S2.pdf:10:hydrogeological impact assessment will be updated. Okay. Thank you. Did anybody have any

EN010103-001946-NZT ISH4 S2.pdf:29:equality impact assessment. And we've identified a means through the stack design the stack height,

EN010103-001580-NZT DCO 1.2 - Application Guide - May 2022.pdf:2: EIA Environmental Impact Assessment - a term used

EN010103-001580-NZT DCO 1.2 - Application Guide - May 2022.pdf:3: Impact Assessment) Regulations 2017.

EN010103-001580-NZT DCO 1.2 - Application Guide - May 2022.pdf:13: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the

EN010103-001580-NZT DCO 1.2 - Application Guide - May 2022.pdf:17: Category 6.0 Environmental Impact Assessment Information May 2021

EN010103-001580-NZT DCO 1.2 - Application Guide - May 2022.pdf:26: Impact Assessment Methods

EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:2: AIA Atmospheric Impact Assessment

EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:2: AQIA Air Quality Impact Assessment

EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:2: EIA Environmental Impact Assessment

EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:12: Impact Assessment (EIA) process.

EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:14:3.2.2 Therefore, these are the European sites covered by the air quality impact assessment

EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:35: an absolute noise threshold, is used as an alternative means of impact assessment.

EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:38:4.2.17 An Air Quality Impact Assessment (AQIA) has been carried out in Appendix 8A [APP-

EN010103-002509-NZT DCO 7.16 - HRA for Change Request (Tracked) - Nov 2022 (D12).pdf:48:4.3.6 An Atmospheric Impact Assessment (AIA) has been undertaken using detailed air

EN010103-001107-NZT DCO 6.4.14 ES Vol III Appendix 10C Contaminated Land Environmental Risk Assessment.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-002171-Environment Agency - Comments on any other information submitted at Deadline 6.pdf:2:We welcome the amendments to the Hydrogeological Impact Assessment (HIA)

EN010103-001883-Climate Emergency Policy and Planning (CEPP) - Comments on any other information submitted at Deadline 3.pdf:1: Impact Assessment

EN010103-001185-210924 - NZT - Response to PINS s51 advice - Final.pdf:1:(Environmental Impact Assessment) Regulations 2017 (the ‘EIA Regulations’).

EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf:3: EIA Environmental Impact Assessment - the

EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf:34: features in accordance with CIEEM guidelines for Ecological Impact assessment in

EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf:40:Consultation impact assessment:

EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf:61: possible enhance local distinctiveness and be guided by Visual Impact Assessment within final

EN010103-001588-NZT DCO 8.6 - NE SoCG - May 2022.pdf:80:benthic data are suitable for the completion of an impact assessment for the proposed Outfall II location.

EN010103-002467-NZT DCO 1.2 - Application Guide - Nov 2022 (D12).pdf:2: EIA Environmental Impact Assessment - a term used for the

EN010103-002467-NZT DCO 1.2 - Application Guide - Nov 2022 (D12).pdf:2: EIA Regulations The Infrastructure Planning (Environmental Impact Assessment)

EN010103-002467-NZT DCO 1.2 - Application Guide - Nov 2022 (D12).pdf:3: results of an Environment Impact Assessment are documented.

EN010103-002467-NZT DCO 1.2 - Application Guide - Nov 2022 (D12).pdf:12: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the

EN010103-002467-NZT DCO 1.2 - Application Guide - Nov 2022 (D12).pdf:18: Category 6.0 Environmental Impact Assessment Information May 2021 Unless

EN010103-002467-NZT DCO 1.2 - Application Guide - Nov 2022 (D12).pdf:31: Impact Assessment

EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:2: AIA Atmospheric Impact Assessment

EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:2: AQIA Air Quality Impact Assessment

EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:2: EIA Environmental Impact Assessment

EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:11: Impact Assessment (EIA) process.

EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:13:3.2.2 Therefore, these are the European sites covered by the air quality impact assessment

EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:34: an absolute noise threshold, is used as an alternative means of impact assessment.

EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:37:4.2.17 An Air Quality Impact Assessment (AQIA) has been carried out (Appendix 8A of the

EN010103-000885-NZT DCO 5.13 - Habitat Regulations Assessment Report.pdf:47:4.3.6 An Atmospheric Impact Assessment (AIA) has been undertaken using detailed air

EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:3: EIA Environmental Impact Assessment - the assessment of the likely

EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:3: EIA Regulations Infrastructure Planning (Environmental Impact Assessment)

EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:37: provided they are within the scope of the environmental impact assessment.

EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:41: (Document Ref. 6.1 - 6.4) also ensure that the air impact assessment and visual

EN010103-001999-NZT DCO 2.2 - Explanatory Memorandum - August 2022(D5) - Clean.pdf:41: impact assessment of the tallest structures associated with the Proposed

EN010103-001860-9.13 - Sensitivity Test Construction Traffic Modelling - June 2022(D3).pdf:7: Impact Assessment

EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (as

EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:13:EcIA Ecological Impact Assessment - a process by which the potential

EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:14:EIA Environmental Impact Assessment – a term used for the assessment

EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:14: of an Environment Impact Assessment are documented.

EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:15:ESIA Environmental and Social Impact Assessment

EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:16:GLVIA Guidelines for Landscape & Visual Impact Assessment – a document

EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:20:LVIA Landscape and Visual Impact Assessment – the process of evaluating

EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:28: Environmental Impact Assessment process. It is a method of ensuring

EN010103-000890-NZT DCO 6.2 ES Vol I Cover and Contents.pdf:31:Worst case An assumption adopted within an environmental impact assessment

EN010103-001182-NZT EL (9).pdf:7:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (9).pdf:8:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (9).pdf:14:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (9).pdf:16: 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment

EN010103-000887-NZT DCO 6.2.2 ES Vol I Chapter 2 Assessment Methodology.pdf:1:2.1 Environmental Impact Assessment Approach and Scope ……………………….. 2-1

EN010103-000887-NZT DCO 6.2.2 ES Vol I Chapter 2 Assessment Methodology.pdf:1:2.6 Impact Assessment Methodology and Significance Criteria ……………………. 2-5

EN010103-000887-NZT DCO 6.2.2 ES Vol I Chapter 2 Assessment Methodology.pdf:2:2.1 Environmental Impact Assessment Approach

EN010103-000887-NZT DCO 6.2.2 ES Vol I Chapter 2 Assessment Methodology.pdf:2: • Advice Note Seven: Environmental Impact Assessment, Process,

EN010103-000887-NZT DCO 6.2.2 ES Vol I Chapter 2 Assessment Methodology.pdf:2:2.1.4 In response to the Scoping Opinion, the Environmental Impact Assessment

EN010103-000887-NZT DCO 6.2.2 ES Vol I Chapter 2 Assessment Methodology.pdf:6:2.6 Impact Assessment Methodology and

EN010103-000887-NZT DCO 6.2.2 ES Vol I Chapter 2 Assessment Methodology.pdf:6: section of each of the impact assessments reported in Chapters 8 to 24. The

EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:2: AIA Atmospheric Impact Assessment

EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:2: AQIA Air Quality Impact Assessment

EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:2: EIA Environmental Impact Assessment

EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:12: Impact Assessment (EIA) process.

EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:14:3.2.2 Therefore, these are the European sites covered by the air quality impact assessment

EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:35: an absolute noise threshold, is used as an alternative means of impact assessment.

EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:38:4.2.17 An Air Quality Impact Assessment (AQIA) has been carried out in Appendix 8A[APP-

EN010103-002056-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) August 2022 (D6).pdf:48:4.3.6 An Atmospheric Impact Assessment (AIA) has been undertaken using detailed air

EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:3: EIA Environmental Impact Assessment - the assessment of the likely

EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:3: EIA Regulations Infrastructure Planning (Environmental Impact Assessment)

EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:37: provided they are within the scope of the environmental impact assessment.

EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:40: (Document Ref. 6.1 - 6.4) also ensure that the air impact assessment and visual

EN010103-002045-NZT DCO 2.2 - Explanatory Memorandum (Clean) August 2022 (D6).pdf:40: impact assessment of the tallest structures associated with the Proposed

EN010103-001182-NZT EL (3).pdf:7:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (3).pdf:8:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (3).pdf:14:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (3).pdf:16: 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment

EN010103-001171-EN010103 The Net Zero Teesside Project A05 Notification of Decision to Accept Application.pdf:1: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017.

EN010103-000827-NZT DCO 2.1 - Draft Development Consent Order.pdf:6:(Environmental Impact Assessment) Regulations 2017(e) and having had regard to the documents

EN010103-001986-NZT DCO 8.20 - Exolum Seal Sands & Exolum Riverside SoCG - August 2022(D5).pdf:2: EIA Environmental Impact Assessment - the assessment of the

EN010103-001986-NZT DCO 8.20 - Exolum Seal Sands & Exolum Riverside SoCG - August 2022(D5).pdf:2: EIA Regulations Infrastructure Planning (Environmental Impact Assessment)

EN010103-001331-NZT DCO 7.5 - Letter Requesting Proposed Changes - Apr 2022_Redacted.pdf:2:consulted upon and assessed as part of the environmental impact assessment (EIA) for the Project.

EN010103-001331-NZT DCO 7.5 - Letter Requesting Proposed Changes - Apr 2022_Redacted.pdf:5:Planning (Environmental Impact Assessment) Regulations 2017’ (the ‘EIA Regulations’). There is no

EN010103-001182-NZT EL (2).pdf:7:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (2).pdf:8:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (2).pdf:14:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (2).pdf:16: 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment

EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:2: AIA Atmospheric Impact Assessment

EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:2: AQIA Air Quality Impact Assessment

EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:2: EIA Environmental Impact Assessment

EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:11: Impact Assessment (EIA) process.

EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:13:3.2.2 Therefore, these are the European sites covered by the air quality impact assessment

EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:34: an absolute noise threshold, is used as an alternative means of impact assessment.

EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:37:4.2.17 An Air Quality Impact Assessment (AQIA) has been carried out in Appendix 8A[APP-

EN010103-001479-NZT DCO 5.13 Habitat Regulations Assessment Report Rev 3 Final 2022-04-26.pdf:47:4.3.6 An Atmospheric Impact Assessment (AIA) has been undertaken using detailed air

EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:2: AIA Atmospheric Impact Assessment

EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:2: AQIA Air Quality Impact Assessment

EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:2: EIA Environmental Impact Assessment

EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:11: Impact Assessment (EIA) process.

EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:13:3.2.2 Therefore, these are the European sites covered by the air quality impact assessment

EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:38:4.2.17 An Air Quality Impact Assessment (AQIA) has been carried out in Appendix 8A[APP-

EN010103-001849-5.13 - HRA Report (Clean) - June 2022(D3).pdf:49:4.3.6 An Atmospheric Impact Assessment (AIA) has been undertaken using detailed air

EN010103-001145-NZT DCO 6.4.34 ES Vol III Appendix 15A Ornithology Baseline Part 1.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001145-NZT DCO 6.4.34 ES Vol III Appendix 15A Ornithology Baseline Part 1.pdf:3: undertaken in support of the ecological impact assessment (EcIA) of the

EN010103-001145-NZT DCO 6.4.34 ES Vol III Appendix 15A Ornithology Baseline Part 1.pdf:3: ornithological features are and are not relevant to the impact assessment of

EN010103-001145-NZT DCO 6.4.34 ES Vol III Appendix 15A Ornithology Baseline Part 1.pdf:10: impact assessment) or

EN010103-001145-NZT DCO 6.4.34 ES Vol III Appendix 15A Ornithology Baseline Part 1.pdf:17:numbers for an impact assessment, a smaller number of visits is usually sufficient.

EN010103-001145-NZT DCO 6.4.34 ES Vol III Appendix 15A Ornithology Baseline Part 1.pdf:20: the impact assessment within the ES is derived from the collective data sets

EN010103-001145-NZT DCO 6.4.34 ES Vol III Appendix 15A Ornithology Baseline Part 1.pdf:32: the purposes of an impact assessment. However, records relating to some

EN010103-001145-NZT DCO 6.4.34 ES Vol III Appendix 15A Ornithology Baseline Part 1.pdf:32: these sources that could be used to support the impact assessment.

EN010103-001145-NZT DCO 6.4.34 ES Vol III Appendix 15A Ornithology Baseline Part 1.pdf:59: Guidelines for Ecological Impact Assessment in the UK and Ireland:

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:1:Appendix 12B: Ecological Impact Assessment

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:2: Appendix 12B Ecological Impact Assessment Methods

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:2:12B. Ecological Impact Assessment Methods ……………………………..12-1

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:3: Appendix 12B Ecological Impact Assessment Methods

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:3:12B.Ecological Impact Assessment

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:3:12.1.1 Ecological Impact Assessment (EcIA) is the process of identifying,

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:3: such, it is the common approach to impact assessment adopted across all

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:3: Guidelines for Ecological Impact Assessment in the UK and Ireland

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:3: The term ‘important ecological features’ used in the CIEEM Guidelines for Ecological Impact Assessment in the UK and

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:4: Appendix 12B Ecological Impact Assessment Methods

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:5: Appendix 12B Ecological Impact Assessment Methods

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:6: Appendix 12B Ecological Impact Assessment Methods

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:6: the marine ecological impact assessment are:

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:7: Appendix 12B Ecological Impact Assessment Methods

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:8: Appendix 12B Ecological Impact Assessment Methods

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:9: Appendix 12B Ecological Impact Assessment Methods

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:10: Appendix 12B Ecological Impact Assessment Methods

EN010103-001106-NZT DCO 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment Methods.pdf:10: Guidelines for Ecological Impact Assessment in the UK and Ireland:

EN010103-001585-NZT DCO 8.3 - STDC TVCA Teesworks SoCG - May 2022.pdf:3:EIA Environmental Impact Assessment - the assessment

EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:3: EIA Environmental Impact Assessment - the

EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:16: environmental impact assessment (‘EIA’).

EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:48: (Document Ref 6.1 – 6.4) also ensure that the air impact assessment and visual

EN010103-001215-NZT DCO 2.2 - Explanatory Memorandum - Oct 2021 Rev.2.0.pdf:48: impact assessment of the tallest structures associated with the Proposed

EN010103-001234-NZT - Regulation 32 Transboundary Screening (6).pdf:3:Under Regulation 32 of The Infrastructure Planning (Environmental Impact Assessment)

EN010103-002625-NZT DCO 1.2 - Application Guide - Nov 2022 (D13).pdf:2: EIA Environmental Impact Assessment - a term used for the

EN010103-002625-NZT DCO 1.2 - Application Guide - Nov 2022 (D13).pdf:2: EIA Regulations The Infrastructure Planning (Environmental Impact Assessment)

EN010103-002625-NZT DCO 1.2 - Application Guide - Nov 2022 (D13).pdf:3: results of an Environment Impact Assessment are documented.

EN010103-002625-NZT DCO 1.2 - Application Guide - Nov 2022 (D13).pdf:12: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the

EN010103-002625-NZT DCO 1.2 - Application Guide - Nov 2022 (D13).pdf:18: Category 6.0 Environmental Impact Assessment Information May 2021 Unless

EN010103-002625-NZT DCO 1.2 - Application Guide - Nov 2022 (D13).pdf:31: Impact Assessment

EN010103-001153-NZT DCO 5.9 - Statutory Nuisance Statement.pdf:4: EIA Environmental Impact Assessment – a term used for the assessment of

EN010103-001153-NZT DCO 5.9 - Statutory Nuisance Statement.pdf:4: an Environment Impact Assessment are documented.

EN010103-001153-NZT DCO 5.9 - Statutory Nuisance Statement.pdf:14: all relevant matters, for the reasons set out in the ES. Specific impact assessments

EN010103-001153-NZT DCO 5.9 - Statutory Nuisance Statement.pdf:16: significant for the purposes of the Environmental Impact Assessment (EIA).

EN010103-001153-NZT DCO 5.9 - Statutory Nuisance Statement.pdf:18: air quality impact assessment presented in ES Volume I Chapter 8: Air Quality

EN010103-001985-NZT DCO 8.12 - Northumbrian Water Ltd SoCG - August 2022(D5) - Tracked.pdf:3: EIA Environmental Impact Assessment - the

EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:6:and impact assessment processes. The South Tees Area SPD was prepared in line with the adopted Redcar and Cleveland Local Plan (also adopted May

EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:6:and statutory impact assessment processes including Strategic Environmental Assessment (SEA) and Habitats Regulations Assessment (HRA) have been

EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:24:linked and statutory impact assessment processes determination process, will ensure the protection and SSSI and SPA. These designations protect the for industrial development of this coastal strip.

EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:56:a substantive impediment to continued or new industrial Given that the SPA, borders the northern and eastern place as part of the Ecological Impact Assessment (EcIA).

EN010103-001766-NZT DCO 9.8 - Appendix PPL.1.3a - South Tees Regeneration Master Plan - June 2022.pdf:56:be assessed through Ecological Impact Assessments England. There are no records from within the site

EN010103-001983-NZT DCO 8.3 - STDC SoCG - August 2022(D5) - Tracked.pdf:3:EIA Environmental Impact Assessment - the assessment

EN010103-001776-NZT DCO 9.8 - Appendix GEN.1.2 Position Statement Hornsea Project Four and BP - June 2022.pdf:142:16. INADEQUACY OF HORNSEA 4'S ENVIRONMENTAL IMPACT ASSESSMENT

EN010103-001776-NZT DCO 9.8 - Appendix GEN.1.2 Position Statement Hornsea Project Four and BP - June 2022.pdf:142: Planning (Environmental Impact Assessment) Regulations 2017. Specifically, what footprint

EN010103-001776-NZT DCO 9.8 - Appendix GEN.1.2 Position Statement Hornsea Project Four and BP - June 2022.pdf:150:EIA: Environmental Impact Assessment

EN010103-002521-NZT DCO 9.48 - Applicants' Comments on D11 Submissons - Nov 2022 (D12).pdf:2: EIA Environmental Impact Assessment

EN010103-002505-NZT DCO 7.14 - Third ES Addendum NTS - Nov 2022 (D12).pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (as amended)

EN010103-001120-NZT DCO 6.4.36 ES Vol III Appendix 16A Transportation Assessment Part 1.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001120-NZT DCO 6.4.36 ES Vol III Appendix 16A Transportation Assessment Part 1.pdf:2:16.10 Junction Impact Assessment ………………………………………………………….. 16-68

EN010103-001120-NZT DCO 6.4.36 ES Vol III Appendix 16A Transportation Assessment Part 1.pdf:72:16.10 Junction Impact Assessment

EN010103-001779-NZT DCO 9.8 - Appendix BIO.1.39 Example Marine Pollution Contingency Plan - June 2022.pdf:13: Is an impact assessment being undertaken?

EN010103-001854-8.3 - STDC SoCG (Tracked) - June 2022(D3).pdf:3:EIA Environmental Impact Assessment - the assessment

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:4: EIA Environmental Impact Assessment - a term used

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:4: Impact Assessment) Regulations 2017.

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:25:2.6.6 The Proposed Development represents an Environmental Impact Assessment (‘EIA’)

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:39: • The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:53: According to the Impact Assessment for this carbon budget this could lead to a 40-

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:106: • A ‘Lifecycle Greenhouse Gas’ (‘GHG’) impact assessment – an assessment of the

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:106:6.2.99 The Lifecycle GHG impact assessment factors in construction, operational and

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:120: air quality limits. Where the limits conservative assumptions. The results of the operation impact assessment for

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:131: and Visual Impact Assessment (‘LVIA’) generating station.”

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:246: • A ‘Lifecycle Greenhouse Gas’ (‘GHG’) impact assessment – an

EN010103-001581-NZT DCO 5.3 - Planning Statement - May 2022.pdf:246: The Lifecycle GHG impact assessment factors in construction, operational

EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:61: Environmental Impact Assessment Regulations must under go screening, either

EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:61: whether an Environmental Impact Assessment is required to support an application.

EN010103-001765-NZT DCO 9.8 - Appendix PPL.1.3b - South Tees Area SPD - June 2022.pdf:61: requirements of the Environmental Impact Assessment Regulations, any person

EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:2: AIA Atmospheric Impact Assessment

EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:2: AQIA Air Quality Impact Assessment

EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:2: EIA Environmental Impact Assessment

EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:12: Impact Assessment (EIA) process.

EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:14:3.2.2 Therefore, these are the European sites covered by the air quality impact assessment

EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:35: an absolute noise threshold, is used as an alternative means of impact assessment.

EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:38:4.2.17 An Air Quality Impact Assessment (AQIA) has been carried out in Appendix 8A [APP-

EN010103-002330-NZT DCO 5.13 - Habitats Regulations Assessment Report (Clean) Oct 2022 (D9).pdf:48:4.3.6 An Atmospheric Impact Assessment (AIA) has been undertaken using detailed air

EN010103-001954-Redcar and Cleveland Council - Revised Application Guide (clean and tracked versions).pdf:3:EIA Environmental Impact Assessment

EN010103-001954-Redcar and Cleveland Council - Revised Application Guide (clean and tracked versions).pdf:3:LVIA Landscape and Visual Impact Assessment

EN010103-000054-TCUP - Late Response - Durham County Council.pdf:1: Impact Assessment) Regulations 2017 (the EIA Regulations) – Regulations 10 and 11

EN010103-001056-NZT DCO 6.4 ES Vol III Cover and Contents.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (as

EN010103-001056-NZT DCO 6.4 ES Vol III Cover and Contents.pdf:3:Appendix 12B: Ecological Impact Assessment Methods

EN010103-002006-NZT-ExQ2-FINAL.pdf:2:EcIA Ecological Impact Assessment

EN010103-002006-NZT-ExQ2-FINAL.pdf:2:EIA Environmental Impact Assessment

EN010103-002006-NZT-ExQ2-FINAL.pdf:13: Applicants baseline development and the wider EcIA Ecological Impact Assessment has been discussed

EN010103-002006-NZT-ExQ2-FINAL.pdf:13: Development design and EIA Environmental Impact Assessment to date.’

EN010103-002006-NZT-ExQ2-FINAL.pdf:17: findings of the GHG impact assessment for the construction and commissioning, operation and

EN010103-002006-NZT-ExQ2-FINAL.pdf:25: and its relationship to the Landscape and Visual Impact Assessment does not appear to have

EN010103-001139-NZT DCO 6.4.30 ES Vol III Appendix 14B Fisheries and Fish Ecology Baseline Part 1.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-000907-NZT DCO 6.2.23 ES Vol I Chapter 23 Population and Human Health.pdf:2: Impact Assessment (EIA) must identify, describe and assess in an

EN010103-000907-NZT DCO 6.2.23 ES Vol I Chapter 23 Population and Human Health.pdf:7: Impact Assessment and Significance Criteria

EN010103-000907-NZT DCO 6.2.23 ES Vol I Chapter 23 Population and Human Health.pdf:11:Planning April 2019 (Scoping The Scoping Report states that no specific human health impact A specific human health impact assessment has not been

EN010103-002515-NZT DCO 8.30 - NTG SoCG (Clean) - Nov 2022 D12.pdf:3: EIA Environmental Impact Assessment – the

EN010103-002422-NZT DCO 9.47 - Sensitivity Assessment of Construction Programme - Oct 2022 (D11).pdf:2: EIA Environmental Impact Assessment

EN010103-001480-NZT DCO 5.6 Gas Connection Statement Changes Rev 2 Final 2022-04-26 Tracked Changes.pdf:13: Environmental Impact Assessment, which is reported in the ES (Document Refs. 6.2

EN010103-001480-NZT DCO 5.6 Gas Connection Statement Changes Rev 2 Final 2022-04-26 Tracked Changes.pdf:21: the associated Environmental Impact Assessment reported in the ES (Document

EN010103-000896-NZT DCO 6.2.4 ES Vol I Chapter 4 Proposed Development.pdf:3: require separate environmental impact assessments including assessments

EN010103-000896-NZT DCO 6.2.4 ES Vol I Chapter 4 Proposed Development.pdf:3: and will be supported by a separate Environmental Impact Assessment (EIA).

EN010103-000896-NZT DCO 6.2.4 ES Vol I Chapter 4 Proposed Development.pdf:14: impact assessment in this ES for the Proposed Development as presented in

EN010103-000896-NZT DCO 6.2.4 ES Vol I Chapter 4 Proposed Development.pdf:16: Impact Assessment – see Chapter 5 (Construction Programme and

EN010103-000896-NZT DCO 6.2.4 ES Vol I Chapter 4 Proposed Development.pdf:18: been identified as sufficient to allow a robust worst-case impact assessment

EN010103-000067-Acknowledgement of s46 notification Dec 2020.pdf:1:Planning (Environmental Impact Assessment) Regulations 2017 – Regulation

EN010103-000067-Acknowledgement of s46 notification Dec 2020.pdf:1:Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 that

EN010103-002635-NZT DCO 8.4 - MMO SoCG - Final (signed) - Nov 2022 (D13).pdf:3: EIA Environmental Impact Assessment - the

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:2: Impact Assessment) Regulations 2017.

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:2: EIA Environmental Impact Assessment.

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:9: Impact Assessment) Regulations 2017’ (the ‘EIA Regulations’)

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:22:NZT is an Environmental Impact Assessment (‘EIA’) development for the purposes of ‘The Infrastructure

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:22:Planning (Environmental Impact Assessment) Regulations 2017’. The Applicant is therefore required to

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:26:R/2020/0164/CA: Change of use of first and second floor offices NZT is an Environmental Impact Assessment (‘EIA’)

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:26:windows at 23A Milton Street Saltburn by the sea (Environmental Impact Assessment) Regulations 2017’.

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:38:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 -

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:39:Environmental Impact Assessment

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:39:Planning (Environmental Impact Assessment) Regulations 2017 (the ‘EIA Regulations’) that they intend

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:48:ENVIRONMENT & ENVIRONMENTAL IMPACT ASSESSMENT:

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:49:Environmental Impact Assessment

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:50: The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 - Regulation 13 persons having a claim against or an

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:50: Road Traffic Regulation Act 1984 as amended by the Road Traffic Environmental Impact Assessment

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:50: length of road specified below. (Environmental Impact Assessment) Regulations 2017 (the ‘EIA Regulations’) that they intend to provide an

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:51: The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 - Regulation 13

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:51:A diversion route will be signed on site. A letter drop will be done by Environmental Impact Assessment

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:51: (Environmental Impact Assessment) Regulations 2017 (the ‘EIA Regulations’) that they intend to provide

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:53: The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 - Regulation 13

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:53: Environmental Impact Assessment

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:53: 5. The Applicants have notified the SoS in writing under Regulation 8(1)(b) of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the ‘EIA Regulations’) that they intend to

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:60:Environmental Impact Assessment

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:60:Planning (Environmental Impact Assessment) Regulations 2017 (the ‘EIA Regulations’) that they intend

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:97:Environmental Impact Assessment

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:97:Planning (Environmental Impact Assessment) Regulations 2017 (the ‘EIA Regulations’) that they intend

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:102:Environmental Impact Assessment

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:102:Planning (Environmental Impact Assessment) Regulations 2017 (the ‘EIA Regulations’) that they intend

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:117:Environmental Impact Assessment

EN010103-001162-NZT DCO 1.4 - Notices for Non-Statutory_Statutory Publicity.pdf:117:Planning (Environmental Impact Assessment) Regulations 2017 (the ‘EIA Regulations’) that they intend

EN010103-002516-NZT DCO 8.30 - NTG SoCG (Tracked) - Nov 2022 D12.pdf:3: EIA Environmental Impact Assessment – the

EN010103-002239-NZT DCO 8.6 - Natural England SoCG (Clean) - Sept 2022(D8).pdf:3: EIA Environmental Impact Assessment - the

EN010103-001143-NZT DCO 6.4.32 ES Vol III Appendix 14D Subtidal Benthic Ecology.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001143-NZT DCO 6.4.32 ES Vol III Appendix 14D Subtidal Benthic Ecology.pdf:4: environmental assessments (e.g. Environmental Impact Assessment,

EN010103-002637-NZT DCO 8.6 - Natural England SoCG - Final (signed) - Oct 2022 (D13).pdf:3: EIA Environmental Impact Assessment - the

EN010103-001786-NZT DCO 8.30 - NTL, NTLL and NTRL SoCG - June 2022 (Clean).pdf:3: EIA Environmental Impact Assessment - the

EN010103-001481-NZT DCO 5.6 Gas Connection Statement Changes Rev 2 2022-04-26 Final.pdf:12: Impact Assessment, which is reported in the ES (Document Refs. 6.2 to 6.4).

EN010103-001481-NZT DCO 5.6 Gas Connection Statement Changes Rev 2 2022-04-26 Final.pdf:19: the associated Environmental Impact Assessment reported in the ES (Document

EN010103-002177-NZT DCO 6.4.49 - ES Vol III Appendix 25A Commitments Register Sept 2022(D7) (Tracked).pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017

EN010103-001151-NZT DCO 6.4.49 ES Vol III Appendix 25A Commitments Register.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-000830-NZT DCO 5.5 - Electricity Grid Connection Statement.pdf:11: are assessed as part of the Environmental Impact Assessment, which is reported in

EN010103-000830-NZT DCO 5.5 - Electricity Grid Connection Statement.pdf:17: as part of the associated Environmental Impact Assessment reported in the ES

EN010103-001875-Redcar and Cleveland Borough Council.pdf:3:EIA Environmental Impact Assessment

EN010103-001875-Redcar and Cleveland Borough Council.pdf:3:LVIA Landscape and Visual Impact Assessment

EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:4:Environmental Impact Assessment Scoping consultation (Regulation 15 (4) of the EIA

EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:4:Environmental Impact Assessment (EIA) for this development.

EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:4: 2 Note on Environmental Impact Assessment Directive for Local Planning Authorities Office of the Deputy Prime

EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:5:Schedule 4 of the Town & Country Planning (Environmental Impact Assessment) Regulations 2017,

EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:5:Ecological Impact Assessment (EcIA) have been developed by the Chartered Institute of Ecology

EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:7:results, impact assessments and appropriate accompanying mitigation strategies included as part of

EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:7:therefore advises that survey, impact assessment and mitigation proposals for Habitats and Species

EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:8:Natural England supports the publication Guidelines for Landscape and Visual Impact Assessment,

EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:8:landscape and visual impact assessment.

EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:8:Environmental Impact Assessment process should detail the measures to be taken to ensure the

EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:8:cumulative impact assessment should include other proposals currently at Scoping stage. Due to

EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:9:The ES should include an impact assessment to identify, describe and evaluate the effects that are

EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:11:With reference to the protection of the railway, the Environmental Impact Assessment should consider issues that

EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:13:We have read the Environmental Impact Assessment (EIA) Scoping Report and note the intentions of

EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:16:health impact assessment, and development consent.

EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:17:(Environmental Impact Assessment: Process, Preliminary Environmental Information and

EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:17:not make links to the list of protected characteristics within an Equality Impact Assessment

EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:19: Environmental Impact Assessment: A guide to good practice and procedures - A consultation paper; 2006; Department for Communities

EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:25:PHE expects promoters to carry out the necessary radiological impact assessments to

EN010103-001017-NZT DCO 6.4.2 ES Vol III Appendix 1B EIA Scoping Opinion Part 3.pdf:25:Any radiological impact assessment should also consider the possibility of short-term

EN010103-002743-Applicant NZT DCO 1.2 - Application Guide - March 2023.pdf:2: EIA Environmental Impact Assessment - a term used for the

EN010103-002743-Applicant NZT DCO 1.2 - Application Guide - March 2023.pdf:2: EIA Regulations The Infrastructure Planning (Environmental Impact Assessment)

EN010103-002743-Applicant NZT DCO 1.2 - Application Guide - March 2023.pdf:3: results of an Environment Impact Assessment are documented.

EN010103-002743-Applicant NZT DCO 1.2 - Application Guide - March 2023.pdf:12: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the

EN010103-002743-Applicant NZT DCO 1.2 - Application Guide - March 2023.pdf:18: Category 6.0 Environmental Impact Assessment Information May 2021 Unless

EN010103-002743-Applicant NZT DCO 1.2 - Application Guide - March 2023.pdf:31: Impact Assessment

EN010103-001571-NZT DCO 8.29 - INEOS UK SNS Ltd SoCG - May 2022.pdf:2: EIA Environmental Impact Assessment - the

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:4: EIA Environmental Impact Assessment - a term used

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:4: Impact Assessment) Regulations 2017

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:23:2.6.6 The Proposed Development represents an Environmental Impact Assessment (‘EIA’)

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:37: • The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:96: • A ‘Lifecycle Greenhouse Gas’ (‘GHG’) impact assessment – an assessment of the

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:97:6.2.97 The Lifecyle GHG impact assessment factors in construction, operational and

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:111: air quality limits. Where the limits conservative assumptions. The results of the operation impact assessment for

EN010103-000831-NZT DCO 5.3 - Planning Statement.pdf:122: and Visual Impact Assessment (‘LVIA’) generating station.”

EN010103-001280-Rule 6 Letter.pdf:17: • The approach to landscape and visual impact assessment, including the

EN010103-001280-Rule 6 Letter.pdf:45: • methodology for Environmental Impact Assessment including assessment of

EN010103-001214-NZT DCO 2.1 - Draft Development Consent Order - Oct 2021 Rev.2.0.pdf:6:(Environmental Impact Assessment) Regulations 2017(e) and having had regard to the documents

EN010103-001234-NZT - Regulation 32 Transboundary Screening (8).pdf:3:Under Regulation 32 of The Infrastructure Planning (Environmental Impact Assessment)

EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:2: AIA Atmospheric Impact Assessment

EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:2: AQIA Air Quality Impact Assessment

EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:2: EIA Environmental Impact Assessment

EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:11: Impact Assessment (EIA) process.

EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:13:3.2.2 Therefore, these are the European sites covered by the air quality impact assessment

EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:34: an absolute noise threshold, is used as an alternative means of impact assessment.

EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:38:4.2.17 An Air Quality Impact Assessment (AQIA) has been carried out in Appendix 8A[APP-

EN010103-001850-5.13 - HRA Report (Tracked) - June 2022(D3).pdf:49:4.3.6 An Atmospheric Impact Assessment (AIA) has been undertaken using detailed air

EN010103-002329-NZT DCO 1.2 - Application Guide Oct 2022 (D9).pdf:2: EIA Environmental Impact Assessment - a term used

EN010103-002329-NZT DCO 1.2 - Application Guide Oct 2022 (D9).pdf:3: Impact Assessment) Regulations 2017.

EN010103-002329-NZT DCO 1.2 - Application Guide Oct 2022 (D9).pdf:13: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the

EN010103-002329-NZT DCO 1.2 - Application Guide Oct 2022 (D9).pdf:19: Category 6.0 Environmental Impact Assessment Information May 2021 Unless

EN010103-002329-NZT DCO 1.2 - Application Guide Oct 2022 (D9).pdf:32: Impact Assessment Methods

EN010103-001182-NZT EL (14).pdf:7:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (14).pdf:8:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (14).pdf:14:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (14).pdf:16: 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment

EN010103-001182-NZT EL (8).pdf:7:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (8).pdf:8:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (8).pdf:14:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (8).pdf:16: 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment

EN010103-001158-NZT DCO 5.6 - Gas Connection and Pipelines Statement.pdf:12: Environmental Impact Assessment, which is reported in the ES (Document Refs. 6.2

EN010103-001158-NZT DCO 5.6 - Gas Connection and Pipelines Statement.pdf:20: the associated Environmental Impact Assessment reported in the ES (Document

EN010103-Advice-00009-1-210419 - Net Zero Teesside FINAL with draft docs feedback.pdf:1:Environmental Impact Assessment (EIA) (relating to the offshore works) and storage

EN010103-002643-NZT DCO 9.51 - Applicants' Response to ExA's RFI dated 2 Nov 2022 - Nov 22 (D13).pdf:2: EIA Environmental Impact Assessment

EN010103-001021-NZT DCO 6.4.6 ES Vol III Appendix 8A Air Quality - Construction Phase.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001021-NZT DCO 6.4.6 ES Vol III Appendix 8A Air Quality - Construction Phase.pdf:2:Table 8A-19. Results of Construction Traffic Impact Assessment at Human

EN010103-001021-NZT DCO 6.4.6 ES Vol III Appendix 8A Air Quality - Construction Phase.pdf:2:Table 8A-21: Results of Construction Traffic Impact Assessment at Ecological

EN010103-001021-NZT DCO 6.4.6 ES Vol III Appendix 8A Air Quality - Construction Phase.pdf:24:Table 8A-19. Results of Construction Traffic Impact Assessment at Human

EN010103-001021-NZT DCO 6.4.6 ES Vol III Appendix 8A Air Quality - Construction Phase.pdf:26: Taken from ‘Indicative values within nutrient nitrogen critical load ranges for use in air pollution impact assessments’

EN010103-001021-NZT DCO 6.4.6 ES Vol III Appendix 8A Air Quality - Construction Phase.pdf:26:Table 8A-21: Results of Construction Traffic Impact Assessment at Ecological

EN010103-001234-NZT - Regulation 32 Transboundary Screening (10).pdf:3:Under Regulation 32 of The Infrastructure Planning (Environmental Impact Assessment)

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:2: be considered as part of the Environmental Impact Assessment (EIA) of the

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:2: • Appendix 12B: Ecological Impact Assessment Methodology;

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:5: Impact Assessment and Significance Criteria

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:5: Ecological Impact Assessment (EcIA) is the process of identifying,

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:5: Appendix 12B: Ecological Impact Assessment Methods (ES Volume III,

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:10: requirements for robust ecological impact assessment.

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:13: impact assessment are defined in Chapter 4: The Proposed Development,

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:14:relevant to the ecological impact assessment, with

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:15:effort should be clearly explained and justified in informed the ecological impact assessment

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:15:assessment in accordance with the ‘Guidelines for 12B: Ecological Impact Assessment Methods (ES

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:15:Ecological Impact Assessment in the UK and Volume III, Document Ref. 6.4).

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:15:and species, Environment Agency, letter relevant to the impact assessment for the

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:32: 12B: Ecological Impact Assessment Methods (ES Volume III, Document Ref.

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:35: The impact assessment described below assumes that the contractor will

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:40: Given the findings of the above impact assessment, mitigation measures are

EN010103-000899-NZT DCO 6.2.13 ES Vol I Chapter 13 Aquatic Ecology and Nature Conservation.pdf:42: CIEEM (2019). Guidelines for Ecological Impact Assessment in the UK and

EN010103-Advice-00011-1-Teesside Net Zero Meeting Note_15 Sept 2021_Final.pdf:4:(Environmental Impact Assessment) Regulations 2017 (the ‘EIA Regulations’).

EN010103-001982-NZT DCO 8.3 - STDC SoCG - August 2022(D5) - Clean.pdf:3:EIA Environmental Impact Assessment - the assessment

EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf:3: EIA Environmental Impact Assessment. The

EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf:3: (Environmental Impact Assessment) Regulations

EN010103-002050-NZT DCO 3.2 - Statement of Reasons (Tracked) August 2022 (D6).pdf:30:3.1.14 The Environmental Impact Assessment (’EIA’) has therefore been undertaken adopting

EN010103-001958-Environment Agency - Comments on any other information submitted at Deadline 4.pdf:2:Deadline 4 Submission - DCO 9.17 - Hydrogeological Impact Assessment

EN010103-001958-Environment Agency - Comments on any other information submitted at Deadline 4.pdf:2:The Hydrogeological Impact Assessment (HIA) summarises and interprets the

EN010103-001958-Environment Agency - Comments on any other information submitted at Deadline 4.pdf:5: (f) an updated hydrogeological impact assessment that is informed by

EN010103-001958-Environment Agency - Comments on any other information submitted at Deadline 4.pdf:7:Deadline 4 Submission - DCO 9.17 - Hydrogeological Impact Assessment

EN010103-001958-Environment Agency - Comments on any other information submitted at Deadline 4.pdf:7:The Hydrogeological Impact Assessment (HIA) summarises and interprets the

EN010103-001304-NZT DCO - Notification of Proposed Changes - Document -Final - 18.02.22.pdf:2: EIA Environmental Impact Assessment

EN010103-001304-NZT DCO - Notification of Proposed Changes - Document -Final - 18.02.22.pdf:4: upon and assessed as part of the environmental impact assessment (EIA)

EN010103-000906-NZT DCO 6.2.22 ES Vol I Chapter 22 Major Accidents and Natural Disasters.pdf:44: The Infrastructure Planning (Environmental Impact Assessment)

EN010103-001996-NZT DCO 2.1 - Draft DCO - August 2022(D5).pdf:7:(Environmental Impact Assessment) Regulations 2017(b) and having had regard to the documents

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:3: • Stage 3: WFD Impact Assessment.

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:12: • Stage 3: WFD Impact Assessment - A detailed assessment of the water

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:18:9.3.24 The impact assessment is based on a source-pathway-receptor model. For an

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:23: forward into the impact assessment, and are assessed in

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:52: need to be assessed in the WFD impact assessment. These receptors are

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:55: further consideration in the WFD impact assessment, summarised in Table

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:57:9.6.18 Habitats should be included as part of the WFD impact assessment if the

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:57: have been scoped into the WFD impact assessment on account of the

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:61: in the WFD impact assessment. The risks of introducing or spreading INNS

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:61: been scoped into the WFD impact assessment for the Tees Coastal is shown

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:63: consideration in the WFD impact assessment, summarised in Table 9C-21.

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:64: impact assessment.

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:65:9.6.39 Habitats should be included as part of the WFD impact assessment if the

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:65: been scoped out of the WFD impact assessment as they do not meet the

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:67: been scoped into the WFD impact assessment for the Tees Coastal is shown

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:129: included in the full impact assessment once received. The general pattern

EN010103-002423-NZT DCO - 6.4.11 ES Vol III Appendix 9C WFD Assessment - Oct 2022 (D11) (Clean).pdf:136:D.1.5 Two earlier impact assessments of sediment quality were undertaken to

EN010103-001182-NZT EL (4).pdf:7:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (4).pdf:8:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (4).pdf:14:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (4).pdf:16: 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment

EN010103-002054-NZT DCO 5.5 Electricity Grid Connection Statement (Clean) August 2022 (D6).pdf:11: are assessed as part of the Environmental Impact Assessment, which is reported in

EN010103-002054-NZT DCO 5.5 Electricity Grid Connection Statement (Clean) August 2022 (D6).pdf:17: as part of the associated Environmental Impact Assessment reported in the ES

EN010103-001113-NZT DCO 6.4.29 ES Vol III Appendix 14A Intertidal Benthic Ecology Survey Report.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001784-NZT DCO 8.33 - National Highways SoCG - June 2022.pdf:2: EIA Environmental Impact Assessment - the

EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:2: AIA Atmospheric Impact Assessment

EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:2: AQIA Air Quality Impact Assessment

EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:2: EIA Environmental Impact Assessment

EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:12: Impact Assessment (EIA) process.

EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:14:3.2.2 Therefore, these are the European sites covered by the air quality impact assessment

EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:35: an absolute noise threshold, is used as an alternative means of impact assessment.

EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:39:4.2.17 An Air Quality Impact Assessment (AQIA) has been carried out in Appendix 8A [APP-

EN010103-002257-NZT DCO - 5.13 - HRA (Clean) - Sept 2022(D8).pdf:49:4.3.6 An Atmospheric Impact Assessment (AIA) has been undertaken using detailed air

EN010103-001155-NZT DCO 5.11 - Indicative Lighting Strategy.pdf:12: DCO. In addition, the environmental impact assessment (in particular the landscape

EN010103-001155-NZT DCO 5.11 - Indicative Lighting Strategy.pdf:15: or rules were set for impact assessment purposes. ILP guidance GN01/20 (Ref. 1)

EN010103-001997-NZT DCO 2.1 - Draft DCO (Comparison with July 2022) - August 2022(D5).pdf:7:(Environmental Impact Assessment) Regulations 2017(b) and having had regard to the documents

EN010103-002512-NZT DCO 8.6 - Natural England SoCG - Final (signed) - Nov 2022 (D12).pdf:3: EIA Environmental Impact Assessment - the

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:196: societal impact assessment (ESHIA) and the biodiversity protection

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:196: On the basis of this impact assessment, and referring to the highest

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:253: waste management and impact assessments, etc.), health (occupational – the imposition of increased local content requirements;

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:274:management describes TotalEnergies’ requirements for a unified assessments and impact assessments on human rights, managing the

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:278:impact assessments to be carried out and, if necessary, actions must be taken, be sources of chronic or accidental pollution. In addition to the

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:283: TotalEnergies conducts assessments and impact assessments of with a total of 517 employees (in Kenya and Poland). These

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:283: – Impact assessments to analyze the challenges and the societal and 2020 in Subsidiaries in Brazil, Cameroon, Egypt, Nigeria,

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:283: impact assessments on human rights; is planned to follow up the action plan for the Pau site (France) in 2022.

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:283: Impact assessments of industrial projects

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:283: assessment. These assessments help identify Subsidiaries’ best societal impact assessment is then conducted to evaluate and analyze

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:283: In addition to these impact assessments, specific human rights impact

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:284: Human Rights Impact Assessment

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:284: TotalEnergies launched a human rights risks and impact assessment in and traditional leaders of Vulnerable Ethnic Groups self-identifying as

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:284: 2016 through societal and environmental impact assessments. These Indigenous Peoples. Three Tanzanian NGOs have been supporting this

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:284: conduct specific human rights impact assessments in parallel with the impacted by the Project.

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:284: assessments. The specific human rights impact assessment for EACOP Since 2013, the Tilenga and EACOP projects have formed an

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:284: have a dedicated Gender Impact Assessment carried out.

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:286: A Human Rights Impact Assessment had been conducted in 2015 for conducted for all JTF officers deployed to site. In 2021, 1,027 officers

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:288:Code of Conduct and respect human rights. The roadmap for 2021-2022 example, in the impact assessments of new projects), preventive and

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:400: safety and security studies, impact assessments, particularly

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:434:impact assessments to be carried out and, if necessary, actions must be Hydrocarbon content of onshore

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:458:human rights violations in each country, the number of alerts received the Standalone human rights impact assessments may also be conducted in

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:458:previous year and the date of the subsidiary’s last assessment. These addition to the environmental and societal impact assessments in high-

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:458:awareness-raising sessions. Employees are encouraged to voice their launched in 2016 a human rights risk and impact assessment through

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:458: environmental impact assessments. This specific human rights impact

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:458:assessments were conducted in 2020 in Madagascar and in Pau The specific human rights impact assessment on the Tilenga project was

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:468: Environmental and Societal Impact Assessment (ESIA), the Human

EN010103-002628-NZT DCO 3.3 - Funding Statement - Appendix 4 - Total - Nov 2022 (D13).pdf:468: Rights Impact Assessment for the Uganda project, and reports from

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:51: (f) an update to the hydrogeological impact assessment including hydrogeological

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:53: must take into account the updated hydrogeological impact assessment and any further

EN010103-002525-NZT DCO 2.1 - Final draft DCO (Clean) - Nov 2022 (D12).pdf:57:hydrogeological impact assessment and any further ground investigation reports and groundwater

EN010103-002250-NZT DCO 1.2 - Application Guide - Sept 2022(D8).pdf:2: EIA Environmental Impact Assessment - a term used

EN010103-002250-NZT DCO 1.2 - Application Guide - Sept 2022(D8).pdf:3: Impact Assessment) Regulations 2017.

EN010103-002250-NZT DCO 1.2 - Application Guide - Sept 2022(D8).pdf:13: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the

EN010103-002250-NZT DCO 1.2 - Application Guide - Sept 2022(D8).pdf:19: Category 6.0 Environmental Impact Assessment Information May 2021 Unless

EN010103-002250-NZT DCO 1.2 - Application Guide - Sept 2022(D8).pdf:31: Impact Assessment Methods

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:3: supported by Environmental Impact Assessment (EIA).

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:4: Planning (Environmental Impact Assessment) Regulations 2017 (‘the EIA

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:5:Consultation) impact assessment to identify, describe and evaluate the effects that are

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:25: • the Environmental & Social Impact Assessment (ESIA) process is anticipated to include a

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:26: • increases in Suspended Sediment • the Environmental & Social Impact Assessment (ESIA) process will include a formal public

EN010103-001150-NZT DCO 6.4.48 ES Vol III Appendix 24C Statement of Combined Effects.pdf:29: • the Environmental & Social Impact Assessment (ESIA) will include a formal public consultation

EN010103-001911-NZT DCO 9.16 - Sensitivity test traffic modelling A1085 A1042 July 2022 (D4).pdf:8:2.6 Impact Assessment

EN010103-001018-NZT DCO 6.4.3 ES Vol III Appendix 1C Statement of Competence.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001018-NZT DCO 6.4.3 ES Vol III Appendix 1C Statement of Competence.pdf:3: The Environmental Impact Assessment (EIA) has been undertaken by

EN010103-001234-NZT - Regulation 32 Transboundary Screening (14).pdf:3:Under Regulation 32 of The Infrastructure Planning (Environmental Impact Assessment)

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:8:Infrastructure Planning (Environmental Impact Assessment) Regulation 2017© and has had

EN010103-001637-ClientEarth - Written Representations (WRs), including summaries of all WRs exceeding 1500 words.pdf:163: of surveys and environmental impact assessments in respect of the Facility; (ii) costs

EN010103-002236-NZT DCO 8.4 - MMO SoCG (Tracked) - Sept 2022(D8).pdf:3: EIA Environmental Impact Assessment - the

EN010103-002236-NZT DCO 8.4 - MMO SoCG (Tracked) - Sept 2022(D8).pdf:43: separate Environmental Impact Assessment (EIA) it is dealt with via a separate consenting regime. However, we remain

EN010103-002236-NZT DCO 8.4 - MMO SoCG (Tracked) - Sept 2022(D8).pdf:93:benthic data are suitable for the completion of an impact assessment for the proposed Outfall II location.

EN010103-001785-NZT DCO 8.30 - NTL, NTLL and NTRL SoCG - June 2022 (Tracked).pdf:3: EIA Environmental Impact Assessment - the

EN010103-001906-NZT DCO 8.33 - National Highways SoCG July 2022 (Final) (D4).pdf:3: EIA Environmental Impact Assessment - the

EN010103-001182-NZT EL (1).pdf:7:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (1).pdf:8:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (1).pdf:14:Volume 6 Environmental Impact Assessment Information

EN010103-001182-NZT EL (1).pdf:16: 6.4.19 ES Vol III Appendix 12B Ecological Impact Assessment

EN010103-001291-National Highways.pdf:17:Junction Impact Assessment

EN010103-002407-NZT DCO - 9.43 Written Summary of Oral Submissions at ISH5 - Oct 2022 (D11).pdf:25: updated hydrogeological impact assessment and any further

EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:2: AIA Atmospheric Impact Assessment

EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:2: AQIA Air Quality Impact Assessment

EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:2: EIA Environmental Impact Assessment

EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:12: Impact Assessment (EIA) process.

EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:14:3.2.2 Therefore, these are the European sites covered by the air quality impact assessment

EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:35: an absolute noise threshold, is used as an alternative means of impact assessment.

EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:39:4.2.17 An Air Quality Impact Assessment (AQIA) has been carried out in Appendix 8A[APP-

EN010103-002057-NZT DCO 5.13 - Habitats Regulations Assessment Report (Tracked) August 2022 (D6).pdf:49:4.3.6 An Atmospheric Impact Assessment (AIA) has been undertaken using detailed air

EN010103-001472-NZT DCO 2.1 - Draft DCO - Apr 2022.pdf:6:(Environmental Impact Assessment) Regulations 2017(e) and having had regard to the documents

EN010103-002175-NZT DCO 1.2 - Application Guide - Sept 2022(D7).pdf:2: EIA Environmental Impact Assessment - a term used

EN010103-002175-NZT DCO 1.2 - Application Guide - Sept 2022(D7).pdf:3: Impact Assessment) Regulations 2017.

EN010103-002175-NZT DCO 1.2 - Application Guide - Sept 2022(D7).pdf:13: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the

EN010103-002175-NZT DCO 1.2 - Application Guide - Sept 2022(D7).pdf:18: Category 6.0 Environmental Impact Assessment Information May 2021

EN010103-002175-NZT DCO 1.2 - Application Guide - Sept 2022(D7).pdf:31: Impact Assessment Methods

EN010103-001897-NZT DCO 8.11 - Northern Powergrid SoCG (Tracked) - July 22 (D4).pdf:3:EIA Environmental Impact Assessment - the assessment

EN010103-002511-NZT DCO 8.3 - STDC SoCG (Tracked) - Nov 2022 (D12).pdf:3:EIA Environmental Impact Assessment - the assessment

EN010103-002183-NZT DCO 9.32 - Applicants' Comments on Deadline 6 Submissions - Sept 2022(D7).pdf:2: EIA Environmental Impact Assessment

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:235:management and impact assessments, etc.), health (occupational safety

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:254: there are guides relating to carrying out societal impact assessments

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:254: and impact assessments on human rights, managing the local societal

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:256: impact assessments to be carried out and, if necessary, actions must

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:262: Subsidiary assessments Impact assessments of industrial projects

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:262: – Impact assessments to analyze the issues and societal context of economic and cultural challenges in the impacted area. This is

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:262: industrial projects, supplemented by societal impact assessments that measure and

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:262: Assessed entities are identified according to several criteria, including the In addition to these impact assessments, stand-alone human rights

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:262: level of risk of human rights violation in each country, the number of alerts impact assessments may also be conducted in high-risk areas or

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:262: assessment. These assessments help identify Subsidiaries’ best of the human rights impact assessment relating to the EACOP oil pipeline

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:263:Environmental and social impact assessment (ESIA) studies have been Uganda Wildlife Authority (UWA). Total is also working closely with IUCN

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:263:in the best interest of all actors concerned, including the government Impact assessments

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:263:and population of Mozambique. The societal and environmental impact assessment began in 2011

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:263:transformation of the region of Cabo Delgado and of Mozambique. It A first human rights impact assessment was carried out in 2015.

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:265:in the impact assessments of new projects), preventive and remediation were carried out in 2020.

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:354: for economic, social and human development, which currently faces a impact assessments, particularly environmental and societal, and

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:358: social impact assessments were conducted for both projects in attention has also been given to river crossings, and horizontal drilling

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:358: (1) The Tilenga impact assessment was approved by the government in April 2019. The Tanzanian portion of the EACOP impact assessment was approved in November 2019

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:359: – Publish the human rights impact assessment for the EACOP environmental and human context, TOTAL has designed the project

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:378: impact assessments to be carried out and, if necessary, actions must discharges only occur during the maintenance periods of the water reinjection

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:394: For target groups: Standalone human rights impact assessments may also be conducted

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:394: in addition to the environmental and societal impact assessments in

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:394: of the human rights impact assessment relating to the EACOP oil pipeline

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:401:impacted area. This is supplemented by societal impact assessments subsidiaries to define their societal strategy and associated action plans.

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:402: the impact assessment process to address fears and concerns relating

EN010103-000818-NZT DCO 3.3 - Funding Statement - Appendix 4.pdf:403:and initiatives: Habiter Mieux avec l’Anah, (a social and private housing studies and impact assessments concerning human rights, emphasis

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:2: Appendix 17B Landscape and Visual Impact Assessment Proposed Methodology

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:2:17B. Landscape and Visual Impact Assessment Methodology …………… 1

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:3: Appendix 17B Landscape and Visual Impact Assessment Methodology

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:3:17.1.1 The Landscape and Visual Impact Assessment (LVIA) has been based on

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:3: • Guidelines for Landscape and Visual Impact Assessment, Third Edition.

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:4: Appendix 17B Landscape and Visual Impact Assessment Methodology

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:5: Appendix 17B Landscape and Visual Impact Assessment Methodology

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:6: Appendix 17B Landscape and Visual Impact Assessment Methodology

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:7: Appendix 17B Landscape and Visual Impact Assessment Methodology

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:8: Appendix 17B Landscape and Visual Impact Assessment Methodology

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:9: Appendix 17B Landscape and Visual Impact Assessment Methodology

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:10: Appendix 17B Landscape and Visual Impact Assessment Methodology

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:11: Appendix 17B Landscape and Visual Impact Assessment Methodology

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:12: Appendix 17B Landscape and Visual Impact Assessment Methodology

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:13: Appendix 17B Landscape and Visual Impact Assessment Methodology

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:14: Appendix 17B Landscape and Visual Impact Assessment Methodology

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:15: Appendix 17B Landscape and Visual Impact Assessment Methodology

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:16: Appendix 17B Landscape and Visual Impact Assessment Methodology

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:17: Appendix 17B Landscape and Visual Impact Assessment Methodology

EN010103-001129-NZT DCO 6.4.40 ES Vol III Appendix 17B LVIA Proposed Methodology.pdf:18: Appendix 17B Landscape and Visual Impact Assessment Methodology

EN010103-001793-NZT DCO 2.1 - Draft DCO (Comparison with April 2022) - June 2022.pdf:5:(Environmental Impact Assessment) Regulations 2017(e) and having had regard to the documents

EN010103-001073-NZT DCO 6.4.12 ES Vol III Appendix 10A PSSR.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:3:9.1.3 The impact assessment has been undertaken in accordance with the following

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:22:9.3.10 The impact assessment is based on a source-pathway-receptor approach. For

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:23: full impact assessment stage, where appropriate.

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:50:9.4.57 Two earlier impact assessments of sediment quality were undertaken to

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:66: Floodplain Sensitivity for Impact Assessment

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:66: sensitivity of the floodplain for impact assessment purposes is considered

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:67: therefore, been taken into account during the impact assessment and will be

EN010103-000895-NZT DCO 6.2.9 ES Vol I Chapter 9 Surface Water, Flood Risk and Water Resources.pdf:70: Therefore, only the outcome of the impact assessment for a new outfall is

EN010103-001141-NZT DCO 6.4.30 ES Vol III Appendix 14B Fisheries and Fish Ecology Baseline Part 3.pdf:57: Cumulative Impact Assessments. Version 1.0. A report for the British

EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:1:Table 8-10: Results of Operational Impact Assessment for Human Health

EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:1:Table 8-11: Results of Operational Impact Assessment for Worst Case

EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:13: Impact Assessment Methodology

EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:24: In-combination impact assessments to include the In-combination effects,

EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:34:8.5.9 The impact assessment is based on emissions performance from the carbon

EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:38:Table 8-10: Results of Operational Impact Assessment for Human Health Impacts

EN010103-000894-NZT DCO 6.2.8 ES Vol 1 Chapter 8 Air Quality.pdf:41:Table 8-11: Results of Operational Impact Assessment for Worst Case Ecological Receptor Impacts

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:36: power, considerably reducing its carbon footprint. The field presented the impact assessment for Wisting. Since 1

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:65:The CONAMA Regulation No. 382/06 regulates air emissions largely to environmental and social impact assessments. The

EN010103-001602-NZT DCO 9.4 - APPENDIX 3 LATEST AUDITED ACCOUNTS – EQUINOR NEW ENERGY LIMITED.pdf:115:Health and working environment As part of environmental and social impact assessments for new

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:3: considered as part of the Environmental Impact Assessment (EIA) of the

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:4:  Appendix 12B: Ecological Impact Assessment Methodology

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:10: impact assessment in this ES for the Proposed Development as presented in

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:11:14.3.9 All ecological impact assessments (EcIA) for the project have been completed

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:11: Management's (CIEEM) Guidelines for Ecological Impact Assessment in the

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:12: Ecological Impact Assessment Methods has been, where appropriate,

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:12:14.3.11 The aims of the ecological impact assessment (EcIA) are to:

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:19:be undertaken with the most up-to-date version of for Ecological Impact Assessment in the UK and

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:23:environment and its associated receptors I, Document Ref. 6.2. The impact assessment for

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:25:been considered. findings of the impact assessment. As noted

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:46:14.6.2 To enable a focussed impact assessment, a scoping exercise has been

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:46: require further impact assessment below (see EIA Scoping Report, Appendix

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:105: considered in the impact assessments for the York Potash Harbour Facilities

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:116: (2019). Guidelines for Ecological Impact Assessment in the UK and Ireland:

EN010103-000900-NZT DCO 6.2.14 ES Vol I Chapter 14 Marine Ecology and Nature Conservation.pdf:117: modelling for environmental impact assessment. Environmental Impact

EN010103-001234-NZT - Regulation 32 Transboundary Screening (5).pdf:3:Under Regulation 32 of The Infrastructure Planning (Environmental Impact Assessment)

EN010103-002418-NZT DCO 7.13a - Notification of Further Proposed Changes - Oct 2022 (D11).pdf:2: EIA Environmental Impact Assessment

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:2: Environmental Impact Assessment (EIA) in accordance with the

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:2: Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:13: Impact Assessment and Significance Criteria

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:16:(Scoping advises that the cumulative impact assessment should include other proposals currently at effects assessment will consider cumulative

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:16: The ES should include an impact assessment to identify, describe and evaluate the effects

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:17:Environment 30.09.20 The EIA in-combination impact assessment must include Tees REP at Tees Dock. The Tees MGT Teesside Ltd’s Tees REP (ID 68), the

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:58:24.5.53 The air quality impact assessment informing the Ecological Impact

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:58:24.5.54 The air quality impact assessment identified potential for a cumulative effect

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:65:24.5.62 The air quality impact assessment presented at Chapter 8: Air Quality

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:74: considered in the impact assessments for the York Potash Harbour Facilities

EN010103-000917-NZT DCO 6.2.24 ES Vol I Chapter 24 Cumulative and Combined Effects.pdf:102: The Infrastructure Planning (Environmental Impact Assessment)

EN010103-001103-NZT DCO 6.4.16 ES Vol III Appendix 11A Construction Noise Assessment Methodol.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001126-NZT DCO 6.4.37 ES Vol III Appendix 16B Framework Construction Worker Travel Plan.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-002504-NZT DCO 7.13b - Letter Requesting Further Proposed Change - Nov 2022 (D12).pdf:4:Infrastructure Planning (Environmental Impact Assessment) Regulations 2017’ (the ‘EIA Regulations’).

EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:2: AIA Atmospheric Impact Assessment

EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:2: AQIA Air Quality Impact Assessment

EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:2: EIA Environmental Impact Assessment

EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:12: Impact Assessment (EIA) process.

EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:14:3.2.2 Therefore, these are the European sites covered by the air quality impact assessment

EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:35: an absolute noise threshold, is used as an alternative means of impact assessment.

EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:38:4.2.17 An Air Quality Impact Assessment (AQIA) has been carried out in Appendix 8A [APP-

EN010103-002508-NZT DCO 7.16 - HRA for Change Request (Clean) - Nov 2022 (D12).pdf:48:4.3.6 An Atmospheric Impact Assessment (AIA) has been undertaken using detailed air

EN010103-001234-NZT - Regulation 32 Transboundary Screening (3).pdf:3:Under Regulation 32 of The Infrastructure Planning (Environmental Impact Assessment)

EN010103-001134-NZT DCO 6.4.45 ES Vol III Appendix 20B- Navigational Risk Assessment Part 1.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001134-NZT DCO 6.4.45 ES Vol III Appendix 20B- Navigational Risk Assessment Part 1.pdf:6: recommendations as part of the Environmental Impact Assessment

EN010103-001134-NZT DCO 6.4.45 ES Vol III Appendix 20B- Navigational Risk Assessment Part 1.pdf:17: the CO2 Export Pipeline will require a separate environmental impact assessment.

EN010103-001134-NZT DCO 6.4.45 ES Vol III Appendix 20B- Navigational Risk Assessment Part 1.pdf:21: environmental impact assessment.

EN010103-002507-NZT DCO 7.15.2 - Third ES Addendum Volume II (Figures) - Nov 2022 (D12).pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (as

EN010103-001797-NZT DCO 9.10 - Applicants' Comments on Deadline 1 submissions - June 2022.pdf:2:EIA Environmental Impact Assessment

EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:43:EQS in Table 2-1 is highlighted in yellow. A water quality impact assessment is not required for those

EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:70:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:118:Proposed Development, the Environmental Impact Assessment (EIA) for NZT is being undertaken

EN010103-002322-NZT DCO 9.36 - Nutrient Nitrogen Briefing Paper Clean Oct 2022 (D9).pdf:120:EIA Environmental Impact Assessment

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (as

EN010103-001332-NZT DCO 7.8.1 - Environmental Statement Addendum - Volume I - Apr 2022.pdf:49: impact assessment.

EN010103-002324-NZT DCO 9.38 - Applicants' Comments on Deadline 8 Submissions Oct 2022 (D9).pdf:2: EIA Environmental Impact Assessment

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:1:Table 21-6: Magnitude Criteria for GHG Impact Assessment ………………………… 21-18

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:1:Table 21-7: Significance of Effects Matrix for GHG Emissions Impact Assessment 21-

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:3: (Environmental Impact Assessment) Regulations 2017 (the ‘EIA

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:3:  Lifecycle greenhouse gas (GHG) impact assessment – the potential

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:5: The Infrastructure Planning (Environmental Impact Assessment)

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:10: Environmental Impact Assessment

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:11: IEMA Environmental Impact Assessment Guide to Assessing Greenhouse

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:11: IEMA Environmental Impact Assessment Guide to Climate Change

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:15: Therefore, for the purpose of the GHG emissions impact assessment, the

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:20:Table 21-6: Magnitude Criteria for GHG Impact Assessment

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:23:21.3.38 This Section presents preliminary findings of the GHG impact assessment

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:81: Biodiversity into Environmental Impact Assessment (online). Available

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:82: IEMA (2017). Environmental Impact Assessment Guide to: Assessing

EN010103-000905-NZT DCO 6.2.21 ES Vol I Chapter 21 Climate Change.pdf:82: IEMA (2020). Environmental Impact Assessment Guide to: Climate Change

EN010103-002075-NZT DCO 9.29 - Cumulative GHG Onshore and Offshore Assessment August 2022 (D6).pdf:2: EIA Environmental Impact Assessment

EN010103-002075-NZT DCO 9.29 - Cumulative GHG Onshore and Offshore Assessment August 2022 (D6).pdf:6: “Is it intended to undertake a cumulative impact assessment of life-cycle carbon

EN010103-002075-NZT DCO 9.29 - Cumulative GHG Onshore and Offshore Assessment August 2022 (D6).pdf:8: environmental impact assessment Emissions, Rev 02, dated 18/05/2022

EN010103-001916-NZT DCO 9.21 - Notification of Further Proposed Changes and Update on Remaining Optionality July 2022 (D4).pdf:2: EIA Environmental Impact Assessment

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:2:17.2.1 The landscape and visual impact assessment takes account of the legislation

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:6:17.3.1 The landscape and visual impact assessment has been based on the following

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:6: • Guidelines for Landscape and Visual Impact Assessment (GLVIA 3),

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:6: Impact Assessment and Significance Criteria

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:6: 17B: Landscape and Visual Impact Assessment Methodology (ES Volume III,

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:7: Landscape and Visual Impact Assessment Methodology (ES Volume III,

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:7: Landscape Impact Assessment Methodology

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:8: and Visual Impact Assessment Methodology (ES Volume III, Document Ref.

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:8: Visual Impact Assessment Methodology

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:8: impact assessment, specific terminology is used to describe the magnitude of

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:8: impact (see Appendix 17B: Landscape and Visual Impact Assessment

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:9:17.3.20 The landscape and visual impact assessment has been undertaken in

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:10:17.3.25 For the purposes of this Landscape and Visual Impact Assessment (LVIA) the

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:30: within Appendix 17B: Landscape and Visual Impact Assessment Methodology

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:32: Appendix 17B: Landscape and Visual Impact Assessment Methodology (ES

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:56: impact assessment as detailed at the PEI Stage have now been resolved i.e.

EN010103-000909-NZT DCO 6.2.17 ES Vol I Chapter 17 Landscape and Visual Amenity.pdf:62: visual impact assessment are set out in Table 17.14.

EN010103-001234-NZT - Regulation 32 Transboundary Screening.pdf:3:Under Regulation 32 of The Infrastructure Planning (Environmental Impact Assessment)

EN010103-002634-NZT DCO 3.3 - Funding Statement - Appendix 1 (Tracked) - Nov 2022 (D13).pdf:3: EIA Environmental Impact Assessment. The

EN010103-002634-NZT DCO 3.3 - Funding Statement - Appendix 1 (Tracked) - Nov 2022 (D13).pdf:3: Impact Assessment) Regulations 2017 (as

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:1:Document Reference: 9.17 Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:2:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:2: Document Ref 9.17 Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:2: EIA Environmental Impact Assessment

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:2: HIA Hydrogeological Impact Assessment

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:3:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:4:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:4:3.0 Hydrogeological Impact Assessment ……………………………………………………………. 21

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:4:Table 4.1: Summary of the Impact Assessment……………………………………………………………. 33

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:5:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:5:1.1.1 This Hydrogeological Impact Assessment (HIA) Report (Document Ref. 9.17) has been

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:6:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:7:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:7: Hydrogeological Impact Assessment to assess the impact of the Proposed

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:8:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:9:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:10:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:11:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:12:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:13:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:14:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:15:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:16:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:17:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:18:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:19:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:20:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:21:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:22:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:23:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:24:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:25:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:25:3.0 HYDROGEOLOGICAL IMPACT ASSESSMENT

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:25: a Hydrogeological Impact Assessment (HIA) and the conclusions of the HIA should

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:25: “Solution: Applicant to provide a Hydrogeological Impact Assessment and to assess

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:26:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:27:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:28:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:29:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:30:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:31:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:32:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:33:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:34:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:35:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:36:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:37:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:37:4.1.2 The impact assessment is based on Tables 3.1 and 3.2 to identify where significant

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:37: acceptable. Table 4.1 provides a summary of the impact assessment.

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:37: Table 4.1: Summary of the Impact Assessment

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:37:4.1.3 Based on the findings of the hydrogeological Impact Assessment, it is considered that

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:38:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:39:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:39:5.1.1 Based on the findings of the Hydrogeological Impact Assessment, the following

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:40:Hydrogeological Impact Assessment Report

EN010103-001912-NZT DCO 9.17 - Hydrogeological Impact Assessment July 2022 (D4).pdf:41:Hydrogeological Impact Assessment Report

EN010103-001993-NZT DCO 9.25 - Applicants' Comments on Deadline 4 Submissions - August 2022(D5).pdf:2: EIA Environmental Impact Assessment

EN010103-001114-NZT DCO 6.4.13 ES Vol III Appendix 10B Contaminated Land- Conceptual Site Model.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-002636-NZT DCO 8.5 - EA SoCG - Final (signed) - Oct 2022 (D13).pdf:3: EIA Environmental Impact Assessment - the

EN010103-002636-NZT DCO 8.5 - EA SoCG - Final (signed) - Oct 2022 (D13).pdf:20: The EA agrees that the Hydrogeological Impact Assessment

EN010103-001576-NZT DCO 9.3 - Written Summary ISH2 - May 2022.pdf:35: Storage (Environmental Impact Assessment) Regulations 2020. The ESIA is due to be

EN010103-001131-NZT DCO 6.4.42 ES Vol III Appendix 18A Cultural Heritage Baseline Report.pdf:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010103-001131-NZT DCO 6.4.42 ES Vol III Appendix 18A Cultural Heritage Baseline Report.pdf:30: Practice Guidance – Environmental Impact Assessment Online. Available

EN010103-001945-NZT ISH4 S1.pdf:9:So the first item on here is comments and observations on the landscaping visual impact assessment,

EN010103-001945-NZT ISH4 S1.pdf:20:But the landscape of visual impact assessment we did identify potentially significant or moderate

EN010103-001956-c 16 May 2022.pdf:5: EIA Environmental Impact Assessment

EN010082-000649-Regulation 23 Notice of Decision (2).pdf:1:(ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2009

EN010082-000649-Regulation 23 Notice of Decision (2).pdf:1:Impact Assessment) Regulations 2009 that a determination has been made on an

EN010082-000649-Regulation 23 Notice of Decision (2).pdf:1:regulation 23(2)(d) of the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000394-7 8 - Tees CCPP - SoCG with Highways England - DRAFT.pdf:2:EIA Environmental Impact Assessment

EN010082-000394-7 8 - Tees CCPP - SoCG with Highways England - DRAFT.pdf:6: Impact Assessment (‘EIA’) Scoping Opinion in March 2017, following submission of the Applicant’s

EN010082-000394-7 8 - Tees CCPP - SoCG with Highways England - DRAFT.pdf:8: PEIR Response The traffic impact assessment to be An additional ‘Sensitivity’ assessment has been

EN010082-000394-7 8 - Tees CCPP - SoCG with Highways England - DRAFT.pdf:8: PEIR Response The cumulative impact assessment to Cumulative effects arising from construction

EN010082-000394-7 8 - Tees CCPP - SoCG with Highways England - DRAFT.pdf:21:observed to be high, then it is recommended suitable junction impact assessment methods to

EN010082-000394-7 8 - Tees CCPP - SoCG with Highways England - DRAFT.pdf:21:into the traffic impact assessment. The provision of this data as traffic figures and analysed against

EN010082-000394-7 8 - Tees CCPP - SoCG with Highways England - DRAFT.pdf:22: 4) The traffic impact assessment to be expanded to assess the impact of development traffic

EN010082-000394-7 8 - Tees CCPP - SoCG with Highways England - DRAFT.pdf:22: 5) The cumulative impact assessment to present the traffic data of identified major

EN010082-000394-7 8 - Tees CCPP - SoCG with Highways England - DRAFT.pdf:25:4) The traffic impact assessment to be expanded to assess the impact of development traffic against background

EN010082-000394-7 8 - Tees CCPP - SoCG with Highways England - DRAFT.pdf:25:5) The cumulative impact assessment to present the traffic data of identified major developments including the

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:2:2009 EIA Regulations The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:2:EIA Environmental Impact Assessment

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:3:LVIA Landscape and Visual Impact Assessment

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:12:1.21 The Proposed Development represents an Environmental Impact Assessment (‘EIA’) development

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:12:1.22 ‘The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017’ (the ‘2017

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:12: (Environmental Impact Assessment) Regulations 2009’ (the ‘2009 EIA Regulations’). The 2009

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:17: • The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 (the

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:40: of draft air and noise impact assessments and providing to the EA a Best Available Techniques

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:46: states that applicants should include a Landscape and Visual Impact Assessment

EN010082-000211-EN010082-5.5-Planning Statement-Final-November 2017.pdf:48: decommissioning of energy Infrastructure may have socio-economic impacts at provides a socio-economic impact assessment of the Proposed Development.

EN010082-000499-_DOC_40066269(1)_DEADLINE 2_ EM v2 (Formatted - Clean).pdf:2:EIA Environmental Impact Assessment

EN010082-000499-_DOC_40066269(1)_DEADLINE 2_ EM v2 (Formatted - Clean).pdf:2:2009 EIA Regulations The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

EN010082-000499-_DOC_40066269(1)_DEADLINE 2_ EM v2 (Formatted - Clean).pdf:2:2017 EIA Regulations The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017

EN010082-000012-Scoping Opinion.pdf:5:19 of the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000012-Scoping Opinion.pdf:38: with the Guidelines for Landscape and Visual Impact Assessment

EN010082-000012-Scoping Opinion.pdf:40: ‘Environmental Impact Assessment: Preliminary Environmental

EN010082-000012-Scoping Opinion.pdf:47: Health Impact Assessment

EN010082-000012-Scoping Opinion.pdf:47: whether or not to submit a stand-alone Health Impact Assessment

EN010082-000012-Scoping Opinion.pdf:49: Impact Assessment) Regulations 2009 (SI 2263) (as amended) (the

EN010082-000012-Scoping Opinion.pdf:52:A1.10 The SoS acknowledges that the Environmental Impact Assessment

EN010082-000012-Scoping Opinion.pdf:55: of presentation, to consider the impact assessment in a similar

EN010082-000012-Scoping Opinion.pdf:66:Environmental Impact Assessment Requirements

EN010082-000012-Scoping Opinion.pdf:66:Environmental Impact Assessment:

EN010082-000012-Scoping Opinion.pdf:67:Consideration will need to be had within the Environmental Impact Assessment

EN010082-000012-Scoping Opinion.pdf:76:Planning (Environmental Impact Assessment) Regulations 2009 (as

EN010082-000012-Scoping Opinion.pdf:86:Environmental Impact Assessment Scoping consultation (Regulation 15 (3) (i) of the EIA

EN010082-000012-Scoping Opinion.pdf:86:Environmental Impact Assessment (EIA) for this development.

EN010082-000012-Scoping Opinion.pdf:86: Note on Environmental Impact Assessment Directive for Local Planning Authorities Office of the Deputy Prime

EN010082-000012-Scoping Opinion.pdf:87:Schedule 4 of the Town & Country Planning (Environmental Impact Assessment) Regulations 2011,

EN010082-000012-Scoping Opinion.pdf:87:Ecological Impact Assessment (EcIA) have been developed by the Chartered Institute of Ecology

EN010082-000012-Scoping Opinion.pdf:89:results, impact assessments and appropriate accompanying mitigation strategies included as part of

EN010082-000012-Scoping Opinion.pdf:89:therefore advises that survey, impact assessment and mitigation proposals for Habitats and Species

EN010082-000012-Scoping Opinion.pdf:90:Natural England supports the publication Guidelines for Landscape and Visual Impact Assessment,

EN010082-000012-Scoping Opinion.pdf:90:landscape and visual impact assessment.

EN010082-000012-Scoping Opinion.pdf:90:Environmental Impact Assessment process should detail the measures to be taken to ensure the

EN010082-000012-Scoping Opinion.pdf:90:cumulative impact assessment should include other proposals currently at Scoping stage. Due to

EN010082-000012-Scoping Opinion.pdf:91:The ES should include an impact assessment to identify, describe and evaluate the effects that are

EN010082-000012-Scoping Opinion.pdf:93: - We have no comments to make on the approach to ecological impact assessment at the local

EN010082-000012-Scoping Opinion.pdf:98: Environmental Impact Assessment: A guide to good practice and procedures - A consultation paper; 2006; Department for

EN010082-000012-Scoping Opinion.pdf:103:of every risk or impact assessment of proposed plans that involve a potential

EN010082-000377-2.1 - Tees CCPP - Draft DCO with proposed change - tracked Rev 2.pdf:2:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009© and has had

EN010082-000377-2.1 - Tees CCPP - Draft DCO with proposed change - tracked Rev 2.pdf:2: Amendment) Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000377-2.1 - Tees CCPP - Draft DCO with proposed change - tracked Rev 2.pdf:2: Impact Assessment) Regulations 2017 (S.I. 2017/572), but continues to apply to this application for development consent

EN010082-000377-2.1 - Tees CCPP - Draft DCO with proposed change - tracked Rev 2.pdf:3: Impact Assessment) Regulations 2007 (S.I. 2007/1062). Section 329 was amended by section 112(4) of, and Schedule 18

EN010082-000648-Tees CCPP Decision Letter 5 April 2019 (2).pdf:3:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 (“the

EN010082-000648-Tees CCPP Decision Letter 5 April 2019 (2).pdf:3:of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017.

EN010082-000648-Tees CCPP Decision Letter 5 April 2019 (2).pdf:3:ExA were: the Environmental Impact Assessment; Air Quality and Emissions;

EN010082-000648-Tees CCPP Decision Letter 5 April 2019 (2).pdf:12:the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 that

EN010082-000648-Tees CCPP Decision Letter 5 April 2019 (2).pdf:13:(Environmental Impact Assessment) Regulations 2009.

EN010082-000379-6.2.5 - Tees CCPP - ES Chapter 5 Project Description - tracked Rev 2 with figures.pdf:3: for the impact assessment including ‘realistic worst case scenarios’. Typically

EN010082-000379-6.2.5 - Tees CCPP - ES Chapter 5 Project Description - tracked Rev 2 with figures.pdf:3: structures (for the visual impact assessment), design and layout of structures

EN010082-000142-EN010082-1.1-Application Cover Letter-Final-November 2017.pdf:3:Environmental Impact Assessment

EN010082-000142-EN010082-1.1-Application Cover Letter-Final-November 2017.pdf:3:The Project represents an Environmental Impact Assessment (‘EIA’) development and therefore the

EN010082-000142-EN010082-1.1-Application Cover Letter-Final-November 2017.pdf:3:‘The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017’ (the ‘2017 EIA

EN010082-000142-EN010082-1.1-Application Cover Letter-Final-November 2017.pdf:3:Impact Assessment) Regulations 2009’ (the ‘2009 EIA Regulations’). The 2009 EIA Regulations however

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:6: 1.5. ENVIRONMENTAL IMPACT ASSESSMENT…………………………………………… 7

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:6: 4.6. ENVIRONMENTAL IMPACT ASSESSMENT METHODOLOGY ……………………… 32

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:15:1.5. ENVIRONMENTAL IMPACT ASSESSMENT

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:15: Impact Assessment (EIA) is required (EIA development).

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:15: (Environmental Impact Assessment) Regulations 2009 (SI 2263) (the

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:15: Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:25: Impact Assessment) Regulations 2009 (as amended) as discussed further

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:25: Infrastructure Planning (Environmental Impact Assessment)

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:25: (Environmental Impact Assessment) Regulations 2017 (the 2017 EIA

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:25: Impact Assessment) Regulations 2009 (the 2009 EIA Regulations)

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:26: Infrastructure Planning (Environmental Impact Assessment)

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:30: impact assessment and transboundary matters with regard to impacts on

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:36: • Environmental Impact Assessment;

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:40:4.6. ENVIRONMENTAL IMPACT ASSESSMENT

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:45:4.9.10. The study area for the air quality impact assessment is a 15 km radius

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:52: impact assessment, on the basis that this is the most likely stack height

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:56: Critical Limit or Critical Load. The air quality impact assessment [APP-

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:60: CIEEM (2016) Guidelines for Ecological Impact Assessment in the UK and

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:68: Guidelines for Landscape and Visual Impact Assessment (GLVIA), produced by

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:155:EIA Environmental Impact Assessment

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:156:LVIA Landscape and Visual Impact Assessment

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:157: Impact Assessment) Regulations 2009

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:157: Impact Assessment) Regulations 2017

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:161:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009© and has had

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:161: Amendment) Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:161: Impact Assessment) Regulations 2017 (S.I. 2017/572), but continues to apply to this application for development consent

EN010082-000654-TEES Final Recommendation Report and Errata.pdf:162: Impact Assessment) Regulations 2007 (S.I. 2007/1062). Section 329 was amended by section 112(4) of, and Schedule 18

EN010082-Advice-00004-1-Tees CCPP note of site visit and meeting on 2 March 2017.pdf:3:impact assessment, including any matters which the Secretary of State had agreed at

EN010082-000173-EN010082-6.2.2-ES Chapter 2-Legislation Policy and Guidance-Final-November 2017.pdf:3: • The Infrastructure Planning (Environmental Impact Assessment)

EN010082-000173-EN010082-6.2.2-ES Chapter 2-Legislation Policy and Guidance-Final-November 2017.pdf:3: Planning (Environmental Impact Assessment) Regulations 2017 (the 2017

EN010082-000173-EN010082-6.2.2-ES Chapter 2-Legislation Policy and Guidance-Final-November 2017.pdf:10:2.28 The impact assessment principles that are identified as being particularly

EN010082-000173-EN010082-6.2.2-ES Chapter 2-Legislation Policy and Guidance-Final-November 2017.pdf:10: EN-2 Impact Assessment Principle

EN010082-000173-EN010082-6.2.2-ES Chapter 2-Legislation Policy and Guidance-Final-November 2017.pdf:11:2.30 The specific impact assessment principles that are identified as being

EN010082-000173-EN010082-6.2.2-ES Chapter 2-Legislation Policy and Guidance-Final-November 2017.pdf:11: EN-4 Impact Assessment Principle

EN010082-000173-EN010082-6.2.2-ES Chapter 2-Legislation Policy and Guidance-Final-November 2017.pdf:11: and good design (Section 2.5). The technology specific impact assessment

EN010082-000173-EN010082-6.2.2-ES Chapter 2-Legislation Policy and Guidance-Final-November 2017.pdf:11: EN-5 Impact Assessment Principle

EN010082-000576-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Clean).pdf:8: the Assessment of Dust from Demolition and undertake a construction impact assessment.

EN010082-000174-EN010082-6.2.3-ES Chapter 3-EIA Approach-Final-November 2017.pdf:3: (Environmental Impact Assessment) Regulations 2009 (the 2009 EIA

EN010082-000174-EN010082-6.2.3-ES Chapter 3-EIA Approach-Final-November 2017.pdf:3:3.1 The impact assessment has followed a systematic process that predicts the

EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:14:6.26 The impact assessment compares CSMs for the construction (and

EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:42: which has been combined with impact assessment methodologies in the

EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:43:6.130 In terms of impact assessment, the soils at the site are assessed as being of low

EN010082-000177-EN010082-6.2.6-ES Chapter 6-Ground Conditions, Water Resources and Flooding-Final-November 2017.pdf:44:6.132 In terms of impact assessment, the shallow groundwater has been assessed to

EN010082-000395-7 9 - Tees CCPP - SoCG Statement of Commonality - Deadline 2.pdf:2:EIA Environmental Impact Assessment

EN010082-000496-_CONSENTORDER_40063542(1)_DEADLINE 2_ DCOv2.pdf:2:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009© and has had

EN010082-000496-_CONSENTORDER_40063542(1)_DEADLINE 2_ DCOv2.pdf:2: Amendment) Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000496-_CONSENTORDER_40063542(1)_DEADLINE 2_ DCOv2.pdf:2: Impact Assessment) Regulations 2017 (S.I. 2017/572), but continues to apply to this application for development consent

EN010082-000496-_CONSENTORDER_40063542(1)_DEADLINE 2_ DCOv2.pdf:3: Impact Assessment) Regulations 2007 (S.I. 2007/1062). Section 329 was amended by section 112(4) of, and Schedule 18

EN010082-000314-TEES - Regulation 24 Transboundary Screening (1).pdf:4:(Environmental Impact Assessment) Regulations 2017 (the 2017 EIA Regulations). The

EN010082-000314-TEES - Regulation 24 Transboundary Screening (1).pdf:4:Impact Assessment) Regulations 2009 (the 2009 EIA Regulations) are therefore considered

EN010082-000314-TEES - Regulation 24 Transboundary Screening (1).pdf:5: within the study area for the air quality impact assessment.

EN010082-000314-TEES - Regulation 24 Transboundary Screening (1).pdf:5:(Environmental Impact Assessment) Regulations 2017 (the 2017 EIA Regulations). The

EN010082-000314-TEES - Regulation 24 Transboundary Screening (1).pdf:5:2017 EIA Regulations). The Infrastructure Planning (Environmental Impact Assessment)

EN010082-000432-244690 EN010082 Natural England Written Representations Tees CCPP - Final.pdf:7: the scope of surveys. Environmental Impact Assessment Scoping

EN010082-000643-Sembcorp Utilities (UK) Limited.pdf:2: building sizes and footprints (e.g. the landscape and visual impact assessment) are related to

EN010082-000179-EN010082-6.2.8-ES-Chapter 8-Noise and Vibration-Final-November 2017.pdf:13:8.2.3 Impact Assessment Methodology and Significance Criteria

EN010082-000185-EN010082-6.2.14-ES Chapter 14-Human Health-Final-November 2017.pdf:3:14.2 The amended Environmental Impact Assessment (EIA) Directive

EN010082-000185-EN010082-6.2.14-ES Chapter 14-Human Health-Final-November 2017.pdf:3: Infrastructure Planning (Environmental Impact Assessment) Regulations 2017

EN010082-000185-EN010082-6.2.14-ES Chapter 14-Human Health-Final-November 2017.pdf:5:England report][Environmental Impact assessment at this stage of the project.

EN010082-000185-EN010082-6.2.14-ES Chapter 14-Human Health-Final-November 2017.pdf:5: Environmental Impact Assessment (EIA) and the conclusions drawn.

EN010082-000185-EN010082-6.2.14-ES Chapter 14-Human Health-Final-November 2017.pdf:7:14.11 Table 14.2 identifies the key policies relevant to this health impact assessment.

EN010082-000185-EN010082-6.2.14-ES Chapter 14-Human Health-Final-November 2017.pdf:8: project level assessments, including Environmental Impact Assessment, and

EN010082-000185-EN010082-6.2.14-ES Chapter 14-Human Health-Final-November 2017.pdf:9: Document (2007), which require a health impact assessment on a project

EN010082-000185-EN010082-6.2.14-ES Chapter 14-Human Health-Final-November 2017.pdf:9: Principles of Development states that a “Health Impact Assessment will be

EN010082-000185-EN010082-6.2.14-ES Chapter 14-Human Health-Final-November 2017.pdf:10:14.2.1 Defining Health and Health Impact Assessment

EN010082-000185-EN010082-6.2.14-ES Chapter 14-Human Health-Final-November 2017.pdf:12: • A Short Guide to Health Impact Assessment: Informing Healthy

EN010082-000185-EN010082-6.2.14-ES Chapter 14-Human Health-Final-November 2017.pdf:12: • An Easy Guide To Health Impact Assessments For Local Authorities,

EN010082-000185-EN010082-6.2.14-ES Chapter 14-Human Health-Final-November 2017.pdf:12: • Introducing health impact assessment (HIA): Informing the decision-

EN010082-000185-EN010082-6.2.14-ES Chapter 14-Human Health-Final-November 2017.pdf:12: (1) World Health Organization (1999) Health impact assessment: Main concepts and suggested approach. Copenhagen:

EN010082-000185-EN010082-6.2.14-ES Chapter 14-Human Health-Final-November 2017.pdf:18:14.2.9 Impact Assessment Methodology and Significance Criteria

EN010082-000267-TEES CCPP Section 55 Acceptance of Applications Checklist Final.pdf:4: Regulation 8 of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (2017 EIA Regulations), or Regulation 6 of The Infrastructure Planning

EN010082-000267-TEES CCPP Section 55 Acceptance of Applications Checklist Final.pdf:4: (Environmental Impact Assessment) Regulations 2009 (2009 EIA Regulations) (where Regulation 37 of the 2017 EIA Regulations applies).

EN010082-000193-EN010082-6.3.3-ES Annex C-Flood Risk Assessment-Final-November 2017.pdf:5: (Environmental Impact Assessment) Regulations 2009. A summary of key

EN010082-000404-6.3.19 - Tees CCPP - Annex L CEMP - UPDATED.pdf:8: the Assessment of Dust from Demolition and undertake a construction impact assessment.

EN010082-000353-Tees CCPP Preliminary Meeting Note Final.pdf:5:ordered with the Draft DCO first, followed by the Environmental Impact Assessment

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:3: information should be taken as indicative but is suitable for impact assessment

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:9: confirming that socio-economic impact assessments should consider

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:12: been considered further in terms of detailed impact assessment.

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:15:13.2.6 Impact Assessment Methodology and Significance Criteria

EN010082-000184-EN010082-6.2.13-ES Chapter 13-Socio Economic Characteristics-Final-November 2017.pdf:40: stages of the socio-economic impact assessment, Sembcorp has yet to assess

EN010082-000556-7.4 - Tees CCPP - Environment Agency SoCG - DRAFT UNSIGNED - 22.08.18.pdf:6: in March 2017 in response to SCU’s request for an Environmental Impact Assessment (‘EIA’) Scoping

EN010082-000581-8.61 - Tees CCPP - Stack Diameter Sensitivity Study.pdf:3:1.2 The current impact assessment for the Project uses an 8.0m internal diameter

EN010082-000187-EN010082-6.2.16-ES-Chapter 16-Summary of Cumulative and Indirect Effects-Final-November 2017.pdf:5:16.17 The landscape and visual impact assessment undertook further consideration

EN010082-000525-7.3 - Tees CCPP - SoCG with Redcar Cleveland - FINAL - 06.07.18.pdf:28: (Environmental Impact Assessment) Regulations 2017 require an assessment of major accidents and

EN010082-000551-8.54 - Explanatory Memorandum - Tracked (v3).pdf:2:EIA Environmental Impact Assessment

EN010082-000551-8.54 - Explanatory Memorandum - Tracked (v3).pdf:2:2009 EIA Regulations The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

EN010082-000551-8.54 - Explanatory Memorandum - Tracked (v3).pdf:2:2017 EIA Regulations The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017

EN010082-000583-8.63 - Tees CCPP - Draft DCO - Tracked - Version 6.pdf:2:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009© and has had

EN010082-000583-8.63 - Tees CCPP - Draft DCO - Tracked - Version 6.pdf:2: Amendment) Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000583-8.63 - Tees CCPP - Draft DCO - Tracked - Version 6.pdf:2: (Environmental Impact Assessment) Regulations 2017 (S.I. 2017/572), but continues to apply to this application for

EN010082-000583-8.63 - Tees CCPP - Draft DCO - Tracked - Version 6.pdf:3: 105A-105D were inserted by regulation 4(2) of the Highways (Environmental Impact Assessment) Regulations 2007

EN010082-000393-7 7 - Tees CCPP - SoCG with Historic England - DRAFT.pdf:2:EIA Environmental Impact Assessment

EN010082-000393-7 7 - Tees CCPP - SoCG with Historic England - DRAFT.pdf:5: • impact assessment on key assets; and

EN010082-000393-7 7 - Tees CCPP - SoCG with Historic England - DRAFT.pdf:6: 2017 in response to SCU’s request for an Environmental Impact Assessment (‘EIA’) Scoping Opinion.

EN010082-000521-8.47 - Tees CCPP Examination – ISH Environmental Matters – follow up items on Air Quality.pdf:1:In the air quality impact assessment, a Moderate impact for the 1 hour NO2 is defined

EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated).pdf:2:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009(d) and has had

EN010082-000649-Regulation 23 Notice of Decision.pdf:1:(ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2009

EN010082-000649-Regulation 23 Notice of Decision.pdf:1:Impact Assessment) Regulations 2009 that a determination has been made on an

EN010082-000649-Regulation 23 Notice of Decision.pdf:1:regulation 23(2)(d) of the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000363-TEES - 180502 - Rule 17 letter.pdf:1:consultation and the Environmental Impact Assessment.

EN010082-000405-8.10 - Tees CCPP - Updated Mitigation Table.pdf:2:1 As per definitions in the Institute of Environmental Management and Assessment (November 2015) IEMA Environmental Impact Assessment Guide to Shaping Quality Development.

EN010082-000388-7 2 - Tees CCPP - SoCG with NE - Signed_Redacted.pdf:2: EIA Environmental Impact Assessment

EN010082-000388-7 2 - Tees CCPP - SoCG with NE - Signed_Redacted.pdf:7: 2017 in response to SCU’s request for an Environmental Impact Assessment (‘EIA’) Scoping Opinion.

EN010082-000555-8.50 - Tees CCPP - Applicant's Comments on Responses to the ExA's SWQs - Deadline 6 - FINAL - 22.08.18.pdf:2:GLVIA3 Guidelines for Landscape and Visual Impact Assessment, Third Edition

EN010082-000555-8.50 - Tees CCPP - Applicant's Comments on Responses to the ExA's SWQs - Deadline 6 - FINAL - 22.08.18.pdf:2:HIA Health Impact Assessment

EN010082-000555-8.50 - Tees CCPP - Applicant's Comments on Responses to the ExA's SWQs - Deadline 6 - FINAL - 22.08.18.pdf:3:LVIA landscape and visual impact assessment

EN010082-000143-EN010082-1.2-Application Guide-Final-November 2017.pdf:2: EIA Environmental Impact Assessment

EN010082-000143-EN010082-1.2-Application Guide-Final-November 2017.pdf:7: Regulations’) and ‘The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

EN010082-000143-EN010082-1.2-Application Guide-Final-November 2017.pdf:7: 2.3 ‘The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017’ (the ‘2017 EIA

EN010082-000143-EN010082-1.2-Application Guide-Final-November 2017.pdf:7: 2.10 The Project represents an Environmental Impact Assessment (‘EIA’) development and therefore the

EN010082-000143-EN010082-1.2-Application Guide-Final-November 2017.pdf:9: Category 6.0 Environmental Impact Assessment Information

EN010082-000653-Tees CCPP - Correspondence received after the close of Examination (1).pdf:20: building sizes and footprints (e.g. the landscape and visual impact assessment) are related to

EN010082-000396-8 5 - Tees CCP - Applicant's Comments on Relevant Reps - FINAL (2).pdf:2:EIA Environmental Impact Assessment

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:2:GLVIA3 Guidelines for Landscape and Visual Impact Assessment, Third Edition

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:2:HIA Health Impact Assessment

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:3:LVIA landscape and visual impact assessment

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:8:Q1.1.6 Applicant As set out in Table 7.1 of the ES APP-049 the EA commented that the The assessment of impacts on habitats is a critical issue for the air quality impact assessment. Based upon EA guidance (Environment

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:8: contributions which are an output of the dispersion modelling. Nevertheless, The air quality impact assessment APP-049 demonstrated that the 1% threshold is not exceeded at any location, and there was

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:9: application site, as described in paragraph 7.83 of the ES APP-049 are assessment considered the maximum impacts predicted anywhere outside the Project site boundary. The air quality impact assessment

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:11: mitigation is proposed, why not? not significant. The impact assessment considers these embedded measures and therefore are included in the ES assessment and HRA

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:13: therefore used in the air quality impact assessment, on the basis that this is the most likely stack height that would be adopted for the

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:14: from the Application site. impact assessment work.

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:14: Agency the critical loads or levels for given pollutants (as acknowledged in paragraph impact assessment, the project does not trigger these thresholds at any habitat sites. Underpinning this, there is a general trend in

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:14: Plans for the Teesmouth and Cleveland Coast SPA and the North York Moors The air quality impact assessment APP-049 sets out a staged screening process to identify whether there is a potential for a project to

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:14: SPA and SAC, which refer to atmospheric nitrogen deposition as issues which result in a Likely Significant Effect. Where the air quality impact assessment identifies there is a potential for LSE, this triggers further

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:18: no material impact on the air quality impact assessment.

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:21: account in the Environmental Impact Assessment? Please indicate where the

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:31:5 Environmental Impact Assessment

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:35: Historic England was based on a 2km radius around the site. visit in association with a landscape and visual impact assessment specialist it was concluded that no significant effects would result

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:41: Impact Assessment, Third Edition (GLVIA3).

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:42: landscape and visual impact assessment? phases); however, each phase would be less intense than for Scenario 1. The landscape and visual impact assessment (‘LVIA’) [APP-

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:45: & Assessment (2013) Guidelines for Landscape and Visual Impact Assessment (Third Edition).

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:45: and visual impact assessment? These have the existing industrial areas in the background so grey cladding is more suitable.

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:49: Redcar and Local Plan states that a Health Impact Assessment (HIA) will be required an assessment of the likely significant health effects. RCBC did not request a HIA although it is noted within the HIA as emerging

EN010082-000397-8 6 - Tees CCP - Applicant's Response to ExA's WQs - Deadline 2 - FINAL.pdf:51: traffic impact assessment.

EN010082-000478-Applicant’s Comments on the Environment Agency’s Written Representations D3.pdf:2:GLVIA3 Guidelines for Landscape and Visual Impact Assessment, Third Edition

EN010082-000478-Applicant’s Comments on the Environment Agency’s Written Representations D3.pdf:2:HIA Health Impact Assessment

EN010082-000478-Applicant’s Comments on the Environment Agency’s Written Representations D3.pdf:3:LVIA landscape and visual impact assessment

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:2:EIA Environmental Impact Assessment

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:2:2009 EIA Regulations The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:2:2017 EIA Regulations The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:10: Planning (Environmental Impact Assessment) Regulations 2009’ (the ‘2009 EIA Regulations’) and

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:12: Impact Assessment (‘EIA’) Regulation 11 Publicity: on 14 and 21 June 2017.

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:12: Impact Assessment Regulation 11 publicity carried

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:29: • The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 (the ‘2009

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:29:3.13 The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the ‘2017

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:32: • PINS Advice Note 7 ‘Environmental Impact Assessment: screening, scoping and preliminary

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:38: • PINS Advice Note 7 ‘Environmental Impact Assessment: screening, scoping and preliminary

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:40: environmental impact assessment (’EIA’) work undertaken on the Proposed Development (e.g. the

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:73: - Job creation. Ref. 6.2.13) provides a socio-economic impact assessment of the Proposed economic characteristics (Ref 6.2.13).

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:85: Authority tive impact assessment of traffic impacts in relation to tion Document Ref. 6.2.10) provides an assessment of 6.2.10)

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:87: 4) The traffic impact assessment to be expanded to response (both provided in Appendix A of the TA).

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:87: 5) The cumulative impact assessment to present the to coordinate with the proponents of these schemes

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:92: erals potash processing facility. It would also strengthen nomic impact assessment of the Proposed Development.

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:93: outcome, of an environmental impact assessment. Storage and Carbon Capture and Readiness Statement’

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:118: EIA Environmental Impact Assessment

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:119: 5.0 ENVIRONMENTAL IMPACT ASSESSMENT………….P

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:124: 5.0 ENVIRONMENTAL IMPACT ASSESSMENT

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:125: 5.1 The project requires an Environmental Impact Assessment

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:125: Impact Assessment) Regulations 2009” (as amended) and is

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:136: Appendix 3 Environmental Impact Assessment

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:137: EIA Environmental Impact Assessment

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:153: Appendix 3: Environmental Impact Assessment

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:153: A3.1 The project requires an Environmental Impact Assessment (“EIA”) to be

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:153: Planning (Environmental Impact Assessment) Regulations 2009” (as amended)

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:164: Appendix 3 Environmental Impact Assessment

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:165: EIA Environmental Impact Assessment

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:180: The Project is an Environmental Impact Assessment (EIA) development and so the Applicant will prepare an Environmental

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:182: Appendix 3: Environmental Impact Assessment

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:182: A3.1 The project requires an Environmental Impact Assessment (“EIA”) to be

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:182: Planning (Environmental Impact Assessment) Regulations 2009” (as amended)

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:185: Appendix 3 Environmental Impact Assessment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:186: EIA . . . . . . . . . . . . . . . . . . . Environmental Impact Assessment

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:200: The Project is an Environmental Impact Assessment (EIA) development and so the Applicant

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:203: Impact Assessment

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:203: A3.1 The project requires an Environmental Impact Assessment (“EIA”) to be prepared as it is a project that

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:203: comes within Schedule 1 of “The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:207: The Project is an Environmental Impact Assessment (EIA)

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:279: Planning (Environmental Impact Assessment) Regulations 2009 (as

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:281: (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2009 - ‘PRE-APPLICATION PUBLICITY UNDER

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:282: In addition to the above, Regulation 11 of ‘The Infrastructure Planning (Environmental Impact Assessment)

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:282: Environmental Impact Assessment

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:282: Due to the nature and size of the Project, Sembcorp is undertaking an Environmental Impact Assessment

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:282: ‘The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017’ (the ‘2017 EIA

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:287: The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 - Regulation 11

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:287: 5. The Project represents Environmental Impact Assessment (‘EIA’) development and therefore an EIA will be

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:293: Planning (Environmental Impact Assessment) Regulations 2009 (as amended)

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:293: (the ‘EIA Regulations’) which requires an Environmental Impact Assessment

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:302: The air quality impact assessment considered impacts during the construction

EN010082-000216-EN010082-5.1-Consultation Report-Final-November 2017.pdf:357: 1. Notice is hereby given that Sembcorp Utilities UK Limited 3.1 a combined cycle gas turbine (‘CCGT’) plant, comprising 5. The Project represents Environmental Impact Assessment

EN010082-000515-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Clean v3.pdf:8: the Assessment of Dust from Demolition and undertake a construction impact assessment.

EN010082-000648-Tees CCPP Decision Letter 5 April 2019 (1).pdf:3:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 (“the

EN010082-000648-Tees CCPP Decision Letter 5 April 2019 (1).pdf:3:of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017.

EN010082-000648-Tees CCPP Decision Letter 5 April 2019 (1).pdf:3:ExA were: the Environmental Impact Assessment; Air Quality and Emissions;

EN010082-000648-Tees CCPP Decision Letter 5 April 2019 (1).pdf:12:the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 that

EN010082-000648-Tees CCPP Decision Letter 5 April 2019 (1).pdf:13:(Environmental Impact Assessment) Regulations 2009.

EN010082-000480-HSE D3 Submission.pdf:2:and the Environmental Impact Assessment.

EN010082-000516-6.3.19 - Tees CCPP - Annex L CEMP - Final-2018 - Tracked v3.pdf:8: the Assessment of Dust from Demolition and undertake a construction impact assessment.

EN010082-000296-Certificate of Compliance With Regulation 13.pdf:1: The Infrastructure Planning (Environmental Impact Assessment)

EN010082-000296-Certificate of Compliance With Regulation 13.pdf:1:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 –

EN010082-000314-TEES - Regulation 24 Transboundary Screening (3).pdf:4:(Environmental Impact Assessment) Regulations 2017 (the 2017 EIA Regulations). The

EN010082-000314-TEES - Regulation 24 Transboundary Screening (3).pdf:4:Impact Assessment) Regulations 2009 (the 2009 EIA Regulations) are therefore considered

EN010082-000314-TEES - Regulation 24 Transboundary Screening (3).pdf:5: within the study area for the air quality impact assessment.

EN010082-000314-TEES - Regulation 24 Transboundary Screening (3).pdf:5:(Environmental Impact Assessment) Regulations 2017 (the 2017 EIA Regulations). The

EN010082-000314-TEES - Regulation 24 Transboundary Screening (3).pdf:5:2017 EIA Regulations). The Infrastructure Planning (Environmental Impact Assessment)

EN010082-000430-Redcar and Cleveland Local Impact Report - signed_Redacted.pdf:4:5. Environmental Impact Assessment

EN010082-000430-Redcar and Cleveland Local Impact Report - signed_Redacted.pdf:4: 5.1. A full Environmental Impact Assessment forms part of the application. The

EN010082-000430-Redcar and Cleveland Local Impact Report - signed_Redacted.pdf:5: Community Involvement, the scope of the Environmental Impact Assessment

EN010082-000430-Redcar and Cleveland Local Impact Report - signed_Redacted.pdf:9:9.7. A Landscape and Visual Impact Assessment has been submitted as part of the

EN010082-000172-EN010082-6.2.1-ES Chapter 1-Introduction-Final-November 2017.pdf:2:1.5 SUMMARY OF THE ENVIRONMENTAL IMPACT ASSESSMENT PROCESS 1-7

EN010082-000172-EN010082-6.2.1-ES Chapter 1-Introduction-Final-November 2017.pdf:3: (Environmental Impact Assessment) Regulations 2009 (the ‘2009 EIA

EN010082-000172-EN010082-6.2.1-ES Chapter 1-Introduction-Final-November 2017.pdf:3: (1) Regulation 4 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the ‘2017 EIA

EN010082-000172-EN010082-6.2.1-ES Chapter 1-Introduction-Final-November 2017.pdf:9:1.5 SUMMARY OF THE ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

EN010082-000172-EN010082-6.2.1-ES Chapter 1-Introduction-Final-November 2017.pdf:10: Impact Assessment (EIA) Directive 2014, the purpose of which was to

EN010082-000373-6.2.5 - Tees CCPP - ES Chapter 5 - Project Description - clean Rev 2 with figures.pdf:3: for the impact assessment including ‘realistic worst case scenarios’. Typically

EN010082-000373-6.2.5 - Tees CCPP - ES Chapter 5 - Project Description - clean Rev 2 with figures.pdf:3: structures (for the visual impact assessment), design and layout of structures

EN010082-000206-EN010082-6.3.16-ES Annex I1-Transport Assessment-Final-November 2017.pdf:9:APPENDIX D: Cumulative Impact Assessment

EN010082-000206-EN010082-6.3.16-ES Annex I1-Transport Assessment-Final-November 2017.pdf:120:observed to be high, then it is recommended suitable junction impact assessment methods to

EN010082-000206-EN010082-6.3.16-ES Annex I1-Transport Assessment-Final-November 2017.pdf:120:into the traffic impact assessment. The provision of this data as traffic figures and analysed against

EN010082-000206-EN010082-6.3.16-ES Annex I1-Transport Assessment-Final-November 2017.pdf:121: 4) The traffic impact assessment to be expanded to assess the impact of development traffic

EN010082-000206-EN010082-6.3.16-ES Annex I1-Transport Assessment-Final-November 2017.pdf:121: 5) The cumulative impact assessment to present the traffic data of identified major

EN010082-000206-EN010082-6.3.16-ES Annex I1-Transport Assessment-Final-November 2017.pdf:171:APPENDIX D: Cumulative Impact Assessment

EN010082-000536-8.46 - Tees CCPP - Applicant's Response to ExA's Second WQs - Deadline 5 - FINAL - 07.08.18.pdf:2:GLVIA3 Guidelines for Landscape and Visual Impact Assessment, Third Edition

EN010082-000536-8.46 - Tees CCPP - Applicant's Response to ExA's Second WQs - Deadline 5 - FINAL - 07.08.18.pdf:2:HIA Health Impact Assessment

EN010082-000536-8.46 - Tees CCPP - Applicant's Response to ExA's Second WQs - Deadline 5 - FINAL - 07.08.18.pdf:3:LVIA landscape and visual impact assessment

EN010082-000536-8.46 - Tees CCPP - Applicant's Response to ExA's Second WQs - Deadline 5 - FINAL - 07.08.18.pdf:9: below 75m may result in an effect which is greater than that which has been required, further assessment steps would be needed initially refining that air quality impact assessment to take into

EN010082-000536-8.46 - Tees CCPP - Applicant's Response to ExA's Second WQs - Deadline 5 - FINAL - 07.08.18.pdf:9: height.” refinement of the air quality impact assessment. If the AA determines that a lower stack height would result in

EN010082-000337-Rule 8 Letter.pdf:13:  Environmental Impact Assessment, including issues related

EN010082-000337-Rule 8 Letter.pdf:14: Methodology for Environmental Impact Assessment including

EN010082-000339-TEES - 180412 - Note of Unaccompanied Site Inspection 9 April 2018.pdf:1:Landscape and Visual Impact Assessment (Chapter 11 of the

EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated) (2).pdf:2:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009(d) and has had

EN010082-000489-Applicant's response to the council's late D2 submission.pdf:2:GLVIA3 Guidelines for Landscape and Visual Impact Assessment, Third Edition

EN010082-000489-Applicant's response to the council's late D2 submission.pdf:2:HIA Health Impact Assessment

EN010082-000489-Applicant's response to the council's late D2 submission.pdf:3:LVIA landscape and visual impact assessment

EN010082-000367-Tees CCPP - Non-Material Change - Consultation Notice.pdf:1: The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

EN010082-000367-Tees CCPP - Non-Material Change - Consultation Notice.pdf:1:4. The Project qualifies as Environmental Impact Assessment (‘EIA’) development for the purposes of the

EN010082-000367-Tees CCPP - Non-Material Change - Consultation Notice.pdf:1: Infrastructure Planning (Environmental Impact Assessment) Regulations 2009. The Application was

EN010082-000181-EN010082-6.2.10-ES Chapter 10-Traffic and Transport-Final-November 2017.pdf:7: 4) The traffic impact assessment to be expanded to assess the impact of development traffic against background within the TA and ES as requested

EN010082-000181-EN010082-6.2.10-ES Chapter 10-Traffic and Transport-Final-November 2017.pdf:7: 5) The cumulative impact assessment to present the traffic data of identified major developments including the provided in Appendix A of the TA.

EN010082-000181-EN010082-6.2.10-ES Chapter 10-Traffic and Transport-Final-November 2017.pdf:8:North York Moors Park This Authority notes that in relation to the EIA cumulative impact assessment of traffic impacts in relation to the The York Potash Project Transport

EN010082-000181-EN010082-6.2.10-ES Chapter 10-Traffic and Transport-Final-November 2017.pdf:14:10.2.4 Impact Assessment Methodology and Significance Criteria

EN010082-Advice-00002-1-161214_EN010082_Final meeting note for 14 December 2016.doc_.pdf:2:Seven: Environmental Impact Assessment: Preliminary Environmental Information,

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:6: 1.5. ENVIRONMENTAL IMPACT ASSESSMENT…………………………………………… 7

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:6: 4.6. ENVIRONMENTAL IMPACT ASSESSMENT METHODOLOGY ……………………… 32

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:15:1.5. ENVIRONMENTAL IMPACT ASSESSMENT

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:15: Impact Assessment (EIA) is required (EIA development).

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:15: (Environmental Impact Assessment) Regulations 2009 (SI 2263) (the

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:15: Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:25: Impact Assessment) Regulations 2009 (as amended) as discussed further

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:25: Infrastructure Planning (Environmental Impact Assessment)

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:25: (Environmental Impact Assessment) Regulations 2017 (the 2017 EIA

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:25: Impact Assessment) Regulations 2009 (the 2009 EIA Regulations)

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:26: Infrastructure Planning (Environmental Impact Assessment)

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:30: impact assessment and transboundary matters with regard to impacts on

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:36: • Environmental Impact Assessment;

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:40:4.6. ENVIRONMENTAL IMPACT ASSESSMENT

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:45:4.9.10. The study area for the air quality impact assessment is a 15 km radius

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:52: impact assessment, on the basis that this is the most likely stack height

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:56: Critical Limit or Critical Load. The air quality impact assessment [APP-

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:60: CIEEM (2016) Guidelines for Ecological Impact Assessment in the UK and

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:68: Guidelines for Landscape and Visual Impact Assessment (GLVIA), produced by

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:155:EIA Environmental Impact Assessment

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:156:LVIA Landscape and Visual Impact Assessment

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:157: Impact Assessment) Regulations 2009

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:157: Impact Assessment) Regulations 2017

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:161:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009© and has had

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:161: Amendment) Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:161: Impact Assessment) Regulations 2017 (S.I. 2017/572), but continues to apply to this application for development consent

EN010082-000654-TEES Final Recommendation Report and Errata (1).pdf:162: Impact Assessment) Regulations 2007 (S.I. 2007/1062). Section 329 was amended by section 112(4) of, and Schedule 18

EN010082-000476-Applicant’s Comments on Redcar and Cleveland Borough Council’s Responses to the Examiner’s Written Questions D3.pdf:2:GLVIA3 Guidelines for Landscape and Visual Impact Assessment, Third Edition

EN010082-000476-Applicant’s Comments on Redcar and Cleveland Borough Council’s Responses to the Examiner’s Written Questions D3.pdf:2:HIA Health Impact Assessment

EN010082-000476-Applicant’s Comments on Redcar and Cleveland Borough Council’s Responses to the Examiner’s Written Questions D3.pdf:3:LVIA landscape and visual impact assessment

EN010082-000476-Applicant’s Comments on Redcar and Cleveland Borough Council’s Responses to the Examiner’s Written Questions D3.pdf:8: would it have on nitrogen dioxide (NO2)? analysis service for RCBC and have provided the following explanation. material issue for the project or the air quality impact assessment, as the associated NO 2

EN010082-000476-Applicant’s Comments on Redcar and Cleveland Borough Council’s Responses to the Examiner’s Written Questions D3.pdf:17: Guidelines for Landscape and Visual Impact Assessment, Third

EN010082-000476-Applicant’s Comments on Redcar and Cleveland Borough Council’s Responses to the Examiner’s Written Questions D3.pdf:20:1.10.2 Emerging Policy SD4 of the Redcar and Cleveland Draft The requirement for Health Impact Assessments was found not to be Please refer to the Applicant’s Response to Examining Authority’s Written Questions

EN010082-000476-Applicant’s Comments on Redcar and Cleveland Borough Council’s Responses to the Examiner’s Written Questions D3.pdf:20: Publication New Local Plan states that a Health Impact Assessment sound during the examination of the Local Plan and has been removed. (Application Document Ref: 8.6) submitted at Deadline 2 of the Examination.

EN010082-000476-Applicant’s Comments on Redcar and Cleveland Borough Council’s Responses to the Examiner’s Written Questions D3.pdf:20: Impact Assessment (HIA) should be considered. HIAs are used to judge

EN010082-000653-Tees CCPP - Correspondence received after the close of Examination.pdf:20: building sizes and footprints (e.g. the landscape and visual impact assessment) are related to

EN010082-000524-_DOC_150670236(1)_DEADLINE 4_ DCO (Validated).pdf:2:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009© and has had

EN010082-000524-_DOC_150670236(1)_DEADLINE 4_ DCO (Validated).pdf:2: Amendment) Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000524-_DOC_150670236(1)_DEADLINE 4_ DCO (Validated).pdf:2: Impact Assessment) Regulations 2017 (S.I. 2017/572), but continues to apply to this application for development consent

EN010082-000524-_DOC_150670236(1)_DEADLINE 4_ DCO (Validated).pdf:3: Impact Assessment) Regulations 2007 (S.I. 2007/1062). Section 329 was amended by section 112(4) of, and Schedule 18

EN010082-000350-Placeholder for ExA's Written Questions.pdf:16: Environmental Impact Assessment? Please indicate where the evidence is located and explain whether

EN010082-000350-Placeholder for ExA's Written Questions.pdf:24: 5 Environmental Impact Assessment

EN010082-000350-Placeholder for ExA's Written Questions.pdf:37: Guidelines for Landscape and Visual Impact Assessment, Third Edition (GLVIA3).

EN010082-000350-Placeholder for ExA's Written Questions.pdf:38: second train under Scenario 1 been assessed in the landscape and visual impact assessment?

EN010082-000350-Placeholder for ExA's Written Questions.pdf:44: Redcar and Impact Assessment (HIA) will be required where the development is likely to have a significant impact

EN010082-000350-Placeholder for ExA's Written Questions.pdf:47: should be built into the traffic impact assessment.

EN010082-000369-2.1 - Tees CCPP - Draft DCO with proposed change - clean Rev 2.pdf:2:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009© and has had

EN010082-000369-2.1 - Tees CCPP - Draft DCO with proposed change - clean Rev 2.pdf:2: Amendment) Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000369-2.1 - Tees CCPP - Draft DCO with proposed change - clean Rev 2.pdf:2: Impact Assessment) Regulations 2017 (S.I. 2017/572), but continues to apply to this application for development consent

EN010082-000369-2.1 - Tees CCPP - Draft DCO with proposed change - clean Rev 2.pdf:3: Impact Assessment) Regulations 2007 (S.I. 2007/1062). Section 329 was amended by section 112(4) of, and Schedule 18

EN010082-000497-_DOC_40064625(1)_DEADLINE 2_ DCO showing changes.pdf:2:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009© and has had

EN010082-000497-_DOC_40064625(1)_DEADLINE 2_ DCO showing changes.pdf:2: Amendment) Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000497-_DOC_40064625(1)_DEADLINE 2_ DCO showing changes.pdf:2: Impact Assessment) Regulations 2017 (S.I. 2017/572), but continues to apply to this application for development consent

EN010082-000497-_DOC_40064625(1)_DEADLINE 2_ DCO showing changes.pdf:3: Impact Assessment) Regulations 2007 (S.I. 2007/1062). Section 329 was amended by section 112(4) of, and Schedule 18

EN010082-000589-2.1 - Tees CCPP - Draft Development Consent Order – Final (Version 7).pdf:2:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009© and has had

EN010082-000589-2.1 - Tees CCPP - Draft Development Consent Order – Final (Version 7).pdf:2: Amendment) Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000589-2.1 - Tees CCPP - Draft Development Consent Order – Final (Version 7).pdf:2: Impact Assessment) Regulations 2017 (S.I. 2017/572), but continues to apply to this application for development consent

EN010082-000589-2.1 - Tees CCPP - Draft Development Consent Order – Final (Version 7).pdf:3: Impact Assessment) Regulations 2007 (S.I. 2007/1062). Section 329 was amended by section 112(4) of, and Schedule 18

EN010082-000316-TEES - Final Rule 6 letter.pdf:8:Environmental Impact Assessment including issues related to:

EN010082-000316-TEES - Final Rule 6 letter.pdf:17: • Environmental Impact Assessment, including issues related

EN010082-000316-TEES - Final Rule 6 letter.pdf:18:• Methodology for Environmental Impact Assessment including

EN010082-000316-TEES - Final Rule 6 letter.pdf:28: basis has the environmental impact assessment been undertaken

EN010082-000212-EN010082-5.6-Design Access Statement-Final-November 2017.pdf:2: EIA Environmental Impact Assessment

EN010082-000212-EN010082-5.6-Design Access Statement-Final-November 2017.pdf:8: Environmental Impact Assessment of it has been based and secured by

EN010082-000212-EN010082-5.6-Design Access Statement-Final-November 2017.pdf:16: 4.6 In order to provide sufficient flexibility and ensure a robust Environmental Impact Assessment

EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:2:7.6 The air quality impact assessment considers the following:

EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:3: information required to undertake an air quality impact assessment. This

EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:4:7.13 The Study Area for the air quality impact assessment is a 15 km radius from

EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:4: impact assessment for ecological sites is used to screen for those sites at risk of

EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:9:Environment Agency (Scoping Environmental Impact Assessment Requirements: advice to applicant. We request that the following Stack height sensitivity has been

EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:9:Opinion) information is included within the scope of the Environmental Impact Assessment: undertaken

EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:9: Consideration will need to be had within the Environmental Impact Assessment and Habitats Directive

EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:13:7.19 Air quality impact assessment is subject to a number of different regulations

EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:13: closely related, but are not identical. The air quality impact assessment

EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:17: quality impact assessments for planning (2), and impact assessment for

EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:26:7.2.6 Impact Assessment Methodology and Significance Criteria

EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:27:7.73 Within the air quality impact assessment the large number of sensitive

EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:29: human receptors considered in the impact assessment is set out in Table 7.12

EN010082-000380-6.2.7 - Tees CCPP - ES Chapter 7 Air Quality - tracked Rev 2 with figures.pdf:54:7.128 The air quality impact assessment considered impacts during the construction

EN010082-000554-8.51 - Draft DCO - Clean (v5).pdf:2:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009© and has had

EN010082-000554-8.51 - Draft DCO - Clean (v5).pdf:2: Amendment) Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000554-8.51 - Draft DCO - Clean (v5).pdf:2: Impact Assessment) Regulations 2017 (S.I. 2017/572), but continues to apply to this application for development consent

EN010082-000554-8.51 - Draft DCO - Clean (v5).pdf:3: Impact Assessment) Regulations 2007 (S.I. 2007/1062). Section 329 was amended by section 112(4) of, and Schedule 18

EN010082-000144-EN010082-2.1-Draft Development Consent Order-Final-November 2017.pdf:2:Planning (Environmental Impact Assessment) Regulations 2009 and has had regard to the documents

EN010082-000144-EN010082-2.1-Draft Development Consent Order-Final-November 2017.pdf:2:Amendment) Regulations 2012 ( S.I. 2012/635) and the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000144-EN010082-2.1-Draft Development Consent Order-Final-November 2017.pdf:2:Impact Assessment) Regulations 2017 (S.I. 2017/572), but continues to apply to this application for development consent by

EN010082-000144-EN010082-2.1-Draft Development Consent Order-Final-November 2017.pdf:3: (Environmental Impact Assessment) Regulations 2007 (S.I. 2007/1062). Section 329 was amended by section 112(4) of,

EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated) (3).pdf:2:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009(d) and has had

EN010082-000552-8.53 - Explanatory Memorandum - Clean (v3).pdf:2:EIA Environmental Impact Assessment

EN010082-000552-8.53 - Explanatory Memorandum - Clean (v3).pdf:2:2009 EIA Regulations The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

EN010082-000552-8.53 - Explanatory Memorandum - Clean (v3).pdf:2:2017 EIA Regulations The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017

EN010082-000398-8 7 - Tees CCPP - Written Summary of Oral Case (ISH 10 04 18) - FINAL.pdf:2:EIA Environmental Impact Assessment

EN010082-000398-8 7 - Tees CCPP - Written Summary of Oral Case (ISH 10 04 18) - FINAL.pdf:7: none of the conclusions in the environmental impact assessment are altered the changes ought to be

EN010082-000398-8 7 - Tees CCPP - Written Summary of Oral Case (ISH 10 04 18) - FINAL.pdf:18: environmental impact assessment? If not, please explain whether or not it would alter the conclusions of

EN010082-000477-Applicant’s Comments on the Environment Agency’s Responses to the Examiner’s Written Questions D3.pdf:2:GLVIA3 Guidelines for Landscape and Visual Impact Assessment, Third Edition

EN010082-000477-Applicant’s Comments on the Environment Agency’s Responses to the Examiner’s Written Questions D3.pdf:2:HIA Health Impact Assessment

EN010082-000477-Applicant’s Comments on the Environment Agency’s Responses to the Examiner’s Written Questions D3.pdf:3:LVIA landscape and visual impact assessment

EN010082-000477-Applicant’s Comments on the Environment Agency’s Responses to the Examiner’s Written Questions D3.pdf:9:5 Environmental Impact Assessment

EN010082-000477-Applicant’s Comments on the Environment Agency’s Responses to the Examiner’s Written Questions D3.pdf:13: of the stacks not been fixed within the dDCO, for example by impact assessment source data. material effect on the outcome of either the assessments, as this change is unlikely to be

EN010082-000477-Applicant’s Comments on the Environment Agency’s Responses to the Examiner’s Written Questions D3.pdf:13: Building and stack layout information, used in the Air Impact Assessment would constitute a worse case visually than what has been assessed. Of note is that for both

EN010082-000477-Applicant’s Comments on the Environment Agency’s Responses to the Examiner’s Written Questions D3.pdf:13: The Environmental Impact Assessment will be reviewed during the Please also refer to the Applicant’s Response to Examining Authority’s Written Questions

EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:4: Accordingly a proportionate Ecological Impact Assessment Chapter has been

EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:5: assist in the impact assessment. information provided is in Section 9.4.3.

EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:7:Secretary of State– 3.65 The SoS notes that elements of the ecological assessment will be closely The ecological impact assessment has taken account of the

EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:8: application. Evidence of such agreements should be submitted with the HRA At this stage of the environmental impact assessment

EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:10: Consideration will need to be had within the Environmental Impact Assessment

EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:12: of relevance to the ecological impact assessment for the Project is set out

EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:18:9.2.5 Impact Assessment Methodology and Significance Criteria

EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:18:9.44 The ecological impact assessment has been undertaken taking account of the

EN010082-000180-EN010082-6.2.9-ES Chapter 9-Ecology and Nature Conservation-Final-November 2017.pdf:18: Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater

EN010082-000170-EN010082-6.1-ES Non Technical Summary-Final-November 2017.pdf:3: Planning (Environmental Impact Assessment) Regulations 2009 (as amended)

EN010082-000170-EN010082-6.1-ES Non Technical Summary-Final-November 2017.pdf:3: (the ‘EIA Regulations’) which requires an Environmental Impact Assessment

EN010082-000170-EN010082-6.1-ES Non Technical Summary-Final-November 2017.pdf:3: Regulations and implementing the Environmental Impact Assessment (EIA)

EN010082-000170-EN010082-6.1-ES Non Technical Summary-Final-November 2017.pdf:14:0.43 The air quality impact assessment considered impacts during the construction

EN010082-000170-EN010082-6.1-ES Non Technical Summary-Final-November 2017.pdf:19:0.75 The EIA included a health impact assessment to look at how, if at all, the

EN010082-000517-8.43 - Tees CCPP - Written Summary of Oral Case - Env Matters ISH - FINAL - 05.07.18.pdf:2:EIA Environmental Impact Assessment

EN010082-000517-8.43 - Tees CCPP - Written Summary of Oral Case - Env Matters ISH - FINAL - 05.07.18.pdf:2:LVIA Landscape and Visual Impact Assessment

EN010082-000517-8.43 - Tees CCPP - Written Summary of Oral Case - Env Matters ISH - FINAL - 05.07.18.pdf:13:2.97 KM confirmed that the viewpoints and used in the landscape and visual impact assessment APP-053 are

EN010082-000537-8.47 - Tees CCPP - Draft DCO - Clean (v4).pdf:2:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009© and has had

EN010082-000537-8.47 - Tees CCPP - Draft DCO - Clean (v4).pdf:2: Amendment) Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000537-8.47 - Tees CCPP - Draft DCO - Clean (v4).pdf:2: Impact Assessment) Regulations 2017 (S.I. 2017/572), but continues to apply to this application for development consent

EN010082-000537-8.47 - Tees CCPP - Draft DCO - Clean (v4).pdf:3: Impact Assessment) Regulations 2007 (S.I. 2007/1062). Section 329 was amended by section 112(4) of, and Schedule 18

EN010082-000595-8.71 - Tees CCPP - Explanatory Memorandum - Tracked (Version 4).pdf:2:EIA Environmental Impact Assessment

EN010082-000595-8.71 - Tees CCPP - Explanatory Memorandum - Tracked (Version 4).pdf:2:2009 EIA Regulations The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

EN010082-000595-8.71 - Tees CCPP - Explanatory Memorandum - Tracked (Version 4).pdf:2:2017 EIA Regulations The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017

EN010082-000577-6.3.20 - Tees CCPP - Annex L CEMP - Version 5 (Tracked).pdf:8: the Assessment of Dust from Demolition and undertake a construction impact assessment.

EN010082-000294-Cover Letter for Certificates of Compliance.pdf:1:13 OF THE INFRASTRUCTURE PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS

EN010082-000294-Cover Letter for Certificates of Compliance.pdf:1:Regulation 14 of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 (the

EN010082-000189-EN010082-6.2.18-ES_Chapter 18-Conclusions-Final-November 2017.pdf:2:18.4 Further baseline studies ensued and impact assessment proceeded iteratively

EN010082-000189-EN010082-6.2.18-ES_Chapter 18-Conclusions-Final-November 2017.pdf:2: consultation and impact assessment. Consultation included public meetings

EN010082-000429-Copy of EXA Questions 1.pdf:12: and Visual Impact Assessment, Third Edition (GLVIA3).

EN010082-000429-Copy of EXA Questions 1.pdf:17: Local Plan states that a Health Impact Assessment (HIA) will be required

EN010082-000429-Copy of EXA Questions 1.pdf:36:The requirement for Health Impact Assessments was found not to be sound during the examination of the Local Plan and has been removed. Please note the

EN010082-000429-Copy of EXA Questions 1.pdf:36:wellbeing, a Health Impact Assessment (HIA) should be considered. HIAs are used to judge the effects a proposed development may have on the health and

EN010082-000498-_DOC_40066241(1)_DEADLINE 2_ EM v2 (Formatted - Tracked).pdf:2:EIA Environmental Impact Assessment

EN010082-000498-_DOC_40066241(1)_DEADLINE 2_ EM v2 (Formatted - Tracked).pdf:2:2009 EIA Regulations The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

EN010082-000498-_DOC_40066241(1)_DEADLINE 2_ EM v2 (Formatted - Tracked).pdf:2:2017 EIA Regulations The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017

EN010082-000389-7 3 - Tees CCPP - SoCG with Redcar Cleveland - DRAFT.pdf:28: (Environmental Impact Assessment) Regulations 2017 require an assessment of major accidents and

EN010082-000141-EN010082-1.4-Notices for Statutory Publicity-Final-November 2017.pdf:2: EIA Regulations The Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010082-000141-EN010082-1.4-Notices for Statutory Publicity-Final-November 2017.pdf:6: and The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 (‘the EIA

EN010082-000141-EN010082-1.4-Notices for Statutory Publicity-Final-November 2017.pdf:42:(ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2009 - ‘PRE-APPLICATION PUBLICITY UNDER

EN010082-000141-EN010082-1.4-Notices for Statutory Publicity-Final-November 2017.pdf:43:In addition to the above, Regulation 11 of ‘The Infrastructure Planning (Environmental Impact Assessment)

EN010082-000141-EN010082-1.4-Notices for Statutory Publicity-Final-November 2017.pdf:43:Environmental Impact Assessment

EN010082-000141-EN010082-1.4-Notices for Statutory Publicity-Final-November 2017.pdf:43:Due to the nature and size of the Project, Sembcorp is undertaking an Environmental Impact Assessment

EN010082-000141-EN010082-1.4-Notices for Statutory Publicity-Final-November 2017.pdf:43:‘The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017’ (the ‘2017 EIA

EN010082-000141-EN010082-1.4-Notices for Statutory Publicity-Final-November 2017.pdf:46: The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 - Regulation 11

EN010082-000141-EN010082-1.4-Notices for Statutory Publicity-Final-November 2017.pdf:46:5. The Project represents Environmental Impact Assessment (‘EIA’) development and therefore an EIA will be

EN010082-000650-The Tees Combined Cycle Power Plant Order 2019 (Final) (Validated) (1).pdf:2:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009(d) and has had

EN010082-000501-8.9 - Tees CCPP - Abbreviation List.pdf:4: EIA Environmental Impact Assessment

EN010082-000501-8.9 - Tees CCPP - Abbreviation List.pdf:4: GLVIA 3 Guidelines for Landscape and Visual Impact Assessment

EN010082-000501-8.9 - Tees CCPP - Abbreviation List.pdf:5: HIA Health Impact Assessment

EN010082-000501-8.9 - Tees CCPP - Abbreviation List.pdf:6: LVIA Landscape and Visual Impact Assessment

EN010082-000594-8.69 - Draft Development Consent Order - Tracked (Version 7).pdf:2:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009© and has had

EN010082-000594-8.69 - Draft Development Consent Order - Tracked (Version 7).pdf:2: Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Environmental Impact Assessment) (Amendment)

EN010082-000594-8.69 - Draft Development Consent Order - Tracked (Version 7).pdf:3: Sections 105A-105D were inserted by regulation 4(2) of the Highways (Environmental Impact Assessment) Regulations 2007

EN010082-000203-EN010082-6.3.13-ES Annex G2-Ecological Appraisal_Final.pdf:13:Peak Ecology (2013) Ecological Impact Assessment: Technical Report Dogger Bank Teesside A & B

EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:2:7.6 The air quality impact assessment considers the following:

EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:3: information required to undertake an air quality impact assessment. This

EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:4:7.13 The Study Area for the air quality impact assessment is a 15 km radius from

EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:4: impact assessment for ecological sites is used to screen for those sites at risk of

EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:9:Environment Agency (Scoping Environmental Impact Assessment Requirements: advice to applicant. We request that the following information Stack height sensitivity has been

EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:9:Opinion) is included within the scope of the Environmental Impact Assessment: undertaken

EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:9: Consideration will need to be had within the Environmental Impact Assessment and Habitats Directive

EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:13:7.19 Air quality impact assessment is subject to a number of different regulations

EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:13: closely related, but are not identical. The air quality impact assessment

EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:17: quality impact assessments for planning (2), and impact assessment for

EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:26:7.2.6 Impact Assessment Methodology and Significance Criteria

EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:28:7.73 Within the air quality impact assessment the large number of sensitive

EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:29: human receptors considered in the impact assessment is set out in Table 7.12

EN010082-000374-6.2.7 - Tees CCPP - ES Chapter 7 - Air Quality - clean Rev 2 with figures.pdf:54:7.128 The air quality impact assessment considered impacts during the construction

EN010082-000368-1.2 - Tees CCPP - Application Guide - Rev 3.pdf:2:2009 EIA Regulations The Infrastructure Planning (Environmental Impact Assessment)

EN010082-000368-1.2 - Tees CCPP - Application Guide - Rev 3.pdf:2:2017 EIA Regulations The Infrastructure Planning (Environmental Impact Assessment)

EN010082-000368-1.2 - Tees CCPP - Application Guide - Rev 3.pdf:2:EIA Environmental Impact Assessment

EN010082-000368-1.2 - Tees CCPP - Application Guide - Rev 3.pdf:6: Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 (the ‘2009 EIA

EN010082-000368-1.2 - Tees CCPP - Application Guide - Rev 3.pdf:6:2.3 ‘The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017’ (the ‘2017 EIA

EN010082-000368-1.2 - Tees CCPP - Application Guide - Rev 3.pdf:6:2.10 The Project represents an Environmental Impact Assessment (‘EIA’) development and therefore the

EN010082-000368-1.2 - Tees CCPP - Application Guide - Rev 3.pdf:9: Category 6.0 Environmental Impact Assessment Information

EN010082-000538-8.48 - Tees CCPP - Draft DCO - Tracked (v4).pdf:2:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009© and has had

EN010082-000538-8.48 - Tees CCPP - Draft DCO - Tracked (v4).pdf:2: Amendment) Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000538-8.48 - Tees CCPP - Draft DCO - Tracked (v4).pdf:2: (Environmental Impact Assessment) Regulations 2017 (S.I. 2017/572), but continues to apply to this application for

EN010082-000538-8.48 - Tees CCPP - Draft DCO - Tracked (v4).pdf:3: 105A-105D were inserted by regulation 4(2) of the Highways (Environmental Impact Assessment) Regulations 2007

EN010082-000588-1.2 - Tees CCPP - Application Guide - Rev 3 - FINAL.pdf:2:2009 EIA Regulations The Infrastructure Planning (Environmental Impact Assessment)

EN010082-000588-1.2 - Tees CCPP - Application Guide - Rev 3 - FINAL.pdf:2:2017 EIA Regulations The Infrastructure Planning (Environmental Impact Assessment)

EN010082-000588-1.2 - Tees CCPP - Application Guide - Rev 3 - FINAL.pdf:2:EIA Environmental Impact Assessment

EN010082-000588-1.2 - Tees CCPP - Application Guide - Rev 3 - FINAL.pdf:8: Category 6.0 Environmental Impact Assessment Information

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:5: universally used for landscape and visual impact assessment. GLVIA3.

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:5: local materials. The Environmental Impact Assessment process should detail the measures to considered. These are

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:5: advises that the cumulative impact assessment should include other proposals currently at

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:10:11.9 The Guidelines for Landscape and Visual Impact Assessment (GLVIA 3)

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:10: visual impact assessment for both the construction and operational stages of

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:12: impact assessment comprises two components:

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:12: Visual Impact Assessment (Third Edition).

EN010082-000182-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Final-November 2017.pdf:42: have been considered further in this landscape and visual impact assessment.

EN010082-000392-7 6 - Tees CCPP - SoCG with CAA - Signed_Redacted.pdf:2: EIA Environmental Impact Assessment

EN010082-000392-7 6 - Tees CCPP - SoCG with CAA - Signed_Redacted.pdf:6: March 2017 in response to SCU’s request for an Environmental Impact Assessment (‘EIA’) Scoping

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:5: universally used for landscape and visual impact assessment. GLVIA3.

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:5: local materials. The Environmental Impact Assessment process should detail the measures to considered. These are

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:5: advises that the cumulative impact assessment should include other proposals currently at

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:10:11.9 The Guidelines for Landscape and Visual Impact Assessment (GLVIA 3)

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:10: visual impact assessment for both the construction and operational stages of

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:12: impact assessment comprises two components:

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:12: Visual Impact Assessment (Third Edition).

EN010082-000290-EN010082-6.2.11-ES_Chapter 11-Land and Visual Amenity-Rev 2 -January 2018.pdf:42: have been considered further in this landscape and visual impact assessment.

EN010082-000314-TEES - Regulation 24 Transboundary Screening (2).pdf:4:(Environmental Impact Assessment) Regulations 2017 (the 2017 EIA Regulations). The

EN010082-000314-TEES - Regulation 24 Transboundary Screening (2).pdf:4:Impact Assessment) Regulations 2009 (the 2009 EIA Regulations) are therefore considered

EN010082-000314-TEES - Regulation 24 Transboundary Screening (2).pdf:5: within the study area for the air quality impact assessment.

EN010082-000314-TEES - Regulation 24 Transboundary Screening (2).pdf:5:(Environmental Impact Assessment) Regulations 2017 (the 2017 EIA Regulations). The

EN010082-000314-TEES - Regulation 24 Transboundary Screening (2).pdf:5:2017 EIA Regulations). The Infrastructure Planning (Environmental Impact Assessment)

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:7: Environmental Impact Assessment (EIA) of the applicant’s proposal to

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:7: The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:7: (Environmental Impact Assessment) (Amendment) Regulations 2012 and the

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:13: Impact Assessment of Projects, May 2002;

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:13: Impact Assessment, screening and scoping;

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:29:  The Infrastructure Planning (Environmental Impact Assessment)

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:42: (1) The new Environmental Impact Assessment (EIA) Directive (2014/52/EU) has to be transposed into UK legislation by

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:43:  The Infrastructure Planning (Environmental Impact Assessment)

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:43:  Advice note seven: Environmental Impact Assessment, screening and

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:43:  Environmental Impact Assessment: A Guide to the Procedures, DETR,

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:43:  Guidelines for Environmental Impact Assessment, IEMA, 2004.

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:57: Environmental Impact Assessment

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:78:Ecological Impact Assessment (EcIA)

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:88: impact assessment.

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:97:  highway impact assessment, allowing for the cumulative impact of

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:98: staff trip generation and a highway impact assessment, allowing for the

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:108:During the initial stages of the socio-economic impact assessment, Sembcorp

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:112: proposed as the study area for the landscape and visual impact assessment

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:125:Ecology and Phase One Ecological An ecological impact assessment (EcIA) will be produced covering Deposition of

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:127: and others. traffic flows over growthed impact assessment, allowing for the would access

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:130: EcIA Ecological Impact Assessment

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:130: EIA Environmental Impact Assessment

EN010082-000191-EN010082-6.3.1-ES Annex A-Scoping Report-Final-November 2017.pdf:131:LVIA Landscape and Visual Impact Assessment

EN010082-000378-5.6 - Tees CCPP - Design & Access Statement - tracked Rev 3.pdf:2:EIA Environmental Impact Assessment

EN010082-000378-5.6 - Tees CCPP - Design & Access Statement - tracked Rev 3.pdf:8: the Environmental Impact Assessment of it has been based and

EN010082-000378-5.6 - Tees CCPP - Design & Access Statement - tracked Rev 3.pdf:16:4.6 In order to provide sufficient flexibility and ensure a robust Environmental Impact Assessment

EN010082-000648-Tees CCPP Decision Letter 5 April 2019 (3).pdf:3:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 (“the

EN010082-000648-Tees CCPP Decision Letter 5 April 2019 (3).pdf:3:of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017.

EN010082-000648-Tees CCPP Decision Letter 5 April 2019 (3).pdf:3:ExA were: the Environmental Impact Assessment; Air Quality and Emissions;

EN010082-000648-Tees CCPP Decision Letter 5 April 2019 (3).pdf:12:the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 that

EN010082-000648-Tees CCPP Decision Letter 5 April 2019 (3).pdf:13:(Environmental Impact Assessment) Regulations 2009.

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:4: universally used for landscape and visual impact assessment. GLVIA3.

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:4: local materials. The Environmental Impact Assessment process should detail the measures options were considered.

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:4: advises that the cumulative impact assessment should include other proposals currently at

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:9:11.9 The Guidelines for Landscape and Visual Impact Assessment (GLVIA 3)

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:9: visual impact assessment for both the construction and operational stages of

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:11: impact assessment comprises two components:

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:11: Visual Impact Assessment (Third Edition).

EN010082-000381-6.2.11 - Tees CCPP - ES Chapter 11 LVIA - tracked Rev 3 with figures.pdf:41: have been considered further in this landscape and visual impact assessment.

EN010082-000467-160518 EN010082 Environment Agency Response to ExAs Written Questions.pdf:6: 5 Environmental Impact Assessment

EN010082-000467-160518 EN010082 Environment Agency Response to ExAs Written Questions.pdf:12: air impact assessment source data.

EN010082-000467-160518 EN010082 Environment Agency Response to ExAs Written Questions.pdf:12: Building and stack layout information, used in the Air Impact Assessment model, is provided in Figure

EN010082-000467-160518 EN010082 Environment Agency Response to ExAs Written Questions.pdf:12: The Environmental Impact Assessment will be reviewed during the determination of the Environmental

EN010082-000558-6.3.20 - Annex L CEMP Clean v4 - 22.08.18.pdf:8: the Assessment of Dust from Demolition and undertake a construction impact assessment.

EN010082-000076-Section 46 Acknowledgement.pdf:1:Planning (Environmental Impact Assessment) Regulations 2009 (as

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:4: universally used for landscape and visual impact assessment. GLVIA3.

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:4: local materials. The Environmental Impact Assessment process should detail the measures to considered. These are

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:4: advises that the cumulative impact assessment should include other proposals currently at

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:9:11.9 The Guidelines for Landscape and Visual Impact Assessment (GLVIA 3)

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:9: visual impact assessment for both the construction and operational stages of

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:11: impact assessment comprises two components:

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:11: Visual Impact Assessment (Third Edition).

EN010082-000375-6.2.11 - Tees CCPP - ES Chapter 11 - LVIA - clean Rev 3 with figures.pdf:41: have been considered further in this landscape and visual impact assessment.

EN010082-000215-EN010082-5.9-Statutory Nuisance Statement-Final-November 2017.pdf:13: Environmental Impact Assessment (EIA) as having the potential for

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:7:19 of the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:40: with the Guidelines for Landscape and Visual Impact Assessment

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:42: ‘Environmental Impact Assessment: Preliminary Environmental

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:49: Health Impact Assessment

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:49: whether or not to submit a stand-alone Health Impact Assessment

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:51: Impact Assessment) Regulations 2009 (SI 2263) (as amended) (the

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:54:A1.10 The SoS acknowledges that the Environmental Impact Assessment

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:57: of presentation, to consider the impact assessment in a similar

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:68:Environmental Impact Assessment Requirements

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:68:Environmental Impact Assessment:

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:69:Consideration will need to be had within the Environmental Impact Assessment

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:78:Planning (Environmental Impact Assessment) Regulations 2009 (as

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:88:Environmental Impact Assessment Scoping consultation (Regulation 15 (3) (i) of the EIA

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:88:Environmental Impact Assessment (EIA) for this development.

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:88: Note on Environmental Impact Assessment Directive for Local Planning Authorities Office of the Deputy Prime

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:89:Schedule 4 of the Town & Country Planning (Environmental Impact Assessment) Regulations 2011,

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:89:Ecological Impact Assessment (EcIA) have been developed by the Chartered Institute of Ecology

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:91:results, impact assessments and appropriate accompanying mitigation strategies included as part of

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:91:therefore advises that survey, impact assessment and mitigation proposals for Habitats and Species

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:92:Natural England supports the publication Guidelines for Landscape and Visual Impact Assessment,

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:92:landscape and visual impact assessment.

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:92:Environmental Impact Assessment process should detail the measures to be taken to ensure the

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:92:cumulative impact assessment should include other proposals currently at Scoping stage. Due to

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:93:The ES should include an impact assessment to identify, describe and evaluate the effects that are

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:95: - We have no comments to make on the approach to ecological impact assessment at the local

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:100: Environmental Impact Assessment: A guide to good practice and procedures - A consultation paper; 2006; Department for

EN010082-000192-EN010082-6.3.2-ES Annex B-Scoping Opinion-Final-November 2017.pdf:105:of every risk or impact assessment of proposed plans that involve a potential

EN010082-000519-8.45 - CONSENTORDER_150335454(1)_DEADLINE 4_ DCOv3.pdf:2:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009© and has had

EN010082-000519-8.45 - CONSENTORDER_150335454(1)_DEADLINE 4_ DCOv3.pdf:2: Amendment) Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000519-8.45 - CONSENTORDER_150335454(1)_DEADLINE 4_ DCOv3.pdf:2: Impact Assessment) Regulations 2017 (S.I. 2017/572), but continues to apply to this application for development consent

EN010082-000519-8.45 - CONSENTORDER_150335454(1)_DEADLINE 4_ DCOv3.pdf:3: Impact Assessment) Regulations 2007 (S.I. 2007/1062). Section 329 was amended by section 112(4) of, and Schedule 18

EN010082-000183-EN010082-6.2.12-ES Chapter 12-Cultural Heritage-Final-November 2017.pdf:3: Visual Impact Assessment (Chapter 11).

EN010082-000183-EN010082-6.2.12-ES Chapter 12-Cultural Heritage-Final-November 2017.pdf:4: (1) RSK Environment, 2007. Teesside Power Ltd. Teesside Power Station Upgrade. Archaeological Impact Assessment:

EN010082-000183-EN010082-6.2.12-ES Chapter 12-Cultural Heritage-Final-November 2017.pdf:5: informed by the findings of the landscape and visual impact assessment

EN010082-000183-EN010082-6.2.12-ES Chapter 12-Cultural Heritage-Final-November 2017.pdf:12: (5) Department for Communities and Local Government, Environmental Impact Assessment National Planning Practice

EN010082-000183-EN010082-6.2.12-ES Chapter 12-Cultural Heritage-Final-November 2017.pdf:13: landscape and visual impact assessment specialist and the consultation

EN010082-000183-EN010082-6.2.12-ES Chapter 12-Cultural Heritage-Final-November 2017.pdf:14: expert accompanied by a landscape and visual impact assessment specialist.

EN010082-000183-EN010082-6.2.12-ES Chapter 12-Cultural Heritage-Final-November 2017.pdf:14: (1) ICOMOS (2011) Guidance on Heritage Impact Assessments for Cultural World Heritage Properties. ICOMOS, Paris.

EN010082-000183-EN010082-6.2.12-ES Chapter 12-Cultural Heritage-Final-November 2017.pdf:26: viewpoints (VP) used in the landscape and visual impact assessment, namely:

EN010082-000183-EN010082-6.2.12-ES Chapter 12-Cultural Heritage-Final-November 2017.pdf:31:12.90 The landscape and visual impact assessment undertook further consideration

EN010082-Advice-00001-1-160517_Teesside CCGT.pdf:2:Environmental Impact Assessment

EN010082-000649-Regulation 23 Notice of Decision (1).pdf:1:(ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2009

EN010082-000649-Regulation 23 Notice of Decision (1).pdf:1:Impact Assessment) Regulations 2009 that a determination has been made on an

EN010082-000649-Regulation 23 Notice of Decision (1).pdf:1:regulation 23(2)(d) of the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000145-EN010082-2.2-Explanatory Memorandum-Final-November 2017.pdf:2:EIA Environmental Impact Assessment

EN010082-000145-EN010082-2.2-Explanatory Memorandum-Final-November 2017.pdf:2:2009 EIA Regulations The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

EN010082-000145-EN010082-2.2-Explanatory Memorandum-Final-November 2017.pdf:2:2017 EIA Regulations The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017

EN010082-000557-6.3.20 - Tees CCPP - Annex L CEMP Tracked v4 - 22.08.18.pdf:8: the Assessment of Dust from Demolition and undertake a construction impact assessment.

EN010082-000365-8.2 - Tees CCPP - Non-Material Change - Schedule of Amended Document & Plans - Rev 1.pdf:2:EIA Environmental Impact Assessment

EN010082-000365-8.2 - Tees CCPP - Non-Material Change - Schedule of Amended Document & Plans - Rev 1.pdf:10: Category 6.0 Environmental Impact Assessment

EN010082-000648-Tees CCPP Decision Letter 5 April 2019.pdf:3:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 (“the

EN010082-000648-Tees CCPP Decision Letter 5 April 2019.pdf:3:of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017.

EN010082-000648-Tees CCPP Decision Letter 5 April 2019.pdf:3:ExA were: the Environmental Impact Assessment; Air Quality and Emissions;

EN010082-000648-Tees CCPP Decision Letter 5 April 2019.pdf:12:the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 that

EN010082-000648-Tees CCPP Decision Letter 5 April 2019.pdf:13:(Environmental Impact Assessment) Regulations 2009.

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:6: 1.5. ENVIRONMENTAL IMPACT ASSESSMENT…………………………………………… 7

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:6: 4.6. ENVIRONMENTAL IMPACT ASSESSMENT METHODOLOGY ……………………… 32

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:15:1.5. ENVIRONMENTAL IMPACT ASSESSMENT

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:15: Impact Assessment (EIA) is required (EIA development).

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:15: (Environmental Impact Assessment) Regulations 2009 (SI 2263) (the

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:15: Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:25: Impact Assessment) Regulations 2009 (as amended) as discussed further

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:25: Infrastructure Planning (Environmental Impact Assessment)

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:25: (Environmental Impact Assessment) Regulations 2017 (the 2017 EIA

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:25: Impact Assessment) Regulations 2009 (the 2009 EIA Regulations)

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:26: Infrastructure Planning (Environmental Impact Assessment)

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:30: impact assessment and transboundary matters with regard to impacts on

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:36: • Environmental Impact Assessment;

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:40:4.6. ENVIRONMENTAL IMPACT ASSESSMENT

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:45:4.9.10. The study area for the air quality impact assessment is a 15 km radius

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:52: impact assessment, on the basis that this is the most likely stack height

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:56: Critical Limit or Critical Load. The air quality impact assessment [APP-

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:60: CIEEM (2016) Guidelines for Ecological Impact Assessment in the UK and

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:68: Guidelines for Landscape and Visual Impact Assessment (GLVIA), produced by

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:155:EIA Environmental Impact Assessment

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:156:LVIA Landscape and Visual Impact Assessment

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:157: Impact Assessment) Regulations 2009

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:157: Impact Assessment) Regulations 2017

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:161:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009© and has had

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:161: Amendment) Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:161: Impact Assessment) Regulations 2017 (S.I. 2017/572), but continues to apply to this application for development consent

EN010082-000654-TEES Final Recommendation Report and Errata (2).pdf:162: Impact Assessment) Regulations 2007 (S.I. 2007/1062). Section 329 was amended by section 112(4) of, and Schedule 18

EN010082-000372-5.6 - Tees CCPP - Design & Access Statement - clean Rev 3.pdf:2: EIA Environmental Impact Assessment

EN010082-000372-5.6 - Tees CCPP - Design & Access Statement - clean Rev 3.pdf:8: the Environmental Impact Assessment of it has been based and

EN010082-000372-5.6 - Tees CCPP - Design & Access Statement - clean Rev 3.pdf:16:4.6 In order to provide sufficient flexibility and ensure a robust Environmental Impact Assessment

EN010082-000653-Tees CCPP - Correspondence received after the close of Examination (2).pdf:20: building sizes and footprints (e.g. the landscape and visual impact assessment) are related to

EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:2:7.6 The air quality impact assessment considers the following:

EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:3: information required to undertake an air quality impact assessment. This

EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:4:7.13 The Study Area for the air quality impact assessment is a 15 km radius from

EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:4: impact assessment for ecological sites is used to screen for those sites at risk of

EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:9:Environment Agency (Scoping Environmental Impact Assessment Requirements: advice to applicant. We request that the following information Stack height sensitivity has been

EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:9:Opinion) is included within the scope of the Environmental Impact Assessment: undertaken

EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:9: Consideration will need to be had within the Environmental Impact Assessment and Habitats Directive

EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:13:7.19 Air quality impact assessment is subject to a number of different regulations

EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:13: closely related, but are not identical. The air quality impact assessment

EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:17: quality impact assessments for planning (2), and impact assessment for

EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:26:7.2.6 Impact Assessment Methodology and Significance Criteria

EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:27:7.73 Within the air quality impact assessment the large number of sensitive

EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:29: human receptors considered in the impact assessment is set out in Table 7.12

EN010082-000178-EN010082-6.2.7-ES Chapter 7-Air Quality-Final-November 2017.pdf:55:7.128 The air quality impact assessment considered impacts during the construction

EN010082-000518-8.44 - Tees CCPP - Written Summary of Oral Case - Draft DCO - ISH - FINAL - 06.07.18.pdf:2:EIA Environmental Impact Assessment

EN010082-000518-8.44 - Tees CCPP - Written Summary of Oral Case - Draft DCO - ISH - FINAL - 06.07.18.pdf:9: APP-057 in the Environmental Impact Assessment (‘EIA’).

EN010082-000653-Tees CCPP - Correspondence received after the close of Examination (3).pdf:20: building sizes and footprints (e.g. the landscape and visual impact assessment) are related to

EN010082-000390-7 4 - Tees CCPP - SoCG with Environment Agency - DRAFT (2).pdf:6: in March 2017 in response to SCU’s request for an Environmental Impact Assessment (‘EIA’) Scoping

EN010082-000019-Scoping Report.pdf:5: Environmental Impact Assessment (EIA) of the applicant’s proposal to

EN010082-000019-Scoping Report.pdf:5: The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

EN010082-000019-Scoping Report.pdf:5: (Environmental Impact Assessment) (Amendment) Regulations 2012 and the

EN010082-000019-Scoping Report.pdf:11: Impact Assessment of Projects, May 2002;

EN010082-000019-Scoping Report.pdf:11: Impact Assessment, screening and scoping;

EN010082-000019-Scoping Report.pdf:27:  The Infrastructure Planning (Environmental Impact Assessment)

EN010082-000019-Scoping Report.pdf:40: (1) The new Environmental Impact Assessment (EIA) Directive (2014/52/EU) has to be transposed into UK legislation by

EN010082-000019-Scoping Report.pdf:41:  The Infrastructure Planning (Environmental Impact Assessment)

EN010082-000019-Scoping Report.pdf:41:  Advice note seven: Environmental Impact Assessment, screening and

EN010082-000019-Scoping Report.pdf:41:  Environmental Impact Assessment: A Guide to the Procedures, DETR,

EN010082-000019-Scoping Report.pdf:41:  Guidelines for Environmental Impact Assessment, IEMA, 2004.

EN010082-000019-Scoping Report.pdf:55: Environmental Impact Assessment

EN010082-000019-Scoping Report.pdf:76:Ecological Impact Assessment (EcIA)

EN010082-000019-Scoping Report.pdf:86: impact assessment.

EN010082-000019-Scoping Report.pdf:95:  highway impact assessment, allowing for the cumulative impact of

EN010082-000019-Scoping Report.pdf:96: staff trip generation and a highway impact assessment, allowing for the

EN010082-000019-Scoping Report.pdf:106:During the initial stages of the socio-economic impact assessment, Sembcorp

EN010082-000019-Scoping Report.pdf:110: proposed as the study area for the landscape and visual impact assessment

EN010082-000019-Scoping Report.pdf:123:Ecology and Phase One Ecological An ecological impact assessment (EcIA) will be produced covering Deposition of

EN010082-000019-Scoping Report.pdf:125: and others. traffic flows over growthed impact assessment, allowing for the would access

EN010082-000019-Scoping Report.pdf:128: EcIA Ecological Impact Assessment

EN010082-000019-Scoping Report.pdf:128: EIA Environmental Impact Assessment

EN010082-000019-Scoping Report.pdf:129:LVIA Landscape and Visual Impact Assessment

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:6: 1.5. ENVIRONMENTAL IMPACT ASSESSMENT…………………………………………… 7

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:6: 4.6. ENVIRONMENTAL IMPACT ASSESSMENT METHODOLOGY ……………………… 32

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:15:1.5. ENVIRONMENTAL IMPACT ASSESSMENT

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:15: Impact Assessment (EIA) is required (EIA development).

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:15: (Environmental Impact Assessment) Regulations 2009 (SI 2263) (the

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:15: Infrastructure Planning (Environmental Impact Assessment) Regulations

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:25: Impact Assessment) Regulations 2009 (as amended) as discussed further

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:25: Infrastructure Planning (Environmental Impact Assessment)

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:25: (Environmental Impact Assessment) Regulations 2017 (the 2017 EIA

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:25: Impact Assessment) Regulations 2009 (the 2009 EIA Regulations)

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:26: Infrastructure Planning (Environmental Impact Assessment)

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:30: impact assessment and transboundary matters with regard to impacts on

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:36: • Environmental Impact Assessment;

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:40:4.6. ENVIRONMENTAL IMPACT ASSESSMENT

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:45:4.9.10. The study area for the air quality impact assessment is a 15 km radius

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:52: impact assessment, on the basis that this is the most likely stack height

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:56: Critical Limit or Critical Load. The air quality impact assessment [APP-

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:60: CIEEM (2016) Guidelines for Ecological Impact Assessment in the UK and

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:68: Guidelines for Landscape and Visual Impact Assessment (GLVIA), produced by

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:155:EIA Environmental Impact Assessment

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:156:LVIA Landscape and Visual Impact Assessment

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:157: Impact Assessment) Regulations 2009

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:157: Impact Assessment) Regulations 2017

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:161:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009© and has had

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:161: Amendment) Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:161: Impact Assessment) Regulations 2017 (S.I. 2017/572), but continues to apply to this application for development consent

EN010082-000654-TEES Final Recommendation Report and Errata (3).pdf:162: Impact Assessment) Regulations 2007 (S.I. 2007/1062). Section 329 was amended by section 112(4) of, and Schedule 18

EN010082-000471-Copy of EXA Questions Updated.pdf:8: and Visual Impact Assessment, Third Edition (GLVIA3). guidance as stated by the applicant.

EN010082-000471-Copy of EXA Questions Updated.pdf:10: The requirement for Health Impact Assessments was found not to be sound during the examination of the Local Plan and has been removed. Please note the

EN010082-000471-Copy of EXA Questions Updated.pdf:10: Local Plan states that a Health Impact Assessment (HIA) will be required

EN010082-000471-Copy of EXA Questions Updated.pdf:10: wellbeing, a Health Impact Assessment (HIA) should be considered. HIAs are used to judge the effects a proposed development may have on the health and

EN010082-000649-Regulation 23 Notice of Decision (3).pdf:1:(ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2009

EN010082-000649-Regulation 23 Notice of Decision (3).pdf:1:Impact Assessment) Regulations 2009 that a determination has been made on an

EN010082-000649-Regulation 23 Notice of Decision (3).pdf:1:regulation 23(2)(d) of the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000176-EN010082-6.2.5-ES Chapter 5 -Project Description-Final-November 2017.pdf:3: for the impact assessment including ‘realistic worst case scenarios’. Typically

EN010082-000176-EN010082-6.2.5-ES Chapter 5 -Project Description-Final-November 2017.pdf:3: structures (for the visual impact assessment), design and layout of structures

EN010082-000366-8.3 - Tees CCPP - Non-Material Change - Implication of Non-Mat Change - Final Issue.pdf:2: IMPACT ASSESSMENT 1

EN010082-000366-8.3 - Tees CCPP - Non-Material Change - Implication of Non-Mat Change - Final Issue.pdf:3: IMPACT ASSESSMENT

EN010082-000366-8.3 - Tees CCPP - Non-Material Change - Implication of Non-Mat Change - Final Issue.pdf:3: IMPACT ASSESSMENT

EN010082-000366-8.3 - Tees CCPP - Non-Material Change - Implication of Non-Mat Change - Final Issue.pdf:3:1.4 The Environmental Impact Assessment (EIA) for the Project takes account of

EN010082-000553-8.52 - Draft DCO - Tracked (v5).pdf:2:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009© and has had

EN010082-000553-8.52 - Draft DCO - Tracked (v5).pdf:2: Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Environmental Impact Assessment) (Amendment)

EN010082-000553-8.52 - Draft DCO - Tracked (v5).pdf:3: Sections 105A-105D were inserted by regulation 4(2) of the Highways (Environmental Impact Assessment) Regulations 2007

EN010082-000314-TEES - Regulation 24 Transboundary Screening.pdf:4:(Environmental Impact Assessment) Regulations 2017 (the 2017 EIA Regulations). The

EN010082-000314-TEES - Regulation 24 Transboundary Screening.pdf:4:Impact Assessment) Regulations 2009 (the 2009 EIA Regulations) are therefore considered

EN010082-000314-TEES - Regulation 24 Transboundary Screening.pdf:5: within the study area for the air quality impact assessment.

EN010082-000314-TEES - Regulation 24 Transboundary Screening.pdf:5:(Environmental Impact Assessment) Regulations 2017 (the 2017 EIA Regulations). The

EN010082-000314-TEES - Regulation 24 Transboundary Screening.pdf:5:2017 EIA Regulations). The Infrastructure Planning (Environmental Impact Assessment)

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:2: EIA Environmental Impact Assessment

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:17: noise impact assessment and noise monitoring will be conducted. We are unable

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:27: the turbine hall building, there does not appear to be a detailed explanation noise abatement equipment, noise impact assessment and noise

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:28: equipment, noise impact assessment and noise monitoring will be conducted. required on both stacks. It should be noted the photomontages are

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:28: Landscape and Visual Impact Assessment (Third Edition). . As

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:28: Environmental Impact Assessment.

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:32:(ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2009 (AS AMENDED) (REGULATION 17)

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:35: The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:35:4. The Project qualifies as Environmental Impact Assessment (‘EIA’) development for the purposes of the

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:35: Infrastructure Planning (Environmental Impact Assessment) Regulations 2009. The Application was

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:40:4. The Project qualifies as Environmental Impact Assessment (‘EIA’) development 8. If you wish to respond to this notice, or make representations in respect of the

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:41: The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:41:4. The Project qualifies as Environmental Impact Assessment (‘EIA’) development for the purposes of the

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:41: Infrastructure Planning (Environmental Impact Assessment) Regulations 2009. The Application was

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:48: The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 - Regulation 17 COMPANY Anything considered

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:48: 4. The Project qualifies as Environmental Impact Assessment (‘EIA’) development for the purposes of the Infrastructure Planning (Environmental Impact Assessment) © for any loss or damage caused

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:54: The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 - Regulation 17

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:54: Car removals 4. The Project qualifies as Environmental Impact Assessment (‘EIA’) development for the purposes of the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:60:consultation and the Environmental Impact Assessment.

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:67:public consultation and the Environmental Impact Assessment.

EN010082-000510-CONSULTATION REPORT FOR NON-MATERIAL CHANGE.pdf:78:noise impact assessment and noise monitoring will be conducted. We are unable

EN010082-000579-8.59 - Tees CCPP - Applicant's Responses to the ExA's Information Requests - Deadline 7 - FINAL - 26.09.18.pdf:2:GLVIA3 Guidelines for Landscape and Visual Impact Assessment, Third Edition

EN010082-000579-8.59 - Tees CCPP - Applicant's Responses to the ExA's Information Requests - Deadline 7 - FINAL - 26.09.18.pdf:2:HIA Health Impact Assessment

EN010082-000579-8.59 - Tees CCPP - Applicant's Responses to the ExA's Information Requests - Deadline 7 - FINAL - 26.09.18.pdf:3:LVIA landscape and visual impact assessment

EN010082-000484-Environment Agency D3 Submission.pdf:2:noise impact assessment and noise monitoring will be conducted. We are unable

EN010082-000582-8.62 - Tees CCPP - Draft DCO - Clean - Version 6.pdf:2:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009© and has had

EN010082-000582-8.62 - Tees CCPP - Draft DCO - Clean - Version 6.pdf:2: Amendment) Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Environmental Impact Assessment)

EN010082-000582-8.62 - Tees CCPP - Draft DCO - Clean - Version 6.pdf:2: Impact Assessment) Regulations 2017 (S.I. 2017/572), but continues to apply to this application for development consent

EN010082-000582-8.62 - Tees CCPP - Draft DCO - Clean - Version 6.pdf:3: Impact Assessment) Regulations 2007 (S.I. 2007/1062). Section 329 was amended by section 112(4) of, and Schedule 18

TR030002-000733-York Potash Limited (Annual Report and Accounts). Appendix 2.pdf:27: assessment of the environmental impact assessment and making

TR030002-000733-York Potash Limited (Annual Report and Accounts). Appendix 2.pdf:91: EIA Environmental impact assessment

TR030002-001873-Decision holding letter (2).pdf:5:Environmental Impact Assessment

TR030002-001873-Decision holding letter (2).pdf:6: findings of the traffic impact assessment on which the environmental impact

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:5:CIA Cumulative Impact Assessment

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:7: the Environmental Impact Assessment (EIA) for the Harbour.

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:22: Assessment (CIA) being undertaken on the YPP (refer to Part 5 Cumulative Impact Assessment of

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:59: groundwater impact assessment, the risk of a significant impact arising with respect to the

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:94:10.3.45 An operational phase noise impact assessment is currently being undertaken which will include the

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:100: impact assessment (for the construction of the conveyor) have been completed and the potential

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:111:10.5.49 Both the impact assessment associated with the traffic generated by the project and the air quality

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:127:11.4.14 As noted in Sections 10.3 and 10.4, the noise impact assessment for the Harbour facilities is ongoing

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:127: mitigated by the use of acoustic barriers. It should be noted that the noise impact assessment is still to

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:129: sedimentary regime has been undertaken and reported in Part 5 Cumulative Impact Assessment

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:130:11.4.31 As described above (Noise disturbance during the construction phase), the noise impact assessment

TR030002-000571-Doc 7.3 Appendix 3 - Habitats Regulation Assessment Sept 2014.pdf:132:Subacoustech, 2014. York Potash Project Harbour Facilties: Underwater Noise Impact Assessment.

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:5: in this assessment, other than in the cumulative impact assessment).

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:7: considered in this assessment, other than in the cumulative impact assessment).

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:14:3.5.1 The traffic impact assessment has been guided by the following documents.

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:17:4.2.3 For the purpose of the Harbour facilities Traffic and Transport Cumulative Impact Assessment (CIA) the

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:21: types) the impact assessment. All classified counts have been adjusted to provide the same input data

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:33: established and inform the impact assessment during the construction phase. Table 14 sets out these

TR030002-000481-Section 12 App 12.2 Transport Assessment_1 of 2.pdf:37:6.1.1 The scope of this traffic impact assessment has been developed with stakeholders and includes:

TR030002-001873-Decision holding letter (3).pdf:5:Environmental Impact Assessment

TR030002-001873-Decision holding letter (3).pdf:6: findings of the traffic impact assessment on which the environmental impact

TR030002-000429-EIA Appendices Index.pdf:1:Environmental Impact Assessment

TR030002-000439-ES Section 4 Approach to EIA.pdf:1:4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT

TR030002-000439-ES Section 4 Approach to EIA.pdf:1:4.2 Environmental Impact Assessment guidance

TR030002-000439-ES Section 4 Approach to EIA.pdf:1: Impact Assessment” (2004);

TR030002-000439-ES Section 4 Approach to EIA.pdf:1: “Guidelines for Landscape and Visual Impact Assessment” 3rd Edition (2013);

TR030002-000439-ES Section 4 Approach to EIA.pdf:2: x PINS Advice Note 7: Environmental Impact Assessment, Screening, Scoping and Preliminary

TR030002-000439-ES Section 4 Approach to EIA.pdf:2:4.3 The Environmental Impact Assessment process

TR030002-000439-ES Section 4 Approach to EIA.pdf:4: defined in The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009, as

TR030002-000439-ES Section 4 Approach to EIA.pdf:6: addition, a description of the approach taken to the specific impact assessment for each environmental

TR030002-000439-ES Section 4 Approach to EIA.pdf:9: Table 4-3 Impact assessment matrix

TR030002-000439-ES Section 4 Approach to EIA.pdf:10: design of the proposed scheme. This mitigation is described in Section 3 and the impact assessment

TR030002-000439-ES Section 4 Approach to EIA.pdf:11:4.4 Cumulative Impact Assessment

TR030002-000439-ES Section 4 Approach to EIA.pdf:11:4.4.4 There is no legislation that outlines how cumulative impact assessments (CIAs) should be undertaken.

TR030002-000748-Document 8.3 Appendix 5 - Shipping Notes Part 2.pdf:1:impact assessment.

TR030002-000748-Document 8.3 Appendix 5 - Shipping Notes Part 2.pdf:1:to be established and inform the impact assessment. The table below sets out these assumptions and

TR030002-000748-Document 8.3 Appendix 5 - Shipping Notes Part 2.pdf:25:EIA - Environmental Impact Assessment

TR030002-000766-Document 8.3 Appendix 2 - References.pdf:1: Environmental Impact Assessment Review 43 (2013) pp 73-85

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:28: Summary of Environmental Impact Assessment

TR030002-000425-Doc 5.2 Funding Statement Appendix 2 - Investor Presentation February 2015.pdf:29: Summary of Environmental Impact Assessment

TR030002-000018-Examination Library (4).pdf:10:Environmental Statement - Cumulative Impact Assessment (Doc 6.6)

TR030002-000018-Examination Library (4).pdf:10:APP-129 Environmental Statement - Cumulative Impact Assessment

TR030002-000018-Examination Library (4).pdf:10:Appendices to Cumulative Impact Assessment

TR030002-000018-Examination Library (4).pdf:10:APP-130 Cumulative Impact Assessment - Appendices Index

TR030002-000018-Examination Library (4).pdf:12:APP-185 Environmental Impact Assessment: Appendices Index

TR030002-000018-Examination Library (4).pdf:13:APP-194 Section 4: Approach to Environmental Impact Assessment (EIA)

TR030002-000471-Section 7 App 7.1 Benthic and sediment sampling strategy.pdf:3:ecology for the York Potash Port Facility Environmental Impact Assessment (EIA). The strategy

TR030002-000479-Section 10 App 10.2 Terrestrial ecology survey reports.pdf:77:within an Environmental Impact Assessment by Royal Haskoning DHV on behalf of

TR030002-000479-Section 10 App 10.2 Terrestrial ecology survey reports.pdf:129:incorporated within an Environmental Impact Assessment by Royal Haskoning DHV

TR030002-000421-Doc 1.6 Issues and Document Tracker.pdf:13:Cumulative Impact Assessment (Document 6.6) This has been revised to reflect reduced order limits, incorporate

TR030002-000801-Document 6.8B - Governance Tracker.pdf:6:Section 4 – Approach to the Environmental Impact Assessment

TR030002-000800-Document 4.2B - Explanatory Memorandum (Clean).pdf:10: of the Infrastructure Planning (Environmental Impact Assessment) Regulation

TR030002-000470-Section 6 App 6.4 CEMP.pdf:17: Section 4 – Approach to the Environmental Impact Assessment

TR030002-000053-141105_TR030002_Comments_s51_Advice.pdf:12:impact assessment (EIA) that has been carried out and the applicant is advised to

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:47: Environmental Impact Assessment), Environmental study work underway

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:50: Environmental Impact Assessment Framework contains a presumption

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:56: Impact Assessment (EIA) process.

TR030002-000671-Doc 6.1 Consultation Statement Appendices - 1 to 9.pdf:101: Impact Assessments (EIAs), which are would be designed using guidance from the

TR030002-000459-ES Section 24 References.pdf:2:Cefas (2004). Guidance note for Environmental Impact Assessment in respect of Food and

TR030002-000459-ES Section 24 References.pdf:7:Subacoustech (2014). York Potash Project Harbour Facility. Underwater noise impact assessment.

TR030002-000459-ES Section 24 References.pdf:7:Subacoustech (2014). York Potash Project Harbour Underwater Noise Impact Assessment

TR030002-000459-ES Section 24 References.pdf:7:York Potash Limited (2014). York Potash Harbour Facility Landscape and Visual Impact Assessment

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:9: Infrastructure Planning (Environmental Impact Assessment)

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:30: • Cumulative impact assessment

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:32: Impact Assessment.

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:39: on Landscape and Visual Impact Assessment (The Landscape

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:39: proposed landscape and visual impact assessment with the local

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:40:Cumulative Impact Assessment (CIA) (see Scoping Report

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:46:Health Impact Assessment (HIA)

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:59:Planning Act 2008 (as amended) and the Infrastructure Planning (Environmental Impact Assessment)

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:81:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:81: scope of the environmental impact assessment (“EIA”) for the York Potash Port and

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:82: this should be provided to support the impact assessment. The predictions about

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:83: the primary data collection, specialist studies and impact assessment. It is not clear

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:83: collection, specialist studies and impact assessment.

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:83: necessary to properly undertake the impact assessment and so welcomes this

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:84: Cumulative impact assessment

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:84: Scoping Report that should be considered in the cumulative impact assessment.

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:89:Environmental Impact Assessment Scoping consultation (Regulation 15 (3) (i) of the EIA

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:89:scope of the Environmental Impact Assessment (EIA) for this development.

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:89: Note on Environmental Impact Assessment Directive for Local Planning Authorities Office of the Deputy Prime

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:91:Schedule 4 of the Town & Country Planning (Environmental Impact Assessment) Regulations 2011,

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:94:populations in the wider area, to assist in the impact assessment.

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:95:therefore advises that survey, impact assessment and mitigation proposals for Habitats and Species

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:96:Natural England supports the publication Guidelines for Landscape and Visual Impact Assessment,

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:96:visual impact assessment.

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:96:Environmental Impact Assessment process should detail the measures to be taken to ensure the

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:96:cumulative impact assessment should include other proposals in the area currently at Scoping

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:97:The ES should include an impact assessment to identify, describe and evaluate the effects that are

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:104:Environmental Impact Assessment and Environmental Statement is robust bar a few minor errors

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:109: Environmental Impact Assessment: A guide to good practice and procedures - A consultation paper; 2006; Department for

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:113:of every risk or impact assessment of proposed plans that involve a potential

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:123:Planning (Environmental Impact Assessment) Regulations 2009 (SI 2263)

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:129:presentation, to consider the impact assessment in a similar manner for

TR030002-000463-Section 4 App 4.2 Scoping Opinion.pdf:135:7: Environmental Impact Assessment, Screening and Scoping.

TR030002-001853-Notice of the Decision by the SoS (Reg 23).pdf:1:Infrastructure Planning (Environmental Impact Assessment) Regulations

TR030002-000675-Doc 6.3 Habitats Regulations Assessment_2 of 2.pdf:20:10.3.77 The noise impact assessment included predictions of noise that would be generated due to the

TR030002-000566-Doc 7.1 Planning Statement.pdf:4: Environmental Impact Assessment (‘EIA’)

TR030002-000566-Doc 7.1 Planning Statement.pdf:5: by the Infrastructure Planning (Environmental Impact Assessment)

TR030002-000566-Doc 7.1 Planning Statement.pdf:13: Environmental Impact Assessment (‘EIA’)……………………………………………… 14

TR030002-000566-Doc 7.1 Planning Statement.pdf:29: Environmental Impact Assessment (‘EIA’)

TR030002-000566-Doc 7.1 Planning Statement.pdf:29: (Environmental Impact Assessment) Regulations 2009 (‘the 2009 EIA

TR030002-000566-Doc 7.1 Planning Statement.pdf:29: Impact Assessment) (Amendment) Regulations 2012 (March 2012).

TR030002-000566-Doc 7.1 Planning Statement.pdf:30: 18. Cumulative impact assessment;

TR030002-000566-Doc 7.1 Planning Statement.pdf:44: (vi) Environmental Impact Assessment

TR030002-000566-Doc 7.1 Planning Statement.pdf:44: Environmental Impact Assessment Directive2 that requires a description

TR030002-000566-Doc 7.1 Planning Statement.pdf:95: Impact Assessment) Regulations 2009

TR030002-000566-Doc 7.1 Planning Statement.pdf:103: Environmental Impact Assessment

TR030002-000566-Doc 7.1 Planning Statement.pdf:103: (Environmental Impact Assessment) Regulations 2009 (as updated)

TR030002-000749-Document 8.3 Appendix 1 - Notes on INSPIRE and NPL Guidelines.pdf:2:farm construction on a harbour seal population. Environmental Impact Assessment Review 43 (2013)

TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf:4: MHF and harbour facilities) are discussed in the cumulative impact assessment (see Document 6.6).

TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf:4: within the Environmental Impact Assessment (EIA) process. The standard EIA approach assesses

TR030002-000464-Section 4 App 4.3 WFD compliance assessment.pdf:7: the area, and any planned schemes. These are discussed in the cumulative impact assessment.

TR030002-000253-Regulation 24 Transboundary Screening document (5).pdf:4:Under Regulation 24 of the Infrastructure Planning (Environmental Impact Assessment)

TR030002-000253-Regulation 24 Transboundary Screening document (5).pdf:4: • Cumulative Impact Assessment (March 2015) (application

TR030002-000253-Regulation 24 Transboundary Screening document (5).pdf:5:An updated list of plans/projects included in the cumulative impact assessment is provided

TR030002-000253-Regulation 24 Transboundary Screening document (5).pdf:5:in Table 4.1 of the Cumulative Impact Assessment (application document 6.6). A list of the

TR030002-000253-Regulation 24 Transboundary Screening document (5).pdf:5:Under Regulation 24 of the Infrastructure Planning (Environmental Impact Assessment)

TR030002-001873-Decision holding letter.pdf:5:Environmental Impact Assessment

TR030002-001873-Decision holding letter.pdf:6: findings of the traffic impact assessment on which the environmental impact

TR030002-000710-York Potash Limited (Document 6.8A).pdf:7:Section 4 – Approach to the Environmental Impact Assessment

TR030002-000018-Examination Library.pdf:10:Environmental Statement - Cumulative Impact Assessment (Doc 6.6)

TR030002-000018-Examination Library.pdf:10:APP-129 Environmental Statement - Cumulative Impact Assessment

TR030002-000018-Examination Library.pdf:10:Appendices to Cumulative Impact Assessment

TR030002-000018-Examination Library.pdf:10:APP-130 Cumulative Impact Assessment - Appendices Index

TR030002-000018-Examination Library.pdf:12:APP-185 Environmental Impact Assessment: Appendices Index

TR030002-000018-Examination Library.pdf:13:APP-194 Section 4: Approach to Environmental Impact Assessment (EIA)

TR030002-000110-130729 York Potash meeting - Minutes of the meeting with key statutory bodies.pdf:1:1.2 The main Agenda items were Environmental Impact Assessment (EIA), Habitats

TR030002-000110-130729 York Potash meeting - Minutes of the meeting with key statutory bodies.pdf:3:4. Environmental Impact Assessment and Habitats Regulations Assessment

TR030002-001854-Secretary of State’s Decision Letter and Statement of Reasons.pdf:2:regulation 23(2)(d) of the Infrastructure Planning (Environmental Impact Assessment)

TR030002-001854-Secretary of State’s Decision Letter and Statement of Reasons.pdf:12:(Environmental Impact Assessment) Regulations 2009.

TR030002-000453-ES Section 18 Infrastructure.pdf:19:18.8.6 Table 18-2 presents a summary of the impact assessment undertaken with regard to Infrastructure.

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:4: Guidance on Undertaking Environmental Lighting Impact Assessments) ……..22

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:8: Professionals - Guidance on Undertaking Environmental Lighting Impact Assessments

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:16:* Numbers relate to the relevant LVIA (landscape and visual impact assessment) viewpoint.

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:27: Environmental Lighting Impact Assessments)

TR030002-000504-Section 20 App 20.4 Technical lighting assessment.pdf:82: Undertaking Environmental Lighting Impact Assessments (Guide 04).

TR030002-000572-Doc 7.3 Appendix 4 - Economic Impact Report.pdf:25: influence the overall economic impact assessment that polyhalite increases crop yields, relative to

TR030002-000572-Doc 7.3 Appendix 4 - Economic Impact Report.pdf:47: plans for investment with £300 million to be spent of the Environmental Impact Assessment includ-

TR030002-000572-Doc 7.3 Appendix 4 - Economic Impact Report.pdf:62:the economic impact assessments a more conservative estimated reduction of US$ 8 (GBP 5) per tonne, has

TR030002-000572-Doc 7.3 Appendix 4 - Economic Impact Report.pdf:69: is attracted to the area. The socio-economic impact assessment calculates the project will create 1,140 additional indirect jobs.

TR030002-000445-ES Section 10 Terrestrial ecology.pdf:1:10.1.2 This Ecological Impact Assessment (EcIA) evaluates the nature conservation value of ecological

TR030002-000445-ES Section 10 Terrestrial ecology.pdf:1: for Ecological Impact Assessment in the United Kingdom (Institute of Ecology and Environmental

TR030002-000445-ES Section 10 Terrestrial ecology.pdf:4:Guidelines for Ecological Impact Assessment (EcIA) have been developed by the Institute of Ecology and Section 10

TR030002-000445-ES Section 10 Terrestrial ecology.pdf:5:Principal Importance. Natural England advises that survey, impact assessment and mitigation proposals for Habitats

TR030002-000445-ES Section 10 Terrestrial ecology.pdf:13: identified. The residual impact assessment (i.e. following mitigation) reflects the predicted impact of the

TR030002-000445-ES Section 10 Terrestrial ecology.pdf:14:completed scheme; the residual impact assessment does not take account of enhancement measures

TR030002-000736-Redcar and Cleveland Borough Council (Local Impact Report).pdf:8:• Guidelines for Landscape and Visual Impact Assessment (GLVIA), Third

TR030002-000736-Redcar and Cleveland Borough Council (Local Impact Report).pdf:8:• Guidelines for Environmental Impact Assessment, Institute of Environmental

TR030002-000736-Redcar and Cleveland Borough Council (Local Impact Report).pdf:9:Statement, the Landscape and Visual Impact Assessment (LVIA) details likely

TR030002-000018-Examination Library (5).pdf:10:Environmental Statement - Cumulative Impact Assessment (Doc 6.6)

TR030002-000018-Examination Library (5).pdf:10:APP-129 Environmental Statement - Cumulative Impact Assessment

TR030002-000018-Examination Library (5).pdf:10:Appendices to Cumulative Impact Assessment

TR030002-000018-Examination Library (5).pdf:10:APP-130 Cumulative Impact Assessment - Appendices Index

TR030002-000018-Examination Library (5).pdf:12:APP-185 Environmental Impact Assessment: Appendices Index

TR030002-000018-Examination Library (5).pdf:13:APP-194 Section 4: Approach to Environmental Impact Assessment (EIA)

TR030002-000456-ES Section 21 Recreation and access.pdf:6: and the assessed sensitivity of the receptor / resource. Table 21-4 displays the impact assessment

TR030002-000456-ES Section 21 Recreation and access.pdf:6: Table 21-4 Impact assessment matrix used with regard to recreation and access

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:2: x Guidance note for Environmental Impact Assessment in respect of Food and Environmental

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:5:enhance biodiversity. Natural England advises that survey, impact assessment and mitigation proposals for Habitats and Importance

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:24: estuary has been used in the impact assessment presented below.

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:27: in accordance with the assessment criteria presented in Section 8.4 to inform this impact assessment.

TR030002-000446-ES Section 11 Fisheries and fishing activity.pdf:43: estimate of high sensitivity has been used in this impact assessment. Based on the information

TR030002-000253-Regulation 24 Transboundary Screening document.pdf:4:Under Regulation 24 of the Infrastructure Planning (Environmental Impact Assessment)

TR030002-000253-Regulation 24 Transboundary Screening document.pdf:4: • Cumulative Impact Assessment (March 2015) (application

TR030002-000253-Regulation 24 Transboundary Screening document.pdf:5:An updated list of plans/projects included in the cumulative impact assessment is provided

TR030002-000253-Regulation 24 Transboundary Screening document.pdf:5:in Table 4.1 of the Cumulative Impact Assessment (application document 6.6). A list of the

TR030002-000253-Regulation 24 Transboundary Screening document.pdf:5:Under Regulation 24 of the Infrastructure Planning (Environmental Impact Assessment)

TR030002-000564-Doc 6.8 Governance Tracker.pdf:7:Section 4 – Approach to the Environmental Impact Assessment

TR030002-000722-York Potash Limited 4.pdf:5: Harbour facilities Environmental Impact Assessment (EIA), other than in the cumulative

TR030002-000722-York Potash Limited 4.pdf:5: impact assessment).

TR030002-000722-York Potash Limited 4.pdf:5: Infrastructure Planning (Environmental Impact Assessment) Regulations 2009, as amended by

TR030002-000722-York Potash Limited 4.pdf:5: the Infrastructure Planning (Environmental Impact Assessment) (Amendment) Regulations

TR030002-000722-York Potash Limited 4.pdf:9:4.9. It is agreed that the methodology adopted for the impact assessment is appropriate. There is

TR030002-000722-York Potash Limited 4.pdf:9: agreement on the findings of the impact assessment and mitigation measures proposed.

TR030002-000722-York Potash Limited 4.pdf:10:5.2. The assessment of impacts was undertaken in accordance with the generic impact assessment

TR030002-000722-York Potash Limited 4.pdf:10:5.3. The impact assessment identified a number of impacts that could arise with regard to marine

TR030002-000722-York Potash Limited 4.pdf:11:5.9. It is agreed that the survey design and the methodology adopted for the impact assessment is

TR030002-000722-York Potash Limited 4.pdf:11: appropriate. There is agreement on the findings of the impact assessment and mitigation

TR030002-000722-York Potash Limited 4.pdf:12:6.2. The ecological impact assessment was undertaken in accordance best practice and, in

TR030002-000722-York Potash Limited 4.pdf:12: particular, the Guidelines for Ecological Impact Assessment – Marine and Coastal (IEEM, 2010).

TR030002-000722-York Potash Limited 4.pdf:15: accordance with the generic impact assessment methodology. The principle guidance

TR030002-000722-York Potash Limited 4.pdf:15:  Guidance note for Environmental Impact Assessment in respect of Food and Environmental

TR030002-000722-York Potash Limited 4.pdf:16:7.6. The impact assessment identified a number of key potential impacts, comprising:

TR030002-000722-York Potash Limited 4.pdf:17:7.13. It is agreed that the methodology adopted for the impact assessment is appropriate.

TR030002-000722-York Potash Limited 4.pdf:18: specifically for the proposed scheme have also been used to inform the impact assessment.

TR030002-000722-York Potash Limited 4.pdf:18:8.3. The impact assessment identified a number of potential impacts with regard to coastal

TR030002-000722-York Potash Limited 4.pdf:18:8.5. It is agreed that the methodology adopted for the impact assessment is appropriate. There is

TR030002-000722-York Potash Limited 4.pdf:18: agreement on the findings of the impact assessment and mitigation measures proposed.

TR030002-000452-ES Section 17 Coastal protection and flood defence.pdf:9: impact assessment. The following paragraphs provide specific details relevant to the assessment of

TR030002-000738-York Potash Limited 3.pdf:5:Agreement that the methodology adopted for the impact assessment is Document 6.4 (ES) Agreed Agreed

TR030002-000738-York Potash Limited 3.pdf:5:appropriate (including the ecological impact assessment). Document 6.5 (Appendices to ES)

TR030002-000738-York Potash Limited 3.pdf:6: Harbour facilities Environmental Impact Assessment (EIA), other than in the cumulative

TR030002-000738-York Potash Limited 3.pdf:6: impact assessment).

TR030002-000738-York Potash Limited 3.pdf:6: Infrastructure Planning (Environmental Impact Assessment) Regulations 2009, as amended by

TR030002-000738-York Potash Limited 3.pdf:6: the Infrastructure Planning (Environmental Impact Assessment) (Amendment) Regulations

TR030002-000738-York Potash Limited 3.pdf:9:4.2. The assessment of impacts was undertaken in accordance with the generic impact assessment

TR030002-000738-York Potash Limited 3.pdf:9:4.3. The impact assessment identified a number of impacts that could arise with regard to marine

TR030002-000738-York Potash Limited 3.pdf:10:4.9. It is agreed that the survey design and the methodology adopted for the impact assessment is

TR030002-000738-York Potash Limited 3.pdf:10: appropriate. There is agreement on the findings of the impact assessment and mitigation

TR030002-000738-York Potash Limited 3.pdf:11:5.2. The ecological impact assessment was undertaken in accordance best practice and, in

TR030002-000738-York Potash Limited 3.pdf:11: particular, the Guidelines for Ecological Impact Assessment – Marine and Coastal (IEEM, 2010).

TR030002-000738-York Potash Limited 3.pdf:14: with the guiding principles set out within both the Guidelines for Ecological Impact Assessment

TR030002-000738-York Potash Limited 3.pdf:14: (EcIA) (IEEM, 2006) and the Guidelines for Ecological Impact Assessment – Marine and Coastal

TR030002-000738-York Potash Limited 3.pdf:16:  The baseline data used to inform the impact assessment for waterbird populations is

TR030002-000738-York Potash Limited 3.pdf:16:  The impact assessment identifies and assesses the potentially significant impacts of the

TR030002-000738-York Potash Limited 3.pdf:18:7.5. The ecological impact assessment has been undertaken in accordance with best practice, and in

TR030002-000738-York Potash Limited 3.pdf:18: particular, the Guidelines for Ecological Impact Assessment in the United Kingdom (IEEM,

TR030002-000738-York Potash Limited 3.pdf:19:7.10. It is agreed that the survey effort and methodology adopted for the impact assessment are

TR030002-000738-York Potash Limited 3.pdf:19: appropriate. There is agreement on the findings of the impact assessment and mitigation

TR030002-000738-York Potash Limited 3.pdf:20:8.3. For the purposes of the landscape and visual impact assessment (LVIA), it is considered that

TR030002-000738-York Potash Limited 3.pdf:21:8.8. It is agreed that the methodology adopted for the impact assessment is appropriate. .

TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:15:Environmental Impact Assessment (EIA) to be focusing on the construction period

TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:37: conditions. Possible new conditions will be developed from the findings of a full Environmental Impact Assessment (EIS)

TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:38: York Potash Project-wide HRA and Cumulative Impact Assessment. With elements of information and full detail still not

TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:39: advises that survey, impact assessment and mitigation proposals for Habitats and Species of Principal Importance should

TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:41: the Environmental Impact Assessment will assess the potential impacts of the proposed development on these

TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:41: a cumulative impact assessment as it is not clear that the model has been updated to reflect changes in the estuary.

TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:42: 5.8 Underwater noise - The survey methodologies appear to be adequate and on the whole, the impact assessment

TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:42: does however identify the consultations carried out and specify that a cumulative impact assessment will be presented as a

TR030002-000673-Doc 6.1 Consultation Statement Appendices - 22 to 31.pdf:42: Environment Impact Assessment process, the MMO would not see this letter as a definitive list of all Environmental Impact

TR030002-000450-ES Section 15 Archaeology and heritage.pdf:8: Impact assessment methodology

TR030002-000450-ES Section 15 Archaeology and heritage.pdf:8:15.4.8 The impact assessment methodology adopted for archaeology and cultural heritage defines those

TR030002-000450-ES Section 15 Archaeology and heritage.pdf:8:15.4.9 More specifically the impact assessment presents:

TR030002-000450-ES Section 15 Archaeology and heritage.pdf:8:15.4.10 In the absence of an industry standard methodology for heritage impact assessment, the impact

TR030002-000450-ES Section 15 Archaeology and heritage.pdf:11: heritage significance (importance) in accordance with the impact assessment matrix provided in Table

TR030002-000454-ES Section 19 Socioeconomics.pdf:1:19.4.1 The objectives underlying the socio-economic impact assessment are to provide an assessment of:

TR030002-000410-ExA First Round Questions.pdf:1:Landscape and Visual Impact Assessment ………………………………………….. 30

TR030002-000410-ExA First Round Questions.pdf:17:span for the purposes of the environmental impact assessment of the long term

TR030002-000410-ExA First Round Questions.pdf:30:Landscape and Visual Impact Assessment (LVIA)

TR030002-000410-ExA First Round Questions.pdf:30:Landscape and Visual Impact Assessment (LVIA) and explain the relationship

TR030002-000500-Section 19 App 19.1 Socio economic legislation_policy_guidance.pdf:29: influence the overall economic impact assessment that polyhalite increases crop yields, relative to

TR030002-000500-Section 19 App 19.1 Socio economic legislation_policy_guidance.pdf:51: plans for investment with £300 million to be spent of the Environmental Impact Assessment includ-

TR030002-000500-Section 19 App 19.1 Socio economic legislation_policy_guidance.pdf:67:the economic impact assessments a more conservative estimated reduction of US$ 8 (GBP 5) per tonne, has

TR030002-000500-Section 19 App 19.1 Socio economic legislation_policy_guidance.pdf:76: is attracted to the area. The socio-economic impact assessment calculates the project will create 1,140 additional indirect jobs.

TR030002-000752-Document 8.3 Appendix 5 - Shipping Notes Part 1.pdf:9:The purpose of this report is to inform the Environmental Impact Assessment for the proposed York Potash facility by

TR030002-001856-Examining Authority’s Recommendation Report.pdf:10: Environmental Impact Assessment under the Infrastructure Planning

TR030002-001856-Examining Authority’s Recommendation Report.pdf:10: (Environmental Impact Assessment) Regulations 2009 as amended by

TR030002-001856-Examining Authority’s Recommendation Report.pdf:10: the Infrastructure Planning (Environmental Impact Assessment)

TR030002-001856-Examining Authority’s Recommendation Report.pdf:10: Regulations, there is a Cumulative Impact Assessment both of the

TR030002-001856-Examining Authority’s Recommendation Report.pdf:27: provisions on environmental impact assessment and transboundary

TR030002-001856-Examining Authority’s Recommendation Report.pdf:27: relation to the environmental impact assessment undertaken and in

TR030002-001856-Examining Authority’s Recommendation Report.pdf:29: Impact Assessment) Regulations 2009 (EIA Regulations) and on the

TR030002-001856-Examining Authority’s Recommendation Report.pdf:45: IMPACT ASSESSMENT (EIA) REGULATIONS AND HABITAT

TR030002-001856-Examining Authority’s Recommendation Report.pdf:45: The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 as amended by the

TR030002-001856-Examining Authority’s Recommendation Report.pdf:45:Infrastructure Planning (Environmental Impact assessment) (Amendment) Regulations 2012

TR030002-001856-Examining Authority’s Recommendation Report.pdf:69: to the Cumulative Impact Assessment APP-170. In the first

TR030002-001856-Examining Authority’s Recommendation Report.pdf:69: considered in the Cumulative Impact Assessment.

TR030002-001856-Examining Authority’s Recommendation Report.pdf:80:5.15.3 The Cumulative Impact Assessment also provides a Transport

TR030002-001856-Examining Authority’s Recommendation Report.pdf:190:Environmental Statement - Cumulative Impact Assessment (Doc 6.6)

TR030002-001856-Examining Authority’s Recommendation Report.pdf:190:APP-129 Environmental Statement - Cumulative Impact Assessment

TR030002-001856-Examining Authority’s Recommendation Report.pdf:190:Appendices to Cumulative Impact Assessment

TR030002-001856-Examining Authority’s Recommendation Report.pdf:190:APP-130 Cumulative Impact Assessment - Appendices Index

TR030002-001856-Examining Authority’s Recommendation Report.pdf:192:APP-185 Environmental Impact Assessment: Appendices Index

TR030002-001856-Examining Authority’s Recommendation Report.pdf:193:APP-194 Section 4: Approach to Environmental Impact Assessment (EIA)

TR030002-001856-Examining Authority’s Recommendation Report.pdf:213: EIA Environmental Impact Assessment

TR030002-000018-Examination Library (3).pdf:10:Environmental Statement - Cumulative Impact Assessment (Doc 6.6)

TR030002-000018-Examination Library (3).pdf:10:APP-129 Environmental Statement - Cumulative Impact Assessment

TR030002-000018-Examination Library (3).pdf:10:Appendices to Cumulative Impact Assessment

TR030002-000018-Examination Library (3).pdf:10:APP-130 Cumulative Impact Assessment - Appendices Index

TR030002-000018-Examination Library (3).pdf:12:APP-185 Environmental Impact Assessment: Appendices Index

TR030002-000018-Examination Library (3).pdf:13:APP-194 Section 4: Approach to Environmental Impact Assessment (EIA)

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:1: impacts provided at Appendices 20.2 and 20.3. A Lighting Impact Assessment is provided at

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:1: nature conservation. A lighting impact assessment is included at Appendix 20.4.

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:5: Impact Assessment, produced by the Landscape Institute and the Institute of

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:5: Landscape and Visual Impact Assessment, Third Edition, Landscape Institute and Institute of

TR030002-000455-ES Section 20 Landscape and visual environment.pdf:5:20.4.3 The Guidelines for Landscape and Visual Impact Assessment are not prescriptive and set out a general

TR030002-000711-Applicants Response to First Questions.pdf:44: plan and a description of site allocations in cumulative impact assessment (CIA) (Document 6.6) was

TR030002-000711-Applicants Response to First Questions.pdf:92: Set out how the potential effects of noise The methodology for the noise impact assessment

TR030002-000711-Applicants Response to First Questions.pdf:93: Landscape and Visual Impact Assessment (LVIA)

TR030002-000562-Doc 6.2 Section 79(1) of Environmental Protection Act 1990 Statement.pdf:11: ES, A Lighting Impact Assessment is provided in Appendix 20.4 to

TR030002-000018-Examination Library (2).pdf:10:Environmental Statement - Cumulative Impact Assessment (Doc 6.6)

TR030002-000018-Examination Library (2).pdf:10:APP-129 Environmental Statement - Cumulative Impact Assessment

TR030002-000018-Examination Library (2).pdf:10:Appendices to Cumulative Impact Assessment

TR030002-000018-Examination Library (2).pdf:10:APP-130 Cumulative Impact Assessment - Appendices Index

TR030002-000018-Examination Library (2).pdf:12:APP-185 Environmental Impact Assessment: Appendices Index

TR030002-000018-Examination Library (2).pdf:13:APP-194 Section 4: Approach to Environmental Impact Assessment (EIA)

TR030002-000428-Doc 4.2 Explanatory Memorandum.pdf:13: Planning (Environmental Impact Assessment) Regulation 2009

TR030002-000253-Regulation 24 Transboundary Screening document (3).pdf:4:Under Regulation 24 of the Infrastructure Planning (Environmental Impact Assessment)

TR030002-000253-Regulation 24 Transboundary Screening document (3).pdf:4: • Cumulative Impact Assessment (March 2015) (application

TR030002-000253-Regulation 24 Transboundary Screening document (3).pdf:5:An updated list of plans/projects included in the cumulative impact assessment is provided

TR030002-000253-Regulation 24 Transboundary Screening document (3).pdf:5:in Table 4.1 of the Cumulative Impact Assessment (application document 6.6). A list of the

TR030002-000253-Regulation 24 Transboundary Screening document (3).pdf:5:Under Regulation 24 of the Infrastructure Planning (Environmental Impact Assessment)

TR030002-000451-ES Section 16 Commercial navigation.pdf:3: in Phase 1 and Phase 2). The results of this study were used to inform the impact assessment for this

TR030002-000451-ES Section 16 Commercial navigation.pdf:10: are presented within Table 16-4. These results have been used to inform this impact assessment.

TR030002-000451-ES Section 16 Commercial navigation.pdf:11: using the impact assessment matrix presented in Section 4, an impact of negligible significance is

TR030002-000449-ES Section 14 Noise and vibration.pdf:8:14.3.2 For the purpose of the noise and vibration impact assessment, four categories of noise sensitive

TR030002-000482-Section 12 App 12.2 Transport Assessment_2 of 2.pdf:11: PROPOSED ENVIRONMENTAL IMPACT ASSESSMENT FOR CONSTRUCTION OF A SINGLE WIND TURBINE 49.9 METRES TO HUB

TR030002-000482-Section 12 App 12.2 Transport Assessment_2 of 2.pdf:13: Request for a Scoping Opinion under Regulation 13 of the Town and Country Planning (Environmental Impact Assessment) (England and Wales)

TR030002-001873-Decision holding letter (1).pdf:5:Environmental Impact Assessment

TR030002-001873-Decision holding letter (1).pdf:6: findings of the traffic impact assessment on which the environmental impact

TR030002-000672-Doc 6.1 Consultation Statement Appendices - 10 to 21.pdf:295: Infrastructure Planning (Environmental Impact Assessment) Regulations 2009.

TR030002-000672-Doc 6.1 Consultation Statement Appendices - 10 to 21.pdf:295: Infrastructure Planning (Environmental Impact Assessment) Regulations 2009)

TR030002-000497-Section 15 App 15.4 Additional settings assessment report.pdf:16: Impact Assessment.

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:5: 2.2 Environmental Impact Assessment Directive 9

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:5: 4.1 The Environmental Impact Assessment 29

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:6: 5.18 Cumulative Impact Assessment 91

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:7: EIA Environmental Impact Assessment

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:9: required as part of the Environmental Impact Assessment (EIA) process. In this

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:10: • Define the approach to the impact assessment, particularly relating to issues of

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:10: necessary to inform the impact assessment (i.e. field surveys or modelling).

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:17:2.2 Environmental Impact Assessment Directive

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:17: Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 and

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:17: Infrastructure Planning (Environmental Impact Assessment) (Amendment) Regulations

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:37:4.1 The Environmental Impact Assessment

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:37: Planning (Environmental Impact Assessment) Regulations 2009 (SI 2009/2263) and

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:37: Infrastructure Planning (Environmental Impact Assessment) (Amendment) Regulations

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:37: on screening, scoping, consultation and impact assessment.

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:57: impact assessment, namely:

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:64: of impact assessment.

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:74: The findings of the impact assessment with regard to the hydrodynamic and

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:76: To facilitate the impact assessment, the following data will be obtained:

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:82: • Industrial noise assessment – a noise impact assessment will be conducted to

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:96: Visual Impact Assessment (LVIA) is undertaken. The assessment will be undertaken in

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:99:5.18 Cumulative Impact Assessment

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:99: Background to Cumulative Impact Assessment

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:99: There is no legislation that specifically applies to cumulative impact assessment (CIA) or

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:99: Impact Assessment (EIA) Directive (85/337/EEC) and associated EIA Regulations

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:109: Environmental Impact Assessment.

TR030002-000462-Section 4 App 4.1 Environmental Scoping Report.pdf:111:Assessment (2013). ‘Guidelines on Landscape and Visual Impact Assessment’ 3rd

TR030002-000253-Regulation 24 Transboundary Screening document (4).pdf:4:Under Regulation 24 of the Infrastructure Planning (Environmental Impact Assessment)

TR030002-000253-Regulation 24 Transboundary Screening document (4).pdf:4: • Cumulative Impact Assessment (March 2015) (application

TR030002-000253-Regulation 24 Transboundary Screening document (4).pdf:5:An updated list of plans/projects included in the cumulative impact assessment is provided

TR030002-000253-Regulation 24 Transboundary Screening document (4).pdf:5:in Table 4.1 of the Cumulative Impact Assessment (application document 6.6). A list of the

TR030002-000253-Regulation 24 Transboundary Screening document (4).pdf:5:Under Regulation 24 of the Infrastructure Planning (Environmental Impact Assessment)

TR030002-000448-ES Section 13 Air quality.pdf:6: ES should assess the construction phase, operational phase and impact assessment

TR030002-000448-ES Section 13 Air quality.pdf:11: those inherent in the proposed design, that are identified as being necessary in the impact assessment,

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:19: An important part of the Environmental Impact Assessment (EIA) process is to review

TR030002-000578-Doc 7.3 Appendix 7 - Appendices to Alternative Sites Assessment - Part 3.pdf:30: In order to establish a high-level impact assessment of construction and operational

TR030002-000569-Doc 7.3 Appendix 2a - MDT Planning Statement.pdf:80: heights determined by the visual impact assessment. The design of the building is based on simple

TR030002-000763-Document 4.2A Draft Explanatory Memorandum (Clean).pdf:11: of the Infrastructure Planning (Environmental Impact Assessment) Regulation

TR030002-000018-Examination Library (1).pdf:10:Environmental Statement - Cumulative Impact Assessment (Doc 6.6)

TR030002-000018-Examination Library (1).pdf:10:APP-129 Environmental Statement - Cumulative Impact Assessment

TR030002-000018-Examination Library (1).pdf:10:Appendices to Cumulative Impact Assessment

TR030002-000018-Examination Library (1).pdf:10:APP-130 Cumulative Impact Assessment - Appendices Index

TR030002-000018-Examination Library (1).pdf:12:APP-185 Environmental Impact Assessment: Appendices Index

TR030002-000018-Examination Library (1).pdf:13:APP-194 Section 4: Approach to Environmental Impact Assessment (EIA)

TR030002-000253-Regulation 24 Transboundary Screening document (2).pdf:4:Under Regulation 24 of the Infrastructure Planning (Environmental Impact Assessment)

TR030002-000253-Regulation 24 Transboundary Screening document (2).pdf:4: • Cumulative Impact Assessment (March 2015) (application

TR030002-000253-Regulation 24 Transboundary Screening document (2).pdf:5:An updated list of plans/projects included in the cumulative impact assessment is provided

TR030002-000253-Regulation 24 Transboundary Screening document (2).pdf:5:in Table 4.1 of the Cumulative Impact Assessment (application document 6.6). A list of the

TR030002-000253-Regulation 24 Transboundary Screening document (2).pdf:5:Under Regulation 24 of the Infrastructure Planning (Environmental Impact Assessment)

TR030002-001873-Decision holding letter (4).pdf:5:Environmental Impact Assessment

TR030002-001873-Decision holding letter (4).pdf:6: findings of the traffic impact assessment on which the environmental impact

TR030002-000501-Section 20 App 20.1 LVIA methodology.pdf:3: LVIA is either carried out formally as part of the Environmental Impact Assessment (EIA) process

TR030002-000501-Section 20 App 20.1 LVIA methodology.pdf:3:  Guidelines for Landscape and Visual Impact Assessment (GLVIA), Third Edition

TR030002-000501-Section 20 App 20.1 LVIA methodology.pdf:3:  Guidelines for Environmental Impact Assessment, Institute of Environmental

TR030002-000501-Section 20 App 20.1 LVIA methodology.pdf:4: Schedule 4, Part 1 of The Town and Country Planning (Environmental Impact Assessment) Regulations

TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf:6: set out both the Guidelines for Ecological Impact Assessment (EcIA) (IEEM, 2006) and the Guidelines

TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf:6: for Ecological Impact Assessment – Marine and Coastal (IEEM, 2010), with emphasis being placed

TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf:15: significantly greater value to the impact assessment given it is highly site-specific and spans several

TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf:24: account in the impact assessment presented above. Hence the residual impact would be of low

TR030002-000444-ES Section 9 Marine and coastal ornithology.pdf:36:9.6.16 The noise impact assessment has included predictions of noise generated due to the operation of the

TR030002-000443-ES Section 8 Marine ecology.pdf:3: x Guidelines for ecological impact assessment in Britain and Ireland (Institute of Ecology and

TR030002-000443-ES Section 8 Marine ecology.pdf:3: and coastal ecological impact assessment).

TR030002-000443-ES Section 8 Marine ecology.pdf:6:MMO considers this is necessary to properly undertake the impact assessment and so welcomes this commitment.

TR030002-000443-ES Section 8 Marine ecology.pdf:8:Natural England advises that survey, impact assessment and mitigation proposals for Habitats and Species of Principal Importance

TR030002-000443-ES Section 8 Marine ecology.pdf:22: used to inform the impact assessment.

TR030002-000443-ES Section 8 Marine ecology.pdf:51: to inform the impact assessment, in accordance with the assessment criteria presented in Section 8.4.

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:3: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:5: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:7: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:8: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:9: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:10: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:11: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:12: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:13: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:14: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:15: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:16: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:16:impact assessment in Section 3.4, as the construction noise effect is temporary and, in particular

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:17: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:18: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:19: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:20: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:21: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:22: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:23: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:24: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:25: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:26: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:27: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:28: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:29: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:30: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:31: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:32: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:33: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:34: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:35: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:36: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:37: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:38: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:39: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:40: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:41: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:42: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:43: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:44: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:45: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:46: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:47: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:48: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

TR030002-000474-Section 8 App 8.2 Underwater noise modelling report.pdf:48: Impact Assessment

TR030002-000253-Regulation 24 Transboundary Screening document (1).pdf:4:Under Regulation 24 of the Infrastructure Planning (Environmental Impact Assessment)

TR030002-000253-Regulation 24 Transboundary Screening document (1).pdf:4: • Cumulative Impact Assessment (March 2015) (application

TR030002-000253-Regulation 24 Transboundary Screening document (1).pdf:5:An updated list of plans/projects included in the cumulative impact assessment is provided

TR030002-000253-Regulation 24 Transboundary Screening document (1).pdf:5:in Table 4.1 of the Cumulative Impact Assessment (application document 6.6). A list of the

TR030002-000253-Regulation 24 Transboundary Screening document (1).pdf:5:Under Regulation 24 of the Infrastructure Planning (Environmental Impact Assessment)

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:27:3 CUMULATIVE IMPACT ASSESSMENT

TR030002-000561-Doc 6.7 Environmental Statement Non Technical Summary_2 of 2.pdf:29:3.5.2 The YPP cumulative impact assessment for air quality (including dust/fine particulates and the effect of

TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:1:6.1.5 Information regarding the general approach taken to the impact assessment is discussed in Section 4.

TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:5: need for a Health Impact Assessment.

TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:40:6.5.6 The following impact assessment has been developed assuming the above principles would be

TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:40: set out above, an agricultural soils impact assessment on the soil has not been undertaken.

TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:49:6.7.7 The findings of the impact assessment are summarised in Table 6-14. The assessment assumed that

TR030002-000441-ES Section 6 Hydrology_hydrogeology_land quality.pdf:50:Table 6-14 Impact assessment summary

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:8:CIA Cumulative Impact Assessment

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:40:3.2.1 A formal Environmental Impact Assessment (EIA) Scoping Opinion has been received for the Harbour

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:61: greater value to the impact assessment given it is highly site-specific and spans several years.

TR030002-000674-Doc 6.3 Habitats Regulations Assessment_1 of 2.pdf:78: However, based on the findings of the groundwater impact assessment, the risk of

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:3: 2.2 Environmental Impact Assessment Directive 9

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:3: 4.1 The Environmental Impact Assessment 29

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:4: 5.18 Cumulative Impact Assessment 91

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:5: EIA Environmental Impact Assessment

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:7: required as part of the Environmental Impact Assessment (EIA) process. In this

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:8: • Define the approach to the impact assessment, particularly relating to issues of

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:8: necessary to inform the impact assessment (i.e. field surveys or modelling).

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:15:2.2 Environmental Impact Assessment Directive

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:15: Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 and

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:15: Infrastructure Planning (Environmental Impact Assessment) (Amendment) Regulations

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:35:4.1 The Environmental Impact Assessment

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:35: Planning (Environmental Impact Assessment) Regulations 2009 (SI 2009/2263) and

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:35: Infrastructure Planning (Environmental Impact Assessment) (Amendment) Regulations

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:35: on screening, scoping, consultation and impact assessment.

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:55: impact assessment, namely:

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:62: of impact assessment.

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:72: The findings of the impact assessment with regard to the hydrodynamic and

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:74: To facilitate the impact assessment, the following data will be obtained:

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:80: • Industrial noise assessment – a noise impact assessment will be conducted to

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:94: Visual Impact Assessment (LVIA) is undertaken. The assessment will be undertaken in

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:97:5.18 Cumulative Impact Assessment

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:97: Background to Cumulative Impact Assessment

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:97: There is no legislation that specifically applies to cumulative impact assessment (CIA) or

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:97: Impact Assessment (EIA) Directive (85/337/EEC) and associated EIA Regulations

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:107: Environmental Impact Assessment.

TR030002-000074-131202_TR030002_York Potash Harbour Facilities_Scoping Report.pdf:109:Assessment (2013). ‘Guidelines on Landscape and Visual Impact Assessment’ 3rd

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:53:7.30 A full Landscape and Visual Impact Assessment (LVIA) of the proposals is

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:58: Impact Assessment (EIA) confirms the site has limited suitable habitat and

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:68: Part 5 - Cumulative Impact Assessment.

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:69:  Landscape & Visual Impact Assessment

TR030002-000573-Doc 7.3 Appendix 5 - MHF Planning Statement.pdf:69:  Noise Impact Assessment

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:7: Infrastructure Planning (Environmental Impact Assessment)

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:28: • Cumulative impact assessment

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:30: Impact Assessment.

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:37: on Landscape and Visual Impact Assessment (The Landscape

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:37: proposed landscape and visual impact assessment with the local

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:38:Cumulative Impact Assessment (CIA) (see Scoping Report

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:44:Health Impact Assessment (HIA)

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:57:Planning Act 2008 (as amended) and the Infrastructure Planning (Environmental Impact Assessment)

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:79:Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:79: scope of the environmental impact assessment (“EIA”) for the York Potash Port and

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:80: this should be provided to support the impact assessment. The predictions about

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:81: the primary data collection, specialist studies and impact assessment. It is not clear

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:81: collection, specialist studies and impact assessment.

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:81: necessary to properly undertake the impact assessment and so welcomes this

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:82: Cumulative impact assessment

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:82: Scoping Report that should be considered in the cumulative impact assessment.

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:87:Environmental Impact Assessment Scoping consultation (Regulation 15 (3) (i) of the EIA

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:87:scope of the Environmental Impact Assessment (EIA) for this development.

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:87: Note on Environmental Impact Assessment Directive for Local Planning Authorities Office of the Deputy Prime

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:89:Schedule 4 of the Town & Country Planning (Environmental Impact Assessment) Regulations 2011,

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:92:populations in the wider area, to assist in the impact assessment.

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:93:therefore advises that survey, impact assessment and mitigation proposals for Habitats and Species

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:94:Natural England supports the publication Guidelines for Landscape and Visual Impact Assessment,

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:94:visual impact assessment.

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:94:Environmental Impact Assessment process should detail the measures to be taken to ensure the

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:94:cumulative impact assessment should include other proposals in the area currently at Scoping

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:95:The ES should include an impact assessment to identify, describe and evaluate the effects that are

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:102:Environmental Impact Assessment and Environmental Statement is robust bar a few minor errors

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:107: Environmental Impact Assessment: A guide to good practice and procedures - A consultation paper; 2006; Department for

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:111:of every risk or impact assessment of proposed plans that involve a potential

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:121:Planning (Environmental Impact Assessment) Regulations 2009 (SI 2263)

TR030002-000072-140113_TR030002_York Potash Harbour Facilities_Scoping Opinion Report.pdf:127:presentation, to consider the impact assessment in a similar manner for

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:121: Part 5 - Cumulative Impact Assessment.

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:122:  Landscape & Visual Impact Assessment

TR030002-000568-Doc 7.3 Appendix 1 - Mine and MTS Planning Statement.pdf:122:  Noise Impact Assessment

TR030002-000670-Doc 6.1 Consultation Statement - Main Text.pdf:10: Environmental Impact Assessment and Habitats Regulations ………….. 29

TR030002-000670-Doc 6.1 Consultation Statement - Main Text.pdf:17:Environmental Impact Assessment

TR030002-000670-Doc 6.1 Consultation Statement - Main Text.pdf:33: Impact Assessment (EIA) are detailed in

TR030002-000670-Doc 6.1 Consultation Statement - Main Text.pdf:46: Environmental Impact Assessment and Habitats

TR030002-000670-Doc 6.1 Consultation Statement - Main Text.pdf:46: article 6(1)(b) of the Environmental Impact Assessment (EIA)

TR030002-000670-Doc 6.1 Consultation Statement - Main Text.pdf:46: Planning (Environmental Impact Assessment) Regulations 2009 (SI

TR030002-000670-Doc 6.1 Consultation Statement - Main Text.pdf:50: 18 Cumulative impact assessment;

TR030002-000670-Doc 6.1 Consultation Statement - Main Text.pdf:58: the Environmental Impact Assessment. This was then followed by

TR030002-000670-Doc 6.1 Consultation Statement - Main Text.pdf:69: application will include a Cumulative Impact Assessment which will

TR030002-000755-Document 4.2A Draft Explanatory Memorandum (Tracked).pdf:11: of the Infrastructure Planning (Environmental Impact Assessment) Regulation

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:4:3 CUMULATIVE IMPACT ASSESSMENT ………………………………………………………….. 55

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:8:1.1.3 The full ES presents the findings of an Environmental Impact Assessment (EIA) into the potential

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:8:  Section 3 - Cumulative Impact Assessment

TR030002-000560-Doc 6.7 Environmental Statement Non Technical Summary_1 of 2.pdf:8: Section 3 summarises the Cumulative Impact Assessment (CIA) that has been undertaken in order to

TR030002-000508-Doc 6.6 CIA Appendices Index.pdf:1:Cumulative Impact Assessment

TR030002-000435-ES Section 1 Introduction.pdf:1: considered in this assessment, other than in the cumulative impact assessment).

TR030002-000435-ES Section 1 Introduction.pdf:1: the findings of the Environmental Impact Assessment (EIA) process.

TR030002-000570-Doc 7.3 Appendix 2b - MDT Planning Statement Appendices.pdf:128: of future crops will be included in the impact assessment section of this project as the

TR030002-000570-Doc 7.3 Appendix 2b - MDT Planning Statement Appendices.pdf:144: associated uncertainties in the impact assessment will also be presented.

TR030002-000570-Doc 7.3 Appendix 2b - MDT Planning Statement Appendices.pdf:151: Throughout the impact assessment the availability of potash substitutes is critical; if fertiliser

TR030002-000570-Doc 7.3 Appendix 2b - MDT Planning Statement Appendices.pdf:169:Several assumptions have been made throughout this impact assessment. Perhaps the most

TR030002-000570-Doc 7.3 Appendix 2b - MDT Planning Statement Appendices.pdf:180: climate impact assessment climate in the UK No Does not detail cropping patterns

TR030002-000756-Document 8.3 Appendix 5 - Shipping Notes Part 3.pdf:2:EIA - Environmental Impact Assessment

TR030002-000756-Document 8.3 Appendix 5 - Shipping Notes Part 3.pdf:16:o Emissions to the environment at Continuous Plant Discharges to Air Dust, fugitive emissions Non compliance Environmental impact assessment Emission control equipment

TR030002-000756-Document 8.3 Appendix 5 - Shipping Notes Part 3.pdf:16:p Continuous Plant Discharges to Soil (Minor) Spills Damage to environment Environmental impact assessment Emission control equipment

TR030002-000756-Document 8.3 Appendix 5 - Shipping Notes Part 3.pdf:16:q Continuous Plant Discharges to Water Cooling water, accidental spill, equipment Non compliance Environmental impact assessment Emission control equipment

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:31: proposed scheme. The impact assessment has taken into account the requirements of European and

TR030002-000442-ES Section 7 Marine sediment and water quality.pdf:31:7.8.3 The impact assessment identified a number of impacts that could arise with regard to marine and

TR030002-000765-Document 8.4 Applicants Responses to Other Responses to ExA Q1.pdf:9:applications. Therefore the Cumulative Impact Assessment (CIA)

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:5:environmental impact assessment (EIA) of the development.

TR030002-000466-Section 5 App 5.2 Model calibration and validation.pdf:13: the Tees Estuary and Tees Bay as part of the environmental impact assessment (EIA) of

TR030002-000436-ES Section 2 Legislation_regulation_policy.pdf:1:2.2 Environmental Impact Assessment Directive

TR030002-000436-ES Section 2 Legislation_regulation_policy.pdf:1: Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 (as amended by the

TR030002-000436-ES Section 2 Legislation_regulation_policy.pdf:1: Infrastructure Planning (Environmental Impact Assessment) (Amendment) Regulations 2012). These

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:1: CUMULATIVE LANDSCAPE AND VISUAL IMPACT ASSESSMENT

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:2: CUMULATIVE LANDSCAPE AND VISUAL IMPACT ASSESSMENT

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:3: CUMULATIVE LANDSCAPE AND VISUAL IMPACT ASSESSMENT

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:4: CUMULATIVE LANDSCAPE AND VISUAL IMPACT ASSESSMENT

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:5: CUMULATIVE LANDSCAPE AND VISUAL IMPACT ASSESSMENT

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:6: CUMULATIVE LANDSCAPE AND VISUAL IMPACT ASSESSMENT

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:7: CUMULATIVE LANDSCAPE AND VISUAL IMPACT ASSESSMENT

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:8: CUMULATIVE LANDSCAPE AND VISUAL IMPACT ASSESSMENT

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:9: CUMULATIVE LANDSCAPE AND VISUAL IMPACT ASSESSMENT

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:10: CUMULATIVE LANDSCAPE AND VISUAL IMPACT ASSESSMENT

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:11: CUMULATIVE LANDSCAPE AND VISUAL IMPACT ASSESSMENT

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:12: CUMULATIVE LANDSCAPE AND VISUAL IMPACT ASSESSMENT

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:13: CUMULATIVE LANDSCAPE AND VISUAL IMPACT ASSESSMENT

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:14: CUMULATIVE LANDSCAPE AND VISUAL IMPACT ASSESSMENT

TR030002-000553-Doc 6.6 App 22.3 Sequential receptor assessment.pdf:15: CUMULATIVE LANDSCAPE AND VISUAL IMPACT ASSESSMENT

TR030002-000351-Section 55 Checklist.pdf:4: Planning (Environmental Impact Assessment) Regulations 2009 (as

TR030002-000351-Section 55 Checklist.pdf:4: Regulation 6 of the The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

TR030002-000351-Section 55 Checklist.pdf:9: Regulation 10 of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

TR030002-000351-Section 55 Checklist.pdf:13: Planning (Environmental Impact Assessment) Regulations 2009

TR030002-000351-Section 55 Checklist.pdf:13: Regulation 11 of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

TR030002-000351-Section 55 Checklist.pdf:15:  Cumulative Impact Assessment (Doc 6.6)

TR030002-000351-Section 55 Checklist.pdf:15: Impact Assessment) Regulations 2009 (as amended) (the EIA Regulations)

TR030002-000351-Section 55 Checklist.pdf:19: the Cumulative Impact Assessment (Doc 6.6).

TR030002-000351-Section 55 Checklist.pdf:19: And in the Cumulative Impact Assessment of the ES (Doc 6.6).

TR030002-000059-140113_TR030002_late scoping responses.pdf:1:7: Environmental Impact Assessment, Screening and Scoping.

TR030002-000447-ES Section 12 Traffic and transport.pdf:5: The traffic impact assessment has also been guided by the following documents.

TR030002-000447-ES Section 12 Traffic and transport.pdf:6:12.3.2 The baseline environmental studies, surveys and impact assessment for transport have been

TR030002-000447-ES Section 12 Traffic and transport.pdf:14: Table 12-8 Traffic and transport significance impact assessment matrix

TR030002-000447-ES Section 12 Traffic and transport.pdf:17: development generated traffic and the impact assessment (recognising the similar environment

TR030002-000447-ES Section 12 Traffic and transport.pdf:25: established and inform the impact assessment during the construction phase. Table 12-14 sets out

TR030002-000447-ES Section 12 Traffic and transport.pdf:26:12.5.2 This sub-section contains a summary of the traffic inputs that have informed the impact assessment.

TR030002-000447-ES Section 12 Traffic and transport.pdf:29: require further impact assessment.

TR030002-000111-130523_Meeting Note_York Potash Pipeline teleconference with applicant and Natural England.pdf:1:objectives Assessment (HRA) and Environmental Impact Assessment for

TR030002-000494-Section 15 App 15.1 Archaeology desk based appraisal.pdf:9: impact assessment that will be reported within the ES for the harbour facility and separately for the

TR030002-000494-Section 15 App 15.1 Archaeology desk based appraisal.pdf:70: Environmental Impact Assessment for a new Fouracre, L. 2005. A cultural

TR030002-000701-Environment Agency.pdf:10: Harbour facilities Environmental Impact Assessment (EIA), other than in the cumulative

TR030002-000701-Environment Agency.pdf:10: impact assessment).

TR030002-000701-Environment Agency.pdf:10: Infrastructure Planning (Environmental Impact Assessment) Regulations 2009, as amended by

TR030002-000701-Environment Agency.pdf:10: the Infrastructure Planning (Environmental Impact Assessment) (Amendment) Regulations

TR030002-000701-Environment Agency.pdf:14:4.9. It is agreed that the methodology adopted for the impact assessment is appropriate. There is

TR030002-000701-Environment Agency.pdf:14: agreement on the findings of the impact assessment and mitigation measures proposed.

TR030002-000701-Environment Agency.pdf:15:5.2. The assessment of impacts was undertaken in accordance with the generic impact assessment

TR030002-000701-Environment Agency.pdf:15:5.3. The impact assessment identified a number of impacts that could arise with regard to marine

TR030002-000701-Environment Agency.pdf:16:5.9. It is agreed that the survey design and the methodology adopted for the impact assessment is

TR030002-000701-Environment Agency.pdf:16: appropriate. There is agreement on the findings of the impact assessment and mitigation

TR030002-000701-Environment Agency.pdf:17:6.2. The ecological impact assessment was undertaken in accordance best practice and, in

TR030002-000701-Environment Agency.pdf:17: particular, the Guidelines for Ecological Impact Assessment – Marine and Coastal (IEEM, 2010).

TR030002-000701-Environment Agency.pdf:20: accordance with the generic impact assessment methodology. The principle guidance

TR030002-000701-Environment Agency.pdf:20:  Guidance note for Environmental Impact Assessment in respect of Food and Environmental

TR030002-000701-Environment Agency.pdf:21:7.6. The impact assessment identified a number of key potential impacts, comprising:

TR030002-000701-Environment Agency.pdf:22:7.13. It is agreed that the methodology adopted for the impact assessment is appropriate.

TR030002-000701-Environment Agency.pdf:23: specifically for the proposed scheme have also been used to inform the impact assessment.

TR030002-000701-Environment Agency.pdf:23:8.3. The impact assessment identified a number of potential impacts with regard to coastal

TR030002-000701-Environment Agency.pdf:23:8.5. It is agreed that the methodology adopted for the impact assessment is appropriate. There is

TR030002-000701-Environment Agency.pdf:23: agreement on the findings of the impact assessment and mitigation measures proposed.

TR030002-000434-ES Contents_index.pdf:4: 2.2 Environmental Impact Assessment Directive…………………………………………………………………. 11

TR030002-000434-ES Contents_index.pdf:4:4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT …………………… 125

TR030002-000434-ES Contents_index.pdf:4: 4.2 Environmental Impact Assessment guidance ………………………………………………………………. 125

TR030002-000434-ES Contents_index.pdf:4: 4.3 The Environmental Impact Assessment process ………………………………………………………….. 126

TR030002-000434-ES Contents_index.pdf:4: 4.4 Cumulative Impact Assessment …………………………………………………………………………………. 135

TR030002-000434-ES Contents_index.pdf:13:Section 4 Approach to the Environmental Impact Assessment

TR030002-000434-ES Contents_index.pdf:13:Table 4-3 Impact assessment matrix

TR030002-000434-ES Contents_index.pdf:15:Table 6-14 Impact assessment summary

TR030002-000434-ES Contents_index.pdf:22:Table 12-8 Traffic and transport significance impact assessment matrix

TR030002-000434-ES Contents_index.pdf:30:Table 21-4 Impact assessment matrix used with regard to recreation and access

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:3:Cumulative Impact Assessment

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:4:1 APPROACH TO THE CUMULATIVE IMPACT ASSESSMENT…………………………….. 2

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:4: 1.1 Requirement for Cumulative Impact Assessment …………………………………………………………….. 2

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:4: 1.2 Approach to Cumulative Impact Assessment ………………………………………………………………….. 2

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:8:Table 6.6 Traffic and transport significance impact assessment matrix

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:16:1 APPROACH TO THE CUMULATIVE IMPACT ASSESSMENT

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:16:1.1 Requirement for Cumulative Impact Assessment

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:16: impacts of proposed development(s) are assessed as part of an Environmental Impact Assessment

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:16:1.2 Approach to Cumulative Impact Assessment

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:16: this Cumulative Impact Assessment (CIA) based upon the following definitions:

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:17: consultation paper, Environmental Impact Assessment: A Guide to Good Procedures published in

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:79: worst case traffic generation to be established and inform the impact assessment. A worst case

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:86:6.2.2 The baseline environmental studies, surveys and impact assessment for transport have been

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:87: informed the traffic derivation for the impact assessment. Full details of the proposed embedded

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:96: Table 6-6 Traffic and transport significance impact assessment matrix

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:99: types) the impact assessment. All classified counts have been adjusted to provide the same input data

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:109:6.4.1 In line with the requirements of the codified EIA Directive (2011/92/EU), the impact assessment must

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:109: stakeholders. Equally, the impact assessment must be proportionate and balanced in all aspects and

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:110:6.4.4 Having established the baseline traffic flows periods on which to undertake the impact assessment, the

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:110: facilitate a more detailed and proportionate impact assessment. The starting point in this process is to

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:111:6.4.10 The impact assessment considers the critical periods for a weekday, Saturday and Sunday scenario.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:130: require further impact assessment.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:131: GEART screening thresholds and are not, therefore, considered further in the impact assessment.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:145: considered further in the impact assessment.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:145: increases in magnitude of effect and are therefore further impact assessment is undertaken.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:145: Safety and Driver Delay assessment undertaken for the weekday impact assessment represents worst

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:151:6.5.70 The Highway Safety and Driver Delay assessment undertaken for the weekday impact assessment

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:152: require further impact assessment.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:161: within the impact assessment for the Harbour facilities (ES Section 13 Air Quality) and similar

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:161: mitigation was also proposed as part of the MHF impact assessment. It is considered that with the

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:164:9.1.1 Potential effects relating to land quality (contamination) were scoped out of the impact assessment for

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:164: sites, with a very low likelihood of contamination. Land quality impact assessments were, however,

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:174: and Visual Impact Assessment (CLVIA).

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:199:17.2.8 Based on the assessed receptors and impact assessment matrix in Chapter 14 Noise and Vibration,

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:200:17.2.12 Using the assessed receptors and impact assessment matrix in Chapter 14 Noise and Vibration,

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:268: of the estuary (as discussed within the impact assessment below) where suspended sediment

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:272: middle to lower reaches of the estuary (as discussed within the impact assessment below), where

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:273: Harbour facility and this provides site-specific baseline data for the impact assessment (ES Section 8).

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:282: cumulative impact assessment on commercial navigation that took account of each successive project),

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:286: Impact Assessment, IEMA.

TR030002-000507-Doc 6.6 Environmental Statement_CIA.pdf:286: Landscape Institute & IEMA (2013). Guidelines for Landscape and Visual Impact Assessment. 3rd

TR030002-000495-Section 15 App 15.2 Northern Gateway Archaeological Appraisal.pdf:11:4.1.1 The scope of this environmental impact assessment meets the requirements of

TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:24: Environmental Impact Assessment, July 2013, Section 6.3.1). Further, it did

TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:24: Environmental Impact Assessment, July 2013, Section 6.3.2). More

TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:74: Environmental Impact Assessment’, AMEC, July 2013, Page 52), AMEC

TR030002-000575-Doc 7.3 Appendix 7 - Alternative Sites Assessment.pdf:74: a requirement for the Environmental Impact Assessment (EIA) to report on the

TR030002-000834-Document 4.2B - Explanatory Memorandum (Tracked).pdf:11: provisions of the Infrastructure Planning (Environmental Impact Assessment)

TR030002-000698-Natural England 1.pdf:2: 3.1 Environmental Impact Assessment ………………………………………………..10

TR030002-000698-Natural England 1.pdf:5: Infrastructure Planning (Environmental Impact Assessment)

TR030002-000698-Natural England 1.pdf:7:3.1. Environmental Impact Assessment

TR030002-000698-Natural England 1.pdf:7:3.1.1. The Infrastructure Planning (Environmental Impact Assessment)

TR030002-000698-Natural England 1.pdf:7:Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 1999..

TR030002-000698-Natural England 1.pdf:24: the Cumulative Impact Assessment (CIA) submitted for the wider

TR030002-000698-Natural England 1.pdf:35:Landscape and Visual Impact Assessment (LVIA) ES Chapter 20

TR030002-000698-Natural England 1.pdf:35:Material Transport system and the mine head itself. Please explain Therefore the Cumulative Impact Assessment (CIA) should deal with

TR030002-001873-Decision holding letter (5).pdf:5:Environmental Impact Assessment

TR030002-001873-Decision holding letter (5).pdf:6: findings of the traffic impact assessment on which the environmental impact

TR030002-000417-Doc 1.5 s55 Checklist.pdf:6: screening opinion in respect of the development to which Infrastructure Planning (Environmental Impact Assessment)

TR030002-000417-Doc 1.5 s55 Checklist.pdf:6: Regulation 6 of the The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

TR030002-000417-Doc 1.5 s55 Checklist.pdf:10: Regulation 10 of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

TR030002-000417-Doc 1.5 s55 Checklist.pdf:13: Regulation 11 of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

TR030002-000417-Doc 1.5 s55 Checklist.pdf:16: Section 4 – Approach to the Environmental Impact Assessment

TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:21:− Impact Assessment w.r.t. Health, Safety and Environment Environmental Assessment Tool (FEAT). Participation in UN

TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:24:assessments and livelihood restoration frameworks to n Social impact assessment

TR030002-000879-Document 8 12 - Applicants responses to other parties submissions for deadline 6.pdf:24: n Environmental impact assessment

EIA_2017_00041-APPLICATION-FORM.pdf:2:Environmental impact assessment

EIA_2017_00041-APPLICATION-FORM.pdf:2:What is an Environmental Impact Assessment

EIA_2017_00041-APPLICATION-FORM.pdf:2:The purpose of an Environmental Impact Assessment (EIA) is to protect the environment

EIA_2017_00041-APPLICATION-FORM.pdf:2:environmental impact assessment before permission is granted. This applies to marine

EIA_2017_00041-APPLICATION-FORM.pdf:2:environmental impact assessment. This assessment must be undertaken before consent

EIA_2017_00041-APPLICATION-FORM.pdf:3:Environmental Impact Assessment (EIA) information

EIA_2017_00041-APPLICATION-FORM.pdf:5:Environmental Impact Assessment (EIA) and produced the NGCT Environmental

I&BPB6776R001F01_NGCT scoping document.pdf:4:HaskoningDHV carried out an Environmental Impact Assessment (EIA) and produced the NGCT

I&BPB6776R001F01_NGCT scoping document.pdf:9: Additional topics to consider (as a result of changes in legislation, including the Marine Works (Environmental Impact Assessment) (Amendment) Regulations 2017)

I&BPB6776R001F01_NGCT scoping document.pdf:13:2017 amendments to the Marine Works (Environmental Impact Assessment) Regulations

NGCT_Final_ES at KK with figs.pdf:3: 1.4.2 Town and Country Planning (Environmental Impact Assessment)

NGCT_Final_ES at KK with figs.pdf:3: 1.5 The impact assessment process 19

NGCT_Final_ES at KK with figs.pdf:3: 1.5.1 Environmental Impact Assessment 19

NGCT_Final_ES at KK with figs.pdf:22:EIA Environmental Impact Assessment

NGCT_Final_ES at KK with figs.pdf:33: Impact Assessment (EIA) process undertaken for the proposed NGCT and

NGCT_Final_ES at KK with figs.pdf:45: the baseline conditions and impact assessment for the proposed scheme, are

NGCT_Final_ES at KK with figs.pdf:46: Harbour works (Environmental Impact Assessment) Regulations 1999. This ES

NGCT_Final_ES at KK with figs.pdf:46:1.4.2 Town and Country Planning (Environmental Impact Assessment) (England and

NGCT_Final_ES at KK with figs.pdf:46: Town and Country Planning (Environmental Impact Assessment) (England and

NGCT_Final_ES at KK with figs.pdf:48:1.5 The impact assessment process

NGCT_Final_ES at KK with figs.pdf:48:1.5.1 Environmental Impact Assessment

NGCT_Final_ES at KK with figs.pdf:106: 3. For the purposes of impact assessment, the possible alternative of disposal of

NGCT_Final_ES at KK with figs.pdf:165: in the Town and Country Planning (Environmental Impact Assessments) Regulations

NGCT_Final_ES at KK with figs.pdf:165: 1999, an Environmental Impact Assessment will be required. This document has

NGCT_Final_ES at KK with figs.pdf:242: characteristics are also used to inform the impact assessment of chemical

NGCT_Final_ES at KK with figs.pdf:281: the impact assessment in the ES, if the mitigation measures stated above are

NGCT_Final_ES at KK with figs.pdf:376: 3. For the purposes of impact assessment, it is necessary to assume a worst case

NGCT_Final_ES at KK with figs.pdf:379: 1. The existing environment and impact assessment of the archaeology and

NGCT_Final_ES at KK with figs.pdf:421:Impact assessment

NGCT_Final_ES at KK with figs.pdf:541:facility. Environmental Impact Assessment.

I&BPB6776L001F01.pdf:1:carried out an Environmental Impact Assessment (EIA) and produced the NGCT Environmental

I&BPB6776L001F01.pdf:1:opinion under the Marine Works (Environmental Impact Assessment) Regulations 2007 (as

I&BPB6776L001F01.pdf:1:amended by the Marine Works (Environmental Impact Assessment) (Amendment)

I&BPB6776L001F01.pdf:2:Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended).

Decision Letter.pdf:1:The Marine Works (Environmental Impact Assessment) Regulations 2007, as

20171212 EIA Scoping Response Teesport Extension Final.pdf:1:Marine Works (Environmental Impact Assessment) Regulations

20171212 EIA Scoping Response Teesport Extension Final.pdf:2:3 Environmental Impact Assessment (EIA) …………………………………………………… 4

20171212 EIA Scoping Response Teesport Extension Final.pdf:4:3 Environmental Impact Assessment (EIA)

20171212 EIA Scoping Response Teesport Extension Final.pdf:4: The Marine Works (Environmental Impact Assessment) Regulations 2007 (as

20171212 EIA Scoping Response Teesport Extension Final.pdf:7: (Environmental Impact Assessment) Regulations.

MLA_2020_00079-APPLICATION-FORM.pdf:7:Environmental impact assessment

MLA_2020_00079-APPLICATION-FORM.pdf:9:discuss various technical aspects of the environmental impact assessment. Refer to

IBPB8270R001F01_EIA REPORT(2).pdf:1:Environmental Impact Assessment Report

IBPB8270R001F01_EIA REPORT(2).pdf:3:4.3 Environmental Impact Assessment Directive 35

IBPB8270R001F01_EIA REPORT(2).pdf:6:22.5 Implications on previously reported impact assessment 229

IBPB8270R001F01_EIA REPORT(2).pdf:6:27 CUMULATIVE IMPACT ASSESSMENT 251

IBPB8270R001F01_EIA REPORT(2).pdf:8:Environmental Impact Assessment (EIA) and produced the NGCT Environmental Statement (ES) in 2006

IBPB8270R001F01_EIA REPORT(2).pdf:9:Section 27 presents the findings of a cumulative impact assessment (CIA). Section 28 presents a summary

IBPB8270R001F01_EIA REPORT(2).pdf:39:The impact assessment predicted in Section 26 has been undertaken on a worst-case basis from an

IBPB8270R001F01_EIA REPORT(2).pdf:42:4.3 Environmental Impact Assessment Directive

IBPB8270R001F01_EIA REPORT(2).pdf:42:in this instance, The Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended)

IBPB8270R001F01_EIA REPORT(2).pdf:50:a description of the approach taken to the specific impact assessment for each environmental topic is

IBPB8270R001F01_EIA REPORT(2).pdf:53:Table 5.3 Impact assessment matrix

IBPB8270R001F01_EIA REPORT(2).pdf:54:5.1.6 Cumulative Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:55:There is no legislation that outlines how cumulative impact assessments (CIAs) should be undertaken.

IBPB8270R001F01_EIA REPORT(2).pdf:137:magnitude of low is therefore predicted. Using the impact assessment methodology presented in Section

IBPB8270R001F01_EIA REPORT(2).pdf:142:the impact assessment, using best practice, best available scientific understanding and relevant guidance

IBPB8270R001F01_EIA REPORT(2).pdf:142:Impact Assessment in the UK and Ireland (CIEEM, 2016)).

IBPB8270R001F01_EIA REPORT(2).pdf:142:The impact assessment on waterbirds and seabirds was then determined by following the process outlined

IBPB8270R001F01_EIA REPORT(2).pdf:144:The findings of the following sections have been used to inform the impact assessment:

IBPB8270R001F01_EIA REPORT(2).pdf:192:sensitivity has been used in this impact assessment. Based on the information presented above, the

IBPB8270R001F01_EIA REPORT(2).pdf:202:It is, therefore, concluded that the 2006 transport impact assessments and mitigation remain valid.

IBPB8270R001F01_EIA REPORT(2).pdf:203:The existing environment and impact assessment of the archaeology and cultural heritage resource has

IBPB8270R001F01_EIA REPORT(2).pdf:219:does not have a material bearing on the conclusions of the impact assessment for the operational phase

IBPB8270R001F01_EIA REPORT(2).pdf:228:the NPS for Ports has been used within this socio-economic impact assessment.

IBPB8270R001F01_EIA REPORT(2).pdf:236:22.5 Implications on previously reported impact assessment

IBPB8270R001F01_EIA REPORT(2).pdf:236:A summary of the socio-economic impact assessment presented in the 2006 ES in presented in Table 22.9.

IBPB8270R001F01_EIA REPORT(2).pdf:237:Schedule 3 of The Marine Works (Environmental Impact Assessment) (Amendment) Regulations 2017

IBPB8270R001F01_EIA REPORT(2).pdf:242:Schedule 3 of The Marine Works (Environmental Impact Assessment) (Amendment) Regulations 2017

IBPB8270R001F01_EIA REPORT(2).pdf:245:The Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended) require

IBPB8270R001F01_EIA REPORT(2).pdf:259:27 CUMULATIVE IMPACT ASSESSMENT

IBPB8270R001F01_EIA REPORT(2).pdf:259:(Environmental Impact Assessment) Regulations 2007 (as amended) require an assessment of its potential

IBPB8270R001F01_EIA REPORT(2).pdf:259:The IEMA ‘Guidelines for Environmental Impact Assessment’ (IEMA, 2004) define cumulative impacts as:

IBPB8270R001F01_EIA REPORT(2).pdf:276:During the York Potash Harbour Facilities CIA (which included a cumulative impact assessment on

IBPB8270R001F01_EIA REPORT(2).pdf:301:The York Potash Harbour Facilities ES presented the findings of a cumulative noise impact assessment of

IBPB8270R001F01_EIA REPORT(2).pdf:302:for consented schemes (i.e. the in-combination noise impact assessment undertaken for the NGCT, Sirius

IBPB8270R001F01_EIA REPORT(2).pdf:306:CIEEM, 2010. Guidelines for Ecological Impact Assessment in Britain and Ireland: Marine and Coastal

IBPB8270R001F01_EIA REPORT(2).pdf:306:CIEEM, 2016. Guidelines for Ecological Impact Assessment in the UK and Ireland – Terrestrial, Freshwater

IBPB8270R001F01_EIA REPORT(2).pdf:308:Subacoustech, 2014. York Potash Harbour Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:322: 5 Proposed scope of impact assessment

IBPB8270R001F01_EIA REPORT(2).pdf:323: impact assessment will represent the worst-case

IBPB8270R001F01_EIA REPORT(2).pdf:324: 5.10 Cumulative impact assessment (CIA)

IBPB8270R001F01_EIA REPORT(2).pdf:332: Environmental Impact Assessment (EIA) on the basis that the scheme

IBPB8270R001F01_EIA REPORT(2).pdf:430:Appendix 12 to the Environmental Impact Assessment (EIA) Report (Royal HaskoningDHV, 2019)) which

IBPB8270R001F01_EIA REPORT(2).pdf:454:EIA Environmental Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:460:(HRO) and planning permission in 2006. In support of these applications, an Environmental Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:504: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:506: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:508: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:509: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:510: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:511: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:512: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:513: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:514: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:515: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:516: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:517: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:517:impact assessment in Section 3.4, as the construction noise effect is temporary and, in particular

IBPB8270R001F01_EIA REPORT(2).pdf:518: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:519: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:520: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:521: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:522: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:523: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:524: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:525: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:526: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:527: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:528: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:529: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:530: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:531: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:532: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:533: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:534: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:535: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:536: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:537: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:538: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:539: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:540: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:541: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:542: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:543: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:544: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:545: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:546: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:547: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:548: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:549: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:549: Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:567:1.2.2 The planning application was part of a wider Environmental Impact Assessment (EIA) which was

IBPB8270R001F01_EIA REPORT(2).pdf:568: • A review of the TA baseline conditions that informed the impact assessment conclusions for

IBPB8270R001F01_EIA REPORT(2).pdf:577: for the highway impact assessment.

IBPB8270R001F01_EIA REPORT(2).pdf:581: • A review of the TA baseline conditions that informed the impact assessment conclusions for

IBPB8270R001F01_EIA REPORT(2).pdf:582:6.2.3 It is, therefore, concluded that the 2006 transport impact assessments and mitigation remain

IBPB8270R001F01_EIA REPORT(2).pdf:590:5 Impact Assessment and Mitigation Summary 9

IBPB8270R001F01_EIA REPORT(2).pdf:595:The existing environment and impact assessment of the archaeology and cultural heritage resource for

IBPB8270R001F01_EIA REPORT(2).pdf:600:5 Impact Assessment and Mitigation Summary

IBPB8270R001F01_EIA REPORT(2).pdf:629:Full details of the required works can be found within Section 3 of the Environmental Impact Assessment

IBPB8270R001F01_EIA REPORT(2).pdf:652: Receptor Potential risk to receptor? Note the risk issue(s) for impact assessment

IBPB8270R001F01_EIA REPORT(2).pdf:653: Receptor Potential risk to receptor? Note the risk issue(s) for impact assessment

IBPB8270R001F01_EIA REPORT(2).pdf:661: Receptor Potential risk to receptor? Note the risk issue(s) for impact assessment

IBPB8270R001F01_EIA REPORT(2).pdf:661: Receptor Potential risk to receptor? Note the risk issue(s) for impact assessment

IBPB8270R001F01_EIA REPORT(2).pdf:661: Hydromorphology No Since no receptors were identified to be at risk during scoping, the impact assessment stage is not

IBPB8270R001F01_EIA REPORT(2).pdf:663: Receptor Potential risk to receptor? Note the risk issue(s) for impact assessment

IBPB8270R001F01_EIA REPORT(2).pdf:668: Receptor Potential risk to receptor? Note the risk issue(s) for impact assessment

IBPB8270R001F01_EIA REPORT(2).pdf:670: Receptor Potential risk to receptor? Note the risk issue(s) for impact assessment

20220302_EIA_Consent_Decision_Response MLA202000079.pdf:1:Environmental Impact Assessment

20220302_EIA_Consent_Decision_Response MLA202000079.pdf:1:Marine Works (Environmental Impact Assessment)

20220302_EIA_Consent_Decision_Response MLA202000079.pdf:2:3. Environmental Impact Assessment ……………………………………………………………… 5

20220302_EIA_Consent_Decision_Response MLA202000079.pdf:3:This document is the Environmental Impact Assessment (“EIA”) consent decision

20220302_EIA_Consent_Decision_Response MLA202000079.pdf:5:3. Environmental Impact Assessment

20220302_EIA_Consent_Decision_Response MLA202000079.pdf:5:The Marine Works (Environmental Impact Assessment) (Amendment) Regulations

LON_LIB1-#22563159-v1-Teesside_Gazette_6_May_2020.PDF:2: OAP requires an environmental impact assessment (“EIA”) consent and is

LON_LIB1-#22563159-v1-Teesside_Gazette_6_May_2020.PDF:2: mental Impact Assessment) Regulations 2007 (“the EIA Regulations”).

I&BPB8270MM001F0.1.pdf:2: 5 Proposed scope of impact assessment

I&BPB8270MM001F0.1.pdf:3: impact assessment will represent the worst-case

I&BPB8270MM001F0.1.pdf:4: 5.10 Cumulative impact assessment (CIA)

LON_LIB1-#22528705-v1-Teesside_Gazette_29_4_2020.PDF:2: requires an environmental impact assessment (“EIA”) consent and is

LON_LIB1-#22528705-v1-Teesside_Gazette_29_4_2020.PDF:2: Leather £30 fully fitted Gardens Cleared, Rotovated, Levelled, Turfed, no matter how bad! mental Impact Assessment) Regulations 2007 (“the EIA Regulations”).

MLA202000079 - Publicise EIA request.pdf:1:Impact Assessment and application, in a local newspaper with a wide circulation in the area

MLA202000079 - Publicise EIA request.pdf:2:THE MARINE WORKS (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2007

MLA202000079 - Publicise EIA request.pdf:2:environmental impact assessment (“EIA”) consent and is subject to the requirement for an

MLA202000079 - Publicise EIA request.pdf:2:EIA under the Marine Works (Environmental Impact Assessment) Regulations 2007 (“the

52555455.pdf:1: out an Environment Impact Assessment (EIA) under the below by 23/05/2022, after which

52553196.pdf:1: Environment Impact Assessment (EIA) under the Marine Works (EIA)

IBPB8270R001F01_EIA REPORT.pdf:1:Environmental Impact Assessment Report

IBPB8270R001F01_EIA REPORT.pdf:3:4.3 Environmental Impact Assessment Directive 35

IBPB8270R001F01_EIA REPORT.pdf:6:22.5 Implications on previously reported impact assessment 229

IBPB8270R001F01_EIA REPORT.pdf:6:27 CUMULATIVE IMPACT ASSESSMENT 251

IBPB8270R001F01_EIA REPORT.pdf:8:Environmental Impact Assessment (EIA) and produced the NGCT Environmental Statement (ES) in 2006

IBPB8270R001F01_EIA REPORT.pdf:9:Section 27 presents the findings of a cumulative impact assessment (CIA). Section 28 presents a summary

IBPB8270R001F01_EIA REPORT.pdf:39:The impact assessment predicted in Section 26 has been undertaken on a worst-case basis from an

IBPB8270R001F01_EIA REPORT.pdf:42:4.3 Environmental Impact Assessment Directive

IBPB8270R001F01_EIA REPORT.pdf:42:in this instance, The Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended)

IBPB8270R001F01_EIA REPORT.pdf:50:a description of the approach taken to the specific impact assessment for each environmental topic is

IBPB8270R001F01_EIA REPORT.pdf:53:Table 5.3 Impact assessment matrix

IBPB8270R001F01_EIA REPORT.pdf:54:5.1.6 Cumulative Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:55:There is no legislation that outlines how cumulative impact assessments (CIAs) should be undertaken.

IBPB8270R001F01_EIA REPORT.pdf:137:magnitude of low is therefore predicted. Using the impact assessment methodology presented in Section

IBPB8270R001F01_EIA REPORT.pdf:142:the impact assessment, using best practice, best available scientific understanding and relevant guidance

IBPB8270R001F01_EIA REPORT.pdf:142:Impact Assessment in the UK and Ireland (CIEEM, 2016)).

IBPB8270R001F01_EIA REPORT.pdf:142:The impact assessment on waterbirds and seabirds was then determined by following the process outlined

IBPB8270R001F01_EIA REPORT.pdf:144:The findings of the following sections have been used to inform the impact assessment:

IBPB8270R001F01_EIA REPORT.pdf:192:sensitivity has been used in this impact assessment. Based on the information presented above, the

IBPB8270R001F01_EIA REPORT.pdf:202:It is, therefore, concluded that the 2006 transport impact assessments and mitigation remain valid.

IBPB8270R001F01_EIA REPORT.pdf:203:The existing environment and impact assessment of the archaeology and cultural heritage resource has

IBPB8270R001F01_EIA REPORT.pdf:219:does not have a material bearing on the conclusions of the impact assessment for the operational phase

IBPB8270R001F01_EIA REPORT.pdf:228:the NPS for Ports has been used within this socio-economic impact assessment.

IBPB8270R001F01_EIA REPORT.pdf:236:22.5 Implications on previously reported impact assessment

IBPB8270R001F01_EIA REPORT.pdf:236:A summary of the socio-economic impact assessment presented in the 2006 ES in presented in Table 22.9.

IBPB8270R001F01_EIA REPORT.pdf:237:Schedule 3 of The Marine Works (Environmental Impact Assessment) (Amendment) Regulations 2017

IBPB8270R001F01_EIA REPORT.pdf:242:Schedule 3 of The Marine Works (Environmental Impact Assessment) (Amendment) Regulations 2017

IBPB8270R001F01_EIA REPORT.pdf:245:The Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended) require

IBPB8270R001F01_EIA REPORT.pdf:259:27 CUMULATIVE IMPACT ASSESSMENT

IBPB8270R001F01_EIA REPORT.pdf:259:(Environmental Impact Assessment) Regulations 2007 (as amended) require an assessment of its potential

IBPB8270R001F01_EIA REPORT.pdf:259:The IEMA ‘Guidelines for Environmental Impact Assessment’ (IEMA, 2004) define cumulative impacts as:

IBPB8270R001F01_EIA REPORT.pdf:276:During the York Potash Harbour Facilities CIA (which included a cumulative impact assessment on

IBPB8270R001F01_EIA REPORT.pdf:301:The York Potash Harbour Facilities ES presented the findings of a cumulative noise impact assessment of

IBPB8270R001F01_EIA REPORT.pdf:302:for consented schemes (i.e. the in-combination noise impact assessment undertaken for the NGCT, Sirius

IBPB8270R001F01_EIA REPORT.pdf:306:CIEEM, 2010. Guidelines for Ecological Impact Assessment in Britain and Ireland: Marine and Coastal

IBPB8270R001F01_EIA REPORT.pdf:306:CIEEM, 2016. Guidelines for Ecological Impact Assessment in the UK and Ireland – Terrestrial, Freshwater

IBPB8270R001F01_EIA REPORT.pdf:308:Subacoustech, 2014. York Potash Harbour Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:322: 5 Proposed scope of impact assessment

IBPB8270R001F01_EIA REPORT.pdf:323: impact assessment will represent the worst-case

IBPB8270R001F01_EIA REPORT.pdf:324: 5.10 Cumulative impact assessment (CIA)

IBPB8270R001F01_EIA REPORT.pdf:332: Environmental Impact Assessment (EIA) on the basis that the scheme

IBPB8270R001F01_EIA REPORT.pdf:430:Appendix 12 to the Environmental Impact Assessment (EIA) Report (Royal HaskoningDHV, 2019)) which

IBPB8270R001F01_EIA REPORT.pdf:454:EIA Environmental Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:460:(HRO) and planning permission in 2006. In support of these applications, an Environmental Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:504: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:506: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:508: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:509: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:510: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:511: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:512: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:513: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:514: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:515: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:516: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:517: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:517:impact assessment in Section 3.4, as the construction noise effect is temporary and, in particular

IBPB8270R001F01_EIA REPORT.pdf:518: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:519: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:520: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:521: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:522: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:523: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:524: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:525: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:526: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:527: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:528: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:529: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:530: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:531: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:532: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:533: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:534: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:535: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:536: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:537: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:538: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:539: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:540: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:541: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:542: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:543: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:544: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:545: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:546: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:547: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:548: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:549: York Potash Project Harbour Facilities: Underwater Noise Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:549: Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:567:1.2.2 The planning application was part of a wider Environmental Impact Assessment (EIA) which was

IBPB8270R001F01_EIA REPORT.pdf:568: • A review of the TA baseline conditions that informed the impact assessment conclusions for

IBPB8270R001F01_EIA REPORT.pdf:577: for the highway impact assessment.

IBPB8270R001F01_EIA REPORT.pdf:581: • A review of the TA baseline conditions that informed the impact assessment conclusions for

IBPB8270R001F01_EIA REPORT.pdf:582:6.2.3 It is, therefore, concluded that the 2006 transport impact assessments and mitigation remain

IBPB8270R001F01_EIA REPORT.pdf:590:5 Impact Assessment and Mitigation Summary 9

IBPB8270R001F01_EIA REPORT.pdf:595:The existing environment and impact assessment of the archaeology and cultural heritage resource for

IBPB8270R001F01_EIA REPORT.pdf:600:5 Impact Assessment and Mitigation Summary

IBPB8270R001F01_EIA REPORT.pdf:629:Full details of the required works can be found within Section 3 of the Environmental Impact Assessment

IBPB8270R001F01_EIA REPORT.pdf:652: Receptor Potential risk to receptor? Note the risk issue(s) for impact assessment

IBPB8270R001F01_EIA REPORT.pdf:653: Receptor Potential risk to receptor? Note the risk issue(s) for impact assessment

IBPB8270R001F01_EIA REPORT.pdf:661: Receptor Potential risk to receptor? Note the risk issue(s) for impact assessment

IBPB8270R001F01_EIA REPORT.pdf:661: Receptor Potential risk to receptor? Note the risk issue(s) for impact assessment

IBPB8270R001F01_EIA REPORT.pdf:661: Hydromorphology No Since no receptors were identified to be at risk during scoping, the impact assessment stage is not

IBPB8270R001F01_EIA REPORT.pdf:663: Receptor Potential risk to receptor? Note the risk issue(s) for impact assessment

IBPB8270R001F01_EIA REPORT.pdf:668: Receptor Potential risk to receptor? Note the risk issue(s) for impact assessment

IBPB8270R001F01_EIA REPORT.pdf:670: Receptor Potential risk to receptor? Note the risk issue(s) for impact assessment

MLA202000079 - Screening by agreement letter.pdf:1:THE MARINE WORKS (ENVIRONMENTAL IMPACT ASSESSMENT)

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:4:9 CUMULATIVE IMPACT ASSESSMENT 13

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:5:Environmental Impact Assessment (EIA) and produced the NGCT Environmental Statement (ES) in 2006

PB8270-RHD-ZZ-XX-RP-Z-0002.pdf:17:9 CUMULATIVE IMPACT ASSESSMENT

Licence Document (Marine).pdf:8: for the purpose of the Environmental Impact Assessment

Schedule 7 - Archaeological WSI.pdf:3:5 Impact Assessment and Mitigation Summary 9

Schedule 7 - Archaeological WSI.pdf:8:The existing environment and impact assessment of the archaeology and cultural heritage resource for

Schedule 7 - Archaeological WSI.pdf:13:5 Impact Assessment and Mitigation Summary

Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf:1:Environmental Impact Assessment

Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf:1:Marine Works (Environmental Impact Assessment)

Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf:2:3. Environmental Impact Assessment ……………………………………………………………… 5

Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf:3:This document is the Environmental Impact Assessment (“EIA”) consent decision

Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf:5:3. Environmental Impact Assessment

Schedule 8_ 20220302_EIA_Consent_Decision_Response MLA202000079.pdf:5:The Marine Works (Environmental Impact Assessment) (Amendment) Regulations

MLA_2021_00215-APPLICATION-FORM.pdf:3:Environmental Impact Assessment (EIA) Screening Request was submitted to the Marine

MLA_2021_00215-APPLICATION-FORM.pdf:3:Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended)

MLA_2021_00215-APPLICATION-FORM.pdf:4:Impact Assessment) Regulations 2017 (as amended).

MLA_2021_00215-APPLICATION-FORM.pdf:7:Environmental impact assessment

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:3:1.3 Environmental Impact Assessment Screening 7

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:6:EIA Environmental Impact Assessment

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:8:1.3 Environmental Impact Assessment Screening

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:8:Environmental Impact Assessment (EIA) Screening Requests were submitted to the Marine Management

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:8:accordance with the Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended) 1

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:8:and the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended),

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:8: As amended by The Marine Works (Environmental Impact Assessment) (Amendment) Regulations 2017).

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:20:3.1.1 Marine Works (Environmental Impact Assessment) Regulations (as

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:20:under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended)

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:20:by RCBC (Appendix A) and from under the Marine Works (Environmental Impact Assessment) Regulations

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:51:TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT)

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:51:It is considered that an Environmental Impact Assessment is not required for the following

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:57:Marine Works (Environmental Impact Assessment) Regulations

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:57:Marine Works (Environmental Impact Assessment) Regulations 2007 (“the

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:57:3. Environmental Impact Assessment (EIA) ……………………………………………………… 3

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:59:3. Environmental Impact Assessment (EIA)

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:59:The Marine Works (Environmental Impact Assessment) Regulations 2007 (“the

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:59:an Environmental Impact Assessment is required in relation to the proposed works, if

MLA_2021_00215-PB5051-RHD-106-ZZ-RP-Z-0021 Tees Dock Ro-Ro 2 Environmental Report_Final-1.pdf:61:screened out of requiring an Environmental Impact Assessment under the

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:3:1.3 Environmental Impact Assessment Screening 7

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:6:EIA Environmental Impact Assessment

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:8:1.3 Environmental Impact Assessment Screening

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:8:Environmental Impact Assessment (EIA) Screening Requests were submitted to the Marine Management

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:8:accordance with the Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended) 1

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:8:and the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended),

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:8: As amended by The Marine Works (Environmental Impact Assessment) (Amendment) Regulations 2017).

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:20:3.1.1 Marine Works (Environmental Impact Assessment) Regulations (as

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:20:under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended)

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:20:by RCBC (Appendix A) and from under the Marine Works (Environmental Impact Assessment) Regulations

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:51:TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT)

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:51:It is considered that an Environmental Impact Assessment is not required for the following

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:57:Marine Works (Environmental Impact Assessment) Regulations

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:57:Marine Works (Environmental Impact Assessment) Regulations 2007 (“the

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:57:3. Environmental Impact Assessment (EIA) ……………………………………………………… 3

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:59:3. Environmental Impact Assessment (EIA)

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:59:The Marine Works (Environmental Impact Assessment) Regulations 2007 (“the

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:59:an Environmental Impact Assessment is required in relation to the proposed works, if

MLA_2021_00215-Tees Dock Ro-Ro 2 Environmental Report-13.pdf:61:screened out of requiring an Environmental Impact Assessment under the

MLA_2015_00334-APPLICATION-FORM.pdf:5:Environmental impact assessment

Appendix 16.1a - DNV Report Rev1 2004.pdf:2: Environmental impact assessment

Appendix 16.1a - DNV Report Rev1 2004.pdf:6:in the modelling area. DNV’s work is a part of a larger Environmental Impact Assessment (EIA)

3 EIS Appendices (3).pdf:79:Appendix 2 EnvironmentalImpact Assessment To be suppliedseparatelyby

3 EIS Appendices (3).pdf:117: Environmental impact assessment

3 EIS Appendices (3).pdf:121:in the modelling area. DNV’s work is a part of a larger Environmental Impact Assessment (EIA)

Appendix 16.1b - DNV Addendum Report 2005.pdf:2:part of an Environmental Impact Assessment carried out by other consultants.

Appendix 16.1b - DNV Addendum Report 2005.pdf:4:Environmental Impact Assessment and was reported upon in the DNV Report 2004-1387

Appendix 16.1b - DNV Addendum Report 2005.pdf:20:develop the output for the environmental statement or impact assessment, without a full

1911South-Tees-Master-Plan-Nov-19.2.pdf:6:and impact assessment processes. The South Tees Area SPD was prepared in line with the adopted Redcar and Cleveland Local Plan (also adopted May

1911South-Tees-Master-Plan-Nov-19.2.pdf:6:and statutory impact assessment processes including Strategic Environmental Assessment (SEA) and Habitats Regulations Assessment (HRA) have been

1911South-Tees-Master-Plan-Nov-19.2.pdf:24:linked and statutory impact assessment processes determination process, will ensure the protection and SSSI and SPA. These designations protect the for industrial development of this coastal strip.

1911South-Tees-Master-Plan-Nov-19.2.pdf:56:a substantive impediment to continued or new industrial Given that the SPA, borders the northern and eastern place as part of the Ecological Impact Assessment (EcIA).

1911South-Tees-Master-Plan-Nov-19.2.pdf:56:be assessed through Ecological Impact Assessments England. There are no records from within the site

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1141-MLA.2020.00506.2 SBQ MLV2 FIR 19 Response.pdf:2: 1. MMO require an impact assessment regarding fish / fishery impacts from increased disposal.

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1141-MLA.2020.00506.2 SBQ MLV2 FIR 19 Response.pdf:3:(both within the original Environmental Impact Assessment (EIA) Report submitted in support of the

PC1084-RHD-SB-EN-NT-EV-1127 MLA.2020.00506.R8 Response to Consultation Comments on Scheme of Monitoring.pdf:6: modelling that was undertaken as part of the Environmental Impact Assessment

20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf:1:MARINE WORKS (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2007 (AS

20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf:1: phase may vary, and the Environmental Impact Assessment is conducted assuming that the

20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf:3:21. The ES indicates that (coastal process) effects and impact assessment is carried out by ‘Expert

20210119 MLA202000506 Tees South Bank Quay CP advice + JPQC.pdf:5:29. A ‘standard’ discussion of cumulative impact assessment (CIA) is provided i.e., indicating that

PC1084-RHD-SB-EN-NT-EV-1127 MLA.2020.00506.R8 Response to Consultation Comments on Scheme of Monitoring.pdf:6: modelling that was undertaken as part of the Environmental Impact Assessment

MLA 2020 00506 South Bank Phase 1 MLA 2020 00507 Phase 2.pdf:1:has been subject to an Environmental Impact Assessment which included assessment of the

PC1084-RHD-SB-EN-NT-EV-1124 Updated Scheme of Monitoring - May 2022.pdf:1:The Environmental Impact Assessment (EIA) Report (Royal HaskoningDHV, 2020) predicted that during

20210121 MLA202000506 Tees South Bank Quay Phase I Benthic ecology + JPQC.pdf:1:9. The above cited reports represent the Environmental Impact Assessment (EIA) and associated

20210121 MLA202000506 Tees South Bank Quay Phase I Benthic ecology + JPQC.pdf:3:20. Yes, the EIA clearly sets out the impact assessment methodology: it uses a well-established

MLA202000506 & MLA202000507 Tees South Bank Quay Phases 1&2 UWN advice + JPQC.pdf:1:MARINE WORKS (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS (AMENDED)

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:1:1. With reference to the above request to review the Environmental Impact Assessment report for the

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:3: Barrage fish counter, information collated and compiled from previous impact assessments for

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:5: cumulative impact assessment (Section 27.5.9) along with the Anglo-American Harbour facilities

20210115 MLA202000506 South Bank Quay-phase 1 - Fisheries advice MG GE + JPQC.pdf:11: and impact assessment for fish and fish ecology, which is standard practice for an application of

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:2:The Environmental Impact Assessment (EIA) Report (Royal HaskoningDHV, 2020) predicted that during

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:4:The Cumulative Impact Assessment (CIA) of the EIA report then considers the potential cumulative effects

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:11: 6. Royal HaskoningDHV (2020) South Bank Quay Environmental Impact Assessment (EIA) Report

20220518 MLA202000506 L2021003331Tees South Bank (phase 1) Monitoring Plan Fisheries advice FINAL.pdf:3: the Environmental Impact Assessment (EIA) (see Figure 1)

20210201 MLA202000506 MLA202000507 Tees South Bank Phases 1 and 2 - EIA Licence Advice Minute - SEAL Advice v2+SJB.pdf:4: assessment. The NGCT was taken forward for cumulative impact assessment (CIA) and this

20210201 MLA202000506 MLA202000507 Tees South Bank Phases 1 and 2 - EIA Licence Advice Minute - SEAL Advice v2+SJB.pdf:5: impact assessment.

20210201 MLA202000506 MLA202000507 Tees South Bank Phases 1 and 2 - EIA Licence Advice Minute - SEAL Advice v2+SJB.pdf:6: Quay, and recommend that the applicant provides a more detailed impact assessment

20210603 MLA2020005067 Tees South Bank Quay Supplementary Report Review Fisheries advice MG GE + JP.pdf:1:6. The fisheries assessment presented in the Environmental Impact Assessment (EIA) report was

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:3:4.4 Environmental Impact Assessment Directive 28

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:7:27 CUMULATIVE IMPACT ASSESSMENT 482

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:8:13 Landscape and visual impact assessment methodology

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:8:14 Landscape and visual impact assessment figures

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:9:Environmental Impact Assessment (EIA) in support of a marine licence application to the Marine

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:9:The study area is shown on Figure 1.2. Landscape and visual impact assessment has been detailed

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:9: impact assessment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:36:4.4 Environmental Impact Assessment Directive

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:36:in this instance, The Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended)

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:36:and the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 are applicable

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:36:required under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017, as

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:43:(Environmental Impact Assessment) Regulations 2007, as amended. In addition, RCBC issued a Scoping

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:43:(Environmental Impact Assessment) Regulations 2007, as amended, and the Town and Country Planning

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:43:(Environmental Impact Assessment) Regulations 2017, without submitting a formal EIA Screening Request.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:45:a description of the approach taken to the specific impact assessment for each environmental topic is

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:48:Table 5.3 Impact assessment matrix

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:49:5.1.6 Cumulative Impact Assessment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:50:There is no legislation that outlines how cumulative impact assessments (CIAs) should be undertaken.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:60:6.3.6 Impact assessment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:192: therefore the impact assessment presented within

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:209:‘medium’ has been assigned for the purposes of this impact assessment, taking in to account the fragmented

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:210:As such, the impact assessment presented within this section focuses on the potential impacts to marine

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:220:To inform the impact assessment of works during the proposed scheme for marine mammal species,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:220:In addition to the methodology for the impact assessment outlined in Section 5, the magnitude of effect on

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:230:Table 10.5 Reference populations and density estimates to inform the impact assessment for marine

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:231:The underwater noise impact assessments for marine mammal species for the proposed scheme has been

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:245:The ecological impact assessment presented below has been based upon the following guidance and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:246: for Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater and Coastal;

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:246:To inform this Ecological Impact Assessment (EcIA), Tees Valley Combined Authority has undertaken

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:270:the baseline environment on which the impact assessment can be based.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:279:follows a matrix approach to inform the impact assessment, using best practice, best available scientific

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:279:understanding and relevant guidance (e.g. CIEEM Guidelines for Ecological Impact Assessment in the UK

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:291:across the full winter period, the assumption made for the purposes of impact assessment is that North Tees

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:295:sources in the Tees estuary, receptors included in the following impact assessments are as follows:

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:329:While the loss of such habitat is considered to be insignificant (in terms of impact assessment) for the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:342: and Visual Impact Assessment’ to determine the likely impact of the Section 19

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:346:16.3.3 Impact assessment methodology

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:346:The general method for impact assessment is set out in Section 5. The specific approach to the assessment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:346:The impact assessment defines heritage assets, and their settings, likely to be impacted by the proposed

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:346:Specifically, therefore, the impact assessment will present:

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:365:England. Noise Sensitive Receptor (NSR) locations and the methodology for the impact assessment were

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:370:17.3.4 Impact assessment methodology

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:373:Table 17.10 Construction road traffic noise impact assessment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:375:Table 17.13 On-site construction phase noise impact assessment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:377:Table 17.15 Operational phase noise impact assessment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:394:considered as not significant. A detailed impact assessment of road traffic exhaust emissions was

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:397:This section of the EIA Report presents the findings of a Landscape and Visual Impact Assessment (LVIA)

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:400:Institute in the third edition of its ‘Guidelines for Landscape and Visual Impact Assessment’ (GLVIA3, 2013).

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:465:22.3.5 Impact assessment methodology

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:474:Schedule 3 of The Marine Works (Environmental Impact Assessment) (Amendment) Regulations 2017

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:474:Country Planning (Environmental Impact Assessment) Regulations 2017.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:476:The Marine Works (Environmental Impact Assessment) (Amendments) Regulations 2017 and the Town and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:476:Country Planning (Environmental Impact Assessment) 2017 brought in a requirement to consider the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:476:document (Appendix 2), this health impact assessment is therefore a concise assessment which relies on

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:476:undertake a full human health impact assessment.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:490:27 CUMULATIVE IMPACT ASSESSMENT

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:490:Works (Environmental Impact Assessment) Regulations 2007 (as amended) and the Town and Country

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:490:Planning (Environmental Impact Assessment) Regulations 2017 require an assessment of its potential

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:490:The IEMA ‘Guidelines for Environmental Impact Assessment’ (IEMA, 2004) define cumulative impacts as:

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:491:this report and summarised in Table 1.1). Landscape and visual impact assessment has been detailed

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:511:Of the proposed projects which have been screened into the cumulative impact assessment, all have

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:516:from the projects and plans screened in for cumulative impact assessment will not, therefore, also occur

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:583:cumulative noise impact assessment of the NGCT, Dogger Bank Teesside A & Sofia project and the Harbour

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:589:for Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater, Coastal and Marine.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-10.pdf:598:Royal HaskoningDHV (2018). Hartlepool Approach Channel: Environmental Impact Assessment Report.

MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-34.pdf:15:A cumulative impact assessment (CIA) is presented in Section 27 of the EIA Report. Section 27.5.2

MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-34.pdf:17:the impact assessment updated where required within a supplementary report, and it is assumed the MMO

MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-25.pdf:15:A cumulative impact assessment (CIA) is presented in Section 27 of the EIA Report. Section 27.5.2

MLA_2020_00506-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-25.pdf:17:the impact assessment updated where required within a supplementary report, and it is assumed the MMO

PC1084-RHD-SB-EN-NT-EV-1124 Updated Scheme of Monitoring - May 2022.pdf:1:The Environmental Impact Assessment (EIA) Report (Royal HaskoningDHV, 2020) predicted that during

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-0001 Technical Note - Hydrodynamic and Sediment Plume Modelling_Final-49.pdf:5:numerical modelling exercise to inform the Environmental Impact Assessment (EIA) that was prepared as

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:2: volume to be disposed (in this application/phase only) is within the range modelled in the ES and so the previous impact assessment (of

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:3:original environmental impact assessment (EIA) for the South Bank Quay project (as described in document 11, Section 26.3.1 and Section

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:3:relevant impact assessment documentation associated with the Tees Bay C disposal site, in order to determine whether the increased

MLA_2020_00506-MLA_2020_00506_2_RFI 19_Cefas Comments_MMO requested updates.pdf:7: 1. MMO require an impact assessment regarding fish / fishery impacts from increased disposal.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:5:to Environmental Impact Assessment (EIA) under the Marine Works (Environmental Impact Assessment)

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:5:Regulations 2007 (as amended) and the Town and Country Planning (Environmental Impact Assessment)

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:5:presented within this supplementary report, along with additional impact assessment where this is

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:24:the results presented in the EIA report, which the impact assessment was based on, remain valid.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:24:update of the impact assessment in relation to these is presented in the sections below.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:47:The survey results have been reviewed and the impact assessment updated where required within this

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:47:of the previously reported impact assessment. The only additional mitigation measure required following

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-16.pdf:329: Environmental Impact Assessment. Chapter 8 Marine Ecology.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:3:4.4 Environmental Impact Assessment Directive 28

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:7:27 CUMULATIVE IMPACT ASSESSMENT 482

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:8:13 Landscape and visual impact assessment methodology

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:8:14 Landscape and visual impact assessment figures

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:9:Environmental Impact Assessment (EIA) in support of a marine licence application to the Marine

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:9:The study area is shown on Figure 1.2. Landscape and visual impact assessment has been detailed

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:9: impact assessment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:36:4.4 Environmental Impact Assessment Directive

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:36:in this instance, The Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended)

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:36:and the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 are applicable

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:36:required under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017, as

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:43:(Environmental Impact Assessment) Regulations 2007, as amended. In addition, RCBC issued a Scoping

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:43:(Environmental Impact Assessment) Regulations 2007, as amended, and the Town and Country Planning

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:43:(Environmental Impact Assessment) Regulations 2017, without submitting a formal EIA Screening Request.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:45:a description of the approach taken to the specific impact assessment for each environmental topic is

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:48:Table 5.3 Impact assessment matrix

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:49:5.1.6 Cumulative Impact Assessment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:50:There is no legislation that outlines how cumulative impact assessments (CIAs) should be undertaken.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:60:6.3.6 Impact assessment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:192: therefore the impact assessment presented within

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:209:‘medium’ has been assigned for the purposes of this impact assessment, taking in to account the fragmented

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:210:As such, the impact assessment presented within this section focuses on the potential impacts to marine

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:220:To inform the impact assessment of works during the proposed scheme for marine mammal species,

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:220:In addition to the methodology for the impact assessment outlined in Section 5, the magnitude of effect on

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:230:Table 10.5 Reference populations and density estimates to inform the impact assessment for marine

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:231:The underwater noise impact assessments for marine mammal species for the proposed scheme has been

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:245:The ecological impact assessment presented below has been based upon the following guidance and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:246: for Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater and Coastal;

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:246:To inform this Ecological Impact Assessment (EcIA), Tees Valley Combined Authority has undertaken

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:270:the baseline environment on which the impact assessment can be based.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:279:follows a matrix approach to inform the impact assessment, using best practice, best available scientific

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:279:understanding and relevant guidance (e.g. CIEEM Guidelines for Ecological Impact Assessment in the UK

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:291:across the full winter period, the assumption made for the purposes of impact assessment is that North Tees

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:295:sources in the Tees estuary, receptors included in the following impact assessments are as follows:

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:329:While the loss of such habitat is considered to be insignificant (in terms of impact assessment) for the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:342: and Visual Impact Assessment’ to determine the likely impact of the Section 19

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:346:16.3.3 Impact assessment methodology

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:346:The general method for impact assessment is set out in Section 5. The specific approach to the assessment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:346:The impact assessment defines heritage assets, and their settings, likely to be impacted by the proposed

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:346:Specifically, therefore, the impact assessment will present:

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:365:England. Noise Sensitive Receptor (NSR) locations and the methodology for the impact assessment were

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:370:17.3.4 Impact assessment methodology

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:373:Table 17.10 Construction road traffic noise impact assessment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:375:Table 17.13 On-site construction phase noise impact assessment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:377:Table 17.15 Operational phase noise impact assessment

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:394:considered as not significant. A detailed impact assessment of road traffic exhaust emissions was

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:397:This section of the EIA Report presents the findings of a Landscape and Visual Impact Assessment (LVIA)

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:400:Institute in the third edition of its ‘Guidelines for Landscape and Visual Impact Assessment’ (GLVIA3, 2013).

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:465:22.3.5 Impact assessment methodology

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:474:Schedule 3 of The Marine Works (Environmental Impact Assessment) (Amendment) Regulations 2017

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:474:Country Planning (Environmental Impact Assessment) Regulations 2017.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:476:The Marine Works (Environmental Impact Assessment) (Amendments) Regulations 2017 and the Town and

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:476:Country Planning (Environmental Impact Assessment) 2017 brought in a requirement to consider the

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:476:document (Appendix 2), this health impact assessment is therefore a concise assessment which relies on

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:476:undertake a full human health impact assessment.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:490:27 CUMULATIVE IMPACT ASSESSMENT

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:490:Works (Environmental Impact Assessment) Regulations 2007 (as amended) and the Town and Country

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:490:Planning (Environmental Impact Assessment) Regulations 2017 require an assessment of its potential

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:490:The IEMA ‘Guidelines for Environmental Impact Assessment’ (IEMA, 2004) define cumulative impacts as:

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:491:this report and summarised in Table 1.1). Landscape and visual impact assessment has been detailed

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:511:Of the proposed projects which have been screened into the cumulative impact assessment, all have

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:516:from the projects and plans screened in for cumulative impact assessment will not, therefore, also occur

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:583:cumulative noise impact assessment of the NGCT, Dogger Bank Teesside A & Sofia project and the Harbour

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:589:for Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater, Coastal and Marine.

MLA_2020_00506-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:598:Royal HaskoningDHV (2018). Hartlepool Approach Channel: Environmental Impact Assessment Report.

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:3:The application for the original marine licence was supported by an Environmental Impact Assessment

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:25:Marine Works (Environmental Impact Assessment) Regulations

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:25:3. Environmental Impact Assessment (EIA) ……………………………………………………… 4

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:28:3. Environmental Impact Assessment (EIA)

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:28:The Marine Works (Environmental Impact Assessment) Regulations 2007 (“the

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:28:an Environmental Impact Assessment is required in relation to the proposed works, if

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:29:screened out of requiring an Environmental Impact Assessment under the

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1142-MLA.2020.00506.2 South Bank Quay MLV2 Appraisal of Environmental Effects.pdf:35:numerical modelling exercise to inform the Environmental Impact Assessment (EIA) that was prepared as

MLA_2020_00506-PC1084-RHD-SB-EN-NT-EV-1137-MLA.2020.00506.2 South Bank Quay Marine Licence Variation 2 RFI 17-66.pdf:3:the Environment Impact Assessment (EIA) Report (Royal HaskoningDHV, 2020) that in turn supported the

PC1084-RHD-SB-EN-RP-EV-1123 Written Scheme of Investigation.pdf:4:The MLAs were supported by an Environmental Impact Assessment (EIA) (Royal HaskoningDHV, 2020)

PC1084-RHD-SB-EN-RP-EV-1123 Written Scheme of Investigation.pdf:7:as set out in the Landscape and Visual Impact Assessment undertaken for the EIA Report (Royal

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:2:The Environmental Impact Assessment (EIA) Report (Royal HaskoningDHV, 2020) predicted that during

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:4:The Cumulative Impact Assessment (CIA) of the EIA report then considers the potential cumulative effects

PC1084-RHD-SB-XX-NT-Z-0001-South Bank SSC monitoring plan V3.pdf:11: 6. Royal HaskoningDHV (2020) South Bank Quay Environmental Impact Assessment (EIA) Report

MLA_2020_00506-APPLICATION-FORM.pdf:2:environments and requires Environmental Impact Assessment (EIA) in support of a

MLA_2020_00506-APPLICATION-FORM.pdf:7:Environmental impact assessment

MLA_2020_00506-APPLICATION-FORM.pdf:21:inform the impact assessment. Sediment quality data from the proposed dredge

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:4:8 CUMULATIVE IMPACT ASSESSMENT 16

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:5:The proposed scheme has been subject to an Environmental Impact Assessment (EIA) which has assessed

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:18:The landscape and visual impact assessment (LVIA) establishes that operational effects of the proposed

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:20:8 CUMULATIVE IMPACT ASSESSMENT

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:5:to as the proposed scheme). This report accompanies the Environmental Impact Assessment (EIA) in

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:51:Subject: South Bank port facility – Environmental Impact Assessment scoping review

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:51:Environmental Impact Assessment (EIA) in support of a marine licence application to the Marine

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:52:Marine Works (Environmental Impact Assessment) Regulations 2007 as amended, and the Town and

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:52:Country Planning (Environmental Impact Assessment) Regulations 2017 respectively. This document has

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:54: • Landscape and visual impact assessment.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:57: Views of the Grade II* Transporter Bridge should be assessed in the ‘Landscape and Visual Impact Assessment’ to determine the likely impact of the

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:58: for disposal to sea (and to inform the impact assessment). Any material to be dredged and disposed of within licenced disposal areas at-sea must not

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:58: Regulation 4(4) of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 requires the assessment of significant effects

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:63:proposed quay Infrastructure, drawing from the findings of the landscape and visual impact assessment

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:63:construction and operational phases; outputs from the modelling will inform the impact assessment (for

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:64:A detailed cumulative impact assessment with the wider onshore development (or other planned or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:64:A Landscape and Visual Impact Assessment (LVIA) will be undertaken as part of the EIA. This will involve

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:64:Impact Assessment, 3rd edition.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:65: 4.20. Cumulative impact assessment

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:66:A cumulative impact assessment will be undertaken, taking into account any relevant consented - but as

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:75:Environmental Impact Assessment (EIA) for this development.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:77:associated with the site. Any Environmental Impact Assessment should include details of the

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:80: environments and will require Environmental Impact Assessment (EIA) in support of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:80: Town and Country Planning (Environmental Impact Assessment) Regulations 2017.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:81: Impact Assessment scoping review) on environmental assessment requirements in

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:81: Impact Assessment scoping review) on environmental assessment requirements in

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:139:modelling exercise to inform the Environmental Impact Assessment (EIA) that is being prepared as part of

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:143:area is of most interest in terms of the hydrodynamic outputs for the Environmental Impact Assessment.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:253: Impact Assessment (EIA) for Geology and Ground Conditions.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:120: Underwater Noise Impact Assessment – South Bank, Tees Estuary

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:121: Underwater Noise Impact Assessment – South Bank, Tees Estuary

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:122: Underwater Noise Impact Assessment – South Bank, Tees Estuary

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:122:impact assessment. As the measurement or receiver point moves away from the source, the sound

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:123: Underwater Noise Impact Assessment – South Bank, Tees Estuary

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:124: Underwater Noise Impact Assessment – South Bank, Tees Estuary

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:124:3 A Collett, T Mason (2014). York Potash Project Harbour Facilities: Underwater Noise Impact Assessment.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:125: Underwater Noise Impact Assessment – South Bank, Tees Estuary

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:126: Underwater Noise Impact Assessment – South Bank, Tees Estuary

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:127: Underwater Noise Impact Assessment – South Bank, Tees Estuary

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:128: Underwater Noise Impact Assessment – South Bank, Tees Estuary

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:129: Underwater Noise Impact Assessment – South Bank, Tees Estuary

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:129: Report title Underwater Noise Impact Assessment – South

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:135: Cumulative Impact Assessment …………………………………………………………………………… 41

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:137:Table 16: Cumulative Impact Assessment ……………………………………………………………………………….. 42

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:138: EIA Environmental Impact Assessment

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:141: Marine Works EIA (Environmental Impact Assessment) Regulations governing EIA’s for

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:179: CUMULATIVE IMPACT ASSESSMENT

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:179:The cumulative impact assessment was assessed to be a factor of the likelihood of the impact

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:179:The results of the cumulative impact assessment are given in Table 16. All impacts were assessed to

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:180:Table 16: Cumulative Impact Assessment

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:313:The purpose of the Landscape and Visual Impact Assessment (LVIA) is to identify the potential

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:313:LVIA is either carried out formally as part of the Environmental Impact Assessment (EIA) process or

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:313:▪ ‘Guidelines for Landscape and Visual Impact Assessment’ (GLVIA), Third Edition Landscape

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:350:The proposed scheme is defined in full within the Environmental Impact Assessment (EIA) Report (Royal

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:5:to Environmental Impact Assessment (EIA) under the Marine Works (Environmental Impact Assessment)

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:5:Regulations 2007 (as amended) and the Town and Country Planning (Environmental Impact Assessment)

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:5:presented within this supplementary report, along with additional impact assessment where this is

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:24:the results presented in the EIA report, which the impact assessment was based on, remain valid.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:24:update of the impact assessment in relation to these is presented in the sections below.

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:47:The survey results have been reviewed and the impact assessment updated where required within this

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:47:of the previously reported impact assessment. The only additional mitigation measure required following

MLA_2020_00506-PC1084-RHD-ZZ-XX-RP-Z-1115_South Bank Quay supplementary report-31.pdf:329: Environmental Impact Assessment. Chapter 8 Marine Ecology.

R-2021-0830-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:12: Arup Ecological Impact Assessment, 24 June 2020) within the site and / or off-site, and the

R-2021-0830-CD-63262 - Covering Letter - 29.09.21.pdf:1:Distinctiveness in Table 4 of the Arup Ecological Impact Assessment, 24 June 2020) within the site and / or

R-2021-0830-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:12: Arup Ecological Impact Assessment, 24 June 2020) within the site and / or off-site, and the

R-2021-0830-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:14: Arup Ecological Impact Assessment, 24 June 2020) within the site and / or off-site, and the

R-2022-0816-FFM-Teesworks Arboricortural Constraints Survey and Tree Protection Plan.pdf:1: Impact Assessment, Protection

R-2022-0816-FFM-Steel House PandR Cover Letter(1).pdf:6:An Ecological Impact Assessment is submitted with the application which assesses the impact on

R-2022-0816-FFM-Steel House PandR Cover Letter(1).pdf:8:An Ecological Impact Assessment prepared by INCA accompanies this planning application which

R-2022-0816-FFM-Steel House PandR Cover Letter(1).pdf:10:(Environmental Impact Assessment) Regulations 2017 (as amended) (hereafter ‘the EIA Regulations

R-2022-0816-FFM-Steel House PandR Cover Letter(1).pdf:10:• Ecological Impact Assessment (ref: INCA 2022-42), prepared by INCA;

R-2022-0816-FFM-INCA2022-42 EcIA Steel House Park and Ride.pdf:1: Ecological Impact Assessment

R-2022-0816-FFM-INCA2022-42 EcIA Steel House Park and Ride.pdf:3:Environmental Management (CIEEM) guidelines for Ecological Impact Assessment (EcIA) i.

R-2022-0816-FFM-INCA2022-42 EcIA Steel House Park and Ride.pdf:18:i. CIEEM (2016) Guidelines for Ecological Impact Assessment in the UK and Ireland:

R-2022-0515-CD-R 2020 0357 OOM Decision Notice.pdf:3: and the conclusions of the Environmental Impact Assessment that the

R-2021-0754-FFM-Officer Report 0754.pdf:9:Country Planning (Environmental Impact Assessment) Regulations 2017

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:8:C3.1 The Environmental Impact Assessment (EIA) has been carried out in accordance with the EIA

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:8: • Environmental Impact Assessment: A Guide to Procedures 9; and

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:8: • Guidelines for Environmental Impact Assessment 10.

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:29: EIA Environmental Impact Assessment

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:30: 1 Town and Country Planning (Environmental Impact Assessment) Regulations 2017

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:30: Impact Assessment: A Guide to Procedures.

R-2021-0754-FFM-South Industrial Zone Environmental Statement July 2020 Volume 2 Chapter C Transport.pdf:30: Environmental Impact Assessment

R-2021-0754-FFM-371465 Natural England Response Letter REF R.2021.0754.FF Land East of Dockside Road, South Bank.pdf:3:impacts of development are likely to be significant, a Landscape & Visual Impact Assessment should be

R-2021-0754-FFM-371465 Natural England Response Letter REF R.2021.0754.FF Land East of Dockside Road, South Bank.pdf:3:Guidelines for Landscape and Visual Impact Assessment for further guidance.

R-2021-0754-FFM-63455 01 LM Wind Access Road - Cover Letter 18.08.21.pdf:2:(Environmental Impact Assessment) Regulations 2017. The scheme falls within Paragraph 10F of Schedule 2

R-2021-0754-FFM-63455 01 LM Wind Access Road - Cover Letter 18.08.21.pdf:2:of The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 which relates to

R-2021-0754-FFM-63455 01 LM Wind Access Road - Cover Letter 18.08.21.pdf:3:Impact Assessment) Regulations 2017, we note that the Redcar and Cleveland Borough Council are required

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:4:4 Greystones Roundabout Impact Assessment 24

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:28:4 Greystones Roundabout Impact Assessment

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:28: A174, Greystones Impact Assessment Report produced by Integrated Traffic

R-2021-0754-FFM-South Industrial Zone Supplementary Environmental Statement September 2020 Volume 3 Technical Appendices Section 3 Transport.PDF:29:4.2.2 Greystones Impact Assessment Report, Integrated

Environmental Statement, Chapter G Water Management and Flooding Section 7 Residual effects.pdf:1: residual impact assessment has been carried out on the assumption that the above mitigation

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:5:This WFD assessment has three stages: screening, scoping and impact assessment.

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:6:Impact assessment – to describe how any

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:7:2.4 Impact Assessment 6

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:7:6 WFD Impact Assessment 34

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:7:6.2 Impact Assessment – TEES transitional water body 34

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:8:6.3 Impact Assessment – Area not within a WFD water body 40

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:8:6.4 Impact Assessment – Protected sites 47

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:14: through the scoping or impact assessment stages.

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:15:2.4 Impact Assessment

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:15: Screening and Scoping Assessments, is to undertake an Impact Assessment to

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:15: necessary mitigation measures. An impact assessment must be carried out for each

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:15: The Impact Assessment describes how any identified impacts from the proposed

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:43: 6 WFD Impact Assessment

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:43: potentially be at risk from the proposed works. An Impact Assessment is therefore

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:43: The Impact Assessment needs to consider if there is a pathway linking the pressure

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:43:6.2 Impact Assessment – TEES transitional water body

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:49:6.3 Impact Assessment – Area not within a WFD water body

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:56:6.4 Impact Assessment – Protected sites

CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:58: The impact assessment determines whether the proposed works outlined in Section

MLA_2022_00248-APPLICATION-FORM.pdf:6:Environmental impact assessment

R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF:8:  South Bank Site Remediation, Ecological Impact Assessment Revision A Final, dated May

R-2021-0422-CD-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.PDF:16:Appropriate Assessment Revision A Final INCA 2021 and Ecological Impact Assessment Revision A

R-2021-0422-CD-Decision Notice (1).pdf:3: and the conclusions of the Environmental Impact Assessment that the

R-2021-0610-PND-Officer Report 0610.pdf:2:Impact Assessment) Regulations 2017.

R-2022-0342-CD-R 2020 0357 OOM Decision Notice.pdf:3: and the conclusions of the Environmental Impact Assessment that the

R-2023-0246-RMM-TV_ERF_Shadow_HRA.pdf:10: Environmental Impact Assessment Statement of Conformity (EIA SoC).

R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:5: impact assessment (EcIA).

R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:9: Ecological Appraisal, with elements of 2019 Ecological Impact Assessment Guidelines10, taking a

R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:9: Chartered Institute of Ecology and Environmental Management, 2016. Guidelines for Ecological Impact Assessment in the UK and

R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:9: Wray S, Wells D, Long E and Mitchell-Jones T, 2010. Valuing Bats in Ecological Impact Assessment. In Practice, pp 23-25

R-2023-0246-RMM-TV_ERF_Preliminary_Ecological_Appraisal.pdf:9: Chartered Institute of Ecology and Environmental Management (CIEEM), 2019. Guidelines for Ecological Impact Assessment in the UK

R-2023-0246-RMM-428219 - R_2023_0246_RMM Reserved matters for R20190767OOM Construction of an energy recovery facility at Grangetown Prairie, Land East of John Boyle Road - Further Informat.pdf:4:impacts of development are likely to be significant, a Landscape & Visual Impact Assessment should be

R-2023-0246-RMM-428219 - R_2023_0246_RMM Reserved matters for R20190767OOM Construction of an energy recovery facility at Grangetown Prairie, Land East of John Boyle Road - Further Informat.pdf:4:Guidelines for Landscape and Visual Impact Assessment for further guidance.

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:1:Environmental Impact Assessment:

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:2: Environmental Impact Assessment:

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:3:ENVIRONMENTAL IMPACT ASSESSMENT: STATEMENT OF

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:4:ENVIRONMENTAL IMPACT ASSESSMENT: STATEMENT OF

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:6:1.1 This Environmental Impact Assessment (EIA) Statement of Conformity (SoC) is

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:6: and Country Planning (Environmental Impact Assessment) Regulations 2017 (as

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:45: chapter on landscape and visual impact assessment (LVIA) that was prepared for

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:48:6.24 In terms of the overall visual impact assessment, the December 2019 ES LVIA

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:62: remaining topics were not taken forward into the original impact assessment,

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:66: being minor to neutral. The updated landscape and visual impact assessment in

R-2023-0246-RMM-TV_ERF_EIA_SoC_Part_1of2.pdf:94: The original visual impact assessment at construction and operational stage was

R-2023-0246-RMM-TV_ERF_RMs_Cover_Letter_220324.pdf:1: • Environmental Impact Assessment Statement of Conformity report

R-2023-0246-RMM-TV_ERF_RMs_Cover_Letter_220324.pdf:2: • Noise and Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Planning_Supporting_Statement.pdf:6: agreement. It was subject to Environmental Impact Assessment and was

R-2023-0246-RMM-TV_ERF_Planning_Supporting_Statement.pdf:8: Environmental impact assessment (EIA)

R-2023-0246-RMM-TV_ERF_Planning_Supporting_Statement.pdf:9: • Environmental Impact Assessment Statement of Conformity report

R-2023-0246-RMM-TV_ERF_Planning_Supporting_Statement.pdf:9: • Noise and Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Planning_Supporting_Statement.pdf:23: Impact Assessment) Regulations 2017 (as amended), to provide a comparative

R-2023-0246-RMM-TV_ERF_Planning_Supporting_Statement.pdf:30:5.43. The landscape and visual impact assessment was based on an envelope for the

R-2023-0246-RMM-TV_ERF_Planning_Supporting_Statement.pdf:39: Environmental Impact Assessment December 2019 and Chapter 7 (Mitigation)

R-2023-0246-RMM-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:19: 11 of the Environmental Impact Assessment Statement of Conformity) has concluded that the

R-2023-0246-RMM-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:29: assessment to support a permit application. In ecological impact assessments of projects and plans,

R-2023-0246-RMM-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:54: Impact Assessment: Statement of Conformity.

R-2023-0246-RMM-ApplicationFormRedacted.pdf:4:environment impact assessment application and, if so, confirm that an environmental statement was submitted to the planning authority at that time

R-2023-0246-RMM-ApplicationFormRedacted.pdf:4: For description please see the submitted planning statement, environmental impact assessment statement of compliance, and design

R-2023-0246-RMM-MGE05035 Nuisance.pdf:1:I note that an Air Quality Assessment and a Noise Impact Assessment have been

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:1:Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:2:IMPACT ASSESSMENT

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:3:NOISE & VIBRATION IMPACT ASSESSMENT

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:3:Description Noise and Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:4:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:5:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:6:Noise & Vibration Impact Assessment 1

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:7:Noise & Vibration Impact Assessment 2

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:8:Noise & Vibration Impact Assessment 3

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:9:Noise & Vibration Impact Assessment 4

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:10:Noise & Vibration Impact Assessment 5

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:11:Noise & Vibration Impact Assessment 6

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:12:Noise & Vibration Impact Assessment 7

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:13:Noise & Vibration Impact Assessment 8

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:14:Noise & Vibration Impact Assessment 9

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:15:Noise & Vibration Impact Assessment 10

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:16:Noise & Vibration Impact Assessment 11

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:17:Noise & Vibration Impact Assessment 12

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:18:Noise & Vibration Impact Assessment 13

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:19:Noise & Vibration Impact Assessment 14

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:20:Noise & Vibration Impact Assessment 15

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:21:Noise & Vibration Impact Assessment 16

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:22:Noise & Vibration Impact Assessment 17

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:23:Noise & Vibration Impact Assessment 18

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:24:Noise & Vibration Impact Assessment 19

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:25:Noise & Vibration Impact Assessment 20

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:26:Noise & Vibration Impact Assessment 21

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:27:Noise & Vibration Impact Assessment 22

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:28:Noise & Vibration Impact Assessment 23

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:29:Noise & Vibration Impact Assessment 24

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:30:Noise & Vibration Impact Assessment 25

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:31:Noise & Vibration Impact Assessment 26

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:32:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:33:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:33: Ramboll have been appointed to complete a noise impact assessment for the proposed Grangetown

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:34:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:35:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:36:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:37:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:38:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:39:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:40:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:41:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:42:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:43:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:44:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:45:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:46:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:47:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:48:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:49:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:50:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Noise_and_Vibration_Impact_Assessment.pdf:51:Noise & Vibration Impact Assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:4:3.6 Impact Assessment 13

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:10: impact assessment; and

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:10: iii. Impact assessment – considers the potential impacts of your activity, identifies ways to avoid

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:13: cover fish gravels or estuary events and local disturbance at Requires impact assessment the water body) and potentially

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:13: Requires impact assessment Estuary. Deposition of discharged Estuary (S Bank). Deposition of

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:13: Requires impact assessment Requires impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:13: Requires impact assessment Requires impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:13: involves any discharges into the discharge surface water into the processes (from construction discharge surface water into the Tees Requires no impact assessment Requires no impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:13: will also impact depth variation. from the Tees Estuary. Requires impact assessment the Tees Estuary.

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:13: Requires impact assessment Requires impact assessment Requires impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:13:substrate of the riverbed Requires impact assessment Requires impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:13: Requires impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:13: alterations being greatest at this structure of the intertidal zone. Requires impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:13: location. Requires impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:13: Requires impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:14: Requires impact assessment from the Tees Estuary.

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:14: Requires impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:14: Requires impact assessment noted that the drainage design will freshwater flow into this coastal water impact upon the freshwater flows at

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:14: rates to greenfield run-off rates, Requires impact assessment site to the waterbody

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:14: and thus no impact is predicted. Requires no impact assessment.

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:14: Wave exposure Requires no impact Requires no impact Requires no impact assessment Requires no impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:14: Requires impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:14: Requires impact assessment Requires impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:14: westwards direction towards the Requires no impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:14: Requires no impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:15: Requires no impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:15:the riparian zone Requires no impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:15: limited. In addition, no works Requires no impact assessment Requires no impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:15: within the water is proposed. No Requires no impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:15: discharges into the Tees turn discharge into the Tees Requires impact assessment is the potential to directly impact all Requires impact assessment Requires impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:15:identified as being Requires impact assessment conditions). runoff may also result in discharges

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:15: from the Tees Estuary. Requires impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:15: Requires impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:16: Requires impact assessment produce vertical pathways that could

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:16: Requires impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:17: Requires impact assessment mobilisation of material into the water

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:17: Requires no impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:17: Requires impact assessment Construction works will be completed and

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:18: Requires no impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:18: Requires no impact Requires no impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:18: NVZ12SW012440)) Requires no impact Requires no impact assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:18: 3.6 Impact Assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:18: The impact assessment is provided in Table 3.6. Table 3.6 provides a comparison between the

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:18: The impact assessment below is written in the context of the following mitigation measures/design

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:20:Table 3.6: WFD Impact Assessment

R-2023-0246-RMM-TV_ERF_Water_Framework_Directive_Assessment_Review_and_Update.pdf:28:In reference to page 5 of the Ecological Impact Assessment, Arup, 24 June 2020,

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:4: Appendix C – Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:62:Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:63: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:64: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:64: 4.5 Ecological Impact Assessment 10

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:65: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:66: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:66:Development Corporation (STDC) to complete an Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:67: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:68: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:68:Development Corporation (STDC) to complete an Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:69: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:70: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:71: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:72: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:73: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:74: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:75: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:75:4.5 Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:75:Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater, Coastal and

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:76: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:76:The impact assessment process involves:

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:77: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:77:A cumulative impact assessment has been undertaken which considers whether

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:77:Developments included in the cumulative impact assessment comprise the

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:78: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:79: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:80: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:81: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:82: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:83: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:83:5.3.1 Important Habitats (Ecological Impact Assessment)

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:84: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:85: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:86: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:87: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:88: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:89: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:90: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:91: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:92: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:93: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:94: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:95: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:96: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:97: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:98: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:99: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:100: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:101: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:102: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:103: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:104: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:105: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:106: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:107: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:108: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:109: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:110: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:111: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:112: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:113: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:114: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:115: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:116: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:117: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:118: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:119: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:120: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:121: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:123: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:125: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:128: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:129: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:130: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:131: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:132: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:133: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:134: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:136: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:137: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:138: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:139: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:140: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:141: Ecological Impact Assessment

R-2020-0800-CD-Grangetown Prairie CEMP - Rev D.pdf:142: Ecological Impact Assessment

R-2022-0354-CD-R 2020 0357 OOM Decision Notice.pdf:3: and the conclusions of the Environmental Impact Assessment that the

R-2020-0302-PND-OFFICER REPORT.pdf:3:Planning (Environmental Impact Assessment) Regulations 2017, but the

R-2022-0779-CD-COMPLIANCE OFFICER REPORT.pdf:1: out in the Ecological Impact Assessment, INCA,, dated 26 February 2021

R-2022-0779-CD-Sep 22 - CEMP - Steel House Park and Ride Relocation of stockpile mounds.pdf:20:Steel House Mound Ecological Impact Assessment and Biodiversity Assessment dated May 2022,

R-2022-0779-CD-Sep 22 - CEMP - Steel House Park and Ride Relocation of stockpile mounds.pdf:21:As highlighted in the STDC Steel House Mound Ecological Impact Assessment and Biodiversity

R-2022-0779-CD-DOC (CEMP) Covering Letter September 2022.pdf:1:shall demonstrate how the mitigation measures set out in the Ecological Impact Assessment, INCA,

R-2021-0832-CD-63262 - Covering Letter - 29.09.21.pdf:1:Distinctiveness in Table 4 of the Arup Ecological Impact Assessment, 24 June 2020) within the site and / or

R-2021-0832-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:12: Arup Ecological Impact Assessment, 24 June 2020) within the site and / or off-site, and the

R-2021-0832-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:12: Arup Ecological Impact Assessment, 24 June 2020) within the site and / or off-site, and the

R-2021-0832-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:14: Arup Ecological Impact Assessment, 24 June 2020) within the site and / or off-site, and the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_23. Use of natural resources.pdf:1:Schedule 3 of The Marine Works (Environmental Impact Assessment) (Amendment) Regulations 2017

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_23. Use of natural resources.pdf:1:Country Planning (Environmental Impact Assessment) Regulations 2017.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:2:(Environmental Impact Assessment) Regulations 2007, as amended. In addition, RCBC issued a Scoping

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:2:(Environmental Impact Assessment) Regulations 2007, as amended, and the Town and Country Planning

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:2:(Environmental Impact Assessment) Regulations 2017, without submitting a formal EIA Screening Request.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:4:a description of the approach taken to the specific impact assessment for each environmental topic is

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:7:Table 5.3 Impact assessment matrix

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:8:5.1.6 Cumulative Impact Assessment

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:9:There is no legislation that outlines how cumulative impact assessments (CIAs) should be undertaken.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:2:4.4 Environmental Impact Assessment Directive

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:2:in this instance, The Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended)

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:2:and the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 are applicable

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:2:required under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017, as

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:4:England. Noise Sensitive Receptor (NSR) locations and the methodology for the impact assessment were

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:9:17.3.4 Impact assessment methodology

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:12:Table 17.10 Construction road traffic noise impact assessment

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:14:Table 17.13 On-site construction phase noise impact assessment

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:16:Table 17.15 Operational phase noise impact assessment

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:4:8 CUMULATIVE IMPACT ASSESSMENT 16

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:5:The proposed scheme has been subject to an Environmental Impact Assessment (EIA) which has assessed

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:18:The landscape and visual impact assessment (LVIA) establishes that operational effects of the proposed

R-2020-0685-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:20:8 CUMULATIVE IMPACT ASSESSMENT

R-2020-0685-ESM-Appendix 8_Underwater noise assessment.pdf:2: Underwater Noise Impact Assessment – South Bank, Tees Estuary

R-2020-0685-ESM-Appendix 8_Underwater noise assessment.pdf:3: Underwater Noise Impact Assessment – South Bank, Tees Estuary

R-2020-0685-ESM-Appendix 8_Underwater noise assessment.pdf:4: Underwater Noise Impact Assessment – South Bank, Tees Estuary

R-2020-0685-ESM-Appendix 8_Underwater noise assessment.pdf:4:impact assessment. As the measurement or receiver point moves away from the source, the sound

R-2020-0685-ESM-Appendix 8_Underwater noise assessment.pdf:5: Underwater Noise Impact Assessment – South Bank, Tees Estuary

R-2020-0685-ESM-Appendix 8_Underwater noise assessment.pdf:6: Underwater Noise Impact Assessment – South Bank, Tees Estuary

R-2020-0685-ESM-Appendix 8_Underwater noise assessment.pdf:6:3 A Collett, T Mason (2014). York Potash Project Harbour Facilities: Underwater Noise Impact Assessment.

R-2020-0685-ESM-Appendix 8_Underwater noise assessment.pdf:7: Underwater Noise Impact Assessment – South Bank, Tees Estuary

R-2020-0685-ESM-Appendix 8_Underwater noise assessment.pdf:8: Underwater Noise Impact Assessment – South Bank, Tees Estuary

R-2020-0685-ESM-Appendix 8_Underwater noise assessment.pdf:9: Underwater Noise Impact Assessment – South Bank, Tees Estuary

R-2020-0685-ESM-Appendix 8_Underwater noise assessment.pdf:10: Underwater Noise Impact Assessment – South Bank, Tees Estuary

R-2020-0685-ESM-Appendix 8_Underwater noise assessment.pdf:11: Underwater Noise Impact Assessment – South Bank, Tees Estuary

R-2020-0685-ESM-Appendix 8_Underwater noise assessment.pdf:11: Report title Underwater Noise Impact Assessment – South

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:1:This section of the EIA Report presents the findings of a Landscape and Visual Impact Assessment (LVIA)

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:4:Institute in the third edition of its ‘Guidelines for Landscape and Visual Impact Assessment’ (GLVIA3, 2013).

R-2020-0685-ESM-OFFICER REPORT.pdf:4:Environmental Impact Assessment

R-2020-0685-ESM-OFFICER REPORT.pdf:4:Works (Environmental Impact Assessment) Regulations 2007 (the MWR), as

R-2020-0685-ESM-OFFICER REPORT.pdf:5:(Environmental Impact Assessment) Regulations

R-2020-0685-ESM-OFFICER REPORT.pdf:70:Impact Assessment (LVIA). The chapter considers the following potential

R-2020-0685-ESM-OFFICER REPORT.pdf:70:development, a Landscape and Visual Impact Assessment (LVIA) has been

R-2020-0685-ESM-OFFICER REPORT.pdf:88:As required by both the Marine Works (Environmental Impact Assessment)

R-2020-0685-ESM-OFFICER REPORT.pdf:88:(Environmental Impact Assessment) 2017 consideration is required to be

R-2020-0685-ESM-OFFICER REPORT.pdf:89:As required by both the Marine Works (Environmental Impact Assessment)

R-2020-0685-ESM-OFFICER REPORT.pdf:89:(Environmental Impact Assessment) 2017 consideration has been given to

R-2020-0685-ESM-OFFICER REPORT.pdf:90:necessary to undertake a full human health impact assessment a point that

R-2020-0685-ESM-OFFICER REPORT.pdf:95:Cumulative Impact Assessment

R-2020-0685-ESM-OFFICER REPORT.pdf:95:A cumulative impact assessment was carried out to consider the potential for

R-2020-0685-ESM-OFFICER REPORT.pdf:96:supported by an Environmental Impact Assessment as Schedule 1

R-2020-0685-ESM-EIA_Scoping_Response_EIA201900017_FINAL.pdf:1:Marine Works (Environmental Impact Assessment) Regulations 2007 (as

R-2020-0685-ESM-EIA_Scoping_Response_EIA201900017_FINAL.pdf:1:3 Environmental Impact Assessment (EIA) …………………………………………………… 3

R-2020-0685-ESM-EIA_Scoping_Response_EIA201900017_FINAL.pdf:3:3 Environmental Impact Assessment (EIA)

R-2020-0685-ESM-EIA_Scoping_Response_EIA201900017_FINAL.pdf:3:The Marine Works (Environmental Impact Assessment) Regulations 2007 (as

R-2020-0685-ESM-EIA_Scoping_Response_EIA201900017_FINAL.pdf:4:  Landscape and Visual Impact Assessment;

R-2020-0685-ESM-EIA_Scoping_Response_EIA201900017_FINAL.pdf:8:Visual’ impact assessment” to determine the likely impact of the crane and other tall

R-2020-0685-ESM-EIA_Scoping_Response_EIA201900017_FINAL.pdf:11:sea (and to inform the impact assessment). Any material to be dredged and

R-2020-0685-ESM-EIA_Scoping_Response_EIA201900017_FINAL.pdf:13:for environmental impact assessment. Environmental Impact Assessment Review 57

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:9:modelling exercise to inform the Environmental Impact Assessment (EIA) that is being prepared as part of

R-2020-0685-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:13:area is of most interest in terms of the hydrodynamic outputs for the Environmental Impact Assessment.

R-2020-0685-ESM-Appendix 13_Landscape and visual impact assessment methodology.pdf:2:The purpose of the Landscape and Visual Impact Assessment (LVIA) is to identify the potential

R-2020-0685-ESM-Appendix 13_Landscape and visual impact assessment methodology.pdf:2:LVIA is either carried out formally as part of the Environmental Impact Assessment (EIA) process or

R-2020-0685-ESM-Appendix 13_Landscape and visual impact assessment methodology.pdf:2:▪ ‘Guidelines for Landscape and Visual Impact Assessment’ (GLVIA), Third Edition Landscape

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:2: therefore the impact assessment presented within

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:19:‘medium’ has been assigned for the purposes of this impact assessment, taking in to account the fragmented

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:20:As such, the impact assessment presented within this section focuses on the potential impacts to marine

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:4:to as the proposed scheme). This report accompanies the Environmental Impact Assessment (EIA) in

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:5: Cumulative Impact Assessment …………………………………………………………………………… 41

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:7:Table 16: Cumulative Impact Assessment ……………………………………………………………………………….. 42

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:8: EIA Environmental Impact Assessment

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:11: Marine Works EIA (Environmental Impact Assessment) Regulations governing EIA’s for

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:49: CUMULATIVE IMPACT ASSESSMENT

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:49:The cumulative impact assessment was assessed to be a factor of the likelihood of the impact

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:49:The results of the cumulative impact assessment are given in Table 16. All impacts were assessed to

R-2020-0685-ESM-Appendix 9_Navigation Risk Assessment.pdf:50:Table 16: Cumulative Impact Assessment

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:10:6.3.6 Impact assessment

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:8:The proposed scheme is defined in full within the Environmental Impact Assessment (EIA) Report (Royal

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:1:the baseline environment on which the impact assessment can be based.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:10:follows a matrix approach to inform the impact assessment, using best practice, best available scientific

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:10:understanding and relevant guidance (e.g. CIEEM Guidelines for Ecological Impact Assessment in the UK

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:22:across the full winter period, the assumption made for the purposes of impact assessment is that North Tees

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:26:sources in the Tees estuary, receptors included in the following impact assessments are as follows:

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_25. Health risk assessment.pdf:1:The Marine Works (Environmental Impact Assessment) (Amendments) Regulations 2017 and the Town and

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_25. Health risk assessment.pdf:1:Country Planning (Environmental Impact Assessment) 2017 brought in a requirement to consider the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_25. Health risk assessment.pdf:1:document (Appendix 2), this health impact assessment is therefore a concise assessment which relies on

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_25. Health risk assessment.pdf:1:undertake a full human health impact assessment.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:2:The ecological impact assessment presented below has been based upon the following guidance and

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:3: for Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater and Coastal;

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:3:To inform this Ecological Impact Assessment (EcIA), Tees Valley Combined Authority has undertaken

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:3: Environmental Impact Assessment 19

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:6: Environmental Impact Assessment

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:6: the need for Environmental Impact Assessment (‘EIA’).

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:6: Town and Country Planning (Environmental Impact Assessment) Regulations 2017, without

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:23: through the Environmental Impact Assessment which accompanies the application. The South

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:23: Environmental Impact Assessment

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:23: Impact Assessment) Regulations 2017 (the EIA Regulations) as updated by The Town and

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:23: Country Planning and Infrastructure Planning (Environmental Impact Assessment)

R-2020-0685-ESM-61586 Quay Planning Statement 09-11-20.pdf:29:5.58 The landscape and visual impact assessment (LVIA) establishes that operational effects of the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:17:considered as not significant. A detailed impact assessment of road traffic exhaust emissions was

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:4:To inform the impact assessment of works during the proposed scheme for marine mammal species,

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:4:In addition to the methodology for the impact assessment outlined in Section 5, the magnitude of effect on

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:14:Table 10.5 Reference populations and density estimates to inform the impact assessment for marine

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:15:The underwater noise impact assessments for marine mammal species for the proposed scheme has been

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:3:4.4 Environmental Impact Assessment Directive 28

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:7:27 CUMULATIVE IMPACT ASSESSMENT 482

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:8:13 Landscape and visual impact assessment methodology

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:8:14 Landscape and visual impact assessment figures

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:9:Environmental Impact Assessment (EIA) in support of a marine licence application to the Marine

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:9:The study area is shown on Figure 1.2. Landscape and visual impact assessment has been detailed

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:9: impact assessment

R-2020-0685-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:7: Impact Assessment (EIA) for Geology and Ground Conditions.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:2:for Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater, Coastal and Marine.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:11:Royal HaskoningDHV (2018). Hartlepool Approach Channel: Environmental Impact Assessment Report.

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:1:27 CUMULATIVE IMPACT ASSESSMENT

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:1:Works (Environmental Impact Assessment) Regulations 2007 (as amended) and the Town and Country

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:1:Planning (Environmental Impact Assessment) Regulations 2017 require an assessment of its potential

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:1:The IEMA ‘Guidelines for Environmental Impact Assessment’ (IEMA, 2004) define cumulative impacts as:

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:2:this report and summarised in Table 1.1). Landscape and visual impact assessment has been detailed

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:22:Of the proposed projects which have been screened into the cumulative impact assessment, all have

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:27:from the projects and plans screened in for cumulative impact assessment will not, therefore, also occur

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:33:cumulative noise impact assessment of the NGCT, Dogger Bank Teesside A & Sofia project and the Harbour

R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:1:Subject: South Bank port facility – Environmental Impact Assessment scoping review

R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:1:Environmental Impact Assessment (EIA) in support of a marine licence application to the Marine

R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:2:Marine Works (Environmental Impact Assessment) Regulations 2007 as amended, and the Town and

R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:2:Country Planning (Environmental Impact Assessment) Regulations 2017 respectively. This document has

R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:4: • Landscape and visual impact assessment.

R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:7: Views of the Grade II* Transporter Bridge should be assessed in the ‘Landscape and Visual Impact Assessment’ to determine the likely impact of the

R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:8: for disposal to sea (and to inform the impact assessment). Any material to be dredged and disposed of within licenced disposal areas at-sea must not

R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:8: Regulation 4(4) of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 requires the assessment of significant effects

R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:13:proposed quay Infrastructure, drawing from the findings of the landscape and visual impact assessment

R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:13:construction and operational phases; outputs from the modelling will inform the impact assessment (for

R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:14:A detailed cumulative impact assessment with the wider onshore development (or other planned or

R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:14:A Landscape and Visual Impact Assessment (LVIA) will be undertaken as part of the EIA. This will involve

R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:14:Impact Assessment, 3rd edition.

R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:15: 4.20. Cumulative impact assessment

R-2020-0685-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:16:A cumulative impact assessment will be undertaken, taking into account any relevant consented - but as

R-2020-0685-ESM-Appendix 3_Scoping consultation.pdf:2:Environmental Impact Assessment (EIA) for this development.

R-2020-0685-ESM-Appendix 3_Scoping consultation.pdf:4:associated with the site. Any Environmental Impact Assessment should include details of the

R-2020-0685-ESM-Appendix 3_Scoping consultation.pdf:7: environments and will require Environmental Impact Assessment (EIA) in support of

R-2020-0685-ESM-Appendix 3_Scoping consultation.pdf:7: Town and Country Planning (Environmental Impact Assessment) Regulations 2017.

R-2020-0685-ESM-Appendix 3_Scoping consultation.pdf:8: Impact Assessment scoping review) on environmental assessment requirements in

R-2020-0685-ESM-Appendix 3_Scoping consultation.pdf:8: Impact Assessment scoping review) on environmental assessment requirements in

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_22. Climate change.pdf:6:22.3.5 Impact assessment methodology

R-2020-0685-ESM-RCBC scoping opinion.pdf:1: •Landscape and Visual Impact Assessment;

R-2020-0685-ESM-RCBC scoping opinion.pdf:4:Regulation 4(4) of the Town and Country Planning (Environmental Impact Assessment)

R-2020-0685-ESM-RCBC scoping opinion.pdf:4:HSE responses to Environmental Impact Assessment consultations will be limited to our role

R-2020-0685-ESM-RCBC scoping opinion.pdf:8:the Environmental Impact Assessment (EIA) for this development.

R-2020-0685-ESM-RCBC scoping opinion.pdf:8:Schedule 4 of the Town & Country Planning (Environmental Impact Assessment) Regulations

R-2020-0685-ESM-RCBC scoping opinion.pdf:9:for Ecological Impact Assessment (EcIA) have been developed by the Chartered Institute of

R-2020-0685-ESM-RCBC scoping opinion.pdf:11:protected species populations in the wider area, to assist in the impact assessment.

R-2020-0685-ESM-RCBC scoping opinion.pdf:11:for relevant species and the survey results, impact assessments and appropriate

R-2020-0685-ESM-RCBC scoping opinion.pdf:11:decisions’. Natural England therefore advises that survey, impact assessment and mitigation

R-2020-0685-ESM-RCBC scoping opinion.pdf:13:universally used for landscape and visual impact assessment.

R-2020-0685-ESM-RCBC scoping opinion.pdf:13:local materials. The Environmental Impact Assessment process should detail the measures

R-2020-0685-ESM-RCBC scoping opinion.pdf:13:advises that the cumulative impact assessment should include other proposals currently at

R-2020-0685-ESM-RCBC scoping opinion.pdf:14:The ES should include an impact assessment to identify, describe and evaluate the effects

R-2020-0685-ESM-RCBC scoping opinion.pdf:16:I would advise and/or expect that any future Environmental Impact Assessment is

R-2020-0685-ESM-RCBC scoping opinion.pdf:17:accordance with the Town & Country Planning (Environmental Impact Assessment)

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:23:While the loss of such habitat is considered to be insignificant (in terms of impact assessment) for the

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:4: and Visual Impact Assessment’ to determine the likely impact of the Section 19

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:8:16.3.3 Impact assessment methodology

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:8:The general method for impact assessment is set out in Section 5. The specific approach to the assessment

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:8:The impact assessment defines heritage assets, and their settings, likely to be impacted by the proposed

R-2020-0685-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:8:Specifically, therefore, the impact assessment will present:

R-2020-0685-ESM-336540 R_2020_0685_ESM - Demolition of existing quay, capital dredge and development of new quay at South Bank Wharf, Grangetown, Redcar - Phase 2.pdf:3:& Visual Impact Assessment should be provided with the proposal to inform decision making. We

R-2020-0685-ESM-336540 R_2020_0685_ESM - Demolition of existing quay, capital dredge and development of new quay at South Bank Wharf, Grangetown, Redcar - Phase 2.pdf:3:refer you to the Landscape Institute Guidelines for Landscape and Visual Impact Assessment for

R-2020-0685-ESM-HIGHWAYS ENGLAND.pdf:10:An Environmental Impact Assessment (EIA) has been produced (by Royal HaskoningDHV) in support of the

R-2019-0427-FFM-R_2019_0427_FFM - Natural England.pdf:3: & Visual Impact Assessment should be provided with the proposal to inform decision making. We

R-2019-0427-FFM-R_2019_0427_FFM - Natural England.pdf:3: refer you to the Landscape Institute Guidelines for Landscape and Visual Impact Assessment for

R-2019-0427-FFM-201920 Ecology report final.pdf:3:This report does not provide a detailed Ecological Impact Assessment as the works will be phased

R-2019-0427-FFM-201920 Ecology report final.pdf:12:Peak Ecology (2013) Ecological Impact Assessment: Technical Report Dogger Bank Teesside A & B.

R-2021-0473-ESM-LM Wind Reserved Matters Application Form(1).pdf:2:was an environment impact assessment application and, if so, confirm that an environmental statement was submitted to the planning

R-2021-0473-ESM-LM Wind Reserved Matters Application Form(1).pdf:2: The outline planning application was an Environment Impact Assessment application and the necessary Environmental Statement was submitted to the Planning

R-2021-0473-ESM-LM Wind ES Compliance Statement 26.05.21.pdf:12: Planning and Infrastructure Planning (Environmental Impact Assessment) (Amendment)

R-2021-0676-FF-210518_Bravo10 Ecology report_ RevA_INCA.pdf:8:i. CIEEM (2016) Guidelines for Ecological Impact Assessment in the UK and Ireland: Terrestrial,

R-2021-0624-NM-19944173_1(1).pdf:1:Impact Assessment for the South Industrial Zone, where LM Wind would be located, has assumed

R-2021-0624-NM-Decision Notice 0357.pdf:3: and the conclusions of the Environmental Impact Assessment that the

R-2023-0300-DCO-0300 Nuisance.pdf:1:Chapter 6.5 of H2 Teesside Ltd Environmental Impact Assessment Scoping Report

R-2023-0300-DCO-PINS Scoping Opinion R 2023 0300 DCO.pdf:1:General Approach (Application for an Environmental Impact Assessment Scoping

R-2023-0300-DCO-PINS Scoping Opinion R 2023 0300 DCO.pdf:2:Chapter 6.5 of H2 Teesside Ltd Environmental Impact Assessment Scoping Report

R-2023-0300-DCO-PINS Scoping Opinion R 2023 0300 DCO.pdf:2:Chapter 6.2 of H2 Teesside Ltd Environmental Impact Assessment Scoping

R-2023-0300-DCO-PINS Scoping Opinion R 2023 0300 DCO.pdf:3:Chapter 6.4 H2 Teesside Ltd Environmental Impact Assessment Scoping Report

R-2023-0300-DCO-H2TE - Statutory consultation letter.pdf:1:(Environmental Impact Assessment) Regulations 2017 (the EIA Regulations)

R-2023-0300-DCO-Redcar BC H2 Teesside DCO EN0700009 Project RC010.pdf:1: (Environment Impact Assessment) Regulations 2017 (The

R-2023-0300-DCO-HIGHWAYS ENGLAND.pdf:2:a review of an Environmental Impact Assessment EIA Scoping document (dated April

R-2023-0300-DCO-HIGHWAYS ENGLAND.pdf:6:Environmental Impact Assessment Process

R-2023-0300-DCO-CON LAND 0300.pdf:1:Chapter 6.4 H2 Teesside Ltd Environmental Impact Assessment Scoping Report

R-2023-0300-DCO-0300 EP.pdf:1:Comments: Chapter 6.2 of H2 Teesside Ltd Environmental Impact Assessment Scoping

R-2023-0300-DCO-NSIP(1).pdf:2:INFRASTRUCTURE PLANNING (ENVIROMENTAL IMPACT ASSESSMENT) REGULATIONS 2017 (as

R-2023-0300-DCO-NSIP(1).pdf:2:AECOM Environmental Impact Assessment Scoping Report, April 2023, (EN070009-000037), (Appendix A, Figure

R-2023-0300-DCO-NSIP(1).pdf:2:specified in the AECOM Environmental Impact Assessment Scoping Report, April 2023, (EN070009-000037),

R-2023-0300-DCO-NSIP(1).pdf:3:AECOM Environmental Impact Assessment Scoping Report, April 2023, (EN070009-000037), Section 3.14.2, states

R-2023-0300-DCO-NSIP(1).pdf:3:Regulation 5(4) of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 requires the

R-2022-0475-NM-64764 LVIA Update 25-05-22.PDF:1:1.1 The Landscape and Visual Impact Assessment (LVIA) which accompanied the original

R-2022-0475-NM-64764 LVIA Update 25-05-22.PDF:1: Impact Assessments including the preparation of ES Chapters.

R-2022-0186-CD-R 2020 0357 OOM Decision Notice.pdf:3: and the conclusions of the Environmental Impact Assessment that the

R-2021-0166-FFM-Officer Report 0166.pdf:2:Ecological Impact Assessment

R-2021-0166-FFM-Officer Report 0166.pdf:8:The application is supported by an Ecological Impact Assessment l as a

R-2021-0166-FFM-Officer Report 0166.pdf:9:As part of the submitted Ecological Impact Assessment consideration has

R-2021-0166-FFM-Officer Report 0166.pdf:10:Within the Ecological Impact Assessment the following summary has been

R-2021-0166-FFM-Ecological Assessment.pdf:1: Ecological Impact Assessment

R-2021-0166-FFM-Ecological Assessment.pdf:3:Environmental Management (‘CIEEM’) guidelines for Ecological Impact Assessment (‘EcIA’) i.

R-2021-0166-FFM-Ecological Assessment.pdf:15:i. CIEEM (2016) Guidelines for Ecological Impact Assessment in the UK and Ireland: Terrestrial,

R-2021-0166-FFM-Ecological Assessment.pdf:15:ix. Peak Ecology (2013) Ecological Impact Assessment: Technical Report Dogger Bank Teesside A & B

R-2021-0166-FFM-347902 - R_2021_0166_FFM Engineering operations associated with ground remediation and preparation of the site at Phase 4 Grangetown Prairie - No Obj.pdf:3:Where the impacts of development are likely to be significant, a Landscape & Visual Impact Assessment

R-2021-0166-FFM-347902 - R_2021_0166_FFM Engineering operations associated with ground remediation and preparation of the site at Phase 4 Grangetown Prairie - No Obj.pdf:3:Guidelines for Landscape and Visual Impact Assessment for further guidance.

R-2021-0166-FFM-Phase 4 covering letter.pdf:5:An Ecological Impact Assessment prepared by INCA accompanies this planning application which

R-2021-0166-FFM-Phase 4 covering letter.pdf:6:• Ecological Impact Assessment, prepared by INCA;

R-2021-0166-FFM-Decision Notice 0166.pdf:2: out in the Ecological Impact Assessment, INCA, dated 26 February 2021 have

R-2022-0494-FFM-OFFICER REPORT.pdf:2:  Ecological Impact Assessment

R-2022-0494-FFM-OFFICER REPORT.pdf:4:undertaken as advised within the Environmental Impact Assessment

R-2022-0494-FFM-OFFICER REPORT.pdf:9:The application is supported by an Ecological Impact Assessment, as well as

R-2022-0494-FFM-OFFICER REPORT.pdf:10:As part of the submitted Ecological Impact Assessment consideration has

R-2022-0494-FFM-OFFICER REPORT.pdf:11:Within the Ecological Impact Assessment the following summary has been

R-2022-0494-FFM-OFFICER REPORT.pdf:13: mitigation measures set out in the Ecological Impact Assessment, INCA,,

R-2022-0494-FFM-Consultee Response - Natural Heritage Manager.pdf:1:within the Environmental Impact Assessment

R-2022-0494-FFM-395561 - R_2022_0494_FFM - Engineering operations - removal of mounds - Land north of Teesworks area Redcar.pdf:3: Landscape & Visual Impact Assessment should be provided with the proposal to inform decision

R-2022-0494-FFM-DECISION NOTICE.pdf:2: out in the Ecological Impact Assessment, INCA,, dated 26 February 2021 have

R-2022-0494-FFM-19293141_1.pdf:6:EIA Environmental Impact Assessment

R-2022-0494-FFM-19293141_1.pdf:7: Impact Assessment (EIA) for the outline planning application for one of the sites within the

R-2022-0494-FFM-Ecological Impact Assessment.pdf:1:Ecological Impact Assessment

R-2022-0494-FFM-Ecological Impact Assessment.pdf:3:Environmental Management (CIEEM) guidelines for Ecological Impact Assessment (EcIA)

R-2022-0494-FFM-Ecological Impact Assessment.pdf:21:i. CIEEM (2016) Guidelines for Ecological Impact Assessment in the UK and Ireland:

R-2022-0494-FFM-Covering Letter.pdf:7:An Ecological Impact Assessment prepared by INCA accompanies this planning application which

R-2022-0494-FFM-Covering Letter.pdf:9: Ecological Impact Assessment, prepared by INCA

R-2020-0281-PND-officer report 0281.pdf:3:Planning (Environmental Impact Assessment) Regulations 2017, but the

R-2022-0205-SC-Screening Opinion Response.pdf:1:TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT)

R-2022-0205-SC-Screening Opinion Response.pdf:1:It is considered that an Environmental Impact Assessment is not required for the following

R-2022-0205-SC-Screening Opinion Report.pdf:1:The Town and Country Planning (Environmental Impact Assessment) (England and

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:3:purpose of providing an Environmental Impact Assessment (EIA) Screening Request to Redcar and

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:7: seeking to determine if the works would constitute an Environmental Impact Assessment

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:8: accordance with the Town and County Planning (Environmental Impact Assessment)

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:8:2 The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 online. Available at:

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:8:3 The Marine Works (Environmental Impact Assessment) (Amendment) Regulations 2017 online. Available at:

R-2022-0205-SC-Bran Sands EIA Screening Request_FINAL reduced signed.pdf:68: of the Ecological Impact Assessment (EcIA) process used to support some planning

R-2021-1048-FFM-Decision Notice 1048(1).pdf:2: out in the Ecological Impact Assessment, INCA, dated November 2021 have

R-2021-1048-FFM-EN010103-001132-NZT DCO 6.4.43 ES Vol III Appendix 18B Cultural Heritage Gazetter.PDF:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (as

R-2021-1048-FFM-Officer Report 1048.pdf:2: Ecological Impact Assessment

R-2021-1048-FFM-Officer Report 1048.pdf:17:The application is supported by an Ecological Impact Assessment (EIA) and a

R-2021-1048-FFM-Officer Report 1048.pdf:18:of the submitted Ecological Impact Assessment.

R-2021-1048-FFM-Officer Report 1048.pdf:18:As part of the submitted Ecological Impact Assessment consideration has

R-2021-1048-FFM-Officer Report 1048.pdf:20:Within the Ecological Impact Assessment a summary has been provided with

R-2021-1048-FFM-63262_01 NZT Site Remediation Cover Letter - 30.11.21.PDF:4:An Ecological Impact Assessment; and a Shadow Habitats Regulation Assessment, prepared by INCA have

R-2021-1048-FFM-63262_01 NZT Site Remediation Cover Letter - 30.11.21.PDF:6:Environmental Impact Assessment

R-2021-1048-FFM-63262_01 NZT Site Remediation Cover Letter - 30.11.21.PDF:6:Planning (Environmental Impact Assessment) Regulations 2017 (as amended) (“the Regulations”) and it is

R-2021-1048-FFM-63262_01 NZT Site Remediation Cover Letter - 30.11.21.PDF:6:conclusion as to whether the application proposal is one requiring Environmental Impact Assessment.

R-2021-1048-FFM-63262_01 NZT Site Remediation Cover Letter - 30.11.21.PDF:7:• Ecological Impact Assessment (ref: 2021-83), prepared by INCA;

R-2021-1048-FFM-377862 - R_2021_1048_FFM Ground remediation works at Former Redcar Steelworks Site - No Objection Subject to Mitigation.pdf:2:We note within the Ecological Impact Assessment that a baseline habitat survey was completed in

R-2021-1048-FFM-377862 - R_2021_1048_FFM Ground remediation works at Former Redcar Steelworks Site - No Objection Subject to Mitigation.pdf:4:impacts of development are likely to be significant, a Landscape & Visual Impact Assessment should be

R-2021-1048-FFM-377862 - R_2021_1048_FFM Ground remediation works at Former Redcar Steelworks Site - No Objection Subject to Mitigation.pdf:4:Guidelines for Landscape and Visual Impact Assessment for further guidance.

R-2021-1048-FFM-TW-SIZ-XX-JBAU-00-00-RP-EN-0001-S1-P02-NZT_FRA.pdf:6:EIA Environmental Impact Assessment

R-2021-1048-FFM-EN010103-001131-NZT DCO 6.4.42 ES Vol III Appendix 18A Cultural Heritage Baseline Report.PDF:1:The Infrastructure Planning (Environmental Impact Assessment) Regulations

R-2021-1048-FFM-EN010103-001131-NZT DCO 6.4.42 ES Vol III Appendix 18A Cultural Heritage Baseline Report.PDF:30: Practice Guidance – Environmental Impact Assessment Online. Available

R-2021-1048-FFM-2021-83 EcIA NZT Remediation Rev A.PDF:1:Ecological Impact Assessment

R-2021-1048-FFM-2021-83 EcIA NZT Remediation Rev A.PDF:3:Environmental Management (‘CIEEM’) guidelines for Ecological Impact Assessment (‘EcIA’) i.

R-2021-1048-FFM-2021-83 EcIA NZT Remediation Rev A.PDF:19:i. CIEEM (2016) Guidelines for Ecological Impact Assessment in the UK and Ireland: Terrestrial,

R-2021-1048-FFM-2021-83 EcIA NZT Remediation Rev A.PDF:20:ix. Peak Ecology (2013) Ecological Impact Assessment: Technical Report Dogger Bank Teesside A & B

R-2021-0878-ESM-ApplicationFormRedacted.pdf:3:impact assessment application and, if so, confirm that an environmental statement was submitted to the planning authority at that time

R-2021-0878-ESM-ApplicationFormRedacted.pdf:3:Initial outline application was an environment impact assessment application. This was submitted to the planning authority as part of the application.

R-2021-0878-ESM-Natural England.pdf:3:impacts of development are likely to be significant, a Landscape & Visual Impact Assessment should be

R-2021-0878-ESM-Natural England.pdf:3:Guidelines for Landscape and Visual Impact Assessment for further guidance.

R-2021-0878-ESM-61586_01 - LM Hardstading Cover Letter - 19.10.21.PDF:1:Environment Impact Assessment

R-2021-0269-CD-Decision Notice.pdf:3: and the conclusions of the Environmental Impact Assessment that the

R-2021-0067-CD-Jan 20212366 CEMP Metals Recovery Processing Area.pdf:21:Metals Recovery Site Ecological Impact Assessment and Biodiversity Assessment dated 14th

R-2021-0067-CD-Jan 20212366 CEMP Metals Recovery Processing Area.pdf:22:As highlighted in the Ecological Impact Assessment and Biodiversity Net Gain Assessment, Arup,

R-2021-0753-FFM-Arcadis - South Bank Strategy.pdf:8: • South Bank Site Remediation, Ecological Impact Assessment Revision A Final, dated May

R-2021-0753-FFM-Arcadis - South Bank Strategy.pdf:12:Appropriate Assessment Revision A Final INCA 2021 and Ecological Impact Assessment Revision A

R-2020-0357-OOM-Consultee Response - MMO.pdf:2:Environmental Impact Assessment

R-2020-0357-OOM-Consultee Response - MMO.pdf:2:2011/92/EU) is transposed into UK law by the Marine Works (Environmental Impact Assessment)

R-2020-0357-OOM-Consultee Response - MMO.pdf:2:the MWR and The Town and Country Planning (Environmental Impact Assessment) Regulations

R-2020-0357-OOM-322735 R_2020_0357_OOM - Remediation of land at Southern Industrial Zone STDC South Bank (1).pdf:4:& Visual Impact Assessment should be provided with the proposal to inform decision making. We

R-2020-0357-OOM-322735 R_2020_0357_OOM - Remediation of land at Southern Industrial Zone STDC South Bank (1).pdf:4:refer you to the Landscape Institute Guidelines for Landscape and Visual Impact Assessment for

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:4: including the preparation of Environmental Statements for Environmental Impact Assessments

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:4: support Environmental Impact Assessments in addition to providing support and guidance in

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter H - July 2020.pdf:8: by Arcadis, and successfully applied to other Environmental Impact Assessments. The

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:3: judgement of those undertaking the Environmental Impact Assessment (‘EIA’) as well as topic

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:11: Impact Assessment” (2004) and the EC’s “Guidelines for the Assessment of Indirect and

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:11: Planning Practice Guidance (Environmental Impact Assessment) which states that:

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:26: 3 EIA Environmental Impact Assessment

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter N - July 2020.pdf:27: 1 Town and Country Planning (Environmental Impact Assessment) Regulations 2017

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter O - July 2020.pdf:3:O1.2 Schedule 4, Part 7 of the Town and Country Planning (Environmental Impact Assessment)

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter O - July 2020.pdf:19: 6 EIA Environmental Impact Assessment

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter O - July 2020.pdf:20: 1 Town and Country Planning (Environmental Impact Assessment) Regulations 2017

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:4: scale Environmental Impact Assessments (EIA).

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter F - July 2020.pdf:40: 15 EIA: Environmental Impact Assessment

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:24: h Drainage proposals and a Drainage Impact Assessment will be included as part of the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:24: in this aspect. Therefore, a soils impact assessment has not been carried out.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:46: residual impact assessment has been carried out on the assumption that the above mitigation

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:56: EIA Environmental Impact Assessment

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter G - July 2020.pdf:57: GOV.UK (2020). Environmental Impact Assessment guidance. online GOV.UK.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter B - July 2020.pdf:3: have formed the basis of this Environmental Impact Assessment (‘EIA’), and considers the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter B - July 2020.pdf:38: 9 EIA Environmental Impact Assessment

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix C - July 2020.pdf:4:6 Development Impact Assessment 26

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix C - July 2020.pdf:4: 6.1 Sustainable Transport Network Impact Assessment 26

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix C - July 2020.pdf:4: 6.2 Highway Impact Assessment 26

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix C - July 2020.pdf:31:6 Development Impact Assessment

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix C - July 2020.pdf:31:on a worst-case scenario for the purpose of the highway impact assessment

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix C - July 2020.pdf:31:6.2 Highway Impact Assessment

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix C - July 2020.pdf:33:6.2.3 Cumulative Impact Assessment

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix C - July 2020.pdf:51:6 Development Impact Assessment 11

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix C - July 2020.pdf:51: 6.1 Scope of Highway Impact Assessment 11

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix C - July 2020.pdf:51: 6.2 Environmental Impact Assessment 12

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix C - July 2020.pdf:104:Development Impact Assessment

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix C - July 2020.pdf:104:Scope of Highways Impact Assessment

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix C - July 2020.pdf:104:necessary as a result of the comments made within this TM (and any resultant impact assessment

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix C - July 2020.pdf:104:Environmental Impact Assessment

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix C - July 2020.pdf:105: Impact Assessment assessment need of assessment at the SRN is

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix C - July 2020.pdf:128:scenario for the purpose of highway impact assessment (assuming that 82% of people working on

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf:10: Impact Assessment

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter M - July 2020.pdf:11: Impact Assessment Definition

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix L - July 2020.pdf:38:Impact Assessment to support an outline planning application for the South Industrial Zone, South

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:3: out the findings of an Environmental Impact Assessment (‘EIA’) that is being submitted to

R-2020-0357-OOM-South Industrial ES - Vol 1 - Non-Tech Summary - July 2020.pdf:3: Planning (Environmental Impact Assessment) Regulations 2017 (as amended) Part 10(a) relates

R-2020-0357-OOM-Transport Assessment.pdf:2:6 Development Impact Assessment 26

R-2020-0357-OOM-Transport Assessment.pdf:2: 6.1 Sustainable Transport Network Impact Assessment 26

R-2020-0357-OOM-Transport Assessment.pdf:2: 6.2 Highway Impact Assessment 26

R-2020-0357-OOM-Transport Assessment.pdf:26:the transport impact assessment it will be assumed that 82% of employees will

R-2020-0357-OOM-Transport Assessment.pdf:29:6 Development Impact Assessment

R-2020-0357-OOM-Transport Assessment.pdf:29:on a worst-case scenario for the purpose of the highway impact assessment

R-2020-0357-OOM-Transport Assessment.pdf:29:6.2 Highway Impact Assessment

R-2020-0357-OOM-Transport Assessment.pdf:31:6.2.3 Cumulative Impact Assessment

R-2020-0357-OOM-Transport Assessment.pdf:49:6 Development Impact Assessment 11

R-2020-0357-OOM-Transport Assessment.pdf:49: 6.1 Scope of Highway Impact Assessment 11

R-2020-0357-OOM-Transport Assessment.pdf:49: 6.2 Environmental Impact Assessment 12

R-2020-0357-OOM-Transport Assessment.pdf:58:the transport impact assessment, it will be assumed that 82% of employees will

R-2020-0357-OOM-Transport Assessment.pdf:60: highway impact assessment;

R-2020-0357-OOM-Transport Assessment.pdf:61:6 Development Impact Assessment

R-2020-0357-OOM-Transport Assessment.pdf:61:6.1 Scope of Highway Impact Assessment

R-2020-0357-OOM-Transport Assessment.pdf:62:6.2 Environmental Impact Assessment

R-2020-0357-OOM-Transport Assessment.pdf:62:Statement (ES). The Environmental Impact Assessment (EIA) will be carried out

R-2020-0357-OOM-Transport Assessment.pdf:62: Environmental Impact Assessment: A Guide to Procedures (Department of the

R-2020-0357-OOM-Transport Assessment.pdf:62: Guidelines for Environmental Impact Assessment (Institute of Environmental

R-2020-0357-OOM-Transport Assessment.pdf:63:  The scope of the junction impact assessments for the TA;

R-2020-0357-OOM-Transport Assessment.pdf:102:Development Impact Assessment

R-2020-0357-OOM-Transport Assessment.pdf:102:Scope of Highways Impact Assessment

R-2020-0357-OOM-Transport Assessment.pdf:102:necessary as a result of the comments made within this TM (and any resultant impact assessment

R-2020-0357-OOM-Transport Assessment.pdf:102:Environmental Impact Assessment

R-2020-0357-OOM-Transport Assessment.pdf:103: Impact Assessment assessment need of assessment at the SRN is

R-2020-0357-OOM-Transport Assessment.pdf:126:scenario for the purpose of highway impact assessment (assuming that 82% of people working on

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter E - July 2020.pdf:3:E1.5 The author has extensive experience in acoustics survey, impact assessment, and providing

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter E - July 2020.pdf:4: Environmental Impact Assessment (EIA) Regulations 1. The following summarises relevant

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter E - July 2020.pdf:9: (Environmental Impact Assessment) Regulations 2009 15 and has been undertaken according

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter E - July 2020.pdf:30: 1 The Town and Country Planning (Environmental Impact Assessment) Regulations 2017

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter E - July 2020.pdf:30: 15 Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix F - July 2020.pdf:17:The Town And Country Planning (Environmental Impact Assessment) Regulations 2017 Energy From

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:4: Impact Assessment (‘EIA’) submitted to Redcar and Cleveland Borough Council (‘RCBC’) to

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:4: Planning (Environmental Impact Assessment) Regulations 2017 (as amended). Part 10(a)

R-2020-0357-OOM-South Indsutrial Zone SES - Vol 1 - Non Technical Summary.PDF:4: Impact Assessment (EIA) of the proposed development. The EIA process aims to ensure that

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter D - July 2020.pdf:3:D1.5 The author has extensive experience in ecological survey, impact assessment, and providing

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter D - July 2020.pdf:7:D3.17 The impact assessment process involves:

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter D - July 2020.pdf:51: available to inform the impact assessment due to timing of the application.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter D - July 2020.pdf:52: 11 EcIA Ecological Impact Assessment

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter D - July 2020.pdf:55:25 CIEEM (2016) Guidelines for Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:3:J1.5 Atkins demonstrates competence in environmental impact assessment through registration to

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:3: experience in environmental consulting/ environmental impact assessment/ waste

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:10:J3.3 According to the IEMA guidance (Materials and Waste in Environmental Impact Assessment,

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:14: Environmental Impact Assessment, 2020) was sought. The response included general

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter J - July 2020.pdf:30: i IEMA guide to: Materials and Waste in Environmental Impact Assessment -

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter I - July 2020.pdf:4: preparing Socio-Economic Assessment in an Environmental Impact Assessment context. It has

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:8:C3.1 The Environmental Impact Assessment (EIA) has been carried out in accordance with the EIA

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:8: • Environmental Impact Assessment: A Guide to Procedures 9; and

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:8: • Guidelines for Environmental Impact Assessment 10.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:29: EIA Environmental Impact Assessment

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:30: 1 Town and Country Planning (Environmental Impact Assessment) Regulations 2017

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:30: Impact Assessment: A Guide to Procedures.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter C - July 2020.pdf:30: Environmental Impact Assessment

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix G - July 2020.pdf:27:EIA Environmental Impact Assessment

R-2020-0357-OOM-Planning Statement - July 2020.pdf:2: Environmental Impact Assessment 27

R-2020-0357-OOM-Planning Statement - July 2020.pdf:3: the need for Environmental Impact Assessment (‘EIA’). Whilst a formal screening request was

R-2020-0357-OOM-Planning Statement - July 2020.pdf:11:2.36 RCBC issued an Environmental Impact Assessment (‘EIA’) Scoping Opinion (reference.

R-2020-0357-OOM-Planning Statement - July 2020.pdf:29: 1 Environmental Impact Assessment

R-2020-0357-OOM-Planning Statement - July 2020.pdf:29: Environmental Impact Assessment

R-2020-0357-OOM-Planning Statement - July 2020.pdf:29: Impact Assessment) Regulations 2017 (the EIA Regulations) as updated by The Town and

R-2020-0357-OOM-Planning Statement - July 2020.pdf:29: Country Planning and Infrastructure Planning (Environmental Impact Assessment)

R-2020-0357-OOM-Planning Statement - July 2020.pdf:31:5.22 The Ecological Impact Assessment concluded that it is not practically possible for direct

R-2020-0357-OOM-Planning Statement - July 2020.pdf:36: 4 Drainage proposals and a Drainage Impact Assessment will be included as part of the STDC

R-2020-0357-OOM-Planning Statement - July 2020.pdf:39: timescales for construction. The visual impact assessment is based on a ‘massing plan’ of the

R-2020-0357-OOM-Planning Statement - July 2020.pdf:39: visual impact assessment for the proposed site:

R-2020-0357-OOM-Decision Notice.pdf:3: and the conclusions of the Environmental Impact Assessment that the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:3: Impact Assessment (‘EIA’) of proposals for a general industry and storage or distribution

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:6: (Environmental Impact Assessment) Regulations 2017 (Ref 4) which came into force on 16 May

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:6: (Environmental Impact Assessment) (Amendment) Regulations 2018 (Ref 5), which came into

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:12: Visual Impact Assessment RCBC on the scope of the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:32: 2 EIA Environmental Impact Assessment

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:32: 9 LVIA Landscape and Visual Impact Assessment

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:33: 4 Town and Country Planning (Environmental Impact Assessment) Regulations 2017

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter A - July 2020.pdf:33: and Environmental Impact Assessment) (England) (Coronavirus) (Amendment)

R-2020-0357-OOM-Officer report.pdf:71:construction. The residual impact assessment has been carried out on the

R-2020-0357-OOM-Officer report.pdf:109:supported by an Environmental Impact Assessment as Schedule 1

R-2020-0357-OOM-Officer report.pdf:111: processes and the conclusions of the Environmental Impact Assessment

R-2020-0357-OOM-South Industrial Zone ES - Vol 3 - Appendix A - July 2020.pdf:5:In accordance with Regulation 18(5) of the Town and Country Planning (Environmental Impact Assessment)

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:4:L2.9 The following policies are relevant to landscape and visual impact assessment for the proposed

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:6: 1 Guidelines for Landscape and Visual Impact Assessment (Third Edition) published by the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:6:L3.4 The Guidelines for Visual Impact Assessment Third Edition (GLVIA3) acknowledges that LVIA

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:14: Visual Impact Assessment Criteria

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:14:L3.30 The visual impact assessment draws from an identification of the sensitivity of receptors

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:14:L3.31 The impact assessment describes the current visual context from important viewpoints within

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:14: townscape and visual impact assessments in urban settings. Although this assessment is of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:17: as timescales for construction. The visual impact assessment is based on a ‘massing plan’ of

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:17: visual impact assessment takes these factors into account and the AVRs should not be viewed in

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:17: isolation from the visual impact assessment.

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:18:L3.52 Magnitude of change within views is an important element of visual impact assessment. For

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:66: 2 GLVIA – Guidance for Landscape and Visual Impact Assessment

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:66: 5 LVIA – Landscape and Visual Impact Assessment

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter L - July 2020.pdf:67: 1 Guidelines for Landscape and Visual Impact Assessment (Third Edition) published by the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter K - July 2020.pdf:3: Environmental Impact Assessment (EIA) Regulations (as amended) Ref 2 he has led on the

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter K - July 2020.pdf:4: The Town and Country Planning (Environmental Impact Assessment)

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter K - July 2020.pdf:4: Ref 3, identifies the important role that the Environmental Impact Assessment (‘EIA’) process

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter K - July 2020.pdf:24: 8 EIA Environmental Impact Assessment

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter K - July 2020.pdf:25: 2 Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as

R-2020-0357-OOM-South Industrial ES - Vol 2 - Chapter K - July 2020.pdf:25: Impact Assessment) (Amendment) Regulations 2018)

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:4:4 Greystones Roundabout Impact Assessment 24

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:28:4 Greystones Roundabout Impact Assessment

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:28: A174, Greystones Impact Assessment Report produced by Integrated Traffic

R-2020-0357-OOM-South Industrial Zone SES - Vol 3 - Technical Appendices (Section 3).PDF:29:4.2.2 Greystones Impact Assessment Report, Integrated

R-2020-0357-OOM-322735 R_2020_0357_OOM - Remediation of land at Southern Industrial Zone STDC South Bank.pdf:4:& Visual Impact Assessment should be provided with the proposal to inform decision making. We

R-2020-0357-OOM-322735 R_2020_0357_OOM - Remediation of land at Southern Industrial Zone STDC South Bank.pdf:4:refer you to the Landscape Institute Guidelines for Landscape and Visual Impact Assessment for

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:8: 25 of the Town and Country Planning (Environmental Impact Assessment (‘EIA’)) Regulations

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:8: Environmental Impact Assessment) (England) (Coronavirus) (Amendment) Regulations came

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:28:4.4 The author has extensive experience in ecological survey, impact assessment, and providing

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:51: scale Environmental Impact Assessments (EIA).

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:78: 22 EcIA Ecological Impact Assessment

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:78: 25 EIA Environmental Impact Assessment

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:81: 4 Town and Country Planning (Environmental Impact Assessment) Regulations 2017

R-2020-0357-OOM-South Industrial Zone SES - Vol 2 - Supplementary Environmental Statement.PDF:81: and Environmental Impact Assessment) (England) (Coronavirus) (Amendment) (14 May

R-2020-0357-OOM-Habitats Regulation Assessment.pdf:46:site was not available to inform the impact assessment due to timing of the

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:1:Impact Assessment)

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:5:5.1.3 Impact Assessments 31

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:6:6.3.2 Impact Assessment 39

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:7:7.5 Impact Assessment 92

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:8:10.3.3 Impact Assessment Methodology 156

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:12:EIA Environmental Impact Assessment

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:14: the Scheme. It also documents the Environmental Impact Assessment (EIA)

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:14: • The Town and Country Planning (Environmental Impact Assessment)

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:38: (Environmental Impact Assessment (EIA) and Environmental Management), Della

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:39: Guidelines for Ecological Impact Assessment (EcIA) have been developed

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:43: consenting requirements. Environmental Impact Assessment (EIA) is widely recognised

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:44:5.1.3 Impact Assessments

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:44: The general approach of the Impact Assessment is to determine the significance of

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:52:6.3.2 Impact Assessment

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:52: The ecological impact assessment is based on guidance provided by the Chartered

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:52: Advice Note 130/10, Ecology and Nature Conservation: Criteria for Impact Assessment,

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:52: the ecological impact assessment on the receptors of highest importance. The

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:53: The impact assessment process involves:

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:54: Criteria for Impact Assessment.

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:62: APIS website does provide habitat-specific critical loads for use in impact assessment.

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:86: This chapter presents the Landscape and Visual Impact Assessment (LVIA) for the

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:87: • Guidelines for Landscape and Visual Impact Assessment, 3rd edition (GLVIA3).

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:89: Visual Impact Assessment, produced by the Landscape Institute and the

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:89: and visual impact assessment.

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:89: using local materials. The Environmental Impact Assessment process

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:95: resource of the area. It does not form part of an Environment Impact Assessment (EIA).

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:105:7.5 Impact Assessment

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:116: almost 5km away. The Landscape and Visual Impact Assessment (LVIA), in Chapter 7

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:126: Therefore, a soils impact assessment has not been carried out.

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:141: The impact assessment has been carried out on the assumption that the above

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:148: Stand-alone Flood Risk Assessment (FRA), including Drainage Impact assessment (DIA)

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:149: The general approach of the impact assessment to determine the significance of

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:169:10.3.3 Impact Assessment Methodology

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:179: A social impact assessment has been undertaken to assess the development proposals

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:196: A social impact assessment has been undertaken to determine the likelihood of any

R-2019-0767-OOM-2019s0951 - Energy Recovery Facility Environmental Statement.pdf:219: context of the Environmental Impact Assessment (EIA) Regulations. In line with Part 7

R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:3: EU Limit Value Impact Assessment 63

R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:7:(Environmental Impact Assessment) Regulations 2017 which were last updated in March 2019.

R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:23:critical loads. However, the APIS website does provide habitat-specific critical loads for use in impact assessment.

R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:46:Proposed Development. Based on the impact assessment, appropriate mitigation has been identified.

R-2019-0767-OOM-REP-1011778-AQ-CR-20200306-Grangetown Prairie Energy from Waste-AQA-R02.pdf:63: EU Limit Value Impact Assessment

R-2019-0767-OOM-Environmental Statement ES Volume 2.pdf:1:Impact Assessment)

R-2019-0767-OOM-Environmental Statement ES Volume 2.pdf:6:EIA Environmental Impact Assessment

R-2019-0767-OOM-Chapter 8 WFD Assessment.pdf:3:2.4 Impact Assessment …………………………………………………………………………………………… 5

R-2019-0767-OOM-Chapter 8 WFD Assessment.pdf:4:6 WFD Impact Assessment …………………………………………………………………. 21

R-2019-0767-OOM-Chapter 8 WFD Assessment.pdf:4:6.2 Impact assessment …………………………………………………………………………………………..21

R-2019-0767-OOM-Chapter 8 WFD Assessment.pdf:10: through the scoping or impact assessment stages.

R-2019-0767-OOM-Chapter 8 WFD Assessment.pdf:11:2.4 Impact Assessment

R-2019-0767-OOM-Chapter 8 WFD Assessment.pdf:11: and Scoping Assessments, is to undertake an Impact Assessment to consider the

R-2019-0767-OOM-Chapter 8 WFD Assessment.pdf:11: measures. An impact assessment must be carried out for each receptor identified

R-2019-0767-OOM-Chapter 8 WFD Assessment.pdf:11: The Impact Assessment describes how any identified impacts from the proposed

R-2019-0767-OOM-Chapter 8 WFD Assessment.pdf:27:6 WFD Impact Assessment

R-2019-0767-OOM-Chapter 8 WFD Assessment.pdf:27: potentially be at risk from the proposed works. An Impact Assessment is therefore

R-2019-0767-OOM-Chapter 8 WFD Assessment.pdf:27: The Impact Assessment needs to consider if there is a pathway linking the pressure to

R-2019-0767-OOM-Chapter 8 WFD Assessment.pdf:27:6.2 Impact assessment

R-2019-0767-OOM-20191201 ERF Planning DAS_Issued.pdf:6:3 Environmental Impact Assessment -5-

R-2019-0767-OOM-20191201 ERF Planning DAS_Issued.pdf:6:12.3 Landscape and Visual Impact Assessment (LVIA) - 29 -

R-2019-0767-OOM-20191201 ERF Planning DAS_Issued.pdf:7:LVIA Landscape and Visual Impact Assessment

R-2019-0767-OOM-20191201 ERF Planning DAS_Issued.pdf:12:3 Environmental Impact Assessment

R-2019-0767-OOM-20191201 ERF Planning DAS_Issued.pdf:12: The Town and Country Planning (Environmental Impact Assessment) Regulations govern the

R-2019-0767-OOM-20191201 ERF Planning DAS_Issued.pdf:12: Regulations has been to transpose the 2014 amended Environmental Impact Assessment Directive

R-2019-0767-OOM-20191201 ERF Planning DAS_Issued.pdf:24: in attendance with Dorian Latham, Technical Director (Environmental Impact Assessment and

R-2019-0767-OOM-20191201 ERF Planning DAS_Issued.pdf:36:12.3 Landscape and Visual Impact Assessment (LVIA)

R-2019-0767-OOM-20191201 ERF Planning DAS_Issued.pdf:36: A Landscape Visual Impact Assessment has been undertaken. It concluded that the site is situated

R-2019-0767-OOM-20191201 ERF Planning DAS_Issued.pdf:37: Screening, Scoping and Impact Assessment were all undertaken as part of this work. It was

R-2019-0767-OOM-Appendix B Scoping Response.pdf:1:Impact Assessment) Regulations 2017.

R-2019-0767-OOM-Appendix B Scoping Response.pdf:5:In relation to the protection of the railway, any Environmental Impact Assessment for the site should

R-2019-0767-OOM-Non Technical Summary_Final.pdf:2:The Environmental Statement provides the summary of the Environmental Impact Assessment

R-2019-0767-OOM-Non Technical Summary_Final.pdf:2:been submitted to support the Outline Planning application. Impact Assessment aims to determine

R-2019-0767-OOM-Non Technical Summary_Final.pdf:2:areas will have their own assessment guidelines for impact assessment. Impacts and mitigation are

R-2019-0767-OOM-Non Technical Summary_Final.pdf:11:EIA Environmental Impact Assessment

R-2019-0767-OOM-Appendix B Screening.pdf:1:Country Planning (Environmental Impact Assessment) Regulations 2011 and now

R-2019-0767-OOM-Appendix B Screening.pdf:1:Impact Assessment) Regulations 2017. Energy from Waste Plant (EFW) Plant,

R-2019-0767-OOM-Appendix B Screening.pdf:1:confirmation of the Environmental Impact Assessment (EIA) Screening.

R-2019-0767-OOM-Appendix B Screening.pdf:1:(Environmental Impact Assessment) Regulations 2017. The process comprises a series

R-2019-0767-OOM-Chapter 13 Grangetown Prairie Transport Statement.pdf:44:Impact Assessment) Regulations 2017.

R-2019-0767-OOM-Chapter 13 Grangetown Prairie Transport Statement.pdf:48:In relation to the protection of the railway, any Environmental Impact Assessment for the site should

R-2019-0767-OOM-Chapter 13 Grangetown Prairie Transport Statement.pdf:48:Environmental Impact Assessment (EIA) for this development.

R-2019-0767-OOM-Chapter 13 Grangetown Prairie Transport Statement.pdf:49:Schedule 4 of the Town & Country Planning (Environmental Impact Assessment) Regulations 2017,

R-2019-0767-OOM-Chapter 13 Grangetown Prairie Transport Statement.pdf:50:Impact Assessment (EcIA) have been developed by the Chartered Institute of Ecology and

R-2019-0767-OOM-Chapter 13 Grangetown Prairie Transport Statement.pdf:51:results, impact assessments and appropriate accompanying mitigation strategies included as part of

R-2019-0767-OOM-Chapter 13 Grangetown Prairie Transport Statement.pdf:52:therefore advises that survey, impact assessment and mitigation proposals for Habitats and Species

R-2019-0767-OOM-Chapter 13 Grangetown Prairie Transport Statement.pdf:53:Natural England supports the publication Guidelines for Landscape and Visual Impact Assessment,

R-2019-0767-OOM-Chapter 13 Grangetown Prairie Transport Statement.pdf:53:impact assessment.

R-2019-0767-OOM-Chapter 13 Grangetown Prairie Transport Statement.pdf:53:Environmental Impact Assessment process should detail the measures to be taken to ensure the

R-2019-0767-OOM-Chapter 13 Grangetown Prairie Transport Statement.pdf:55:The ES should include an impact assessment to identify, describe and evaluate the effects that are

R-2019-0767-OOM-officer report.pdf:27:Visual Impact Assessment (LVIA); Flood Risk; Water Framework Directive;

R-2019-0767-OOM-officer report.pdf:33:on the assessment of impacts on specific species. The impact assessment is

R-2019-0767-OOM-officer report.pdf:33:130/10, Ecology and Nature Conservation: Criteria for Impact Assessment,

R-2019-0767-OOM-officer report.pdf:34: The impact assessment process involves:

R-2019-0767-OOM-officer report.pdf:38:The impact assessment covers an area of 10km as a zone of influence (ZoI)

R-2019-0767-OOM-officer report.pdf:50:The Landscape and Visual Impact Assessment has concluded that the

R-2019-0767-OOM-officer report.pdf:54:A Flood Risk Assessment (FRA), including Drainage Impact Assessment

R-2019-0767-OOM-officer report.pdf:55:The general approach of the impact assessment to determine the significance

R-2019-0767-OOM-officer report.pdf:75:supported by an Environmental Impact Assessment as Schedule 1

R-2019-0767-OOM-officer report.pdf:77: Impact Assessment and Air Quality Assessment that the development

R-2019-0767-OOM-officer report.pdf:78: 1 of the submitted Environmental Impact Assessment December 2019

R-2019-0767-OOM-Decision Notice_R20190767OOM(4).pdf:2: conclusions of the Environmental Impact Assessment and Air Quality

R-2019-0767-OOM-Decision Notice_R20190767OOM(4).pdf:2: Environmental Impact Assessment December 2019 and Chapter 7 (Mitigation)

R-2019-0767-OOM-Appendix B Scoping Letter Request.pdf:1:Town and Country Planning (Environmental Impact Assessment)

R-2019-0767-OOM-Appendix B Scoping Letter Request.pdf:3:(Environmental Impact Assessment) Regulations 2017. We propose that the

R-2019-0767-OOM-Appendix B Scoping Letter Request.pdf:3: impact assessment.

R-2019-0767-OOM-Appendix B Scoping Letter Request.pdf:7:impact assessments. A desk study of current and previous planning

R-2021-0831-CD-63262_01 - Biodiversity Strategy IB - Sept 2021.PDF:12: Arup Ecological Impact Assessment, 24 June 2020) within the site and / or off-site, and the

R-2021-0831-CD-63262 - Covering Letter - 29.09.21.pdf:1:Distinctiveness in Table 4 of the Arup Ecological Impact Assessment, 24 June 2020) within the site and / or

R-2021-0831-CD-393340-R_2021_0831_CD-NE_Response.pdf:2:impacts of development are likely to be significant, a Landscape & Visual Impact Assessment should be

R-2021-0831-CD-393340-R_2021_0831_CD-NE_Response.pdf:2:Guidelines for Landscape and Visual Impact Assessment for further guidance.

R-2021-0831-CD-DECISION NOTICE 0357.pdf:3: and the conclusions of the Environmental Impact Assessment that the

R-2021-0831-CD-63262 - Teesworks Environment and Biodiversity Strategy May 2022.PDF:14: Arup Ecological Impact Assessment, 24 June 2020) within the site and / or off-site, and the

R-2021-0831-CD-Teesworks Environment and Biodiversity Strategy - Sept 2021.pdf:12: Arup Ecological Impact Assessment, 24 June 2020) within the site and / or off-site, and the

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:8: • Metals Recovery Site Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:14:An Ecological Impact Assessment and Biodiversity Net Gain Assessment was undertaken by ARUP

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:14:The Ecological Impact Assessment identified a number of breeding and wintering bird species most

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:14:The Ecological Impact Assessment and Biodiversity Net Gain Assessment (ARUP 2020) did not record

R-2020-0743-CD-10035117-AUK-XX-XX-RP-ZZ-0181-MPA_ROA and Strategy.pdf:14:The Ecological Impact Assessment and Biodiversity Net Gain Assessment (ARUP 2020) document

R-2023-0224-CD-P20-1004 Grangetown Prairie shadow HRA.pdf:5: Environmental Impact Assessment and Air Quality Assessment that the development will not give

R-2023-0224-CD-P20-1004 Grangetown Prairie shadow HRA.pdf:43: Consequently, the emissions arising from the two stacks associated with its two process lines have been incorporated into the cumulative impact assessment

R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:13: two process lines will be incorporated into the cumulative impact assessment undertaken

R-2023-0224-CD-P20-1004 Grangetown Prairie Biodiversity Improvement Plan.pdf:22: Country Planning (Environmental Impact Assessment) Regulations 2017. Volume 1: Environmental

R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:59: Environmental Impact Assessment and Air Quality Assessment that the development will not give

R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:97: Consequently, the emissions arising from the two stacks associated with its two process lines have been incorporated into the cumulative impact assessment

R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:121:4 Impact Assessment ……………………………………………………………………………………………………………………. 9

R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:129:4 Impact Assessment

R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (3 of 3).pdf:138: Consequently, the emissions arising from the two stacks associated with its two process lines have been incorporated into the cumulative impact assessment

R-2023-0224-CD-P20-1004 Grangetown Prairie Air Quality Impacts on SSSI.pdf:4:4 Impact Assessment ……………………………………………………………………………………………………………………. 9

R-2023-0224-CD-P20-1004 Grangetown Prairie Air Quality Impacts on SSSI.pdf:12:4 Impact Assessment

R-2023-0224-CD-P20-1004 Grangetown Prairie Air Quality Impacts on SSSI.pdf:21: Consequently, the emissions arising from the two stacks associated with its two process lines have been incorporated into the cumulative impact assessment

R-2023-0224-CD-Decision Notice_R20190767OOM(4).pdf:2: conclusions of the Environmental Impact Assessment and Air Quality

R-2023-0224-CD-Decision Notice_R20190767OOM(4).pdf:2: Environmental Impact Assessment December 2019 and Chapter 7 (Mitigation)

R-2023-0224-CD-ECL.007.04.01_ADM - Issue 1a (2 of 3).pdf:43: lines will be incorporated into the cumulative impact assessment undertaken as part of this

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:46: Landscape and Visual Impact Assessment can be used.”

R-2023-0247-OOM-TV_BAF_Landscape_and_Visual_Appraisal_Part_1of2.pdf:51: • The Guidelines for Landscape and Visual Impact Assessment, (GLVIA) 3rd

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:1:Noise Impact Assessment

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:3:NOISE IMPACT ASSESSMENT

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:3:Description Noise Impact Assessment

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:4:Noise Impact Assessment

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:5:Noise Impact Assessment

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:6:Noise Impact Assessment 1

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:6: referred to as the ‘Applicant’) to prepare a Noise Impact Assessment for the proposed development

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:7:Noise Impact Assessment 2

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:8:Noise Impact Assessment 3

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:9:Noise Impact Assessment 4

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:10:Noise Impact Assessment 5

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:11:Noise Impact Assessment 6

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:12:Noise Impact Assessment 7

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:13:Noise Impact Assessment 8

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:14:Noise Impact Assessment 9

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:15:Noise Impact Assessment 10

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:16:Noise Impact Assessment 11

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:17:Noise Impact Assessment 12

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:18:Noise Impact Assessment 13

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:19:Noise Impact Assessment 14

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:20:Noise Impact Assessment 15

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:21:Noise Impact Assessment 16

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:22:Noise Impact Assessment 17

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:23:Noise Impact Assessment 18

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:24:Noise Impact Assessment 19

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:25:Noise Impact Assessment 20

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:26:Noise Impact Assessment 21

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:27:Noise Impact Assessment 22

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:28:Noise Impact Assessment 23

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:29:Noise Impact Assessment 24

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:30:Noise Impact Assessment 25

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:31:Noise Impact Assessment 26

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:32:Noise Impact Assessment 27

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:33:Noise Impact Assessment

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:34:Noise Impact Assessment

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:35:Noise Impact Assessment

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:36:Noise Impact Assessment

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:37:Noise Impact Assessment

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:38:Noise Impact Assessment

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:39:Noise Impact Assessment

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:40:Noise Impact Assessment

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:41:Noise Impact Assessment

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:42:Noise Impact Assessment

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:43:Noise Impact Assessment

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:44:Noise Impact Assessment

R-2023-0247-OOM-TV_BAF_Noise_Impact_Assessment.pdf:45:Noise Impact Assessment

R-2023-0247-OOM-TV_BAF_Heritage_Statement_Part_1of2.pdf:19:IEMA, IHBC and CifA, 2021, Principles of Cultural Heritage Impact Assessment in the UK

R-2023-0247-OOM-428285 - R_2023_0247_OOM Outline application for bottom ash facility Grangetown Prairie Land East of John Boyle Road - No Objection subject to mitigation.pdf:3:impacts of development are likely to be significant, a Landscape & Visual Impact Assessment should be

R-2023-0247-OOM-428285 - R_2023_0247_OOM Outline application for bottom ash facility Grangetown Prairie Land East of John Boyle Road - No Objection subject to mitigation.pdf:3:Guidelines for Landscape and Visual Impact Assessment for further guidance.

R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:9: Town and Country Planning (Environmental Impact Assessment) Regulations

R-2023-0247-OOM-TV_BAF_Contaminated_Land_Review.pdf:9: Redcar, The Town and Country Planning (Environmental Impact Assessment) Regulations 2017, ref. 2019s0951

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:1:Environmental Impact Assessment:

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:2: Environmental Impact Assessment:

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:5:1.1 This report sets out the environmental impact assessment (EIA) screening exercise

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:5: Planning (Environmental Impact Assessment) Regulations 2017 (as amended;

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:5: Planning Practice Guidance: Environmental Impact Assessment (updated 2020),

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:18: Noise Impact Assessment report is submitted to RCBC as supporting information

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:27: Guidelines for Landscape and Visual Impact Assessment (third edition, 2013) has

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:36: • Noise impact assessment

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:36: • Ecological impact assessment

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:41:Environmental Impact Assessment:

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:42: Environmental Impact Assessment:

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:43:ENVIRONMENTAL IMPACT ASSESSMENT: STATEMENT OF

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:44:ENVIRONMENTAL IMPACT ASSESSMENT: STATEMENT OF

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:46:1.1 This Environmental Impact Assessment (EIA) Statement of Conformity (SoC) is

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:46: and Country Planning (Environmental Impact Assessment) Regulations 2017 (as

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:85: chapter on landscape and visual impact assessment (LVIA) that was prepared for

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:88:6.24 In terms of the overall visual impact assessment, the December 2019 ES LVIA

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:102: remaining topics were not taken forward into the original impact assessment,

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:106: being minor to neutral. The updated landscape and visual impact assessment in

R-2023-0247-OOM-TV_BAF_EIA_Screening_Report_Part_1of2.pdf:134: The original visual impact assessment at construction and operational stage was

R-2023-0247-OOM-TV_BAF_Planning_and_Design_Statement.pdf:8: Environmental impact assessment (EIA)

R-2023-0247-OOM-TV_BAF_Planning_and_Design_Statement.pdf:9: • Environmental Impact Assessment screening report

R-2023-0247-OOM-TV_BAF_Planning_and_Design_Statement.pdf:9: • Ecological impact assessment

R-2023-0247-OOM-TV_BAF_Planning_and_Design_Statement.pdf:12: HRA screening assessment, an ecological impact assessment is also submitted

R-2023-0247-OOM-TV_BAF_Planning_and_Design_Statement.pdf:40:5.118. The applicant has considered whether Environmental Impact Assessment (EIA) is

R-2023-0247-OOM-TV_BAF_Planning_and_Design_Statement.pdf:41:5.127. An ecological impact assessment and a shadow Habitats Regulations

R-2023-0247-OOM-TV_BAF_Planning_and_Design_Statement.pdf:41:5.128. The ecological impact assessment identifies that the site is of nature conservation

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:1:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:3:ECOLOGICAL IMPACT ASSESSMENT

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:3:Description Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:4:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:5:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:5: referred to as the ‘Applicant’) to prepare an ecological impact assessment (hereafter referred to

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:5: 1Chartered Institute of Ecology and Environmental Management (CIEEM), 2019. Guidelines for Ecological Impact Assessment in the UK

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:6:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:6: 5 Chartered Institute of Ecology and Environmental Management (CIEEM), 2019. Guidelines for Ecological Impact Assessment in the

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:7:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:8:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:9:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:10:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:11:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:11: 11 Wray S, Wells D, Long E, Mitchell-Jones T., 2010. Valuing Bats in Ecological Impact Assessment, CIEEM In-Practice. 23-25

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:12:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:13:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:14:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:15:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:16:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:17:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:18:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:19:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:20:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:21:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:22:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:23:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:24:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:25:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:26:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:27:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:28:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:29:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:30:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:31:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:32:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:33:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:34:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:35:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:36:Ecological Impact Assessment

R-2023-0247-OOM-TV_BAF_Ecological_Impact_Assessment.pdf:37:Ecological Impact Assessment

R-2023-0247-OOM-PN 0247.pdf:1:I note that an Air Quality Assessment and a Noise Impact Assessment have been

R-2023-0247-OOM-TV_BAF_Air_Quality_Assessment.pdf:4: undertake an Air Quality Impact Assessment to support the planning application for the

R-2023-0247-OOM-TV_BAF_Air_Quality_Assessment.pdf:6:5 Construction Phase Impact Assessment …………………………………………………………………………………………….14

R-2023-0247-OOM-TV_BAF_Air_Quality_Assessment.pdf:6:6 Operational Phase Impact Assessment ………………………………………………………………………………………………18

R-2023-0247-OOM-TV_BAF_Air_Quality_Assessment.pdf:15: 5 Construction Phase Impact Assessment

R-2023-0247-OOM-TV_BAF_Air_Quality_Assessment.pdf:19: 6 Operational Phase Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter D - Noise & Vibration - Dec 2020.pdf:6: Environmental Impact Assessment (EIA) Regulations 1. The following summarises relevant

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter D - Noise & Vibration - Dec 2020.pdf:10: is therefore inherently a cumulative impact assessment.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter D - Noise & Vibration - Dec 2020.pdf:11: professionals in Environmental Impact Assessments.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter D - Noise & Vibration - Dec 2020.pdf:16:D3.56 The temporary construction impact assessment is based on the assumption that construction

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter D - Noise & Vibration - Dec 2020.pdf:33: the noise impact assessment. It was agreed that the existing noise environment around the site

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter D - Noise & Vibration - Dec 2020.pdf:38: 1 The Town and Country Planning (Environmental Impact Assessment) Regulations 2017

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter D - Noise & Vibration - Dec 2020.pdf:38: 15 Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter E - Air Quality - Dec 2020.pdf:5: development scale Environmental Impact Assessments (‘EIA’).

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter E - Air Quality - Dec 2020.pdf:36: 16 EIA: Environmental Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:5: are relevant to Landscape and Visual Impact assessment. More general information on the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:5:J2.9 The following policies are relevant to landscape and visual impact assessment for the proposed

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:7: 1 Guidelines for Landscape and Visual Impact Assessment (Third Edition) published by the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:7:J3.4 The Guidelines for Visual Impact Assessment Third Edition (GLVIA3) acknowledges that LVIA

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:15: Visual Impact Assessment Criteria

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:15:J3.29 The visual impact assessment draws from an identification of the sensitivity of receptors

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:15:J3.30 The impact assessment describes the current visual context from important viewpoints within

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:15: townscape and visual impact assessments in urban settings. Although this assessment is of

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:18: visual impact assessment takes these factors into account and the AVRs should not be viewed in

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:18: isolation from the visual impact assessment.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:18:J3.50 The magnitude of change within views is an important element of visual impact assessment. For

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:36: criteria are then applied in the visual impact assessment. Appendix J2 illustrates the location

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:36: impact assessment. To enable an accurate assessment of cumulative visual effects the Verified

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:36: development can be observed are included within the visual impact assessment.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:38: as timescales for construction. The visual impact assessment is based on a ‘massing plan’ of

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:39: plan is used to inform both the landscape and visual impact assessments as the likely worst case

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:62: 2 GLVIA – Guidance for Landscape and Visual Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:62: 5 LVIA – Landscape and Visual Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter J - LVIA - Dec 2020.pdf:63: 1 Guidelines for Landscape and Visual Impact Assessment (Third Edition) published by the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:7: Statements for Environmental Impact Assessments (EIA) and other regulatory, permitting and

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:7: Environmental Statements to support Environmental Impact Assessments in addition to

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter G Ground Conditions - Dec 2020.PDF:11: by Arcadis, and successfully applied to other Environmental Impact Assessments. The

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:6:Subject STDC Outline Applications: Environmental Impact Assessments

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:6: Projects) of Schedule 2 of the Town and Country Planning (Environmental Impact Assessment)

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:7: is considered that all five of the proposed developments are Environmental Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:32:sites, the outline planning applications and the proposed scope of the Environmental Impact Assessments (‘EIA’).

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:32:Environmental Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter A Introduction and Background - Dec 2020.pdf:35:In accordance with Regulation 18(5) of the Town and Country Planning (Environmental Impact Assessment)

R-2020-0820-ESM-341100 R_2020_0820_ESM - Natural England.pdf:3:& Visual Impact Assessment should be provided with the proposal to inform decision making. We

R-2020-0820-ESM-341100 R_2020_0820_ESM - Natural England.pdf:3:refer you to the Landscape Institute Guidelines for Landscape and Visual Impact Assessment for

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter J - LVIA - Dec 2020.pdf:43:Subject: RE: Teesworks Outline Planning Applications - Landscape and Visual Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter J - LVIA - Dec 2020.pdf:44:Subject: Teesworks Outline Planning Applications - Landscape and Visual Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter F - Water Management - Dec 2020.pdf:34:EIA Environmental Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter H - Socio Economic - Dec 2020.PDF:6: preparing Socio-Economic Assessment in an Environmental Impact Assessment context. It has

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:4: Environmental Impact Assessment 28

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:5: Planning (Environmental Impact Assessment) Regulations 2017 (as amended) Part 10(a) relates

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:32: 1 Environmental Impact Assessment

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:32: Environmental Impact Assessment

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:32: Impact Assessment) Regulations 2017 (the EIA Regulations) as updated by The Town and

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:32: Country Planning and Infrastructure Planning (Environmental Impact Assessment)

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:39: 2 A Surface Water Management Plan, drainage proposals and a Drainage Impact Assessment

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:40: the noise impact assessment. It was agreed that the existing noise environment around the site

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:43: timescales for construction. The visual impact assessment is based on a ‘massing plan’ of the

R-2020-0820-ESM-Lackeny - Planning Statement - Dec 2020.pdf:43: visual impact assessment for the proposed site:

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:4:K1.5 Atkins demonstrates competence in environmental impact assessment through registration to

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:4: years of experience in environmental consulting/ environmental impact assessment/ waste

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:11:K3.3 According to the IEMA guidance (Materials and Waste in Environmental Impact Assessment,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:16: will be undertaken as part of the wider cumulative impact assessment in Chapter N.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter K - Waste and Materials - Dec 2020(1).PDF:31: 19 IEMA guide to: Materials and Waste in Environmental Impact Assessment - Guidance for a

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:5:6 Sustainable Transport Network Impact Assessment 25

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:5:7 Highway Impact Assessment 26

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:5: 7.3 Cumulative Impact Assessment 28

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:5: 7.5 Strategic Road Network Impact Assessment 45

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:32:7 Highway Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:34:7.3 Cumulative Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:51:7.5 Strategic Road Network Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:61:To account for the bus service, the highway impact assessment has assumed only

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:67:6 Development Impact Assessment 13

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:67: 6.1 Scope of Highway Impact Assessment 13

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:67: 6.2 Environmental Impact Assessment 14

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:68:Environmental Impact Assessment.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:73:junction impact assessments. Access is expected to also be permitted via the

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:80:6 Development Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:80:6.1 Scope of Highway Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:80:Table 7 Junctions Impact Assessments

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:81:6.2 Environmental Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:81:Statement (ES) for each development. The Environmental Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:81: Environmental Impact Assessment: A Guide to Procedures (Department of the

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:81: Guidelines for Environmental Impact Assessment (Institute of Environmental

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:81:  The scope of the junction impact assessments for the TA’s;

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:89:Development Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:89:Scope of Highway Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:89:Environmental Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:96: Development impact assessment made need of assessment at the SRN is

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:263:6 Development Impact Assessment 13

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:263: 6.1 Scope of Highway Impact Assessment 13

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:263: 6.2 Environmental Impact Assessment 14

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:264:Environmental Impact Assessment.

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:269:junction impact assessments. Access is expected to also be permitted via the

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:276:6 Development Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:276:6.1 Scope of Highway Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:276:Table 7 Junctions Impact Assessments

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:277:6.2 Environmental Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:277:Statement (ES) for each development. The Environmental Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:277: Environmental Impact Assessment: A Guide to Procedures (Department of the

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:277: Guidelines for Environmental Impact Assessment (Institute of Environmental

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:277:  The scope of the junction impact assessments for the TA’s;

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:285:Development Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:285:Scope of Highway Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:285:Environmental Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter C - Transport - Dec 2020.pdf:292: Development impact assessment made need of assessment at the SRN is

R-2020-0820-ESM-Lackenby ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:3: out the findings of an Environmental Impact Assessment (‘EIA’) that has been submitted to

R-2020-0820-ESM-Lackenby ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:3: Planning (Environmental Impact Assessment) Regulations 2017 (as amended). Part 10(a)

R-2020-0820-ESM-Lackenby ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:15: • A detailed FRA and Drainage Impact Assessment (DIA) with drainage strategy (for both foul

R-2020-0820-ESM-Lackenby ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:20:11.1 A Landscape and Visual Impact Assessment has been undertaken by BDP to assess the

R-2020-0820-ESM-Lackenby ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:25: occupier), a detailed Flood Risk Assessment, Drainage Impact Assessment with drainage

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter I - Climate Change - Dec 2020.PDF:6: to the 2017 Environmental Impact Assessment (EIA) Regulations (as amended) Ref 2 he has

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter I - Climate Change - Dec 2020.PDF:7: The Town and Country Planning (Environmental Impact Assessment)

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter I - Climate Change - Dec 2020.PDF:7: Ref 3, identifies the important role that the Environmental Impact Assessment (‘EIA’) process

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter I - Climate Change - Dec 2020.PDF:29: 8 EIA Environmental Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter I - Climate Change - Dec 2020.PDF:30: 2 Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter I - Climate Change - Dec 2020.PDF:30: Impact Assessment) (Amendment) Regulations 2018)

R-2020-0820-ESM-2022 03 08 (Lakenby 0820) Conds.pdf:3:accompanied by a transport impact assessment setting out the predicted peak hour

R-2020-0820-ESM-2022 03 08 (Lakenby 0820) Conds.pdf:3:28. All traffic impact assessments submitted to the Local Planning Authority pursuant

R-2020-0820-ESM-2022 03 08 (Lakenby 0820) Conds.pdf:4:Condition 29 unless a transport impact assessment has been submitted to and

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:6: “Teesworks”. It sets out the findings of an Environmental Impact Assessment (‘EIA’) of

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:8: 6 Ecological Impact Assessment; and

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:9: Country Planning (Environmental Impact Assessment) Regulations 2017 (Ref 5) which came

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:9: Infrastructure Planning (Environmental Impact Assessment) (Amendment) Regulations 2018

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:9: Impact Assessment) (England) (Coronavirus) (Amendment) Regulations 2020 (hereafter ‘the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:36: 5 EIA Environmental Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:37: 5 Town and Country Planning (Environmental Impact Assessment) Regulations 2017

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter A Introduction and Background - Dec 2020.PDF:37: and Environmental Impact Assessment) (England) (Coronavirus) (Amendment)

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter I - Climate Change - Dec 2020.pdf:15: EIA Environmental Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:6: Environmental Impact Assessment (‘EIA’), and considers the design rationale underpinning the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:18: state under the Infrastructure Planning Environmental Impact Assessment Regulations

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:19: Regulations and Environmental Impact Assessments relating to those demolition schemes.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:24: environmental impact assessment.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter B - Site Description and Scheme Proposals - Dec 2020.PDF:44: 14 EIA Environmental Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter M - Mitigation and Monitoring - Dec 2020.PDF:4:M1.2 Schedule 4, Part 7 of the Town and Country Planning (Environmental Impact Assessment)

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter M - Mitigation and Monitoring - Dec 2020.PDF:15: Management - A detailed Flood Risk Assessment (‘FRA’) Impact Assessment,

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter M - Mitigation and Monitoring - Dec 2020.PDF:15: and Flooding and Drainage Impact Assessment (‘DIA’) SuWMP and WFD

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter M - Mitigation and Monitoring - Dec 2020.PDF:15: A detailed FRA and Drainage Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter M - Mitigation and Monitoring - Dec 2020.PDF:20: 14 DIA – Drainage Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter M - Mitigation and Monitoring - Dec 2020.PDF:20: 17 EIA - Environmental Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter M - Mitigation and Monitoring - Dec 2020.PDF:22: 1 Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter M - Mitigation and Monitoring - Dec 2020.PDF:22: Impact Assessment) (Amendment) Regulations 2018, which be viewed at:

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter M - Mitigation and Monitoring - Dec 2020.PDF:22: 2 IEMA Environmental Impact Assessment Guide to Shaping Quality Development’ Report

R-2020-0820-ESM-Decision Notice 0820.pdf:8: must be accompanied by a transport impact assessment setting out the

R-2020-0820-ESM-Decision Notice 0820.pdf:8:26. All traffic impact assessments submitted to the Local Planning Authority

R-2020-0820-ESM-Lackenby ES - Vol 3 - Chapter D - Noise & Vibration - Dec 2020.pdf:11:Country Planning (Environmental Impact Assessment) Regulations 2017 Energy From Waste Plant (Efw)

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:5: is a member of the IEMA Environmental Impact Assessment (EIA) Quality Mark.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:37: a soils impact assessment has not been carried out.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:43: detailed Flood Risk Assessment and Drainage Impact Assessment as well as WFD Assessment –

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:46: i A detailed FRA and Drainage Impact Assessment (DIA) with drainage strategy (for

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:61: 11 DIA Drainage Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:61: 14 EIA Environmental Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:64: 33 GOV.UK (2017a). The Town and Country Planning (Environmental Impact Assessment)

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter F - Water Management - Dec 2020(1).PDF:64: 39 GOV.UK (2020). Environmental Impact Assessment guidance. online GOV.UK. Available

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:9:C3.1 The Environmental Impact Assessment (EIA) has been carried out in accordance with the EIA

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:9: 1 Environmental Impact Assessment: A Guide to Procedures 9;

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:9: 2 Guidelines for Environmental Impact Assessment 10; and

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:29: EIA Environmental Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:30: 1 Town and Country Planning (Environmental Impact Assessment) Regulations 2017

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:30: Impact Assessment: A Guide to Procedures.

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter C - Transport - Dec 2020.pdf:30: Environmental Impact Assessment

R-2020-0820-ESM-Lackenby EcIA Rev A.pdf:1:Ecological Impact Assessment

R-2020-0820-ESM-Lackenby EcIA Rev A.pdf:3:Environmental Management (‘CIEEM’) guidelines for Ecological Impact Assessment (‘EcIA’) i.

R-2020-0820-ESM-Lackenby EcIA Rev A.pdf:17:i. CIEEM (2016) Guidelines for Ecological Impact Assessment in the UK and Ireland: Terrestrial,

R-2020-0820-ESM-Lackenby EcIA Rev A.pdf:17:ix. Peak Ecology (2013) Ecological Impact Assessment: Technical Report Dogger Bank Teesside A & B

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:4: The professional judgement of those undertaking the Environmental Impact Assessment (‘EIA’)

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:10: exception of Landscape Visual Impact Assessment (‘LVIA’) (during construction and operation)

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:12: Impact Assessment” (2004) and the European Commission’s (‘EC’s’) “Guidelines for the

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:12: further clarified in the Planning Practice Guidance (Environmental Impact Assessment) which

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:48: with the defined Viewpoints for the visual impact assessment. The most significant visual

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:72: 6 DIA – Drainage Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:72: 9 EIA – Environmental Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:72: 17 LVIA – Landscape Visual Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:73: 2 IEMA (2004) Guidelines for Environmental Impact Assessment

R-2020-0820-ESM-Lackenby ES - Vol 2 - Chapter L - Cumulative Effects - Dec 2020.PDF:73: 3 Planning Practice Guidance (Environmental Impact Assessment) (2017) (ID: 4-035-

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:1: Ecological Impact Assessment and

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:2: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:2: 4.5 Ecological Impact Assessment 12

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:3: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:4: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:4:Development Corporation (STDC) to complete an Ecological Impact Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:5: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:6: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:6:Development Corporation (STDC) to complete an Ecological Impact Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:7: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:8: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:9: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:10: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:11: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:12: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:13: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:13:4.5 Ecological Impact Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:13:The impact assessment process involves:

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:13:Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater, Coastal and

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:14: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:14:A cumulative impact assessment has been undertaken which considers whether

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:15: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:15:Developments included in the cumulative impact assessment comprise the

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:16: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:17: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:18: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:19: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:19:5.3.1 Important Habitats (Ecological Impact Assessment)

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:20: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:21: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:22: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:23: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:24: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:25: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:26: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:27: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:28: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:29: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:30: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:31: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:32: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:32:baseline ecological conditions scoped into the ecological impact assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:33: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:34: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:35: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:36: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:37: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:38: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:39: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:40: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:41: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:42: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:45: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:48: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:49: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:50: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:51: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:52: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:53: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:54: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:56: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:57: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:58: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:59: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:60: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:61: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:67: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:68: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-2020_05_29_STDC Eston Road EcIA_Issue.PDF:69: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0270-FFM-319577 Response Letter.pdf:4:development are likely to be significant, a Landscape & Visual Impact Assessment should be provided

R-2020-0270-FFM-319577 Response Letter.pdf:4:Landscape and Visual Impact Assessment for further guidance.

R-2020-0270-FFM-Officer Report 0270.pdf:2:  Ecological Impact Assessment

R-2020-0270-FFM-Officer Report 0270.pdf:11:The application is supported by an Ecological Impact Assessment and

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:3:Environmental Impact Assessment

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:3:Environmental Impact Assessment) Regulations 2017. Planning practice guidance states that demolition

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:3:works are capable of constituting a ‘project’ within the meaning of the Environmental Impact Assessment

R-2020-0724-PND-60722_FINAL Cover Letter_Nov 2020.PDF:3:(Environmental Impact Assessment) Regulations 2017 as updated (“the EIA regulations 2017”). The

R-2020-0724-PND-Officer Report.pdf:2:(Environmental Impact Assessment) Regulations 2017, but the demolition is

R-2023-0339-CD-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:7: associated Environmental Impact Assessment in relation to the proposed development of REC.

R-2023-0339-CD-Chapter 9 Geology Hydrogeology and Contamination.pdf:4: environmental impact assessment process. This involves considering how the impacts of

R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:8:  South Bank Site Remediation, Ecological Impact Assessment Revision A Final, dated May

R-2022-0355-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:16:Appropriate Assessment Revision A Final INCA 2021 and Ecological Impact Assessment Revision A

R-2022-0355-FFM-20857612_1.pdf:2:Impact Assessment that the development will not give rise to significant adverse impacts on the

R-2022-0355-FFM-CFB03707 Nuisance.pdf:2:- Provide a noise impact assessment, to be carried out by a competent person in

R-2022-0355-FFM-64764 SeAH Detailed Application Covering Letter March 2022(1).pdf:2:Environmental Impact Assessment

R-2022-0355-FFM-Officer report.pdf:7:  Provide a noise impact assessment, to be carried out by a competent

R-2022-0355-FFM-Officer report.pdf:10:a Landscape and Visual Impact Assessment that was based on the

R-2022-0355-FFM-390614 - Erection of Industrial Facility. Land at South Bank, Off Tees Dock Road, South Bank - No Objection.pdf:3:impacts of development are likely to be significant, a Landscape & Visual Impact Assessment should be

R-2022-0355-FFM-390614 - Erection of Industrial Facility. Land at South Bank, Off Tees Dock Road, South Bank - No Objection.pdf:3:Guidelines for Landscape and Visual Impact Assessment for further guidance.

R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf:8: • South Bank Site Remediation, Ecological Impact Assessment Revision A Final, dated May

R-2021-0846-FFM-Arcadis - South Bank Strategy.pdf:12:Appropriate Assessment Revision A Final INCA 2021 and Ecological Impact Assessment Revision A

R-2021-0439-CD-R 2020 0357 OOM Decision Notice.pdf:3: and the conclusions of the Environmental Impact Assessment that the

R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:8:  South Bank Site Remediation, Ecological Impact Assessment Revision A Final, dated May

R-2021-0439-CD-South Bank Quay Strategy Rev. 1.pdf:14:Appropriate Assessment Revision A Final INCA 2021 and Ecological Impact Assessment Revision A

R-2023-0253-RMM-Grangetown ERF - PS - RM - Mar 23.pdf:25: the conclusions of the Environmental Impact Assessment and Air Quality Assessment that the

R-2023-0253-RMM-Grangetown ERF - PS - RM - Mar 23.pdf:26: submitted Environmental Impact Assessment December 2019 and Chapter 7 (Mitigation) of the

R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:13: two process lines will be incorporated into the cumulative impact assessment undertaken

R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:135: lines will be incorporated into the cumulative impact assessment undertaken as part of this

R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:244: Environmental Impact Assessment and Air Quality Assessment that the development will not give

R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:282: Consequently, the emissions arising from the two stacks associated with its two process lines have been incorporated into the cumulative impact assessment

R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:306:4 Impact Assessment ……………………………………………………………………………………………………………………. 9

R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:314:4 Impact Assessment

R-2023-0253-RMM-ECL.007.04.01_ADM - Issue 1a (1 of 3).pdf:323: Consequently, the emissions arising from the two stacks associated with its two process lines have been incorporated into the cumulative impact assessment

R-2023-0253-RMM-P20-1004 Grangetown Prairie Biodiversity Improvement Plan.pdf:22: Country Planning (Environmental Impact Assessment) Regulations 2017. Volume 1: Environmental

R-2023-0253-RMM-ApplicationFormRedacted.pdf:4:environment impact assessment application and, if so, confirm that an environmental statement was submitted to the planning authority at that time

R-2023-0253-RMM-P20-1004 Grangetown Prairie Air Quality Impacts on SSSI.pdf:4:4 Impact Assessment ……………………………………………………………………………………………………………………. 9

R-2023-0253-RMM-P20-1004 Grangetown Prairie Air Quality Impacts on SSSI.pdf:12:4 Impact Assessment

R-2023-0253-RMM-P20-1004 Grangetown Prairie Air Quality Impacts on SSSI.pdf:21: Consequently, the emissions arising from the two stacks associated with its two process lines have been incorporated into the cumulative impact assessment

R-2023-0253-RMM-P20-1004 Grangetown Prairie shadow HRA.pdf:5: Environmental Impact Assessment and Air Quality Assessment that the development will not give

R-2023-0253-RMM-P20-1004 Grangetown Prairie shadow HRA.pdf:43: Consequently, the emissions arising from the two stacks associated with its two process lines have been incorporated into the cumulative impact assessment

R-2023-0253-RMM-428233 - R_2023_0253_RMM Reserved matters application following R20190767OOM - No Objection Subject to Mitigation.pdf:3:impacts of development are likely to be significant, a Landscape & Visual Impact Assessment should be

R-2023-0253-RMM-428233 - R_2023_0253_RMM Reserved matters application following R20190767OOM - No Objection Subject to Mitigation.pdf:3:Guidelines for Landscape and Visual Impact Assessment for further guidance.

R-2021-0943-CD-Natural England.pdf:3:impacts of development are likely to be significant, a Landscape & Visual Impact Assessment should be

R-2021-0943-CD-Natural England.pdf:3:Guidelines for Landscape and Visual Impact Assessment for further guidance.

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:72: Summary of EIA Noise Impact Assessment

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:162:The planning applications were supported by an Environmental Impact Assessment (EIA) Report (Royal

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001_CEMP_A (Fit for Construction)_C03.pdf:168:Gateway Container Terminal (NGCT) Environmental Impact Assessment (EIA). The 2019 NGCT survey

R-2021-0943-CD-SBQ1-GCL-ENV-SBKXX-PL-WM-000001.pdf:72: Summary of EIA Noise Impact Assessment

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:3:Environmental Impact Assessment

R-2021-0397-PND-63262_Cover letter PDF_May 2021.PDF:3:Assessment Directive, and can therefore be subject to Environmental Impact Assessment. Local planning

R-2021-0397-PND-officer report.pdf:2:Country Planning (Environmental Impact Assessment) Regulations 2017.

R-2022-0411-CD-R 2020 0357 OOM Decision Notice.pdf:3: and the conclusions of the Environmental Impact Assessment that the

R-2021-1077-CD-R 2020 0357 OOM Decision Notice.pdf:3: and the conclusions of the Environmental Impact Assessment that the

R-2020-0318-FFM-322582 R_2020_0318_FFM - Ground remediation works at Grangetown Prairie, STDC land, Redcar.pdf:3:& Visual Impact Assessment should be provided with the proposal to inform decision making. We

R-2020-0318-FFM-322582 R_2020_0318_FFM - Ground remediation works at Grangetown Prairie, STDC land, Redcar.pdf:3:refer you to the Landscape Institute Guidelines for Landscape and Visual Impact Assessment for

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:1: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:2: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:2: 4.5 Ecological Impact Assessment 10

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:3: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:4: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:4:Development Corporation (STDC) to complete an Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:5: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:6: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:6:Development Corporation (STDC) to complete an Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:7: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:8: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:9: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:10: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:11: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:12: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:13: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:13:4.5 Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:13:Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater, Coastal and

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:14: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:14:The impact assessment process involves:

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:15: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:15:A cumulative impact assessment has been undertaken which considers whether

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:15:Developments included in the cumulative impact assessment comprise the

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:16: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:17: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:18: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:19: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:20: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:21: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:21:5.3.1 Important Habitats (Ecological Impact Assessment)

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:22: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:23: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:24: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:25: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:26: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:27: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:28: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:29: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:30: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:31: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:32: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:33: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:34: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:35: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:36: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:37: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:38: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:39: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:40: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:41: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:42: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:43: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:44: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:45: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:46: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:47: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:48: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:49: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:50: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:51: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:52: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:53: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:54: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:55: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:56: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:57: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:58: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:59: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:61: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:63: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:66: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:67: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:68: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:69: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:70: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:71: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:72: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:74: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:75: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:76: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:77: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:78: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:79: Ecological Impact Assessment

R-2020-0318-FFM-Prairie Site Remediation EcIA_Issue.PDF:80: Ecological Impact Assessment

R-2020-0318-FFM-MMO response.pdf:2:Environmental Impact Assessment

R-2020-0318-FFM-MMO response.pdf:2:2011/92/EU) is transposed into UK law by the Marine Works (Environmental Impact Assessment)

R-2020-0318-FFM-MMO response.pdf:2:the MWR and The Town and Country Planning (Environmental Impact Assessment) Regulations

R-2020-0318-FFM-officer report.pdf:2:  Ecological Impact Assessment

R-2020-0318-FFM-officer report.pdf:14:The application is supported by an Ecological Impact Assessment which

R-2020-0318-FFM-officer report.pdf:18:As part of the submitted Ecological Impact Assessment a data search with

R-2020-0318-FFM-officer report.pdf:19:Impact Assessment. All species listed within the Ecological Impact

R-2020-0318-FFM-officer report.pdf:21:Within the Ecological Impact Assessment the following summary has been

R-2020-0318-FFM-officer report.pdf:24: Ecological Impact Assessment, 24 June 2020) within the site and / or off-

R-2020-0318-FFM-EA R_2020_0318_FFM 20 August 2020 OFFICIAL_.pdf:2:In reference to page 5 of the Ecological Impact Assessment, Arup, 24 June 2020,

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:5:This WFD assessment has three stages: screening, scoping and impact assessment.

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:6:Impact assessment – to describe how any

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:7:2.4 Impact Assessment 6

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:7:6 WFD Impact Assessment 34

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:7:6.2 Impact Assessment – TEES transitional water body 34

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:8:6.3 Impact Assessment – Area not within a WFD water body 40

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:8:6.4 Impact Assessment – Protected sites 47

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:14: through the scoping or impact assessment stages.

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:15:2.4 Impact Assessment

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:15: Screening and Scoping Assessments, is to undertake an Impact Assessment to

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:15: necessary mitigation measures. An impact assessment must be carried out for each

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:15: The Impact Assessment describes how any identified impacts from the proposed

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:43: 6 WFD Impact Assessment

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:43: potentially be at risk from the proposed works. An Impact Assessment is therefore

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:43: The Impact Assessment needs to consider if there is a pathway linking the pressure

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:43:6.2 Impact Assessment – TEES transitional water body

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:49:6.3 Impact Assessment – Area not within a WFD water body

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:56:6.4 Impact Assessment – Protected sites

R-2021-0924-CD-CHK-JBAU-00-00-RP-EN-0001-S3-P02-South_Bank_WFD_Report.pdf:58: The impact assessment determines whether the proposed works outlined in Section

R-2021-0924-CD-Decision Notice 0357.pdf:3: and the conclusions of the Environmental Impact Assessment that the

R-2021-0729-CD-Decision Notice.pdf:3: and the conclusions of the Environmental Impact Assessment that the

R-2021-0729-CD-South Bank Condition 6 Covering Letter 19.08.21.pdf:1:detail of the development and its processes and the conclusions of the Environmental Impact Assessment

R-2021-0729-CD-COMPLIANCE DECISION NOTICE.pdf:2: and the conclusions of the Environmental Impact Assessment that the

R-2021-0729-CD-INCA2021-59 HRA - South Bank reserved matters.pdf:2:Impact Assessment that the development will not give rise to significant adverse impacts on the

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 10 - LVIA.pdf:6:1 IEMA (2011) Special Report – The State of Environmental Impact Assessment Practice in the UK

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 10 - LVIA.pdf:8:Tyler Grange Group Limited have been instructed to provide a Townscape and Visual Impact Assessment (TVIA) as a Chapter of the Environmental Statement (ES) at PD Ports, Teesside.

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 10 - LVIA.pdf:8:We will provide a Townscape and Visual Impact Assessment (TVIA) to accompany the application, this will be undertaken in accordance with GLVIA3 and I attach a copy of our standard

R-2023-0291-ESM-SOL_23_P016_GLR Statement of Community Engagement Annex 1 - EIA Screening Response.pdf:4:Any Environmental Impact Assessment for this scheme should include consideration of the impact of

R-2023-0291-ESM-ES Vol 1 Chapter 9 Flood Risk and Drainage.pdf:2: has over 5 years’ experience in water quality and hydrological impact assessment.

R-2023-0291-ESM-SOL_23_P016_GLR Statement of Community Engagement Annex 3.B - Sample Letter to Councillors.pdf:4:Green Lithium has prepared an Environmental Impact Assessment (EIA) that assesses the

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 12 - Noise.pdf:20:5.0 Environmental Noise Impact Assessment

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 12 - Noise.pdf:29: noise impact assessment shall be required in order to predict and assess the noise Rating Level as actually

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 12 - Noise.pdf:30: prevent exceeding the noise level limits specified herein. A further environmental noise impact assessment

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 12 - Noise.pdf:35: time periods for environmental noise benchmarking and subsequent acoustic impact assessment purposes.

R-2023-0291-ESM-PD Teeside Heritage Statement 0323.pdf:11: Impact Assessment for a new deep-water container facility within the Northern Gateway to

R-2023-0291-ESM-ApplicationFormRedacted.pdf:9: Confirmation of the scheme being a Schedule 1 EIA development requiring a full Environmental Impact Assessment. With agreement of the

R-2023-0291-ESM-SOL_23_P016_GLR Statement of Community Engagement Annex 2 - Public Notices.pdf:2: The Town and Country Planning (Environmental Impact Assessment) Regulations 2017

R-2023-0291-ESM-SOL_23_P016_GLR Statement of Community Engagement Annex 2 - Public Notices.pdf:2: Country Planning (Environmental Impact Assessment) Regulations 2017 and therefore will

R-2023-0291-ESM-SOL_23_P016_GLR Statement of Community Engagement Annex 2 - Public Notices.pdf:2: Green Lithium has prepared an Environmental Impact Assessment (“EIA”) that assesses the

R-2023-0291-ESM-ES Vol 1 Chapter 10 Landscape.pdf:2: Landscape and Visual Impact Assessment Edition 3 (hereafter referred to as GLVIA3). The GLVIA3 (Ref

R-2023-0291-ESM-ES Vol 1 Chapter 10 Landscape.pdf:2: “…Landscape and Visual Impact Assessment (LVIA) is a tool used to identify and assess the significance

R-2023-0291-ESM-ES Vol 1 Chapter 10 Landscape.pdf:2:10.5. This Townscape and Visual Impact Assessment (LVIA) has been undertaken as a process, providing input

R-2023-0291-ESM-ES Vol 1 Chapter 10 Landscape.pdf:5: • The Guidelines for Landscape and Visual Impact Assessment (‘GLVIA’), Third Edition

R-2023-0291-ESM-ES Vol 1 Chapter 10 Landscape.pdf:20:Ref 10.1: Guidelines for Landscape and Visual Impact Assessment Edition 3, Landscape Institute and IEMA,

R-2023-0291-ESM-ES Vol 1 Chapter 15 Summary and Conclusions.pdf:7: the Environmental Impact Assessments carried out in support of the application identifying any specific

R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:12:PLANNING AND ENVIRONMENTAL IMPACT ASSESSMENT

R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:12:1.34. The Environmental Impact Assessment Directive1 (the “EIA Directive”) requires that, before granting

R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:12: procedure known as environmental impact assessment (or “EIA”) of any project which is likely to have

R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:12: England on 16th May 2017 through the Town and Country Planning (Environmental Impact Assessment)

R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:71:5.20. The applicant has completed a Landscape and Visual Impact Assessment (LVIA) as part of the planning

R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:78: and refers to the findings of the Environmental Impact Assessment and associated ES.

R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:81: and Visual Impact Assessment that has been carried out on the basis of the outline parameters plan

R-2023-0291-ESM-SOL_23_P016_GLR Planning Statement.pdf:82:6.31 In this context, a Landscape and Visual Impact assessment has been completed and has concluded that

R-2023-0291-ESM-ES Vol 2 Green Lithium Appendix 14 - Contaminated Lands.pdf:35: identified and may need to be diverted or impact assessments undertaken to

R-2023-0291-ESM-Officer Letter_R20220675SCP.pdf:3:Any Environmental Impact Assessment for this scheme should include consideration of the impact of

R-2023-0291-ESM-SOL_23_P016_GLR Statement of Community Engagement Annex 3.A - Local Businesses.pdf:3:Country Planning (Environmental Impact Assessment) Regulations 2017 and therefore will be

R-2023-0291-ESM-SOL_23_P016_GLR Statement of Community Engagement Annex 3.A - Local Businesses.pdf:3:The applicant has prepared an Environmental Impact Assessment (EIA) that assesses the

R-2023-0291-ESM-ES Vol 1 Chapter 8 Ecology.pdf:2:8.1. This chapter provides an Ecological Impact Assessment (EcIA) and presents the current ecological

R-2023-0291-ESM-ES Vol 1 Chapter 8 Ecology.pdf:5:8.18. The ecological evaluation and impact assessment approach used in this report is based on Guidelines for

R-2023-0291-ESM-ES Vol 1 Chapter 8 Ecology.pdf:5: Ecological Impact Assessment in the United Kingdom and Ireland (“CIEEM guidelines”) (Ref 8.2) as well

R-2023-0291-ESM-ES Vol 1 Chapter 8 Ecology.pdf:7:Impact Assessment

R-2023-0291-ESM-ES Vol 1 Chapter 8 Ecology.pdf:7:8.25. The impact assessment process involves the following steps:

R-2023-0291-ESM-ES Vol 1 Chapter 8 Ecology.pdf:7:8.27. The impact assessment process considers both direct and indirect impacts: direct ecological impacts are

R-2023-0291-ESM-ES Vol 1 Chapter 8 Ecology.pdf:8: Country Planning (Environmental Impact Assessment) Regulations 2017.

R-2023-0291-ESM-ES Vol 1 Chapter 8 Ecology.pdf:24:Ref 8.1: CIEEM. (2018). Guidelines for Ecological Impact Assessment in the UK and Ireland: Terrestrial,

R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:3: Table 1.1: Environmental Impact Assessment Consultant Team 9

R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:8: CCIA Climate Charge Impact Assessment

R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:8: ECIA Ecological Impact Assessment

R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:8: EIA Environmental Impact Assessment

R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:12: Impact Assessment) Regulations 2017 (hereafter referred to as the EIA Regulations).

R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:16: Planning (Environmental Impact Assessment) Regulations 2017 (hereafter referred to as the EIA

R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:16: Environmental Impact Assessment) (England) (Coronavirus) (Amendment) Regulations 2020 (UK

R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:17: • Advice Note Seven: Environmental Impact Assessment: Preliminary Environmental Information,

R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:17: • Guidelines for Environmental Impact Assessment, Institute of Environmental Management and

R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:17: • Environmental Impact Assessment Handbook: A practical guide for planners, developers and

R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:18: to the Environmental Impact Assessment are identified in Table 1.1 overleaf.

R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:19: Table 1.1: Environmental Impact Assessment Consultant Team

R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:37: Impact Assessment) Regulations 2017 (as amended) (UK Government, 2017).

R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:72:Ref 5.1: The Town and Country Planning (Environmental Impact Assessment) Regulations (2017)

R-2023-0291-ESM-ES Vol 1 Chapter 1 to 6.pdf:72:Ref 5.2: Impact Assessment Guidelines and ES Review Criteria from the Institute of Environmental Management

R-2023-0291-ESM-PN 0291.pdf:3:  An odour impact assessment shall be carried out by a competent person in

R-2023-0291-ESM-SOL_23_P016_GLR ES Vol 3 Exec Summary.pdf:12:5.1. The EIA provides an Ecological Impact Assessment (EcIA) and presents the current ecological baseline at

R-2023-0291-ESM-SOL_23_P016_GLR ES Vol 3 Exec Summary.pdf:14:7.3. The landscape and visual impact assessment has conservatively modelled and assessed the impacts of

R-2023-0291-ESM-SOL_23_P016_GLR Ventilation and Extraction Statement.pdf:2:Guidance and the impacts assessed. The impact assessment confirmed that the impacts associated with air quality

R-2023-0291-ESM-SOL_23_P016_GLR Ventilation and Extraction Statement.pdf:2:are acceptable in terms of human, ecological and environmental impact. The Air Quality Impact Assessment is

R-2023-0291-ESM-SOL_23_P016_GLR Statement of Community Engagement Annex 3.C - Online Public Consultation Page.pdf:9: point of this meeting was to agree upon the scope of the environmental impact assessment. If

R-2023-0291-ESM-SOL_23_P016_GLR Statement of Community Engagement Annex 3.C - Online Public Consultation Page.pdf:10: Environmental Impact Assessment (EIA) that provides a rigorous assessment on all aspects of

R-2023-0291-ESM-Green Lithium_BREEAM NC 2018 Pre-Assessment Report_1 (with Appendices).pdf:35: pollution 1 1 1 assessed site, or where there are noise-sensitive areas within this radius, a noise impact assessment Assumed targeted; NIA required from Acoustician. Acoustician / M&E

R-2023-0291-ESM-Green Lithium_BREEAM NC 2018 Pre-Assessment Report_1 (with Appendices).pdf:48: mitigation measures. Examples of relevant experience are ecological impact assessments,

R-2023-0291-ESM-20230328 Green Lithium TS_RG_RF.pdf:2:abilities and expertise in traffic engineering, transport planning, environmental impact assessment, air

R-2023-0291-ESM-20230328 Green Lithium TS_RG_RF.pdf:5:EIA Environmental Impact Assessment

R-2021-0905-CD-Decision Notice.pdf:3: and the conclusions of the Environmental Impact Assessment that the

R-2020-0799-CD-Nov 2020 - 2383 - CEMP - Prairie Phase 2 Works Prairie Rev 2 (1).pdf:19:STDC Prairie Site Remediation Ecological Impact Assessment dated 24th June 2020 operatives

R-2020-0799-CD-Nov 2020 - 2383 - CEMP - Prairie Phase 2 Works Prairie Rev 2 (1).pdf:20:Impact Assessment dated 24th June 2020 and its disturbed nature, there is the potential for

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:4: Appendix C – Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:62:Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:63: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:64: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:64: 4.5 Ecological Impact Assessment 10

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:65: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:66: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:66:Development Corporation (STDC) to complete an Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:67: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:68: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:68:Development Corporation (STDC) to complete an Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:69: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:70: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:71: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:72: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:73: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:74: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:75: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:75:4.5 Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:75:Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater, Coastal and

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:76: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:76:The impact assessment process involves:

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:77: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:77:A cumulative impact assessment has been undertaken which considers whether

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:77:Developments included in the cumulative impact assessment comprise the

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:78: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:79: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:80: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:81: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:82: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:83: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:83:5.3.1 Important Habitats (Ecological Impact Assessment)

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:84: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:85: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:86: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:87: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:88: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:89: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:90: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:91: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:92: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:93: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:94: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:95: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:96: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:97: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:98: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:99: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:100: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:101: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:102: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:103: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:104: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:105: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:106: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:107: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:108: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:109: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:110: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:111: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:112: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:113: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:114: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:115: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:116: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:117: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:118: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:119: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:120: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:121: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:123: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:125: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:128: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:129: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:130: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:131: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:132: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:133: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:134: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:136: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:137: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:138: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:139: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:140: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:141: Ecological Impact Assessment

R-2020-0799-CD-Grangetown Prairie CEMP - Rev D.pdf:142: Ecological Impact Assessment

R-2022-0746-CD-406263 response.pdf:2:development are likely to be significant, a Landscape & Visual Impact Assessment should be provided with

R-2022-0746-CD-406263 response.pdf:2:and Visual Impact Assessment for further guidance.

R-2022-0746-CD-Decision Notice (4).pdf:3: and the conclusions of the Environmental Impact Assessment that the

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:9: South Bank Site Remediation, Ecological Impact Assessment Revision A Final, dated May

R-2022-0096-CD-10035117-AUK-XX-XX-RP-ZZ-0408-02-Rem_Strat_South_Bank_West_Rev01 (Part 1).pdf:17:Assessment Revision A Final INCA 2021 and Ecological Impact Assessment Revision A Final, Report

R-2022-0096-CD-Decision Notice.pdf:3: and the conclusions of the Environmental Impact Assessment that the

R-2022-0237-CD-Decision Notice R 2021 0166 FFM.pdf:2: out in the Ecological Impact Assessment, INCA, dated 26 February 2021 have

R-2021-0713-CD-Arcadis - South Bank Strategy.pdf:8: • South Bank Site Remediation, Ecological Impact Assessment Revision A Final, dated May

R-2021-0713-CD-Arcadis - South Bank Strategy.pdf:12:Appropriate Assessment Revision A Final INCA 2021 and Ecological Impact Assessment Revision A

R-2021-0608-PND-Officer Report 0608.pdf:2:Town and Country Planning (Environmental Impact Assessment) Regulations

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:3:ecology, based on the requirements of an Environmental Impact Assessment (EIA), to

R-2021-0608-PND-210801_Ecolgy screening (EIA criteria) for Teesworks demolitions_INCA_RevA.pdf:11:The Town and Country Planning (Environmental Impact Assessment) Regulations 2017.

R-2021-0608-PND-363937 - R_2021_0608_PND Prior Notification for demolition of structures at Former Redcar Steel Works Site (Teesworks), Redcar.pdf:3:Where the impacts of development are likely to be significant, a Landscape & Visual Impact Assessment

R-2021-0608-PND-363937 - R_2021_0608_PND Prior Notification for demolition of structures at Former Redcar Steel Works Site (Teesworks), Redcar.pdf:3:Guidelines for Landscape and Visual Impact Assessment for further guidance.

MLA 2020 00506 South Bank Phase 1 MLA 2020 00507 Phase 2.pdf:1:has been subject to an Environmental Impact Assessment which included assessment of the

20210121 MLA202000507 Tees South Bank Quay Phase II Benthic ecology JPQC.pdf:1:9. The above cited reports represent the Environmental Impact Assessment (EIA) and associated

20210121 MLA202000507 Tees South Bank Quay Phase II Benthic ecology JPQC.pdf:3:20. Yes, the EIA clearly sets out the impact assessment methodology: it uses a well-established

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:1:MARINE WORKS (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2007 (AS

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:1: phase may vary, and the Environmental Impact Assessment is conducted assuming that the

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:3:21. The ES indicates that (coastal process) effects and impact assessment is carried out by ‘Expert

20210119 MLA202000507 Tees South Bank Quay CP advice + JPQC.pdf:5:29. A ‘standard’ discussion of cumulative impact assessment (CIA) is provided i.e., indicating that

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:1:1. With reference to the above request to review the Environmental Impact Assessment report for the

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:3: Barrage fish counter, information collated and compiled from previous impact assessments for

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:5: cumulative impact assessment (Section 27.5.9) along with the Anglo-American Harbour facilities

20210115 MLA202000507 South Bank Quay-phase 2 - Fisheries advice MG GE + JPQC.pdf:11: and impact assessment for fish and fish ecology, which is standard practice for an application of

MLA202000506 & MLA202000507 Tees South Bank Quay Phases 1&2 UWN advice + JPQC.pdf:1:MARINE WORKS (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS (AMENDED)

20210201 MLA202000506 MLA202000507 Tees South Bank Phases 1 and 2 - EIA Licence Advice Minute - SEAL Advice v2+SJB.pdf:4: assessment. The NGCT was taken forward for cumulative impact assessment (CIA) and this

20210201 MLA202000506 MLA202000507 Tees South Bank Phases 1 and 2 - EIA Licence Advice Minute - SEAL Advice v2+SJB.pdf:5: impact assessment.

20210201 MLA202000506 MLA202000507 Tees South Bank Phases 1 and 2 - EIA Licence Advice Minute - SEAL Advice v2+SJB.pdf:6: Quay, and recommend that the applicant provides a more detailed impact assessment

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:4:8 CUMULATIVE IMPACT ASSESSMENT 16

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:5:The proposed scheme has been subject to an Environmental Impact Assessment (EIA) which has assessed

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:18:The landscape and visual impact assessment (LVIA) establishes that operational effects of the proposed

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS-5.pdf:20:8 CUMULATIVE IMPACT ASSESSMENT

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:3:4.4 Environmental Impact Assessment Directive 28

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:7:27 CUMULATIVE IMPACT ASSESSMENT 482

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:8:13 Landscape and visual impact assessment methodology

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:8:14 Landscape and visual impact assessment figures

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:9:Environmental Impact Assessment (EIA) in support of a marine licence application to the Marine

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:9:The study area is shown on Figure 1.2. Landscape and visual impact assessment has been detailed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:9: impact assessment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:36:4.4 Environmental Impact Assessment Directive

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:36:in this instance, The Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended)

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:36:and the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 are applicable

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:36:required under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017, as

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:43:(Environmental Impact Assessment) Regulations 2007, as amended. In addition, RCBC issued a Scoping

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:43:(Environmental Impact Assessment) Regulations 2007, as amended, and the Town and Country Planning

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:43:(Environmental Impact Assessment) Regulations 2017, without submitting a formal EIA Screening Request.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:45:a description of the approach taken to the specific impact assessment for each environmental topic is

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:48:Table 5.3 Impact assessment matrix

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:49:5.1.6 Cumulative Impact Assessment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:50:There is no legislation that outlines how cumulative impact assessments (CIAs) should be undertaken.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:60:6.3.6 Impact assessment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:192: therefore the impact assessment presented within

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:209:‘medium’ has been assigned for the purposes of this impact assessment, taking in to account the fragmented

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:210:As such, the impact assessment presented within this section focuses on the potential impacts to marine

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:220:To inform the impact assessment of works during the proposed scheme for marine mammal species,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:220:In addition to the methodology for the impact assessment outlined in Section 5, the magnitude of effect on

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:230:Table 10.5 Reference populations and density estimates to inform the impact assessment for marine

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:231:The underwater noise impact assessments for marine mammal species for the proposed scheme has been

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:245:The ecological impact assessment presented below has been based upon the following guidance and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:246: for Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater and Coastal;

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:246:To inform this Ecological Impact Assessment (EcIA), Tees Valley Combined Authority has undertaken

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:270:the baseline environment on which the impact assessment can be based.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:279:follows a matrix approach to inform the impact assessment, using best practice, best available scientific

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:279:understanding and relevant guidance (e.g. CIEEM Guidelines for Ecological Impact Assessment in the UK

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:291:across the full winter period, the assumption made for the purposes of impact assessment is that North Tees

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:295:sources in the Tees estuary, receptors included in the following impact assessments are as follows:

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:329:While the loss of such habitat is considered to be insignificant (in terms of impact assessment) for the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:342: and Visual Impact Assessment’ to determine the likely impact of the Section 19

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:346:16.3.3 Impact assessment methodology

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:346:The general method for impact assessment is set out in Section 5. The specific approach to the assessment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:346:The impact assessment defines heritage assets, and their settings, likely to be impacted by the proposed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:346:Specifically, therefore, the impact assessment will present:

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:365:England. Noise Sensitive Receptor (NSR) locations and the methodology for the impact assessment were

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:370:17.3.4 Impact assessment methodology

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:373:Table 17.10 Construction road traffic noise impact assessment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:375:Table 17.13 On-site construction phase noise impact assessment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:377:Table 17.15 Operational phase noise impact assessment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:394:considered as not significant. A detailed impact assessment of road traffic exhaust emissions was

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:397:This section of the EIA Report presents the findings of a Landscape and Visual Impact Assessment (LVIA)

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:400:Institute in the third edition of its ‘Guidelines for Landscape and Visual Impact Assessment’ (GLVIA3, 2013).

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:465:22.3.5 Impact assessment methodology

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:474:Schedule 3 of The Marine Works (Environmental Impact Assessment) (Amendment) Regulations 2017

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:474:Country Planning (Environmental Impact Assessment) Regulations 2017.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:476:The Marine Works (Environmental Impact Assessment) (Amendments) Regulations 2017 and the Town and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:476:Country Planning (Environmental Impact Assessment) 2017 brought in a requirement to consider the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:476:document (Appendix 2), this health impact assessment is therefore a concise assessment which relies on

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:476:undertake a full human health impact assessment.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:490:27 CUMULATIVE IMPACT ASSESSMENT

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:490:Works (Environmental Impact Assessment) Regulations 2007 (as amended) and the Town and Country

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:490:Planning (Environmental Impact Assessment) Regulations 2017 require an assessment of its potential

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:490:The IEMA ‘Guidelines for Environmental Impact Assessment’ (IEMA, 2004) define cumulative impacts as:

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:491:this report and summarised in Table 1.1). Landscape and visual impact assessment has been detailed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:511:Of the proposed projects which have been screened into the cumulative impact assessment, all have

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:516:from the projects and plans screened in for cumulative impact assessment will not, therefore, also occur

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:583:cumulative noise impact assessment of the NGCT, Dogger Bank Teesside A & Sofia project and the Harbour

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:589:for Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater, Coastal and Marine.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-9.pdf:598:Royal HaskoningDHV (2018). Hartlepool Approach Channel: Environmental Impact Assessment Report.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:5:to as the proposed scheme). This report accompanies the Environmental Impact Assessment (EIA) in

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:51:Subject: South Bank port facility – Environmental Impact Assessment scoping review

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:51:Environmental Impact Assessment (EIA) in support of a marine licence application to the Marine

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:52:Marine Works (Environmental Impact Assessment) Regulations 2007 as amended, and the Town and

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:52:Country Planning (Environmental Impact Assessment) Regulations 2017 respectively. This document has

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:54: • Landscape and visual impact assessment.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:57: Views of the Grade II* Transporter Bridge should be assessed in the ‘Landscape and Visual Impact Assessment’ to determine the likely impact of the

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:58: for disposal to sea (and to inform the impact assessment). Any material to be dredged and disposed of within licenced disposal areas at-sea must not

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:58: Regulation 4(4) of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 requires the assessment of significant effects

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:63:proposed quay Infrastructure, drawing from the findings of the landscape and visual impact assessment

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:63:construction and operational phases; outputs from the modelling will inform the impact assessment (for

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:64:A detailed cumulative impact assessment with the wider onshore development (or other planned or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:64:A Landscape and Visual Impact Assessment (LVIA) will be undertaken as part of the EIA. This will involve

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:64:Impact Assessment, 3rd edition.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:65: 4.20. Cumulative impact assessment

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:66:A cumulative impact assessment will be undertaken, taking into account any relevant consented - but as

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:75:Environmental Impact Assessment (EIA) for this development.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:77:associated with the site. Any Environmental Impact Assessment should include details of the

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:80: environments and will require Environmental Impact Assessment (EIA) in support of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:80: Town and Country Planning (Environmental Impact Assessment) Regulations 2017.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:81: Impact Assessment scoping review) on environmental assessment requirements in

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:81: Impact Assessment scoping review) on environmental assessment requirements in

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:139:modelling exercise to inform the Environmental Impact Assessment (EIA) that is being prepared as part of

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:143:area is of most interest in terms of the hydrodynamic outputs for the Environmental Impact Assessment.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part1-3.pdf:253: Impact Assessment (EIA) for Geology and Ground Conditions.

MLA_2020_00507-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-10.pdf:15:A cumulative impact assessment (CIA) is presented in Section 27 of the EIA Report. Section 27.5.2

MLA_2020_00507-PC1084-RHD-SB-EN-CO-EV-1116 Response to Cefas comments-10.pdf:17:the impact assessment updated where required within a supplementary report, and it is assumed the MMO

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:3:4.4 Environmental Impact Assessment Directive 28

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:7:27 CUMULATIVE IMPACT ASSESSMENT 482

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:8:13 Landscape and visual impact assessment methodology

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:8:14 Landscape and visual impact assessment figures

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:9:Environmental Impact Assessment (EIA) in support of a marine licence application to the Marine

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:9:The study area is shown on Figure 1.2. Landscape and visual impact assessment has been detailed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:9: impact assessment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:36:4.4 Environmental Impact Assessment Directive

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:36:in this instance, The Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended)

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:36:and the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 are applicable

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:36:required under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017, as

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:43:(Environmental Impact Assessment) Regulations 2007, as amended. In addition, RCBC issued a Scoping

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:43:(Environmental Impact Assessment) Regulations 2007, as amended, and the Town and Country Planning

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:43:(Environmental Impact Assessment) Regulations 2017, without submitting a formal EIA Screening Request.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:45:a description of the approach taken to the specific impact assessment for each environmental topic is

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:48:Table 5.3 Impact assessment matrix

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:49:5.1.6 Cumulative Impact Assessment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:50:There is no legislation that outlines how cumulative impact assessments (CIAs) should be undertaken.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:60:6.3.6 Impact assessment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:192: therefore the impact assessment presented within

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:209:‘medium’ has been assigned for the purposes of this impact assessment, taking in to account the fragmented

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:210:As such, the impact assessment presented within this section focuses on the potential impacts to marine

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:220:To inform the impact assessment of works during the proposed scheme for marine mammal species,

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:220:In addition to the methodology for the impact assessment outlined in Section 5, the magnitude of effect on

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:230:Table 10.5 Reference populations and density estimates to inform the impact assessment for marine

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:231:The underwater noise impact assessments for marine mammal species for the proposed scheme has been

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:245:The ecological impact assessment presented below has been based upon the following guidance and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:246: for Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater and Coastal;

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:246:To inform this Ecological Impact Assessment (EcIA), Tees Valley Combined Authority has undertaken

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:270:the baseline environment on which the impact assessment can be based.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:279:follows a matrix approach to inform the impact assessment, using best practice, best available scientific

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:279:understanding and relevant guidance (e.g. CIEEM Guidelines for Ecological Impact Assessment in the UK

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:291:across the full winter period, the assumption made for the purposes of impact assessment is that North Tees

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:295:sources in the Tees estuary, receptors included in the following impact assessments are as follows:

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:329:While the loss of such habitat is considered to be insignificant (in terms of impact assessment) for the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:342: and Visual Impact Assessment’ to determine the likely impact of the Section 19

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:346:16.3.3 Impact assessment methodology

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:346:The general method for impact assessment is set out in Section 5. The specific approach to the assessment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:346:The impact assessment defines heritage assets, and their settings, likely to be impacted by the proposed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:346:Specifically, therefore, the impact assessment will present:

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:365:England. Noise Sensitive Receptor (NSR) locations and the methodology for the impact assessment were

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:370:17.3.4 Impact assessment methodology

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:373:Table 17.10 Construction road traffic noise impact assessment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:375:Table 17.13 On-site construction phase noise impact assessment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:377:Table 17.15 Operational phase noise impact assessment

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:394:considered as not significant. A detailed impact assessment of road traffic exhaust emissions was

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:397:This section of the EIA Report presents the findings of a Landscape and Visual Impact Assessment (LVIA)

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:400:Institute in the third edition of its ‘Guidelines for Landscape and Visual Impact Assessment’ (GLVIA3, 2013).

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:465:22.3.5 Impact assessment methodology

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:474:Schedule 3 of The Marine Works (Environmental Impact Assessment) (Amendment) Regulations 2017

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:474:Country Planning (Environmental Impact Assessment) Regulations 2017.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:476:The Marine Works (Environmental Impact Assessment) (Amendments) Regulations 2017 and the Town and

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:476:Country Planning (Environmental Impact Assessment) 2017 brought in a requirement to consider the

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:476:document (Appendix 2), this health impact assessment is therefore a concise assessment which relies on

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:476:undertake a full human health impact assessment.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:490:27 CUMULATIVE IMPACT ASSESSMENT

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:490:Works (Environmental Impact Assessment) Regulations 2007 (as amended) and the Town and Country

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:490:Planning (Environmental Impact Assessment) Regulations 2017 require an assessment of its potential

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:490:The IEMA ‘Guidelines for Environmental Impact Assessment’ (IEMA, 2004) define cumulative impacts as:

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:491:this report and summarised in Table 1.1). Landscape and visual impact assessment has been detailed

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:511:Of the proposed projects which have been screened into the cumulative impact assessment, all have

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:516:from the projects and plans screened in for cumulative impact assessment will not, therefore, also occur

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:583:cumulative noise impact assessment of the NGCT, Dogger Bank Teesside A & Sofia project and the Harbour

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:589:for Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater, Coastal and Marine.

MLA_2020_00507-PC1084_RHD-ZZ-XX-RP-Z-1100_EIA Report_main body-8.pdf:598:Royal HaskoningDHV (2018). Hartlepool Approach Channel: Environmental Impact Assessment Report.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:120: Underwater Noise Impact Assessment – South Bank, Tees Estuary

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:121: Underwater Noise Impact Assessment – South Bank, Tees Estuary

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:122: Underwater Noise Impact Assessment – South Bank, Tees Estuary

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:122:impact assessment. As the measurement or receiver point moves away from the source, the sound

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:123: Underwater Noise Impact Assessment – South Bank, Tees Estuary

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:124: Underwater Noise Impact Assessment – South Bank, Tees Estuary

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:124:3 A Collett, T Mason (2014). York Potash Project Harbour Facilities: Underwater Noise Impact Assessment.

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:125: Underwater Noise Impact Assessment – South Bank, Tees Estuary

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:126: Underwater Noise Impact Assessment – South Bank, Tees Estuary

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:127: Underwater Noise Impact Assessment – South Bank, Tees Estuary

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:128: Underwater Noise Impact Assessment – South Bank, Tees Estuary

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:129: Underwater Noise Impact Assessment – South Bank, Tees Estuary

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:129: Report title Underwater Noise Impact Assessment – South

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:135: Cumulative Impact Assessment …………………………………………………………………………… 41

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:137:Table 16: Cumulative Impact Assessment ……………………………………………………………………………….. 42

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:138: EIA Environmental Impact Assessment

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:141: Marine Works EIA (Environmental Impact Assessment) Regulations governing EIA’s for

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:179: CUMULATIVE IMPACT ASSESSMENT

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:179:The cumulative impact assessment was assessed to be a factor of the likelihood of the impact

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:179:The results of the cumulative impact assessment are given in Table 16. All impacts were assessed to

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:180:Table 16: Cumulative Impact Assessment

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:313:The purpose of the Landscape and Visual Impact Assessment (LVIA) is to identify the potential

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:313:LVIA is either carried out formally as part of the Environmental Impact Assessment (EIA) process or

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:313:▪ ‘Guidelines for Landscape and Visual Impact Assessment’ (GLVIA), Third Edition Landscape

MLA_2020_00507-PC1084-RHD-ZZ-XX-RP-Z-1100_EIA Report_Appendices_Part2-4.pdf:350:The proposed scheme is defined in full within the Environmental Impact Assessment (EIA) Report (Royal

MLA_2020_00507-APPLICATION-FORM.pdf:2:environments and requires Environmental Impact Assessment (EIA) in support of a

MLA_2020_00507-APPLICATION-FORM.pdf:7:Environmental impact assessment

MLA_2020_00507-APPLICATION-FORM.pdf:20:inform the impact assessment. Sediment quality data from the proposed dredge

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:3:4.4 Environmental Impact Assessment Directive 28

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:7:27 CUMULATIVE IMPACT ASSESSMENT 482

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:8:13 Landscape and visual impact assessment methodology

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:8:14 Landscape and visual impact assessment figures

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:9:Environmental Impact Assessment (EIA) in support of a marine licence application to the Marine

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:9:The study area is shown on Figure 1.2. Landscape and visual impact assessment has been detailed

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:9: impact assessment

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:36:4.4 Environmental Impact Assessment Directive

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:36:in this instance, The Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended)

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:36:and the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 are applicable

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:36:required under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017, as

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:43:(Environmental Impact Assessment) Regulations 2007, as amended. In addition, RCBC issued a Scoping

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:43:(Environmental Impact Assessment) Regulations 2007, as amended, and the Town and Country Planning

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:43:(Environmental Impact Assessment) Regulations 2017, without submitting a formal EIA Screening Request.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:45:a description of the approach taken to the specific impact assessment for each environmental topic is

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:48:Table 5.3 Impact assessment matrix

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:49:5.1.6 Cumulative Impact Assessment

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:50:There is no legislation that outlines how cumulative impact assessments (CIAs) should be undertaken.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:60:6.3.6 Impact assessment

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:192: therefore the impact assessment presented within

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:209:‘medium’ has been assigned for the purposes of this impact assessment, taking in to account the fragmented

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:210:As such, the impact assessment presented within this section focuses on the potential impacts to marine

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:220:To inform the impact assessment of works during the proposed scheme for marine mammal species,

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:220:In addition to the methodology for the impact assessment outlined in Section 5, the magnitude of effect on

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:230:Table 10.5 Reference populations and density estimates to inform the impact assessment for marine

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:231:The underwater noise impact assessments for marine mammal species for the proposed scheme has been

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:245:The ecological impact assessment presented below has been based upon the following guidance and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:246: for Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater and Coastal;

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:246:To inform this Ecological Impact Assessment (EcIA), Tees Valley Combined Authority has undertaken

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:270:the baseline environment on which the impact assessment can be based.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:279:follows a matrix approach to inform the impact assessment, using best practice, best available scientific

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:279:understanding and relevant guidance (e.g. CIEEM Guidelines for Ecological Impact Assessment in the UK

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:291:across the full winter period, the assumption made for the purposes of impact assessment is that North Tees

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:295:sources in the Tees estuary, receptors included in the following impact assessments are as follows:

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:329:While the loss of such habitat is considered to be insignificant (in terms of impact assessment) for the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:342: and Visual Impact Assessment’ to determine the likely impact of the Section 19

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:346:16.3.3 Impact assessment methodology

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:346:The general method for impact assessment is set out in Section 5. The specific approach to the assessment

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:346:The impact assessment defines heritage assets, and their settings, likely to be impacted by the proposed

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:346:Specifically, therefore, the impact assessment will present:

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:365:England. Noise Sensitive Receptor (NSR) locations and the methodology for the impact assessment were

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:370:17.3.4 Impact assessment methodology

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:373:Table 17.10 Construction road traffic noise impact assessment

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:375:Table 17.13 On-site construction phase noise impact assessment

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:377:Table 17.15 Operational phase noise impact assessment

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:394:considered as not significant. A detailed impact assessment of road traffic exhaust emissions was

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:397:This section of the EIA Report presents the findings of a Landscape and Visual Impact Assessment (LVIA)

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:400:Institute in the third edition of its ‘Guidelines for Landscape and Visual Impact Assessment’ (GLVIA3, 2013).

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:465:22.3.5 Impact assessment methodology

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:474:Schedule 3 of The Marine Works (Environmental Impact Assessment) (Amendment) Regulations 2017

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:474:Country Planning (Environmental Impact Assessment) Regulations 2017.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:476:The Marine Works (Environmental Impact Assessment) (Amendments) Regulations 2017 and the Town and

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:476:Country Planning (Environmental Impact Assessment) 2017 brought in a requirement to consider the

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:476:document (Appendix 2), this health impact assessment is therefore a concise assessment which relies on

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:476:undertake a full human health impact assessment.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:490:27 CUMULATIVE IMPACT ASSESSMENT

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:490:Works (Environmental Impact Assessment) Regulations 2007 (as amended) and the Town and Country

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:490:Planning (Environmental Impact Assessment) Regulations 2017 require an assessment of its potential

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:490:The IEMA ‘Guidelines for Environmental Impact Assessment’ (IEMA, 2004) define cumulative impacts as:

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:491:this report and summarised in Table 1.1). Landscape and visual impact assessment has been detailed

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:511:Of the proposed projects which have been screened into the cumulative impact assessment, all have

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:516:from the projects and plans screened in for cumulative impact assessment will not, therefore, also occur

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:583:cumulative noise impact assessment of the NGCT, Dogger Bank Teesside A & Sofia project and the Harbour

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:589:for Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater, Coastal and Marine.

R-2020-0371-SCP-PC1084_R-2020-0371-SCP-RHD-ZZ-XX-RP-Z-1100_EIA_Report_main_body-from-gov-uk.pdf:598:Royal HaskoningDHV (2018). Hartlepool Approach Channel: Environmental Impact Assessment Report.

R-2020-0371-SCP-EA R_2020_0371_SCP 14 August 2020 OFFICIAL.pdf:1:Environmental Impact Assessment scoping review, Royal Haskoning DHV, 15 July

R-2020-0371-SCP-EA R_2020_0371_SCP 14 August 2020 OFFICIAL.pdf:8:Cumulative Impact Assessment.

R-2020-0371-SCP-EA R_2020_0371_SCP 14 August 2020 OFFICIAL.pdf:8:cumulative impact assessment. We are in agreement with this.

R-2020-0371-SCP-NETWORK RAIL.pdf:1:Environmental Impact Assessment should include details of the haulage routes in the Transport Assessment and a

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:1:Subject: South Bank port facility – Environmental Impact Assessment scoping review

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:1:Environmental Impact Assessment (EIA) in support of a marine licence application to the Marine

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:2:Marine Works (Environmental Impact Assessment) Regulations 2007 as amended, and the Town and

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:2:Country Planning (Environmental Impact Assessment) Regulations 2017 respectively. This document has

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:4: • Landscape and visual impact assessment.

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:7: Views of the Grade II* Transporter Bridge should be assessed in the ‘Landscape and Visual Impact Assessment’ to determine the likely impact of the

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:8: for disposal to sea (and to inform the impact assessment). Any material to be dredged and disposed of within licenced disposal areas at-sea must not

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:8: Regulation 4(4) of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 requires the assessment of significant effects

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:13:proposed quay Infrastructure, drawing from the findings of the landscape and visual impact assessment

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:13:construction and operational phases; outputs from the modelling will inform the impact assessment (for

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:14:A detailed cumulative impact assessment with the wider onshore development (or other planned or

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:14:A Landscape and Visual Impact Assessment (LVIA) will be undertaken as part of the EIA. This will involve

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:14:Impact Assessment, 3rd edition.

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:15: 4.20. Cumulative impact assessment

R-2020-0371-SCP-PC1084-RHD-SB-EN-NT-EV-1106.pdf:16:A cumulative impact assessment will be undertaken, taking into account any relevant consented - but as

R-2020-0371-SCP-NEAR.pdf:1:Impact Assessment scoping review’ (Reference PC1084-RHD-SB-EN-NT-EV-1106), proposes the

R-2020-0371-SCP-NEAR.pdf:1:quay Infrastructure, drawing from the findings of the landscape and visual impact assessment (LVIA) (detailed in

R-2020-0371-SCP-323395 R_2020_0371_SCP - Natural England.pdf:1:Environmental Impact Assessment Scoping consultation (Regulation 15 (4) of the EIA

R-2020-0371-SCP-323395 R_2020_0371_SCP - Natural England.pdf:1:Environmental Impact Assessment (EIA) for this development.

R-2020-0371-SCP-323395 R_2020_0371_SCP - Natural England.pdf:1: 2 Note on Environmental Impact Assessment Directive for Local Planning Authorities Office of the Deputy Prime

R-2020-0371-SCP-323395 R_2020_0371_SCP - Natural England.pdf:2:Schedule 4 of the Town & Country Planning (Environmental Impact Assessment) Regulations 2017,

R-2020-0371-SCP-323395 R_2020_0371_SCP - Natural England.pdf:2:Ecological Impact Assessment (EcIA) have been developed by the Chartered Institute of Ecology

R-2020-0371-SCP-323395 R_2020_0371_SCP - Natural England.pdf:4:results, impact assessments and appropriate accompanying mitigation strategies included as part of

R-2020-0371-SCP-323395 R_2020_0371_SCP - Natural England.pdf:4:therefore advises that survey, impact assessment and mitigation proposals for Habitats and Species

R-2020-0371-SCP-323395 R_2020_0371_SCP - Natural England.pdf:5:Natural England supports the publication Guidelines for Landscape and Visual Impact Assessment,

R-2020-0371-SCP-323395 R_2020_0371_SCP - Natural England.pdf:5:landscape and visual impact assessment.

R-2020-0371-SCP-323395 R_2020_0371_SCP - Natural England.pdf:5:Environmental Impact Assessment process should detail the measures to be taken to ensure the

R-2020-0371-SCP-323395 R_2020_0371_SCP - Natural England.pdf:5:cumulative impact assessment should include other proposals currently at Scoping stage. Due to

R-2020-0371-SCP-323395 R_2020_0371_SCP - Natural England.pdf:6:The ES should include an impact assessment to identify, describe and evaluate the effects that are

R-2020-0684-ESM-Appendix 13_Landscape and visual impact assessment methodology.pdf:2:The purpose of the Landscape and Visual Impact Assessment (LVIA) is to identify the potential

R-2020-0684-ESM-Appendix 13_Landscape and visual impact assessment methodology.pdf:2:LVIA is either carried out formally as part of the Environmental Impact Assessment (EIA) process or

R-2020-0684-ESM-Appendix 13_Landscape and visual impact assessment methodology.pdf:2:▪ ‘Guidelines for Landscape and Visual Impact Assessment’ (GLVIA), Third Edition Landscape

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_13. Fish and fisheries.pdf:23:While the loss of such habitat is considered to be insignificant (in terms of impact assessment) for the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:2:(Environmental Impact Assessment) Regulations 2007, as amended. In addition, RCBC issued a Scoping

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:2:(Environmental Impact Assessment) Regulations 2007, as amended, and the Town and Country Planning

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:2:(Environmental Impact Assessment) Regulations 2017, without submitting a formal EIA Screening Request.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:4:a description of the approach taken to the specific impact assessment for each environmental topic is

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:7:Table 5.3 Impact assessment matrix

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:8:5.1.6 Cumulative Impact Assessment

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_5. Approach to the EIA.pdf:9:There is no legislation that outlines how cumulative impact assessments (CIAs) should be undertaken.

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:1:Subject: South Bank port facility – Environmental Impact Assessment scoping review

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:1:Environmental Impact Assessment (EIA) in support of a marine licence application to the Marine

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:2:Marine Works (Environmental Impact Assessment) Regulations 2007 as amended, and the Town and

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:2:Country Planning (Environmental Impact Assessment) Regulations 2017 respectively. This document has

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:4: • Landscape and visual impact assessment.

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:7: Views of the Grade II* Transporter Bridge should be assessed in the ‘Landscape and Visual Impact Assessment’ to determine the likely impact of the

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:8: for disposal to sea (and to inform the impact assessment). Any material to be dredged and disposed of within licenced disposal areas at-sea must not

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:8: Regulation 4(4) of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 requires the assessment of significant effects

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:13:proposed quay Infrastructure, drawing from the findings of the landscape and visual impact assessment

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:13:construction and operational phases; outputs from the modelling will inform the impact assessment (for

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:14:A detailed cumulative impact assessment with the wider onshore development (or other planned or

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:14:A Landscape and Visual Impact Assessment (LVIA) will be undertaken as part of the EIA. This will involve

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:14:Impact Assessment, 3rd edition.

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:15: 4.20. Cumulative impact assessment

R-2020-0684-ESM-PC1084-RHD-SB-EN-NT-EV-1106_Appendix 2_Scoping note.pdf:16:A cumulative impact assessment will be undertaken, taking into account any relevant consented - but as

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:2: therefore the impact assessment presented within

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:19:‘medium’ has been assigned for the purposes of this impact assessment, taking in to account the fragmented

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_9. Marine ecology.pdf:20:As such, the impact assessment presented within this section focuses on the potential impacts to marine

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:4:8 CUMULATIVE IMPACT ASSESSMENT 16

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:5:The proposed scheme has been subject to an Environmental Impact Assessment (EIA) which has assessed

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:18:The landscape and visual impact assessment (LVIA) establishes that operational effects of the proposed

R-2020-0684-ESM-PC1084-RHD-ZZ-XX-RP-Z-1108_NTS.pdf:20:8 CUMULATIVE IMPACT ASSESSMENT

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:1:27 CUMULATIVE IMPACT ASSESSMENT

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:1:Works (Environmental Impact Assessment) Regulations 2007 (as amended) and the Town and Country

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:1:Planning (Environmental Impact Assessment) Regulations 2017 require an assessment of its potential

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:1:The IEMA ‘Guidelines for Environmental Impact Assessment’ (IEMA, 2004) define cumulative impacts as:

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:2:this report and summarised in Table 1.1). Landscape and visual impact assessment has been detailed

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:22:Of the proposed projects which have been screened into the cumulative impact assessment, all have

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_27. Cumulative impact assessment.pdf:27:from the projects and plans screened in for cumulative impact assessment will not, therefore, also occur

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:3:4.4 Environmental Impact Assessment Directive 28

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:7:27 CUMULATIVE IMPACT ASSESSMENT 482

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:8:13 Landscape and visual impact assessment methodology

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:8:14 Landscape and visual impact assessment figures

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:9:Environmental Impact Assessment (EIA) in support of a marine licence application to the Marine

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:9:The study area is shown on Figure 1.2. Landscape and visual impact assessment has been detailed

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_1. Introduction.pdf:9: impact assessment

R-2020-0684-ESM-Appendix 8_Underwater noise assessment.pdf:2: Underwater Noise Impact Assessment – South Bank, Tees Estuary

R-2020-0684-ESM-Appendix 8_Underwater noise assessment.pdf:3: Underwater Noise Impact Assessment – South Bank, Tees Estuary

R-2020-0684-ESM-Appendix 8_Underwater noise assessment.pdf:4: Underwater Noise Impact Assessment – South Bank, Tees Estuary

R-2020-0684-ESM-Appendix 8_Underwater noise assessment.pdf:4:impact assessment. As the measurement or receiver point moves away from the source, the sound

R-2020-0684-ESM-Appendix 8_Underwater noise assessment.pdf:5: Underwater Noise Impact Assessment – South Bank, Tees Estuary

R-2020-0684-ESM-Appendix 8_Underwater noise assessment.pdf:6: Underwater Noise Impact Assessment – South Bank, Tees Estuary

R-2020-0684-ESM-Appendix 8_Underwater noise assessment.pdf:6:3 A Collett, T Mason (2014). York Potash Project Harbour Facilities: Underwater Noise Impact Assessment.

R-2020-0684-ESM-Appendix 8_Underwater noise assessment.pdf:7: Underwater Noise Impact Assessment – South Bank, Tees Estuary

R-2020-0684-ESM-Appendix 8_Underwater noise assessment.pdf:8: Underwater Noise Impact Assessment – South Bank, Tees Estuary

R-2020-0684-ESM-Appendix 8_Underwater noise assessment.pdf:9: Underwater Noise Impact Assessment – South Bank, Tees Estuary

R-2020-0684-ESM-Appendix 8_Underwater noise assessment.pdf:10: Underwater Noise Impact Assessment – South Bank, Tees Estuary

R-2020-0684-ESM-Appendix 8_Underwater noise assessment.pdf:11: Underwater Noise Impact Assessment – South Bank, Tees Estuary

R-2020-0684-ESM-Appendix 8_Underwater noise assessment.pdf:11: Report title Underwater Noise Impact Assessment – South

R-2020-0684-ESM-EIA_Scoping_Response_EIA201900017_FINAL.pdf:1:Marine Works (Environmental Impact Assessment) Regulations 2007 (as

R-2020-0684-ESM-EIA_Scoping_Response_EIA201900017_FINAL.pdf:1:3 Environmental Impact Assessment (EIA) …………………………………………………… 3

R-2020-0684-ESM-EIA_Scoping_Response_EIA201900017_FINAL.pdf:3:3 Environmental Impact Assessment (EIA)

R-2020-0684-ESM-EIA_Scoping_Response_EIA201900017_FINAL.pdf:3:The Marine Works (Environmental Impact Assessment) Regulations 2007 (as

R-2020-0684-ESM-EIA_Scoping_Response_EIA201900017_FINAL.pdf:4:  Landscape and Visual Impact Assessment;

R-2020-0684-ESM-EIA_Scoping_Response_EIA201900017_FINAL.pdf:8:Visual’ impact assessment” to determine the likely impact of the crane and other tall

R-2020-0684-ESM-EIA_Scoping_Response_EIA201900017_FINAL.pdf:11:sea (and to inform the impact assessment). Any material to be dredged and

R-2020-0684-ESM-HIGHWAYS ENGLAND.pdf:10:An Environmental Impact Assessment (EIA) has been produced (by Royal HaskoningDHV) in support of the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:2:The ecological impact assessment presented below has been based upon the following guidance and

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:3: for Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater and Coastal;

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_11. Terrestrial ecology.pdf:3:To inform this Ecological Impact Assessment (EcIA), Tees Valley Combined Authority has undertaken

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1111_Appendix 1_Waste Report.pdf:4:to as the proposed scheme). This report accompanies the Environmental Impact Assessment (EIA) in

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:4:England. Noise Sensitive Receptor (NSR) locations and the methodology for the impact assessment were

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:9:17.3.4 Impact assessment methodology

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:12:Table 17.10 Construction road traffic noise impact assessment

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:14:Table 17.13 On-site construction phase noise impact assessment

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_17. Noise and vibration.pdf:16:Table 17.15 Operational phase noise impact assessment

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:2:4.4 Environmental Impact Assessment Directive

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:2:in this instance, The Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended)

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:2:and the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 are applicable

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_4. Legislative framework.pdf:2:required under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017, as

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:5: Cumulative Impact Assessment …………………………………………………………………………… 41

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:7:Table 16: Cumulative Impact Assessment ……………………………………………………………………………….. 42

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:8: EIA Environmental Impact Assessment

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:11: Marine Works EIA (Environmental Impact Assessment) Regulations governing EIA’s for

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:49: CUMULATIVE IMPACT ASSESSMENT

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:49:The cumulative impact assessment was assessed to be a factor of the likelihood of the impact

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:49:The results of the cumulative impact assessment are given in Table 16. All impacts were assessed to

R-2020-0684-ESM-Appendix 9_Navigation Risk Assessment.pdf:50:Table 16: Cumulative Impact Assessment

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:9:modelling exercise to inform the Environmental Impact Assessment (EIA) that is being prepared as part of

R-2020-0684-ESM-Appendix 5_Hydro-dynamic and sedimentary plume modelling report.pdf:13:area is of most interest in terms of the hydrodynamic outputs for the Environmental Impact Assessment.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_22. Climate change.pdf:6:22.3.5 Impact assessment methodology

R-2020-0684-ESM-Officer Report 0684.pdf:4:Environmental Impact Assessment

R-2020-0684-ESM-Officer Report 0684.pdf:5:Works (Environmental Impact Assessment) Regulations 2007 (the MWR), as

R-2020-0684-ESM-Officer Report 0684.pdf:5:(Environmental Impact Assessment) Regulations

R-2020-0684-ESM-Officer Report 0684.pdf:70:Impact Assessment (LVIA). The chapter considers the following potential

R-2020-0684-ESM-Officer Report 0684.pdf:70:development, a Landscape and Visual Impact Assessment (LVIA) has been

R-2020-0684-ESM-Officer Report 0684.pdf:88:As required by both the Marine Works (Environmental Impact Assessment)

R-2020-0684-ESM-Officer Report 0684.pdf:88:(Environmental Impact Assessment) 2017 consideration is required to be

R-2020-0684-ESM-Officer Report 0684.pdf:89:As required by both the Marine Works (Environmental Impact Assessment)

R-2020-0684-ESM-Officer Report 0684.pdf:89:(Environmental Impact Assessment) 2017 consideration has been given to

R-2020-0684-ESM-Officer Report 0684.pdf:90:necessary to undertake a full human health impact assessment a point that

R-2020-0684-ESM-Officer Report 0684.pdf:95:Cumulative Impact Assessment

R-2020-0684-ESM-Officer Report 0684.pdf:95:A cumulative impact assessment was carried out to consider the potential for

R-2020-0684-ESM-Officer Report 0684.pdf:96:supported by an Environmental Impact Assessment as Schedule 1

R-2020-0684-ESM-CONSULTATION MMO 0684.pdf:2:Environmental Impact Assessment

R-2020-0684-ESM-CONSULTATION MMO 0684.pdf:2:2011/92/EU) is transposed into UK law by the Marine Works (Environmental Impact Assessment)

R-2020-0684-ESM-CONSULTATION MMO 0684.pdf:2:the MWR and The Town and Country Planning (Environmental Impact Assessment) Regulations

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_29. Habitats Regulations Assessment.pdf:33:cumulative noise impact assessment of the NGCT, Dogger Bank Teesside A & Sofia project and the Harbour

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1109_Appendix 15_Flood Risk Assessment.pdf:8:The proposed scheme is defined in full within the Environmental Impact Assessment (EIA) Report (Royal

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:2:for Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater, Coastal and Marine.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_30. References.pdf:11:Royal HaskoningDHV (2018). Hartlepool Approach Channel: Environmental Impact Assessment Report.

R-2020-0684-ESM-Appendix 3_Scoping consultation.pdf:2:Environmental Impact Assessment (EIA) for this development.

R-2020-0684-ESM-Appendix 3_Scoping consultation.pdf:4:associated with the site. Any Environmental Impact Assessment should include details of the

R-2020-0684-ESM-Appendix 3_Scoping consultation.pdf:7: environments and will require Environmental Impact Assessment (EIA) in support of

R-2020-0684-ESM-Appendix 3_Scoping consultation.pdf:7: Town and Country Planning (Environmental Impact Assessment) Regulations 2017.

R-2020-0684-ESM-Appendix 3_Scoping consultation.pdf:8: Impact Assessment scoping review) on environmental assessment requirements in

R-2020-0684-ESM-Appendix 3_Scoping consultation.pdf:8: Impact Assessment scoping review) on environmental assessment requirements in

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:1:the baseline environment on which the impact assessment can be based.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:10:follows a matrix approach to inform the impact assessment, using best practice, best available scientific

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:10:understanding and relevant guidance (e.g. CIEEM Guidelines for Ecological Impact Assessment in the UK

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:22:across the full winter period, the assumption made for the purposes of impact assessment is that North Tees

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_12. Marine and coastal ornithology.pdf:26:sources in the Tees estuary, receptors included in the following impact assessments are as follows:

R-2020-0684-ESM-PC1084-RHD-SB-EN-RP-EV-1107_Appendix 7_Land quality desk study.pdf:7: Impact Assessment (EIA) for Geology and Ground Conditions.

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:3: Environmental Impact Assessment 19

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:6: Environmental Impact Assessment

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:6: the need for Environmental Impact Assessment (‘EIA’).

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:6: Town and Country Planning (Environmental Impact Assessment) Regulations 2017, without

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:23: through the Environmental Impact Assessment which accompanies the application. The South

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:23: Environmental Impact Assessment

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:23: Impact Assessment) Regulations 2017 (the EIA Regulations) as updated by The Town and

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:23: Country Planning and Infrastructure Planning (Environmental Impact Assessment)

R-2020-0684-ESM-61586 Quay Planning Statement 09-11-20.pdf:29:5.58 The landscape and visual impact assessment (LVIA) establishes that operational effects of the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:4: and Visual Impact Assessment’ to determine the likely impact of the Section 19

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:8:16.3.3 Impact assessment methodology

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:8:The general method for impact assessment is set out in Section 5. The specific approach to the assessment

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:8:The impact assessment defines heritage assets, and their settings, likely to be impacted by the proposed

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_16. Archaeology and cultural heritage.pdf:8:Specifically, therefore, the impact assessment will present:

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_25. Health risk assessment.pdf:1:The Marine Works (Environmental Impact Assessment) (Amendments) Regulations 2017 and the Town and

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_25. Health risk assessment.pdf:1:Country Planning (Environmental Impact Assessment) 2017 brought in a requirement to consider the

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_25. Health risk assessment.pdf:1:document (Appendix 2), this health impact assessment is therefore a concise assessment which relies on

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_25. Health risk assessment.pdf:1:undertake a full human health impact assessment.

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:4:To inform the impact assessment of works during the proposed scheme for marine mammal species,

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:4:In addition to the methodology for the impact assessment outlined in Section 5, the magnitude of effect on

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:14:Table 10.5 Reference populations and density estimates to inform the impact assessment for marine

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_10. Marine mammals.pdf:15:The underwater noise impact assessments for marine mammal species for the proposed scheme has been

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:1:This section of the EIA Report presents the findings of a Landscape and Visual Impact Assessment (LVIA)

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_19. Landscape and visual.pdf:4:Institute in the third edition of its ‘Guidelines for Landscape and Visual Impact Assessment’ (GLVIA3, 2013).

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_6. Hydrodynamic and sedimentary regime.pdf:10:6.3.6 Impact assessment

R-2020-0684-ESM-336521 R_2020_0684_ESM - Demolition of existing quay, capital dredge and development of new quay at South Bank Wharf, Grangetown, Redcar - Phase 1.pdf:3:& Visual Impact Assessment should be provided with the proposal to inform decision making. We

R-2020-0684-ESM-336521 R_2020_0684_ESM - Demolition of existing quay, capital dredge and development of new quay at South Bank Wharf, Grangetown, Redcar - Phase 1.pdf:3:refer you to the Landscape Institute Guidelines for Landscape and Visual Impact Assessment for

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_18. Air quality.pdf:17:considered as not significant. A detailed impact assessment of road traffic exhaust emissions was

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_23. Use of natural resources.pdf:1:Schedule 3 of The Marine Works (Environmental Impact Assessment) (Amendment) Regulations 2017

R-2020-0684-ESM-PC1084_RHD-ZZ-XX-RP-Z-1100_23. Use of natural resources.pdf:1:Country Planning (Environmental Impact Assessment) Regulations 2017.

R-2020-0684-ESM-RCBC scoping opinion.pdf:1: •Landscape and Visual Impact Assessment;

R-2020-0684-ESM-RCBC scoping opinion.pdf:4:Regulation 4(4) of the Town and Country Planning (Environmental Impact Assessment)

R-2020-0684-ESM-RCBC scoping opinion.pdf:4:HSE responses to Environmental Impact Assessment consultations will be limited to our role

R-2020-0684-ESM-RCBC scoping opinion.pdf:8:the Environmental Impact Assessment (EIA) for this development.

R-2020-0684-ESM-RCBC scoping opinion.pdf:8:Schedule 4 of the Town & Country Planning (Environmental Impact Assessment) Regulations

R-2020-0684-ESM-RCBC scoping opinion.pdf:9:for Ecological Impact Assessment (EcIA) have been developed by the Chartered Institute of

R-2020-0684-ESM-RCBC scoping opinion.pdf:11:protected species populations in the wider area, to assist in the impact assessment.

R-2020-0684-ESM-RCBC scoping opinion.pdf:11:for relevant species and the survey results, impact assessments and appropriate

R-2020-0684-ESM-RCBC scoping opinion.pdf:11:decisions’. Natural England therefore advises that survey, impact assessment and mitigation

R-2020-0684-ESM-RCBC scoping opinion.pdf:13:universally used for landscape and visual impact assessment.

R-2020-0684-ESM-RCBC scoping opinion.pdf:13:local materials. The Environmental Impact Assessment process should detail the measures

R-2020-0684-ESM-RCBC scoping opinion.pdf:13:advises that the cumulative impact assessment should include other proposals currently at

R-2020-0684-ESM-RCBC scoping opinion.pdf:14:The ES should include an impact assessment to identify, describe and evaluate the effects

R-2020-0684-ESM-RCBC scoping opinion.pdf:16:I would advise and/or expect that any future Environmental Impact Assessment is

R-2020-0684-ESM-RCBC scoping opinion.pdf:17:accordance with the Town & Country Planning (Environmental Impact Assessment)

R-2021-0405-FFM-DECISION NOTICE.pdf:2: out in the Ecological Impact Assessment, INCA,, dated May 2021 have been

R-2021-0405-FFM-210512, EcIA for South Bank Site Remediation_INCA_RevA Final.PDF:1:Ecological Impact Assessment

R-2021-0405-FFM-210512, EcIA for South Bank Site Remediation_INCA_RevA Final.PDF:3:Environmental Management (‘CIEEM’) guidelines for Ecological Impact Assessment (EcIA) i.

R-2021-0405-FFM-210512, EcIA for South Bank Site Remediation_INCA_RevA Final.PDF:27:i. CIEEM (2016) Guidelines for Ecological Impact Assessment in the UK and Ireland: Terrestrial,

R-2021-0405-FFM-210512, EcIA for South Bank Site Remediation_INCA_RevA Final.PDF:27:ix. Peak Ecology (2013) Ecological Impact Assessment: Technical Report Dogger Bank Teesside A & B

R-2021-0405-FFM-OFFICER REPORT.pdf:3:  Ecological Impact Assessment

R-2021-0405-FFM-OFFICER REPORT.pdf:11:The application is supported by an Ecological Impact Assessment and a

R-2021-0405-FFM-OFFICER REPORT.pdf:12:of the submitted Ecological Impact Assessment.

R-2021-0405-FFM-OFFICER REPORT.pdf:12:sites are set out in Table 3 of the submitted Ecological Impact Assessment.

R-2021-0405-FFM-OFFICER REPORT.pdf:12:As part of the submitted Ecological Impact Assessment consideration has

R-2021-0405-FFM-OFFICER REPORT.pdf:14:Within the Ecological Impact Assessment a summary has been provided with

R-2021-0405-FFM-63262_01 - South Bank Remediation Cover Letter - 13.05.21.PDF:5:An Ecological Impact Assessment, prepared by INCA, accompanies this planning application which

R-2021-0405-FFM-63262_01 - South Bank Remediation Cover Letter - 13.05.21.PDF:7:Environmental Impact Assessment

R-2021-0405-FFM-63262_01 - South Bank Remediation Cover Letter - 13.05.21.PDF:7:Planning (Environmental Impact Assessment) Regulations 2017 (as amended) (“the Regulations”) and it is

R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:8:  South Bank Site Remediation, Ecological Impact Assessment Revision A Final, dated May

R-2021-0405-FFM-10035117-AUK-XX-XX-RP-ZZ-0293-01-South Bank Quay Strategy rev1.PDF:14:Appropriate Assessment Revision A Final INCA 2021 and Ecological Impact Assessment Revision A

R-2021-0268-CD-Decision Notice.pdf:3: and the conclusions of the Environmental Impact Assessment that the

R-2022-0526-CD-COMPLIANCE OFFICER REPORT.pdf:1:Air Quality Impact Assessment (10 June 2022 – Ref 32435-RP-IE-001)

R-2022-0526-CD-COMPLIANCE OFFICER REPORT.pdf:2:provision of an Air Quality Impact Assessment relating to construction activities

R-2022-0526-CD-R 2020 0357 OOM Decision Notice.pdf:3: and the conclusions of the Environmental Impact Assessment that the

R-2022-0526-CD-AQIA_FINAL.pdf:1:Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:2: REPORT NAME: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:3: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:4: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:5: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:5: Hilson Moran has been instructed by K2 and SeHa to undertake an Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:6: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:6: Hilson Moran has been instructed by K2 and SeHa to undertake an Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:7: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:8: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:9: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:10: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:11: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:12: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:13: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:14: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:15: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:16: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:17: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:18: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:19: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:20: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:21: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:22: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:23: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:24: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:25: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:26: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:27: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:28: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:29: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:30: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:31: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:31:5.1.3.1. Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:32: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:33: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:34: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:35: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:36: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:37: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:38: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:39: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:40: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:41: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:42: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:43: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:44: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:45: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:46: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:47: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:48: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:49: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:50: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:51: Air Quality Impact Assessment

R-2022-0526-CD-AQIA_FINAL.pdf:52: Air Quality Impact Assessment

R-2020-0539-PND-Officer report _R20200539PND.pdf:3:(Environmental Impact Assessment) Regulations 2017, but the demolition is

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:3:Environmental Impact Assessment

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:3:Consideration has been given in relation to the Environmental Impact Assessment Regulations 2017.

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:3:meaning of the Environmental Impact Assessment directive as concluded by the European Court of Justice.

R-2020-0539-PND-60772_South Bank pump houses cover letter_September 2020.PDF:3:(Environmental Impact Assessment) Regulations 2017 as updated (“the EIA regulations 2017”). The

R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:20:Metals Recovery Site Ecological Impact Assessment and Biodiversity Assessment dated 14 th

R-2022-0755-CD-Aug 22 - CEMP - Land West of Warrenby - Site Preparation Remediation Works.pdf:22:As highlighted in the Ecological Impact Assessment and Biodiversity Net Gain Assessment, Arup,

R-2022-0755-CD-63262 Covering Letter NZT DoC 13.09.22.pdf:1:shall demonstrate how the mitigation measures set out in the Ecological Impact Assessment, INCA,

R-2022-0435-CD-Compliance Decision Notice 0435(1).pdf:2: and the conclusions of the Environmental Impact Assessment that the

R-2022-0435-CD-395126 - R_2022_0435_CD Partial discharge of Condition 6. Land at South Tees Development Corporation, South Bank - No Objections.pdf:3:impacts of development are likely to be significant, a Landscape & Visual Impact Assessment should be

R-2022-0435-CD-395126 - R_2022_0435_CD Partial discharge of Condition 6. Land at South Tees Development Corporation, South Bank - No Objections.pdf:3:Guidelines for Landscape and Visual Impact Assessment for further guidance.

R-2022-0435-CD-391845-R20220435CD.pdf:2:impacts of development are likely to be significant, a Landscape & Visual Impact Assessment should be

R-2022-0435-CD-391845-R20220435CD.pdf:2:Guidelines for Landscape and Visual Impact Assessment for further guidance.

R-2022-0435-CD-INCA2022-12 HRA - SeAH South Bank Rev 1.pdf:2:Impact Assessment that the development will not give rise to significant adverse impacts on the

R-2022-0435-CD-64764_01 Covering Letter 03.05.2022(1).pdf:1:Impact Assessment that the development will not give rise to significant adverse impacts on the

R-2020-0283-PND-Officer report.pdf:2:Planning (Environmental Impact Assessment) Regulations 2017, but the

R-2019-0331-SCP-Archaeological Advice R-2019-0331-SCP South Bank Wharf _.pdf:1:accordance with the Town & Country Planning (Environmental Impact Assessment) Regulations

R-2019-0331-SCP-284160 R_2019_0331_SCP - EIA Scoping, South Bank Wharf Redevelopment, South Bank, Middlesbrough.pdf:1:Environmental Impact Assessment Scoping consultation (Regulation 15 (4) of the EIA

R-2019-0331-SCP-284160 R_2019_0331_SCP - EIA Scoping, South Bank Wharf Redevelopment, South Bank, Middlesbrough.pdf:1:Environmental Impact Assessment (EIA) for this development.

R-2019-0331-SCP-284160 R_2019_0331_SCP - EIA Scoping, South Bank Wharf Redevelopment, South Bank, Middlesbrough.pdf:1: 2 Note on Environmental Impact Assessment Directive for Local Planning Authorities Office of the Deputy Prime

R-2019-0331-SCP-284160 R_2019_0331_SCP - EIA Scoping, South Bank Wharf Redevelopment, South Bank, Middlesbrough.pdf:2:Schedule 4 of the Town & Country Planning (Environmental Impact Assessment) Regulations 2017,

R-2019-0331-SCP-284160 R_2019_0331_SCP - EIA Scoping, South Bank Wharf Redevelopment, South Bank, Middlesbrough.pdf:2:Ecological Impact Assessment (EcIA) have been developed by the Chartered Institute of Ecology

R-2019-0331-SCP-284160 R_2019_0331_SCP - EIA Scoping, South Bank Wharf Redevelopment, South Bank, Middlesbrough.pdf:4:results, impact assessments and appropriate accompanying mitigation strategies included as part of

R-2019-0331-SCP-284160 R_2019_0331_SCP - EIA Scoping, South Bank Wharf Redevelopment, South Bank, Middlesbrough.pdf:4:therefore advises that survey, impact assessment and mitigation proposals for Habitats and Species

R-2019-0331-SCP-284160 R_2019_0331_SCP - EIA Scoping, South Bank Wharf Redevelopment, South Bank, Middlesbrough.pdf:5:Natural England supports the publication Guidelines for Landscape and Visual Impact Assessment,

R-2019-0331-SCP-284160 R_2019_0331_SCP - EIA Scoping, South Bank Wharf Redevelopment, South Bank, Middlesbrough.pdf:5:landscape and visual impact assessment.

R-2019-0331-SCP-284160 R_2019_0331_SCP - EIA Scoping, South Bank Wharf Redevelopment, South Bank, Middlesbrough.pdf:5:Environmental Impact Assessment process should detail the measures to be taken to ensure the

R-2019-0331-SCP-284160 R_2019_0331_SCP - EIA Scoping, South Bank Wharf Redevelopment, South Bank, Middlesbrough.pdf:5:cumulative impact assessment should include other proposals currently at Scoping stage. Due to

R-2019-0331-SCP-284160 R_2019_0331_SCP - EIA Scoping, South Bank Wharf Redevelopment, South Bank, Middlesbrough.pdf:6:The ES should include an impact assessment to identify, describe and evaluate the effects that are

R-2019-0331-SCP-Letter to RCBC 19.05.20 Scoping Request FINAL.pdf:1: Town and Country Planning (Environmental Impact Assessment) Regulations 2017

R-2019-0331-SCP-Letter to RCBC 19.05.20 Scoping Request FINAL.pdf:1: 1 development under the Environmental Impact Assessment (EIA) Regulations, by reason of the size

R-2019-0331-SCP-Letter to RCBC 19.05.20 Scoping Request FINAL.pdf:14: Country Planning (Environmental Impact Assessment) Regulations 2017. The ES will provide all the

R-2019-0331-SCP-Letter to RCBC 19.05.20 Scoping Request FINAL.pdf:15: • Landscape and Visual Impact Assessment;

R-2019-0331-SCP-Letter to RCBC 19.05.20 Scoping Request FINAL.pdf:15: Throughout the environmental impact assessment, each environmental discipline specialist will liaise

R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:1: •Landscape and Visual Impact Assessment;

R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:4:Regulation 4(4) of the Town and Country Planning (Environmental Impact Assessment)

R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:4:HSE responses to Environmental Impact Assessment consultations will be limited to our role

R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:8:the Environmental Impact Assessment (EIA) for this development.

R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:8:Schedule 4 of the Town & Country Planning (Environmental Impact Assessment) Regulations

R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:9:for Ecological Impact Assessment (EcIA) have been developed by the Chartered Institute of

R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:11:protected species populations in the wider area, to assist in the impact assessment.

R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:11:for relevant species and the survey results, impact assessments and appropriate

R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:11:decisions’. Natural England therefore advises that survey, impact assessment and mitigation

R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:13:universally used for landscape and visual impact assessment.

R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:13:local materials. The Environmental Impact Assessment process should detail the measures

R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:13:advises that the cumulative impact assessment should include other proposals currently at

R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:14:The ES should include an impact assessment to identify, describe and evaluate the effects

R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:16:I would advise and/or expect that any future Environmental Impact Assessment is

R-2019-0331-SCP-Officer Letter_R20190331SCP.pdf:17:accordance with the Town & Country Planning (Environmental Impact Assessment)

R-2019-0331-SCP-HSE.pdf:1:Regulation 4(4) of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 requires

R-2019-0331-SCP-HSE.pdf:1:HSE responses to Environmental Impact Assessment consultations will be limited to our role in the land use planning

R-2019-0331-SCP-NHM.pdf:1:I would advise and/or expect that any future Environmental Impact Assessment is comprehensive, covering all

R-2020-0679-PND-Officer Report.pdf:2:Impact Assessment) Regulations 2017, but the demolition is not considered to

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:3:Environmental Impact Assessment

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:3:Consideration has been given in relation to the Environmental Impact Assessment Regulations 2017.

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:3:meaning of the Environmental Impact Assessment directive as concluded by the European Court of Justice.

R-2020-0679-PND-60722_Cover letter torpedo v2_Nov 2020.PDF:3:(Environmental Impact Assessment) Regulations 2017 as updated (“the EIA regulations 2017”). The

R-2021-0879-FF-63262 01 Dorman Long Training Centre Cover Letter 14.10.21.pdf:5:Environmental Impact Assessment

R-2021-0879-FF-63262 01 Dorman Long Training Centre Cover Letter 14.10.21.pdf:5:Planning (Environmental Impact Assessment) Regulations 2017 (as amended) (“the Regulations”). The site

R-2021-0879-FF-63262 01 Dorman Long Training Centre Cover Letter 14.10.21.pdf:5:therefore, is not subject to an Environmental Impact Assessment.

R-2021-0589-PND-Officer Report 0589.pdf:2:Planning (Environmental Impact Assessment) Regulations 2017.

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:Environmental Impact Assessment

R-2021-0589-PND-63262_Cover letter Prior Approval_July 2021.PDF:3:Assessment Directive, and can therefore be subject to Environmental Impact Assessment. Local planning

R-2022-0343-ESM-64764 SeAH EIA Compliance Statement (2) May 2022 pdf.pdf:11: Planning and Infrastructure Planning (Environmental Impact Assessment) (Amendment)

R-2022-0343-ESM-ApplicationFormRedacted.pdf:4:environment impact assessment application and, if so, confirm that an environmental statement was submitted to the planning authority at that time

R-2022-0343-ESM-64764 SeAH EIA Compliance Statement April 2022.pdf:11: Planning and Infrastructure Planning (Environmental Impact Assessment) (Amendment)

R-2020-0411-FFM-Appendix 1.2 Statement of Expertise - formatted.pdf:3: Environmental Impact Assessment (EIA) Quality Mark. This means that RPS adheres to the

R-2020-0411-FFM-Appendix 1.2 Statement of Expertise - formatted.pdf:4: Landscape and Visual Impact Assessment

R-2020-0411-FFM-Appendix 1.2 Statement of Expertise - formatted.pdf:4: Visual Impact Assessments (LVIAs) for major development projects. She has worked on many

R-2020-0411-FFM-Appendix 1.2 Statement of Expertise - formatted.pdf:5: projects and she has project managed numerous landscape and visual impact assessments for

R-2020-0411-FFM-Appendix 1.2 Statement of Expertise - formatted.pdf:5: Assessment and Environmental Impact Assessment.

R-2020-0411-FFM-Appendix 1.2 Statement of Expertise - formatted.pdf:6: experience of transport planning and environmental impact assessment. Joanna’s experience has

R-2020-0411-FFM-Appendix 1.2 Statement of Expertise - formatted.pdf:6: undertaking highway capacity assessments, undertaking environmental impact assessments and

R-2020-0411-FFM-Appendix 1.2 Statement of Expertise - formatted.pdf:6: engineering and environmental impact assessment. David has a particular expertise in preparing

R-2020-0411-FFM-Appendix 1.2 Statement of Expertise - formatted.pdf:7: environmental noise and vibration impact assessments for major developments. He is an expert in

R-2020-0411-FFM-Appendix 1.1 Information Required with an ES.pdf:1:Country Planning (Environmental Impact Assessment) Regulations

R-2020-0411-FFM-Chapter 9 Geology Hydrogeology and Contamination.pdf:4: environmental impact assessment process. This involves considering how the impacts of

R-2020-0411-FFM-11366_Response to Anglo American_AS_S.pdf:2: transport impacts is required within the submitted Environmental Impact Assessment. As above, it is

R-2020-0411-FFM-11366_Response to Anglo American_AS_S.pdf:2: cumulative impact assessment.

R-2020-0411-FFM-EA R_2020_0411_FFM v2 10 November 2020 OFFICIAL .pdf:2:Prior to the installation of the surface water outfall a scour impact assessment and

R-2020-0411-FFM-Chapter 1 Introduction.pdf:1: Impact Assessment (EIA) process and accompanies the planning application for the proposed

R-2020-0411-FFM-Chapter 1 Introduction.pdf:1: and Country Planning (Environmental Impact Assessment) Regulations 2017 as amended. These

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:2:EIA Environmental Impact Assessment

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:3: 4.4 Stage 3: Impact Assessment ……………………………………………………………………………………. 13

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:4: (Environment Impact Assessment) (EIA) Regulations 2017 (as amended) for the proposed

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:5: • impact assessment – considers the potential impacts of your activity, identifies ways to avoid

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:13:Receptor Potential Note the risk issue(s) for impact assessment

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:14:Receptor Potential Note the risk issue(s) for impact assessment

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:14: Receptors scoped out of Stage 3 Impact Assessment

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:16:4.4 Stage 3: Impact Assessment

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:16:4.4.1 Based on the outcomes of the Stage 2 scoping assessment, this impact assessment establishes

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:23: impact assessments and mitigation strategies proposed (documented in Chapter 2: Project

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:26:Could impact on the hydromorphology (for Impact assessment not No. The waterbody is already heavily modified and the outfall will be

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:26:Could significantly impact the hydromorphology Impact assessment not Outfall proposed in a location of the Tees Estuary that is already affected

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:26:Is in a water body that is heavily modified for the Impact assessment not Not modified for the same activity

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:29:Is in a water body with a phytoplankton status of Impact assessment not No: Phytoplankton classification of the Tees Estuary is Good

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:29:Is in a water body with a history of harmful algae Impact assessment not Not monitored. The water body contains several high quality bathing

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:30:It disturbs sediment with contaminants above Cefas Impact assessment not There will be no disturbance of sediment within the Tees Estuary. Where

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:31: The chemicals released are on the Environmental Impact assessment not There will be no direct discharges of chemicals into the water body.

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:31: Carry out your impact assessment using the Environment Agency’s surface water pollution risk assessment guidance, part of Environmental Permitting Regulations guidance.

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:33:Receptor Potential risk to Note the risk issue(s) for impact assessment

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:34:Receptor Potential risk to Note the risk issue(s) for impact assessment

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:34:If you haven’t identified any receptors at risk during scoping, you don’t need to continue to the impact assessment stage and your WFD assessment is complete.

R-2020-0411-FFM-Appendix 8.3 WFD.pdf:34:If you’ve identified one or more receptors at risk during scoping, you should continue to the impact assessment stage.

R-2020-0411-FFM-Chapter 12 Noise and Vibration.pdf:1: Impact Assessment (EIA) undertaken to consider the noise and vibration effects of the

R-2020-0411-FFM-Chapter 5 Planning Policy.pdf:1: explicit requirement in the Town and Country Planning (Environmental Impact Assessment)

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:9: terms of the Environmental Impact Assessment (EIA) Regulations.

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:10: that are likely to be subject to dust impact assessment means that it is not possible to be

R-2020-0411-FFM-Chapter 11 Air Quality.pdf:25:11.5.14 In accordance with the Town and Country Planning (Environmental Impact Assessment)

R-2020-0411-FFM-Chapter 2 Project Description.pdf:18:2.5.27 The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 require

R-2020-0411-FFM-Non Technical Summary.pdf:2: 5.1 Landscape and Visual Impact Assessment ………………………………………………………………………14

R-2020-0411-FFM-Non Technical Summary.pdf:3: Environmental Impact Assessment has been undertaken in accordance with UK legal

R-2020-0411-FFM-Non Technical Summary.pdf:8:2.2.31 The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as

R-2020-0411-FFM-Non Technical Summary.pdf:13:3.2.4 The findings of the Environmental Impact Assessment process have influenced the iterative design

R-2020-0411-FFM-Non Technical Summary.pdf:13: Environmental Impact Assessment process, including the following

R-2020-0411-FFM-Non Technical Summary.pdf:14: Chapter 6 Landscape and Visual Impact Assessment

R-2020-0411-FFM-Non Technical Summary.pdf:16:5.1 Landscape and Visual Impact Assessment

R-2020-0411-FFM-Non Technical Summary.pdf:16:5.1.1 The landscape and visual impact assessment identifies and addresses the existing landscape and

R-2020-0411-FFM-Non Technical Summary.pdf:16: which is not significant in terms of Environmental Impact Assessment.

R-2020-0411-FFM-Non Technical Summary.pdf:21:5.5.6 Environmental impact assessments determined that the effects of driver delay, severance,

R-2020-0411-FFM-Non Technical Summary.pdf:23: significant effects are not considered likely in terms of the Environmental Impact Assessment (EIA)

R-2020-0411-FFM-Non Technical Summary.pdf:25: assessment in the form of an additional chapter or Health Impact Assessment is not considered

R-2020-0411-FFM-Chapter 8 Hydrology and Flood Risk.pdf:7: Impact Assessment Methodology.

R-2020-0411-FFM-Chapter 3 Needs and Alternatives - formatted.pdf:9: Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (2017 SI

R-2020-0411-FFM-Chapter 13 - Other Environmental Effects.pdf:1: considered likely in terms of the Environmental Impact Assessment (EIA) Regulations, including

R-2020-0411-FFM-Chapter 13 - Other Environmental Effects.pdf:3: assessment in the form of an additional chapter or Health Impact Assessment is not considered

R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf:1: Environmental Impact Assessment (EIA) of the project. The chapter also includes details of the

R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf:5: Impact Assessment;

R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf:5: Impact Assessment Practice in the UK. Special Report;

R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf:12: Impact Assessment.

R-2020-0411-FFM-Chapter 4 - EIA Methodology.pdf:12: Impact Assessment Practice in the UK. Special Report.

R-2020-0411-FFM-11366_REC Planning Statement_S_AS.pdf:28:3.1.92 The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 require

R-2020-0411-FFM-Pre-App Consultation Report 14-07-2020 Final (1).pdf:5:Impact Assessment Report to be submitted to RCBC, and informed the technical studies of the EIA.

R-2020-0411-FFM-Pre-App Consultation Report 14-07-2020 Final (1).pdf:5:by the technical work supporting the planning application and Environmental Impact assessment

R-2020-0411-FFM-Pre-App Consultation Report 14-07-2020 Final (1).pdf:11:Impact Assessment Report to be submitted to Redcar and Cleveland Borough Council, and informed

R-2020-0411-FFM-Pre-App Consultation Report 14-07-2020 Final (1).pdf:18:As part of the Environmental Impact Assessment which will support the planning

R-2020-0411-FFM-Pre-App Consultation Report 14-07-2020 Final (1).pdf:20:main issues to be considered in the Environmental Impact Assessment process,

R-2020-0411-FFM-Appendix 10.1 Transport Assessment.pdf:3:Annex N REC Traffic Impact Assessment

R-2020-0411-FFM-Appendix 10.1 Transport Assessment.pdf:3:Annex P Cumulative Impact Assessment

R-2020-0411-FFM-Appendix 10.1 Transport Assessment.pdf:28: attached at Annex O. The impact assessment is attached at Annex P and summarised in Table

R-2020-0411-FFM-Appendix 10.1 Transport Assessment.pdf:94: REC Traffic Impact Assessment

R-2020-0411-FFM-Appendix 10.1 Transport Assessment.pdf:102: Cumulative Impact Assessment

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:4: Requirement for Environmental Impact Assessment …………………………………………………………………….7

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:6:EIA Environmental Impact Assessment

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:7: (Environmental Impact Assessment) Regulations 2017, as amended (hereafter referred to as ‘the

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:13: Requirement for Environmental Impact Assessment

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:15: Impact Assessment;

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:15: Impact Assessment Practice in the UK. Special Report;

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:15: Impact Assessment: A Primer for a Proportional Approach.

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:27:5.10 The Landscape and Visual Impact Assessment (LVIA) undertaken as part of the Landscape and

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:27: • Guidelines for Landscape and Visual Impact Assessment: Third Edition (GLVIA) (Landscape

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:27: cumulative impact assessment will be undertaken of the developments within the Landscape and

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:29: accordance with the ecological impact assessment guidelines published by the Chartered Institute

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:33:5.59 The Environmental Impact Assessment would be undertaken with reference to published guidance

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:35:5.77 An impact assessment of the development traffic on each highway link will be undertaken. As the

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:39: Impact Assessment

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:39: Impact Assessment Practice in the UK

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:39: for Landscape and Visual Impact Assessment: Third Edition

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:49: (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2017

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:50:Environmental Impact Assessment (EIA) for this development.

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:55:however I would question the need for these within a cumulative impact assessment as these are not

R-2020-0411-FFM-Appendix 4.1 Redcar Energy Centre Scoping Report and Scoping Opinion.pdf:55:these within a cumulative impact assessment as these again are not committed developments.

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:1: • Town & Country Planning (Environmental Impact Assessment) Regulations 2017 (as

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:4: • Guidelines for Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:5: are considered in further detail within Chapter 11 and within the impact assessment section of this

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:7: 7 May 2020 (Pre- Natural England’s Discretionary Advice The Impact Assessment Section of this

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:21: into the impact assessment when assigning a significance of effect although not explicitly

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:30: R/2019/0427/FFM 1.96 km No detailed ecological impact assessment

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:30: R/2018/0364/NID 5.18 km Detailed impact assessment not available,

R-2020-0411-FFM-Chapter 7 Ecology and Ornithology.pdf:35: CIEEM (2018) Guidelines for Ecological Impact Assessment in the UK and Ireland: Terrestrial,

R-2020-0411-FFM-Letter on behalf of Anglo American.pdf:1:within the submitted Environmental Impact Assessment.

R-2020-0411-FFM-Chapter 10 Transport.pdf:7: considered to be not significant in Environmental Impact Assessment (EIA) terms.

R-2020-0411-FFM-Chapter 10 Transport.pdf:10:10.3.22 Receptors to be considered within the impact assessment were selected based upon the access

R-2020-0411-FFM-Appendix 9.1 Preliminary Phase 1 Risk Assessment.pdf:7: associated Environmental Impact Assessment in relation to the proposed development of REC.

R-2020-0411-FFM-Appendix 7.2 Ecology PEA.pdf:19:CIEEM (2016). Guidelines for Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:1:6 LANDSCAPE AND VISUAL IMPACT ASSESSMENT

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:2: guidance on landscape and visual impact assessment (LVIA) described in the following

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:2: • Guidelines for Landscape and Visual Impact Assessment, 3rd Edition (GLVIA3) (Landscape

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:3: Table 6.1: Consultation Responses Relevant to Landscape and Visual Impact Assessment

R-2020-0411-FFM-Chapter 6 Landscape and Visual Impact.pdf:44: Guidelines for Landscape and Visual Impact Assessment, 3rd Edition.

R-2021-0728-PND-Officer Report(1).pdf:2:environmental impact assessments.

R-2021-0728-PND-Officer Report(1).pdf:2:Country Planning (Environmental Impact Assessment) Regulations 2017.

R-2021-0728-PND-Cover Letter.pdf:2:Environmental Impact Assessment

R-2021-0728-PND-Cover Letter.pdf:2:Assessment Directive, and can therefore be subject to Environmental Impact Assessment. Local planning

R-2021-0465-FFM-356907 - R_2021_0465_FFM - Erection of 3396sqm of B2_B8 floorspace. Tees Dock Road. Grangetown.pdf:4:Where the impacts of development are likely to be significant, a Landscape & Visual Impact Assessment

R-2021-0465-FFM-356907 - R_2021_0465_FFM - Erection of 3396sqm of B2_B8 floorspace. Tees Dock Road. Grangetown.pdf:4:Guidelines for Landscape and Visual Impact Assessment for further guidance.

R-2021-0465-FFM-Officer Report 0465.pdf:6:a Landscape and Visual Impact Assessment that was based on the

R-2021-0465-FFM-LM Wind Detailed Applicaiton Covering Letter 28.05.21.pdf:3:Environmental Impact Assessment

R-2021-0465-FFM-LM Wind Detailed Applicaiton Covering Letter 28.05.21.pdf:3:(Environmental Impact Assessment) Regulations 2017 (EIA Regulations) (as amended), which relates to

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:8:  South Bank Site Remediation, Ecological Impact Assessment Revision A Final, dated May

R-2021-0465-FFM-10035117-AUK-XX-XX-RP-ZZ-0271-02-South Bank Priority Strategy.pdf:16:Appropriate Assessment Revision A Final INCA 2021 and Ecological Impact Assessment Revision A

R-2021-0152-CD-60722_Covering letter DOC Arch_Feb 2021.PDF:2:measures set out in Chapter 15 of Volume 1 of the submitted Environmental Impact Assessment December

R-2021-0152-CD-Compliance Decision.pdf:2: Environmental Impact Assessment December 2019 and Chapter 7 (Mitigation)

R-2023-0179-SCP-424840_HyGreen_Redcar_EIA_Scoping_NEresponse_28.3.23.pdf:1:Environmental Impact Assessment Scoping consultation (Regulation 15 (4) of the Town and

R-2023-0179-SCP-424840_HyGreen_Redcar_EIA_Scoping_NEresponse_28.3.23.pdf:1:Environmental Impact Assessment (EIA) for the proposed development.

R-2023-0179-SCP-424840_HyGreen_Redcar_EIA_Scoping_NEresponse_28.3.23.pdf:1: ‘HyGreen Hydrogen Project Application for an Environmental Impact Assessment Scoping Opinion Land at

R-2023-0179-SCP-424840_HyGreen_Redcar_EIA_Scoping_NEresponse_28.3.23.pdf:1:Redcar, Teesside - The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 –

R-2023-0179-SCP-424840_HyGreen_Redcar_EIA_Scoping_NEresponse_28.3.23.pdf:2:Schedule 4 of the Town and Country Planning (Environmental Impact Assessment) Regulations

R-2023-0179-SCP-424840_HyGreen_Redcar_EIA_Scoping_NEresponse_28.3.23.pdf:2:An impact assessment should identify, describe, and evaluate the effects that are likely to result

R-2023-0179-SCP-424840_HyGreen_Redcar_EIA_Scoping_NEresponse_28.3.23.pdf:3:Ecological Impact Assessment (EcIA) is the process of identifying, quantifying, and evaluating the

R-2023-0179-SCP-HSE.pdf:1:Town and Country Planning (Environmental Impact Assessment) Regulations 2017, Regulation 4(4) - the

R-2023-0179-SCP-230306 - HyGreen - EIA Scoping Opinion Request Letter - Final.pdf:1:THE TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS

R-2023-0179-SCP-230306 - HyGreen - EIA Scoping Opinion Request Letter - Final.pdf:1:Environmental Impact Assessment (EIA) Scoping Opinion from Redcar and Cleveland Borough Council

R-2023-0179-SCP-230306 - HyGreen - EIA Scoping Opinion Request Letter - Final.pdf:3: Impact Assessment (EIA)

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:1:Application for an Environmental Impact Assessment Scoping Opinion

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:1:The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 –

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:3: EcIA Ecological Impact Assessment

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:3: EIA Environmental Impact Assessment

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:3: GLVIA3 Guidelines for Landscape and Visual Impact Assessment (third edition)

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:4: LVIA Landscape and Visual Impact Assessment

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:7:7.0 Environmental Impact Assessment (EIA) Process ………………………………………….. 118

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:7:A-8 Other Developments to be Considered in the Cumulative Impact Assessment ………. 137

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:8: Impact Assessment) Regulations 2017 (herein referred to as the ‘EIA Regulations’).

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:11: • Section 7 – Environmental Impact Assessment (EIA) Process: provides an overview

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:56:6.1.27 An impact assessment will be undertaken to assess the potential effects on the water

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:56: adverse impacts. Therefore, a qualitative impact assessment shall be undertaken to

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:57: purposes of the impact assessment for the Proposed Development. If there is

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:65: contaminated land topic is scoped into the future impact assessment.

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:65: the ecological impact assessment (EcIA). The approach taken is described below.

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:66: reflects standard guidance for air quality impact assessment during operation of an

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:66: further air quality impact assessment of operation is scoped out. Accordingly, the

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:66: purposes of the final ecological impact assessment.

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:66: standard guidance for air quality impact assessment and also other good practice

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:66: purposes of the final ecological impact assessment with reference to the sub-section

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:70: ecological impact assessment.

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:71: Ecological Impact Assessment (EcIA) and for purposes of the BNG assessment.

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:72: inform impact assessment cannot be obtained from third parties. Development Site boundary.

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:76: nature conservation is scoped into the future impact assessment. Marine ecology

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:79: the future impact assessment.

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:79:6.1.119 The proposed method of landscape and visual impact assessment has been devised

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:79: • ‘Guidelines for Landscape and Visual Impact Assessment’ third edition (GLVIA3)

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:83: operation is scoped into future impact assessment.

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:86: the future impact assessment.

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:87: • cumulative impact assessment; and

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:90: future impact assessment. These emission sources are summarised in the following

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:93: impact assessment. The scope of the noise and vibration assessment will comprise:

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:98: impact assessment. The approach to assessing the socio-economics effects will be

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:114: into the future impact assessment.

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:118:7.0 ENVIRONMENTAL IMPACT ASSESSMENT (EIA) PROCESS

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:122: of the impact assessments chapters. The limitations presented by this uncertainty

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:127: Guidelines for Ecological Impact Assessment in the UK and Ireland. (Version 1.2 –

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:131: Materials and waste in Environmental Impact Assessment, Guidance for a

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:131: Effective Scoping of Human Health in Environmental Impact Assessment online.

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:131: Determining Significance for Human Health in Environmental Impact Assessment

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:131: Principles of Cultural Heritage Impact Assessment in the UK online. Available at:

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:132: visual impact assessment, Advice Note 01/11 online. Available at:

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:132: Assessment, (2013). Guidelines for Landscape and Visual Impact Assessment. 3rd

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:135: • The Infrastructure Planning (Environmental Impact Assessment) Regulations

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:137:A-8 Other Developments to be Considered in the Cumulative Impact Assessment

R-2023-0179-SCP-HyGreen Production Facility Scoping Report_FINAL.pdf:145: 1:25,000 @ A3 in the Cumulative Impact Assessment

R-2023-0179-SCP-CON LAND 0179.pdf:1:contaminated land topic is scoped into the future impact assessment.

R-2023-0179-SCP-CON LAND 0179.pdf:1:environmental impact assessment.

R-2023-0179-SCP-PN 0179.pdf:1:and Noise and Vibration are scoped into the future impact assessment.

R-2023-0179-SCP-PN 0179.pdf:1:Impact Assessment/

R-2023-0179-SCP-SCOPING OPINION DECISION.pdf:1:THE TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT)

R-2023-0179-SCP-SCOPING OPINION DECISION.pdf:1:General Approach (Application for an Environmental Impact Assessment Scoping

R-2023-0179-SCP-SCOPING OPINION DECISION.pdf:3:and Noise and Vibration are scoped into the future impact assessment.

R-2023-0179-SCP-SCOPING OPINION DECISION.pdf:3:Impact Assessment.

R-2023-0179-SCP-SCOPING OPINION DECISION.pdf:3:hydrogeology and contaminated land topic is scoped into the future impact assessment.

R-2023-0179-SCP-SCOPING OPINION DECISION.pdf:3:environmental impact assessment.

R-2023-0179-SCP-SCOPING OPINION DECISION.pdf:7:scope of the Environmental Impact Assessment (EIA) for the proposed development.

R-2023-0179-SCP-SCOPING OPINION DECISION.pdf:7:Schedule 4 of the Town and Country Planning (Environmental Impact Assessment) Regulations

R-2023-0179-SCP-SCOPING OPINION DECISION.pdf:8:An impact assessment should identify, describe, and evaluate the effects that are likely to result

R-2023-0179-SCP-SCOPING OPINION DECISION.pdf:9:Ecological Impact Assessment (EcIA) is the process of identifying, quantifying, and evaluating the

R-2023-0179-SCP-Figure A-8 - Other Developments to be Considered in the Cumulative Impact Assessment.pdf:1: 1:25,000 @ A3 in the Cumulative Impact Assessment

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:6: Environmental Impact Assessments (EIA) and other regulatory, permitting and planning

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:6: Environmental Statements to support Environmental Impact Assessments in addition to

R-2020-0819-ESM-VOL 2 CHAPTER H.pdf:10: by Arcadis, and successfully applied to other Environmental Impact Assessments. The

R-2020-0819-ESM-341083 R_2020_0819_ESM - Outline permission for development of general industrial, storage and distribution facilities at Dorman Point for Teesworks, Redcar.pdf:3:& Visual Impact Assessment should be provided with the proposal to inform decision making. We

R-2020-0819-ESM-341083 R_2020_0819_ESM - Outline permission for development of general industrial, storage and distribution facilities at Dorman Point for Teesworks, Redcar.pdf:3:refer you to the Landscape Institute Guidelines for Landscape and Visual Impact Assessment for

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:6:Subject STDC Outline Applications: Environmental Impact Assessments

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:6: Projects) of Schedule 2 of the Town and Country Planning (Environmental Impact Assessment)

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:7: is considered that all five of the proposed developments are Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:32:sites, the outline planning applications and the proposed scope of the Environmental Impact Assessments (‘EIA’).

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:32:Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter A - Introduction and Background - Dec 2020.PDF:35:In accordance with Regulation 18(5) of the Town and Country Planning (Environmental Impact Assessment)

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter E - Noise & Vibration - Dec 2020.PDF:11:Country Planning (Environmental Impact Assessment) Regulations 2017 Energy From Waste Plant (Efw)

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter J - Climate Change - Dec 2020.PDF:15: EIA Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF:4:O1.2 Schedule 4, Part 7 of the Town and Country Planning (Environmental Impact Assessment)

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF:23: 15 DIA – Drainage Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF:23: 18 EIA - Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF:25: 1 Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF:25: Impact Assessment) (Amendment) Regulations 2018, which be viewed at:

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF:25: 2 IEMA Environmental Impact Assessment Guide to Shaping Quality Development’ Report

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter G - Water Management and Flooding - Dec 2020.PDF:34:EIA Environmental Impact Assessment

R-2020-0819-ESM-2022 03 08 (Dorman Point 0819) Conds.pdf:3:accompanied by a transport impact assessment setting out the predicted peak hour

R-2020-0819-ESM-2022 03 08 (Dorman Point 0819) Conds.pdf:3:28. All traffic impact assessments submitted to the Local Planning Authority pursuant

R-2020-0819-ESM-2022 03 08 (Dorman Point 0819) Conds.pdf:4:Condition 29 unless a transport impact assessment has been submitted to and

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:5:6 Sustainable Transport Impact Assessment 25

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:5:7 Highway Impact Assessment 26

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:5: 7.3 Cumulative Impact Assessment 28

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:5: 7.5 Strategic Road Network Impact Assessment 44

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:29:Estate. For the purpose of impact assessment, it is assumed that all development

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:31:6 Sustainable Transport Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:32:7 Highway Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:34:7.3 Cumulative Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:50:7.5 Strategic Road Network Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:60:To account for the bus service, the highway impact assessment has assumed only

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:66:6 Development Impact Assessment 13

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:66: 6.1 Scope of Highway Impact Assessment 13

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:66: 6.2 Environmental Impact Assessment 14

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:67:Environmental Impact Assessment.

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:72:junction impact assessments. Access is expected to also be permitted via the

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:79:6 Development Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:79:6.1 Scope of Highway Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:79:Table 7 Junctions Impact Assessments

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:80:6.2 Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:80:Statement (ES) for each development. The Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:80: Environmental Impact Assessment: A Guide to Procedures (Department of the

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:80: Guidelines for Environmental Impact Assessment (Institute of Environmental

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:80:  The scope of the junction impact assessments for the TA’s;

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:88:Development Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:88:Scope of Highway Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:88:Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:95: Development impact assessment made need of assessment at the SRN is

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:252:6 Development Impact Assessment 13

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:252: 6.1 Scope of Highway Impact Assessment 13

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:252: 6.2 Environmental Impact Assessment 14

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:253:Environmental Impact Assessment.

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:258:junction impact assessments. Access is expected to also be permitted via the

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:265:6 Development Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:265:6.1 Scope of Highway Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:265:Table 7 Junctions Impact Assessments

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:266:6.2 Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:266:Statement (ES) for each development. The Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:266: Environmental Impact Assessment: A Guide to Procedures (Department of the

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:266: Guidelines for Environmental Impact Assessment (Institute of Environmental

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:266:  The scope of the junction impact assessments for the TA’s;

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:274:Development Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:274:Scope of Highway Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:274:Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:281: Development impact assessment made need of assessment at the SRN is

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:4: Environmental Impact Assessment 32

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:5: Planning (Environmental Impact Assessment) Regulations 2017 (as amended). Part 10(a)

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:35: 1 Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:36: Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:36: Impact Assessment) Regulations 2017 (the EIA Regulations) as updated by The Town and

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:36: Country Planning and Infrastructure Planning (Environmental Impact Assessment)

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:38:5.20 The Ecological Impact Assessment concluded that it is not practically possible for direct

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:42: 2 Drainage proposals and a Drainage Impact Assessment will be included as part of the STDC

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:43: the noise impact assessment. It was agreed that the existing noise environment around the site

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:46: timescales for construction. The visual impact assessment is based on a ‘massing plan’ of the

R-2020-0819-ESM-Dorman Point - Planning Statement - Dec 2020.pdf:46: visual impact assessment for the proposed site:

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:4: to the 2017 Environmental Impact Assessment (EIA) Regulations (as amended) Ref 2 he has

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:5: The Town and Country Planning (Environmental Impact Assessment)

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:5: Ref 3, identifies the important role that the Environmental Impact Assessment (‘EIA’) process

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:27: EIA Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:28: 2 Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:28: Impact Assessment) (Amendment) Regulations 2018)

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020.PDF:12: Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:5: development scale Environmental Impact Assessments (‘EIA’).

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:38: 16 EIA: Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:5: Environmental Impact Assessment (‘EIA’), and considers the design rationale underpinning the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:17: state under the Infrastructure Planning Environmental Impact Assessment Regulations

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:18: Regulations and Environmental Impact Assessments relating to those demolition schemes.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter B -Site Description and Scheme Proposals - Dec 2020.PDF:45: 16 EIA Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:7:Subject STDC Outline Applications: Environmental Impact Assessments

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:7: Projects) of Schedule 2 of the Town and Country Planning (Environmental Impact Assessment)

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:8: is considered that all five of the proposed developments are Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:33:sites, the outline planning applications and the proposed scope of the Environmental Impact Assessments (‘EIA’).

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter N - Cumulative Effects - Dec 2020.PDF:33:Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:5: are relevant to Landscape and Visual Impact assessment. More general information on the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:5:L2.9 The following policies are relevant to landscape and visual impact assessment for the proposed

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:7: 1 Guidelines for Landscape and Visual Impact Assessment (Third Edition) published by the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:7:L3.4 The Guidelines for Visual Impact Assessment Third Edition (GLVIA3) acknowledges that LVIA

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:15: Visual Impact Assessment Criteria

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:15:L3.29 The visual impact assessment draws from an identification of the sensitivity of receptors

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:15:L3.30 The impact assessment describes the current visual context from important viewpoints within

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:15: townscape and visual impact assessments in urban settings. Although this assessment is of

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:18: visual impact assessment takes these factors into account and the AVRs should not be viewed in

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:18: isolation from the visual impact assessment.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:18:L3.50 The magnitude of change within views is an important element of visual impact assessment. For

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:35: criteria are then applied in the visual impact assessment. Appendix L2 illustrates the location

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:35: impact assessment. To enable an accurate assessment of cumulative visual effects the Verified

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:35: development can be observed are included within the visual impact assessment.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:37: timescales for construction. The visual impact assessment is based on a ‘massing plan’ of the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:38: plan is used to inform both the landscape and visual impact assessments as the likely worst case

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:60: 2 GLVIA – Guidance for Landscape and Visual Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:60: 5 LVIA – Landscape and Visual Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:61: 1 Guidelines for Landscape and Visual Impact Assessment (Third Edition) published by the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:4: is a member of the IEMA Environmental Impact Assessment (EIA) Quality Mark.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:37: a soils impact assessment has not been carried out.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:41: detailed Flood Risk Assessment and Drainage Impact Assessment as well as WFD Assessment –

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:45: i A detailed FRA and Drainage Impact Assessment (DIA) with drainage strategy (for

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:60: 11 DIA Drainage Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:60: 14 EIA Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:63: 33 GOV.UK (2017a). The Town and Country Planning (Environmental Impact Assessment)

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter G - Water Management and Flooding - Dec 2020.PDF:63: 39 GOV.UK (2020). Environmental Impact Assessment guidance. online GOV.UK. Available

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:9:this is not an Ecological Impact Assessment (EcIA) of a specific development.

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:16:Peak Ecology (2013) Ecological Impact Assessment: Technical Report Dogger Bank Teesside A & B

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:6: Environmental Impact Assessment (‘EIA’) Regulations 1. The following summarises relevant

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:10: assessment is therefore inherently a cumulative impact assessment.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:11: professionals in Environmental Impact Assessments.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:34: the noise impact assessment. It was agreed that the existing noise environment around the site

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:39: 1 The Town and Country Planning (Environmental Impact Assessment) Regulations 2017

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:39: 15 Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:3: out the findings of an Environmental Impact Assessment (‘EIA’) that has been submitted to

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:3: Planning (Environmental Impact Assessment) Regulations 2017 (as amended). Part 10(a)

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:17: • A detailed FRA and Drainage Impact Assessment (DIA) with drainage strategy (for both foul

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:23:12.1 A Landscape and Visual Impact Assessment has been undertaken by BDP to assess the

R-2020-0819-ESM-Dorman Point ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:28: occupier), a detailed Flood Risk Assessment, Drainage Impact Assessment with drainage

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:4:M1.5 Atkins demonstrates competence in environmental impact assessment through registration to

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:4: years of experience in environmental consulting/ environmental impact assessment/ waste

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:11:M3.3 According to the IEMA guidance (Materials and Waste in Environmental Impact Assessment,

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:16: will be undertaken as part of the wider cumulative impact assessment in Chapter N.

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020(1).PDF:31: 19 IEMA guide to: Materials and Waste in Environmental Impact Assessment - Guidance for a

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter L - LVIA - Dec 2020.PDF:43:Subject: RE: Teesworks Outline Planning Applications - Landscape and Visual Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 3 - Chapter L - LVIA - Dec 2020.PDF:44:Subject: Teesworks Outline Planning Applications - Landscape and Visual Impact Assessment

R-2020-0819-ESM-Decision Notice 0819.pdf:9: must be accompanied by a transport impact assessment setting out the

R-2020-0819-ESM-Decision Notice 0819.pdf:9:29. All traffic impact assessments submitted to the Local Planning Authority

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:4: The professional judgement of those undertaking the Environmental Impact Assessment (‘EIA’)

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:10: exception of Ecology (during construction), Landscape Visual Impact Assessment (‘LVIA’)

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:12: Impact Assessment” (2004) and the European Commission’s (‘EC’s’) “Guidelines for the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:12: further clarified in the Planning Practice Guidance (Environmental Impact Assessment) which

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:49: with the defined Viewpoints for the visual impact assessment. The most significant visual

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:74: 6 DIA - Drainage Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:74: 10 EIA - Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:74: 21 LVIA - Landscape Visual Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:76: 2 IEMA (2004) Guidelines for Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter N - Cumulative and Residual Effects - Dec 2020.PDF:76: 3 Planning Practice Guidance (Environmental Impact Assessment) (2017) (ID: 4-035-

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:9: Environmental Management (‘CIEEM’) guidelines for Ecological Impact Assessment (‘EcIA’)

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:38: 16 EcIA Ecological Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:39: ix CIEEM (2016) Guidelines for Ecological Impact Assessment in the UK and

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020.PDF:39: xi Peak Ecology (2013) Ecological Impact Assessment: Technical Report Dogger

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter I - Socio-Economic - Dec 2020.PDF:5: preparing Socio-Economic Assessment in an Environmental Impact Assessment context. It has

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:9:C3.1 The Environmental Impact Assessment (EIA) has been carried out in accordance with the EIA

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:9: 1 Environmental Impact Assessment: A Guide to Procedures 9;

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:9: 2 Guidelines for Environmental Impact Assessment 10; and

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:32: EIA Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:33: 1 Town and Country Planning (Environmental Impact Assessment) Regulations 2017

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:33: Impact Assessment: A Guide to Procedures

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:33: Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:4: “Teesworks”. It sets out the findings of an Environmental Impact Assessment (‘EIA’) of

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:7: Country Planning (Environmental Impact Assessment) Regulations 2017 (Ref 5) which came

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:7: Infrastructure Planning (Environmental Impact Assessment) (Amendment) Regulations 2018

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:7: Impact Assessment) (England) (Coronavirus) (Amendment) Regulations 2020 (hereafter ‘the

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:34: 5 EIA Environmental Impact Assessment

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:35: 5 Town and Country Planning (Environmental Impact Assessment) Regulations 2017

R-2020-0819-ESM-Dorman Point ES - Vol 2 - Chapter A - Introduction and Background - Dec 2020.PDF:35: and Environmental Impact Assessment) (England) (Coronavirus) (Amendment)

R-2023-0277-CD-10035117-AUK-XX-XX-RP-ZZ-623-01-Data Gap Areas GQRA.pdf:45: out in the Ecological Impact Assessment, INCA, dated November 2021 have

R-2023-0277-CD-DECISION NOTICE.pdf:2: out in the Ecological Impact Assessment, INCA, dated November 2021 have

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:4:M1.5 Atkins demonstrates competence in environmental impact assessment through registration to

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:4: years of experience in environmental consulting/ environmental impact assessment/ waste

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:11:M3.3 According to the IEMA guidance (Materials and Waste in Environmental Impact Assessment,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:16: will be undertaken as part of the wider cumulative impact assessment in Chapter N.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter M - Waste and Materials Management - Dec 2020.PDF:31: 19. IEMA guide to: Materials and Waste in Environmental Impact Assessment - Guidance for a

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:4: The professional judgement of those undertaking the Environmental Impact Assessment (‘EIA’)

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:11: exception of Ecology (during construction) and Landscape Visual Impact Assessment (‘LVIA’)

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:14: Impact Assessment” (2004) and the European Commission’s (‘EC’s’) “Guidelines for the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:14: further clarified in the Planning Practice Guidance (Environmental Impact Assessment) which

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:45: and Drainage Impact Assessment (‘DIA’) with drainage strategy, WFD assessment and

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:51: with the defined Viewpoints for the visual impact assessment. The most significant visual

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:77: 6 DIA - Drainage Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:77: 9 EIA - Environmental Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:77: 22 LVIA - Landscape Visual Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:79: 2 IEMA (2004) Guidelines for Environmental Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter N - Cumulative Effects - Dec 2020.PDF:79: 3 Planning Practice Guidance (Environmental Impact Assessment) (2017) (ID: 4-035-

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:5: is a member of the IEMA Environmental Impact Assessment (EIA) Quality Mark.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:41: impact assessment has not been carried out.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:45: Impact Assessment as well as WFD Assessment – as detailed in Section G6.0 Mitigation and

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:50: i A detailed FRA and Drainage Impact Assessment (DIA) with drainage

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:69: 13 EIA Environmental Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:72: 35 GOV.UK (2017a). The Town and Country Planning (Environmental Impact Assessment)

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter G - Water - Dec 2020.PDF:72: 41 GOV.UK (2020). Environmental Impact Assessment guidance. online GOV.UK.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:9:C3.1 The Environmental Impact Assessment (EIA) has been carried out in accordance with the EIA

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:9: • Environmental Impact Assessment: A Guide to Procedures 9;

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:9: • Guidelines for Environmental Impact Assessment 10; and

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:31: EIA Environmental Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:32: 1 Town and Country Planning (Environmental Impact Assessment) Regulations 2017

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:32: Impact Assessment: A Guide to Procedures.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter C - Transport - Dec 2020.PDF:32: Environmental Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:5: Environmental Impact Assessments (EIA) and other regulatory, permitting and planning

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:5: Environmental Statements to support Environmental Impact Assessments in addition to

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter H - Ground Conditions - Dec 2020.PDF:9: by Arcadis, and successfully applied to other Environmental Impact Assessments. The

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:6: Environmental Impact Assessment (‘EIA’) Regulations 1. The following summarises relevant

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:10: assessment is therefore inherently a cumulative impact assessment.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:11: professionals in Environmental Impact Assessments.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:34: the noise impact assessment. It was agreed that the existing noise environment around the site

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:39: 1 The Town and Country Planning (Environmental Impact Assessment) Regulations 2017

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter E - Noise & Vibration - Dec 2020.PDF:39: 15 Infrastructure Planning (Environmental Impact Assessment) Regulations 2009

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF:4:O1.2 Schedule 4, Part 7 of the Town and Country Planning (Environmental Impact Assessment)

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF:16: and Flooding - A detailed Flood Risk Assessment Impact Assessment,

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF:23: 15 DIA – Drainage Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF:23: 18 EIA - Environmental Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF:25: 1 Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF:25: Impact Assessment) (Amendment) Regulations 2018, which be viewed at:

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter O - Mitigation and Monitoring - Dec 2020.PDF:25: 2 IEMA Environmental Impact Assessment Guide to Shaping Quality Development’ Report

R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:3: out the findings of an Environmental Impact Assessment (‘EIA’) that has been submitted to

R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:3: Planning (Environmental Impact Assessment) Regulations 2017 (as amended) Part 10(a) relates

R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:18: • A detailed FRA and Drainage Impact Assessment (DIA) with drainage strategy (for both foul

R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:24:11.1 A Landscape and Visual Impact Assessment has been undertaken by BDP to assess the

R-2020-0822-ESM-Long Acres ES - Vol 1 - Non Technical Summary - Dec 2020.pdf:29: occupier), a detailed Flood Risk Assessment, Drainage Impact Assessment with drainage

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:12: Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:13: Impact Assessment Definition

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter K - Below Ground Heritage - Dec 2020(1).PDF:14: Impact Assessment Definition

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:6:Subject STDC Outline Applications: Environmental Impact Assessments

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:6: Projects) of Schedule 2 of the Town and Country Planning (Environmental Impact Assessment)

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:7: is considered that all five of the proposed developments are Environmental Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:32:sites, the outline planning applications and the proposed scope of the Environmental Impact Assessments (‘EIA’).

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:32:Environmental Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter A - Intro and Background - Dec 2020.PDF:35:In accordance with Regulation 18(5) of the Town and Country Planning (Environmental Impact Assessment)

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:5:L2.9 The following policies are relevant to landscape and visual impact assessment for the proposed

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:7: 1 Guidelines for Landscape and Visual Impact Assessment (Third Edition) published by the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:7:L3.4 The Guidelines for Visual Impact Assessment Third Edition (GLVIA3) acknowledges that LVIA

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:15: Visual Impact Assessment Criteria

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:15:L3.29 The visual impact assessment draws from an identification of the sensitivity of receptors

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:15:L3.30 The impact assessment describes the current visual context from important viewpoints within

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:15: townscape and visual impact assessments in urban settings. Although this assessment is of

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:18: visual impact assessment takes these factors into account and the AVRs should not be viewed in

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:18: isolation from the visual impact assessment.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:19:L3.50 The magnitude of change within views is an important element of visual impact assessment. For

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:34: criteria are then applied in the visual impact assessment. Appendix L2 illustrates the location

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:34: impact assessment. To enable an accurate assessment of cumulative visual effects the Verified

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:35: development can be observed are included within the visual impact assessment.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:36: as timescales for construction. The visual impact assessment is based on a ‘massing plan’ of

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:37: plan is used to inform both the landscape and visual impact assessments as the likely worst case

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:57: 2 GLVIA – Guidance for Landscape and Visual Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:57: 5 LVIA – Landscape and Visual Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter L - LVIA - Dec 2020.PDF:58: 1 Guidelines for Landscape and Visual Impact Assessment (Third Edition) published by the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter I - Socio-Economics - Dec 2020.PDF:5: preparing Socio-Economic Assessment in an Environmental Impact Assessment context. It has

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:4: Environmental Impact Assessment (‘EIA’), and considers the design rationale underpinning the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:17: state under the Infrastructure Planning Environmental Impact Assessment Regulations

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:18: Environmental Impact Assessments relating to those demolition schemes.

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter B - Site and Scheme Description - Dec 2020.PDF:43: 13 EIA Environmental Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:4: “Teesworks”. It sets out the findings of an Environmental Impact Assessment (‘EIA’) of

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:7: Country Planning (Environmental Impact Assessment) Regulations 2017 (Ref 5) which came

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:7: Infrastructure Planning (Environmental Impact Assessment) (Amendment) Regulations 2018

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:7: Impact Assessment) (England) (Coronavirus) (Amendment) Regulations 2020 (hereafter ‘the

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:34: 5 EIA Environmental Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:35: 5 Town and Country Planning (Environmental Impact Assessment) Regulations 2017

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter A - Intro and Background - Dec 2020.PDF:35: and Environmental Impact Assessment) (England) (Coronavirus) (Amendment)

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:5:6 Sustainable Transport Impact Assessment 23

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:5:7 Highway Impact Assessment 24

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:5: 7.3 Cumulative Impact Assessment 26

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:5: 7.5 Strategic Road Network Impact Assessment 36

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:29:6 Sustainable Transport Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:30:7 Highway Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:32:7.3 Cumulative Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:42:7.5 Strategic Road Network Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:52:To account for the bus service, the highway impact assessment has assumed only

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:58:6 Development Impact Assessment 13

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:58: 6.1 Scope of Highway Impact Assessment 13

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:58: 6.2 Environmental Impact Assessment 14

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:59:Environmental Impact Assessment.

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:64:junction impact assessments. Access is expected to also be permitted via the

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:71:6 Development Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:71:6.1 Scope of Highway Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:71:Table 7 Junctions Impact Assessments

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:72:6.2 Environmental Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:72:Statement (ES) for each development. The Environmental Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:72: Environmental Impact Assessment: A Guide to Procedures (Department of the

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:72: Guidelines for Environmental Impact Assessment (Institute of Environmental

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:72:  The scope of the junction impact assessments for the TA’s;

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:80:Development Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:80:Scope of Highway Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:80:Environmental Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:87: Development impact assessment made need of assessment at the SRN is

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:208:6 Development Impact Assessment 13

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:208: 6.1 Scope of Highway Impact Assessment 13

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:208: 6.2 Environmental Impact Assessment 14

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:209:Environmental Impact Assessment.

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:214:junction impact assessments. Access is expected to also be permitted via the

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:221:6 Development Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:221:6.1 Scope of Highway Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:221:Table 7 Junctions Impact Assessments

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:222:6.2 Environmental Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:222:Statement (ES) for each development. The Environmental Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:222: Environmental Impact Assessment: A Guide to Procedures (Department of the

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:222: Guidelines for Environmental Impact Assessment (Institute of Environmental

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:222:  The scope of the junction impact assessments for the TA’s;

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:230:Development Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:230:Scope of Highway Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:230:Environmental Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter C - Transport - Dec 2020.PDF:237: Development impact assessment made need of assessment at the SRN is

R-2020-0822-ESM-Long Acres ES - Vol 3 - Chapter E - Noise & Vibration - Dec 2020.PDF:11:Country Planning (Environmental Impact Assessment) Regulations 2017 Energy From Waste Plant (Efw)

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:9: Environmental Management (‘CIEEM’) guidelines for Ecological Impact Assessment (‘EcIA’)

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:41: 16 EcIA Ecological Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:42:x CIEEM (2016) Guidelines for Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter D - Biodiversity and Ecology - Dec 2020(1).PDF:42:xi Peak Ecology (2013) Ecological Impact Assessment: Technical Report Dogger Bank Teesside A & B

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:5: development scale Environmental Impact Assessments (‘EIA’).

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter F - Air Quality - Dec 2020.PDF:38: 16 EIA: Environmental Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:4: to the 2017 Environmental Impact Assessment (EIA) Regulations (as amended) Ref 2 he has

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:5: The Town and Country Planning (Environmental Impact Assessment)

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:5: Ref 3, identifies the important role that the Environmental Impact Assessment (‘EIA’) process

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:29: EIA Environmental Impact Assessment

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:30: 2 Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as

R-2020-0822-ESM-Long Acres ES - Vol 2 - Chapter J - Climate Change - Dec 2020.PDF:30: Impact Assessment) (Amendment) Regulations 2018)

R-2020-0465-FFM-Officer report _R20200465FFM.pdf:3: • Ecological Impact Assessment

R-2020-0465-FFM-Officer report _R20200465FFM.pdf:11:The application is supported by an Ecological Impact Assessment which

R-2020-0465-FFM-Officer report _R20200465FFM.pdf:17:Within the Ecological Impact Assessment the following summary has been

R-2020-0465-FFM-60722_01 - Cover Letter - 24.08.20.PDF:5:An Ecological Impact Assessment, prepared by Arup, accompanies this planning application which

R-2020-0465-FFM-60722_01 - Cover Letter - 24.08.20.PDF:5:within the site are not “important” and of low quality, in terms of Ecology Impact Assessment. There is,

R-2020-0465-FFM-60722_01 - Cover Letter - 24.08.20.PDF:6:Environmental Impact Assessment

R-2020-0465-FFM-60722_01 - Cover Letter - 24.08.20.PDF:6:Planning (Environmental Impact Assessment) Regulations 2017 (as amended) (“the Regulations”) and it is

R-2020-0465-FFM-60722_01 - Cover Letter - 24.08.20.PDF:7:• Ecological Impact Assessment and Biodiversity Net Gain Assessment, prepared by Arup;

R-2020-0465-FFM-Metals Recovery Site HRA_Issue.PDF:12:Ecological Impact Assessment (EcIA) and HRA of the SIZ, which includes the

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:1: Ecological Impact Assessment and

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:2: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:2: 4.4 Ecological Impact Assessment 11

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:3: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:4: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:4:Development Corporation (STDC) to complete an Ecological Impact Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:5: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:6: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:6:Development Corporation (STDC) to complete an Ecological Impact Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:7: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:8: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:9: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:10: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:11: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:12: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:13: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:14: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:14:4.4 Ecological Impact Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:14:The impact assessment process involves:

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:14:Ecological Impact Assessment in the UK and Ireland: Terrestrial, Freshwater, Coastal and

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:15: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:15:A cumulative impact assessment has been undertaken which considers whether

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:16: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:16:Developments included in the cumulative impact assessment comprise the

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:17: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:18: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:19: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:20: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:21: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:22: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:23: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:24: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:25: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:26: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:27: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:28: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:29: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:30: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:31: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:32: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:33: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:34: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:35: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:36: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:37: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:38: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:39: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:40: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:41: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:42: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:43: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:44: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:45: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:46: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:47: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:48: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:49: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:50: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:51: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:52: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:58: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:59: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:60: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:61: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:62: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:63: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:67: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:68: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:69: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:70: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2020-0465-FFM-MRS EcIA Report_Issue.PDF:71: Ecological Impact Assessment and Biodiversity Net Gain Assessment

R-2023-0227-CD-TV_ERF_Condition_Discharge_Cover_Letter_230323.pdf:2:the Environmental Impact Assessment and Air Quality Assessment that the

R-2023-0227-CD-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:19: 11 of the Environmental Impact Assessment Statement of Conformity) has concluded that the

R-2023-0227-CD-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:29: assessment to support a permit application. In ecological impact assessments of projects and plans,

R-2023-0227-CD-TV_ERF_Air_Quality_Emissions_Modelling_Report.pdf:54: Impact Assessment: Statement of Conformity.

R-2023-0227-CD-Decision Notice_R20190767OOM(4).pdf:2: conclusions of the Environmental Impact Assessment and Air Quality

R-2023-0227-CD-Decision Notice_R20190767OOM(4).pdf:2: Environmental Impact Assessment December 2019 and Chapter 7 (Mitigation)

R-2023-0227-CD-TV_ERF_Shadow_HRA.pdf:9: Environmental Impact Assessment Statement of Conformity (EIA SoC).

171019South-Tees-Master-Plan-19-Nov-17.pdf:56:designated as South Gare and Coatham Sands SSSI 2.12.4 WATER VOLE (ARVICOLA AMPHIBIUS) are species of principal importance in England. part of the Ecological Impact Assessment (EcIA).

teesworks_-_keywords_-_impactassessment.txt · Last modified: 2024/04/02 18:10 by 127.0.0.1